{"updated":"2026-10-20T01:47:08.453Z","source":{"name":"Northern Ireland Assembly Open Data","url":"https://data.niassembly.gov.uk/","licence":"Open Government Licence v3.0","licenceUrl":"https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/"},"site":{"url":"https://askedbystewart.nidata.fyi","name":"Asked by Stewart","memberLastName":"Dickson","local":{"area":"East Antrim","description":"East Antrim places, Mid and East Antrim or Antrim and Newtownabbey councils, or the Northern Trust","terms":["east antrim","larne","carrickfergus","whitehead","greenisland","islandmagee","glenarm","carnlough","ballycarry","ballynure","glynn","magheramorne","gobbins","jordanstown","monkstown","rathcoole","newtownabbey","mid and east antrim","antrim and newtownabbey","northern trust","northern health and social care trust"]}},"member":{"personId":"303","name":"Stewart Dickson","firstName":"Stewart","lastName":"Dickson","displayName":"Mr Stewart Dickson","title":"MLA - East Antrim","party":"Alliance Party","constituency":"East Antrim","profileUrl":"https://aims.niassembly.gov.uk/mlas/details.aspx?&aff=18808&per=303&sel=1&ind=0&prv=0","photoUrl":"https://aims.niassembly.gov.uk/images/mla/303.jpg","contact":{"constituency":{"address":["8 WEST STREET","CARRICKFERGUS"],"postcode":"BT38 7AR","phone":"028 9335 0286","email":"stewart.dickson@mla.niassembly.gov.uk","latitude":54.714745804664,"longitude":-5.808346361308},"assembly":{"address":["Parliament Buildings","Belfast"],"postcode":"BT4 3XX","phone":null,"email":"stewart.dickson@mla.niassembly.gov.uk","latitude":54.59907579121,"longitude":-5.828601611087}},"ministerialRoles":[]},"questions":[{"id":"504433","reference":"AQO 4187/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2026-10-15","answerBy":"2026-11-03","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education for an update on the anticipated timescale for completing roof repairs at Central Integrated Primary School, Carrickfergus.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%204187%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=504433","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=504433"}},{"id":"504422","reference":"AQO 4176/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2026-10-15","answerBy":"2026-11-02","answered":null,"answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to outline any steps she is taking to attract new investment and create high-quality jobs in East Antrim.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%204176%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=504422","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=504422"}},{"id":"501259","reference":"AQW 53304/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-09-29","answerBy":"2026-10-07","answered":null,"answeredOrally":false,"priority":true,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister in relation to the Garvaghy Road area over the past 28 years, to detail (i) any Executive Office funding for community groups, programmes and projects; (ii) the number of local young people who have participated in Executive Office-funded summer camps or youth programmes; (iii) any action taken to engage the Orange Order and Garvaghy Road residents’ representatives to support resolution of the dispute; and (iv) any funding provided to the relevant council for Executive Office projects in the area.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2053304%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=501259","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=501259"}},{"id":"502154","reference":"AQO 4042/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2026-09-24","answerBy":"2026-10-05","answered":"2026-10-05","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to outline any engagement she has had with employees, trade union representatives and the local community following Glens of Antrim Potatoes being placed into administration.","answerText":"I was saddened to learn that Glens of Antrim Potatoes has been placed into administration; my thoughts are with those affected.\n\nMy Department, through Invest NI, has been in regular contact with Company representatives since the announcement and has sought a meeting with them.\n\nInvest NI has also been in contact with the Department for Communities, and Causeway Coast & Glens and Mid and East Antrim Council. The administrators, Department for Communities and both Councils delivered an employment support workshop on Friday 25th September to help employees understand their rights, benefits entitlements, help to undertake job searches and signposting to wider support services.\n\nInvest NI is also working with Mid and East Antrim Council and the Labour Market Partnership to identify jobs vacancies within local businesses. A jobs fair is taking place on Friday 2nd October with businesses with vacancies attending alongside Ballymena Jobs & Benefits Office and support organisations.\n\nMy Department’s Redundancy Payments Service has been in contact with the administrators to support those applying for statutory redundancy and/or insolvency payments from the National Insurance Fund.","answerHtml":"<p>I was saddened to learn that Glens of Antrim Potatoes has been placed into administration; my thoughts are with those affected.</p><p>My Department, through Invest NI, has been in regular contact with Company representatives since the announcement and has sought a meeting with them.</p><p>Invest NI has also been in contact with the Department for Communities, and Causeway Coast &amp; Glens and Mid and East Antrim Council. The administrators, Department for Communities and both Councils delivered an employment support workshop on Friday 25th September to help employees understand their rights, benefits entitlements, help to undertake job searches and signposting to wider support services.</p><p>Invest NI is also working with Mid and East Antrim Council and the Labour Market Partnership to identify jobs vacancies within local businesses. A jobs fair is taking place on Friday 2nd October with businesses with vacancies attending alongside Ballymena Jobs &amp; Benefits Office and support organisations.</p><p>My Department’s Redundancy Payments Service has been in contact with the administrators to support those applying for statutory redundancy and/or insolvency payments from the National Insurance Fund.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%204042%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=502154","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=502154"}},{"id":"499752","reference":"AQW 52675/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-09-22","answerBy":"2026-09-25","answered":"2026-09-24","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to outline any action she is taking to provide support following the announcement of the loss of 95 jobs at Glens of Antrim Potatoes in Cushendall and Ballymena.","answerText":"I was saddened to learn of the appointment of administrators to Glens of Antrim Potatoes. My thoughts are with the employees affected by this announcement, their families and the wider communities that will understandably be worried by this news.\n\nInvest NI has been in regular contact with the Company and their accountants and following this announcement is seeking a meeting with Company representatives.\n\nIn relation to supporting the affected workers, my Department has been in contact with colleagues from the Department for Communities, Mid and East Antrim Council, the Labour Market Partnership, and the Administators.\n\nAn employment support workshop takes place on Friday 25th September at 10.00am at the McEvoy suite in the Ballymena North Business & Recreation Centre, to help ensure affected employees are aware of available support such as careers advice, retraining opportunities, assistance with job searches and signposting to support services.\n\nIn addition, Invest NI is working with Mid and East Antrim Council to help identify jobs vacancies with local employers.\n\nMy Department will continue to monitor the situation closely and provide assistance where it can.","answerHtml":"<p>I was saddened to learn of the appointment of administrators to Glens of Antrim Potatoes. My thoughts are with the employees affected by this announcement, their families and the wider communities that will understandably be worried by this news.</p><p>Invest NI has been in regular contact with the Company and their accountants and following this announcement is seeking a meeting with Company representatives.</p><p>In relation to supporting the affected workers, my Department has been in contact with colleagues from the Department for Communities, Mid and East Antrim Council, the Labour Market Partnership, and the Administators.</p><p>An employment support workshop takes place on Friday 25th September at 10.00am at the McEvoy suite in the Ballymena North Business &amp; Recreation Centre, to help ensure affected employees are aware of available support such as careers advice, retraining opportunities, assistance with job searches and signposting to support services.</p><p>In addition, Invest NI is working with Mid and East Antrim Council to help identify jobs vacancies with local employers.</p><p>My Department will continue to monitor the situation closely and provide assistance where it can.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2052675%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=499752","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=499752"}},{"id":"499409","reference":"AQO 3955/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2026-09-10","answerBy":"2026-09-21","answered":"2026-09-24","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health when Northern Ireland's participation in the UK-wide Best4 screening trial is expected to commence.","answerText":"I fully recognise the potential value of the Best4 Study and remain supportive of efforts to facilitate participation in Northern Ireland, provided that all legal, governance and confidentiality requirements can be met.\n\nTo provide context, the proposed recruitment approach would involve the use of prescribing information held on behalf of my Department to identify individuals who may be eligible for the study. As this information was originally collected for the provision and management of healthcare services, any use of identifiable patient information for research recruitment must be carefully assessed against data protection legislation and the common law duty of confidentiality.\n\nSignificant work has been undertaken by my Department and partner organisations to explore options for participation, including legal review, information governance assessment and consideration of alternative recruitment pathways. While progress has been made, further work is required to determine whether a lawful, proportionate and practical recruitment mechanism can be established, including consideration of a public interest case and direct patient invitation approaches. One option currently being explored would allow eligible individuals to be contacted directly without their information first being disclosed to researchers.\n\nI appreciate concerns that the study has commenced elsewhere in the UK while arrangements remain under consideration here. Northern Ireland does not currently have an equivalent statutory mechanism to Section 251 of the NHS Act 2006 and therefore any proposal must also demonstrate a lawful basis for processing and appropriately address the common law duty of confidentiality. As a result, approaches adopted elsewhere cannot simply be replicated in Northern Ireland.\n\nI have asked officials to reengage with the study team to advise on options for participation, determine the details on number of participants required and confirm how costs will be met. Only once these details are established, and all information governance actions have been undertaken, can recruitment of participants commence. Following discussion with statisticians that have experience of undertaking similar exercises, it is estimated that recruitment of participants can commence in November 2026. My Department will continue to keep progress under review.","answerHtml":"<p>I fully recognise the potential value of the Best4 Study and remain supportive of efforts to facilitate participation in Northern Ireland, provided that all legal, governance and confidentiality requirements can be met.</p><p>To provide context, the proposed recruitment approach would involve the use of prescribing information held on behalf of my Department to identify individuals who may be eligible for the study. As this information was originally collected for the provision and management of healthcare services, any use of identifiable patient information for research recruitment must be carefully assessed against data protection legislation and the common law duty of confidentiality.</p><p>Significant work has been undertaken by my Department and partner organisations to explore options for participation, including legal review, information governance assessment and consideration of alternative recruitment pathways. While progress has been made, further work is required to determine whether a lawful, proportionate and practical recruitment mechanism can be established, including consideration of a public interest case and direct patient invitation approaches. One option currently being explored would allow eligible individuals to be contacted directly without their information first being disclosed to researchers.</p><p>I appreciate concerns that the study has commenced elsewhere in the UK while arrangements remain under consideration here. Northern Ireland does not currently have an equivalent statutory mechanism to Section 251 of the NHS Act 2006 and therefore any proposal must also demonstrate a lawful basis for processing and appropriately address the common law duty of confidentiality. As a result, approaches adopted elsewhere cannot simply be replicated in Northern Ireland.</p><p>I have asked officials to reengage with the study team to advise on options for participation, determine the details on number of participants required and confirm how costs will be met. Only once these details are established, and all information governance actions have been undertaken, can recruitment of participants commence. Following discussion with statisticians that have experience of undertaking similar exercises, it is estimated that recruitment of participants can commence in November 2026. My Department will continue to keep progress under review.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203955%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=499409","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=499409"}},{"id":"497268","reference":"AQW 51271/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-09-08","answerBy":"2026-09-23","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail when he intends to bring the Health and Social Care (Data Processing Bill) to the Assembly.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2051271%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=497268","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=497268"}},{"id":"493930","reference":"AQW 50319/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-07-02","answerBy":"2026-07-21","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail any plans to expand and standardise diabetes prevention programmes across all Health and Social Care Trusts.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2050319%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=493930","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=493930"}},{"id":"493929","reference":"AQW 50318/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-07-02","answerBy":"2026-07-21","answered":"2026-08-05","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health whether any strategy will be in place to succeed the Diabetes Strategic Framework, including a timeframe for when this will be published.","answerText":"The Diabetes Strategic Framework for Northern Ireland was launched in November 2016. Launched in tandem the NI Diabetes Network brings together people living with diabetes, carers, and health and social care professionals working in partnership with Diabetes UK on the design and delivery of better diabetes services.\n\nThe Network supports the implementation of the Strategic Framework for Diabetes and is one of a series of initiatives which aims to transform Health and Social Care (HSC) services across Northern Ireland.\n\nMy officials are currently considering next steps in relation to the Diabetes Strategic Framework. To assist with this, preparations are underway to host a planning workshop with the NI Diabetes Network in early Autumn.\n\nThis event will build on a similar workshop held earlier this year and will focus on identifying future strategic priorities and mechanisms to sustain the effective partnership arrangements developed during the lifespan of the Framework.","answerHtml":"<p>The Diabetes Strategic Framework for Northern Ireland was launched in November 2016. Launched in tandem the NI Diabetes Network brings together people living with diabetes, carers, and health and social care professionals working in partnership with Diabetes UK on the design and delivery of better diabetes services.</p><p>The Network supports the implementation of the Strategic Framework for Diabetes and is one of a series of initiatives which aims to transform Health and Social Care (HSC) services across Northern Ireland.</p><p>My officials are currently considering next steps in relation to the Diabetes Strategic Framework. To assist with this, preparations are underway to host a planning workshop with the NI Diabetes Network in early Autumn.</p><p>This event will build on a similar workshop held earlier this year and will focus on identifying future strategic priorities and mechanisms to sustain the effective partnership arrangements developed during the lifespan of the Framework.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2050318%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=493929","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=493929"}},{"id":"493928","reference":"AQW 50317/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-07-02","answerBy":"2026-07-21","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail when a regional diabetes audit will become fully operational.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2050317%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=493928","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=493928"}},{"id":"492163","reference":"AQW 49401/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-06-23","answerBy":"2026-07-08","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health when he will answer (i) AQW 44325/22-27; (ii) AQW 45595/22-27; (iii) AQW 38086/22-27; and (iv) AQW 34879/22-27.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2049401%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=492163","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=492163"}},{"id":"492162","reference":"AQW 49400/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-06-23","answerBy":"2026-07-08","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, pursuant to AQW 32505/22-27, to detail when the most clinically appropriate time for potential implementation of capsule sponge testing will be determined for the region.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2049400%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=492162","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=492162"}},{"id":"491177","reference":"AQW 49022/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-06-18","answerBy":"2026-07-03","answered":"2026-07-08","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health whether any further efficiencies and savings are planned as part of the additional functionality of EpicCare Link.","answerText":"My Department does not hold plans for further efficiencies or savings arising directly from the implementation or additional functionality of EpicCare Link.\n\nEpicCare Link provides authorised primary and community care users with predominantly read‑only access to clinical information held within the encompass system to support continuity of care. It does not schedule or deliver clinical activity and provides only limited additional functionality. It is not designed to directly generate measurable financial savings or efficiencies.\n\nWhile the encompass system as a whole supports a wide range of clinical and operational processes across Health and Social Care, EpicCare Link is a specific component focused on information access and does not in itself drive these activities.","answerHtml":"<p>My Department does not hold plans for further efficiencies or savings arising directly from the implementation or additional functionality of EpicCare Link.</p><p>EpicCare Link provides authorised primary and community care users with predominantly read‑only access to clinical information held within the encompass system to support continuity of care. It does not schedule or deliver clinical activity and provides only limited additional functionality. It is not designed to directly generate measurable financial savings or efficiencies.</p><p>While the encompass system as a whole supports a wide range of clinical and operational processes across Health and Social Care, EpicCare Link is a specific component focused on information access and does not in itself drive these activities.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2049022%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=491177","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=491177"}},{"id":"491176","reference":"AQW 49021/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-06-18","answerBy":"2026-07-03","answered":"2026-07-08","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health whether there are any plans to ring-fence recurrent funding, to protect allied health professional cancer posts and ensure service continuity for patients.","answerText":"Allied Health Professionals (AHPs) are central to delivering cancer care across the entire patient pathway contributing to diagnosis, treatment, patient support, prehabilitation and rehabilitation, management of long-term effects, and palliative and end-of-life care. These roles are also important in supporting the delivery of many key actions within the Cancer Strategy for Northern Ireland 2022–2032.\n\nAs I have previously outlined, the delivery of the Cancer Strategy, including funding for AHP posts to support this, will require significant and sustained investment. While recurrent funding to date has established an important foundation, substantially increased resources will be necessary to fully realise the Strategy’s intended outcomes.","answerHtml":"<p>Allied Health Professionals (AHPs) are central to delivering cancer care across the entire patient pathway contributing to diagnosis, treatment, patient support, prehabilitation and rehabilitation, management of long-term effects, and palliative and end-of-life care. These roles are also important in supporting the delivery of many key actions within the Cancer Strategy for Northern Ireland 2022–2032.</p><p>As I have previously outlined, the delivery of the Cancer Strategy, including funding for AHP posts to support this, will require significant and sustained investment. While recurrent funding to date has established an important foundation, substantially increased resources will be necessary to fully realise the Strategy’s intended outcomes.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2049021%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=491176","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=491176"}},{"id":"491175","reference":"AQW 49020/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-06-18","answerBy":"2026-07-03","answered":"2026-07-21","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail the number of allied health professional roles that remain on short-term or non-recurrent funding, broken down by (i) Health and Social Care Trust; and (ii) profession.","answerText":"The number of whole time equivalent (WTE) allied health professional roles that remain on short-term or non-recurrent funding, broken down by Health and Social Care Trust and profession is set out in Table 1.\n\nProfession\tBHSCTWTE\tNHSCTWTE\tSEHSCTWTE\tSHSCTWTE\tWHSCTWTE\nDietetics\t7.9\t0\t0\t0\t0\nOccupational Therapy\t0\t0\t0\t0\t0\nOrthoptics\t0\t0\t0\t0\t0\nPhysiotherapy\t15.8\t0\t0\t0\t0\nPodiatry\t0\t0\t0\t0\t0\nRadiography\t0\t0\t0\t0\t0\nSpeech and language therapy\t0\t0\t0\t0\t0\nMDT roles\t0\t3.5\t0\t0\t0\n\nTable 1: Number of allied health professional roles that remain on short-term or non-recurrent funding.","answerHtml":"<p>The number of whole time equivalent (WTE) allied health professional roles that remain on short-term or non-recurrent funding, broken down by Health and Social Care Trust and profession is set out in Table 1.</p><div class=\"table-wrap\"><table><tr><td>Profession</td><td>BHSCTWTE</td><td>NHSCTWTE</td><td>SEHSCTWTE</td><td>SHSCTWTE</td><td>WHSCTWTE</td></tr><tr><td>Dietetics</td><td>7.9</td><td>0</td><td>0</td><td>0</td><td>0</td></tr><tr><td>Occupational Therapy</td><td>0</td><td>0</td><td>0</td><td>0</td><td>0</td></tr><tr><td>Orthoptics</td><td>0</td><td>0</td><td>0</td><td>0</td><td>0</td></tr><tr><td>Physiotherapy</td><td>15.8</td><td>0</td><td>0</td><td>0</td><td>0</td></tr><tr><td>Podiatry</td><td>0</td><td>0</td><td>0</td><td>0</td><td>0</td></tr><tr><td>Radiography</td><td>0</td><td>0</td><td>0</td><td>0</td><td>0</td></tr><tr><td>Speech and language therapy</td><td>0</td><td>0</td><td>0</td><td>0</td><td>0</td></tr><tr><td>MDT roles</td><td>0</td><td>3.5</td><td>0</td><td>0</td><td>0</td></tr></table></div><p>Table 1: Number of allied health professional roles that remain on short-term or non-recurrent funding.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2049020%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=491175","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=491175"}},{"id":"491174","reference":"AQW 49019/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-06-18","answerBy":"2026-07-03","answered":"2026-07-09","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail any steps his Department is taking to ensure that allied health professional workforce planning reflects (i) rising cancer incidence; (ii) growing survivorship needs; and (iii) increasing complexity of care.","answerText":"The Allied Health Professions (AHP) workforce provides critical input to cancer care pathways, with many of the fourteen Allied Health Professions offering practical clinical and therapeutic support to those requiring cancer treatments.\n\nMy Department published the Cancer Strategy in March 2022, and it sets out the key steps to achieving the overall vision for improved cancer outcomes for the people of Northern Ireland. It presents a comprehensive and challenging programme of service stabilisation and improvement, reliant on collaborative working and new and innovative approaches to the delivery of care.\n\nSince this, work has been ongoing to review and develop cancer services through the Strategic Review of Radiotherapy Services, the Breast Service Review and the review of the AHP Cancer Rehabilitation workforce. These, and other workforce reviews, will consider the factors identified around increased incidence, increased complexity, and, importantly, improved survival rates when assessing the required workforce levels for AHP services.","answerHtml":"<p>The Allied Health Professions (AHP) workforce provides critical input to cancer care pathways, with many of the fourteen Allied Health Professions offering practical clinical and therapeutic support to those requiring cancer treatments.</p><p>My Department published the Cancer Strategy in March 2022, and it sets out the key steps to achieving the overall vision for improved cancer outcomes for the people of Northern Ireland. It presents a comprehensive and challenging programme of service stabilisation and improvement, reliant on collaborative working and new and innovative approaches to the delivery of care.</p><p>Since this, work has been ongoing to review and develop cancer services through the Strategic Review of Radiotherapy Services, the Breast Service Review and the review of the AHP Cancer Rehabilitation workforce. These, and other workforce reviews, will consider the factors identified around increased incidence, increased complexity, and, importantly, improved survival rates when assessing the required workforce levels for AHP services.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2049019%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=491174","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=491174"}},{"id":"491173","reference":"AQW 49018/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-06-18","answerBy":"2026-07-03","answered":"2026-07-09","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail (i) the number of allied health professional cancer business cases that have remained unreviewed or unapproved, since 2016; and (ii) the length of time that they have been outstanding.","answerText":"My Department does not maintain a central dataset that identifies all Allied Health Professional (AHP) cancer-related business cases submitted across the Health and Social Care (HSC) system since 2016, nor does it gather information on the number of such cases that have remained unreviewed or unapproved over that period.\n\nThe development, submission and initial consideration of business cases for service developments are primarily matters for individual HSC Trusts. Trusts are responsible for prioritising proposals within their allocated budgets and for progressing business cases through the appropriate approval processes.","answerHtml":"<p>My Department does not maintain a central dataset that identifies all Allied Health Professional (AHP) cancer-related business cases submitted across the Health and Social Care (HSC) system since 2016, nor does it gather information on the number of such cases that have remained unreviewed or unapproved over that period.</p><p>The development, submission and initial consideration of business cases for service developments are primarily matters for individual HSC Trusts. Trusts are responsible for prioritising proposals within their allocated budgets and for progressing business cases through the appropriate approval processes.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2049018%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=491173","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=491173"}},{"id":"490914","reference":"AQW 48897/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-06-17","answerBy":"2026-07-02","answered":"2026-07-01","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health whether there has been any change in clinical activity since the implementation of EpicCare Link, including (i) elective major surgery within theatre; (ii) paediatric major surgery activity; (iii) outpatient activity and throughput; and (v) oncology services, broken down by Health and Social Care Trust.","answerText":"My Department does not hold analysis which attributes changes in clinical activity directly to the implementation of EpicCare Link.\n\nEpicCare Link is designed to support safer and more informed clinical decision-making through improved access to patient information. It provides authorised primary and community care users with predominantly read‑only access to clinical information held within the encompass system. It does not schedule or deliver clinical activity and provides only limited additional functionality.\n\nWhile the encompass system as a whole supports a wide range of clinical and operational processes across Health and Social Care, EpicCare Link is a specific component focused on information access and does not in itself drive these activities.\n\nHealth and Social Care Trusts are responsible for the planning, delivery and reporting of clinical services, including elective surgery, paediatric surgery, outpatient throughput and oncology services. Activity levels are influenced by a wide range of factors, including workforce, capacity, demand and wider service pressures.","answerHtml":"<p>My Department does not hold analysis which attributes changes in clinical activity directly to the implementation of EpicCare Link.</p><p>EpicCare Link is designed to support safer and more informed clinical decision-making through improved access to patient information. It provides authorised primary and community care users with predominantly read‑only access to clinical information held within the encompass system. It does not schedule or deliver clinical activity and provides only limited additional functionality.</p><p>While the encompass system as a whole supports a wide range of clinical and operational processes across Health and Social Care, EpicCare Link is a specific component focused on information access and does not in itself drive these activities.</p><p>Health and Social Care Trusts are responsible for the planning, delivery and reporting of clinical services, including elective surgery, paediatric surgery, outpatient throughput and oncology services. Activity levels are influenced by a wide range of factors, including workforce, capacity, demand and wider service pressures.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2048897%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=490914","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=490914"}},{"id":"490913","reference":"AQW 48896/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-06-17","answerBy":"2026-07-02","answered":"2026-07-01","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail any measurable efficiencies or savings that have been achieved since the introduction of EpicCare Link, including how these are being quantified, broken down by Health and Social Care Trust.","answerText":"My Department does not hold analysis which identifies measurable efficiencies or savings directly attributable to the implementation of EpicCare Link.\n\nEpicCare Link provides authorised primary and community care users with predominantly read‑only access to clinical information held within the encompass system to support continuity of care. It does not schedule or deliver clinical activity and provides only limited additional functionality. It is not designed to directly generate measurable financial savings or efficiencies.\n\nWhile the encompass system as a whole supports a wide range of clinical and operational processes across Health and Social Care, EpicCare Link is a specific component focused on information access and does not in itself drive these activities.","answerHtml":"<p>My Department does not hold analysis which identifies measurable efficiencies or savings directly attributable to the implementation of EpicCare Link.</p><p>EpicCare Link provides authorised primary and community care users with predominantly read‑only access to clinical information held within the encompass system to support continuity of care. It does not schedule or deliver clinical activity and provides only limited additional functionality. It is not designed to directly generate measurable financial savings or efficiencies.</p><p>While the encompass system as a whole supports a wide range of clinical and operational processes across Health and Social Care, EpicCare Link is a specific component focused on information access and does not in itself drive these activities.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2048896%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=490913","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=490913"}},{"id":"490912","reference":"AQW 48895/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-06-17","answerBy":"2026-07-02","answered":"2026-07-01","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail any administrative support that is currently in place to mitigate any additional data entry burden placed on clinicians following the EpicCare Link implementation, including (i) whether clinicians are routinely required to input data previously completed by administrative staff; and (ii) any plans in place to rebalance this.","answerText":"EpicCare Link is a component of the encompass system which provides authorised users with predominantly read‑only access to clinical information to support continuity of care. While the encompass system as a whole supports a wide range of clinical and operational processes across Health and Social Care, EpicCare Link is a specific component focused on information access and does not in itself drive these activities.\n\nencompass system design has focused on supporting integrated digital workflows, enabling information to be captured once and reused across care settings, thereby reducing duplication and improving the availability of timely clinical information.\n\nThere is no expectation that clinicians will routinely undertake tasks previously performed by administrative staff. However, changes to workflows are inherent in the transition to digital systems, with clinicians required to input structured information at the point of care to support data quality and patient safety.\n\nThe impact of encompass on clinical workflows continues to be reviewed. Any required adjustments, including the balance of administrative and clinical tasks, are considered as part of the continuous improvement approach.","answerHtml":"<p>EpicCare Link is a component of the encompass system which provides authorised users with predominantly read‑only access to clinical information to support continuity of care. While the encompass system as a whole supports a wide range of clinical and operational processes across Health and Social Care, EpicCare Link is a specific component focused on information access and does not in itself drive these activities.</p><p>encompass system design has focused on supporting integrated digital workflows, enabling information to be captured once and reused across care settings, thereby reducing duplication and improving the availability of timely clinical information.</p><p>There is no expectation that clinicians will routinely undertake tasks previously performed by administrative staff. However, changes to workflows are inherent in the transition to digital systems, with clinicians required to input structured information at the point of care to support data quality and patient safety.</p><p>The impact of encompass on clinical workflows continues to be reviewed. Any required adjustments, including the balance of administrative and clinical tasks, are considered as part of the continuous improvement approach.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2048895%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=490912","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=490912"}},{"id":"490911","reference":"AQW 48894/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-06-17","answerBy":"2026-07-02","answered":"2026-07-01","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health whether any consideration has been given to the use of Artificial Intelligence-assisted tools, such as Copilot, to reduce clinician workload and improve productivity as part of the EpicCare Link system.","answerText":"EpicCare Link is a component of the encompass system which provides authorised users with predominantly read‑only access to clinical information to support continuity of care. While the encompass system as a whole supports a wide range of clinical and operational processes across Health and Social Care, EpicCare Link is a specific component focused on information access and does not in itself drive these activities.\n\nConsideration is being given to the potential role of Artificial Intelligence (AI) assisted tools, including solutions such as Copilot, across the wider encompass programme and the Health and Social Care digital landscape in Northern Ireland.","answerHtml":"<p>EpicCare Link is a component of the encompass system which provides authorised users with predominantly read‑only access to clinical information to support continuity of care. While the encompass system as a whole supports a wide range of clinical and operational processes across Health and Social Care, EpicCare Link is a specific component focused on information access and does not in itself drive these activities.</p><p>Consideration is being given to the potential role of Artificial Intelligence (AI) assisted tools, including solutions such as Copilot, across the wider encompass programme and the Health and Social Care digital landscape in Northern Ireland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2048894%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=490911","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=490911"}},{"id":"490910","reference":"AQW 48893/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-06-17","answerBy":"2026-07-02","answered":"2026-07-16","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail any impact of EpicCare Link implementation on (i) theatre lists and scheduling efficiency; and (ii) electronic consultations and encounters, including whether a formal evaluation has been carried out.","answerText":"My Department does not hold analysis which attributes changes in theatre lists, scheduling efficiency, or electronic consultations and encounters directly to the implementation of EpicCare Link.\n\nEpicCare Link provides authorised primary and community care users with predominantly read only access to patient information held within the encompass system. It is designed to support safer and more informed clinical decision making through improved access to information and is not intended to directly influence theatre scheduling, service efficiency or the volume of clinical encounters.\n\nThe planning, scheduling and delivery of theatre activity and outpatient services, including electronic consultations, are the responsibility of Health and Social Care Trusts and are supported by a range of clinical and operational systems and processes.\n\nNo formal evaluation has been undertaken to isolate the impact of EpicCare Link on these areas.","answerHtml":"<p>My Department does not hold analysis which attributes changes in theatre lists, scheduling efficiency, or electronic consultations and encounters directly to the implementation of EpicCare Link.</p><p>EpicCare Link provides authorised primary and community care users with predominantly read only access to patient information held within the encompass system. It is designed to support safer and more informed clinical decision making through improved access to information and is not intended to directly influence theatre scheduling, service efficiency or the volume of clinical encounters.</p><p>The planning, scheduling and delivery of theatre activity and outpatient services, including electronic consultations, are the responsibility of Health and Social Care Trusts and are supported by a range of clinical and operational systems and processes.</p><p>No formal evaluation has been undertaken to isolate the impact of EpicCare Link on these areas.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2048893%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=490910","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=490910"}},{"id":"490563","reference":"AQW 48785/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-06-16","answerBy":"2026-06-24","answered":"2026-06-25","answeredOrally":false,"priority":true,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, pursuant to AQW 40637/22-27, whether he has any plans to introduce a Bill of Amendment to the Health and Social Care (Control of Data Processing) Act (Northern Ireland) 2016, given it was due to be introduced by April 2026.","answerText":"Work to progress the proposed Health and Social Care (Data Processing Amendment) Bill is ongoing. The timing of introduction remains subject to the Assembly’s legislative timetable and Executive processes.\n\nSubject to these dependencies, the Bill is expected to be introduced later in the current Assembly mandate.","answerHtml":"<p>Work to progress the proposed Health and Social Care (Data Processing Amendment) Bill is ongoing. The timing of introduction remains subject to the Assembly’s legislative timetable and Executive processes.</p><p>Subject to these dependencies, the Bill is expected to be introduced later in the current Assembly mandate.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2048785%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=490563","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=490563"}},{"id":"487708","reference":"AQO 3626/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2026-05-21","answerBy":"2026-06-01","answered":"2026-06-01","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education for his response to the report on the Independent Review of Teacher Workload in Northern Ireland.","answerText":"I am committed to tackling the issue of workload and ensuring that teachers can focus on what matters most – teaching, learning and supporting pupils. That is why I commissioned an Independent Panel last May to look specifically at teacher and school leader workload.\n\nIn response to the Panel’s report, the Department published a Workload Action Plan on 28 April 2026, translating the Panel’s recommendations into practical, deliverable and time-bound measures.\n\nThe Workload Action Plan forms a key part of my wider TransformED programme, which is focused on modernising education, strengthening the profession and improving outcomes for learners. It sets out a clear programme of reform to reduce unnecessary workload and deliver a more manageable and sustainable workload culture for teachers and school leaders.","answerHtml":"<p>I am committed to tackling the issue of workload and ensuring that teachers can focus on what matters most – teaching, learning and supporting pupils. That is why I commissioned an Independent Panel last May to look specifically at teacher and school leader workload.</p><p>In response to the Panel’s report, the Department published a Workload Action Plan on 28 April 2026, translating the Panel’s recommendations into practical, deliverable and time-bound measures.</p><p>The Workload Action Plan forms a key part of my wider TransformED programme, which is focused on modernising education, strengthening the profession and improving outcomes for learners. It sets out a clear programme of reform to reduce unnecessary workload and deliver a more manageable and sustainable workload culture for teachers and school leaders.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203626%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=487708","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=487708"}},{"id":"484933","reference":"AQW 46348/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-05-15","answerBy":"2026-06-02","answered":"2026-06-03","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health whether durvalumab, known as Imfinzi, is available for patients who have been diagnosed with certain types stomach cancers.","answerText":"My Department has a formal link with the National Institute for Health and Care Excellence (NICE) under which NICE Technology Appraisals are reviewed locally for their legal and policy applicability here, and where found to be applicable, they are endorsed for implementation within Health and Social Care (HSC) organisations. In practice, this means that treatments that have been recommended by NICE for routine use in the NHS in England are also available in Northern Ireland.\n\nOn 14 May 2026, NICE published its final draft guidance recommending the use of durvalumab (Imfinzi®), as an option for neoadjuvant and adjuvant treatment with 5-fluorouracil, leucovorin, oxaliplatin and docetaxel (FLOT) chemotherapy, then alone as adjuvant treatment, for resectable gastric or gastro-oesophageal junction adenocarcinoma in adults. Final guidance is expected on 3 June 2026.\n\nWhen the final guidance for this treatment is issued by NICE, my Department will consider it under the usual process for NICE Technology Appraisals as per the guidance set out in circular HSC (SQSD) 12/22 which is available at:\n\nhttps://www.health-ni.gov.uk/sites/default/files/publications/health/doh-hsc-sqsd-12-22.pdf","answerHtml":"<p>My Department has a formal link with the National Institute for Health and Care Excellence (NICE) under which NICE Technology Appraisals are reviewed locally for their legal and policy applicability here, and where found to be applicable, they are endorsed for implementation within Health and Social Care (HSC) organisations. In practice, this means that treatments that have been recommended by NICE for routine use in the NHS in England are also available in Northern Ireland.</p><p>On 14 May 2026, NICE published its final draft guidance recommending the use of durvalumab (Imfinzi®), as an option for neoadjuvant and adjuvant treatment with 5-fluorouracil, leucovorin, oxaliplatin and docetaxel (FLOT) chemotherapy, then alone as adjuvant treatment, for resectable gastric or gastro-oesophageal junction adenocarcinoma in adults. Final guidance is expected on 3 June 2026.</p><p>When the final guidance for this treatment is issued by NICE, my Department will consider it under the usual process for NICE Technology Appraisals as per the guidance set out in circular HSC (SQSD) 12/22 which is available at:</p><p>https://www.health-ni.gov.uk/sites/default/files/publications/health/doh-hsc-sqsd-12-22.pdf</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2046348%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=484933","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=484933"}},{"id":"484752","reference":"AQW 46261/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-05-14","answerBy":"2026-06-01","answered":"2026-06-03","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail (i) any assessment that has been made on the disparity in access to weight management medications, such as GLP-1 receptor agonists, between Northern Ireland and other parts of the UK; and (ii) any steps he is taking to address this.","answerText":"Obesity remains one of the most significant public health challenges facing Northern Ireland, with serious consequences for population health and growing pressure on our health and social care system.\n\nThe Department is aware of the disparity in access to specialist weight management services and associated medications, including GLP-1 receptor agonists, between Northern Ireland and other parts of the UK.\n\nWith regard to weight management medications, such as GLP-1 receptor agonists, the Department has a formal link with the National Institute for Health and Care Excellence (NICE) under which NICE Technology Appraisals are reviewed locally for their legal and policy applicability here, and where found to be applicable, they are endorsed for implementation within Health and Social Care (HSC) organisations.\n\nNICE has published TA664 (liraglutide) and TA875 (semaglutide) which advises that these treatments are recommended as an option for weight management alongside a reduced-calorie diet and increased physical activity in adults. NICE recommends that these treatments should only be prescribed within a specialist multidisciplinary weight management service (including but not limited to tiers 3 and 4). However, as Northern Ireland does not currently have a specialist weight management service and as such these treatments are not currently available within the HSC.\n\nNICE has also published TA1026 (tirzepatide) which advises that this treatment is recommended as an option for the management of obesity in people with a body mass index of more than 35 and at least one weight-related illness. As this represents a very large number of people, the guidance recommends that rollout will need to be carefully managed in a phased manner to ensure that healthcare professionals can continue to meet the full range of health needs for all their patients.\n\nTo address this disparity, in May 2025, I announced my plans for the establishment of a Regional Obesity Management Service for Northern Ireland and work has been progressing to implement phase one. This phase will focus on the development of a community-based service where adult patients will have access to lifestyle support to ensure maximum effectiveness, as well as obesity management medication such as GLP-1 receptor agonists, if clinically appropriate. It is anticipated this phase will be operational later in 2026.\n\nImplementation of further phases of the new service will be subject to securing the necessary funding and service requirements including clinical capacity and specialist support.","answerHtml":"<p>Obesity remains one of the most significant public health challenges facing Northern Ireland, with serious consequences for population health and growing pressure on our health and social care system.</p><p>The Department is aware of the disparity in access to specialist weight management services and associated medications, including GLP-1 receptor agonists, between Northern Ireland and other parts of the UK.</p><p>With regard to weight management medications, such as GLP-1 receptor agonists, the Department has a formal link with the National Institute for Health and Care Excellence (NICE) under which NICE Technology Appraisals are reviewed locally for their legal and policy applicability here, and where found to be applicable, they are endorsed for implementation within Health and Social Care (HSC) organisations.</p><p>NICE has published TA664 (liraglutide) and TA875 (semaglutide) which advises that these treatments are recommended as an option for weight management alongside a reduced-calorie diet and increased physical activity in adults. NICE recommends that these treatments should only be prescribed within a specialist multidisciplinary weight management service (including but not limited to tiers 3 and 4). However, as Northern Ireland does not currently have a specialist weight management service and as such these treatments are not currently available within the HSC.</p><p>NICE has also published TA1026 (tirzepatide) which advises that this treatment is recommended as an option for the management of obesity in people with a body mass index of more than 35 and at least one weight-related illness. As this represents a very large number of people, the guidance recommends that rollout will need to be carefully managed in a phased manner to ensure that healthcare professionals can continue to meet the full range of health needs for all their patients.</p><p>To address this disparity, in May 2025, I announced my plans for the establishment of a Regional Obesity Management Service for Northern Ireland and work has been progressing to implement phase one. This phase will focus on the development of a community-based service where adult patients will have access to lifestyle support to ensure maximum effectiveness, as well as obesity management medication such as GLP-1 receptor agonists, if clinically appropriate. It is anticipated this phase will be operational later in 2026.</p><p>Implementation of further phases of the new service will be subject to securing the necessary funding and service requirements including clinical capacity and specialist support.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2046261%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=484752","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=484752"}},{"id":"485291","reference":"AQO 3583/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2026-05-07","answerBy":"2026-05-18","answered":"2026-05-18","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities whether he will renew and update the targets in the Housing Supply Strategy 2024-2039 to take account of the lack of funding for new builds and issues impacting NI Water’s ability to meet wastewater demands.","answerText":"The Housing Supply Strategy states an ambition to deliver 100,000 homes of all tenures over a 15-year period, providing a clear framework for delivery.\n\nThis is an Executive Strategy, and the Executive has therefore committed to collectively identify actions to deliver the strategy, through a series of action plans.\n\nOngoing collaboration between Executive Departments is essential to address whole system barriers to supply. To give an example this includes the issue of wastewater constraints, with my officials engaging closely with the Department for Infrastructure to unlock capacity for new social homes.\n\nThe Strategy was published in December 2024. Whilst there is scope to undertake a strategic review of the Strategy every 5 years, I see no reason to change its ambition barely a year after it was published.\n\nI remain focussed on the Strategy’s ambition and I have continually made clear the priority I place on housing and finding new solutions with the resources available to me. This Executive must also collectively demonstrate that it is serious about prioritising housing in its decision making and funding allocations.","answerHtml":"<p>The Housing Supply Strategy states an ambition to deliver 100,000 homes of all tenures over a 15-year period, providing a clear framework for delivery.</p><p>This is an Executive Strategy, and the Executive has therefore committed to collectively identify actions to deliver the strategy, through a series of action plans.</p><p>Ongoing collaboration between Executive Departments is essential to address whole system barriers to supply. To give an example this includes the issue of wastewater constraints, with my officials engaging closely with the Department for Infrastructure to unlock capacity for new social homes.</p><p>The Strategy was published in December 2024. Whilst there is scope to undertake a strategic review of the Strategy every 5 years, I see no reason to change its ambition barely a year after it was published.</p><p>I remain focussed on the Strategy’s ambition and I have continually made clear the priority I place on housing and finding new solutions with the resources available to me. This Executive must also collectively demonstrate that it is serious about prioritising housing in its decision making and funding allocations.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203583%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=485291","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=485291"}},{"id":"485350","reference":"AQO 3565/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2026-05-07","answerBy":"2026-05-18","answered":"2026-05-19","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs to outline any engagement he has had with businesses on the economic benefits of decarbonising the economy.","answerText":"I engage regularly with businesses and business representative bodies on the opportunities and economic benefits from decarbonising our economy.\n\nI recently participated in EY’s Four Futures event, which brought together a range of stakeholders to consider the actions required to deliver a more sustainable and competitive economy. I continue to engage directly with industry, including a recent visit to Encirc, to discuss decarbonisation options and the opportunities associated with lowcarbon innovation and investment. I also attended the Business in the Community Top Environmental Performers Forum and discussed how decarbonisation can drive productivity, resilience and growth. The leadership shown by these businesses is helping shape a more sustainable and competitive economy for Northern Ireland.\n\nIn making the case for action, I have highlighted the Climate Change Committee’s recent analysis on costs, which shows that, when assessed in line with Green Book guidance, the benefits of Net Zero outweigh the costs and that continued reliance on fossil fuels exposes the economy to price shocks and wider damage.\n\nThrough my engagement with businesses it is clear, that they understand that climate action is an investment in their sustainable future and not a burdensome cost. Recently I’ve seen firsthand how projects such as ARC Zero are demonstrating a pathway to low carbon farming, demonstrating the benefits of climate action in delivering economic opportunities, cleaner air, healthier communities, and stronger, more resilient ecosystems.\n\nThe evidence supports that every pound spent on climate action brings two to four times the economic and social benefit, whilst avoiding billions in climate damage. I will continue to work with partners across government and the business community to support a fair and just transition and to maximise the economic and environmental benefits for Northern Ireland.","answerHtml":"<p>I engage regularly with businesses and business representative bodies on the opportunities and economic benefits from decarbonising our economy.</p><p>I recently participated in EY’s Four Futures event, which brought together a range of stakeholders to consider the actions required to deliver a more sustainable and competitive economy. I continue to engage directly with industry, including a recent visit to Encirc, to discuss decarbonisation options and the opportunities associated with lowcarbon innovation and investment. I also attended the Business in the Community Top Environmental Performers Forum and discussed how decarbonisation can drive productivity, resilience and growth. The leadership shown by these businesses is helping shape a more sustainable and competitive economy for Northern Ireland.</p><p>In making the case for action, I have highlighted the Climate Change Committee’s recent analysis on costs, which shows that, when assessed in line with Green Book guidance, the benefits of Net Zero outweigh the costs and that continued reliance on fossil fuels exposes the economy to price shocks and wider damage.</p><p>Through my engagement with businesses it is clear, that they understand that climate action is an investment in their sustainable future and not a burdensome cost. Recently I’ve seen firsthand how projects such as ARC Zero are demonstrating a pathway to low carbon farming, demonstrating the benefits of climate action in delivering economic opportunities, cleaner air, healthier communities, and stronger, more resilient ecosystems.</p><p>The evidence supports that every pound spent on climate action brings two to four times the economic and social benefit, whilst avoiding billions in climate damage. I will continue to work with partners across government and the business community to support a fair and just transition and to maximise the economic and environmental benefits for Northern Ireland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203565%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=485350","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=485350"}},{"id":"483305","reference":"AQW 45596/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-05-06","answerBy":"2026-05-14","answered":"2026-05-15","answeredOrally":false,"priority":true,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to detail how a Stage 4 cancer patient, with a time limited prognosis, who had specifically paid for a seat on an Enterprise service from Connolly Train Station on 5 May 2026 was left standing in the aisle and was not provided any assistance.","answerText":"This issue is an operational matter for Translink. I have sought the requested information and have been advised as follows:\n\nThe train due to operate the 1650 hours from Dublin on Tuesday 05 May 2026 experienced mechanical issues (door fault) whilst in service earlier that day. In an effort to provide continuity of service to passengers, and not cancel the service, an alternative train was sourced albeit a non-Enterprise train with reduced capacity and facilities. This information was posted on Irish Rail social media from 1249 hours and reposted by Translink social media to give passengers the opportunity to decide to travel on this reduced service or travel on an earlier/later train.\n\nAll trains in service have priority seating for passengers who have additional needs. As the train was extremely busy, the Train Manager could not make their way through the train however on arrival at Drogheda the Train Manager made their way down the outside of the train, boarding at each door to offer assistance and apologise for the inconvenience.\n\nWhilst the service was crewed by NI Railways, under the terms of the Passenger Charter, refund requests should be made to the Company from whom your ticket was purchased. Translink understanding is the passenger purchased their ticket from Iarnród Éireann and were directed to make their claim through them directly. Translink is disappointed that this message does not appear to have been relayed appropriately and professionally and Translink is happy to reach out to the passenger for further information and offer its apologies.","answerHtml":"<p>This issue is an operational matter for Translink. I have sought the requested information and have been advised as follows:</p><p>The train due to operate the 1650 hours from Dublin on Tuesday 05 May 2026 experienced mechanical issues (door fault) whilst in service earlier that day. In an effort to provide continuity of service to passengers, and not cancel the service, an alternative train was sourced albeit a non-Enterprise train with reduced capacity and facilities. This information was posted on Irish Rail social media from 1249 hours and reposted by Translink social media to give passengers the opportunity to decide to travel on this reduced service or travel on an earlier/later train.</p><p>All trains in service have priority seating for passengers who have additional needs. As the train was extremely busy, the Train Manager could not make their way through the train however on arrival at Drogheda the Train Manager made their way down the outside of the train, boarding at each door to offer assistance and apologise for the inconvenience.</p><p>Whilst the service was crewed by NI Railways, under the terms of the Passenger Charter, refund requests should be made to the Company from whom your ticket was purchased. Translink understanding is the passenger purchased their ticket from Iarnród Éireann and were directed to make their claim through them directly. Translink is disappointed that this message does not appear to have been relayed appropriately and professionally and Translink is happy to reach out to the passenger for further information and offer its apologies.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2045596%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=483305","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=483305"}},{"id":"483304","reference":"AQW 45595/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-05-06","answerBy":"2026-05-21","answered":"2026-06-20","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail when the injectable form of pembrolizumab will be made available for cancer patients.","answerText":"Northern Health and Social Care (HSC) Trust, South Eastern HSC Trust and Western HSC Trust have already rolled out injectable pembrolizumab (Keytruda) in April 2026 as part of a managed transition involving a substantial programme of work to update existing clinical protocols and minimising waste of the existing infusion product\n\nSouthern HSC Trust have informed my Department that they are managing this transition and will move to provide injectables in approximately two weeks.\n\nBelfast (HSC) Trust are also managing this transition to injectables and plan to switch at the start of June 2026.","answerHtml":"<p>Northern Health and Social Care (HSC) Trust, South Eastern HSC Trust and Western HSC Trust have already rolled out injectable pembrolizumab (Keytruda) in April 2026 as part of a managed transition involving a substantial programme of work to update existing clinical protocols and minimising waste of the existing infusion product</p><p>Southern HSC Trust have informed my Department that they are managing this transition and will move to provide injectables in approximately two weeks.</p><p>Belfast (HSC) Trust are also managing this transition to injectables and plan to switch at the start of June 2026.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2045595%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=483304","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=483304"}},{"id":"480700","reference":"AQW 44325/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-04-20","answerBy":"2026-05-06","answered":"2026-06-25","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail any public health information programmes promoted by the Public Health Agency, in each of the last five years, including (i) the reason for undertaking the campaign; and (ii) a breakdown of any budget spent, including on the media used.","answerText":"The public health information programmes promoted by the Public Health Agency, the associated expenditure, and reasons for undertaking those campaigns, are set out in the table below.\n\nCampaign\tMedia (included in total campaign spend)\tTotal campaign spend 2025-26\tReason for undertaking the campaign\nMental health/Lifeline\t£ 290,000\t£350,000\tPromote the Lifeline crisis helpline and increase help-seeking behaviour among those experiencing emotional distress.\nFlu\t£49,641\t£69,652\tTo encourage those eligible for the free flu vaccine to take up the offer and get vaccinated asap\nTotal\t\t£419,652\n\nCampaign\tMedia (included in total campaign spend)\tTotal campaign spend 2024-25\tReason for undertaking the campaign\nMental health/Lifeline\t£79,248\t£99,617\tPromote the Lifeline crisis helpline and increase help-seeking behaviour among those experiencing emotional distress.\nFlu\t£12,936\t£19,923\tEncourage those eligible for the flu vaccine to to take up the offer and get vaccinated asap\nTotal\t\t£119,540\n\nCampaign\tMedia (included in total campaign spend)\tTotal campaign spend 2023-24\tReason for undertaking the campaign\nMMR vaccination\t£49,204\t£ 71,195\tPromote and encourage uptake of the MMR vaccine\nOrgan donation\t£153,600\t£203,423\tInform the public about the change in organ donation law and inform them of their options on organ donation and how to register a decision\nTotal\t\t£274,618\n\nCampaign\tMedia (included in total campaign spend)\tTotal campaign spend 2022-23\tReason for undertaking the campaign\nCOVID vaccine\t£27,937\t£39,979\tPromote and encourage uptake of the COVID vaccine.\nSexual health\t£179,009\t£262,777\tIncrease awareness of the risks associated with unprotected sex and encourage the target audience to think about and take action to look after their sexual health.\nWinter vaccines\t£157,456\t£245,800\tPromote and encourage uptake of the flu and COVID vaccines\nOrgan donation\t£355,857\t£599,119\tInform the public about the change in organ donation law and inform them of their options on organ donation and how to register a decision\nMental health\t£105,635\t£119,727\tEncourage openness and discussion in relation to mental health problems and encourage anyone experiencing difficulties to seek help.\nLifeline\t£181,341\t£300,156\tPromote the Lifeline crisis helpline and increase help-seeking behaviour among those experiencing emotional distress.\nFAST\t£103,777\t£129,999\tCommunicate the signs and symptoms of stroke, using the FAST acronym and treat a stroke as a medical emergency and call 999 immediately\nTotal\t\t£1,697,557\n\nCampaign\tMedia (included in total campaign spend)\tTotal campaign spend 2021-22\tReason for undertaking the campaign\nCOVID surge enhanced testing\tNIL\t£ 13,627\tTargeted mailout to homes in areas with COVID outbreaks to signpost to community vaccination pop-ups.\nCOVID vaccine (multiple campaigns)\t£320,606\t£451,675\tEncourage those eligible for flu vaccination and the COVID booster vaccination to take up the offer of the vaccines when invited\nDigital Self-Trace\t£91,700\t£109,953\tDigital Contact Tracing (DCT) service - build awareness of and confidence in the service and encourage the public to make use of DCT if they test positive for COVID.\nNIPs regs\t£17,194\t£23,539\tRaise awareness of the new Nicotine Inhaling Products (Age of Sale and Proxy Purchasing) Regulations and encourage public support and adherence.\nSmoking regs\t£78,178\t£149,003\tRaise awareness of the new Smoke-Free (Private Vehicles) regulations and encourage public support and adherence.\nWinter vaccines\t£118,044\t£186,848\tEncourage those eligible for flu vaccination and the COVID booster vaccination to take up the offer of the vaccines when invited.\nFAST\t£79,115\t£99,775\tCommunicate the signs and symptoms of stroke, using the FAST acronym and treat a stroke as a medical emergency and call 999 immediately\nOrgan donation\t£58,139\t£84,460\tEncourage the public to talk about their organ donation wishes with family and friends and increase registrations to the NHS Organ Donor Register.\nObesity\t£131,469\t£148,644\tRaise awareness of the health risks of being overweight/obese (type 2 diabetes, heart disease and some cancers) and encourage positive action to reduce weight among those who are overweight/obese.\nTotal\t\t£1,267,524","answerHtml":"<p>The public health information programmes promoted by the Public Health Agency, the associated expenditure, and reasons for undertaking those campaigns, are set out in the table below.</p><div class=\"table-wrap\"><table><tr><td>Campaign</td><td>Media (included in total campaign spend)</td><td>Total campaign spend 2025-26</td><td>Reason for undertaking the campaign</td></tr><tr><td>Mental health/Lifeline</td><td>£ 290,000</td><td>£350,000</td><td>Promote the Lifeline crisis helpline and increase help-seeking behaviour among those experiencing emotional distress.</td></tr><tr><td>Flu</td><td>£49,641</td><td>£69,652</td><td>To encourage those eligible for the free flu vaccine to take up the offer and get vaccinated asap</td></tr><tr><td>Total</td><td></td><td>£419,652</td><td></td></tr><tr><td></td><td></td><td></td><td></td></tr><tr><td>Campaign</td><td>Media (included in total campaign spend)</td><td>Total campaign spend 2024-25</td><td>Reason for undertaking the campaign</td></tr><tr><td>Mental health/Lifeline</td><td>£79,248</td><td>£99,617</td><td>Promote the Lifeline crisis helpline and increase help-seeking behaviour among those experiencing emotional distress.</td></tr><tr><td>Flu</td><td>£12,936</td><td>£19,923</td><td>Encourage those eligible for the flu vaccine to to take up the offer and get vaccinated asap</td></tr><tr><td>Total</td><td></td><td>£119,540</td><td></td></tr><tr><td></td><td></td><td></td><td></td></tr><tr><td>Campaign</td><td>Media (included in total campaign spend)</td><td>Total campaign spend 2023-24</td><td>Reason for undertaking the campaign</td></tr><tr><td>MMR vaccination</td><td>£49,204</td><td>£ 71,195</td><td>Promote and encourage uptake of the MMR vaccine</td></tr><tr><td>Organ donation</td><td>£153,600</td><td>£203,423</td><td>Inform the public about the change in organ donation law and inform them of their options on organ donation and how to register a decision</td></tr><tr><td>Total</td><td></td><td>£274,618</td><td></td></tr><tr><td></td><td></td><td></td><td></td></tr><tr><td>Campaign</td><td>Media (included in total campaign spend)</td><td>Total campaign spend 2022-23</td><td>Reason for undertaking the campaign</td></tr><tr><td>COVID vaccine</td><td>£27,937</td><td>£39,979</td><td>Promote and encourage uptake of the COVID vaccine.</td></tr><tr><td>Sexual health</td><td>£179,009</td><td>£262,777</td><td>Increase awareness of the risks associated with unprotected sex and encourage the target audience to think about and take action to look after their sexual health.</td></tr><tr><td>Winter vaccines</td><td>£157,456</td><td>£245,800</td><td>Promote and encourage uptake of the flu and COVID vaccines</td></tr><tr><td>Organ donation</td><td>£355,857</td><td>£599,119</td><td>Inform the public about the change in organ donation law and inform them of their options on organ donation and how to register a decision</td></tr><tr><td>Mental health</td><td>£105,635</td><td>£119,727</td><td>Encourage openness and discussion in relation to mental health problems and encourage anyone experiencing difficulties to seek help.</td></tr><tr><td>Lifeline</td><td>£181,341</td><td>£300,156</td><td>Promote the Lifeline crisis helpline and increase help-seeking behaviour among those experiencing emotional distress.</td></tr><tr><td>FAST</td><td>£103,777</td><td>£129,999</td><td>Communicate the signs and symptoms of stroke, using the FAST acronym and treat a stroke as a medical emergency and call 999 immediately</td></tr><tr><td>Total</td><td></td><td>£1,697,557</td><td></td></tr><tr><td></td><td></td><td></td><td></td></tr><tr><td>Campaign</td><td>Media (included in total campaign spend)</td><td>Total campaign spend 2021-22</td><td>Reason for undertaking the campaign</td></tr><tr><td>COVID surge enhanced testing</td><td>NIL</td><td>£ 13,627</td><td>Targeted mailout to homes in areas with COVID outbreaks to signpost to community vaccination pop-ups.</td></tr><tr><td>COVID vaccine (multiple campaigns)</td><td>£320,606</td><td>£451,675</td><td>Encourage those eligible for flu vaccination and the COVID booster vaccination to take up the offer of the vaccines when invited</td></tr><tr><td>Digital Self-Trace</td><td>£91,700</td><td>£109,953</td><td>Digital Contact Tracing (DCT) service - build awareness of and confidence in the service and encourage the public to make use of DCT if they test positive for COVID.</td></tr><tr><td>NIPs regs</td><td>£17,194</td><td>£23,539</td><td>Raise awareness of the new Nicotine Inhaling Products (Age of Sale and Proxy Purchasing) Regulations and encourage public support and adherence.</td></tr><tr><td>Smoking regs</td><td>£78,178</td><td>£149,003</td><td>Raise awareness of the new Smoke-Free (Private Vehicles) regulations and encourage public support and adherence.</td></tr><tr><td>Winter vaccines</td><td>£118,044</td><td>£186,848</td><td>Encourage those eligible for flu vaccination and the COVID booster vaccination to take up the offer of the vaccines when invited.</td></tr><tr><td>FAST</td><td>£79,115</td><td>£99,775</td><td>Communicate the signs and symptoms of stroke, using the FAST acronym and treat a stroke as a medical emergency and call 999 immediately</td></tr><tr><td>Organ donation</td><td>£58,139</td><td>£84,460</td><td>Encourage the public to talk about their organ donation wishes with family and friends and increase registrations to the NHS Organ Donor Register.</td></tr><tr><td>Obesity</td><td>£131,469</td><td>£148,644</td><td>Raise awareness of the health risks of being overweight/obese (type 2 diabetes, heart disease and some cancers) and encourage positive action to reduce weight among those who are overweight/obese.</td></tr><tr><td>Total</td><td></td><td>£1,267,524</td><td></td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2044325%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=480700","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=480700"}},{"id":"480499","reference":"AQW 44206/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-04-17","answerBy":"2026-05-05","answered":"2026-05-08","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities to detail (i) any engagement he has had with home heating oil suppliers and distributors to ensure there will be no price gouging, and that small loads can be delivered without price penalty; and (ii) whether he will promote the use of oil buying clubs.","answerText":"My Department is engaging with a range of stakeholders to inform the practical delivery of the home heating oil support scheme. This has included discussions with the Northern Ireland Oil Federation representing local oil distributors, National Energy Action, the Fuel Poverty Coalition, and the Consumer Council for Northern Ireland. Further engagement is planned throughout the process to help protect consumers against price gouging.\n\nThe Oil Savings Network, part of the NI Energy Advice Service, funded by my Department and delivered by the Housing Executive offers support and advice on purchasing oil. This scheme is open to all householders and further information can be found here: https://www.nihe.gov.uk/housing-help/ni-energy-advice/oil-savings-network. This scheme will be actively promoted as part of the launch of my Department’s Heating Oil Support Scheme.\n\nIn parallel, the NI Energy Advice Line, provides free and impartial advice on managing fuel costs, accessing support schemes, and making informed decisions about energy use, including options available to oil heated households.","answerHtml":"<p>My Department is engaging with a range of stakeholders to inform the practical delivery of the home heating oil support scheme. This has included discussions with the Northern Ireland Oil Federation representing local oil distributors, National Energy Action, the Fuel Poverty Coalition, and the Consumer Council for Northern Ireland. Further engagement is planned throughout the process to help protect consumers against price gouging.</p><p>The Oil Savings Network, part of the NI Energy Advice Service, funded by my Department and delivered by the Housing Executive offers support and advice on purchasing oil. This scheme is open to all householders and further information can be found here: https://www.nihe.gov.uk/housing-help/ni-energy-advice/oil-savings-network. This scheme will be actively promoted as part of the launch of my Department’s Heating Oil Support Scheme.</p><p>In parallel, the NI Energy Advice Line, provides free and impartial advice on managing fuel costs, accessing support schemes, and making informed decisions about energy use, including options available to oil heated households.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2044206%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=480499","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=480499"}},{"id":"480498","reference":"AQW 44205/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-04-17","answerBy":"2026-05-05","answered":"2026-05-08","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities to detail any steps he is taking to ensure that those in receipt of £100 home heating oil grants will get value for money when purchasing oil.","answerText":"My Department is engaging with a range of stakeholders to inform the practical delivery of the home heating oil support scheme. This has included discussions with the Northern Ireland Oil Federation representing local oil distributors, National Energy Action, the Fuel Poverty Coalition, and the Consumer Council for Northern Ireland. Further engagement is planned throughout the process to help consumers get value for money.\n\nThe Oil Savings Network, part of the NI Energy Advice Service, funded by my Department and delivered by the Housing Executive offers support and advice on purchasing oil. This scheme is open to all householders and further information can be found here: https://www.nihe.gov.uk/housing-help/ni-energy-advice/oil-savings-network. This scheme will be actively promoted as part of the launch of my Department’s Heating Oil Support Scheme.\n\nIn parallel, the NI Energy Advice Line, provides free and impartial advice on managing fuel costs, accessing support schemes, and making informed decisions about energy use, including options available to oil heated households.","answerHtml":"<p>My Department is engaging with a range of stakeholders to inform the practical delivery of the home heating oil support scheme. This has included discussions with the Northern Ireland Oil Federation representing local oil distributors, National Energy Action, the Fuel Poverty Coalition, and the Consumer Council for Northern Ireland. Further engagement is planned throughout the process to help consumers get value for money.</p><p>The Oil Savings Network, part of the NI Energy Advice Service, funded by my Department and delivered by the Housing Executive offers support and advice on purchasing oil. This scheme is open to all householders and further information can be found here: https://www.nihe.gov.uk/housing-help/ni-energy-advice/oil-savings-network. This scheme will be actively promoted as part of the launch of my Department’s Heating Oil Support Scheme.</p><p>In parallel, the NI Energy Advice Line, provides free and impartial advice on managing fuel costs, accessing support schemes, and making informed decisions about energy use, including options available to oil heated households.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2044205%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=480498","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=480498"}},{"id":"480497","reference":"AQW 44204/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-04-17","answerBy":"2026-05-05","answered":"2026-05-21","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister, since the publication of the High Street Taskforce Report in March 2022, to detail any action (i) taken by their office to deliver a 21st Century High Street; (ii) taken to deliver on the report, including areas of success and areas of failure; (iii) they plan to take to deliver on the report, given the current economic environment in our high streets.","answerText":"The High Street Task Force’s Report “Delivering a 21st Century High Street” was submitted to The Executive Office and published on 22 March 2022. Junior Ministers who chaired the Task Force publicly accepted the report. Since then, a number of the recommendations have been taken forward by Ministerial colleagues at the Department for Communities, Department for the Economy, Department of Finance, and Department for Infrastructure. Further detail can be sought from those departments.","answerHtml":"<p>The High Street Task Force’s Report “Delivering a 21st Century High Street” was submitted to The Executive Office and published on 22 March 2022. Junior Ministers who chaired the Task Force publicly accepted the report. Since then, a number of the recommendations have been taken forward by Ministerial colleagues at the Department for Communities, Department for the Economy, Department of Finance, and Department for Infrastructure. Further detail can be sought from those departments.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2044204%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=480497","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=480497"}},{"id":"479699","reference":"AQW 43841/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-04-14","answerBy":"2026-04-29","answered":"2026-04-29","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to detail (i) the reason why the recent road resurfacing work, at the junction of Old Carrick Road and Monkstown Road, Newtownabbey, failed to include a significant subsidence dip in the Monkstown Road, less than one meter from the end of the resurfacing work; and (ii) any action her Department will take to address this road issue.","answerText":"The resurfacing works at the Monkstown Road were targeted at improving the condition of the junction itself, where turning movements place the greatest stress on the carriageway surface, to provide the best overall improvement to the junction.\n\nMy officials have assessed the area around the tie-in point for the junction resurfacing scheme and advise that the minimal difference in level does not present a concern, and no further remedial works are required at this time.","answerHtml":"<p>The resurfacing works at the Monkstown Road were targeted at improving the condition of the junction itself, where turning movements place the greatest stress on the carriageway surface, to provide the best overall improvement to the junction.</p><p>My officials have assessed the area around the tie-in point for the junction resurfacing scheme and advise that the minimal difference in level does not present a concern, and no further remedial works are required at this time.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2043841%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=479699","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=479699"}},{"id":"479698","reference":"AQW 43840/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-04-14","answerBy":"2026-04-29","answered":"2026-04-22","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail the availability of scalp cooling for patients in receipt of certain types of chemotherapy, in each Health and Social Care Trust.","answerText":"Scalp cooling treatments are not currently commissioned within Health and Social Care in Northern Ireland, and are not part of the National Institute for Health and Care Excellence (NICE) recommended care pathway for managing hair loss during chemotherapy. The routine commissioning of this treatment can only be considered based on the long-term evidence of efficacy, available funding and the relative priority of this service in the context of other service development proposals and the overall financial position.\n\nMy Department’s position can be reviewed if new or updated NICE recommendations emerge that support scalp cooling for cancer patients.\n\nI remain committed to aligning our commissioning approach with the strongest available evidence and national guidance as it develops.","answerHtml":"<p>Scalp cooling treatments are not currently commissioned within Health and Social Care in Northern Ireland, and are not part of the National Institute for Health and Care Excellence (NICE) recommended care pathway for managing hair loss during chemotherapy. The routine commissioning of this treatment can only be considered based on the long-term evidence of efficacy, available funding and the relative priority of this service in the context of other service development proposals and the overall financial position.</p><p>My Department’s position can be reviewed if new or updated NICE recommendations emerge that support scalp cooling for cancer patients.</p><p>I remain committed to aligning our commissioning approach with the strongest available evidence and national guidance as it develops.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2043840%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=479698","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=479698"}},{"id":"479697","reference":"AQW 43839/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-04-14","answerBy":"2026-04-29","answered":"2026-04-29","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities to detail any (i) action he is taking to protect the closed FLAME Gasworks Museum in Carrickfergus, including ensuring that the building, equipment and artefacts are preserved; and (ii) plans his Department has to secure the future of the museum and reopen it to the public.","answerText":"My Department continues to fulfil its statutory responsibility to maintain Carrickfergus Gasworks State Care Monument.\n\nMid and East Antrim Borough Council have responsibility for the gas appliances and artefacts; they remain in situ at the Gasworks.\n\nThere are currently no plans to reopen the site to the public.","answerHtml":"<p>My Department continues to fulfil its statutory responsibility to maintain Carrickfergus Gasworks State Care Monument.</p><p>Mid and East Antrim Borough Council have responsibility for the gas appliances and artefacts; they remain in situ at the Gasworks.</p><p>There are currently no plans to reopen the site to the public.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2043839%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=479697","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=479697"}},{"id":"478685","reference":"AQW 43546/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-03-31","answerBy":"2026-04-17","answered":"2026-04-16","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister to detail (i) how the professional photographs taken during the St Patrick’s Day programme in Washington D.C. will be distributed and used; and (ii) any assurances that they will not be made available for personal or party political purposes.","answerText":"Photography is an essential part of government and ministerial communications. Photographs taken during a series of events to mark St Patrick’s Week in Washington D.C. were distributed via the department’s social media channels and to media via press releases. Once published, they are in the public domain.\n\nAs with all ministerial engagements, photographs taken during the series of events in Washington D.C. are held by the department and may be used for future communication purposes.","answerHtml":"<p>Photography is an essential part of government and ministerial communications. Photographs taken during a series of events to mark St Patrick’s Week in Washington D.C. were distributed via the department’s social media channels and to media via press releases. Once published, they are in the public domain.</p><p>As with all ministerial engagements, photographs taken during the series of events in Washington D.C. are held by the department and may be used for future communication purposes.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2043546%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=478685","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=478685"}},{"id":"478684","reference":"AQW 43545/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-03-31","answerBy":"2026-04-17","answered":"2026-04-16","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister to detail any public benefit derived from expenditure of almost £5,000 on professional photography during the St Patrick’s Day programme in Washington D.C.","answerText":"We were able to secure professional, press-quality images capturing the wide range of events attended by the deputy First Minister.","answerHtml":"<p>We were able to secure professional, press-quality images capturing the wide range of events attended by the deputy First Minister.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2043545%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=478684","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=478684"}},{"id":"480781","reference":"AQO 3437/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2026-03-26","answerBy":"2026-04-20","answered":"2026-04-20","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities for an update on the work of the Housing for All Ministerial Panel - Housing Thematic Sub-Group.","answerText":"The “Housing for All” Ministerial Panel Housing Thematic Sub-group is chaired by NIHE and acts as an advisory body to help guide the ‘Housing for All’ Shared Housing Programme.\n\nThe sub-group shares experience in delivery of shared communities and progress on good relations outcomes.\n\nThe latest meeting took place on Wednesday, 4 March 2026, and included:\n\nDiscussion of the Housing for All Shared Housing Programme for 2025/26, which incorporated six new developments across Northern Ireland.\n\nthe importance of connectivity between new and existing shared housing schemes, as well as the opportunities presented by developments in new locations, including Maghera and Craigavon.\n\nBusiness planning for 2026/27, including further development of shared housing and shared spaces in citycentre locations, and the continued evolution of Good Relations Plans.\n\nMembers received presentations on T:BUC and the Peace Builders Project, a planned good relations programme in South Belfast.","answerHtml":"<p>The “Housing for All” Ministerial Panel Housing Thematic Sub-group is chaired by NIHE and acts as an advisory body to help guide the ‘Housing for All’ Shared Housing Programme.</p><p>The sub-group shares experience in delivery of shared communities and progress on good relations outcomes.</p><p>The latest meeting took place on Wednesday, 4 March 2026, and included:</p><p>Discussion of the Housing for All Shared Housing Programme for 2025/26, which incorporated six new developments across Northern Ireland.</p><p>the importance of connectivity between new and existing shared housing schemes, as well as the opportunities presented by developments in new locations, including Maghera and Craigavon.</p><p>Business planning for 2026/27, including further development of shared housing and shared spaces in citycentre locations, and the continued evolution of Good Relations Plans.</p><p>Members received presentations on T:BUC and the Peace Builders Project, a planned good relations programme in South Belfast.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203437%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=480781","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=480781"}},{"id":"477825","reference":"AQO 3333/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2026-03-12","answerBy":"2026-03-23","answered":"2026-03-25","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education, given that the feasibility review for the Carrickfergus Academy new build concluded in November 2025, to outline when the business case is expected to be complete.","answerText":"It is anticipated that drafting of the Business Case will be completed by the end of March 2026.\n\nThe Business Case will then be reviewed by Departmental economists before being issued to the Department of Finance for consideration.\n\nIt is anticipated that a decision on the Business Case will be issued in Summer 2026.","answerHtml":"<p>It is anticipated that drafting of the Business Case will be completed by the end of March 2026.</p><p>The Business Case will then be reviewed by Departmental economists before being issued to the Department of Finance for consideration.</p><p>It is anticipated that a decision on the Business Case will be issued in Summer 2026.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203333%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=477825","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=477825"}},{"id":"474868","reference":"AQO 3313/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2026-03-05","answerBy":"2026-03-16","answered":"2026-03-16","answeredOrally":true,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance for an update on his engagement with hospitality businesses in relation to the methodology used to calculate their rates.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr O'Dowd (The Minister of Finance)","text":"With your permission, a LeasCheann Comhairle,"},{"speaker":"","text":"I will answer questions 1, 6 and 10 together. On 29 January 2026, I outlined my decision to stop further work on the Reval2026 process. In my meeting with the hospitality sector on 29 January, I advised that I was looking forward to engaging with the hospitality sector and other sectors on any proposals that would be brought forward. My immediate focus over the past few weeks has been on advancing the legislation required to facilitate the annual billing exercise for the rating system. Alongside that, I am focused on progressing the draft multi-year Budget, following the close of that consultation earlier this month. As I outlined in the regional rates debate in the House on 10 March, rates bills will issue this year that are based on rateable values in the current valuation list, creating certainty for businesses in respect of their 2026-27 rates bills. I will address the next steps for Reval2026 in due course."},{"speaker":"Mr Brett","text":"I thank the Minister for his update, and I understand that he has a busy in tray at present. Is it his view, then, that he will have a final proposal for Reval2027 or whatever we are going to call it in 2027, because nothing will be published in the remainder of this calendar year?"},{"speaker":"Mr O'Dowd","text":"It is unlikely that anything will be published in the remainder of this calendar year. We will decide our next move in discussions with all sectors, whether that will be Reval2027 or Reval2028. However, it was right to stop, engage and then decide on a way forward."},{"speaker":"Mr K Buchanan","text":"Minister, in your statement on 29 January, you said:"},{"speaker":"","text":"How can a business thrive when its proposed net asset value (NAV) jumps from £66,000 to £119,000?"},{"speaker":"Mr O'Dowd","text":"I cannot comment on any individual business. However, a significant increase in Reval suggests that there was a significant physical extension to the business, a change in the business model where different services were provided or an increase in income for that business. Those are the usual projections. Furthermore, all businesses had the benefit of the COVID moneys removed. There was a significant leap upwards for many businesses in those circumstances, but other businesses will have seen reductions. The Member will be aware that those who focused solely on the hospitality sector now want to focus on other sectors. I currently face pre-action letters from at least one sector that has concerns that, having benefited from Reval2026, it is now losing out as a result of it. It is not a simple as concentrating on one premises or one sector; it is a multifaceted equation. As I said to your colleague, the best way forward was to stop the process, take time to engage and then move forward."},{"speaker":"Mr Dickson","text":"Thank you for your answer, Minister. You stated previously that you had asked the hospitality industry to bring forward evidence to make the case for a change in methodology. When do you expect that evidence to come forward, and how long will it take you and your officials to review the evidence in order to ensure that changes can be made?"},{"speaker":"Mr O'Dowd","text":"The hospitality sector offered to bring evidence to me. I welcome the opportunity to engage with the sector on that evidence when it is presented. The detail of that evidence and the need for discussion around it will dictate how long it will be before I can evaluate it."},{"speaker":"Miss Hargey","text":"Minister, will you outline what current supports there are in the rating system for local businesses and what supports you plan to bring forward?"},{"speaker":"Mr O'Dowd","text":"We currently provide our business sector with around a quarter of a billion pounds' worth of support. Across the whole tax base, 75% of non-domestic properties are currently entitled to some form of rate relief. The current small business rate relief scheme supports almost 30,000 businesses with discounts of between 20% and 50% on their rates. I proposed in my draft Budget a fund of around £10 million to increase support further for the small business sector, which will include the hospitality sector and others."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203313%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=474868","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2026-03-16&docID=475858#AQO%203313/22-27","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=474868"}},{"id":"473516","reference":"AQO 3251/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2026-02-26","answerBy":"2026-03-09","answered":"2026-03-09","answeredOrally":true,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs to outline the benefits of recycling for the local economy.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr Muir","text":"Recycling offers many benefits to our local economy. It supports our circular economy, keeps materials in use, reduces reliance on raw virgin materials and provides opportunities for companies to handle, process and reuse materials. However, those recycling benefits can only be realised if we accept that the quality of the recyclate is as important as the quantity, and quality relies on reducing contamination through the separate collection of some core materials. Good-quality recyclate can be reprocessed locally, keeping economic value in Northern Ireland. The high level of waste exports makes our waste someone else's problem and goes against the principles of proximity and self-sufficiency, whilst also undermining our efforts to reduce our carbon footprint. It also represents lost economic opportunities for Northern Ireland. My Department's previous consultation on recycling and waste collection reforms included proposals on driving down the volume of residual waste and improving both the quality and quantity of material being collected for recycling. As Minister, I continue to seek support from my Executive colleagues for the publication of the departmental response, which would provide the clarity that councils and businesses are asking for as they proceed to make investment decisions and align with our ambitions to boost the local reprocessing industry, create new local job opportunities and enhance our local circular economy."},{"speaker":"Mr Dickson","text":"Thank you, Minister, for your answer. You are right: the quality of recycling material is important, and it is important that we boost that across all our local authorities. Can the Minister tell the House when we will receive guidance for our local authorities?"},{"speaker":"Mr Muir","text":"I sent an Executive paper to my colleagues last summer, and I continue to engage with them so that I can publish that. There is a real need for us to build on our success in recycling. That has plateaued in recent years, but we are sitting at around 50% in terms of households. That is a real achievement, but there is more that we can do. I seek to issue guidance to councils on recycling. For example, in Ards and North Down, paper, card and plastic are collected in one bin and there is a separate kerbside glass collection. That delivers good-quality recycling and a good quantity. That is the kind of thing that I am looking at when it comes to giving guidance to councils. It is guidance, so they can decide what they want to do, but it is important that the Department issues guidance on this. We need to take cognisance of the fact that commingling glass, paper and card can reduce the quality of recycling. In addition, councils in Northern Ireland are receiving approximately £50 million in additional funding through the extended producer responsibility scheme and are supported through the DAERA household waste recycling collaborative change programme. It is important that they are able to use that funding to increase the quality and quantity of recycling. It is also important that we are conscious that the average residual waste collected by councils contains approximately 28% food waste, 10% garden waste and 18% dry recycling. There is more that we can do so that people are aware of what should and should not go into residual waste. Alongside that, businesses should be doing the same as households, and I am seeking to give guidance on that."},{"speaker":"Mr Buckley","text":"Minister, if there is one thing that our constituents and, indeed, local ratepayers do not want, it is further interference from central government in their bin collections, which are already suboptimal in many locations. Do you accept that many councils are doing a fine job in setting recycling targets for waste that commingles? I name Armagh City, Banbridge and Craigavon Borough Council as an example."},{"speaker":"Mr Muir","text":"When it comes to the performance and delivery of any council, it is for councillors to hold their officials to account. In Northern Ireland, we have legal targets for recycling. It is important that we meet those targets. We are also conscious of the issues. The issues of residual waste and shipping that away and the problems that that has been causing for residents in areas such as Warrenpoint are raised with me in the Chamber regularly. It is important that we address that. In addition, we have the £50 million of additional money that is coming through councils to help them to improve their recycling infrastructure. As I have set out, it is not just about quantity but about quality. If waste is commingling, there is an issue there with the quality of the recyclate. I speak with businesses in Northern Ireland, such as Enva and Encirc, that would like to be able to use the glass that is being recycled by our households and to have that in the circular economy. However, with that commingling, the quality of the recovery is reduced."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203251%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=473516","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2026-03-09&docID=474547#AQO%203251/22-27","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=473516"}},{"id":"473499","reference":"AQO 3234/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2026-02-26","answerBy":"2026-03-09","answered":"2026-03-09","answeredOrally":true,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice for an update on the Speeding up Justice programme.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mrs Long","text":"The speeding up justice programme is a five-year programme of work driven by the Criminal Justice Board and aimed at reducing avoidable delay across the criminal justice system. The programme is part of the Executive's Programme for Government delivery, specifically with regard to the safer communities priority and underpinned by the reform and transformation of public services priority. The programme comprises five projects: out-of-court disposals; early engagement; committal reform; remit of the Magistrates' Court; and digital. The early engagement and out-of-court disposals projects are supported by £20·5 million of transformation funding. Work on out-of-court disposals is advancing at pace, and I hope to bring forward secondary legislation on that in the coming months that should see expanded powers for police officers to deal with lower-level offences by way of penalty notices. That will help to divert cases that involve lower-level offending away from prosecution through the courts, where they are currently attracting only monetary fines, and ensure that finite criminal justice resources are used effectively. Building on the first phase of committal reform, work is progressing on the next phase — direct committal — which I plan to implement in November 2026. That will allow the most-serious cases to progress more quickly to Crown Court. That is supported by early engagement, which is exploring opportunities for early engagement between police, prosecution and defence so that cases move faster through the system. Work is progressing on a number of initiatives, including measures to improve file quality and taking learning from the better case management processes used in England and Wales. I am progressing work on the remit of the Magistrates' Court project, which is exploring options to expand the jurisdiction of Magistrates' Courts, enabling cases to be handled in a more proportionate manner and helping to reduce backlogs in the court system. All the projects will be supported by digital initiatives, which can help to make the projects more sustainable in the long term. Taken collectively, the programme should rebalance resources, where lower-level offending will be dealt with outside formal court processes, releasing much-needed resources to deal with the most serious offending."},{"speaker":"Mr Dickson","text":"Thank you, Minister, for your answer. Since coming to the Assembly, I have taken a great deal of interest in the speeding up justice programme. Will you provide more detail on the out-of-court disposal work that you and your Department are doing?"},{"speaker":"Mrs Long","text":"Out-of-court disposals are part of the Programme for Government commitment and are central to tackling delay in the criminal justice system, which is under significant pressure due to years of underfunding. Out-of-court disposals have been recognised by Lord Leveson as a central measure to reduce demand on the criminal courts, and stabilise the system, which is at risk of collapse, offering a far faster and more proportionate and cost-effective response to lower-level offending whilst improving victim satisfaction and creating opportunities for early rehabilitation. Out-of-court disposals are long-standing and essential tools to help to divert appropriate cases that involve low-level offending away from prosecution through the courts and ensure that resources are used well. To deal most swiftly with serious cases that are heard in the Crown Court, including murders, serious sexual offence cases and others, we need to create capacity across the system and free up police, prosecutors and courts. It will be vital, therefore, that cases are dealt with proportionately, prosecuted at the right court tier or, if appropriate, dealt with through out-of-court disposal. The measures are not about leniency. They are about delivering the same outcomes but through a shorter measure. Most of the cases that we are talking about for out-of-court disposal will be those that would receive similar outcomes — that is, a monetary penalty — when they go through the courts. In order to get to that point, however, much more resource will have been used by police, prosecutors and the courts. It is important that we are able to get out-of-court disposals progressed because that will, ultimately, underpin much of the rest of the work that we do, and it is our justification for the application and bid to the transformation fund."},{"speaker":"Ms Ferguson","text":"I welcome the five strands of speeding up justice. Will the Minister throw some light on the £20·5 million transformation money received and what impact that is having to date?"},{"speaker":"Mrs Long","text":"Significant progress has already been made, but we are in a difficult position because the withdrawal of the Criminal Bar Association (CBA) from cases has been, if you like, acting contrary to our intentions. However, we have been looking carefully and, of course, there is much more to be done. We made a 7·8% reduction in case-processing times across 2023-24 and another 0·5% across 2024-25. That is something positive that we have been able to deliver. The Criminal Justice Board is also giving careful consideration to the development of formal targets for reducing delay so that we can provide those measurables. A range of options has been explored to determine how system-wide targets can be approached and derived. Defining what measures we should monitor is straightforward, but agreeing what meaningful targets look like is less straightforward, so we are still working on that. In line with the public transformation board funding, a range of action-based targets has been set. At present, as I said, we are focusing on the development of out-of-court disposals. After that, we will look at the Magistrates' Court and then at some of the other measures that I mentioned earlier."},{"speaker":"Mr McGlone","text":"Minister, the speeding up justice programme will increase the number of cases being dealt with, but can you give an assurance that it will not diminish the quality of justice that people receive?"},{"speaker":"Mrs Long","text":"I give that assurance. We are looking at particular cohorts of cases for which, at the moment, the normal, most likely penalty would be monetary. Allowing the PSNI to deliver that as a penalty notice rather than have to go through the courts and prosecutors in order to get, in essence, the same outcome will free up significant resources. Lord Leveson's study demonstrated that the public were happier because they saw justice being delivered more swiftly. That also allows for additional rehabilitation opportunities for the individual and ensures that, if somebody already has a penalty notice, they cannot benefit from a second one. If somebody reoffends in short measure, they will end up going through the courts. Crucially, if they do not reoffend, we can keep them out of the justice system and, hopefully, avoid problems that we might otherwise have with desistance. The key for me is the outcomes and the satisfaction of victims. In many cases where it takes a long time for the courts to get to the point of giving out a monetary penalty, that seems to be unsatisfactory."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203234%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=473499","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2026-03-09&docID=474547#AQO%203234/22-27","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=473499"}},{"id":"472456","reference":"AQW 41103/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-02-20","answerBy":"2026-03-09","answered":"2026-03-02","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister, pursuant to AQO 2931/22-27, whether stronger arrangements used in local government, requiring members to leave the room where conflicts arise, have been considered.","answerText":"The member is referred to the answer for AQW 41102/22-27.","answerHtml":"<p>The member is referred to the answer for AQW 41102/22-27.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2041103%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=472456","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=472456"}},{"id":"472455","reference":"AQW 41102/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-02-20","answerBy":"2026-03-09","answered":"2026-03-02","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister, pursuant to AQO 2931/22-27, whether the Executive Office plans to review guidance on ministerial conflicts of interest, to strengthen public confidence.","answerText":"Relevant guidance is kept under regular review as to its continuing effectiveness.","answerHtml":"<p>Relevant guidance is kept under regular review as to its continuing effectiveness.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2041102%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=472455","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=472455"}},{"id":"472454","reference":"AQW 41101/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-02-20","answerBy":"2026-03-09","answered":"2026-03-02","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister, pursuant to AQW 36484/22-27,  to detail any organisations in East Antrim involved.","answerText":"Pursuant to the answer provided for AQW 36484/22-27, organisations that have been involved in projects to address issues around racial and social cohesion in East Antrim are Larne YMCA and the Inter-Ethnic Forum.","answerHtml":"<p>Pursuant to the answer provided for AQW 36484/22-27, organisations that have been involved in projects to address issues around racial and social cohesion in East Antrim are Larne YMCA and the Inter-Ethnic Forum.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2041101%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=472454","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=472454"}},{"id":"474140","reference":"AQO 3224/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2026-02-19","answerBy":"2026-03-03","answered":"2026-03-03","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure, in light of the relocation of Islandmagee Primary School on the Low Road, whether the part-time 20mph speed limit will be applied at the new school location.","answerText":"Road safety is a high priority for my Department, and we are committed to working proactively to make our roads safer and to address the needs of all road users. We are acutely aware that children and young people are amongst the most vulnerable groups using our roads, particularly around schools.\n\nThe introduction of part-time 20mph zones at schools across the north is a significant intervention that has helped to ensure that children, parents and staff feel safer as they travel to and from school on a daily basis and in recognition of this intervention I announced a third tranche of 40 schools bringing the total delivered since 2020/21 to 273 schools.\n\nThis tranche focused on rural schools that are located on roads where the national speed limit applies however I am aware that there are schools in urban and residential areas that would benefit from a reduction in the speed limit, and I am currently undertaking a consultation on Speed Limits which includes the introduction of permanent 20mph zones.\n\nIslandmagee Primary School previously benefitted from a 20mph zone due to its location on a road where the national speed limit applied, however its relocation within a 30mph speed limit means that it does not meet the current criteria for inclusion in this third tranche.\n\nFurther consideration on the use of permanent 20mph zones will be taken on completion of the consultation.","answerHtml":"<p>Road safety is a high priority for my Department, and we are committed to working proactively to make our roads safer and to address the needs of all road users. We are acutely aware that children and young people are amongst the most vulnerable groups using our roads, particularly around schools.</p><p>The introduction of part-time 20mph zones at schools across the north is a significant intervention that has helped to ensure that children, parents and staff feel safer as they travel to and from school on a daily basis and in recognition of this intervention I announced a third tranche of 40 schools bringing the total delivered since 2020/21 to 273 schools.</p><p>This tranche focused on rural schools that are located on roads where the national speed limit applies however I am aware that there are schools in urban and residential areas that would benefit from a reduction in the speed limit, and I am currently undertaking a consultation on Speed Limits which includes the introduction of permanent 20mph zones.</p><p>Islandmagee Primary School previously benefitted from a 20mph zone due to its location on a road where the national speed limit applied, however its relocation within a 30mph speed limit means that it does not meet the current criteria for inclusion in this third tranche.</p><p>Further consideration on the use of permanent 20mph zones will be taken on completion of the consultation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203224%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=474140","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=474140"}},{"id":"474302","reference":"AQO 3211/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2026-02-19","answerBy":"2026-03-02","answered":"2026-03-02","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health when his Department will publish further details on the funding and implementation of hybrid closed loop systems for managing blood glucose in type 1 diabetes.","answerText":"The National Institute for Health and Care Excellence TA943 - Hybrid closed loop systems for managing blood glucose levels in Type 1 diabetes, has been endorsed as applicable to Northern Ireland.\n\nSubsequently, I supported the establishment of a clinical working group to work with relevant stakeholders across Health and Social Care to develop a five-year implementation plan, outlining an appropriate timescale for rollout.\n\nSimilar to other nations, service delivery will be phased over a 5-year period in response to the guidance, owing to the scale and scope of this recommendation.\n\nWork has been completed in terms of overall provision; priority groups; system costs; workforce and communication requirements, to both enable and support.\n\nThe Regional Insulin Pump service, led by Belfast Trust, in partnership with remaining Trusts, will deliver this plan, as a service development. £1.839m of funding annually has been secured to support implementation of this plan, with the final stages of commissioning to be completed in the coming weeks.\n\nFunding is required for devices, in addition to upskilling and recruiting the workforce needed to offer Hybrid Closed Loop safely, effectively and equitably across the region.\n\nThe implementation plan is in the final stages of drafting and will support equitable, sustainable and affordable access to this technology, which is targeted to optimise outcomes for those groups most likely to benefit.\n\nIn line with NICE guidance, this includes a process of prioritisation and recommended eligibility criteria. However, the most appropriate system for each individual is the responsibility of the Trust and their clinicians to determine, in consultation with the patient and/or the patient’s carer.\n\nOnce finalised, information will be communicated to all stakeholders in due course.","answerHtml":"<p>The National Institute for Health and Care Excellence TA943 - Hybrid closed loop systems for managing blood glucose levels in Type 1 diabetes, has been endorsed as applicable to Northern Ireland.</p><p>Subsequently, I supported the establishment of a clinical working group to work with relevant stakeholders across Health and Social Care to develop a five-year implementation plan, outlining an appropriate timescale for rollout.</p><p>Similar to other nations, service delivery will be phased over a 5-year period in response to the guidance, owing to the scale and scope of this recommendation.</p><p>Work has been completed in terms of overall provision; priority groups; system costs; workforce and communication requirements, to both enable and support.</p><p>The Regional Insulin Pump service, led by Belfast Trust, in partnership with remaining Trusts, will deliver this plan, as a service development. £1.839m of funding annually has been secured to support implementation of this plan, with the final stages of commissioning to be completed in the coming weeks.</p><p>Funding is required for devices, in addition to upskilling and recruiting the workforce needed to offer Hybrid Closed Loop safely, effectively and equitably across the region.</p><p>The implementation plan is in the final stages of drafting and will support equitable, sustainable and affordable access to this technology, which is targeted to optimise outcomes for those groups most likely to benefit.</p><p>In line with NICE guidance, this includes a process of prioritisation and recommended eligibility criteria. However, the most appropriate system for each individual is the responsibility of the Trust and their clinicians to determine, in consultation with the patient and/or the patient’s carer.</p><p>Once finalised, information will be communicated to all stakeholders in due course.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203211%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=474302","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=474302"}},{"id":"469858","reference":"AQW 39889/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-02-05","answerBy":"2026-02-20","answered":"2026-02-20","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail (i) any urgent actions he is taking to address delays in GP-delivered childhood vaccinations; and (ii) the number of children whose routine vaccinations are overdue.","answerText":"Childhood vaccinations are provided by GPs to children registered with their practice. There have been several recent changes in the childhood vaccination schedule, and information has been provided to inform GPs and their practice teams about the new schedule, including through on-line training, and via workshops.\n\nChildhood vaccinations are currently recorded on the Child Health System (CHS), which is also used to schedule vaccination appointments. The Public Health Agency, CHS, and the Strategic Planning and Performance Group have all engaged with GP practices to help improve understanding of the system.\n\nIn addition, work to replace CHS through Encompass is ongoing. This will streamline and digitalise processes relating to how children are called and scheduled for routine immunisations.\n\nThere can be many reasons for children being overdue for vaccination, including varying numbers of children becoming eligible for each vaccine each week, practice capacity to match that demand, and children not being brought for vaccination appointments.\n\nPractices are regularly informed by CHS about children who are overdue, and practice level teams can look at those variable reasons to consider either how their vaccinations are scheduled or whether to engage with parents.\n\nMy Department does not hold a list of children who are overdue for vaccination. I would encourage any parent who is concerned that their child maybe overdue a vaccination to contact their GP practice to make the appropriate arrangements.","answerHtml":"<p>Childhood vaccinations are provided by GPs to children registered with their practice. There have been several recent changes in the childhood vaccination schedule, and information has been provided to inform GPs and their practice teams about the new schedule, including through on-line training, and via workshops.</p><p>Childhood vaccinations are currently recorded on the Child Health System (CHS), which is also used to schedule vaccination appointments. The Public Health Agency, CHS, and the Strategic Planning and Performance Group have all engaged with GP practices to help improve understanding of the system.</p><p>In addition, work to replace CHS through Encompass is ongoing. This will streamline and digitalise processes relating to how children are called and scheduled for routine immunisations.</p><p>There can be many reasons for children being overdue for vaccination, including varying numbers of children becoming eligible for each vaccine each week, practice capacity to match that demand, and children not being brought for vaccination appointments.</p><p>Practices are regularly informed by CHS about children who are overdue, and practice level teams can look at those variable reasons to consider either how their vaccinations are scheduled or whether to engage with parents.</p><p>My Department does not hold a list of children who are overdue for vaccination. I would encourage any parent who is concerned that their child maybe overdue a vaccination to contact their GP practice to make the appropriate arrangements.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2039889%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=469858","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=469858"}},{"id":"470342","reference":"AQO 3078/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2026-01-29","answerBy":"2026-02-09","answered":"2026-02-09","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to outline any assessment that has been made of the recent storm damage to the sea walls along the Carrickfergus coastline at Rhanbuoy Park.","answerText":"My officials initially assessed the damage to the sea wall, at Rhanbuoy Park, immediately following Storm Bram, which occurred on Tuesday 9 December 2025.\n\nTemporary measures were put in place to ensure public safety and mitigate against future flooding, until permanent repairs can be completed.\n\nAs you will appreciate work of this nature is susceptible to the elements; therefore, repairs will be scheduled during more amenable weather conditions.\n\nOfficials continue to carry out ad-hoc inspections at this location, especially following adverse weather events and can advise that no reported incidents were received as a result of Storm Chandra.","answerHtml":"<p>My officials initially assessed the damage to the sea wall, at Rhanbuoy Park, immediately following Storm Bram, which occurred on Tuesday 9 December 2025.</p><p>Temporary measures were put in place to ensure public safety and mitigate against future flooding, until permanent repairs can be completed.</p><p>As you will appreciate work of this nature is susceptible to the elements; therefore, repairs will be scheduled during more amenable weather conditions.</p><p>Officials continue to carry out ad-hoc inspections at this location, especially following adverse weather events and can advise that no reported incidents were received as a result of Storm Chandra.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203078%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=470342","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=470342"}},{"id":"468185","reference":"AQW 39167/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-01-27","answerBy":"2026-02-11","answered":"2026-02-11","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure whether the responsibility for the maintenance of the footpath on the Islandmagee Road, Whitehead, opposite Whitehead Primary School, rests with her Department or Mid and East Antrim Borough Council.","answerText":"I can confirm that the responsibility for maintenance of the footpath at the location specified rests with my Department.","answerHtml":"<p>I can confirm that the responsibility for maintenance of the footpath at the location specified rests with my Department.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2039167%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=468185","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=468185"}},{"id":"467435","reference":"AQO 3040/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2026-01-22","answerBy":"2026-02-03","answered":"2026-02-03","answeredOrally":true,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance how his Department ensures a consistent approach to social value in the public sector.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr O'Dowd","text":"Mr Speaker, may I have an extra minute to answer the question?"},{"speaker":"Mr Speaker","text":"Certainly."},{"speaker":"Mr O'Dowd","text":"The procurement policy note (PPN) 01/21 on social value in procurement was revised in February 2025 following reviews by the Strategic Investment Board (SIB) and key stakeholders, including the voluntary, community and social enterprise sectors, Departments and centres of procurement expertise (COPEs). The reviews identified the policy as having made a real difference to how contractors incorporate social value into their business models. However, they also identified some unintended consequences for small and microbusinesses that were finding it more difficult to compete with larger companies for contracts where social value was a scored criterion. Key changes were made to remove barriers for those businesses. The policy ensures a consistent approach to social value in the public sector and mandates that, for services contracts above £500,000 and work contracts over the UK threshold, at least 10% of the total award criteria must be allocated to social value. The PPN further outlines requirements to incorporate social value in procurements under four themes: increasing secure employment and skills; building ethical and resilient supply chains; delivering climate action; and promoting well-being. To help maintain consistency in the scoring of social value, model criteria have been developed. That consistency also helps with reporting social value outcomes, which are monitored through the SIB portal. The social value procurement policy also requires Departments to develop a social value strategy to align social value objectives with their procurement pipelines and to look for other opportunities across their operational and policy responsibilities to improve social and economic outcomes. My Department is the first to publish its social value strategy and recently published its first progress report on the implementation of that strategy. The public procurement policy statement (PPPS) published in June 2025 sets out the Executive's priorities for a more streamlined, simplified and accessible procurement environment. It has four principles, including social value. The social value principle has six objectives, each of which is accompanied by a specific action and descriptor to ensure clarity and consistency in the delivery of the objectives."},{"speaker":"Mr Dickson","text":"Thank you, Minister, for your comprehensive response; it is greatly valued. Do you agree that, in the absence of a statutory duty on public authorities to consider social value in their spending decisions, the current policy-based approach risks inconsistency and could be changed at ministerial direction? Will you consider supporting legislation that would place such a duty alongside a duty on your Department to provide guidance and training on a statutory footing?"},{"speaker":"Mr O'Dowd","text":"The Member will have heard me set out the comprehensive criteria that are used. As a result of the work that has been carried out, there has been success not only in my Department, with its role in procurement, but in other Departments. We are seeing success. As legislators, we will say that legislation has its uses, but it is not always necessary. If evidence is produced that statute is the best way forward, I will be more than happy to look at it."},{"speaker":"Miss Hargey","text":"Minister, you highlighted some of the challenges regarding social value in procurement in the PPN. Will you highlight some of the opportunities and benefits?"},{"speaker":"Mr O'Dowd","text":"Policies and strategies have their value, but, unless they deliver, they are just documentation. In this instance, over 7,200 people who were long-term unemployed or disadvantaged in the labour market have gained employment and over 370 social enterprises have been part of the supply chain in public-sector contracts. There have been over 11,700 hours of volunteering with the voluntary and community and social enterprise sectors, 27,700 hours of health and well-being initiatives and 2,600 hours of digital inclusion initiatives, and almost 700 environmental action plans have been delivered. It is making a significant difference in our society."},{"speaker":"Mr Harvey","text":"The voluntary and community sector in Northern Ireland delivers huge social value through excellent front-line services in the hearts of our communities. Has the Finance Minister an assessment of how much value that sector delivers in Northern Ireland?"},{"speaker":"Mr O'Dowd","text":"I do not have an assessment in front of me, but the voluntary and community sector has proven its worth time and time again; indeed, I will meet the sector again tomorrow in relation to the local growth fund and the challenges that that will bring. I think that all Members can agree that the voluntary and community sector makes a huge difference across our communities."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203040%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=467435","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2026-02-03&docID=468376#AQO%203040/22-27","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=467435"}},{"id":"466437","reference":"AQW 38307/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-01-15","answerBy":"2026-01-30","answered":"2026-02-10","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health whether his Department, or any of its agencies, will be represented either in person or online at the European Cancer Screening and Early Detection Policy Summit for Newly Implementable Programmes for Prostate, Lung, and Gastric Cancer Screening, in Brussels on 17 and 18 February 2026.","answerText":"My Department or the Public Health Agency have not been invited to attend this event.\n\nScreening policy across the UK is informed by the recommendations of the UK National Screening Committee (UK NSC), an independent committee which advises the four UK health Departments on screening matters. My Department will continue to be guided by the UK NSC’s recommendations on proposals for screening programmes.","answerHtml":"<p>My Department or the Public Health Agency have not been invited to attend this event.</p><p>Screening policy across the UK is informed by the recommendations of the UK National Screening Committee (UK NSC), an independent committee which advises the four UK health Departments on screening matters. My Department will continue to be guided by the UK NSC’s recommendations on proposals for screening programmes.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2038307%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=466437","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=466437"}},{"id":"466068","reference":"AQW 38086/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-01-13","answerBy":"2026-01-28","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail how dialysis patients avail of reimbursement costs of dialysis on a cruise with an approved supplier, similar to patients who receive reimbursement in Scotland, England and Wales.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2038086%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=466068","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=466068"}},{"id":"466067","reference":"AQW 38085/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-01-13","answerBy":"2026-01-28","answered":"2026-03-04","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail how dialysis patients, who wish to travel to the Republic of Ireland, arrange dialysis treatment.","answerText":"The Belfast Trust have a dialysis co-ordinator who assists patients to make arrangement for dialysis if they travel to the Republic of Ireland. They often direct patients and their families to Irish Kidney Association or Freedom, dialysis holiday specialists who can help identify suitable units close to holiday venue and assist in arranging holiday dialysis.\n\nThe dialysis coordinator can assist patients in making arrangements with that particular centre once they have their dates and destinations planned. They will normally reach out to the team in the destination centre to discuss the patient, what their medical needs are and share their current dialysis therapy plan to ensure the centre can accommodate the safe delivery of dialysis.","answerHtml":"<p>The Belfast Trust have a dialysis co-ordinator who assists patients to make arrangement for dialysis if they travel to the Republic of Ireland. They often direct patients and their families to Irish Kidney Association or Freedom, dialysis holiday specialists who can help identify suitable units close to holiday venue and assist in arranging holiday dialysis.</p><p>The dialysis coordinator can assist patients in making arrangements with that particular centre once they have their dates and destinations planned. They will normally reach out to the team in the destination centre to discuss the patient, what their medical needs are and share their current dialysis therapy plan to ensure the centre can accommodate the safe delivery of dialysis.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2038085%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=466067","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=466067"}},{"id":"465337","reference":"AQW 37775/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-01-08","answerBy":"2026-01-23","answered":"2026-01-23","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to detail the reasons for the reported shortages of salt and gritting resources in Mid and East Antrim Borough Council, due to supply issues with her Department, including (i) the nature and duration of the supply issues; (ii) any contingency arrangements that were in place; and (iii) any steps being taken to prevent a recurrence.","answerText":"The Department provides gritting salt under existing agreements with a number of councils, for the removal of snow and ice from town centre footways and pedestrian areas. These agreements are activated during prolonged periods of severe weather.\n\nPriority is given to the provision of salt for the treatment of the gritted road network, after which the Department makes salt available to local Councils for the treatment of town centre footways and pedestrian areas. There are currently no issues impacting this supply of salt.\n\nThis agreement is for salt supplies in addition to stocks held by Councils for the treatment of council facilities.","answerHtml":"<p>The Department provides gritting salt under existing agreements with a number of councils, for the removal of snow and ice from town centre footways and pedestrian areas. These agreements are activated during prolonged periods of severe weather.</p><p>Priority is given to the provision of salt for the treatment of the gritted road network, after which the Department makes salt available to local Councils for the treatment of town centre footways and pedestrian areas. There are currently no issues impacting this supply of salt.</p><p>This agreement is for salt supplies in addition to stocks held by Councils for the treatment of council facilities.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2037775%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=465337","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=465337"}},{"id":"465336","reference":"AQW 37774/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2026-01-08","answerBy":"2026-01-23","answered":"2026-01-23","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to detail when the rock face cladding at the sea defences wall on the Belfast Road dual carriageway, Carrickfergus, will be replaced.","answerText":"My officials have confirmed that the cladding to the sea wall along the Belfast Road, Carrickfergus is not a structural issue and at present, due to other high priority work, my Department has no plans to replace it. While there are many areas that would benefit from investment, due to limited budget resources, maintenance work is taken forward through the prioritisation of that deemed most in need for intervention.","answerHtml":"<p>My officials have confirmed that the cladding to the sea wall along the Belfast Road, Carrickfergus is not a structural issue and at present, due to other high priority work, my Department has no plans to replace it. While there are many areas that would benefit from investment, due to limited budget resources, maintenance work is taken forward through the prioritisation of that deemed most in need for intervention.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2037774%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=465336","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=465336"}},{"id":"472321","reference":"AQO 2931/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2026-01-08","answerBy":"2026-01-19","answered":"2026-02-19","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister, further to media reports, to outline why their Department does not hold information in relation to whether or not the deputy First Minister recused herself from discussions on finances relating to the Education Authority.","answerText":"Ministers are not required to recuse themselves from discussion, and as such there is no recorded information in relation to recusals. Ministers are required to declare an interest where they are proposing or supporting an action which is likely to, or perceived to, have a direct benefit to themselves or to another person or organisation with whom they have a close personal relationship or interest. Such an interest was declared by the deputy First Minister in relation to these circumstances.","answerHtml":"<p>Ministers are not required to recuse themselves from discussion, and as such there is no recorded information in relation to recusals. Ministers are required to declare an interest where they are proposing or supporting an action which is likely to, or perceived to, have a direct benefit to themselves or to another person or organisation with whom they have a close personal relationship or interest. Such an interest was declared by the deputy First Minister in relation to these circumstances.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202931%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=472321","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=472321"}},{"id":"461672","reference":"AQW 36484/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-11-28","answerBy":"2025-12-15","answered":"2025-12-17","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister, pursuant to AQO 2296/22-27, to detail (i) how the £220,000 was broken down by local council area; (ii) any projects that were initiated following the allocation of the funds; and (iii) how the effectiveness of this funding will be assessed.","answerText":"All councils were asked to submit applications up to £20k for the additional £220k funding. Allocations are detailed in the below table.\n\nCouncil\tAmount\nAntrim and Newtownabbey Borough Council\t£20,000\nArds and North Down Borough Council\t£20,000\nArmagh and Banbridge Borough Council\t£20,000\nBelfast City Council\t£20,000\nCauseway Coast and Glens Borough Council\t£17,600\nDerry City and Strabane District Council\t£20,000\nFermanagh and Omagh District Council\t£20,000\nLisburn and Castlereagh City Council\t£20,000\nMid and East Antrim Borough Council\t£20,000\nMid Ulster Council\t£20,000\nNewry, Mourne and Down District Council\t£20,000\n\nInitiatives supported to date following the allocation of additional funds to the District Council Good Relations Programme (DCGRP) are shown below:\n\nCouncil\tProgrammes/Projects\nABC\tGood Relations Family Fun Day, 6x Community Support Hubs, New Residents Guide, Challenging Behaviours Programme\nANA\tANA Education Programme, ANA Engagement Programme, ANA Enrichment Programme, ANA Early Action Programme\nAND\tGood Relations International Community Event, 2x Multicultural School Workshops\nBCC\tNo Room for Hate\nCCG\tDiversity Education Cultural Workshops, Changemaker Programme\nDCSC\tWaterside Neighbourhood Partnership, Greater Shantallow Area Partnership, Triax\nFAO\tCoolnagard Community Development Association, Hospital Community Development Association, Strathroy Community Development Association, Lisanelly Community Development Association\nLCCC\tSeymour Hill ASB Project, Glenavy Youth Project, Inclusion Football, Derriaghy/Milltown Hate Crime Project, LCCC Young Asylum Seeker Project, Community Cohesion Fund\nMEA\tMEA Common Good Programme, MEA Integrate Programme\nMU\tDiversity through Creative Arts, New and Diverse Communities, BME Inclusion\nNMD\tNewry Water Festival, Cultural Day Downpatrick, Newry Mela, Small Worlds Sessions, Chinese Celebration Event, Romanian Family Day, Newry Diwali\n\nThe outcomes of additional funding provided for social and racial cohesion purposes are assessed using participant questionnaires, designed to measure the impact of the activities they have undertaken, and qualitative feedback reports.","answerHtml":"<p>All councils were asked to submit applications up to £20k for the additional £220k funding. Allocations are detailed in the below table.</p><div class=\"table-wrap\"><table><tr><td>Council</td><td>Amount</td></tr><tr><td>Antrim and Newtownabbey Borough Council</td><td>£20,000</td></tr><tr><td>Ards and North Down Borough Council</td><td>£20,000</td></tr><tr><td>Armagh and Banbridge Borough Council</td><td>£20,000</td></tr><tr><td>Belfast City Council</td><td>£20,000</td></tr><tr><td>Causeway Coast and Glens Borough Council</td><td>£17,600</td></tr><tr><td>Derry City and Strabane District Council</td><td>£20,000</td></tr><tr><td>Fermanagh and Omagh District Council</td><td>£20,000</td></tr><tr><td>Lisburn and Castlereagh City Council</td><td>£20,000</td></tr><tr><td>Mid and East Antrim Borough Council</td><td>£20,000</td></tr><tr><td>Mid Ulster Council</td><td>£20,000</td></tr><tr><td>Newry, Mourne and Down District Council</td><td>£20,000</td></tr></table></div><p>Initiatives supported to date following the allocation of additional funds to the District Council Good Relations Programme (DCGRP) are shown below:</p><div class=\"table-wrap\"><table><tr><td>Council</td><td>Programmes/Projects</td></tr><tr><td>ABC</td><td>Good Relations Family Fun Day, 6x Community Support Hubs, New Residents Guide, Challenging Behaviours Programme</td></tr><tr><td>ANA</td><td>ANA Education Programme, ANA Engagement Programme, ANA Enrichment Programme, ANA Early Action Programme</td></tr><tr><td>AND</td><td>Good Relations International Community Event, 2x Multicultural School Workshops</td></tr><tr><td>BCC</td><td>No Room for Hate</td></tr><tr><td>CCG</td><td>Diversity Education Cultural Workshops, Changemaker Programme</td></tr><tr><td>DCSC</td><td>Waterside Neighbourhood Partnership, Greater Shantallow Area Partnership, Triax</td></tr><tr><td>FAO</td><td>Coolnagard Community Development Association, Hospital Community Development Association, Strathroy Community Development Association, Lisanelly Community Development Association</td></tr><tr><td>LCCC</td><td>Seymour Hill ASB Project, Glenavy Youth Project, Inclusion Football, Derriaghy/Milltown Hate Crime Project, LCCC Young Asylum Seeker Project, Community Cohesion Fund</td></tr><tr><td>MEA</td><td>MEA Common Good Programme, MEA Integrate Programme</td></tr><tr><td>MU</td><td>Diversity through Creative Arts, New and Diverse Communities, BME Inclusion</td></tr><tr><td>NMD</td><td>Newry Water Festival, Cultural Day Downpatrick, Newry Mela, Small Worlds Sessions, Chinese Celebration Event, Romanian Family Day, Newry Diwali</td></tr></table></div><p>The outcomes of additional funding provided for social and racial cohesion purposes are assessed using participant questionnaires, designed to measure the impact of the activities they have undertaken, and qualitative feedback reports.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2036484%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=461672","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=461672"}},{"id":"461328","reference":"AQW 36323/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-11-26","answerBy":"2025-12-11","answered":"2025-12-05","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure for her assessment of the investigation, by the Office for Environmental Protection, into her Department and its role in the regulation of sewage discharges into Belfast Lough.","answerText":"I welcome the Office for Environmental Protection’s investigation into the regulation of sewage discharges into Belfast Lough and can advise that my Department will cooperate fully with this investigation.\n\nHowever, it is important to note that the Department of Environment, Agriculture and Rural Affairs’ Northern Ireland Environment Agency regulates the sewage discharges into Belfast Lough, not DFI.","answerHtml":"<p>I welcome the Office for Environmental Protection’s investigation into the regulation of sewage discharges into Belfast Lough and can advise that my Department will cooperate fully with this investigation.</p><p>However, it is important to note that the Department of Environment, Agriculture and Rural Affairs’ Northern Ireland Environment Agency regulates the sewage discharges into Belfast Lough, not DFI.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2036323%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=461328","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=461328"}},{"id":"460439","reference":"AQO 2827/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2025-11-20","answerBy":"2025-12-02","answered":"2025-12-02","answeredOrally":true,"priority":false,"department":"Northern Ireland Assembly Commission","departmentId":"2","minister":"Assembly Commission","question":"To ask the Assembly Commission, given that MLA remuneration is currently under independent review, whether it has any plans to review MLAs' staff pay scales and grading structures.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Ms Ennis","text":"I thank the Member for his question. On 18 March 2020, the Assembly Commission agreed that determining MLA salaries and pensions should continue to be the role of an independent body but that the determination of allowances could be undertaken by the Assembly Commission. Powers to make determinations on allowances were conferred on the Assembly Commission by the Assembly on 30 June 2020. Those powers include determining matters relating to MLAs’ support staff salaries. On 27 August 2020, the Assembly Commission made the Assembly Members (Salaries and Expenses) (Amendment) Determination 2020. It introduced several changes relating to the terms and conditions of MLA support staff, including updated pay scales. That was in response to the ongoing concerns raised by MLAs regarding staff terms and conditions and the Assembly Commission's desire to ensure that the terms and conditions for support staff were fair and reasonable. At that time, the pay scales and grading structures were aligned to those of Assembly Commission staff, including a provision for annual indexation, which aligned to the rate used by the Assembly Commission each year. Pay scales for MLA staff and the associated grading structures are not dependent on MLA remuneration. Therefore, it is not necessary for reviews to be undertaken at the same time. A new determination was published in February 2025, and, while no changes were made to the pay scales or grading structures at that time, the Assembly Commission continues to keep the provisions under review."},{"speaker":"Mr Dickson","text":"I thank the Commission member for her response. I am sure that she and all Members recognise the value of staff to Members. When will the next review of those salaries and pay scales be undertaken?"},{"speaker":"Ms Ennis","text":"I wholly concur: we could not do our jobs without the valuable support of our staff in our constituency offices and in Parliament Buildings. As set out in paragraph 1 of the determination, its purpose is to ensure that Members do not suffer financial detriment by reason of costs incurred in connection with the exercise of functions as Members. Therefore, the Assembly Commission is mindful of the need to ensure that the provisions of the determination fulfil that purpose and are set at an appropriate level. Indexation provisions were introduced in the 2020, as I said, in the determination in relation to the salaries of Members' staff, and further indexation was introduced in the 2025 determination in relation to constituency office operating costs. A further comprehensive review of the determination is therefore not scheduled. Typically, that would be undertaken in advance of a new mandate, and I hope that we would look at that in advance of the 2027 election."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202827%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=460439","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2025-12-02&docID=461172#AQO%202827/22-27","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=460439"}},{"id":"461177","reference":"AQO 2769/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2025-11-13","answerBy":"2025-11-25","answered":"2025-11-25","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance for an update on the December Monitoring Round.","answerText":"The December Monitoring round was commissioned on 22 October, with departmental returns due last Thursday 20 November.\n\nThese returns, combined with the Chancellor’s Autumn Budget announcement on 26 November, will inform the level of funding available for allocation in the December Monitoring round.\n\nI will bring proposals to the Executive for agreement shortly after the Autumn Budget.","answerHtml":"<p>The December Monitoring round was commissioned on 22 October, with departmental returns due last Thursday 20 November.</p><p>These returns, combined with the Chancellor’s Autumn Budget announcement on 26 November, will inform the level of funding available for allocation in the December Monitoring round.</p><p>I will bring proposals to the Executive for agreement shortly after the Autumn Budget.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202769%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=461177","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=461177"}},{"id":"457888","reference":"AQW 34880/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-11-06","answerBy":"2025-11-21","answered":"2025-11-21","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail a timeline for when a decision will be made on the introduction of low dose computed tomography lung cancer screening.","answerText":"As stated in the three-year Health and Social Care Plan, it is intended that by April 2027, subject to additional funding, to have a targeted lung screening programme in Northern Ireland.\n\nThe aim of this new targeted screening programme is to improve earlier diagnosis. If the individual has a higher risk of developing cancer, they will be offered a low dose Computerised Tomography (CT) of their lungs.","answerHtml":"<p>As stated in the three-year Health and Social Care Plan, it is intended that by April 2027, subject to additional funding, to have a targeted lung screening programme in Northern Ireland.</p><p>The aim of this new targeted screening programme is to improve earlier diagnosis. If the individual has a higher risk of developing cancer, they will be offered a low dose Computerised Tomography (CT) of their lungs.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2034880%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=457888","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=457888"}},{"id":"457887","reference":"AQW 34879/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-11-06","answerBy":"2025-11-21","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health given that the April 2025 Northern Ireland Cancer Registry report Routes to Diagnosis highlights a disproportionately high rate of emergency presentations for lung cancer, to detail any steps his Department is taking to reduce late-stage diagnosis and improve survival rates.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2034879%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=457887","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=457887"}},{"id":"457886","reference":"AQW 34878/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-11-06","answerBy":"2025-11-21","answered":"2025-12-01","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister to detail any actions they have taken to resolve the impasse over the Maze Long Kesh site, to allow for its future development, since they have taken up office.","answerText":"We have met with the Board of the Maze/Long Kesh Development Corporation (MLKDC). Members of the Board have also met on several occasions with the TEO Permanent Secretary. We have received advice from officials on the immediate priorities for the site, and this is under consideration. We recognise the potential of the site and the need to move forward with consensus. No decisions have been made yet on the future development of the site.","answerHtml":"<p>We have met with the Board of the Maze/Long Kesh Development Corporation (MLKDC). Members of the Board have also met on several occasions with the TEO Permanent Secretary. We have received advice from officials on the immediate priorities for the site, and this is under consideration. We recognise the potential of the site and the need to move forward with consensus. No decisions have been made yet on the future development of the site.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2034878%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=457886","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=457886"}},{"id":"457885","reference":"AQW 34877/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-11-06","answerBy":"2025-11-21","answered":"2025-11-21","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail any plans he has to address health inequalities arising from the absence of a lung cancer screening programme, particularly in deprived areas with a higher smoking prevalence.","answerText":"Reducing health inequalities is one of my key areas of focus and shortening the period of life spent in ill-health will help to reduce pressures on our health services and improve the quality of life for many of our population\n\nSmoking is one of the key drivers of health inequalities in NI – with the smoking death rate in the most deprived communities twice as high as in the least deprived communities. Similarly, the NI Cancer Registry published statistics in July 2025 on lung cancer incidence shows that lung cancer incidence rates in the most deprived areas are almost double the rate seen in the least deprived areas.\n\nThe implementation of the Tobacco and Vapes Bill will therefore be a key action in helping to reduce these health inequalities.","answerHtml":"<p>Reducing health inequalities is one of my key areas of focus and shortening the period of life spent in ill-health will help to reduce pressures on our health services and improve the quality of life for many of our population</p><p>Smoking is one of the key drivers of health inequalities in NI – with the smoking death rate in the most deprived communities twice as high as in the least deprived communities. Similarly, the NI Cancer Registry published statistics in July 2025 on lung cancer incidence shows that lung cancer incidence rates in the most deprived areas are almost double the rate seen in the least deprived areas.</p><p>The implementation of the Tobacco and Vapes Bill will therefore be a key action in helping to reduce these health inequalities.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2034877%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=457885","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=457885"}},{"id":"457884","reference":"AQW 34876/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-11-06","answerBy":"2025-11-21","answered":"2025-11-21","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail the rational for Northern Ireland remaining the only UK region without a lung cancer screening programme or pilot, despite evidence from the UK National Screening Committee and the Northern Ireland Cancer Registry that many cases are diagnosed through emergency presentations which are associated with poorer outcomes.","answerText":"As stated in the three-year Health and Social Care Plan, it is intended that by April 2027, subject to additional funding, to have a targeted lung screening programme in Northern Ireland.\n\nWe are at the early stages of scoping out what the requirements of the new programme for Northern Ireland will be. This requires a significant amount of work on the supporting pathways (including call/recall, additional diagnostics, workforce, pathways for incidental findings and treatment services) to be undertaken and with consideration to the symptomatic pathways.","answerHtml":"<p>As stated in the three-year Health and Social Care Plan, it is intended that by April 2027, subject to additional funding, to have a targeted lung screening programme in Northern Ireland.</p><p>We are at the early stages of scoping out what the requirements of the new programme for Northern Ireland will be. This requires a significant amount of work on the supporting pathways (including call/recall, additional diagnostics, workforce, pathways for incidental findings and treatment services) to be undertaken and with consideration to the symptomatic pathways.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2034876%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=457884","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=457884"}},{"id":"455315","reference":"AQO 2611/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2025-10-16","answerBy":"2025-11-03","answered":"2025-11-03","answeredOrally":true,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to outline any action he is taking to ensure patients in Northern Ireland are afforded the same access to clinical trials as patients in other parts of the UK.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr Nesbitt","text":"The Department of Health facilitates access for patients to clinical trials through the work of the Health and Social Care (HSC) research and development division in the Public Health Agency (PHA). The division oversees participation in UK-wide clinical governance and trial approval processes. In addition, it funds core research infrastructure, which, in turn, supports access to clinical trials. That includes the Northern Ireland Clinical Research Network, a cancer trials network, a clinical trials unit, a clinical research facility and research offices in each of the trusts. Approximately 80% of clinical trials taking place in Northern Ireland also have research sites in other UK nations. However, I recognise that many clinical trials open only in a small number of sites around the UK and seek to recruit only a limited number of patients who have very specific characteristics. Therefore, not all trials will open in Northern Ireland or, indeed, in any other part of the United Kingdom."},{"speaker":"Mr Dickson","text":"Thank you very much. Minister, how is your Department working with relevant stakeholders, such as universities, and the trusts to make Northern Ireland an attractive partner for UK-wide and international trials? Why has the Department brought about a great deal of confusion regarding EU rules, which, we were told, were blocking trials, with correspondence from you, Minister, last week saying that that was all wrong, there were no EU blockages and trials should be able to proceed? In reality, Minister, the blockage is in the Belfast Health and Social Care Trust."},{"speaker":"Mr Nesbitt","text":"To be fair to the Belfast Trust, the Department of Health and our arm's-length bodies (ALBs) rely, on such occasions, on the advice of a UK-wide body, which is the Medicines and Healthcare products Regulatory Agency (MHRA). It originally gave an opinion that we had to conform to specific EU regulations — the EU in vitro diagnostic regulatory conditions — and that therefore we could not proceed with the trial. It now appears that MHRA has reviewed its analysis, and we are good to go as long as we have the right governance structures locally through the Belfast Trust. That was unfortunate, because it has led to a delay, but I do not think that it has led to any patient safety concerns. At the Patrick Johnston facility on the Queen's site in Belfast City Hospital, I have seen in action the ball that goes down the throat to look for Barrett's oesophagus. It is magnificent. It is so quick, it is cost-effective and it delivers better outcomes, so it is a matter of regret that we have had that one-year delay. On how we tap into the rest of the UK, I was at the launch recently at the Ulster Hospital of the Northern Ireland commercial research delivery centre. That is a clinical trial centre. It is brand new, and it will link us in to a UK network. That is really good news, because we have clinicians who are incredibly passionate about clinical trials and Northern Ireland is of a size that is almost perfect for clinical trials. When we do them, we do them really well. I happen to think that we are missing a bit of a trick by not becoming global leaders or, certainly, UK-wide leaders in the field."},{"speaker":"Mr Brooks","text":"On the back of the Member's question, when will patients have access to those trials? For clarity, reiterating what the Member asked, can we be sure that the EU regulations will not be a barrier in future to patients accessing such trials?"},{"speaker":"Mr Nesbitt","text":"I can be specific only about the clinical trials regarding that ball that goes down on a string for Barrett's oesophagus. The MHRA is now saying that the EU regulations do not apply, so we can go ahead. We cannot start it immediately, because we must make sure that we have the right governance arrangements in place in the Belfast Trust. I would like to think that they will now proceed at pace, because we should all be slightly embarrassed, although it was not our fault but that of the MHRA across the water. At that, it was a one-year delay that was unnecessary. Let us show the public that we will make up lost ground on that. On the application of other EU regulations for developments in health and social care, I can give the Member no assurance. He knows my view: we came out of Europe without thinking through the consequences, and, sadly, some of the consequences impact on health and social care delivery."},{"speaker":"Mr Chambers","text":"I was pleased to learn recently that good progress has been made on the cancer research strategy, and I think that publication is imminent. How important was it to give the research organisations and individuals locally that further time to feed into the draft plan and allow them to work in partnership with the Department?"},{"speaker":"Mr Nesbitt","text":"I will respond to the Member in a couple of ways. There is no point in having what, we think, is a solid strategy if it does not have buy-in from stakeholders. As well as the need for buy-in, we have to be sure that, if we are going to have a strategy, we will be able to follow it up not just with an implementation plan but with one that is fully costed and deliverable. The Member will know that I pointed to the cancer strategy, rather than the cancer research strategy, and the mental health strategy as two gold-plated 10-year strategies that we cannot afford to implement in full. The feedback that we got some months ago was that some key stakeholders were not buying into the document as it was written up then, so it was important that we stepped back, re-engaged with them, listened to them and reacted positively. We have done that to the best of our ability, and I believe that all the key stakeholders are now relatively satisfied. They are not absolutely delighted: who would be? You cannot expect everybody to be delighted with a strategy. However, I believe that we have got to a place where we can have confidence that we are doing the right thing by the people whom we are trying to serve: the patients and service users for whom we are trying to deliver better outcomes."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202611%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=455315","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2025-11-03&docID=456024#AQO%202611/22-27","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=455315"}},{"id":"454311","reference":"AQW 33300/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-10-10","answerBy":"2025-10-27","answered":"2025-10-23","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail the number of students who have taken advantage of (i) the Turing Scheme; and (ii) Erasmus, via the Irish Government Scheme for Northern Ireland, since the United Kingdom left the European Union.","answerText":"Further Education Colleges have provided data which indicates that since 31 January 2020, 796 FE students have secured a place on the Turing Scheme and 203 students have participated in the Irish Government Mobility Scheme. It should be noted that the colleges have stated that some figures are unavailable for the year 2021/22 and so the actual number could be higher. Higher Education Institutions have provided data to my Department which indicates 1,185 higher education students have secured a placement under the Turing Scheme and 1,773 higher education students have participated in the Irish Government Mobility Scheme.","answerHtml":"<p>Further Education Colleges have provided data which indicates that since 31 January 2020, 796 FE students have secured a place on the Turing Scheme and 203 students have participated in the Irish Government Mobility Scheme. It should be noted that the colleges have stated that some figures are unavailable for the year 2021/22 and so the actual number could be higher. Higher Education Institutions have provided data to my Department which indicates 1,185 higher education students have secured a placement under the Turing Scheme and 1,773 higher education students have participated in the Irish Government Mobility Scheme.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2033300%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=454311","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=454311"}},{"id":"454310","reference":"AQW 33299/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-10-10","answerBy":"2025-10-27","answered":"2025-10-17","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education to detail any assessment made of the impact of the Fair Employment (School Teachers) Act (Northern Ireland) 2022.","answerText":"My Department has not carried out an assessment of the impact of the Fair Employment (School Teachers) Act (Northern Ireland) 2022.\n\nFollowing the implementation of the Fair Employment (School Teachers) Act (Northern Ireland) 2022 employing authorities (Education Authority (EA) and Council for Catholic Maintained Schools (CCMS)) and Board of Governors were required to review their recruitment and selection procedures, ensuring that they address the implications of fair employment legislation.\n\nThrough the Teachers’ Negotiation Committee (TNC) a Fair Employment Working Group was established to consider the implications of the Act to ensure a co-ordinated implementation of the legislation.\n\nThrough the working group the monitoring requirements and form to be used were agreed with the employing authorities (EA and CCMS). They are each required to report to the Equality Commission Northern Ireland (ECNI) in an agreed return. All other schools report independently to the ECNI.\n\nMy Department has ensured that the Fair Employment (School Teachers) Act (Northern Ireland) 2022 has been implemented across all grant-aided schools in Northern Ireland.","answerHtml":"<p>My Department has not carried out an assessment of the impact of the Fair Employment (School Teachers) Act (Northern Ireland) 2022.</p><p>Following the implementation of the Fair Employment (School Teachers) Act (Northern Ireland) 2022 employing authorities (Education Authority (EA) and Council for Catholic Maintained Schools (CCMS)) and Board of Governors were required to review their recruitment and selection procedures, ensuring that they address the implications of fair employment legislation.</p><p>Through the Teachers’ Negotiation Committee (TNC) a Fair Employment Working Group was established to consider the implications of the Act to ensure a co-ordinated implementation of the legislation.</p><p>Through the working group the monitoring requirements and form to be used were agreed with the employing authorities (EA and CCMS). They are each required to report to the Equality Commission Northern Ireland (ECNI) in an agreed return. All other schools report independently to the ECNI.</p><p>My Department has ensured that the Fair Employment (School Teachers) Act (Northern Ireland) 2022 has been implemented across all grant-aided schools in Northern Ireland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2033299%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=454310","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=454310"}},{"id":"453600","reference":"AQW 32961/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-10-07","answerBy":"2025-10-22","answered":"2025-10-14","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to outline any steps he is taking to prioritise brain cancer within the Cancer Strategy for Northern Ireland 2022-2032.","answerText":"The Northern Ireland Cancer Strategy 2022-2032 aims to transform cancer services by ensuring equitable and timely access to the most effective, evidence-based referral, diagnosis, treatment and support for people impacted by a cancer diagnosis across our communities, rather than prioritising specific cancers.\n\nIt is important that we remain committed to the transformation of cancer services through the implementation of the Cancer Strategy, this will help to ensure equitable access across all cancer services, including those provided for brain cancer patients.","answerHtml":"<p>The Northern Ireland Cancer Strategy 2022-2032 aims to transform cancer services by ensuring equitable and timely access to the most effective, evidence-based referral, diagnosis, treatment and support for people impacted by a cancer diagnosis across our communities, rather than prioritising specific cancers.</p><p>It is important that we remain committed to the transformation of cancer services through the implementation of the Cancer Strategy, this will help to ensure equitable access across all cancer services, including those provided for brain cancer patients.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2032961%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=453600","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=453600"}},{"id":"453599","reference":"AQW 32960/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-10-07","answerBy":"2025-10-22","answered":"2025-10-22","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to outline any steps he is taking to ensure that people can access cancer trials despite hold-ups for signing up by Belfast Health and Social Care Trust.","answerText":"The Health and Social Care (HSC) Research & Development (R&D) Division within the Public Health Agency are responsible for the administration of the Department’s budgetary allocation for Research & Development, including support for research offices in each of the acute Trusts.\n\nAt present, HSC R&D do not specifically commission cancer research studies. Rather, they provide funding to cancer research infrastructure such as the Northern Ireland Cancer Trials Network (NICTN), the Belfast Experimental Medicine Centre and the Northern Ireland Biobank.\n\nResponsibility for the approval of research studies in Belfast Health and Social Care Trust lies with the Trust Research Office.\n\nThe Trust has agreed to implement prioritised actions to meet the UK wide 150-day target for clinical trial study set-up, and funding has been provided by the HSC R&D Division in support of this.\n\nI acknowledge the importance of cancer clinical trials and research and recognise that they have historically been underfunded in Northern Ireland.\n\nIt is clear that significant and sustained investment in cancer clinical trials and research is urgently required. However, in the context of ongoing budgetary challenges being faced by the Department, this is not possible at this point in time.","answerHtml":"<p>The Health and Social Care (HSC) Research &amp; Development (R&amp;D) Division within the Public Health Agency are responsible for the administration of the Department’s budgetary allocation for Research &amp; Development, including support for research offices in each of the acute Trusts.</p><p>At present, HSC R&amp;D do not specifically commission cancer research studies. Rather, they provide funding to cancer research infrastructure such as the Northern Ireland Cancer Trials Network (NICTN), the Belfast Experimental Medicine Centre and the Northern Ireland Biobank.</p><p>Responsibility for the approval of research studies in Belfast Health and Social Care Trust lies with the Trust Research Office.</p><p>The Trust has agreed to implement prioritised actions to meet the UK wide 150-day target for clinical trial study set-up, and funding has been provided by the HSC R&amp;D Division in support of this.</p><p>I acknowledge the importance of cancer clinical trials and research and recognise that they have historically been underfunded in Northern Ireland.</p><p>It is clear that significant and sustained investment in cancer clinical trials and research is urgently required. However, in the context of ongoing budgetary challenges being faced by the Department, this is not possible at this point in time.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2032960%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=453599","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=453599"}},{"id":"452811","reference":"AQW 32735/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-10-03","answerBy":"2025-10-20","answered":"2025-10-22","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister to detail (i) any assessment made of the impact of the Fair Employment (School Teachers) Act (Northern Ireland) 2022; and (ii) whether any monitoring or evaluation of its implementation has been undertaken, or is planned.","answerText":"The Fair Employment (School Teachers) Act 2022 (Teachers Act) came into effect on 12th May 2024. Responsibility for fair employment monitoring, including that of teachers, rests with the Equality Commission for NI (ECNI).\n\nTo date, no assessment has been made of the impact of the Teachers Act.\n\nTEO officials will remain engaged with ECNI and the Department of Education as necessary regarding the smooth implementation of the Teachers Act.","answerHtml":"<p>The Fair Employment (School Teachers) Act 2022 (Teachers Act) came into effect on 12th May 2024. Responsibility for fair employment monitoring, including that of teachers, rests with the Equality Commission for NI (ECNI).</p><p>To date, no assessment has been made of the impact of the Teachers Act.</p><p>TEO officials will remain engaged with ECNI and the Department of Education as necessary regarding the smooth implementation of the Teachers Act.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2032735%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=452811","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=452811"}},{"id":"454679","reference":"AQO 2532/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2025-10-02","answerBy":"2025-10-13","answered":"2025-10-14","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs to outline the next steps to develop Northern Ireland’s first Climate Action Plan.","answerText":"The consultation on Northern Ireland’s first Climate Action Plan recently closed and I want to express my gratitude to the 224 individuals, businesses and organisations who provided consultation responses and to the approximately 700 people who attended the wide range of consultation events across Northern Ireland.\n\nIt is important that we take the appropriate time to consider these valuable insights and that the views of consultees are incorporated into the final Plan as appropriate. DAERA will be working with other Departments to update the document and finalise the Climate Action Plan for Executive consideration as soon as possible.","answerHtml":"<p>The consultation on Northern Ireland’s first Climate Action Plan recently closed and I want to express my gratitude to the 224 individuals, businesses and organisations who provided consultation responses and to the approximately 700 people who attended the wide range of consultation events across Northern Ireland.</p><p>It is important that we take the appropriate time to consider these valuable insights and that the views of consultees are incorporated into the final Plan as appropriate. DAERA will be working with other Departments to update the document and finalise the Climate Action Plan for Executive consideration as soon as possible.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202532%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=454679","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=454679"}},{"id":"452439","reference":"AQW 32505/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-10-01","answerBy":"2025-10-09","answered":"2025-10-13","answeredOrally":false,"priority":true,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, given that the UK-wide BEST4 trial of capsule sponge testing for Barrett’s oesophagus and oesophageal cancer has already been approved in Great Britain and is already recruiting, to detail what immediate action will his Department take to ensure patients can access this UK-wide clinical trial, noting that the Belfast Health and Social Care Trust has had the fully funded NI trial documentation for over a year for approval.","answerText":"The Belfast Health and Social Care Trust is currently unable to participate in the BEST4 trial due to aspects of the trial not being compliant with the European Union In Vitro Diagnostic Regulation (EU IVDR 2017/746). The sponsor of the trial, Cambridge University Hospitals NHS Foundation Trust, will be required to submit an application to the regulator MHRA, to enable the trial to progress.\n\nThe Local Information Pack (LIP) application for the BEST 4 study was received by the Belfast Health and Social Care Trust’s Research Office from the study sponsor on 4 October 2024. The Belfast Health and Social Care Trust are still awaiting the release of the Study Wide Governance Report from the PHA HSC Approvals Service, to facilitate their participation, which is dependent on resolution of the EU IVDR compliance issue. Until this report is received, the Belfast Health and Social Care Trust cannot progress to the opening of the trial. I understand that discussions are ongoing between the HSC Approvals Service, the trial sponsor and the MHRA to resolve the regulatory requirements in NI for the trial.\n\nHowever, I am pleased to share that the Northern Ireland Cancer Network’s Upper Gastrointestinal Clinical Reference Group are reviewing clinical evidence, including guidance from NICE and the British Society of Gastroenterology, alongside research findings, to determine the most clinically appropriate contexts for potential implementation of capsule sponge testing across the region.","answerHtml":"<p>The Belfast Health and Social Care Trust is currently unable to participate in the BEST4 trial due to aspects of the trial not being compliant with the European Union In Vitro Diagnostic Regulation (EU IVDR 2017/746). The sponsor of the trial, Cambridge University Hospitals NHS Foundation Trust, will be required to submit an application to the regulator MHRA, to enable the trial to progress.</p><p>The Local Information Pack (LIP) application for the BEST 4 study was received by the Belfast Health and Social Care Trust’s Research Office from the study sponsor on 4 October 2024. The Belfast Health and Social Care Trust are still awaiting the release of the Study Wide Governance Report from the PHA HSC Approvals Service, to facilitate their participation, which is dependent on resolution of the EU IVDR compliance issue. Until this report is received, the Belfast Health and Social Care Trust cannot progress to the opening of the trial. I understand that discussions are ongoing between the HSC Approvals Service, the trial sponsor and the MHRA to resolve the regulatory requirements in NI for the trial.</p><p>However, I am pleased to share that the Northern Ireland Cancer Network’s Upper Gastrointestinal Clinical Reference Group are reviewing clinical evidence, including guidance from NICE and the British Society of Gastroenterology, alongside research findings, to determine the most clinically appropriate contexts for potential implementation of capsule sponge testing across the region.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2032505%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=452439","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=452439"}},{"id":"461038","reference":"AQO 2475/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2025-09-25","answerBy":"2025-10-06","answered":"2025-10-31","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister, given the Inquiry (Mother and Baby Institutions, Magdalene Laundries and Workhouses) and Redress Scheme Bill (NIA Bill 15/22-27) lists 11 relevant institutions, but leaves additions to The Executive Office regulations, how they will ensure any decisions in relation to this are transparent and include survivor consultation and Assembly oversight, rather than ministerial discretion.","answerText":"We deeply regret the pain and suffering of victims and survivors and this legislation is an important stage in uncovering the truth and holding those responsible to account.\n\nThe Bill provides a clear focus for the inquiry and redress scheme but, crucially, it also embeds some flexibility.\n\nThere are 11 institutions included in the standardised payment. However, institutions can be added or removed and the time period can be amended, subject to Assembly approval.\n\nFor the public inquiry, there will be a prescribed list of institutions, also subject to Assembly approval.\n\nThis flexibility is important as it will allow recommendations from the Independent Panel, Inquiry Chair and others to be considered.\n\nThis ensures democratic scrutiny, but it also means the inquiry and redress scheme can be delivered in a timely way, which is so important, especially for the many birth mothers who have long campaigned for justice.","answerHtml":"<p>We deeply regret the pain and suffering of victims and survivors and this legislation is an important stage in uncovering the truth and holding those responsible to account.</p><p>The Bill provides a clear focus for the inquiry and redress scheme but, crucially, it also embeds some flexibility.</p><p>There are 11 institutions included in the standardised payment. However, institutions can be added or removed and the time period can be amended, subject to Assembly approval.</p><p>For the public inquiry, there will be a prescribed list of institutions, also subject to Assembly approval.</p><p>This flexibility is important as it will allow recommendations from the Independent Panel, Inquiry Chair and others to be considered.</p><p>This ensures democratic scrutiny, but it also means the inquiry and redress scheme can be delivered in a timely way, which is so important, especially for the many birth mothers who have long campaigned for justice.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202475%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=461038","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=461038"}},{"id":"450458","reference":"AQW 31723/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-09-22","answerBy":"2025-10-07","answered":"2025-10-02","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to detail what proportion of the new railings on the Whiteabbey seafront came from the (i) active travel budget; and (ii) the roads budget.","answerText":"I can advise that the cost of the new railings at Whiteabbey seafront was funded from my Department’s active travel budget.","answerHtml":"<p>I can advise that the cost of the new railings at Whiteabbey seafront was funded from my Department’s active travel budget.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2031723%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=450458","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=450458"}},{"id":"448407","reference":"AQO 2296/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2025-09-01","answerBy":"2025-09-08","answered":"2025-11-26","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister how the £220,000 allocation to address issues around racial and social cohesion can be targeted to ensure support reaches areas most affected by recent racially motivated incidents.","answerText":"Challenges around racial and social cohesion are being experienced globally. While issues around housing and local services are separate, it is important to state that the Executive strongly condemns sectarianism and racism in any form.\n\nFollowing the disorder in June, we moved quickly to ensure that £220,000 in additional funding was made available through the District Council Good Relations Programme, to help support racial and social cohesion here.\n\nUtilising the expertise and local knowledge of council officers helped to ensure that funding was targeted in areas that would benefit most from such interventions. Detail on specific projects funded to date are available on request.","answerHtml":"<p>Challenges around racial and social cohesion are being experienced globally. While issues around housing and local services are separate, it is important to state that the Executive strongly condemns sectarianism and racism in any form.</p><p>Following the disorder in June, we moved quickly to ensure that £220,000 in additional funding was made available through the District Council Good Relations Programme, to help support racial and social cohesion here.</p><p>Utilising the expertise and local knowledge of council officers helped to ensure that funding was targeted in areas that would benefit most from such interventions. Detail on specific projects funded to date are available on request.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202296%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=448407","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=448407"}},{"id":"447200","reference":"AQO 2196/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2025-06-12","answerBy":"2025-07-01","answered":"2025-07-28","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister, in light of the recent racially motivated violence in Ballymena, for their assessment of the impact that a ten year absence of an action plan and budget for the Racial Equality Strategy has had on its delivery.","answerText":"First and foremost, our thoughts and support are with those impacted by the recent disorder. The Executive unequivocally condemns the violence we have witnessed, and we again call for calm across our communities.\n\nThe Racial Equality Strategy 2015-2025 was designed as a cross-departmental initiative that would support the mainstreaming of work to address racial inequalities.\n\nIt identified eleven key actions to support this. The majority of these have been completed or are being progressed, with some intended to continue throughout the lifetime of the strategy.\n\nWhile significant progress has been made, recent events have highlighted that there is still much more to do. We also recognise that the landscape has changed significantly since the current Strategy’s creation.\n\nRacial inequalities are not confined to a single area, and cannot be tackled by one department alone, or indeed by government working in isolation.\n\nOur focus is very much on ensuring full implementation of remaining actions but in parallel, work is ongoing to develop a new strategic approach to racial equality so that collectively we can strive to create a safe, prosperous and welcoming society for all.","answerHtml":"<p>First and foremost, our thoughts and support are with those impacted by the recent disorder. The Executive unequivocally condemns the violence we have witnessed, and we again call for calm across our communities.</p><p>The Racial Equality Strategy 2015-2025 was designed as a cross-departmental initiative that would support the mainstreaming of work to address racial inequalities.</p><p>It identified eleven key actions to support this. The majority of these have been completed or are being progressed, with some intended to continue throughout the lifetime of the strategy.</p><p>While significant progress has been made, recent events have highlighted that there is still much more to do. We also recognise that the landscape has changed significantly since the current Strategy’s creation.</p><p>Racial inequalities are not confined to a single area, and cannot be tackled by one department alone, or indeed by government working in isolation.</p><p>Our focus is very much on ensuring full implementation of remaining actions but in parallel, work is ongoing to develop a new strategic approach to racial equality so that collectively we can strive to create a safe, prosperous and welcoming society for all.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202196%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=447200","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=447200"}},{"id":"442163","reference":"AQO 2176/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2025-06-05","answerBy":"2025-06-17","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to outline any action being taken to mitigate against the impact of shortages of the drug Creon.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202176%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=442163","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=442163"}},{"id":"441821","reference":"AQW 28075/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-06-03","answerBy":"2025-06-06","answered":"2025-06-06","answeredOrally":false,"priority":true,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail any action he has taken to secure supplies of the drug Creon which is in short supply for cancer patients in Northern Ireland, especially those patients with pancreatic cancer.","answerText":"Medicines are manufactured as part of a highly complex, regulated and global industry; therefore, medicine shortages are not uncommon and can occur for a variety of reasons. Whilst supply issues can’t always be prevented, there are well-established tools and processes to mitigate risks to patients which are agreed UK-wide and locally via medicine shortage management groups.\n\nAlthough Creon® preparations remain available, my Department is aware that the quantities are limited and capped across the UK due to manufacturing constraints until January 2026, which may result in some localised and sporadic supply disruptions.\n\nMy Department published an updated National Patient Safety Alert on 23 December 2024 regarding PERT products, which provided healthcare professionals with advice and actions to take to ensure patients can continue to access appropriate treatments. Healthcare professionals are also recommended to use the NHS Specialist Pharmacy Service’s (SPS) website including the medicines supply tool that provides up-to-date information on all medicine supply disruptions and a dedicated page to assist healthcare professionals on prescribing and ordering PERT products- https://www.sps.nhs.uk/articles/prescribing-and-ordering-available-pancreatic-enzyme-replacement-therapies/.\n\nPERT products have been added to the UK restricted export and hoarding list and Serious Shortage Protocols for Creon 10,000 and 25,000 capsules have been issued and apply in Northern Ireland (NI). Unlicensed imports have also been sourced from other markets and may be prescribed and supplied where deemed appropriate.\n\nAdditionally, I wrote to Wes Streeting MP, Secretary of State for Health and Social Care, and Karin Smyth MP, Minister of Health (Secondary Care), highlighting the ongoing impacts medicine disruptions are having in NI, including PERT products, and my support for wider collaboration to improve long-term supply resilience across the UK.\n\nAny patients impacted by this supply disruption should contact a healthcare professional for advice on actions to take.","answerHtml":"<p>Medicines are manufactured as part of a highly complex, regulated and global industry; therefore, medicine shortages are not uncommon and can occur for a variety of reasons. Whilst supply issues can’t always be prevented, there are well-established tools and processes to mitigate risks to patients which are agreed UK-wide and locally via medicine shortage management groups.</p><p>Although Creon® preparations remain available, my Department is aware that the quantities are limited and capped across the UK due to manufacturing constraints until January 2026, which may result in some localised and sporadic supply disruptions.</p><p>My Department published an updated National Patient Safety Alert on 23 December 2024 regarding PERT products, which provided healthcare professionals with advice and actions to take to ensure patients can continue to access appropriate treatments. Healthcare professionals are also recommended to use the NHS Specialist Pharmacy Service’s (SPS) website including the medicines supply tool that provides up-to-date information on all medicine supply disruptions and a dedicated page to assist healthcare professionals on prescribing and ordering PERT products- https://www.sps.nhs.uk/articles/prescribing-and-ordering-available-pancreatic-enzyme-replacement-therapies/.</p><p>PERT products have been added to the UK restricted export and hoarding list and Serious Shortage Protocols for Creon 10,000 and 25,000 capsules have been issued and apply in Northern Ireland (NI). Unlicensed imports have also been sourced from other markets and may be prescribed and supplied where deemed appropriate.</p><p>Additionally, I wrote to Wes Streeting MP, Secretary of State for Health and Social Care, and Karin Smyth MP, Minister of Health (Secondary Care), highlighting the ongoing impacts medicine disruptions are having in NI, including PERT products, and my support for wider collaboration to improve long-term supply resilience across the UK.</p><p>Any patients impacted by this supply disruption should contact a healthcare professional for advice on actions to take.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2028075%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=441821","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=441821"}},{"id":"441272","reference":"AQO 2111/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2025-05-29","answerBy":"2025-06-09","answered":null,"answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities for an update on the implementation of the Period Products (Free Provision) Act (Northern Ireland) 2022.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202111%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=441272","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=441272"}},{"id":"444560","reference":"AQO 2103/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2025-05-29","answerBy":"2025-06-09","answered":"2025-06-24","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister for their assessment of the role that the Commissioner for Survivors of Institutional Childhood Abuse has had in supporting victims of childhood abuse.","answerText":"We are pleased to confirm that, following a review undertaken by Professor Alexis Jay, we have decided that the office of the Commissioner should remain in operation for an additional two years, up to December 2027.\n\nWe have offered Fiona Ryan the opportunity to remain in her role for this time to continue the good work she and her office do in supporting and advocating for Victims and Survivors of Historical Institutional Abuse.\n\nProfessor Jay’s review found that, although the workload of the Commissioner has reduced with the recent closure of the Redress Scheme to new applications, a short extension would allow time to consider how best to support victims and survivors moving forward. We look forward to working with the Commissioner and her staff over this time as we continue to support those who suffered institutional abuse.","answerHtml":"<p>We are pleased to confirm that, following a review undertaken by Professor Alexis Jay, we have decided that the office of the Commissioner should remain in operation for an additional two years, up to December 2027.</p><p>We have offered Fiona Ryan the opportunity to remain in her role for this time to continue the good work she and her office do in supporting and advocating for Victims and Survivors of Historical Institutional Abuse.</p><p>Professor Jay’s review found that, although the workload of the Commissioner has reduced with the recent closure of the Redress Scheme to new applications, a short extension would allow time to consider how best to support victims and survivors moving forward. We look forward to working with the Commissioner and her staff over this time as we continue to support those who suffered institutional abuse.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202103%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=444560","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=444560"}},{"id":"441894","reference":"AQO 2092/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2025-05-22","answerBy":"2025-06-03","answered":"2025-06-04","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs how proposals within his Animal Welfare Pathway 2025-27 will benefit pets and their owners.","answerText":"The Animal Welfare Pathway sets out a range of practical interventions that I intend to bring forward within the lifetime of this Assembly mandate, to help strengthen our current welfare legislation, and to ensure that there are robust initiatives in place, so our beloved pets can receive the care needed for a high quality of life.\n\nI am confident that the proposals within the Pathway, which were developed through engagement with key stakeholders in animal welfare, including the Northern Ireland Companion Animal Welfare Group (NICAWG), will facilitate and deliver improvements to the lives of companion animals throughout Northern Ireland.\n\nThe proposals include consideration of the evidence on prohibition of aversive training devices, in particular shock collars, enhancements to microchipping requirements, exploration of mandatory cat microchipping, and development of an Animal Welfare and Responsible Dog Ownership Campaign.\n\nWork is already underway on a number of reforms, including the recruitment of an Expert Advisory Group to review dog breeding regulations, and the launch of a public consultation on the proposed new rules for the sale and supply of puppies and kittens.","answerHtml":"<p>The Animal Welfare Pathway sets out a range of practical interventions that I intend to bring forward within the lifetime of this Assembly mandate, to help strengthen our current welfare legislation, and to ensure that there are robust initiatives in place, so our beloved pets can receive the care needed for a high quality of life.</p><p>I am confident that the proposals within the Pathway, which were developed through engagement with key stakeholders in animal welfare, including the Northern Ireland Companion Animal Welfare Group (NICAWG), will facilitate and deliver improvements to the lives of companion animals throughout Northern Ireland.</p><p>The proposals include consideration of the evidence on prohibition of aversive training devices, in particular shock collars, enhancements to microchipping requirements, exploration of mandatory cat microchipping, and development of an Animal Welfare and Responsible Dog Ownership Campaign.</p><p>Work is already underway on a number of reforms, including the recruitment of an Expert Advisory Group to review dog breeding regulations, and the launch of a public consultation on the proposed new rules for the sale and supply of puppies and kittens.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202092%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=441894","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=441894"}},{"id":"440625","reference":"AQO 2054/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2025-05-22","answerBy":"2025-06-02","answered":"2025-06-02","answeredOrally":true,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure why no public consultation took place before the installation of new shoreline barriers at Shore Road, Whiteabbey, despite their obstruction of views across Belfast Lough.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Ms Kimmins","text":"I have met the Member on this issue. He knows that my Department has legislative responsibility to maintain roads and footpaths to an appropriate standard, ensuring the safety of all road users, including pedestrians and cyclists. That is managed through the provision of infrastructure that is designed and installed to current safety standards. Substandard railings along the Shore Road, Newtownabbey were identified for replacement due to their poor state of repair. The railings were adjacent to a combined footway/cycleway, and the replacement railings were required to be increased in height to 1·5 metres to meet the minimum safety standards. My Department was not required to consult the public on the routine parapet upgrade works at that location. However, my officials did consult Antrim and Newtownabbey Borough Council on the design of the new railings at the location and provided two options for its consideration. Due to the additional cost associated with the bespoke design option, the council confirmed that it was content to proceed with the standard railing option in August 2024. My Department further highlighted the proposed scheme as planned works in its annual report to council in November 2024."},{"speaker":"Mr Dickson","text":"Thank you very much, Minister, for your answer and for meeting me on the issue, when, as you know, we had the opportunity to express local concerns. You undertook to re-examine the unnecessarily overly engineered barrier, and particularly the chicken wire that covers it, not only blocking the view but causing further health and safety issues. Will you soon be in a position to respond to the specific issues that I raised with you? Will it be possible to remove that unsightly chicken wire, which blocks the view of Belfast lough for residents, commuters and cyclists?"},{"speaker":"Ms Kimmins","text":"I thank the Member for raising that. In response to the issues that he raised — it is fair to say that he documented and clearly showed me the key issues about which he and his constituents have been concerned — I spoke to officials and got some updates on why that was done in the first place. The wire mesh is an anti-climb requirement, as prescribed in design standard 'CD 377: Requirements for road restraint systems', which I am sure means nothing to you, me or many of your constituents. With that being said, I asked whether we could look at removing it, because I recognise that the view of the lough has been restricted and that there has been a real issue with the aesthetics of that beautiful area. To ensure that we continue to meet safety standards, we have come to a bit of a compromise. Complete removal is not permitted under the design standard, but my Department is considering the removal of the wire mesh between the two uppermost rails so that it will potentially remain on just the bottom one. That would ensure that views of the lough were opened up, while still providing the required safety interventions for cyclists and others who use the topside. As part of our discussions, the Member mentioned his concerns for those who are on the shoreside of the railings and the potential for them if somebody were to get into difficulties with getting out. I raised that matter with officials, and I hope that, should we decide to move forward with the proposal, that would be a welcome compromise that would address the needs of everybody involved."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202054%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=440625","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2025-06-02&docID=440989#AQO%202054/22-27","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=440625"}},{"id":"442490","reference":"AQO 2042/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2025-05-15","answerBy":"2025-05-27","answered":"2025-06-06","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister whether their Department has considered establishing a Citizens' Assembly as a venue for the public to explore institutional reform options, as outlined in the recently published Reform of Stormont report.","answerText":"It is important that the AERC continues its ongoing review, which we understand includes public consultation, and brings forward a report on potential options.","answerHtml":"<p>It is important that the AERC continues its ongoing review, which we understand includes public consultation, and brings forward a report on potential options.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202042%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=442490","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=442490"}},{"id":"440065","reference":"AQO 1885/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2025-04-03","answerBy":"2025-04-28","answered":"2025-05-13","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister for an update on the draft Refugee Integration Strategy.","answerText":"We are pleased to have approved the draft Refugee Integration Strategy and associated Delivery Framework and obtained Executive approval. We are preparing to formally publish and launch the Strategy in due course.","answerHtml":"<p>We are pleased to have approved the draft Refugee Integration Strategy and associated Delivery Framework and obtained Executive approval. We are preparing to formally publish and launch the Strategy in due course.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201885%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=440065","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=440065"}},{"id":"433420","reference":"AQO 1806/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2025-03-20","answerBy":"2025-03-31","answered":"2025-03-31","answeredOrally":true,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities for his assessment of whether the UK Government's proposed changes to the benefits system will increase poverty among disabled people in Northern Ireland.","answerText":"","answerHtml":"","oralExchange":[],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201806%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=433420","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2025-03-31&docID=434620#AQO%201806/22-27","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=433420"}},{"id":"431814","reference":"AQW 24098/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-03-10","answerBy":"2025-03-19","answered":"2025-03-14","answeredOrally":false,"priority":true,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education to detail (i) when the policy on the School Enhancement Programme was changed; and (ii) the rationale for this decision, given the money that the Education Authority may have already spent on consultancy and architecture fees.","answerText":"There has been no change to the policy regarding the School Enhancement Programme (SEP). Funding continues to be available to progress SEP projects through the design stages to pre-tender. A decision to release projects to tender for a contractor will be taken on a case-by-case basis, dependent on budget availability at that time. I will continue to make the case for additional funding for education through the Executive.","answerHtml":"<p>There has been no change to the policy regarding the School Enhancement Programme (SEP). Funding continues to be available to progress SEP projects through the design stages to pre-tender. A decision to release projects to tender for a contractor will be taken on a case-by-case basis, dependent on budget availability at that time. I will continue to make the case for additional funding for education through the Executive.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2024098%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=431814","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=431814"}},{"id":"431442","reference":"AQO 1724/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2025-03-06","answerBy":"2025-03-18","answered":"2025-03-18","answeredOrally":true,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister for an update on the establishment of a steering group to consider a memorial to victims and survivors, as recommended in the Historical Institutional Abuse Inquiry report.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mrs O'Neill","text":"The establishment of a memorial is the final outstanding recommendation of the Hart inquiry report, and we remain committed to its implementation. Following our engagement with the four main victims and survivors’ groups, we are pleased to confirm that there is support for fulfilling that recommendation through having a memorial plaque in Parliament Buildings. We will write to the Speaker to seek approval to progress that and are grateful to him for his support to date. We recognise that some survivors wish to see a broader programme, including localised memorials. Officials have spoken to local authorities, and we have sought input from representative groups and people who are not associated or affiliated with a particular group. Once potential locations are confirmed, we will work with the Arts Council to ensure that the views of victims and survivors are central in designing a memorial."},{"speaker":"Mr Dickson","text":"Thank you for your answer, First Minister. Given that, as you said, some of the groups are not happy or comfortable with the proposals, how will your office take into account the sensitivities and breadth of concerns expressed by victims and survivors?"},{"speaker":"Mrs O'Neill","text":"I assure you that we will do everything that we can to make sure that their views are taken on board. Those people have been failed at every turn over the years. It is important that we get this right. We are committed. The deputy First Minister and I have met some of the groups and individuals and want to continue to engage with them, because their voices are crucial. We must get the remaining part of the jigsaw — memorialisation — right. We are making strides with memorialisation in this Building, but, wider than that, we will work with the Arts Council on what other form of memorial would be appropriate. As the Member recognised, there are different views. Some feel that an education programme would be the best way to go, and some feel that plaques are appropriate. Everybody will have a different view, but we must make sure that we have a forum in which everybody's view is heard, and I can assure you that that is the determination of the deputy First Minister and me."},{"speaker":"Mrs Dillon","text":"I am glad to hear of the intention for a wider programme. First Minister, will you detail how you will ensure that the voices of victims and survivors are heard and that they are engaged throughout the widening of the programme?"},{"speaker":"Mrs O'Neill","text":"As I said, the deputy First Minister and I have met some of the groups because we want them to know that they are being heard in our office and that, as we advance the memorialisation, we do so in a way that will be received well by them and will make a difference to them and their experience. We will ensure that their voices are heard. As I said, we have made progress in this Building, but, as part of our next steps, officials will continue to engage directly with victims and survivors not only through the representative groups but by direct outreach to those who are not affiliated with any of those groups. We also envisage that the additional element to all that will be that the Arts Council will provide a structured forum for victim and survivor input. Therefore, they will get to help shape the final memorial and what it might look like, what form it might take and what its wording might be. They will be part and parcel of helping to shape memorials in a way that reflects their personal experience and their wishes. We hope that that broad approach will be the best way for us to ensure that the widest possible range of voices is heard as we develop the plans further."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201724%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=431442","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2025-03-18&docID=432305#AQO%201724/22-27","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=431442"}},{"id":"429149","reference":"AQW 23023/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-02-20","answerBy":"2025-03-07","answered":"2025-03-07","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, pursuant to AQW 18424/22-27, whether anyone from Northern Ireland is currently on the Transform trial.","answerText":"The Transform trial is being conducted by Prostate Cancer UK. This is a clinical trial which will compare the most promising tests and provide evidence about the best way to screen for prostate cancer. I have been advised that the Transform trial is not yet open but when it does open, the focus, at least initially, will be around the London area.","answerHtml":"<p>The Transform trial is being conducted by Prostate Cancer UK. This is a clinical trial which will compare the most promising tests and provide evidence about the best way to screen for prostate cancer. I have been advised that the Transform trial is not yet open but when it does open, the focus, at least initially, will be around the London area.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2023023%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=429149","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=429149"}},{"id":"429148","reference":"AQW 23022/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-02-20","answerBy":"2025-03-07","answered":"2025-04-14","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister to detail (i) a list all of public appointments made by the Executive Office; (ii) the tenure of these positions; and (iii) any action being taken to ensure the continuity of these appointments at renewal.","answerText":"We are responsible for the appointment of a significant and diverse range of public appointments. These are listed, together with the associated tenure status, in the table below.\n\nPublic appointments are complex and lengthy processes. Extensive planning takes place far in advance of the end of appointment terms to mitigate against vacancies occurring, insofar as this is possible. Where positions are listed as currently vacant, active processes are in place. TEO’s Central Appointments Unit will monitor the position on an ongoing basis.\n\nArm’s Length Body\tPosition\tExpiry/Status of Current Term\nNI Climate Commissioner\tCommissioner\tInaugural appointment\nThe Northern Ireland Judicial Appointments Commission (NIJAC)\t5 Lay Member Commissioners\t1 x vacant position\n1 x term expires June 2025\n3 x term expires May 2026\nThe Strategic Investment Board (SIB)\tChair\tVacant\nNon Executive Directors\t2 x Vacant\n4 x term expires September - October 2025\nCommunity Relations Council\tChair\tTerm expires: 31st May 2027\nBoard Members\t50% board: term expires 30th November 2025\n50% board term expires 31st May 2027\nTruth Recovery Independent Panel\t2 co-Chairs, 5 expert members, 3 victim and survivors’ members\tTerm expires: October 2025\n\nTruth Recovery Redress Service\t\tVacant – posts not yet established\n\n2 non-judicial members\nThe Office of Identity and Cultural Expression\tDirector\tInaugural appointments\n5 other members\nThe Irish Language Commissioner\tIrish Language Commissioner\tInaugural appointment\nThe Commissioner for the Ulster Scots and the Ulster British tradition\tCommissioner for the Ulster Scots and the Ulster British tradition\tInaugural appointment\nCommission for Victims and Survivors\tCommissioner\tVacant\nVictims & Survivors Service\tChair\tChair\n7 Board Members\t3 board positions vacant\n4 board members term expire October 2026 and August/September 2027\nCommissioner for Survivors of Institutional Childhood Abuse\tCommissioner\tTerm expires: December 2025\nMaze Long Kesh Development Corporation (MLKDC)\tChair\tVacant\nBoard Members\t6 board positions vacant\n4 board members term expires October 2028\nCommissioner for Children and Young People for Northern Ireland (NICCY)\tCommissioner\tTerm expires: September 2027\nCommissioner for Older People for Northern Ireland (COPNI)\tCommissioner\tTerm expires: April 2029\nCommissioner for Public Appointments for Northern Ireland (CPANI)\tCommissioner\tVacant\nPolice Ombudsman for Northern Ireland (PONI)\tOmbudsman\tTerm expires: July 2026","answerHtml":"<p>We are responsible for the appointment of a significant and diverse range of public appointments. These are listed, together with the associated tenure status, in the table below.</p><p>Public appointments are complex and lengthy processes. Extensive planning takes place far in advance of the end of appointment terms to mitigate against vacancies occurring, insofar as this is possible. Where positions are listed as currently vacant, active processes are in place. TEO’s Central Appointments Unit will monitor the position on an ongoing basis.</p><div class=\"table-wrap\"><table><tr><td>Arm’s Length Body</td><td>Position</td><td>Expiry/Status of Current Term</td></tr><tr><td>NI Climate Commissioner</td><td>Commissioner</td><td>Inaugural appointment</td></tr><tr><td>The Northern Ireland Judicial Appointments Commission (NIJAC)</td><td>5 Lay Member Commissioners</td><td>1 x vacant position</td></tr><tr><td></td><td></td><td>1 x term expires June 2025</td></tr><tr><td></td><td></td><td>3 x term expires May 2026</td></tr><tr><td>The Strategic Investment Board (SIB)</td><td>Chair</td><td>Vacant</td></tr><tr><td></td><td>Non Executive Directors</td><td>2 x Vacant</td></tr><tr><td></td><td></td><td>4 x term expires September - October 2025</td></tr><tr><td>Community Relations Council</td><td>Chair</td><td>Term expires: 31st May 2027</td></tr><tr><td></td><td>Board Members</td><td>50% board: term expires 30th November 2025</td></tr><tr><td></td><td></td><td>50% board term expires 31st May 2027</td></tr><tr><td>Truth Recovery Independent Panel</td><td>2 co-Chairs, 5 expert members, 3 victim and survivors’ members</td><td>Term expires: October 2025</td></tr><tr><td></td><td></td><td></td></tr><tr><td>Truth Recovery Redress Service</td><td></td><td>Vacant – posts not yet established</td></tr><tr><td></td><td></td><td></td></tr><tr><td></td><td>2 non-judicial members</td><td></td></tr><tr><td>The Office of Identity and Cultural Expression</td><td>Director</td><td>Inaugural appointments</td></tr><tr><td></td><td>5 other members</td><td></td></tr><tr><td>The Irish Language Commissioner</td><td>Irish Language Commissioner</td><td>Inaugural appointment</td></tr><tr><td>The Commissioner for the Ulster Scots and the Ulster British tradition</td><td>Commissioner for the Ulster Scots and the Ulster British tradition</td><td>Inaugural appointment</td></tr><tr><td>Commission for Victims and Survivors</td><td>Commissioner</td><td>Vacant</td></tr><tr><td>Victims &amp; Survivors Service</td><td>Chair</td><td>Chair</td></tr><tr><td></td><td>7 Board Members</td><td>3 board positions vacant</td></tr><tr><td></td><td></td><td>4 board members term expire October 2026 and August/September 2027</td></tr><tr><td>Commissioner for Survivors of Institutional Childhood Abuse</td><td>Commissioner</td><td>Term expires: December 2025</td></tr><tr><td>Maze Long Kesh Development Corporation (MLKDC)</td><td>Chair</td><td>Vacant</td></tr><tr><td></td><td>Board Members</td><td>6 board positions vacant</td></tr><tr><td></td><td></td><td>4 board members term expires October 2028</td></tr><tr><td>Commissioner for Children and Young People for Northern Ireland (NICCY)</td><td>Commissioner</td><td>Term expires: September 2027</td></tr><tr><td>Commissioner for Older People for Northern Ireland (COPNI)</td><td>Commissioner</td><td>Term expires: April 2029</td></tr><tr><td>Commissioner for Public Appointments for Northern Ireland (CPANI)</td><td>Commissioner</td><td>Vacant</td></tr><tr><td>Police Ombudsman for Northern Ireland (PONI)</td><td>Ombudsman</td><td>Term expires: July 2026</td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2023022%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=429148","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=429148"}},{"id":"429147","reference":"AQW 23021/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-02-20","answerBy":"2025-03-07","answered":"2025-03-03","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister when a Commissioner for Public Appointments will be appointed.","answerText":"Preparations to appoint a Commissioner for Public Appointments NI are well progressed, and the competition will be launched shortly.","answerHtml":"<p>Preparations to appoint a Commissioner for Public Appointments NI are well progressed, and the competition will be launched shortly.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2023021%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=429147","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=429147"}},{"id":"429146","reference":"AQW 23020/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-02-20","answerBy":"2025-03-07","answered":"2025-08-07","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities to detail the number of official visits he has made to East Antrim since taking office.","answerText":"24.","answerHtml":"<p>24.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2023020%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=429146","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=429146"}},{"id":"429145","reference":"AQW 23019/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-02-20","answerBy":"2025-03-07","answered":"2025-03-07","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education to detail the number of official visits he has made to East Antrim since taking office.","answerText":"Since taking office I have made 5 visits in the East Antrim constituency.","answerHtml":"<p>Since taking office I have made 5 visits in the East Antrim constituency.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2023019%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=429145","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=429145"}},{"id":"428167","reference":"AQW 22636/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-02-14","answerBy":"2025-03-03","answered":"2025-02-23","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to detail any plans to repair or resurface the section of road between Greenisland Golf Club and the Monkstown Road, given the potholes and subsidence that has led to a long crack in the existing surface of the road.","answerText":"While there are many roads across East Antrim constituency, including the B90 Old Carrick / Upper Road, that would benefit from investment, due to limited budget resources, resurfacing work is taken forward through the prioritisation of those deemed most in need for intervention.\n\nDetails of the planned list of resurfacing schemes for the 2025/26 financial year will be included within my Department’s Annual Report to Councils.\n\nIn the meantime, officials will continue to undertake regular inspections and repair defects in accordance with my Department’s policy.","answerHtml":"<p>While there are many roads across East Antrim constituency, including the B90 Old Carrick / Upper Road, that would benefit from investment, due to limited budget resources, resurfacing work is taken forward through the prioritisation of those deemed most in need for intervention.</p><p>Details of the planned list of resurfacing schemes for the 2025/26 financial year will be included within my Department’s Annual Report to Councils.</p><p>In the meantime, officials will continue to undertake regular inspections and repair defects in accordance with my Department’s policy.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022636%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=428167","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=428167"}},{"id":"428166","reference":"AQW 22635/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-02-14","answerBy":"2025-03-03","answered":"2025-02-23","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to detail any plans to repair or resurface the footpath on the B90 old Carrick Road, from the boundary with Mid and East Antrim to the junction of the Monkstown Road.","answerText":"While there are many footways across the East Antrim constituency, including the footway along the B90 Old Carrick Road, which would benefit from investment, due to limited budget resources, structural maintenance work is taken forward through the prioritisation of those deemed most in need for intervention.\n\nDetails of the planned list of carriageway and footway resurfacing schemes for the 2025/26 financial year will be included within my Department’s Annual Report to Councils.\n\nIn the meantime, officials will continue to undertake regular inspections and repair defects in accordance with my Department’s policy.","answerHtml":"<p>While there are many footways across the East Antrim constituency, including the footway along the B90 Old Carrick Road, which would benefit from investment, due to limited budget resources, structural maintenance work is taken forward through the prioritisation of those deemed most in need for intervention.</p><p>Details of the planned list of carriageway and footway resurfacing schemes for the 2025/26 financial year will be included within my Department’s Annual Report to Councils.</p><p>In the meantime, officials will continue to undertake regular inspections and repair defects in accordance with my Department’s policy.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022635%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=428166","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=428166"}},{"id":"428165","reference":"AQW 22634/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-02-14","answerBy":"2025-03-03","answered":"2025-02-20","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to detail the resurface threshold per mile for roads that have had numerous repairs and potholes.","answerText":"Under Article 8 of the Roads (Northern Ireland) Order 1993, my Department has a statutory duty to maintain all public roads in a safe and serviceable condition and to seek to fulfil this duty, an annual programme of resurfacing and reconstruction works is undertaken, the extent of which is dictated by the availability of funding.\n\nOn trunk roads, information is routinely gathered and analysed from a variety of specialist machine surveys and visual inspections and this information is used in order to help inform decisions regarding our annual maintenance programmes. On other roads, divisional programmes are prepared on the basis of a number of data factors including road usage and general surface condition surveys as well as information from maintenance inspections, public enquiries and public liability claims.\n\nProgrammes are subject to continual review and take into account a wide range of factors such as worsening condition of other roads, planned works by utilities, additional in year funding, contractor capacity etc.","answerHtml":"<p>Under Article 8 of the Roads (Northern Ireland) Order 1993, my Department has a statutory duty to maintain all public roads in a safe and serviceable condition and to seek to fulfil this duty, an annual programme of resurfacing and reconstruction works is undertaken, the extent of which is dictated by the availability of funding.</p><p>On trunk roads, information is routinely gathered and analysed from a variety of specialist machine surveys and visual inspections and this information is used in order to help inform decisions regarding our annual maintenance programmes. On other roads, divisional programmes are prepared on the basis of a number of data factors including road usage and general surface condition surveys as well as information from maintenance inspections, public enquiries and public liability claims.</p><p>Programmes are subject to continual review and take into account a wide range of factors such as worsening condition of other roads, planned works by utilities, additional in year funding, contractor capacity etc.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022634%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=428165","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=428165"}},{"id":"428164","reference":"AQW 22633/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-02-14","answerBy":"2025-03-03","answered":"2025-02-23","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to detail the road maintenance plans for East Antrim for the 2025-26 financial year.","answerText":"Resurfacing schemes are funded through my Department’s Structural Maintenance Programme; regrettably, for some time the available investment has not kept pace with what is needed to maintain all of our roads in a reasonable condition.\n\nWhile there are many roads that would benefit from investment, due to limited budget resources, resurfacing work is taken forward through the prioritisation of those deemed most in need for intervention.\n\nDetails of planned resurfacing schemes will be included within the Department’s Annual Report to Council.","answerHtml":"<p>Resurfacing schemes are funded through my Department’s Structural Maintenance Programme; regrettably, for some time the available investment has not kept pace with what is needed to maintain all of our roads in a reasonable condition.</p><p>While there are many roads that would benefit from investment, due to limited budget resources, resurfacing work is taken forward through the prioritisation of those deemed most in need for intervention.</p><p>Details of planned resurfacing schemes will be included within the Department’s Annual Report to Council.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022633%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=428164","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=428164"}},{"id":"426893","reference":"AQW 22076/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-02-06","answerBy":"2025-02-21","answered":"2025-04-23","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister, pursuant to AQW 20158 22-27, to detail any responses they have had from Ministerial colleagues in the (i) Department for Communities; (ii) Department for the Economy; (iii) Department of Finance; and (iv) Department for Infrastructure in relation to the establishment of a cross-departmental working group.","answerText":"On 10th October we wrote to Ministerial colleagues at the Departments for Communities, Economy, Finance and Infrastructure asking them to consider the recommendations of the High Street Task Force report and determine the way forward, bringing matters to the Executive for consideration as necessary.\n\nResponses were received from all four departments, outlining how they would take forward recommendations that fell within their responsibilities.","answerHtml":"<p>On 10th October we wrote to Ministerial colleagues at the Departments for Communities, Economy, Finance and Infrastructure asking them to consider the recommendations of the High Street Task Force report and determine the way forward, bringing matters to the Executive for consideration as necessary.</p><p>Responses were received from all four departments, outlining how they would take forward recommendations that fell within their responsibilities.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022076%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=426893","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=426893"}},{"id":"426892","reference":"AQW 22075/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-02-06","answerBy":"2025-02-21","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health (i) for an update on an all-island cancer strategy; and (ii) to detail any discussions he has had with his southern counterpart in relation to such a strategy.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022075%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=426892","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=426892"}},{"id":"426891","reference":"AQW 22074/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-02-06","answerBy":"2025-02-21","answered":"2025-02-19","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to detail (i) the safety record of existing cycle lanes in East Antrim; and (ii) the future plans for cycle lanes in East Antrim.","answerText":"My Department has not identified any collision clusters along existing cycle lanes in the East Antrim area that would trigger consideration as part of a Local Transport Safety Measures programme.\n\nMy department has developed a draft Active Travel Delivery Plan which sets out how we propose to prioritise delivery of active travel infrastructure for the next 10 years and beyond. The plan includes draft network maps for larger settlements, including Larne, Carrickfergus and Greenisland in the East Antrim area, with the aim of encouraging people to consider walking, wheeling or cycling for shorter everyday journeys.\n\nPublic consultation on the draft plan runs until 28 February 2025 and I would encourage all those with an interest in development of high quality, safe pedestrian and cycling infrastructure to engage with this consultation.","answerHtml":"<p>My Department has not identified any collision clusters along existing cycle lanes in the East Antrim area that would trigger consideration as part of a Local Transport Safety Measures programme.</p><p>My department has developed a draft Active Travel Delivery Plan which sets out how we propose to prioritise delivery of active travel infrastructure for the next 10 years and beyond. The plan includes draft network maps for larger settlements, including Larne, Carrickfergus and Greenisland in the East Antrim area, with the aim of encouraging people to consider walking, wheeling or cycling for shorter everyday journeys.</p><p>Public consultation on the draft plan runs until 28 February 2025 and I would encourage all those with an interest in development of high quality, safe pedestrian and cycling infrastructure to engage with this consultation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022074%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=426891","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=426891"}},{"id":"426890","reference":"AQW 22073/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-02-06","answerBy":"2025-02-21","answered":"2025-02-19","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to detail her Department's active travel plans for East Antrim.","answerText":"My department has developed a draft Active Travel Delivery Plan which sets out how we propose to prioritise delivery of active travel infrastructure for the next 10 years and beyond. The plan includes draft network maps for larger settlements, including Larne, Carrickfergus and Greenisland in the East Antrim area, with the aim of encouraging people to consider walking, wheeling or cycling for shorter everyday journeys.\n\nPublic consultation on the draft plan runs until 28 February 2025. I would encourage all those with an interest in development of high quality, safe pedestrian and cycling infrastructure to engage with this consultation.\n\nMy department is also updating our design guidance for active travel infrastructure based on current national and international best practice for the design of high-quality active travel infrastructure. Future schemes will be delivered in line with this updated guidance.","answerHtml":"<p>My department has developed a draft Active Travel Delivery Plan which sets out how we propose to prioritise delivery of active travel infrastructure for the next 10 years and beyond. The plan includes draft network maps for larger settlements, including Larne, Carrickfergus and Greenisland in the East Antrim area, with the aim of encouraging people to consider walking, wheeling or cycling for shorter everyday journeys.</p><p>Public consultation on the draft plan runs until 28 February 2025. I would encourage all those with an interest in development of high quality, safe pedestrian and cycling infrastructure to engage with this consultation.</p><p>My department is also updating our design guidance for active travel infrastructure based on current national and international best practice for the design of high-quality active travel infrastructure. Future schemes will be delivered in line with this updated guidance.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022073%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=426890","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=426890"}},{"id":"424858","reference":"AQO 1468/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2025-01-23","answerBy":"2025-02-03","answered":"2025-02-03","answeredOrally":true,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice for her assessment of the number of paramilitary style attacks over the last year.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mrs Long","text":"At the outset, I record my condemnation of the two most serious recent paramilitary-style shootings that occurred: one of a teenager in Ards, the other of a pensioner in Coleraine. Such barbaric brutality has no place in our community. Those attacks must stop. Statistics provided by the PSNI indicate that, in 2024, there were 28 casualties of paramilitary-style attacks, a significant reduction from the 50 recorded in 2023. Within that, there were five casualties of paramilitary-style shootings, approximately a quarter of the number that occurred in 2023. Whilst there is likely to be a range of factors affecting the reduction, I must commend the Executive programme on paramilitarism and organised crime (EPPOC) on the work being done to address this complex societal and generational issue. Over the last eight years, EPPOC has been testing innovative interventions aimed at tackling paramilitary harm in the here and now and breaking the cycle of violence for future generations. Those interventions include those that support victims of paramilitary harm, improving outcomes for individuals and helping to break the victim-perpetrator cycle. Targeted youth work that is delivered in a variety of ways, including through street-based initiatives and even in emergency departments, and help to prevent young people at risk of paramilitary exploitation and abuse from becoming engaged in criminality in the first place are just some of the structures that we have put in place."},{"speaker":"Mr Dickson","text":"I thank the Minister for her comments on the two recent events. Will the Minister outline the interventions that the programme makes to provide specific support for victims of paramilitary-style attacks?"},{"speaker":"Mrs Long","text":"Since 2021, the programme has developed and tested a range of interventions involving over 2,500 victims of paramilitary harm who have been directly supported by the programme. That is helping to break the victim-perpetrator cycle for future generations. Key interventions include the Insync project, the first bespoke service designed for victims of paramilitary-style attacks. It was commissioned by EPPOC in 2022 and is delivered by NIACRO. As well as providing support for victims of paramilitary violence, it is actively learning about effective approaches and informing work on tackling violence and paramilitarism more generally. The hospital-based Connect project for youth work places youth workers in three hospital emergency departments. They work as navigators, engaging young people when they first arrive at the hospital and through community-based follow-up. As well as the work to change the language around paramilitary violence, the programme helps to raise awareness of the specific nature of the trauma caused by paramilitaries. That may mean that more service providers are better able to identify those requiring specific help and support."},{"speaker":"Mr Beattie","text":"Does the Minister agree that the statistics on paramilitary attacks do not tell the whole story? When you add moneylending, racketeering, extortion and intimidation, all that activity has a negative effect on society and can be just as harming as paramilitary-style attacks."},{"speaker":"Mrs Long","text":"Without doubt, the reach of harm that paramilitaries inflict on our communities is extensive and wide-ranging. The Member has namechecked a number of the most common types. Of course, it is not limited to those. We know that child sexual and criminal exploitation, among many other things, is a feature of paramilitaries in our community. Ultimately, whilst I want to reduce the harm of paramilitaries in communities, I want more than anything to end the existence of paramilitaries in our community. That is a permanent solution to what we face as a community, and it needs to be accelerated."},{"speaker":"Mr O'Toole","text":"Minister, one of the activities that paramilitaries have been engaged in in addition to, if I can call them this, traditional paramilitary-style attacks is hate crime, particularly race hate crime, in South Belfast. What is her Department specifically looking to do to address that? Does it include hate crime legislation?"},{"speaker":"Mrs Long","text":"As the Member knows, paramilitaries will act under any banner that allows them to justify their existence to a local community or to pretend that they are protagonists acting on behalf of that community. The truth is that they feed off the misery in those communities. The Member will also be aware that I intend to implement the aggravator model, which Judge Marrinan recommended in his report on hate crime, as part of the sentencing Bill that we hope to introduce in the autumn of this year. The following year, we hope to introduce legislation on victims and witnesses of crime that will see more protections for vulnerable victims and witnesses extended to victims of hate crime. There are, however, things that we can do and are doing in the meantime, including providing bespoke support to members of ethnic minority groups and different racial groups in society and giving reassurance through the work that the Department is doing more widely to combat those ills."},{"speaker":"Mr Carroll","text":"Last week, the Minister for Communities removed intimidation points for victims of paramilitary-style violence. Minister, does your Department have any concern about the impact that that will have on people's safety and on their ability to live a life free from paramilitaries?"},{"speaker":"Mrs Long","text":"I was clear in my statement that, while I welcome the fact that the criteria for extra points relating to paramilitary harm have been changed to reflect the wider harms that happen in our society, such as domestic violence and sexual abuse, which were very much a secondary consideration when it came to claiming points for homelessness, I recognised the importance of ensuring that people are no longer being driven from their homes by such organisations or individuals. The Executive now need to focus on how we can ensure that people can remain in their home safely rather than allow individuals to dictate where and when people can live at peace and get on with their lives."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201468%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=424858","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2025-02-03&docID=425759#AQO%201468/22-27","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=424858"}},{"id":"423182","reference":"AQO 1399/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2025-01-09","answerBy":"2025-01-21","answered":"2025-01-21","answeredOrally":true,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education for an update on his engagement with teaching unions in relation to planned industrial action over pay.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr Givan","text":"With your permission, Mr Speaker, I will answer questions 4 and 8 together. Through the Teachers' Negotiating Committee (TNC), a joint pay group is operational, and meetings are taking place with employers, sectoral support bodies and the recognised teaching trade unions — represented by the Northern Ireland Teachers' Council (NITC) — to explain to and update them on the current financial pressures in education and discuss the current pay claim from the NITC. The claim was substantially higher than what has been recommended by the United Kingdom Government and accepted by teachers in England. In line with the requirements of public-sector pay policy, any proposals for a teachers' pay award must be affordable, and that is proving difficult to resolve, given the pressures that already face the Education budget. Four of the five unions on the NITC balloted for industrial action and action short of strike action, and that was due to commence on Monday 13 January. I provided confirmation that I am committed to securing the funding that is required to make a formal pay offer in the context of the agreement reached in the summer of last year in England and Wales and on the understanding that we secure agreement on a sustained period of stability, free from industrial action, including action short of strike, in our schools. As a result of that, the four trade unions agreed to suspend their industrial action for four weeks to allow further discussion aimed at finalising the ongoing pay negotiations. The workload agreement, TNC 2024/2, is effective in providing clarification, advice and guidance on teachers' terms and conditions to boards of governors, principals and teachers. Management side and the NITC have jointly designed a framework to address the recommendations contained in the eight completed workforce reviews."},{"speaker":"Mrs Dillon","text":"I thank the Minister for his answer. Minister, as you will be well aware, the pay issue goes much wider than just our teachers. Our classroom assistants are very frustrated by their pay increase. Have you met classroom assistants and engaged with them directly? They are among the lowest-paid workers across society, yet they do vital work by supporting our young children, including our most vulnerable children."},{"speaker":"Mr Givan","text":"I agree with the Member on the hugely important contribution that our teaching staff and support staff make. That is why, when the institutions were restored, the Executive prioritised them. The Finance Minister made funding available, and I worked with the unions to negotiate a pay settlement that resolved a three-year dispute. We increased the starting salary for new teachers from £23,000 to £30,000. We increased teachers' pay by double digits, and a backdated payment was made for that. We also resolved the industrial dispute by support staff through the pay and grading review, and that has resulted in significant pay increases for all support staff. We are now trying to resolve the issue for the current financial year. I am engaging in good faith to get a resolution. My team is meeting the unions right now, and diaries have been cleared to allow negotiations to continue tomorrow and Thursday. We have an opportunity over the next number of weeks to bring those negotiations to a conclusion. I have outlined the parameters within which we need to reach agreement, and I have been working incredibly hard to try to identify the funding that we need in order for a formal pay offer to be made. I will continue to do that. I absolutely accept that support staff require support. I met the Member's party colleague the Member for Foyle, who did some work on the role of classroom assistants and provided me with a report. That was very helpful and demonstrated their value, which I already knew. During that meeting, he provided evidence that was helpful to me. I know that it is a shared aim of all of us in the House to support teachers and the wider support staff, and I know that the Executive want to do that."},{"speaker":"Mr Dickson","text":"Thank you, Minister, for your answer. Will you outline for the House what plans you have to consult teachers' unions and other trade unions to review teacher and classroom assistant workloads in order to better represent the reality of life in the classroom for them?"},{"speaker":"Mr Givan","text":"I thank the Member for that question. Three of the four unions balloted purely on the pay issue, but one union included issues to do with workload. My original response highlighted issues to do with workload, including commitments that were made and work streams that we have been taking forward. A timetable for the implementation of the areas that can be progressed, immediately and over the short to medium term, has been agreed with the trade unions. The focus of both management side and the NITC is to determine the areas of work that, once revised and implemented, will have the potential to impact positively on working practices in the education sector. A programme of work has been prepared, grouping the recommendations that are in progress and those that can be progressed with existing resources into themes, one of which relates to school leaders. I will continue to do all that I can to progress those measures and to secure the funding and resources that are needed to provide a pay settlement. I will work with the unions to get a resolution over the next number of weeks."},{"speaker":"Mr Kingston","text":"Can the Minister advise whether teachers' terms and conditions in England are the same as those in Northern Ireland?"},{"speaker":"Mr Givan","text":"We are incredibly fortunate in this country: teaching is a valued profession here and we have high levels of application to all our initial teacher training colleges. As an Executive, we want to attract the brightest and best to the profession. I and the Executive support that position. Northern Ireland negotiates terms and conditions through the management side, which is made up of employers such as the Education Authority, the Council for Catholic Maintained Schools (CCMS) and others. We negotiate those terms and conditions for Northern Ireland. When a pay settlement is reached in England, the terms and conditions for teachers there are not the same as those in Northern Ireland. For example, in Northern Ireland, there is a legal right to automatic pay progression, so teachers here automatically move up their scales. In England, pay progression is subject to an annual performance review by the employer, so a teacher may not move up. It is important that we recognise that there is a different context in Northern Ireland. The exceptions to the directed working time budgets are tighter in England. There is greater flexibility in Northern Ireland. When looking at pay, it is not as simple as saying, \"We demand pay parity with England\", because the terms and conditions are not like for like. We need to find solutions to such issues that recognise the legal framework in Northern Ireland."},{"speaker":"Mr Crawford","text":"I appreciate the Minister's work on the issue. Is there a long-term strategy to ensure competitive pay for teachers in Northern Ireland? How often will teachers' salaries be reviewed?"},{"speaker":"Mr Givan","text":"I thank the Member for that question. Every year, we seek to review and reach a settlement on pay. A short time after the Executive's restoration, teachers' pay increased by over 10%. That was backdated. We resolved the industrial action by our support staff and delivered a significant increase in their pay. We review pay every year. I want that to happen sooner, but we have not been in a position to move forward, because the Department of Education has not had the funding to do so. I have had to work to identify what funding there could be. That will require difficult decisions for me, as a Minister, and I have no doubt that Members will criticise me for the decisions that I will need to take, but we are prioritising teachers' pay. That will have implications for the next financial year, because there will be a cumulative impact. That is why I unashamedly make the case for additional resource for the Department of Education. We want to attract people into the profession. It is a deeply valued profession. People often go into it because it is vocational, and we should never take that for granted. We should always pay them the appropriate salary to reflect their contribution to our children and young people, who, ultimately, are the future. We have workforce strategies in place. We are struggling to recruit people to teach particular subjects at post-primary level. That requires us to look at those issues, but I want to make sure that we pay our workforce the right rate to reflect the important work that they do. I will continue to seek to do that in the years ahead."},{"speaker":"Ms Hunter","text":"Minister, many Irish-medium schools have voiced their frustration that teachers make more money in the South of Ireland. Therefore, we lose a lot of our Irish-speaking teachers to the South. Will a pay award that increases salaries be enough to keep teachers in the North? What further steps will your Department take?"},{"speaker":"Mr Givan","text":"I am not aware of salary being an issue in attracting people to Irish-medium schools. There is an issue with how we make sure that people who are qualified and proficient in the Irish language are able to deliver education through that medium. The Department recognises that that is a particular issue for Irish-medium schools, and work is being done to make sure that we provide support. For example, the reductions in the number of placements in our teacher training colleges did not apply to the Irish-medium sector. That recognised the needs of the sector and the legal duties on the Department in that respect. I recognise that that is an issue for Irish-medium. It is an issue for some other subjects at post-primary level when it comes to attracting staff. We need to make sure that terms and conditions are attractive and that teachers can be supported in the working environment, which we can do through a number of measures. As I reform the education system, we will look at curriculum and ways in which we carry out assessment. Key to that will be teachers' professional development and empowering our teachers who want to be provided with that support to carry out their job. I am determined that we seek to do that."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201399%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=423182","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2025-01-21&docID=423732#AQO%201399/22-27","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=423182"}},{"id":"424441","reference":"AQO 1389/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2025-01-09","answerBy":"2025-01-20","answered":"2025-01-20","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on the development of tidal and wave energy in Northern Ireland.","answerText":"Question 13 – AQO 1389/22-27\n\nMy Department, in collaboration with other departments and key stakeholders, have developed an Offshore Renewable Energy Action Plan (OREAP) to enable offshore renewable energy development in the north’s marine area from 2030.\n\nDfE have appointed RPS Ireland to undertake an update to the 2012 Strategic Environmental Assessment (SEA) and Habitats Regulation Assessment (HRA) of Offshore Renewable Energy in the NI Marine Area.\n\nThe SEA/HRA will enable us, in collaboration with key delivery partners, to identify suitable areas for offshore renewable energy development across various technology types including tidal and wave.","answerHtml":"<p>Question 13 – AQO 1389/22-27</p><p>My Department, in collaboration with other departments and key stakeholders, have developed an Offshore Renewable Energy Action Plan (OREAP) to enable offshore renewable energy development in the north’s marine area from 2030.</p><p>DfE have appointed RPS Ireland to undertake an update to the 2012 Strategic Environmental Assessment (SEA) and Habitats Regulation Assessment (HRA) of Offshore Renewable Energy in the NI Marine Area.</p><p>The SEA/HRA will enable us, in collaboration with key delivery partners, to identify suitable areas for offshore renewable energy development across various technology types including tidal and wave.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201389%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=424441","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=424441"}},{"id":"422965","reference":"AQW 20160/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-01-08","answerBy":"2025-01-23","answered":"2025-01-14","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister, given that terrorism is a reserved matter, and in light of the Terrorism (Protection of Premises) Bill 2024 currently going through Westminster, whether they can confirm that their Department will be the lead Department in this matter.","answerText":"The Terrorism (Protection of Premises) Bill was introduced in Westminster on 12 September 2024. Several elements of the Bill are of particular relevance to Departments here, due to the broad range of premises, events and statutory obligations that fall within scope of its provisions.\n\nSince its introduction, the Home Office Security Minister has been liaising with a number of Executive Ministers regarding the implications of the Bill. It will be a matter for those impacted Ministers to continue to work directly with the Home Office on the issues relevant to their department.","answerHtml":"<p>The Terrorism (Protection of Premises) Bill was introduced in Westminster on 12 September 2024. Several elements of the Bill are of particular relevance to Departments here, due to the broad range of premises, events and statutory obligations that fall within scope of its provisions.</p><p>Since its introduction, the Home Office Security Minister has been liaising with a number of Executive Ministers regarding the implications of the Bill. It will be a matter for those impacted Ministers to continue to work directly with the Home Office on the issues relevant to their department.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020160%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=422965","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=422965"}},{"id":"422964","reference":"AQW 20159/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-01-08","answerBy":"2025-01-23","answered":"2025-02-11","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister, pursuant to AQO 901/22-27, to detail any discussions they have had with Ministerial colleagues in the (i) Department for Communities; (ii) Department for the Economy; (iii) Department of Finance; and (iiii) Department for Infrastructure in relation to the 14 recommendations outlined in the Delivering a 21st Century High Street report by the High Street Task Force.","answerText":"The scope of the recommendations lie within the responsibilities of a number of departments.\n\nOn 10th October we wrote to Ministerial colleagues at the Departments for Communities, Economy, Finance, and Infrastructure asking them to consider the recommendations of the High Street Task Force report and determine the way forward, bringing matters to the Executive for consideration, as necessary.","answerHtml":"<p>The scope of the recommendations lie within the responsibilities of a number of departments.</p><p>On 10th October we wrote to Ministerial colleagues at the Departments for Communities, Economy, Finance, and Infrastructure asking them to consider the recommendations of the High Street Task Force report and determine the way forward, bringing matters to the Executive for consideration, as necessary.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020159%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=422964","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=422964"}},{"id":"422963","reference":"AQW 20158/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2025-01-08","answerBy":"2025-01-23","answered":"2025-02-10","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister (i) which Department will be taking the lead on the implementation of the findings of the High Street Task Force report Delivering a 21st Century High Street; and (ii) whether local councils have also been consulted.","answerText":"The scope of the High Street Taskforce Report recommendations lie within the responsibilities of a number of departments.\n\nOn 10th October we wrote to Ministerial colleagues at the Departments for Communities, Economy, Finance and Infrastructure, noting our view that a cross-departmental working group should be established of the relevant departments along with local councils. We therefore asked them to consider the recommendations of the High Street Task Force report and determine the way forward, bringing matters to the Executive for consideration as necessary.","answerHtml":"<p>The scope of the High Street Taskforce Report recommendations lie within the responsibilities of a number of departments.</p><p>On 10th October we wrote to Ministerial colleagues at the Departments for Communities, Economy, Finance and Infrastructure, noting our view that a cross-departmental working group should be established of the relevant departments along with local councils. We therefore asked them to consider the recommendations of the High Street Task Force report and determine the way forward, bringing matters to the Executive for consideration as necessary.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020158%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=422963","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=422963"}},{"id":"422587","reference":"AQO 1322/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2025-01-06","answerBy":"2025-01-13","answered":"2025-01-13","answeredOrally":true,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice for an update on her legislative programme for the remainder of the 2022-2027 mandate.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mrs Long","text":"As you will be aware, it was not possible to introduce any legislation or progress key policy decisions in the absence of Ministers, the Executive and the Northern Ireland Assembly during a significant portion of the early part of this mandate. I therefore had to review and re-prioritise my previous, more ambitious legislative plans on my return as Minister of Justice at the beginning of last year. My revised legislative programme now includes plans to bring forward three Assembly Bills, which equates to one per annum, during the time remaining in this significantly shortened mandate. They are a mixed-content Justice Bill, which was introduced to the Assembly on Tuesday 17 September 2024; a sentencing Bill, which is planned for introduction by autumn 2025; and a victims and witnesses of crime Bill, which is planned for introduction by March 2026."},{"speaker":"Mr Dickson","text":"Thank you, Minister, for your answer. Minister, there has been a great deal of interest expressed to me, as a former member of the Justice Committee, about the content of the victims and witnesses Bill. Can you perhaps outline for the House the general principles behind that Bill and the type of offences that will be covered?"},{"speaker":"Mrs Long","text":"We are looking at a range of issues in relation to the victims and witnesses Bill, including, first, the potential to include some of the recommendations in Judge Marrinan's report around support for victims of hate crime and special measures in the courts. We also intend to bring forward additional measures to complete some of the legislative requirements of elements of the Gillen review that, we agreed, were necessary, and to put the Commissioner Designate for Victims of Crime on a statutory footing. We are looking at a number of other issues, but it is the third Justice Bill in the mandate, so there is ongoing development in what we intend to include in it. It is important that those issues are advanced during the mandate and that we have the opportunity to look at, for example, legislation around a disclosure regime, protection for complainants and restriction of access to third-party material, particularly when it comes to things such as counselling records, about which I know many Members are concerned."},{"speaker":"Mr O'Toole","text":"Minister, I commend you for introducing legislation in 2024. Many Ministers could learn from that. I also appreciate your being in the Chamber. You are clearly suffering from a cold, so fair play for being here and answering questions. In light of the seriousness of the hate crime situation that we face, given what we saw on the streets of Belfast last summer, will you revisit your plan not to introduce stand-alone hate crime legislation, which was a commitment in your party's manifesto, and seek to introduce a Bill in this mandate that properly tackles hate crime? I appreciate that you will say that that will be part of another Bill, but will you revisit your plan not to introduce stand-alone hate crime measures?"},{"speaker":"Mrs Long","text":"I have no intention of revisiting that plan. I considered the issue carefully before opting for the course of action that I took. Had I decided to not decouple the elements of the hate crime Bill from each other and to proceed with them as I have, at pace, I would not be in a position to make any progress on hate crime in the mandate, because it would have been the fourth Justice Bill of the mandate and would have fallen off the end of the time frame. If I were to revisit the hate crime Bill now, I would not have sufficient time, first, for legislative counsel to advance it, and for the policy development work that would need to take place in my Department before the end of the mandate. Effectively, I would be slowing down progress on tackling hate crime rather than speeding it up. I have opted to accelerate it, albeit it means that there will not be stand-alone legislation. To be clear, there is no difference between legislative provisions being in a stand-alone Bill and their being included in other vehicles. When they are in legislation, they are the law."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201322%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=422587","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2025-01-13&docID=422082#AQO%201322/22-27","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=422587"}},{"id":"419543","reference":"AQW 18978/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-11-28","answerBy":"2024-12-13","answered":"2024-12-13","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail the number of dietitians currently in (i) full-time; (ii) part-time; and (iii) job share posts for patients diagnosed with oesophageal and gastric cancer, broken down by Health and Social Care Trust.","answerText":"Information provided by the Health and Social Care (HSC) Trusts on the number of dietitians currently employed on a full-time, part-time and job share basis, for patients diagnosed with oesophageal and gastric cancer, is detailed in the table below.\n\nHSC Dietitians Employed (Headcount) for Oesophageal & Gastric Cancer Patients, by HSC Trust & Work Pattern\n\nHSC Trust\tFull-Time\tPart-Time\tJob Share\nBelfast\tBelfast City Hospital ~\t2\t2\t0\nNI Cancer Centre\t1\t0\t0\nNorthern *\t0\t2\t0\nSouth Eastern #\t0\t0\t0\nSouthern ^\t3\t1\t0\nWestern\t0\t1\t0\n\nSource: Information & Analysis Directorate, DoH\n\n~ Dietitians see both cancer and non-cancer patients requiring Upper Gastrointestinal surgery.\n\n* Core/ general community dietetic staff also manage some gastric/ oesophageal patients but there is no dedicated funding for this.\n\n# Patients with a diagnosis of oesophageal and gastric cancer are referred into and seen by Core Dietetic Services across their patient journey. There is no specific Dietetic staffing resource identified solely for oesophageal and gastric cancers.\n\n^ Dietitians provide input to patients that have been diagnosed with oesophageal and gastric cancer. This work is only a proportion of each job plan, as dietitians provide a service to a larger cohort of patients with cancer and palliative conditions.","answerHtml":"<p>Information provided by the Health and Social Care (HSC) Trusts on the number of dietitians currently employed on a full-time, part-time and job share basis, for patients diagnosed with oesophageal and gastric cancer, is detailed in the table below.</p><p>HSC Dietitians Employed (Headcount) for Oesophageal &amp; Gastric Cancer Patients, by HSC Trust &amp; Work Pattern</p><div class=\"table-wrap\"><table><tr><td colspan=\"2\">HSC Trust</td><td>Full-Time</td><td>Part-Time</td><td>Job Share</td></tr><tr><td>Belfast</td><td>Belfast City Hospital ~</td><td>2</td><td>2</td><td>0</td></tr><tr><td></td><td>NI Cancer Centre</td><td>1</td><td>0</td><td>0</td></tr><tr><td colspan=\"2\">Northern *</td><td>0</td><td>2</td><td>0</td></tr><tr><td colspan=\"2\">South Eastern #</td><td>0</td><td>0</td><td>0</td></tr><tr><td colspan=\"2\">Southern ^</td><td>3</td><td>1</td><td>0</td></tr><tr><td colspan=\"2\">Western</td><td>0</td><td>1</td><td>0</td></tr></table></div><p>Source: Information &amp; Analysis Directorate, DoH</p><p>~ Dietitians see both cancer and non-cancer patients requiring Upper Gastrointestinal surgery.</p><p>* Core/ general community dietetic staff also manage some gastric/ oesophageal patients but there is no dedicated funding for this.</p><p># Patients with a diagnosis of oesophageal and gastric cancer are referred into and seen by Core Dietetic Services across their patient journey. There is no specific Dietetic staffing resource identified solely for oesophageal and gastric cancers.</p><p>^ Dietitians provide input to patients that have been diagnosed with oesophageal and gastric cancer. This work is only a proportion of each job plan, as dietitians provide a service to a larger cohort of patients with cancer and palliative conditions.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018978%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=419543","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=419543"}},{"id":"419542","reference":"AQW 18977/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-11-28","answerBy":"2024-12-13","answered":"2024-12-13","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail the number of dietitians currently in (i) full-time; (ii) part-time; and (iii) job share posts at the regional service based at Belfast City Hospital for patients diagnosed with oesophageal and gastric cancer.","answerText":"Information provided by the Health and Social Care (HSC) Trusts on the number of dietitians currently employed on a full-time, part-time and job share basis, for patients diagnosed with oesophageal and gastric cancer, is detailed in the table below.\n\nHSC Dietitians Employed (Headcount) for Oesophageal & Gastric Cancer Patients, by HSC Trust & Work Pattern\n\nHSC Trust\tFull-Time\tPart-Time\tJob Share\nBelfast\tBelfast City Hospital ~\t2\t2\t0\nNI Cancer Centre\t1\t0\t0\nNorthern *\t0\t2\t0\nSouth Eastern #\t0\t0\t0\nSouthern ^\t3\t1\t0\nWestern\t0\t1\t0\n\nSource: Information & Analysis Directorate, DoH\n\n~ Dietitians see both cancer and non-cancer patients requiring Upper Gastrointestinal surgery.\n\n* Core/ general community dietetic staff also manage some gastric/ oesophageal patients but there is no dedicated funding for this.\n\n# Patients with a diagnosis of oesophageal and gastric cancer are referred into and seen by Core Dietetic Services across their patient journey. There is no specific Dietetic staffing resource identified solely for oesophageal and gastric cancers.\n\n^ Dietitians provide input to patients that have been diagnosed with oesophageal and gastric cancer. This work is only a proportion of each job plan, as dietitians provide a service to a larger cohort of patients with cancer and palliative conditions.","answerHtml":"<p>Information provided by the Health and Social Care (HSC) Trusts on the number of dietitians currently employed on a full-time, part-time and job share basis, for patients diagnosed with oesophageal and gastric cancer, is detailed in the table below.</p><p>HSC Dietitians Employed (Headcount) for Oesophageal &amp; Gastric Cancer Patients, by HSC Trust &amp; Work Pattern</p><div class=\"table-wrap\"><table><tr><td colspan=\"2\">HSC Trust</td><td>Full-Time</td><td>Part-Time</td><td>Job Share</td></tr><tr><td>Belfast</td><td>Belfast City Hospital ~</td><td>2</td><td>2</td><td>0</td></tr><tr><td></td><td>NI Cancer Centre</td><td>1</td><td>0</td><td>0</td></tr><tr><td colspan=\"2\">Northern *</td><td>0</td><td>2</td><td>0</td></tr><tr><td colspan=\"2\">South Eastern #</td><td>0</td><td>0</td><td>0</td></tr><tr><td colspan=\"2\">Southern ^</td><td>3</td><td>1</td><td>0</td></tr><tr><td colspan=\"2\">Western</td><td>0</td><td>1</td><td>0</td></tr></table></div><p>Source: Information &amp; Analysis Directorate, DoH</p><p>~ Dietitians see both cancer and non-cancer patients requiring Upper Gastrointestinal surgery.</p><p>* Core/ general community dietetic staff also manage some gastric/ oesophageal patients but there is no dedicated funding for this.</p><p># Patients with a diagnosis of oesophageal and gastric cancer are referred into and seen by Core Dietetic Services across their patient journey. There is no specific Dietetic staffing resource identified solely for oesophageal and gastric cancers.</p><p>^ Dietitians provide input to patients that have been diagnosed with oesophageal and gastric cancer. This work is only a proportion of each job plan, as dietitians provide a service to a larger cohort of patients with cancer and palliative conditions.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018977%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=419542","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=419542"}},{"id":"419541","reference":"AQW 18976/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-11-28","answerBy":"2024-12-13","answered":"2024-12-12","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail the current funding allocated for oesophageal and gastric cancer prevention, broken down by Health and Social Care Trust.","answerText":"There is no funding allocated specifically to health and social care trusts for oesophageal and gastric cancer prevention. In Northern Ireland several organisations contribute to cancer prevention but primary responsibility lies with the Public Health Agency (PHA). The PHA lead on health promotion and disease prevention initiatives including programmes which may reduce cancer risk such as promoting healthy lifestyle choices (e.g. smoking cessation healthy eating and physical activity), implementing awareness campaigns on lifestyle cancer risks, and supporting screening programmes for early detection.\n\nThe proportion of cancer incidence in Northern Ireland attributable to modifiable lifestyle and environmental factors is estimated to be in the 30% to 40% range, this includes oesophageal and gastric cancers. A population approach, supported by policy and legislative measures, is required to encourage and support people to live healthier lives and reduce the prevalence of cancer risk factors such as tobacco and alcohol consumption, obesity, lack of physical activity.\n\nThe Cancer Strategy for Northern Ireland 2022 – 2032 emphasises cancer prevention as a key element in its approach and highlights increasing public awareness of cancer-related risk factors through specific strategies on tobacco, substance use, and overweight and obesity – including diet and physical exercise. A Cancer Strategy Progress Report is due for publication in early 2025 which will include further detail against actions. A new 3-year cancer strategy plan is also under development which will consider the need for prevention work.\n\nIt is important to note that all Health and Social Care Trusts carry out surveillance for patients with the premalignant condition, Barrett’s oesophagus. Barrett’s oesophagus can increase risk of oesophageal cancer. Surveillance focusses on detecting early signs of precancerous changes to the oesophagus in those diagnosed with Barrett’s Oesophagus. Patients have regular endoscopic surveillance with frequency dependent upon the nature of their condition. Work has also commenced to establish the need for targeted surveillance for other gastric premalignant conditions as part of Cancer Strategy Action 11.","answerHtml":"<p>There is no funding allocated specifically to health and social care trusts for oesophageal and gastric cancer prevention. In Northern Ireland several organisations contribute to cancer prevention but primary responsibility lies with the Public Health Agency (PHA). The PHA lead on health promotion and disease prevention initiatives including programmes which may reduce cancer risk such as promoting healthy lifestyle choices (e.g. smoking cessation healthy eating and physical activity), implementing awareness campaigns on lifestyle cancer risks, and supporting screening programmes for early detection.</p><p>The proportion of cancer incidence in Northern Ireland attributable to modifiable lifestyle and environmental factors is estimated to be in the 30% to 40% range, this includes oesophageal and gastric cancers. A population approach, supported by policy and legislative measures, is required to encourage and support people to live healthier lives and reduce the prevalence of cancer risk factors such as tobacco and alcohol consumption, obesity, lack of physical activity.</p><p>The Cancer Strategy for Northern Ireland 2022 – 2032 emphasises cancer prevention as a key element in its approach and highlights increasing public awareness of cancer-related risk factors through specific strategies on tobacco, substance use, and overweight and obesity – including diet and physical exercise. A Cancer Strategy Progress Report is due for publication in early 2025 which will include further detail against actions. A new 3-year cancer strategy plan is also under development which will consider the need for prevention work.</p><p>It is important to note that all Health and Social Care Trusts carry out surveillance for patients with the premalignant condition, Barrett’s oesophagus. Barrett’s oesophagus can increase risk of oesophageal cancer. Surveillance focusses on detecting early signs of precancerous changes to the oesophagus in those diagnosed with Barrett’s Oesophagus. Patients have regular endoscopic surveillance with frequency dependent upon the nature of their condition. Work has also commenced to establish the need for targeted surveillance for other gastric premalignant conditions as part of Cancer Strategy Action 11.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018976%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=419541","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=419541"}},{"id":"418324","reference":"AQW 18424/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-11-19","answerBy":"2024-12-04","answered":"2024-12-04","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, in light of Sir Chris Hoy's diagnosis, whether he will consider lowering the age limit for prostate cancer testing.","answerText":"Screening for prostate cancer is currently not recommended by the UK National Screening Committee (UK NSC). They last considered the evidence for screening for prostate cancer in 2020 and concluded that screening was not recommended. This is because of the poor ability of the prostate specific antigen (PSA) test to predict cancer, which could lead to unnecessary tests that carry risks of potentially life-changing harm. Additionally, some prostate cancers may not produce elevated PSA levels, leading to false-negative results that provide false reassurance. Prostate cancer is rare in men under 50 but the risk increases with age.\n\nThe UK NSC has commissioned a prostate cancer screening evidence review and cost effectiveness model, and it is expected to review this work during 2025. The UK NSC process will include a public consultation.\n\nThe UK Health Departments, through the National Institute for Health and Care Research (NIHR), have invested in a significant programme of research to address the evidence gaps in this important area. A clinical trial (called the TRANSFORM trial), which will compare the most promising tests and provide evidence about the best way to screen for prostate cancer, is due to start in early 2025.\n\nMy Department will continue to be guided by the UK NSC’s recommendations on proposals for screening programmes.\n\nAnyone with symptoms which they believe may be related to the prostate gland should contact their GP.","answerHtml":"<p>Screening for prostate cancer is currently not recommended by the UK National Screening Committee (UK NSC). They last considered the evidence for screening for prostate cancer in 2020 and concluded that screening was not recommended. This is because of the poor ability of the prostate specific antigen (PSA) test to predict cancer, which could lead to unnecessary tests that carry risks of potentially life-changing harm. Additionally, some prostate cancers may not produce elevated PSA levels, leading to false-negative results that provide false reassurance. Prostate cancer is rare in men under 50 but the risk increases with age.</p><p>The UK NSC has commissioned a prostate cancer screening evidence review and cost effectiveness model, and it is expected to review this work during 2025. The UK NSC process will include a public consultation.</p><p>The UK Health Departments, through the National Institute for Health and Care Research (NIHR), have invested in a significant programme of research to address the evidence gaps in this important area. A clinical trial (called the TRANSFORM trial), which will compare the most promising tests and provide evidence about the best way to screen for prostate cancer, is due to start in early 2025.</p><p>My Department will continue to be guided by the UK NSC’s recommendations on proposals for screening programmes.</p><p>Anyone with symptoms which they believe may be related to the prostate gland should contact their GP.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018424%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=418324","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=418324"}},{"id":"417937","reference":"AQW 18263/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-11-15","answerBy":"2024-11-25","answered":"2024-11-25","answeredOrally":false,"priority":true,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health (i) whether the roll-out and training of Maggie’s Call has been completed; and (ii) whether it is now fully operational.","answerText":"The roll-out and training of Maggie’s Call has not been completed; however, it is fully operational in Carnlough. Further roll-out has been halted following a legal challenge from the Fire Brigade’s Union.\n\nBoth NIFRS and NIAS remain committed to progressing this joint emergency medical response initiative; however, discussion at the National Joint Committee (NJC) is seen as the most appropriate mechanism to enable progress to be made.","answerHtml":"<p>The roll-out and training of Maggie’s Call has not been completed; however, it is fully operational in Carnlough. Further roll-out has been halted following a legal challenge from the Fire Brigade’s Union.</p><p>Both NIFRS and NIAS remain committed to progressing this joint emergency medical response initiative; however, discussion at the National Joint Committee (NJC) is seen as the most appropriate mechanism to enable progress to be made.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018263%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=417937","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=417937"}},{"id":"417936","reference":"AQW 18262/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-11-15","answerBy":"2024-12-02","answered":"2024-12-03","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to detail (i) the total cost to clean up the bonfire site at Prince Andrew Way, Carrickfergus, in 2024; and (ii) the cumulative cost of damage repairs to the site and adjacent areas in the last ten years.","answerText":"The total cost incurred by my Department, in association with the bonfire located at Prince Andrew Way, Carrickfergus was £4,268.92 in 2024.\n\nMy Department’s records only go as far back as 2017 in accordance with the retention schedule, and no data is held for the year 2022. It should also be noted that there was no bonfire in 2020 due to the Covid pandemic. However, I can advise that over the last 8 years (inclusive of 2024) the costs associated with the Prince Andrew Way bonfire are £32,743.43.","answerHtml":"<p>The total cost incurred by my Department, in association with the bonfire located at Prince Andrew Way, Carrickfergus was £4,268.92 in 2024.</p><p>My Department’s records only go as far back as 2017 in accordance with the retention schedule, and no data is held for the year 2022. It should also be noted that there was no bonfire in 2020 due to the Covid pandemic. However, I can advise that over the last 8 years (inclusive of 2024) the costs associated with the Prince Andrew Way bonfire are £32,743.43.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018262%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=417936","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=417936"}},{"id":"419145","reference":"AQO 1191/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2024-11-14","answerBy":"2024-11-25","answered":"2024-11-26","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs how the EU proposals for a universal approach on the welfare of dogs and cats and their traceability will impact Northern Ireland.","answerText":"Under the Windsor Framework (Implementation) Regulations 2024, new EU laws, including the EU proposal for a universal approach on the welfare of dogs and cats and their traceability, no longer sit within my ministerial responsibilities. They come under the direction and control of the Secretary of State for Environment, Food and Rural Affairs.\n\nWhile some of the aspects of this European proposal would not be new to Northern Ireland, it is my view that other elements would enhance and supplement our existing laws.\n\nI am very mindful of the welfare benefits of tightening breeding rules, microchipping cats and banning shock collars, so I am actively considering the introduction of domestic legislation here, using existing powers.\n\nI have written to the UK Government on this matter and they will be keeping a watching brief on developments.","answerHtml":"<p>Under the Windsor Framework (Implementation) Regulations 2024, new EU laws, including the EU proposal for a universal approach on the welfare of dogs and cats and their traceability, no longer sit within my ministerial responsibilities. They come under the direction and control of the Secretary of State for Environment, Food and Rural Affairs.</p><p>While some of the aspects of this European proposal would not be new to Northern Ireland, it is my view that other elements would enhance and supplement our existing laws.</p><p>I am very mindful of the welfare benefits of tightening breeding rules, microchipping cats and banning shock collars, so I am actively considering the introduction of domestic legislation here, using existing powers.</p><p>I have written to the UK Government on this matter and they will be keeping a watching brief on developments.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201191%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=419145","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=419145"}},{"id":"415647","reference":"AQO 1096/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2024-10-24","answerBy":"2024-11-11","answered":"2024-11-11","answeredOrally":true,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education to outline the measures he is taking to reduce bureaucracy within the Education Authority and the Department’s arms-length bodies.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr Givan","text":"I accept that there is a need to review and improve service delivery in education. To that end, education services will be reformed through the outworkings of the end-to-end reviews of special educational needs (SEN) and school improvement, which focus on the development of high-quality, cost-effective services. The reviews will shortly produce recommendations on how delivery models can be more responsive, agile and customer-focused. Service delivery improvements will be achieved initially through the reconfiguration and refocusing of services delivered by the EA and other education bodies. Progress will be closely monitored, and, if necessary, more fundamental structural change will be implemented."},{"speaker":"Mr Dickson","text":"Thank you, Minister, for your answer. You will be aware that the independent review of education recommended the creation of a single managing authority: what action are you taking to bring that about in this mandate?"},{"speaker":"Mr Givan","text":"The independent review of education identified a number of key areas that relate to the managing authority role. I will highlight one of them, which is that the level of support for controlled schools was \"suboptimal\"."},{"speaker":"","text":"That is why I have created a task force to address that issue. We need to make sure that, where managing authorities operate, they do so on an equitable basis, providing support to the various sectors. The Education Authority has failed the controlled sector in particular. The independent review of education provided evidence to that effect, as did the landscape review of the Education Authority. There is work taking place to highlight how those issues need to be addressed. There is evidence for that. We have engaged with schools on that task force, and that is providing further evidence on the need for change. However, I expect the managing authorities to work together to deliver consistency in the level of support that is required, but there is a clear need to address the failings that exist in relation to the controlled sector."},{"speaker":"Mr Brooks","text":"In his answers so far, the Minister has, in some ways, commented on what I was going to ask, namely whether he agrees that the Education Authority has been failing our controlled schools. Perhaps he would like to comment further on the evidence for that."},{"speaker":"Mr Givan","text":"Let me quote from the independent review so that it is not me saying it. A number of things have been stated in that report:"},{"speaker":"","text":"It then says:"},{"speaker":"","text":"It also says:"},{"speaker":"","text":"It also says:"},{"speaker":"","text":"It also says:"},{"speaker":"","text":"The evidence is clear, and the landscape review also provided clear evidence on EA's failings towards the controlled sector."},{"speaker":"Mr Crawford","text":"Minister, I have a follow-on from Mr Dickson's original question. How will the Department monitor progress on reducing red tape in the Education Authority, and what matrix will be used to evaluate success?"},{"speaker":"Mr Givan","text":"Obviously, the Department engages with the EA on the various recommendations in the landscape review. There were 13 recommendations highlighted relating to improvements required to support organisational effectiveness, governance, accountability and relationships. The report indicated that, whilst matters have improved over recent years, many aspects of the operation of the Education Authority remain profoundly unsatisfactory. This is ongoing work that my Department has with the EA to ensure that, as an organisation, it addresses the failings that have been well documented and rehearsed not just in independent reviews but by many Members across the Chamber."},{"speaker":"Ms Hunter","text":"As recently as Friday, Minister, I was at a school and spoke with parents, teachers and principals about the lack of responsiveness from the EA. Off the back of that, can you detail some specific examples of what has been done to transform the work culture in the EA with regard to criticism about a lack of responsiveness?"},{"speaker":"Mr Givan","text":"I made a clear intervention to ensure that we had a new chief executive in the Education Authority. That intervention was severely criticised by the leader of the SDLP. I very much want the Education Authority to be responsive and to address its failings, but, when I make those changes, I appeal to Members to support me rather than doing what happened on that occasion, when the leader of the SDLP took the opportunity to have a go — unnecessarily so."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201096%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=415647","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2024-11-11&docID=416633#AQO%201096/22-27","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=415647"}},{"id":"418194","reference":"AQO 1087/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2024-10-24","answerBy":"2024-11-11","answered":"2024-11-14","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister to what extent they raised Northern Ireland's unique market access at the International Investment Summit, held on 14 October 2024.","answerText":"The International Investment Summit was an opportunity for us to make clear that our economy is open for investment. It allowed us to be visible to a wide range of global investment stakeholders, and to engage directly with companies who might consider investing here, as well as those who already have a presence.\n\nWe welcomed the opportunity to reinforce the message of why this is a great place to invest and to highlight our labour market advantages, business operating advantages, competitiveness advantages and location advantages.","answerHtml":"<p>The International Investment Summit was an opportunity for us to make clear that our economy is open for investment. It allowed us to be visible to a wide range of global investment stakeholders, and to engage directly with companies who might consider investing here, as well as those who already have a presence.</p><p>We welcomed the opportunity to reinforce the message of why this is a great place to invest and to highlight our labour market advantages, business operating advantages, competitiveness advantages and location advantages.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201087%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=418194","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=418194"}},{"id":"413706","reference":"AQO 1010/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2024-10-10","answerBy":"2024-10-21","answered":"2024-10-21","answeredOrally":true,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure for an update on the York Street Interchange scheme.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr O'Dowd","text":"Major road schemes are an important part of the work that is delivered by my Department as it seeks to reduce journey times, increase reliability and improve road safety. In October 2022, I published a report on the placemaking and active travel review (PATR) of the scheme and asked my officials to carry out further work on three scenarios that were recommended in it. The work to prepare a placemaking and active travel development report has now been completed. Due to underinvestment in major road schemes and the constrained budget position, the scheme was considered as part of the prioritisation of major schemes, and further works were paused as part of the outworking of that review. I met officials on 9 October 2024 to review the report, which allows me to consider the way forward for the scheme. Any subsequent decision to proceed with the York Street interchange project can only be made when I am confident that there is budget certainty for the scheme and that its delivery is in line with my Department's emerging transport plans."},{"speaker":"Mr Dickson","text":"I thank the Minister for his answer. Minister, do you accept that the delay in progressing the project causes serious environmental issues at various bottlenecks and economic delays for constituents in East Antrim in particular, and that it restricts the future and enhanced use of the Belfast-Derry and Belfast-Larne railway lines and the potential for a Belfast International Airport railway connection?"},{"speaker":"Mr O'Dowd","text":"I accept that the status quo is far from ideal. We need to make a significant investment in the York Street area and move forward with a project that benefits not only commuters who travel through the area but those who live in and do business in the area. That was the reason for the placemaking report. I am studying how to move forward on a number of major road projects, and I keep coming back to the question of how to finance them. That is the part of the equation that is missing. The Budget statement from the Chancellor of the Exchequer might shed some light on options for the Executive, but, until new options are available to me, I am very restricted in what further projects I can deliver."},{"speaker":"Mr O'Toole","text":"Clearly, there are big projects that need to happen. I will touch on two projects that are happening — the maintenance at the Sydenham bypass and Belfast Grand Central Station — and on all the disruption associated with them. I support both those things happening — I am clearly a huge supporter of Grand Central — but there is a risk of the entire city grinding to a halt. What are you doing, Minister, to ensure that the best possible information gets to people who use public transport? I tried to get on a bus the other day, near my constituency office in Botanic Avenue. The display at the bus stop said that no buses were running, but a bus showed up 10 minutes later. We need to get proper information to commuters who are in the city or coming into the city. What are you doing to minimise disruption?"},{"speaker":"Mr O'Dowd","text":"I remind Members that I provided them with a written ministerial statement as early as, I think, April or May, which outlined the challenges that Belfast would face as a result of the works that would have to be carried out as part of the public realm works for Belfast Grand Central Station. Members have been briefed on this since that time. What am I doing? We are bringing forward measures to allow taxis into the bus lanes, which will free up some commuter travel in the area."},{"speaker":"","text":"I have asked my officials to engage with Belfast City Council directly to see what measures we can take jointly to inform citizens and promote Belfast. I have also asked them to respond to a request from Retail NI and Hospitality Ulster for a further extension to the moratorium on roadworks around Christmas. I have asked my officials to see whether we can do that. If it is an option, let us do it to support traders. We are in danger of sending out a message that Belfast is closed for business. It is not. Belfast is extremely busy, which is great. My responsibility is to get commuters in and out of the city in an effective and efficient manner. The investment that we are making in the Sydenham bypass will do that; the investment that we are making in Belfast Grand Central Station will do that; and other measures, including the eastern transport plan, which is an all-encompassing plan around Belfast, will do that."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201010%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=413706","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2024-10-21&docID=414507#AQO%201010/22-27","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=413706"}},{"id":"413484","reference":"AQW 16457/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-10-09","answerBy":"2024-10-24","answered":"2024-10-23","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, given that one in eight women are expected to face breast cancer in their lifetime, (i) for a summary of the options available to women at high risk of breast cancer; and (ii) whether there will be an expansion of screening programs to enable earlier and more frequent access to those with genetic predispositions or other elevated risk factors.","answerText":"for a summary of the options available to women at high risk of breast cancer\n\nIf a woman thinks she may be at high risk of breast cancer due to family history she can access information on eligibility for genetic testing on the Genetic Medicine Website. All NI Trusts have Breast Family History resources available on their websites, these are also available on the Northern Ireland Cancer Network website. Breast family history resources | Northern Ireland Cancer Network (hscni.net)\n\nFor women and families where there is a known inherited genetic change in a high-risk cancer gene, relatives can either request a referral from their GP or self-refer to the Cancer Genetics service to discuss genetic testing. The service offers cascade family testing to blood relatives of the index patient to identify those family members who have inherited the variant and are at a higher risk of developing breast, ovarian, and other cancers. This enables the establishment of preventive and surveillance measures such as risk-reducing mastectomy or chemo prevention treatment.\n\nFamily history clinics are embedded within the breast service of each trust. A patient may also be referred by their GP to a family history clinic for assessment due to family history of breast cancer. Family history clinics identify women who may be eligible for genetic testing or may benefit from a further assessment with the Cancer Genetics Service. Chemo prevention drugs are discussed with all patients at family history clinics in line with National Institute for Health & Care Excellence (NICE) guidance. Where appropriate patients with familial / genetic risk will be offered risk reduction surgery in all Trusts to reduce the risk of breast cancer. All Trusts have Breast Family History resources available on their websites, they are also available on the Northern Ireland Cancer Network website. Breast family history resources | Northern Ireland Cancer Network (hscni.net)\n\nwhether there will be an expansion of screening programs to enable earlier and more frequent access to those with genetic predispositions or other elevated risk factors\n\nWomen at very high risk of breast cancer are currently offered breast screening annually and at an earlier age than the routine Breast Screening Programme for the general population. This surveillance screening for women at very high risk (VHR) of developing breast cancer was introduced in Northern Ireland in 2013 and is carried out at a Specialist Imaging Unit in Antrim Area Hospital.\n\nWomen identified as being at very high risk (8 times greater relative risk compared to women in the general population) of developing breast cancer are referred into the programme, following an assessment by a specialist in genetics or oncology confirming one of the following genetic mutations: BRCA1, BRCA2, TP53, A-T homozygotes, PALB2, PTEN, STK11, CDH1, or another genetic mutation with a similar level of risk; or because they have had radiotherapy treatment to an area involving breast tissue.\n\nWomen at very high risk are invited for annual MRI, mammography, or both depending on their age and the reason for their referral. Tests and frequency of testing for these women in Northern Ireland is in line with the NHS England Breast Screening Programme Protocols for the surveillance of women at higher risk of developing breast cancer.\n\nA Public Health Agency leaflet ‘Breast surveillance screening for women with a very high risk of breast cancer’, is publicly available and it explains the breast surveillance screening programme for these women in Northern Ireland.\n\nThere are no plans to further expand the very high-risk breast screening programme.","answerHtml":"<p>for a summary of the options available to women at high risk of breast cancer</p><p>If a woman thinks she may be at high risk of breast cancer due to family history she can access information on eligibility for genetic testing on the Genetic Medicine Website. All NI Trusts have Breast Family History resources available on their websites, these are also available on the Northern Ireland Cancer Network website. Breast family history resources | Northern Ireland Cancer Network (hscni.net)</p><p>For women and families where there is a known inherited genetic change in a high-risk cancer gene, relatives can either request a referral from their GP or self-refer to the Cancer Genetics service to discuss genetic testing. The service offers cascade family testing to blood relatives of the index patient to identify those family members who have inherited the variant and are at a higher risk of developing breast, ovarian, and other cancers. This enables the establishment of preventive and surveillance measures such as risk-reducing mastectomy or chemo prevention treatment.</p><p>Family history clinics are embedded within the breast service of each trust. A patient may also be referred by their GP to a family history clinic for assessment due to family history of breast cancer. Family history clinics identify women who may be eligible for genetic testing or may benefit from a further assessment with the Cancer Genetics Service. Chemo prevention drugs are discussed with all patients at family history clinics in line with National Institute for Health &amp; Care Excellence (NICE) guidance. Where appropriate patients with familial / genetic risk will be offered risk reduction surgery in all Trusts to reduce the risk of breast cancer. All Trusts have Breast Family History resources available on their websites, they are also available on the Northern Ireland Cancer Network website. Breast family history resources | Northern Ireland Cancer Network (hscni.net)</p><p>whether there will be an expansion of screening programs to enable earlier and more frequent access to those with genetic predispositions or other elevated risk factors</p><p>Women at very high risk of breast cancer are currently offered breast screening annually and at an earlier age than the routine Breast Screening Programme for the general population. This surveillance screening for women at very high risk (VHR) of developing breast cancer was introduced in Northern Ireland in 2013 and is carried out at a Specialist Imaging Unit in Antrim Area Hospital.</p><p>Women identified as being at very high risk (8 times greater relative risk compared to women in the general population) of developing breast cancer are referred into the programme, following an assessment by a specialist in genetics or oncology confirming one of the following genetic mutations: BRCA1, BRCA2, TP53, A-T homozygotes, PALB2, PTEN, STK11, CDH1, or another genetic mutation with a similar level of risk; or because they have had radiotherapy treatment to an area involving breast tissue.</p><p>Women at very high risk are invited for annual MRI, mammography, or both depending on their age and the reason for their referral. Tests and frequency of testing for these women in Northern Ireland is in line with the NHS England Breast Screening Programme Protocols for the surveillance of women at higher risk of developing breast cancer.</p><p>A Public Health Agency leaflet ‘Breast surveillance screening for women with a very high risk of breast cancer’, is publicly available and it explains the breast surveillance screening programme for these women in Northern Ireland.</p><p>There are no plans to further expand the very high-risk breast screening programme.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016457%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=413484","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=413484"}},{"id":"413364","reference":"AQO 943/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2024-09-26","answerBy":"2024-10-08","answered":"2024-10-08","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on the implementation of the Independent Review of Invest NI Action Plan.","answerText":"Question 15 – AQO 943/22-27\n\nThe Action Plan sets out 35 Strategic Actions in response to the Independent Review. 17 actions have already been completed and a further 11 actions are expected to be delivered by the end of this calendar year. The remaining 7 actions will be delivered in 2025 and 2026.\n\nI remain committed to delivering the profound change called for by the Independent Review Panel.","answerHtml":"<p>Question 15 – AQO 943/22-27</p><p>The Action Plan sets out 35 Strategic Actions in response to the Independent Review. 17 actions have already been completed and a further 11 actions are expected to be delivered by the end of this calendar year. The remaining 7 actions will be delivered in 2025 and 2026.</p><p>I remain committed to delivering the profound change called for by the Independent Review Panel.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20943%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=413364","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=413364"}},{"id":"412377","reference":"AQO 845/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2024-09-12","answerBy":"2024-10-01","answered":"2024-10-02","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health for his assessment of how to address cancer treatment waiting times, in line with the priorities in the draft Programme for Government 2024-2027.","answerText":"Our cancer waiting times are unacceptable.\n\nTo make sure people wait shorter we need to reform healthcare services to provide our clinicians with the most effective tools to do their job.\n\nElective Care Centres is one way we help to address this issue. These centres of excellence makes surgery outcomes improve and provide a more effective and efficient service.\n\nWe must also ensure that pathways into cancer services are as streamlined as possible.\n\nTo this end, reviews of the three main haematological cancer pathways have been completed. This will ensure the best pathways for our patients ensuring faster treatment and better outcomes.\n\nWe are also leading the way in implementing an optimal care pathway for Pancreatic Cancer – this has the potential to significantly reduce waiting times for suspected pancreatic cancer patients. I hope that this model of work can then be rolled out across other tumour sites reducing waits.\n\nMy officials are also working with the HSC to establish more resilient and equitable services for patients with breast cancer, and Head and Neck Cancer.\n\nThe Cancer Strategy establishes a strategic roadmap to improve outcomes for all patients who require cancer treatment and must be fully implemented.\n\nWhile some of this can be achieved through existing resources, additional investment in workforce and capital equipment is essential if we are to increase capacity to meet service demands.","answerHtml":"<p>Our cancer waiting times are unacceptable.</p><p>To make sure people wait shorter we need to reform healthcare services to provide our clinicians with the most effective tools to do their job.</p><p>Elective Care Centres is one way we help to address this issue. These centres of excellence makes surgery outcomes improve and provide a more effective and efficient service.</p><p>We must also ensure that pathways into cancer services are as streamlined as possible.</p><p>To this end, reviews of the three main haematological cancer pathways have been completed. This will ensure the best pathways for our patients ensuring faster treatment and better outcomes.</p><p>We are also leading the way in implementing an optimal care pathway for Pancreatic Cancer – this has the potential to significantly reduce waiting times for suspected pancreatic cancer patients. I hope that this model of work can then be rolled out across other tumour sites reducing waits.</p><p>My officials are also working with the HSC to establish more resilient and equitable services for patients with breast cancer, and Head and Neck Cancer.</p><p>The Cancer Strategy establishes a strategic roadmap to improve outcomes for all patients who require cancer treatment and must be fully implemented.</p><p>While some of this can be achieved through existing resources, additional investment in workforce and capital equipment is essential if we are to increase capacity to meet service demands.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20845%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=412377","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=412377"}},{"id":"410700","reference":"AQO 734/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2024-09-02","answerBy":"2024-09-09","answered":"2024-09-09","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister for an update on the draft Refugee Integration Strategy.","answerText":"We are considering a draft Refugee Integration Strategy and plan to bring a final version, and an associated Thematic Delivery Plan, to the Executive for agreement shortly.","answerHtml":"<p>We are considering a draft Refugee Integration Strategy and plan to bring a final version, and an associated Thematic Delivery Plan, to the Executive for agreement shortly.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20734%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=410700","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=410700"}},{"id":"408363","reference":"AQO 701/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2024-06-20","answerBy":"2024-07-01","answered":"2024-07-23","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to provide a timeline on the implementation of the Northern Ireland Cancer Strategy 2022-2032.","answerText":"The Cancer Strategy is a 10 year plan to reform cancer services in Northern Ireland. Since publication in 2022, we have already seen significant progress against a number of actions.\n\nKey examples of progress to date include the development of Rapid Diagnosis Centres and services to provide genomic testing for cancer patients. Both these services will help improve pathways and improve patient outcomes.\n\nWe have completed reviews of haematological cancer pathways, and Adolescent and Young Adult cancer services, and are progressing work to implement the recommendations.\n\nWe have invested in oncology and haematology stabilisation plans and Clinical Nurse Specialists, to ensure that the services are better staffed.\n\nWork is currently underway to review Breast Cancer Services and to implement an optimal care pathway for pancreatic cancer patients. The focus of this work is reducing the length of time that these patients are waiting for diagnosis and treatment, therefore improving patient outcomes.\n\nChildren’s oncology and haematology services have benefited from closer collaboration with our closest neighbours, including the development of bone marrow stem cell transplant services.\n\nWe are developing a cancer research strategy which will be published this year which will help increase the uptake in clinical trials, therefore improving outcomes.\n\nThere is undoubtedly more to be done, and additional investment is required, but the cancer strategy is already starting to deliver benefits for cancer patients in Northern Ireland.","answerHtml":"<p>The Cancer Strategy is a 10 year plan to reform cancer services in Northern Ireland. Since publication in 2022, we have already seen significant progress against a number of actions.</p><p>Key examples of progress to date include the development of Rapid Diagnosis Centres and services to provide genomic testing for cancer patients. Both these services will help improve pathways and improve patient outcomes.</p><p>We have completed reviews of haematological cancer pathways, and Adolescent and Young Adult cancer services, and are progressing work to implement the recommendations.</p><p>We have invested in oncology and haematology stabilisation plans and Clinical Nurse Specialists, to ensure that the services are better staffed.</p><p>Work is currently underway to review Breast Cancer Services and to implement an optimal care pathway for pancreatic cancer patients. The focus of this work is reducing the length of time that these patients are waiting for diagnosis and treatment, therefore improving patient outcomes.</p><p>Children’s oncology and haematology services have benefited from closer collaboration with our closest neighbours, including the development of bone marrow stem cell transplant services.</p><p>We are developing a cancer research strategy which will be published this year which will help increase the uptake in clinical trials, therefore improving outcomes.</p><p>There is undoubtedly more to be done, and additional investment is required, but the cancer strategy is already starting to deliver benefits for cancer patients in Northern Ireland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20701%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=408363","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=408363"}},{"id":"406181","reference":"AQW 13572/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-06-19","answerBy":"2024-07-04","answered":"2024-07-03","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health (i) for his assessment of estimates from the Royal College of Radiology that 25 per cent of clinical oncology consultants and 18 per cent of clinical radiology consultants in Northern Ireland are forecast to retire in the next five years; and (ii) what plans he has to retain more clinical oncologists and radiologists in the workforce.","answerText":"I am acutely aware of the workforce challenges that exists across health and social care and therefore welcome the Royal College of Radiologists’ 2023 Workforce Census Reports for Clinical Oncology and Clinical Radiology. I have already agreed to meet representatives from the Royal College to discuss their recommendations in detail, including their predictions relating to retirements and shortfalls in the current and future number of clinical oncologists and clinical/interventional radiologists. This will inform my Department’s ongoing collaboration with the health and social care system on the development of imaging and cancer services.\n\nMy Department is committed to the provision of effective imaging and cancer services in Northern Ireland, ensuring patient safety and quality of care. The Strategic Framework for Imaging Services in Health and Social Care (2018) recognised that our existing training mechanism could not deliver the number of clinical radiologists required to meet increasing demand. While much has been achieved over recent years, with training places having been increased by 46% from 37 (2015/16) to 54 (2022/23), the Department recognises that a more innovative approach is required to generate the radiologist workforce required to meet future demand.\n\nAfter extensive consideration of best practice options, including those set out in the Royal College of Radiology’s Radiology Training 2016 – 2026: A vision and a solution, the Department and HSC are taking forward a proposal for a multi-professional Imaging Academy for Northern Ireland. This will significantly increase the supply of locally trained consultant radiologists and advanced radiographer practitioners to address the increasing demand for imaging investigations and reduce reliance on costly outsourcing.\n\nFollowing a robust options appraisal process by an independent expert panel, the Mater Infirmorum Hospital site in Belfast HSC Trust has been identified as the optimum location for the proposed Imaging Academy. This would be expected to provide trainees with the additional clinical and office space and full Picture Archiving and Community System access recommended by the Royal College of Radiologists. However, progressing this initiative remains subject to business case approval and the availability of funding (£3.3m is currently earmarked for establishment of the Imaging Academy in the Department’s draft Capital Plan).\n\nPending the establishment of the Imaging Academy, a costed workforce plan (approximately £6m per annum over the next 3-5 years) for imaging services has also been developed, to bring training within imaging teams, including clinical radiologists, up to date. Regrettably, funding for this programme remains unapproved.\n\nRegarding interventional radiology, the Regional Imaging Board has endorsed a Hub and Spoke model for this service. This will utilise existing resources across the region, optimising specialist care provision to high standards and improving access for patients. The model exists in Belfast HSC Trust and has been extended to the Western HSC Trust. However, there is no dedicated funding to roll this model out across all of Northern Ireland and consequently other HSC Trusts have to rely on creating capacity themselves.\n\nIn terms of oncology, A Cancer Strategy for Northern Ireland 2022 – 2032 sets the overall direction. By 2024/25, £10.88m will have already been invested to stabilise HSC Trusts’ oncology and haematology services. This funding has secured an additional 167.6 WTE posts across the full range of healthcare disciplines delivering oncology and haematology services. The resultant growth in whole time equivalent (WTE) Consultant Radiologists, Specialty Doctors, Consultant Radiographers, Specialist Radiographers and Radiographers is shown in the following table.\n\nStabilisation of HSC Trusts’ Oncology and Haematology Services\nIncrease in WTE funded posts: Consultants/Specialty Doctors/Consultant Radiographers/Specialist Radiographers/Radiographers\nStaff type\tOncology\tHaematology\nConsultant\t9.75 WTE\t7.58 WTE\nSpecialty Doctor\t8.0 WTE\t8.0 WTE\nConsultant Radiographer/Specialist Radiographer\t6.5 WTE\nRadiographer\t3.0 WTE\nTOTAL\t27.25 WTE\t15.58 WTE\nGRAND TOTAL\t42.83 WTE\n\nSpecific cancer pathways are currently being developed, which will inform future strategic workforce planning to address workforce requirements for clinical oncologists and other professions.\n\nThe Royal College of Radiologists have also identified recruitment and retention as the key elements of their three-point plan to support clinical oncology and clinical radiology. I am pleased to say that my Department’s Health and Social Care Workforce Strategy 2026: Delivering for Our People and its current Second Action Plan contains a comprehensive and ambitious work programme that includes the development of initiatives to enhance our attraction, recruitment and retention across all staff groups and specialties. I look forward to discussion with College representatives on these matters at our forthcoming meeting.\n\nMy Department has an extensive range of plans and programmes to develop effective cancer and imaging services in Northern Ireland, supporting the education and training of the medical oncologists, medical radiologists and other professional staff upon which these services depend. However, we can only take forward these ambitious plans if we are funded to do so.\n\nThe 2024/25 Budget outcome was extremely disappointing for this Department and is likely to have serious consequences for health and social care, including cancer and imaging services. The additional funding provided was significantly less than what is required and has resulted in 2.3% less funding in 2024/25 than was spent in 2023/24. My Department is currently anticipating a shortfall of £340m, which means some extremely difficult decisions will be required to manage within the allocated budget. The impact has already been felt in that my Department has not able to commission a needed expansion of three places in the August intake to the medical radiology training programme.\n\nIn the meantime, until the Department is provided with the additional funding for which I will continue to advocate, we will not be able to do all that we want or know is required, to develop a reformed health and social care system for the people of Northern Ireland.\n\nOur immediate focus will therefore be on preserving and protecting existing services, retaining patient safety at the forefront of service delivery.","answerHtml":"<p>I am acutely aware of the workforce challenges that exists across health and social care and therefore welcome the Royal College of Radiologists’ 2023 Workforce Census Reports for Clinical Oncology and Clinical Radiology. I have already agreed to meet representatives from the Royal College to discuss their recommendations in detail, including their predictions relating to retirements and shortfalls in the current and future number of clinical oncologists and clinical/interventional radiologists. This will inform my Department’s ongoing collaboration with the health and social care system on the development of imaging and cancer services.</p><p>My Department is committed to the provision of effective imaging and cancer services in Northern Ireland, ensuring patient safety and quality of care. The Strategic Framework for Imaging Services in Health and Social Care (2018) recognised that our existing training mechanism could not deliver the number of clinical radiologists required to meet increasing demand. While much has been achieved over recent years, with training places having been increased by 46% from 37 (2015/16) to 54 (2022/23), the Department recognises that a more innovative approach is required to generate the radiologist workforce required to meet future demand.</p><p>After extensive consideration of best practice options, including those set out in the Royal College of Radiology’s Radiology Training 2016 – 2026: A vision and a solution, the Department and HSC are taking forward a proposal for a multi-professional Imaging Academy for Northern Ireland. This will significantly increase the supply of locally trained consultant radiologists and advanced radiographer practitioners to address the increasing demand for imaging investigations and reduce reliance on costly outsourcing.</p><p>Following a robust options appraisal process by an independent expert panel, the Mater Infirmorum Hospital site in Belfast HSC Trust has been identified as the optimum location for the proposed Imaging Academy. This would be expected to provide trainees with the additional clinical and office space and full Picture Archiving and Community System access recommended by the Royal College of Radiologists. However, progressing this initiative remains subject to business case approval and the availability of funding (£3.3m is currently earmarked for establishment of the Imaging Academy in the Department’s draft Capital Plan).</p><p>Pending the establishment of the Imaging Academy, a costed workforce plan (approximately £6m per annum over the next 3-5 years) for imaging services has also been developed, to bring training within imaging teams, including clinical radiologists, up to date. Regrettably, funding for this programme remains unapproved.</p><p>Regarding interventional radiology, the Regional Imaging Board has endorsed a Hub and Spoke model for this service. This will utilise existing resources across the region, optimising specialist care provision to high standards and improving access for patients. The model exists in Belfast HSC Trust and has been extended to the Western HSC Trust. However, there is no dedicated funding to roll this model out across all of Northern Ireland and consequently other HSC Trusts have to rely on creating capacity themselves.</p><p>In terms of oncology, A Cancer Strategy for Northern Ireland 2022 – 2032 sets the overall direction. By 2024/25, £10.88m will have already been invested to stabilise HSC Trusts’ oncology and haematology services. This funding has secured an additional 167.6 WTE posts across the full range of healthcare disciplines delivering oncology and haematology services. The resultant growth in whole time equivalent (WTE) Consultant Radiologists, Specialty Doctors, Consultant Radiographers, Specialist Radiographers and Radiographers is shown in the following table.</p><div class=\"table-wrap\"><table><tr><td colspan=\"3\">Stabilisation of HSC Trusts’ Oncology and Haematology Services<br>Increase in WTE funded posts: Consultants/Specialty Doctors/Consultant Radiographers/Specialist Radiographers/Radiographers</td></tr><tr><td>Staff type</td><td>Oncology</td><td>Haematology</td></tr><tr><td>Consultant</td><td>9.75 WTE</td><td>7.58 WTE</td></tr><tr><td>Specialty Doctor</td><td>8.0 WTE</td><td>8.0 WTE</td></tr><tr><td>Consultant Radiographer/Specialist Radiographer</td><td>6.5 WTE</td><td></td></tr><tr><td>Radiographer</td><td>3.0 WTE</td><td></td></tr><tr><td>TOTAL</td><td>27.25 WTE</td><td>15.58 WTE</td></tr><tr><td>GRAND TOTAL</td><td colspan=\"2\">42.83 WTE</td></tr></table></div><p>Specific cancer pathways are currently being developed, which will inform future strategic workforce planning to address workforce requirements for clinical oncologists and other professions.</p><p>The Royal College of Radiologists have also identified recruitment and retention as the key elements of their three-point plan to support clinical oncology and clinical radiology. I am pleased to say that my Department’s Health and Social Care Workforce Strategy 2026: Delivering for Our People and its current Second Action Plan contains a comprehensive and ambitious work programme that includes the development of initiatives to enhance our attraction, recruitment and retention across all staff groups and specialties. I look forward to discussion with College representatives on these matters at our forthcoming meeting.</p><p>My Department has an extensive range of plans and programmes to develop effective cancer and imaging services in Northern Ireland, supporting the education and training of the medical oncologists, medical radiologists and other professional staff upon which these services depend. However, we can only take forward these ambitious plans if we are funded to do so.</p><p>The 2024/25 Budget outcome was extremely disappointing for this Department and is likely to have serious consequences for health and social care, including cancer and imaging services. The additional funding provided was significantly less than what is required and has resulted in 2.3% less funding in 2024/25 than was spent in 2023/24. My Department is currently anticipating a shortfall of £340m, which means some extremely difficult decisions will be required to manage within the allocated budget. The impact has already been felt in that my Department has not able to commission a needed expansion of three places in the August intake to the medical radiology training programme.</p><p>In the meantime, until the Department is provided with the additional funding for which I will continue to advocate, we will not be able to do all that we want or know is required, to develop a reformed health and social care system for the people of Northern Ireland.</p><p>Our immediate focus will therefore be on preserving and protecting existing services, retaining patient safety at the forefront of service delivery.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013572%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=406181","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=406181"}},{"id":"406180","reference":"AQW 13571/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-06-19","answerBy":"2024-07-04","answered":"2024-07-03","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, in relation to the Royal College of Radiologists’ 2023 Clinical Oncology Workforce Census, to detail his plans to ensure the 9 per cent shortfall of consultant oncologists (i) is addressed; and (ii) does not impact patient safety or the quality of care.","answerText":"I am acutely aware of the workforce challenges that exists across health and social care and therefore welcome the Royal College of Radiologists’ 2023 Workforce Census Reports for Clinical Oncology and Clinical Radiology. I have already agreed to meet representatives from the Royal College to discuss their recommendations in detail, including their predictions relating to retirements and shortfalls in the current and future number of clinical oncologists and clinical/interventional radiologists. This will inform my Department’s ongoing collaboration with the health and social care system on the development of imaging and cancer services.\n\nMy Department is committed to the provision of effective imaging and cancer services in Northern Ireland, ensuring patient safety and quality of care. The Strategic Framework for Imaging Services in Health and Social Care (2018) recognised that our existing training mechanism could not deliver the number of clinical radiologists required to meet increasing demand. While much has been achieved over recent years, with training places having been increased by 46% from 37 (2015/16) to 54 (2022/23), the Department recognises that a more innovative approach is required to generate the radiologist workforce required to meet future demand.\n\nAfter extensive consideration of best practice options, including those set out in the Royal College of Radiology’s Radiology Training 2016 – 2026: A vision and a solution, the Department and HSC are taking forward a proposal for a multi-professional Imaging Academy for Northern Ireland. This will significantly increase the supply of locally trained consultant radiologists and advanced radiographer practitioners to address the increasing demand for imaging investigations and reduce reliance on costly outsourcing.\n\nFollowing a robust options appraisal process by an independent expert panel, the Mater Infirmorum Hospital site in Belfast HSC Trust has been identified as the optimum location for the proposed Imaging Academy. This would be expected to provide trainees with the additional clinical and office space and full Picture Archiving and Community System access recommended by the Royal College of Radiologists. However, progressing this initiative remains subject to business case approval and the availability of funding (£3.3m is currently earmarked for establishment of the Imaging Academy in the Department’s draft Capital Plan).\n\nPending the establishment of the Imaging Academy, a costed workforce plan (approximately £6m per annum over the next 3-5 years) for imaging services has also been developed, to bring training within imaging teams, including clinical radiologists, up to date. Regrettably, funding for this programme remains unapproved.\n\nRegarding interventional radiology, the Regional Imaging Board has endorsed a Hub and Spoke model for this service. This will utilise existing resources across the region, optimising specialist care provision to high standards and improving access for patients. The model exists in Belfast HSC Trust and has been extended to the Western HSC Trust. However, there is no dedicated funding to roll this model out across all of Northern Ireland and consequently other HSC Trusts have to rely on creating capacity themselves.\n\nIn terms of oncology, A Cancer Strategy for Northern Ireland 2022 – 2032 sets the overall direction. By 2024/25, £10.88m will have already been invested to stabilise HSC Trusts’ oncology and haematology services. This funding has secured an additional 167.6 WTE posts across the full range of healthcare disciplines delivering oncology and haematology services. The resultant growth in whole time equivalent (WTE) Consultant Radiologists, Specialty Doctors, Consultant Radiographers, Specialist Radiographers and Radiographers is shown in the following table.\n\nStabilisation of HSC Trusts’ Oncology and Haematology Services\nIncrease in WTE funded posts: Consultants/Specialty Doctors/Consultant Radiographers/Specialist Radiographers/Radiographers\nStaff type\tOncology\tHaematology\nConsultant\t9.75 WTE\t7.58 WTE\nSpecialty Doctor\t8.0 WTE\t8.0 WTE\nConsultant Radiographer/Specialist Radiographer\t6.5 WTE\nRadiographer\t3.0 WTE\nTOTAL\t27.25 WTE\t15.58 WTE\nGRAND TOTAL\t42.83 WTE\n\nSpecific cancer pathways are currently being developed, which will inform future strategic workforce planning to address workforce requirements for clinical oncologists and other professions.\n\nThe Royal College of Radiologists have also identified recruitment and retention as the key elements of their three-point plan to support clinical oncology and clinical radiology. I am pleased to say that my Department’s Health and Social Care Workforce Strategy 2026: Delivering for Our People and its current Second Action Plan contains a comprehensive and ambitious work programme that includes the development of initiatives to enhance our attraction, recruitment and retention across all staff groups and specialties. I look forward to discussion with College representatives on these matters at our forthcoming meeting.\n\nMy Department has an extensive range of plans and programmes to develop effective cancer and imaging services in Northern Ireland, supporting the education and training of the medical oncologists, medical radiologists and other professional staff upon which these services depend. However, we can only take forward these ambitious plans if we are funded to do so.\n\nThe 2024/25 Budget outcome was extremely disappointing for this Department and is likely to have serious consequences for health and social care, including cancer and imaging services. The additional funding provided was significantly less than what is required and has resulted in 2.3% less funding in 2024/25 than was spent in 2023/24. My Department is currently anticipating a shortfall of £340m, which means some extremely difficult decisions will be required to manage within the allocated budget. The impact has already been felt in that my Department has not able to commission a needed expansion of three places in the August intake to the medical radiology training programme.\n\nIn the meantime, until the Department is provided with the additional funding for which I will continue to advocate, we will not be able to do all that we want or know is required, to develop a reformed health and social care system for the people of Northern Ireland.\n\nOur immediate focus will therefore be on preserving and protecting existing services, retaining patient safety at the forefront of service delivery.","answerHtml":"<p>I am acutely aware of the workforce challenges that exists across health and social care and therefore welcome the Royal College of Radiologists’ 2023 Workforce Census Reports for Clinical Oncology and Clinical Radiology. I have already agreed to meet representatives from the Royal College to discuss their recommendations in detail, including their predictions relating to retirements and shortfalls in the current and future number of clinical oncologists and clinical/interventional radiologists. This will inform my Department’s ongoing collaboration with the health and social care system on the development of imaging and cancer services.</p><p>My Department is committed to the provision of effective imaging and cancer services in Northern Ireland, ensuring patient safety and quality of care. The Strategic Framework for Imaging Services in Health and Social Care (2018) recognised that our existing training mechanism could not deliver the number of clinical radiologists required to meet increasing demand. While much has been achieved over recent years, with training places having been increased by 46% from 37 (2015/16) to 54 (2022/23), the Department recognises that a more innovative approach is required to generate the radiologist workforce required to meet future demand.</p><p>After extensive consideration of best practice options, including those set out in the Royal College of Radiology’s Radiology Training 2016 – 2026: A vision and a solution, the Department and HSC are taking forward a proposal for a multi-professional Imaging Academy for Northern Ireland. This will significantly increase the supply of locally trained consultant radiologists and advanced radiographer practitioners to address the increasing demand for imaging investigations and reduce reliance on costly outsourcing.</p><p>Following a robust options appraisal process by an independent expert panel, the Mater Infirmorum Hospital site in Belfast HSC Trust has been identified as the optimum location for the proposed Imaging Academy. This would be expected to provide trainees with the additional clinical and office space and full Picture Archiving and Community System access recommended by the Royal College of Radiologists. However, progressing this initiative remains subject to business case approval and the availability of funding (£3.3m is currently earmarked for establishment of the Imaging Academy in the Department’s draft Capital Plan).</p><p>Pending the establishment of the Imaging Academy, a costed workforce plan (approximately £6m per annum over the next 3-5 years) for imaging services has also been developed, to bring training within imaging teams, including clinical radiologists, up to date. Regrettably, funding for this programme remains unapproved.</p><p>Regarding interventional radiology, the Regional Imaging Board has endorsed a Hub and Spoke model for this service. This will utilise existing resources across the region, optimising specialist care provision to high standards and improving access for patients. The model exists in Belfast HSC Trust and has been extended to the Western HSC Trust. However, there is no dedicated funding to roll this model out across all of Northern Ireland and consequently other HSC Trusts have to rely on creating capacity themselves.</p><p>In terms of oncology, A Cancer Strategy for Northern Ireland 2022 – 2032 sets the overall direction. By 2024/25, £10.88m will have already been invested to stabilise HSC Trusts’ oncology and haematology services. This funding has secured an additional 167.6 WTE posts across the full range of healthcare disciplines delivering oncology and haematology services. The resultant growth in whole time equivalent (WTE) Consultant Radiologists, Specialty Doctors, Consultant Radiographers, Specialist Radiographers and Radiographers is shown in the following table.</p><div class=\"table-wrap\"><table><tr><td colspan=\"3\">Stabilisation of HSC Trusts’ Oncology and Haematology Services<br>Increase in WTE funded posts: Consultants/Specialty Doctors/Consultant Radiographers/Specialist Radiographers/Radiographers</td></tr><tr><td>Staff type</td><td>Oncology</td><td>Haematology</td></tr><tr><td>Consultant</td><td>9.75 WTE</td><td>7.58 WTE</td></tr><tr><td>Specialty Doctor</td><td>8.0 WTE</td><td>8.0 WTE</td></tr><tr><td>Consultant Radiographer/Specialist Radiographer</td><td>6.5 WTE</td><td></td></tr><tr><td>Radiographer</td><td>3.0 WTE</td><td></td></tr><tr><td>TOTAL</td><td>27.25 WTE</td><td>15.58 WTE</td></tr><tr><td>GRAND TOTAL</td><td colspan=\"2\">42.83 WTE</td></tr></table></div><p>Specific cancer pathways are currently being developed, which will inform future strategic workforce planning to address workforce requirements for clinical oncologists and other professions.</p><p>The Royal College of Radiologists have also identified recruitment and retention as the key elements of their three-point plan to support clinical oncology and clinical radiology. I am pleased to say that my Department’s Health and Social Care Workforce Strategy 2026: Delivering for Our People and its current Second Action Plan contains a comprehensive and ambitious work programme that includes the development of initiatives to enhance our attraction, recruitment and retention across all staff groups and specialties. I look forward to discussion with College representatives on these matters at our forthcoming meeting.</p><p>My Department has an extensive range of plans and programmes to develop effective cancer and imaging services in Northern Ireland, supporting the education and training of the medical oncologists, medical radiologists and other professional staff upon which these services depend. However, we can only take forward these ambitious plans if we are funded to do so.</p><p>The 2024/25 Budget outcome was extremely disappointing for this Department and is likely to have serious consequences for health and social care, including cancer and imaging services. The additional funding provided was significantly less than what is required and has resulted in 2.3% less funding in 2024/25 than was spent in 2023/24. My Department is currently anticipating a shortfall of £340m, which means some extremely difficult decisions will be required to manage within the allocated budget. The impact has already been felt in that my Department has not able to commission a needed expansion of three places in the August intake to the medical radiology training programme.</p><p>In the meantime, until the Department is provided with the additional funding for which I will continue to advocate, we will not be able to do all that we want or know is required, to develop a reformed health and social care system for the people of Northern Ireland.</p><p>Our immediate focus will therefore be on preserving and protecting existing services, retaining patient safety at the forefront of service delivery.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013571%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=406180","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=406180"}},{"id":"406179","reference":"AQW 13570/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-06-19","answerBy":"2024-07-04","answered":"2024-07-03","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, in relation to the Royal College of Radiologists’ 2023 Clinical Radiology Workforce Census, to detail his plans to ensure the 27 per cent shortfall of consultant radiologists (i) is addressed; and (ii) does not impact patient safety or the quality of care.","answerText":"I am acutely aware of the workforce challenges that exists across health and social care and therefore welcome the Royal College of Radiologists’ 2023 Workforce Census Reports for Clinical Oncology and Clinical Radiology. I have already agreed to meet representatives from the Royal College to discuss their recommendations in detail, including their predictions relating to retirements and shortfalls in the current and future number of clinical oncologists and clinical/interventional radiologists. This will inform my Department’s ongoing collaboration with the health and social care system on the development of imaging and cancer services.\n\nMy Department is committed to the provision of effective imaging and cancer services in Northern Ireland, ensuring patient safety and quality of care. The Strategic Framework for Imaging Services in Health and Social Care (2018) recognised that our existing training mechanism could not deliver the number of clinical radiologists required to meet increasing demand. While much has been achieved over recent years, with training places having been increased by 46% from 37 (2015/16) to 54 (2022/23), the Department recognises that a more innovative approach is required to generate the radiologist workforce required to meet future demand.\n\nAfter extensive consideration of best practice options, including those set out in the Royal College of Radiology’s Radiology Training 2016 – 2026: A vision and a solution, the Department and HSC are taking forward a proposal for a multi-professional Imaging Academy for Northern Ireland. This will significantly increase the supply of locally trained consultant radiologists and advanced radiographer practitioners to address the increasing demand for imaging investigations and reduce reliance on costly outsourcing.\n\nFollowing a robust options appraisal process by an independent expert panel, the Mater Infirmorum Hospital site in Belfast HSC Trust has been identified as the optimum location for the proposed Imaging Academy. This would be expected to provide trainees with the additional clinical and office space and full Picture Archiving and Community System access recommended by the Royal College of Radiologists. However, progressing this initiative remains subject to business case approval and the availability of funding (£3.3m is currently earmarked for establishment of the Imaging Academy in the Department’s draft Capital Plan).\n\nPending the establishment of the Imaging Academy, a costed workforce plan (approximately £6m per annum over the next 3-5 years) for imaging services has also been developed, to bring training within imaging teams, including clinical radiologists, up to date. Regrettably, funding for this programme remains unapproved.\n\nRegarding interventional radiology, the Regional Imaging Board has endorsed a Hub and Spoke model for this service. This will utilise existing resources across the region, optimising specialist care provision to high standards and improving access for patients. The model exists in Belfast HSC Trust and has been extended to the Western HSC Trust. However, there is no dedicated funding to roll this model out across all of Northern Ireland and consequently other HSC Trusts have to rely on creating capacity themselves.\n\nIn terms of oncology, A Cancer Strategy for Northern Ireland 2022 – 2032 sets the overall direction. By 2024/25, £10.88m will have already been invested to stabilise HSC Trusts’ oncology and haematology services. This funding has secured an additional 167.6 WTE posts across the full range of healthcare disciplines delivering oncology and haematology services. The resultant growth in whole time equivalent (WTE) Consultant Radiologists, Specialty Doctors, Consultant Radiographers, Specialist Radiographers and Radiographers is shown in the following table.\n\nStabilisation of HSC Trusts’ Oncology and Haematology Services\nIncrease in WTE funded posts: Consultants/Specialty Doctors/Consultant Radiographers/Specialist Radiographers/Radiographers\nStaff type\tOncology\tHaematology\nConsultant\t9.75 WTE\t7.58 WTE\nSpecialty Doctor\t8.0 WTE\t8.0 WTE\nConsultant Radiographer/Specialist Radiographer\t6.5 WTE\nRadiographer\t3.0 WTE\nTOTAL\t27.25 WTE\t15.58 WTE\nGRAND TOTAL\t42.83 WTE\n\nSpecific cancer pathways are currently being developed, which will inform future strategic workforce planning to address workforce requirements for clinical oncologists and other professions.\n\nThe Royal College of Radiologists have also identified recruitment and retention as the key elements of their three-point plan to support clinical oncology and clinical radiology. I am pleased to say that my Department’s Health and Social Care Workforce Strategy 2026: Delivering for Our People and its current Second Action Plan contains a comprehensive and ambitious work programme that includes the development of initiatives to enhance our attraction, recruitment and retention across all staff groups and specialties. I look forward to discussion with College representatives on these matters at our forthcoming meeting.\n\nMy Department has an extensive range of plans and programmes to develop effective cancer and imaging services in Northern Ireland, supporting the education and training of the medical oncologists, medical radiologists and other professional staff upon which these services depend. However, we can only take forward these ambitious plans if we are funded to do so.\n\nThe 2024/25 Budget outcome was extremely disappointing for this Department and is likely to have serious consequences for health and social care, including cancer and imaging services. The additional funding provided was significantly less than what is required and has resulted in 2.3% less funding in 2024/25 than was spent in 2023/24. My Department is currently anticipating a shortfall of £340m, which means some extremely difficult decisions will be required to manage within the allocated budget. The impact has already been felt in that my Department has not able to commission a needed expansion of three places in the August intake to the medical radiology training programme.\n\nIn the meantime, until the Department is provided with the additional funding for which I will continue to advocate, we will not be able to do all that we want or know is required, to develop a reformed health and social care system for the people of Northern Ireland.\n\nOur immediate focus will therefore be on preserving and protecting existing services, retaining patient safety at the forefront of service delivery.","answerHtml":"<p>I am acutely aware of the workforce challenges that exists across health and social care and therefore welcome the Royal College of Radiologists’ 2023 Workforce Census Reports for Clinical Oncology and Clinical Radiology. I have already agreed to meet representatives from the Royal College to discuss their recommendations in detail, including their predictions relating to retirements and shortfalls in the current and future number of clinical oncologists and clinical/interventional radiologists. This will inform my Department’s ongoing collaboration with the health and social care system on the development of imaging and cancer services.</p><p>My Department is committed to the provision of effective imaging and cancer services in Northern Ireland, ensuring patient safety and quality of care. The Strategic Framework for Imaging Services in Health and Social Care (2018) recognised that our existing training mechanism could not deliver the number of clinical radiologists required to meet increasing demand. While much has been achieved over recent years, with training places having been increased by 46% from 37 (2015/16) to 54 (2022/23), the Department recognises that a more innovative approach is required to generate the radiologist workforce required to meet future demand.</p><p>After extensive consideration of best practice options, including those set out in the Royal College of Radiology’s Radiology Training 2016 – 2026: A vision and a solution, the Department and HSC are taking forward a proposal for a multi-professional Imaging Academy for Northern Ireland. This will significantly increase the supply of locally trained consultant radiologists and advanced radiographer practitioners to address the increasing demand for imaging investigations and reduce reliance on costly outsourcing.</p><p>Following a robust options appraisal process by an independent expert panel, the Mater Infirmorum Hospital site in Belfast HSC Trust has been identified as the optimum location for the proposed Imaging Academy. This would be expected to provide trainees with the additional clinical and office space and full Picture Archiving and Community System access recommended by the Royal College of Radiologists. However, progressing this initiative remains subject to business case approval and the availability of funding (£3.3m is currently earmarked for establishment of the Imaging Academy in the Department’s draft Capital Plan).</p><p>Pending the establishment of the Imaging Academy, a costed workforce plan (approximately £6m per annum over the next 3-5 years) for imaging services has also been developed, to bring training within imaging teams, including clinical radiologists, up to date. Regrettably, funding for this programme remains unapproved.</p><p>Regarding interventional radiology, the Regional Imaging Board has endorsed a Hub and Spoke model for this service. This will utilise existing resources across the region, optimising specialist care provision to high standards and improving access for patients. The model exists in Belfast HSC Trust and has been extended to the Western HSC Trust. However, there is no dedicated funding to roll this model out across all of Northern Ireland and consequently other HSC Trusts have to rely on creating capacity themselves.</p><p>In terms of oncology, A Cancer Strategy for Northern Ireland 2022 – 2032 sets the overall direction. By 2024/25, £10.88m will have already been invested to stabilise HSC Trusts’ oncology and haematology services. This funding has secured an additional 167.6 WTE posts across the full range of healthcare disciplines delivering oncology and haematology services. The resultant growth in whole time equivalent (WTE) Consultant Radiologists, Specialty Doctors, Consultant Radiographers, Specialist Radiographers and Radiographers is shown in the following table.</p><div class=\"table-wrap\"><table><tr><td colspan=\"3\">Stabilisation of HSC Trusts’ Oncology and Haematology Services<br>Increase in WTE funded posts: Consultants/Specialty Doctors/Consultant Radiographers/Specialist Radiographers/Radiographers</td></tr><tr><td>Staff type</td><td>Oncology</td><td>Haematology</td></tr><tr><td>Consultant</td><td>9.75 WTE</td><td>7.58 WTE</td></tr><tr><td>Specialty Doctor</td><td>8.0 WTE</td><td>8.0 WTE</td></tr><tr><td>Consultant Radiographer/Specialist Radiographer</td><td>6.5 WTE</td><td></td></tr><tr><td>Radiographer</td><td>3.0 WTE</td><td></td></tr><tr><td>TOTAL</td><td>27.25 WTE</td><td>15.58 WTE</td></tr><tr><td>GRAND TOTAL</td><td colspan=\"2\">42.83 WTE</td></tr></table></div><p>Specific cancer pathways are currently being developed, which will inform future strategic workforce planning to address workforce requirements for clinical oncologists and other professions.</p><p>The Royal College of Radiologists have also identified recruitment and retention as the key elements of their three-point plan to support clinical oncology and clinical radiology. I am pleased to say that my Department’s Health and Social Care Workforce Strategy 2026: Delivering for Our People and its current Second Action Plan contains a comprehensive and ambitious work programme that includes the development of initiatives to enhance our attraction, recruitment and retention across all staff groups and specialties. I look forward to discussion with College representatives on these matters at our forthcoming meeting.</p><p>My Department has an extensive range of plans and programmes to develop effective cancer and imaging services in Northern Ireland, supporting the education and training of the medical oncologists, medical radiologists and other professional staff upon which these services depend. However, we can only take forward these ambitious plans if we are funded to do so.</p><p>The 2024/25 Budget outcome was extremely disappointing for this Department and is likely to have serious consequences for health and social care, including cancer and imaging services. The additional funding provided was significantly less than what is required and has resulted in 2.3% less funding in 2024/25 than was spent in 2023/24. My Department is currently anticipating a shortfall of £340m, which means some extremely difficult decisions will be required to manage within the allocated budget. The impact has already been felt in that my Department has not able to commission a needed expansion of three places in the August intake to the medical radiology training programme.</p><p>In the meantime, until the Department is provided with the additional funding for which I will continue to advocate, we will not be able to do all that we want or know is required, to develop a reformed health and social care system for the people of Northern Ireland.</p><p>Our immediate focus will therefore be on preserving and protecting existing services, retaining patient safety at the forefront of service delivery.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013570%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=406179","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=406179"}},{"id":"406178","reference":"AQW 13569/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-06-19","answerBy":"2024-07-04","answered":"2024-07-03","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health whether he will meet with the Royal College of Radiologists and Health and Social Care NI to discuss recommendations in the 2023 Clinical Oncology and Clinical Radiology Workforce Census report.","answerText":"I am acutely aware of the workforce challenges that exists across health and social care and therefore welcome the Royal College of Radiologists’ 2023 Workforce Census Reports for Clinical Oncology and Clinical Radiology. I have already agreed to meet representatives from the Royal College to discuss their recommendations in detail, including their predictions relating to retirements and shortfalls in the current and future number of clinical oncologists and clinical/interventional radiologists. This will inform my Department’s ongoing collaboration with the health and social care system on the development of imaging and cancer services.\n\nMy Department is committed to the provision of effective imaging and cancer services in Northern Ireland, ensuring patient safety and quality of care. The Strategic Framework for Imaging Services in Health and Social Care (2018) recognised that our existing training mechanism could not deliver the number of clinical radiologists required to meet increasing demand. While much has been achieved over recent years, with training places having been increased by 46% from 37 (2015/16) to 54 (2022/23), the Department recognises that a more innovative approach is required to generate the radiologist workforce required to meet future demand.\n\nAfter extensive consideration of best practice options, including those set out in the Royal College of Radiology’s Radiology Training 2016 – 2026: A vision and a solution, the Department and HSC are taking forward a proposal for a multi-professional Imaging Academy for Northern Ireland. This will significantly increase the supply of locally trained consultant radiologists and advanced radiographer practitioners to address the increasing demand for imaging investigations and reduce reliance on costly outsourcing.\n\nFollowing a robust options appraisal process by an independent expert panel, the Mater Infirmorum Hospital site in Belfast HSC Trust has been identified as the optimum location for the proposed Imaging Academy. This would be expected to provide trainees with the additional clinical and office space and full Picture Archiving and Community System access recommended by the Royal College of Radiologists. However, progressing this initiative remains subject to business case approval and the availability of funding (£3.3m is currently earmarked for establishment of the Imaging Academy in the Department’s draft Capital Plan).\n\nPending the establishment of the Imaging Academy, a costed workforce plan (approximately £6m per annum over the next 3-5 years) for imaging services has also been developed, to bring training within imaging teams, including clinical radiologists, up to date. Regrettably, funding for this programme remains unapproved.\n\nRegarding interventional radiology, the Regional Imaging Board has endorsed a Hub and Spoke model for this service. This will utilise existing resources across the region, optimising specialist care provision to high standards and improving access for patients. The model exists in Belfast HSC Trust and has been extended to the Western HSC Trust. However, there is no dedicated funding to roll this model out across all of Northern Ireland and consequently other HSC Trusts have to rely on creating capacity themselves.\n\nIn terms of oncology, A Cancer Strategy for Northern Ireland 2022 – 2032 sets the overall direction. By 2024/25, £10.88m will have already been invested to stabilise HSC Trusts’ oncology and haematology services. This funding has secured an additional 167.6 WTE posts across the full range of healthcare disciplines delivering oncology and haematology services. The resultant growth in whole time equivalent (WTE) Consultant Radiologists, Specialty Doctors, Consultant Radiographers, Specialist Radiographers and Radiographers is shown in the following table.\n\nStabilisation of HSC Trusts’ Oncology and Haematology Services\nIncrease in WTE funded posts: Consultants/Specialty Doctors/Consultant Radiographers/Specialist Radiographers/Radiographers\nStaff type\tOncology\tHaematology\nConsultant\t9.75 WTE\t7.58 WTE\nSpecialty Doctor\t8.0 WTE\t8.0 WTE\nConsultant Radiographer/Specialist Radiographer\t6.5 WTE\nRadiographer\t3.0 WTE\nTOTAL\t27.25 WTE\t15.58 WTE\nGRAND TOTAL\t42.83 WTE\n\nSpecific cancer pathways are currently being developed, which will inform future strategic workforce planning to address workforce requirements for clinical oncologists and other professions.\n\nThe Royal College of Radiologists have also identified recruitment and retention as the key elements of their three-point plan to support clinical oncology and clinical radiology. I am pleased to say that my Department’s Health and Social Care Workforce Strategy 2026: Delivering for Our People and its current Second Action Plan contains a comprehensive and ambitious work programme that includes the development of initiatives to enhance our attraction, recruitment and retention across all staff groups and specialties. I look forward to discussion with College representatives on these matters at our forthcoming meeting.\n\nMy Department has an extensive range of plans and programmes to develop effective cancer and imaging services in Northern Ireland, supporting the education and training of the medical oncologists, medical radiologists and other professional staff upon which these services depend. However, we can only take forward these ambitious plans if we are funded to do so.\n\nThe 2024/25 Budget outcome was extremely disappointing for this Department and is likely to have serious consequences for health and social care, including cancer and imaging services. The additional funding provided was significantly less than what is required and has resulted in 2.3% less funding in 2024/25 than was spent in 2023/24. My Department is currently anticipating a shortfall of £340m, which means some extremely difficult decisions will be required to manage within the allocated budget. The impact has already been felt in that my Department has not able to commission a needed expansion of three places in the August intake to the medical radiology training programme.\n\nIn the meantime, until the Department is provided with the additional funding for which I will continue to advocate, we will not be able to do all that we want or know is required, to develop a reformed health and social care system for the people of Northern Ireland.\n\nOur immediate focus will therefore be on preserving and protecting existing services, retaining patient safety at the forefront of service delivery.","answerHtml":"<p>I am acutely aware of the workforce challenges that exists across health and social care and therefore welcome the Royal College of Radiologists’ 2023 Workforce Census Reports for Clinical Oncology and Clinical Radiology. I have already agreed to meet representatives from the Royal College to discuss their recommendations in detail, including their predictions relating to retirements and shortfalls in the current and future number of clinical oncologists and clinical/interventional radiologists. This will inform my Department’s ongoing collaboration with the health and social care system on the development of imaging and cancer services.</p><p>My Department is committed to the provision of effective imaging and cancer services in Northern Ireland, ensuring patient safety and quality of care. The Strategic Framework for Imaging Services in Health and Social Care (2018) recognised that our existing training mechanism could not deliver the number of clinical radiologists required to meet increasing demand. While much has been achieved over recent years, with training places having been increased by 46% from 37 (2015/16) to 54 (2022/23), the Department recognises that a more innovative approach is required to generate the radiologist workforce required to meet future demand.</p><p>After extensive consideration of best practice options, including those set out in the Royal College of Radiology’s Radiology Training 2016 – 2026: A vision and a solution, the Department and HSC are taking forward a proposal for a multi-professional Imaging Academy for Northern Ireland. This will significantly increase the supply of locally trained consultant radiologists and advanced radiographer practitioners to address the increasing demand for imaging investigations and reduce reliance on costly outsourcing.</p><p>Following a robust options appraisal process by an independent expert panel, the Mater Infirmorum Hospital site in Belfast HSC Trust has been identified as the optimum location for the proposed Imaging Academy. This would be expected to provide trainees with the additional clinical and office space and full Picture Archiving and Community System access recommended by the Royal College of Radiologists. However, progressing this initiative remains subject to business case approval and the availability of funding (£3.3m is currently earmarked for establishment of the Imaging Academy in the Department’s draft Capital Plan).</p><p>Pending the establishment of the Imaging Academy, a costed workforce plan (approximately £6m per annum over the next 3-5 years) for imaging services has also been developed, to bring training within imaging teams, including clinical radiologists, up to date. Regrettably, funding for this programme remains unapproved.</p><p>Regarding interventional radiology, the Regional Imaging Board has endorsed a Hub and Spoke model for this service. This will utilise existing resources across the region, optimising specialist care provision to high standards and improving access for patients. The model exists in Belfast HSC Trust and has been extended to the Western HSC Trust. However, there is no dedicated funding to roll this model out across all of Northern Ireland and consequently other HSC Trusts have to rely on creating capacity themselves.</p><p>In terms of oncology, A Cancer Strategy for Northern Ireland 2022 – 2032 sets the overall direction. By 2024/25, £10.88m will have already been invested to stabilise HSC Trusts’ oncology and haematology services. This funding has secured an additional 167.6 WTE posts across the full range of healthcare disciplines delivering oncology and haematology services. The resultant growth in whole time equivalent (WTE) Consultant Radiologists, Specialty Doctors, Consultant Radiographers, Specialist Radiographers and Radiographers is shown in the following table.</p><div class=\"table-wrap\"><table><tr><td colspan=\"3\">Stabilisation of HSC Trusts’ Oncology and Haematology Services<br>Increase in WTE funded posts: Consultants/Specialty Doctors/Consultant Radiographers/Specialist Radiographers/Radiographers</td></tr><tr><td>Staff type</td><td>Oncology</td><td>Haematology</td></tr><tr><td>Consultant</td><td>9.75 WTE</td><td>7.58 WTE</td></tr><tr><td>Specialty Doctor</td><td>8.0 WTE</td><td>8.0 WTE</td></tr><tr><td>Consultant Radiographer/Specialist Radiographer</td><td>6.5 WTE</td><td></td></tr><tr><td>Radiographer</td><td>3.0 WTE</td><td></td></tr><tr><td>TOTAL</td><td>27.25 WTE</td><td>15.58 WTE</td></tr><tr><td>GRAND TOTAL</td><td colspan=\"2\">42.83 WTE</td></tr></table></div><p>Specific cancer pathways are currently being developed, which will inform future strategic workforce planning to address workforce requirements for clinical oncologists and other professions.</p><p>The Royal College of Radiologists have also identified recruitment and retention as the key elements of their three-point plan to support clinical oncology and clinical radiology. I am pleased to say that my Department’s Health and Social Care Workforce Strategy 2026: Delivering for Our People and its current Second Action Plan contains a comprehensive and ambitious work programme that includes the development of initiatives to enhance our attraction, recruitment and retention across all staff groups and specialties. I look forward to discussion with College representatives on these matters at our forthcoming meeting.</p><p>My Department has an extensive range of plans and programmes to develop effective cancer and imaging services in Northern Ireland, supporting the education and training of the medical oncologists, medical radiologists and other professional staff upon which these services depend. However, we can only take forward these ambitious plans if we are funded to do so.</p><p>The 2024/25 Budget outcome was extremely disappointing for this Department and is likely to have serious consequences for health and social care, including cancer and imaging services. The additional funding provided was significantly less than what is required and has resulted in 2.3% less funding in 2024/25 than was spent in 2023/24. My Department is currently anticipating a shortfall of £340m, which means some extremely difficult decisions will be required to manage within the allocated budget. The impact has already been felt in that my Department has not able to commission a needed expansion of three places in the August intake to the medical radiology training programme.</p><p>In the meantime, until the Department is provided with the additional funding for which I will continue to advocate, we will not be able to do all that we want or know is required, to develop a reformed health and social care system for the people of Northern Ireland.</p><p>Our immediate focus will therefore be on preserving and protecting existing services, retaining patient safety at the forefront of service delivery.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013569%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=406178","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=406178"}},{"id":"405828","reference":"AQW 13454/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-06-17","answerBy":"2024-07-02","answered":"2024-07-01","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health whether his Department is collaborating with other UK jurisdictions that have banned sunbeds in order to learn from their experiences and follow best practices.","answerText":"Whilst commercial sunbed bans have been introduced in some countries including Australia and Brazil, UK and European jurisdictions have typically introduced age restrictions and other regulatory measures in relation to their use. The Skin Cancer Prevention Strategy steering group frequently engage with other jurisdictions in relation to best practice and the Department continues to work with partner organisations, including the Public Health Agency, District Councils and Cancer Focus NI, to reduce sunbed use and raise awareness of the harms they cause.","answerHtml":"<p>Whilst commercial sunbed bans have been introduced in some countries including Australia and Brazil, UK and European jurisdictions have typically introduced age restrictions and other regulatory measures in relation to their use. The Skin Cancer Prevention Strategy steering group frequently engage with other jurisdictions in relation to best practice and the Department continues to work with partner organisations, including the Public Health Agency, District Councils and Cancer Focus NI, to reduce sunbed use and raise awareness of the harms they cause.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013454%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=405828","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=405828"}},{"id":"405655","reference":"AQW 13400/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-06-14","answerBy":"2024-07-01","answered":"2024-06-28","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, given the evidence linking sunbed use to increased melanoma risk, what steps he is taking to ban sunbeds in Northern Ireland.","answerText":"The Department’s Skin Cancer Prevention Strategy aims to reduce the incidence of skin cancer and therefore future regulatory measures in relation to sunbeds have not been ruled out. We continue to work with partner organisations, including the Public Health Agency, District Councils and Cancer Focus NI, to reduce sunbed use and raise awareness of the harms they cause.","answerHtml":"<p>The Department’s Skin Cancer Prevention Strategy aims to reduce the incidence of skin cancer and therefore future regulatory measures in relation to sunbeds have not been ruled out. We continue to work with partner organisations, including the Public Health Agency, District Councils and Cancer Focus NI, to reduce sunbed use and raise awareness of the harms they cause.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013400%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=405655","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=405655"}},{"id":"405654","reference":"AQW 13399/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-06-14","answerBy":"2024-07-01","answered":"2024-07-11","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure (i) how current safety regulations for Battery Energy Storage Systems compare with Regulation (EU) 2023/1542; and (ii) whether there are any plans to align standards with these regulations.","answerText":"Regulation (EU) 2023/1542, which amends Directive 2008/98/EC and Regulation (EU) 2019/1020 and repeals Directive 2006/66/EC, has been in force from 18th February 2024 and is applicable here. It replaces the EU Batteries Directive (2006/66/EC), which is listed in Annex 2 of the Windsor Framework.\n\nIt will gradually introduce new rules to strengthen sustainability of batteries and waste batteries, to protect the environment and human health, and increase circularity.\n\nThe North of Ireland will implement this EU regulation as it is within the scope of the Windsor Framework. DfE is currently assessing the necessary requirements and supporting implementing legislation required and is working closely with DAERA. DfE will engage with stakeholders through this process, however the expected timeline is not known at this time.","answerHtml":"<p>Regulation (EU) 2023/1542, which amends Directive 2008/98/EC and Regulation (EU) 2019/1020 and repeals Directive 2006/66/EC, has been in force from 18th February 2024 and is applicable here. It replaces the EU Batteries Directive (2006/66/EC), which is listed in Annex 2 of the Windsor Framework.</p><p>It will gradually introduce new rules to strengthen sustainability of batteries and waste batteries, to protect the environment and human health, and increase circularity.</p><p>The North of Ireland will implement this EU regulation as it is within the scope of the Windsor Framework. DfE is currently assessing the necessary requirements and supporting implementing legislation required and is working closely with DAERA. DfE will engage with stakeholders through this process, however the expected timeline is not known at this time.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013399%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=405654","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=405654"}},{"id":"405653","reference":"AQW 13398/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-06-14","answerBy":"2024-07-01","answered":"2024-07-11","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure what measures are being taken to ensure that the public is adequately informed and consulted with in relation to proposed Battery Energy Storage Systems installations, especially those near residential areas, to address any community concerns.","answerText":"Provisions in the Planning Act (NI) 2011, the Planning (General Development Procedure) Order (NI) 2015 (‘GDPO’) and the Planning (Development Management) Regulations (NI) 2015 provide for pre application community consultation to be undertaken for applications for development belonging to the category of major development. Consultation includes at least one public event and notice in a newspaper.\n\nRegulation 8 of the GDPO makes provision for notice to be given on receipt of applications for planning permission. It includes advertisement in local newspapers and neighbour notification by letter to prescribed properties.\n\nMembers of the public can also find and follow planning applications via the Planning Portal.","answerHtml":"<p>Provisions in the Planning Act (NI) 2011, the Planning (General Development Procedure) Order (NI) 2015 (‘GDPO’) and the Planning (Development Management) Regulations (NI) 2015 provide for pre application community consultation to be undertaken for applications for development belonging to the category of major development. Consultation includes at least one public event and notice in a newspaper.</p><p>Regulation 8 of the GDPO makes provision for notice to be given on receipt of applications for planning permission. It includes advertisement in local newspapers and neighbour notification by letter to prescribed properties.</p><p>Members of the public can also find and follow planning applications via the Planning Portal.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013398%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=405653","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=405653"}},{"id":"405652","reference":"AQW 13397/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-06-14","answerBy":"2024-07-01","answered":"2024-07-11","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to detail the guidance provided to local council planning decision-makers to ensure that battery installations include comprehensive decommissioning plans, covering end-of-life management and environmentally sound disposal of batteries.","answerText":"Guidance on a range of topics has been provided by my Department through Development Management Practice Notes. These are designed to guide planning officers and others engaged in the planning system through development management processes and deal primarily with procedures as well as good practice.\n\nFrom April 2019 my department has engaged with local planning authorities (LPAs) as part of its Environmental Governance Work Programme, intended to enhance competence and capacity on environmental compliance in the planning system, particularly in relation to environmental impact assessment (EIA).\n\nThe programme included the development and delivery of two levels of bespoke EIA training to over 200 planning staff, the publication of a number of EIA Development Management Practice Notes and the establishment of an Environmental Officers Forum, to facilitate discussions on key and emerging EIA issues.","answerHtml":"<p>Guidance on a range of topics has been provided by my Department through Development Management Practice Notes. These are designed to guide planning officers and others engaged in the planning system through development management processes and deal primarily with procedures as well as good practice.</p><p>From April 2019 my department has engaged with local planning authorities (LPAs) as part of its Environmental Governance Work Programme, intended to enhance competence and capacity on environmental compliance in the planning system, particularly in relation to environmental impact assessment (EIA).</p><p>The programme included the development and delivery of two levels of bespoke EIA training to over 200 planning staff, the publication of a number of EIA Development Management Practice Notes and the establishment of an Environmental Officers Forum, to facilitate discussions on key and emerging EIA issues.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013397%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=405652","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=405652"}},{"id":"405651","reference":"AQW 13396/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-06-14","answerBy":"2024-07-01","answered":"2024-07-11","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure, given the recent rise in installations of Battery Energy Storage Systems, what steps he is taking to develop a specific regulatory framework that addresses the fire safety and environmental risks associated with these systems.","answerText":"Through an existing framework which includes planning policies; local development plans; guidance; environmental impact assessments; case law; pre-application community consultation; pre-application discussions; consultation with expert bodies and consideration at planning committee meetings I am content that the risks associated with these developments and any separation distances from residential properties can be addressed at present.","answerHtml":"<p>Through an existing framework which includes planning policies; local development plans; guidance; environmental impact assessments; case law; pre-application community consultation; pre-application discussions; consultation with expert bodies and consideration at planning committee meetings I am content that the risks associated with these developments and any separation distances from residential properties can be addressed at present.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013396%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=405651","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=405651"}},{"id":"404730","reference":"AQO 603/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2024-06-06","answerBy":"2024-06-17","answered":"2024-06-17","answeredOrally":true,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs for an update on the action his Department is taking in relation to blue-green algae in Lough Neagh.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr Muir","text":"Although there are no quick fixes for the problems at Lough Neagh, I am pleased to provide an update on the actions that my Department is taking to tackle them. DAERA has led on the development of a report that contains evidence-based actions to tackle the blue-green algae blooms in the lough and secure longer-term improvements in water quality across Northern Ireland. However, approval by the Executive of the draft environmental improvement plan (EIP) is key to taking a strategic approach to the issues facing Lough Neagh in the context of the wider catchment area. I will continue to engage with Executive colleagues to seek their approval on the draft EIP and the Lough Neagh report. My Department has led on the soon-to-be-launched small business research initiative to explore potential solutions to treat and reduce blue-green algae blooms without impacting the natural environment of Lough Neagh and associated Northern Ireland waterways. It has also led on the development of an inter-agency monitoring protocol to support the response to blue-green algae issues this year. The protocol has been published on DAERA’s website, and provides guidance on how water users should consider blue-green algae risks and details the Department’s monitoring response. I am pleased to confirm that action on the ground has already commenced. For example, through the College of Agriculture, Food and Rural Enterprise, my Department has already delivered nutrient management programmes for farmers and land managers targeted on Lough Neagh catchment areas. The Lough Neagh report and action plan is key and needs Executive approval, but there are many actions that I am taking, as I have outlined to the Chamber. Key to that is the future farm support and development programme, which is a new way forward that is focused on improved and sustainable productivity. Environmental sustainability, built-in resilience, food security and effective and functioning supply chains are key parts of that. The farming with nature package is also a key component. Among the many actions that we are taking, I am commissioning an independent scientific review of the impact on Lough Neagh of sand extraction. I am putting more resources towards, and more regulation on, the Lough Neagh catchment area, and I am scoping the expansion of the sustainable catchment programme."},{"speaker":"Mr Speaker","text":"Time is up for listed questions to the Minister. We move on to topical questions."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20603%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=404730","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2024-06-17&docID=405246#AQO%20603/22-27","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=404730"}},{"id":"404465","reference":"AQO 523/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2024-05-23","answerBy":"2024-06-03","answered":"2024-06-05","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education for his assessment of the role of affordable childcare in addressing poverty.","answerText":"I appreciate the role which appropriate early learning and childcare provision can play in helping children and families out of poverty. The Department for Communities leads on the Anti-Poverty Strategy and is represented on the Task and Finish Group which I established to support the development of an Early Learning and Childcare Strategy. Their input has helped shape the package of measures which I announced on 23 May. This includes a commitment to increase investment in early years programmes such as Sure Start, Pathway and Toybox. These are targeted at some of the most disadvantaged communities and groups within Northern Ireland and aim to ‘level the playing field’ for many young children experiencing poverty.\n\nResearch by the Institute of Fiscal Studies shows that child development outcomes are most effectively achieved through group programmes like this which provide a range of wrap-around support and include parental involvement.\n\nIn addition, families on Universal Credit are entitled to significant support with their childcare costs which particularly benefits parents working fewer hours and on lower incomes. In the 3 years from December 2020 to November 2023, 185,000 Universal Credit childcare payments were made in Northern Ireland, totalling £80m.\n\nI am aware of the financial strain which childcare costs are putting on many families not eligible for Universal Credit. That is why I have decided to introduce a Northern Ireland childcare subsidy scheme initially targeted at parents eligible for Tax Free Childcare who have children below Primary school age. This group tends to be the highest users of childcare, incur the greatest costs and are most likely to consider it ‘difficult or very difficult to afford’.","answerHtml":"<p>I appreciate the role which appropriate early learning and childcare provision can play in helping children and families out of poverty. The Department for Communities leads on the Anti-Poverty Strategy and is represented on the Task and Finish Group which I established to support the development of an Early Learning and Childcare Strategy. Their input has helped shape the package of measures which I announced on 23 May. This includes a commitment to increase investment in early years programmes such as Sure Start, Pathway and Toybox. These are targeted at some of the most disadvantaged communities and groups within Northern Ireland and aim to ‘level the playing field’ for many young children experiencing poverty.</p><p>Research by the Institute of Fiscal Studies shows that child development outcomes are most effectively achieved through group programmes like this which provide a range of wrap-around support and include parental involvement.</p><p>In addition, families on Universal Credit are entitled to significant support with their childcare costs which particularly benefits parents working fewer hours and on lower incomes. In the 3 years from December 2020 to November 2023, 185,000 Universal Credit childcare payments were made in Northern Ireland, totalling £80m.</p><p>I am aware of the financial strain which childcare costs are putting on many families not eligible for Universal Credit. That is why I have decided to introduce a Northern Ireland childcare subsidy scheme initially targeted at parents eligible for Tax Free Childcare who have children below Primary school age. This group tends to be the highest users of childcare, incur the greatest costs and are most likely to consider it ‘difficult or very difficult to afford’.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20523%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=404465","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=404465"}},{"id":"402570","reference":"AQW 12310/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-05-21","answerBy":"2024-05-30","answered":"2024-05-23","answeredOrally":false,"priority":true,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance when she will answer AQW 11532/22-27.","answerText":"The response to AQW 11532 22-27 was issued on 22 May 2024.","answerHtml":"<p>The response to AQW 11532 22-27 was issued on 22 May 2024.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012310%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=402570","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=402570"}},{"id":"402330","reference":"AQW 12224/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-05-20","answerBy":"2024-06-05","answered":"2024-06-05","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure how he will ensure the additional 600 vehicle movements daily from the planning application LA03/2022/1109/F, concentrated during peak travel periods, does not exacerbate the existing safety issues at the A2 and Glenville Road junction, Newtownabbey.","answerText":"Planning application LA03/2022/1109/F for a community pharmacy and residential apartments is a current 'live' Planning Application which falls under the consideration and governance of Antrim and Newtownabbey Borough Council Planning.","answerHtml":"<p>Planning application LA03/2022/1109/F for a community pharmacy and residential apartments is a current &#39;live&#39; Planning Application which falls under the consideration and governance of Antrim and Newtownabbey Borough Council Planning.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012224%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=402330","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=402330"}},{"id":"402329","reference":"AQW 12223/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-05-20","answerBy":"2024-06-05","answered":"2024-06-05","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure whether he was aware of planning application LA03/2022/1109/F for the redevelopment of 570 to 578 Shore Road, Newtownabbey, when considering the safety measures for the Glenville Road and A2 junction.","answerText":"I can confirm my officials were aware of, and have taken into account, planning application LA03/2022/1109/F in their consideration of safety measures at the junction of Glenville Road with the A2 Shore Road, Whiteabbey.","answerHtml":"<p>I can confirm my officials were aware of, and have taken into account, planning application LA03/2022/1109/F in their consideration of safety measures at the junction of Glenville Road with the A2 Shore Road, Whiteabbey.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012223%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=402329","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=402329"}},{"id":"402328","reference":"AQW 12222/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-05-20","answerBy":"2024-06-05","answered":"2024-05-30","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail the (i) current; and (ii) future plans to support the development of offshore wind programs.","answerText":"In order to meet the targets established in the Climate Change Act and the Energy Strategy, our energy system must diversify to harness an increasing amount of indigenous and clean energy sources. Offshore renewable energy will have a key role to play in achieving net zero.\n\nMy Department, in collaboration with other departments and key stakeholders, have developed an Offshore Renewable Energy Action Plan (OREAP) to enable offshore renewable energy development in the north’s marine area from 2030.\n\nDepartment officials are also developing a support scheme to incentivise investment in larger scale renewable electricity projects. The High-Level Design for this support scheme was published in April 2024.\n\nI recognise the importance of offshore renewables for our net zero future. Incentivising the necessary investment in offshore projects will continue to be part of the development process for the support scheme, in line with the work on the critical path timeline for offshore renewable energy being undertaken by the Offshore Renewable Energy Action Plan (OREAP) Steering Group.","answerHtml":"<p>In order to meet the targets established in the Climate Change Act and the Energy Strategy, our energy system must diversify to harness an increasing amount of indigenous and clean energy sources. Offshore renewable energy will have a key role to play in achieving net zero.</p><p>My Department, in collaboration with other departments and key stakeholders, have developed an Offshore Renewable Energy Action Plan (OREAP) to enable offshore renewable energy development in the north’s marine area from 2030.</p><p>Department officials are also developing a support scheme to incentivise investment in larger scale renewable electricity projects. The High-Level Design for this support scheme was published in April 2024.</p><p>I recognise the importance of offshore renewables for our net zero future. Incentivising the necessary investment in offshore projects will continue to be part of the development process for the support scheme, in line with the work on the critical path timeline for offshore renewable energy being undertaken by the Offshore Renewable Energy Action Plan (OREAP) Steering Group.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012222%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=402328","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=402328"}},{"id":"402327","reference":"AQW 12221/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-05-20","answerBy":"2024-06-05","answered":"2024-05-29","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education to detail (i) the schools in East Antrim awaiting the completion of capital projects; (ii) the progress, status, and anticipated completion dates of these projects; and (iii) the current prioritisation ranking of these projects.","answerText":"There are currently seven capital projects in East Antrim awaiting completion.\n\nThe current position of these projects is as follows:\n\nSchool\tCurrent Position\nIslandmagee Primary School\tProject is in the construction stage, with completion anticipated in summer 2024.\nSt Killian’s College\tProject is in the design stage and a revised planning application is to be submitted in the coming months.\nBelfast High School\tThe project was announced in March 2022, however was paused in April 2023.\nCarrickfergus Academy\tProcurement of an Integrated Consultant Team for the project has commenced, following the re-start of the project in February 2024.\nLarne Grammar School\tThe project was announced in March 2022, however was paused in April 2023.\nLarne High School\tThe project was announced in March 2022, however was paused in April 2023.\nUlidia Integrated College\tProject is in the construction stage with completion anticipated by the end of 2024.\n\nProjects will continue to advance in planning and design but will only be permitted to progress to construction when affordable within the wider education budget context. As I have previously stated, it is my intention to continue to make the case for significant additional and sustained capital budget to invest right across the schools’ estate.","answerHtml":"<p>There are currently seven capital projects in East Antrim awaiting completion.</p><p>The current position of these projects is as follows:</p><div class=\"table-wrap\"><table><tr><td>School</td><td>Current Position</td></tr><tr><td>Islandmagee Primary School</td><td>Project is in the construction stage, with completion anticipated in summer 2024.</td></tr><tr><td>St Killian’s College</td><td>Project is in the design stage and a revised planning application is to be submitted in the coming months.</td></tr><tr><td>Belfast High School</td><td>The project was announced in March 2022, however was paused in April 2023.</td></tr><tr><td>Carrickfergus Academy</td><td>Procurement of an Integrated Consultant Team for the project has commenced, following the re-start of the project in February 2024.</td></tr><tr><td>Larne Grammar School</td><td>The project was announced in March 2022, however was paused in April 2023.</td></tr><tr><td>Larne High School</td><td>The project was announced in March 2022, however was paused in April 2023.</td></tr><tr><td>Ulidia Integrated College</td><td>Project is in the construction stage with completion anticipated by the end of 2024.</td></tr></table></div><p>Projects will continue to advance in planning and design but will only be permitted to progress to construction when affordable within the wider education budget context. As I have previously stated, it is my intention to continue to make the case for significant additional and sustained capital budget to invest right across the schools’ estate.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012221%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=402327","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=402327"}},{"id":"400890","reference":"AQO 446/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2024-05-09","answerBy":"2024-05-20","answered":"2024-05-20","answeredOrally":true,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice for an update on a new domestic and sexual abuse strategy.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mrs Long","text":"Together with the Minister of Health, I am finalising a new seven-year domestic and sexual abuse strategy, with input from the Department of Education, the Department for Communities and the Executive Office. The draft strategy is built around five pillars: partnership; prevention; children and young people; support and provision; and justice. It will provide the basis for a wide range of work to protect and support victims and address abusive behaviours. I thank voluntary and community sector partners for their invaluable input to the strategy and for sharing insights from those with lived experience. That has led to a more effective strategy that will make a meaningful difference to those affected by domestic and sexual abuse and their families. Health and Justice officials will brief their respective Committees on 30 May, we hope, and I intend to publish the strategy and action plan jointly with the Minister of Health in June."},{"speaker":"Madam Principal Deputy Speaker","text":"Stewart, you have time for a quick supplementary, and, Minister, a quick response."},{"speaker":"Mr Dickson","text":"Thank you, Minister. Will the Minister outline the Department's response to the Leonard Consultancy report on multi-agency risk assessment conferencing (MARAC) services?"},{"speaker":"Mrs Long","text":"I am committed to ensuring that the risks posed to victims of domestic abuse are assessed and managed as effectively as possible, so we are setting up a dedicated multi-agency oversight group to consider the report's recommendations and develop costed options for reform. That group will be informed by a number of working groups that will be established to report to it. The core membership will include DOJ, the Department of Health and the PSNI, with other organisations invited to contribute."},{"speaker":"Madam Principal Deputy Speaker","text":"Perfect. That ends the period for listed questions. We move now to 15 minutes of topical questions. Question 3 has been withdrawn."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20446%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=400890","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2024-05-20&docID=401598#AQO%20446/22-27","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=400890"}},{"id":"400657","reference":"AQW 11532/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-05-08","answerBy":"2024-05-16","answered":"2024-05-22","answeredOrally":false,"priority":true,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance to detail what action she is taking to bring forward social value legislation.","answerText":"Leveraging public spend to achieve better social value outcomes is a key priority.\n\nTo date positive outcomes of the Scorning Social Value Procurement Policy Note have included:\n\n• 3,500+ people who were long-term unemployed or disadvantaged in the labour market have gained employment\n\n• 75+ social enterprises are now part of government supply chains\n\n• 2,700+ hours of volunteering with the Voluntary, Community and Social Enterprises sector\n\n• 6,500+ hours of skills development activities\n\n• 2,800+ weeks of work experience\n\n• Over 3,500 hours of environmental awareness initiatives\n\n• 2400+ hours of health and well-being initiatives\n\nThe new Procurement Act 2023 places a duty on contracting authorities to have regard ‘to the importance of maximising public benefit’ and ‘to the fact that small and medium-sized enterprises may face particular barriers to participation and consider whether such barriers can be removed or reduced’.\n\nIn light of the new regulations, I am also reviewing the current Scoring Social Value Policy to identify areas where the Policy can be strengthened to improve its impact. One of the issues I am keen to address is feedback received from representative groups for small and medium sized and micro businesses who believe that some areas of the Scoring Social Value Policy may be impacting on their ability to tender for government contracts.\n\nThe ability to amend Policy, particularly to address any unintended consequences, is essential.\n\nMy priority at present is to ensure we have the most impactful means to deliver Social Value. Following consultation with the key stakeholders, I plan to bring the revised Policy to the Executive for approval following the Summer recess.","answerHtml":"<p>Leveraging public spend to achieve better social value outcomes is a key priority.</p><p>To date positive outcomes of the Scorning Social Value Procurement Policy Note have included:</p><p>• 3,500+ people who were long-term unemployed or disadvantaged in the labour market have gained employment</p><p>• 75+ social enterprises are now part of government supply chains</p><p>• 2,700+ hours of volunteering with the Voluntary, Community and Social Enterprises sector</p><p>• 6,500+ hours of skills development activities</p><p>• 2,800+ weeks of work experience</p><p>• Over 3,500 hours of environmental awareness initiatives</p><p>• 2400+ hours of health and well-being initiatives</p><p>The new Procurement Act 2023 places a duty on contracting authorities to have regard ‘to the importance of maximising public benefit’ and ‘to the fact that small and medium-sized enterprises may face particular barriers to participation and consider whether such barriers can be removed or reduced’.</p><p>In light of the new regulations, I am also reviewing the current Scoring Social Value Policy to identify areas where the Policy can be strengthened to improve its impact. One of the issues I am keen to address is feedback received from representative groups for small and medium sized and micro businesses who believe that some areas of the Scoring Social Value Policy may be impacting on their ability to tender for government contracts.</p><p>The ability to amend Policy, particularly to address any unintended consequences, is essential.</p><p>My priority at present is to ensure we have the most impactful means to deliver Social Value. Following consultation with the key stakeholders, I plan to bring the revised Policy to the Executive for approval following the Summer recess.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011532%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=400657","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=400657"}},{"id":"400084","reference":"AQO 429/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2024-05-02","answerBy":"2024-05-14","answered":"2024-05-14","answeredOrally":true,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to outline any progress that has been made to provide traffic controlling measures at the junction between Shore Road and Glenville Road, Whiteabbey.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr O'Dowd","text":"A study of the Glenville Road/Shore Road junction was undertaken by my Department's consultancy partner. The junction was modelled, and several options were considered, including signalisation of the junction. Signalisation of the junction, however, has significant downsides, increasing congestion on the A2 Shore Road for a relatively small number of vehicle movements. It is also a very costly option and will be competing against other equally important schemes for my Department's limited funding. In the interim, it is proposed to renew and extend the existing yellow-box markings to provide increased visibility. My Department will also take forward a proposal to prohibit right-turn movement on the Glenville Road and U-turn movement on the signalised junction at Shore Road/Glenavna Road. A full design and detailed estimate for the signalisation of the junction will be progressed as resources permit."},{"speaker":"Mr Dickson","text":"I thank the Minister for his answer; indeed, I got a similar answer from the divisional roads manager today. However, Minister, your answer and the divisional roads manager's answer are localised to that particular area and the number of vehicles. There was a further accident there yesterday. There has practically been one every day in the last couple of weeks. Every time an accident happens at the junction of Glenville Road and Shore Road, traffic is backed up the whole way to the Westlink."},{"speaker":"Madam Principal Deputy Speaker","text":"Come to your question, Stewart."},{"speaker":"Mr Dickson","text":"There is a wider context than just the 47 vehicle turns at the junction."},{"speaker":"Mr O'Dowd","text":"I am aware of the increased accident history at the junction. I was engaged with officials in preparing for Question Time today, and we were talking through the issues. They made me aware of the increased number of accidents at that junction, and I have asked them to look into the matter further. I accept that, when you make a change at a junction or do not make a change, it impacts further down the road, perhaps, sometimes, for several miles. My Department is also aware of that, and officials will look at that as well before we make a final decision on how we move this. The interim measure will be the increase in the yellow box at the area. Again, I urge all drivers to take extreme care when using our roads."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20429%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=400084","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2024-05-14&docID=400577#AQO%20429/22-27","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=400084"}},{"id":"400050","reference":"AQO 395/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2024-05-02","answerBy":"2024-05-13","answered":"2024-05-13","answeredOrally":true,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister to outline any steps they have taken to implement the recommendations and proposals of the Commission on Flags, Identity, Culture and Tradition Final Report, since 3 February 2024.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mrs Little-Pengelly (The deputy First Minister)","text":"The Commission on Flags, Identity, Culture and Tradition, otherwise referred to as FICT, concluded its work and provided its final report to Ministers on 17 July 2020. A series of next steps, including a FICT implementation plan, was approved by the Executive on 25 March 2021. On 1 April 2021, initial engagement of Departments was approved by Ministers. On 22 April 2024, officials met junior Ministers to discuss matters relating to the report and the possible way forward. Officials are now preparing a submission on the back of that engagement, which is expected to set out a number of options for consideration regarding the next steps on the report and its recommendations."},{"speaker":"Mr Dickson","text":"I thank the deputy First Minister for her answer. Given that the commission does not support the status quo with regard to flags and emblems on public property, and the fact that you have now had over four years since the initiation of that report in which to take action, what action will your Department actually take to deal with flags on public property?"},{"speaker":"Mrs Little-Pengelly","text":"I thank the Member for his question. There was consensus on a number of the commission's recommendations. We hope to be able to move forward with consensus on some of those, but we await the submission and advice from officials. Inevitably, there will be other aspects of the report on which there is no consensus. We will engage on all the recommendations and assess how we can move forward. The key issue is that we are waiting for that submission, recommendation and advice from officials at this stage."},{"speaker":"Ms Ní Chuilín","text":"In short: you are waiting on the submission on the FICT implementation plan. When do you anticipate its coming forward? Will it be before or after the summer recess?"},{"speaker":"Mrs Little-Pengelly","text":"I am always acutely aware when I respond to questions on that area that it deals with a number of tricky and contentious issues on which there has been no consensus since the Good Friday/Belfast Agreement, nor was there consensus before. We are aware that the officials' advice is at an advanced stage, and we anticipate getting that in the next short while. We will work through it and have those discussions absolutely in good faith. We do anticipate getting it prior to the summer recess."},{"speaker":"Mr Kingston","text":"How important is it to be respectful of our various cultures and identities in Northern Ireland, particularly as we move into the main parading season?"},{"speaker":"Mrs Little-Pengelly","text":"I thank the Member for his question. Of course, the right to freedom of expression is a fundamental human right and one that must be respected by us all. The right to be able to explore, learn about and express all our identities, including in the public space, is precious in our society. I absolutely believe that to be essential. The Executive Office has responsibility for a number of those issues around fundamental human rights. I hope that we can all move to a space where we show that respect to one another, including for parading and other traditions."},{"speaker":"Mr McGrath","text":"What does the deputy First Minister have to say to my constituents who have unwanted flags flying outside their homes for the whole summer? Will she commit to including a legal framework for removing those flags in the Programme for Government, whether we get it this summer or not?"},{"speaker":"Mrs Little-Pengelly","text":"I thank the Member for his question. He will be aware from the debate on that issue in the past number of weeks that there is no consensus on that recommendation from FICT. Of course, the commission itself did not have consensus on that recommendation either."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20395%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=400050","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2024-05-13&docID=400576#AQO%20395/22-27","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=400050"}},{"id":"398164","reference":"AQW 10499/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-04-19","answerBy":"2024-05-07","answered":"2024-05-03","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health why PatientView has ceased to operate in Northern Ireland.","answerText":"The UK Kidney Association has agreed a new arrangement with ‘Patients Knows Best’ to re-platform their patient facing system ‘Patient View’ across the UK.\n\nThis has involved a period of transition to allow Trusts to undertake Cyber Security and Data Protection Impact Assessments consistent with digital governance requirements. These are now complete.\n\nThe UK Kidney Association and Patient Knows Best have been contacted and advised of the imminence of roll out in Northern Ireland. A registration email is to be forwarded to all patients who have consented to the previous Renal Patient View System. Patients will be able to follow this link and sign up online giving them access to available digital health records.\n\nWe hope the information above assures you that we are making good progress to enable access to Patient Knows Best for people in Northern Ireland.","answerHtml":"<p>The UK Kidney Association has agreed a new arrangement with ‘Patients Knows Best’ to re-platform their patient facing system ‘Patient View’ across the UK.</p><p>This has involved a period of transition to allow Trusts to undertake Cyber Security and Data Protection Impact Assessments consistent with digital governance requirements. These are now complete.</p><p>The UK Kidney Association and Patient Knows Best have been contacted and advised of the imminence of roll out in Northern Ireland. A registration email is to be forwarded to all patients who have consented to the previous Renal Patient View System. Patients will be able to follow this link and sign up online giving them access to available digital health records.</p><p>We hope the information above assures you that we are making good progress to enable access to Patient Knows Best for people in Northern Ireland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010499%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=398164","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=398164"}},{"id":"398163","reference":"AQW 10498/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-04-19","answerBy":"2024-05-07","answered":"2024-05-03","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, given that it is 50 years old, whether he intends to replace the Tower Block facilities at the City Hospital.","answerText":"Construction of the 15 storey Tower Block at the Belfast City Hospital commenced in the 1970s with the Tower Block opening on 6th January 1986. The Belfast Health and Social Care Trust have submitted a proposal to carry out refurbishment of the Belfast City Hospital Tower Block and to date funding of £6.4m has been provided to the Trust. Funding will continue to be provided to the Trust on an ongoing annual basis.","answerHtml":"<p>Construction of the 15 storey Tower Block at the Belfast City Hospital commenced in the 1970s with the Tower Block opening on 6th January 1986. The Belfast Health and Social Care Trust have submitted a proposal to carry out refurbishment of the Belfast City Hospital Tower Block and to date funding of £6.4m has been provided to the Trust. Funding will continue to be provided to the Trust on an ongoing annual basis.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010498%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=398163","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=398163"}},{"id":"398162","reference":"AQW 10497/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-04-19","answerBy":"2024-05-07","answered":"2024-05-09","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health when Northern Ireland will contribute to the National Cancer Diagnosis Audit.","answerText":"My Department is currently working with clinicians, and the Northern Ireland Cancer Registry, to determine what can be done to include Northern Ireland data within the National Cancer Diagnosis Audit.","answerHtml":"<p>My Department is currently working with clinicians, and the Northern Ireland Cancer Registry, to determine what can be done to include Northern Ireland data within the National Cancer Diagnosis Audit.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010497%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=398162","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=398162"}},{"id":"399879","reference":"AQO 378/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2024-04-18","answerBy":"2024-04-30","answered":"2024-04-30","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education to outline what steps he is taking to ensure Special Educational Needs schools are fully resourced to deal with the rising demand for school places.","answerText":"Department budgets for 2024-25 were recently agreed by the Northern Ireland Executive.\n\nOver the past number of years, Special Educational Needs (SEN) costs have continued to increase year-on-year, with an anticipated c£156m required in 2024-25 to meet increasing demand and to take forward a Transformation Programme for SEN.\n\nAs part of the department's 2024-25 budget bids, I have sought the necessary funding required to ensure that special schools and the wider system are effectively resourced for this incoming academic year. The full amount of funding sought has not been met.","answerHtml":"<p>Department budgets for 2024-25 were recently agreed by the Northern Ireland Executive.</p><p>Over the past number of years, Special Educational Needs (SEN) costs have continued to increase year-on-year, with an anticipated c£156m required in 2024-25 to meet increasing demand and to take forward a Transformation Programme for SEN.</p><p>As part of the department&#39;s 2024-25 budget bids, I have sought the necessary funding required to ensure that special schools and the wider system are effectively resourced for this incoming academic year. The full amount of funding sought has not been met.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20378%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=399879","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=399879"}},{"id":"397014","reference":"AQW 9908/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-04-11","answerBy":"2024-04-26","answered":"2024-04-26","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to detail the number of cycle accidents in each of the last five years, broken down by age profile.","answerText":"My Department does not hold this information. The PSNI are responsible for collecting and validating data on Road Traffic Collisions. I would, therefore, refer you to the PSNI.","answerHtml":"<p>My Department does not hold this information. The PSNI are responsible for collecting and validating data on Road Traffic Collisions. I would, therefore, refer you to the PSNI.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209908%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=397014","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=397014"}},{"id":"397013","reference":"AQW 9907/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-04-11","answerBy":"2024-04-26","answered":"2024-04-26","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure, pursuant to AQW 9059/22-27, how many rectification notices have been served in the last five years.","answerText":"Utility companies are responsible for the permanent reinstatement of roads to an agreed specification. When utility companies do not reinstate roads in a satisfactory manner, the Department applies the procedures for inspection of reinstatements and for dealing with reinstatement failures as set out in the Northern Ireland Road Authority and Utilities Committee (NIRAUC) Code of Practice for Inspections. The number of reinstatement failures is set out in the table below.\n\nYear\tReinstatement Failures\n2019/2020\t1024\n2020/2021\t759\n2021/2022\t1009\n2022/2023\t1259\n2023/2024\t908\n\nThe reinstatement defects recorded in the table were notified to the company responsible for the necessary remedial works.","answerHtml":"<p>Utility companies are responsible for the permanent reinstatement of roads to an agreed specification. When utility companies do not reinstate roads in a satisfactory manner, the Department applies the procedures for inspection of reinstatements and for dealing with reinstatement failures as set out in the Northern Ireland Road Authority and Utilities Committee (NIRAUC) Code of Practice for Inspections. The number of reinstatement failures is set out in the table below.</p><div class=\"table-wrap\"><table><tr><td>Year</td><td>Reinstatement Failures</td></tr><tr><td>2019/2020</td><td>1024</td></tr><tr><td>2020/2021</td><td>759</td></tr><tr><td>2021/2022</td><td>1009</td></tr><tr><td>2022/2023</td><td>1259</td></tr><tr><td>2023/2024</td><td>908</td></tr></table></div><p>The reinstatement defects recorded in the table were notified to the company responsible for the necessary remedial works.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209907%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=397013","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=397013"}},{"id":"397012","reference":"AQW 9906/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-04-11","answerBy":"2024-04-26","answered":"2024-04-25","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, in relation to the April 2024 vasectomy services announcement, how he intends to assist GP practices in the resulting increased appointments.","answerText":"I was delighted to announce that non-scalpel vasectomy services in Northern Ireland will be transferred from secondary care to primary care. This will take effect from April 2024, with a transition phase throughout 2024/25.\n\nThis service enables GPs to refer patients requesting a non-scalpel vasectomy to a designated host practice where an accredited GP Vasectomist will perform the procedure negating the need for a referral to secondary care. Funding has been committed to support the provision of this procedure across Primary Care Elective and I can advise that work has commenced with the SPPG and the Federation Support Unit to re-establish this service for patients across Northern Ireland with a transition phase throughout 2024/25.","answerHtml":"<p>I was delighted to announce that non-scalpel vasectomy services in Northern Ireland will be transferred from secondary care to primary care. This will take effect from April 2024, with a transition phase throughout 2024/25.</p><p>This service enables GPs to refer patients requesting a non-scalpel vasectomy to a designated host practice where an accredited GP Vasectomist will perform the procedure negating the need for a referral to secondary care. Funding has been committed to support the provision of this procedure across Primary Care Elective and I can advise that work has commenced with the SPPG and the Federation Support Unit to re-establish this service for patients across Northern Ireland with a transition phase throughout 2024/25.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209906%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=397012","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=397012"}},{"id":"397011","reference":"AQW 9905/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-04-11","answerBy":"2024-04-26","answered":"2024-04-26","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure how many primary schools avail of the Cycle Proficiency Scheme.","answerText":"The Cycling Proficiency Scheme was delivered in 314 schools in 2022/23. There was a drop in numbers in 2023/24 to 150 schools due largely to a reduction in funding available for the scheme. I have recently confirmed that the scheme will be funded in 2024/25 and I’m pleased to say that to date 258 schools have indicated their intention to offer the scheme to their pupils this year.","answerHtml":"<p>The Cycling Proficiency Scheme was delivered in 314 schools in 2022/23. There was a drop in numbers in 2023/24 to 150 schools due largely to a reduction in funding available for the scheme. I have recently confirmed that the scheme will be funded in 2024/25 and I’m pleased to say that to date 258 schools have indicated their intention to offer the scheme to their pupils this year.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209905%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=397011","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=397011"}},{"id":"397010","reference":"AQW 9904/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-04-11","answerBy":"2024-04-26","answered":"2024-04-26","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure when a review of the Cycle Proficiency Scheme was last carried out.","answerText":"The Cycling Proficiency Scheme was externally reviewed in 2013. The Department subsequently updated the Scheme and associated resources in 2015 which brought it broadly in line with cycle training across the UK. The current Cycling Proficiency Scheme sits between National Standards levels 1 and 2, with the main difference being that on-road training is an option for schools to consider at the end of the scheme. The ongoing effectiveness of the scheme is also monitored on an annual basis by Northern Ireland Statistics and Research Agency (NISRA) and a report card produced to document the results.\n\nThe Cycling Proficiency Scheme is offered to all primary schools and has consistently been supported and valued. I’m pleased to say that, since this year’s scheme was launched last month, the level of interest from schools wishing to participate is extremely encouraging.","answerHtml":"<p>The Cycling Proficiency Scheme was externally reviewed in 2013. The Department subsequently updated the Scheme and associated resources in 2015 which brought it broadly in line with cycle training across the UK. The current Cycling Proficiency Scheme sits between National Standards levels 1 and 2, with the main difference being that on-road training is an option for schools to consider at the end of the scheme. The ongoing effectiveness of the scheme is also monitored on an annual basis by Northern Ireland Statistics and Research Agency (NISRA) and a report card produced to document the results.</p><p>The Cycling Proficiency Scheme is offered to all primary schools and has consistently been supported and valued. I’m pleased to say that, since this year’s scheme was launched last month, the level of interest from schools wishing to participate is extremely encouraging.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209904%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=397010","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=397010"}},{"id":"395380","reference":"AQW 9482/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-03-22","answerBy":"2024-04-10","answered":"2024-03-29","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy why full grant funding is not available for students choosing to complete degrees online.","answerText":"Prior to my taking office, the higher education student support package for academic year 2024/25 had already been determined.\n\nI have asked my officials to update me on any work to date on a review of Higher Education Funding, as well as proposals to take it forward. As part of this, I will be engaging with my officials to consider the current support available and to determine whether this can be improved.","answerHtml":"<p>Prior to my taking office, the higher education student support package for academic year 2024/25 had already been determined.</p><p>I have asked my officials to update me on any work to date on a review of Higher Education Funding, as well as proposals to take it forward. As part of this, I will be engaging with my officials to consider the current support available and to determine whether this can be improved.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209482%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=395380","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=395380"}},{"id":"395379","reference":"AQW 9481/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-03-22","answerBy":"2024-04-10","answered":"2024-04-09","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail (i) what cancer prevention vaccines are available; and (ii) the delivery programme of each vaccine.","answerText":"The only cancer preventable vaccine available in Northern Ireland and the rest of the UK, is the human papillomavirus (HPV) vaccine, which primarily prevents cervical cancer. It also helps reduce some types of other cancers linked to HPV, such as head and neck cancer, including oropharyngeal cancer (a type of throat cancer) and mouth cancer.\n\nThe HPV vaccine is offered routinely, through a school-based vaccination programme, to all males and females aged 12 to 13 years (school Year 9).\n\nIt is also available to people up to the age of 25 who, for whatever reason, did not take up the offer of vaccination in school, on request via their GP.\n\nIn addition, HPV vaccination is also offered to gay, bisexual and other men who have sex with men, and some transgender people, up to the age of 45, via specialist sexual-health services.","answerHtml":"<p>The only cancer preventable vaccine available in Northern Ireland and the rest of the UK, is the human papillomavirus (HPV) vaccine, which primarily prevents cervical cancer. It also helps reduce some types of other cancers linked to HPV, such as head and neck cancer, including oropharyngeal cancer (a type of throat cancer) and mouth cancer.</p><p>The HPV vaccine is offered routinely, through a school-based vaccination programme, to all males and females aged 12 to 13 years (school Year 9).</p><p>It is also available to people up to the age of 25 who, for whatever reason, did not take up the offer of vaccination in school, on request via their GP.</p><p>In addition, HPV vaccination is also offered to gay, bisexual and other men who have sex with men, and some transgender people, up to the age of 45, via specialist sexual-health services.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209481%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=395379","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=395379"}},{"id":"397505","reference":"AQO 276/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2024-03-21","answerBy":"2024-04-15","answered":"2024-04-15","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health whether the encompass programme will enable cancer patients and survivors to have virtual access to their own digital clinical data.","answerText":"encompass, which went live in the South Eastern Trust on 9 November 2023 and will be implemented region wide by Spring next year, includes a patient portal called My Care. This portal enables patients and service users to take more control over their care.\n\nInformation such as letters, supporting information, lab results and radiology results will be made available to patients.\n\nTo ensure that support is in place for patients in dealing with sensitive or upsetting information, some information relating to cancer testing and diagnosis will not be available immediately through the portal. This information will not be released until the patient has had an in-person discussion with their care team.\n\nA separate regional information system (RISOH) will continue to be used for detailed documentation of oncology treatments until a replacement system is in place. RISOH and encompass have been interfaced to enable patients to see the treatment appointment details in My Care.","answerHtml":"<p>encompass, which went live in the South Eastern Trust on 9 November 2023 and will be implemented region wide by Spring next year, includes a patient portal called My Care. This portal enables patients and service users to take more control over their care.</p><p>Information such as letters, supporting information, lab results and radiology results will be made available to patients.</p><p>To ensure that support is in place for patients in dealing with sensitive or upsetting information, some information relating to cancer testing and diagnosis will not be available immediately through the portal. This information will not be released until the patient has had an in-person discussion with their care team.</p><p>A separate regional information system (RISOH) will continue to be used for detailed documentation of oncology treatments until a replacement system is in place. RISOH and encompass have been interfaced to enable patients to see the treatment appointment details in My Care.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20276%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=397505","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=397505"}},{"id":"394450","reference":"AQW 9061/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-03-15","answerBy":"2024-04-04","answered":"2024-04-04","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to detail the standards utility providers must meet when carrying out road repairs.","answerText":"The Street Works (Northern Ireland) Order 1995 (the Order) forms the legislative framework for street works by statutory undertakers such as utility providers. The Order requires the undertaker, when reinstating a street, to comply with such requirements as may be prescribed in relation to the specification of materials and the standards of workmanship to be observed. These requirements have been prescribed in the Specification for the Reinstatement of Openings in Roads (2nd Edition), a code of practice approved by the Department under Article 31 of the Order. Details of this can be found at:\n\nwww.infrastructure-ni.gov.uk/sites/default/files/publications/drd/nirauc-code-of-practice-specification-for-the-reinstatement-of-openings-in-roads-2nd-edition.pdf","answerHtml":"<p>The Street Works (Northern Ireland) Order 1995 (the Order) forms the legislative framework for street works by statutory undertakers such as utility providers. The Order requires the undertaker, when reinstating a street, to comply with such requirements as may be prescribed in relation to the specification of materials and the standards of workmanship to be observed. These requirements have been prescribed in the Specification for the Reinstatement of Openings in Roads (2nd Edition), a code of practice approved by the Department under Article 31 of the Order. Details of this can be found at:</p><p>www.infrastructure-ni.gov.uk/sites/default/files/publications/drd/nirauc-code-of-practice-specification-for-the-reinstatement-of-openings-in-roads-2nd-edition.pdf</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209061%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=394450","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=394450"}},{"id":"394449","reference":"AQW 9060/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-03-15","answerBy":"2024-04-04","answered":"2024-03-25","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail the number of apprenticeships available in East Antrim.","answerText":"My Department’s ApprenticeshipsNI and Higher Level Apprenticeships programmes are demand-led, with apprentices recruited and retained by employers in line with business needs.\n\nAs published in the latest ApprenticeshipsNI statistical bulletin, 438 apprentices in East Antrim were enrolled on the ApprenticeshipsNI programme as at July 2022.\n\nIn relation to the Higher Level Apprenticeships programme, in the academic year 2021/2022, a total of 63 apprentices in East Antrim were undertaking higher level apprenticeships, of which 28 were enrolled at a Further Education college (including the College of Agriculture, Food and Rural Enterprise), and 35 were enrolled at a Northern Ireland higher education institution.\n\nIt should be noted that Parliamentary Constituency is based on an apprentice’s home postcode. Although the apprentice may live in a particular Parliamentary Constituency, they may attend work elsewhere.","answerHtml":"<p>My Department’s ApprenticeshipsNI and Higher Level Apprenticeships programmes are demand-led, with apprentices recruited and retained by employers in line with business needs.</p><p>As published in the latest ApprenticeshipsNI statistical bulletin, 438 apprentices in East Antrim were enrolled on the ApprenticeshipsNI programme as at July 2022.</p><p>In relation to the Higher Level Apprenticeships programme, in the academic year 2021/2022, a total of 63 apprentices in East Antrim were undertaking higher level apprenticeships, of which 28 were enrolled at a Further Education college (including the College of Agriculture, Food and Rural Enterprise), and 35 were enrolled at a Northern Ireland higher education institution.</p><p>It should be noted that Parliamentary Constituency is based on an apprentice’s home postcode. Although the apprentice may live in a particular Parliamentary Constituency, they may attend work elsewhere.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209060%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=394449","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=394449"}},{"id":"394448","reference":"AQW 9059/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-03-15","answerBy":"2024-04-04","answered":"2024-04-04","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure for his assessment of whether the road repairs carried out by a utility provider on the A2 Road from Trooperslane to Hazelbank roundabout are of a sufficient standard.","answerText":"Reinstatements made by utility companies have to meet the required Northern Ireland Road Authority and Utilities Committee (NIRAUC) Specification for the Reinstatement of Openings in Roads.\n\nMy officials have carried out various inspections during the works, which has already led to remedial works being undertaken by the utility company. Further inspections will be carried out jointly with departmental officials and the utility company, and the findings of the independent report you previously provided will also be raised, ensuring that works are carried out safely and to the appropriate standards.\n\nUtility works are also subject to additional inspection regimes on completion of the works, along with routine road inspections, which will ensure that any defective work can be passed onto the utility company for rectification during the appropriate warranty period.","answerHtml":"<p>Reinstatements made by utility companies have to meet the required Northern Ireland Road Authority and Utilities Committee (NIRAUC) Specification for the Reinstatement of Openings in Roads.</p><p>My officials have carried out various inspections during the works, which has already led to remedial works being undertaken by the utility company. Further inspections will be carried out jointly with departmental officials and the utility company, and the findings of the independent report you previously provided will also be raised, ensuring that works are carried out safely and to the appropriate standards.</p><p>Utility works are also subject to additional inspection regimes on completion of the works, along with routine road inspections, which will ensure that any defective work can be passed onto the utility company for rectification during the appropriate warranty period.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209059%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=394448","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=394448"}},{"id":"394447","reference":"AQW 9058/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-03-15","answerBy":"2024-04-04","answered":"2024-03-28","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education to detail any conversations his Department has had with the Department for the Economy in supporting social enterprises by providing affordable and accessible childcare.","answerText":"The Department for the Economy is represented on the Early Learning and Childcare Strategy Programme Board, the Stakeholder Engagement Forum and the Task and Finish Group contributing to the development of short and longer-term support measures. Delivery of an ambitious strategy will require the involvement of all types of provider, including social enterprises.","answerHtml":"<p>The Department for the Economy is represented on the Early Learning and Childcare Strategy Programme Board, the Stakeholder Engagement Forum and the Task and Finish Group contributing to the development of short and longer-term support measures. Delivery of an ambitious strategy will require the involvement of all types of provider, including social enterprises.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209058%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=394447","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=394447"}},{"id":"394446","reference":"AQW 9057/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-03-15","answerBy":"2024-04-04","answered":"2024-04-03","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, given that 66,000 people in Northern Ireland are living with prediabetes, what support his Department is providing to the Type 2 Diabetes Prevention Programme in each Health and Social Care Trust.","answerText":"The Diabetes Prevention Programme is an evidence-based diabetes prevention programme for NI, delivered by the Public Health Agency (PHA). The overall aim of the programme is to reduce the incidence of Type 2 Diabetes by identifying individuals at high risk and offering referral to an evidence-based behaviour change programme. This regional programme was commissioned and implemented by PHA, across all five Heath and Social Care Trusts. While this programme was not recurrently funded, HSCTs continue to deliver at a reduced volume.\n\nPHA leads on the non-departmental actions of the “Fitter Future for All” 10-year Obesity Prevention framework 2012 - 22. PHA invests in a number of obesity prevention programmes that align to diabetes prevention and continues to work with a range of other partners to promote activities that will encourage healthy lifestyles that contribute to obesity prevention.","answerHtml":"<p>The Diabetes Prevention Programme is an evidence-based diabetes prevention programme for NI, delivered by the Public Health Agency (PHA). The overall aim of the programme is to reduce the incidence of Type 2 Diabetes by identifying individuals at high risk and offering referral to an evidence-based behaviour change programme. This regional programme was commissioned and implemented by PHA, across all five Heath and Social Care Trusts. While this programme was not recurrently funded, HSCTs continue to deliver at a reduced volume.</p><p>PHA leads on the non-departmental actions of the “Fitter Future for All” 10-year Obesity Prevention framework 2012 - 22. PHA invests in a number of obesity prevention programmes that align to diabetes prevention and continues to work with a range of other partners to promote activities that will encourage healthy lifestyles that contribute to obesity prevention.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209057%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=394446","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=394446"}},{"id":"396918","reference":"AQO 246/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2024-03-14","answerBy":"2024-04-09","answered":"2024-04-09","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance whether she intends to make no-fault divorces available in Northern Ireland.","answerText":"I am keen to engage with others who may be able to make contributions in relation to no-fault divorces.\n\nI have had exploratory discussions with my officials in the Department who are engaged on a range of civil law reform areas including marriage and civil partnership reform and other important policies.\n\nI will consider this issue within the available resources and overall legislative priorities, and officials will begin preparatory work with the aim to see progress on this policy area during this mandate.","answerHtml":"<p>I am keen to engage with others who may be able to make contributions in relation to no-fault divorces.</p><p>I have had exploratory discussions with my officials in the Department who are engaged on a range of civil law reform areas including marriage and civil partnership reform and other important policies.</p><p>I will consider this issue within the available resources and overall legislative priorities, and officials will begin preparatory work with the aim to see progress on this policy area during this mandate.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20246%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=396918","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=396918"}},{"id":"394250","reference":"AQO 220/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2024-03-14","answerBy":"2024-04-08","answered":"2024-04-08","answeredOrally":true,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education what assistance is available to support schools to travel to Parliament Buildings for an official visit.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr Givan (The Minister of Education)","text":"While I fully recognise the educational value inherent in children visiting Parliament Buildings with their schools, unfortunately, neither my Department nor the Education Authority (EA), as the funding authority for schools, provide specific additional schools funding for travel or lodgings for extracurricular activities. If a school wishes to bring its pupils to Parliament Buildings, it is a matter for the school to organise and fund that through its delegated budget or, possibly, through fundraising events and/or parental contributions. I know that the Member will appreciate that the education sector continues to face extensive unavoidable cost pressures and rising service demands associated with delivering my Department's statutory and policy obligations. My priority will be to provide stability and take every action possible to protect education funding and the front-line services within my Department's statutory remit."},{"speaker":"Mr Dickson","text":"I thank the Minister for his answer. In light of the budgetary challenges associated with travel for many schools, including those in my constituency, how does his Department ensure fair access for schools not only to this Building but, as he said, to other extracurricular activities, particularly for schools in rural or economically disadvantaged areas of Northern Ireland and those that cannot, regrettably, raise large amounts of money through parental contributions and other fundraising activities?"},{"speaker":"Mr Givan","text":"Obviously, there are various means by which funding can be raised, as I referenced in my original response to the Member. General funding is administered through the common funding formula, and, again, that is touched on in the independent review of education. That review, which was in place, has not been taken forward. However, this is one of the areas that I will look at when I consider a report from my Department on the independent review of education, where it touches on funding through that funding scheme. The Member rightly raises the issue of the financial pressures on schools. I want more funding per pupil to be attributed to each school. I am putting that forward as part of our bid. That way, we can get more schools into surplus whereby they can fund visits to this place. I encourage schools to come to this place to learn about it. I first visited this place when I was at school. The late Members Billy Bell and Ivan Davis and, indeed, you, Mr Speaker, were here at the time. That is where I got a taste for being involved in front-line politics in the Assembly. I encourage educational visits. We in the Assembly have an excellent Education Service that provides a lot of support for the schools that visit, and I certainly recommend that schools come here."},{"speaker":"Mrs Erskine","text":"The Minister mentioned parental contributions. Obviously, we have a cost-of-living crisis, and it is difficult for families at the minute. Where does the Minister stand on some schools asking for voluntary contributions from parents?"},{"speaker":"Mr Givan","text":"Under current legislation, voluntary contributions are a matter for boards of governors of schools. While the collection of voluntary contributions is permissible, any request for that needs to make it clear that there is no obligation to contribute, and any registered pupil at the school should be treated no differently according to whether their parents or guardians have made a contribution. It is permissible, but, obviously, there are certain parameters with which such a request needs to comply."},{"speaker":"Mr McNulty","text":"In relation to funding for schools, does the Minister agree that suspending the school enhancement programme works at St Mary's Primary School, Barr, after £350,000 has already been spent will be a waste of his Department's limited financial resources? Will he agree to meet me and the St Mary's school leadership to discuss the progress of that much-needed project?"},{"speaker":"Mr Speaker","text":"I am not sure that that is on the topic, but I will ask the Minister to respond."},{"speaker":"Mr Givan","text":"If the Assembly wants to pay for school enhancement projects as part of its visitation programme, that will be welcome. I doubt that it would go too far, mind you. The Member raises an important issue around capital funding. On day 1 of this Assembly, I made a ministerial statement on the need for increased expenditure in our capital programme. The enhanced programmes are often smaller than the major capital ones. They should be supported. That is why, as part of my budgetary process, I have put forward a bid for well over £500 million to fund capital schemes. That is a live discussion that the Executive will need to consider as part of the budgetary process."},{"speaker":"Mr Speaker","text":"Question 2 has been withdrawn."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20220%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=394250","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2024-04-08&docID=395014#AQO%20220/22-27","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=394250"}},{"id":"392829","reference":"AQW 8417/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-03-07","answerBy":"2024-03-25","answered":"2024-03-25","answeredOrally":false,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice for an update on any proposals to introduce legislation that would make it unlawful for compensation to be paid in respect of a child, without court approval in minor settlements.","answerText":"Further to the consultation in 2021 on this issue, my Department has been considering the detail of the provision that would be needed to introduce a new statutory requirement for court approval of all minor settlements. This has highlighted a number of complex legal and practical issues, including upon whom any duty to seek court approval should be placed, how such a duty could be enforced and the consequences of non-compliance.\n\nMy Department is currently considering whether there is a legislative solution, which is feasible and proportionate, having regard also to the existing position, under the common law, that a settlement for a child which is not approved by a court is not binding and final. If any legislative provision is appropriate, it is my intention that, subject to Justice Committee and Executive agreement, this could be facilitated by way of inclusion in the mixed-content Modernisation of Justice Bill, which is one of my legislative priorities in this mandate.","answerHtml":"<p>Further to the consultation in 2021 on this issue, my Department has been considering the detail of the provision that would be needed to introduce a new statutory requirement for court approval of all minor settlements. This has highlighted a number of complex legal and practical issues, including upon whom any duty to seek court approval should be placed, how such a duty could be enforced and the consequences of non-compliance.</p><p>My Department is currently considering whether there is a legislative solution, which is feasible and proportionate, having regard also to the existing position, under the common law, that a settlement for a child which is not approved by a court is not binding and final. If any legislative provision is appropriate, it is my intention that, subject to Justice Committee and Executive agreement, this could be facilitated by way of inclusion in the mixed-content Modernisation of Justice Bill, which is one of my legislative priorities in this mandate.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208417%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=392829","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=392829"}},{"id":"392828","reference":"AQW 8416/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-03-07","answerBy":"2024-03-25","answered":"2024-03-22","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, pursuant to AQW 6323/22-27, what chemotherapy treatments are available on a cross-border basis at Altnagelvin Hospital.","answerText":"The Western Trust (North West Cancer Centre) has a Service Level Agreement in place with HSE for the provision of radiotherapy to ROI patients and the provision of concurrent radiotherapy/chemotherapy for a small number of patients (as clinically indicated).\n\nTherefore, no stand-alone chemotherapy treatment is provided at NWCC for ROI patients.","answerHtml":"<p>The Western Trust (North West Cancer Centre) has a Service Level Agreement in place with HSE for the provision of radiotherapy to ROI patients and the provision of concurrent radiotherapy/chemotherapy for a small number of patients (as clinically indicated).</p><p>Therefore, no stand-alone chemotherapy treatment is provided at NWCC for ROI patients.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208416%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=392828","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=392828"}},{"id":"392827","reference":"AQW 8415/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-03-07","answerBy":"2024-03-25","answered":"2024-11-11","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities (i) what discussions have taken place with the Housing Executive to support leaseholders who are struggling to afford planned maintenance and refurbishment scheme costs as ordered by the Housing Executive under the right-to-buy scheme; and (ii) what action he has taken to create a sinking fund similar to what happens in the private sector given that no adequate facility is currently in place.","answerText":"My officials have been working with the Housing Executive (NIHE) for some time, not only on the matter of supporting leaseholders but also in relation to the fact that if a number of leaseholders are not able to pay for the planned works this has the potential to block much needed work to NIHE tenanted properties.\n\nWith this in mind, DfC and DoF have given approval to the Housing Executive to offer buy back with vacant possession option to leaseholders if the cost of the works is over £10k.\n\nWhen delivering Planned Scheme works, Housing Executive (NIHE) advises leaseholders of the estimated costs of works in advance of commencement of the scheme on site. The NIHE also offers leaseholders the opportunity to pay into a Planned Scheme account for these works, in advance of receiving the final invoice when works are completed. I can advise that the Housing Executive is continuing to consider the issue of leasehold properties.\n\nThe Housing Executive has advised the standard Flat Lease by virtue of which all Housing Executive flats/maisonettes are sold under the statutory House Sales Scheme, empowers but does not compel the Housing Executive to create a reserve to finance future capital costs. When the sale of flats commenced around 1983 the Housing Executive did not elect to create such a reserve and no contributions to such a reserve have ever been included in the Service Charge which is collected from Leaseholders.\n\nThe Housing Executive does not currently have any proposals to ask Leaseholders to contribute to the creation of a reserve fund for those of its blocks which contain sold flats. In the short to mid-term there are already major planned scheme works scheduled, which would mean Leaseholders would have to make a contribution towards the cost of future potential works at the same time as having to make payment for works that have already been carried out.","answerHtml":"<p>My officials have been working with the Housing Executive (NIHE) for some time, not only on the matter of supporting leaseholders but also in relation to the fact that if a number of leaseholders are not able to pay for the planned works this has the potential to block much needed work to NIHE tenanted properties.</p><p>With this in mind, DfC and DoF have given approval to the Housing Executive to offer buy back with vacant possession option to leaseholders if the cost of the works is over £10k.</p><p>When delivering Planned Scheme works, Housing Executive (NIHE) advises leaseholders of the estimated costs of works in advance of commencement of the scheme on site. The NIHE also offers leaseholders the opportunity to pay into a Planned Scheme account for these works, in advance of receiving the final invoice when works are completed. I can advise that the Housing Executive is continuing to consider the issue of leasehold properties.</p><p>The Housing Executive has advised the standard Flat Lease by virtue of which all Housing Executive flats/maisonettes are sold under the statutory House Sales Scheme, empowers but does not compel the Housing Executive to create a reserve to finance future capital costs. When the sale of flats commenced around 1983 the Housing Executive did not elect to create such a reserve and no contributions to such a reserve have ever been included in the Service Charge which is collected from Leaseholders.</p><p>The Housing Executive does not currently have any proposals to ask Leaseholders to contribute to the creation of a reserve fund for those of its blocks which contain sold flats. In the short to mid-term there are already major planned scheme works scheduled, which would mean Leaseholders would have to make a contribution towards the cost of future potential works at the same time as having to make payment for works that have already been carried out.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208415%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=392827","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=392827"}},{"id":"392826","reference":"AQW 8414/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-03-07","answerBy":"2024-03-25","answered":"2024-03-22","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, in light of the UK government’s launch of the Children and Young People Cancer Taskforce, what action he is taking to ensure children and young people in Northern Ireland with cancer have similar treatment.","answerText":"The Cancer Strategy recognises the need for a tailored service for children and young people with cancer.\n\nMy Department is developing minimum standards for treatment of Adolescents and Young Adults with cancer. This seeks to ensure that all children and young adults have access to high quality, developmentally appropriate, cancer care, including access to clinical trials.","answerHtml":"<p>The Cancer Strategy recognises the need for a tailored service for children and young people with cancer.</p><p>My Department is developing minimum standards for treatment of Adolescents and Young Adults with cancer. This seeks to ensure that all children and young adults have access to high quality, developmentally appropriate, cancer care, including access to clinical trials.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208414%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=392826","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=392826"}},{"id":"393954","reference":"AQO 174/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2024-02-29","answerBy":"2024-03-12","answered":"2024-03-13","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities to outline when Sub-Regional Stadia Programme for Soccer funding will be available for sports clubs.","answerText":"My officials have been working closely with clubs at all levels to build strong relationships and understand needs and are developing proposals in partnership with an Advisory Working Group.\n\nI have asked my officials to present me with proposals and options for consideration to take this commitment forward as a matter of priority.\n\nOnce final proposals are confirmed and approvals are secured, I will be able to provide a timeframe for the process to apply for funding.","answerHtml":"<p>My officials have been working closely with clubs at all levels to build strong relationships and understand needs and are developing proposals in partnership with an Advisory Working Group.</p><p>I have asked my officials to present me with proposals and options for consideration to take this commitment forward as a matter of priority.</p><p>Once final proposals are confirmed and approvals are secured, I will be able to provide a timeframe for the process to apply for funding.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20174%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=393954","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=393954"}},{"id":"390103","reference":"AQW 7285/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-02-22","answerBy":"2024-03-08","answered":"2024-03-07","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, given news that thousands of patients in England at risk of bowel cancer will be offered regular checks, what action he is taking to detect cancers early in people with Lynch syndrome.","answerText":"In Northern Ireland, patients with a family history of colorectal cancer can access colonoscopy surveillance as recommended by British Society of Gastroenterology. Assessment of familial colorectal cancer risk is available to patients via the Northern Ireland Regional Genetics Service.","answerHtml":"<p>In Northern Ireland, patients with a family history of colorectal cancer can access colonoscopy surveillance as recommended by British Society of Gastroenterology. Assessment of familial colorectal cancer risk is available to patients via the Northern Ireland Regional Genetics Service.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207285%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=390103","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=390103"}},{"id":"390102","reference":"AQW 7284/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-02-22","answerBy":"2024-03-08","answered":"2024-03-07","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health what action he is taking to implement Martha’s Rule in Northern Ireland.","answerText":"My Department is aware of the recent announcement by NHS England in respect of Martha’s Rule and will take time to consider the plans for rollout of the scheme in England.","answerHtml":"<p>My Department is aware of the recent announcement by NHS England in respect of Martha’s Rule and will take time to consider the plans for rollout of the scheme in England.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207284%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=390102","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=390102"}},{"id":"388752","reference":"AQO 67/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2024-02-15","answerBy":"2024-02-26","answered":"2024-02-26","answeredOrally":true,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education to outline his engagement with pre-school education settings on their readiness to facilitate the extension of the Pre-School Education Programme.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr Givan","text":"There has been significant engagement with stakeholder groups and preschool settings on the standardisation of preschool sessions as part of the wider early learning and childcare strategy engagement. A stakeholder engagement forum was established in autumn 2022 to ensure maximum engagement and to assist with the development of costed options for an early learning and childcare strategy. My Department also commissioned an independent in-depth scoping study to assess the state of readiness of the preschool sector to transition to a standardised 22·5 hours a week. That involved detailed surveys for every funded preschool education setting. The scoping study is nearing completion. In addition, my officials carried out extensive engagement in regard to the amalgamation for standardisation pilot. The information gathered will be used to inform further decisions and plans for the phased implementation of standardisation for all preschools and to inform the development of costed options for standardisation for the Executive. It is essential that we have input from a wide range of stakeholders as we take forward that work, and I am committed to ongoing and meaningful engagement."},{"speaker":"Mr Dickson","text":"Thank you, Minister, for your answer. Given the advancement of the plans that you have outlined to the House, what are the capital investment needs for those preschool settings in order to facilitate the meeting of those requirements?"},{"speaker":"Mr Givan","text":"The full, detailed costs of standardisation will depend on a range of factors, on some of which decisions have yet to be taken. It will also be informed by the scoping study that is due to report at the end of March. I will engage with Executive colleagues on that in due course. In order to give a figure to the Member, however, we have estimated that standardisation is likely to cost approximately an extra £35 million a year when fully operational, with additional up-front and one-off capital costs of approximately £10 million plus human resource costs. That is on top of the £65 million that the current programme costs annually."},{"speaker":"Mrs Mason","text":"Knowing the issues with the workforce in early years settings, has the Minister considered a workforce strategy as part of that engagement with childcare settings?"},{"speaker":"Mr Givan","text":"The Member raises a point that has already been highlighted to me by childcare providers, which is that the ability to attract and retain people in the workforce is a challenge. That needs to be taken into account in what we are trying to achieve. There is a childcare strategy stakeholder engagement forum, and I will seek to engage with that, as well as with other organisations that make provision in this area. In providing appropriate childcare, we need to make sure that we have the workforce available to make that provision."},{"speaker":"Mr Dunne","text":"How long will it take for all sessions to move to 22·5 hours?"},{"speaker":"Mr Givan","text":"That will be dependent on Executive approval and the availability of funding. Options will be set out in the scoping study. Decisions taken on those options will impact on the speed of transition to a standardised session length. Some preschool settings will be in a position to transition to the standardised session length quickly, while others will take much longer. It is likely to be a number of years before standardisation is fully implemented and all funded preschool sessions are moved to 22·5 hours per week."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%2067%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=388752","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2024-02-26&docID=389673#AQO%2067/22-27","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=388752"}},{"id":"388283","reference":"AQW 6324/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-02-13","answerBy":"2024-02-21","answered":"2024-02-20","answeredOrally":false,"priority":true,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, given the impact of the prolonged impasse, what action he is planning to take to fast track the Cancer Strategy in Northern Ireland.","answerText":"The implementation of the NI Cancer strategy remains a priority for my Department since its launch in March 2022. Despite the many challenges presented over the proceeding years, considerable progress has been made by my officials within the constrained budgetary resources available. The prioritisation of the cancer strategy will be considered along with the many other compelling but competing demands for extra funding across the health and social care system at this time.","answerHtml":"<p>The implementation of the NI Cancer strategy remains a priority for my Department since its launch in March 2022. Despite the many challenges presented over the proceeding years, considerable progress has been made by my officials within the constrained budgetary resources available. The prioritisation of the cancer strategy will be considered along with the many other compelling but competing demands for extra funding across the health and social care system at this time.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206324%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=388283","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=388283"}},{"id":"388282","reference":"AQW 6323/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2024-02-13","answerBy":"2024-02-28","answered":"2024-03-05","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health (i) how many oncology patients from County Donegal receive treatment in Altnagelvin Hospital; and (ii) what treatments are available to these patients.","answerText":"Cross Border arrangements have been in place with Republic of Ireland (ROI) since 2017 for radiotherapy services. A total of 1353 ROI Oncology patients have received radiotherapy treatment at the North West Cancer Centre (NWCC), Altnagelvin Hospital. This figure includes 268 patients treated during the calendar year 2023. Patients are funded by the Health Services Executive through a service level agreement with Western HSC Trust.\n\nNWCC offers treatment for palliative patients across all tumour sites and radical treatments for Breast, Prostate, Lung, Gastrointestinal and Skin.","answerHtml":"<p>Cross Border arrangements have been in place with Republic of Ireland (ROI) since 2017 for radiotherapy services. A total of 1353 ROI Oncology patients have received radiotherapy treatment at the North West Cancer Centre (NWCC), Altnagelvin Hospital. This figure includes 268 patients treated during the calendar year 2023. Patients are funded by the Health Services Executive through a service level agreement with Western HSC Trust.</p><p>NWCC offers treatment for palliative patients across all tumour sites and radical treatments for Breast, Prostate, Lung, Gastrointestinal and Skin.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206323%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=388282","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=388282"}},{"id":"387642","reference":"AQO 29/22-27","type":"Oral","typeCode":"AQO","mandate":"22-27","tabled":"2024-02-08","answerBy":"2024-02-19","answered":"2024-02-19","answeredOrally":true,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs what his plans are in relation to the agri-food sector.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr Muir","text":"I am very aware of the value and importance of the agri-food sector to Northern Ireland’s economy, with the agriculture and food processing sectors employing around 80,000 people. That is particularly significant in our rural and coastal areas. I was inspired by my visit last week to Roy Lyttle's farm in Newtownards, and I look forward to engaging with a wide range of stakeholders in the coming weeks and months to hear their views on ways in which to help the sector to continue to prosper, as well as their playing a critical role in achieving our environmental obligations. My Department is dedicated to improving the sustainability, productivity and resilience of the agri-food sector in Northern Ireland and continues to operate a range of existing programmes to support it. Those programmes include the Northern Ireland regional food programme, which supports the promotion of Northern Ireland produce. My officials are also progressing a range of new policies across agriculture and food. In particular, DAERA is leading on the development of a new cross-departmental food strategy framework, which presents a new whole-of-government approach to food in order to get better outcomes for Northern Ireland, to transform our food system for future generations and to help position Northern Ireland as the home of sustainable food. I am committed to working across government and with other partners to address the opportunities and challenges that lie ahead. I look forward to receiving further briefings from my officials on those important areas and will consider how they can be progressed."},{"speaker":"Mr Dickson","text":"Thank you, Minister, and congratulations on your appointment. Will the Minister outline to the House what progress he believes has been made on delivering a Northern Ireland food strategy?"},{"speaker":"Mr Muir","text":"My officials are leading on the development of a cross-departmental Northern Ireland food strategy framework. It is a new, strategic, collaborative effort on food that will help improve economic, environmental, health and social outcomes for Northern Ireland. A public consultation exercise was carried out in the autumn of 2021. A Northern Ireland food strategy framework review lab, involving all relevant Departments, was held in October last year, with the aim of testing the draft framework against recent changes in the strategic policy context and refreshing the text, as required. I look forward to reviewing the food strategy framework, and I intend to discuss the matter with Executive colleagues before consideration of its publication."},{"speaker":"Mr Elliott","text":"I welcome the Minister to his first Question Time. Will he continue to implement the farm support programmes, as initiated by the former AERA Minister?"},{"speaker":"Mr Muir","text":"I congratulate the Member on his appointment as Chair of the Committee, and I look forward to working with him. The farm support and development programme is something on which I have been engaging with officials over the past two weeks, and I will be engaging with them again tomorrow. My officials have been working on the new farm support and development programme. The schemes and measures that are being introduced will provide levers to contribute to statutory obligations under the Climate Change Act 2022, with a firm focus on just transition. In June 2023, my Department launched a timeline for the roll-out of its proposed farm support and development programme. That timeline provided the industry with an overview of when proposed schemes and measures will be introduced on a phased basis, subject to legislative and business case cover. On 1 January 2024, the beef carbon reduction scheme was introduced. It is aimed at improving the efficiency of the beef sector and reducing livestock greenhouse gas emissions, thereby contributing to meeting the Climate Change Act targets."},{"speaker":"","text":"That scheme is the most significant new element from the overall farm support programme to be added in 2024-25. Work is ongoing on the development of the proposed farm sustainability payment, farming with nature package and a number of other enabling measures and action schemes. I will take some time to consider the overall content and progress of the proposed programme and how it addresses the priorities in the sector. I had a constructive meeting, last week, with the Ulster Farmers' Union at which we discussed this. The meeting was productive and useful, and there was a meeting of minds on many areas. I say to those who have a perception about me that I intend, over the next three years, to prove them wrong."},{"speaker":"Mr Irwin","text":"Given the importance of the agri-food sector to Northern Ireland, the Minister will be aware that some 300 planning applications from the agriculture sector are stuck with the Northern Ireland Environment Agency (NIEA) and have not been responded to at this time due to ammonia levels. Will the Minister give an undertaking that he will look into that and expedite it as soon as possible to ensure that new applications and improvements on farms can go ahead?"},{"speaker":"Mr Muir","text":"I thank the Member for his question; he is moving ahead to Diane's question. I am very conscious of the issue around ammonia. Over the past two weeks, I have read quite a lot about ammonia. I have the KPMG report, which was produced by the sector, at my bedside. I have read over half of it already. I am aware that it is a complex issue. There are no easy solutions. I am also aware of the current situation that is impeding planning applications. My officials are working hard to address any issues in the system. We need to move at pace and to make sure that whatever we do is correct, so that we are not back at square one. I acknowledge the frustration and anger from the sector on the matter. I hear it, and I intend to act."},{"speaker":"Mr McCrossan","text":"I, too, congratulate the Minister on his first Question Time. Does the Minister agree that the agri-food sector in the North is an important part of the all-island industry, that cross-border trade and supply chains benefit the economy across the island of Ireland and that, despite Brexit and the efforts of some of his Executive colleagues, the future sustainable economic growth of the sector relies on taking advantage of and building on those all-island links?"},{"speaker":"Mr Muir","text":"As Minister of Agriculture, Environment and Rural Affairs, I am keen to work North/South and east-west. There are a lot of commonalities, and the reality is that trade moves both ways. Last Thursday, I spoke to Pippa Hackett from the South. I have also been in contact with Charlie McConalogue, and I am engaging with Eamon Ryan. I am doing the same with my colleagues in Wales and Scotland, and I have reached out to DEFRA. I have invited Steve Barclay to Northern Ireland, but, if he will not come here, I will go and see him, because we need to engage across the whole North/South and east-west area and to work towards our common goals."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%2029%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=387642","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2024-02-19&docID=388359#AQO%2029/22-27","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=387642"}},{"id":"384282","reference":"AQW 4717/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-10-14","answerBy":"2024-02-06","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health when he will answer (i) AQW 1164/22-27; (ii) AQW 3304/22-27; and (iii) AQW 3305/22-27.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204717%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=384282","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=384282"}},{"id":"384281","reference":"AQW 4716/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-10-14","answerBy":"2022-10-24","answered":"2022-10-25","answeredOrally":false,"priority":true,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health what actions his Department is taking to assist social work students in full time unpaid placement, in light of the cost of living crisis.","answerText":"My Department provides a Social Work Student Incentive Scheme for all NI Degree in Social Work students who are domicile and studying full-time in Northern Ireland. Social Work students can access a non-means tested payment of £4,000 for each year of their study. In addition, they are awarded £500 per year to cover expenses whilst on Practice Learning placements. The Student Incentive Scheme is in addition to any Student Finance support, which can be applied for separately.","answerHtml":"<p>My Department provides a Social Work Student Incentive Scheme for all NI Degree in Social Work students who are domicile and studying full-time in Northern Ireland. Social Work students can access a non-means tested payment of £4,000 for each year of their study. In addition, they are awarded £500 per year to cover expenses whilst on Practice Learning placements. The Student Incentive Scheme is in addition to any Student Finance support, which can be applied for separately.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204716%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=384281","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=384281"}},{"id":"384136","reference":"AQW 4623/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-10-13","answerBy":"2022-10-21","answered":"2022-10-19","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) what action he has taken to further progress the Energy Strategy; and (ii) for his assessment of the impact a vacancy in the ministerial office post 28 October 2022 will have on the Strategy.","answerText":"The Energy Strategy – The Path to Net Zero Energy, continues to progress since its publication in December 2021. Delivery of the Energy Strategy is governed by the Energy Strategy Programme Board, which is chaired by DfE’s Permanent Secretary and consists of members from DfC, DfI, DAERA, DoF and TEO. The Energy Strategy Programme board has met 3 times in 2022.\n\nMonthly checkpoint meetings are held involving the leads for the delivery of the Energy Strategy Action Plan 2022, which has 22 key Actions for priority attention during this calender year. My Department has committed to publish a report in Q1 of 2023 to demonstrate progress against the 22 Actions, as well as ongoing work to publish an Action Plan for 2023 to further progress the Energy Strategy.\n\nShould there not be a Minister in place after 28th October 2022, senior officials will continue to carry out departmental functions and run public services, operating within the scope of the policy direction set by the outgoing Minister.","answerHtml":"<p>The Energy Strategy – The Path to Net Zero Energy, continues to progress since its publication in December 2021. Delivery of the Energy Strategy is governed by the Energy Strategy Programme Board, which is chaired by DfE’s Permanent Secretary and consists of members from DfC, DfI, DAERA, DoF and TEO. The Energy Strategy Programme board has met 3 times in 2022.</p><p>Monthly checkpoint meetings are held involving the leads for the delivery of the Energy Strategy Action Plan 2022, which has 22 key Actions for priority attention during this calender year. My Department has committed to publish a report in Q1 of 2023 to demonstrate progress against the 22 Actions, as well as ongoing work to publish an Action Plan for 2023 to further progress the Energy Strategy.</p><p>Should there not be a Minister in place after 28th October 2022, senior officials will continue to carry out departmental functions and run public services, operating within the scope of the policy direction set by the outgoing Minister.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204623%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=384136","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=384136"}},{"id":"384135","reference":"AQW 4622/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-10-13","answerBy":"2022-10-28","answered":"2022-10-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail (i) all of the organisations in East Antrim at risk of losing EU Funding; and (ii) what action he is taking to reduce the resulting impact.","answerText":"I recognise the valuable contribution many local groups in East Antrim, indeed right across Northern Ireland, make to our communities. I plan to make an announcement shortly on the funding of all ESF groups for the remainder of this financial year.\n\nDetails of current ESF supported projects, for whom EU funding will cease on 31 March 2023, can be accessed on a constituency-by-constituency basis on-line as follows: 65 European Social Fund Call 3 Projects by constituency and council area | Department for the Economy (economy-ni.gov.uk)\n\nERDF funding will cease on 31 December 2023. East Antrim based organisations currently in receipt of ERDF funding through Invest NI are as follows: Advanced Sensors Limited & Teva NI Limited.\n\nThe Finance Minister continues to take responsibility on behalf of the NI Executive for replacement of all EU funding. I continue to strongly advocate for funding to be directed to key priority areas which includes activity currently funded through the European Social & Regional Development Funds.","answerHtml":"<p>I recognise the valuable contribution many local groups in East Antrim, indeed right across Northern Ireland, make to our communities. I plan to make an announcement shortly on the funding of all ESF groups for the remainder of this financial year.</p><p>Details of current ESF supported projects, for whom EU funding will cease on 31 March 2023, can be accessed on a constituency-by-constituency basis on-line as follows: 65 European Social Fund Call 3 Projects by constituency and council area | Department for the Economy (economy-ni.gov.uk)</p><p>ERDF funding will cease on 31 December 2023. East Antrim based organisations currently in receipt of ERDF funding through Invest NI are as follows: Advanced Sensors Limited &amp; Teva NI Limited.</p><p>The Finance Minister continues to take responsibility on behalf of the NI Executive for replacement of all EU funding. I continue to strongly advocate for funding to be directed to key priority areas which includes activity currently funded through the European Social &amp; Regional Development Funds.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204622%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=384135","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=384135"}},{"id":"384134","reference":"AQW 4621/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-10-13","answerBy":"2022-10-28","answered":"2022-10-24","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what action his Department has taken to meet the requirements of the Climate Change Act.","answerText":"The Energy Strategy – The Path to Net Zero Energy, has committed to the vision of net zero carbon by 2050. It outlines a roadmap to 2030 aiming to deliver a 56% reduction in energy-related emissions, which will contribute to the 48% lower than baseline target in net Northern Ireland emissions required by the Climate Change Act by 2030.","answerHtml":"<p>The Energy Strategy – The Path to Net Zero Energy, has committed to the vision of net zero carbon by 2050. It outlines a roadmap to 2030 aiming to deliver a 56% reduction in energy-related emissions, which will contribute to the 48% lower than baseline target in net Northern Ireland emissions required by the Climate Change Act by 2030.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204621%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=384134","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=384134"}},{"id":"384133","reference":"AQW 4620/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-10-13","answerBy":"2024-02-05","answered":null,"answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to outline the strategies or actions his Department has taken to ensure all citizens have the opportunity to become digitally literate and fully participate in our increasingly digital society.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204620%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=384133","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=384133"}},{"id":"383949","reference":"AQW 4504/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-10-12","answerBy":"2022-10-20","answered":"2024-07-24","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to outline (i) the impact that the absence of an Executive has on the development of policy and legislation; and (ii) what measures he can take to minimise the impact.","answerText":"This question was asked in the previous mandate and to the previous Minister for the Economy.","answerHtml":"<p>This question was asked in the previous mandate and to the previous Minister for the Economy.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204504%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=383949","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=383949"}},{"id":"383471","reference":"AQW 4314/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-10-07","answerBy":"2022-10-24","answered":"2022-10-24","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure, pursuant to AQW 3396/22-27, to outline the number of electric vehicles expected to be in use for each year.","answerText":"In developing the Transport input to the Executive’s Energy Strategy the Department for Infrastructure commissioned four research projects, one of which, Development of Electric Vehicles in Northern Ireland was produced by Steer. In its report, Steer forecasts there could be between 60,000 and 125,000 EVs in the North by 2025.","answerHtml":"<p>In developing the Transport input to the Executive’s Energy Strategy the Department for Infrastructure commissioned four research projects, one of which, Development of Electric Vehicles in Northern Ireland was produced by Steer. In its report, Steer forecasts there could be between 60,000 and 125,000 EVs in the North by 2025.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204314%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=383471","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=383471"}},{"id":"383103","reference":"AQW 4123/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-10-05","answerBy":"2022-10-20","answered":"2022-10-13","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to outline what steps he is taking to support university students during the cost of living crisis.","answerText":"I acknowledge the impact the cost of living is having on households across Northern Ireland.\n\nIn recognition of the cost of living crisis and the impact this is having on higher education students, for the current academic year, I have been able to allocate additional funding of £2.8m to the Higher Education Support Funds which are administered on my Department's behalf by the five local higher education institutions. The Support Funds provide financial help to students whose access to higher education might be inhibited by financial considerations, or who, for whatever reason, face financial difficulties in meeting their living costs.\n\nThis additional funding brings the total allocation for the year to £5.6m. My Department has provided greater flexibility for the local higher education institutions, when dealing with student applications, to ensure that any student who is experiencing genuine financial difficulty has access to support.\n\nI have also approved an allocation of £1.17m to provide a further 10% increase, in addition to the already planned 2.9% uplift, to the non-repayable stipend to cover DfE funded Post Graduate Scheme student’s living costs in academic year 2022/23. This increase is designed to help mitigate against the impact of the increased cost of living for PhD students, particularly those from a lower socio-economic background. The increase means that 729 Full Time Equivalent DfE-funded PhD students commencing or continuing their studies in October 2022, will see their annual living cost stipend rise from £16,062 in academic year 2021/22, to £17,668 academic year 2022/23.","answerHtml":"<p>I acknowledge the impact the cost of living is having on households across Northern Ireland.</p><p>In recognition of the cost of living crisis and the impact this is having on higher education students, for the current academic year, I have been able to allocate additional funding of £2.8m to the Higher Education Support Funds which are administered on my Department&#39;s behalf by the five local higher education institutions. The Support Funds provide financial help to students whose access to higher education might be inhibited by financial considerations, or who, for whatever reason, face financial difficulties in meeting their living costs.</p><p>This additional funding brings the total allocation for the year to £5.6m. My Department has provided greater flexibility for the local higher education institutions, when dealing with student applications, to ensure that any student who is experiencing genuine financial difficulty has access to support.</p><p>I have also approved an allocation of £1.17m to provide a further 10% increase, in addition to the already planned 2.9% uplift, to the non-repayable stipend to cover DfE funded Post Graduate Scheme student’s living costs in academic year 2022/23. This increase is designed to help mitigate against the impact of the increased cost of living for PhD students, particularly those from a lower socio-economic background. The increase means that 729 Full Time Equivalent DfE-funded PhD students commencing or continuing their studies in October 2022, will see their annual living cost stipend rise from £16,062 in academic year 2021/22, to £17,668 academic year 2022/23.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204123%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=383103","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=383103"}},{"id":"383102","reference":"AQW 4122/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-10-05","answerBy":"2022-10-20","answered":"2022-10-20","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure, pursuant to AQW 3306/22-27, what steps he is taking to support taxi drivers in the short to medium term.","answerText":"You are aware of the recent public consultation on increasing the maximum fare structure. The consultation was open for eight weeks and closed on the 7 October 2022. My officials are now preparing a synopsis of the consultation responses and a paper on the way forward for my consideration. It is only after this process has concluded that my decision on the outcome of the review can be implemented along with any necessary amendments to the Taxis (Taximeters, Devices and Maximum Fares) Regulations (NI) 2015. This review is to help balance the needs of drivers, operators and taxi customers, including vulnerable passengers.\n\nYou may wish to note that, the training manual, “All you need to know to be a Taxi Driver”, which is available on NIDirect, is under review to create a more streamlined, user-friendly version. As a result a revision aid has been developed, based on the information contained in the training manual. This revision aid will soon be available through NIDirect and will help to support candidates in acquiring the knowledge needed for the taxi theory test.","answerHtml":"<p>You are aware of the recent public consultation on increasing the maximum fare structure. The consultation was open for eight weeks and closed on the 7 October 2022. My officials are now preparing a synopsis of the consultation responses and a paper on the way forward for my consideration. It is only after this process has concluded that my decision on the outcome of the review can be implemented along with any necessary amendments to the Taxis (Taximeters, Devices and Maximum Fares) Regulations (NI) 2015. This review is to help balance the needs of drivers, operators and taxi customers, including vulnerable passengers.</p><p>You may wish to note that, the training manual, “All you need to know to be a Taxi Driver”, which is available on NIDirect, is under review to create a more streamlined, user-friendly version. As a result a revision aid has been developed, based on the information contained in the training manual. This revision aid will soon be available through NIDirect and will help to support candidates in acquiring the knowledge needed for the taxi theory test.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204122%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=383102","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=383102"}},{"id":"381134","reference":"AQW 3398/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-09-22","answerBy":"2022-10-07","answered":"2022-10-03","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health what action he is taking to discourage and reduce the use of disposable vaping products among children and young people.","answerText":"As you will be aware I introduced regulations on 1 February prohibiting the sale, and proxy purchase, of nicotine inhaling products to under 18s. These regulations are enforced by district council enforcement officers and apply to all types of nicotine containing e-cigarettes, including disposable devices.\n\nThe Public Health Agency (PHA) commissions a smoking prevention uptake programme for children and young people called 'Smoke Busters' which includes information on the harms associated with vaping. The programme is facilitated by Cancer Focus NI and is delivered in primary schools across NI, targeting 6,000 Year 6 and 7 pupils each year. In addition, the PHA are exploring (in liaison with CCEA) opportunities for a post primary education programme regarding vaping, as well as the development of age appropriate resources warning of the harms associated with vaping, that can be accessed by schools, community youth groups and parents/carers.\n\nRecent reports from other parts of the UK indicate a rise in youth vaping. The Department will continue to monitor this position and will consider appropriate mechanisms to reduce youth uptake as part of our strategic work on tobacco control.","answerHtml":"<p>As you will be aware I introduced regulations on 1 February prohibiting the sale, and proxy purchase, of nicotine inhaling products to under 18s. These regulations are enforced by district council enforcement officers and apply to all types of nicotine containing e-cigarettes, including disposable devices.</p><p>The Public Health Agency (PHA) commissions a smoking prevention uptake programme for children and young people called &#39;Smoke Busters&#39; which includes information on the harms associated with vaping. The programme is facilitated by Cancer Focus NI and is delivered in primary schools across NI, targeting 6,000 Year 6 and 7 pupils each year. In addition, the PHA are exploring (in liaison with CCEA) opportunities for a post primary education programme regarding vaping, as well as the development of age appropriate resources warning of the harms associated with vaping, that can be accessed by schools, community youth groups and parents/carers.</p><p>Recent reports from other parts of the UK indicate a rise in youth vaping. The Department will continue to monitor this position and will consider appropriate mechanisms to reduce youth uptake as part of our strategic work on tobacco control.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203398%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=381134","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=381134"}},{"id":"381133","reference":"AQW 3397/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-09-22","answerBy":"2022-10-07","answered":"2022-10-03","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health what plans he has to review access to regular scans for patients who have been treated for primary breast cancer.","answerText":"A review has recently been completed on the Breast Cancer Self Directed After Care Protocol and Survivorship Pathway. This will be presented for ratification at the next Northern Ireland Cancer Network Breast Clinical Reference Group meeting 21 October 2022. The Breast Cancer Self Directed After Care Protocol and Survivorship Pathway is offered to patients who are treated with curative intent.\n\nAccess to scans currently aligns with NICE guideline 101 (NG101 Early and locally advanced breast cancer: diagnosis and management).","answerHtml":"<p>A review has recently been completed on the Breast Cancer Self Directed After Care Protocol and Survivorship Pathway. This will be presented for ratification at the next Northern Ireland Cancer Network Breast Clinical Reference Group meeting 21 October 2022. The Breast Cancer Self Directed After Care Protocol and Survivorship Pathway is offered to patients who are treated with curative intent.</p><p>Access to scans currently aligns with NICE guideline 101 (NG101 Early and locally advanced breast cancer: diagnosis and management).</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203397%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=381133","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=381133"}},{"id":"381132","reference":"AQW 3396/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-09-22","answerBy":"2022-10-07","answered":"2022-10-06","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure how many electric vehicle charging points will be available by the end of (i) 2022; (ii) 2023; (iii) 2024; and (iv) 2025.","answerText":"The current electric vehicle public charge point network is owned by the Electricity Supply Board (ESB) and is operated on a commercial basis. ESB announced in November 2021 that it had been awarded £3.27 million from the Levelling Up Fund to expand and enhance the EV charging network. ESB can be contacted directly regarding its plans for its charge point infrastructure. The market is also open to other commercial operators who would wish to provide charging infrastructure.\n\nI am pleased that my Department has been able to support the FASTER Project, funded through the INTERREG VA Territorial Co-operation Programme which is managed by the Special EU Programmes Body (SEUPB). The project has received funding to install a total of 73 EV Rapid charging points across the island of Ireland and the West of Scotland by 31 May 2023. It is expected that 20-30 of these will be located in the North.\n\nFunding opportunities for the installation of charge point infrastructure in GB-NI are provided by the Office for Zero Emission Vehicles (OZEV). A local council consortium, led by Derry City and Strabane District Council, submitted a joint application to the Energy Saving Trust which manages the fund on behalf of OZEV on 30 March 2022. Derry City and Strabane District council is best placed to advise about the application. My Department is represented, in an advisory capacity, on the ORCS council consortium.\n\nMy Department has also set up an EV Infrastructure Task-Force which brings together representatives from government, consumers, energy providers, industry and EV drivers to consider our EV Infrastructure requirements and to help set out a clear action plan by autumn 2022 to deliver a fit for purpose, modern EV charging network.","answerHtml":"<p>The current electric vehicle public charge point network is owned by the Electricity Supply Board (ESB) and is operated on a commercial basis. ESB announced in November 2021 that it had been awarded £3.27 million from the Levelling Up Fund to expand and enhance the EV charging network. ESB can be contacted directly regarding its plans for its charge point infrastructure. The market is also open to other commercial operators who would wish to provide charging infrastructure.</p><p>I am pleased that my Department has been able to support the FASTER Project, funded through the INTERREG VA Territorial Co-operation Programme which is managed by the Special EU Programmes Body (SEUPB). The project has received funding to install a total of 73 EV Rapid charging points across the island of Ireland and the West of Scotland by 31 May 2023. It is expected that 20-30 of these will be located in the North.</p><p>Funding opportunities for the installation of charge point infrastructure in GB-NI are provided by the Office for Zero Emission Vehicles (OZEV). A local council consortium, led by Derry City and Strabane District Council, submitted a joint application to the Energy Saving Trust which manages the fund on behalf of OZEV on 30 March 2022. Derry City and Strabane District council is best placed to advise about the application. My Department is represented, in an advisory capacity, on the ORCS council consortium.</p><p>My Department has also set up an EV Infrastructure Task-Force which brings together representatives from government, consumers, energy providers, industry and EV drivers to consider our EV Infrastructure requirements and to help set out a clear action plan by autumn 2022 to deliver a fit for purpose, modern EV charging network.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203396%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=381132","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=381132"}},{"id":"381131","reference":"AQW 3395/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-09-22","answerBy":"2022-10-07","answered":"2022-10-03","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to outline what actions he is taking to support the social enterprise sector in 2022/2023.","answerText":"It is important to note from the outset that, in April 2015, as part of the transfer of functions under the Review of Public Administration (RPA), responsibility for social entrepreneurship transferred from the then Department of Enterprise, Trade and Investment (DETI) to local government.\n\nMy Department’s support for the sector is primarily through the funding of the Social Economy Work Programme (SEWP) which is delivered by Social Enterprise NI (SENI). One of the SEWP’s key objectives is to develop a cohesive approach to procurement opportunities, training, lobbying and working with central government, councils, education bodies and other groups. My Department has also included an action for SENI as part of the SEWP to develop a database of the actual social enterprises operational within NI. The database, which will be the intellectual property of DfE, is designed to capture the contact details, location, size, capacity and offering of each individual social enterprise. This work is ongoing.\n\nIn addition, my Department’s Skills Focus and InnovateUs programmes have been extended to enable social enterprises to apply for support.\n\nInvest NI has advised that the Northern Ireland Business Start Up Programme (NIBSUP), promoted under the ‘Go for it’ brand and delivered by Councils in Northern Ireland, is available to all potential new start businesses, including social enterprises. The programme provides one-to-one support from experienced business advisors, with help to develop a practical business plan and referral to follow on support options.\n\nInvest NI also provides a comprehensive range of information on www.nibusinessinfo.co.uk which is particularly helpful for people considering starting a social enterprise.","answerHtml":"<p>It is important to note from the outset that, in April 2015, as part of the transfer of functions under the Review of Public Administration (RPA), responsibility for social entrepreneurship transferred from the then Department of Enterprise, Trade and Investment (DETI) to local government.</p><p>My Department’s support for the sector is primarily through the funding of the Social Economy Work Programme (SEWP) which is delivered by Social Enterprise NI (SENI). One of the SEWP’s key objectives is to develop a cohesive approach to procurement opportunities, training, lobbying and working with central government, councils, education bodies and other groups. My Department has also included an action for SENI as part of the SEWP to develop a database of the actual social enterprises operational within NI. The database, which will be the intellectual property of DfE, is designed to capture the contact details, location, size, capacity and offering of each individual social enterprise. This work is ongoing.</p><p>In addition, my Department’s Skills Focus and InnovateUs programmes have been extended to enable social enterprises to apply for support.</p><p>Invest NI has advised that the Northern Ireland Business Start Up Programme (NIBSUP), promoted under the ‘Go for it’ brand and delivered by Councils in Northern Ireland, is available to all potential new start businesses, including social enterprises. The programme provides one-to-one support from experienced business advisors, with help to develop a practical business plan and referral to follow on support options.</p><p>Invest NI also provides a comprehensive range of information on www.nibusinessinfo.co.uk which is particularly helpful for people considering starting a social enterprise.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203395%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=381131","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=381131"}},{"id":"380982","reference":"AQW 3316/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-09-21","answerBy":"2022-10-06","answered":"2022-10-03","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 3079/22-27, what factors contributed to his assessment that a statutory right to time off work for people undergoing fertility treatment is not a priority at this time.","answerText":"Many factors, including financial; legal; resource; and time inform the prioritisation of policy making and implementation. In the present case, my Department is under a statutory obligation to introduce regulations which will deliver a statutory right to miscarriage leave and pay and domestic abuse safe leave.\n\nIn the case of miscarriage leave and pay, regulations must be introduced by my Department no later than 6 April 2026. I gave a commitment during the last Assembly mandate I would endeavour to do so by April 2024. I remain committed to achieving this target.\n\nThe Domestic Abuse (Safe Leave) Act (NI) 2022 commenced life as a private members Bill. Much of the policy development work which would otherwise have been undertaken by a departmentally sponsored bill before it undergoes the legislative process and receives Royal Assent now needs to be undertaken.\n\nIn both instances, stakeholder engagement and formal consultation will be required. It is for these reasons that I have asked officials to prioritise these important pieces of work at this time.","answerHtml":"<p>Many factors, including financial; legal; resource; and time inform the prioritisation of policy making and implementation. In the present case, my Department is under a statutory obligation to introduce regulations which will deliver a statutory right to miscarriage leave and pay and domestic abuse safe leave.</p><p>In the case of miscarriage leave and pay, regulations must be introduced by my Department no later than 6 April 2026. I gave a commitment during the last Assembly mandate I would endeavour to do so by April 2024. I remain committed to achieving this target.</p><p>The Domestic Abuse (Safe Leave) Act (NI) 2022 commenced life as a private members Bill. Much of the policy development work which would otherwise have been undertaken by a departmentally sponsored bill before it undergoes the legislative process and receives Royal Assent now needs to be undertaken.</p><p>In both instances, stakeholder engagement and formal consultation will be required. It is for these reasons that I have asked officials to prioritise these important pieces of work at this time.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203316%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=380982","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=380982"}},{"id":"380972","reference":"AQW 3306/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-09-21","answerBy":"2022-10-06","answered":"2022-09-23","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure what plans he has to support taxi drivers, given the rising cost of fuel.","answerText":"My Department is responsible for the regulation of the taxi industry across the North. This role requires balancing the needs of taxi customers, including vulnerable passengers, as well as drivers and operators. My Department remains committed to working within this remit to play its part, alongside those in the taxi industry, to address the range of issues the industry faces, including the high cost of fuel.\n\nAs part of its regulatory role the Department is currently consulting with the public, taxi drivers/operators and stakeholders on a review of taxi fares, which will finish on the 7th of October 2022 - https://www.infrastructure-ni.gov.uk/consultations/taxi-fare-increase-public-consultation-2022 . This review has factored in a large increase for depot charges, 2022 fuel prices, and other increased costs such as insurance and labour. We are actively encouraging all of those with an interest to respond to the consultation, and I would ask that you respond if you have not already done so, and also encourage anyone that has raised the issue with you to respond by the deadline. After this process has concluded the outcome of the review can be implemented, to help address the needs of drivers, operators and taxi customers, including vulnerable passengers.","answerHtml":"<p>My Department is responsible for the regulation of the taxi industry across the North. This role requires balancing the needs of taxi customers, including vulnerable passengers, as well as drivers and operators. My Department remains committed to working within this remit to play its part, alongside those in the taxi industry, to address the range of issues the industry faces, including the high cost of fuel.</p><p>As part of its regulatory role the Department is currently consulting with the public, taxi drivers/operators and stakeholders on a review of taxi fares, which will finish on the 7th of October 2022 - https://www.infrastructure-ni.gov.uk/consultations/taxi-fare-increase-public-consultation-2022 . This review has factored in a large increase for depot charges, 2022 fuel prices, and other increased costs such as insurance and labour. We are actively encouraging all of those with an interest to respond to the consultation, and I would ask that you respond if you have not already done so, and also encourage anyone that has raised the issue with you to respond by the deadline. After this process has concluded the outcome of the review can be implemented, to help address the needs of drivers, operators and taxi customers, including vulnerable passengers.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203306%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=380972","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=380972"}},{"id":"380971","reference":"AQW 3305/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-09-21","answerBy":"2022-10-06","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, pursuant to AQW 3081/22-27, what energy support is available for patients living with (i) cancer; and (ii) a terminal illness.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203305%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=380971","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=380971"}},{"id":"380970","reference":"AQW 3304/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-09-21","answerBy":"2022-10-06","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, pursuant to AQW 3081/22-27, to outline all the categories of patients who are entitled to electricity reimbursement for costs associated with their condition.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203304%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=380970","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=380970"}},{"id":"380488","reference":"AQW 3082/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-09-08","answerBy":"2022-09-26","answered":"2022-09-20","answeredOrally":false,"priority":false,"department":"Northern Ireland Assembly Commission","departmentId":"2","minister":"Assembly Commission","question":"To ask the Assembly Commission what consideration has been given to removing plastic bottles from sale in the canteen in Parliament Buildings, and switching to more sustainable packaging.","answerText":"The Assembly Commission is committed to being an exemplar organisation in terms of sustainability and works closely with its support services contractor, Sodexo, to achieve this.\n\nAs part of its continuing certification under ISO 14001:2015 (the International Standard for Environmental Management Systems), the Assembly Commission develops and monitors progress against a Continuous Improvement Plan for each year. The Plan for 2022-23 includes the commitment to “Continue to work towards phasing out single use plastics”.\n\nThat commitment is made in light of the Assembly Commission’s approach to sustainability of seeking to reduce the overall waste generated across all recycling streams rather than providing an alternative to fill the gap. However, it is worth noting the plastic bottles that are offered for sale within the catering outlets are all fully recyclable while cans are provided for some product lines.\n\nSingle use plastic containers and cutlery are being replaced with more sustainable and compostable alternatives. All pass holders in Parliament Buildings are actively encouraged to bring their own reusable bottles and cups to the restaurant or for takeaway use. Ceramic mugs, glasses and stainless-steel cutlery is available for use and jugs of water are provided at all meetings and events rather than bottles of water.\n\nFurther to this, the Assembly Commission uses a Department of Finance collaborative agreement to ensure that zero waste is sent to landfill from Parliament Buildings.\n\nThe Assembly Commission will continue to consider opportunities to improve its environmental performance in Parliament Buildings and specifically within the catering outlets.","answerHtml":"<p>The Assembly Commission is committed to being an exemplar organisation in terms of sustainability and works closely with its support services contractor, Sodexo, to achieve this.</p><p>As part of its continuing certification under ISO 14001:2015 (the International Standard for Environmental Management Systems), the Assembly Commission develops and monitors progress against a Continuous Improvement Plan for each year. The Plan for 2022-23 includes the commitment to “Continue to work towards phasing out single use plastics”.</p><p>That commitment is made in light of the Assembly Commission’s approach to sustainability of seeking to reduce the overall waste generated across all recycling streams rather than providing an alternative to fill the gap. However, it is worth noting the plastic bottles that are offered for sale within the catering outlets are all fully recyclable while cans are provided for some product lines.</p><p>Single use plastic containers and cutlery are being replaced with more sustainable and compostable alternatives. All pass holders in Parliament Buildings are actively encouraged to bring their own reusable bottles and cups to the restaurant or for takeaway use. Ceramic mugs, glasses and stainless-steel cutlery is available for use and jugs of water are provided at all meetings and events rather than bottles of water.</p><p>Further to this, the Assembly Commission uses a Department of Finance collaborative agreement to ensure that zero waste is sent to landfill from Parliament Buildings.</p><p>The Assembly Commission will continue to consider opportunities to improve its environmental performance in Parliament Buildings and specifically within the catering outlets.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203082%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=380488","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=380488"}},{"id":"380487","reference":"AQW 3081/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-09-08","answerBy":"2022-09-26","answered":"2022-09-15","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, in light of rising energy prices, what additional support is available to people who require medical machines such as oxygen machines in their homes.","answerText":"All patients prescribed home oxygen concentrators have the associated electricity costs reimbursed fully. After the first six months, reimbursements are made using a series of estimated and actual readings.\n\nThis system “self-calibrates” over time. However if patients are still concerned in the interim, they can telephone their actual readings to BOC (the supplier of the home oxygen service) on a monthly basis and this will ensure even greater accuracy.\n\nIn early 2022, due to rising energy costs, correspondence was sent to every patient who uses home oxygen to assure them that they would be reimbursed fully for any electricity costs associated with their concentrators and that if they were concerned they could contact BOC with readings and get a refund on a monthly basis.\n\nElectricity reimbursement rates are continually reviewed and increased in line with external price changes.","answerHtml":"<p>All patients prescribed home oxygen concentrators have the associated electricity costs reimbursed fully. After the first six months, reimbursements are made using a series of estimated and actual readings.</p><p>This system “self-calibrates” over time. However if patients are still concerned in the interim, they can telephone their actual readings to BOC (the supplier of the home oxygen service) on a monthly basis and this will ensure even greater accuracy.</p><p>In early 2022, due to rising energy costs, correspondence was sent to every patient who uses home oxygen to assure them that they would be reimbursed fully for any electricity costs associated with their concentrators and that if they were concerned they could contact BOC with readings and get a refund on a monthly basis.</p><p>Electricity reimbursement rates are continually reviewed and increased in line with external price changes.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203081%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=380487","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=380487"}},{"id":"380486","reference":"AQW 3080/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-09-08","answerBy":"2022-09-26","answered":"2022-09-21","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what support he is providing to takeaway businesses in Northern Ireland, in light of reports that half of Northern Ireland’s takeaways are at threat of closure due to rising costs.","answerText":"I am acutely aware of the pressure that businesses are facing across the board, primarily as a result of soaring wholesale energy costs associated with Russia’s invasion of Ukraine. In the last year, since September 2021, the wholesale cost of natural gas has trebled (+194%), while the cost of coal (+104%) and home heating oil (+107%) has doubled. Coupled with ongoing global supply chain disruptions, these unprecedented increases in energy costs are driving inflation across the economy, including input cost pressures for small businesses.\n\nAs we are seeing across Europe and beyond, the magnitude of these global inflationary pressures means that it can only be tackled meaningfully by significant interventions at a national government level. That is why in recent weeks and months I have taken every opportunity to engage with UK Government to highlight the inflationary pressures being felt by households and businesses in Northern Ireland.\n\nFollowing these engagements, I welcome the UK Government’s commitment to deliver the much needed £400 Energy Support Payment Scheme in Northern Ireland. In addition, the announcement by the Prime Minister of an Energy Price Guarantee and her continued commitment that the same level of support will be made available in Northern Ireland. This relief will give households and businesses a degree of certainty with their bills over the coming months. My Department will continue to engage with the UK Government and others to ensure these support measures reach Northern Ireland households and businesses as soon as possible.\n\nThe outlook remains challenging but I am hopeful for the future. I am investing in those areas where we can gain the best long-term outcomes, which will help us build greater economic resilience for the future. For example, I have published an energy strategy which will deliver a step change in how we move away from our reliance on overseas, imported fossil fuels. Alongside our investment in skills this will support the delivery of our ambitious 10X Economic Vision for the benefit of all our people.\n\nIn practical terms, Invest Northern Ireland’s Energy and Resource Efficiency Support for businesses provides a suite of support, including specialist advice and investment capital, to enable local businesses to become more efficient and resilient through green efficiencies.","answerHtml":"<p>I am acutely aware of the pressure that businesses are facing across the board, primarily as a result of soaring wholesale energy costs associated with Russia’s invasion of Ukraine. In the last year, since September 2021, the wholesale cost of natural gas has trebled (+194%), while the cost of coal (+104%) and home heating oil (+107%) has doubled. Coupled with ongoing global supply chain disruptions, these unprecedented increases in energy costs are driving inflation across the economy, including input cost pressures for small businesses.</p><p>As we are seeing across Europe and beyond, the magnitude of these global inflationary pressures means that it can only be tackled meaningfully by significant interventions at a national government level. That is why in recent weeks and months I have taken every opportunity to engage with UK Government to highlight the inflationary pressures being felt by households and businesses in Northern Ireland.</p><p>Following these engagements, I welcome the UK Government’s commitment to deliver the much needed £400 Energy Support Payment Scheme in Northern Ireland. In addition, the announcement by the Prime Minister of an Energy Price Guarantee and her continued commitment that the same level of support will be made available in Northern Ireland. This relief will give households and businesses a degree of certainty with their bills over the coming months. My Department will continue to engage with the UK Government and others to ensure these support measures reach Northern Ireland households and businesses as soon as possible.</p><p>The outlook remains challenging but I am hopeful for the future. I am investing in those areas where we can gain the best long-term outcomes, which will help us build greater economic resilience for the future. For example, I have published an energy strategy which will deliver a step change in how we move away from our reliance on overseas, imported fossil fuels. Alongside our investment in skills this will support the delivery of our ambitious 10X Economic Vision for the benefit of all our people.</p><p>In practical terms, Invest Northern Ireland’s Energy and Resource Efficiency Support for businesses provides a suite of support, including specialist advice and investment capital, to enable local businesses to become more efficient and resilient through green efficiencies.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203080%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=380486","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=380486"}},{"id":"380485","reference":"AQW 3079/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-09-08","answerBy":"2022-09-26","answered":"2022-09-14","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether he is considering introducing a statutory right to time off work for people undergoing fertility treatment.","answerText":"Good employers recognise the potential impact undergoing fertility treatment can have on the ability of employees to work during this period. They have flexible supportive working policies in place such as homeworking, flexible hours or compassionate leave. I would encourage all employers to offer such flexible and supportive working arrangements for their staff.\n\nThere are no plans at present to introduce a statutory tight to time off for persons undergoing fertility treatment. An immediate focus and priority for my Department is the progression of paid miscarriage leave and domestic abuse safe leave.","answerHtml":"<p>Good employers recognise the potential impact undergoing fertility treatment can have on the ability of employees to work during this period. They have flexible supportive working policies in place such as homeworking, flexible hours or compassionate leave. I would encourage all employers to offer such flexible and supportive working arrangements for their staff.</p><p>There are no plans at present to introduce a statutory tight to time off for persons undergoing fertility treatment. An immediate focus and priority for my Department is the progression of paid miscarriage leave and domestic abuse safe leave.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203079%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=380485","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=380485"}},{"id":"376100","reference":"AQW 1654/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-06-16","answerBy":"2022-07-01","answered":"2022-06-27","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure, pursuant to AQW 1159/22-27, (i) which recommendations from the report will he be addressing, and (ii) for a timescale for the competition of the York Street Interchange project.","answerText":"(i) The Placemaking and Active Travel Review (PATR) included the assessment of a number of different options to enhance placemaking and active travel provision. The report recommends that 3 options be taken forward for further consideration. This work is ongoing.\n\n(ii) A timescale for the future procurement and construction of the project cannot be confirmed at this time as it is dependent upon a number of factors, including the completion of any follow up work resulting from the PATR and the availability of funding.","answerHtml":"<p>(i) The Placemaking and Active Travel Review (PATR) included the assessment of a number of different options to enhance placemaking and active travel provision. The report recommends that 3 options be taken forward for further consideration. This work is ongoing.</p><p>(ii) A timescale for the future procurement and construction of the project cannot be confirmed at this time as it is dependent upon a number of factors, including the completion of any follow up work resulting from the PATR and the availability of funding.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201654%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=376100","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=376100"}},{"id":"375195","reference":"AQW 1186/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-06-08","answerBy":"2022-06-23","answered":"2022-06-16","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance, further to the UK Government’s ban on charging ground rent on leases in England and Wales, what steps his Department is taking to reform ground rent.","answerText":"The system of land tenure in England and Wales differs substantially from land law in this jurisdiction. In England and Wales, issues around exponential increases in ground rents have necessitated reform.\n\nThis issue has not been raised by many existing tenants in this jurisdiction and following the introduction of the Property (NI) Order 1997, no new ground rents, or increases to ground rents, have been permitted in dwelling houses.\n\nThe reform of the law on ground rent is therefore not an area currently under consideration by the Department for the purposes of legislation.\n\nIt is possible for a tenant to buy out their ground rent in this jurisdiction. Information on how to do this is available on the NI Direct website.","answerHtml":"<p>The system of land tenure in England and Wales differs substantially from land law in this jurisdiction. In England and Wales, issues around exponential increases in ground rents have necessitated reform.</p><p>This issue has not been raised by many existing tenants in this jurisdiction and following the introduction of the Property (NI) Order 1997, no new ground rents, or increases to ground rents, have been permitted in dwelling houses.</p><p>The reform of the law on ground rent is therefore not an area currently under consideration by the Department for the purposes of legislation.</p><p>It is possible for a tenant to buy out their ground rent in this jurisdiction. Information on how to do this is available on the NI Direct website.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201186%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=375195","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=375195"}},{"id":"375173","reference":"AQW 1164/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-06-08","answerBy":"2022-06-23","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health whether he has plans to introduce a fund similar to the Innovative Medicines Fund, recently announced by the Department of Health and Social Care.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201164%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=375173","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=375173"}},{"id":"375168","reference":"AQW 1159/22-27","type":"Written","typeCode":"AQW","mandate":"22-27","tabled":"2022-06-08","answerBy":"2022-06-23","answered":"2022-06-14","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure for an update on the York Street Interchange Scheme.","answerText":"The Place making and Active Travel Review, which aimed to maximise the social, economic and environmental benefits of the York Street Interchange project and its contribution to the future development of Belfast, has now been completed. The report identified a number of options to enhance place making and improve active travel provision. Work is ongoing to refine the shortlisted options and consider factors relating to their potential implementation.","answerHtml":"<p>The Place making and Active Travel Review, which aimed to maximise the social, economic and environmental benefits of the York Street Interchange project and its contribution to the future development of Belfast, has now been completed. The report identified a number of options to enhance place making and improve active travel provision. Work is ongoing to refine the shortlisted options and consider factors relating to their potential implementation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201159%2F22-27","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=375168","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=375168"}},{"id":"371585","reference":"AQW 30816/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-03-10","answerBy":"2022-03-25","answered":"2022-03-25","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities (i) why people receiving tax credit are not eligible for the £200 Energy Payment Support Scheme; and (ii) whether she has any plans to extend it to those who are not eligible.","answerText":"I refer the member to my statement in the Assembly on 1 March 2022.","answerHtml":"<p>I refer the member to my statement in the Assembly on 1 March 2022.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2030816%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=371585","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=371585"}},{"id":"372408","reference":"AQO 3285/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2022-03-03","answerBy":"2022-03-15","answered":"2022-03-15","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health what steps he is taking to implement Project DELTA to improve oesophageal cancer diagnosis using Cytosponge in Northern Ireland.","answerText":"Project DELTA has been developed by University of Cambridge. This study will improve oesophageal cancer diagnosis using Cytosponge, a new medical test that aims to improve early detection and surveillance of Barrett’s Oesophagus. Cytosponge is a less invasive methods to identify cell changes. In practice this means swallowing a pill on a string. The pill dissolves and turns into a sponge which is then pulled up with the string. This replaces the need for the person to undergo an endoscopy – which is both very unpleasant for the person and is time consuming for the health and social care system.\n\nIdentifying cell changes is important to ensure conditions such as Barrett’s do not progress to become oesophageal cancer. It is hence a welcomed new tool in the early detection management and prevention of cancer.\n\nI am delighted to advise that all Northern Ireland Healthcare Trusts are in the process of enrolling in the DELTA study. Trusts are currently working through the study trial paperwork and are reviewing the relevant governance arrangements. It is hoped that up to 100 patients in each Trust will be enrolled in the Study throughout 2022.\n\nThis will also allow the wider spread use of Cytosponge whilst the longer term consideration for commission of such services are being considered. As of yet, the National Institute for Health and Care Excellence have not recommended the use of the Cytosponge-TFF3 test in any of their guidelines.\n\nIn addition the Northern Ireland Cancer Network are maintaining communication with both the clinicians involved and the DELTA team at Cambridge to ensure effective use of information and outcomes of the study can help inform future decision making.\n\nI am in the process of considering the new Cancer Strategy. Going forward, new developments such as Cytosponge must be welcomed and we must strengthen even more our existing cultures in our cancer service to partake in clinical trials and develop new ways of working to improve patient outcomes.","answerHtml":"<p>Project DELTA has been developed by University of Cambridge. This study will improve oesophageal cancer diagnosis using Cytosponge, a new medical test that aims to improve early detection and surveillance of Barrett’s Oesophagus. Cytosponge is a less invasive methods to identify cell changes. In practice this means swallowing a pill on a string. The pill dissolves and turns into a sponge which is then pulled up with the string. This replaces the need for the person to undergo an endoscopy – which is both very unpleasant for the person and is time consuming for the health and social care system.</p><p>Identifying cell changes is important to ensure conditions such as Barrett’s do not progress to become oesophageal cancer. It is hence a welcomed new tool in the early detection management and prevention of cancer.</p><p>I am delighted to advise that all Northern Ireland Healthcare Trusts are in the process of enrolling in the DELTA study. Trusts are currently working through the study trial paperwork and are reviewing the relevant governance arrangements. It is hoped that up to 100 patients in each Trust will be enrolled in the Study throughout 2022.</p><p>This will also allow the wider spread use of Cytosponge whilst the longer term consideration for commission of such services are being considered. As of yet, the National Institute for Health and Care Excellence have not recommended the use of the Cytosponge-TFF3 test in any of their guidelines.</p><p>In addition the Northern Ireland Cancer Network are maintaining communication with both the clinicians involved and the DELTA team at Cambridge to ensure effective use of information and outcomes of the study can help inform future decision making.</p><p>I am in the process of considering the new Cancer Strategy. Going forward, new developments such as Cytosponge must be welcomed and we must strengthen even more our existing cultures in our cancer service to partake in clinical trials and develop new ways of working to improve patient outcomes.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203285%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=372408","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=372408"}},{"id":"369210","reference":"AQW 30077/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-02-22","answerBy":"2022-03-09","answered":"2022-03-02","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) whether he has received a copy of the Travel Agents (Coronavirus) Financial Assistance Scheme 2021 from the Executive Office; and (ii) when he intends to develop a similar scheme.","answerText":"(i) I can confirm that I have received high level rationale and information for the Travel Agents (Coronavirus) Financial Assistance Scheme 2021 from the Executive Office.\n\n(ii) Responsibility for travel agents is not constrained to one specific department. Currently the Executive is not in a position to meet and my Department has no mandate from the Executive to take forward any further schemes outside of those already announced.","answerHtml":"<p>(i) I can confirm that I have received high level rationale and information for the Travel Agents (Coronavirus) Financial Assistance Scheme 2021 from the Executive Office.</p><p>(ii) Responsibility for travel agents is not constrained to one specific department. Currently the Executive is not in a position to meet and my Department has no mandate from the Executive to take forward any further schemes outside of those already announced.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2030077%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=369210","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=369210"}},{"id":"368859","reference":"AQO 3207/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2022-02-17","answerBy":"2022-03-01","answered":"2022-03-01","answeredOrally":true,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs for an update on the total cost of the legal advice he received in relation to halting sanitary and phytosanitary checks at points of entry.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr Poots (The Minister of Agriculture, Environment and Rural Affairs)","text":"As I have not yet received an invoice, I am unable to provide an update on the total cost of the legal advice that I received in relation to halting sanitary and phytosanitary checks at points of entry."},{"speaker":"Mr Dickson","text":"Thank you very much, Minister, for a somewhat disappointing answer. Do you agree that sanitary and phytosanitary checks at points of entry are vital to upholding our animal welfare and good food standards? How will we deal with standards under the UK's free trade agreements with Australia and New Zealand, which definitely threaten our food standards and regulations?"},{"speaker":"Mr Poots","text":"I certainly do not agree that they are necessary. In the first instance, food that comes into Northern Ireland and is to remain in Northern Ireland poses zero threat to the European Union single market. The fact that the Alliance Party, today, through Mr Dickson, has indicated that it wants to have checks between Great Britain and Northern Ireland, which will lead to less supply and, in turn, to higher costs and a reduced offer to consumers, demonstrates beyond reasonable doubt that the Alliance Party is more interested in the politics of the European Union than it is about the people whom it serves."},{"speaker":"Mr McGuigan","text":"Minister, in your responses to previous questions for written and oral answer, including the one just now, you have not provided an answer about the cost of that advice on halting sanitary and phytosanitary checks. Can you confirm how much was paid to the Attorney General for his advice? Was he paid with public money?"},{"speaker":"Mr Poots","text":"Well, we do not have a bill, the Attorney General is female, not male, and the Attorney General does not charge for advice."},{"speaker":"Mr O'Toole","text":"I note that the Agriculture Minister has not made clear why he chose to take legal advice from the former Attorney General rather than the current one. I want to ask about the free trade deals with Australia and New Zealand, the latter of which was signed yesterday. Last year, Minister, you said that you had been clear with UK Ministers that tariff-free access to the UK for New Zealand farmers posed a serious threat to our farmers. What went wrong, Minister? Did the UK Ministers simply not listen to you?"},{"speaker":"Mr Poots","text":"First of all, the Member makes an assumption that I did not receive advice from the current Attorney General and, indeed, from the Departmental Solicitor's Office and others. The Member will be well aware that that is purely an assumption and does not have any veracity. Nonetheless, we will leave that to one side. On the New Zealand trade deal, of course I have demonstrated quite clearly my concerns about potential trade deals. There are trade deals that will bring us significant benefits and open the doors for Northern Ireland to export its high-quality food. Quite a number of trade deals have already taken place that will be to our benefit. The trade deals with Australia and New Zealand will always be challenging for us because they are large food-producing countries. However, there are opportunities for other businesses in Northern Ireland, not least for people who export engineering expertise to Australia, for example, with all the mining equipment that is produced, mainly in mid-Ulster. Therefore, there are advantages to those deals as well as disadvantages. The disadvantages, if they come through, will take time to come through. At present, Australia sells a large amount of its beef in Southeast Asia, and, consequently, does not need the UK market, but that may not always be the case. I have highlighted and expressed my concerns about that. That having been said, when we left the European Union, our beef was about 20% lower in price than it currently is, so it is hard for the Member to claim that we have done badly out of it."},{"speaker":"Mr Allister","text":"The Alliance party and the other rigorous implementers of the protocol are obsessing about the modest cost of legal advice, which established that the checks were unlawful, in contrast with the figure that the Minister gave last month of £10 million for the cost of those checks, never mind the tens of millions of pounds of costs to business under the Trader Support Service (TSS). Does the Minister agree that that is a telling insight into where the interests of such questioners lie?"},{"speaker":"Mr Poots","text":"Absolutely. Thousands of checks and CHED documents have to be completed by businesses, and additional staff had to be recruited by businesses as a consequence of the protocol. The services that are provided by the TSS will be withdrawn, and, ultimately, that cost will be passed on. The European Union demands that we pass all the costs that the Government and this Department bear to businesses, and it even wants us to check people's cars and luggage. That is what the Alliance Party wants, and that is why the Alliance Party has shown itself up today in its demands for the rigorous implementation of the protocol. [Interruption.]"},{"speaker":"Mr Beggs","text":"I thank the Minister for his answer"},{"speaker":"","text":"—"},{"speaker":"Mr Speaker","text":"Order, Members."},{"speaker":"Mr Beggs","text":"— to the question on legal costs, but there is an additional cost for transport arrangements and bureaucracy across business, with some suppliers not even continuing to supply Northern Ireland. What assessment has there been of the detrimental impact on the Northern Ireland economy and to the public, who cannot even buy some plants in garden centres?"},{"speaker":"Mr Poots","text":"The fact is that it is easier to import a tree from Lithuania than from Lancashire. That might not be the case when Mr Putin is finished, but that is the reality, folks. We have a country that has had a barrier put within it. That has never been tried in any other country in the world. The fact that we have individuals in this country saying, \"We want more of it [Interruption.]"},{"speaker":"","text":"Mr Poots, you have not done enough on the protocol. We want you to do more to make it difficult for people to buy goods"},{"speaker":"","text":"from their own country\"."},{"speaker":"Mr Speaker","text":"Order, Members. [Interruption.]"},{"speaker":"Mr Poots","text":"That is an outrageous situation and an outrageous proposal."},{"speaker":"Mr Speaker","text":"I do not want to have to keep intervening, but I will insist that we get order so that we can continue with Question Time."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203207%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=368859","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2022-03-01&docID=369445#AQO%203207/17-22","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=368859"}},{"id":"368530","reference":"AQW 29848/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-02-16","answerBy":"2022-03-03","answered":"2022-03-07","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what plans he has to provide additional support to events businesses that have been adversely affected during the pandemic.","answerText":"I understand that the Covid-19 pandemic has created challenges and difficulties for society at large, and the economic impacts have been significant.\n\nThe Executive Covid Taskforce continues to assess the need for financial support in response to the gradually improving health situation and will make recommendations for any necessary support for sectors likely to suffer irreparable damage.\n\nThe recent easement of remaining restrictions on businesses will enable us to move towards a return to a normal trading environment and as such my Department has no plans for any additional financial support for businesses relating to the pandemic.","answerHtml":"<p>I understand that the Covid-19 pandemic has created challenges and difficulties for society at large, and the economic impacts have been significant.</p><p>The Executive Covid Taskforce continues to assess the need for financial support in response to the gradually improving health situation and will make recommendations for any necessary support for sectors likely to suffer irreparable damage.</p><p>The recent easement of remaining restrictions on businesses will enable us to move towards a return to a normal trading environment and as such my Department has no plans for any additional financial support for businesses relating to the pandemic.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2029848%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=368530","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=368530"}},{"id":"368286","reference":"AQW 29768/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-02-15","answerBy":"2022-03-02","answered":"2022-02-21","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 28956/17-22, whether he has received details of the Travel Agents (Coronavirus) Financial Assistance Scheme 2021 from the Executive Office.","answerText":"The Travel Agents (Coronavirus) Financial Assistance Scheme administered by the Executive Office opened for applications on the 19th of March 2021. The Scheme offered one-off support for travel agents experiencing difficulties as a result of the pandemic in the form off a grant payment of £10,000 for agents operating from a commercial premise or £3,500 for agents working from home.\n\nTravel Agents with more than one premises could apply for payment for each premise operated.\n\nThe total amount allocated to the Scheme was £1.175 million.","answerHtml":"<p>The Travel Agents (Coronavirus) Financial Assistance Scheme administered by the Executive Office opened for applications on the 19th of March 2021. The Scheme offered one-off support for travel agents experiencing difficulties as a result of the pandemic in the form off a grant payment of £10,000 for agents operating from a commercial premise or £3,500 for agents working from home.</p><p>Travel Agents with more than one premises could apply for payment for each premise operated.</p><p>The total amount allocated to the Scheme was £1.175 million.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2029768%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=368286","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=368286"}},{"id":"368285","reference":"AQW 29767/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-02-15","answerBy":"2022-03-02","answered":"2022-02-25","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy how many businesses have received funding from Invest NI for petroleum exploration in the last 12 months.","answerText":"Invest NI has not funded any business for petroleum exploration in the last 12 months.","answerHtml":"<p>Invest NI has not funded any business for petroleum exploration in the last 12 months.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2029767%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=368285","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=368285"}},{"id":"368084","reference":"AQW 29692/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-02-14","answerBy":"2022-03-01","answered":"2022-02-22","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure what action she is taking to support airports and airport ground crews affected by COVID-19, in light of the Airport and Ground Operations Support Scheme being made available in England.","answerText":"As Minister for Infrastructure, my powers relating to NI’s three main airports are limited to the Airports (NI) Order 1994. These are powers to control noise, control land in the interests of the safe and efficient use of airports, make byelaws, provide for airport constabularies and airport consultative committees and to give grants to assist capital expenditure.\n\nDue to the exceptional circumstances that emerged from the COVID pandemic in Spring 2020, my Department was, for expediency and logistical reasons, asked to facilitate the distribution of emergency funding on behalf of the Executive to the City of Derry Airport and Belfast City Airport. In April 2020, the NI Executive, DfT and HM Treasury agreed a package of temporary financial support over 3 months to maintain air connectivity, with the Executive meeting half of the costs. City of Derry Airport was granted £924,435 and Belfast City Airport was granted £2,192,347.\n\nFollowing a decision by the Executive, on 19 November 2020 I announced £1.23 million in additional support to Derry City and Strabane District Council for City of Derry Airport. This short term support grant was to help City of Derry Airport to remain operational until March 2021 and was drawn down from the £10 million set aside by the Executive to provide further support, as and when required, for Airports during the COVID 19 crisis.\n\nMy understanding is that the Executive has no plans in place to launch an Airport and Ground Operations Support Scheme for airports and airport ground crews affected by COVID-19.\n\nI remain committed to working with Executive colleagues to listen to cases brought forward for support from airports and to working together with the rest of the Executive to identify ways to support our airports.","answerHtml":"<p>As Minister for Infrastructure, my powers relating to NI’s three main airports are limited to the Airports (NI) Order 1994. These are powers to control noise, control land in the interests of the safe and efficient use of airports, make byelaws, provide for airport constabularies and airport consultative committees and to give grants to assist capital expenditure.</p><p>Due to the exceptional circumstances that emerged from the COVID pandemic in Spring 2020, my Department was, for expediency and logistical reasons, asked to facilitate the distribution of emergency funding on behalf of the Executive to the City of Derry Airport and Belfast City Airport. In April 2020, the NI Executive, DfT and HM Treasury agreed a package of temporary financial support over 3 months to maintain air connectivity, with the Executive meeting half of the costs. City of Derry Airport was granted £924,435 and Belfast City Airport was granted £2,192,347.</p><p>Following a decision by the Executive, on 19 November 2020 I announced £1.23 million in additional support to Derry City and Strabane District Council for City of Derry Airport. This short term support grant was to help City of Derry Airport to remain operational until March 2021 and was drawn down from the £10 million set aside by the Executive to provide further support, as and when required, for Airports during the COVID 19 crisis.</p><p>My understanding is that the Executive has no plans in place to launch an Airport and Ground Operations Support Scheme for airports and airport ground crews affected by COVID-19.</p><p>I remain committed to working with Executive colleagues to listen to cases brought forward for support from airports and to working together with the rest of the Executive to identify ways to support our airports.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2029692%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=368084","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=368084"}},{"id":"368083","reference":"AQW 29691/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-02-14","answerBy":"2022-03-01","answered":"2022-02-22","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what action he is taking to support (i) domestic; and (ii) transatlantic air travel from Northern Ireland.","answerText":"My Department launched the NI Domestic Aviation Kickstart Scheme (NIDAKS) in June 2021, which provided unprecedented support to maintain and enhance NI’s domestic air connectivity with GB during the period June to October 2021. Each of NI’s airports and their related airlines welcomed the support provided by the Scheme.\n\nIn March 2021 the Executive agreed to fund the City of Derry Airport (CoDA) – London Public Service Obligation (PSO) route for a further two years to the end of March 2023. The funding is split 50/50 between my Department and the UK Department for Transport (DfT), and equates to c£1.0m per annum of support from DfE for the CoDA - London PSO route.\n\nAs demonstrated by NIDAKS, my Department is always willing to consider requests for support, and work collaboratively with the aviation sector to seek outcomes that deliver Value for Money; are within the policy remit and legal vires of the Department; and are compliant with the UK’s policy on subsidy control and its legally binding commitments in international trade agreements.\n\nWe have been approached by two potential airlines interested in operating transatlantic routes and those discussions are ongoing. In parallel, we need to determine what is possible in respect of support to airlines under the EU-UK Trade and Co-operation Agreement (TCA). This will be critical to the development of any Route Development Scheme for international travel for Northern Ireland.\n\nI recently wrote to the Transport Secretary to seek clarification on how to interpret the conditions detailed in Article 367, paragraph 15 of the TCA which details conditions for Subsidies to Air Carriers. I requested that he expedite publication of the TCA guidance as soon as possible.\n\nMeanwhile Tourism Ireland continues to provide cooperative marketing support to airlines operating to all three NI airports. Cooperative marketing is the funding mechanism that has been successfully used, previously, to secure transatlantic routes.","answerHtml":"<p>My Department launched the NI Domestic Aviation Kickstart Scheme (NIDAKS) in June 2021, which provided unprecedented support to maintain and enhance NI’s domestic air connectivity with GB during the period June to October 2021. Each of NI’s airports and their related airlines welcomed the support provided by the Scheme.</p><p>In March 2021 the Executive agreed to fund the City of Derry Airport (CoDA) – London Public Service Obligation (PSO) route for a further two years to the end of March 2023. The funding is split 50/50 between my Department and the UK Department for Transport (DfT), and equates to c£1.0m per annum of support from DfE for the CoDA - London PSO route.</p><p>As demonstrated by NIDAKS, my Department is always willing to consider requests for support, and work collaboratively with the aviation sector to seek outcomes that deliver Value for Money; are within the policy remit and legal vires of the Department; and are compliant with the UK’s policy on subsidy control and its legally binding commitments in international trade agreements.</p><p>We have been approached by two potential airlines interested in operating transatlantic routes and those discussions are ongoing. In parallel, we need to determine what is possible in respect of support to airlines under the EU-UK Trade and Co-operation Agreement (TCA). This will be critical to the development of any Route Development Scheme for international travel for Northern Ireland.</p><p>I recently wrote to the Transport Secretary to seek clarification on how to interpret the conditions detailed in Article 367, paragraph 15 of the TCA which details conditions for Subsidies to Air Carriers. I requested that he expedite publication of the TCA guidance as soon as possible.</p><p>Meanwhile Tourism Ireland continues to provide cooperative marketing support to airlines operating to all three NI airports. Cooperative marketing is the funding mechanism that has been successfully used, previously, to secure transatlantic routes.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2029691%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=368083","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=368083"}},{"id":"367537","reference":"AQW 29551/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-02-10","answerBy":"2022-02-25","answered":"2022-03-04","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities whether she intends to implement a similar scheme to the £350 boost for households to help with recent rising energy costs, as announced by the Chancellor last week.","answerText":"My Department has a number of schemes in place\n\nAffordable Warmth Scheme is available to low-income owner-occupiers and households in the private rented sector and includes multiple measures such as cavity wall insulation, installation of gas or oil, boiler replacement, replacement windows.\n\nBoiler Replacement Scheme provides a grant of up to £1,000 towards the cost of replacing old and inefficient boilers over 15 years old. This is open to owner-occupiers with a household income of less than £40,000.\n\nWinter Fuel payment is a tax free and non means tested benefit which is paid annually to eligible older people. The rate payable is between £100 and £300 depending on personal circumstances, to help people pay their heating bills.\n\nThe Emergency Fuel Payment Scheme will operate from 6 January to 31 March 2022 and my Department has contributed £2m to support this Scheme. It will provide immediate support of up to £100 worth of electric gas or oil to eligible people experiencing an emergency fuel crisis.\n\nDiscretionary Support is an award of short-term financial help to assist with additional expenditure for fuel costs if a person is in an extreme, exceptional or crisis situation.\n\nEnergy Payment Support Scheme is a one-off Payment of £200 payable to people who between 13-19 December 2021 inclusive were in receipt of one of the following benefits: Pension Credit; Universal Credit; Income related Employment and Support Allowance; Income Based Job Seekers Allowance; or Income Support.","answerHtml":"<p>My Department has a number of schemes in place</p><p>Affordable Warmth Scheme is available to low-income owner-occupiers and households in the private rented sector and includes multiple measures such as cavity wall insulation, installation of gas or oil, boiler replacement, replacement windows.</p><p>Boiler Replacement Scheme provides a grant of up to £1,000 towards the cost of replacing old and inefficient boilers over 15 years old. This is open to owner-occupiers with a household income of less than £40,000.</p><p>Winter Fuel payment is a tax free and non means tested benefit which is paid annually to eligible older people. The rate payable is between £100 and £300 depending on personal circumstances, to help people pay their heating bills.</p><p>The Emergency Fuel Payment Scheme will operate from 6 January to 31 March 2022 and my Department has contributed £2m to support this Scheme. It will provide immediate support of up to £100 worth of electric gas or oil to eligible people experiencing an emergency fuel crisis.</p><p>Discretionary Support is an award of short-term financial help to assist with additional expenditure for fuel costs if a person is in an extreme, exceptional or crisis situation.</p><p>Energy Payment Support Scheme is a one-off Payment of £200 payable to people who between 13-19 December 2021 inclusive were in receipt of one of the following benefits: Pension Credit; Universal Credit; Income related Employment and Support Allowance; Income Based Job Seekers Allowance; or Income Support.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2029551%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=367537","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=367537"}},{"id":"367536","reference":"AQW 29550/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-02-10","answerBy":"2022-02-25","answered":"2022-02-14","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to outline how many of the additional 8,500 premises to be brought into scope under Project Stratum are in East Antrim.","answerText":"My Department has secured the necessary additional capital funding of £32m in order to bring a further 8,469 premises into Project Stratum, including 159 premises in the East Antrim Constituency. The inclusion of these additional premises will bring the total number of premises in the East Antrim Constituency to benefit from Project Stratum to 2,033.","answerHtml":"<p>My Department has secured the necessary additional capital funding of £32m in order to bring a further 8,469 premises into Project Stratum, including 159 premises in the East Antrim Constituency. The inclusion of these additional premises will bring the total number of premises in the East Antrim Constituency to benefit from Project Stratum to 2,033.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2029550%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=367536","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=367536"}},{"id":"367535","reference":"AQW 29549/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-02-10","answerBy":"2022-02-25","answered":"2022-02-24","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education what extra support has been provided in schools for children with increased emotional or behavioural problems as a result of the COVID-19 pandemic.","answerText":"The emotional health and wellbeing of children and young people continues to be a high priority for my Department.\n\nThe Framework for Children and Young People’s Emotional Health and Wellbeing in Education, and the accompanying Implementation Plan, has enhanced the support provided for pupils during the pandemic, with a focus on promotion, prevention and early intervention, through an integrated approach between Education and Health.\n\nSupporting strands which have been implemented include the recently launched primary school therapeutic and counselling support pilot, Healthy Happy Minds, a text a nurse service, a new EA Youth Service REACH programme (Resilience Education Assisting Change to Happen), and the CCEA Wellbeing Hub which provides a repository of high quality resources to assist teachers and learners in the area of Wellbeing.\n\nProgrammes planned for 2022 include an expansion to the existing RISE NI programme which is a multi-professional early intervention team currently working in primary schools, an enhanced school nursing pilot and a school staff wellbeing project run by the EA’s Education Psychology Service. Approvals are also being progressed for the ‘Emotional Wellbeing Teams in School’, the Child and Adolescent Mental Health Service (CAMHS led programme) and the EA’s ‘Being Well Doing Well’ programme.\n\nI can confirm that an additional £5m was made available for another COVID Wellbeing Fund for 2021/22 which has provided dedicated funding to address wellbeing pressures arising as a result of the pandemic. The funding has been distributed directly to all schools (nursery, primary, post primary and special schools), as well as EOTAS (Education Otherwise Than At School) and Youth Settings, giving them flexibility in how they support the mental health and wellbeing of children and young people, and the staff working with them.\n\nTo further support emotional wellbeing during the pandemic DE also introduced the Safer Schools NI App, created by the iNEQE Safeguarding Group, which provides a one-stop-shop digital library of age-appropriate safeguarding resources for schools. The availability of the Safer Schools app is helping to ensure teachers, parents and children and young people have the knowledge they need to keep safe online.","answerHtml":"<p>The emotional health and wellbeing of children and young people continues to be a high priority for my Department.</p><p>The Framework for Children and Young People’s Emotional Health and Wellbeing in Education, and the accompanying Implementation Plan, has enhanced the support provided for pupils during the pandemic, with a focus on promotion, prevention and early intervention, through an integrated approach between Education and Health.</p><p>Supporting strands which have been implemented include the recently launched primary school therapeutic and counselling support pilot, Healthy Happy Minds, a text a nurse service, a new EA Youth Service REACH programme (Resilience Education Assisting Change to Happen), and the CCEA Wellbeing Hub which provides a repository of high quality resources to assist teachers and learners in the area of Wellbeing.</p><p>Programmes planned for 2022 include an expansion to the existing RISE NI programme which is a multi-professional early intervention team currently working in primary schools, an enhanced school nursing pilot and a school staff wellbeing project run by the EA’s Education Psychology Service. Approvals are also being progressed for the ‘Emotional Wellbeing Teams in School’, the Child and Adolescent Mental Health Service (CAMHS led programme) and the EA’s ‘Being Well Doing Well’ programme.</p><p>I can confirm that an additional £5m was made available for another COVID Wellbeing Fund for 2021/22 which has provided dedicated funding to address wellbeing pressures arising as a result of the pandemic. The funding has been distributed directly to all schools (nursery, primary, post primary and special schools), as well as EOTAS (Education Otherwise Than At School) and Youth Settings, giving them flexibility in how they support the mental health and wellbeing of children and young people, and the staff working with them.</p><p>To further support emotional wellbeing during the pandemic DE also introduced the Safer Schools NI App, created by the iNEQE Safeguarding Group, which provides a one-stop-shop digital library of age-appropriate safeguarding resources for schools. The availability of the Safer Schools app is helping to ensure teachers, parents and children and young people have the knowledge they need to keep safe online.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2029549%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=367535","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=367535"}},{"id":"367534","reference":"AQW 29548/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-02-10","answerBy":"2022-02-25","answered":"2022-02-24","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education (i) to outline the mechanisms in place to identify which children should benefit from Targeting Social Need funding and Sure Start funding and; (ii) whether schools are required to spend the funding entirely on pupils from disadvantaged backgrounds.","answerText":"It is a core DE policy to tackle underachievement and promote the raising of standards and equality in all our schools and enable every young person to fulfil his or her potential. At the core of the policy is self-evaluation leading to sustained self-improvement, combined with a formal intervention process for those schools where the quality of education provision is less than satisfactory.\n\nWhilst eligibility for TSN is determined by the number of FSME pupils in a school, there is a strong case for interventions at whole school, year group, class and individual level, depending upon the challenges being faced. Schools are best placed to decide how to use their Targeting Social Need budget.\n\nSure Start services are targeted towards the 25% most disadvantaged geographical areas as per the Northern Ireland Multiple Deprivation Measure (NIMDM), which is the official measure of deprivation in Northern Ireland. Sure Start Services are delivered by 38 Sure Start settings in the targeted areas and are available to children aged 0-3 years, prior to attending school.","answerHtml":"<p>It is a core DE policy to tackle underachievement and promote the raising of standards and equality in all our schools and enable every young person to fulfil his or her potential. At the core of the policy is self-evaluation leading to sustained self-improvement, combined with a formal intervention process for those schools where the quality of education provision is less than satisfactory.</p><p>Whilst eligibility for TSN is determined by the number of FSME pupils in a school, there is a strong case for interventions at whole school, year group, class and individual level, depending upon the challenges being faced. Schools are best placed to decide how to use their Targeting Social Need budget.</p><p>Sure Start services are targeted towards the 25% most disadvantaged geographical areas as per the Northern Ireland Multiple Deprivation Measure (NIMDM), which is the official measure of deprivation in Northern Ireland. Sure Start Services are delivered by 38 Sure Start settings in the targeted areas and are available to children aged 0-3 years, prior to attending school.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2029548%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=367534","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=367534"}},{"id":"369286","reference":"AQO 3157/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2022-02-10","answerBy":"2022-02-22","answered":"2022-02-22","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance for an update on what steps he is taking to ensure community groups, currently eligible for EU funding, do not miss out on the Shared Prosperity Fund.","answerText":"I have been raising this matter with British Government Ministers for two years now. The continued lack of detail on the Shared Prosperity Fund is concerning. The British Government’s engagement to date on EU Structural Fund replacements has been wholly inadequate with a failure to recognise impact of the loss of approximately £80m per annum to spending power here.\n\nI have met with NICVA and a number of community groups who depend on ESF funding to listen to their concerns and update them on my engagement. I continue to seek a greater role for our Departments in this fund. It is essential that the SPF is co-designed and co-delivered, has a substantive role for the Executive, is complementary to other funding streams and aligns with Executive priorities.\n\nI recognise that lack of detail on any replacements for ESF funding is causing significant anxiety for groups. I, and my department will continue to update groups as engagement continues with Whitehall on this fund.\n\nCommunity groups will have the opportunity to bid for EU funding from the upcoming PEACE PLUS Programme.","answerHtml":"<p>I have been raising this matter with British Government Ministers for two years now. The continued lack of detail on the Shared Prosperity Fund is concerning. The British Government’s engagement to date on EU Structural Fund replacements has been wholly inadequate with a failure to recognise impact of the loss of approximately £80m per annum to spending power here.</p><p>I have met with NICVA and a number of community groups who depend on ESF funding to listen to their concerns and update them on my engagement. I continue to seek a greater role for our Departments in this fund. It is essential that the SPF is co-designed and co-delivered, has a substantive role for the Executive, is complementary to other funding streams and aligns with Executive priorities.</p><p>I recognise that lack of detail on any replacements for ESF funding is causing significant anxiety for groups. I, and my department will continue to update groups as engagement continues with Whitehall on this fund.</p><p>Community groups will have the opportunity to bid for EU funding from the upcoming PEACE PLUS Programme.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203157%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=369286","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=369286"}},{"id":"366219","reference":"AQW 29027/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-02-01","answerBy":"2022-02-09","answered":"2022-02-14","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail the businesses that received any of the £1.61million that was provided to 21 businesses for fossil fuel and mineral extraction by Invest NI over the last 5 years.","answerText":"Invest NI uses the UK Standard Industrial Classification (UK SIC) of economic activities to categorise supported business. The sector most relevant to this question is ‘Mining and Quarrying’, and those businesses classified as such have been used to provide this answer. Table 1 below details the businesses, within Mining and Quarrying, which have received the £1.61 million Invest NI assistance. A description of the activity of the business based on SIC codes has also been provided to give more detail.\n\nTable 1 -Invest NI Businesses Assisted Within Mining and Quarrying (2016-17 to 2020-21)\n\nMINING AND QUARRYING\n8.11 - Quarrying of ornamental and building stone, limestone, gypsum, chalk and slate\nJames Stevenson (Quarries) Ltd\nMcGirr Brothers Quarries\nRobinson Quarry Masters Limited\n8.12 - Operation of gravel and sand pits; mining of clays and kaolin\nMilltown Gravel Ltd\nTJC Sand and Gravel Ltd\n8.91 - Mining of chemical and fertilizer minerals\nIrish Wheatgrass Juice Ltd\nNew Gen Agri\nPip Chemicals\n8.92 - Extraction of peat\nBulrush Horticulture Limited\nEvergreen Horticultural Products\nMc. Don Peat Supplies Limited\nMcCann Bros\nSimpro Ireland\nWestland Horticulture Limited\n8.93 - Extraction of salt\nIrish Salt Mining and Exploration Company Limited\nWilson Salt Limited\n8.99 - Other mining and quarrying n.e.c.\nCollen Brothers (Quarries) Limited\nEdentrillick Quarries Limited\nKing Bros Quarry\nM W Johnston & Son Ltd.\nW&J Chambers Concrete Products Ltd\n\nFor the Member’s future reference, Invest NI proactively publishes a full breakdown of financial support offered to every business on the NI Open Data online portal which can be accessed from the following link: Invest NI Open Data).","answerHtml":"<p>Invest NI uses the UK Standard Industrial Classification (UK SIC) of economic activities to categorise supported business. The sector most relevant to this question is ‘Mining and Quarrying’, and those businesses classified as such have been used to provide this answer. Table 1 below details the businesses, within Mining and Quarrying, which have received the £1.61 million Invest NI assistance. A description of the activity of the business based on SIC codes has also been provided to give more detail.</p><p>Table 1 -Invest NI Businesses Assisted Within Mining and Quarrying (2016-17 to 2020-21)</p><div class=\"table-wrap\"><table><tr><td>MINING AND QUARRYING</td></tr><tr><td>8.11 - Quarrying of ornamental and building stone, limestone, gypsum, chalk and slate</td></tr><tr><td>James Stevenson (Quarries) Ltd</td></tr><tr><td>McGirr Brothers Quarries</td></tr><tr><td>Robinson Quarry Masters Limited</td></tr><tr><td>8.12 - Operation of gravel and sand pits; mining of clays and kaolin</td></tr><tr><td>Milltown Gravel Ltd</td></tr><tr><td>TJC Sand and Gravel Ltd</td></tr><tr><td>8.91 - Mining of chemical and fertilizer minerals</td></tr><tr><td>Irish Wheatgrass Juice Ltd</td></tr><tr><td>New Gen Agri</td></tr><tr><td>Pip Chemicals</td></tr><tr><td>8.92 - Extraction of peat</td></tr><tr><td>Bulrush Horticulture Limited</td></tr><tr><td>Evergreen Horticultural Products</td></tr><tr><td>Mc. Don Peat Supplies Limited</td></tr><tr><td>McCann Bros</td></tr><tr><td>Simpro Ireland</td></tr><tr><td>Westland Horticulture Limited</td></tr><tr><td>8.93 - Extraction of salt</td></tr><tr><td>Irish Salt Mining and Exploration Company Limited</td></tr><tr><td>Wilson Salt Limited</td></tr><tr><td>8.99 - Other mining and quarrying n.e.c.</td></tr><tr><td>Collen Brothers (Quarries) Limited</td></tr><tr><td>Edentrillick Quarries Limited</td></tr><tr><td>King Bros Quarry</td></tr><tr><td>M W Johnston &amp; Son Ltd.</td></tr><tr><td>W&amp;J Chambers Concrete Products Ltd</td></tr></table></div><p>For the Member’s future reference, Invest NI proactively publishes a full breakdown of financial support offered to every business on the NI Open Data online portal which can be accessed from the following link: Invest NI Open Data).</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2029027%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=366219","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=366219"}},{"id":"366217","reference":"AQW 29025/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-02-01","answerBy":"2022-02-16","answered":"2022-02-14","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy how many businesses received funding from Invest NI for petroleum licensing in the last 12 months.","answerText":"Invest NI does not fund petroleum licences. Licences are granted by the Department for the Economy (DfE) under the Petroleum (Production) Act (Northern Ireland) 1964.","answerHtml":"<p>Invest NI does not fund petroleum licences. Licences are granted by the Department for the Economy (DfE) under the Petroleum (Production) Act (Northern Ireland) 1964.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2029025%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=366217","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=366217"}},{"id":"366216","reference":"AQW 29024/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-02-01","answerBy":"2022-02-16","answered":"2022-02-14","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy when he intends to bring proposals for petroleum licensing to the Executive.","answerText":"On 31 January 2022 I circulated an Executive paper on future onshore petroleum licensing policy options to Executive colleagues.","answerHtml":"<p>On 31 January 2022 I circulated an Executive paper on future onshore petroleum licensing policy options to Executive colleagues.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2029024%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=366216","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=366216"}},{"id":"365958","reference":"AQW 28956/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-01-31","answerBy":"2022-02-15","answered":"2022-02-14","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what conversations he has had with the First and deputy First Minister to introduce a scheme similar to the Travel Agents (Coronavirus) Financial Assistance Scheme 2021.","answerText":"Throughout the pandemic I have been in regular discussion with both the First Minister and deputy First Ministers regarding support for various sectors of the economy as the need arose for public intervention. The Executive have provided a host of schemes at various stages of the pandemic, including one for Travel Agents administered by TEO.\n\nAt this stage we are well on our way to moving beyond restrictions on business and towards a return to a normal trading environment which is what business clearly want most.","answerHtml":"<p>Throughout the pandemic I have been in regular discussion with both the First Minister and deputy First Ministers regarding support for various sectors of the economy as the need arose for public intervention. The Executive have provided a host of schemes at various stages of the pandemic, including one for Travel Agents administered by TEO.</p><p>At this stage we are well on our way to moving beyond restrictions on business and towards a return to a normal trading environment which is what business clearly want most.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2028956%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=365958","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=365958"}},{"id":"365734","reference":"AQW 28895/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-01-28","answerBy":"2022-02-14","answered":"2022-02-08","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) what approaches have been made to his Department for match funding in relation to European Social Fund projects for the 2022-23 financial year; and (ii) what provision is being made in his Departmental Budget for the 2022-23 financial year to provide match funding to European Social Fund projects during the 2022-23 financial year.","answerText":"A number of stakeholders have engaged with me and my officials on this issue. My Department has pledged £6.3m in match funding for all 67 projects that successfully applied under the ESF extension period in 2022-23. When this Call was launched, we made clear that by providing this 15% contribution to all projects we had exhausted our available budget allocation. The costs being covered include an increase to the rates of reimbursement. As I have previously indicated, this extension was only made possible through the additional national budget secured and applied in 2020-21, enabling us to carry forward the unspent and replaced EU funding in that year. This is not a flexibility that exists for national funds. Therefore, my Department has invested significantly more national funding to these projects than originally planned.\n\nOn top of the EC (50%) and DfE (15%) contributions, projects need to secure an additional £14.7m (35%). Based on the information provided by projects, we understand that c£8m remains outstanding. These projects contribute to the policy objectives of a wide range of bodies and as such, historically, the balance of funding has come from a variety of sources that include other Government departments, Health Trusts and Local Councils as well as other funding organisations.\n\nMy Department did submit a bid to the Department of Finance for £5m in the 2022-25 Budget exercise to meet the anticipated residual gap but this has not been included in the draft DfE Budget allocation. As you are aware, this is currently out for consultation and I would encourage you and the impacted organisations to make appropriate representations.\n\nWhilst the Department of Finance (DoF) leads on the replacement of EU Funding, at official level we continue to engage with DoF and Whitehall colleagues to try to ensure that the UK Shared Prosperity Fund will cover gaps that will be created when the ESF support ends. We have also proactively engaged with the Department for Levelling Up, Housing and Communities on the specific issue of ESF match funding.\n\nWe remain committed to working with projects to reduce scope and scale should they be unable to secure the full amount from other sources.","answerHtml":"<p>A number of stakeholders have engaged with me and my officials on this issue. My Department has pledged £6.3m in match funding for all 67 projects that successfully applied under the ESF extension period in 2022-23. When this Call was launched, we made clear that by providing this 15% contribution to all projects we had exhausted our available budget allocation. The costs being covered include an increase to the rates of reimbursement. As I have previously indicated, this extension was only made possible through the additional national budget secured and applied in 2020-21, enabling us to carry forward the unspent and replaced EU funding in that year. This is not a flexibility that exists for national funds. Therefore, my Department has invested significantly more national funding to these projects than originally planned.</p><p>On top of the EC (50%) and DfE (15%) contributions, projects need to secure an additional £14.7m (35%). Based on the information provided by projects, we understand that c£8m remains outstanding. These projects contribute to the policy objectives of a wide range of bodies and as such, historically, the balance of funding has come from a variety of sources that include other Government departments, Health Trusts and Local Councils as well as other funding organisations.</p><p>My Department did submit a bid to the Department of Finance for £5m in the 2022-25 Budget exercise to meet the anticipated residual gap but this has not been included in the draft DfE Budget allocation. As you are aware, this is currently out for consultation and I would encourage you and the impacted organisations to make appropriate representations.</p><p>Whilst the Department of Finance (DoF) leads on the replacement of EU Funding, at official level we continue to engage with DoF and Whitehall colleagues to try to ensure that the UK Shared Prosperity Fund will cover gaps that will be created when the ESF support ends. We have also proactively engaged with the Department for Levelling Up, Housing and Communities on the specific issue of ESF match funding.</p><p>We remain committed to working with projects to reduce scope and scale should they be unable to secure the full amount from other sources.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2028895%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=365734","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=365734"}},{"id":"365733","reference":"AQW 28894/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-01-28","answerBy":"2022-02-14","answered":"2022-03-25","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health (i) what approaches have been made to his Department for match funding in relation to European Social Fund projects for the 2022-23 financial year; and (ii) what provision is being made in his Departmental Budget for the 2022-23 financial year to provide match funding to European Social Fund projects during the 2022-23 financial year.","answerText":"For over three decades, the European Social Fund (ESF) Programme, funded by the European Commission, has been a key source of funding for disadvantaged people. This includes the long-term unemployed, ex-offenders, young people not in education, employment or training (NEETS), and people with a disability.\n\nThe ESF has enabled people with a wide range of disabilities to access and stay in supported employment. This has helped Trusts to meet their strategic priorities as set out in the draft Programme for government Framework and related regional health and social care service delivery models.\n\nThe Fund has been due to finish at the end of March 2022, however the programme has been extended under ESF Call 3 until 31st March 2023, dependent on organisations securing the necessary match funding. Beyond this, arrangements post-ESF remain unclear - including the role of the UK Shared Prosperity Fund as its replacement.\n\nThe total value of ESF projects that specifically support the disability sector is £15.6m, supporting 21 individual projects.\n\nThe majority of projects have sufficient match funding in place to proceed post 01 April 2022, however I understand that a small number still have match funding gaps. All have a minimum of 81% of the funding in place and could be scaled back if absolutely necessary.","answerHtml":"<p>For over three decades, the European Social Fund (ESF) Programme, funded by the European Commission, has been a key source of funding for disadvantaged people. This includes the long-term unemployed, ex-offenders, young people not in education, employment or training (NEETS), and people with a disability.</p><p>The ESF has enabled people with a wide range of disabilities to access and stay in supported employment. This has helped Trusts to meet their strategic priorities as set out in the draft Programme for government Framework and related regional health and social care service delivery models.</p><p>The Fund has been due to finish at the end of March 2022, however the programme has been extended under ESF Call 3 until 31st March 2023, dependent on organisations securing the necessary match funding. Beyond this, arrangements post-ESF remain unclear - including the role of the UK Shared Prosperity Fund as its replacement.</p><p>The total value of ESF projects that specifically support the disability sector is £15.6m, supporting 21 individual projects.</p><p>The majority of projects have sufficient match funding in place to proceed post 01 April 2022, however I understand that a small number still have match funding gaps. All have a minimum of 81% of the funding in place and could be scaled back if absolutely necessary.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2028894%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=365733","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=365733"}},{"id":"365232","reference":"AQW 28721/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-01-26","answerBy":"2022-02-10","answered":"2022-02-03","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance to detail what steps he is taking to ensure community groups, currently eligible for EU funding, do not miss out on the Shared Prosperity Fund.","answerText":"There has been minimal information shared by the British Government on the Shared Prosperity Fund. We have been excluded from the policy development and design of the fund, which is likely to be delivered centrally by Whitehall, bypassing the Executive and transferring spending power from our Assembly and Executive to Whitehall.\n\nI have been consistently seeking clarity from the British Government on replacement funding and I have met and engaged with several groups impacted by this issue and I am giving voice to their concerns in my engagement with Whitehall on this matter.\n\nI am working to try and secure a substantive and meaningful role for the Executive in the design and delivery of the Shared Prosperity fund to ensure that it delivers effectively for all of our citizens, particularly the most vulnerable in our society.\n\nIt is clear no longer having access to EU Funds and the lack of detail on replacements will impact these groups negatively and there is little we can do to mitigate that impact as long as the British Government continue to withhold replacement funding.","answerHtml":"<p>There has been minimal information shared by the British Government on the Shared Prosperity Fund. We have been excluded from the policy development and design of the fund, which is likely to be delivered centrally by Whitehall, bypassing the Executive and transferring spending power from our Assembly and Executive to Whitehall.</p><p>I have been consistently seeking clarity from the British Government on replacement funding and I have met and engaged with several groups impacted by this issue and I am giving voice to their concerns in my engagement with Whitehall on this matter.</p><p>I am working to try and secure a substantive and meaningful role for the Executive in the design and delivery of the Shared Prosperity fund to ensure that it delivers effectively for all of our citizens, particularly the most vulnerable in our society.</p><p>It is clear no longer having access to EU Funds and the lack of detail on replacements will impact these groups negatively and there is little we can do to mitigate that impact as long as the British Government continue to withhold replacement funding.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2028721%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=365232","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=365232"}},{"id":"365230","reference":"AQW 28719/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-01-26","answerBy":"2022-02-10","answered":"2022-02-24","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities whether his Department is considering any further financial support for freelance workers in creative industries who have been impacted by the restrictions on the hospitality industry as a result of the COVID-19 Omicron variant.","answerText":"In September, I acted on the recommendation of the Culture Arts and Heritage Recovery Taskforce and launched the Creative Individuals Recovery Programme. This provided awards of up to £2,000 to help creative freelance and self-employed individuals reactivate, or enhance their trade, vocation or profession within the creative economy.\n\nI am pleased to say that 1433 people received just under £3 million.","answerHtml":"<p>In September, I acted on the recommendation of the Culture Arts and Heritage Recovery Taskforce and launched the Creative Individuals Recovery Programme. This provided awards of up to £2,000 to help creative freelance and self-employed individuals reactivate, or enhance their trade, vocation or profession within the creative economy.</p><p>I am pleased to say that 1433 people received just under £3 million.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2028719%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=365230","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=365230"}},{"id":"365229","reference":"AQW 28718/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-01-26","answerBy":"2022-02-10","answered":"2022-02-24","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities what steps she is taking to provide support to freelance workers in creative industries within the hospitality sector who have been affected by the Omicron variant and the associated restrictions.","answerText":"In September, I acted on the recommendation of the Culture Arts and Heritage Recovery Taskforce and launched the Creative Individuals Recovery Programme. This provided awards of up to £2,000 to help creative freelance and self-employed individuals reactivate, or enhance their trade, vocation or profession within the creative economy.\n\nI am pleased to say that 1433 people received just under £3 million.","answerHtml":"<p>In September, I acted on the recommendation of the Culture Arts and Heritage Recovery Taskforce and launched the Creative Individuals Recovery Programme. This provided awards of up to £2,000 to help creative freelance and self-employed individuals reactivate, or enhance their trade, vocation or profession within the creative economy.</p><p>I am pleased to say that 1433 people received just under £3 million.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2028718%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=365229","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=365229"}},{"id":"364939","reference":"AQW 28634/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-01-25","answerBy":"2022-02-09","answered":"2022-02-01","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy why he did not make a bid to the Minister of Finance for support for businesses in the hospitality industry which are not currently eligible for support under the Omicron Hospitality Payment Scheme, but have been affected by the Omicron COVID-19 variant and associated restrictions.","answerText":"Whilst the Omicron Hospitality Payment scheme agreed by the Executive before Christmas was warmly welcomed, there was huge disappointment and frustration that hotels were excluded.\n\nI always maintained that hotels should be included as they faced the same challenges as those businesses which were eligible for support. I wrote to the Finance Minister on two occasions urging him to extend the scheme to the hotel sector.\n\nI am delighted that the Executive has now agreed to extend the scheme thereby providing much needed support to this vital industry.\n\nThis payment will be between £10,000 and £20,000 dependent on the rateable value of the property.","answerHtml":"<p>Whilst the Omicron Hospitality Payment scheme agreed by the Executive before Christmas was warmly welcomed, there was huge disappointment and frustration that hotels were excluded.</p><p>I always maintained that hotels should be included as they faced the same challenges as those businesses which were eligible for support. I wrote to the Finance Minister on two occasions urging him to extend the scheme to the hotel sector.</p><p>I am delighted that the Executive has now agreed to extend the scheme thereby providing much needed support to this vital industry.</p><p>This payment will be between £10,000 and £20,000 dependent on the rateable value of the property.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2028634%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=364939","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=364939"}},{"id":"364938","reference":"AQW 28633/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-01-25","answerBy":"2022-02-09","answered":"2022-01-28","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy when he intends to bring policy options on the future of onshore petroleum licensing to the Executive.","answerText":"I hope to bring policy options on the future of onshore petroleum licensing to the Executive soon. Following the Executive’s decision, a public consultation will be undertaken on the Executive’s preferred policy option.","answerHtml":"<p>I hope to bring policy options on the future of onshore petroleum licensing to the Executive soon. Following the Executive’s decision, a public consultation will be undertaken on the Executive’s preferred policy option.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2028633%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=364938","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=364938"}},{"id":"364937","reference":"AQW 28632/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-01-25","answerBy":"2022-02-09","answered":"2022-02-14","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy when he intends to bring proposals on the future of the Non-Domestic Renewable Heat Incentive Scheme to the Executive for agreement.","answerText":"I have brought proposals on the future of the Non-Domestic RHI Scheme to the Executive for consideration. No decision has been taken.","answerHtml":"<p>I have brought proposals on the future of the Non-Domestic RHI Scheme to the Executive for consideration. No decision has been taken.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2028632%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=364937","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=364937"}},{"id":"364478","reference":"AQO 3037/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2022-01-20","answerBy":"2022-01-31","answered":"2022-01-31","answeredOrally":true,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health whether he will consider expanding the role of the Northern Ireland Fire and Rescue Service as first responders in life-threatening situations, to support the ambulance service in rural areas.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr Swann","text":"First, I take this opportunity to express my heartfelt condolences to the friends and family of little Maggie Black. One can only but imagine the sense of shock and loss that her family and the wider Carnlough community have experienced over these last two months. In their grief, however, they still find the strength to campaign for greater emergency medical cover in rural communities. I am sure that I speak for all in the House when I commend them for their efforts and selfless determination. In response to the question, I am pleased that there has been much greater collaboration between healthcare providers and the Northern Ireland Fire and Rescue Service over recent times. One of the most recent examples of that was firefighters providing driving assistance to the Ambulance Service in light of sustained workforce pressures. Do I believe that there could be greater collaboration? Yes, I do. Members may be aware that the Fire and Rescue Service was involved in a co-responder pilot in which crews were dispatched to cardiac arrest calls. That pilot proved successful in improving response times, and, last year, I asked that the possibility of its further roll-out be explored. The recent loss has brought the need for that into sharp focus and has brought a renewed sense of determination on my part. Although there is still some final work to be done, I hope to be able to announce details in the very near future."},{"speaker":"Mr Dickson","text":"Thank you, Minister. Have you reached out to Maggie Black's family and friends in respect of the meeting that they would like to have with you to explore these issues? Following on from your answer, I call on you to put that co-responder trial on a secure footing so that we can deliver a co-responder service not only in rural areas but in any area of Northern Ireland where it is relevant for the Northern Ireland Fire and Rescue Service and the Northern Ireland Ambulance Service to do that together. Can we also ensure that there is a great deal of upskilling?"},{"speaker":"Mr Swann","text":"I thank the Member. I recently received an invitation to meet the family. I am willing to take up that invitation, and, if the Member wants to get in touch with my office, we can coordinate something at that point. As I said, the Ambulance Service previously engaged with the Fire and Rescue Service in a co-responder pilot in which fire crews were dispatched to cardiac arrest calls in the catchment areas of fire stations. That proved successful in improving responses, but further engagement with the Fire Brigades Union was required before it could be adopted more widely. In November of last year, Northern Ireland Ambulance Service's senior management held a meeting with their counterparts in the Northern Ireland Fire and Rescue Service to explore how that could be rolled out across all of Northern Ireland. Discussions between the Northern Ireland Fire and Rescue Service, Northern Ireland Ambulance Service and representative bodies for collaboration in an emergency medical response are ongoing. I will meet the Northern Ireland Fire and Rescue Service's Chief Fire Officer and chair early next month."},{"speaker":"Mr Butler","text":"I would like to add my name to those offering condolences to the family of Maggie Black. They have suffered and put their grief into good work to try to see this through. I am sure that the Minister agrees with me that, having been an early responder to emergency incidents for many years, the Northern Ireland Fire and Rescue Service has had its hands on victims of many different types of incident. Does the Minister agree that, using the learning from the first-class response that it has provided for Northern Ireland over the last 20 or 30 years, many aspects of collaboration could be explored through this potential arrangement?"},{"speaker":"Mr Swann","text":"I thank the Member for his question. As he is aware, one of the things that makes Northern Ireland unique is the fact that the Northern Ireland Fire and Rescue Service sits under the Department of Health. When I engage with the chair of the service or the Chief Fire and Rescue Officer, they see a natural fit for their services, and they see what they can do additionally by being part of the first response amongst our community responders. As I said, we have engaged with them. The Northern Ireland Ambulance Service also dispatches multiple community responder schemes across Northern Ireland. We want to work closely with it in order to make sure that there is synergy in the services and supports that the Northern Ireland Fire and Rescue Service provides to its counterparts and compatriots in the Northern Ireland Ambulance Service."},{"speaker":"Mr McGrath","text":"I welcome the answers that the Minister has given so far about what seems to be quite a logical process. In my area, through no fault of the Ambulance Service, you could be waiting for up to 18 or 20 minutes for an ambulance to arrive in a 999 scenario, yet there are part-time fire stations that could have six paramedics rolling out within a matter of minutes. Does the Minister have any understanding of the work of the Dublin fire and rescue service, where that co-response already exists? I am meeting the Chief Fire Officer in Dublin on Friday. If the Minister felt that it were useful, we could have some follow-up meetings with departmental officials to try to roll the measure out."},{"speaker":"Mr Swann","text":"I have had engagement about taking it forward with our new Chief Fire and Rescue Officer, who is a driving force behind the additional services that the Northern Ireland Fire and Rescue Service could provide. He brings experience from previous roles, and he understands the challenges, opportunities and additionality in what the Northern Ireland Fire and Rescue Service can provide. Those conversations are ongoing. As I indicated, I will meet the Northern Ireland Fire and Rescue Service Chief Fire and Rescue Officer and chair next month."},{"speaker":"Ms Á Murphy","text":"Minister, rural communities are experiencing a significant deficit of public services, not least in life-saving services. What plans does your Department have to address the lack of fire cover and ambulance provision in rural areas?"},{"speaker":"Mr Swann","text":"The Member may or may not be aware that the Northern Ireland Fire and Rescue Service has a public consultation out about how it restructures its management sector. It is looking to map that on to our local councils, which was not done when the new councils were set up. There is a consultation out so that the Northern Ireland Fire and Rescue Service can also follow those boundaries. \"Coterminosity\" was a great word that was used at the time. It seems to have slipped, but the Northern Ireland Fire and Rescue Service is progressing it."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203037%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=364478","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2022-01-31&docID=365157#AQO%203037/17-22","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=364478"}},{"id":"364115","reference":"AQW 28196/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-01-18","answerBy":"2022-02-02","answered":"2022-01-24","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health (i) how many green sites have been developed in healthcare settings; (ii) where these sites are located; and (iii) for his assessment of how successful they have been.","answerText":"The Elective Care Framework published on 15 June 21 committed that Belfast City Hospital and Lagan Valley Hospital (LVH) would remain as elective (‘green’) sites serving the region with every effort made to keep elected care services entirely separate from any exposure to Covid-19.\n\nThe Day Procedure Centre (DPC) at LVH for example is working extremely well, supporting a range of specialties from across the region to undertake the most urgent clinical day cases. Clinical teams are also delivering cataract operations on a regional basis at the Downe Hospital, South Tyrone and the Mid-Ulster Hospital. Work is also underway to deliver regional day procedure lists at Omagh although this will be dependent on available staffing.\n\nWork continues to develop further designated ‘green’ sites and ‘green pathways’ across the HSC for delivery of elective care in the safest and most efficient manner possible.\n\nHowever in order for ‘green’ sites and pathways to work sustainably and effectively they need to be adequately staffed and COVID continues to have a serious impact on capacity in the system.","answerHtml":"<p>The Elective Care Framework published on 15 June 21 committed that Belfast City Hospital and Lagan Valley Hospital (LVH) would remain as elective (‘green’) sites serving the region with every effort made to keep elected care services entirely separate from any exposure to Covid-19.</p><p>The Day Procedure Centre (DPC) at LVH for example is working extremely well, supporting a range of specialties from across the region to undertake the most urgent clinical day cases. Clinical teams are also delivering cataract operations on a regional basis at the Downe Hospital, South Tyrone and the Mid-Ulster Hospital. Work is also underway to deliver regional day procedure lists at Omagh although this will be dependent on available staffing.</p><p>Work continues to develop further designated ‘green’ sites and ‘green pathways’ across the HSC for delivery of elective care in the safest and most efficient manner possible.</p><p>However in order for ‘green’ sites and pathways to work sustainably and effectively they need to be adequately staffed and COVID continues to have a serious impact on capacity in the system.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2028196%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=364115","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=364115"}},{"id":"364114","reference":"AQW 28195/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-01-18","answerBy":"2022-02-02","answered":"2022-01-26","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health how much waiting list initiative funding has been made available to each Health and Social Care Trust to enable them to provide additional clinics.","answerText":"£90m non-recurrent funding has been made available to Health and Social Care Trusts (HSCTs) in 2021/22 to help reduce waiting times for outpatient assessments, diagnostic tests and treatments. This funding has been used to secure additional capacity, both in-house and in the independent sector, across a range of elective specialties.\n\nThe breakdown of allocation to each HSCT is outlined in the following table:\n\nTrust\t2021/22\nTotal £m\nBHSCT\t32.89\nNHSCT\t9.77\nSEHSCT\t21.54\nSHSCT\t11.13\nWHSCT\t12.40\nTotal Non-recurrent\t87.74\n\nThe balance of the available funding (i.e. £2.26m) is being utilised on a regional basis to undertake endoscopy procedures and to enable a range of outpatient assessments and day case procedures to be undertaken in primary care settings.","answerHtml":"<p>£90m non-recurrent funding has been made available to Health and Social Care Trusts (HSCTs) in 2021/22 to help reduce waiting times for outpatient assessments, diagnostic tests and treatments. This funding has been used to secure additional capacity, both in-house and in the independent sector, across a range of elective specialties.</p><p>The breakdown of allocation to each HSCT is outlined in the following table:</p><div class=\"table-wrap\"><table><tr><td>Trust</td><td>2021/22</td></tr><tr><td></td><td>Total £m</td></tr><tr><td>BHSCT</td><td>32.89</td></tr><tr><td>NHSCT</td><td>9.77</td></tr><tr><td>SEHSCT</td><td>21.54</td></tr><tr><td>SHSCT</td><td>11.13</td></tr><tr><td>WHSCT</td><td>12.40</td></tr><tr><td>Total Non-recurrent</td><td>87.74</td></tr></table></div><p>The balance of the available funding (i.e. £2.26m) is being utilised on a regional basis to undertake endoscopy procedures and to enable a range of outpatient assessments and day case procedures to be undertaken in primary care settings.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2028195%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=364114","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=364114"}},{"id":"364113","reference":"AQW 28194/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-01-18","answerBy":"2022-02-02","answered":"2022-01-25","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health how many intensive care unit beds are protected for (i) complex surgery; and (ii) use in the independent sector.","answerText":"Critical care capacity across Northern Ireland hospitals is usually maintained at a steady state of 88 ICU beds. The latest critical care surge plan outlines how each critical care unit will increase ICU beds from the baseline of 88 to a maximum total of 119. Each level of surge has a nominal number of ICU beds assigned for unscheduled care including winter pressures, COVID-19 and time-critical / sensitive elective surgery.\n\nCritical care capacity for complex surgery is modelled as requiring a maximum of 17 beds throughout Northern Ireland. This is therefore the maximum number of ICU beds nominally earmarked for this purpose. This capacity does not include Post Anaesthetic Care Unit (PACU) capacity of between 4-6 beds in Belfast Trust which also manages complex patients.\n\nIt should be noted that not all complex surgery presents on the elective pathway, as there are considerable number of patients receiving surgery that present via emergency departments. However, there is a process in place which books beds for elective patients that may need capacity in a critical care bed.\n\nWe do not currently use Critical Care capacity outside Trust facilities.","answerHtml":"<p>Critical care capacity across Northern Ireland hospitals is usually maintained at a steady state of 88 ICU beds. The latest critical care surge plan outlines how each critical care unit will increase ICU beds from the baseline of 88 to a maximum total of 119. Each level of surge has a nominal number of ICU beds assigned for unscheduled care including winter pressures, COVID-19 and time-critical / sensitive elective surgery.</p><p>Critical care capacity for complex surgery is modelled as requiring a maximum of 17 beds throughout Northern Ireland. This is therefore the maximum number of ICU beds nominally earmarked for this purpose. This capacity does not include Post Anaesthetic Care Unit (PACU) capacity of between 4-6 beds in Belfast Trust which also manages complex patients.</p><p>It should be noted that not all complex surgery presents on the elective pathway, as there are considerable number of patients receiving surgery that present via emergency departments. However, there is a process in place which books beds for elective patients that may need capacity in a critical care bed.</p><p>We do not currently use Critical Care capacity outside Trust facilities.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2028194%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=364113","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=364113"}},{"id":"364112","reference":"AQW 28193/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-01-18","answerBy":"2022-02-02","answered":"2022-01-24","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health when the Cancer Strategy for Northern Ireland 2021-2031 will be published.","answerText":"The new 10 year Northern Ireland (NI) cancer strategy is currently being finalised following a review of the responses received during the consultation period. It is due to be published in early February. Its overall aim is to ensure that everyone in NI has equitable and timely access to the most effective, evidence-based referral, diagnosis, treatment, support and person centred cancer care.","answerHtml":"<p>The new 10 year Northern Ireland (NI) cancer strategy is currently being finalised following a review of the responses received during the consultation period. It is due to be published in early February. Its overall aim is to ensure that everyone in NI has equitable and timely access to the most effective, evidence-based referral, diagnosis, treatment, support and person centred cancer care.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2028193%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=364112","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=364112"}},{"id":"363652","reference":"AQW 28022/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-01-14","answerBy":"2022-01-31","answered":"2022-01-21","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health when Phase 2 of the £500 HSC Special Recognition Payment will begin.","answerText":"At this stage I am unable to provide you with a definitive date but would like to reassure you that work is ongoing to finalise the arrangements for Phase 2. Details will be communicated shortly to all Independent Sector care home and domiciliary care providers registered with the RQIA.\n\nI remain committed to ensuring that all necessary actions are taken and options explored to allow independent care staff who qualify under the eligibility criteria to receive the recognition payment as soon as practicable.","answerHtml":"<p>At this stage I am unable to provide you with a definitive date but would like to reassure you that work is ongoing to finalise the arrangements for Phase 2. Details will be communicated shortly to all Independent Sector care home and domiciliary care providers registered with the RQIA.</p><p>I remain committed to ensuring that all necessary actions are taken and options explored to allow independent care staff who qualify under the eligibility criteria to receive the recognition payment as soon as practicable.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2028022%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=363652","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=363652"}},{"id":"363651","reference":"AQW 28021/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-01-14","answerBy":"2022-01-31","answered":"2022-02-01","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health when he will implement the use of Cytosponge to identify oesophageal conditions such as Barret's oesophagus.","answerText":"Officials at the Health and Social Care Board are aware of recent trials on the use of Cytosponge for early detection of Barrett's oesophagus and oesophageal cancer showing positive results. Therefore decisions to commission the test will be guided by evidence and will be considered alongside other cancer priorities and in the context of the available resource.\n\nIn contributing towards evidence on use of Cytosponge all Trusts have enrolled in the DELTA study developed by University of Cambridge.\n\nIt is intended that Northern Ireland will join the research arm for patients with known Barrett’s Oesophagus (risk factor of Oesophageal cancer) who would usually have endoscopic surveillance. For these individuals Cytosponge test will provide information on their risk through use of additional biomarkers and can be used to help prioritise patients for endoscopy.\n\nHowever due to COVID 19 and significant unscheduled care pressures on the service and nursing capacity, planning for DELTA has been paused in agreement with the DELTA team at Cambridge. The position is to be evaluated again early February (patients can be recruited until Dec 22). Full trust participation in the DELTA project will be funding dependent.\n\nI remain fully committed to the improvement of cancer outcomes through early detection and this is a focus of the upcoming Cancer Strategy due to be published next month.","answerHtml":"<p>Officials at the Health and Social Care Board are aware of recent trials on the use of Cytosponge for early detection of Barrett&#39;s oesophagus and oesophageal cancer showing positive results. Therefore decisions to commission the test will be guided by evidence and will be considered alongside other cancer priorities and in the context of the available resource.</p><p>In contributing towards evidence on use of Cytosponge all Trusts have enrolled in the DELTA study developed by University of Cambridge.</p><p>It is intended that Northern Ireland will join the research arm for patients with known Barrett’s Oesophagus (risk factor of Oesophageal cancer) who would usually have endoscopic surveillance. For these individuals Cytosponge test will provide information on their risk through use of additional biomarkers and can be used to help prioritise patients for endoscopy.</p><p>However due to COVID 19 and significant unscheduled care pressures on the service and nursing capacity, planning for DELTA has been paused in agreement with the DELTA team at Cambridge. The position is to be evaluated again early February (patients can be recruited until Dec 22). Full trust participation in the DELTA project will be funding dependent.</p><p>I remain fully committed to the improvement of cancer outcomes through early detection and this is a focus of the upcoming Cancer Strategy due to be published next month.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2028021%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=363651","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=363651"}},{"id":"363650","reference":"AQW 28020/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-01-14","answerBy":"2022-01-31","answered":"2022-02-25","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education for an update on (i) maintenance plans; and (ii) replacement plans for schools in East Antrim.","answerText":"Information relating to maintenance within the East Antrim area schools will take the Education Authority some time to collate. I have asked my Estate Operations Team to forward this information to you as soon as it is received.\n\nThere are two new build capital projects in East Antrim:\n\nSt Killian’s College - formed by the amalgamation of St MacNissi’s College, St Comgall’s College and St Aloysius High School; and\n\nIslandmagee Primary School - formed by the amalgamation of Kilcoan and Mullaghdubh Primary Schools.\n\nThere are four schools in East Antrim advancing in design under the second call to the School Enhancement Programme (SEP):\n\nRoddensvale School;\n\nThornfield House School ;\n\nSchool, Carrickfergus Grammar School; and\n\nGreenisland Primary.\n\nUlidia Integrated College which was announced to proceed in planning in March 2016 under the Fresh Start Agreement is due to commence on site spring 2022. This will provide a post-primary school accommodating 700 pupils at an overall estimated investment £25m.","answerHtml":"<p>Information relating to maintenance within the East Antrim area schools will take the Education Authority some time to collate. I have asked my Estate Operations Team to forward this information to you as soon as it is received.</p><p>There are two new build capital projects in East Antrim:</p><p>St Killian’s College - formed by the amalgamation of St MacNissi’s College, St Comgall’s College and St Aloysius High School; and</p><p>Islandmagee Primary School - formed by the amalgamation of Kilcoan and Mullaghdubh Primary Schools.</p><p>There are four schools in East Antrim advancing in design under the second call to the School Enhancement Programme (SEP):</p><p>Roddensvale School;</p><p>Thornfield House School ;</p><p>School, Carrickfergus Grammar School; and</p><p>Greenisland Primary.</p><p>Ulidia Integrated College which was announced to proceed in planning in March 2016 under the Fresh Start Agreement is due to commence on site spring 2022. This will provide a post-primary school accommodating 700 pupils at an overall estimated investment £25m.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2028020%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=363650","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=363650"}},{"id":"365658","reference":"AQO 3004/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2022-01-13","answerBy":"2022-01-24","answered":"2022-01-25","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what action he is taking to assist those people who have ongoing issues with, or have not received, their High Street Scheme card.","answerText":"The High Street Scheme closed on 7th January 2022. My Department is currently exploring options for providing a remedy payment to verified applicants who did not receive their Spend Local pre-paid card before the scheme closure date or who had difficulty activating or using their card.","answerHtml":"<p>The High Street Scheme closed on 7th January 2022. My Department is currently exploring options for providing a remedy payment to verified applicants who did not receive their Spend Local pre-paid card before the scheme closure date or who had difficulty activating or using their card.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203004%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=365658","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=365658"}},{"id":"363467","reference":"AQO 2990/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2022-01-13","answerBy":"2022-01-24","answered":null,"answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister to outline which of their Department’s New Decade, New Approach commitments, that should have been implemented in this mandate, remain outstanding.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202990%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=363467","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=363467"}},{"id":"363297","reference":"AQW 27871/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-01-12","answerBy":"2022-01-27","answered":"2022-01-31","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what his Department is doing to support hospitality businesses not currently eligible for the Omicron Hospitality Payment.","answerText":"Whilst the Omicron Hospitality Payment scheme agreed by the Executive before Christmas was warmly welcomed, there was huge disappointment and frustration that hotels were excluded.\n\nI always maintained that hotels should have been included as they faced the same challenges as those businesses which were eligible for support. I wrote to the Finance Minister on two occasions urging him to extend the scheme to the hotel sector.\n\nI am delighted that the Executive has now agreed to extend the scheme to the hotel sector thereby providing much needed support to this vital industry.\n\nThis payment will be between £10,000 and £20,000 dependent on the rateable value of the property.","answerHtml":"<p>Whilst the Omicron Hospitality Payment scheme agreed by the Executive before Christmas was warmly welcomed, there was huge disappointment and frustration that hotels were excluded.</p><p>I always maintained that hotels should have been included as they faced the same challenges as those businesses which were eligible for support. I wrote to the Finance Minister on two occasions urging him to extend the scheme to the hotel sector.</p><p>I am delighted that the Executive has now agreed to extend the scheme to the hotel sector thereby providing much needed support to this vital industry.</p><p>This payment will be between £10,000 and £20,000 dependent on the rateable value of the property.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2027871%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=363297","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=363297"}},{"id":"363295","reference":"AQW 27869/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-01-12","answerBy":"2022-01-27","answered":"2022-02-15","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on the Apprenticeship NI HGV pilot scheme.","answerText":"I am unclear on what the Member is referring to.\n\nHowever, Level 2 Driving Goods Vehicles and Level 3 Driving Goods Vehicles apprenticeship frameworks are already available through the ApprenticeshipsNI programme for eligible applicants.\n\nBoth apprenticeship frameworks include knowledge-based and competence-based qualifications in driving a range of goods vehicles including articulated vehicles. Skills that require mandatory training, such as HGV licensing, are not funded or delivered by the Department for the Economy.","answerHtml":"<p>I am unclear on what the Member is referring to.</p><p>However, Level 2 Driving Goods Vehicles and Level 3 Driving Goods Vehicles apprenticeship frameworks are already available through the ApprenticeshipsNI programme for eligible applicants.</p><p>Both apprenticeship frameworks include knowledge-based and competence-based qualifications in driving a range of goods vehicles including articulated vehicles. Skills that require mandatory training, such as HGV licensing, are not funded or delivered by the Department for the Economy.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2027869%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=363295","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=363295"}},{"id":"363294","reference":"AQW 27868/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2022-01-12","answerBy":"2022-01-27","answered":"2022-02-04","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on the fully funded, open to all, HGV scheme which was expected to be available at the end of 2021.","answerText":"The existing Level 2 Driving Goods Vehicles and Level 3 Driving Goods Vehicles apprenticeship frameworks were to be included in the proposed extension of the ApprenticeshipsNI programme to all ages.\n\nHowever, the inescapable resource pressures that my Department now faces as a result of the Draft Budget 2022-2025, which proposes real terms cuts to the Department’s baseline totalling £259 million across the three years, means that initiatives such as all age apprenticeships, which will require additional funding, cannot be progressed at this time.","answerHtml":"<p>The existing Level 2 Driving Goods Vehicles and Level 3 Driving Goods Vehicles apprenticeship frameworks were to be included in the proposed extension of the ApprenticeshipsNI programme to all ages.</p><p>However, the inescapable resource pressures that my Department now faces as a result of the Draft Budget 2022-2025, which proposes real terms cuts to the Department’s baseline totalling £259 million across the three years, means that initiatives such as all age apprenticeships, which will require additional funding, cannot be progressed at this time.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2027868%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=363294","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=363294"}},{"id":"361826","reference":"AQW 27467/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-12-15","answerBy":"2022-01-05","answered":"2022-01-17","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities what plans are in place to deal with the rising number of homeless people placed in temporary accommodation.","answerText":"The Housing Executive has statutory responsibility for responding to Homelessness.\n\nThe Housing Executive’s strategic priorities to respond to homelessness are outlined in the Homelessness Strategy 2017-22 (https://www.nihe.gov.uk/Documents/Homelessness/homelessness-strategy-northern-ireland-2017-2022.aspx?ext=.) and Chronic Homelessness Action Plan (https://www.nihe.gov.uk/Documents/Chronic-homelessness/Chronic-Homelessness-Action-Plan.aspx)\n\nThe Housing Executive has also continued to deliver actions outlined in its Covid-19 Reset Plan (https://www.nihe.gov.uk/Documents/Homelessness/homelessness-reset-plan-the-way-home.aspx?ext=.) published in November 2020. The Reset Plan outlines a range of priorities across the themes of rough sleeping, temporary accommodation, homelessness prevention, homelessness services and collaborative working to continue to support the most vulnerable in society as we emerge from the pandemic.\n\nIn addition, the Housing Executive is currently consulting on both the draft Homelessness Strategy 2022-27 (https://www.nihe.gov.uk/Documents/Consultation-Draft-Homelessness-Strategy-2022-27/Ending-Homelessness-Together-draft-strategy-2022-2.aspx) which has recently been published and also on Homeless to Home, a draft Strategic Action Plan for Temporary Accommodation (https://www.nihe.gov.uk/Documents/Consultation-Draft-Homelessness-Strategy-2022-27/Ending-Homelessness-Together-draft-strategy-2022-2.aspx.) In line with their statutory duty, the Housing Executive will publish a revised version of the Homelessness Strategy 2022-27 in April 2022.\n\nThe Housing Executive continues to work closely with the Department and its housing association delivery partners to increase the levels of new social housing, address housing need generally and reduce the number of Full Duty Applicants being placed in temporary accommodation.","answerHtml":"<p>The Housing Executive has statutory responsibility for responding to Homelessness.</p><p>The Housing Executive’s strategic priorities to respond to homelessness are outlined in the Homelessness Strategy 2017-22 (https://www.nihe.gov.uk/Documents/Homelessness/homelessness-strategy-northern-ireland-2017-2022.aspx?ext=.) and Chronic Homelessness Action Plan (https://www.nihe.gov.uk/Documents/Chronic-homelessness/Chronic-Homelessness-Action-Plan.aspx)</p><p>The Housing Executive has also continued to deliver actions outlined in its Covid-19 Reset Plan (https://www.nihe.gov.uk/Documents/Homelessness/homelessness-reset-plan-the-way-home.aspx?ext=.) published in November 2020. The Reset Plan outlines a range of priorities across the themes of rough sleeping, temporary accommodation, homelessness prevention, homelessness services and collaborative working to continue to support the most vulnerable in society as we emerge from the pandemic.</p><p>In addition, the Housing Executive is currently consulting on both the draft Homelessness Strategy 2022-27 (https://www.nihe.gov.uk/Documents/Consultation-Draft-Homelessness-Strategy-2022-27/Ending-Homelessness-Together-draft-strategy-2022-2.aspx) which has recently been published and also on Homeless to Home, a draft Strategic Action Plan for Temporary Accommodation (https://www.nihe.gov.uk/Documents/Consultation-Draft-Homelessness-Strategy-2022-27/Ending-Homelessness-Together-draft-strategy-2022-2.aspx.) In line with their statutory duty, the Housing Executive will publish a revised version of the Homelessness Strategy 2022-27 in April 2022.</p><p>The Housing Executive continues to work closely with the Department and its housing association delivery partners to increase the levels of new social housing, address housing need generally and reduce the number of Full Duty Applicants being placed in temporary accommodation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2027467%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=361826","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=361826"}},{"id":"361825","reference":"AQW 27466/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-12-15","answerBy":"2022-01-05","answered":"2021-12-22","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure, further to the Young Persons' Free Bus Travel Scheme in Scotland, whether the Minister plans to introduce a similar scheme to incentivise sustainable travel.","answerText":"I recognise that children and young people use public transport to access education, training, employment and to maintain social connections. My Department already supports half fare travel on public transport services in Northern Ireland for those aged 5-16 under the Northern Ireland Concessionary Fares Scheme. Other discounted tickets are available for young people. The Translink y-link card is a smart card for all 16-23 years olds using Translink services within Northern Ireland. This card offers 1/3 off Translink bus and rail travel in Northern Ireland and up to 50% off the Enterprise tickets. Also available is the 24+ Student Railcard for those in full time education which enables those over the age of 24 to receive up to 1/3 off rail fares. I recognise that these discounts do not match those being offered in Scotland under the Young Person’s Free Travel Bus Scheme but concessions are available on both bus and rail services here.\n\nI very much recognise the multiple benefits delivered by the Concessionary Fares Scheme and would like to see it expanded but my ambition is limited by the level of funding made available to me.","answerHtml":"<p>I recognise that children and young people use public transport to access education, training, employment and to maintain social connections. My Department already supports half fare travel on public transport services in Northern Ireland for those aged 5-16 under the Northern Ireland Concessionary Fares Scheme. Other discounted tickets are available for young people. The Translink y-link card is a smart card for all 16-23 years olds using Translink services within Northern Ireland. This card offers 1/3 off Translink bus and rail travel in Northern Ireland and up to 50% off the Enterprise tickets. Also available is the 24+ Student Railcard for those in full time education which enables those over the age of 24 to receive up to 1/3 off rail fares. I recognise that these discounts do not match those being offered in Scotland under the Young Person’s Free Travel Bus Scheme but concessions are available on both bus and rail services here.</p><p>I very much recognise the multiple benefits delivered by the Concessionary Fares Scheme and would like to see it expanded but my ambition is limited by the level of funding made available to me.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2027466%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=361825","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=361825"}},{"id":"361824","reference":"AQW 27465/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-12-15","answerBy":"2022-01-05","answered":"2022-01-07","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education, further to the Department for Education's recent launch of an online marketplace for schools to buy air purifiers to help address COVID-19 in schools in England, to outline what steps her Department has taken to introduce a similar scheme.","answerText":"High Efficiency Particulate Air (HEPA) Filters may be appropriate for installation in some areas where poor ventilation is identified and work continues to identify how these are best used and where they should be installed.\n\nThe Education Authority (EA) has placed an initial order for 100 Air Filtration Units, which will be deployed to areas where specific remedial action to improve ventilation is either not possible, or will have a lead time to address. These units will be supplied by the EA to affected schools, as an interim measure, until such times as remedial works are completed, wherever necessary.\n\nIt is important to note that air filtration units are not required in all classrooms, particularly those with existing good ventilation. My Department’s approach is therefore a controlled interim measure and does not represent a wider deployment of air filtration units to schools. This is similar to the approach being adopted in other jurisdictions.\n\nMy Department will continue to work closely with other jurisdictions, however it is important to emphasise that current guidance current guidance is that such units are not a substitute for good ventilation. My Department and the EA are therefore focussing on a range of mitigations to put in place in our schools, where ventilation issues have been identified.","answerHtml":"<p>High Efficiency Particulate Air (HEPA) Filters may be appropriate for installation in some areas where poor ventilation is identified and work continues to identify how these are best used and where they should be installed.</p><p>The Education Authority (EA) has placed an initial order for 100 Air Filtration Units, which will be deployed to areas where specific remedial action to improve ventilation is either not possible, or will have a lead time to address. These units will be supplied by the EA to affected schools, as an interim measure, until such times as remedial works are completed, wherever necessary.</p><p>It is important to note that air filtration units are not required in all classrooms, particularly those with existing good ventilation. My Department’s approach is therefore a controlled interim measure and does not represent a wider deployment of air filtration units to schools. This is similar to the approach being adopted in other jurisdictions.</p><p>My Department will continue to work closely with other jurisdictions, however it is important to emphasise that current guidance current guidance is that such units are not a substitute for good ventilation. My Department and the EA are therefore focussing on a range of mitigations to put in place in our schools, where ventilation issues have been identified.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2027465%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=361824","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=361824"}},{"id":"360796","reference":"AQW 26955/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-12-07","answerBy":"2021-12-15","answered":"2021-12-20","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to his response during Question Time on 6 December 2021 when he announced his Department was using a next-day service for the delivery of High Street Scheme cards, to detail (i) the steps he took he took to procure a contractor for this service; (ii) the additional cost of the next-day delivery service per card; and (iii) the overall anticipated cost for the remainder of this process.","answerText":"(i) the steps he took to procure a contractor for this service;\n\nThis service is being provided for through the existing Card Provider contract.\n\n(ii) the additional cost of the next-day delivery service per card; and\n\n(iii) the overall anticipated cost for the remainder of this process.\n\nCard costs have been identified as commercially sensitive information, which can be provided on request once the contract has ended. The contract ends in July 2022 (or when both parties decide to terminate it, if earlier).","answerHtml":"<p>(i) the steps he took to procure a contractor for this service;</p><p>This service is being provided for through the existing Card Provider contract.</p><p>(ii) the additional cost of the next-day delivery service per card; and</p><p>(iii) the overall anticipated cost for the remainder of this process.</p><p>Card costs have been identified as commercially sensitive information, which can be provided on request once the contract has ended. The contract ends in July 2022 (or when both parties decide to terminate it, if earlier).</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2026955%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=360796","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=360796"}},{"id":"360794","reference":"AQW 26953/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-12-07","answerBy":"2021-12-22","answered":"2021-12-22","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education what progress has been made on maintenance works at Larne High School.","answerText":"Following a condition survey of the Larne High School buildings, which was carried out in August 2021, a business case for a minor works scheme to progress the refurbishment of changing rooms and associated works (at an estimated cost of £450k) was initiated. The Education Authority (EA) have advised me that it is hoped that these works, along with a window upgrade scheme at an estimated cost of £100k, will be addressed under the 2022/23 Maintenance Unavoidable Programme. This is however subject to the availability of capital funding.\n\nThe EA are also progressing an emergency works scheme to upgrade plaster work and flooring, which is due to be delivered before 31 March 2022.","answerHtml":"<p>Following a condition survey of the Larne High School buildings, which was carried out in August 2021, a business case for a minor works scheme to progress the refurbishment of changing rooms and associated works (at an estimated cost of £450k) was initiated. The Education Authority (EA) have advised me that it is hoped that these works, along with a window upgrade scheme at an estimated cost of £100k, will be addressed under the 2022/23 Maintenance Unavoidable Programme. This is however subject to the availability of capital funding.</p><p>The EA are also progressing an emergency works scheme to upgrade plaster work and flooring, which is due to be delivered before 31 March 2022.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2026953%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=360794","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=360794"}},{"id":"360793","reference":"AQW 26952/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-12-07","answerBy":"2021-12-22","answered":"2021-12-09","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education how many children receive free school meals in East Antrim.","answerText":"Provisional figures sourced from the 2021/22 school census report that there were 3,662 pupils enrolled in schools located in the East Antrim constituency that were recorded as being entitled to free school meals. This figure includes pupils enrolled in nursery schools, primary/preparatory departments (including nursery units, reception and year 1 – 7 classes), post primary and special schools.\n\nPlease note that data are provisional at this time and may be subject to change before the end of the validation process, which is still ongoing. Figures relating to free school meal entitlement, specifically, are expected to rise. This is due to a large number of late or incomplete free school meal applications made to the Education Authority. Finalised figures will be available at the end of February 2022.","answerHtml":"<p>Provisional figures sourced from the 2021/22 school census report that there were 3,662 pupils enrolled in schools located in the East Antrim constituency that were recorded as being entitled to free school meals. This figure includes pupils enrolled in nursery schools, primary/preparatory departments (including nursery units, reception and year 1 – 7 classes), post primary and special schools.</p><p>Please note that data are provisional at this time and may be subject to change before the end of the validation process, which is still ongoing. Figures relating to free school meal entitlement, specifically, are expected to rise. This is due to a large number of late or incomplete free school meal applications made to the Education Authority. Finalised figures will be available at the end of February 2022.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2026952%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=360793","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=360793"}},{"id":"360542","reference":"AQW 26877/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-12-06","answerBy":"2021-12-21","answered":"2021-12-14","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health whether his Department will allow people to obtain a paper copy of their vaccine status from their GP if they do not have access to digital services.","answerText":"A certificate can be requested using the telephone service 0300 200 7814, available Monday to Sunday from 8.00 am to 8.00 pm. The service can provide assistance to those who need help with their applications for either the digital or paper certificates.\n\nI understand that some people, particularly those who are older and perhaps with vulnerabilities, will need a little more time to access certification. Therefore, people will be able to use their Vaccination Card alongside photographic identification to gain entry to premises covered by the regulations.","answerHtml":"<p>A certificate can be requested using the telephone service 0300 200 7814, available Monday to Sunday from 8.00 am to 8.00 pm. The service can provide assistance to those who need help with their applications for either the digital or paper certificates.</p><p>I understand that some people, particularly those who are older and perhaps with vulnerabilities, will need a little more time to access certification. Therefore, people will be able to use their Vaccination Card alongside photographic identification to gain entry to premises covered by the regulations.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2026877%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=360542","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=360542"}},{"id":"360541","reference":"AQW 26876/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-12-06","answerBy":"2021-12-21","answered":"2021-12-15","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health how the allocation of the National Health and Social Care Levy will be distributed in Northern Ireland.","answerText":"The allocation related to the National Health and Social Care Levy will be included within my Departments total budget 2022-25 allocation from the Department of Finance, once this has been agreed by the Executive. The allocation will be used to fund Health and Social Care’s inescapable commitments and prioritised pressures.\n\nWhile the funding raised by the levy is very welcome, due to the lack of recurrent investment that Health and Social Care in Northern Ireland has received over the last number of years the budget will be needed to simply fund existing services.","answerHtml":"<p>The allocation related to the National Health and Social Care Levy will be included within my Departments total budget 2022-25 allocation from the Department of Finance, once this has been agreed by the Executive. The allocation will be used to fund Health and Social Care’s inescapable commitments and prioritised pressures.</p><p>While the funding raised by the levy is very welcome, due to the lack of recurrent investment that Health and Social Care in Northern Ireland has received over the last number of years the budget will be needed to simply fund existing services.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2026876%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=360541","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=360541"}},{"id":"360416","reference":"AQW 26815/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-12-03","answerBy":"2021-12-20","answered":"2021-12-09","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail the Health and Social Care tariffs for residential and nursing homes in (i) Northern Ireland; and (ii) the rest of the UK.","answerText":"The current social care charging regulations for the UK are detailed below:-\n\nCurrent Charging Regulations throughout the UK 2021/2022\n\n2021/2022 limits\tPersonal\nExpenses\nAllowance\n(PEA)\tSavings Credit\nDisregards\nNorthern Ireland\tLower: £14,250\nUpper: £23,250\t£27.19\tUp to £5.75 per week for individuals.\nUp to £8.60 per week for couples.\nEngland\tLower: £14,250\nUpper: £23,250\t£24.90\t£5.75 per week for individuals.\nUp to £8.60 per week for couples.\nScotland\tLower: £18,000\nUpper: £28,750\t£29.30\t£6.90 per week for individuals.\n£10.25 per week for couples.\nWales\tSingle limit: £50,000\t£33.00\t£5.75 per week for individuals.\n£8.60 per week for couples.","answerHtml":"<p>The current social care charging regulations for the UK are detailed below:-</p><p>Current Charging Regulations throughout the UK 2021/2022</p><div class=\"table-wrap\"><table><tr><td></td><td>2021/2022 limits</td><td>Personal<br>Expenses<br>Allowance<br>(PEA)</td><td>Savings Credit<br>Disregards</td></tr><tr><td>Northern Ireland</td><td>Lower: £14,250<br>Upper: £23,250</td><td>£27.19</td><td>Up to £5.75 per week for individuals.<br>Up to £8.60 per week for couples.</td></tr><tr><td>England</td><td>Lower: £14,250<br>Upper: £23,250</td><td>£24.90</td><td>£5.75 per week for individuals.<br>Up to £8.60 per week for couples.</td></tr><tr><td>Scotland</td><td>Lower: £18,000<br>Upper: £28,750</td><td>£29.30</td><td>£6.90 per week for individuals.<br>£10.25 per week for couples.</td></tr><tr><td>Wales</td><td>Single limit: £50,000</td><td>£33.00</td><td>£5.75 per week for individuals.<br>£8.60 per week for couples.</td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2026815%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=360416","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=360416"}},{"id":"360414","reference":"AQW 26813/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-12-03","answerBy":"2021-12-20","answered":"2021-12-08","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education when she intends to visit to Larne High School and Carrickfergus Academy, as outlined during Question Time on 29 June 2021.","answerText":"I am scheduled to visit Larne High School and Carrickfergus Academy on 19 January 2022.","answerHtml":"<p>I am scheduled to visit Larne High School and Carrickfergus Academy on 19 January 2022.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2026813%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=360414","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=360414"}},{"id":"360412","reference":"AQW 26811/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-12-03","answerBy":"2021-12-20","answered":"2022-01-24","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to outline what legal provisions the Health and Safety Executive will (i) approve; (ii) inspect; and (iii) monitor in the construction of the Islandmagee Gas Storage Project.","answerText":"The construction and operation of the Islandmagee Gas Storage Project falls under the Control of Major Accident Hazards Regulations (COMAH) (Northern Ireland) 2000, for which the Health and Safety Executive (NI) is the joint Competent Authority (CA) with the Northern Ireland Environment Agency (NIEA). The proposed development is an ‘Upper Tier’ COMAH site.\n\nPrior to construction and operation, the operator of the site must submit a safety report for consideration by the CA. This requires the applicant to ensure that adequate safeguards will be in place to control risks for major accident hazard scenarios and that risks are reduced to a level that is as low as reasonably practicable (ALARP).\n\nThe CA’s statutory functions under COMAH include assessing safety reports and accident prevention policy, organising a system of inspections of COMAH establishments, investigating, and reporting on major accidents. The CA will assess whether the safety report has provided sufficient information to show that the COMAH site is controlling the risks that site operations could cause to people who live and work nearby, as well as to site workers and to the environment.\n\nIf examination of the safety report reveals a possible serious deficiency, the CA will evaluate by engagement with the operator. On confirming a serious deficiency in the measures to prevent or mitigate major accidents, the CA will prohibit the bringing into operation, or continued operation, the relevant activities.\n\nIn respect of ‘inspection’ of the construction of the project, the Health and Safety at Work Order (NI) 1978 enables appointed Inspectors to visit any site or premises at any reasonable time to review the standards of workplace health, safety and welfare. Upper Tier COMAH establishments are, subject to a minimum of yearly inspections by the CA during the operational stage.\n\nThe following legal provisions enforceable by HSENI, will be applicable:-\n\nHealth and Safety at Work Order (NI) 1978 and other subordinate health and safety legislation – applicable throughout the lifetime of the project;\n\nThe Construction (Design and Management) Regulations (Northern Ireland) 2016 – applicable during the design and construction phase and the decommissioning stage;\n\nBorehole Sites and Operations Regulations (NI) 1995 – applicable prior to commencement of drilling and at the decommissioning stage;\n\nPipelines Safety Regulations (Northern Ireland) 1997 – applicable during the construction, operation and decommissioning stage;\n\nGas Safety (Management) Regulations (Northern Ireland) 1997 – applicable during the operational stage;\n\nThe Control of Major Accident Hazards Regulations (Northern Ireland) 2015 – applicable throughout the lifetime of the project;\n\nOffshore Installations and Wells (Design and Construction, etc.) Regulations (NI) 1996 –it is expected that the operator will follow the requirements of this legislation to meet with the requirements of COMAH. This will include the requirement for an independent review of the well design to ensure it is designed, modified, commissioned, constructed, equipped, operated, maintained, suspended and abandoned to ensure no unplanned escape of fluids from the well so far as is reasonably practicable and risks to persons are as low as is reasonably practicable.","answerHtml":"<p>The construction and operation of the Islandmagee Gas Storage Project falls under the Control of Major Accident Hazards Regulations (COMAH) (Northern Ireland) 2000, for which the Health and Safety Executive (NI) is the joint Competent Authority (CA) with the Northern Ireland Environment Agency (NIEA). The proposed development is an ‘Upper Tier’ COMAH site.</p><p>Prior to construction and operation, the operator of the site must submit a safety report for consideration by the CA. This requires the applicant to ensure that adequate safeguards will be in place to control risks for major accident hazard scenarios and that risks are reduced to a level that is as low as reasonably practicable (ALARP).</p><p>The CA’s statutory functions under COMAH include assessing safety reports and accident prevention policy, organising a system of inspections of COMAH establishments, investigating, and reporting on major accidents. The CA will assess whether the safety report has provided sufficient information to show that the COMAH site is controlling the risks that site operations could cause to people who live and work nearby, as well as to site workers and to the environment.</p><p>If examination of the safety report reveals a possible serious deficiency, the CA will evaluate by engagement with the operator. On confirming a serious deficiency in the measures to prevent or mitigate major accidents, the CA will prohibit the bringing into operation, or continued operation, the relevant activities.</p><p>In respect of ‘inspection’ of the construction of the project, the Health and Safety at Work Order (NI) 1978 enables appointed Inspectors to visit any site or premises at any reasonable time to review the standards of workplace health, safety and welfare. Upper Tier COMAH establishments are, subject to a minimum of yearly inspections by the CA during the operational stage.</p><p>The following legal provisions enforceable by HSENI, will be applicable:-</p><p>Health and Safety at Work Order (NI) 1978 and other subordinate health and safety legislation – applicable throughout the lifetime of the project;</p><p>The Construction (Design and Management) Regulations (Northern Ireland) 2016 – applicable during the design and construction phase and the decommissioning stage;</p><p>Borehole Sites and Operations Regulations (NI) 1995 – applicable prior to commencement of drilling and at the decommissioning stage;</p><p>Pipelines Safety Regulations (Northern Ireland) 1997 – applicable during the construction, operation and decommissioning stage;</p><p>Gas Safety (Management) Regulations (Northern Ireland) 1997 – applicable during the operational stage;</p><p>The Control of Major Accident Hazards Regulations (Northern Ireland) 2015 – applicable throughout the lifetime of the project;</p><p>Offshore Installations and Wells (Design and Construction, etc.) Regulations (NI) 1996 –it is expected that the operator will follow the requirements of this legislation to meet with the requirements of COMAH. This will include the requirement for an independent review of the well design to ensure it is designed, modified, commissioned, constructed, equipped, operated, maintained, suspended and abandoned to ensure no unplanned escape of fluids from the well so far as is reasonably practicable and risks to persons are as low as is reasonably practicable.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2026811%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=360412","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=360412"}},{"id":"360768","reference":"AQO 2879/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-11-25","answerBy":"2021-12-07","answered":"2021-12-07","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance how he intends to use building control to help achieve Net Zero.","answerText":"Building control is a responsibility of district councils.\n\nMy Department is currently consulting on proposals to amend technical booklet guidance to the Building Regulations energy efficiency requirements for new buildings. Proposals include measures to support a fabric first approach and improve the emissions performance, leading to a likely inclusion of renewables in most new buildings.\n\nThe consultation closes on the 19th December and I remain hopeful of publishing new uplifted guidance within the current mandate, if possible.\n\nMy Department’s ambitious provisional programme proposes further phased uplifts in 2022/23 and 2026/2027, to further address these issues which will make a significant contribution to reaching Net Zero.","answerHtml":"<p>Building control is a responsibility of district councils.</p><p>My Department is currently consulting on proposals to amend technical booklet guidance to the Building Regulations energy efficiency requirements for new buildings. Proposals include measures to support a fabric first approach and improve the emissions performance, leading to a likely inclusion of renewables in most new buildings.</p><p>The consultation closes on the 19th December and I remain hopeful of publishing new uplifted guidance within the current mandate, if possible.</p><p>My Department’s ambitious provisional programme proposes further phased uplifts in 2022/23 and 2026/2027, to further address these issues which will make a significant contribution to reaching Net Zero.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202879%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=360768","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=360768"}},{"id":"358373","reference":"AQO 2809/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-11-18","answerBy":"2021-11-29","answered":"2021-11-29","answeredOrally":true,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs what steps he is taking to ensure the welfare of animals at the Port of Larne.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr Poots (The Minister of Agriculture, Environment and Rural Affairs)","text":"Welfare checks on all animals moving through Larne port are conducted by a veterinary-led portal inspection team. In relation to imports, all farmed livestock are unloaded at approved facilities, where a detailed veterinary health and welfare assessment is completed before any onward travel is permitted. For other species, the same general rules apply to welfare checks. Those animals, however, are generally inspected on the vehicle and unloaded only if a welfare problem is suspected. In addition, documentary checks are completed as part of the overall welfare assessment to ensure that the vehicle is approved and fit for purpose, the attendants are competent and the journey is in line with legislative parameters. For animals moving to Great Britain through Larne port, a general welfare assessment is conducted on all consignments to ensure compliance with the relevant welfare legislation before onward travel is permitted. Those checks are in addition to similar checks completed by the certifying official veterinarian (OV) at the premises of origin. For dogs, an assessment is made of the animals' fitness to travel and the conditions of travel only where it is a commercial transaction or there are more than five animals being transported. The same documentary checks as for livestock relating to the transporter and the vehicle apply to the transport of dogs. Should any adverse findings be disclosed during welfare inspections, all affected animals will be detained and treated in accordance with the nature of the findings. An associated range of enforcement measures are available to Department officials, including formal notices, a penalty-based system for transport authorisation, disqualification and potential prosecution."},{"speaker":"Mr Dickson","text":"Thank you, Minister, for your answer. You halted an application for an equine and other commercial transportation of animals facility at Redlands Road in Larne. Can you assure the House that, with the additional inspections that are required, the appropriate level of animal welfare is being maintained? When will you allow the expansion of the current equine and other animals facility at Redlands Road, as per the planning application?"},{"speaker":"Mr Poots","text":"Were there welfare issues, my veterinarians — people who specialise in animal welfare — would be obliged to draw them to my attention, and they have not done that. If they have those issues, I am sure that they will draw them to my attention."},{"speaker":"Mr Beggs","text":"Ewe lambs have been stranded in Scotland, there have been restrictions on movements to agricultural shows, and there has been much talk of easing and removing the restrictions. How many live animals have come into Northern Ireland from GB, and how many have gone from Northern Ireland to GB? When will all the new regulations be printed, so that we understand what is being proposed?"},{"speaker":"Mr Poots","text":"I will clarify for the Member that livestock checks have taken place at the port of Larne for around 20 years, and certainly since the foot-and-mouth outbreak. Those checks ensure that the fine animal health status that we have here is maintained and should not be confused with the impact of the Northern Ireland protocol. However, the European Union has made it incredibly difficult for people who show livestock in Great Britain. That has been hugely damaging to the pedigree sector and, indeed, for the important importation of lambs from Scotland, which generally happens at this time of the year and augments our hill farms in particular. Considerable work has been done by veterinary officials to deal with all of those issues. My veterinary officials have proved to the European Union, beyond all reasonable doubt, that this causes no danger, impact or harm to the European Union's single market and, therefore, at this stage, any potential delays are political delays."},{"speaker":"Mr McGuigan","text":"I will follow on from the two previous questions. In the interests of animal welfare, can the Minister confirm that he has enough veterinary staff in the Department to carry out the checks at Larne?"},{"speaker":"Mr Poots","text":"Yes, we have. It would be illogical to transfer veterinary staff to carry out checks on, for example, groupage, where a lorry carries maybe 300 different food items to be used in a store such as Sainsbury's that does not have a base in the Republic of Ireland. Yet, that is being requested of us. If the Member believes that checking such goods, which pose no threat to the European Union's single market, would be a good use of a veterinarian's time, as opposed to dealing with issues such as bovine TB, Johne's disease and the many other issues that are looked after by the Department's vets, he should stand up and say that. I do not think that it is a good use of a veterinarian's time."},{"speaker":"Mr O'Toole","text":"Will the Minister agree with me and confirm, as he did earlier, that there have always been animal health checks at the port of Larne and the Irish Sea and, that, if some people got their way and we put a border for sanitary and phytosanitary (SPS) goods on the island of Ireland, farmers in this place would face two sets of checks: one when moving goods onto the island of Ireland and another when moving goods from Northern Ireland into the Republic? Clearly, we all want to see checks minimised, but, given that checks have already existed at seaports, does it not make sense to consolidate them in one location?"},{"speaker":"Mr Poots","text":"A considerable element of the checks on live animals have always taken place. I have indicated that I am happy to assist the European Union to ensure that goods with the potential risk of entering the Republic of Ireland are checked on its behalf. They should pay for that, mind you, because it prevents goods from entering the European Union through Ireland, and those checks should not be paid for from our purse. Nonetheless, we do not have to do those checks at Newry or the Fermanagh border; they can be done elsewhere. They do not have to be done at the ports either. However, we can do that, and that should be separated from the goods that are to remain in Northern Ireland. There should be no internal barriers between Great Britain and Northern Ireland in that circumstance."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202809%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=358373","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2021-11-29&docID=359050#AQO%202809/17-22","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=358373"}},{"id":"357432","reference":"AQW 25697/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-11-12","answerBy":"2021-11-29","answered":"2021-11-18","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education whether she has any plans to incorporate dance into the primary school curriculum.","answerText":"Dance is currently a compulsory element of the Northern Ireland curriculum at primary level. It is taught within the Physical Development and Movement area of learning at Foundation Stage and under the Physical Education area of learning at Key Stages 1 and 2.","answerHtml":"<p>Dance is currently a compulsory element of the Northern Ireland curriculum at primary level. It is taught within the Physical Development and Movement area of learning at Foundation Stage and under the Physical Education area of learning at Key Stages 1 and 2.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2025697%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=357432","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=357432"}},{"id":"357047","reference":"AQW 25545/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-11-10","answerBy":"2021-11-25","answered":"2021-11-15","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what procedure is in place for people who lose their High Street Scheme cards.","answerText":"The Department has set up an automated Customer Services Line on 028 9531 3153 where Spend Local Prepaid card recipients can report a lost or stolen card. Cards reported as lost or stolen are cancelled and a replacement card issued with any remaining balance transferred to the new card.\n\nTo replace a lost or stolen card the card recipient will need to know the card’s 16-digit card number. If they do not recall this number, which can be found on the letter which accompanied the card, they will need to phone a manned Customer Services line on 028 9590 8459.\n\nCard recipients can also instantly report a lost or stolen card, and block or unblock their card from use through the client services portal.","answerHtml":"<p>The Department has set up an automated Customer Services Line on 028 9531 3153 where Spend Local Prepaid card recipients can report a lost or stolen card. Cards reported as lost or stolen are cancelled and a replacement card issued with any remaining balance transferred to the new card.</p><p>To replace a lost or stolen card the card recipient will need to know the card’s 16-digit card number. If they do not recall this number, which can be found on the letter which accompanied the card, they will need to phone a manned Customer Services line on 028 9590 8459.</p><p>Card recipients can also instantly report a lost or stolen card, and block or unblock their card from use through the client services portal.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2025545%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=357047","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=357047"}},{"id":"357046","reference":"AQW 25544/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-11-10","answerBy":"2021-11-25","answered":"2021-12-07","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities what action she is taking to protect vulnerable people living in inadequately insulated housing this winter.","answerText":"My Department offers support to assist vulnerable people to improve the energy efficiency of their homes.\n\nPrivately Owned and Privately Rented Homes\n\nThe Affordable Warmth Scheme is the Executive's main fuel poverty scheme and is available to eligible owner occupiers or those in private rented accommodation. It provides a range of energy efficiency measures including loft, cavity wall and solid wall insulation, replacement of inefficient heating systems and replacement windows where appropriate.\n\nSince the Scheme was introduced in 2015 my Department has invested £92m to install 39,281 energy efficiency improvement measures in 21,376 homes, 11,103 of which have been insulation measures.\n\nHousing Executive Homes\n\nThe Housing Executive is working to improve the insulation performance of its properties.\n\nWhen heating replacement or other relevant improvement measures that would need Building Control approval are being carried out loft insulation is upgraded to comply with the current Building Regulation requirement of 270mm.\n\nThe Executive’s Cavity Wall Insulation Action Plan acknowledges that stock-wide remediation/replacement will be necessary. This will require significant funding to be identified and made available.\n\nIn the interim the Housing Executive will investigate and address cavity wall insulation issues where these are having a detrimental impact on the structure of the dwelling.\n\nFunding secured from the European Regional Development Fund (ERDF) has facilitated a six year programme to address thermal efficiency in 1,900 aluminium bungalows and No Fines dwellings. This is primarily through the installation of new external wall cladding. Other energy improvement measures will include new double glazing and roof space insulation.","answerHtml":"<p>My Department offers support to assist vulnerable people to improve the energy efficiency of their homes.</p><p>Privately Owned and Privately Rented Homes</p><p>The Affordable Warmth Scheme is the Executive&#39;s main fuel poverty scheme and is available to eligible owner occupiers or those in private rented accommodation. It provides a range of energy efficiency measures including loft, cavity wall and solid wall insulation, replacement of inefficient heating systems and replacement windows where appropriate.</p><p>Since the Scheme was introduced in 2015 my Department has invested £92m to install 39,281 energy efficiency improvement measures in 21,376 homes, 11,103 of which have been insulation measures.</p><p>Housing Executive Homes</p><p>The Housing Executive is working to improve the insulation performance of its properties.</p><p>When heating replacement or other relevant improvement measures that would need Building Control approval are being carried out loft insulation is upgraded to comply with the current Building Regulation requirement of 270mm.</p><p>The Executive’s Cavity Wall Insulation Action Plan acknowledges that stock-wide remediation/replacement will be necessary. This will require significant funding to be identified and made available.</p><p>In the interim the Housing Executive will investigate and address cavity wall insulation issues where these are having a detrimental impact on the structure of the dwelling.</p><p>Funding secured from the European Regional Development Fund (ERDF) has facilitated a six year programme to address thermal efficiency in 1,900 aluminium bungalows and No Fines dwellings. This is primarily through the installation of new external wall cladding. Other energy improvement measures will include new double glazing and roof space insulation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2025544%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=357046","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=357046"}},{"id":"356811","reference":"AQW 25452/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-11-09","answerBy":"2021-11-24","answered":"2021-11-19","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs, in relation to the recent operating lossess of Islandmagee Energy's parent company, what mechanisms are in place to ensure that the cost of decommissioning and management of the decommisioned gas caverns do not fall on the taxpayer or to be discharged from the Northern Ireland Block Grant.","answerText":"I have previously stated the position at our Oral Questions on 8 November that Islandmagee Energy Ltd. is responsible for the safe decommissioning of the gas storage caverns at the end of the project's life. The company must ensure that arrangements are made in respect of any residual liabilities.\n\nThe arrangements for safe decommissioning should the company fail, are an issue for the landowner, in this instance, The Crown Estate (TCE). TCE has indicated that an acceptable abandonment programme, including the arrangements for residual liabilities, will be required before a lease will be issued to the company. TCE has indicated that works cannot commence below mean high water spring tide level until the issue is resolved. My Department will continue to engage with TCE.","answerHtml":"<p>I have previously stated the position at our Oral Questions on 8 November that Islandmagee Energy Ltd. is responsible for the safe decommissioning of the gas storage caverns at the end of the project&#39;s life. The company must ensure that arrangements are made in respect of any residual liabilities.</p><p>The arrangements for safe decommissioning should the company fail, are an issue for the landowner, in this instance, The Crown Estate (TCE). TCE has indicated that an acceptable abandonment programme, including the arrangements for residual liabilities, will be required before a lease will be issued to the company. TCE has indicated that works cannot commence below mean high water spring tide level until the issue is resolved. My Department will continue to engage with TCE.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2025452%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=356811","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=356811"}},{"id":"356810","reference":"AQW 25451/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-11-09","answerBy":"2021-11-24","answered":"2021-11-22","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs, with regards to the Islandmagee Gas Caverns storage project, whether he will publish the independent reports.","answerText":"The final authorisations and all supporting material has now been made publically available on the DAERA website. This includes a third party audit of the Brine Dispersal Model by HR Wallingford.\n\nThe Habitats Regulations Assessment (HRA), incorporating the advice of a third party reviewer, has been published on the DAERA website. I do not intend to publish the third party review of an earlier draft of the HRA, as I believe this would be confusing for the public.","answerHtml":"<p>The final authorisations and all supporting material has now been made publically available on the DAERA website. This includes a third party audit of the Brine Dispersal Model by HR Wallingford.</p><p>The Habitats Regulations Assessment (HRA), incorporating the advice of a third party reviewer, has been published on the DAERA website. I do not intend to publish the third party review of an earlier draft of the HRA, as I believe this would be confusing for the public.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2025451%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=356810","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=356810"}},{"id":"356809","reference":"AQW 25450/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-11-09","answerBy":"2021-11-24","answered":"2021-11-23","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs whether he will review the draft notice to approve the marine licence for the Islandmagee Gas Storage Project and the consent of discharge.","answerText":"I am satisfied that all material considerations have been assessed by officials for the marine licence application, reviews of the discharge consent and abstraction licence for the proposed Islandmagee gas storage development. Therefore, I do not intend to review the decisions on the matter.\n\nFinal licences were issued to the applicant on 5 November 2021 and have now been made available along with the Habitats Regulations Assessment on the DAERA webpage.","answerHtml":"<p>I am satisfied that all material considerations have been assessed by officials for the marine licence application, reviews of the discharge consent and abstraction licence for the proposed Islandmagee gas storage development. Therefore, I do not intend to review the decisions on the matter.</p><p>Final licences were issued to the applicant on 5 November 2021 and have now been made available along with the Habitats Regulations Assessment on the DAERA webpage.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2025450%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=356809","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=356809"}},{"id":"356808","reference":"AQW 25449/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-11-09","answerBy":"2021-11-24","answered":"2021-11-12","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy when he intends to publish the Skills Strategy.","answerText":"The 12 week consultation for the Skills Strategy for Northern Ireland, ‘Skills for a 10x Economy’ closed on the 19th August. The Skills team is currently working to finalise the Strategy, with the aim of launching it by the end of this year.","answerHtml":"<p>The 12 week consultation for the Skills Strategy for Northern Ireland, ‘Skills for a 10x Economy’ closed on the 19th August. The Skills team is currently working to finalise the Strategy, with the aim of launching it by the end of this year.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2025449%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=356808","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=356808"}},{"id":"356807","reference":"AQW 25448/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-11-09","answerBy":"2021-11-24","answered":"2021-11-22","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy when he intends to publish the Energy Strategy.","answerText":"Subject to Executive approval, I would hope to publish the Energy Strategy in the coming weeks.","answerHtml":"<p>Subject to Executive approval, I would hope to publish the Energy Strategy in the coming weeks.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2025448%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=356807","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=356807"}},{"id":"356490","reference":"AQW 25302/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-11-05","answerBy":"2021-11-22","answered":"2021-11-15","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure what is being done to incentivise rural consumers to use electric vehicles.","answerText":"The Road to Zero Strategy outlines how the British Government will support the transition to zero emission road transport and reduce emissions from conventional vehicles during the transition. The Office for Zero Emission Vehicles (OZEV) continues to provide a broad range of funding in GB-NI including plug-in grants for cars, vans, taxis and motorcycles, with the provision of grants for home, work and on-street residential charging infrastructure.\n\nIt is important to recognise that the majority of charging should take place at home rather than on the public network, with the majority of electric vehicle drivers, including in rural areas, having availed of the OZEV home charge point grant. The majority of drivers, especially in rural areas, should meet the requirements of the grant i.e. their home has a driveway or garage. Given the average distances travelled by car in the North, it is expected that home charging should be sufficient for the majority of EV drivers without the need to overly rely on the public charging network.\n\nThe electric vehicle public charge point network is owned by the Electricity Supply Board (ESB) and is operated on a commercial basis. It is responsible for the operation, maintenance and development of the network. There are currently 320 22kWh (Fast) public charge points at 160 locations and a further 17 50kWh DC (Rapid) public charge points in the North. ESB can be contacted directly at ecars@esb.ie or enquiries can be sent directly to ESB, Two Gateway, East Wall Road, DUBLIN 3, D03 A995. Whilst the market is open to other commercial operators who would wish to provide charging infrastructure, to date, ESB is the only public network provider in the North.\n\nI have met with ESB to encourage it to repair non-functioning charge points. ESB recently commenced a replacement programme which will upgrade a number of faulty charge points with more modern operational charge points. ESB has advised that this work programme is being carried out in two phases. It has confirmed that it has now completed phase 1, the replacement of the first 15 AC Fast charge posts (30 charge points), and has received very positive feedback. ESB has also advised that the second phase of 15 AC Fast charge posts (30 charge points) including 5 Rapid chargers has recently commenced. I have also encouraged ESB to introduce charging on its public network as soon as possible.\n\nAn award of funding under the Levelling Up Fund (LUF) has recently been made to ESB. Whilst the award is very welcome, neither the Executive nor my Department have had a role in the LUF. Therefore, I am not in a position at this time to provide any further information on that funding outside of what is currently in the public domain.\n\nI am also pleased to have been able to support the FASTER Project, funded through the INTERREG VA Territorial Co-operation Programme which is managed by the Special EU Programmes Body (SEUPB). The project has received funding through the programme to install a total of 73 EV Rapid charging points across the island of Ireland and the West of Scotland by 31 May 2023. My Department will be contributing €513,945 (£455,371) of Match Funding towards the FASTER project. The responsibility for the implementation of the project rests with SEUPB and it has agreed a delivery schedule with the project partners, led by the East Border Region Group Limited. I understand the locations for the charge points has not as yet been finalised, however, it is expected between 20-30 of these will be located in the North.\n\nI am also taking a number of actions in respect of charge point infrastructure, including the introduction of changes to the planning system, which came into operation on 21 December 2020 and liaising with British Government Ministers in respect of future funding for our charge point network.\n\nFunding opportunities for the installation of charge point infrastructure in GB-NI are provided by OZEV. I have recently had a further meeting with Minister Maclean, who was then the Minister for the Future of Transport at the Department for Transport, to discuss the move to electric vehicles, the approach to installing charge point infrastructure and future funding including development opportunities for our charge point network. I have been assured that OZEV will continue to highlight opportunities for charge point operators in GB to consider entering the market here in the North.\n\nThe British Government has made £20 million in grant funding available to local authorities/councils in GB-NI during 2021-22 to provide charge points for residents without off-street parking. I have recently written to councils advising them that I have made available match-funding of circa £350k, subject to public expenditure processes, from within my Department’s Blue Green Fund to assist local councils making an application to the On-street Residential Charge Point Scheme (ORCS). Accessing the funding, from the Blue Green Fund is dependent on our councils submitting a successful ORCS application and I am disappointed that to date none of our councils have done so.\n\nI would again encourage councils to avail of the ORCS funding which provides a grant for 75% of the capital costs of procuring and installing charge points and associated dedicated parking bays. This funding cannot be accessed by my Department, it is only available to local councils and it is for them to apply individually or collectively. Therefore, should a council make a successful application to ORCS for 75% funding, the 25% match from my Blue Green Fund will mean that the capital costs are fully covered. My Department is also represented, in an advisory capacity, on an ORCS council consortium set up to look at applying for ORCS funding. My officials will continue to make themselves available to local councils to provide support, advice and guidance.\n\nMy Department has also been leading on the Transport Working Group (TWG), set up to inform the transport elements of the Executive’s Energy Strategy. An Energy Strategy for Northern Ireland Options Paper has recently been consulted upon. The Strategy, which is due to be published later this year, will include actions that need to be taken forward if we are to achieve a cleaner, greener transport system. The out workings of the TWG will include consideration of future requirements for publically available electric vehicle charge points in the North. I am keen to work within the framework of the Energy Strategy to ensure a co-ordinated and coherent approach which is focused on assessing and meeting future needs for charging infrastructure in this fast-changing policy area.\n\nYou will be aware, I have recently announced the establishment of an Electric Vehicle Infrastructure Task-Force, which comprises key organisations with a role to play in this area. The role of this Task-Force is to consider EV Infrastructure in the context of the overarching principles of prioritising active travel (walking, wheeling and cycling) and public transport towards decarbonising our transport system. In establishing this Task-Force, I recognise the importance of having a modern, reliable public electric vehicle charging infrastructure to provide confidence to users of ultra-low emission vehicles and improving connectivity across the North. It is planned to hold the inaugural meeting of the group shortly, subject to the availability of representatives.\n\nI remain committed to working in partnership with Executive colleagues and others across our islands to help deliver a change in the way we travel that also helps us to tackle the climate crisis.","answerHtml":"<p>The Road to Zero Strategy outlines how the British Government will support the transition to zero emission road transport and reduce emissions from conventional vehicles during the transition. The Office for Zero Emission Vehicles (OZEV) continues to provide a broad range of funding in GB-NI including plug-in grants for cars, vans, taxis and motorcycles, with the provision of grants for home, work and on-street residential charging infrastructure.</p><p>It is important to recognise that the majority of charging should take place at home rather than on the public network, with the majority of electric vehicle drivers, including in rural areas, having availed of the OZEV home charge point grant. The majority of drivers, especially in rural areas, should meet the requirements of the grant i.e. their home has a driveway or garage. Given the average distances travelled by car in the North, it is expected that home charging should be sufficient for the majority of EV drivers without the need to overly rely on the public charging network.</p><p>The electric vehicle public charge point network is owned by the Electricity Supply Board (ESB) and is operated on a commercial basis. It is responsible for the operation, maintenance and development of the network. There are currently 320 22kWh (Fast) public charge points at 160 locations and a further 17 50kWh DC (Rapid) public charge points in the North. ESB can be contacted directly at ecars@esb.ie or enquiries can be sent directly to ESB, Two Gateway, East Wall Road, DUBLIN 3, D03 A995. Whilst the market is open to other commercial operators who would wish to provide charging infrastructure, to date, ESB is the only public network provider in the North.</p><p>I have met with ESB to encourage it to repair non-functioning charge points. ESB recently commenced a replacement programme which will upgrade a number of faulty charge points with more modern operational charge points. ESB has advised that this work programme is being carried out in two phases. It has confirmed that it has now completed phase 1, the replacement of the first 15 AC Fast charge posts (30 charge points), and has received very positive feedback. ESB has also advised that the second phase of 15 AC Fast charge posts (30 charge points) including 5 Rapid chargers has recently commenced. I have also encouraged ESB to introduce charging on its public network as soon as possible.</p><p>An award of funding under the Levelling Up Fund (LUF) has recently been made to ESB. Whilst the award is very welcome, neither the Executive nor my Department have had a role in the LUF. Therefore, I am not in a position at this time to provide any further information on that funding outside of what is currently in the public domain.</p><p>I am also pleased to have been able to support the FASTER Project, funded through the INTERREG VA Territorial Co-operation Programme which is managed by the Special EU Programmes Body (SEUPB). The project has received funding through the programme to install a total of 73 EV Rapid charging points across the island of Ireland and the West of Scotland by 31 May 2023. My Department will be contributing €513,945 (£455,371) of Match Funding towards the FASTER project. The responsibility for the implementation of the project rests with SEUPB and it has agreed a delivery schedule with the project partners, led by the East Border Region Group Limited. I understand the locations for the charge points has not as yet been finalised, however, it is expected between 20-30 of these will be located in the North.</p><p>I am also taking a number of actions in respect of charge point infrastructure, including the introduction of changes to the planning system, which came into operation on 21 December 2020 and liaising with British Government Ministers in respect of future funding for our charge point network.</p><p>Funding opportunities for the installation of charge point infrastructure in GB-NI are provided by OZEV. I have recently had a further meeting with Minister Maclean, who was then the Minister for the Future of Transport at the Department for Transport, to discuss the move to electric vehicles, the approach to installing charge point infrastructure and future funding including development opportunities for our charge point network. I have been assured that OZEV will continue to highlight opportunities for charge point operators in GB to consider entering the market here in the North.</p><p>The British Government has made £20 million in grant funding available to local authorities/councils in GB-NI during 2021-22 to provide charge points for residents without off-street parking. I have recently written to councils advising them that I have made available match-funding of circa £350k, subject to public expenditure processes, from within my Department’s Blue Green Fund to assist local councils making an application to the On-street Residential Charge Point Scheme (ORCS). Accessing the funding, from the Blue Green Fund is dependent on our councils submitting a successful ORCS application and I am disappointed that to date none of our councils have done so.</p><p>I would again encourage councils to avail of the ORCS funding which provides a grant for 75% of the capital costs of procuring and installing charge points and associated dedicated parking bays. This funding cannot be accessed by my Department, it is only available to local councils and it is for them to apply individually or collectively. Therefore, should a council make a successful application to ORCS for 75% funding, the 25% match from my Blue Green Fund will mean that the capital costs are fully covered. My Department is also represented, in an advisory capacity, on an ORCS council consortium set up to look at applying for ORCS funding. My officials will continue to make themselves available to local councils to provide support, advice and guidance.</p><p>My Department has also been leading on the Transport Working Group (TWG), set up to inform the transport elements of the Executive’s Energy Strategy. An Energy Strategy for Northern Ireland Options Paper has recently been consulted upon. The Strategy, which is due to be published later this year, will include actions that need to be taken forward if we are to achieve a cleaner, greener transport system. The out workings of the TWG will include consideration of future requirements for publically available electric vehicle charge points in the North. I am keen to work within the framework of the Energy Strategy to ensure a co-ordinated and coherent approach which is focused on assessing and meeting future needs for charging infrastructure in this fast-changing policy area.</p><p>You will be aware, I have recently announced the establishment of an Electric Vehicle Infrastructure Task-Force, which comprises key organisations with a role to play in this area. The role of this Task-Force is to consider EV Infrastructure in the context of the overarching principles of prioritising active travel (walking, wheeling and cycling) and public transport towards decarbonising our transport system. In establishing this Task-Force, I recognise the importance of having a modern, reliable public electric vehicle charging infrastructure to provide confidence to users of ultra-low emission vehicles and improving connectivity across the North. It is planned to hold the inaugural meeting of the group shortly, subject to the availability of representatives.</p><p>I remain committed to working in partnership with Executive colleagues and others across our islands to help deliver a change in the way we travel that also helps us to tackle the climate crisis.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2025302%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=356490","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=356490"}},{"id":"356489","reference":"AQW 25301/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-11-05","answerBy":"2021-11-22","answered":"2021-11-11","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to oultine his plans to join the National Metastatic Breast Cancer Audit.","answerText":"Whilst I understand that the NHS England announced in May 2021 that it will fund the first ever National Metastatic Breast Cancer Audit. Unfortunately NI does not currently collect and organise the data necessary to carry out this audit.\n\nThe draft 10 year NI cancer strategy has completed its public consultation; its overall aim is to ensure that everyone in Northern Ireland, has equitable and timely access to the most effective, evidence-based referral, diagnosis, treatment, support and person centred cancer care.\n\nThe need for developments in data collection, coordination and application is a central focus of the strategy. Commitment has been made to carry out a review of the use of data in cancer healthcare, including a formal review of the NI Cancer Registry’s role, engagement with stakeholders regarding optimum use of data, and to ensure that the data collected is used to ensure better cancer care for every patient.\n\nIn addition, the strategy specifically acknowledges that work is needed to better understand the needs and experiences of less heard groups including those with metastatic cancer, such as secondary breast cancer. The strategy gives several commitments that will address the needs and improve the treatment care and support of patients with secondary breast cancer.","answerHtml":"<p>Whilst I understand that the NHS England announced in May 2021 that it will fund the first ever National Metastatic Breast Cancer Audit. Unfortunately NI does not currently collect and organise the data necessary to carry out this audit.</p><p>The draft 10 year NI cancer strategy has completed its public consultation; its overall aim is to ensure that everyone in Northern Ireland, has equitable and timely access to the most effective, evidence-based referral, diagnosis, treatment, support and person centred cancer care.</p><p>The need for developments in data collection, coordination and application is a central focus of the strategy. Commitment has been made to carry out a review of the use of data in cancer healthcare, including a formal review of the NI Cancer Registry’s role, engagement with stakeholders regarding optimum use of data, and to ensure that the data collected is used to ensure better cancer care for every patient.</p><p>In addition, the strategy specifically acknowledges that work is needed to better understand the needs and experiences of less heard groups including those with metastatic cancer, such as secondary breast cancer. The strategy gives several commitments that will address the needs and improve the treatment care and support of patients with secondary breast cancer.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2025301%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=356489","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=356489"}},{"id":"355710","reference":"AQW 24911/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-11-01","answerBy":"2021-11-16","answered":"2021-11-15","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs, with regards to draft licences issued for the proposed Islandmagee Gas Caverns storage project, to outline the procedure or pre-conditions that are to be met by the applicant to trigger the grant of a final licence.","answerText":"The Department issued drafts of the consents it proposes to issue for a short period to enable the applicant, Islandmagee Energy Ltd, to raise any minor matters.\n\nIslandmagee Energy Ltd subsequently indicated a desire to move to final licences. These final licences were issued to Islandmagee Energy Limited on 5 November 2021.\n\nThe consents contain conditions which Islandmagee Energy Ltd must adhere to. These will be publically available on the DAERA website and on the relevant Public Registers.","answerHtml":"<p>The Department issued drafts of the consents it proposes to issue for a short period to enable the applicant, Islandmagee Energy Ltd, to raise any minor matters.</p><p>Islandmagee Energy Ltd subsequently indicated a desire to move to final licences. These final licences were issued to Islandmagee Energy Limited on 5 November 2021.</p><p>The consents contain conditions which Islandmagee Energy Ltd must adhere to. These will be publically available on the DAERA website and on the relevant Public Registers.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2024911%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=355710","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=355710"}},{"id":"355709","reference":"AQW 24910/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-11-01","answerBy":"2021-11-16","answered":"2021-11-15","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs, given the cross-cutting, significant and controversial nature of the proposed Islandmagee Gas Caverns storage project, whether he will bring the issue to the Executive Committee for final decisions.","answerText":"I am cognisant of my responsibilities as set out at sections 20 and 28 of the Northern Ireland Act 1998, as amended, and also of my commitments under the Ministerial Code to refer cross-cutting, significant and controversial matters to the Executive Committee. I considered this matter carefully based on advice provided by officials at the time and am content that the decision did not met the criteria for Executive Referral.","answerHtml":"<p>I am cognisant of my responsibilities as set out at sections 20 and 28 of the Northern Ireland Act 1998, as amended, and also of my commitments under the Ministerial Code to refer cross-cutting, significant and controversial matters to the Executive Committee. I considered this matter carefully based on advice provided by officials at the time and am content that the decision did not met the criteria for Executive Referral.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2024910%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=355709","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=355709"}},{"id":"355209","reference":"AQW 24816/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-10-22","answerBy":"2021-11-01","answered":"2021-11-30","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether he will extend the deadline for the High Street Scheme to ensure that everyone that wishes to apply can have their application processed in time.","answerText":"To offer all applicants a fair timescale in which to use their Spend Local Prepaid card, I announced on 2 November that I was extending the deadline for applicants to use their Spend Local Prepaid card by two weeks from 30 November to 14 December. This means that the vast majority of people will have at least four weeks to use their card. I have no plans to extend the spending period further.\n\nWe have also taken the necessary steps to update procedures to avoid any unnecessary delay in approving the manual applications which have been necessary to ensure the validity of some applications.","answerHtml":"<p>To offer all applicants a fair timescale in which to use their Spend Local Prepaid card, I announced on 2 November that I was extending the deadline for applicants to use their Spend Local Prepaid card by two weeks from 30 November to 14 December. This means that the vast majority of people will have at least four weeks to use their card. I have no plans to extend the spending period further.</p><p>We have also taken the necessary steps to update procedures to avoid any unnecessary delay in approving the manual applications which have been necessary to ensure the validity of some applications.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2024816%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=355209","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=355209"}},{"id":"355208","reference":"AQW 24815/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-10-22","answerBy":"2021-11-08","answered":"2021-10-25","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on the his Department’s Review of the Northern Ireland Postgraduate Tuition Fee Loan.","answerText":"My Department undertook a review of the postgraduate landscape across the UK and Republic of Ireland (RoI). As part of this review, the Department considered the current levels of postgraduate funding available to Northern Ireland students, as well as what is currently available to students in other areas of the UK and RoI. Following the review, my predecessor published a public consultation on 26 April 2021 which ran until 25 June 2021.\n\nMy Department is currently considering the responses to the consultation, and I hope to be able to publish a response later this year. Any outcomes, particularly in relation to the levels of financial support available, will be dependent on the funding that is available to my Department over the coming years.","answerHtml":"<p>My Department undertook a review of the postgraduate landscape across the UK and Republic of Ireland (RoI). As part of this review, the Department considered the current levels of postgraduate funding available to Northern Ireland students, as well as what is currently available to students in other areas of the UK and RoI. Following the review, my predecessor published a public consultation on 26 April 2021 which ran until 25 June 2021.</p><p>My Department is currently considering the responses to the consultation, and I hope to be able to publish a response later this year. Any outcomes, particularly in relation to the levels of financial support available, will be dependent on the funding that is available to my Department over the coming years.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2024815%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=355208","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=355208"}},{"id":"357371","reference":"AQO 2700/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-10-21","answerBy":"2021-11-09","answered":"2021-11-10","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what incentives he will offer to encourage people to reduce fossil fuel reliance in the home.","answerText":"My Department is in the process of finalising a new Energy Strategy for publication, subject to Executive approval, in the coming weeks. This Strategy will set out the Executive’s vision of net zero carbon and affordable energy.\n\nAlmost, two out of every three homes in Northern Ireland are currently heated by fossil fuel heating oil, with natural gas providing heat for the majority of the rest. This is very different to GB, where most homes are connected to the gas network and fewer than five percent rely on home heating oil. Our reliance on these fossil fuels to heat our homes leaves us vulnerable to rapid cost increases, linked to price spikes in the global energy market.\n\nThe new Energy Strategy will set out the pathway for eliminating our reliance on imported fossil fuels and support the expansion of secure, locally sourced and sustainable low carbon energy sources.\n\nMy Department’s Energy Strategy Policy Options consultation, which closed in July, included a proposal to introduce a low carbon heat capital grant scheme, similar to the recently announced Boiler Upgrade Scheme in England and Wales that is planned for April 2022. Responses to the consultation welcomed the proposal. Officials are developing the details for such initiatives across the heat, power and transport sectors to ensure that, any taxpayer support is used efficiently and effectively and, two, any support from the UK Government that applies across the whole of the UK, such as the Renewable Transport Fuel Obligation, is accessed by Northern Ireland consumers.","answerHtml":"<p>My Department is in the process of finalising a new Energy Strategy for publication, subject to Executive approval, in the coming weeks. This Strategy will set out the Executive’s vision of net zero carbon and affordable energy.</p><p>Almost, two out of every three homes in Northern Ireland are currently heated by fossil fuel heating oil, with natural gas providing heat for the majority of the rest. This is very different to GB, where most homes are connected to the gas network and fewer than five percent rely on home heating oil. Our reliance on these fossil fuels to heat our homes leaves us vulnerable to rapid cost increases, linked to price spikes in the global energy market.</p><p>The new Energy Strategy will set out the pathway for eliminating our reliance on imported fossil fuels and support the expansion of secure, locally sourced and sustainable low carbon energy sources.</p><p>My Department’s Energy Strategy Policy Options consultation, which closed in July, included a proposal to introduce a low carbon heat capital grant scheme, similar to the recently announced Boiler Upgrade Scheme in England and Wales that is planned for April 2022. Responses to the consultation welcomed the proposal. Officials are developing the details for such initiatives across the heat, power and transport sectors to ensure that, any taxpayer support is used efficiently and effectively and, two, any support from the UK Government that applies across the whole of the UK, such as the Renewable Transport Fuel Obligation, is accessed by Northern Ireland consumers.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202700%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=357371","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=357371"}},{"id":"354818","reference":"AQW 24624/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-10-20","answerBy":"2021-11-04","answered":"2022-01-24","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether the Home and Attractions scheme will be launched this year.","answerText":"The proposed NI Holiday at Home voucher scheme was outlined in the Phase Two Tourism Recovery Action Plan to support and rebuild the tourism sector.\n\nTourism NI designed a scheme and developed a supporting Business Case. Unfortunately Departmental economists were unable to confirm that it offered value for money, so I therefore issued a Ministerial Direction to my Departmental Accounting Officer as I very much recognised the continued pressure the sector is under, particularly when restrictions on trade remained in place.\n\nAs set out in Managing Public Money, any Ministerial Direction needs to be endorsed by the Executive or the Minister of Finance. Unfortunately, neither the Executive nor the Minister of Finance were willing to endorse the issuing of a Ministerial Direction. I regret therefore that the proposed scheme can not now progress.\n\nI informed the Economy Committee and representative bodies of this decision on 2 December 2021. I know this decision was a considerable disappointment to the accommodation and wider tourism and hospitality sectors.\n\nWe will continue to work hard to deliver on the actions within the Tourism Recovery Action Plan to help these sectors on their recovery journey.","answerHtml":"<p>The proposed NI Holiday at Home voucher scheme was outlined in the Phase Two Tourism Recovery Action Plan to support and rebuild the tourism sector.</p><p>Tourism NI designed a scheme and developed a supporting Business Case. Unfortunately Departmental economists were unable to confirm that it offered value for money, so I therefore issued a Ministerial Direction to my Departmental Accounting Officer as I very much recognised the continued pressure the sector is under, particularly when restrictions on trade remained in place.</p><p>As set out in Managing Public Money, any Ministerial Direction needs to be endorsed by the Executive or the Minister of Finance. Unfortunately, neither the Executive nor the Minister of Finance were willing to endorse the issuing of a Ministerial Direction. I regret therefore that the proposed scheme can not now progress.</p><p>I informed the Economy Committee and representative bodies of this decision on 2 December 2021. I know this decision was a considerable disappointment to the accommodation and wider tourism and hospitality sectors.</p><p>We will continue to work hard to deliver on the actions within the Tourism Recovery Action Plan to help these sectors on their recovery journey.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2024624%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=354818","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=354818"}},{"id":"354817","reference":"AQW 24623/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-10-20","answerBy":"2021-11-04","answered":"2021-11-02","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs to outline the reasons for his decision to allow a draft Marine Construction Licence to Infrastrata for gas storage caverns under Larne Lough, Islandmagee.","answerText":"I approved the DAERA consents for the proposed Islandmagee Gas Storage project on 27 September 2021. The relevant documentation was issued to Islandmagee Energy Ltd. on 12 October 2021.\n\nMy decision was informed by consideration of environmental information and the views of people who responded to the consultation on the application. The matter is complex and, as such, I have given the documentation all due consideration.\n\nI am satisfied that all material considerations have been assessed by officials and adequate mitigation has been identified to minimise the impacts of the project. The mitigation identified has been incorporated into the Marine Licence, Discharge Consent and Abstraction Licence and will augment the existing mitigation in the planning permission.","answerHtml":"<p>I approved the DAERA consents for the proposed Islandmagee Gas Storage project on 27 September 2021. The relevant documentation was issued to Islandmagee Energy Ltd. on 12 October 2021.</p><p>My decision was informed by consideration of environmental information and the views of people who responded to the consultation on the application. The matter is complex and, as such, I have given the documentation all due consideration.</p><p>I am satisfied that all material considerations have been assessed by officials and adequate mitigation has been identified to minimise the impacts of the project. The mitigation identified has been incorporated into the Marine Licence, Discharge Consent and Abstraction Licence and will augment the existing mitigation in the planning permission.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2024623%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=354817","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=354817"}},{"id":"354816","reference":"AQW 24622/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-10-20","answerBy":"2021-11-04","answered":"2021-10-28","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs given a hydrogen storage project (a) has not been applied for, (b) assessed for environmental impacts, or (c) consulted upon, whether any proposals for transitioning the Infrastrata Islandmagee Gas Storage Project to hydrogen will require a fresh application.","answerText":"The application made by Islandmagee Energy Limited was for a marine construction licence for the creation of caverns for the storage of natural gas. A draft marine licence was issued on 12 October for the storage of natural gas. The Company has indicated acceptance of the terms of the draft licence, and a full licence will be issued shortly.\n\nA condition of that licence is that if the licensee wishes to vary or change the intended use of the caverns, that it shall contact the Department immediately. The Company has been advised that a change of use may invalidate the licence and that a further application may be necessary.","answerHtml":"<p>The application made by Islandmagee Energy Limited was for a marine construction licence for the creation of caverns for the storage of natural gas. A draft marine licence was issued on 12 October for the storage of natural gas. The Company has indicated acceptance of the terms of the draft licence, and a full licence will be issued shortly.</p><p>A condition of that licence is that if the licensee wishes to vary or change the intended use of the caverns, that it shall contact the Department immediately. The Company has been advised that a change of use may invalidate the licence and that a further application may be necessary.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2024622%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=354816","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=354816"}},{"id":"353553","reference":"AQW 24085/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-10-12","answerBy":"2021-10-27","answered":"2021-10-19","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) for his assessment of the UN IPCC scientific evidence on petroleum; and (ii) whether he will consider petroleum policy licensing options based on this research.","answerText":"The Sixth Assessment Report from the UN IPCC indicates that considerable work still needs to be done to reduce our carbon emissions and meet climate targets. The UN IPCC research, as well as other international research and independent NI-specific research on the impacts of petroleum licensing, is being used to inform consideration of policy options for the future of petroleum licensing in Northern Ireland. I hope to be in a position to present policy options to the Executive later in the year.","answerHtml":"<p>The Sixth Assessment Report from the UN IPCC indicates that considerable work still needs to be done to reduce our carbon emissions and meet climate targets. The UN IPCC research, as well as other international research and independent NI-specific research on the impacts of petroleum licensing, is being used to inform consideration of policy options for the future of petroleum licensing in Northern Ireland. I hope to be in a position to present policy options to the Executive later in the year.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2024085%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=353553","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=353553"}},{"id":"353552","reference":"AQW 24084/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-10-12","answerBy":"2021-10-27","answered":"2022-01-21","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether, in the preparation of petroleum licensing options to bring before the Executive, he will be including an option to ban petroleum licensing altogether.","answerText":"A full range of policy options for the future of petroleum licensing in Northern Ireland is under consideration, including a ban on all petroleum licensing.\n\nI hope to bring these options to the Executive in the New Year for agreement of a preferred policy option.\n\nFollowing Executive approval of a preferred option, my Department will take forward a public consultation which will set out the range of options considered and the rationale for the preferred policy option.","answerHtml":"<p>A full range of policy options for the future of petroleum licensing in Northern Ireland is under consideration, including a ban on all petroleum licensing.</p><p>I hope to bring these options to the Executive in the New Year for agreement of a preferred policy option.</p><p>Following Executive approval of a preferred option, my Department will take forward a public consultation which will set out the range of options considered and the rationale for the preferred policy option.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2024084%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=353552","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=353552"}},{"id":"353551","reference":"AQW 24083/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-10-12","answerBy":"2021-10-27","answered":"2021-10-25","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether his Department has considered introducing a fund to support businesses in their efforts to improve indoor ventilation, similar to the £25 million fund introduced in Scotland.","answerText":"As part of the Executive’s COVID Taskforce work is underway to examine the utilisation of ventilation and fresh air in limiting the spread of COVID, as set out in the Executive’s Autumn/Winter Contingency Plan. The work of the Taskforce, which includes DfE, will require consideration of many issues, including important and complex technical aspects. That work will also explore the precise purpose, details and merits of the scheme announced in Scotland once further information on it is available from the Scottish Government.","answerHtml":"<p>As part of the Executive’s COVID Taskforce work is underway to examine the utilisation of ventilation and fresh air in limiting the spread of COVID, as set out in the Executive’s Autumn/Winter Contingency Plan. The work of the Taskforce, which includes DfE, will require consideration of many issues, including important and complex technical aspects. That work will also explore the precise purpose, details and merits of the scheme announced in Scotland once further information on it is available from the Scottish Government.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2024083%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=353551","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=353551"}},{"id":"353210","reference":"AQW 23934/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-10-08","answerBy":"2021-10-25","answered":"2022-01-27","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what advice his Department will provide in regards to the environmentally-friendly disposal of High Street Scheme cards.","answerText":"We have not provided any such advice.","answerHtml":"<p>We have not provided any such advice.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2023934%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=353210","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=353210"}},{"id":"353209","reference":"AQW 23933/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-10-08","answerBy":"2021-10-25","answered":"2021-12-14","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail the total expected administrative costs associated with the High Street Scheme.","answerText":"The scheme is still ongoing and it is not possible at this moment in time to give a definitive figure in terms of overall costs. The Executive provided £145m to fund the scheme.\n\nSome costs associated with the administration of the scheme are treated as commercially sensitive information and cannot be released until the contract period has ended. For this reason also it is not possible to detail the total administrative costs of the scheme at present.","answerHtml":"<p>The scheme is still ongoing and it is not possible at this moment in time to give a definitive figure in terms of overall costs. The Executive provided £145m to fund the scheme.</p><p>Some costs associated with the administration of the scheme are treated as commercially sensitive information and cannot be released until the contract period has ended. For this reason also it is not possible to detail the total administrative costs of the scheme at present.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2023933%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=353209","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=353209"}},{"id":"353208","reference":"AQW 23932/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-10-08","answerBy":"2021-10-25","answered":"2021-12-22","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to explain why some applicants for the High Street scheme have received cards with other people’s names printed on them.","answerText":"Cards are printed using an automated system involving a computer and camera, but if a damaged card is detected, manual intervention is required. In a small number of cases amongst the 1.4 million cards issued – the incorrect name was printed on a card following manual intervention.\n\nOnce this issue was identified, improved manual quality control processes were implemented by the card provider and the Department is unaware of any further instances of such mistakes occurring.","answerHtml":"<p>Cards are printed using an automated system involving a computer and camera, but if a damaged card is detected, manual intervention is required. In a small number of cases amongst the 1.4 million cards issued – the incorrect name was printed on a card following manual intervention.</p><p>Once this issue was identified, improved manual quality control processes were implemented by the card provider and the Department is unaware of any further instances of such mistakes occurring.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2023932%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=353208","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=353208"}},{"id":"353207","reference":"AQW 23931/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-10-08","answerBy":"2021-10-25","answered":"2022-01-14","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health whether he will ensure closer follow up of cancer patients to mitigate previous delays for elective surgeries.","answerText":"I can confirm that a number of actions have been taken to ensure closer follow up of cancer patients to mitigate previous delays for elective surgeries; these include:\n\na.the development of green (i.e. staff and patients segregated from COVID-19 environments) pathways for surgical patients; the creation of green sites where surgery or diagnostics can be maintained throughout the pandemic;\n\nb.regional planning and co-ordination of surgical capacity to ensure equitable access across Northern Ireland;\n\nc.ICU beds protected for complex surgery; and, use of facilities in the independent sector.\n\nEfforts are continuing to maximise access to IS provision and waiting list initiative money is being made available to all Trusts to enable them to provide additional clinics/lists where staffing allows. The Day Procedure Unit at Lagan Valley Hospital has also increased capacity to deliver red flag diagnostic procedures on a regional basis.\n\nHowever, even with these actions, the overall position remains challenging and continues to be kept under review by the Department and Health and Social Care Board and addressed by each Health Trust through their Winter Plans. All Trusts monitor the patients waiting for elective surgery and patients continue to be monitored and followed up by their clinical teams with respect to their individual cancer pathways.\n\nUltimately, a significant improvement in cancer services will require a step change in workforce, monitoring and investment as outlined in the Cancer Recovery Plan; Building Back Better, the Elective Care Framework: Restart, Recovery and Redesign and the new 10 year Cancer Strategy, which has just completed its consultation period and will be published in December 2021.","answerHtml":"<p>I can confirm that a number of actions have been taken to ensure closer follow up of cancer patients to mitigate previous delays for elective surgeries; these include:</p><p>a.the development of green (i.e. staff and patients segregated from COVID-19 environments) pathways for surgical patients; the creation of green sites where surgery or diagnostics can be maintained throughout the pandemic;</p><p>b.regional planning and co-ordination of surgical capacity to ensure equitable access across Northern Ireland;</p><p>c.ICU beds protected for complex surgery; and, use of facilities in the independent sector.</p><p>Efforts are continuing to maximise access to IS provision and waiting list initiative money is being made available to all Trusts to enable them to provide additional clinics/lists where staffing allows. The Day Procedure Unit at Lagan Valley Hospital has also increased capacity to deliver red flag diagnostic procedures on a regional basis.</p><p>However, even with these actions, the overall position remains challenging and continues to be kept under review by the Department and Health and Social Care Board and addressed by each Health Trust through their Winter Plans. All Trusts monitor the patients waiting for elective surgery and patients continue to be monitored and followed up by their clinical teams with respect to their individual cancer pathways.</p><p>Ultimately, a significant improvement in cancer services will require a step change in workforce, monitoring and investment as outlined in the Cancer Recovery Plan; Building Back Better, the Elective Care Framework: Restart, Recovery and Redesign and the new 10 year Cancer Strategy, which has just completed its consultation period and will be published in December 2021.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2023931%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=353207","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=353207"}},{"id":"353206","reference":"AQW 23930/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-10-08","answerBy":"2021-10-25","answered":"2021-10-21","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health what actions he is taking to ensure that the system for elective cancer surgeries is made more resilient.","answerText":"I can confirm that a number of actions have been taken to enhance the resilience of the elective cancer surgeries system; in order to protect cancer surgery the Department has carried out extensive planning for surge periods, which has included:\n\na.the development of green (i.e. staff and patients segregated from COVID-19 environments) pathways for surgical patients; the creation of green sites where surgery or diagnostics can be maintained throughout the pandemic;\n\nb.regional planning and co-ordination of surgical capacity to ensure equitable access across Northern Ireland;\n\nc.ICU beds protected for complex surgery; and, use of facilities in the independent sector.\n\nEfforts are continuing maximise access to IS provision and waiting list initiative money is being made available to Trusts to enable them to provide additional clinics/lists where staffing allows. The Day Procedure Unit at Lagan Valley Hospital has also increased capacity to deliver red flag diagnostic procedures on a regional basis.\n\nNICaN has also issued revised referral guidance for bladder and colorectal cancer which aim to support primary care decision making and streamline referrals. This includes the introduction of qFIT testing for patients with bowel symptoms into primary care from 5 July 2021. Finally, additional investment has been made into cancer tracking support to enable the proactive management of patients through their pathways.\n\nHowever, even with these actions, the overall position remains challenging and continues to be kept under review by the Department and Health and Social Care Board.\n\nUltimately, a significant improvement in cancer waiting times will require a step change in both workforce and investment as outlined in the Cancer Recovery Plan; Building Back Better and the Elective Care Framework: Restart, Recovery and Redesign.","answerHtml":"<p>I can confirm that a number of actions have been taken to enhance the resilience of the elective cancer surgeries system; in order to protect cancer surgery the Department has carried out extensive planning for surge periods, which has included:</p><p>a.the development of green (i.e. staff and patients segregated from COVID-19 environments) pathways for surgical patients; the creation of green sites where surgery or diagnostics can be maintained throughout the pandemic;</p><p>b.regional planning and co-ordination of surgical capacity to ensure equitable access across Northern Ireland;</p><p>c.ICU beds protected for complex surgery; and, use of facilities in the independent sector.</p><p>Efforts are continuing maximise access to IS provision and waiting list initiative money is being made available to Trusts to enable them to provide additional clinics/lists where staffing allows. The Day Procedure Unit at Lagan Valley Hospital has also increased capacity to deliver red flag diagnostic procedures on a regional basis.</p><p>NICaN has also issued revised referral guidance for bladder and colorectal cancer which aim to support primary care decision making and streamline referrals. This includes the introduction of qFIT testing for patients with bowel symptoms into primary care from 5 July 2021. Finally, additional investment has been made into cancer tracking support to enable the proactive management of patients through their pathways.</p><p>However, even with these actions, the overall position remains challenging and continues to be kept under review by the Department and Health and Social Care Board.</p><p>Ultimately, a significant improvement in cancer waiting times will require a step change in both workforce and investment as outlined in the Cancer Recovery Plan; Building Back Better and the Elective Care Framework: Restart, Recovery and Redesign.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2023930%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=353206","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=353206"}},{"id":"353098","reference":"AQO 2582/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-10-07","answerBy":"2021-10-18","answered":"2021-10-18","answeredOrally":true,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education to outline her plans to improve the school estate at Larne High School.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Miss McIlveen","text":"Since 2019, four minor capital works projects have been completed at Larne High School. These were accommodation works for special educational needs, completed in November 2020 at a cost of £54,000; refurbishment of a 2G synthetic pitch, completed in July 2021 at a cost of £300,000; a Disability Discrimination Act (DDA)-specific accommodation scheme, completed in 2019 at a cost of £163,000; and a school meals accommodation project, completed in October 2021 at a cost of £828,000. The school also submitted minor works applications for an upgrade of boiler flues and roof works during the last minor works call in 2017. Unfortunately, those applications were not ranked highly enough to progress at that time, but they will remain on the new call list and will be considered for progression, should additional funding become available. Senior officials from the Department and the Education Authority visited the school in early July to discuss minor works with the principal and are aware of the issues at the school. The EA has completed a condition survey, which will inform the identification and prioritisation of any work at the school, and it will continue to engage with the principal in that regard."},{"speaker":"Mr Dickson","text":"Thank you, Minister, for your answer. I am aware that the moneys that you set out have already been spent on the school. In reality, however, much of it has been painting over the cracks. For example, the new meals hall was needed because the old one fell down. That is the state of the buildings that we are talking about. Minister, will you undertake to visit the school to see at first hand the parlous state of the building? Despite the additional works that have been done, the building is not fit for purpose, yet the principal and staff are delivering an excellent education."},{"speaker":"Miss McIlveen","text":"I thank the Member for his question. Obviously, we have had discussions before in relation to that school and others in the east Antrim area. I gave a commitment to visit the school, and that was planned for September but, unfortunately, had to be rescheduled. I will be in contact with the Member with an update on a date for the visit when it is put in the diary."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202582%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=353098","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2021-10-18&docID=353646#AQO%202582/17-22","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=353098"}},{"id":"352174","reference":"AQO 2543/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-09-30","answerBy":"2021-10-11","answered":"2021-10-11","answeredOrally":true,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister whether their Department will implement all of its New Decade, New Approach commitments by the end of this mandate.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr Givan","text":"We are committed to delivering all the Executive Office's NDNA commitments and to moving on those things that have been delayed. Our Department has made good progress in a number of areas, including provision of support for victims and survivors of historical abuse, the conduct of Executive business and the European Union's exit subcommittee."},{"speaker":"Mr Dickson","text":"I am delighted to hear the First Minister say \"all\" because, to date, one might describe the Executive Office as somewhat embarrassed by the paucity of legislation that is being brought through the House. In fact, we are at the end of the mandate and are seeing more private Member's business and private Member's Bills being debated in the House than business being brought forward by the Executive Office and the First Minister and the deputy First Minister. Will they up their game and guarantee that all the commitments that were made in New Decade, New Approach will be delivered before the end of the mandate?"},{"speaker":"Mr Givan","text":"The Executive Office has been incredibly busy making sure that all the Departments that the First Minister and deputy First Minister have to oversee in their role on the Executive unlocked a whole series of legislation on a range of issues at the end of June, not least of which were the Criminal Justice (Committal Reform) Bill, for which the Minister from the Member's party is responsible, and the Organ and Tissue Donation (Deemed Consent) Bill. The Executive are taking forward many other Bills. If any Member looks at the Assembly's legislative programme, they will see that it is overwhelmingly led by the Executive. Of course, I also welcome private Members' Bills, not least my own, for which Christopher Stalford has taken on responsibility."},{"speaker":"Ms Sheerin","text":"Given that New Decade, New Approach was the basis on which these institutions were restored, does the Minister agree that the public have a right to expect it all to be delivered?"},{"speaker":"Mr Givan","text":"When we look at all the NDNA commitments, we see that one that is critically important is the recognition and implementation of Northern Ireland as an integral part of the internal market. That is one of the commitments the United Kingdom Government entered into and was the basis on which my party entered into these institutions. That needs to be put right, so I agree that all of NDNA needs to be implemented."},{"speaker":"Dr Aiken","text":"I noticed that an NDNA commitment was about a lot of issues to do with dealing with the challenges identified by the renewable heat incentive (RHI) inquiry. I also noticed that, in his written statement last week, the Finance Minister referred to a lot of the things that are to be implemented, yet we have already seen correspondence from senior civil servants from as far back as December 2018, saying that actions were to be taken. Is that acceptable? Also, I welcome the new Member for Fermanagh and South Tyrone. I have just seen you. You are very welcome to the House."},{"speaker":"Mr Givan","text":"The Finance Minister provided a written statement to the Assembly outlining the Executive's response to the RHI inquiry report. Also in response to the report, the Assembly took forward the Functioning of Government (Miscellaneous Provisions) Bill, which was led by the Member for North Antrim and supported by my party. The Assembly and the Executive have been responding to the findings in the report on the RHI inquiry."},{"speaker":"Mr Speaker","text":"On a welcoming note, I call Deborah Erskine."},{"speaker":"Mrs Erskine","text":"Thank you, Mr Speaker. Will the First Minister detail what progress has been made on the NDNA commitment to increase police numbers?"},{"speaker":"Mr Givan","text":"I, too, welcome Deborah, the new Member for Fermanagh and South Tyrone, to the House. Deborah is a good friend of the family, and I am delighted that she has taken up the role of serving the people of the great constituency of Fermanagh and South Tyrone. My family are more from the south Tyrone end of that constituency, but it is a pleasure to have Deborah here, taking up her role in this House. I welcome her. The Member is right that the commitments on policing, which were put forward by my party, are a key part of NDNA. In respect of their implementation, in order to get us back up to 7,500 police officers, the budget had an in-year allocation of £12·3 million, £9·8 million of which will enable the police to retain their numbers at the current level of 7,000. The additional £2·5 million enabled the recruitment of 100 more officers. That is a step forward in reaching the NDNA target of 7,500. To get us to that target, this party will want to see that reflected in the budget for the following three years."},{"speaker":"Mr Allister","text":"Given that the First Minister's party returned to Government only on the basis that, as promised in NDNA, Her Majesty's Government would legislate to restore Northern Ireland's full position within the internal market of the United Kingdom, which has not happened, will he give us an update on his party's leader's promise that, if it does not happen in October, his party leader will resign him as First Minister, along with his colleagues?"},{"speaker":"Mr Givan","text":"The Member knows that, as a result of actions taken by the Democratic Unionist Party, we have now got to a place where the European Union recognises the harm that is being done by the rigorous implementation of the protocol that most of the parties in the Assembly called for. I welcome the fact that people recognise that the protocol is not working and that change needs to be made. Of course, some people's assessment of change will likely differ from the assessment that my party will take of what comes forward. I look forward to the proposals from the European Union later this week and to seeing how the United Kingdom Government respond to them. Let us get to a place where there are no longer any east-west barriers. That is interdependent with the North/South relationship, and I look forward to us getting to that place."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202543%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=352174","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2021-10-11&docID=352777#AQO%202543/17-22","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=352174"}},{"id":"351292","reference":"AQW 23087/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-09-24","answerBy":"2021-10-11","answered":"2021-10-25","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education pursuant to AQW 22361 17-22 and considering the long waiting times for a Health Trust diagnosis, whether she will allow for a referral to the Autism Advisory and Intervention Service where there is strong professional evidence available to point towards an autism diagnosis.","answerText":"The process of referrals to the Education Authority (EA) Autism Advisory and Intervention Service (AAIS) is an operational matter for the EA.\n\nThe EA AAIS provide general advice and guidance for children and young people who are awaiting or undergoing an autism assessment/diagnosis. Parent/ carers are able to request a statutory assessment of Special Educational Needs (SEN) should they feel their child/young person requires further supports in relation to accessing learning, in the interim.\n\nThe EA are currently taking forward their Special Educational Needs and Disability (SEND) Strategic Development Programme, within which the process of referrals for children and young people to EA Pupil Support Services, including the AAIS, will be subject to review.","answerHtml":"<p>The process of referrals to the Education Authority (EA) Autism Advisory and Intervention Service (AAIS) is an operational matter for the EA.</p><p>The EA AAIS provide general advice and guidance for children and young people who are awaiting or undergoing an autism assessment/diagnosis. Parent/ carers are able to request a statutory assessment of Special Educational Needs (SEN) should they feel their child/young person requires further supports in relation to accessing learning, in the interim.</p><p>The EA are currently taking forward their Special Educational Needs and Disability (SEND) Strategic Development Programme, within which the process of referrals for children and young people to EA Pupil Support Services, including the AAIS, will be subject to review.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2023087%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=351292","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=351292"}},{"id":"351291","reference":"AQW 23086/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-09-24","answerBy":"2021-10-11","answered":"2021-10-15","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities for her assessment of the adequacey of the current schemes to insulate homes vulnerable to fuel poverty.","answerText":"The Affordable Warmth Scheme provides a range of heating and insulation measures to thermal efficiency.\n\nThe Affordable Warmth Scheme take a ‘whole house’ approach encouraging households to undertake all appropriate measures in their home to combat the effects of fuel poverty including Cavity Wall, Loft and Solid Wall insulation.\n\nThe Housing Executive’s intention is to adopt a Fabric First approach which entails insulation improvements in order to reduce both energy use/cost for its tenants and to prepare the properties for future decarbonised heating systems.\n\nThe Housing Executive has been upgrading loft insulation to current standards whenever a new heating system is installed. It is acknowledged that improvements in insulating the walls of its properties is also required.\n\nThe ‘Energy Efficiency in Social Housing Programme’, is aimed at improving the thermal performance of a number of non-traditionally constructed properties. Early results from some Aluminium Bungalow schemes indicate that the SAP ratings of the properties improved by an average of 14 points, and that energy use in them is reduced by approximately a third. Similarly an initial assessment of the first completed No Fines scheme indicates a post-works 10 point increase in SAP rating.","answerHtml":"<p>The Affordable Warmth Scheme provides a range of heating and insulation measures to thermal efficiency.</p><p>The Affordable Warmth Scheme take a ‘whole house’ approach encouraging households to undertake all appropriate measures in their home to combat the effects of fuel poverty including Cavity Wall, Loft and Solid Wall insulation.</p><p>The Housing Executive’s intention is to adopt a Fabric First approach which entails insulation improvements in order to reduce both energy use/cost for its tenants and to prepare the properties for future decarbonised heating systems.</p><p>The Housing Executive has been upgrading loft insulation to current standards whenever a new heating system is installed. It is acknowledged that improvements in insulating the walls of its properties is also required.</p><p>The ‘Energy Efficiency in Social Housing Programme’, is aimed at improving the thermal performance of a number of non-traditionally constructed properties. Early results from some Aluminium Bungalow schemes indicate that the SAP ratings of the properties improved by an average of 14 points, and that energy use in them is reduced by approximately a third. Similarly an initial assessment of the first completed No Fines scheme indicates a post-works 10 point increase in SAP rating.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2023086%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=351291","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=351291"}},{"id":"351290","reference":"AQW 23085/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-09-24","answerBy":"2021-10-11","answered":"2022-01-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on his Department’s work in implementing the relevant sections of New Decade, New Approach.","answerText":"The 'New Decade, New Approach' (NDNA) document sets out an ambitious package of measures covering a broad range of social, economic and cultural issues.\n\nClearly the focus of this Department for the past eighteen months has been in managing the economic fallout from the COVID pandemic and beginning the work to deliver our economic recovery action plan, which remains a clear priority.\n\nAs we recover and emerge from the impact of COVID I will of course review and action a range of NDNA commitments that fall to this Department.","answerHtml":"<p>The &#39;New Decade, New Approach&#39; (NDNA) document sets out an ambitious package of measures covering a broad range of social, economic and cultural issues.</p><p>Clearly the focus of this Department for the past eighteen months has been in managing the economic fallout from the COVID pandemic and beginning the work to deliver our economic recovery action plan, which remains a clear priority.</p><p>As we recover and emerge from the impact of COVID I will of course review and action a range of NDNA commitments that fall to this Department.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2023085%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=351290","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=351290"}},{"id":"351289","reference":"AQW 23084/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-09-24","answerBy":"2021-10-11","answered":"2021-09-30","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail the planning that has been taking place in his Department to ensure affordable access to electricity and heating this winter for homes and businesses.","answerText":"While fuel poverty is the responsibility of Department for Communities, my Department has a light touch multi-faceted approach in terms of energy poverty - maximizing income through economic activity, regulated prices, promoting competition and supporting energy efficiency.\n\nMy officials continue to work with the Utility Regulator and the Consumer Council to ensure consumers are protected as much as possible through the regulated tariff regime for gas and electricity in Northern Ireland.\n\nThe Consumer Council has a small business energy price comparison tool which enables small businesses, charities or organisations to compare electricity and natural gas prices from suppliers in Northern Ireland. Their website also has a number of free resources including help for all consumers to be more energy efficient at home, get the best from their electricity or gas supply and save money.\n\nMy Department is preparing to publish a new Energy Strategy in the coming months. One of the key objectives of the Strategy will be to ensure that all households and businesses have access to essential and affordable energy to enable a decent standard of living, health and competitiveness. We plan to achieve this by enabling consumers to be active participants in the energy market and by further protecting those who are unable or unwilling to participate actively.","answerHtml":"<p>While fuel poverty is the responsibility of Department for Communities, my Department has a light touch multi-faceted approach in terms of energy poverty - maximizing income through economic activity, regulated prices, promoting competition and supporting energy efficiency.</p><p>My officials continue to work with the Utility Regulator and the Consumer Council to ensure consumers are protected as much as possible through the regulated tariff regime for gas and electricity in Northern Ireland.</p><p>The Consumer Council has a small business energy price comparison tool which enables small businesses, charities or organisations to compare electricity and natural gas prices from suppliers in Northern Ireland. Their website also has a number of free resources including help for all consumers to be more energy efficient at home, get the best from their electricity or gas supply and save money.</p><p>My Department is preparing to publish a new Energy Strategy in the coming months. One of the key objectives of the Strategy will be to ensure that all households and businesses have access to essential and affordable energy to enable a decent standard of living, health and competitiveness. We plan to achieve this by enabling consumers to be active participants in the energy market and by further protecting those who are unable or unwilling to participate actively.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2023084%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=351289","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=351289"}},{"id":"351288","reference":"AQW 23083/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-09-24","answerBy":"2021-10-11","answered":"2021-11-19","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to clarify (i) how High Street Stimulus scheme vouchers can be donated to charity; and (ii) whether they can be donated directly.","answerText":"Individuals can support charities by either using their card to make a purchase in a charity shop or by purchasing goods in local business and then donating them to foodbanks or other charities for distribution, or to be sold in charity shops. All eligible spend using a Spend Local card will contribute to stimulating the local economy and, in turn, the recovery.","answerHtml":"<p>Individuals can support charities by either using their card to make a purchase in a charity shop or by purchasing goods in local business and then donating them to foodbanks or other charities for distribution, or to be sold in charity shops. All eligible spend using a Spend Local card will contribute to stimulating the local economy and, in turn, the recovery.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2023083%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=351288","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=351288"}},{"id":"350343","reference":"AQW 22680/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-09-17","answerBy":"2021-10-04","answered":"2021-11-17","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether he will ensure that organisations can set up single accounts on NIDirect to assist people with High Street Stimulus scheme applications.","answerText":"The online portal was housed on NI Direct however an account was not required to log on to the portal and make an application. Applications could also be made through the telephone service.","answerHtml":"<p>The online portal was housed on NI Direct however an account was not required to log on to the portal and make an application. Applications could also be made through the telephone service.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022680%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=350343","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=350343"}},{"id":"350342","reference":"AQW 22679/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-09-17","answerBy":"2021-10-04","answered":"2021-11-17","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to confirm whether the telephone service for the High Street Stimulus scheme application will be free of charge.","answerText":"The applications portal for a Spend Local Prepaid card opened 27 September until midnight 25 October. A telephone applications service was then launched on 11 October until midnight 25 October to support applications from people who were unable to access or use the online portal. I can confirm the telephone applications number 0800 046 8333 was free of charge from both landlines and mobiles.\n\nI can also confirm the manned High Street Voucher Scheme Customer Support Services number 0800 046 8330, and the Automated Enquiries number 0800 046 8333, both launched after midnight on the 25 October to support customers who needed assistance or information on their applications, were also free of charge from both landlines and mobiles.","answerHtml":"<p>The applications portal for a Spend Local Prepaid card opened 27 September until midnight 25 October. A telephone applications service was then launched on 11 October until midnight 25 October to support applications from people who were unable to access or use the online portal. I can confirm the telephone applications number 0800 046 8333 was free of charge from both landlines and mobiles.</p><p>I can also confirm the manned High Street Voucher Scheme Customer Support Services number 0800 046 8330, and the Automated Enquiries number 0800 046 8333, both launched after midnight on the 25 October to support customers who needed assistance or information on their applications, were also free of charge from both landlines and mobiles.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022679%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=350342","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=350342"}},{"id":"350341","reference":"AQW 22678/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-09-17","answerBy":"2021-10-04","answered":"2022-01-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what alternative policy interventions were considered to stimulate consumer spending in Northern Ireland, prior to deciding to establish the High Street Stimulus scheme.","answerText":"My Department has been at the forefront of the Executive's response to the economic impacts of the pandemic. We have delivered unprecedented financial support that has enabled thousands of businesses to keep their doors open, secured tens of thousands of jobs and provided hope for families and communities.\n\nWe provided around a half a billion pounds to over 32,000 businesses through a number of essential support schemes, all of which were developed and delivered in unprecedented turnaround times.\n\nWith Invest Northern Ireland we introduced new schemes to support business and alongside Tourism NI we weighed in with support for that sector. We also provided much needed support for Higher and Further Education students.\n\nThrough the launch of the Executive’s supported Economic Recovery Action Plan (ERAP) in February past, my Department clearly and deliberately shifted its focus from crisis response to economic recovery.\n\nAt its heart of this is the High Street Scheme.\n\nBy providing every eligible adult in Northern Ireland with a pre-paid Spend Local £100 card, rather than implementing another grant scheme, means we will stimulate economic recovery on our local high streets and town centres and at the same time protect local jobs. The High Street Scheme means that 1.4 million people will receive and spend £140m in local businesses throughout Northern Ireland and shift consumer spending from online to physical locations.\n\nThere is also the multiplier effect by bringing many more customers back through the doors of local retail, hospitality and other sectors, and in leveraging spend over and above the £100 on the card by people who will use it as part payment for a larger purchase.","answerHtml":"<p>My Department has been at the forefront of the Executive&#39;s response to the economic impacts of the pandemic. We have delivered unprecedented financial support that has enabled thousands of businesses to keep their doors open, secured tens of thousands of jobs and provided hope for families and communities.</p><p>We provided around a half a billion pounds to over 32,000 businesses through a number of essential support schemes, all of which were developed and delivered in unprecedented turnaround times.</p><p>With Invest Northern Ireland we introduced new schemes to support business and alongside Tourism NI we weighed in with support for that sector. We also provided much needed support for Higher and Further Education students.</p><p>Through the launch of the Executive’s supported Economic Recovery Action Plan (ERAP) in February past, my Department clearly and deliberately shifted its focus from crisis response to economic recovery.</p><p>At its heart of this is the High Street Scheme.</p><p>By providing every eligible adult in Northern Ireland with a pre-paid Spend Local £100 card, rather than implementing another grant scheme, means we will stimulate economic recovery on our local high streets and town centres and at the same time protect local jobs. The High Street Scheme means that 1.4 million people will receive and spend £140m in local businesses throughout Northern Ireland and shift consumer spending from online to physical locations.</p><p>There is also the multiplier effect by bringing many more customers back through the doors of local retail, hospitality and other sectors, and in leveraging spend over and above the £100 on the card by people who will use it as part payment for a larger purchase.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022678%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=350341","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=350341"}},{"id":"351798","reference":"AQO 2489/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-09-16","answerBy":"2021-09-28","answered":"2021-09-28","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to outline plans for long-term COVID-19 testing facilities in Larne.","answerText":"A Mobile Testing Unit has been deployed in Larne from 7 September 2021 and currently remains there.\n\nThere is also a Mobile Testing Unit currently deployed in Newtownabbey and a walk through testing site in Ballymena which are located 15 miles & 20 miles from Larne respectively.\n\nThe number and location of test sites is continually reviewed by my Department and the Public Health Agency and change in locations are made as required in response to demand.\n\nIt remains the case that the vast majority of people will be able to book a test at a site close to them and within 15 minutes travel time.\n\nBy providing a mix of walk-through, drive-through and home testing options across Northern Ireland, we can optimise equality of access and help ensure that people who need to get tested can do so in a way that suits their needs.","answerHtml":"<p>A Mobile Testing Unit has been deployed in Larne from 7 September 2021 and currently remains there.</p><p>There is also a Mobile Testing Unit currently deployed in Newtownabbey and a walk through testing site in Ballymena which are located 15 miles &amp; 20 miles from Larne respectively.</p><p>The number and location of test sites is continually reviewed by my Department and the Public Health Agency and change in locations are made as required in response to demand.</p><p>It remains the case that the vast majority of people will be able to book a test at a site close to them and within 15 minutes travel time.</p><p>By providing a mix of walk-through, drive-through and home testing options across Northern Ireland, we can optimise equality of access and help ensure that people who need to get tested can do so in a way that suits their needs.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202489%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=351798","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=351798"}},{"id":"350237","reference":"AQO 2458/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-09-16","answerBy":"2021-09-27","answered":"2021-09-27","answeredOrally":true,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister for an update on when the report of the Commission on Flags, Identity, Culture and Tradition will be published.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mrs O'Neill","text":"With your permission, again, Mr Speaker, junior Minister Kearney will answer that question."},{"speaker":"Mr Kearney","text":"The Executive discussed the FICT report at their meeting last Thursday and agreed that the report should be published. Consideration is being given as to how best to facilitate that."},{"speaker":"Mr Speaker","text":"I call Stewart Dickson for a supplementary. Be brief, please."},{"speaker":"Mr Dickson","text":"I thank the Minister for his reply. Will the Minister explain, and elaborate on for the House, what is holding up publication of the report? What meetings have been held since the Minister's most recent announcement that the report was in preparation?"},{"speaker":"Mr Kearney","text":"I thank the Member for that question. The same blockages remained over the summer when I was committed to making progress. I reported on those blockages on 28 June. My efforts to take this forward have, again, been frustrated. A special Executive meeting to discuss the report, recommendations and approved next steps should have convened at the end of April or beginning of May, but that did not happen. Therefore, I formally proposed to the Executive on 8 July that a full report be brought to the Executive by mid-September and that the report and recommendations be published at that time. The most recently scheduled meeting of the FICT working group was due to take place on 21 September, but that was cancelled. During the Executive meeting on 23 September, I called for the procrastination to end and again urged that the report be published, with an implementation plan. The Executive agreed with that position. That is appropriate. It is an Executive report. I intend to ensure that this commitment is delivered imminently. There is no excuse for any further delay or blocking on the matter."},{"speaker":"Mr Speaker","text":"That ends the period for listed questions. We move on to 15 minutes of topical questions. Question 7 has been withdrawn."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202458%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=350237","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2021-09-27&docID=350780#AQO%202458/17-22","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=350237"}},{"id":"349842","reference":"AQW 22486/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-09-15","answerBy":"2021-09-30","answered":"2021-09-28","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for his assessment of the importance of travel agencies in growing and maintaining an air route network to Northern Ireland.","answerText":"As Economy Minister, I am responsible for maintaining and enhancing NI’s air connectivity, both domestically and internationally. Inbound tourism and Foreign Direct Investment are absolutely vital to NI and both depend on NI’s air connectivity.\n\nThere is no available statistical data to determine the contribution that business and travel, generated through local travel agencies, makes to maintaining key routes to Northern Ireland. However, it is widely accepted that the travel agency business model in Northern Ireland is based on marketing and selling travel packages and services to destinations throughout the world.","answerHtml":"<p>As Economy Minister, I am responsible for maintaining and enhancing NI’s air connectivity, both domestically and internationally. Inbound tourism and Foreign Direct Investment are absolutely vital to NI and both depend on NI’s air connectivity.</p><p>There is no available statistical data to determine the contribution that business and travel, generated through local travel agencies, makes to maintaining key routes to Northern Ireland. However, it is widely accepted that the travel agency business model in Northern Ireland is based on marketing and selling travel packages and services to destinations throughout the world.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022486%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=349842","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=349842"}},{"id":"349841","reference":"AQW 22485/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-09-15","answerBy":"2021-09-30","answered":"2022-02-21","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy why travel agency businesses are considered to be outside the remit of his Department.","answerText":"Responsibility for the travel industry falls across several departments.\n\nThroughout the pandemic I and my officials have been in regular contact with the Executive Covid Taskforce in respect of support for various sectors of the economy as the need arose for public intervention. The Executive has provided a host of schemes at various stages of the pandemic, including one for Travel Agents administered by TEO.","answerHtml":"<p>Responsibility for the travel industry falls across several departments.</p><p>Throughout the pandemic I and my officials have been in regular contact with the Executive Covid Taskforce in respect of support for various sectors of the economy as the need arose for public intervention. The Executive has provided a host of schemes at various stages of the pandemic, including one for Travel Agents administered by TEO.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022485%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=349841","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=349841"}},{"id":"349840","reference":"AQW 22484/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-09-15","answerBy":"2021-09-30","answered":"2021-09-23","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, following an announcement by the Scottish Government that proof of COVID-19 vaccination will be required to enter certain venues, what engagement has he had with the Scottish Government to ensure that Northern Ireland certification will be accepted in Scotland.","answerText":"A solution to provide NI Citizens with certified proof of their vaccination status to facilitate International Travel was deployed on 2 July 2021. It adheres to EU and WHO specifications for such certificates and produced to the agreed UK format. The NI Executive has not yet established a policy on Domestic Use of Covid vaccination information.\n\nMy Department has no responsibility over entry requirements of commercial companies for access to their services.","answerHtml":"<p>A solution to provide NI Citizens with certified proof of their vaccination status to facilitate International Travel was deployed on 2 July 2021. It adheres to EU and WHO specifications for such certificates and produced to the agreed UK format. The NI Executive has not yet established a policy on Domestic Use of Covid vaccination information.</p><p>My Department has no responsibility over entry requirements of commercial companies for access to their services.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022484%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=349840","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=349840"}},{"id":"349839","reference":"AQW 22483/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-09-15","answerBy":"2021-09-30","answered":"2021-09-28","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on the development of an Energy Strategy for Northern Ireland.","answerText":"You will be aware a comprehensive Energy Strategy Policy Options Consultation paper was published in March 2021. This consultation received 283 responses – around four times the level of responses to the previous Strategic Energy Framework – facilitated by our extensive programme of collaboration and engagement.\n\nInformed by the responses to the consultation, I intend to bring a new Energy Strategy to the NI Executive for approval prior to COP26.","answerHtml":"<p>You will be aware a comprehensive Energy Strategy Policy Options Consultation paper was published in March 2021. This consultation received 283 responses – around four times the level of responses to the previous Strategic Energy Framework – facilitated by our extensive programme of collaboration and engagement.</p><p>Informed by the responses to the consultation, I intend to bring a new Energy Strategy to the NI Executive for approval prior to COP26.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022483%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=349839","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=349839"}},{"id":"349642","reference":"AQW 22361/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-09-14","answerBy":"2021-09-29","answered":"2021-09-23","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education, given the current waiting times for diagnosis, to detail the action she is taking to ensure that children awaiting an autism diagnosis are provided with autism support services by the Education Authority.","answerText":"Autism is a medical diagnosis and as such the matter of progressing an assessment is for the individual Health Trust.\n\nThe Education Authority’s (EA) Autism Advisory and Intervention Service (AAIS) can provide general advice and guidance for children and young people who are awaiting or undergoing an autism assessment, alongside additional resources available to support schools, pupils and parent/carers which can be accessed via the EA website.\n\nShould parent/ carers feel that their child/ young person is still having difficulty accessing learning, despite assistance being provided by the school, or other professionals, they can submit a request for a Statutory Assessment direct to EA via their online request form.","answerHtml":"<p>Autism is a medical diagnosis and as such the matter of progressing an assessment is for the individual Health Trust.</p><p>The Education Authority’s (EA) Autism Advisory and Intervention Service (AAIS) can provide general advice and guidance for children and young people who are awaiting or undergoing an autism assessment, alongside additional resources available to support schools, pupils and parent/carers which can be accessed via the EA website.</p><p>Should parent/ carers feel that their child/ young person is still having difficulty accessing learning, despite assistance being provided by the school, or other professionals, they can submit a request for a Statutory Assessment direct to EA via their online request form.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022361%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=349642","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=349642"}},{"id":"349641","reference":"AQW 22360/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-09-14","answerBy":"2021-09-29","answered":"2021-12-07","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what support his Department is providing to businesses following the recent Supreme Court case in regards to COVID-19 and business interruption insurance.","answerText":"The issue of business interruption insurance is a matter for the Financial Conduct Authority (FCA) and does not fall within the remit of my Department to answer.\n\nAffected businesses should seek independent legal advice or direct any queries to the FCA.\n\nFor information, the Supreme Court case on this issue was decided earlier in 2021, which has helped to provide clarity for businesses:\n\nhttps://www.fca.org.uk/news/press-releases/supreme-court-judgment-business-interruption-insurance-test-case","answerHtml":"<p>The issue of business interruption insurance is a matter for the Financial Conduct Authority (FCA) and does not fall within the remit of my Department to answer.</p><p>Affected businesses should seek independent legal advice or direct any queries to the FCA.</p><p>For information, the Supreme Court case on this issue was decided earlier in 2021, which has helped to provide clarity for businesses:</p><p>https://www.fca.org.uk/news/press-releases/supreme-court-judgment-business-interruption-insurance-test-case</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022360%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=349641","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=349641"}},{"id":"349640","reference":"AQW 22359/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-09-14","answerBy":"2021-09-29","answered":"2021-11-30","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what actions he is taking to encourage students from Northern Ireland to attend universities in the Republic of Ireland and vice versa.","answerText":"Where a student decides to undertake their higher education studies is a matter for the individual based on a myriad of factors.","answerHtml":"<p>Where a student decides to undertake their higher education studies is a matter for the individual based on a myriad of factors.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022359%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=349640","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=349640"}},{"id":"349639","reference":"AQW 22358/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-09-14","answerBy":"2021-09-29","answered":"2021-09-21","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether he has considered developing a specific scheme for HGV driver apprenticeships.","answerText":"The ApprenticeshipsNI programme already offers funded apprenticeship training, for those aged between 16 and 24 years old, in Driving Goods Vehicles at both Level 2 and Level 3. Work is underway to amend the age eligibility criteria for ApprenticeshipsNI frameworks which would make them available to older apprentices. Both apprenticeship frameworks include knowledge-based and competence-based qualifications in driving a range of goods vehicles including articulated vehicles.","answerHtml":"<p>The ApprenticeshipsNI programme already offers funded apprenticeship training, for those aged between 16 and 24 years old, in Driving Goods Vehicles at both Level 2 and Level 3. Work is underway to amend the age eligibility criteria for ApprenticeshipsNI frameworks which would make them available to older apprentices. Both apprenticeship frameworks include knowledge-based and competence-based qualifications in driving a range of goods vehicles including articulated vehicles.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022358%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=349639","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=349639"}},{"id":"349204","reference":"AQW 22082/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-09-09","answerBy":"2021-09-17","answered":"2021-09-16","answeredOrally":false,"priority":true,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities for her assessment of the risk of increasing levels of fuel poverty this winter; and to detail the actions she is taking to protect vulnerable households from rising energy prices.","answerText":"Fuel poverty is defined as needing to spend more than ten per cent of the total household income on all fuel use to maintain a satisfactory level of heating, that is, twenty one degrees in the living room and eighteen degrees in other occupied rooms. Fuel poverty is generally caused by a combination of three factors, poor household energy efficiency, low income and fuel costs.\n\nI am aware of the recently announced increase in energy prices and of the potential impact this will have on low income households, particularly as the timing of the increase coincides with the end of the furlough scheme and the phasing out of the Universal Credit top up.\n\nI wrote to Thérèse Coffey, Secretary of State for Work and Pensions, on 26 July and expressed my grave concern that the £20 uplift in Universal Credit is being withdrawn, particularly in the wake of the COVID-19 pandemic. I have written again on 30 August to Thérèse Coffey, Secretary of State for Work and Pensions in a joint letter with the Scottish and Welsh Ministers to seek the continuation of the £20 uplift to Universal Credit. This is similar to a joint letter that was issued on 12 November 2020. If the uplift is not extended after 5 October 2021, I will include it as part of the planned review of welfare mitigations measures.\n\nMy Department offers a range of support to assist low income households with rising energy prices.\n\nThe Affordable Warmth Scheme\n\nThe Affordable Warmth Scheme is the Executive’s main fuel poverty scheme providing a range of energy efficiency improvement measures which include cavity and loft insulation as well as new and replacement heating systems and windows where appropriate. The Scheme has invested over £90 million and improved the energy efficiency of almost 21,000 households since it was introduced in 2015.\n\nI approved changes to the eligibility criteria for the Scheme which were implemented on 1 July 21. Those changes increased the income threshold from £20,000 to £23,000 and removed disability benefits from the calculation of income. It is anticipated this will increase the number of households eligible for support.\n\nThe Boiler Replacement Scheme\n\nThe Boiler Replacement Scheme is a grant based scheme funded by the Department and administered by the Housing Executive which provides a grant of up to £1,000 to eligible households towards the cost of replacing old and inefficient boilers over 15 years old.\n\nCold Weather Payment Scheme\n\nThe Social Fund Cold Weather Payment Scheme provides a one off payment of £25 to the elderly, disabled and those with children under 5 years old in periods of severe weather. These periods are assessed by the Met Office which links every residential postcode to selected weather stations around the country, so that when the temperature criterion for a postcode is met (i.e. the average temperature is recorded or forecast to be 0oC or below over seven consecutive days) a payment is automatically triggered.\n\nWinter Fuel Payments\n\nThe Winter Fuel Payment is a tax free and non means tested benefit which is paid annually to eligible older people. The rate payable is between £100 and £300 depending on personal circumstances, to help people pay their heating bills. To be eligible for a Winter Fuel Payment an individual must have reached the qualifying age in the qualifying week, which is the third week in September. In addition to the above criteria the only other criteria is that a person lives in the UK during a qualifying week.\n\nDiscretionary Support\n\nAn award of short-term financial help may be made through the Discretionary Support scheme to assist with additional expenditure for fuel costs if a person is in an extreme, exceptional or crisis situation. Such awards will be made as an interest free loan provided a person meets the eligibility criteria. This includes an assessment of the ability to repay a loan and the level of existing Government debt. A person does not have to be claiming benefits to be eligible for Discretionary Support and it is available to those who are working if their annual income is below £20,894.40. Currently a maximum of three loans can be made in a rolling 12 month period.","answerHtml":"<p>Fuel poverty is defined as needing to spend more than ten per cent of the total household income on all fuel use to maintain a satisfactory level of heating, that is, twenty one degrees in the living room and eighteen degrees in other occupied rooms. Fuel poverty is generally caused by a combination of three factors, poor household energy efficiency, low income and fuel costs.</p><p>I am aware of the recently announced increase in energy prices and of the potential impact this will have on low income households, particularly as the timing of the increase coincides with the end of the furlough scheme and the phasing out of the Universal Credit top up.</p><p>I wrote to Thérèse Coffey, Secretary of State for Work and Pensions, on 26 July and expressed my grave concern that the £20 uplift in Universal Credit is being withdrawn, particularly in the wake of the COVID-19 pandemic. I have written again on 30 August to Thérèse Coffey, Secretary of State for Work and Pensions in a joint letter with the Scottish and Welsh Ministers to seek the continuation of the £20 uplift to Universal Credit. This is similar to a joint letter that was issued on 12 November 2020. If the uplift is not extended after 5 October 2021, I will include it as part of the planned review of welfare mitigations measures.</p><p>My Department offers a range of support to assist low income households with rising energy prices.</p><p>The Affordable Warmth Scheme</p><p>The Affordable Warmth Scheme is the Executive’s main fuel poverty scheme providing a range of energy efficiency improvement measures which include cavity and loft insulation as well as new and replacement heating systems and windows where appropriate. The Scheme has invested over £90 million and improved the energy efficiency of almost 21,000 households since it was introduced in 2015.</p><p>I approved changes to the eligibility criteria for the Scheme which were implemented on 1 July 21. Those changes increased the income threshold from £20,000 to £23,000 and removed disability benefits from the calculation of income. It is anticipated this will increase the number of households eligible for support.</p><p>The Boiler Replacement Scheme</p><p>The Boiler Replacement Scheme is a grant based scheme funded by the Department and administered by the Housing Executive which provides a grant of up to £1,000 to eligible households towards the cost of replacing old and inefficient boilers over 15 years old.</p><p>Cold Weather Payment Scheme</p><p>The Social Fund Cold Weather Payment Scheme provides a one off payment of £25 to the elderly, disabled and those with children under 5 years old in periods of severe weather. These periods are assessed by the Met Office which links every residential postcode to selected weather stations around the country, so that when the temperature criterion for a postcode is met (i.e. the average temperature is recorded or forecast to be 0oC or below over seven consecutive days) a payment is automatically triggered.</p><p>Winter Fuel Payments</p><p>The Winter Fuel Payment is a tax free and non means tested benefit which is paid annually to eligible older people. The rate payable is between £100 and £300 depending on personal circumstances, to help people pay their heating bills. To be eligible for a Winter Fuel Payment an individual must have reached the qualifying age in the qualifying week, which is the third week in September. In addition to the above criteria the only other criteria is that a person lives in the UK during a qualifying week.</p><p>Discretionary Support</p><p>An award of short-term financial help may be made through the Discretionary Support scheme to assist with additional expenditure for fuel costs if a person is in an extreme, exceptional or crisis situation. Such awards will be made as an interest free loan provided a person meets the eligibility criteria. This includes an assessment of the ability to repay a loan and the level of existing Government debt. A person does not have to be claiming benefits to be eligible for Discretionary Support and it is available to those who are working if their annual income is below £20,894.40. Currently a maximum of three loans can be made in a rolling 12 month period.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022082%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=349204","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=349204"}},{"id":"349203","reference":"AQW 22081/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-09-09","answerBy":"2021-09-24","answered":"2021-11-17","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health what plans are in place to ensure long-term and full-time provision of GP services in Glenarm and Carnlough.","answerText":"General Medical Services (GMS) in Glenarm and Carnlough are provided by Glens of Antrim Medical Practice with one Practice in Larne providing GMS services to Glenarm village also. Currently the Glens of Antrim Medical Practice provides 9 sessions of GMS cover in Carnlough. I understand there has been ongoing engagement between the Health and Social Care Board (HSCB) and the Practice regarding the continuation of care for patients in the area. Service provision in these areas continues to be a contractual matter between the HSCB and the Practice.","answerHtml":"<p>General Medical Services (GMS) in Glenarm and Carnlough are provided by Glens of Antrim Medical Practice with one Practice in Larne providing GMS services to Glenarm village also. Currently the Glens of Antrim Medical Practice provides 9 sessions of GMS cover in Carnlough. I understand there has been ongoing engagement between the Health and Social Care Board (HSCB) and the Practice regarding the continuation of care for patients in the area. Service provision in these areas continues to be a contractual matter between the HSCB and the Practice.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022081%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=349203","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=349203"}},{"id":"349284","reference":"AQO 2417/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-09-09","answerBy":"2021-09-20","answered":null,"answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities what action she is taking to protect vulnerable households facing fuel poverty this winter.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202417%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=349284","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=349284"}},{"id":"349117","reference":"AQW 22008/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-09-08","answerBy":"2021-09-16","answered":"2021-09-23","answeredOrally":false,"priority":true,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to outline the reasons for the lack of COVID-19 testing facilities in the Larne area; and whether he will ensure long-term testing facilities are established in the town.","answerText":"A Mobile Testing Unit has been deployed in Larne from 7 September 2021.\n\nThe number and location of test sites is continually reviewed by my Department and by the Public Health Agency (PHA).\n\nFull details of current locations can be found on the PHA website at https://www.publichealth.hscni.net/covid-19-coronavirus/testing-and-tracing-covid-19/testing-covid-19","answerHtml":"<p>A Mobile Testing Unit has been deployed in Larne from 7 September 2021.</p><p>The number and location of test sites is continually reviewed by my Department and by the Public Health Agency (PHA).</p><p>Full details of current locations can be found on the PHA website at https://www.publichealth.hscni.net/covid-19-coronavirus/testing-and-tracing-covid-19/testing-covid-19</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022008%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=349117","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=349117"}},{"id":"349116","reference":"AQW 22007/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-09-08","answerBy":"2021-09-23","answered":"2021-09-30","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail the contingency planning being undertaken in regards to vocational and essential skills assessments for 2021/22 to prevent any potential disruption as a result of the COVID-19 pandemic.","answerText":"On 6th September I announced that assessment should resume for vocational and technical qualifications (VTQs), with suitable adaptations put in place for 2021-22 academic year.\n\nThe Vocational and Technical Qualifications Contingency Regulatory Framework (VCRF) has been implemented to oversee Awarding Organisations’ (AO) assessment and awarding activities during 2021/22. The VCRF sets out an expectation that examinations with adaptations should go ahead as the most reliable form of assessment, and also has the contingency measure built in to revert to Teacher Assessed Grades should the need arise due to changes in PHA requirements during the year.\n\nEssential Skills assessments for 2021/22 will be through summative external assessment as normal with the previous adaptations from 2020/21 retained in place e.g. on-demand end tests, for use as required.\n\nTwo of the three Essential Skills Awarding Organisations (AO) have now issued their guidance for 2021/22 to learning centres, with the third AO expected to issue guidance imminently. In addition to the arrangements outlined above, this guidance will require learning centres to retain formative and summative trusted sources of assessment evidence from the commencement of teaching and learning in September 2021. This will ensure evidence is easily available, if alternative arrangements are required later in the academic year.","answerHtml":"<p>On 6th September I announced that assessment should resume for vocational and technical qualifications (VTQs), with suitable adaptations put in place for 2021-22 academic year.</p><p>The Vocational and Technical Qualifications Contingency Regulatory Framework (VCRF) has been implemented to oversee Awarding Organisations’ (AO) assessment and awarding activities during 2021/22. The VCRF sets out an expectation that examinations with adaptations should go ahead as the most reliable form of assessment, and also has the contingency measure built in to revert to Teacher Assessed Grades should the need arise due to changes in PHA requirements during the year.</p><p>Essential Skills assessments for 2021/22 will be through summative external assessment as normal with the previous adaptations from 2020/21 retained in place e.g. on-demand end tests, for use as required.</p><p>Two of the three Essential Skills Awarding Organisations (AO) have now issued their guidance for 2021/22 to learning centres, with the third AO expected to issue guidance imminently. In addition to the arrangements outlined above, this guidance will require learning centres to retain formative and summative trusted sources of assessment evidence from the commencement of teaching and learning in September 2021. This will ensure evidence is easily available, if alternative arrangements are required later in the academic year.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022007%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=349116","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=349116"}},{"id":"349115","reference":"AQW 22006/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-09-08","answerBy":"2021-09-23","answered":"2021-09-24","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on the Holiday at Home Voucher scheme.","answerText":"The Holiday at Home Voucher Scheme will allow Northern Ireland households to claim back 50% off a stay of two nights or more in certified accommodation, up to the value of £100. Vouchers will also be issued offering 50% off visits to attractions or tourism experience providers, up to the value of £20. Vouchers will be allocated on a first come first served basis and each household can apply for one of each type of voucher. Households can then claim their voucher money back by uploading their receipt and voucher details online. Tourism NI is currently working with the industry to decide on the most opportune time to launch the scheme.","answerHtml":"<p>The Holiday at Home Voucher Scheme will allow Northern Ireland households to claim back 50% off a stay of two nights or more in certified accommodation, up to the value of £100. Vouchers will also be issued offering 50% off visits to attractions or tourism experience providers, up to the value of £20. Vouchers will be allocated on a first come first served basis and each household can apply for one of each type of voucher. Households can then claim their voucher money back by uploading their receipt and voucher details online. Tourism NI is currently working with the industry to decide on the most opportune time to launch the scheme.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2022006%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=349115","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=349115"}},{"id":"348902","reference":"AQO 2395/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-09-06","answerBy":"2021-09-14","answered":"2021-09-14","answeredOrally":true,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs for an update on the proposed Islandmagee Gas Caverns Marine Licence application.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr Poots","text":"I am considering a number of documents relating to the proposed Islandmagee gas storage project. The documents relate to an application for a marine licence and the review of a discharge consent and abstraction licence. The matter that I am determining is complex, and, as such, it is vital that I give the documentation all due consideration."},{"speaker":"Mr Dickson","text":"Thank you, Minister. I trust that you will appreciate that this issue requires a great deal of detailed analysis and investigation. Nevertheless, it is effectively a sword of Damocles being held over many residents in Islandmagee and far beyond. Given the approach of the COP26 environment conference in Scotland later this year, together with the number of serious incidents around the world regarding this type of gas storage, and given that this is a fossil fuel and the United Kingdom wishes to move us away from fossil fuel, will the Minister please help to alleviate the fears and concerns of my constituents in Islandmagee and across East Antrim? Can we have a positive decision that the Department is clear that fossil fuel is a fuel of the past?"},{"speaker":"Mr Poots","text":"Unfortunately, I cannot look at the issue in the same way as the Member for East Antrim or, indeed, his colleagues from East Antrim who are in my party might look at it. I have to look at it purely on the basis of the scientific and planning evidence that is provided to me. Whatever decision I arrive at will be based on the qualitative material that is garnered by them in order to make recommendations to me. Therefore, I cannot take a decision that would be prejudiced by bias either for or against. I have to take in all the arguments and arrive at a reasoned position that is defensible thereafter."},{"speaker":"Dr Archibald","text":"Given the recent Intergovernmental Panel on Climate Change (IPCC) report that shows that we rapidly need to decarbonise and, as Mr Dickson said, move away from fossil fuels, as part of the consideration of the application, are you considering the potential for legal challenge on the basis of climate legislation that is going through the Assembly?"},{"speaker":"Mr Poots","text":"I am under the impression that, should I approve the application, I will be challenged judicially, and, if I refuse the application, I will be challenged judicially. I have to make a decision based on the information provided to me, not on whether one or other party will challenge me judicially thereafter. If I make a decision and one or other party challenges that decision, it is for that party to demonstrate that I have not been rational and have not done all the things that I should have done as a Minister. Who knows what would happen thereafter?"},{"speaker":"Mr Deputy Speaker (Mr Beggs)","text":"I call Justin McNulty."},{"speaker":"Mr McNulty","text":"Question 4."},{"speaker":"Mr Deputy Speaker (Mr Beggs)","text":"Apologies. I thought that the Member wanted to ask a supplementary question. I will now to go Mark Durkan."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202395%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=348902","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2021-09-14&docID=348692#AQO%202395/17-22","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=348902"}},{"id":"349467","reference":"AQO 2372/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-09-06","answerBy":"2021-09-13","answered":"2021-09-14","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister, in light of COVID-19, what further financial support will they provide to Northern Ireland travel agents.","answerText":"The Department for the Economy has taken the lead in delivering a range of business grant support schemes since the beginning of the pandemic. In addition, DfE has published a comprehensive Economic Recovery Action Plan, which the Executive has funded in full for this financial year.\n\nThis Plan includes a number of interventions aimed at supporting the travel and tourism sector, such as the ‘Holiday at Home’ scheme.\n\nIt will be for the Executive collectively to determine how any funding is allocated as we progress through the roadmap and the lifting of restrictions.","answerHtml":"<p>The Department for the Economy has taken the lead in delivering a range of business grant support schemes since the beginning of the pandemic. In addition, DfE has published a comprehensive Economic Recovery Action Plan, which the Executive has funded in full for this financial year.</p><p>This Plan includes a number of interventions aimed at supporting the travel and tourism sector, such as the ‘Holiday at Home’ scheme.</p><p>It will be for the Executive collectively to determine how any funding is allocated as we progress through the roadmap and the lifting of restrictions.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202372%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=349467","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=349467"}},{"id":"346847","reference":"AQW 21657/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-07-08","answerBy":"2021-07-20","answered":"2021-09-15","answeredOrally":false,"priority":true,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health why Northern Ireland travellers to Poland cannot acquire an interim proof of vaccination document, to avoid quarantine on arrival.","answerText":"The potential requirement to provide NI Citizens with certified proof of their vaccination status to facilitate International Travel was identified in April 2020. My officials tracked the development of the EU and WHO specification for such certificates whilst considering the technical infrastructure required to deliver a secure solution which would be interoperable with other UK systems and countries worldwide. Once the specification was finalised development work was commenced to deliver a system to provide a digital and non-digital solution for the production of, secure, trusted certificates by 19 July 2021.\n\nIn response to a unilateral decision by some destination countries to require evidence of vaccination against Covid-19 my Department diverted resources from the development of the Covid-19 Certification Scheme (CCS) to provide an interim solution for urgent International Travel. This was a manual solution to the immediate problem.\n\nThere was a large demand for certificates and priority was given to those travelling immediately to destinations that required a vaccination certificate to avoid compulsory 10 days quarantine. Other applicants were advised to use alternatives, such as PCR tests, where they existed to ensure they would be able to travel.\n\nThe interim CCS supplied 14,000 certificates over the operating period of 2 July to 23 July. A number of applications did not meet the published criteria and could not be taken forward.\n\nThe interim solution transitioned to the comprehensive CCS on 23 July. This uses a combination of NI Direct (Department of Finance) and Health and Social Care IT systems to, wherever possible, automatically verify an applicant’s identity, locate the relevant vaccination information and provide a trusted, digital certificate via an emailed PDF document or the mobile phone App – CovidCert NI. A helpline (0300 200 7814) is available for those unable to use the digital solution.\n\nBy 6 September 2021 the comprehensive CCS had delivered 79,267 certificates for those wishing to travel during August 2021 and a further 24,170 for those wishing to travel in September. Over 80% were delivered using automated processes for identity verification and matching with the vaccination records.\n\nBoth the interim and comprehensive solution have experienced challenges in supplying the requested information due to;\n\nProviding incorrect identity documents;\n\nPoor quality photographs of documents submitted;\n\nRequired information not supplied;\n\nRequesting certificates for travel outside of the specified dates;\n\nFraudulent applications being made;\n\nVaccination information missing or incorrectly transcribed into the Vaccination Management System;\n\nMis-information circulating in Social Media concerning those who resided in the Republic of Ireland but who received vaccinations in Northern Ireland and those Northern Ireland residents holding or travelling on an Irish Passport; and\n\nThe Helpline being inundated with non-International Travel Certification queries.\n\nIt should be noted that at this time the Covid Certification Scheme has only been registered with the UK Information Commissioner’s Office for the production of certificates to facilitate International Travel.\n\nThe NI Executive has not yet established a policy on Domestic Use of Covid vaccination information.","answerHtml":"<p>The potential requirement to provide NI Citizens with certified proof of their vaccination status to facilitate International Travel was identified in April 2020. My officials tracked the development of the EU and WHO specification for such certificates whilst considering the technical infrastructure required to deliver a secure solution which would be interoperable with other UK systems and countries worldwide. Once the specification was finalised development work was commenced to deliver a system to provide a digital and non-digital solution for the production of, secure, trusted certificates by 19 July 2021.</p><p>In response to a unilateral decision by some destination countries to require evidence of vaccination against Covid-19 my Department diverted resources from the development of the Covid-19 Certification Scheme (CCS) to provide an interim solution for urgent International Travel. This was a manual solution to the immediate problem.</p><p>There was a large demand for certificates and priority was given to those travelling immediately to destinations that required a vaccination certificate to avoid compulsory 10 days quarantine. Other applicants were advised to use alternatives, such as PCR tests, where they existed to ensure they would be able to travel.</p><p>The interim CCS supplied 14,000 certificates over the operating period of 2 July to 23 July. A number of applications did not meet the published criteria and could not be taken forward.</p><p>The interim solution transitioned to the comprehensive CCS on 23 July. This uses a combination of NI Direct (Department of Finance) and Health and Social Care IT systems to, wherever possible, automatically verify an applicant’s identity, locate the relevant vaccination information and provide a trusted, digital certificate via an emailed PDF document or the mobile phone App – CovidCert NI. A helpline (0300 200 7814) is available for those unable to use the digital solution.</p><p>By 6 September 2021 the comprehensive CCS had delivered 79,267 certificates for those wishing to travel during August 2021 and a further 24,170 for those wishing to travel in September. Over 80% were delivered using automated processes for identity verification and matching with the vaccination records.</p><p>Both the interim and comprehensive solution have experienced challenges in supplying the requested information due to;</p><p>Providing incorrect identity documents;</p><p>Poor quality photographs of documents submitted;</p><p>Required information not supplied;</p><p>Requesting certificates for travel outside of the specified dates;</p><p>Fraudulent applications being made;</p><p>Vaccination information missing or incorrectly transcribed into the Vaccination Management System;</p><p>Mis-information circulating in Social Media concerning those who resided in the Republic of Ireland but who received vaccinations in Northern Ireland and those Northern Ireland residents holding or travelling on an Irish Passport; and</p><p>The Helpline being inundated with non-International Travel Certification queries.</p><p>It should be noted that at this time the Covid Certification Scheme has only been registered with the UK Information Commissioner’s Office for the production of certificates to facilitate International Travel.</p><p>The NI Executive has not yet established a policy on Domestic Use of Covid vaccination information.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2021657%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=346847","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=346847"}},{"id":"346846","reference":"AQW 21656/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-07-08","answerBy":"2021-07-27","answered":"2021-07-27","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what support he is providing to the aerospace manufacturing industry.","answerText":"Invest NI and my Department continue to work closely with the wider Aerospace sector in our commitment to provide support as we emerge from the current pandemic.\n\nInvest NI is committed to supporting Aerospace companies and in the last year offered over £2.8m in grant support and £3.3m in support for Innovation and almost £3m in support for skills.\n\nInvest NI also works in partnership with ADS, the trade organisation for companies in the UK Aerospace, Defence, Security and Space sectors. Together the support the aerospace industry in Northern Ireland through programmes like the Aerospace Technology Institute, National Aerospace Technology Exploitation Programme, Sharing in Growth and 21st Century Supply Chain Programme (SC21) Competitiveness & Growth.\n\nInvest NI has also invested over £1m in an Aerospace diversification programme to identify potential new target sectors, markets and customers, along with a review of sector capabilities.\n\nCareers advice has been provided to almost 250 individuals in the aviation sector since April. This advice includes directing individuals to the programmes funded by the Department including the Assured Skills Academies and the new Flexible Skills Programme (FSP). Both of these initiatives provide short term training to assist individuals into employment. In the last financial year almost 6,000 individuals benefited from the FSP and we plan to deliver 47 Assured Skills Academies in 2021-22.\n\nUK Government has also put substantial support in place to help the aviation and aerospace sector. This includes £11 billion made available through the Bank of England’s Covid Corporate Financing Facility, grants for research and development, loan guarantees and support for exporters.\n\nI fully appreciate the challenges faced by the NI aerospace industry and shall continue to do everything possible to represent the interests of the sector.","answerHtml":"<p>Invest NI and my Department continue to work closely with the wider Aerospace sector in our commitment to provide support as we emerge from the current pandemic.</p><p>Invest NI is committed to supporting Aerospace companies and in the last year offered over £2.8m in grant support and £3.3m in support for Innovation and almost £3m in support for skills.</p><p>Invest NI also works in partnership with ADS, the trade organisation for companies in the UK Aerospace, Defence, Security and Space sectors. Together the support the aerospace industry in Northern Ireland through programmes like the Aerospace Technology Institute, National Aerospace Technology Exploitation Programme, Sharing in Growth and 21st Century Supply Chain Programme (SC21) Competitiveness &amp; Growth.</p><p>Invest NI has also invested over £1m in an Aerospace diversification programme to identify potential new target sectors, markets and customers, along with a review of sector capabilities.</p><p>Careers advice has been provided to almost 250 individuals in the aviation sector since April. This advice includes directing individuals to the programmes funded by the Department including the Assured Skills Academies and the new Flexible Skills Programme (FSP). Both of these initiatives provide short term training to assist individuals into employment. In the last financial year almost 6,000 individuals benefited from the FSP and we plan to deliver 47 Assured Skills Academies in 2021-22.</p><p>UK Government has also put substantial support in place to help the aviation and aerospace sector. This includes £11 billion made available through the Bank of England’s Covid Corporate Financing Facility, grants for research and development, loan guarantees and support for exporters.</p><p>I fully appreciate the challenges faced by the NI aerospace industry and shall continue to do everything possible to represent the interests of the sector.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2021656%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=346846","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=346846"}},{"id":"346649","reference":"AQW 21580/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-07-07","answerBy":"2021-07-26","answered":"2021-07-19","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure for her assessment of the impacts of constraints in the water and wastewater network on housebuilding in East Antrim.","answerText":"I have previously advised, in my responses to AQWs 16423/17-22, 18019/17-22, 18085/17-22, 18670/17-22, 18672/17-22 and 18748/17022 on infrastructure capacity constraints in East Antrim. No drinking water capacity issues have been identified in the East Antrim area. However wastewater capacity issues have been identified in parts of the Larne, Ballymena, Carrickfergus, Greenisland, Ballycarry, Portglenone, Tully Road (Carnlough and Glenarm), Whitehead/Ballystrudder/Ballycarry, Cushendall and Cushendun areas. Of the Wastewater Treatment Works (WwTW) located in the East Antrim constituency area (excluding Larne WwTW), the Mullaghboy WwTW is currently operating above its design capacity. In the Whitehead, Ballystrudder, Ballycarry, Tully Road (Carnlough and Glenarm), Cushendall and Cushendun areas, issues relate to the sewers nearing capacity.\n\nIn these areas NI Water will work with developers, and Mid and East Antrim Borough Council, to consider alternative solutions and look at all available options. Developers should engage with NI Water’s Developer Services Solution Engineering Team, which will conduct a more detailed analysis of the wastewater system and, if required, investigate potential developer led solutions to address capacity issues.\n\nNI Water is a statutory consultee in the planning process and it provides responses to planning applications based on a range of criteria including on whether there is capacity in the sewerage system to accept new connections. NI Water can consider the provision of positive planning responses where developers can demonstrate the following (including calculations): (a) like for like development, (b) extant previously approved development (where NI Water has given a positive response) and (c) where the development will offer a reduced loading on the sewer network, which may include storm separation and/or attenuation. However, it should be noted that local planning is the remit of local councils. NI Water provides information and advice to the appropriate local council and the council is obliged to take that advice into consideration but the councils ultimately make the planning decisions which may, or may not, reflect the advice provided by NI Water.\n\nNI Water has advised that it’s PC21 (2021-2027) infrastructure plans for the Mid and East Antrim Borough Council area require approximately £100 million pounds of investment to upgrade wastewater assets. This is over and above essential base maintenance investment associated with its assets during PC21. This investment will make a significant contribution to addressing the sewer and wastewater capacity issues and help facilitate new housing development in Mid and East Antrim.\n\nI have allocated £344.5 million for funding essential water and sewerage services in 2021-2022, fully funding the first year of PC21, and continue to present the need to commit sufficient pubic funds for the reminder of the PC21 period to Executive colleagues.","answerHtml":"<p>I have previously advised, in my responses to AQWs 16423/17-22, 18019/17-22, 18085/17-22, 18670/17-22, 18672/17-22 and 18748/17022 on infrastructure capacity constraints in East Antrim. No drinking water capacity issues have been identified in the East Antrim area. However wastewater capacity issues have been identified in parts of the Larne, Ballymena, Carrickfergus, Greenisland, Ballycarry, Portglenone, Tully Road (Carnlough and Glenarm), Whitehead/Ballystrudder/Ballycarry, Cushendall and Cushendun areas. Of the Wastewater Treatment Works (WwTW) located in the East Antrim constituency area (excluding Larne WwTW), the Mullaghboy WwTW is currently operating above its design capacity. In the Whitehead, Ballystrudder, Ballycarry, Tully Road (Carnlough and Glenarm), Cushendall and Cushendun areas, issues relate to the sewers nearing capacity.</p><p>In these areas NI Water will work with developers, and Mid and East Antrim Borough Council, to consider alternative solutions and look at all available options. Developers should engage with NI Water’s Developer Services Solution Engineering Team, which will conduct a more detailed analysis of the wastewater system and, if required, investigate potential developer led solutions to address capacity issues.</p><p>NI Water is a statutory consultee in the planning process and it provides responses to planning applications based on a range of criteria including on whether there is capacity in the sewerage system to accept new connections. NI Water can consider the provision of positive planning responses where developers can demonstrate the following (including calculations): (a) like for like development, (b) extant previously approved development (where NI Water has given a positive response) and (c) where the development will offer a reduced loading on the sewer network, which may include storm separation and/or attenuation. However, it should be noted that local planning is the remit of local councils. NI Water provides information and advice to the appropriate local council and the council is obliged to take that advice into consideration but the councils ultimately make the planning decisions which may, or may not, reflect the advice provided by NI Water.</p><p>NI Water has advised that it’s PC21 (2021-2027) infrastructure plans for the Mid and East Antrim Borough Council area require approximately £100 million pounds of investment to upgrade wastewater assets. This is over and above essential base maintenance investment associated with its assets during PC21. This investment will make a significant contribution to addressing the sewer and wastewater capacity issues and help facilitate new housing development in Mid and East Antrim.</p><p>I have allocated £344.5 million for funding essential water and sewerage services in 2021-2022, fully funding the first year of PC21, and continue to present the need to commit sufficient pubic funds for the reminder of the PC21 period to Executive colleagues.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2021580%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=346649","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=346649"}},{"id":"346648","reference":"AQW 21579/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-07-07","answerBy":"2021-07-26","answered":"2021-08-12","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs pursuant to AQW 19845-17/22, why there has been low take up of the Small Woodland Grant Scheme in East Antrim.","answerText":"The Small Woodland Grant Scheme opened for the first time in December 2020 which provided a short window in which applicants could apply for and plant new woodland under the scheme last year. The reopening of the scheme earlier this year in June provides more time for land owners to avail of the scheme. At this introductory stage of the new Small Woodland Grant Scheme no trends can yet be established regarding the uptake of the scheme on a constituency basis.\n\nAnecdotally, however as you will be aware, the East Antrim Constituency is relatively small geographically (about 4% of NI land cover) with substantial urban population. Additionally it includes significant areas such as the Antrim Hills Special Protection Area and Garron Plateau ASSI where environmental objectives favour protecting existing habitats and species. These factors are likely to have a bearing on the amount of land suitable for planting and hence the uptake of the scheme in the constituency. The Small Woodland Grant Scheme is available to encourage owners of suitable land in the constituency to plant new native woodlands.","answerHtml":"<p>The Small Woodland Grant Scheme opened for the first time in December 2020 which provided a short window in which applicants could apply for and plant new woodland under the scheme last year. The reopening of the scheme earlier this year in June provides more time for land owners to avail of the scheme. At this introductory stage of the new Small Woodland Grant Scheme no trends can yet be established regarding the uptake of the scheme on a constituency basis.</p><p>Anecdotally, however as you will be aware, the East Antrim Constituency is relatively small geographically (about 4% of NI land cover) with substantial urban population. Additionally it includes significant areas such as the Antrim Hills Special Protection Area and Garron Plateau ASSI where environmental objectives favour protecting existing habitats and species. These factors are likely to have a bearing on the amount of land suitable for planting and hence the uptake of the scheme in the constituency. The Small Woodland Grant Scheme is available to encourage owners of suitable land in the constituency to plant new native woodlands.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2021579%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=346648","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=346648"}},{"id":"346246","reference":"AQW 21411/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-07-05","answerBy":"2021-07-22","answered":"2021-08-19","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health whether people who have exceptional assurance to stay in the UK for a limited amount of time, as they are unable to return to a country due to Covid-19 impacts on travel or entry, will be entitled to a COVID-19 vaccine.","answerText":"A mechanism has been available to those not registered with a GP in Northern Ireland due to being temporarily resident here for some time.\n\nThe NI Direct webpage “Get a Covid 19 Vaccination in Northern Ireland” contains the following advice:\n\n“If you're not registered with a GP in NI but live here or are temporarily a resident in NI, you should email the Department of Health at COVID-19VaccinationProgramme@health-ni.gov.uk and they will advise you how you can be vaccinated.”\n\nOnce eligibility was established, a vaccination was arranged at one of the regional trust vaccination centres. This enabled those who were temporarily living in Northern Ireland to access vaccinations.\n\nThere has been a high volume of enquiries via this mechanism indicating strong awareness of this route to accessing a vaccination.\n\nFurther, the Public Health Agency organised vaccination clinics tailored to asylum seekers on 18th May and 19th May. All Asylum Seekers and migrants are eligible for the Covid Vaccine regardless of their status. They all can attend local Popup Vaccine Clinics and some local Pharmacies are offering Moderna Vaccine.\n\nIn July , the Red Cross and the Public Health Agency delivered 4 evening workshops. These were attended by over 80 asylum seekers and refugees from Eritrea, Sudan, Iran and Somalia, with the final workshop being delivered to those who arrived within the previous 2 weeks and most in need to vaccine info having not been exposed to any local health information to date.\n\nVaccination clinics led by Belfast Health and Social Care Trust were held on 27 and 28 July. These clinics saw 324 people vaccinated and supported by NINES (NI New Entrants Service) with interpreters. Many of those attending, received their first vaccine.\n\nA further clinic is planned for September.","answerHtml":"<p>A mechanism has been available to those not registered with a GP in Northern Ireland due to being temporarily resident here for some time.</p><p>The NI Direct webpage “Get a Covid 19 Vaccination in Northern Ireland” contains the following advice:</p><p>“If you&#39;re not registered with a GP in NI but live here or are temporarily a resident in NI, you should email the Department of Health at COVID-19VaccinationProgramme@health-ni.gov.uk and they will advise you how you can be vaccinated.”</p><p>Once eligibility was established, a vaccination was arranged at one of the regional trust vaccination centres. This enabled those who were temporarily living in Northern Ireland to access vaccinations.</p><p>There has been a high volume of enquiries via this mechanism indicating strong awareness of this route to accessing a vaccination.</p><p>Further, the Public Health Agency organised vaccination clinics tailored to asylum seekers on 18th May and 19th May. All Asylum Seekers and migrants are eligible for the Covid Vaccine regardless of their status. They all can attend local Popup Vaccine Clinics and some local Pharmacies are offering Moderna Vaccine.</p><p>In July , the Red Cross and the Public Health Agency delivered 4 evening workshops. These were attended by over 80 asylum seekers and refugees from Eritrea, Sudan, Iran and Somalia, with the final workshop being delivered to those who arrived within the previous 2 weeks and most in need to vaccine info having not been exposed to any local health information to date.</p><p>Vaccination clinics led by Belfast Health and Social Care Trust were held on 27 and 28 July. These clinics saw 324 people vaccinated and supported by NINES (NI New Entrants Service) with interpreters. Many of those attending, received their first vaccine.</p><p>A further clinic is planned for September.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2021411%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=346246","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=346246"}},{"id":"346245","reference":"AQW 21410/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-07-05","answerBy":"2021-07-22","answered":"2022-02-17","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 19971/17-22, whether he will make a bid to the Executive for a further COVID-19 travel agents financial support scheme.","answerText":"Responsibility for travel agents is not constrained to one specific department.\n\nCurrently the Executive is not in a position to meet and my Department has no mandate from the Executive to take forward any further schemes outside of those already announced.","answerHtml":"<p>Responsibility for travel agents is not constrained to one specific department.</p><p>Currently the Executive is not in a position to meet and my Department has no mandate from the Executive to take forward any further schemes outside of those already announced.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2021410%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=346245","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=346245"}},{"id":"346082","reference":"AQW 21324/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-07-02","answerBy":"2021-07-21","answered":"2021-09-22","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health for his assessment of the need to expand the official symptoms list of COVID-19, to allow for wider testing of potential cases.","answerText":"The case definition for COVID-19 is subject to ongoing review and consideration at national level. Any change in the formal case definition will be based on an agreed position as advised by the four UK Chief Medical Officers.\n\nThere are no immediate plans to announce changes to the formal case definition for COVID-19.","answerHtml":"<p>The case definition for COVID-19 is subject to ongoing review and consideration at national level. Any change in the formal case definition will be based on an agreed position as advised by the four UK Chief Medical Officers.</p><p>There are no immediate plans to announce changes to the formal case definition for COVID-19.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2021324%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=346082","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=346082"}},{"id":"346081","reference":"AQW 21323/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-07-02","answerBy":"2021-07-21","answered":"2021-08-20","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail the plans for further booster COVID-19 vaccinations later in 2021, including which specific groups will be eligible.","answerText":"The member will be aware that the Chief Medical Officer has confirmed that the Joint Committee on Vaccination and Immunisation (JCVI) has provided interim advice on revaccination.\n\nIn summary JCVI has advised that the COVID-19 booster programme should be offered in two stages:\n\nStage 1. The following persons should be offered a third dose COVID-19 booster vaccine and the annual influenza vaccine, as soon as possible from September 2021:\n\nadults aged 16 years and over who are immunosuppressed;\n\nthose living in residential care homes for older adults;\n\nall adults aged 70 years or over;\n\nadults aged 16 years and over who are considered clinically extremely vulnerable;\n\nfrontline health and social care workers.\n\nStage 2. The following persons should be offered a third dose COVID-19 booster vaccine as soon as practicable after Stage 1, with equal emphasis on deployment of the influenza vaccine where eligible\n\nall adults aged 50 years and over\n\nall adults aged 16 – 49 years who are in an influenza or COVID-19 at-risk group.\n\nHousehold contacts of immunosuppressed individuals","answerHtml":"<p>The member will be aware that the Chief Medical Officer has confirmed that the Joint Committee on Vaccination and Immunisation (JCVI) has provided interim advice on revaccination.</p><p>In summary JCVI has advised that the COVID-19 booster programme should be offered in two stages:</p><p>Stage 1. The following persons should be offered a third dose COVID-19 booster vaccine and the annual influenza vaccine, as soon as possible from September 2021:</p><p>adults aged 16 years and over who are immunosuppressed;</p><p>those living in residential care homes for older adults;</p><p>all adults aged 70 years or over;</p><p>adults aged 16 years and over who are considered clinically extremely vulnerable;</p><p>frontline health and social care workers.</p><p>Stage 2. The following persons should be offered a third dose COVID-19 booster vaccine as soon as practicable after Stage 1, with equal emphasis on deployment of the influenza vaccine where eligible</p><p>all adults aged 50 years and over</p><p>all adults aged 16 – 49 years who are in an influenza or COVID-19 at-risk group.</p><p>Household contacts of immunosuppressed individuals</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2021323%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=346081","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=346081"}},{"id":"345830","reference":"AQW 21199/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-30","answerBy":"2021-07-19","answered":"2021-07-07","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities to detail her plans for the reopening of Job and Benefit Offices.","answerText":"The Jobs & Benefits office network re-opened on a limited appointment basis on 5 May 2021. This cautious resumption of face to face services has been implemented to support customers who might be struggling with telephony and digital channels and those who are not engaging with Universal Credit by telephone or their online journal.","answerHtml":"<p>The Jobs &amp; Benefits office network re-opened on a limited appointment basis on 5 May 2021. This cautious resumption of face to face services has been implemented to support customers who might be struggling with telephony and digital channels and those who are not engaging with Universal Credit by telephone or their online journal.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2021199%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=345830","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=345830"}},{"id":"345829","reference":"AQW 21198/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-30","answerBy":"2021-07-19","answered":"2021-07-19","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail outcomes of COVID-19 wastewater surveillance.","answerText":"The wastewater surveillance programme is currently testing samples from 14 wastewater treatment works twice per week. These sites were selected to achieve the broadest population coverage using a Geographical Information Science based approach.\n\nWastewater testing is being used to monitor and track virus activity. It complements the clinical surveillance by providing information on the prevalence and spread of the disease. Results from wastewater surveillance are also used by the Public Health Agency to inform approaches to COVID testing where appropriate. Information also provides a sentinel system to track virus levels in the community, which again inform public health intervention as appropriate.","answerHtml":"<p>The wastewater surveillance programme is currently testing samples from 14 wastewater treatment works twice per week. These sites were selected to achieve the broadest population coverage using a Geographical Information Science based approach.</p><p>Wastewater testing is being used to monitor and track virus activity. It complements the clinical surveillance by providing information on the prevalence and spread of the disease. Results from wastewater surveillance are also used by the Public Health Agency to inform approaches to COVID testing where appropriate. Information also provides a sentinel system to track virus levels in the community, which again inform public health intervention as appropriate.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2021198%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=345829","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=345829"}},{"id":"345828","reference":"AQW 21197/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-30","answerBy":"2021-07-19","answered":"2021-07-15","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether the Study USA Programme will go ahead for this year.","answerText":"I am pleased to confirm that the Study USA programme will proceed for academic year 2021/22.\n\nThe full press release on this issue can be found at Frew confirms Study USA Programme for 2021/22 will proceed | Department for the Economy (economy-ni.gov.uk) for your information.","answerHtml":"<p>I am pleased to confirm that the Study USA programme will proceed for academic year 2021/22.</p><p>The full press release on this issue can be found at Frew confirms Study USA Programme for 2021/22 will proceed | Department for the Economy (economy-ni.gov.uk) for your information.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2021197%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=345828","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=345828"}},{"id":"345511","reference":"AQW 21048/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-28","answerBy":"2021-07-15","answered":"2021-07-08","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 19724 17-22, for a timeline for the completion of the Transition of Young People into Careers (14-19) Project.","answerText":"The Transition of Young People into Careers (14-19) Project is currently developing a strategic framework document which will set out the actions that are required to truly transform the 14-19 education and training landscape. As well as longer and medium-term actions, the framework will emphasise the actions that could be taken in the short-term to help move towards a more strategic approach.\n\nThe Minister of Education and I expect the draft framework and associated action plan by will be completed by autumn 2021.","answerHtml":"<p>The Transition of Young People into Careers (14-19) Project is currently developing a strategic framework document which will set out the actions that are required to truly transform the 14-19 education and training landscape. As well as longer and medium-term actions, the framework will emphasise the actions that could be taken in the short-term to help move towards a more strategic approach.</p><p>The Minister of Education and I expect the draft framework and associated action plan by will be completed by autumn 2021.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2021048%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=345511","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=345511"}},{"id":"345510","reference":"AQW 21047/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-28","answerBy":"2021-07-15","answered":"2021-07-09","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to outline the reasons for the delay in producing a system for proving COVID-19 vaccination status, in comparison to the rest of the UK and Europe.","answerText":"I can confirm that work is underway by Departmental officials on the provision of a Covid Certificate Scheme, compliant with EU and WHO information exchange standards. I provided full details of this work in my response to AQO Assembly Question (Oral) AQO 2336/17-22, including the challenges in meeting data protection and cyber security standards. The text of the response can be found on the NI Assembly website, at\n\nhttp://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2021/07/05&docID=345817#3569098","answerHtml":"<p>I can confirm that work is underway by Departmental officials on the provision of a Covid Certificate Scheme, compliant with EU and WHO information exchange standards. I provided full details of this work in my response to AQO Assembly Question (Oral) AQO 2336/17-22, including the challenges in meeting data protection and cyber security standards. The text of the response can be found on the NI Assembly website, at</p><p>http://aims.niassembly.gov.uk/officialreport/report.aspx?&amp;eveDate=2021/07/05&amp;docID=345817#3569098</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2021047%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=345510","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=345510"}},{"id":"345509","reference":"AQW 21046/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-28","answerBy":"2021-07-15","answered":"2021-07-09","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure for an update on progress on the York Street Interchange Project.","answerText":"As part of the NDNA agreement the Executive has committed to drive the delivery of essential infrastructure projects, including the York Street Interchange. I am committed to the delivery of this scheme but I want to be satisfied that the full package of improvements is the right fit for the future of our city and that we can maximise the benefits this project can deliver for our economy, environment and importantly the local community.\n\nIn March this year I announced the outcome of a short sharp review of the York Street Interchange Project, accepting in full its six recommendations. As a result of these I have asked for some further work to be carried out, particularly around place making and to maximise ambition in terms of what can be delivered for communities, connectivity and the wider living places agenda.\n\nThis work will also take into account the further development of the Bolder Vision for Belfast to reimagine how the city will look and feel in the future. This work is currently underway and I have asked the consultants to report on this in the autumn of 2021 at which time I will consider the next steps for the scheme.","answerHtml":"<p>As part of the NDNA agreement the Executive has committed to drive the delivery of essential infrastructure projects, including the York Street Interchange. I am committed to the delivery of this scheme but I want to be satisfied that the full package of improvements is the right fit for the future of our city and that we can maximise the benefits this project can deliver for our economy, environment and importantly the local community.</p><p>In March this year I announced the outcome of a short sharp review of the York Street Interchange Project, accepting in full its six recommendations. As a result of these I have asked for some further work to be carried out, particularly around place making and to maximise ambition in terms of what can be delivered for communities, connectivity and the wider living places agenda.</p><p>This work will also take into account the further development of the Bolder Vision for Belfast to reimagine how the city will look and feel in the future. This work is currently underway and I have asked the consultants to report on this in the autumn of 2021 at which time I will consider the next steps for the scheme.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2021046%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=345509","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=345509"}},{"id":"345343","reference":"AQW 20950/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-25","answerBy":"2021-07-05","answered":"2021-07-02","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) for his assessment of the risk of additional costs to consumers by the re-introduction of EU roaming fees; and (ii) to outline the engagement he has had with the UK Government on this matter.","answerText":"As you are aware, mobile phone charges are a commercial matter for the privatised telecommunications providers. However, my Department continues to engage regularly with the Department for Digital, Culture, Media and Sport (DCMS) on this and other matters.\n\nMy officials continue to highlight the unique position that many residents in Northern Ireland face regarding the possibility of crossing the border between Northern Ireland and the Republic of Ireland many times a day as they go about their daily business, and why it is critical that they should not be subject to any additional costs while they do so.\n\nI welcome the fact that the recent announcement from EE clearly stated that any introduction of roaming mobile charges will not be applied to their UK customers on the island of Ireland; this means that EE customers living or travelling in Northern Ireland should not incur any additional charges while ‘roaming’ accidentally or otherwise.\n\nThe recent O2 announcement was technically not a re-introduction of EU roaming charges, but rather a recalibration of their fair usage allowances, it is adding a \"fair use\" data cap of 25GB a month and will not charge customers more to use their phones in the EU. Effectively this means that plans with more than 25GB included will only get 25GB of free roaming data. Customers on plans below 25GB will be allowed to use all of that data while abroad at no extra cost. If they exceed their limit, it will cost £3.50 per gigabyte of data.\n\nThe application of fair use limits is a normal practice for telecommunications providers, and is something which these companies were also permitted to do when the UK was still part of the EU.","answerHtml":"<p>As you are aware, mobile phone charges are a commercial matter for the privatised telecommunications providers. However, my Department continues to engage regularly with the Department for Digital, Culture, Media and Sport (DCMS) on this and other matters.</p><p>My officials continue to highlight the unique position that many residents in Northern Ireland face regarding the possibility of crossing the border between Northern Ireland and the Republic of Ireland many times a day as they go about their daily business, and why it is critical that they should not be subject to any additional costs while they do so.</p><p>I welcome the fact that the recent announcement from EE clearly stated that any introduction of roaming mobile charges will not be applied to their UK customers on the island of Ireland; this means that EE customers living or travelling in Northern Ireland should not incur any additional charges while ‘roaming’ accidentally or otherwise.</p><p>The recent O2 announcement was technically not a re-introduction of EU roaming charges, but rather a recalibration of their fair usage allowances, it is adding a &quot;fair use&quot; data cap of 25GB a month and will not charge customers more to use their phones in the EU. Effectively this means that plans with more than 25GB included will only get 25GB of free roaming data. Customers on plans below 25GB will be allowed to use all of that data while abroad at no extra cost. If they exceed their limit, it will cost £3.50 per gigabyte of data.</p><p>The application of fair use limits is a normal practice for telecommunications providers, and is something which these companies were also permitted to do when the UK was still part of the EU.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020950%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=345343","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=345343"}},{"id":"345342","reference":"AQW 20949/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-25","answerBy":"2021-07-14","answered":"2021-07-15","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy when (i) AQW 19971/17-22; and (ii) AQW 20392/17-22 will be answered.","answerText":"(i) AQW 19971/17-22 was answered on Friday 2nd July 2021.\n\n(ii) AQW 20392/17-22 was answered on Friday 2nd July 2021.\n\nAs you will understand, my office is receiving an exceptional amount of communication and correspondence at this time, including a significant increase in Assembly Questions.","answerHtml":"<p>(i) AQW 19971/17-22 was answered on Friday 2nd July 2021.</p><p>(ii) AQW 20392/17-22 was answered on Friday 2nd July 2021.</p><p>As you will understand, my office is receiving an exceptional amount of communication and correspondence at this time, including a significant increase in Assembly Questions.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020949%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=345342","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=345342"}},{"id":"345341","reference":"AQW 20948/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-25","answerBy":"2021-07-14","answered":"2021-07-07","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities pursuant to AQW 20389/17-22, when the review is expected to commence.","answerText":"The legislative provisions within the Caravans Act 2011 are cross-cutting with other Departments. Preparatory work is already underway, and once that has been completed, my Department will formally undertake the 2021 Review later this year.\n\nUntil the process is agreed with the other Departments, the Department is not in a position to commit to a specific formal launch date at present.","answerHtml":"<p>The legislative provisions within the Caravans Act 2011 are cross-cutting with other Departments. Preparatory work is already underway, and once that has been completed, my Department will formally undertake the 2021 Review later this year.</p><p>Until the process is agreed with the other Departments, the Department is not in a position to commit to a specific formal launch date at present.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020948%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=345341","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=345341"}},{"id":"346448","reference":"AQO 2347/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-06-24","answerBy":"2021-07-05","answered":"2021-07-05","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to outline his plans for pop-up COVID-19 vaccination clinics.","answerText":"We have delivered a vaccine to 1,171,653 people with 890, 335 people have now received both doses. As we near the end of the current programme we want to ensure the highest uptake of vaccine and have expanded our deployment methods to achieve this by making vaccination as accessible as possible, particularly those aged 18 to 29 years of age. In addition a programme of targeted pop up clinics reaching into particular communities is underway.\n\nThe Health Trusts have developed plans to run mobile vaccination clinics across Northern Ireland, primarily targeting areas of high footfall. In addition, as the programme is open to the youngest adults, we are targeting areas where younger adults can be reached. These mobile clinics are in addition to the pop-up clinics which the PHA/Trusts have organised for particular hard to reach groups/communities.\n\nThese mobile clinics have also been the first use of the Moderna vaccine in Northern Ireland.\n\nSouth Eastern Trust have plans to deploy their vaccination bus in five population centres within their area throughout July. Last weekend saw South Eastern Trust run mobile clinics in Castlewellan and Donard Park, Newcastle. Belfast Trust provided a vaccination bus in Belfast City Centre last weekend and will target other locations, particularly in areas with a high number of persons aged under 30. Southern Trust held a clinic over the weekend at the Quays Shopping Centre, Newry and are planning further mobile clinics. Western and Northern Trusts are also developing plans to deploy mobile vaccination facilities to their population centres.\n\nBy way of example of this approach, Community Vaccine Clinics or “pop up” clinics have been led in Ballysally, Coleraine on 12th and 13th May, Creggan on 23rd June, Twinbrook / Poleglass on 21st and 22nd June and for asylum seekers in Belfast on 20th May.\n\nIt is hoped these targeted pop up clinics will increase vaccine uptake within specified neighbourhoods by allowing people to come to a local clinic in a familiar community setting.\n\nWalk in clinics at the Trust vaccination centres have also been introduced. SSE Arena ran a pilot walk in clinic on Sunday 27th June, which vaccinated almost 400 individuals, while other Trusts piloted walk in clinics on 29th June and this walk in option will continue.","answerHtml":"<p>We have delivered a vaccine to 1,171,653 people with 890, 335 people have now received both doses. As we near the end of the current programme we want to ensure the highest uptake of vaccine and have expanded our deployment methods to achieve this by making vaccination as accessible as possible, particularly those aged 18 to 29 years of age. In addition a programme of targeted pop up clinics reaching into particular communities is underway.</p><p>The Health Trusts have developed plans to run mobile vaccination clinics across Northern Ireland, primarily targeting areas of high footfall. In addition, as the programme is open to the youngest adults, we are targeting areas where younger adults can be reached. These mobile clinics are in addition to the pop-up clinics which the PHA/Trusts have organised for particular hard to reach groups/communities.</p><p>These mobile clinics have also been the first use of the Moderna vaccine in Northern Ireland.</p><p>South Eastern Trust have plans to deploy their vaccination bus in five population centres within their area throughout July. Last weekend saw South Eastern Trust run mobile clinics in Castlewellan and Donard Park, Newcastle. Belfast Trust provided a vaccination bus in Belfast City Centre last weekend and will target other locations, particularly in areas with a high number of persons aged under 30. Southern Trust held a clinic over the weekend at the Quays Shopping Centre, Newry and are planning further mobile clinics. Western and Northern Trusts are also developing plans to deploy mobile vaccination facilities to their population centres.</p><p>By way of example of this approach, Community Vaccine Clinics or “pop up” clinics have been led in Ballysally, Coleraine on 12th and 13th May, Creggan on 23rd June, Twinbrook / Poleglass on 21st and 22nd June and for asylum seekers in Belfast on 20th May.</p><p>It is hoped these targeted pop up clinics will increase vaccine uptake within specified neighbourhoods by allowing people to come to a local clinic in a familiar community setting.</p><p>Walk in clinics at the Trust vaccination centres have also been introduced. SSE Arena ran a pilot walk in clinic on Sunday 27th June, which vaccinated almost 400 individuals, while other Trusts piloted walk in clinics on 29th June and this walk in option will continue.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202347%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=346448","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=346448"}},{"id":"344899","reference":"AQW 20713/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-22","answerBy":"2021-06-30","answered":"2021-08-19","answeredOrally":false,"priority":true,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister when AQW 20060/17-22 will be answered.","answerText":"AQW 20060/17-22 was answered on 1 July 2021.","answerHtml":"<p>AQW 20060/17-22 was answered on 1 July 2021.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020713%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=344899","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=344899"}},{"id":"344898","reference":"AQW 20712/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-22","answerBy":"2021-07-07","answered":"2021-06-30","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance for an update on progress in developing a Social Value Bill.","answerText":"The Procurement Board has developed an enhanced social value policy that will require contracting authorities to include a minimum weighting for social value in tender award criteria.\n\nI have asked Executive colleagues to approve this policy and once it is approved the appropriate legislative underpinning will be developed.","answerHtml":"<p>The Procurement Board has developed an enhanced social value policy that will require contracting authorities to include a minimum weighting for social value in tender award criteria.</p><p>I have asked Executive colleagues to approve this policy and once it is approved the appropriate legislative underpinning will be developed.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020712%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=344898","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=344898"}},{"id":"343369","reference":"AQW 20583/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-18","answerBy":"2021-06-28","answered":"2021-11-19","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy when (i) AQW 17930/17-22; (ii) AQW 18015/17-22; (iii) AQW 18227/17-22; (iv) AQW 18295/17-22; (v) AQW 19026/17-22; (vi) AQW 19027/17-22; (vii) AQW 19028/17-22; (viii) AQW 19245/17-22; (ix) AQW 19247/17-22; (x) AQW 19407/17-22; (xi) AQW 19643/17-22; (xii) AQW 19722/17-22; (xiii) AQW 19723/17-22; (xiv) AQW 19724/17-22; and, (xv) AQW 19725/17-22 will be answered.","answerText":"All these AQWs have been answered.","answerHtml":"<p>All these AQWs have been answered.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020583%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=343369","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=343369"}},{"id":"343368","reference":"AQW 20582/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-18","answerBy":"2021-07-05","answered":"2021-07-02","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on progress in using the TXGB booking system to enable Northern Ireland tourism businesses to access new markets.","answerText":"My Department’s Tourism Recovery Action Plan includes an action to use the TXGB centralised booking platform to enable local businesses to not only access new markets but also manage sales across multiple global distributions channels. Based upon the information provided to date, TXGB has great potential to achieve these aims. On my behalf, Tourism NI officials have held a number of meetings with Visit England and the developers of TXGB to take this action forward. Tourism NI is currently developing a business case for approval and is considering appropriate procurement options. I look forward to this outcome being achieved over the coming months, as competition intensifies when international markets reopen.","answerHtml":"<p>My Department’s Tourism Recovery Action Plan includes an action to use the TXGB centralised booking platform to enable local businesses to not only access new markets but also manage sales across multiple global distributions channels. Based upon the information provided to date, TXGB has great potential to achieve these aims. On my behalf, Tourism NI officials have held a number of meetings with Visit England and the developers of TXGB to take this action forward. Tourism NI is currently developing a business case for approval and is considering appropriate procurement options. I look forward to this outcome being achieved over the coming months, as competition intensifies when international markets reopen.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020582%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=343368","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=343368"}},{"id":"343367","reference":"AQW 20581/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-18","answerBy":"2021-07-05","answered":"2021-11-22","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to outline how his Department will contribute to the delivery of the newly published UK Government Tourism Recovery Plan.","answerText":"My Department will build on the good relationships already established with the other UK administrations at both Ministerial and official level and I welcome the opportunity for the sharing of best practice that the UK Government Tourism Recovery Plan will facilitate.\n\nWhilst each devolved administration has developed its own recovery action plan, we have been working collaboratively to support the tourism sector towards recovery from Covid-19 as there are many common themes and issues across the jurisdictions.\n\nTourism NI has an existing Memorandum of Understanding with Visit Britain which is working effectively to mutual benefit.\n\nWhilst the recovery plan is focused on England, a number of actions are applicable to the industry UK-wide. For example, Tourism NI is currently working alongside Visit Britain in implementing the Tourism Exchange Great Britain (TXGB) business-to-business platform which is referenced in the UK Plan.\n\nThere are also number of policy initiatives on which collaboration between the four Nations is already ongoing:\n\nTourism NI partnered with the national tourism bodies of England, Scotland and Wales to introduce ‘We’re Good To Go’, a Covid safety accreditation, to the sector in 2020. In Northern Ireland, over 1,800 businesses have already signed up to this accreditation.\n\nTourism NI sits on the Visit Britain Data Analytics Interboard, which includes representatives from the tourism boards of the four nations. Northern Ireland is currently leading the way in this area in the development of a Tourism Data Hub, having experimented with a variety of data sources and started to build the technological infrastructure required.\n\nTourism NI will further strengthen relationships with Visit Britain on the issue of sustainability to ensure NI’s efforts are amplified through alignment or, when appropriate, lead the way for our closest competitors and collaborators.\n\nDiscussions are underway on the UK National Lottery voucher scheme and how it might link with the Holiday at Home Voucher Scheme that Tourism NI will be launching later in the year.\n\nI am pleased to see that the Plan recognises the importance of business events for the UK. This presents an opportunity for Northern Ireland to build on its existing national and international conference base as the plan seeks to spread this market opportunity across all parts of the UK.","answerHtml":"<p>My Department will build on the good relationships already established with the other UK administrations at both Ministerial and official level and I welcome the opportunity for the sharing of best practice that the UK Government Tourism Recovery Plan will facilitate.</p><p>Whilst each devolved administration has developed its own recovery action plan, we have been working collaboratively to support the tourism sector towards recovery from Covid-19 as there are many common themes and issues across the jurisdictions.</p><p>Tourism NI has an existing Memorandum of Understanding with Visit Britain which is working effectively to mutual benefit.</p><p>Whilst the recovery plan is focused on England, a number of actions are applicable to the industry UK-wide. For example, Tourism NI is currently working alongside Visit Britain in implementing the Tourism Exchange Great Britain (TXGB) business-to-business platform which is referenced in the UK Plan.</p><p>There are also number of policy initiatives on which collaboration between the four Nations is already ongoing:</p><p>Tourism NI partnered with the national tourism bodies of England, Scotland and Wales to introduce ‘We’re Good To Go’, a Covid safety accreditation, to the sector in 2020. In Northern Ireland, over 1,800 businesses have already signed up to this accreditation.</p><p>Tourism NI sits on the Visit Britain Data Analytics Interboard, which includes representatives from the tourism boards of the four nations. Northern Ireland is currently leading the way in this area in the development of a Tourism Data Hub, having experimented with a variety of data sources and started to build the technological infrastructure required.</p><p>Tourism NI will further strengthen relationships with Visit Britain on the issue of sustainability to ensure NI’s efforts are amplified through alignment or, when appropriate, lead the way for our closest competitors and collaborators.</p><p>Discussions are underway on the UK National Lottery voucher scheme and how it might link with the Holiday at Home Voucher Scheme that Tourism NI will be launching later in the year.</p><p>I am pleased to see that the Plan recognises the importance of business events for the UK. This presents an opportunity for Northern Ireland to build on its existing national and international conference base as the plan seeks to spread this market opportunity across all parts of the UK.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020581%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=343367","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=343367"}},{"id":"342143","reference":"AQW 20527/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-17","answerBy":"2021-07-02","answered":"2021-08-12","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) whether his Department is aware that the Coronavirus Job Retention Scheme could be used to support employees self-isolating; and (ii) whether his Department advised employers of this.","answerText":"The Coronavirus Job Retention Scheme (CJRS) is administered by HMRC, which is responsible for setting the eligibility criteria for the scheme. Employers can contact HMRC directly or access the guidance available on the UK Government website.\n\nIn addition, guidance for employers and employees, including signposting to the HMRC guidance, is available online at www.nibusinessinfo.co.uk and https://www.nidirect.gov.uk/campaigns/coronavirus-covid-19. The Labour Relations Agency also provides information to employers and workers about employment matters through its Workplace Information Service.","answerHtml":"<p>The Coronavirus Job Retention Scheme (CJRS) is administered by HMRC, which is responsible for setting the eligibility criteria for the scheme. Employers can contact HMRC directly or access the guidance available on the UK Government website.</p><p>In addition, guidance for employers and employees, including signposting to the HMRC guidance, is available online at www.nibusinessinfo.co.uk and https://www.nidirect.gov.uk/campaigns/coronavirus-covid-19. The Labour Relations Agency also provides information to employers and workers about employment matters through its Workplace Information Service.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020527%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=342143","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=342143"}},{"id":"342142","reference":"AQW 20526/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-17","answerBy":"2021-07-02","answered":"2021-06-28","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities for an update on the development of a Culture, Arts and Heritage Recovery Strategy.","answerText":"I announced the formation of the Culture, Arts & Heritage Recovery Taskforce on 17 May. The taskforce is considering measures to support re-opening and recovery of the sectors in the immediate term and is also identifying long term actions that should be considered in the development of a new Culture, Arts & Heritage Strategy.\n\nThe taskforce expects to report to me in August and I look forward to receiving recommendations to assist the development of the new Strategy.","answerHtml":"<p>I announced the formation of the Culture, Arts &amp; Heritage Recovery Taskforce on 17 May. The taskforce is considering measures to support re-opening and recovery of the sectors in the immediate term and is also identifying long term actions that should be considered in the development of a new Culture, Arts &amp; Heritage Strategy.</p><p>The taskforce expects to report to me in August and I look forward to receiving recommendations to assist the development of the new Strategy.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020526%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=342142","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=342142"}},{"id":"342141","reference":"AQW 20525/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-17","answerBy":"2021-07-02","answered":"2021-06-24","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities when AQW 19243/17-22 will be answered.","answerText":"AQW 19243/17-22 was answered on 18th June 2021.","answerHtml":"<p>AQW 19243/17-22 was answered on 18th June 2021.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020525%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=342141","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=342141"}},{"id":"342140","reference":"AQW 20524/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-17","answerBy":"2021-07-02","answered":"2021-06-28","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure what action is being taken to improve bus connectivity in East Antrim.","answerText":"Since taking office, I have been clear that my priority is addressing regional imbalance, and better connecting communities.\n\nMy officials are currently developing a new suite of transport plans, with the first in line for completion being the Regional Strategic Transport Network Transport Plan. It will set out future investment and improvement for our strategic transport networks, by road, rail and bus, and reflect my commitment to improving connectivity for the benefit of our economy and communities across all of the North. It is expected to be issued for consultation later this year.\n\nAs we emerge from COVID-19 it is critical that our planning prioritises a Green Recovery and that we put in place the infrastructure that supports Active Travel and Public Transport choices. Throughout the pandemic Translink has maintained bus services and we are now starting to see a positive return in bus usage which has resulted in a number of service enhancements being planned for July and September.\n\nThe Larne to Belfast 256 Express is returning to a full timetable and the Ballyclare to Belfast Urby services are returning at 20 minutes peak and hourly off peak. Rural connections from Ballymena to local villages are being improved and the Antrim Town Service to the Antrim Hospital is increasing in frequency. In the longer term Translink is also planning improved connections to the hospital.\n\nAdditional rural transport services are delivered by Rural Community Transport Partnerships which my Department funds through the Rural Transport Fund. These services play a valuable role in connecting people, some of whom are the most vulnerable in our society, to opportunities including accessing essential local services.","answerHtml":"<p>Since taking office, I have been clear that my priority is addressing regional imbalance, and better connecting communities.</p><p>My officials are currently developing a new suite of transport plans, with the first in line for completion being the Regional Strategic Transport Network Transport Plan. It will set out future investment and improvement for our strategic transport networks, by road, rail and bus, and reflect my commitment to improving connectivity for the benefit of our economy and communities across all of the North. It is expected to be issued for consultation later this year.</p><p>As we emerge from COVID-19 it is critical that our planning prioritises a Green Recovery and that we put in place the infrastructure that supports Active Travel and Public Transport choices. Throughout the pandemic Translink has maintained bus services and we are now starting to see a positive return in bus usage which has resulted in a number of service enhancements being planned for July and September.</p><p>The Larne to Belfast 256 Express is returning to a full timetable and the Ballyclare to Belfast Urby services are returning at 20 minutes peak and hourly off peak. Rural connections from Ballymena to local villages are being improved and the Antrim Town Service to the Antrim Hospital is increasing in frequency. In the longer term Translink is also planning improved connections to the hospital.</p><p>Additional rural transport services are delivered by Rural Community Transport Partnerships which my Department funds through the Rural Transport Fund. These services play a valuable role in connecting people, some of whom are the most vulnerable in our society, to opportunities including accessing essential local services.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020524%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=342140","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=342140"}},{"id":"342139","reference":"AQW 20523/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-17","answerBy":"2021-07-02","answered":"2021-08-18","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister when AQW 19246/17-22 will be answered.","answerText":"AQW 19246/17-22 was answered on 16 July 2021.","answerHtml":"<p>AQW 19246/17-22 was answered on 16 July 2021.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020523%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=342139","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=342139"}},{"id":"342223","reference":"AQO 2311/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-06-17","answerBy":"2021-06-29","answered":"2021-06-29","answeredOrally":true,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education for her assessment of the condition of the school estate in East Antrim.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Miss McIlveen","text":"My Department’s capital programme aims to ensure that school premises are planned, delivered and improved to support the delivery of the desired education outcomes and to provide a safe and secure environment for all users. I understand that, in the East Antrim constituency, over the last three financial years, approximately £6·3 million has been invested in minor works schemes to improve existing assets. Under my Department’s major capital works programme, which was initiated in 2012, five schools were announced as proceeding in planning for major capital investment. With an investment of in the region of £8·7 million, two of those projects, Woodburn Primary School and Corran Integrated Primary School, have been completed. A further three schools are progressing through various Royal Institute of British Architects (RIBA) stages: Abbey Community College, St Killian’s College and Islandmagee Primary School. Over £5 million has been invested in Acorn Integrated Primary School and Belfast High School under the first school enhancement programme (SEP). A further four schools have been announced to advance in design under the second call, with a total estimated investment of £16 million. Those projects are at an early stage of planning and design. The schools are Roddensvale School, Thornfield House School, Carrickfergus Grammar School and Greenisland Primary School. Ulidia Integrated College was announced as a major capital project under the Fresh Start programme in March 2016. The business case for a new build school on the existing site was approved in December 2018. That £25 million investment will provide up-to-date accommodation and sports facilities for 700 pupils. Whilst significant capital investment is under way in the East Antrim constituency, I acknowledge that a large number of schools in the constituency require maintenance, which is funded from the resource budget. The budget for school maintenance is just one of the budgetary pressures currently faced by my Department, which allocated £20·5 million to the Education Authority for maintenance for 2021-22. This year, an estimated spend of £800,000 will be committed for planned maintenance and statutory remedial projects in schools in East Antrim."},{"speaker":"Mr Dickson","text":"I appreciate the large sums of money that her Department has put into improving schools in East Antrim, particularly the schools that she mentioned. However, two schools seem to have been overlooked and are in very difficult situations. Carrickfergus Academy is the result of a merger between Downshire Community School and Carrickfergus College and was sold to the boards of governors, parents and the community as a new build school, yet that seems to be a long way away. Likewise, Larne High School is in a perilous state of repair. It seems to be the school that time forgot, not in the education that is being delivered in the building —"},{"speaker":"Mr Deputy Speaker (Mr Beggs)","text":"Will the Member come to his question?"},{"speaker":"Mr Dickson","text":"— by the principal and staff. Will the Minister accompany me on a visit to both schools?"},{"speaker":"Miss McIlveen","text":"I thank the Member for his question, which is similar to the question asked by my colleague about the anticipation of a new build when an amalgamation takes place. It is my intention to make a major capital works call before the end of the current financial year, and that may assist with that project. I am more than happy to accept his invitation to visit both schools."},{"speaker":"Mr Lyons","text":"I also congratulate the Minister on her appointment and wish her well in her new role. I echo Mr Dickson's comments, especially about Larne High School, which is in need of an urgent upgrade. I am pleased to hear what the Minister said about the capital works programme. Can she give any more detail on when it is likely to be in place? I also raise with her the issue of Greenisland Primary School, which is in a similar state of disrepair."},{"speaker":"Miss McIlveen","text":"I thank the Member for his question. I assume that he is looking for information on Larne High School. In October 2017, there was a call for minor works applications. Two applications were made for the school, for an upgrade of boiler flues and roofing, but they did not rank highly enough. Since 2019, four business cases have been approved for minor capital works: accommodation works for special educational needs (SEN), which were completed in 2020; Disability Discrimination Act (DDA)-specific accommodation, which was completed in 2019; the refurbishment of a 2G synthetic pitch, which is due to complete RIBA stage 5 in July; and strategic investment in the school meals accommodation project, which is due to complete RIBA stage 5 in September. I understand that the EA maintenance service will scope the changing rooms and gym hall for consideration for delivery in either financial year 2021-22 or in subsequent years, subject to capital budget availability. Larne High School was not put forward by the EA for consideration under the most recent major works call, which closed on 31 October, nor was an application made on behalf of the school submitted under the latest school enhancement programme call. I do not have any information with me on Greenisland Primary School, but I am happy to accompany the Member on a visit, if he so wishes."},{"speaker":"Mr Sheehan","text":"I also wish the Member well in her new role as Education Minister. The Minister will be aware that the school estate across the North is crying out for investment. Many schools have been operating in outdated, inappropriate and so-called temporary accommodation for 20 years. Can she outline her investment plans for the school estate that our young people need and deserve?"},{"speaker":"Mr Deputy Speaker (Mr Beggs)","text":"I remind the Member that the question was a constituency question specific to East Antrim. The Minister may or may not wish to respond."},{"speaker":"Miss McIlveen","text":"I am content to respond. I agree with the Member when he says that the school estate is crying out for investment and that far too many schools have outdated accommodation. In the past two weeks, I have visited quite a number of schools that went from one extreme to the other: from exemplary accommodation to accommodation that school leaders despair of. It concerns me that we still have not seen delivery of projects that have been prioritised for in excess of 10 years. It also concerns me that there is a significant backlog of minor works. We had 6,000 applications in the last call, and only around 1,300 of those have been progressed. I know that the reason for that is the number of emergency applications. I am concerned, and I agree with what the Member said. As I said in a previous response, I plan to issue further calls. I am meeting my officials to see how we can be better prepared so that we have shovel-ready projects when capital becomes available."},{"speaker":"Mr Deputy Speaker (Mr Beggs)","text":"I call Jim Allister, and I remind him that it is a constituency question."},{"speaker":"Mr Allister","text":"Thank you, Mr Deputy Speaker. I suggest to the Minister that it is a false economy not to maintain our schools. By way of example, I cite Moorfields Primary School, and I declare an interest as chair of the board of governors. A new school was provided a dozen years ago, yet, because of a failure to address plaster failings and a failure to repaint it, it is now riddled with cracks and growing moss, and it will take a lot of money to repair it at some time in the future. Why are we not keeping the stock that we have at such a level as to protect against excess expenditure in the future?"},{"speaker":"Miss McIlveen","text":"I thank the Member for his question, and I do not disagree with what he has said. I understand that some of what he spoke of is to do with resource pressures, but I am happy to go back to officials to see what Moorfields Primary School's current status is and then come back to the Member."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202311%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=342223","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2021-06-29&docID=345034#AQO%202311/17-22","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=342223"}},{"id":"341831","reference":"AQW 20392/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-15","answerBy":"2021-06-23","answered":"2021-07-02","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for his assessment of the adequacy of the level of COVID-19 financial support provided to travel agents to date.","answerText":"The Executive Office introduced a bespoke scheme for travel agents in March 2021. The Travel Agents Coronavirus Financial Assistance Scheme 2021 provided a grant payment of £10k to travel agency businesses operating from commercial premises, or a £3.5k payment to self-employed travel agents working from home.\n\nSince March 2020, the NI Executive and the UK Government have introduced an unprecedented number of interventions and packages of financial support to help those who have been affected by the consequences of Covid-19. These included the Coronavirus Job Retention Scheme for businesses employing staff, whilst many self-employed Travel Agents or Tour Operators would have been eligible to claim for lost revenue through the Self-Employment Income Support Scheme.\n\nThe Department for the Economy has led in the delivery of business related support, providing more than £513 million of much needed funds to support local businesses from all sectors and occupations throughout Northern Ireland, with the primary aim of helping these businesses to survive the pandemic, and protect as many local jobs as possible.\n\nI am aware that some travel agents, subject to the respective eligibility criteria, have availed of the £10k Small Business Support Scheme, the £25k Retail, Hospitality, Tourism and Leisure Scheme, the Micro-business Hardship Fund and more recently, the Covid Restrictions Business Support Scheme Part B.\n\nThe Department of Finance made available further top-up payments of £5,000 and £10,000 for businesses which received grants during the first lockdown. Travel Agencies operating in retail premises also benefitted from 100% rates holiday for 12 months in 2020/21 and this has now been extended for 2021/22.\n\nThose whom are self-employed in the sector and who continue to remain impacted can avail of the national Self-Employment Income Support Scheme (SEISS). Details on how to apply for the 5th grant (which covers May to September) will be available by the end of June. The grant will provide 80% of 3 months trading profit (up to a maximum of £7,500) for those who have faced 30% or greater reduction in turnover and 30% of 3 months trading profit (up to a maximum of £2,850) for those businesses facing less than 30% reduction in turnover.\n\nDespite the unprecedented level of financial support that has and is being offered, the Department appreciates that there are some businesses and individuals who continue to be severely negatively impacted. However, it will be for the Executive collectively to determine how any Covid-related funding is allocated as we progress through the roadmap and the lifting of restrictions.","answerHtml":"<p>The Executive Office introduced a bespoke scheme for travel agents in March 2021. The Travel Agents Coronavirus Financial Assistance Scheme 2021 provided a grant payment of £10k to travel agency businesses operating from commercial premises, or a £3.5k payment to self-employed travel agents working from home.</p><p>Since March 2020, the NI Executive and the UK Government have introduced an unprecedented number of interventions and packages of financial support to help those who have been affected by the consequences of Covid-19. These included the Coronavirus Job Retention Scheme for businesses employing staff, whilst many self-employed Travel Agents or Tour Operators would have been eligible to claim for lost revenue through the Self-Employment Income Support Scheme.</p><p>The Department for the Economy has led in the delivery of business related support, providing more than £513 million of much needed funds to support local businesses from all sectors and occupations throughout Northern Ireland, with the primary aim of helping these businesses to survive the pandemic, and protect as many local jobs as possible.</p><p>I am aware that some travel agents, subject to the respective eligibility criteria, have availed of the £10k Small Business Support Scheme, the £25k Retail, Hospitality, Tourism and Leisure Scheme, the Micro-business Hardship Fund and more recently, the Covid Restrictions Business Support Scheme Part B.</p><p>The Department of Finance made available further top-up payments of £5,000 and £10,000 for businesses which received grants during the first lockdown. Travel Agencies operating in retail premises also benefitted from 100% rates holiday for 12 months in 2020/21 and this has now been extended for 2021/22.</p><p>Those whom are self-employed in the sector and who continue to remain impacted can avail of the national Self-Employment Income Support Scheme (SEISS). Details on how to apply for the 5th grant (which covers May to September) will be available by the end of June. The grant will provide 80% of 3 months trading profit (up to a maximum of £7,500) for those who have faced 30% or greater reduction in turnover and 30% of 3 months trading profit (up to a maximum of £2,850) for those businesses facing less than 30% reduction in turnover.</p><p>Despite the unprecedented level of financial support that has and is being offered, the Department appreciates that there are some businesses and individuals who continue to be severely negatively impacted. However, it will be for the Executive collectively to determine how any Covid-related funding is allocated as we progress through the roadmap and the lifting of restrictions.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020392%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=341831","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=341831"}},{"id":"341830","reference":"AQW 20391/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-15","answerBy":"2021-06-30","answered":"2021-07-02","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail the actions he is taking to rebuild the domestic and international air route network to Northern Ireland airports.","answerText":"On Thursday 24 June 2021 I announced the launch of the NI Domestic Aviation Kickstart Scheme (NIDAKS) as part of my Department’s Economic Recovery Action Plan (ERAP).\n\nThe NIDAKS is a £4.5million initiative to support air connectivity between Northern Ireland and Great Britain and has three elements – maintaining a minimum route frequency on a core network of domestic routes, incentivising enhanced frequency on those routes above the minimum, and encouraging new routes which are economically important to NI.\n\nThe NIDAKS aim is to support inbound tourism and business travel between Northern Ireland and Great Britain and to encourage inward investment into the local economy. These are essential for recovery.\n\nOur domestic and international air connectivity is critical, for both the local tourism sector and the wider economy, especially as we focus on recovery. The launch of the NIDAKS delivers on our commitment to support NI’s domestic air connectivity with GB.\n\nMy Department is very supportive and always willing to discuss any opportunities which will enhance Northern Ireland’s connectivity, both domestically and internationally. We are especially interested in proposals that will address the lack of scheduled transatlantic routes.\n\nClearly, all such proposals will need to deliver Value for Money; be within the policy remit and legal vires of the Department; and be compliant with the UK’s policy on subsidy control and commitments in international trade agreements.","answerHtml":"<p>On Thursday 24 June 2021 I announced the launch of the NI Domestic Aviation Kickstart Scheme (NIDAKS) as part of my Department’s Economic Recovery Action Plan (ERAP).</p><p>The NIDAKS is a £4.5million initiative to support air connectivity between Northern Ireland and Great Britain and has three elements – maintaining a minimum route frequency on a core network of domestic routes, incentivising enhanced frequency on those routes above the minimum, and encouraging new routes which are economically important to NI.</p><p>The NIDAKS aim is to support inbound tourism and business travel between Northern Ireland and Great Britain and to encourage inward investment into the local economy. These are essential for recovery.</p><p>Our domestic and international air connectivity is critical, for both the local tourism sector and the wider economy, especially as we focus on recovery. The launch of the NIDAKS delivers on our commitment to support NI’s domestic air connectivity with GB.</p><p>My Department is very supportive and always willing to discuss any opportunities which will enhance Northern Ireland’s connectivity, both domestically and internationally. We are especially interested in proposals that will address the lack of scheduled transatlantic routes.</p><p>Clearly, all such proposals will need to deliver Value for Money; be within the policy remit and legal vires of the Department; and be compliant with the UK’s policy on subsidy control and commitments in international trade agreements.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020391%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=341830","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=341830"}},{"id":"341829","reference":"AQW 20390/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-15","answerBy":"2021-06-30","answered":"2021-06-28","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs pursuant to AQW 19641/17-22, for his assessment of how the new UK-Australia trade deal will impact Northern Ireland (i) generally; and; (ii) in regards to Northern Ireland’s dual market access to the UK and EU single market for goods.","answerText":"The agreement in principle reached between the UK and Australia on 15 June 2021 is in line with previous expectations and therefore my assessment on the impact on Northern Ireland agriculture as set out in AQW19641/17-22 is unchanged. I remain concerned about the impact on the beef and sheep sectors in particular and will continue to express these concerns to the UK Government.\n\nI do not believe that there will be any impact on the ability of NI goods to access the UK or EU markets. However, sales of beef and other products from Northern Ireland going to the GB market will face more competition from Australian imports as a result of this agreement.","answerHtml":"<p>The agreement in principle reached between the UK and Australia on 15 June 2021 is in line with previous expectations and therefore my assessment on the impact on Northern Ireland agriculture as set out in AQW19641/17-22 is unchanged. I remain concerned about the impact on the beef and sheep sectors in particular and will continue to express these concerns to the UK Government.</p><p>I do not believe that there will be any impact on the ability of NI goods to access the UK or EU markets. However, sales of beef and other products from Northern Ireland going to the GB market will face more competition from Australian imports as a result of this agreement.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020390%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=341829","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=341829"}},{"id":"341828","reference":"AQW 20389/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-15","answerBy":"2021-06-30","answered":"2021-06-24","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities, pursuant to AQW 16921/17-22, for her assessment of concerns that additional protections for caravan owners should be included in the Caravan Act.","answerText":"The 2021 Review, when launched, will have no pre-determined outcomes. The need to put in place any additional protections will be decided only when all the responses from the Review have been received and given due consideration.","answerHtml":"<p>The 2021 Review, when launched, will have no pre-determined outcomes. The need to put in place any additional protections will be decided only when all the responses from the Review have been received and given due consideration.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020389%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=341828","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=341828"}},{"id":"341288","reference":"AQW 20204/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-10","answerBy":"2021-06-25","answered":"2021-07-02","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 19174 17-22, to detail (i) any specific plans for a £10 million pilot invest to save fund, and (ii) when this will commence.","answerText":"The Energy Management Strategy and Action Plan for central government outlined the creation of an energy ‘invest to save’ fund as a critical action in meeting the objective of lowering net energy consumption by 30% by 2030 from a 2016/17 baseline year.\n\nMy Department has secured £10 million in capital funding as part of the Economic Recovery Action Plan and is working with the Energy Management Unit in the Strategic Investment Board to pilot a funding model for energy efficiency in central government.\n\nThe initial focus of this funding is to develop an understanding of the readiness and capacity of central government to deliver energy related projects and to scope out any potential procurement challenges that may exist.\n\nTo date departments and arm’s length bodies have been invited to submit details of potential energy projects within their estates along with outlining costs and specifics around delivery confidence within this financial year. The Energy Management Unit is offering support through this process through providing specialist energy and technical advice to enable consistency in business case completion.\n\nIn preparation for this funding, and in alignment with the strategy action plan, the Energy Management Unit has undertaken an extensive period of communication across central government through regular energy manager’s forums and by hosting ad hoc and topical workshops that consider collaborative energy procurement and buying strategies, the work is not only aimed at providing expertise where it may not be otherwise available but aims to influence and supplement existing work in ensuring better energy management.","answerHtml":"<p>The Energy Management Strategy and Action Plan for central government outlined the creation of an energy ‘invest to save’ fund as a critical action in meeting the objective of lowering net energy consumption by 30% by 2030 from a 2016/17 baseline year.</p><p>My Department has secured £10 million in capital funding as part of the Economic Recovery Action Plan and is working with the Energy Management Unit in the Strategic Investment Board to pilot a funding model for energy efficiency in central government.</p><p>The initial focus of this funding is to develop an understanding of the readiness and capacity of central government to deliver energy related projects and to scope out any potential procurement challenges that may exist.</p><p>To date departments and arm’s length bodies have been invited to submit details of potential energy projects within their estates along with outlining costs and specifics around delivery confidence within this financial year. The Energy Management Unit is offering support through this process through providing specialist energy and technical advice to enable consistency in business case completion.</p><p>In preparation for this funding, and in alignment with the strategy action plan, the Energy Management Unit has undertaken an extensive period of communication across central government through regular energy manager’s forums and by hosting ad hoc and topical workshops that consider collaborative energy procurement and buying strategies, the work is not only aimed at providing expertise where it may not be otherwise available but aims to influence and supplement existing work in ensuring better energy management.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020204%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=341288","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=341288"}},{"id":"341287","reference":"AQW 20203/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-10","answerBy":"2021-06-25","answered":"2021-06-25","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs, pursuant to AQW 19408 17-22, (i) when a calculation of costs will be complete; and (ii) to provide this information when available.","answerText":"Further to AQW 19408 17-22, my officials confirm that the formal review process for compensation claims is still ongoing for quotations received to date and DAERA have not yet been formally issued with any verified costs.\n\nAs previously advised, until all claims have been submitted by contractors and reviewed by the Project Manager in accordance with the contract, the cost to the Department cannot be confirmed.\n\nWhen the compensation claims are received, assessed and any adjudication process completed my officials will communicate these costs to you.","answerHtml":"<p>Further to AQW 19408 17-22, my officials confirm that the formal review process for compensation claims is still ongoing for quotations received to date and DAERA have not yet been formally issued with any verified costs.</p><p>As previously advised, until all claims have been submitted by contractors and reviewed by the Project Manager in accordance with the contract, the cost to the Department cannot be confirmed.</p><p>When the compensation claims are received, assessed and any adjudication process completed my officials will communicate these costs to you.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020203%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=341287","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=341287"}},{"id":"340990","reference":"AQW 20060/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-08","answerBy":"2021-06-16","answered":"2021-07-01","answeredOrally":false,"priority":true,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister when payments under the Travel Agents (Coronavirus) Financial Assistance Scheme will be made.","answerText":"The Travel Agents Financial Assistance Scheme was agreed by the Executive to ensure the continued viability of the travel agency sector here.\n\nThe Scheme was open for application from the 19th to the 26th March 2021. Officials within TEO are currently processing 187 applications. It is anticipated that payments will be made to successful applicants in early summer.\n\nThe Scheme will provide a one-off payment of £10,000 for travel agents operating from commercial premises here and a one-off payment of £3,500 for self-employed travel agents working from home.\n\nIt is expected that the Scheme will provide in the region of £1.1 to £1.3 million of much needed support for this sector.\n\nFinal costs will be known once all applications have been processed.","answerHtml":"<p>The Travel Agents Financial Assistance Scheme was agreed by the Executive to ensure the continued viability of the travel agency sector here.</p><p>The Scheme was open for application from the 19th to the 26th March 2021. Officials within TEO are currently processing 187 applications. It is anticipated that payments will be made to successful applicants in early summer.</p><p>The Scheme will provide a one-off payment of £10,000 for travel agents operating from commercial premises here and a one-off payment of £3,500 for self-employed travel agents working from home.</p><p>It is expected that the Scheme will provide in the region of £1.1 to £1.3 million of much needed support for this sector.</p><p>Final costs will be known once all applications have been processed.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020060%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=340990","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=340990"}},{"id":"340989","reference":"AQW 20059/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-08","answerBy":"2021-06-23","answered":"2021-07-02","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on her Department's progress in implementing the Energy Management Strategy and Action Plan for the Central Government Estate to 2030.","answerText":"My Department sponsors an Energy Management Unit in the Strategic Investment Board to manage the delivery of the Energy Management Strategy & Action Plan to 2030. Delivering on this strategy and action plan is a collective responsibility across central government and the role of the unit is to facilitate Departments and Arms Length Bodies to deliver on potential energy-savings opportunities\n\nThe Energy Management Strategy and Action Plan sets out a pathway for central government to establish effective energy management processes that unlock value and includes an objective of lowering net energy consumption by 30% by 2030 from a 2016/17 baseline year.\n\nOver the last three years, and in alignment with the strategy action plan, an extensive energy consumption data collection process has been undertaken to ensure a robust, validated and verified dataset is in place allowing for a more accurate representation of the baseline year. This process will be further supported by the inception of a centrally procured framework delivering a service to provide automatic meter reading systems across the central government estate, progress here is ongoing.\n\nAs part of this development phase of the strategy the Energy Management Unit continue to undertake a number of bilateral discussions with Centres of Procurement Excellence across central government. The discussions have focused not only on procurement but have taken into account other key enablers such as piloting behavioural change and building on a recently commissioned exemplar buildings study. Collaboration and engagement across central government to drive awareness and influence decision making has been the emphasis of discussions to date.\n\nSince its launch in May 2019 the strategy commits the Energy Management Unit co-sponsored by my department to report progress against the aforementioned baseline annually, the first annual report is publically available at www.sibni.org, the second annual report covering the period 1st April 2020 – 31 March 2021 will be published later this year.","answerHtml":"<p>My Department sponsors an Energy Management Unit in the Strategic Investment Board to manage the delivery of the Energy Management Strategy &amp; Action Plan to 2030. Delivering on this strategy and action plan is a collective responsibility across central government and the role of the unit is to facilitate Departments and Arms Length Bodies to deliver on potential energy-savings opportunities</p><p>The Energy Management Strategy and Action Plan sets out a pathway for central government to establish effective energy management processes that unlock value and includes an objective of lowering net energy consumption by 30% by 2030 from a 2016/17 baseline year.</p><p>Over the last three years, and in alignment with the strategy action plan, an extensive energy consumption data collection process has been undertaken to ensure a robust, validated and verified dataset is in place allowing for a more accurate representation of the baseline year. This process will be further supported by the inception of a centrally procured framework delivering a service to provide automatic meter reading systems across the central government estate, progress here is ongoing.</p><p>As part of this development phase of the strategy the Energy Management Unit continue to undertake a number of bilateral discussions with Centres of Procurement Excellence across central government. The discussions have focused not only on procurement but have taken into account other key enablers such as piloting behavioural change and building on a recently commissioned exemplar buildings study. Collaboration and engagement across central government to drive awareness and influence decision making has been the emphasis of discussions to date.</p><p>Since its launch in May 2019 the strategy commits the Energy Management Unit co-sponsored by my department to report progress against the aforementioned baseline annually, the first annual report is publically available at www.sibni.org, the second annual report covering the period 1st April 2020 – 31 March 2021 will be published later this year.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020059%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=340989","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=340989"}},{"id":"340988","reference":"AQW 20058/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-08","answerBy":"2021-06-23","answered":"2021-06-24","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether her Department will reintroduce funding to cover tuition costs of postgraduate study in professional software development.","answerText":"The Department recently announced 100 Master's Studentships for 2021/22 in key policy areas supportive of the Departmental 10X Vision. Further details, including information on which courses will be included, will be available shortly on the websites of Queen's University and Ulster University.\n\nAs part of my plans to increase lifelong learning and support individuals to upskill into priority economic areas, I am introducing a Flexible Skills Fund, which will provide opportunities across the Further and Higher education sectors, at a cost of £5.6m in 2021. It is envisaged that a number of these will be at postgraduate level, and include software development.\n\nThis builds on our Covid-19 upskilling programmes in 2020/21, which provided fully funded opportunities at postgraduate level, including 400 in software development, and 300 in related areas including artificial intelligence and data analytics.","answerHtml":"<p>The Department recently announced 100 Master&#39;s Studentships for 2021/22 in key policy areas supportive of the Departmental 10X Vision. Further details, including information on which courses will be included, will be available shortly on the websites of Queen&#39;s University and Ulster University.</p><p>As part of my plans to increase lifelong learning and support individuals to upskill into priority economic areas, I am introducing a Flexible Skills Fund, which will provide opportunities across the Further and Higher education sectors, at a cost of £5.6m in 2021. It is envisaged that a number of these will be at postgraduate level, and include software development.</p><p>This builds on our Covid-19 upskilling programmes in 2020/21, which provided fully funded opportunities at postgraduate level, including 400 in software development, and 300 in related areas including artificial intelligence and data analytics.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020058%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=340988","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=340988"}},{"id":"340987","reference":"AQW 20057/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-08","answerBy":"2021-06-23","answered":"2021-06-29","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, pursuant to AQW 17472/17-22, for his assessment of the urgency of rolling out these centres.","answerText":"In line with the recommendations in the Cancer Recovery Plan, the Department and HSCB will bring forward proposals for the development of one or more Rapid Diagnostic Centres by March 2022. These centres will require significant additional investment in staff and infrastructure.","answerHtml":"<p>In line with the recommendations in the Cancer Recovery Plan, the Department and HSCB will bring forward proposals for the development of one or more Rapid Diagnostic Centres by March 2022. These centres will require significant additional investment in staff and infrastructure.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020057%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=340987","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=340987"}},{"id":"340759","reference":"AQW 19972/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-07","answerBy":"2021-06-15","answered":"2021-07-19","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) for her assessment of the recently launched UK Community Renewal Fund; and (ii) to detail her Department’s engagement with the UK Government regarding this scheme.","answerText":"EU replacement funding negotiations with the UK Government are led by the NI Finance Minister. There is no formal role for, or allocation of funding to the Department or NI Executive. This reduces our spending power in key priority areas. My predecessors have made several representations to the Secretary of State seeking an enhanced role that would help ensure better strategic alignment. Disappointingly, these representations and meetings at official level have had little influence.\n\nThe Community Renewal Fund announced as part of Budget 2021 is being delivered directly by the Ministry for Housing, Communities and Local Government. The £11m allocated to Northern Ireland under this pilot Programme falls significantly short of what we would have historically spent on activities funded by EU Structural Funds. The Fund also cuts across a number of key policy areas of my Department. Where this happens, policy planning within the Department needs to be adjusted to reflect that funding now and in the future will be administered directly by MHCLG.\n\nMy predecessors have raised these issues and the need for a more meaningful role for impacted policy Departments with Westminster colleagues but to no avail.","answerHtml":"<p>EU replacement funding negotiations with the UK Government are led by the NI Finance Minister. There is no formal role for, or allocation of funding to the Department or NI Executive. This reduces our spending power in key priority areas. My predecessors have made several representations to the Secretary of State seeking an enhanced role that would help ensure better strategic alignment. Disappointingly, these representations and meetings at official level have had little influence.</p><p>The Community Renewal Fund announced as part of Budget 2021 is being delivered directly by the Ministry for Housing, Communities and Local Government. The £11m allocated to Northern Ireland under this pilot Programme falls significantly short of what we would have historically spent on activities funded by EU Structural Funds. The Fund also cuts across a number of key policy areas of my Department. Where this happens, policy planning within the Department needs to be adjusted to reflect that funding now and in the future will be administered directly by MHCLG.</p><p>My predecessors have raised these issues and the need for a more meaningful role for impacted policy Departments with Westminster colleagues but to no avail.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019972%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=340759","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=340759"}},{"id":"340758","reference":"AQW 19971/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-07","answerBy":"2021-06-22","answered":"2021-07-02","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what consideration has been given to provide further financial support, in addition to the Travel Agents (Coronavirus) Financial Assistance Scheme 2021, to travel agents as a result of ongoing restrictions on international travel.","answerText":"The Executive Office has responsibility for the provision of support to travel agents. As such, TEO introduced a bespoke scheme for travel agents in March 2021. The Travel Agents Coronavirus Financial Assistance Scheme 2021 provided a grant payment of £10k to travel agency businesses operating from commercial premises, or a £3.5k payment to self-employed travel agents working from home.\n\nSince March 2020, the NI Executive and the UK Government have introduced an unprecedented number of interventions and packages of financial support to help those who have been affected by the consequences of Covid-19. These included the Coronavirus Job Retention Scheme for businesses employing staff, whilst many self-employed Travel Agents or Tour Operators would have been eligible to claim for lost revenue through the Self-Employment Income Support Scheme.\n\nThe Department for the Economy has led in the delivery of business related support, providing more than £513 million of much needed funds to support local businesses from all sectors and occupations throughout Northern Ireland, with the primary aim of helping these businesses to survive the pandemic, and protect as many local jobs as possible.\n\nI am aware that some travel agents, subject to the respective eligibility criteria, have availed of the £10k Small Business Support Scheme, the £25k Retail, Hospitality, Tourism and Leisure Scheme, the Micro-business Hardship Fund and more recently, the Covid Restrictions Business Support Scheme Part B.\n\nThe Department of Finance made available further top-up payments of £5,000 and £10,000 for businesses which received grants during the first lockdown. Travel Agencies operating in retail premises also benefitted from 100% rates holiday for 12 months in 2020/21 and this has now been extended for 2021/22.\n\nThose whom are self-employed in the sector and who continue to remain impacted can avail of the national Self-Employment Income Support Scheme (SEISS). Details on how to apply for the 5th grant (which covers May to September) will be available by the end of June. The grant will provide 80% of 3 months trading profit (up to a maximum of £7,500) for those who have faced 30% or greater reduction in turnover and 30% of 3 months trading profit (up to a maximum of £2,850) for those businesses facing less than 30% reduction in turnover.\n\nDespite the unprecedented level of financial support that has and is being offered, the Department appreciates that there are some businesses and individuals who continue to be severely negatively impacted. However, it will be for the Executive collectively to determine how any Covid-related funding is allocated as we progress through the roadmap and the lifting of restrictions.","answerHtml":"<p>The Executive Office has responsibility for the provision of support to travel agents. As such, TEO introduced a bespoke scheme for travel agents in March 2021. The Travel Agents Coronavirus Financial Assistance Scheme 2021 provided a grant payment of £10k to travel agency businesses operating from commercial premises, or a £3.5k payment to self-employed travel agents working from home.</p><p>Since March 2020, the NI Executive and the UK Government have introduced an unprecedented number of interventions and packages of financial support to help those who have been affected by the consequences of Covid-19. These included the Coronavirus Job Retention Scheme for businesses employing staff, whilst many self-employed Travel Agents or Tour Operators would have been eligible to claim for lost revenue through the Self-Employment Income Support Scheme.</p><p>The Department for the Economy has led in the delivery of business related support, providing more than £513 million of much needed funds to support local businesses from all sectors and occupations throughout Northern Ireland, with the primary aim of helping these businesses to survive the pandemic, and protect as many local jobs as possible.</p><p>I am aware that some travel agents, subject to the respective eligibility criteria, have availed of the £10k Small Business Support Scheme, the £25k Retail, Hospitality, Tourism and Leisure Scheme, the Micro-business Hardship Fund and more recently, the Covid Restrictions Business Support Scheme Part B.</p><p>The Department of Finance made available further top-up payments of £5,000 and £10,000 for businesses which received grants during the first lockdown. Travel Agencies operating in retail premises also benefitted from 100% rates holiday for 12 months in 2020/21 and this has now been extended for 2021/22.</p><p>Those whom are self-employed in the sector and who continue to remain impacted can avail of the national Self-Employment Income Support Scheme (SEISS). Details on how to apply for the 5th grant (which covers May to September) will be available by the end of June. The grant will provide 80% of 3 months trading profit (up to a maximum of £7,500) for those who have faced 30% or greater reduction in turnover and 30% of 3 months trading profit (up to a maximum of £2,850) for those businesses facing less than 30% reduction in turnover.</p><p>Despite the unprecedented level of financial support that has and is being offered, the Department appreciates that there are some businesses and individuals who continue to be severely negatively impacted. However, it will be for the Executive collectively to determine how any Covid-related funding is allocated as we progress through the roadmap and the lifting of restrictions.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019971%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=340758","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=340758"}},{"id":"340757","reference":"AQW 19970/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-07","answerBy":"2021-06-22","answered":"2021-06-16","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance, pursuant to AQW 19173/17-22, to detail the support his Department provides in regards to cybersecurity for Department-specific business IT applications.","answerText":"Department of Finance’s Construction & Procurement Delivery (CPD) business area assist NICS Departments in procuring cyber resilient applications through the provision of detailed security schedules within their tender documentation and specifications.\n\nDepartments are responsible for funding and implementing their business IT applications. This includes ensuring that cybersecurity is embedded within their solutions and implementing appropriate governance arrangements.","answerHtml":"<p>Department of Finance’s Construction &amp; Procurement Delivery (CPD) business area assist NICS Departments in procuring cyber resilient applications through the provision of detailed security schedules within their tender documentation and specifications.</p><p>Departments are responsible for funding and implementing their business IT applications. This includes ensuring that cybersecurity is embedded within their solutions and implementing appropriate governance arrangements.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019970%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=340757","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=340757"}},{"id":"340756","reference":"AQW 19969/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-07","answerBy":"2021-06-22","answered":"2021-06-18","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities for an update on the progress of the Housing Executive’s 2021 House Condition Survey.","answerText":"An update of the proposed way forward on the Housing Condition Survey 2021 was published on the Housing Executive website on the 10 February 2021.\n\nFurther updates will be provided on the Housing Executive’s website when available.","answerHtml":"<p>An update of the proposed way forward on the Housing Condition Survey 2021 was published on the Housing Executive website on the 10 February 2021.</p><p>Further updates will be provided on the Housing Executive’s website when available.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019969%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=340756","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=340756"}},{"id":"340505","reference":"AQW 19916/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-04","answerBy":"2021-06-21","answered":"2021-06-16","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure what action she is taking to improve energy efficiency across her Department, arm's-length bodies, and departmental estate.","answerText":"As Northern Ireland's biggest electricity user with a spend of over £30m per annum, NI Water recognises the need to drive value for money in relation to energy consumption and the moral duty to address the resulting carbon emissions. Therefore, NI Water has an ambitious energy programme for the next price control PC21 (2021 to 2027).\n\nTo reduce its usage, NI Water is creating an Intelligent Energy Control Centre to monitor, control and optimise assets; introducing enhanced sensors and meters; and upgrading pumps and blowers. It is investing to produce its own electricity and has installed 59 solar sites across Northern Ireland. The green electricity generated is used to supply water and waste water assets. NI Water is also developing innovative contracting mechanisms and technologies to improve how the business interacts with the electricity market and increase the amount of green electricity procured by the business.\n\nTransport consumes 35% of all energy in Northern Ireland, therefore I am acutely aware of the role that public transport has to play in helping to decarbonise transport and improve its energy efficiency. This will be achieved through both a modal shift from the private car to public transport and other forms of active travel and the transition of bus and rail technologies from dependency on fossil fuels to renewable energy sources such as full electric and hydrogen propulsion. To support this aim, I have recently announced £66m in funding for 100 zero emission and 45 low emission buses.\n\nCurrently all electricity utilised by Translink is generated from renewable sources and it has also developed a strategy that has as an objective to migrate from the currently predominantly diesel only fleet to a zero emission energy efficient fleet by 2040.\n\nMy Department implemented a programme to replace street lights with more energy efficient LED units in 2015. To date, approximately 39% of the total street lighting stock has been replaced, resulting in a 24% reduction in energy consumption. This programme also delivers savings in maintenance costs due to the much longer operating life of LEDs as well as providing environmental benefits. I am committed to achieving further reductions in energy use for street lighting and I intend to make further allocations for LED retrofitting in 2021/22.\n\nDfI now uses LED traffic signal heads when upgrading existing junctions and in all new installations. The use of LED heads rather than the traditional incandescent lamps produces a power and carbon savings of over 75%. All modern traffic controllers operate using Extra Low Voltage rather than 240v as previously used, this results in powers savings of approximately 60%.\n\nA new method of “distributed” traffic signal installation is being trialled in the current financial year. Traditional traffic control systems use many cables to connect street furniture to the traffic controller each with multiple cores. A distributed system uses Intelligent components to significantly reduce individual cable connections and results in up to 85% reduction in copper cable usage.\n\nMy Department has developed a nine year rolling capital fleet investment plan, to enable fleet and plant to be procured that comply with the latest emission standards at the date of manufacture. As part of this plan, my officials will be monitoring the trial of zero emission vehicles and are also monitoring the development of hydrogen technologies as a possible alternative to fully electric vehicles where this is suitable. The Department has recently procured a number of fully electric vans in a pilot exercise to test their suitability for its operational functions.\n\nI have approved the construction of two new Driver and Vehicle Test Centres at Hydebank, Belfast and Mallusk, Newtownabbey. Both buildings have been designed to achieve the BREEAM* Excellence standard. This has resulted in several Low to Zero Carbon technologies being incorporated into the design including photovoltaic cells to generate electricity for onsite use, heat recovery within the office Air Handling Unit, rainwater harvesting to serve WCs and urinals, solar hot water to assist hot water provision at the site and a pollution control system to minimise power consumption of the test hall ventilation.\n\n*BREEAM (Building Research Establishment Environmental Assessment Method) is a sustainability assessment method that sets standards for the environmental performance of buildings through the design, specification, construction and operation phases.","answerHtml":"<p>As Northern Ireland&#39;s biggest electricity user with a spend of over £30m per annum, NI Water recognises the need to drive value for money in relation to energy consumption and the moral duty to address the resulting carbon emissions. Therefore, NI Water has an ambitious energy programme for the next price control PC21 (2021 to 2027).</p><p>To reduce its usage, NI Water is creating an Intelligent Energy Control Centre to monitor, control and optimise assets; introducing enhanced sensors and meters; and upgrading pumps and blowers. It is investing to produce its own electricity and has installed 59 solar sites across Northern Ireland. The green electricity generated is used to supply water and waste water assets. NI Water is also developing innovative contracting mechanisms and technologies to improve how the business interacts with the electricity market and increase the amount of green electricity procured by the business.</p><p>Transport consumes 35% of all energy in Northern Ireland, therefore I am acutely aware of the role that public transport has to play in helping to decarbonise transport and improve its energy efficiency. This will be achieved through both a modal shift from the private car to public transport and other forms of active travel and the transition of bus and rail technologies from dependency on fossil fuels to renewable energy sources such as full electric and hydrogen propulsion. To support this aim, I have recently announced £66m in funding for 100 zero emission and 45 low emission buses.</p><p>Currently all electricity utilised by Translink is generated from renewable sources and it has also developed a strategy that has as an objective to migrate from the currently predominantly diesel only fleet to a zero emission energy efficient fleet by 2040.</p><p>My Department implemented a programme to replace street lights with more energy efficient LED units in 2015. To date, approximately 39% of the total street lighting stock has been replaced, resulting in a 24% reduction in energy consumption. This programme also delivers savings in maintenance costs due to the much longer operating life of LEDs as well as providing environmental benefits. I am committed to achieving further reductions in energy use for street lighting and I intend to make further allocations for LED retrofitting in 2021/22.</p><p>DfI now uses LED traffic signal heads when upgrading existing junctions and in all new installations. The use of LED heads rather than the traditional incandescent lamps produces a power and carbon savings of over 75%. All modern traffic controllers operate using Extra Low Voltage rather than 240v as previously used, this results in powers savings of approximately 60%.</p><p>A new method of “distributed” traffic signal installation is being trialled in the current financial year. Traditional traffic control systems use many cables to connect street furniture to the traffic controller each with multiple cores. A distributed system uses Intelligent components to significantly reduce individual cable connections and results in up to 85% reduction in copper cable usage.</p><p>My Department has developed a nine year rolling capital fleet investment plan, to enable fleet and plant to be procured that comply with the latest emission standards at the date of manufacture. As part of this plan, my officials will be monitoring the trial of zero emission vehicles and are also monitoring the development of hydrogen technologies as a possible alternative to fully electric vehicles where this is suitable. The Department has recently procured a number of fully electric vans in a pilot exercise to test their suitability for its operational functions.</p><p>I have approved the construction of two new Driver and Vehicle Test Centres at Hydebank, Belfast and Mallusk, Newtownabbey. Both buildings have been designed to achieve the BREEAM* Excellence standard. This has resulted in several Low to Zero Carbon technologies being incorporated into the design including photovoltaic cells to generate electricity for onsite use, heat recovery within the office Air Handling Unit, rainwater harvesting to serve WCs and urinals, solar hot water to assist hot water provision at the site and a pollution control system to minimise power consumption of the test hall ventilation.</p><p>*BREEAM (Building Research Establishment Environmental Assessment Method) is a sustainability assessment method that sets standards for the environmental performance of buildings through the design, specification, construction and operation phases.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019916%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=340505","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=340505"}},{"id":"340504","reference":"AQW 19915/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-04","answerBy":"2021-06-21","answered":"2021-06-18","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities what actions she is taking to improve energy efficiency across her Department, arm's-length bodies, and departmental estate.","answerText":"This Department holds in its own right two freehold buildings and three leased buildings and is currently participating in the ‘Energy Management Strategy and Action Plan to 2030’ (sponsored by the Department for Economy), which will contribute to a 30% reduction in net energy consumption by 2030.\n\nConsideration will be given to further energy saving possibilities such as the installation of Light Emitting Diode (LED) lighting on an ‘invest to save’ basis. When delivering public realm schemes, there is a requirement to ensure that the works comply with the Low Carbon Design principles.\n\nWhilst generally my Department does not have responsibility for energy reporting for its Arm’s Length Bodies (ALB’s), who have responsibility for their own energy measures, many of the ALB’s are committed to contributing to the Department’s actions on climate change.\n\nIn addition, during 2021/22, the Department will pilot a scheme to improve energy efficiency and test the use of renewable energy at the main depot used by our heritage craftspeople.","answerHtml":"<p>This Department holds in its own right two freehold buildings and three leased buildings and is currently participating in the ‘Energy Management Strategy and Action Plan to 2030’ (sponsored by the Department for Economy), which will contribute to a 30% reduction in net energy consumption by 2030.</p><p>Consideration will be given to further energy saving possibilities such as the installation of Light Emitting Diode (LED) lighting on an ‘invest to save’ basis. When delivering public realm schemes, there is a requirement to ensure that the works comply with the Low Carbon Design principles.</p><p>Whilst generally my Department does not have responsibility for energy reporting for its Arm’s Length Bodies (ALB’s), who have responsibility for their own energy measures, many of the ALB’s are committed to contributing to the Department’s actions on climate change.</p><p>In addition, during 2021/22, the Department will pilot a scheme to improve energy efficiency and test the use of renewable energy at the main depot used by our heritage craftspeople.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019915%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=340504","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=340504"}},{"id":"340256","reference":"AQW 19846/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-03","answerBy":"2021-06-18","answered":"2021-06-17","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs pursuant to AQW 18889/17-22, to detail the work undertaken by his Department in designing new support schemes and opportunities for farmers since the UK left the EU.","answerText":"I have previously shared the four desired outcomes around which future support is being developed. Work is continuing to develop an agricultural support framework portfolio and I see roles for a simplified area based income support safety net and coupled support. I am also keen to examine how a genetics and livestock data programme can be embedded to improve the economic and environmental performance of our grazing livestock.\n\nWork is progressing on future agri-environment policy and schemes as officials engage with farmers and environmental organisations to develop policy proposals. We also need to expand investment and knowledge tools to support better nutrient management and reductions in carbon, ammonia and nitrates emissions alongside continuing professional development.\n\nI look forward to engaging further on my Department’s proposals over the coming months.","answerHtml":"<p>I have previously shared the four desired outcomes around which future support is being developed. Work is continuing to develop an agricultural support framework portfolio and I see roles for a simplified area based income support safety net and coupled support. I am also keen to examine how a genetics and livestock data programme can be embedded to improve the economic and environmental performance of our grazing livestock.</p><p>Work is progressing on future agri-environment policy and schemes as officials engage with farmers and environmental organisations to develop policy proposals. We also need to expand investment and knowledge tools to support better nutrient management and reductions in carbon, ammonia and nitrates emissions alongside continuing professional development.</p><p>I look forward to engaging further on my Department’s proposals over the coming months.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019846%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=340256","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=340256"}},{"id":"340255","reference":"AQW 19845/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-03","answerBy":"2021-06-18","answered":"2021-07-06","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs pursuant to AQW 18086/17-22, to detail (i) the number of successful applicants; and (ii) the number of trees planted, broken down by constituency.","answerText":"The Small Woodland Grant Scheme generated 368 applications in 2020 of which 285 were successful. The applications approved relate to an area of 314 hectares which if all were taken forward would result in planting circa 450,000 trees.\n\nAt this stage 130 hectares of the successful applications, equating to approximately 190,000 trees has been claimed by land owners as having been planted. Following the end of the SAF 2021 period on 11 June, verification of these claims will now take place against the scheme requirements, including the woodland location and extent. This will facilitate reporting by Constituency when checks have been completed and updating of the NI woodland register.\n\nI am advised that many applicants have indicated their intention to pursue further planting of areas not yet planted in a subsequent application period. The Small Woodland Grant Scheme has reopened on 22 June which will accommodate these applicants in the forthcoming planting season.\n\nThe prescribed number of trees in each constituency associated with the 285 successful applications is shown in Table 1.\n\nTable 1: Small Woodland Grant Scheme Approved Areas\n\nConstituency Name\tSuccessful Applications\tApproved Area (ha)\tEstimated tree numbers\n(1,000 trees)\nFermanagh & South Tyrone\t41\t48\t69\nSouth Down\t38\t35\t51\nWest Tyrone\t31\t36\t51\nEast Londonderry\t30\t43\t62\nStrangford\t26\t36\t51\nMid Ulster\t23\t22\t32\nNorth Antrim\t23\t22\t31\nNewry & Armagh\t19\t13\t18\nLagan Valley\t13\t15\t22\nSouth Antrim\t13\t11\t15\nUpper Bann\t9\t9\t13\nEast Antrim\t5\t5\t8\nNorth Down\t5\t4\t6\nFoyle\t3\t3\t5\nBelfast East\t3\t2\t3\nBelfast North\t2\t4\t6\nBelfast South\t1\t6\t9\nBelfast West\t0\t0\t0\nTOTAL\t285\t314\t452","answerHtml":"<p>The Small Woodland Grant Scheme generated 368 applications in 2020 of which 285 were successful. The applications approved relate to an area of 314 hectares which if all were taken forward would result in planting circa 450,000 trees.</p><p>At this stage 130 hectares of the successful applications, equating to approximately 190,000 trees has been claimed by land owners as having been planted. Following the end of the SAF 2021 period on 11 June, verification of these claims will now take place against the scheme requirements, including the woodland location and extent. This will facilitate reporting by Constituency when checks have been completed and updating of the NI woodland register.</p><p>I am advised that many applicants have indicated their intention to pursue further planting of areas not yet planted in a subsequent application period. The Small Woodland Grant Scheme has reopened on 22 June which will accommodate these applicants in the forthcoming planting season.</p><p>The prescribed number of trees in each constituency associated with the 285 successful applications is shown in Table 1.</p><p>Table 1: Small Woodland Grant Scheme Approved Areas</p><div class=\"table-wrap\"><table><tr><td>Constituency Name</td><td>Successful Applications</td><td>Approved Area (ha)</td><td>Estimated tree numbers<br>(1,000 trees)</td></tr><tr><td>Fermanagh &amp; South Tyrone</td><td>41</td><td>48</td><td>69</td></tr><tr><td>South Down</td><td>38</td><td>35</td><td>51</td></tr><tr><td>West Tyrone</td><td>31</td><td>36</td><td>51</td></tr><tr><td>East Londonderry</td><td>30</td><td>43</td><td>62</td></tr><tr><td>Strangford</td><td>26</td><td>36</td><td>51</td></tr><tr><td>Mid Ulster</td><td>23</td><td>22</td><td>32</td></tr><tr><td>North Antrim</td><td>23</td><td>22</td><td>31</td></tr><tr><td>Newry &amp; Armagh</td><td>19</td><td>13</td><td>18</td></tr><tr><td>Lagan Valley</td><td>13</td><td>15</td><td>22</td></tr><tr><td>South Antrim</td><td>13</td><td>11</td><td>15</td></tr><tr><td>Upper Bann</td><td>9</td><td>9</td><td>13</td></tr><tr><td>East Antrim</td><td>5</td><td>5</td><td>8</td></tr><tr><td>North Down</td><td>5</td><td>4</td><td>6</td></tr><tr><td>Foyle</td><td>3</td><td>3</td><td>5</td></tr><tr><td>Belfast East</td><td>3</td><td>2</td><td>3</td></tr><tr><td>Belfast North</td><td>2</td><td>4</td><td>6</td></tr><tr><td>Belfast South</td><td>1</td><td>6</td><td>9</td></tr><tr><td>Belfast West</td><td>0</td><td>0</td><td>0</td></tr><tr><td>TOTAL</td><td>285</td><td>314</td><td>452</td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019845%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=340255","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=340255"}},{"id":"340254","reference":"AQW 19844/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-03","answerBy":"2021-06-18","answered":"2021-06-18","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities for her assessment of the risk of increasing levels of fuel poverty as a result of the economic impact of COVID-19; and what action she is taking to address this situation.","answerText":"Fuel poverty is determined by three factors: energy prices, energy efficiency and household income. The economic impact of COVID-19 can potentially impact on household income and energy prices. Therefore reductions in earnings and/or increases in energy prices could have the potential to increase levels of fuel poverty.\n\nThe Affordable Warmth Scheme is the Executive’s main intervention to tackle the effects of fuel poverty by providing a range of heating and insulation measures to improve the energy efficiency of low income households.\n\nA budget of £16 million has been allocated to the Scheme to support delivery of energy efficiency measures in 2021/22. This is an increase of £4 million allocated in 20/21.\n\nI have also approved changes to the eligibility criteria for the Affordable Warmth Scheme increasing the income threshold from £20,000 to £23,000 and removing certain benefits from the calculation of income for the Scheme, namely Disability Living Allowance, Personal Independence Allowance, Attendance Allowance and Carers’ Allowance. This will offer increased accessibility to support from the Scheme. These eligibility changes are due to come into effect on 01 July 2021.","answerHtml":"<p>Fuel poverty is determined by three factors: energy prices, energy efficiency and household income. The economic impact of COVID-19 can potentially impact on household income and energy prices. Therefore reductions in earnings and/or increases in energy prices could have the potential to increase levels of fuel poverty.</p><p>The Affordable Warmth Scheme is the Executive’s main intervention to tackle the effects of fuel poverty by providing a range of heating and insulation measures to improve the energy efficiency of low income households.</p><p>A budget of £16 million has been allocated to the Scheme to support delivery of energy efficiency measures in 2021/22. This is an increase of £4 million allocated in 20/21.</p><p>I have also approved changes to the eligibility criteria for the Affordable Warmth Scheme increasing the income threshold from £20,000 to £23,000 and removing certain benefits from the calculation of income for the Scheme, namely Disability Living Allowance, Personal Independence Allowance, Attendance Allowance and Carers’ Allowance. This will offer increased accessibility to support from the Scheme. These eligibility changes are due to come into effect on 01 July 2021.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019844%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=340254","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=340254"}},{"id":"340253","reference":"AQW 19843/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-03","answerBy":"2021-06-18","answered":"2021-07-02","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on the Northern Ireland Domestic Aviation Kickstart Scheme.","answerText":"On Thursday 24 June 2021 I announced the launch of the NI Domestic Aviation Kickstart Scheme (NIDAKS) as part of my Department’s Economic Recovery Action Plan (ERAP).\n\nThe NIDAKS is a £4.5million initiative to support air connectivity between Northern Ireland and Great Britain and has three elements – maintaining a minimum route frequency on a core network of domestic routes, incentivising enhanced frequency on those routes above the minimum, and encouraging new routes which are economically important to NI.\n\nThe NIDAKS aim is to support inbound tourism and business travel between Northern Ireland and Great Britain and to encourage inward investment into the local economy. These are essential for recovery.\n\nOur domestic and international air connectivity is critical, for both the local tourism sector and the wider economy, especially as we focus on recovery. The launch of the NIDAKS delivers on our commitment to support NI’s domestic air connectivity with GB.","answerHtml":"<p>On Thursday 24 June 2021 I announced the launch of the NI Domestic Aviation Kickstart Scheme (NIDAKS) as part of my Department’s Economic Recovery Action Plan (ERAP).</p><p>The NIDAKS is a £4.5million initiative to support air connectivity between Northern Ireland and Great Britain and has three elements – maintaining a minimum route frequency on a core network of domestic routes, incentivising enhanced frequency on those routes above the minimum, and encouraging new routes which are economically important to NI.</p><p>The NIDAKS aim is to support inbound tourism and business travel between Northern Ireland and Great Britain and to encourage inward investment into the local economy. These are essential for recovery.</p><p>Our domestic and international air connectivity is critical, for both the local tourism sector and the wider economy, especially as we focus on recovery. The launch of the NIDAKS delivers on our commitment to support NI’s domestic air connectivity with GB.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019843%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=340253","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=340253"}},{"id":"340252","reference":"AQW 19842/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-03","answerBy":"2021-06-18","answered":"2021-09-03","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what actions she is taking in conjunction with the Minister for Infrastructure to promote rail and ferry routes to Northern Ireland for tourists from the Common Travel Area.","answerText":"The importance of connectivity, as a key theme for recovery, has been recognised in the Tourism Recovery Action Plan that was launched by my Department at the end of May.\n\nThe ferry and rail routes to Northern Ireland provide important connectivity from the ROI and GB markets in terms of both Leisure and Business Tourism.\n\nIn terms of Business Tourism, Tourism NI works closely with ferry operators and GB companies that have booked group business, to ensure their itineraries can be delivered.\n\nIn terms of Leisure Tourism, Tourism NI has recently welcomed various media partners from the GB market, several of whom have travelled by ferry. This will be covered in their corresponding editorials and read by potential GB consumers.\n\nTourism NI has also promoted the Carlingford Lough ferry route through social media and its website, discovernorthernireland.com.\n\nTourism NI is also planning to advertise in forthcoming editions of the Southern Irish Rail Company’s on board publication ‘Go Rail’, to promote Short Breaks in Northern Ireland by train.\n\nTourism Ireland in GB has written to the two ferry operators serving Northern Ireland from Great Britain (Stena Line and P&O Ferries) inviting them to submit proposals to undertake co-operative promotional activity in GB to highlight attractive fares on ferry crossings to Northern Ireland. Both ferry operators have submitted proposals that will be considered as part of a dedicated campaign to promote Northern Ireland in GB\n\nIn respect of travel across the Common Travel Area, Translink provides public transport connections to the ports and airports and has maintained the Belfast to Glasgow/Edinburgh bus service throughout the COVID-19 pandemic. Translink has also maintained the cross border rail and bus network throughout the pandemic and currently these are being built back as demand increases.\n\nAll these services provide vital tourist links within the Common Travel Area. Translink works closely with Tourism NI and Visit Belfast to help promote Northern Ireland as a destination and public transport as a means to get here and travel while here.\n\nTranslink also offers a large number of discounted fares to encourage travel on our public transport network including by tourists.","answerHtml":"<p>The importance of connectivity, as a key theme for recovery, has been recognised in the Tourism Recovery Action Plan that was launched by my Department at the end of May.</p><p>The ferry and rail routes to Northern Ireland provide important connectivity from the ROI and GB markets in terms of both Leisure and Business Tourism.</p><p>In terms of Business Tourism, Tourism NI works closely with ferry operators and GB companies that have booked group business, to ensure their itineraries can be delivered.</p><p>In terms of Leisure Tourism, Tourism NI has recently welcomed various media partners from the GB market, several of whom have travelled by ferry. This will be covered in their corresponding editorials and read by potential GB consumers.</p><p>Tourism NI has also promoted the Carlingford Lough ferry route through social media and its website, discovernorthernireland.com.</p><p>Tourism NI is also planning to advertise in forthcoming editions of the Southern Irish Rail Company’s on board publication ‘Go Rail’, to promote Short Breaks in Northern Ireland by train.</p><p>Tourism Ireland in GB has written to the two ferry operators serving Northern Ireland from Great Britain (Stena Line and P&amp;O Ferries) inviting them to submit proposals to undertake co-operative promotional activity in GB to highlight attractive fares on ferry crossings to Northern Ireland. Both ferry operators have submitted proposals that will be considered as part of a dedicated campaign to promote Northern Ireland in GB</p><p>In respect of travel across the Common Travel Area, Translink provides public transport connections to the ports and airports and has maintained the Belfast to Glasgow/Edinburgh bus service throughout the COVID-19 pandemic. Translink has also maintained the cross border rail and bus network throughout the pandemic and currently these are being built back as demand increases.</p><p>All these services provide vital tourist links within the Common Travel Area. Translink works closely with Tourism NI and Visit Belfast to help promote Northern Ireland as a destination and public transport as a means to get here and travel while here.</p><p>Translink also offers a large number of discounted fares to encourage travel on our public transport network including by tourists.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019842%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=340252","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=340252"}},{"id":"339930","reference":"AQW 19725/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-01","answerBy":"2021-06-16","answered":"2021-06-30","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) whether references to potential opportunities in regards to Northern Ireland’s dual market access, were included in previous drafts of her Department’s 10X Economy policy document; and (ii) why these opportunities are not noted in the final document.","answerText":"The content of working drafts of policy papers including ‘10x Economy: An Economic Vision for a Decade of Innovation’ do not represent Departmental policy.\n\nThe ‘10x Economy’ paper refers to ‘Windows of Opportunity’ within which the Priority Technologies and Clusters will be aligned to boost inclusive, green economic growth. The paper notes institutional windows ‘that are created by public policy intervening in an industry or market to make drastic changes, e.g., the unique set of trading arrangements created from leaving the EU.’\n\nOur economic vision is further developed through the ‘Trade and Investment for a 10x Economy’ paper which sets out the strategic priorities and high level ambitions that will shape our approach to trade and investment. This paper also refers to challenges created by disruption to trade via the Covid-19 pandemic and the UK leaving the EU and states that all opportunities must be exploited to deliver our 10x Vision.\n\nIn setting out a pathway towards a 10x Economy, we must recognise the challenges we face that are specific to Northern Ireland but also the global shifts which impact on our economy. Equally, we must acknowledge our existing strengths and opportunities that will place Northern Ireland amongst the elite small advanced economies.\n\nThe 10x Economic Vision paper represents our first step towards our ambition and further work is underway to develop policy and interventions which will recognise the challenges and opportunities we face today. The paper is the first in a series which will outline how we will make step changes towards an economy that is ten times better than it is today. To date, my Department has also published ‘Skills for 10x Economy' as well as 'Trade and Investment for a 10x Economy' mentioned above.","answerHtml":"<p>The content of working drafts of policy papers including ‘10x Economy: An Economic Vision for a Decade of Innovation’ do not represent Departmental policy.</p><p>The ‘10x Economy’ paper refers to ‘Windows of Opportunity’ within which the Priority Technologies and Clusters will be aligned to boost inclusive, green economic growth. The paper notes institutional windows ‘that are created by public policy intervening in an industry or market to make drastic changes, e.g., the unique set of trading arrangements created from leaving the EU.’</p><p>Our economic vision is further developed through the ‘Trade and Investment for a 10x Economy’ paper which sets out the strategic priorities and high level ambitions that will shape our approach to trade and investment. This paper also refers to challenges created by disruption to trade via the Covid-19 pandemic and the UK leaving the EU and states that all opportunities must be exploited to deliver our 10x Vision.</p><p>In setting out a pathway towards a 10x Economy, we must recognise the challenges we face that are specific to Northern Ireland but also the global shifts which impact on our economy. Equally, we must acknowledge our existing strengths and opportunities that will place Northern Ireland amongst the elite small advanced economies.</p><p>The 10x Economic Vision paper represents our first step towards our ambition and further work is underway to develop policy and interventions which will recognise the challenges and opportunities we face today. The paper is the first in a series which will outline how we will make step changes towards an economy that is ten times better than it is today. To date, my Department has also published ‘Skills for 10x Economy&#39; as well as &#39;Trade and Investment for a 10x Economy&#39; mentioned above.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019725%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=339930","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=339930"}},{"id":"339929","reference":"AQW 19724/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-01","answerBy":"2021-06-16","answered":"2021-06-23","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what actions she is taking, in conjunction with the Minister of Education, to address issues of the duplication of courses between further education colleges and sixth forms at secondary schools.","answerText":"The potential for duplication of provision and competition between schools and FE colleges for post-16 learners is one of the key challenges raised in a baseline document, which has been provided to both the Minister of Education and I for consideration as part of the Transition of Young People into Careers (14-19) Project.\n\nWe are currently reviewing how this issue and the other issues raised in the document can best be addressed as part of a joined up approach between our Departments in order to ensure that all learners have access to the training and education pathways which best meet their needs.","answerHtml":"<p>The potential for duplication of provision and competition between schools and FE colleges for post-16 learners is one of the key challenges raised in a baseline document, which has been provided to both the Minister of Education and I for consideration as part of the Transition of Young People into Careers (14-19) Project.</p><p>We are currently reviewing how this issue and the other issues raised in the document can best be addressed as part of a joined up approach between our Departments in order to ensure that all learners have access to the training and education pathways which best meet their needs.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019724%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=339929","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=339929"}},{"id":"339928","reference":"AQW 19723/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-01","answerBy":"2021-06-16","answered":"2021-06-30","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) for her assessment of the availability of study pathways between Northern Ireland universities and further education colleges; and (ii) what action her Department is taking to promote further integration between higher and further education.","answerText":"A number of study pathways between Northern Ireland universities and further education colleges are currently in place and working well.\n\nThe Further Education (FE) sector is focussed on ensuring that clearly structured and articulated progression pathways exist for full time and part time courses at Levels 2-3 through to Higher Education (HE). The FE sector plays a significant role in the delivery of Level 4 and 5 qualifications. Pathways for learners undertaking these courses include progression to degree programmes in further study both at college and university and a variety of successful employment routes.\n\nCollaboration Partnerships are in place between the six Further Education Colleges and both Ulster and Queen’s universities. Three colleges have also recently developed validation partnerships with the Open University and this is an expanding area.\n\nVarious pathways exist, these include:\n\nFoundation Degrees (FD) are currently the Department’s preferred qualification at level 4 and 5. Colleges and universities collaborate extensively in the delivery of FDs where colleges deliver the course and universities validate the course content to ensure appropriate quality and standard is achieved to attain an award. Each FD must have at least one progression route into a level 6 qualification at university.\n\nAccess to HE courses are targeted at students who have been out of education for at least two years and who wish to enter HE but do not have either sufficient or any formal qualifications. These are mainly delivered at the colleges and may be used for entry to any HE provider.\n\nAll Higher Level Apprenticeships (HLAs) in Northern Ireland are underpinned with a qualification at L4 or higher. The majority of HLAs utilise a Foundation Degree (L5) and allow for the potential of progression to further courses at L6 & L7 where available. As part of the process for new HLAs to be approved for delivery Training Providers must outline the potential progression pathways that will be available to apprentices upon completion of an HLA.\n\nWork is planned to identify ways in which pathways can be enhanced further. Steps are also being taken to improve integration between the Northern Ireland universities and Further Education Colleges. Relevant actions being taken forward by my Department in this respect include:\n\nSkills Strategy consultation\n\nI launched a draft Skills Strategy consultation document on 27th May; this public consultation is open for 12 weeks. The consultation document was developed in conjunction with the Skills Strategy Advisory Group. The Further Education Colleges and Higher Education Institutions play an active role on this body, along with representatives from across industry, to ensure the right approaches to future skills needs are identified and implemented in a joined up, collaborative manner to benefit individuals, employers and the local economy.\n\nThe draft Strategy has 3 main objectives, with 3 associated policy enablers; one of these is ‘Building Strong Relationships’. This means working across government to build more cohesive skills policy solutions and to build strong relationships with external stakeholders to co-design skills solutions which support better jobs and better wages for all our people.\n\nThe key action underpinning this will be the development of a new Northern Ireland Skills Council, to oversee the Strategy’s implementation. Whilst the terms of reference and specific make-up of the Council is yet to be agreed, the concept draws on international best practice to establish a forum to drive a more collaborative approach to policy, with ministerial leadership and representation from senior figures in key government departments, business, education (including higher and further education) and trades unions.\n\nSkills Interventions Programme and Flexible Skills Fund\n\nAs part of the Departmental response to Covid-19, a Skills Intervention Programme was launched, providing training opportunities from entry level to masters, for 5,900 individuals impacted by the pandemic. All training was provided through the colleges and universities, in a range of sectors including digital, engineering and leadership, with graduate placement opportunities. Programme design included collaboration across the further and higher education sectors to maximise choice and eliminate duplication.\n\nThe Department, in conjunction with the Northern Ireland Office, is taking forward a new Flexible Skills Fund to support individuals to upskill and reskill. This will be delivered through local universities and colleges, and engagement has begun on its format. An onus will be placed on providers working together to create pathways and streamline learning across the further and higher education sectors, that provides training opportunities that have been approved through engagement with employers.\n\nReview of Level 4 and 5 provision and HE in FE\n\nA comprehensive review of Level 4 and 5 provision and HE in FE commenced in November 2020 involving a wide range of stakeholders including colleges and universities. It is expected to report in spring 2022A number of work strands are underway and further work strands planned that will specifically focus on qualifications delivered collaboratively and on pathways and progression routes between the FE colleges and local universities.\n\nTertiary Education Senior Leaders Forum\n\nA Tertiary Education Group has recently been established by my Department. The Group has agreed to meet at least three times per annum and, going forward, will formalise its establishment as the Tertiary Education Senior Leaders Forum, chaired by the DfE Permanent Secretary. The core purpose of the Forum is to foster greater collaboration between all those involved in education post-compulsory school-age and to help move towards a unified tertiary education sector in Northern Ireland.","answerHtml":"<p>A number of study pathways between Northern Ireland universities and further education colleges are currently in place and working well.</p><p>The Further Education (FE) sector is focussed on ensuring that clearly structured and articulated progression pathways exist for full time and part time courses at Levels 2-3 through to Higher Education (HE). The FE sector plays a significant role in the delivery of Level 4 and 5 qualifications. Pathways for learners undertaking these courses include progression to degree programmes in further study both at college and university and a variety of successful employment routes.</p><p>Collaboration Partnerships are in place between the six Further Education Colleges and both Ulster and Queen’s universities. Three colleges have also recently developed validation partnerships with the Open University and this is an expanding area.</p><p>Various pathways exist, these include:</p><p>Foundation Degrees (FD) are currently the Department’s preferred qualification at level 4 and 5. Colleges and universities collaborate extensively in the delivery of FDs where colleges deliver the course and universities validate the course content to ensure appropriate quality and standard is achieved to attain an award. Each FD must have at least one progression route into a level 6 qualification at university.</p><p>Access to HE courses are targeted at students who have been out of education for at least two years and who wish to enter HE but do not have either sufficient or any formal qualifications. These are mainly delivered at the colleges and may be used for entry to any HE provider.</p><p>All Higher Level Apprenticeships (HLAs) in Northern Ireland are underpinned with a qualification at L4 or higher. The majority of HLAs utilise a Foundation Degree (L5) and allow for the potential of progression to further courses at L6 &amp; L7 where available. As part of the process for new HLAs to be approved for delivery Training Providers must outline the potential progression pathways that will be available to apprentices upon completion of an HLA.</p><p>Work is planned to identify ways in which pathways can be enhanced further. Steps are also being taken to improve integration between the Northern Ireland universities and Further Education Colleges. Relevant actions being taken forward by my Department in this respect include:</p><p>Skills Strategy consultation</p><p>I launched a draft Skills Strategy consultation document on 27th May; this public consultation is open for 12 weeks. The consultation document was developed in conjunction with the Skills Strategy Advisory Group. The Further Education Colleges and Higher Education Institutions play an active role on this body, along with representatives from across industry, to ensure the right approaches to future skills needs are identified and implemented in a joined up, collaborative manner to benefit individuals, employers and the local economy.</p><p>The draft Strategy has 3 main objectives, with 3 associated policy enablers; one of these is ‘Building Strong Relationships’. This means working across government to build more cohesive skills policy solutions and to build strong relationships with external stakeholders to co-design skills solutions which support better jobs and better wages for all our people.</p><p>The key action underpinning this will be the development of a new Northern Ireland Skills Council, to oversee the Strategy’s implementation. Whilst the terms of reference and specific make-up of the Council is yet to be agreed, the concept draws on international best practice to establish a forum to drive a more collaborative approach to policy, with ministerial leadership and representation from senior figures in key government departments, business, education (including higher and further education) and trades unions.</p><p>Skills Interventions Programme and Flexible Skills Fund</p><p>As part of the Departmental response to Covid-19, a Skills Intervention Programme was launched, providing training opportunities from entry level to masters, for 5,900 individuals impacted by the pandemic. All training was provided through the colleges and universities, in a range of sectors including digital, engineering and leadership, with graduate placement opportunities. Programme design included collaboration across the further and higher education sectors to maximise choice and eliminate duplication.</p><p>The Department, in conjunction with the Northern Ireland Office, is taking forward a new Flexible Skills Fund to support individuals to upskill and reskill. This will be delivered through local universities and colleges, and engagement has begun on its format. An onus will be placed on providers working together to create pathways and streamline learning across the further and higher education sectors, that provides training opportunities that have been approved through engagement with employers.</p><p>Review of Level 4 and 5 provision and HE in FE</p><p>A comprehensive review of Level 4 and 5 provision and HE in FE commenced in November 2020 involving a wide range of stakeholders including colleges and universities. It is expected to report in spring 2022A number of work strands are underway and further work strands planned that will specifically focus on qualifications delivered collaboratively and on pathways and progression routes between the FE colleges and local universities.</p><p>Tertiary Education Senior Leaders Forum</p><p>A Tertiary Education Group has recently been established by my Department. The Group has agreed to meet at least three times per annum and, going forward, will formalise its establishment as the Tertiary Education Senior Leaders Forum, chaired by the DfE Permanent Secretary. The core purpose of the Forum is to foster greater collaboration between all those involved in education post-compulsory school-age and to help move towards a unified tertiary education sector in Northern Ireland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019723%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=339928","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=339928"}},{"id":"339927","reference":"AQW 19722/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-01","answerBy":"2021-06-16","answered":"2021-06-30","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what incentives her Department is considering to encourage students. without offers from Northern Ireland universities, to consider study at a further education college, rather than travelling elsewhere.","answerText":"Individual Further Education (FE) colleges promote Higher Education (HE) curriculum through a number of channels including websites, prospectuses and social media. Colleges also use their own local media outlets to promote specific programmes as well as engaging with local schools and careers officers.\n\nOn 2 June 2021, the six FE colleges, supported by DfE, launched the ‘FE for Me’ collaborative marketing campaign, the purpose of which is to promote the benefits of undertaking a programme of study at a local FE college.\n\nThis campaign promotes opportunities for school leavers including full-time and part-time HE and higher level apprenticeships within the six regional FE colleges.\n\nFE colleges are also working with Queens University Belfast and Ulster University on the creation of a microsite to promote college HE options should any applicant be unsuccessful in August. The microsite will be operational by 11 June and shared with local schools and careers officers to ensure that parents and young people are made aware of options to undertake Foundation degree, HND and other higher level education programmes.\n\nAdditional work is also being progressed with the Universities to explore how Colleges and University Admission teams can work together on A level results day, 10 August, to ensure that student enquiries are directed to relevant personnel within colleges who can offer advice and guidance on college HE options.\n\nA new website has been created for the six regional colleges (www.furthereducationni.com) to coalesce sectoral activity and signpost prospective learner to their local College website.\n\nMy Department’s Careers Service is available to provide impartial advice and guidance to all pupils making post 16 and post 18 decisions. Careers Advisers offer personalised support outlining all the suitable options including HE courses available within FE colleges.","answerHtml":"<p>Individual Further Education (FE) colleges promote Higher Education (HE) curriculum through a number of channels including websites, prospectuses and social media. Colleges also use their own local media outlets to promote specific programmes as well as engaging with local schools and careers officers.</p><p>On 2 June 2021, the six FE colleges, supported by DfE, launched the ‘FE for Me’ collaborative marketing campaign, the purpose of which is to promote the benefits of undertaking a programme of study at a local FE college.</p><p>This campaign promotes opportunities for school leavers including full-time and part-time HE and higher level apprenticeships within the six regional FE colleges.</p><p>FE colleges are also working with Queens University Belfast and Ulster University on the creation of a microsite to promote college HE options should any applicant be unsuccessful in August. The microsite will be operational by 11 June and shared with local schools and careers officers to ensure that parents and young people are made aware of options to undertake Foundation degree, HND and other higher level education programmes.</p><p>Additional work is also being progressed with the Universities to explore how Colleges and University Admission teams can work together on A level results day, 10 August, to ensure that student enquiries are directed to relevant personnel within colleges who can offer advice and guidance on college HE options.</p><p>A new website has been created for the six regional colleges (www.furthereducationni.com) to coalesce sectoral activity and signpost prospective learner to their local College website.</p><p>My Department’s Careers Service is available to provide impartial advice and guidance to all pupils making post 16 and post 18 decisions. Careers Advisers offer personalised support outlining all the suitable options including HE courses available within FE colleges.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019722%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=339927","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=339927"}},{"id":"339926","reference":"AQW 19721/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-06-01","answerBy":"2021-06-16","answered":"2021-06-04","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance to detail the reasons for the delay in the payment of Northern Ireland Civil Service Pensions for the month of May 2021.","answerText":"The delay in payment was due to an administrative error concerning the processing date. Unfortunately with the 31 May 2021 being a bank holiday this resulted in pensions not credited to bank accounts on 28 May 2021 as expected. All payments were made by 1 June 2021.","answerHtml":"<p>The delay in payment was due to an administrative error concerning the processing date. Unfortunately with the 31 May 2021 being a bank holiday this resulted in pensions not credited to bank accounts on 28 May 2021 as expected. All payments were made by 1 June 2021.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019721%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=339926","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=339926"}},{"id":"339776","reference":"AQW 19643/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-28","answerBy":"2021-06-15","answered":"2021-06-29","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, given the announcement that Dublin Port will not accept cruise ships for 2022, what actions she is taking to ensure that cruise ship facilities are developed to benefit from the potential of additional tourism business.","answerText":"Considerable efforts and funds have been devoted to the development and promotion of cruise tourism to the region and as a result it has been one of Belfast and Northern Ireland’s success stories of recent years and is a key contributor to our tourism economy.\n\nCruise Belfast, the sales and marketing partnership between Belfast Harbour and Visit Belfast, has established strong and profitable working relationships with cruise lines and operators since 1999.\n\nSignificant investment has been made to Belfast’s port-side facilities in recent years. My Department, through Tourism Northern Ireland, part funded an £800,000 programme in 2019, which included the first dedicated cruise welcome facility on the Island of Ireland. It enables larger cruise ships to dock in Belfast and includes a Visitor Information Centre. This represents an important development of the city’s cruise tourism infrastructure and utilises the latest digital and audio-visual technology to showcase Belfast and Northern Ireland’s visitor attractions. In addition, new gangways and luggage scanners were installed to enable Belfast to be promoted as an embarkation port.\n\nSince the outbreak of Covid-19 Cruise Belfast has worked closely with the Public Health Agency NI, Port Health Authority, Maritime Policing, and Belfast City Council Emergency Planning Team to put in place measures to support the safe return of cruise tourism to Belfast and Northern Ireland in 2021 and beyond. To facilitate new Covid health protocols, capital funding was also secured from the Department for the Economy Tourism Recovery Programme in March to ensure that full safe-guarding measures are in place for the first cruise arrivals. The investment will help to provide as safe an environment as possible for cruise guests, crew, local staff and the wider local population, whilst delivering a warm and informative welcome.\n\nThe Cruise Belfast team has maintained regular contact with the cruise lines, their shipping agents and shore-excursion companies, particularly those that have become regular callers to Northern Ireland prior to the pandemic. As a result, they are well informed of the work being done to welcome them back safely to Northern Ireland.\n\nThe cruise industry has consistently ranked Belfast highly as a UK Port of Call. This strong track record, combined with the investment in facilities will only help to strengthen Belfast’s position as a cruise destination. Cruise Belfast will continue to engage with the cruise lines to take advantage of market opportunities as they arise from Port of Dublin’s decision to limit cruise calls in 2022","answerHtml":"<p>Considerable efforts and funds have been devoted to the development and promotion of cruise tourism to the region and as a result it has been one of Belfast and Northern Ireland’s success stories of recent years and is a key contributor to our tourism economy.</p><p>Cruise Belfast, the sales and marketing partnership between Belfast Harbour and Visit Belfast, has established strong and profitable working relationships with cruise lines and operators since 1999.</p><p>Significant investment has been made to Belfast’s port-side facilities in recent years. My Department, through Tourism Northern Ireland, part funded an £800,000 programme in 2019, which included the first dedicated cruise welcome facility on the Island of Ireland. It enables larger cruise ships to dock in Belfast and includes a Visitor Information Centre. This represents an important development of the city’s cruise tourism infrastructure and utilises the latest digital and audio-visual technology to showcase Belfast and Northern Ireland’s visitor attractions. In addition, new gangways and luggage scanners were installed to enable Belfast to be promoted as an embarkation port.</p><p>Since the outbreak of Covid-19 Cruise Belfast has worked closely with the Public Health Agency NI, Port Health Authority, Maritime Policing, and Belfast City Council Emergency Planning Team to put in place measures to support the safe return of cruise tourism to Belfast and Northern Ireland in 2021 and beyond. To facilitate new Covid health protocols, capital funding was also secured from the Department for the Economy Tourism Recovery Programme in March to ensure that full safe-guarding measures are in place for the first cruise arrivals. The investment will help to provide as safe an environment as possible for cruise guests, crew, local staff and the wider local population, whilst delivering a warm and informative welcome.</p><p>The Cruise Belfast team has maintained regular contact with the cruise lines, their shipping agents and shore-excursion companies, particularly those that have become regular callers to Northern Ireland prior to the pandemic. As a result, they are well informed of the work being done to welcome them back safely to Northern Ireland.</p><p>The cruise industry has consistently ranked Belfast highly as a UK Port of Call. This strong track record, combined with the investment in facilities will only help to strengthen Belfast’s position as a cruise destination. Cruise Belfast will continue to engage with the cruise lines to take advantage of market opportunities as they arise from Port of Dublin’s decision to limit cruise calls in 2022</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019643%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=339776","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=339776"}},{"id":"339775","reference":"AQW 19642/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-28","answerBy":"2021-06-15","answered":"2021-06-11","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 19025 17-22, (i) to detail the total costs that her Department has incurred to date in regards to the management loans to the Presbyterian Mutual Society; and (ii) whether a final report on the total costs to the Executive will be produced.","answerText":"All costs, with the exception of salaries incurred by my Department, are fully recoverable from the Presbyterian Mutual Society scheme of arrangement.\n\nMy Department does not separately account for the time and salary costs of staff managing the loans to PMS. These costs are not separately identifiable and could only be recovered at disproportionate cost.\n\nIt is anticipated that following the final outworking of PMS, a paper for the Executive will be prepared.","answerHtml":"<p>All costs, with the exception of salaries incurred by my Department, are fully recoverable from the Presbyterian Mutual Society scheme of arrangement.</p><p>My Department does not separately account for the time and salary costs of staff managing the loans to PMS. These costs are not separately identifiable and could only be recovered at disproportionate cost.</p><p>It is anticipated that following the final outworking of PMS, a paper for the Executive will be prepared.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019642%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=339775","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=339775"}},{"id":"339774","reference":"AQW 19641/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-28","answerBy":"2021-06-15","answered":"2021-06-15","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs for his assessment of the proposed free-trade deal with Australia, and the potential impact on the Northern Ireland agricultural sector.","answerText":"Negotiations are continuing on a free trade agreement with Australia and we need to await their outcome before coming to a definitive conclusion. I am concerned about reports that tariffs may be removed completely for sensitive agricultural products. This presents a high level of risk to farmers in Northern Ireland and across the UK, particularly in the beef and sheep sectors. Australia has a number of distinct advantages over Northern Ireland and the rest of the UK in terms of the land available for farming, climate and lower standards that allows it’s farmers to have considerably lower costs of production. Australian beef and sheep products have the potential to undercut UK producers and to reduce Northern Ireland’s market share in GB which is our most important market for these products.\n\nI have long maintained that tariff and quota protection must be retained for sensitive agricultural products and have emphasised the importance of this to UK Government Ministers. I have written to Defra Secretary of State George Eustice to express my strong opposition to the prospect of a zero tariff, zero quota Free Trade Agreement (FTA) between the UK and Australia. I have also met with, and subsequently wrote to the Minister of State for Trade Policy, Greg Hands MP to outline my concerns. I will continue to pursue these matters with the Government.","answerHtml":"<p>Negotiations are continuing on a free trade agreement with Australia and we need to await their outcome before coming to a definitive conclusion. I am concerned about reports that tariffs may be removed completely for sensitive agricultural products. This presents a high level of risk to farmers in Northern Ireland and across the UK, particularly in the beef and sheep sectors. Australia has a number of distinct advantages over Northern Ireland and the rest of the UK in terms of the land available for farming, climate and lower standards that allows it’s farmers to have considerably lower costs of production. Australian beef and sheep products have the potential to undercut UK producers and to reduce Northern Ireland’s market share in GB which is our most important market for these products.</p><p>I have long maintained that tariff and quota protection must be retained for sensitive agricultural products and have emphasised the importance of this to UK Government Ministers. I have written to Defra Secretary of State George Eustice to express my strong opposition to the prospect of a zero tariff, zero quota Free Trade Agreement (FTA) between the UK and Australia. I have also met with, and subsequently wrote to the Minister of State for Trade Policy, Greg Hands MP to outline my concerns. I will continue to pursue these matters with the Government.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019641%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=339774","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=339774"}},{"id":"341231","reference":"AQO 2183/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-05-27","answerBy":"2021-06-08","answered":"2021-06-08","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance for an update on top-up grants for businesses that did not receive financial support during the recent lockdown.","answerText":"Throughout this pandemic I have been determined to ensure support reached as many businesses as possible. My Department has been at the forefront of providing vital support to businesses, sustaining businesses and protecting the jobs they provide. The Top-Up Grants are designed to provide financial support to thousands of businesses which were allowed to remain open and therefore unable to access grant support despite experiencing a significant reduction in trade because of the restrictions.\n\nI am pleased to say that on 27 May 2021 payments of the £5,000 Top-Up were issued to 12,056 businesses. The total value of those payments was £60.3 million.\n\nOn the same day, payments of the £10,000 Top-Up were issued to 1,148 businesses. The total value of those payments was £11.5 million.\n\nApproximately 1,560 potentially eligible small businesses operate from properties where the landlord pays the rates. My department needs to gather additional information to confirm that those business still operate from the same address. An application process for these businesses and any business which started to trade between 20 May 2020 and 1 March 2021 will be launched later this month and I expect payments to be made in late June and early July.","answerHtml":"<p>Throughout this pandemic I have been determined to ensure support reached as many businesses as possible. My Department has been at the forefront of providing vital support to businesses, sustaining businesses and protecting the jobs they provide. The Top-Up Grants are designed to provide financial support to thousands of businesses which were allowed to remain open and therefore unable to access grant support despite experiencing a significant reduction in trade because of the restrictions.</p><p>I am pleased to say that on 27 May 2021 payments of the £5,000 Top-Up were issued to 12,056 businesses. The total value of those payments was £60.3 million.</p><p>On the same day, payments of the £10,000 Top-Up were issued to 1,148 businesses. The total value of those payments was £11.5 million.</p><p>Approximately 1,560 potentially eligible small businesses operate from properties where the landlord pays the rates. My department needs to gather additional information to confirm that those business still operate from the same address. An application process for these businesses and any business which started to trade between 20 May 2020 and 1 March 2021 will be launched later this month and I expect payments to be made in late June and early July.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202183%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=341231","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=341231"}},{"id":"339141","reference":"AQW 19408/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-25","answerBy":"2021-06-10","answered":"2021-06-09","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs pursuant to AQW 18230/17-22, whether his Department has any initial estimates for the compensation that may be due to contractors.","answerText":"Further to AQW 18230/17-22, DAERA can confirm that the formal review process for compensation claims is ongoing for quotations received to date, but have not been formally issued with any verified costs.\n\nUntil all claims have been submitted by contractors and reviewed by the Project Manager in accordance with the contract, the cost to the Department cannot be confirmed. Further clarity can be provided when the compensation claims are received, assessed and any adjudication process completed.","answerHtml":"<p>Further to AQW 18230/17-22, DAERA can confirm that the formal review process for compensation claims is ongoing for quotations received to date, but have not been formally issued with any verified costs.</p><p>Until all claims have been submitted by contractors and reviewed by the Project Manager in accordance with the contract, the cost to the Department cannot be confirmed. Further clarity can be provided when the compensation claims are received, assessed and any adjudication process completed.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019408%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=339141","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=339141"}},{"id":"339140","reference":"AQW 19407/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-25","answerBy":"2021-06-10","answered":"2021-07-29","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) whether the Insolvency Service will be implementing changes similar to those in England and Wales in regards to monetary eligibility criteria for Debt Relief Orders; and (ii) to provide a timeline for the introduction of these changes.","answerText":"It is my Department’s policy to keep Northern Ireland’s insolvency legislation in parity with that applying in England and Wales. As legislation has been made at Westminster to increase the monetary eligibility limits for Debt Relief Orders applying in England & Wales, my Department is proposing to make similar changes to the Northern Ireland scheme.\n\nWhilst there is insufficient time during the current Assembly mandate to allow the process to be completed in full, it is hoped that a formal public consultation on the proposals can be carried out later this year. This will pave the way for the legislation being made once the new administration is in place, which should take six to nine months thereafter.","answerHtml":"<p>It is my Department’s policy to keep Northern Ireland’s insolvency legislation in parity with that applying in England and Wales. As legislation has been made at Westminster to increase the monetary eligibility limits for Debt Relief Orders applying in England &amp; Wales, my Department is proposing to make similar changes to the Northern Ireland scheme.</p><p>Whilst there is insufficient time during the current Assembly mandate to allow the process to be completed in full, it is hoped that a formal public consultation on the proposals can be carried out later this year. This will pave the way for the legislation being made once the new administration is in place, which should take six to nine months thereafter.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019407%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=339140","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=339140"}},{"id":"339138","reference":"AQW 19405/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-25","answerBy":"2021-06-10","answered":"2021-06-04","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance, pursuant to AQW 16275/17-22, what specific actions are being taken to decarbonise buildings; and to detail any decarbonising targets contained within plans.","answerText":"My Department is responsible for managing the Civil Service Office Estate, which equates to around 4% of total Public Sector energy consumption here.\n\nDoF has prepared a number of Energy Efficiency and Carbon Reduction Plans to achieve cumulative energy savings and consequential reductions in carbon for the Civil Service Office Estate, which feed into an overarching Energy Management Strategy and Action Plan for the Central Government Estate to 2030. The sponsor department for this is the Department for the Economy supported by the Strategic Investment Board, who have details of decarbonising actions and targets for the wider Public Sector Estate.\n\nActions and investments that my Department plans to undertake over the 3 years of its current Plan, up to 2022/23, to improve energy efficiency and reduce carbon in the Civil Service Office Estate fall into three categories. Targets are expressed in terms of energy usage reductions rather than decarbonisation.\n\nReduction in the footprint of the Civil Service Office Estate\n\nReducing the size of the Estate is expected to lead to a 1% reduction in energy useage.\n\nCapital investments in energy efficiency\n\nIdentifying and implementing energy saving projects for capital investment from recommendations detailed in energy surveys and cyclical maintenance observations is expected to lead to a 2% reduction in energy useage.\n\nBehavioural change\n\nEncouraging and supporting Departmental Energy Managers to motivate behavioural change in staff is expected to lead to a 1% reduction in energy useage.\n\nConnect 2 regional hubs are anticipated to reduce commuting frequencies and distances and, along with future new ways of working, lead to further reductions in energy usage and carbon emissions.","answerHtml":"<p>My Department is responsible for managing the Civil Service Office Estate, which equates to around 4% of total Public Sector energy consumption here.</p><p>DoF has prepared a number of Energy Efficiency and Carbon Reduction Plans to achieve cumulative energy savings and consequential reductions in carbon for the Civil Service Office Estate, which feed into an overarching Energy Management Strategy and Action Plan for the Central Government Estate to 2030. The sponsor department for this is the Department for the Economy supported by the Strategic Investment Board, who have details of decarbonising actions and targets for the wider Public Sector Estate.</p><p>Actions and investments that my Department plans to undertake over the 3 years of its current Plan, up to 2022/23, to improve energy efficiency and reduce carbon in the Civil Service Office Estate fall into three categories. Targets are expressed in terms of energy usage reductions rather than decarbonisation.</p><p>Reduction in the footprint of the Civil Service Office Estate</p><p>Reducing the size of the Estate is expected to lead to a 1% reduction in energy useage.</p><p>Capital investments in energy efficiency</p><p>Identifying and implementing energy saving projects for capital investment from recommendations detailed in energy surveys and cyclical maintenance observations is expected to lead to a 2% reduction in energy useage.</p><p>Behavioural change</p><p>Encouraging and supporting Departmental Energy Managers to motivate behavioural change in staff is expected to lead to a 1% reduction in energy useage.</p><p>Connect 2 regional hubs are anticipated to reduce commuting frequencies and distances and, along with future new ways of working, lead to further reductions in energy usage and carbon emissions.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019405%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=339138","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=339138"}},{"id":"339137","reference":"AQW 19404/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-25","answerBy":"2021-06-10","answered":"2021-06-10","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs, pursuant to AQW 18476/17-22, (i) whether any Civil Service hours have been expended on lodging, or preparing to lodge, judicial proceedings; and (ii) to detail the total number of hours.","answerText":"Pursuant to AQW 18476/17-22, to date my Department has not lodged any judicial proceedings in respect of the Northern Ireland Protocol and has not expended any hours in preparing to lodge proceedings.","answerHtml":"<p>Pursuant to AQW 18476/17-22, to date my Department has not lodged any judicial proceedings in respect of the Northern Ireland Protocol and has not expended any hours in preparing to lodge proceedings.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019404%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=339137","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=339137"}},{"id":"338821","reference":"AQW 19247/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-21","answerBy":"2021-06-01","answered":"2021-06-23","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) for her assessment of the financial hardship faced by musicians and DJs unable to perform due to COVID-19 restrictions on live music; and (ii) to detail whether she will ensure ongoing financial support is provided until musicians and DJs can resume work as normal.","answerText":"The Department for Communities (DfC) has lead responsibility for supporting the arts sector in Northern Ireland, and through the Arts Council of Northern Ireland, has provided funding to support artists and performers with grants of up to £5,000 during the COVID-19 crisis.\n\nThe Department for Communities has recently established the Culture, Arts & Heritage Taskforce which will advise on, among other things, how the individuals and organisations impacted by the restrictions in those sectors might be supported while the restrictions continue and as they ease.\n\nThe Taskforce can be contacted at arci@communities-ni.gov.uk.\n\nIt will be for the Executive collectively to determine how any Covid-related funding is allocated as we progress through the roadmap and the lifting of restrictions.\n\nMusicians and DJs were both eligible for support from the Covid Restrictions Business Support Scheme: Part B. The Scheme launched on 18 November 2020 and closed to new applicants on 7 April 2021. With the recent round of funding announced by the Minister of Finance on 21 May 2021, successful applicants will continue to receive a grant for as long as they were eligible up to and including 23 May.\n\nThose whom are self-employed in the sector and who continue to remain impacted can avail of the national Self-Employment Income Support Scheme (SEISS). Details on how to apply for the 5th grant (which covers May to September) will be available by the end of June. The grant will provide 80% of 3 months trading profit (up to a maximum of £7,500) for those who have faced 30% or greater reduction in turnover and 30% of 3 months trading profit (up to a maximum of £2,850) for those businesses facing less than 30% reduction in turnover.","answerHtml":"<p>The Department for Communities (DfC) has lead responsibility for supporting the arts sector in Northern Ireland, and through the Arts Council of Northern Ireland, has provided funding to support artists and performers with grants of up to £5,000 during the COVID-19 crisis.</p><p>The Department for Communities has recently established the Culture, Arts &amp; Heritage Taskforce which will advise on, among other things, how the individuals and organisations impacted by the restrictions in those sectors might be supported while the restrictions continue and as they ease.</p><p>The Taskforce can be contacted at arci@communities-ni.gov.uk.</p><p>It will be for the Executive collectively to determine how any Covid-related funding is allocated as we progress through the roadmap and the lifting of restrictions.</p><p>Musicians and DJs were both eligible for support from the Covid Restrictions Business Support Scheme: Part B. The Scheme launched on 18 November 2020 and closed to new applicants on 7 April 2021. With the recent round of funding announced by the Minister of Finance on 21 May 2021, successful applicants will continue to receive a grant for as long as they were eligible up to and including 23 May.</p><p>Those whom are self-employed in the sector and who continue to remain impacted can avail of the national Self-Employment Income Support Scheme (SEISS). Details on how to apply for the 5th grant (which covers May to September) will be available by the end of June. The grant will provide 80% of 3 months trading profit (up to a maximum of £7,500) for those who have faced 30% or greater reduction in turnover and 30% of 3 months trading profit (up to a maximum of £2,850) for those businesses facing less than 30% reduction in turnover.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019247%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=338821","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=338821"}},{"id":"338820","reference":"AQW 19246/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-21","answerBy":"2021-06-08","answered":"2021-07-16","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister what assessment has been made as to when live music can resume at venues; and what engagement has taken place with those working in the sector to achieve this.","answerText":"From 5 July live music has been permitted at licensed and unlicensed hospitality premises that sell or provide food and/or drink for consumption on the premises. This should be at ambient level only to allow conversation at normal levels and with suitable mitigations in place, such as screens.\n\nMusic is also permitted at outdoor events with no restriction on volume.\n\nFull details of current regulations is available at: https://www.nidirect.gov.uk/articles/coronavirus-covid-19-regulations-guidance-what-restrictions-mean-you\n\nThe Executive is committed to continuing to work in partnership with all sectors to ensure the approach to relaxations is focused on building resilience and reducing the need for further restrictions in the future.","answerHtml":"<p>From 5 July live music has been permitted at licensed and unlicensed hospitality premises that sell or provide food and/or drink for consumption on the premises. This should be at ambient level only to allow conversation at normal levels and with suitable mitigations in place, such as screens.</p><p>Music is also permitted at outdoor events with no restriction on volume.</p><p>Full details of current regulations is available at: https://www.nidirect.gov.uk/articles/coronavirus-covid-19-regulations-guidance-what-restrictions-mean-you</p><p>The Executive is committed to continuing to work in partnership with all sectors to ensure the approach to relaxations is focused on building resilience and reducing the need for further restrictions in the future.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019246%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=338820","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=338820"}},{"id":"338819","reference":"AQW 19245/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-21","answerBy":"2021-06-08","answered":"2021-06-24","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail what specific support her Department is providing to the corporate events sector.","answerText":"Since March 2020, the NI Executive and the UK Government have introduced an unprecedented number of interventions and packages of financial support to help those who have been affected by the consequences of Covid-19.\n\nThe Department for the Economy has led in the delivery of business related support, providing more than £485 million of much needed funds to support local businesses from all sectors and occupations throughout Northern Ireland, with the primary aim of helping these businesses to survive the pandemic, and protect as many local jobs as possible. This included the £25k Business Support Scheme in 2020 and more recently, the Large Tourism and Hospitality Business Support Scheme.","answerHtml":"<p>Since March 2020, the NI Executive and the UK Government have introduced an unprecedented number of interventions and packages of financial support to help those who have been affected by the consequences of Covid-19.</p><p>The Department for the Economy has led in the delivery of business related support, providing more than £485 million of much needed funds to support local businesses from all sectors and occupations throughout Northern Ireland, with the primary aim of helping these businesses to survive the pandemic, and protect as many local jobs as possible. This included the £25k Business Support Scheme in 2020 and more recently, the Large Tourism and Hospitality Business Support Scheme.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019245%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=338819","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=338819"}},{"id":"338818","reference":"AQW 19244/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-21","answerBy":"2021-06-08","answered":"2021-06-08","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to detail key traffic accident blackspots, broken down by constituency, excluding East Antrim.","answerText":"My officials routinely carry out reviews of collision cluster sites when developing the Collision Remedial programme that sits within the wider Local Transport and Safety Measures (LTSM) programme. This review seeks to identify sites where 4 or more collisions have occurred within a three year period to determine if the application of appropriate road safety engineering measures would help reduce the number and severity of collisions.\n\nThe table below provides details of the locations of collision cluster sites identified in each Division and council area which, for completeness, also includes East Antrim. Unfortunately the information requested is not currently available for Armagh, Banbridge & Craigavon Council, Newry Mourne and Down Council (West) or the Council areas within Roads Western Division. However, I have asked the Divisional Roads Managers to write to the Member within four weeks with specific details for those areas not included below:\n\nNORTHERN DIVISION\nCauseway Coast & Glens Borough Council\nMillburn Road with Artillery Road Coleraine\nPortstewart Road with Glenmanus Road Portrush\nFrosses Road with Kirk Road Ballymoney\nMain Street Dungiven\nMain Street Limavady with Connell Street Limavady\nCastlerock Road/Waterside gyratory\nBallyquin Road with Derryork Road Limavady\nRailway Road with Circular Road Coleraine\nBushmills Road Roundabout Coleraine\nGracehill Road with Fivey Road Ballymoney\nMoyarget Road with Whitepark Road Ballycastle\nAltinure Road with Glenedra Road Feeny\nBallybogey Road with Priestland Road Revallagh\nForeglen Road with Feeny Road Dungiven\nBallybogy Road with Dunluce Road Portrush\nBallyquin Road with Greystone Road Limavady\nDunluce Road with Priestland Road Bushmills\nCastlerock Road with Kings Road Coleraine\nWindyhill Road with Dunboe Road Coleraine\nBann Road with Moneyleck Road Rasharkin\nColeraine Road with Loguestown Road Coleraine\nDrumcroone Rd /Dunhill Rd Roundabout Coleraine\nRailway Road with Mill Road Coleraine\nMillburn Road with Union Street Coleraine\n\nMid & East Antrim Borough Council\nA26 Crankill Road / Kildowney Road, Ballymena\nA42 Galgorm Road / Waveney Road, Ballymena\nParkway Roundabout / Broughshane Street, Ballymena.\nLarne Road / Penneybridge industrial estate, Ballymena.\nCromkill Road / Ballee Road West, Ballymena\nSlaght Road / Ballee Road West, Ballymena\nCardonaghy Road / Corbally Road, Ballymena.\nA2 Shore Road / Gallows Green, Carrickfergus.\nA2 Shore Road / Windmill Avenue, Carrickfergus.\nA2 Shore Road / Davys Street, Carrickfergus.\nA2 Shore Road / Castle Roundabout, Carrickfergus.\nC75 Albert Road / North Street, Carrickfergus.\nC75 North Road / Prince William Way, Carrickfergus.\nC75 North Road / Prince Andrew Way, Carrickfergus.\nB90 Middle Road / Woodburn Road, Carrickfergus.\nA8 Harbour Highway / Pound Street, Larne.\nC72 Old Glenarm Road / Greenland Road, Larne.\n\nAntrim & Newtownabbey Borough Council\nB59 Doagh Road / Monkstown Road, Newtownabbey.\nB90 Old Carrick Road / Monkstown Road, Newtownabbey.\nA2 Shore Road / Glenwell Road, Whiteabbey.\nA2 Shore Road / Jordanstown Road, Whiteabbey.\nA2 Shore Road / Station Road R’About, Whiteabbey.\nA2 Shore Road / Hazelbank Roundabout, Whiteabbey.\nA2 Shore Road / Doagh Road, Whiteabbey.\nA2 Shore Road / Longwood Road, Whiteabbey\nChurch road roundabout / Abbeycentre, Whiteabbey\nChurch Road / Tesco entrance, Whiteabbey.\nChurch Road / Valley playing fields entrance, Whiteabbey.\nA6 Sandyknowes Roundabout / M2 North Bound Off slip.\nA6 Sandyknowes Roundabout / Ballyclare Road.\nB95 Mallusk Road / Scullions Road, Glengormley.\nCorrs Corner R’about / Ballyclare Road North, Glengormley.\nCorrs Corner R’about / Ballyclare Road South, Glengormley\nA8 Ballyclare Road / Ballycraigy Road, Glengormley.\nB90 Manse Road / Prince Charles Way, Glengormley.\nB90 Manse Rd / Carnmoney Rd Roundabout, Glengormley\nB90 Manse Road / Doagh Road, Glengormley.\nB90 Doagh Road / Carntall Road, Glengormley.\nA6 Antrim Road / Farmley Road / Glengormley.\nA6 Antrim Road / Church Way, Glengormley.\nA6 Antrim Road / O’Neill Road, Glengormley.\nO’Neill Road / Station Road Roundabout (cloughfern)\nA52 Ballyutoag Road / Nutts Corner, Crumlin.\nA26 Moira Road / Nutts Corner, Crumlin.\nA26 Tully Road / Nutts Corner, Crumlin.\nRogurey Road / Ballydonnelly Road, Toome.\nM22 / A6 Moneynick road, Randalstown.\nA6 New Street / Main Street, Randalstown.\nA26 Lisnevenagh Road / Dunsilly Roundabout, Antrim.\nA6 Castle Road / Dublin Road, Antrim\nOriel Road / Station Road, Antrim.\nFountain Hill / Parkhall Road, Antrim\nFountain Hill / Belfast Road, Antrim\nA26 Oldstone Road, Sevenmile Straight, Antrim.\nA6 Belfast Road / Ballycraigy Road, Antrim\nA6 Antrim Road / The Village, Templepatrick.\nM2 Off slip / A57 Ballyclare Road, Templepatrick.\nA57 Templepatrick Road / Mill Road, Ballyclare.\nA57 Templepatrick Road / Ballynure Road, Ballyclare.\n\nSOUTHERN DIVISION\nNorth Down and Ards Borough Council – North Down\nSouth Circular Road / Bloomfield Road / Bloomfield Road South\nWest & South Circular Road.- Newtownards Road Roundabout\nCraigantlet Road / Whinney Hill / Dunlady Road\nHamilton Road from Bingham Street to Springfield Avenue\nA2 / Shore Road/The esplanade/ Holywood By-Pass, Holywood\nRathgael Rd Roundabout / Balloo Rd / Newtownards Rd\nBelfast Road / Old Belfast Road / Rathgael Road\nA2 Bangor Road / Ballymoney Road / Craigdarragh Road\nA2 / Ballyrobert Road\nBalloo Road / Gransha Road / Tadworth\nA2 / Ballysallagh Road\nA2 / Seahill Road\nEast Circular Rd / Donaghadee Rd / High Donaghadee Rd Roundabout\nAbbey St / Main St / Dufferin Ave / Castle Park Ave\nA2 / Bangor Road, Croft Road, Holywood\nHigh Street / Albert Street\nBallymiscaw Road / Ballyregan Road / Church Road\nBallysallagh Rd / Crawfordsburn Rd\nGransha Road / Ballycrochan Road / Cotton Road / Upper Gransha Road / Gransha Road South / Green Road (Six Road Ends)\nHigh St - Sullivan Pl, Holywood\nA2 / Whinney Hill\nGransha Road Roundabout / South & East Circular Road\nDonaghadee Road / Groomsport Road\nNewtownards Rd / Bangor Road, Conlig\nA2 onslip at West Circular Road\nJacksons Road / Belfast Road\nHolywood By-pass (90m south west of jacksons Road) at grid 339050 378104\n\nNorth Down and Ards Borough Council - Ards\nWoolco Roundabout, Newtownards\nMovilla Road / Upper Gransha Road / Killaughey Road / Ballyblack Road East\nBallyblack Road East / Grange Road / Ballyblack Road Carrowdore\nComber Road Roundabout, Newtownards\nHigh Street / Lower Mary Street / Pound Street, Newtownards\nHigh Street / Bridge Street / Castle Street / The Square Comber\nNorth Road / Bangor Road, Newtownards\nHardford Link / William Street / Crawfordsburn Road / Talbot Street, Newtownards\nComber Road / Jubilee Road, Newtownards\nDonaghadee Road (263m SW of Kerrs Road)\nBlair Mayne Road / Access to Cinema Carpark, Newtownards\nZion Place Rounabout & Bangor Road, Newtownards\nRegent Street / Church / William Street / Frederick Street / Newtownards\nMountstewart Road / Carrowdore Road / Cardy Road / Manse Road, Carrowdore\nMovilla Road / Donaghadee Road\nBlenheim Drive / Comber Road, Newtownards\nBallyblack Road East / Moss Road, Newtownards\nPortaferry Road / Castlebawn Road, Newtownards\nHardford Link / Glenford / Corry Street, Newtownards\nTalbot Street / Upper North Street, Newtownards\nSouth Street / High Street, Newtownards\nWoolco Roundabout, Newtownards\nMovilla Road / Upper Gransha Road / Killaughey Road / Ballyblack Road East\nBallyblack Road East / Grange Road / Ballyblack Road Carrowdore\nComber Road Roundabout, Newtownards\nHigh Street / Lower Mary Street / Pound Street, Newtownards\nHigh Street / Bridge Street / Castle Street / The Square Comber\nNorth Road / Bangor Road, Newtownards\nHardford Link / William Street / Crawfordsburn Road / Talbot Street, Newtownards\nComber Road / Jubilee Road, Newtownards\nDonaghadee Road (263m SW of Kerrs Road)\nBlair Mayne Road / Access to Cinema Carpark, Newtownards\nZion Place Rounabout & Bangor Road, Newtownards\nRegent Street / Church / William Street / Frederick Street / Newtownards\nMountstewart Road / Carrowdore Road / Cardy Road / Manse Road, Carrowdore\nMovilla Road / Donaghadee Road\nBlenheim Drive / Comber Road, Newtownards\nBallyblack Road East / Moss Road, Newtownards\nPortaferry Road / Castlebawn Road, Newtownards\nHardford Link / Glenford / Corry Street, Newtownards\nTalbot Street / Upper North Street, Newtownards\nSouth Street / High Street, Newtownards\n\nNewry Mourne and Down District Council (East)\nMarket Street / St Patrick's Avenue, Downpatrick\nShimna Road / Dundrum Road / Castlewellan Road Roundabout, Newcastle\nShimna Road / Bryansford Avenue\nMain Street / Upper Square. Castlewellan\nBallydugan Road / Downe Retail Park, Downpatrick\nArdglass Road / Ballyhornan Road Junction, Downpatrick\nLisburn Road / Magheraknock Road, Ballynahinch\nMagheraknock Road - Glassdrumman Road, Ballynahinch\nChurch Street / Saul Way, Downpatrick\nWindmill Street / High Street, Ballynahinch\nCastlewellan Road / Drumcaw Road / Dromara Road / Hollybush Road at Moneycarragh Bridge\nBelfast Road / Inch Abbey Road, Downpatrick\nMain Street, Clough\nBallydugan Road / Bonecastle Road, Downpatrick\nStrangford Road / Mearne Road, Downpatrick\nCrossgar Road / Main Street / Todds Hill, Saintfield\nCorrigs Avenue / Dundrum Road, Newcastle\n\nArmagh, Banbridge & Craigavon Council\nLocations not currently available\n\nNewry Mourne and Down District Council (West)\nLocations not currently available\n\nEASTERN DIVISION\nBelfast City Council\nStewartstown Rd from Teeling Rbt to Creightons Rd roundabout (excl R'abouts)\nSydenham By Pass / Dee Street\nYork Street / Westlink / M2 onslip\nSydenham By-Pass / Holywood Rd at Tillysburn Roundabout\nCastle Street / Millfield / Divis Street / College Avenue\nOrmeau Road from Hatfield Street to Stranmillis Embankment\nAndersonstown Road / Finaghy Road North\nNelson Street / York Link\nSaintfield Road / Upper Knockbreda Road / Newtownbreda Road (Forestside)\nStockmans lane / Kennedy Way / M1 Roundabout (All)\nAlbertbridge Rd / Ravenhill Rd / Short Strand / Albert Bridge\nGreat Victoria Street / Amelia Street (3356 7378)\nMonagh By-Pass / Upper Springfield Road\nA55 / Castlereagh Road / Ballygowan Road\nFalls Road / Grosvenor Road\nFalls Road / Donegall Road Junction.\nYork Street / Great Georges Street\nUpper Newtownards Road from Holland Dr to Eastleigh Dr\nStockmans lane / Boucher Road\nStewartstown Road / Blacks Road / Suffolk Road\nBeersbridge Road / Castlereagh Road/St / Templemore ave\nAntrim Road / Carlisle Circus / Crumlin Road\nCrumlin Road entrance to Mater hospital\nYork Street / Brougham St\nShore Road / Mount Vernon Road\nM3 Off Slip / Nelson Street / Great Georges Street\nCrumlin Rd-.Ballyutoag Rd from Horseshoe to Lylehill Rd Lower\nBellsbridge rbt (Cregagh Rd / Ladas Dr / Mount Merrion Ave)\nLisburn Road / Balmoral Avenue\nGrosvenor Road / Durham Street\nAndersonstown Road / Shaws Road / Stewartstown Road\nShaftesbury Sq / Bradbury Pl / Donegall Pass & Road /Botanic Ave/ Dublin Rd/ Gt Victoria St\nShankill Road from Tennant Street to Lanark Way\nBelmont Rd / Parkway / Hawthornden Way Roundabout\nClifton Street / Westlink\nShankill Road / Agnes St\nMalone Road from Wellesley Avenue to Malone Avenue\nAndersonstown Road / Riverdale Park East ( BRT )\nMillfield / North Street / Peters Hill\nGreat Victoria Street / Bruce Street\nAndersonstown Road / Kennedy Way \"Junction\"\nUpper N'ards Rd / Knock Rd / Hawthornden Way (3876 7395)\nFalls Road / Clonard Street\nStewartstown Rd, ( Teeling Roundabout )\nUpper Newtownards Road / North Road\nOrmeau Emb / Ormeau Road / Annadale Emb\nOrmeau Road / Ormeau Avenue / Cromac Street\nFalls Road / Whiterock Road / St. James Road\nClifton Street / North Queen Street / Carrick Hill / Donegal Street\nSpringfield Road / Whiterock Road\nFalls Road / Northumberland Street / Albert Street\nHigh Street / Victoria Street / Queens Square\nWoodstock Rd from Willowfield Pde to Hillsboriugh Drive\nWestlink / Divis Street\nOldpark Rd / Cliftonville Rd / Alliance Ave / Westland Rd\nKnock Road / Kings Road\nShore Road / Fortwilliam Park\nMalone Road / Balmoral Avenue\nMiddlepath Street / M3 Onslip\nOrmeau Road / Ravenhill Road Roundabout\nDonegall Place / Donegall Square North\nShankill Rd / Dover St / Boundary St / North Boundary St.\nKingsway / Dunmurry Lane\nSydenham By-Pass / George Best City Airport entrance/exit\nMilltown Road / Belvoir Drive\nUpper Galwally / Bradford Court / Forestside\nYork Street / Donegall Street (3381 7476)\nVictoria Street / May Street\nKnock Road / Sandown Road / Shandon Park\nCrumlin Road / Clifton Park Avenue / Agnes Street / Oldpark Rd.\nWoodstock Rd/ Portallo/ Redcar St ( Duplicate )\nUpper Lisburn Rd / Finaghy Rd North / Finaghy Rd South\nFalls Road / Kennedy Centre Entrance\nTates Ave / Glenmachan St / Boucher Road Roundabout\nSpringfield Road / New Barnsley Park\nNewtownards Rd / Upper Newtownards Rd / Holywood Rd.\nUpper Newtownards Road / Kerrsland Dr / Kerrsland Pde\nGreat Victoria Street / Grosvenor Road / Howard Street\nOld Golf Course Road / Creighton Road Roundabout\nAntrim Road / Brookvale Ave\nAnnadale Embankment / Sunnyside Street\nWoodstock Road / Willowfield Street / My Ladys Road\nGlen Road / Kennedy Way / Monagh By Pass Rbt (All)\nLisburn Rd-D'brook St-Eglantine Ave-Tates Ave-Cussick St\nUpper Knockbreda Road / Glencregagh Road / Upper Galwally\nAntrim Road / Duncairn Gardens / Atlantic Avenue\nMillfield / Smithfield Sq North / Wilson Str (3346 7452)\nGreat Victoria Street / Glengall Street\nNewtownards Road / Bridge End\nEast Bridge Street / Oxford Street\nCollege Square East / Wellington Place (3353 7407)\nOrmeau Road / University Street\nUniversity Rd / Fountainville Ave / Upper Crescent\nEast Bridge Street / Stewart Street\nBotantic Ave / Lower Crescent / Cameron St\nVictoria Street / Ann Street (3421 7434)\nMcKinstry Road / Stewartstown Road - Roundabout\nCrumlin Road / Ballysillan Road\nMalone Road / Upper Malone Road Roundabout\nSpringfield Road / Springfield Avenue\nCromac Sq-East Bridge St-Cromac St-Hamilton St-Victoria St\nLisburn Road / Lower Windsor Ave / Windsor Ave\nVictoria Street / Chichester Street\nAntrim Road / Limestone Road / Cavehill Road (3322 7647)\nHolywood Road / Edenvale Drive / Park Avenue\nUniversity Road / Elmwood Avenue\nKennedy Way / Blackstaff Road (3077 7167)\nDublin Road / Bruce Street / Bankmore Street\nBrougham Street at entrance to shopping centre\nUpper Dunmurry Lane / Old Golf Course Road\nAntrim Road / Cliftonville Road.\nA55 Knockbreda Road - Cregagh Road\nOrmeau Road / Donegall Pass (3416 7332)\n\nLisburn & Castlereagh City Council\nMoira Roundabout ( All Approaches )\nSprucefield Roundabout (All approaches )\nBallykeel Xrds B'nahinch Rd / Howe Rd / Dromara Rd / Hillsborough Rd / Magheraconluce Rd\nThiepval Road / Governors Road / Longstone Street ( Roundabout )\nHillsborough Road /Laganbank Road/ Governors Road Junction\nLaganbank Road / Queens Road (at Union Bridge)\nM1 Saintfield Road (Roundabout)\nA1 / Hillsborough Road Roundabout. ( At Hillsborough )\nLongstone St, Tonagh Ave - Warren Gdns / Tonagh Drive\nM1 Blacks Road citybound top of on-slip\nMcKinstry Road / Derriaghy Road / The Cutts\nBallinderry Road / Knockmore Road (2396 6440)\nSaintfield Road / Saintfield Road / Old Ballynahinch Road (299 617)\nThiepval Road / Bentrim Road Roundabout / Prince William Road\nBallinderry Rd - Moneybroom Rd-Lissue Rd ( Junction )\nBallynahinch Rd / Edentrillick Rd / Leapogues Rd (McAdams crossroads)\n(A1) Hillsborough Road (A101) Magherageery Road Roundabout, Lisburn\nMullaglass Rd / Braithwaites Rd / Pond Pk Rd East (Sale's Corner)\nMagheraknock from Lough Road to Laurel Road\nWallace Ave / Seymour Street / Queens Road\nLaganbank Road / Hill Street\nStewartstown Road / Twinbrook Road\nPrince William Road / Knockmore Road\nMoira Village, Main Street - Meeting Street Junction, Lisburn.\nDundrod Road / Leathemstown Road / Quarterland Road\nLeathemstown Rd / Fort Rd / Tullyrusk Road\nOld Ballynahinch Road / Comber Road / Comber Road Junction.\nLongstone Street / Warren Gardens / Tonagh Drive ( Duplicated )\nRock Rd from Steedstown Rd to Hannahstown Rd near Ballymac\nOld Ballynahinch Road from Bailliesmills Road to Drennan Road\nStewartstown Road / Bellsteel Road\nBallyskeagh Road / Drumbeg Road +bend at church\nHillsborough Road Entrance to Sprucefield Shopping Centre - Roundabout.\nMoira Road / Ballycreen Drive\nColinglen Road / Colinswell Road / Glenside Road (2697 7102)\nMcKinstry Road / Wilmar Road\nMoira Road - Lisburn Road Glenavey Staggered junction (See grids Lisburn)\nSloan Street / Mercer Street\nHillsborough Road / Dromara Road (Slip Road) Junction.\nPrince William Road / Ballymacash Road\nSloan Street / Gregg Street / Young Street\nBallygowan Road / Manse Road / Upper Braniel Road\nComber Road / Old Dundonald Road / Grahamsbridge Road\nSaintfield Road / Cairnshill Road / Beechill Road\nSaintfield Road / Upper Knockbreda Road / Newtownbreda Road (Forestside)\nSaintfield Road from Carryduff to divisional boundary\nUpper Newtownards Road / Dunlady Road / Robbs Road\nUpper Galwally / Bradford Court\nMilltown Road / Teardrop Roundabout\nSaintfield Road / Old Saintfield Road (at Knockbracken Hospital)\nB'gowan Rd / Moneyrea Rd / Gransha Rd / Knockbracken Rd (Maryland Crossroads)\nUpper Newtownards Road / Comber Road\nBallynahinch Road / Church Road / Hillsborough Road\nBallygowan Road / Church Road / Glen Road\nUpper Newtownards Road / Eastlink Road / Ulster Hospital\nSaintfield Road / Newton Park / School Road\nGilnahirk Road West / Upper Braniel Rd from Manns Rd to Gilnahirk Rd\nUpper Newtownards Road / Craigleith Drive\nSaintfield Road / Commons Brae Bend\nOld Dundonald Road / Ballyhanwood Road\n\nWESTERN DIVISION\nLocations not currently available","answerHtml":"<p>My officials routinely carry out reviews of collision cluster sites when developing the Collision Remedial programme that sits within the wider Local Transport and Safety Measures (LTSM) programme. This review seeks to identify sites where 4 or more collisions have occurred within a three year period to determine if the application of appropriate road safety engineering measures would help reduce the number and severity of collisions.</p><p>The table below provides details of the locations of collision cluster sites identified in each Division and council area which, for completeness, also includes East Antrim. Unfortunately the information requested is not currently available for Armagh, Banbridge &amp; Craigavon Council, Newry Mourne and Down Council (West) or the Council areas within Roads Western Division. However, I have asked the Divisional Roads Managers to write to the Member within four weeks with specific details for those areas not included below:</p><div class=\"table-wrap\"><table><tr><td>NORTHERN DIVISION</td></tr><tr><td>Causeway Coast &amp; Glens Borough Council</td></tr><tr><td>Millburn Road with Artillery Road Coleraine</td></tr><tr><td>Portstewart Road with Glenmanus Road Portrush</td></tr><tr><td>Frosses Road with Kirk Road Ballymoney</td></tr><tr><td>Main Street Dungiven</td></tr><tr><td>Main Street Limavady with Connell Street Limavady</td></tr><tr><td>Castlerock Road/Waterside gyratory</td></tr><tr><td>Ballyquin Road with Derryork Road Limavady</td></tr><tr><td>Railway Road with Circular Road Coleraine</td></tr><tr><td>Bushmills Road Roundabout Coleraine</td></tr><tr><td>Gracehill Road with Fivey Road Ballymoney</td></tr><tr><td>Moyarget Road with Whitepark Road Ballycastle</td></tr><tr><td>Altinure Road with Glenedra Road Feeny</td></tr><tr><td>Ballybogey Road with Priestland Road Revallagh</td></tr><tr><td>Foreglen Road with Feeny Road Dungiven</td></tr><tr><td>Ballybogy Road with Dunluce Road Portrush</td></tr><tr><td>Ballyquin Road with Greystone Road Limavady</td></tr><tr><td>Dunluce Road with Priestland Road Bushmills</td></tr><tr><td>Castlerock Road with Kings Road Coleraine</td></tr><tr><td>Windyhill Road with Dunboe Road Coleraine</td></tr><tr><td>Bann Road with Moneyleck Road Rasharkin</td></tr><tr><td>Coleraine Road with Loguestown Road Coleraine</td></tr><tr><td>Drumcroone Rd /Dunhill Rd Roundabout Coleraine</td></tr><tr><td>Railway Road with Mill Road Coleraine</td></tr><tr><td>Millburn Road with Union Street Coleraine</td></tr><tr><td></td></tr><tr><td>Mid &amp; East Antrim Borough Council</td></tr><tr><td>A26 Crankill Road / Kildowney Road, Ballymena</td></tr><tr><td>A42 Galgorm Road / Waveney Road, Ballymena</td></tr><tr><td>Parkway Roundabout / Broughshane Street, Ballymena.</td></tr><tr><td>Larne Road / Penneybridge industrial estate, Ballymena.</td></tr><tr><td>Cromkill Road / Ballee Road West, Ballymena</td></tr><tr><td>Slaght Road / Ballee Road West, Ballymena</td></tr><tr><td>Cardonaghy Road / Corbally Road, Ballymena.</td></tr><tr><td>A2 Shore Road / Gallows Green, Carrickfergus.</td></tr><tr><td>A2 Shore Road / Windmill Avenue, Carrickfergus.</td></tr><tr><td>A2 Shore Road / Davys Street, Carrickfergus.</td></tr><tr><td>A2 Shore Road / Castle Roundabout, Carrickfergus.</td></tr><tr><td>C75 Albert Road / North Street, Carrickfergus.</td></tr><tr><td>C75 North Road / Prince William Way, Carrickfergus.</td></tr><tr><td>C75 North Road / Prince Andrew Way, Carrickfergus.</td></tr><tr><td>B90 Middle Road / Woodburn Road, Carrickfergus.</td></tr><tr><td>A8 Harbour Highway / Pound Street, Larne.</td></tr><tr><td>C72 Old Glenarm Road / Greenland Road, Larne.</td></tr><tr><td></td></tr><tr><td>Antrim &amp; Newtownabbey Borough Council</td></tr><tr><td>B59 Doagh Road / Monkstown Road, Newtownabbey.</td></tr><tr><td>B90 Old Carrick Road / Monkstown Road, Newtownabbey.</td></tr><tr><td>A2 Shore Road / Glenwell Road, Whiteabbey.</td></tr><tr><td>A2 Shore Road / Jordanstown Road, Whiteabbey.</td></tr><tr><td>A2 Shore Road / Station Road R’About, Whiteabbey.</td></tr><tr><td>A2 Shore Road / Hazelbank Roundabout, Whiteabbey.</td></tr><tr><td>A2 Shore Road / Doagh Road, Whiteabbey.</td></tr><tr><td>A2 Shore Road / Longwood Road, Whiteabbey</td></tr><tr><td>Church road roundabout / Abbeycentre, Whiteabbey</td></tr><tr><td>Church Road / Tesco entrance, Whiteabbey.</td></tr><tr><td>Church Road / Valley playing fields entrance, Whiteabbey.</td></tr><tr><td>A6 Sandyknowes Roundabout / M2 North Bound Off slip.</td></tr><tr><td>A6 Sandyknowes Roundabout / Ballyclare Road.</td></tr><tr><td>B95 Mallusk Road / Scullions Road, Glengormley.</td></tr><tr><td>Corrs Corner R’about / Ballyclare Road North, Glengormley.</td></tr><tr><td>Corrs Corner R’about / Ballyclare Road South, Glengormley</td></tr><tr><td>A8 Ballyclare Road / Ballycraigy Road, Glengormley.</td></tr><tr><td>B90 Manse Road / Prince Charles Way, Glengormley.</td></tr><tr><td>B90 Manse Rd / Carnmoney Rd Roundabout, Glengormley</td></tr><tr><td>B90 Manse Road / Doagh Road, Glengormley.</td></tr><tr><td>B90 Doagh Road / Carntall Road, Glengormley.</td></tr><tr><td>A6 Antrim Road / Farmley Road / Glengormley.</td></tr><tr><td>A6 Antrim Road / Church Way, Glengormley.</td></tr><tr><td>A6 Antrim Road / O’Neill Road, Glengormley.</td></tr><tr><td>O’Neill Road / Station Road Roundabout (cloughfern)</td></tr><tr><td>A52 Ballyutoag Road / Nutts Corner, Crumlin.</td></tr><tr><td>A26 Moira Road / Nutts Corner, Crumlin.</td></tr><tr><td>A26 Tully Road / Nutts Corner, Crumlin.</td></tr><tr><td>Rogurey Road / Ballydonnelly Road, Toome.</td></tr><tr><td>M22 / A6 Moneynick road, Randalstown.</td></tr><tr><td>A6 New Street / Main Street, Randalstown.</td></tr><tr><td>A26 Lisnevenagh Road / Dunsilly Roundabout, Antrim.</td></tr><tr><td>A6 Castle Road / Dublin Road, Antrim</td></tr><tr><td>Oriel Road / Station Road, Antrim.</td></tr><tr><td>Fountain Hill / Parkhall Road, Antrim</td></tr><tr><td>Fountain Hill / Belfast Road, Antrim</td></tr><tr><td>A26 Oldstone Road, Sevenmile Straight, Antrim.</td></tr><tr><td>A6 Belfast Road / Ballycraigy Road, Antrim</td></tr><tr><td>A6 Antrim Road / The Village, Templepatrick.</td></tr><tr><td>M2 Off slip / A57 Ballyclare Road, Templepatrick.</td></tr><tr><td>A57 Templepatrick Road / Mill Road, Ballyclare.</td></tr><tr><td>A57 Templepatrick Road / Ballynure Road, Ballyclare.</td></tr></table></div><div class=\"table-wrap\"><table><tr><td>SOUTHERN DIVISION</td></tr><tr><td>North Down and Ards Borough Council – North Down</td></tr><tr><td>South Circular Road / Bloomfield Road / Bloomfield Road South</td></tr><tr><td>West &amp; South Circular Road.- Newtownards Road Roundabout</td></tr><tr><td>Craigantlet Road / Whinney Hill / Dunlady Road</td></tr><tr><td>Hamilton Road from Bingham Street to Springfield Avenue</td></tr><tr><td>A2 / Shore Road/The esplanade/ Holywood By-Pass, Holywood</td></tr><tr><td>Rathgael Rd Roundabout / Balloo Rd / Newtownards Rd</td></tr><tr><td>Belfast Road / Old Belfast Road / Rathgael Road</td></tr><tr><td>A2 Bangor Road / Ballymoney Road / Craigdarragh Road</td></tr><tr><td>A2 / Ballyrobert Road</td></tr><tr><td>Balloo Road / Gransha Road / Tadworth</td></tr><tr><td>A2 / Ballysallagh Road</td></tr><tr><td>A2 / Seahill Road</td></tr><tr><td>East Circular Rd / Donaghadee Rd / High Donaghadee Rd Roundabout</td></tr><tr><td>Abbey St / Main St / Dufferin Ave / Castle Park Ave</td></tr><tr><td>A2 / Bangor Road, Croft Road, Holywood</td></tr><tr><td>High Street / Albert Street</td></tr><tr><td>Ballymiscaw Road / Ballyregan Road / Church Road</td></tr><tr><td>Ballysallagh Rd / Crawfordsburn Rd</td></tr><tr><td>Gransha Road / Ballycrochan Road / Cotton Road / Upper Gransha Road / Gransha Road South / Green Road (Six Road Ends)</td></tr><tr><td>High St - Sullivan Pl, Holywood</td></tr><tr><td>A2 / Whinney Hill</td></tr><tr><td>Gransha Road Roundabout / South &amp; East Circular Road</td></tr><tr><td>Donaghadee Road / Groomsport Road</td></tr><tr><td>Newtownards Rd / Bangor Road, Conlig</td></tr><tr><td>A2 onslip at West Circular Road</td></tr><tr><td>Jacksons Road / Belfast Road</td></tr><tr><td>Holywood By-pass (90m south west of jacksons Road) at grid 339050 378104</td></tr><tr><td></td></tr><tr><td>North Down and Ards Borough Council - Ards</td></tr><tr><td>Woolco Roundabout, Newtownards</td></tr><tr><td>Movilla Road / Upper Gransha Road / Killaughey Road / Ballyblack Road East</td></tr><tr><td>Ballyblack Road East / Grange Road / Ballyblack Road Carrowdore</td></tr><tr><td>Comber Road Roundabout, Newtownards</td></tr><tr><td>High Street / Lower Mary Street / Pound Street, Newtownards</td></tr><tr><td>High Street / Bridge Street / Castle Street / The Square Comber</td></tr><tr><td>North Road / Bangor Road, Newtownards</td></tr><tr><td>Hardford Link / William Street / Crawfordsburn Road / Talbot Street, Newtownards</td></tr><tr><td>Comber Road / Jubilee Road, Newtownards</td></tr><tr><td>Donaghadee Road (263m SW of Kerrs Road)</td></tr><tr><td>Blair Mayne Road / Access to Cinema Carpark, Newtownards</td></tr><tr><td>Zion Place Rounabout &amp; Bangor Road, Newtownards</td></tr><tr><td>Regent Street / Church / William Street / Frederick Street / Newtownards</td></tr><tr><td>Mountstewart Road / Carrowdore Road / Cardy Road / Manse Road, Carrowdore</td></tr><tr><td>Movilla Road / Donaghadee Road</td></tr><tr><td>Blenheim Drive / Comber Road, Newtownards</td></tr><tr><td>Ballyblack Road East / Moss Road, Newtownards</td></tr><tr><td>Portaferry Road / Castlebawn Road, Newtownards</td></tr><tr><td>Hardford Link / Glenford / Corry Street, Newtownards</td></tr><tr><td>Talbot Street / Upper North Street, Newtownards</td></tr><tr><td>South Street / High Street, Newtownards</td></tr><tr><td>Woolco Roundabout, Newtownards</td></tr><tr><td>Movilla Road / Upper Gransha Road / Killaughey Road / Ballyblack Road East</td></tr><tr><td>Ballyblack Road East / Grange Road / Ballyblack Road Carrowdore</td></tr><tr><td>Comber Road Roundabout, Newtownards</td></tr><tr><td>High Street / Lower Mary Street / Pound Street, Newtownards</td></tr><tr><td>High Street / Bridge Street / Castle Street / The Square Comber</td></tr><tr><td>North Road / Bangor Road, Newtownards</td></tr><tr><td>Hardford Link / William Street / Crawfordsburn Road / Talbot Street, Newtownards</td></tr><tr><td>Comber Road / Jubilee Road, Newtownards</td></tr><tr><td>Donaghadee Road (263m SW of Kerrs Road)</td></tr><tr><td>Blair Mayne Road / Access to Cinema Carpark, Newtownards</td></tr><tr><td>Zion Place Rounabout &amp; Bangor Road, Newtownards</td></tr><tr><td>Regent Street / Church / William Street / Frederick Street / Newtownards</td></tr><tr><td>Mountstewart Road / Carrowdore Road / Cardy Road / Manse Road, Carrowdore</td></tr><tr><td>Movilla Road / Donaghadee Road</td></tr><tr><td>Blenheim Drive / Comber Road, Newtownards</td></tr><tr><td>Ballyblack Road East / Moss Road, Newtownards</td></tr><tr><td>Portaferry Road / Castlebawn Road, Newtownards</td></tr><tr><td>Hardford Link / Glenford / Corry Street, Newtownards</td></tr><tr><td>Talbot Street / Upper North Street, Newtownards</td></tr><tr><td>South Street / High Street, Newtownards</td></tr><tr><td></td></tr><tr><td>Newry Mourne and Down District Council (East)</td></tr><tr><td>Market Street / St Patrick&#39;s Avenue, Downpatrick</td></tr><tr><td>Shimna Road / Dundrum Road / Castlewellan Road Roundabout, Newcastle</td></tr><tr><td>Shimna Road / Bryansford Avenue</td></tr><tr><td>Main Street / Upper Square. Castlewellan</td></tr><tr><td>Ballydugan Road / Downe Retail Park, Downpatrick</td></tr><tr><td>Ardglass Road / Ballyhornan Road Junction, Downpatrick</td></tr><tr><td>Lisburn Road / Magheraknock Road, Ballynahinch</td></tr><tr><td>Magheraknock Road - Glassdrumman Road, Ballynahinch</td></tr><tr><td>Church Street / Saul Way, Downpatrick</td></tr><tr><td>Windmill Street / High Street, Ballynahinch</td></tr><tr><td>Castlewellan Road / Drumcaw Road / Dromara Road / Hollybush Road at Moneycarragh Bridge</td></tr><tr><td>Belfast Road / Inch Abbey Road, Downpatrick</td></tr><tr><td>Main Street, Clough</td></tr><tr><td>Ballydugan Road / Bonecastle Road, Downpatrick</td></tr><tr><td>Strangford Road / Mearne Road, Downpatrick</td></tr><tr><td>Crossgar Road / Main Street / Todds Hill, Saintfield</td></tr><tr><td>Corrigs Avenue / Dundrum Road, Newcastle</td></tr><tr><td></td></tr><tr><td>Armagh, Banbridge &amp; Craigavon Council</td></tr><tr><td>Locations not currently available</td></tr><tr><td></td></tr><tr><td>Newry Mourne and Down District Council (West)</td></tr><tr><td>Locations not currently available</td></tr></table></div><div class=\"table-wrap\"><table><tr><td>EASTERN DIVISION</td></tr><tr><td>Belfast City Council</td></tr><tr><td>Stewartstown Rd from Teeling Rbt to Creightons Rd roundabout (excl R&#39;abouts)</td></tr><tr><td>Sydenham By Pass / Dee Street</td></tr><tr><td>York Street / Westlink / M2 onslip</td></tr><tr><td>Sydenham By-Pass / Holywood Rd at Tillysburn Roundabout</td></tr><tr><td>Castle Street / Millfield / Divis Street / College Avenue</td></tr><tr><td>Ormeau Road from Hatfield Street to Stranmillis Embankment</td></tr><tr><td>Andersonstown Road / Finaghy Road North</td></tr><tr><td>Nelson Street / York Link</td></tr><tr><td>Saintfield Road / Upper Knockbreda Road / Newtownbreda Road (Forestside)</td></tr><tr><td>Stockmans lane / Kennedy Way / M1 Roundabout (All)</td></tr><tr><td>Albertbridge Rd / Ravenhill Rd / Short Strand / Albert Bridge</td></tr><tr><td>Great Victoria Street / Amelia Street (3356 7378)</td></tr><tr><td>Monagh By-Pass / Upper Springfield Road</td></tr><tr><td>A55 / Castlereagh Road / Ballygowan Road</td></tr><tr><td>Falls Road / Grosvenor Road</td></tr><tr><td>Falls Road / Donegall Road Junction.</td></tr><tr><td>York Street / Great Georges Street</td></tr><tr><td>Upper Newtownards Road from Holland Dr to Eastleigh Dr</td></tr><tr><td>Stockmans lane / Boucher Road</td></tr><tr><td>Stewartstown Road / Blacks Road / Suffolk Road</td></tr><tr><td>Beersbridge Road / Castlereagh Road/St / Templemore ave</td></tr><tr><td>Antrim Road / Carlisle Circus / Crumlin Road</td></tr><tr><td>Crumlin Road entrance to Mater hospital</td></tr><tr><td>York Street / Brougham St</td></tr><tr><td>Shore Road / Mount Vernon Road</td></tr><tr><td>M3 Off Slip / Nelson Street / Great Georges Street</td></tr><tr><td>Crumlin Rd-.Ballyutoag Rd from Horseshoe to Lylehill Rd Lower</td></tr><tr><td>Bellsbridge rbt (Cregagh Rd / Ladas Dr / Mount Merrion Ave)</td></tr><tr><td>Lisburn Road / Balmoral Avenue</td></tr><tr><td>Grosvenor Road / Durham Street</td></tr><tr><td>Andersonstown Road / Shaws Road / Stewartstown Road</td></tr><tr><td>Shaftesbury Sq / Bradbury Pl / Donegall Pass &amp; Road /Botanic Ave/ Dublin Rd/ Gt Victoria St</td></tr><tr><td>Shankill Road from Tennant Street to Lanark Way</td></tr><tr><td>Belmont Rd / Parkway / Hawthornden Way Roundabout</td></tr><tr><td>Clifton Street / Westlink</td></tr><tr><td>Shankill Road / Agnes St</td></tr><tr><td>Malone Road from Wellesley Avenue to Malone Avenue</td></tr><tr><td>Andersonstown Road / Riverdale Park East ( BRT )</td></tr><tr><td>Millfield / North Street / Peters Hill</td></tr><tr><td>Great Victoria Street / Bruce Street</td></tr><tr><td>Andersonstown Road / Kennedy Way &quot;Junction&quot;</td></tr><tr><td>Upper N&#39;ards Rd / Knock Rd / Hawthornden Way (3876 7395)</td></tr><tr><td>Falls Road / Clonard Street</td></tr><tr><td>Stewartstown Rd, ( Teeling Roundabout )</td></tr><tr><td>Upper Newtownards Road / North Road</td></tr><tr><td>Ormeau Emb / Ormeau Road / Annadale Emb</td></tr><tr><td>Ormeau Road / Ormeau Avenue / Cromac Street</td></tr><tr><td>Falls Road / Whiterock Road / St. James Road</td></tr><tr><td>Clifton Street / North Queen Street / Carrick Hill / Donegal Street</td></tr><tr><td>Springfield Road / Whiterock Road</td></tr><tr><td>Falls Road / Northumberland Street / Albert Street</td></tr><tr><td>High Street / Victoria Street / Queens Square</td></tr><tr><td>Woodstock Rd from Willowfield Pde to Hillsboriugh Drive</td></tr><tr><td>Westlink / Divis Street</td></tr><tr><td>Oldpark Rd / Cliftonville Rd / Alliance Ave / Westland Rd</td></tr><tr><td>Knock Road / Kings Road</td></tr><tr><td>Shore Road / Fortwilliam Park</td></tr><tr><td>Malone Road / Balmoral Avenue</td></tr><tr><td>Middlepath Street / M3 Onslip</td></tr><tr><td>Ormeau Road / Ravenhill Road Roundabout</td></tr><tr><td>Donegall Place / Donegall Square North</td></tr><tr><td>Shankill Rd / Dover St / Boundary St / North Boundary St.</td></tr><tr><td>Kingsway / Dunmurry Lane</td></tr><tr><td>Sydenham By-Pass / George Best City Airport entrance/exit</td></tr><tr><td>Milltown Road / Belvoir Drive</td></tr><tr><td>Upper Galwally / Bradford Court / Forestside</td></tr><tr><td>York Street / Donegall Street (3381 7476)</td></tr><tr><td>Victoria Street / May Street</td></tr><tr><td>Knock Road / Sandown Road / Shandon Park</td></tr><tr><td>Crumlin Road / Clifton Park Avenue / Agnes Street / Oldpark Rd.</td></tr><tr><td>Woodstock Rd/ Portallo/ Redcar St ( Duplicate )</td></tr><tr><td>Upper Lisburn Rd / Finaghy Rd North / Finaghy Rd South</td></tr><tr><td>Falls Road / Kennedy Centre Entrance</td></tr><tr><td>Tates Ave / Glenmachan St / Boucher Road Roundabout</td></tr><tr><td>Springfield Road / New Barnsley Park</td></tr><tr><td>Newtownards Rd / Upper Newtownards Rd / Holywood Rd.</td></tr><tr><td>Upper Newtownards Road / Kerrsland Dr / Kerrsland Pde</td></tr><tr><td>Great Victoria Street / Grosvenor Road / Howard Street</td></tr><tr><td>Old Golf Course Road / Creighton Road Roundabout</td></tr><tr><td>Antrim Road / Brookvale Ave</td></tr><tr><td>Annadale Embankment / Sunnyside Street</td></tr><tr><td>Woodstock Road / Willowfield Street / My Ladys Road</td></tr><tr><td>Glen Road / Kennedy Way / Monagh By Pass Rbt (All)</td></tr><tr><td>Lisburn Rd-D&#39;brook St-Eglantine Ave-Tates Ave-Cussick St</td></tr><tr><td>Upper Knockbreda Road / Glencregagh Road / Upper Galwally</td></tr><tr><td>Antrim Road / Duncairn Gardens / Atlantic Avenue</td></tr><tr><td>Millfield / Smithfield Sq North / Wilson Str (3346 7452)</td></tr><tr><td>Great Victoria Street / Glengall Street</td></tr><tr><td>Newtownards Road / Bridge End</td></tr><tr><td>East Bridge Street / Oxford Street</td></tr><tr><td>College Square East / Wellington Place (3353 7407)</td></tr><tr><td>Ormeau Road / University Street</td></tr><tr><td>University Rd / Fountainville Ave / Upper Crescent</td></tr><tr><td>East Bridge Street / Stewart Street</td></tr><tr><td>Botantic Ave / Lower Crescent / Cameron St</td></tr><tr><td>Victoria Street / Ann Street (3421 7434)</td></tr><tr><td>McKinstry Road / Stewartstown Road - Roundabout</td></tr><tr><td>Crumlin Road / Ballysillan Road</td></tr><tr><td>Malone Road / Upper Malone Road Roundabout</td></tr><tr><td>Springfield Road / Springfield Avenue</td></tr><tr><td>Cromac Sq-East Bridge St-Cromac St-Hamilton St-Victoria St</td></tr><tr><td>Lisburn Road / Lower Windsor Ave / Windsor Ave</td></tr><tr><td>Victoria Street / Chichester Street</td></tr><tr><td>Antrim Road / Limestone Road / Cavehill Road (3322 7647)</td></tr><tr><td>Holywood Road / Edenvale Drive / Park Avenue</td></tr><tr><td>University Road / Elmwood Avenue</td></tr><tr><td>Kennedy Way / Blackstaff Road (3077 7167)</td></tr><tr><td>Dublin Road / Bruce Street / Bankmore Street</td></tr><tr><td>Brougham Street at entrance to shopping centre</td></tr><tr><td>Upper Dunmurry Lane / Old Golf Course Road</td></tr><tr><td>Antrim Road / Cliftonville Road.</td></tr><tr><td>A55 Knockbreda Road - Cregagh Road</td></tr><tr><td>Ormeau Road / Donegall Pass (3416 7332)</td></tr><tr><td></td></tr><tr><td>Lisburn &amp; Castlereagh City Council</td></tr><tr><td>Moira Roundabout ( All Approaches )</td></tr><tr><td>Sprucefield Roundabout (All approaches )</td></tr><tr><td>Ballykeel Xrds B&#39;nahinch Rd / Howe Rd / Dromara Rd / Hillsborough Rd / Magheraconluce Rd</td></tr><tr><td>Thiepval Road / Governors Road / Longstone Street ( Roundabout )</td></tr><tr><td>Hillsborough Road /Laganbank Road/ Governors Road Junction</td></tr><tr><td>Laganbank Road / Queens Road (at Union Bridge)</td></tr><tr><td>M1 Saintfield Road (Roundabout)</td></tr><tr><td>A1 / Hillsborough Road Roundabout. ( At Hillsborough )</td></tr><tr><td>Longstone St, Tonagh Ave - Warren Gdns / Tonagh Drive</td></tr><tr><td>M1 Blacks Road citybound top of on-slip</td></tr><tr><td>McKinstry Road / Derriaghy Road / The Cutts</td></tr><tr><td>Ballinderry Road / Knockmore Road (2396 6440)</td></tr><tr><td>Saintfield Road / Saintfield Road / Old Ballynahinch Road (299 617)</td></tr><tr><td>Thiepval Road / Bentrim Road Roundabout / Prince William Road</td></tr><tr><td>Ballinderry Rd - Moneybroom Rd-Lissue Rd ( Junction )</td></tr><tr><td>Ballynahinch Rd / Edentrillick Rd / Leapogues Rd (McAdams crossroads)</td></tr><tr><td>(A1) Hillsborough Road (A101) Magherageery Road Roundabout, Lisburn</td></tr><tr><td>Mullaglass Rd / Braithwaites Rd / Pond Pk Rd East (Sale&#39;s Corner)</td></tr><tr><td>Magheraknock from Lough Road to Laurel Road</td></tr><tr><td>Wallace Ave / Seymour Street / Queens Road</td></tr><tr><td>Laganbank Road / Hill Street</td></tr><tr><td>Stewartstown Road / Twinbrook Road</td></tr><tr><td>Prince William Road / Knockmore Road</td></tr><tr><td>Moira Village, Main Street - Meeting Street Junction, Lisburn.</td></tr><tr><td>Dundrod Road / Leathemstown Road / Quarterland Road</td></tr><tr><td>Leathemstown Rd / Fort Rd / Tullyrusk Road</td></tr><tr><td>Old Ballynahinch Road / Comber Road / Comber Road Junction.</td></tr><tr><td>Longstone Street / Warren Gardens / Tonagh Drive ( Duplicated )</td></tr><tr><td>Rock Rd from Steedstown Rd to Hannahstown Rd near Ballymac</td></tr><tr><td>Old Ballynahinch Road from Bailliesmills Road to Drennan Road</td></tr><tr><td>Stewartstown Road / Bellsteel Road</td></tr><tr><td>Ballyskeagh Road / Drumbeg Road +bend at church</td></tr><tr><td>Hillsborough Road Entrance to Sprucefield Shopping Centre - Roundabout.</td></tr><tr><td>Moira Road / Ballycreen Drive</td></tr><tr><td>Colinglen Road / Colinswell Road / Glenside Road (2697 7102)</td></tr><tr><td>McKinstry Road / Wilmar Road</td></tr><tr><td>Moira Road - Lisburn Road Glenavey Staggered junction (See grids Lisburn)</td></tr><tr><td>Sloan Street / Mercer Street</td></tr><tr><td>Hillsborough Road / Dromara Road (Slip Road) Junction.</td></tr><tr><td>Prince William Road / Ballymacash Road</td></tr><tr><td>Sloan Street / Gregg Street / Young Street</td></tr><tr><td>Ballygowan Road / Manse Road / Upper Braniel Road</td></tr><tr><td>Comber Road / Old Dundonald Road / Grahamsbridge Road</td></tr><tr><td>Saintfield Road / Cairnshill Road / Beechill Road</td></tr><tr><td>Saintfield Road / Upper Knockbreda Road / Newtownbreda Road (Forestside)</td></tr><tr><td>Saintfield Road from Carryduff to divisional boundary</td></tr><tr><td>Upper Newtownards Road / Dunlady Road / Robbs Road</td></tr><tr><td>Upper Galwally / Bradford Court</td></tr><tr><td>Milltown Road / Teardrop Roundabout</td></tr><tr><td>Saintfield Road / Old Saintfield Road (at Knockbracken Hospital)</td></tr><tr><td>B&#39;gowan Rd / Moneyrea Rd / Gransha Rd / Knockbracken Rd (Maryland Crossroads)</td></tr><tr><td>Upper Newtownards Road / Comber Road</td></tr><tr><td>Ballynahinch Road / Church Road / Hillsborough Road</td></tr><tr><td>Ballygowan Road / Church Road / Glen Road</td></tr><tr><td>Upper Newtownards Road / Eastlink Road / Ulster Hospital</td></tr><tr><td>Saintfield Road / Newton Park / School Road</td></tr><tr><td>Gilnahirk Road West / Upper Braniel Rd from Manns Rd to Gilnahirk Rd</td></tr><tr><td>Upper Newtownards Road / Craigleith Drive</td></tr><tr><td>Saintfield Road / Commons Brae Bend</td></tr><tr><td>Old Dundonald Road / Ballyhanwood Road</td></tr></table></div><div class=\"table-wrap\"><table><tr><td>WESTERN DIVISION</td></tr><tr><td>Locations not currently available</td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019244%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=338818","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=338818"}},{"id":"338817","reference":"AQW 19243/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-21","answerBy":"2021-06-08","answered":"2021-06-18","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities (i) for her assessment of the financial hardship faced by musicians and DJs unable to perform due to COVID-19 restrictions on live music; and (ii) what financial support she will provide to help alleviate the hardship.","answerText":"I recognise the enormous challenges that are being faced across the arts sector as we seek to tackle COVID-19. Restrictions on gatherings and the need for social distancing have had enormous impacts on practice, performance and the development of talent, and on the financial position of individuals and organisations across the arts and the wider creative and heritage sectors.\n\nThe Culture, Arts & Heritage Taskforce which I recently established will advise on, among other things, how the individuals and organisations impacted by the restrictions in those sectors might be supported while the restrictions continue and as they ease.\n\nThe Executive has also put in place a number of schemes to provide financial support to individuals and businesses impacted by the current restrictions. Self-employed musicians and DJs can also avail of the range of advice and potential support that is on offer. Information is available at\n\nInformation is available at: https://www.nibusinessinfo.co.uk/business-support/coronavirus.","answerHtml":"<p>I recognise the enormous challenges that are being faced across the arts sector as we seek to tackle COVID-19. Restrictions on gatherings and the need for social distancing have had enormous impacts on practice, performance and the development of talent, and on the financial position of individuals and organisations across the arts and the wider creative and heritage sectors.</p><p>The Culture, Arts &amp; Heritage Taskforce which I recently established will advise on, among other things, how the individuals and organisations impacted by the restrictions in those sectors might be supported while the restrictions continue and as they ease.</p><p>The Executive has also put in place a number of schemes to provide financial support to individuals and businesses impacted by the current restrictions. Self-employed musicians and DJs can also avail of the range of advice and potential support that is on offer. Information is available at</p><p>Information is available at: https://www.nibusinessinfo.co.uk/business-support/coronavirus.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019243%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=338817","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=338817"}},{"id":"338618","reference":"AQW 19175/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-20","answerBy":"2021-05-28","answered":"2021-05-24","answeredOrally":false,"priority":true,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health given that Scotland, Wales and England now have systems either in place or in development, to detail the solutions his Department is considering in regards to proving COVID-19 vaccination status for those seeking to travel.","answerText":"The NI Vaccination Programme is being concentrated on the vaccination of the population to protect everyone, particularly older and vulnerable citizens in our community. It will also help us move gradually towards the easing of restrictions in society, and particularly for travel, when it is safe to do so.\n\nThe Department of Health is working on a solution to enable proof of vaccination to the agreed standard. It is anticipated that a paper based option will be available in the first instance, from a specialist printing service. This requires infrastructure to be developed, allowing citizens to request certification which is securely linking to their personal data. Further details will follow shortly. In the meantime it should be noted that neither GP practices or other HSC organisations are able to issue letters for travel purposes.","answerHtml":"<p>The NI Vaccination Programme is being concentrated on the vaccination of the population to protect everyone, particularly older and vulnerable citizens in our community. It will also help us move gradually towards the easing of restrictions in society, and particularly for travel, when it is safe to do so.</p><p>The Department of Health is working on a solution to enable proof of vaccination to the agreed standard. It is anticipated that a paper based option will be available in the first instance, from a specialist printing service. This requires infrastructure to be developed, allowing citizens to request certification which is securely linking to their personal data. Further details will follow shortly. In the meantime it should be noted that neither GP practices or other HSC organisations are able to issue letters for travel purposes.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019175%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=338618","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=338618"}},{"id":"338617","reference":"AQW 19174/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-20","answerBy":"2021-06-07","answered":"2021-06-08","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether he will seek to introduce a replacement for the Central Energy Efficiency Fund to improve energy efficiency in public buildings.","answerText":"As the Department for the Economy (DfE) leads on energy policy including oversight for strategic energy management across NI Central Government, I will respond to the question originally directed to the Finance Minister.\n\nIn January 2019 the NICS Board approved the Energy Management Strategy and Action Plan (EMS) for NI Central Government. My Department sponsors an Energy Management Unit in the Strategic Investment Board to work across central government to deliver on this.\n\nThe Strategy includes the adoption of a net energy consumption reduction target of 30% by 2030 for NI Central Government that will ensure that Government does not spend any more on energy costs in 2030 than it does today. It is estimated that an investment of £370m is required over the period to 2030 to achieve this aim.\n\nA critical action contained within the EMS is the creation of an energy ‘invest to save’ approach to funding. This funding mechanism aims to establish effective energy management procurement opportunities that unlock value. It is recognised that it is not feasible to achieve the 30% energy consumption reduction target without targeted investment.\n\nI have therefore secured £10million in capital funding to pilot an energy ‘invest to save fund’ across the central government estate as part of the Economic Recovery Action Plan (ERAP) which will not only provide an economic stimulus but also to unlock energy savings across central government. This pilot will inform the development and roll-out of a substantive funding approach in future years.","answerHtml":"<p>As the Department for the Economy (DfE) leads on energy policy including oversight for strategic energy management across NI Central Government, I will respond to the question originally directed to the Finance Minister.</p><p>In January 2019 the NICS Board approved the Energy Management Strategy and Action Plan (EMS) for NI Central Government. My Department sponsors an Energy Management Unit in the Strategic Investment Board to work across central government to deliver on this.</p><p>The Strategy includes the adoption of a net energy consumption reduction target of 30% by 2030 for NI Central Government that will ensure that Government does not spend any more on energy costs in 2030 than it does today. It is estimated that an investment of £370m is required over the period to 2030 to achieve this aim.</p><p>A critical action contained within the EMS is the creation of an energy ‘invest to save’ approach to funding. This funding mechanism aims to establish effective energy management procurement opportunities that unlock value. It is recognised that it is not feasible to achieve the 30% energy consumption reduction target without targeted investment.</p><p>I have therefore secured £10million in capital funding to pilot an energy ‘invest to save fund’ across the central government estate as part of the Economic Recovery Action Plan (ERAP) which will not only provide an economic stimulus but also to unlock energy savings across central government. This pilot will inform the development and roll-out of a substantive funding approach in future years.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019174%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=338617","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=338617"}},{"id":"338616","reference":"AQW 19173/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-20","answerBy":"2021-06-07","answered":"2021-05-03","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance, following the cyber-attack on the Health Service Executive in the Republic of Ireland, what assurances he can give regarding the robustness of data security in the Northern Ireland Civil Service.","answerText":"Department of Finance Digital Shared Services (DSS) provide a corporate IT infrastructure service to all NICS Departments. It has implemented multi-layered technical defences to help protect NICS Departments and its network from cyber attacks.\n\nWe have complemented these technical developments with significant staff awareness materials to provide robust data security for all organisations using the NICS network.\n\nWe continue to enhance our security operations with Department of Finance services and applications regularly audited against industry standards.\n\nMany NICS Departments manage their own specific line of business IT applications and associated governance arrangements.","answerHtml":"<p>Department of Finance Digital Shared Services (DSS) provide a corporate IT infrastructure service to all NICS Departments. It has implemented multi-layered technical defences to help protect NICS Departments and its network from cyber attacks.</p><p>We have complemented these technical developments with significant staff awareness materials to provide robust data security for all organisations using the NICS network.</p><p>We continue to enhance our security operations with Department of Finance services and applications regularly audited against industry standards.</p><p>Many NICS Departments manage their own specific line of business IT applications and associated governance arrangements.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019173%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=338616","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=338616"}},{"id":"338475","reference":"AQW 19097/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-19","answerBy":"2021-06-04","answered":"2021-06-10","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health (i) for his assessment of current levels of lung cancer screening; and, (ii) whether he will seek to introduce screening based on risk factors at GP level.","answerText":"Lung cancer screening is not a formal screening programme, therefore unfortunately there is no information available on the level of clinical testing for lung cancer that is currently happening within GP practices in Northern Ireland.\n\nThe Public Health Agency do not have a population screening programme for lung cancer and it has not at this point been recommended by the UK National Screening Committee. However there is currently a pilot project for high risk lung cancers underway in the Southern Health and Social Care Trust.\n\nTargeted screening for those at high risk of lung cancer is also being piloted in England and the results of this pilot are awaited. Consideration of the pilot programme in the Southern Health and Social Care Trust and cancer screening programmes overall will be considered in the forthcoming Cancer Strategy.","answerHtml":"<p>Lung cancer screening is not a formal screening programme, therefore unfortunately there is no information available on the level of clinical testing for lung cancer that is currently happening within GP practices in Northern Ireland.</p><p>The Public Health Agency do not have a population screening programme for lung cancer and it has not at this point been recommended by the UK National Screening Committee. However there is currently a pilot project for high risk lung cancers underway in the Southern Health and Social Care Trust.</p><p>Targeted screening for those at high risk of lung cancer is also being piloted in England and the results of this pilot are awaited. Consideration of the pilot programme in the Southern Health and Social Care Trust and cancer screening programmes overall will be considered in the forthcoming Cancer Strategy.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019097%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=338475","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=338475"}},{"id":"338474","reference":"AQW 19096/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-19","answerBy":"2021-06-04","answered":"2021-06-01","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health how he will ensure easy availability of Tagrisso (Osimertinib) under compassionate use to benefit patients.","answerText":"Medicines can be provided to patients on compassionate use grounds through various routes, including as agreed with the pharmaceutical company on a named patient basis; post closure of a clinical trial; and the Early Access to Medicines Scheme (EAMS) operated by the Medicines and Healthcare products Regulatory Agency (MHRA).\n\nTo avoid a delay for Northern Ireland patients accessing osimertinib (Tagrisso) while differences in regulatory processes are being resolved, prescribing will be at the oncologist’s discretion, on an ‘off label’ basis (i.e. a medicine that is being used in a way that is different to that described in the licence). Doctors are allowed to prescribe medicines outside of the label in areas of unmet medical need and the General Medical Council provides clear recommendations to physicians on ‘off label’ prescribing.","answerHtml":"<p>Medicines can be provided to patients on compassionate use grounds through various routes, including as agreed with the pharmaceutical company on a named patient basis; post closure of a clinical trial; and the Early Access to Medicines Scheme (EAMS) operated by the Medicines and Healthcare products Regulatory Agency (MHRA).</p><p>To avoid a delay for Northern Ireland patients accessing osimertinib (Tagrisso) while differences in regulatory processes are being resolved, prescribing will be at the oncologist’s discretion, on an ‘off label’ basis (i.e. a medicine that is being used in a way that is different to that described in the licence). Doctors are allowed to prescribe medicines outside of the label in areas of unmet medical need and the General Medical Council provides clear recommendations to physicians on ‘off label’ prescribing.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019096%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=338474","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=338474"}},{"id":"338473","reference":"AQW 19095/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-19","answerBy":"2021-06-04","answered":"2021-06-10","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail the number of patients that could benefit from Tagrisso (Osimertinib) as a post-surgery treatment for early-stage lung cancer.","answerText":"Precise figures on the number of patients that could benefit from Tagrisso (osimertinib) as a post-surgery treatment for early-stage lung cancer are not available.\n\nI wish to offer the assurance that patients in Northern Ireland will have the same access to Tagrisso as patients in the rest of the United Kingdom, within the National Institute for Health and Clinical Excellence (NICE) guidelines.","answerHtml":"<p>Precise figures on the number of patients that could benefit from Tagrisso (osimertinib) as a post-surgery treatment for early-stage lung cancer are not available.</p><p>I wish to offer the assurance that patients in Northern Ireland will have the same access to Tagrisso as patients in the rest of the United Kingdom, within the National Institute for Health and Clinical Excellence (NICE) guidelines.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019095%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=338473","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=338473"}},{"id":"338264","reference":"AQW 19028/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-18","answerBy":"2021-06-03","answered":"2021-06-16","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) for her assessment of the number of medicine and dentistry offers made this year across the UK; and, (ii) what mitigations may be offered to applicants for this year, if fewer places are available due to deferrals from 2020.","answerText":"I can confirm that up to 50 additional places will be offered for the undergraduate Medicine course at QUB, for the 2021 intake. This is to address the exceptional impact of COVID-19 on A-level students reflected in the Education Minister’s announcement in 2020 that Northern Ireland A-level students would receive the higher grade of either their Centre Assessed Grade, or the grade provided to them by CCEA.\n\nNo additional places will be provided on the Dentistry course at QUB.\n\n.","answerHtml":"<p>I can confirm that up to 50 additional places will be offered for the undergraduate Medicine course at QUB, for the 2021 intake. This is to address the exceptional impact of COVID-19 on A-level students reflected in the Education Minister’s announcement in 2020 that Northern Ireland A-level students would receive the higher grade of either their Centre Assessed Grade, or the grade provided to them by CCEA.</p><p>No additional places will be provided on the Dentistry course at QUB.</p><p>.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019028%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=338264","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=338264"}},{"id":"338263","reference":"AQW 19027/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-18","answerBy":"2021-06-03","answered":"2021-07-27","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 18298/17-22, whether she will seek to set up a mechanism for structured engagement with social partners on developing wider economic policy.","answerText":"As outlined in the answer to AQW 18298/17-22, my Department has a cross sector engagement forum which includes representatives from across society. I recognise that social partners have an important role to play in the development of our economy and I am fully committed to open and full engagement with all key stakeholders as my Department develops short and long-term economic policy.\n\nSince the early stages of the Covid-19 pandemic my Department has been in close contact with stakeholders regarding the actions required to support businesses and citizens.\n\nMy Department has been in continuous contact with Trade Bodies, Councils, Arms Length Bodies, the Economic Advisory Group and others in order to gather information on the impacts of both Covid-19 and EU Exit on the Northern Ireland economy. This is input has subsequently been used to develop the Economic Recovery Action Plan, which was published on 25th February and has been strongly endorsed by the business community here.\n\nOn 21st of April, my Department hosted a virtual stakeholder event to continue the discussion on recovery in recognition that partnership and collaboration are key to the successful delivery of the actions set out in the Plan. A wide range of organisations were present at this event including a representative of the voluntary and community sector.\n\nThe Vision for a 10x Economy, launched on 11th May, provides a framework for economic policy going forward that will build an innovative and inclusive economy. Engagement with a range of stakeholders was key in developing the Vision and determining the pathway to delivering benefits to all our people.\n\nThe structures to develop and monitor economic policy derived from the Vision, and the subsequent future work programme to fulfil its ambition, will be determined through co-design with an extensive range of key stakeholders. It is essential to take a partnership and collaboration based approach in developing economic policy and achieving our ambition of an economy which is ten times better than today.","answerHtml":"<p>As outlined in the answer to AQW 18298/17-22, my Department has a cross sector engagement forum which includes representatives from across society. I recognise that social partners have an important role to play in the development of our economy and I am fully committed to open and full engagement with all key stakeholders as my Department develops short and long-term economic policy.</p><p>Since the early stages of the Covid-19 pandemic my Department has been in close contact with stakeholders regarding the actions required to support businesses and citizens.</p><p>My Department has been in continuous contact with Trade Bodies, Councils, Arms Length Bodies, the Economic Advisory Group and others in order to gather information on the impacts of both Covid-19 and EU Exit on the Northern Ireland economy. This is input has subsequently been used to develop the Economic Recovery Action Plan, which was published on 25th February and has been strongly endorsed by the business community here.</p><p>On 21st of April, my Department hosted a virtual stakeholder event to continue the discussion on recovery in recognition that partnership and collaboration are key to the successful delivery of the actions set out in the Plan. A wide range of organisations were present at this event including a representative of the voluntary and community sector.</p><p>The Vision for a 10x Economy, launched on 11th May, provides a framework for economic policy going forward that will build an innovative and inclusive economy. Engagement with a range of stakeholders was key in developing the Vision and determining the pathway to delivering benefits to all our people.</p><p>The structures to develop and monitor economic policy derived from the Vision, and the subsequent future work programme to fulfil its ambition, will be determined through co-design with an extensive range of key stakeholders. It is essential to take a partnership and collaboration based approach in developing economic policy and achieving our ambition of an economy which is ten times better than today.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019027%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=338263","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=338263"}},{"id":"338262","reference":"AQW 19026/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-18","answerBy":"2021-06-03","answered":"2021-07-02","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) for her assessment of immediate challenges to restarting the tourism economy; and (ii) what actions her Department is taking to assist local tourism businesses.","answerText":"(i) There are a number of challenges facing the tourism economy. The most immediate relates to getting the sector reopened fully and operating safely.\n\nThere is also a need to stimulate demand from key markets, including encouraging our own local citizens to holiday at home.\n\nAs important, is the need to support businesses to innovate and diversify to take on both the challenges and the opportunities-this will be essential to sustainable recovery.\n\n(ii) Following decisions taken by the NI Executive, Tourism NI and my Department have worked together to produce a number of guides to support businesses in understanding how they can reopen and work safely during Covid-19. They have also worked with a number of the sectoral bodies to deliver webinars to assist businesses in preparing to reopen and to get involved in marketing activity that will stimulate demand. Tourism NI also introduced ‘We’re Good To Go’, a UK wide Covid safety accreditation scheme, to the sector in 2020 which has had strong take-up from the industry and provides safety reassurance to customers. I established a Tourism Recovery Steering Group to shape and steer a response to the Covid-19 crisis. The Steering Group (supported by a Working Group) developed phase one of the Tourism Recovery Action Plan. This was instrumental in securing additional funding to help the tourism and hospitality industry deal with the impact of COVID. It has helped in terms of supporting business survivability, improving industry resilience and driving essential visitor demand.\n\nOn 28 May I launched phase 2 of the Tourism Recovery Action Plan. This Plan has been co-ordinated by my Department and Tourism NI, with extensive input from industry stakeholders including tourism and hospitality businesses. It sets out a range of actions to support the identified needs of businesses and assist recovery.\n\nKey activity will include a range of industry support programmes and marketing initiatives such as a holiday at home voucher scheme. There will be major campaigns that will support all sectors of the tourism and hospitality industry in attracting visitors from domestic, Republic of Ireland and overseas markets.\n\nThe Plan also sets out a number of key building blocks to assist in the long-term recovery and sustainable growth of the tourism industry.\n\nThe Plan is a living document and will be kept under review as we move into recovery.","answerHtml":"<p>(i) There are a number of challenges facing the tourism economy. The most immediate relates to getting the sector reopened fully and operating safely.</p><p>There is also a need to stimulate demand from key markets, including encouraging our own local citizens to holiday at home.</p><p>As important, is the need to support businesses to innovate and diversify to take on both the challenges and the opportunities-this will be essential to sustainable recovery.</p><p>(ii) Following decisions taken by the NI Executive, Tourism NI and my Department have worked together to produce a number of guides to support businesses in understanding how they can reopen and work safely during Covid-19. They have also worked with a number of the sectoral bodies to deliver webinars to assist businesses in preparing to reopen and to get involved in marketing activity that will stimulate demand. Tourism NI also introduced ‘We’re Good To Go’, a UK wide Covid safety accreditation scheme, to the sector in 2020 which has had strong take-up from the industry and provides safety reassurance to customers. I established a Tourism Recovery Steering Group to shape and steer a response to the Covid-19 crisis. The Steering Group (supported by a Working Group) developed phase one of the Tourism Recovery Action Plan. This was instrumental in securing additional funding to help the tourism and hospitality industry deal with the impact of COVID. It has helped in terms of supporting business survivability, improving industry resilience and driving essential visitor demand.</p><p>On 28 May I launched phase 2 of the Tourism Recovery Action Plan. This Plan has been co-ordinated by my Department and Tourism NI, with extensive input from industry stakeholders including tourism and hospitality businesses. It sets out a range of actions to support the identified needs of businesses and assist recovery.</p><p>Key activity will include a range of industry support programmes and marketing initiatives such as a holiday at home voucher scheme. There will be major campaigns that will support all sectors of the tourism and hospitality industry in attracting visitors from domestic, Republic of Ireland and overseas markets.</p><p>The Plan also sets out a number of key building blocks to assist in the long-term recovery and sustainable growth of the tourism industry.</p><p>The Plan is a living document and will be kept under review as we move into recovery.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019026%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=338262","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=338262"}},{"id":"338261","reference":"AQW 19025/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-18","answerBy":"2021-06-03","answered":"2021-05-27","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on repayments of the loan provided to Presbyterian Mutual Society by the NI Executive.","answerText":"As at 31 March 2021 £131.5m has been repaid from the £175m loan provided to the Presbyterian Mutual Society leaving a balance outstanding of £43.5m.\n\nCurrent forecasts indicate there will potentially be a shortfall of £18.5m and an Expected Credit Loss provision, with budget cover, has been recognised to cover this in the Department for the Economy’s 2020/21 accounts.\n\nIn addition, due to the order of repayment of the various loans, a £50m loan provided under the Mutual Access Fund is now considered unrecoverable, however this had been written down to nil in previous years.","answerHtml":"<p>As at 31 March 2021 £131.5m has been repaid from the £175m loan provided to the Presbyterian Mutual Society leaving a balance outstanding of £43.5m.</p><p>Current forecasts indicate there will potentially be a shortfall of £18.5m and an Expected Credit Loss provision, with budget cover, has been recognised to cover this in the Department for the Economy’s 2020/21 accounts.</p><p>In addition, due to the order of repayment of the various loans, a £50m loan provided under the Mutual Access Fund is now considered unrecoverable, however this had been written down to nil in previous years.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019025%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=338261","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=338261"}},{"id":"337936","reference":"AQW 18891/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-14","answerBy":"2021-06-01","answered":"2021-05-28","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) for her assessment of concerns that due to decisions on providing predicted grades for A-level courses for this year, students seeking to move into higher education through access to higher education courses are at a disadvantage, compared to students undertaking A-levels; and (ii) what action she is taking to ensure fairness amongst all prospective higher education students.","answerText":"An offer of a place in higher education is often made based on predicted grades at the point of application and before results are known. This applies equally for applicants on Access courses and A-level courses. When results are published, those who fulfil their offer of a place are admitted.\n\nAs autonomous bodies, universities are responsible for their own policies and procedures on admissions. No additional action is necessary to ensure fairness, as Access students will be treated in the same way as other Level 3 applicants in the 2021 admissions cycle.","answerHtml":"<p>An offer of a place in higher education is often made based on predicted grades at the point of application and before results are known. This applies equally for applicants on Access courses and A-level courses. When results are published, those who fulfil their offer of a place are admitted.</p><p>As autonomous bodies, universities are responsible for their own policies and procedures on admissions. No additional action is necessary to ensure fairness, as Access students will be treated in the same way as other Level 3 applicants in the 2021 admissions cycle.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018891%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=337936","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=337936"}},{"id":"337935","reference":"AQW 18890/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-14","answerBy":"2021-06-01","answered":"2021-05-26","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, given the impact of COVID-19, to outline the action she is taking to support students leaving post-primary education to take their next steps towards further or higher education.","answerText":"My Department’s Careers Service offers impartial advice and guidance to all pupils in their final years of post-primary education, on all the options available including further and higher education, apprenticeships and higher level apprenticeships and employment.\n\nOver the past year Careers Advisers have worked with schools to ensure that young people could access personalised support digitally through email, telephone or video calls. To date 16,500 pupils have accessed this service this year and Careers advisers will continue to offer support over the summer period to help students make informed decisions about their career options.\n\nMy Department is continuing its investment in the Further Education (FE) estate to deliver modern, efficient, fit for purpose campuses that are welcoming, comfortable, healthy, neutral and vibrant places to learn and innovate.\n\nIn 2020, two major capital projects to build new campuses were completed in Banbridge and Armagh with a further new campus, in Enniskillen, being completed in April 2021. It is hoped that sector wide marketing and promotional campaigns undertaken over the coming months will encourage increased number of students leaving post primary schools in 2021 to avail of the state of the art, accessible facilities, offering significantly improved student facilities and support infrastructure and providing an enhanced curriculum offering, utilising the latest technology and equipment.\n\nThis capital investment has taken place alongside a major investment by my Department in college administrative systems meaning that learners can now apply and enrol on-line for courses at their local FE colleges. This is particularly important during the current public health restrictions removing the need for large numbers of learners on-site at a particular time.\n\nColleges have the capacity and are particularly well placed to accommodate any students who have found their education disrupted by the recent pandemic and will provide them with the knowledge, skills and support they need to progress to employment or higher education.\n\nIn order to raise public awareness of these opportunities available through FE, DfE has now commissioned the six colleges to work together to create a collective identity for the sector and to develop an annual campaign which will focus specifically on promoting the unique product offering for full time FE including higher education (HE) provision.\n\nThe Department recognises the clear potential for learning deficits to affect people who are entering higher education this coming year, due to the impact of the pandemic and officials are in discussions with both the HE and FE sectors on how best to mitigate this.","answerHtml":"<p>My Department’s Careers Service offers impartial advice and guidance to all pupils in their final years of post-primary education, on all the options available including further and higher education, apprenticeships and higher level apprenticeships and employment.</p><p>Over the past year Careers Advisers have worked with schools to ensure that young people could access personalised support digitally through email, telephone or video calls. To date 16,500 pupils have accessed this service this year and Careers advisers will continue to offer support over the summer period to help students make informed decisions about their career options.</p><p>My Department is continuing its investment in the Further Education (FE) estate to deliver modern, efficient, fit for purpose campuses that are welcoming, comfortable, healthy, neutral and vibrant places to learn and innovate.</p><p>In 2020, two major capital projects to build new campuses were completed in Banbridge and Armagh with a further new campus, in Enniskillen, being completed in April 2021. It is hoped that sector wide marketing and promotional campaigns undertaken over the coming months will encourage increased number of students leaving post primary schools in 2021 to avail of the state of the art, accessible facilities, offering significantly improved student facilities and support infrastructure and providing an enhanced curriculum offering, utilising the latest technology and equipment.</p><p>This capital investment has taken place alongside a major investment by my Department in college administrative systems meaning that learners can now apply and enrol on-line for courses at their local FE colleges. This is particularly important during the current public health restrictions removing the need for large numbers of learners on-site at a particular time.</p><p>Colleges have the capacity and are particularly well placed to accommodate any students who have found their education disrupted by the recent pandemic and will provide them with the knowledge, skills and support they need to progress to employment or higher education.</p><p>In order to raise public awareness of these opportunities available through FE, DfE has now commissioned the six colleges to work together to create a collective identity for the sector and to develop an annual campaign which will focus specifically on promoting the unique product offering for full time FE including higher education (HE) provision.</p><p>The Department recognises the clear potential for learning deficits to affect people who are entering higher education this coming year, due to the impact of the pandemic and officials are in discussions with both the HE and FE sectors on how best to mitigate this.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018890%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=337935","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=337935"}},{"id":"337934","reference":"AQW 18889/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-14","answerBy":"2021-06-01","answered":"2021-05-25","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs, pursuant to AQW 18087/17-22 and in relation to the potential centralisation of funding, for his assessment of the deliverability of local priorities in regards to the future of agriculture.","answerText":"I understand that the UK leaving the EU will have created some uncertainty regarding agricultural funding.\n\nUK Government has committed to maintain the funding available to farmers and land managers in every year of this Parliament, supplementing the remaining EU funding that farmers and land managers across the UK will receive for agri-environment and rural development projects.\n\nIt is clear that business as usual in relation to agricultural support is not an option. The future is about doing more with the funding at our disposal in a sustainable and smart way. As we redefine our agricultural policies and support schemes outside of the EU, I intend to provide opportunities for all of our farmers. Schemes and support are needed to help farmers develop their businesses, no matter where they farm, to become more efficient and to maximise the sustainable returns they can achieve from the assets at their disposal.","answerHtml":"<p>I understand that the UK leaving the EU will have created some uncertainty regarding agricultural funding.</p><p>UK Government has committed to maintain the funding available to farmers and land managers in every year of this Parliament, supplementing the remaining EU funding that farmers and land managers across the UK will receive for agri-environment and rural development projects.</p><p>It is clear that business as usual in relation to agricultural support is not an option. The future is about doing more with the funding at our disposal in a sustainable and smart way. As we redefine our agricultural policies and support schemes outside of the EU, I intend to provide opportunities for all of our farmers. Schemes and support are needed to help farmers develop their businesses, no matter where they farm, to become more efficient and to maximise the sustainable returns they can achieve from the assets at their disposal.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018889%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=337934","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=337934"}},{"id":"337571","reference":"AQW 18751/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-12","answerBy":"2021-05-20","answered":"2021-05-26","answeredOrally":false,"priority":true,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities whether she will meet with me to discuss governance at Mid and East Antrim Borough Council.","answerText":"My Private Office has responded to you on this matter.","answerHtml":"<p>My Private Office has responded to you on this matter.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018751%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=337571","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=337571"}},{"id":"337570","reference":"AQW 18750/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-12","answerBy":"2021-05-27","answered":"2021-06-02","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister for an update on New Decade, New Approach legislation to be brought forward by their Department.","answerText":"We are committed to the development and implementation of the rights, language and identity proposals contained in New Decade, New Approach.\n\nWe will progress the legislation during this mandate and create the relevant bodies as quickly as possible thereafter.","answerHtml":"<p>We are committed to the development and implementation of the rights, language and identity proposals contained in New Decade, New Approach.</p><p>We will progress the legislation during this mandate and create the relevant bodies as quickly as possible thereafter.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018750%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=337570","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=337570"}},{"id":"337569","reference":"AQW 18749/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-12","answerBy":"2021-05-27","answered":"2021-05-21","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure pursuant to AQW 18016/17-22, to outline what action is being undertaken to reduce collisions at the locations detailed.","answerText":"As stated in my previous response, my Department routinely reviews collision cluster sites to identify locations where it may be possible to reduce the number and severity of collisions by seeking to address specific collision types with appropriate road safety engineering measures.\n\nI am advised that remedial measures are implemented at cluster sites when considered appropriate to do so, an example being at the A8/Pound Street junction in Larne where specific traffic management measures were implemented to address poor lane discipline and potential ambiguity in relation to road markings. This scheme has proven to be particularly beneficial in reducing targeted collisions from 8 collisions in a three year period to 3 collisions in subsequent years.\n\nI can confirm that options for collision remedial measures were also being considered at the Doagh Road/Monkstown Road junction but as a recently approved planning application includes provision for an upgrade of this junction, it was decided not to proceed with works at this time. At the remaining sites identified in my previous response, due to the varied nature and differing causation factors of collisions, it has not been possible to identify a specific problem that might be addressed through implementation of engineering measures.","answerHtml":"<p>As stated in my previous response, my Department routinely reviews collision cluster sites to identify locations where it may be possible to reduce the number and severity of collisions by seeking to address specific collision types with appropriate road safety engineering measures.</p><p>I am advised that remedial measures are implemented at cluster sites when considered appropriate to do so, an example being at the A8/Pound Street junction in Larne where specific traffic management measures were implemented to address poor lane discipline and potential ambiguity in relation to road markings. This scheme has proven to be particularly beneficial in reducing targeted collisions from 8 collisions in a three year period to 3 collisions in subsequent years.</p><p>I can confirm that options for collision remedial measures were also being considered at the Doagh Road/Monkstown Road junction but as a recently approved planning application includes provision for an upgrade of this junction, it was decided not to proceed with works at this time. At the remaining sites identified in my previous response, due to the varied nature and differing causation factors of collisions, it has not been possible to identify a specific problem that might be addressed through implementation of engineering measures.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018749%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=337569","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=337569"}},{"id":"337568","reference":"AQW 18748/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-12","answerBy":"2021-05-27","answered":"2021-05-26","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure,pursuant to AQW 18019/17-22, for her assessment of the risks to (i) public health; and (ii) the environment from identified sewage overflow incidents.","answerText":"Sewage overflow incidents are operational matters for NI Water and any associated risks, and consequences, are for it, and its environmental regulators, to mitigate against and address. The Northern Ireland Environment Agency (NIEA) is responsible for protecting public health and the environment by providing effective and efficient regulation and enforcement of water supplies. Responsibility for the regulation of discharges from the Larne Sewage Network falls under the remit of the NIEA. A number of measures including legislative requirements, have been put in place by both NI Water and NIEA to mitigate risks associated with sewage overflows in the Larne area\n\nNI Water has advised that sewer networks have a finite capacity and are designed to overflow to relieve pressure on the system. The overflow is released through safety valves or Combined Sewer Overflows (CSOs) which flow into the receiving freshwater or marine environment. The CSOs operate on a sewer network during periods of storm/ extreme wet weather and bring significant dilution in the receiving environment, which minimises the risks to the environment, The CSOs are also to stop the internal flooding of households and businesses with sewage which would present a risk to public health.\n\nThe NIEA is responsible, under the Urban Wastewater Treatment Directive, for protecting the environment from the adverse effects of urban wastewater discharges. I understand that the NIEA is currently engaging with NI Water in relation to a number of improvements required to the sewerage network in the Larne area. These improvements are intended to mitigate any risks to neighbouring bathing and shellfish waters and reduce the impact of sewage spills from the sewer network.","answerHtml":"<p>Sewage overflow incidents are operational matters for NI Water and any associated risks, and consequences, are for it, and its environmental regulators, to mitigate against and address. The Northern Ireland Environment Agency (NIEA) is responsible for protecting public health and the environment by providing effective and efficient regulation and enforcement of water supplies. Responsibility for the regulation of discharges from the Larne Sewage Network falls under the remit of the NIEA. A number of measures including legislative requirements, have been put in place by both NI Water and NIEA to mitigate risks associated with sewage overflows in the Larne area</p><p>NI Water has advised that sewer networks have a finite capacity and are designed to overflow to relieve pressure on the system. The overflow is released through safety valves or Combined Sewer Overflows (CSOs) which flow into the receiving freshwater or marine environment. The CSOs operate on a sewer network during periods of storm/ extreme wet weather and bring significant dilution in the receiving environment, which minimises the risks to the environment, The CSOs are also to stop the internal flooding of households and businesses with sewage which would present a risk to public health.</p><p>The NIEA is responsible, under the Urban Wastewater Treatment Directive, for protecting the environment from the adverse effects of urban wastewater discharges. I understand that the NIEA is currently engaging with NI Water in relation to a number of improvements required to the sewerage network in the Larne area. These improvements are intended to mitigate any risks to neighbouring bathing and shellfish waters and reduce the impact of sewage spills from the sewer network.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018748%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=337568","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=337568"}},{"id":"337567","reference":"AQW 18747/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-12","answerBy":"2021-05-27","answered":"2022-03-25","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to outline the current extent of rapid testing for COVID-19 in Northern Ireland.","answerText":"Over the past year, almost 60m LFTs have been delivered to Northern Ireland. This has made rapid testing available to all, delivered through a range of workplace, education and community settings.\n\nAt present, we are delivering in excess of 1m LFDs to different use cases across Northern Ireland.\n\nMy Department’s Test and Trace Transition Plan, published on 24 March 2022 sets out how we will continue to utilise LFDs to support rapid testing for COVID-19 to protect the most vulnerable and those at highest risk of serious illness should they contract COVID-19.","answerHtml":"<p>Over the past year, almost 60m LFTs have been delivered to Northern Ireland. This has made rapid testing available to all, delivered through a range of workplace, education and community settings.</p><p>At present, we are delivering in excess of 1m LFDs to different use cases across Northern Ireland.</p><p>My Department’s Test and Trace Transition Plan, published on 24 March 2022 sets out how we will continue to utilise LFDs to support rapid testing for COVID-19 to protect the most vulnerable and those at highest risk of serious illness should they contract COVID-19.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018747%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=337567","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=337567"}},{"id":"337313","reference":"AQW 18673/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-11","answerBy":"2021-05-26","answered":"2021-05-20","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure whether the full dualling of the Larne line has been considered as part of the future of the Northern Ireland railway network.","answerText":"I am ambitious for our rail network and am keen to do all that I can to explore how we can progress rail improvements within the limited budgetary envelope that we have. I also want to ensure that any proposals for changes to the rail network include operational and financial viability and have a very clear focus on the part that rail can play in growing the all-island economy, improving the ability of people to connect with and access opportunities.\n\nSince coming into office, I have been clear that my priority is addressing regional imbalance, better connecting communities and, importantly, ensuring that we shape our places around our people, for our people and with our people. Last month I was delighted to announce with Transport Minister, Eamon Ryan TD, an All Island Strategic Rail Review. This review will allow us to consider our rail network across this island to view how we can improve it for everyone. Whilst it reflects the commitment under the New Decade, New Approach agreement, Minister Ryan and I are keen that we use this opportunity to consider how we can improve our rail network across all areas of the island of Ireland. This Review will consider our rail infrastructure to Larne.\n\nMy Department is also currently preparing a new Regional Strategic Transport Network Transport Plan (RSTNTP) which will set out my priorities for future development of the main road and rail networks to 2035. I expect to publish the Draft RSTNTP for consultation towards the end of this year and I would welcome your input into improving rail infrastructure and services across Northern Ireland including Larne.","answerHtml":"<p>I am ambitious for our rail network and am keen to do all that I can to explore how we can progress rail improvements within the limited budgetary envelope that we have. I also want to ensure that any proposals for changes to the rail network include operational and financial viability and have a very clear focus on the part that rail can play in growing the all-island economy, improving the ability of people to connect with and access opportunities.</p><p>Since coming into office, I have been clear that my priority is addressing regional imbalance, better connecting communities and, importantly, ensuring that we shape our places around our people, for our people and with our people. Last month I was delighted to announce with Transport Minister, Eamon Ryan TD, an All Island Strategic Rail Review. This review will allow us to consider our rail network across this island to view how we can improve it for everyone. Whilst it reflects the commitment under the New Decade, New Approach agreement, Minister Ryan and I are keen that we use this opportunity to consider how we can improve our rail network across all areas of the island of Ireland. This Review will consider our rail infrastructure to Larne.</p><p>My Department is also currently preparing a new Regional Strategic Transport Network Transport Plan (RSTNTP) which will set out my priorities for future development of the main road and rail networks to 2035. I expect to publish the Draft RSTNTP for consultation towards the end of this year and I would welcome your input into improving rail infrastructure and services across Northern Ireland including Larne.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018673%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=337313","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=337313"}},{"id":"337312","reference":"AQW 18672/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-11","answerBy":"2021-05-26","answered":"2021-05-20","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure pursuant to AQW 18085/17-22, to provide further detail for each of the areas, except for Larne, where problems have been identified.","answerText":"NI Water has advised that, of the Waste water Treatment Works (WwTW) located in the East Antrim constituency area (excluding Larne WwTW), the Mullaghboy WwTW is currently operating above its design capacity.\n\nIn the Whitehead, Ballystrudder, Ballycarry, Tully Road (Carnlough and Glenarm), Cushendall and Cushendun areas, issues relate to the sewers nearing capacity. In these areas developers should engage with NI Water’s Developer Services Solution Engineering Team, which will conduct more detailed analysis of the wastewater system and, if required, investigate potential developer led solutions to address capacity issues.","answerHtml":"<p>NI Water has advised that, of the Waste water Treatment Works (WwTW) located in the East Antrim constituency area (excluding Larne WwTW), the Mullaghboy WwTW is currently operating above its design capacity.</p><p>In the Whitehead, Ballystrudder, Ballycarry, Tully Road (Carnlough and Glenarm), Cushendall and Cushendun areas, issues relate to the sewers nearing capacity. In these areas developers should engage with NI Water’s Developer Services Solution Engineering Team, which will conduct more detailed analysis of the wastewater system and, if required, investigate potential developer led solutions to address capacity issues.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018672%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=337312","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=337312"}},{"id":"337311","reference":"AQW 18671/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-11","answerBy":"2021-05-26","answered":"2021-05-20","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure pursuant to AQW 18018/17-22, whether any studies have ever been completed to electrify any part of the Northern Ireland railway network.","answerText":"I am ambitious for our rail network and am keen to do all that I can to explore how we can progress rail improvements within the limited budgetary envelope that we have. I also want to ensure that any proposals for changes to the rail network include operational and financial viability and have a very clear focus on the part that rail can play in growing the all-island economy, improving the ability of people to connect with and access opportunities and addressing regional imbalance.\n\nTo date, there has been no studies completed in relation to the electrification of any part of the Northern Ireland railway network. However the All Island Strategic Rail Review, which Minister Ryan and I recently announced, will allow us to consider our network across this island to view how we can improve it for everyone. Whilst it reflects and builds on the commitment under the New Decade, New Approach agreement of the Irish and British Governments to examine the feasibility of a high/higher speed rail link between Derry, Belfast, Dublin and Cork, Minister Ryan and I have a shared ambition for rail and commitment to tackling the climate emergency, and we are keen that we use this opportunity to consider the decarbonisation of our rail network across the island of Ireland.","answerHtml":"<p>I am ambitious for our rail network and am keen to do all that I can to explore how we can progress rail improvements within the limited budgetary envelope that we have. I also want to ensure that any proposals for changes to the rail network include operational and financial viability and have a very clear focus on the part that rail can play in growing the all-island economy, improving the ability of people to connect with and access opportunities and addressing regional imbalance.</p><p>To date, there has been no studies completed in relation to the electrification of any part of the Northern Ireland railway network. However the All Island Strategic Rail Review, which Minister Ryan and I recently announced, will allow us to consider our network across this island to view how we can improve it for everyone. Whilst it reflects and builds on the commitment under the New Decade, New Approach agreement of the Irish and British Governments to examine the feasibility of a high/higher speed rail link between Derry, Belfast, Dublin and Cork, Minister Ryan and I have a shared ambition for rail and commitment to tackling the climate emergency, and we are keen that we use this opportunity to consider the decarbonisation of our rail network across the island of Ireland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018671%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=337311","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=337311"}},{"id":"337310","reference":"AQW 18670/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-11","answerBy":"2021-05-26","answered":"2021-05-20","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure pursuant to AQW 18085/17-22, to detail the specific areas where development has been constrained in East Antrim by problems with water infrastructure.","answerText":"NI Water is a statutory consultee on planning decisions and provides information on issues such as such as water quality, sewerage and drainage infrastructure, including Waste water Treatment Works (WwTW) and network capacity. It has advised me that development in East Antrim is not being constrained by its drinking water infrastructure.\n\nNI Water does not receive notification from planning authorities on the reasons for planning refusals. Local Councils, as the Planning Authority for the majority of planning applications, would be best placed to provide this information.","answerHtml":"<p>NI Water is a statutory consultee on planning decisions and provides information on issues such as such as water quality, sewerage and drainage infrastructure, including Waste water Treatment Works (WwTW) and network capacity. It has advised me that development in East Antrim is not being constrained by its drinking water infrastructure.</p><p>NI Water does not receive notification from planning authorities on the reasons for planning refusals. Local Councils, as the Planning Authority for the majority of planning applications, would be best placed to provide this information.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018670%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=337310","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=337310"}},{"id":"337309","reference":"AQW 18669/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-11","answerBy":"2021-05-26","answered":"2021-05-20","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure whether all new developments are required to implement sewer and storm water separation.","answerText":"Under Article 161 of the Water and Sewerage Services (Northern Ireland) Order 2006, there is a requirement for developers to enter into agreements for adoption of all sewers serving two or more properties. Article 161 agreements state that the developer must construct all sewers in accordance with Sewers for Adoption NI Edition 1, which requires separate foul and surface water sewer systems to be provided. Developers must construct the sewerage in accordance with the terms of the agreement in order to have the sewers adopted by NI Water.\n\nAdditionally, officials in the Department of Finance have advised that Part N (Drainage) of the building regulations provides for separate drainage systems for foul water and rainwater from a building to the point where they meet a sewer or other specified point of disposal.","answerHtml":"<p>Under Article 161 of the Water and Sewerage Services (Northern Ireland) Order 2006, there is a requirement for developers to enter into agreements for adoption of all sewers serving two or more properties. Article 161 agreements state that the developer must construct all sewers in accordance with Sewers for Adoption NI Edition 1, which requires separate foul and surface water sewer systems to be provided. Developers must construct the sewerage in accordance with the terms of the agreement in order to have the sewers adopted by NI Water.</p><p>Additionally, officials in the Department of Finance have advised that Part N (Drainage) of the building regulations provides for separate drainage systems for foul water and rainwater from a building to the point where they meet a sewer or other specified point of disposal.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018669%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=337309","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=337309"}},{"id":"336739","reference":"AQW 18476/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-06","answerBy":"2021-05-21","answered":"2021-05-21","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs (i) to detail the costs incurred to date for legal advice sought by his Department for the purposes of lodging judicial proceedings against the Ireland/Northern Ireland Protocol; and (ii) whether this issue has been discussed at the Executive due to its cross-cutting nature.","answerText":"To date there have been no costs incurred by my Department for the purposes of lodging judicial proceedings against the Northern Ireland Protocol and the matter has not been considered by the Executive.","answerHtml":"<p>To date there have been no costs incurred by my Department for the purposes of lodging judicial proceedings against the Northern Ireland Protocol and the matter has not been considered by the Executive.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018476%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=336739","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=336739"}},{"id":"336738","reference":"AQW 18475/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-06","answerBy":"2021-05-21","answered":"2022-01-25","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health (i) for his assessment of the impact of the COVID-19 pandemic on asthma care; and (ii) how he will ensure that full asthma services are resumed as soon as possible.","answerText":"Asthma care services are provided in both primary and secondary care settings.\n\nIn primary care, the general practice telephone first consultations has allowed patients to seek timely medical advice from their GP for both routine and urgent problems. The GP determines the most appropriate approach to safely addressing the patient’s needs, including patients experiencing asthma exacerbations, using their clinical expertise. Practices have also continued to assess patients who present with possible new asthma diagnosis.\n\nIn secondary care, clinicians have also sought to ensure that patient care can be addressed through a mixed approach which has included face to face and telephone consultations. Whilst there has been significant pressure on respiratory services as a whole, including periods where it has been necessary to pause face to face appointments, innovative strategies have also been utilised to try to maintain patient care and to assess new patients. For example, a homecare facility was set up in the Belfast Trust so that patients could administer biologics at home with remotely monitoring in place and in the South Eastern Trust virtual review appointments and early discharge work was undertaken through the Respiratory Hubs.\n\nWork continues both within primary and secondary care settings to ensure that those requiring assessment and treatment for asthma can be appropriately managed, treated and supported in a timely manner.","answerHtml":"<p>Asthma care services are provided in both primary and secondary care settings.</p><p>In primary care, the general practice telephone first consultations has allowed patients to seek timely medical advice from their GP for both routine and urgent problems. The GP determines the most appropriate approach to safely addressing the patient’s needs, including patients experiencing asthma exacerbations, using their clinical expertise. Practices have also continued to assess patients who present with possible new asthma diagnosis.</p><p>In secondary care, clinicians have also sought to ensure that patient care can be addressed through a mixed approach which has included face to face and telephone consultations. Whilst there has been significant pressure on respiratory services as a whole, including periods where it has been necessary to pause face to face appointments, innovative strategies have also been utilised to try to maintain patient care and to assess new patients. For example, a homecare facility was set up in the Belfast Trust so that patients could administer biologics at home with remotely monitoring in place and in the South Eastern Trust virtual review appointments and early discharge work was undertaken through the Respiratory Hubs.</p><p>Work continues both within primary and secondary care settings to ensure that those requiring assessment and treatment for asthma can be appropriately managed, treated and supported in a timely manner.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018475%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=336738","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=336738"}},{"id":"336737","reference":"AQW 18474/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-06","answerBy":"2021-05-21","answered":"2021-05-18","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities whether extended trading hours has been considered to assist with the recovery of retail and to reduce the potential for crowding.","answerText":"The main legislation governing retail trading hours for which I am responsible is the Shops (Sunday Trading &c.) (NI) Order 1997 (the 1997 Order). This allows small shops unrestricted opening on Sundays while large shops (i.e. those with a floor area exceeding 280 square metres) are restricted to opening for a maximum of five hours between 1.00pm and 6.00pm.\n\nI understand that some district councils have taken the decision not to pursue enforcement of Sunday trading hours thereby allowing retailers to trade for longer hours.\n\nThe Minister for Economy, Diane Dodds, MLA, leads on the economic recovery.","answerHtml":"<p>The main legislation governing retail trading hours for which I am responsible is the Shops (Sunday Trading &amp;c.) (NI) Order 1997 (the 1997 Order). This allows small shops unrestricted opening on Sundays while large shops (i.e. those with a floor area exceeding 280 square metres) are restricted to opening for a maximum of five hours between 1.00pm and 6.00pm.</p><p>I understand that some district councils have taken the decision not to pursue enforcement of Sunday trading hours thereby allowing retailers to trade for longer hours.</p><p>The Minister for Economy, Diane Dodds, MLA, leads on the economic recovery.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018474%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=336737","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=336737"}},{"id":"338407","reference":"AQO 2068/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-05-06","answerBy":"2021-05-18","answered":"2021-05-18","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health for his assessment of concerns reported by constituents that in-person GP services have become increasingly difficult to access.","answerText":"I am aware of the narrative, as indicated again in this question, that GP services are becoming increasingly difficult to access. Let me be clear – evidence shows that is not the case.\n\nThe most recent figures from two weeks ago shows that in that particular week there were 164,137 consultations. That is a rate of 82 per 1,000 patients. Almost 40% of these were face to face.\n\nThe pre-covid consultation rate was 86 per 1,000 patients and 50% face to face. So that shows the number of consultations, and the proportion of those which are face to face, are only very slightly reduced.\n\nGeneral Practice has changed the way it works in responding to the current pandemic and despite the demands and capacity limits that COVID has created, GPs have maintained all of the core elements of general practice services.\n\nThe GP practice telephone first triage system introduced at the start of the pandemic allows patients to continue to seek medical advice from their GP for both routine and urgent problems. The GP then uses their clinical judgement to decide if the patient can be safely managed over the telephone or whether a face to face appointment is required.\n\nTechnologies such as video conferencing and enabling patients to send photographs by text has helped to facilitate diagnosis and ensures that patients are only required to visit surgeries where is it absolutely essential.\n\nGP practices are open and are providing face to face appointments for those patients who are assessed as requiring them. If the Member has concerns about any particular practice then of course I would urge him to write to my Department immediately. I am assured that the vast majority of our general practitioners are working diligently, albeit under ever increases stresses and pressures.","answerHtml":"<p>I am aware of the narrative, as indicated again in this question, that GP services are becoming increasingly difficult to access. Let me be clear – evidence shows that is not the case.</p><p>The most recent figures from two weeks ago shows that in that particular week there were 164,137 consultations. That is a rate of 82 per 1,000 patients. Almost 40% of these were face to face.</p><p>The pre-covid consultation rate was 86 per 1,000 patients and 50% face to face. So that shows the number of consultations, and the proportion of those which are face to face, are only very slightly reduced.</p><p>General Practice has changed the way it works in responding to the current pandemic and despite the demands and capacity limits that COVID has created, GPs have maintained all of the core elements of general practice services.</p><p>The GP practice telephone first triage system introduced at the start of the pandemic allows patients to continue to seek medical advice from their GP for both routine and urgent problems. The GP then uses their clinical judgement to decide if the patient can be safely managed over the telephone or whether a face to face appointment is required.</p><p>Technologies such as video conferencing and enabling patients to send photographs by text has helped to facilitate diagnosis and ensures that patients are only required to visit surgeries where is it absolutely essential.</p><p>GP practices are open and are providing face to face appointments for those patients who are assessed as requiring them. If the Member has concerns about any particular practice then of course I would urge him to write to my Department immediately. I am assured that the vast majority of our general practitioners are working diligently, albeit under ever increases stresses and pressures.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202068%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=338407","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=338407"}},{"id":"336792","reference":"AQO 2034/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-05-06","answerBy":"2021-05-17","answered":"2021-05-17","answeredOrally":true,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister for an update on the Travel Agents (Coronavirus) Financial Assistance Scheme 2021.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mrs Foster","text":"The Travel Agents (Coronavirus) Financial Assistance Scheme was agreed by the Executive to ensure the continued viability of the travel agency sector here. The scheme is intended to help vulnerable but viable travel agents, including self-employed homeworkers, with the cost of reopening or keeping a business operational, reconnecting with employees and customers, adapting customer marketing and financial planning. A viable travel agents industry is critical to supporting a return to normal and building confidence that travel agents and other retail businesses will continue to be a feature of our high streets. The payments for the scheme should make a significant contribution to the continued viability of the sector here. The scheme was open for application from 19 March to 26 March 2021. Officials in TEO are processing 187 applications. It is anticipated that payments will be made to successful applicants in early summer. The scheme is expected to provide in the region of £1·1 million to £1·3 million of much-needed support for the sector. Final costs will be known once all applications have been processed."},{"speaker":"Mr Dickson","text":"Thank you very much, First Minister, on behalf of travel agents who will benefit from the scheme. It is much-needed support. We recognise the value of travel agents to the economy of Northern Ireland. Their counterparts in the rest of the UK will be using the NHS app to prove that their clients have received the vaccination. The NHS app is not available to travel agents in Northern Ireland, yet most of their bookings are done on a UK-wide basis. If an online app is not available in Northern Ireland, what alternative is there to provide that information from citizens who wish to travel?"},{"speaker":"Mrs Foster","text":"I thank the Member for his question. In England and Wales, the apps speak to each other, but it does not do so in Scotland. There is an issue in Scotland and Northern Ireland. We have discussed it with the other devolved Administrations, as you would expect, under the Chancellor of the Duchy of Lancaster. We speak every week about the upcoming difficulties. In the short term, they are looking at having a paper trail if you have had your vaccination. That is not just a letter but, obviously, something that is compliant with safety and data protection rules to make sure that there is no fraud. You cannot just turn up with a letter that somebody from your office has typed out for you, for example. A lot of work is going in to data protection and cybersecurity issues around that. We will probably get an update on that this week. Scotland has a similar problem to ours, and we need to get the apps to speak to each other. Work is going on around the paper alternative, and work is also going on around the digital piece to see if we can get the apps all connected. They are meant to speak to each other. When I go across to England, I should be able to use the Northern Ireland app, so why can we not get it to work for the COVID certification as well? Work is going on, and I assure the Member that that is happening."},{"speaker":"Mr McHugh","text":"I totally understand that travel and tourism have suffered so much, and I appreciate the emphasis that has been placed on them, in particular. However, so many other industries and businesses have also suffered throughout the pandemic. Can the Minister provide details of the financial assistance that is in place for other industries?"},{"speaker":"Mrs Foster","text":"I am happy to get the office to write to you with the full range of assistance that is available. Obviously, the COVID localised restrictions support scheme is still in place until such times as hospitality is open in full. There are probably schemes from the Department for the Economy that I do not know about. I would rather write to you with a more substantive answer so that you have all the schemes in front of you."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202034%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=336792","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2021-05-17&docID=337442#AQO%202034/17-22","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=336792"}},{"id":"336567","reference":"AQW 18388/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-05","answerBy":"2021-05-20","answered":"2021-05-21","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, given the expected increase in medical graduates, what action he is taking to ensure an adequate number of foundation training places are available in the Health Service.","answerText":"I am aware of the significant increase that will be required to the future number of posts available under the Northern Ireland Foundation Programme, particularly from 2025 onwards. It will be necessary to address a temporary increase in medical graduates from the QUB Medical School, combined with the additional output that will be generated by Ulster University's new Graduate Entry Medical School.\n\nMy officials will be working with the Northern Ireland Medical and Dental Training Agency and HSC Trusts to identify the necessary postings and additional finance. I expect that, working in partnership with these organisations, the Northern Ireland Foundation Programme will be expanded to provide new medical graduates with excellent foundation training opportunities that will launch their careers in the HSC.","answerHtml":"<p>I am aware of the significant increase that will be required to the future number of posts available under the Northern Ireland Foundation Programme, particularly from 2025 onwards. It will be necessary to address a temporary increase in medical graduates from the QUB Medical School, combined with the additional output that will be generated by Ulster University&#39;s new Graduate Entry Medical School.</p><p>My officials will be working with the Northern Ireland Medical and Dental Training Agency and HSC Trusts to identify the necessary postings and additional finance. I expect that, working in partnership with these organisations, the Northern Ireland Foundation Programme will be expanded to provide new medical graduates with excellent foundation training opportunities that will launch their careers in the HSC.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018388%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=336567","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=336567"}},{"id":"336566","reference":"AQW 18387/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-05","answerBy":"2021-05-20","answered":"2021-05-17","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail her role in resolving the current pay dispute with further education lecturers.","answerText":"I want to take this opportunity to set out clearly what my role and that of my Department is in relation to the current dispute as there appears to be some misunderstanding at present, and my role may differ from other Ministers in other Departments.\n\n.\n\nThe Further Education (Northern Ireland) Order 1997 which established the Further Education Colleges specifies that:\n\n“The terms and conditions of the employees of the governing body of an institution of further education ….. shall be such as may be determined by the governing body after consultation with representatives of the employees concerned.”\n\nThe Governing Bodies of the colleges are therefore employers in their own right and negotiations on lecturer’s terms and conditions take place through the Lecturers Negotiating Committee which is comprised of representatives of Colleges as the employers and the Trade Unions. As I have said previously, neither the Department nor I as Minister have any role in these negotiations and I understand that this position has been adopted consistently by previous ministers, both in the Department for Economy and previously the Department for Employment and Learning, during earlier negotiations.\n\nThe Department’s role and my role as Minister reflect our respective responsibilities in ensuring that proper governance is in place around the use of public resources. Colleges are Non-Departmental Public Bodies of the Department and are required under their respective Financial Memoranda to refer “any activities which appear novel, contentious or repercussive” to DfE as their sponsor Department for approval. In addition, colleges are required to ensure that annual pay increases for staff must be in accordance with the Department of Finance guidance. All proposed pay awards must have prior approval of both the Department and the Department of Finance before implementation.\n\nAs a result, any Business Case developed as a result of the negotiations will have to be referred to the Department for appraisal prior to seeking my approval before approval is sought from the Department of Finance.\n\nThe Departmental appraisal of the Business Case will consider the issue of affordability and will identify the extent of any additional financial resources which would be required to deliver the preferred option. I will then explore at that point, how any additional requirements can be met including whether a bid for additional resources is required. However, you will note that I cannot submit a formal bid for additional resources until there is an approved business case is in place and I have clarity on the quantum of resource required.\n\nI considered that it was important to provide this level of detail as comparisons have been made between my role and the role which the Minister for Education played in the recent negotiations on teachers’ pay. Teachers’ terms and conditions are negotiated within the Teachers’ Negotiating Committee (TNC) which is made up of DE, employing authorities and the five recognised teachers’ unions (known collectively as NITC). .DE determines pay and uses TNC to negotiate it:\n\n“in accordance with the provisions of Article 69(1) and (6) of the Education and Libraries (Northern Ireland) Order 1986, following negotiations with Teachers’ Unions, the Department of Education has determined that the salaries and allowances to be paid to teachers in grant-aided schools shall be…”\n\nIn addition, in relation to my role, the fact that I and my officials meet with the Colleges regularly but have not met with the Trade Unions is being cited as evidence that neither the Department nor I can carry out an impartial and objective assessment of any business case developed as a result of the negotiations.\n\nAs I explained earlier, DfE is sponsor Department for the six FE Colleges and I as Minister, am ultimately accountable to the Assembly for their efficiency and effectiveness. This necessitates regular meetings between colleges and their sponsor Department to obtain assurance on how public funding is being utilised. That is a key part of my role and of DfE’s role as a sponsor Department. I do not have a similar function in relation to trade unions.\n\nI have gone into some detail in this response in order to clear up some of the misconceptions which have been circulating recently and I hope this provides some clarity around the role that I and my Department are required to play during the current negotiations. I would stress that in no way should our requirement to carry out that role be seen as an impediment or a barrier to the negotiations which are currently ongoing.","answerHtml":"<p>I want to take this opportunity to set out clearly what my role and that of my Department is in relation to the current dispute as there appears to be some misunderstanding at present, and my role may differ from other Ministers in other Departments.</p><p>.</p><p>The Further Education (Northern Ireland) Order 1997 which established the Further Education Colleges specifies that:</p><p>“The terms and conditions of the employees of the governing body of an institution of further education ….. shall be such as may be determined by the governing body after consultation with representatives of the employees concerned.”</p><p>The Governing Bodies of the colleges are therefore employers in their own right and negotiations on lecturer’s terms and conditions take place through the Lecturers Negotiating Committee which is comprised of representatives of Colleges as the employers and the Trade Unions. As I have said previously, neither the Department nor I as Minister have any role in these negotiations and I understand that this position has been adopted consistently by previous ministers, both in the Department for Economy and previously the Department for Employment and Learning, during earlier negotiations.</p><p>The Department’s role and my role as Minister reflect our respective responsibilities in ensuring that proper governance is in place around the use of public resources. Colleges are Non-Departmental Public Bodies of the Department and are required under their respective Financial Memoranda to refer “any activities which appear novel, contentious or repercussive” to DfE as their sponsor Department for approval. In addition, colleges are required to ensure that annual pay increases for staff must be in accordance with the Department of Finance guidance. All proposed pay awards must have prior approval of both the Department and the Department of Finance before implementation.</p><p>As a result, any Business Case developed as a result of the negotiations will have to be referred to the Department for appraisal prior to seeking my approval before approval is sought from the Department of Finance.</p><p>The Departmental appraisal of the Business Case will consider the issue of affordability and will identify the extent of any additional financial resources which would be required to deliver the preferred option. I will then explore at that point, how any additional requirements can be met including whether a bid for additional resources is required. However, you will note that I cannot submit a formal bid for additional resources until there is an approved business case is in place and I have clarity on the quantum of resource required.</p><p>I considered that it was important to provide this level of detail as comparisons have been made between my role and the role which the Minister for Education played in the recent negotiations on teachers’ pay. Teachers’ terms and conditions are negotiated within the Teachers’ Negotiating Committee (TNC) which is made up of DE, employing authorities and the five recognised teachers’ unions (known collectively as NITC). .DE determines pay and uses TNC to negotiate it:</p><p>“in accordance with the provisions of Article 69(1) and (6) of the Education and Libraries (Northern Ireland) Order 1986, following negotiations with Teachers’ Unions, the Department of Education has determined that the salaries and allowances to be paid to teachers in grant-aided schools shall be…”</p><p>In addition, in relation to my role, the fact that I and my officials meet with the Colleges regularly but have not met with the Trade Unions is being cited as evidence that neither the Department nor I can carry out an impartial and objective assessment of any business case developed as a result of the negotiations.</p><p>As I explained earlier, DfE is sponsor Department for the six FE Colleges and I as Minister, am ultimately accountable to the Assembly for their efficiency and effectiveness. This necessitates regular meetings between colleges and their sponsor Department to obtain assurance on how public funding is being utilised. That is a key part of my role and of DfE’s role as a sponsor Department. I do not have a similar function in relation to trade unions.</p><p>I have gone into some detail in this response in order to clear up some of the misconceptions which have been circulating recently and I hope this provides some clarity around the role that I and my Department are required to play during the current negotiations. I would stress that in no way should our requirement to carry out that role be seen as an impediment or a barrier to the negotiations which are currently ongoing.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018387%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=336566","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=336566"}},{"id":"336346","reference":"AQW 18298/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-04","answerBy":"2021-05-19","answered":"2021-05-14","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for her assessment of the adequacy of current engagement of social partners in addressing poverty and low pay, and in developing economic policy in Northern Ireland.","answerText":"In line with New Decade New Approach, the Executive’s actions to address poverty will be contained within the new Anti-Poverty Strategy. The Department for Communities is leading on the development of the Anti-Poverty Strategy using a co-design approach. A public consultation exercise is scheduled for later in the year and it is planned that the Anti-Poverty Strategy will be published in December 2021, subject to Executive approval.\n\nFurther information on the co-design process and timetable can be found at: Social Inclusion Strategies | Department for Communities (communities-ni.gov.uk)\n\nI am fully committed to open and full engagement with all key stakeholders, including social partners, as my Department develops short and long-term economic policy.\n\nThe Executive’s Programme for Government is built upon, and informed by, partnership working and collaboration both internally within the Civil Service and with our external partners. The principles of this partnership approach is applied to economic policy development throughout my Department.\n\nI recognise that social partners have an important role to play in the development of our economy. I want to see continued collaboration between all partners as we look to the future and improve our economic performance.\n\nBy way of example, my Department has a cross sector engagement forum, which includes representatives from the business community, the voluntary & community sector, and from a wide range of sectors such as universities, retail, colleges, food, trade union, transport/haulage and local chambers of commerce. This was established in June 2017 to allow the Department to seek stakeholder views and to collectively discuss how best to work together throughout the EU Exit process.\n\nThe forum has since also facilitated engagement on issues arising from the pandemic and now on the new trading environment arising from the Protocol and the UK-EU Trade and Cooperation Agreement that could affect key sectors of the Northern Ireland economy.\n\nI have recently launched my Economic Vision for a Decade of Innovation which provides a bold ambition to build an innovative and inclusive economy. My Department and I will continue to engage with all key partners as we develop the work programme to deliver the Vision which aims to deliver better jobs with better wages, in a more flexible working environment and a better overall quality of life. This collaboration and engagement will be crucial if we are to succeed in our ambitions for Northern Ireland.","answerHtml":"<p>In line with New Decade New Approach, the Executive’s actions to address poverty will be contained within the new Anti-Poverty Strategy. The Department for Communities is leading on the development of the Anti-Poverty Strategy using a co-design approach. A public consultation exercise is scheduled for later in the year and it is planned that the Anti-Poverty Strategy will be published in December 2021, subject to Executive approval.</p><p>Further information on the co-design process and timetable can be found at: Social Inclusion Strategies | Department for Communities (communities-ni.gov.uk)</p><p>I am fully committed to open and full engagement with all key stakeholders, including social partners, as my Department develops short and long-term economic policy.</p><p>The Executive’s Programme for Government is built upon, and informed by, partnership working and collaboration both internally within the Civil Service and with our external partners. The principles of this partnership approach is applied to economic policy development throughout my Department.</p><p>I recognise that social partners have an important role to play in the development of our economy. I want to see continued collaboration between all partners as we look to the future and improve our economic performance.</p><p>By way of example, my Department has a cross sector engagement forum, which includes representatives from the business community, the voluntary &amp; community sector, and from a wide range of sectors such as universities, retail, colleges, food, trade union, transport/haulage and local chambers of commerce. This was established in June 2017 to allow the Department to seek stakeholder views and to collectively discuss how best to work together throughout the EU Exit process.</p><p>The forum has since also facilitated engagement on issues arising from the pandemic and now on the new trading environment arising from the Protocol and the UK-EU Trade and Cooperation Agreement that could affect key sectors of the Northern Ireland economy.</p><p>I have recently launched my Economic Vision for a Decade of Innovation which provides a bold ambition to build an innovative and inclusive economy. My Department and I will continue to engage with all key partners as we develop the work programme to deliver the Vision which aims to deliver better jobs with better wages, in a more flexible working environment and a better overall quality of life. This collaboration and engagement will be crucial if we are to succeed in our ambitions for Northern Ireland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018298%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=336346","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=336346"}},{"id":"336345","reference":"AQW 18297/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-04","answerBy":"2021-05-19","answered":"2021-05-14","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will develop a remote working strategy, to ensure that the benefits of remote working are maximised, and current employment rights law in this area are fit for purpose.","answerText":"I have no immediate plans to develop a remote working strategy; however, my economic vision for NI, as outlined in the recently published: A 10x Economy, recognises that the Covid-19 pandemic alongside digital advancements has driven transformative change in attitudes to remote and more agile ways of working.\n\nFor many, working remotely has become the norm, with many companies indicating they will offer more flexible ways of working in the future. The current change to mass remote working of office workers occurred almost overnight and the effects of that change are not yet fully understood. Only after we have further evidence of the impact of these changes can decisions be made for the longer term.\n\nWe should remember, though, that for many, working remotely is not an option. Therefore any future decisions that we make as a society, employers and individuals, must take into account the diversity of the job market and the needs of our economy.\n\nCurrently, in terms of facilitating remote working, the right to request a flexible working arrangement is already part of our employment law framework. Many good employers recognise the positive impact flexible working can have on their workforce and productivity. I would urge all employers to accommodate flexible working patterns where possible, as this can help retain skilled workers, maximise participation in the economy and ensure everyone achieves his or her potential. The Labour Relations Agency has produced A Practical Guide to Working from Home: Covid-19 and beyond which provides useful guidance for both employers and individuals when considering a home working arrangement.\n\nAlso, I recognise the importance of good broadband to working remotely. Project Stratum, the largest telecommunications infrastructure project undertaken by my Department, will deliver gigabit capable broadband infrastructure to more than 76,000 primarily rural premises across NI. Project Stratum will act as an enabler, helping businesses develop and extend their reach, and helping individuals fulfil their potential. As we emerge from this Covid-19 crisis, Project Stratum will play a vital role in re-building our economy, offering encouragement to businesses and citizens in those areas in need of broadband improvement by building the infrastructure necessary to enable their local economies to grow, compete and prosper.\n\nIn the longer term, delivering on: A 10x Economy will underpin our work on rebuilding the NI economy and promoting economic recovery and resilience. I am committed to delivering a strong, competitive and regionally balanced economy that works for everyone. For all of our people this means better jobs with better wages, in a more flexible working environment and a better overall quality of life.","answerHtml":"<p>I have no immediate plans to develop a remote working strategy; however, my economic vision for NI, as outlined in the recently published: A 10x Economy, recognises that the Covid-19 pandemic alongside digital advancements has driven transformative change in attitudes to remote and more agile ways of working.</p><p>For many, working remotely has become the norm, with many companies indicating they will offer more flexible ways of working in the future. The current change to mass remote working of office workers occurred almost overnight and the effects of that change are not yet fully understood. Only after we have further evidence of the impact of these changes can decisions be made for the longer term.</p><p>We should remember, though, that for many, working remotely is not an option. Therefore any future decisions that we make as a society, employers and individuals, must take into account the diversity of the job market and the needs of our economy.</p><p>Currently, in terms of facilitating remote working, the right to request a flexible working arrangement is already part of our employment law framework. Many good employers recognise the positive impact flexible working can have on their workforce and productivity. I would urge all employers to accommodate flexible working patterns where possible, as this can help retain skilled workers, maximise participation in the economy and ensure everyone achieves his or her potential. The Labour Relations Agency has produced A Practical Guide to Working from Home: Covid-19 and beyond which provides useful guidance for both employers and individuals when considering a home working arrangement.</p><p>Also, I recognise the importance of good broadband to working remotely. Project Stratum, the largest telecommunications infrastructure project undertaken by my Department, will deliver gigabit capable broadband infrastructure to more than 76,000 primarily rural premises across NI. Project Stratum will act as an enabler, helping businesses develop and extend their reach, and helping individuals fulfil their potential. As we emerge from this Covid-19 crisis, Project Stratum will play a vital role in re-building our economy, offering encouragement to businesses and citizens in those areas in need of broadband improvement by building the infrastructure necessary to enable their local economies to grow, compete and prosper.</p><p>In the longer term, delivering on: A 10x Economy will underpin our work on rebuilding the NI economy and promoting economic recovery and resilience. I am committed to delivering a strong, competitive and regionally balanced economy that works for everyone. For all of our people this means better jobs with better wages, in a more flexible working environment and a better overall quality of life.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018297%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=336345","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=336345"}},{"id":"336344","reference":"AQW 18296/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-04","answerBy":"2021-05-19","answered":"2021-05-14","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether her Department has identified areas where new primary legislation is required in regards to improving employment rights.","answerText":"The significant impact of the pandemic has resulted in a need to prioritise Covid-19 related employment legislation. Legislation has already been introduced to protect workers’ rights in respect of annual leave and in relation to statutory family-related payments and redundancy entitlements for those on the furlough scheme. Legislation to extend protections against detriment to all workers in relation to any action they may take to protect themselves or others where they reasonably believe there is serious and imminent danger comes into operation on 31 May 2021. Previously this health and safety provision had only been afforded to employees. To date, it has been possible to use secondary legislation for these purposes.\n\nIn terms of primary legislation, I am pleased to be have been able to make progress towards the introduction of a Bill to provide for Parental Bereavement Leave and Pay, an important employment right for those parents in work who suffer the loss of a child. This will be the only piece of employment related primary legislation I will have time to introduce during this mandate.\n\nWhile Northern Ireland already has a robust framework of employment rights in place, the unprecedented impact of the pandemic means that it will be necessary to keep other aspects of employment law under review. Employment law is also continually evolving at UK level and internationally. There will therefore inevitably be requirements to introduce further secondary legislation and to introduce primary legislation in the future. Any policy proposals for new legislation would be subject to appropriate public consultation and the necessary approvals from the Executive and the Assembly.","answerHtml":"<p>The significant impact of the pandemic has resulted in a need to prioritise Covid-19 related employment legislation. Legislation has already been introduced to protect workers’ rights in respect of annual leave and in relation to statutory family-related payments and redundancy entitlements for those on the furlough scheme. Legislation to extend protections against detriment to all workers in relation to any action they may take to protect themselves or others where they reasonably believe there is serious and imminent danger comes into operation on 31 May 2021. Previously this health and safety provision had only been afforded to employees. To date, it has been possible to use secondary legislation for these purposes.</p><p>In terms of primary legislation, I am pleased to be have been able to make progress towards the introduction of a Bill to provide for Parental Bereavement Leave and Pay, an important employment right for those parents in work who suffer the loss of a child. This will be the only piece of employment related primary legislation I will have time to introduce during this mandate.</p><p>While Northern Ireland already has a robust framework of employment rights in place, the unprecedented impact of the pandemic means that it will be necessary to keep other aspects of employment law under review. Employment law is also continually evolving at UK level and internationally. There will therefore inevitably be requirements to introduce further secondary legislation and to introduce primary legislation in the future. Any policy proposals for new legislation would be subject to appropriate public consultation and the necessary approvals from the Executive and the Assembly.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018296%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=336344","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=336344"}},{"id":"336343","reference":"AQW 18295/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-04","answerBy":"2021-05-19","answered":"2021-07-27","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail (i) what meetings she has had with trade union and trade union representative groups; and (ii) business representative groups, over the past 18 months.","answerText":"Since assuming office on 6 July, I have not yet had the opportunity to meet with trade union representatives or wider business representative groups. I intend to meet with a range of groups over the comings weeks and months however.","answerHtml":"<p>Since assuming office on 6 July, I have not yet had the opportunity to meet with trade union representatives or wider business representative groups. I intend to meet with a range of groups over the comings weeks and months however.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018295%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=336343","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=336343"}},{"id":"336342","reference":"AQW 18294/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-05-04","answerBy":"2021-05-19","answered":"2021-06-24","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health (i) for her assessment of the impact of COVID-19 on competition for medicine and dentistry places at local universities; and (ii) whether she will seek to work with the Minister of Health to expand place numbers to ensure that students applying this year are not adversely impacted.","answerText":"My Department has been working closely with Queen’s University Belfast in relation to its medical and dental courses.\n\nI can confirm that up to 50 additional places will be offered for the undergraduate Medicine course at QUB, for the 2021 intake. This is to address the impact of COVID-19 on A-level students following the Education Minister’s announcement in 2020 that NI A-level students would receive the higher grade of either their Centre Assessed Grade, or the grade provided to them by CCEA.\n\nNo additional places will be provided on the Dentistry course.","answerHtml":"<p>My Department has been working closely with Queen’s University Belfast in relation to its medical and dental courses.</p><p>I can confirm that up to 50 additional places will be offered for the undergraduate Medicine course at QUB, for the 2021 intake. This is to address the impact of COVID-19 on A-level students following the Education Minister’s announcement in 2020 that NI A-level students would receive the higher grade of either their Centre Assessed Grade, or the grade provided to them by CCEA.</p><p>No additional places will be provided on the Dentistry course.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018294%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=336342","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=336342"}},{"id":"336087","reference":"AQW 18230/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-30","answerBy":"2021-05-18","answered":"2021-05-19","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs, pursuant to AQW 16422/17-22, (i) for an update on any costs his Department has determined thus far associated with the halting of work, including for consultants, engineers and other services; and (ii) whether this issue has been raised at Executive.","answerText":"Further to AQW 16422/17-22 and the instruction issued to the contractors on 2 April 2021 advising them to move to a controlled stop DAERA have not received any contractor compensation claims to date.\n\nThe controlled stop, which triggered a compensation event was for an initial period of six weeks and was extended for a further three weeks on 6 May 2021. Full costs associated with the controlled stop will be clear following further scoping work and discussions with contractors. Further clarity will also be provided when compensation claims are received and any adjudication process completed.\n\nAny additional costs incurred in relation to these works will be captured in the development of the Full Business Case (FBC). As the proposals will be significant, cross-cutting and controversial, following completion of the FBC, I intend to take options for consideration and decision to the Northern Ireland Executive.","answerHtml":"<p>Further to AQW 16422/17-22 and the instruction issued to the contractors on 2 April 2021 advising them to move to a controlled stop DAERA have not received any contractor compensation claims to date.</p><p>The controlled stop, which triggered a compensation event was for an initial period of six weeks and was extended for a further three weeks on 6 May 2021. Full costs associated with the controlled stop will be clear following further scoping work and discussions with contractors. Further clarity will also be provided when compensation claims are received and any adjudication process completed.</p><p>Any additional costs incurred in relation to these works will be captured in the development of the Full Business Case (FBC). As the proposals will be significant, cross-cutting and controversial, following completion of the FBC, I intend to take options for consideration and decision to the Northern Ireland Executive.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018230%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=336087","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=336087"}},{"id":"336086","reference":"AQW 18229/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-30","answerBy":"2021-05-18","answered":"2021-05-17","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs pursuant to AQW 16422/17-22, to detail how the decision to halt work was communicated to contractors.","answerText":"In consultation with DAERA Officials, Construction and Procurement Delivery (Department of Finance), issued an instruction to the contractors advising them to move to a controlled stop on 02 April 2021.","answerHtml":"<p>In consultation with DAERA Officials, Construction and Procurement Delivery (Department of Finance), issued an instruction to the contractors advising them to move to a controlled stop on 02 April 2021.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018229%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=336086","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=336086"}},{"id":"336085","reference":"AQW 18228/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-30","answerBy":"2021-05-18","answered":"2021-05-12","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs whether he will consider introducing a bottle deposit scheme for Northern Ireland.","answerText":"My officials have been developing options for a Deposit Return Scheme (DRS) for drinks containers, alongside England and Wales to ensure consistency for major UK suppliers and retailers.\n\nI launched a public consultation on options for the DRS on 24 March 2021, which will close on 4th June 2021.\n\nFurther detail on the proposed DRS can be found on the following link. https://www.daera-ni.gov.uk/consultations/introducing-deposit-return-scheme-england-wales-and-northern-ireland","answerHtml":"<p>My officials have been developing options for a Deposit Return Scheme (DRS) for drinks containers, alongside England and Wales to ensure consistency for major UK suppliers and retailers.</p><p>I launched a public consultation on options for the DRS on 24 March 2021, which will close on 4th June 2021.</p><p>Further detail on the proposed DRS can be found on the following link. https://www.daera-ni.gov.uk/consultations/introducing-deposit-return-scheme-england-wales-and-northern-ireland</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018228%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=336085","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=336085"}},{"id":"336084","reference":"AQW 18227/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-30","answerBy":"2021-05-18","answered":"2021-06-24","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) for her assessment of the impact of long COVID on workers; and (ii) what actions she is taking to ensure that employers are supportive of a return to work for those facing the illness.","answerText":"As part (i) of your question is of a medical nature, I sought advice from the Department of Health, with Minister Swann providing the following response:\n\n‘We are still at the early stages in the development of our understanding of the long-term effects of COVID-19, and in particular what forms of treatment will be effective.\n\nSince the publication by the National Institute for Care and Health Excellence (NICE) of a rapid guideline on the condition in December 2020, the Health and Social Care Board have been developing costed proposals for the assessment and treatment of people who continue to experience long-term health effects as a result of COVID-19 infection.\n\nTHE HSCB has recently submitted proposals to the Department of Health.\n\nOnce a final service model has been approved, work will be undertaken to deliver the appropriate services rapidly.\n\nAlthough the recording of data on the condition continues in Northern Ireland, there will be insufficient data to conduct analysis for a number of months. In the interim, the available evidence and research on prevalence at the UK level continues to be monitored.\n\nA recent publication by the Office for National Statistics (ONS) estimates that 1.1 million people in private households in the UK are experiencing long COVID. This relates to self-reported long COVID, rather than clinically diagnosed ongoing symptomatic COVID-19 or post-COVID-19 syndrome. Of those people 26,000 were from Northern Ireland.’\n\nI would expect employers to act with sensitivity and fairness to employees who find themselves in the situation of suffering from Long Covid.\n\nAs with any illness, disability or long term sick absence, employees should consult their GP or another health care professional, such as an occupational therapist. These discussions should focus on how the employee’s symptoms impact on their job, and how the work affects their symptoms.\n\nEmployers must follow their own sick absence policy and any relevant disability discrimination guidelines. Employers should also discuss practical steps or adjustments with the employee that may help when they return.\n\nEmployees who believe they are being treated or dismissed unfairly may be able to complain to an Industrial Tribunal. Anyone who finds themselves in this position may wish to consider contacting the Labour Relations Agency - Workplace Information Service on 03300 555 300 for confidential and impartial information.\n\nIn addition, the Law Centre NI provides free, independent, specialist legal advice (subject to capacity) on employment rights. The Law Centre can be contacted on their advice line on 028 9024 4401 or by email: employmentadvice@lawcentreni.org.","answerHtml":"<p>As part (i) of your question is of a medical nature, I sought advice from the Department of Health, with Minister Swann providing the following response:</p><p>‘We are still at the early stages in the development of our understanding of the long-term effects of COVID-19, and in particular what forms of treatment will be effective.</p><p>Since the publication by the National Institute for Care and Health Excellence (NICE) of a rapid guideline on the condition in December 2020, the Health and Social Care Board have been developing costed proposals for the assessment and treatment of people who continue to experience long-term health effects as a result of COVID-19 infection.</p><p>THE HSCB has recently submitted proposals to the Department of Health.</p><p>Once a final service model has been approved, work will be undertaken to deliver the appropriate services rapidly.</p><p>Although the recording of data on the condition continues in Northern Ireland, there will be insufficient data to conduct analysis for a number of months. In the interim, the available evidence and research on prevalence at the UK level continues to be monitored.</p><p>A recent publication by the Office for National Statistics (ONS) estimates that 1.1 million people in private households in the UK are experiencing long COVID. This relates to self-reported long COVID, rather than clinically diagnosed ongoing symptomatic COVID-19 or post-COVID-19 syndrome. Of those people 26,000 were from Northern Ireland.’</p><p>I would expect employers to act with sensitivity and fairness to employees who find themselves in the situation of suffering from Long Covid.</p><p>As with any illness, disability or long term sick absence, employees should consult their GP or another health care professional, such as an occupational therapist. These discussions should focus on how the employee’s symptoms impact on their job, and how the work affects their symptoms.</p><p>Employers must follow their own sick absence policy and any relevant disability discrimination guidelines. Employers should also discuss practical steps or adjustments with the employee that may help when they return.</p><p>Employees who believe they are being treated or dismissed unfairly may be able to complain to an Industrial Tribunal. Anyone who finds themselves in this position may wish to consider contacting the Labour Relations Agency - Workplace Information Service on 03300 555 300 for confidential and impartial information.</p><p>In addition, the Law Centre NI provides free, independent, specialist legal advice (subject to capacity) on employment rights. The Law Centre can be contacted on their advice line on 028 9024 4401 or by email: employmentadvice@lawcentreni.org.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018227%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=336084","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=336084"}},{"id":"337203","reference":"AQO 1998/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-04-29","answerBy":"2021-05-10","answered":"2021-05-10","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities to outline her powers regarding local government oversight.","answerText":"My Department has the following powers of last resort, provided in the Local Government Act (NI) 2014, regarding local government oversight:\n\nSection 104 - My Department (or any Department) may direct a council to make a report or return or supply specific information with respect to the exercise of the council’s functions.\n\nSection 105 - My Department (or any Department) may cause a local inquiry to be held along with such investigations it sees fit in connection with the administration of any statutory provision relating to the functions of a council or its committees and sub-committees\n\nSection 106 - My Department (or any Department) may, after an inquiry or investigation has been completed and the Department is satisfied that the council has failed to discharge any if its functions, may make an order that the council is in default and direct a council to take action, within a specified period.","answerHtml":"<p>My Department has the following powers of last resort, provided in the Local Government Act (NI) 2014, regarding local government oversight:</p><p>Section 104 - My Department (or any Department) may direct a council to make a report or return or supply specific information with respect to the exercise of the council’s functions.</p><p>Section 105 - My Department (or any Department) may cause a local inquiry to be held along with such investigations it sees fit in connection with the administration of any statutory provision relating to the functions of a council or its committees and sub-committees</p><p>Section 106 - My Department (or any Department) may, after an inquiry or investigation has been completed and the Department is satisfied that the council has failed to discharge any if its functions, may make an order that the council is in default and direct a council to take action, within a specified period.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201998%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=337203","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=337203"}},{"id":"335544","reference":"AQW 18087/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-28","answerBy":"2021-05-14","answered":"2021-05-13","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs for an update on progress in developing post-Brexit farm support schemes.","answerText":"Work is underway to develop an agricultural support framework portfolio better suited to local needs and one that will provide for and secure long term sustainability within the industry.\n\nIn developing a future support framework, priority consideration is being given to address the four desired outcomes identified with key food, farming and environmental stakeholders, namely; increased productivity, environmental sustainability, improved resilience and a competitive supply chain.\n\nI am determined to work with our farmers, land managers and environmental stakeholders, to co-design a new approach that is focused on delivering these outcomes.","answerHtml":"<p>Work is underway to develop an agricultural support framework portfolio better suited to local needs and one that will provide for and secure long term sustainability within the industry.</p><p>In developing a future support framework, priority consideration is being given to address the four desired outcomes identified with key food, farming and environmental stakeholders, namely; increased productivity, environmental sustainability, improved resilience and a competitive supply chain.</p><p>I am determined to work with our farmers, land managers and environmental stakeholders, to co-design a new approach that is focused on delivering these outcomes.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018087%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=335544","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=335544"}},{"id":"335543","reference":"AQW 18086/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-28","answerBy":"2021-05-14","answered":"2021-06-02","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs for an update on the £4 Million Small Woodland Grant Scheme.","answerText":"I launched the Small Woodland Grant Scheme in December 2020 to encourage new native woodlands of 0.2 hectares and larger. The first period for receipt of applications closed at the end of February with 368 applications having been submitted. A total of 314 hectares were approved by the Department and it is anticipated that around 150 hectares of this will be planted and claimed by landowners in 2021.\n\nThe Small Woodland Grant Scheme and Forest Expansion Scheme will reopen in summer this year to support new planting projects in the winter of 2021/22 to be claimed in 2022.","answerHtml":"<p>I launched the Small Woodland Grant Scheme in December 2020 to encourage new native woodlands of 0.2 hectares and larger. The first period for receipt of applications closed at the end of February with 368 applications having been submitted. A total of 314 hectares were approved by the Department and it is anticipated that around 150 hectares of this will be planted and claimed by landowners in 2021.</p><p>The Small Woodland Grant Scheme and Forest Expansion Scheme will reopen in summer this year to support new planting projects in the winter of 2021/22 to be claimed in 2022.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018086%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=335543","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=335543"}},{"id":"335542","reference":"AQW 18085/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-28","answerBy":"2021-05-14","answered":"2021-05-10","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure (i) to outline any water supply and wastewater capacity issues that exist in the (a) Whitehead; (b) Islandmagee; (c) Ballygalley; (d) Milltown; (e) Glenarm; (f) Carnlough; (g) Glenariff; and (h) Cushendall areas; and (j) any other villages or settlements in East Antrim; and (ii) how Northern Ireland Water is working to resolve these capacity issues.","answerText":"NI Water has advised that no drinking water supply capacity issues have been identified in the East Antrim area. However, wastewater network and treatment capacity issues have been identified in parts of the Larne, Ballymena, Carrickfergus, Greenisland, Ballycarry, Portglenone, Tully Road (Carnlough and Glenarm), Whitehead/Ballystrudder/Ballycarry, Cushendall and Cushendun wastewater treatment works.\n\nIn terms of resolving issues in the East Antrim area, NI Water plans to upgrade Larne waste water treatment works (WwTWs) and its sewer catchment (Larne / Blackcave) during the period covered by its Price Control - PC21 (April 2021 – March 2027). Current estimates are ca£30 million and the upgrade is subject to funding by the NI Executive of the PC21 Business Plan. Areas assessed as nearing capacity, by NI Water’s sewerage network capacity mapping tool, are not in the PC21 business plan but may be subject to future PC27 (2027-2033) business planning prioritisation processes and funding. In areas where capacity is constraining development, NI Water can consider the provision of positive planning responses for these areas where developers can demonstrate: (1) like for like development, (2) extant previously approved development (where NI Water has given a positive response) and (3) where the development will offer a reduced loading on the sewer network, which may include storm separation and/or attenuation. In addition, NI Water has put in place a Solution Engineering Team which can assess options for storm water offsetting within a catchment that may be funded by developers to facilitate a proposed development.","answerHtml":"<p>NI Water has advised that no drinking water supply capacity issues have been identified in the East Antrim area. However, wastewater network and treatment capacity issues have been identified in parts of the Larne, Ballymena, Carrickfergus, Greenisland, Ballycarry, Portglenone, Tully Road (Carnlough and Glenarm), Whitehead/Ballystrudder/Ballycarry, Cushendall and Cushendun wastewater treatment works.</p><p>In terms of resolving issues in the East Antrim area, NI Water plans to upgrade Larne waste water treatment works (WwTWs) and its sewer catchment (Larne / Blackcave) during the period covered by its Price Control - PC21 (April 2021 – March 2027). Current estimates are ca£30 million and the upgrade is subject to funding by the NI Executive of the PC21 Business Plan. Areas assessed as nearing capacity, by NI Water’s sewerage network capacity mapping tool, are not in the PC21 business plan but may be subject to future PC27 (2027-2033) business planning prioritisation processes and funding. In areas where capacity is constraining development, NI Water can consider the provision of positive planning responses for these areas where developers can demonstrate: (1) like for like development, (2) extant previously approved development (where NI Water has given a positive response) and (3) where the development will offer a reduced loading on the sewer network, which may include storm separation and/or attenuation. In addition, NI Water has put in place a Solution Engineering Team which can assess options for storm water offsetting within a catchment that may be funded by developers to facilitate a proposed development.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018085%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=335542","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=335542"}},{"id":"335284","reference":"AQW 18019/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-27","answerBy":"2021-05-13","answered":"2021-05-11","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure pursuant to AQW 16423/17-22, (i) to detail (a) the number of recorded incidents of spills from the network; and, (b) their locations; (ii) the number of recorded incidents of flooding in properties as a result of sewage backing up; (iii) to define the meaning of ‘receiving environment’; (iv) to detail the number of unsatisfactory intermittent discharges; (v) what planning approvals and funding have been obtained thus far for improvement works; (vi) for an update on network modelling in regards to the Larne area; (vii) what engagement has been undertaken thus far with the Northern Ireland Environment Agency regarding required work; and (viii) what notice has been given to the public in regards to these issues.","answerText":"NI Water has advised me of the following:\n\nNI Water’s urban drainage model developed for the Larne catchment provides information on predicted spills/discharges from network assets into the environment. The table below outlines the predicted network spills and defines the receiving environment.\n\nAsset Name\tReceiving Water\tAnnual Spill Frequency\nBlackcave WwPS Storm Tanks Overflow\tIrish Sea\t34\nLarne WwTW Storm Tank Overflow\tLarne Lough\t27\nPound Street / St. Johns Place junction CSO\tRiver Culvert\t80\nMinnis Fleck Inver River CSO\tInver River\t24\nSandy Bay WwPS CSO\tLarne Lough\t21\nMurrayfield WwPS CSO\tInver River\t15\nCurran Road Loughview CSO\tLarne Lough\t15\nLarne High School CSO\tRiver Culvert\t26\nLarne Harbour Redlands Road WwPS ERO\tLarne Lough\t31\nCross Street Pound CSO\tRiver Culvert\t27\nBlackarch East CSO\tIrish Sea\t16\nBallygalley Slipway WwPS CSO\tIrish Sea\t5\nNewpark Shore WwPS CSO\tMagheramorne River\t26\nCranfield Park East CSO\tUnnamed\t7\nUpper Cairncastle Road CSO\tUnnamed\t3\nCairngorm Drive CSO\tUnnamed\t2\nKitson’s Yard CSO\tUnknown\t2\nBallygalley Coast Road CSO\tIrish Sea\t16\nMill Brae One CSO\tInver River\t15\nKnocklayde CSO\tRiver Culvert\t5\nDrains Bay WwPS CSO\tKillyglen Burn\t6\nMain Street Agnew CSO\tRiver Culvert\t1\nLarne Harbour WwPS CSO\tLarne Lough\t1\nGlynn WwPS CSO\tLarne Lough\t1\nBank Road Larne CSO\tRiver Culvert\t5\nInver Primary School CSO\tInver River\t1\nMill Brae Two CSO\tInver River\t1\nNM001385180\tRiver Culvert\t2\nCircular Road CSO\tInver River\t2\nStation Road Tank Sewer CSO\tUnknown\t0.2\nCedar Grove Drains CSO\tKillyglen Burn\t0.2\nNM001382614\tRiver Culvert\t1\nBrustin Lee WwPS ERO\tBallygalley River\t0.4\nNM001382423\tCombined Network\t0.4\nBlackcave CSO\tIrish Sea\t0.2\nThe Roddens CSO\tRiver Culvert\t0.2\nNM001382422\tCombined Network\t0.2\nNM001382116\tRiver Culvert\t17\nCroft Manor WwPS ERO\tBallygalley River\t0.3\nNM001382119\tRiver Culvert\t0.3\nCoastguard Road WwPS CSO\tLarne Lough\t0.1\nCasements CSO\tUnknown\t0.2\nNM001385169\tRiver Culvert\t1\nCranbourne WwPS ERO\tUnnamed\t0.1\nNM001385179\tRiver Culvert\t0.1\nWilmuir Crescent CSO\tRiver Culvert\t0.1\n\nNI Water has no properties on the external, or internal, flooding DG5 register for the Larne catchment. It has also advised that where flooding has occurred the cause would have been sewer blockages i.e. flooding other causes and not capacity related.\n\nThe receiving environment is referenced in the table above, provided in response to question (i).\n\nNI Water is currently aware of 29 Unsatisfactory Intermittent Discharges (UIDs). This information is based on evidence derived from the urban drainage model, pollution incidents and operational staff, within the Larne network. NI Water has provided spill assessment data to the Northern Ireland Environment Agency (NIEA) for its consideration and to enable a formal ‘Statement of Need’ for Larne to be generated.\n\nNI Water has advised that it can progress options to provide solutions, land requirements and planning when it receives the Statement of Need from NIEA. The implementation of any capital improvements in Larne will be subject to prioritisation and the availability of adequate funding. NI Water’s PC21 Business Plan includes provision for network sewerage improvements within the Blackcave network.\n\nNI Water is currently awaiting the Utility Regulator’s PC21 Final Determination which will include decisions on NI Water’s PC21 Business Plan proposals amounting to approximately £2 billion for the period 2021 to 2027. Funding of the PC21 Business Plan, if agreed by the Utility Regulator and NI Water, is reliant on the allocation of adequate funding by the NI Executive. NI Water has advised me that it will take multiple Price Control investment timeframes to address the wastewater system capacity issues. This presents a challenge for the Executive as to how economic development can be supported while the necessary investment is delivered. If insufficient funding is provided, a prioritisation exercise will need to be undertaken, and agreed, with my Department and NI Water’s key stakeholders (the UR, NIEA, the Drinking Water Inspectorate and the Consumer Council Northern Ireland). This could lead to significant impacts upon the wastewater upgrade programme.\n\nNI Water is currently progressing a Drainage Area Study (DAS) of the Larne catchment (encompassing the Blackcave network). This study, which involves the creation of a detailed hydraulic model to replicate the sewerage network, is at an advanced stage with an anticipated completion date of June 2021. Substantial survey work has been undertaken in the Larne catchment to inform the DAS process (including flow survey, ancillary surveys and CCTV investigations).\n\nThe modelling appraisal has identified network capacity issues affecting the catchment. NI Water has, using the DAS process, developed a suite of outline solutions to address both pollution from unsatisfactory overflows and to reduce the risk of out of sewer flooding. The scale of the solutions generated by the DAS (based on precautionary environmental principle) represent a significant capital investment. Therefore it is likely that NI Water will seek to achieve more sustainable catchment outcomes through a parallel Integrated Environmental Modelling (IEM) study.\n\nNI Water provided spill assessment data on 22nd April 2021 to the Northern Ireland Environment Agency (NIEA) for its consideration and to enable a formal ‘Statement of Need’ for Larne to be generated. Please refer to previous answer (iv).\n\nNI Water has highlighted wastewater capacity issues, both in relation to Larne and other areas across Northern Ireland, for several years. It’s PC21 Business Plan sets out investment requirements to begin addressing capacity issues over the PC21 Price Control period (2021 to 2027) and for future 6 year Price Controls (PC27 and PC33). The Utility Regulator also issued the PC21 Draft Determination for Public Consultation on the 30 September 2020 and presented the proposals as to how NI Water will begin to address a lack of capacity in its sewerage networks and wastewater treatment works in the PC21 period.\n\nNI Water has made several presentations to Mid and East Antrim Borough Council during 2019/20 and 2020/21. Its staff have also met, on numerous occasions, with Councillors, Council Planners, MEA Chief Executive, MLAs and an MP.\n\nWastewater capacity information is available on NI Water’s website: Wastewater Capacity (niwater.com).","answerHtml":"<p>NI Water has advised me of the following:</p><p>NI Water’s urban drainage model developed for the Larne catchment provides information on predicted spills/discharges from network assets into the environment. The table below outlines the predicted network spills and defines the receiving environment.</p><div class=\"table-wrap\"><table><tr><td>Asset Name</td><td>Receiving Water</td><td>Annual Spill Frequency</td></tr><tr><td>Blackcave WwPS Storm Tanks Overflow</td><td>Irish Sea</td><td>34</td></tr><tr><td>Larne WwTW Storm Tank Overflow</td><td>Larne Lough</td><td>27</td></tr><tr><td>Pound Street / St. Johns Place junction CSO</td><td>River Culvert</td><td>80</td></tr><tr><td>Minnis Fleck Inver River CSO</td><td>Inver River</td><td>24</td></tr><tr><td>Sandy Bay WwPS CSO</td><td>Larne Lough</td><td>21</td></tr><tr><td>Murrayfield WwPS CSO</td><td>Inver River</td><td>15</td></tr><tr><td>Curran Road Loughview CSO</td><td>Larne Lough</td><td>15</td></tr><tr><td>Larne High School CSO</td><td>River Culvert</td><td>26</td></tr><tr><td>Larne Harbour Redlands Road WwPS ERO</td><td>Larne Lough</td><td>31</td></tr><tr><td>Cross Street Pound CSO</td><td>River Culvert</td><td>27</td></tr><tr><td>Blackarch East CSO</td><td>Irish Sea</td><td>16</td></tr><tr><td>Ballygalley Slipway WwPS CSO</td><td>Irish Sea</td><td>5</td></tr><tr><td>Newpark Shore WwPS CSO</td><td>Magheramorne River</td><td>26</td></tr><tr><td>Cranfield Park East CSO</td><td>Unnamed</td><td>7</td></tr><tr><td>Upper Cairncastle Road CSO</td><td>Unnamed</td><td>3</td></tr><tr><td>Cairngorm Drive CSO</td><td>Unnamed</td><td>2</td></tr><tr><td>Kitson’s Yard CSO</td><td>Unknown</td><td>2</td></tr><tr><td>Ballygalley Coast Road CSO</td><td>Irish Sea</td><td>16</td></tr><tr><td>Mill Brae One CSO</td><td>Inver River</td><td>15</td></tr><tr><td>Knocklayde CSO</td><td>River Culvert</td><td>5</td></tr><tr><td>Drains Bay WwPS CSO</td><td>Killyglen Burn</td><td>6</td></tr><tr><td>Main Street Agnew CSO</td><td>River Culvert</td><td>1</td></tr><tr><td>Larne Harbour WwPS CSO</td><td>Larne Lough</td><td>1</td></tr><tr><td>Glynn WwPS CSO</td><td>Larne Lough</td><td>1</td></tr><tr><td>Bank Road Larne CSO</td><td>River Culvert</td><td>5</td></tr><tr><td>Inver Primary School CSO</td><td>Inver River</td><td>1</td></tr><tr><td>Mill Brae Two CSO</td><td>Inver River</td><td>1</td></tr><tr><td>NM001385180</td><td>River Culvert</td><td>2</td></tr><tr><td>Circular Road CSO</td><td>Inver River</td><td>2</td></tr><tr><td>Station Road Tank Sewer CSO</td><td>Unknown</td><td>0.2</td></tr><tr><td>Cedar Grove Drains CSO</td><td>Killyglen Burn</td><td>0.2</td></tr><tr><td>NM001382614</td><td>River Culvert</td><td>1</td></tr><tr><td>Brustin Lee WwPS ERO</td><td>Ballygalley River</td><td>0.4</td></tr><tr><td>NM001382423</td><td>Combined Network</td><td>0.4</td></tr><tr><td>Blackcave CSO</td><td>Irish Sea</td><td>0.2</td></tr><tr><td>The Roddens CSO</td><td>River Culvert</td><td>0.2</td></tr><tr><td>NM001382422</td><td>Combined Network</td><td>0.2</td></tr><tr><td>NM001382116</td><td>River Culvert</td><td>17</td></tr><tr><td>Croft Manor WwPS ERO</td><td>Ballygalley River</td><td>0.3</td></tr><tr><td>NM001382119</td><td>River Culvert</td><td>0.3</td></tr><tr><td>Coastguard Road WwPS CSO</td><td>Larne Lough</td><td>0.1</td></tr><tr><td>Casements CSO</td><td>Unknown</td><td>0.2</td></tr><tr><td>NM001385169</td><td>River Culvert</td><td>1</td></tr><tr><td>Cranbourne WwPS ERO</td><td>Unnamed</td><td>0.1</td></tr><tr><td>NM001385179</td><td>River Culvert</td><td>0.1</td></tr><tr><td>Wilmuir Crescent CSO</td><td>River Culvert</td><td>0.1</td></tr></table></div><p>NI Water has no properties on the external, or internal, flooding DG5 register for the Larne catchment. It has also advised that where flooding has occurred the cause would have been sewer blockages i.e. flooding other causes and not capacity related.</p><p>The receiving environment is referenced in the table above, provided in response to question (i).</p><p>NI Water is currently aware of 29 Unsatisfactory Intermittent Discharges (UIDs). This information is based on evidence derived from the urban drainage model, pollution incidents and operational staff, within the Larne network. NI Water has provided spill assessment data to the Northern Ireland Environment Agency (NIEA) for its consideration and to enable a formal ‘Statement of Need’ for Larne to be generated.</p><p>NI Water has advised that it can progress options to provide solutions, land requirements and planning when it receives the Statement of Need from NIEA. The implementation of any capital improvements in Larne will be subject to prioritisation and the availability of adequate funding. NI Water’s PC21 Business Plan includes provision for network sewerage improvements within the Blackcave network.</p><p>NI Water is currently awaiting the Utility Regulator’s PC21 Final Determination which will include decisions on NI Water’s PC21 Business Plan proposals amounting to approximately £2 billion for the period 2021 to 2027. Funding of the PC21 Business Plan, if agreed by the Utility Regulator and NI Water, is reliant on the allocation of adequate funding by the NI Executive. NI Water has advised me that it will take multiple Price Control investment timeframes to address the wastewater system capacity issues. This presents a challenge for the Executive as to how economic development can be supported while the necessary investment is delivered. If insufficient funding is provided, a prioritisation exercise will need to be undertaken, and agreed, with my Department and NI Water’s key stakeholders (the UR, NIEA, the Drinking Water Inspectorate and the Consumer Council Northern Ireland). This could lead to significant impacts upon the wastewater upgrade programme.</p><p>NI Water is currently progressing a Drainage Area Study (DAS) of the Larne catchment (encompassing the Blackcave network). This study, which involves the creation of a detailed hydraulic model to replicate the sewerage network, is at an advanced stage with an anticipated completion date of June 2021. Substantial survey work has been undertaken in the Larne catchment to inform the DAS process (including flow survey, ancillary surveys and CCTV investigations).</p><p>The modelling appraisal has identified network capacity issues affecting the catchment. NI Water has, using the DAS process, developed a suite of outline solutions to address both pollution from unsatisfactory overflows and to reduce the risk of out of sewer flooding. The scale of the solutions generated by the DAS (based on precautionary environmental principle) represent a significant capital investment. Therefore it is likely that NI Water will seek to achieve more sustainable catchment outcomes through a parallel Integrated Environmental Modelling (IEM) study.</p><p>NI Water provided spill assessment data on 22nd April 2021 to the Northern Ireland Environment Agency (NIEA) for its consideration and to enable a formal ‘Statement of Need’ for Larne to be generated. Please refer to previous answer (iv).</p><p>NI Water has highlighted wastewater capacity issues, both in relation to Larne and other areas across Northern Ireland, for several years. It’s PC21 Business Plan sets out investment requirements to begin addressing capacity issues over the PC21 Price Control period (2021 to 2027) and for future 6 year Price Controls (PC27 and PC33). The Utility Regulator also issued the PC21 Draft Determination for Public Consultation on the 30 September 2020 and presented the proposals as to how NI Water will begin to address a lack of capacity in its sewerage networks and wastewater treatment works in the PC21 period.</p><p>NI Water has made several presentations to Mid and East Antrim Borough Council during 2019/20 and 2020/21. Its staff have also met, on numerous occasions, with Councillors, Council Planners, MEA Chief Executive, MLAs and an MP.</p><p>Wastewater capacity information is available on NI Water’s website: Wastewater Capacity (niwater.com).</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018019%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=335284","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=335284"}},{"id":"335283","reference":"AQW 18018/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-27","answerBy":"2021-05-13","answered":"2021-05-10","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure what assessment has been made in regards to the electrification of the Larne railway line.","answerText":"As Infrastructure Minister, I have made addressing climate change one of my key priorities. I am focused on delivering clean public transport, however the cost of delivering a full decarbonisation of our bus and rail network will be significant.\n\nTo date, there has been no assessment to electrify the Larne railway line as this is a decision that needs to be taken strategically across the whole rail network. To that end, I can confirm that the recently announced All Island Strategic Rail review will consider the decarbonisation of the rail network on the island of Ireland.\n\nIn addition Translink's ambition is to decarbonise the public transport fleet by 2040 and is undertaking the necessary feasibility studies to examine this issue. Any decision to decarbonise the rail network will therefore need to be taken on a strategic basis considering the technologies available and the funding required at that time.","answerHtml":"<p>As Infrastructure Minister, I have made addressing climate change one of my key priorities. I am focused on delivering clean public transport, however the cost of delivering a full decarbonisation of our bus and rail network will be significant.</p><p>To date, there has been no assessment to electrify the Larne railway line as this is a decision that needs to be taken strategically across the whole rail network. To that end, I can confirm that the recently announced All Island Strategic Rail review will consider the decarbonisation of the rail network on the island of Ireland.</p><p>In addition Translink&#39;s ambition is to decarbonise the public transport fleet by 2040 and is undertaking the necessary feasibility studies to examine this issue. Any decision to decarbonise the rail network will therefore need to be taken on a strategic basis considering the technologies available and the funding required at that time.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018018%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=335283","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=335283"}},{"id":"335282","reference":"AQW 18017/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-27","answerBy":"2021-05-13","answered":"2021-05-07","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to detail the number of people in East Antrim waiting for a practical driving test appointment.","answerText":"At 30 April 2021, 344 people in the East Antrim area had booked a practical driving test appointment on the Driver & Vehicle Agency’s booking system. The booking system does not hold information on those people that have not yet made an application for a test. It is therefore not possible to detail the number of people from East Antrim waiting for a practical driving test appointment at this time.","answerHtml":"<p>At 30 April 2021, 344 people in the East Antrim area had booked a practical driving test appointment on the Driver &amp; Vehicle Agency’s booking system. The booking system does not hold information on those people that have not yet made an application for a test. It is therefore not possible to detail the number of people from East Antrim waiting for a practical driving test appointment at this time.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018017%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=335282","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=335282"}},{"id":"335281","reference":"AQW 18016/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-27","answerBy":"2021-05-13","answered":"2021-05-10","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure pursuant to AQW 17080/17-22, (i) to detail specifically the accident blackspots in East Antrim; and (ii) the number of accidents that have been recorded at each location.","answerText":"The table below provides details of the collision cluster sites identified in East Antrim along with the number of collisions at each site during the period 2016-2018 (the latest available data provided by the PSNI):\n\nLocation\tNumber of Collisions\nB59 Doagh Road / Monkstown Road, Newtownabbey.\t13\nB90 Old Carrick Road / Monkstown Road, Newtownabbey.\t4\nA2 Shore Road / Glenwell Road, Whiteabbey.\t9\nA2 Shore Road / Jordanstown Road, Whiteabbey.\t8\nA2 Shore Road / Gallows Green, Carrickfergus.\t7\nA2 Shore Road / Windmill Avenue, Carrickfergus.\t4\nA2 Shore Road / Davys Street, Carrickfergus.\t9\nA2 Shore Road / Castle Roundabout, Carrickfergus.\t7\nC75 Albert Road / North Street, Carrickfergus.\t6\nC75 North Road / Prince William Way, Carrickfergus.\t4\nC75 North Road / Prince Andrew Way, Carrickfergus.\t4\nB90 Middle Road / Woodburn Road, Carrickfergus.\t5\nA8 Harbour Highway / Pound Street, Larne.\t8\nC72 Old Glenarm Road / Greenland Road, Larne.\t5","answerHtml":"<p>The table below provides details of the collision cluster sites identified in East Antrim along with the number of collisions at each site during the period 2016-2018 (the latest available data provided by the PSNI):</p><div class=\"table-wrap\"><table><tr><td>Location</td><td>Number of Collisions</td></tr><tr><td>B59 Doagh Road / Monkstown Road, Newtownabbey.</td><td>13</td></tr><tr><td>B90 Old Carrick Road / Monkstown Road, Newtownabbey.</td><td>4</td></tr><tr><td>A2 Shore Road / Glenwell Road, Whiteabbey.</td><td>9</td></tr><tr><td>A2 Shore Road / Jordanstown Road, Whiteabbey.</td><td>8</td></tr><tr><td>A2 Shore Road / Gallows Green, Carrickfergus.</td><td>7</td></tr><tr><td>A2 Shore Road / Windmill Avenue, Carrickfergus.</td><td>4</td></tr><tr><td>A2 Shore Road / Davys Street, Carrickfergus.</td><td>9</td></tr><tr><td>A2 Shore Road / Castle Roundabout, Carrickfergus.</td><td>7</td></tr><tr><td>C75 Albert Road / North Street, Carrickfergus.</td><td>6</td></tr><tr><td>C75 North Road / Prince William Way, Carrickfergus.</td><td>4</td></tr><tr><td>C75 North Road / Prince Andrew Way, Carrickfergus.</td><td>4</td></tr><tr><td>B90 Middle Road / Woodburn Road, Carrickfergus.</td><td>5</td></tr><tr><td>A8 Harbour Highway / Pound Street, Larne.</td><td>8</td></tr><tr><td>C72 Old Glenarm Road / Greenland Road, Larne.</td><td>5</td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018016%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=335281","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=335281"}},{"id":"335280","reference":"AQW 18015/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-27","answerBy":"2021-05-13","answered":"2021-07-27","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 15711/17-22, whether she will bring proposals to the Executive to provide ongoing support grants to businesses, as they recover from the COVID-19 pandemic.","answerText":"The Department for the Economy (DfE) has led in the delivery of business related support, providing over £514 million of much needed funds to businesses and individuals throughout Northern Ireland.\n\nAll DfE business support schemes are now closed. It will be for the Executive collectively to determine how any Covid-related funding is allocated as we progress through the roadmap and the final lifting of restrictions.","answerHtml":"<p>The Department for the Economy (DfE) has led in the delivery of business related support, providing over £514 million of much needed funds to businesses and individuals throughout Northern Ireland.</p><p>All DfE business support schemes are now closed. It will be for the Executive collectively to determine how any Covid-related funding is allocated as we progress through the roadmap and the final lifting of restrictions.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018015%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=335280","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=335280"}},{"id":"335021","reference":"AQW 17931/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-26","answerBy":"2021-05-12","answered":"2021-05-10","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail the total amount spent on adapting Whiteabbey Hospital as a Covid Recovery facility; and how this investment will benefit the hospital site in the long term.","answerText":"£4,170,089 has been spent to date on the Whiteabbey Nightingale facilities. This has enabled the completion of works to provide a regional COVID-19 enhanced rehabilitation facility, to ease pressures on acute and ICU beds across the region. From late November 2020 to the end of March 2021, 145 patients were treated at the facility, with 1,654 acute bed days saved.\n\nAs the pressure from the current wave of COVID-19 eases, the Whiteabbey facility has now turned its focus to providing a regional rehabilitation service for non-COVID-19 patients, to help with efforts to rebuild.\n\nAt the same time, my Department and the Northern Health and Social Care Trust are exploring potential longer-term uses for the Whiteabbey Nightingale facility. While this work is at an early stage, the legacy usage will build upon the existing enhanced rehabilitation model, including the recruited staff, the facilities and the equipment available on site.\n\nIt is important to note, however, that we remain aware that COVID-19 is unpredictable and will likely remain with us, to a greater or lesser degree, for some time. That is why a key principle of the legacy work will be to ensure that the Nightingale facility retains the ability to refocus quickly again on COVID-19, should the need arise.","answerHtml":"<p>£4,170,089 has been spent to date on the Whiteabbey Nightingale facilities. This has enabled the completion of works to provide a regional COVID-19 enhanced rehabilitation facility, to ease pressures on acute and ICU beds across the region. From late November 2020 to the end of March 2021, 145 patients were treated at the facility, with 1,654 acute bed days saved.</p><p>As the pressure from the current wave of COVID-19 eases, the Whiteabbey facility has now turned its focus to providing a regional rehabilitation service for non-COVID-19 patients, to help with efforts to rebuild.</p><p>At the same time, my Department and the Northern Health and Social Care Trust are exploring potential longer-term uses for the Whiteabbey Nightingale facility. While this work is at an early stage, the legacy usage will build upon the existing enhanced rehabilitation model, including the recruited staff, the facilities and the equipment available on site.</p><p>It is important to note, however, that we remain aware that COVID-19 is unpredictable and will likely remain with us, to a greater or lesser degree, for some time. That is why a key principle of the legacy work will be to ensure that the Nightingale facility retains the ability to refocus quickly again on COVID-19, should the need arise.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017931%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=335021","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=335021"}},{"id":"335020","reference":"AQW 17930/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-26","answerBy":"2021-05-12","answered":"2021-10-25","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for (i) her assessment of the benefits of local brewery, distilliery, cidery and winery tap houses for Northern Ireland tourism growth and recovery; and (ii) what engagement she has had with the Minister for Communities in regards to liquor licensing legislation to promote these as part of the Northern Ireland food and drink tourism offer.","answerText":"I am aware Northern Ireland has a strong history of brewing, distilling and fermenting, and the renaissance in craft drink production is revitalising our rural communities and creating jobs across all regions of Northern Ireland.\n\nRecent investment demonstrates great confidence in this vitally important aspect of the visitor economy, which has a fundamental role in attracting visitors back to Northern Ireland by offering more reasons to stay longer and to spend more.\n\nThe Experience Development Programme 2020/21, an almost £5m capital grants programme launched by Tourism NI in 2020, is supporting tourism businesses to enhance the experience they offer to visitors.\n\nTourism NI has been working closely with the craft drinks sector to increase capacity, collaboration and communication amongst the distillery network, with a view to developing a distillery trail under the overarching brand of ‘Embrace a Giant Spirit’. This programme is designed to increase the regional spread of visitors to Northern Ireland and, having commenced in January 2021, brings together a collaborative network of eleven Northern Irish distilleries.\n\nThe Department for Communities Liquor Licensing (Amendment), which obtained Royal Assent on 26 August 2021, introduces a new category of premises for local alcohol producers. I believe these changes will enhance the visitor experience of Northern Ireland as a modern tourism destination, and support the competitiveness and growth of the tourism and hospitality sectors’ contribution to the local economy.","answerHtml":"<p>I am aware Northern Ireland has a strong history of brewing, distilling and fermenting, and the renaissance in craft drink production is revitalising our rural communities and creating jobs across all regions of Northern Ireland.</p><p>Recent investment demonstrates great confidence in this vitally important aspect of the visitor economy, which has a fundamental role in attracting visitors back to Northern Ireland by offering more reasons to stay longer and to spend more.</p><p>The Experience Development Programme 2020/21, an almost £5m capital grants programme launched by Tourism NI in 2020, is supporting tourism businesses to enhance the experience they offer to visitors.</p><p>Tourism NI has been working closely with the craft drinks sector to increase capacity, collaboration and communication amongst the distillery network, with a view to developing a distillery trail under the overarching brand of ‘Embrace a Giant Spirit’. This programme is designed to increase the regional spread of visitors to Northern Ireland and, having commenced in January 2021, brings together a collaborative network of eleven Northern Irish distilleries.</p><p>The Department for Communities Liquor Licensing (Amendment), which obtained Royal Assent on 26 August 2021, introduces a new category of premises for local alcohol producers. I believe these changes will enhance the visitor experience of Northern Ireland as a modern tourism destination, and support the competitiveness and growth of the tourism and hospitality sectors’ contribution to the local economy.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017930%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=335020","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=335020"}},{"id":"335019","reference":"AQW 17929/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-26","answerBy":"2021-05-12","answered":"2021-04-30","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail (i) when she last met with NUS-USI; and (ii) whether she will agree to meet the organisation in the near future.","answerText":"On 14 October 2020, I had a very productive meeting with representatives from NUS-USI, at which we discussed ways in which my Department could support students during the Covid 19 pandemic, as well as ensure that students’ voices are represented in discussions which concern them.\n\nI remain open to meeting with NUS-USI and other representatives of students, diary permitting. Students and their views are very important to me and my officials have been in regular contact with NUS-USI to discuss a broad range of further- and higher-education related matters, which is in addition to the significant volume of correspondence which I regularly receive on their behalf.","answerHtml":"<p>On 14 October 2020, I had a very productive meeting with representatives from NUS-USI, at which we discussed ways in which my Department could support students during the Covid 19 pandemic, as well as ensure that students’ voices are represented in discussions which concern them.</p><p>I remain open to meeting with NUS-USI and other representatives of students, diary permitting. Students and their views are very important to me and my officials have been in regular contact with NUS-USI to discuss a broad range of further- and higher-education related matters, which is in addition to the significant volume of correspondence which I regularly receive on their behalf.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017929%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=335019","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=335019"}},{"id":"335018","reference":"AQW 17928/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-26","answerBy":"2021-05-12","answered":"2021-04-30","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether extended trading hours has been considered to assist with the recovery of retail and reduce the potential for crowding.","answerText":"This is not for my Department to answer. This is for the Department for Communities.","answerHtml":"<p>This is not for my Department to answer. This is for the Department for Communities.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017928%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=335018","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=335018"}},{"id":"335017","reference":"AQW 17927/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-26","answerBy":"2021-05-12","answered":"2021-05-06","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, how she will ensure the potential for greater consumer protections will be considered as part of the expected review of the Caravan Act 2011.","answerText":"The Department for Communities (DfC) has advised that during this year, it intends to conduct a review of the Caravans Act (Northern Ireland) 2011.\n\nMy Department has responsibility for working with consumers and traders in relation to consumer rights and responsibilities and my officials will welcome the opportunity to effectively contribute to this review, when invited to do so by DfC.","answerHtml":"<p>The Department for Communities (DfC) has advised that during this year, it intends to conduct a review of the Caravans Act (Northern Ireland) 2011.</p><p>My Department has responsibility for working with consumers and traders in relation to consumer rights and responsibilities and my officials will welcome the opportunity to effectively contribute to this review, when invited to do so by DfC.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017927%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=335017","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=335017"}},{"id":"334713","reference":"AQW 17778/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-22","answerBy":"2021-05-10","answered":"2021-04-30","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 16923/17-22, for her assessment of (i) the need for energy governance reform; and (ii) whether the complexity identified could undermine the delivery of a zero carbon and sustainable energy future.","answerText":"In the Energy Strategy Policy Options Consultation which I launched last month, governance is one of six delivery priorities identified to progress energy decarbonisation.\n\nThe vision of the Energy Strategy is to achieve ‘net zero carbon and affordable energy’ by 2050. Building on the clear leadership and effective structures established to develop the Energy Strategy, a strong foundation exists to ensure the delivery of our decarbonised energy future is joined-up across different departments, levels of government and sectors.","answerHtml":"<p>In the Energy Strategy Policy Options Consultation which I launched last month, governance is one of six delivery priorities identified to progress energy decarbonisation.</p><p>The vision of the Energy Strategy is to achieve ‘net zero carbon and affordable energy’ by 2050. Building on the clear leadership and effective structures established to develop the Energy Strategy, a strong foundation exists to ensure the delivery of our decarbonised energy future is joined-up across different departments, levels of government and sectors.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017778%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=334713","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=334713"}},{"id":"334712","reference":"AQW 17777/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-22","answerBy":"2021-05-10","answered":"2021-04-27","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for a timeline for expanding apprenticeships to all ages, as outlined in the Economic Recovery Action Plan.","answerText":"I am committed to making apprenticeship opportunities at levels 2 and 3 available to more people and sectors by amending the current age-related criteria.\n\nMy Department continues to develop this proposal, including engaging with stakeholders across a range of sectors on implementation. I intend to bring forward proposals to make sure this commitment is delivered this year as age should not be a barrier to lifelong learning.","answerHtml":"<p>I am committed to making apprenticeship opportunities at levels 2 and 3 available to more people and sectors by amending the current age-related criteria.</p><p>My Department continues to develop this proposal, including engaging with stakeholders across a range of sectors on implementation. I intend to bring forward proposals to make sure this commitment is delivered this year as age should not be a barrier to lifelong learning.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017777%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=334712","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=334712"}},{"id":"334711","reference":"AQW 17776/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-22","answerBy":"2021-05-10","answered":"2021-04-30","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure for her assessment of the level of electric vehicle adoption in Northern Ireland, in comparison to other parts of Europe.","answerText":"There is no readily available comparable data for Northern Ireland and other parts of Europe in terms of the level of electric vehicle adoption. The latest statistics from DVLA/DfT show that the number of ultra-low emission vehicles (ULEVs) registered for the first time in Northern Ireland has increased each year to 2020.\n\nThe most recent Department for Transport (DfT) data indicates that there are 4,186 electric vehicles currently registered at 30 September 2021 in Northern Ireland. In the first nine months of 2020, 1052 Ultra Low Emission Vehicles (ULEVs) were registered in NI, an 82% increase for the whole of the previous year. This demonstrates a significant increase in uptake and is an encouraging sign as we make the transition to 2030 when the ban on the sale of new petrol and diesel vehicles will be introduced.\n\nI remain committed to working in partnership with Executive colleagues and others across our islands to help deliver a change in the way we travel that also helps us to tackle the climate crisis.","answerHtml":"<p>There is no readily available comparable data for Northern Ireland and other parts of Europe in terms of the level of electric vehicle adoption. The latest statistics from DVLA/DfT show that the number of ultra-low emission vehicles (ULEVs) registered for the first time in Northern Ireland has increased each year to 2020.</p><p>The most recent Department for Transport (DfT) data indicates that there are 4,186 electric vehicles currently registered at 30 September 2021 in Northern Ireland. In the first nine months of 2020, 1052 Ultra Low Emission Vehicles (ULEVs) were registered in NI, an 82% increase for the whole of the previous year. This demonstrates a significant increase in uptake and is an encouraging sign as we make the transition to 2030 when the ban on the sale of new petrol and diesel vehicles will be introduced.</p><p>I remain committed to working in partnership with Executive colleagues and others across our islands to help deliver a change in the way we travel that also helps us to tackle the climate crisis.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017776%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=334711","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=334711"}},{"id":"334710","reference":"AQW 17775/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-22","answerBy":"2021-05-10","answered":"2021-04-30","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure whether the current electric vehicle (EV) infrastructure is adequate; and for her assessment of whether Northern Ireland has the potential to lag in EV adoption compared to other European regions, due to the availability of charging facilities.","answerText":"The most recent Department for Transport (DfT) data available indicates that there were 4,186 electric vehicles registered at 30 September 2020 in Northern Ireland. The EV public charge point network is owned by the Electricity Supply Board (ESB) and is operated on a commercial basis. There are currently 320 22kWh (Fast) charge points at 160 locations and a further 17 50kWh DC (Rapid) public charge points in the North.\n\nESB recently confirmed that it plans to replace approx. 60 charge points i.e. 30 charge posts and a further 5 Rapid charge points to upgrade and improve the reliability of the existing public network. I recently met with ESB to discuss what is required in order to ensure the current network is reliable and remains fit for purpose. Whilst the market is open to other commercial operators who would wish to provide charging infrastructure, to date, ESB is the only public network provider in the North. It is anticipated, however, that where possible the majority of EV charging should be carried out at home with the use of a home charge point.\n\nI fully recognise the importance of having modern, reliable public electric vehicle charging infrastructure in providing confidence for users of ultra-low emission vehicles (ULEVs) and in respect of the connectivity improvements this would bring. My Department is, therefore, taking a number of actions in respect of the charge point infrastructure, including:\n\nintroducing changes to the planning system, through permitted development rights, to make it easier to expand the charging infrastructure for electric vehicles which came into operation on 21 December 2020;\n\ncontributing circa. £450,000 of match funding towards the EU INTERREG VA Funded FASTER electric vehicle network project to install a total of 73 EV Rapid charging points across the island of Ireland and the West of Scotland by 31 March 2023; and\n\nengaging with the Office for Zero Emission Vehicles (OZEV) and the Energy Saving Trust (EST), who administer the On-street Residential Charge Point Scheme (ORCS), to provide charge points for residents without off-street parking, and to ensure the scheme can be accessed by councils in the North.\n\nMy Department has also been leading a Transport Working Group, set up to inform the transport elements of the Department for the Economy’s Energy Strategy currently under development and consultation. A number of key areas have been identified for consideration including the electrification of transport and the charging infrastructure required to support the uptake of electric vehicles. As part of this work, my Department has commissioned research to consider future demand for charge points in Northern Ireland.\n\nFollowing the British Government’s announcement that it is bringing forward its plans to ban sales of new diesel and petrol vehicles in the UK to 2030, I have also written to British Ministers to seek clarity on what funding will be provided to support the North in delivering greener, cleaner transport.\n\nI remain committed to working in partnership with Executive colleagues and others across our islands to help deliver a change in the way we travel that also helps us to tackle the climate crisis.","answerHtml":"<p>The most recent Department for Transport (DfT) data available indicates that there were 4,186 electric vehicles registered at 30 September 2020 in Northern Ireland. The EV public charge point network is owned by the Electricity Supply Board (ESB) and is operated on a commercial basis. There are currently 320 22kWh (Fast) charge points at 160 locations and a further 17 50kWh DC (Rapid) public charge points in the North.</p><p>ESB recently confirmed that it plans to replace approx. 60 charge points i.e. 30 charge posts and a further 5 Rapid charge points to upgrade and improve the reliability of the existing public network. I recently met with ESB to discuss what is required in order to ensure the current network is reliable and remains fit for purpose. Whilst the market is open to other commercial operators who would wish to provide charging infrastructure, to date, ESB is the only public network provider in the North. It is anticipated, however, that where possible the majority of EV charging should be carried out at home with the use of a home charge point.</p><p>I fully recognise the importance of having modern, reliable public electric vehicle charging infrastructure in providing confidence for users of ultra-low emission vehicles (ULEVs) and in respect of the connectivity improvements this would bring. My Department is, therefore, taking a number of actions in respect of the charge point infrastructure, including:</p><p>introducing changes to the planning system, through permitted development rights, to make it easier to expand the charging infrastructure for electric vehicles which came into operation on 21 December 2020;</p><p>contributing circa. £450,000 of match funding towards the EU INTERREG VA Funded FASTER electric vehicle network project to install a total of 73 EV Rapid charging points across the island of Ireland and the West of Scotland by 31 March 2023; and</p><p>engaging with the Office for Zero Emission Vehicles (OZEV) and the Energy Saving Trust (EST), who administer the On-street Residential Charge Point Scheme (ORCS), to provide charge points for residents without off-street parking, and to ensure the scheme can be accessed by councils in the North.</p><p>My Department has also been leading a Transport Working Group, set up to inform the transport elements of the Department for the Economy’s Energy Strategy currently under development and consultation. A number of key areas have been identified for consideration including the electrification of transport and the charging infrastructure required to support the uptake of electric vehicles. As part of this work, my Department has commissioned research to consider future demand for charge points in Northern Ireland.</p><p>Following the British Government’s announcement that it is bringing forward its plans to ban sales of new diesel and petrol vehicles in the UK to 2030, I have also written to British Ministers to seek clarity on what funding will be provided to support the North in delivering greener, cleaner transport.</p><p>I remain committed to working in partnership with Executive colleagues and others across our islands to help deliver a change in the way we travel that also helps us to tackle the climate crisis.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017775%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=334710","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=334710"}},{"id":"334709","reference":"AQW 17774/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-22","answerBy":"2021-05-10","answered":"2021-05-07","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure whether she will consider free or reduced cost parking to incentivise the purchase of electric vehicles.","answerText":"I fully recognise the importance of having modern, reliable public electric vehicle charging infrastructure in providing confidence for users of ultra-low emission vehicles (ULEVs) and in respect of the connectivity improvements this would bring. My Department is, therefore, taking a number of actions in respect of the charge point infrastructure, including:\n\nintroducing changes to the planning system, through permitted development rights which came into operation on 21 December 2020, to make it easier to expand the charging infrastructure for electric vehicles;\n\ncontributing circa. £450,000 of match funding towards the EU INTERREG VA Funded FASTER electric vehicle network project to install a total of 73 EV Rapid charging points across the island of Ireland and the West of Scotland by 31 March 2023; and\n\nengaging with the Office for Zero Emission Vehicles (OZEV) and the Energy Saving Trust (EST), who administer the On-street Residential Charge Point Scheme (ORCS), to provide charge points for residents without off-street parking, and to ensure the scheme can be accessed by councils in the North.\n\nESB recently confirmed that it plans to replace approx. 60 charge points i.e. 30 charge posts and a further 5 Rapid charge points to upgrade and improve the reliability of the existing public network. I recently met with ESB to discuss what is required in order to ensure the current network is reliable and remains fit for purpose. Whilst the market is open to other commercial operators who would wish to provide charging infrastructure, to date, ESB is the only public network provider in the North. It is anticipated, however, that where possible the majority of EV charging should be carried out at home with the use of a home charge point. My officials are also considering the future requirements in terms of public charge point infrastructure and will continue to liaise with ESB to consider any specific requests to ensure the public network can meet the needs of EV owners now and in future. ESB currently does not charge e-car drivers for the use of its public charge points in Northern Ireland.\n\nMy Department has also been leading a Transport Working Group, set up to inform the transport elements of the Department for the Economy’s Energy Strategy currently under development and consultation. A number of key areas have been identified for consideration including the electrification of transport and the charging infrastructure required to support the uptake of electric vehicles. As part of this work, my Department has commissioned research to consider future demand for charge points in Northern Ireland.\n\nFollowing the British Government’s announcement that it is bringing forward its plans to ban sales of new diesel and petrol vehicles in the UK to 2030, I have also written to British Ministers to seek clarity on what funding will be provided to support the North in delivering greener, cleaner transport.\n\nElectric vehicles will play an important part in decarbonising transport and a number of other incentives are also in place to encourage the uptake of EVs. The Office for Zero Emission Vehicles (OZEV) provides funding to support the early market for ultra-low emission vehicles (ULEVs) in Great Britain and Northern Ireland including grants for plug-in cars, vans, taxis and motorcycles in addition to grants for home and workplace charging infrastructure.\n\nAction to decarbonise transport, improve air quality and reduce congestion, will also require prioritising measures that reduce vehicle kilometres and encourage walking, cycling and public transport as primary modes of travel in our towns and cities. In addition, by reducing the space allocated to vehicles in town centres, we can create cleaner, greener places that are more attractive for people. Therefore, provision of free or reduced cost parking, whether for electric vehicles or otherwise, is not currently being considered.\n\nI remain committed to working in partnership with Executive colleagues and others across our islands to help deliver a change in the way we travel that also helps us to tackle the climate crisis.","answerHtml":"<p>I fully recognise the importance of having modern, reliable public electric vehicle charging infrastructure in providing confidence for users of ultra-low emission vehicles (ULEVs) and in respect of the connectivity improvements this would bring. My Department is, therefore, taking a number of actions in respect of the charge point infrastructure, including:</p><p>introducing changes to the planning system, through permitted development rights which came into operation on 21 December 2020, to make it easier to expand the charging infrastructure for electric vehicles;</p><p>contributing circa. £450,000 of match funding towards the EU INTERREG VA Funded FASTER electric vehicle network project to install a total of 73 EV Rapid charging points across the island of Ireland and the West of Scotland by 31 March 2023; and</p><p>engaging with the Office for Zero Emission Vehicles (OZEV) and the Energy Saving Trust (EST), who administer the On-street Residential Charge Point Scheme (ORCS), to provide charge points for residents without off-street parking, and to ensure the scheme can be accessed by councils in the North.</p><p>ESB recently confirmed that it plans to replace approx. 60 charge points i.e. 30 charge posts and a further 5 Rapid charge points to upgrade and improve the reliability of the existing public network. I recently met with ESB to discuss what is required in order to ensure the current network is reliable and remains fit for purpose. Whilst the market is open to other commercial operators who would wish to provide charging infrastructure, to date, ESB is the only public network provider in the North. It is anticipated, however, that where possible the majority of EV charging should be carried out at home with the use of a home charge point. My officials are also considering the future requirements in terms of public charge point infrastructure and will continue to liaise with ESB to consider any specific requests to ensure the public network can meet the needs of EV owners now and in future. ESB currently does not charge e-car drivers for the use of its public charge points in Northern Ireland.</p><p>My Department has also been leading a Transport Working Group, set up to inform the transport elements of the Department for the Economy’s Energy Strategy currently under development and consultation. A number of key areas have been identified for consideration including the electrification of transport and the charging infrastructure required to support the uptake of electric vehicles. As part of this work, my Department has commissioned research to consider future demand for charge points in Northern Ireland.</p><p>Following the British Government’s announcement that it is bringing forward its plans to ban sales of new diesel and petrol vehicles in the UK to 2030, I have also written to British Ministers to seek clarity on what funding will be provided to support the North in delivering greener, cleaner transport.</p><p>Electric vehicles will play an important part in decarbonising transport and a number of other incentives are also in place to encourage the uptake of EVs. The Office for Zero Emission Vehicles (OZEV) provides funding to support the early market for ultra-low emission vehicles (ULEVs) in Great Britain and Northern Ireland including grants for plug-in cars, vans, taxis and motorcycles in addition to grants for home and workplace charging infrastructure.</p><p>Action to decarbonise transport, improve air quality and reduce congestion, will also require prioritising measures that reduce vehicle kilometres and encourage walking, cycling and public transport as primary modes of travel in our towns and cities. In addition, by reducing the space allocated to vehicles in town centres, we can create cleaner, greener places that are more attractive for people. Therefore, provision of free or reduced cost parking, whether for electric vehicles or otherwise, is not currently being considered.</p><p>I remain committed to working in partnership with Executive colleagues and others across our islands to help deliver a change in the way we travel that also helps us to tackle the climate crisis.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017774%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=334709","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=334709"}},{"id":"334792","reference":"AQO 1983/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-04-22","answerBy":"2021-05-04","answered":"2021-05-04","answeredOrally":true,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs to outline what engagement he has had with the UK Government on a veterinary agreement between the United Kingdom and the European Union.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr Poots","text":"Under the terms of the withdrawal agreement, the Northern Ireland protocol and domestic legislation, Northern Ireland must continue to align with the European Union’s sanitary and phytosanitary (SPS) rules. I am firmly opposed to the detrimental impact of these newly mandated rules on Northern Ireland businesses and consumers, and to the barriers that they place on the intra-UK movement of animals, goods and products from Great Britain to Northern Ireland. As such, I believe that we must get to a position in which we minimise the impact of these checks and then remove them entirely Discussions are ongoing between the UK Government and the EU Commission, via the UK-EU Joint Committee, with the aim of finding what I hope will be viable solutions to a range of issues related to the Northern Ireland protocol, including SPS checks. The establishment of a common SPS area, under the terms of a potential UK-EU veterinary agreement, could assist in facilitating trade in live animals and agri-food products, which would be helpful. However, as it would not address the entirety of the rules associated with the implementation of the protocol, it cannot properly address the issue. I have engaged and will continue to engage with my ministerial colleagues to explore all available options that could help to remove the protocol and its impact on Northern Ireland-GB trade. Nevertheless, responsibility on the future alignment of the UK within the EU SPS rules and the negotiation of any UK-EU veterinary agreement rests solely with the UK Government."},{"speaker":"Mr Dickson","text":"Minister, your answer sounds as though you are engaged in doing practical things to deal with the protocol. I congratulate you on that and encourage you to continue down that route rather than trying to oppose the protocol."},{"speaker":"Mr Poots","text":"The Member welcomes doing things that reduce the impact of the protocol. I also welcome those things. We do things that help, for example, potatoes or other materials to come into Northern Ireland, but many other things are negatively impacted. Ultimately, we need to deal with the underlying problem: the protocol. Northern Ireland does not pose a threat to the European Union single market. Consequently, goods that enter Northern Ireland from Great Britain — all part of the United Kingdom single market — should not be checked because they do not pose a threat to the single market. This is a political decision, taken at the behest of the Irish Government, but it is damaging Irish people living in Northern Ireland. They need to pull back from that decision and ensure that Northern Ireland is treated fairly and equitably within the United Kingdom."},{"speaker":"Mr Speaker","text":"That ends the period for listed questions. We will now move to 15 minutes of topical questions."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201983%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=334792","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2021-05-04&docID=335376#AQO%201983/17-22","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=334792"}},{"id":"334581","reference":"AQW 17685/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-21","answerBy":"2021-05-07","answered":"2021-04-30","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail the number of Covid Restrictions Business Support Scheme appeals (i) submitted; and (ii) that have been successful.","answerText":"The Covid Restrictions Business Support Scheme (Part A & B) has received a total of 8,415 applications. From this 251 have progressed to appeal as at 26 April 2021 – a breakdown is provided in the table below.\n\nInvest NI considers each appeal on its individual merit and endeavours to resolve each in a timely manner. Most appeals relate to eligibility as per the Scheme Guidance, insufficient evidence supplied with original application, late applications, and grant amount awarded.\n\nScheme\tAppeals Received\tAppeals Rejected\tAppeals Accepted\tAppeals Ongoing\nCRBSS Part A\t79\t39\t34\t6\nCRBSS Part B\t172\t53\t80\t39","answerHtml":"<p>The Covid Restrictions Business Support Scheme (Part A &amp; B) has received a total of 8,415 applications. From this 251 have progressed to appeal as at 26 April 2021 – a breakdown is provided in the table below.</p><p>Invest NI considers each appeal on its individual merit and endeavours to resolve each in a timely manner. Most appeals relate to eligibility as per the Scheme Guidance, insufficient evidence supplied with original application, late applications, and grant amount awarded.</p><div class=\"table-wrap\"><table><tr><td>Scheme</td><td>Appeals Received</td><td>Appeals Rejected</td><td>Appeals Accepted</td><td>Appeals Ongoing</td></tr><tr><td>CRBSS Part A</td><td>79</td><td>39</td><td>34</td><td>6</td></tr><tr><td>CRBSS Part B</td><td>172</td><td>53</td><td>80</td><td>39</td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017685%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=334581","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=334581"}},{"id":"334580","reference":"AQW 17684/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-21","answerBy":"2021-05-07","answered":"2021-05-05","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 17283/17-22, (i) for her assessment of the benefits of the Erasmus Programme; and (ii) whether she will explore ways to assist with, and promote, the continued participation in the programme of students at Northern Ireland universities.","answerText":"I fully recognise the wide ranging benefits that individuals and institutions/organisations from Northern Ireland can secure from participation in international mobility programmes, including schemes which the Department administers and/or provides funding for such as Study USA, the International Development Fund, IAESTE (The International Association for the Exchange of Students for Technical Experience) and UKIERI (UK-India Education and Research Initiative), as well as the recently launched UK Turing Scheme and the Erasmus+ programme.\n\nIn terms of the Irish Government’s proposals for Erasmus+ to which your question refers, these proposals are being taken forward by the Irish Government and our local universities. I expect the universities to actively promote all international mobility programmes that their students might best benefit from.","answerHtml":"<p>I fully recognise the wide ranging benefits that individuals and institutions/organisations from Northern Ireland can secure from participation in international mobility programmes, including schemes which the Department administers and/or provides funding for such as Study USA, the International Development Fund, IAESTE (The International Association for the Exchange of Students for Technical Experience) and UKIERI (UK-India Education and Research Initiative), as well as the recently launched UK Turing Scheme and the Erasmus+ programme.</p><p>In terms of the Irish Government’s proposals for Erasmus+ to which your question refers, these proposals are being taken forward by the Irish Government and our local universities. I expect the universities to actively promote all international mobility programmes that their students might best benefit from.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017684%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=334580","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=334580"}},{"id":"334579","reference":"AQW 17683/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-21","answerBy":"2021-05-07","answered":"2021-04-30","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail the total number of applications to the Covid Restrictions Business Support Scheme (i) received; (ii) approved; (iii) rejected; and (iv) still being, or awaiting to be, processed.","answerText":"Information in relation to the number of businesses that have applied to the Covid Restrictions Business Support Scheme and received payment can be accessed online via the following webpages:\n\nPart A: https://www.nibusinessinfo.co.uk/content/covid-restrictions-business-support-scheme-part\n\nPart B: https://www.nibusinessinfo.co.uk/content/covid-restrictions-business-support-scheme-part-b\n\nThe information details the number of applications to date based by status (submitted/processed/rejected/paid) and provides a breakdown about the operation of the scheme by District Council area and Parliamentary Constituency. The data is updated on a weekly basis.","answerHtml":"<p>Information in relation to the number of businesses that have applied to the Covid Restrictions Business Support Scheme and received payment can be accessed online via the following webpages:</p><p>Part A: https://www.nibusinessinfo.co.uk/content/covid-restrictions-business-support-scheme-part</p><p>Part B: https://www.nibusinessinfo.co.uk/content/covid-restrictions-business-support-scheme-part-b</p><p>The information details the number of applications to date based by status (submitted/processed/rejected/paid) and provides a breakdown about the operation of the scheme by District Council area and Parliamentary Constituency. The data is updated on a weekly basis.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017683%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=334579","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=334579"}},{"id":"334434","reference":"AQW 17616/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-20","answerBy":"2021-04-28","answered":"2021-04-27","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on the High Street Voucher Scheme and Holiday at Home Scheme, including any plans on how the schemes will be administered.","answerText":"The High Street Stimulus and the Holiday at Home Schemes are key components of the Department’s Economic Recovery Action Plan to boost demand in our struggling towns, city centres and tourism sector.\n\nThe schemes will be launched at a time when it is safe and appropriate to stimulate demand and encourage the public to shop on the high street and use local tourism providers.\n\nThe High Street Stimulus Scheme will provide eligible members of the public with a pre-paid card which can be used at ‘bricks and mortar’ businesses including local retail and hospitality sector outlets.\n\nThe Holiday at Home Voucher Scheme will allow NI households to claim back 50% off a stay of two nights or more in NI certified accommodation, up to the value of £100. Vouchers will also be issued, offering 50% off visits to attractions or tourism experience providers, up to the value of £20. Vouchers will be allocated on a first come first served basis and each household can apply for one of each type of voucher. Households can then claim their voucher money back by uploading their receipt and voucher details online.\n\nMedia campaigns for both schemes will be launched in due course to encourage members of the public to register for pre-paid cards and vouchers online.","answerHtml":"<p>The High Street Stimulus and the Holiday at Home Schemes are key components of the Department’s Economic Recovery Action Plan to boost demand in our struggling towns, city centres and tourism sector.</p><p>The schemes will be launched at a time when it is safe and appropriate to stimulate demand and encourage the public to shop on the high street and use local tourism providers.</p><p>The High Street Stimulus Scheme will provide eligible members of the public with a pre-paid card which can be used at ‘bricks and mortar’ businesses including local retail and hospitality sector outlets.</p><p>The Holiday at Home Voucher Scheme will allow NI households to claim back 50% off a stay of two nights or more in NI certified accommodation, up to the value of £100. Vouchers will also be issued, offering 50% off visits to attractions or tourism experience providers, up to the value of £20. Vouchers will be allocated on a first come first served basis and each household can apply for one of each type of voucher. Households can then claim their voucher money back by uploading their receipt and voucher details online.</p><p>Media campaigns for both schemes will be launched in due course to encourage members of the public to register for pre-paid cards and vouchers online.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017616%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=334434","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=334434"}},{"id":"334433","reference":"AQW 17615/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-20","answerBy":"2021-05-06","answered":"2021-06-02","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs pursuant to AQW 16509/17-22, to detail (i) the total number of trees planted; and (ii) the number of trees reported to have died.","answerText":"Your further queries, pursuant to AQW 16509/17-22, relating to the number of trees in situ at the area of Woodburn Forest, previously used as a drill site, are detailed as follows:\n\nThe site was replanted with 2,900 trees.\n\nAn assessment of the number of trees on the site in March 2021, indicates that 2,250 trees are present and growing successfully. The remaining 650 trees are missing and scheduled for replacement in spring 2022.","answerHtml":"<p>Your further queries, pursuant to AQW 16509/17-22, relating to the number of trees in situ at the area of Woodburn Forest, previously used as a drill site, are detailed as follows:</p><p>The site was replanted with 2,900 trees.</p><p>An assessment of the number of trees on the site in March 2021, indicates that 2,250 trees are present and growing successfully. The remaining 650 trees are missing and scheduled for replacement in spring 2022.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017615%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=334433","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=334433"}},{"id":"334432","reference":"AQW 17614/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-20","answerBy":"2021-05-06","answered":"2021-04-29","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will bring forward legislation to ban the practice of fire and rehire in Northern Ireland.","answerText":"As Minister with responsibility for employment, I remain active in protecting those immediately affected by the pandemic.\n\nIn this regard, I have already introduced legislation to:\n\nensure that statutory entitlements connected with redundancy or the termination of employment are based on normal pay, rather than furlough pay;\n\nallow workers who were unable to take holiday leave as a result of the Covid-19 outbreak to carry over their annual leave into the next two leave years; and\n\nextend protections against detriment to all workers in relation to any action they may take to protect themselves or others where they reasonably believe there is serious and imminent danger. Currently this health and safety protection is afforded only to employees.\n\nI am also pleased to have been able to make progress towards the introduction of Parental Bereavement Leave and Pay in NI, an important new employment right for those parents in work who suffer the loss of a child. This will be the only piece of employment related primary legislation I will have time to introduce during this mandate.\n\nNonetheless, I would caution any employer considering giving notice and offering a new contract with revised terms - effectively ‘firing and rehiring’ the employee. There are still statutory processes to follow. The employer must follow a statutory minimum dismissal procedure. They may have to follow a collective redundancy consultation process if a group of employees is involved.\n\nI would encourage all employers considering changing terms and conditions of employment for staff to consult their staff or their representatives to explain the reasons for their plan and to listen to alternative ideas.\n\nAny employees who believe they have been unfairly dismissed from the original contract may be able to complain to an Industrial Tribunal providing they have at least one year's continuous service with their employer. Employees may also be able to claim redundancy if they have at least two years’ service.\n\nAnyone who finds themselves in this position may wish to consider contacting the Labour Relations Agency - Workplace Information Service on 03300 555 300 for confidential and impartial information.\n\nIn addition, the Law Centre NI provides free, independent, specialist legal advice (subject to capacity) on employment rights. The Law Centre can be contacted on their advice line on 028 9024 4401 or by email: employmentadvice@lawcentreni.org.\n\nFurther information may be found at\n\nhttps://www.nidirect.gov.uk/articles/changes-employment-conditions","answerHtml":"<p>As Minister with responsibility for employment, I remain active in protecting those immediately affected by the pandemic.</p><p>In this regard, I have already introduced legislation to:</p><p>ensure that statutory entitlements connected with redundancy or the termination of employment are based on normal pay, rather than furlough pay;</p><p>allow workers who were unable to take holiday leave as a result of the Covid-19 outbreak to carry over their annual leave into the next two leave years; and</p><p>extend protections against detriment to all workers in relation to any action they may take to protect themselves or others where they reasonably believe there is serious and imminent danger. Currently this health and safety protection is afforded only to employees.</p><p>I am also pleased to have been able to make progress towards the introduction of Parental Bereavement Leave and Pay in NI, an important new employment right for those parents in work who suffer the loss of a child. This will be the only piece of employment related primary legislation I will have time to introduce during this mandate.</p><p>Nonetheless, I would caution any employer considering giving notice and offering a new contract with revised terms - effectively ‘firing and rehiring’ the employee. There are still statutory processes to follow. The employer must follow a statutory minimum dismissal procedure. They may have to follow a collective redundancy consultation process if a group of employees is involved.</p><p>I would encourage all employers considering changing terms and conditions of employment for staff to consult their staff or their representatives to explain the reasons for their plan and to listen to alternative ideas.</p><p>Any employees who believe they have been unfairly dismissed from the original contract may be able to complain to an Industrial Tribunal providing they have at least one year&#39;s continuous service with their employer. Employees may also be able to claim redundancy if they have at least two years’ service.</p><p>Anyone who finds themselves in this position may wish to consider contacting the Labour Relations Agency - Workplace Information Service on 03300 555 300 for confidential and impartial information.</p><p>In addition, the Law Centre NI provides free, independent, specialist legal advice (subject to capacity) on employment rights. The Law Centre can be contacted on their advice line on 028 9024 4401 or by email: employmentadvice@lawcentreni.org.</p><p>Further information may be found at</p><p>https://www.nidirect.gov.uk/articles/changes-employment-conditions</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017614%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=334432","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=334432"}},{"id":"334172","reference":"AQW 17472/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-16","answerBy":"2021-04-26","answered":"2021-06-08","answeredOrally":false,"priority":true,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health whether he is considering the establishment of Rapid Diagnostic Centres, similar to those being rolled out as part of the NHS Long Term Plan in England.","answerText":"Rapid Diagnostic Centres have been considered as part of work on the forthcoming Cancer Strategy. There is a high level of clinical support for the development of Rapid Diagnostic Centres as a means of increasing diagnostic capacity. Implementation of Rapid Diagnostic Centres will require additional investment in the staff and infrastructure required to deliver them.","answerHtml":"<p>Rapid Diagnostic Centres have been considered as part of work on the forthcoming Cancer Strategy. There is a high level of clinical support for the development of Rapid Diagnostic Centres as a means of increasing diagnostic capacity. Implementation of Rapid Diagnostic Centres will require additional investment in the staff and infrastructure required to deliver them.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017472%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=334172","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=334172"}},{"id":"334171","reference":"AQW 17471/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-16","answerBy":"2021-05-04","answered":"2021-05-13","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail the arrangements for the resumption of wedding receptions.","answerText":"The number permitted to attend weddings and civil partnerships is to be informed by a risk assessment for the venue.\n\nFace coverings must be worn by all unless exempt, other than those in the marriage party.\n\nReceptions or post ceremony gatherings are not permitted at present. An indicative date of 24 May has been set for the resumption of post ceremony receptions or functions (with numbers to be informed by a risk assessment for the venue). This will be subject to review.\n\nCustomers can view the facilities of venues used for marriages and civil partnerships, such as hotels and other venues, restricted to a maximum of four customers per visit.\n\nFurther guidance is available on NI Direct at the following link: https://www.nidirect.gov.uk/articles/coronavirus-covid-19-weddings-and-civil-partnerships","answerHtml":"<p>The number permitted to attend weddings and civil partnerships is to be informed by a risk assessment for the venue.</p><p>Face coverings must be worn by all unless exempt, other than those in the marriage party.</p><p>Receptions or post ceremony gatherings are not permitted at present. An indicative date of 24 May has been set for the resumption of post ceremony receptions or functions (with numbers to be informed by a risk assessment for the venue). This will be subject to review.</p><p>Customers can view the facilities of venues used for marriages and civil partnerships, such as hotels and other venues, restricted to a maximum of four customers per visit.</p><p>Further guidance is available on NI Direct at the following link: https://www.nidirect.gov.uk/articles/coronavirus-covid-19-weddings-and-civil-partnerships</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017471%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=334171","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=334171"}},{"id":"334170","reference":"AQW 17470/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-16","answerBy":"2021-05-04","answered":"2021-05-25","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister whether self-contained touring caravans and motorhomes are included in the recent COVID-19 restriction easing plans for self-contained accommodation.","answerText":"A review of the current restrictions took place on 15 April and package of relaxations were announced.\n\nFrom 30 April, overnight stays are permitted in self-contained tourism accommodation (such as self-catering houses, caravans and motor homes). This includes any accommodation which does not require guests to share washing facilities, toilets or kitchens.\n\nGuests can only share holiday accommodation with the people they live with in their household, and people in their bubble.\n\nInformation on the current COVID-19 Regulations and what they mean can be found on NI Direct at: https://www.nidirect.gov.uk/articles/coronavirus-covid-19-regulations-guidance-what-restrictions-mean-you","answerHtml":"<p>A review of the current restrictions took place on 15 April and package of relaxations were announced.</p><p>From 30 April, overnight stays are permitted in self-contained tourism accommodation (such as self-catering houses, caravans and motor homes). This includes any accommodation which does not require guests to share washing facilities, toilets or kitchens.</p><p>Guests can only share holiday accommodation with the people they live with in their household, and people in their bubble.</p><p>Information on the current COVID-19 Regulations and what they mean can be found on NI Direct at: https://www.nidirect.gov.uk/articles/coronavirus-covid-19-regulations-guidance-what-restrictions-mean-you</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017470%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=334170","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=334170"}},{"id":"334169","reference":"AQW 17469/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-16","answerBy":"2021-05-04","answered":"2021-05-04","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health for an update on developing a Cancer Strategy for Northern Ireland.","answerText":"Delivery of the Cancer Strategy was delayed for a short period due to the redeployment of staff in response to the global pandemic. However, work has resumed fully on this programme of work and I expect that it will be available for external consultation through the summer of 2021.\n\nUnder the Cancer Strategy remit, my Department with support from the Health and Social Care Board, has prepared a draft COVID-19 recovery plan ‘Building Back; Rebuilding Better’. The plan is fully aligned with the cancer strategy and targets and addresses cancer services impacted by the pandemic and will focus on a 3 year period until March 2024. The plan identifies and seeks to implement a range of actions to support and recover these services over a 3 year timeframe. There are significant costs associated with the plan and delivery will be subject to receiving the required level of investment.","answerHtml":"<p>Delivery of the Cancer Strategy was delayed for a short period due to the redeployment of staff in response to the global pandemic. However, work has resumed fully on this programme of work and I expect that it will be available for external consultation through the summer of 2021.</p><p>Under the Cancer Strategy remit, my Department with support from the Health and Social Care Board, has prepared a draft COVID-19 recovery plan ‘Building Back; Rebuilding Better’. The plan is fully aligned with the cancer strategy and targets and addresses cancer services impacted by the pandemic and will focus on a 3 year period until March 2024. The plan identifies and seeks to implement a range of actions to support and recover these services over a 3 year timeframe. There are significant costs associated with the plan and delivery will be subject to receiving the required level of investment.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017469%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=334169","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=334169"}},{"id":"334168","reference":"AQW 17468/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-16","answerBy":"2021-05-04","answered":"2021-05-20","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health (i) to detail the current restrictions on travel within the Common Travel Area; and (ii) what consideration has been given to easing these restrictions.","answerText":"People should not travel in or out of Northern Ireland except where it is essential to do so.\n\nIf you are arriving into Northern Ireland from within the Common Travel Area and you plan to remain here for at least 24 hours, public health advice is that you should self-isolate upon arrival for 10 days, unless you are exempt.\n\nSome people travelling within the Common Travel Area may be exempt from self-isolation due to the job they do. Information on sector specific exemptions is available at:\n\nhttps://www.nidirect.gov.uk/articles/coronavirus-covid-19-travel-within-common-travel-area-sector-exemptions\n\nAn indicative date of 24 May has been set to allow individuals to travel within the Common Travel Area to visit family and friends.\n\nThis means you will not have to self-isolate for 10 days if you are arriving into Northern Ireland from within the Common Travel Area to visit family or friends, however the public health advice is to take a pre-departure Lateral Flow Device (LFD) test, and then a LFD test on day 2 and day 8 post arrival in NI.","answerHtml":"<p>People should not travel in or out of Northern Ireland except where it is essential to do so.</p><p>If you are arriving into Northern Ireland from within the Common Travel Area and you plan to remain here for at least 24 hours, public health advice is that you should self-isolate upon arrival for 10 days, unless you are exempt.</p><p>Some people travelling within the Common Travel Area may be exempt from self-isolation due to the job they do. Information on sector specific exemptions is available at:</p><p>https://www.nidirect.gov.uk/articles/coronavirus-covid-19-travel-within-common-travel-area-sector-exemptions</p><p>An indicative date of 24 May has been set to allow individuals to travel within the Common Travel Area to visit family and friends.</p><p>This means you will not have to self-isolate for 10 days if you are arriving into Northern Ireland from within the Common Travel Area to visit family or friends, however the public health advice is to take a pre-departure Lateral Flow Device (LFD) test, and then a LFD test on day 2 and day 8 post arrival in NI.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017468%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=334168","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=334168"}},{"id":"333760","reference":"AQW 17285/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-14","answerBy":"2021-04-29","answered":"2021-05-05","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what engagement her Department is having with further and higher education Institutions in relation to preparing for the resumption of increased in-person learning.","answerText":"The Department has engaged regularly and comprehensively with the Further Education (FE) sector throughout the course of the pandemic.\n\nIn June 2020 my Department established an Advisory and Oversight Group (AOG) to work collaboratively with the FE Sector to prepare for the safe resumption of on-site educational delivery. This group includes representatives from the Department for the Economy (DfE), each of the six FE colleges and Trade Unions, Non Statutory Contractors (NSCs) and advisors including the Department’s Quality Improvement Advisor and the Education and Training Inspectorate. The Group developed a guidance document for the sector which has been provided to the colleges and NSCs to advise them on the necessary steps that must be taken to ensure health and safety. This guidance is the “Framework for Safe Resumption of On-Site Educational Provision and Related Activity” document (the Framework) and can be found at Framework for the safe resumption of on-site educational provision and related activity.\n\nThe AOG meets on a regular basis to address key issues that have arisen throughout the year including the practical implications of safely returning to on-site delivery, access to IT equipment to work remotely, assessment and qualifications, and payment of free school meals allowances. This approach has ensured that issues have been identified and addressed as quickly as possible.\n\nIn addition to the work of the AOG, FE Division engages with the College Principals/Chief Executives on a regular and ongoing basis, and officials work in collaboration with the relevant specialist teams within the sector to prepare for the return to on-site face-to-face learning.\n\nThe Executive’s ‘Pathway out of Restrictions’ which was published on 2 March 2021, has provided the FE sector with the approach that will be taken as we move forward over the next few months, and my officials will continue to engage with the sector as we progress through the stages.\n\nMost recently my officials engaged with the colleges to identify those groups of learners most at risk of not completing this year and to take steps to address this. In particular learners studying in ‘close contact’ subject areas, such as hair and beauty, sports studies, and service elements of hospitality, were unable to receive any face-to-face on-site education whilst the wider sector was under occupational operating restrictions which impacted the ability of these learners to gain enough practical experience to allow them to undertake their assessments and subsequently gain employment or move into the next stage of their training.\n\nMy officials collaborated with the colleges to produce specific guidance outlining the process that could be put in place in FE colleges and Non Statutory Contractors to mitigate against the risk of infection/transmission of COVID19 in these training environments with the aim of allowing learners to return to gain the required training. At the Executive meeting on 15 April it was agreed that those learners who are training in close contact subjects can return to on-site training at FE premises from Friday 23 April 2021 (to coincide with the lifting of restrictions in the close contact sectors), subject to strict adherence to specific conditions set out in the new guidance document, the Framework document, and site specific risk assessments.\n\nThe second phase of the ‘Pathway out of Restrictions’ will see a partial return to practical face-to-face learning for increased numbers of FE learners, apprentices and Training for Success (TfS) participants, and my officials will engage with the college principals as we progress through this and subsequent phases to ensure the best outcomes for learners in a safe environment.\n\nAs our Universities are autonomous institutions the return of face to face learning is primarily a matter for them to consider based on the public health advice from the Executive.\n\nI recently announced an £4.1million for the provision of a safe working, learning and research environment in our Higher Education Institutes and all our Higher Education students have access to asymptomatic testing. With these measures I believe that we should be facilitating the potential return for all students as soon as it is possible, I am asking Executive colleagues to consider the current advice and to help our University students regain the learning experience they deserve.","answerHtml":"<p>The Department has engaged regularly and comprehensively with the Further Education (FE) sector throughout the course of the pandemic.</p><p>In June 2020 my Department established an Advisory and Oversight Group (AOG) to work collaboratively with the FE Sector to prepare for the safe resumption of on-site educational delivery. This group includes representatives from the Department for the Economy (DfE), each of the six FE colleges and Trade Unions, Non Statutory Contractors (NSCs) and advisors including the Department’s Quality Improvement Advisor and the Education and Training Inspectorate. The Group developed a guidance document for the sector which has been provided to the colleges and NSCs to advise them on the necessary steps that must be taken to ensure health and safety. This guidance is the “Framework for Safe Resumption of On-Site Educational Provision and Related Activity” document (the Framework) and can be found at Framework for the safe resumption of on-site educational provision and related activity.</p><p>The AOG meets on a regular basis to address key issues that have arisen throughout the year including the practical implications of safely returning to on-site delivery, access to IT equipment to work remotely, assessment and qualifications, and payment of free school meals allowances. This approach has ensured that issues have been identified and addressed as quickly as possible.</p><p>In addition to the work of the AOG, FE Division engages with the College Principals/Chief Executives on a regular and ongoing basis, and officials work in collaboration with the relevant specialist teams within the sector to prepare for the return to on-site face-to-face learning.</p><p>The Executive’s ‘Pathway out of Restrictions’ which was published on 2 March 2021, has provided the FE sector with the approach that will be taken as we move forward over the next few months, and my officials will continue to engage with the sector as we progress through the stages.</p><p>Most recently my officials engaged with the colleges to identify those groups of learners most at risk of not completing this year and to take steps to address this. In particular learners studying in ‘close contact’ subject areas, such as hair and beauty, sports studies, and service elements of hospitality, were unable to receive any face-to-face on-site education whilst the wider sector was under occupational operating restrictions which impacted the ability of these learners to gain enough practical experience to allow them to undertake their assessments and subsequently gain employment or move into the next stage of their training.</p><p>My officials collaborated with the colleges to produce specific guidance outlining the process that could be put in place in FE colleges and Non Statutory Contractors to mitigate against the risk of infection/transmission of COVID19 in these training environments with the aim of allowing learners to return to gain the required training. At the Executive meeting on 15 April it was agreed that those learners who are training in close contact subjects can return to on-site training at FE premises from Friday 23 April 2021 (to coincide with the lifting of restrictions in the close contact sectors), subject to strict adherence to specific conditions set out in the new guidance document, the Framework document, and site specific risk assessments.</p><p>The second phase of the ‘Pathway out of Restrictions’ will see a partial return to practical face-to-face learning for increased numbers of FE learners, apprentices and Training for Success (TfS) participants, and my officials will engage with the college principals as we progress through this and subsequent phases to ensure the best outcomes for learners in a safe environment.</p><p>As our Universities are autonomous institutions the return of face to face learning is primarily a matter for them to consider based on the public health advice from the Executive.</p><p>I recently announced an £4.1million for the provision of a safe working, learning and research environment in our Higher Education Institutes and all our Higher Education students have access to asymptomatic testing. With these measures I believe that we should be facilitating the potential return for all students as soon as it is possible, I am asking Executive colleagues to consider the current advice and to help our University students regain the learning experience they deserve.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017285%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=333760","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=333760"}},{"id":"333759","reference":"AQW 17284/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-14","answerBy":"2021-04-29","answered":"2021-05-06","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy when she will answer AQW 13276/17-22.","answerText":"AQW 13276/17-22 was answered on 20/04/2021.","answerHtml":"<p>AQW 13276/17-22 was answered on 20/04/2021.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017284%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=333759","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=333759"}},{"id":"333758","reference":"AQW 17283/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-14","answerBy":"2021-04-29","answered":"2021-04-21","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on whether she has had any engagement with the Irish Government, regarding continuing participation in the Erasmus Scheme, for students at Northern Ireland universities.","answerText":"The Department has engaged with the Irish Government on the proposed arrangements. The Department has however not developed the arrangements with the Irish Government.","answerHtml":"<p>The Department has engaged with the Irish Government on the proposed arrangements. The Department has however not developed the arrangements with the Irish Government.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017283%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=333758","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=333758"}},{"id":"333757","reference":"AQW 17282/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-14","answerBy":"2021-04-29","answered":"2021-05-04","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for her assessment of whether a direct duty for the Utility Regulator to reduce carbon should be considered.","answerText":"Regulation is identified as a delivery priority in the Energy Strategy Options Consultation published at the end of March.\n\nThe consultation highlights that although the Utility Regulator has played an important role in supporting energy decarbonisation to date, energy regulation is going through a significant transition to adapt to new energy objectives and the scale of innovation required.\n\nWe therefore intend to work with the Utility Regulator to review the adequacy of its legislative remit in the context of the Energy Strategy\n\nI look forward to receiving feedback from the consultation to help inform the future direction for energy policy and regulation in Northern Ireland.","answerHtml":"<p>Regulation is identified as a delivery priority in the Energy Strategy Options Consultation published at the end of March.</p><p>The consultation highlights that although the Utility Regulator has played an important role in supporting energy decarbonisation to date, energy regulation is going through a significant transition to adapt to new energy objectives and the scale of innovation required.</p><p>We therefore intend to work with the Utility Regulator to review the adequacy of its legislative remit in the context of the Energy Strategy</p><p>I look forward to receiving feedback from the consultation to help inform the future direction for energy policy and regulation in Northern Ireland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017282%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=333757","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=333757"}},{"id":"333493","reference":"AQW 17173/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-13","answerBy":"2021-04-28","answered":"2021-05-18","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health how five-year and ten-year survival rates in Northern Ireland, for each type of cancer, compare to other parts of the United Kingdom, and the Republic of Ireland.","answerText":"At present the Northern Ireland Cancer Registry (NICR) have not carried out ten-year survival analysis on any type of cancer. It does however routinely carry out five-year survival analysis on many of the cancer sites. This analysis was part of an international study led by the EUROCARE-5 project investigating survival of cancer patients diagnosed in 2000-2007 with residence in Europe. This survival information, and a UK and Republic of Ireland comparison, is detailed in Table 1 below for 25 major cancer sites.\n\nNorthern Ireland\tEngland\tScotland\tWales\tRepublic of Ireland\nSite\tRSC\tLB\tUB\tRSC\tLB\tUB\tRSC\tLB\tUB\tRSC\tLB\tUB\tRSC\tLB\tUB\nHead and Neck\t48.96\t44.36\t54.03\t46.11\t45.33\t46.91\t43.05\t41.08\t45.11\t42.70\t39.79\t45.82\t42.09\t39.01\t45.42\nEsophagus\t16.12 *\t13.73\t18.92\t12.37\t11.97\t12.79\t10.99\t9.97\t12.13\t13.13\t11.66\t14.79\t15.55 *\t13.88\t17.43\nStomach\t18.06\t15.89\t20.52\t17.00\t16.57\t17.44\t16.11\t14.96\t17.35\t17.78\t16.21\t19.50\t20.32\t18.72\t22.05\nColorectal\t54.00\t52.50\t55.54\t52.08\t51.80\t52.35\t53.84\t53.03\t54.66\t50.95\t49.91\t52.03\t54.32\t53.29\t55.37\nColon\t54.25\t52.36\t56.21\t51.34\t50.98\t51.70\t53.88\t52.86\t54.91\t49.94\t48.59\t51.33\t54.97\t53.66\t56.31\nRectum\t54.32\t51.85\t56.90\t53.74\t53.30\t54.17\t54.19\t52.86\t55.56\t52.61\t50.94\t54.33\t53.01\t51.36\t54.72\nLiver\t8.87\t5.89\t13.36\t8.24\t7.71\t8.81\t7.40\t6.08\t9.00\t8.71\t6.72\t11.30\t12.99\t10.53\t16.02\nPancreas\t3.02\t1.84\t4.96\t4.67\t4.37\t4.98\t3.44\t2.76\t4.30\t5.37\t4.31\t6.69\t6.88\t5.76\t8.22\nLung\t11.04\t10.03\t12.16\t8.80\t8.63\t8.98\t8.65\t8.22\t9.11\t8.55\t7.91\t9.24\t11.82\t11.10\t12.59\nSoft Tissue\t58.40\t51.85\t65.76\t57.63\t56.39\t58.90\t56.39\t52.62\t60.43\t60.20\t55.74\t65.02\t62.70\t58.19\t67.55\nSkin Melanoma\t90.74\t88.46\t93.08\t85.35\t84.93\t85.77\t88.82\t87.58\t90.08\t80.05\t78.24\t81.89\t86.44\t84.88\t88.03\nBreast\t82.12\t80.55\t83.71\t79.30\t79.06\t79.55\t78.46\t77.65\t79.28\t78.20\t77.21\t79.20\t79.01\t77.87\t80.16\nCervix Uteri\t61.13\t56.34\t66.32\t59.59\t58.72\t60.47\t57.89\t55.45\t60.44\t58.10\t55.00\t61.38\t58.87\t55.75\t62.16\nCorpus Uteri\t73.58\t69.96\t77.38\t75.72\t75.12\t76.32\t76.87\t74.85\t78.95\t73.65\t71.38\t76.00\t74.16\t71.35\t77.09\nOvary\t32.27\t29.37\t35.45\t30.57\t30.05\t31.11\t34.02\t32.51\t35.60\t31.66\t29.71\t33.74\t30.34\t28.35\t32.46\nProstate\t83.33\t81.48\t85.23\t80.26\t79.95\t80.58\t78.83\t77.74\t79.94\t78.03\t76.87\t79.22\t85.50\t84.47\t86.54\nTestis\t89.11\t87.01\t91.26\t91.81\t90.19\t93.46\t91.61\t87.17\t96.28\t88.31\t82.70\t94.31\t-\t-\t-\nUrinary Bladder\t76.13\t73.81\t78.52\t72.34\t71.97\t72.71\t48.98\t47.10\t50.94\t71.67\t70.22\t73.16\t73.40\t71.51\t75.33\nKidney\t48.56\t45.28\t52.08\t47.32\t46.74\t47.90\t46.08\t44.42\t47.81\t49.80\t47.64\t52.06\t51.75\t49.43\t54.18\nThyroid\t79.89\t74.62\t85.53\t81.06\t80.11\t82.03\t81.59\t78.58\t84.70\t76.90\t73.16\t80.83\t75.29\t71.22\t79.60\nPlasma cell\t42.30\t38.28\t46.75\t35.41\t34.64\t36.19\t36.62\t34.27\t39.12\t36.69\t33.86\t39.76\t36.15\t33.31\t39.24\nHodgkin's lymphoma\t80.08\t75.35\t85.11\t79.13\t78.27\t80.00\t80.89\t78.35\t83.51\t77.01\t73.43\t80.76\t83.09\t79.91\t86.39\nNon Hodgkin lymphoma\t58.99\t56.50\t61.59\t56.73\t56.30\t57.15\t60.34\t59.00\t61.70\t56.61\t54.97\t58.30\t63.04\t61.37\t64.76\nSBLL/CLL\t61.53\t55.53\t68.19\t68.83\t67.96\t69.72\t75.66\t72.91\t78.50\t67.19\t64.05\t70.49\t75.69\t72.68\t78.82\nCML\t47.99\t38.74\t59.45\t49.57\t47.61\t51.61\t64.62\t58.38\t71.52\t51.91\t44.78\t60.17\t57.94\t49.47\t67.84\nAll Sites\t51.01\t50.47\t51.56\t50.20\t50.11\t50.29\t46.62\t46.35\t46.90\t49.94\t49.58\t50.29\t53.95\t53.57\t54.32\n\nTable 1. Age-standardised five-year Relative Survival (RSC %) for patients diagnosed in 2000-2007 for 25 major malignant cancers, by Regions of the UK and Republic of Ireland with corresponding 95% Confidence Intervals.\n\nSource: Northern Ireland Cancer Registry (NICR)\n\nRelative Survival Cumulative (RSC), Lower Bound 95% Confidence Interval (LB), Upper Bound 95% Confidence Interval (UB)\n\n* Age standardised survival value is unexpectedly high compared to the European mean for this rapidly fatal cancer. This can be due to several reasons including: i) random variations and instability in one or more age classes; ii) problems in the follow up ascertainment; iii) problems in capturing all incident cases, particularly those with worse prognosis, or difficulties in accessing death certificates or in tracing back cases known by death certificate only.","answerHtml":"<p>At present the Northern Ireland Cancer Registry (NICR) have not carried out ten-year survival analysis on any type of cancer. It does however routinely carry out five-year survival analysis on many of the cancer sites. This analysis was part of an international study led by the EUROCARE-5 project investigating survival of cancer patients diagnosed in 2000-2007 with residence in Europe. This survival information, and a UK and Republic of Ireland comparison, is detailed in Table 1 below for 25 major cancer sites.</p><div class=\"table-wrap\"><table><tr><td></td><td colspan=\"3\">Northern Ireland</td><td colspan=\"3\">England</td><td colspan=\"3\">Scotland</td><td colspan=\"3\">Wales</td><td colspan=\"3\">Republic of Ireland</td></tr><tr><td>Site</td><td>RSC</td><td>LB</td><td>UB</td><td>RSC</td><td>LB</td><td>UB</td><td>RSC</td><td>LB</td><td>UB</td><td>RSC</td><td>LB</td><td>UB</td><td>RSC</td><td>LB</td><td>UB</td></tr><tr><td>Head and Neck</td><td>48.96</td><td>44.36</td><td>54.03</td><td>46.11</td><td>45.33</td><td>46.91</td><td>43.05</td><td>41.08</td><td>45.11</td><td>42.70</td><td>39.79</td><td>45.82</td><td>42.09</td><td>39.01</td><td>45.42</td></tr><tr><td>Esophagus</td><td>16.12 *</td><td>13.73</td><td>18.92</td><td>12.37</td><td>11.97</td><td>12.79</td><td>10.99</td><td>9.97</td><td>12.13</td><td>13.13</td><td>11.66</td><td>14.79</td><td>15.55 *</td><td>13.88</td><td>17.43</td></tr><tr><td>Stomach</td><td>18.06</td><td>15.89</td><td>20.52</td><td>17.00</td><td>16.57</td><td>17.44</td><td>16.11</td><td>14.96</td><td>17.35</td><td>17.78</td><td>16.21</td><td>19.50</td><td>20.32</td><td>18.72</td><td>22.05</td></tr><tr><td>Colorectal</td><td>54.00</td><td>52.50</td><td>55.54</td><td>52.08</td><td>51.80</td><td>52.35</td><td>53.84</td><td>53.03</td><td>54.66</td><td>50.95</td><td>49.91</td><td>52.03</td><td>54.32</td><td>53.29</td><td>55.37</td></tr><tr><td>Colon</td><td>54.25</td><td>52.36</td><td>56.21</td><td>51.34</td><td>50.98</td><td>51.70</td><td>53.88</td><td>52.86</td><td>54.91</td><td>49.94</td><td>48.59</td><td>51.33</td><td>54.97</td><td>53.66</td><td>56.31</td></tr><tr><td>Rectum</td><td>54.32</td><td>51.85</td><td>56.90</td><td>53.74</td><td>53.30</td><td>54.17</td><td>54.19</td><td>52.86</td><td>55.56</td><td>52.61</td><td>50.94</td><td>54.33</td><td>53.01</td><td>51.36</td><td>54.72</td></tr><tr><td>Liver</td><td>8.87</td><td>5.89</td><td>13.36</td><td>8.24</td><td>7.71</td><td>8.81</td><td>7.40</td><td>6.08</td><td>9.00</td><td>8.71</td><td>6.72</td><td>11.30</td><td>12.99</td><td>10.53</td><td>16.02</td></tr><tr><td>Pancreas</td><td>3.02</td><td>1.84</td><td>4.96</td><td>4.67</td><td>4.37</td><td>4.98</td><td>3.44</td><td>2.76</td><td>4.30</td><td>5.37</td><td>4.31</td><td>6.69</td><td>6.88</td><td>5.76</td><td>8.22</td></tr><tr><td>Lung</td><td>11.04</td><td>10.03</td><td>12.16</td><td>8.80</td><td>8.63</td><td>8.98</td><td>8.65</td><td>8.22</td><td>9.11</td><td>8.55</td><td>7.91</td><td>9.24</td><td>11.82</td><td>11.10</td><td>12.59</td></tr><tr><td>Soft Tissue</td><td>58.40</td><td>51.85</td><td>65.76</td><td>57.63</td><td>56.39</td><td>58.90</td><td>56.39</td><td>52.62</td><td>60.43</td><td>60.20</td><td>55.74</td><td>65.02</td><td>62.70</td><td>58.19</td><td>67.55</td></tr><tr><td>Skin Melanoma</td><td>90.74</td><td>88.46</td><td>93.08</td><td>85.35</td><td>84.93</td><td>85.77</td><td>88.82</td><td>87.58</td><td>90.08</td><td>80.05</td><td>78.24</td><td>81.89</td><td>86.44</td><td>84.88</td><td>88.03</td></tr><tr><td>Breast</td><td>82.12</td><td>80.55</td><td>83.71</td><td>79.30</td><td>79.06</td><td>79.55</td><td>78.46</td><td>77.65</td><td>79.28</td><td>78.20</td><td>77.21</td><td>79.20</td><td>79.01</td><td>77.87</td><td>80.16</td></tr><tr><td>Cervix Uteri</td><td>61.13</td><td>56.34</td><td>66.32</td><td>59.59</td><td>58.72</td><td>60.47</td><td>57.89</td><td>55.45</td><td>60.44</td><td>58.10</td><td>55.00</td><td>61.38</td><td>58.87</td><td>55.75</td><td>62.16</td></tr><tr><td>Corpus Uteri</td><td>73.58</td><td>69.96</td><td>77.38</td><td>75.72</td><td>75.12</td><td>76.32</td><td>76.87</td><td>74.85</td><td>78.95</td><td>73.65</td><td>71.38</td><td>76.00</td><td>74.16</td><td>71.35</td><td>77.09</td></tr><tr><td>Ovary</td><td>32.27</td><td>29.37</td><td>35.45</td><td>30.57</td><td>30.05</td><td>31.11</td><td>34.02</td><td>32.51</td><td>35.60</td><td>31.66</td><td>29.71</td><td>33.74</td><td>30.34</td><td>28.35</td><td>32.46</td></tr><tr><td>Prostate</td><td>83.33</td><td>81.48</td><td>85.23</td><td>80.26</td><td>79.95</td><td>80.58</td><td>78.83</td><td>77.74</td><td>79.94</td><td>78.03</td><td>76.87</td><td>79.22</td><td>85.50</td><td>84.47</td><td>86.54</td></tr><tr><td>Testis</td><td>89.11</td><td>87.01</td><td>91.26</td><td>91.81</td><td>90.19</td><td>93.46</td><td>91.61</td><td>87.17</td><td>96.28</td><td>88.31</td><td>82.70</td><td>94.31</td><td>-</td><td>-</td><td>-</td></tr><tr><td>Urinary Bladder</td><td>76.13</td><td>73.81</td><td>78.52</td><td>72.34</td><td>71.97</td><td>72.71</td><td>48.98</td><td>47.10</td><td>50.94</td><td>71.67</td><td>70.22</td><td>73.16</td><td>73.40</td><td>71.51</td><td>75.33</td></tr><tr><td>Kidney</td><td>48.56</td><td>45.28</td><td>52.08</td><td>47.32</td><td>46.74</td><td>47.90</td><td>46.08</td><td>44.42</td><td>47.81</td><td>49.80</td><td>47.64</td><td>52.06</td><td>51.75</td><td>49.43</td><td>54.18</td></tr><tr><td>Thyroid</td><td>79.89</td><td>74.62</td><td>85.53</td><td>81.06</td><td>80.11</td><td>82.03</td><td>81.59</td><td>78.58</td><td>84.70</td><td>76.90</td><td>73.16</td><td>80.83</td><td>75.29</td><td>71.22</td><td>79.60</td></tr><tr><td>Plasma cell</td><td>42.30</td><td>38.28</td><td>46.75</td><td>35.41</td><td>34.64</td><td>36.19</td><td>36.62</td><td>34.27</td><td>39.12</td><td>36.69</td><td>33.86</td><td>39.76</td><td>36.15</td><td>33.31</td><td>39.24</td></tr><tr><td>Hodgkin&#39;s lymphoma</td><td>80.08</td><td>75.35</td><td>85.11</td><td>79.13</td><td>78.27</td><td>80.00</td><td>80.89</td><td>78.35</td><td>83.51</td><td>77.01</td><td>73.43</td><td>80.76</td><td>83.09</td><td>79.91</td><td>86.39</td></tr><tr><td>Non Hodgkin lymphoma</td><td>58.99</td><td>56.50</td><td>61.59</td><td>56.73</td><td>56.30</td><td>57.15</td><td>60.34</td><td>59.00</td><td>61.70</td><td>56.61</td><td>54.97</td><td>58.30</td><td>63.04</td><td>61.37</td><td>64.76</td></tr><tr><td>SBLL/CLL</td><td>61.53</td><td>55.53</td><td>68.19</td><td>68.83</td><td>67.96</td><td>69.72</td><td>75.66</td><td>72.91</td><td>78.50</td><td>67.19</td><td>64.05</td><td>70.49</td><td>75.69</td><td>72.68</td><td>78.82</td></tr><tr><td>CML</td><td>47.99</td><td>38.74</td><td>59.45</td><td>49.57</td><td>47.61</td><td>51.61</td><td>64.62</td><td>58.38</td><td>71.52</td><td>51.91</td><td>44.78</td><td>60.17</td><td>57.94</td><td>49.47</td><td>67.84</td></tr><tr><td>All Sites</td><td>51.01</td><td>50.47</td><td>51.56</td><td>50.20</td><td>50.11</td><td>50.29</td><td>46.62</td><td>46.35</td><td>46.90</td><td>49.94</td><td>49.58</td><td>50.29</td><td>53.95</td><td>53.57</td><td>54.32</td></tr></table></div><p>Table 1. Age-standardised five-year Relative Survival (RSC %) for patients diagnosed in 2000-2007 for 25 major malignant cancers, by Regions of the UK and Republic of Ireland with corresponding 95% Confidence Intervals.</p><p>Source: Northern Ireland Cancer Registry (NICR)</p><p>Relative Survival Cumulative (RSC), Lower Bound 95% Confidence Interval (LB), Upper Bound 95% Confidence Interval (UB)</p><p>* Age standardised survival value is unexpectedly high compared to the European mean for this rapidly fatal cancer. This can be due to several reasons including: i) random variations and instability in one or more age classes; ii) problems in the follow up ascertainment; iii) problems in capturing all incident cases, particularly those with worse prognosis, or difficulties in accessing death certificates or in tracing back cases known by death certificate only.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017173%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=333493","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=333493"}},{"id":"333492","reference":"AQW 17172/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-13","answerBy":"2021-04-28","answered":"2021-04-22","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether her Department has undertaken any work in regards to the feasibility of district heating networks.","answerText":"The feasibility of district heat networks is being considered as part of my Department’s new Energy Strategy, with the draft Energy Strategy policy options consultation issued on 31 March, and a final Energy Strategy due to be published by the end of the year.\n\nDistrict heat networks operate by distributing heat for space heating and hot water, through insulated pipes from a central source to a number of buildings in a local area. Where the heat source uses renewable energy or waste heat, then such an approach may be one of a number of potential options to decarbonise heat in Northern Ireland.\n\nMy Department is currently engaging with The Department for Business, Energy & Industrial Strategy (BEIS) on a National Comprehensive Assessment (NCA) of the potential for efficient heating and cooling in the UK, with a focus on the use of district heating networks, which is due to be published next month.","answerHtml":"<p>The feasibility of district heat networks is being considered as part of my Department’s new Energy Strategy, with the draft Energy Strategy policy options consultation issued on 31 March, and a final Energy Strategy due to be published by the end of the year.</p><p>District heat networks operate by distributing heat for space heating and hot water, through insulated pipes from a central source to a number of buildings in a local area. Where the heat source uses renewable energy or waste heat, then such an approach may be one of a number of potential options to decarbonise heat in Northern Ireland.</p><p>My Department is currently engaging with The Department for Business, Energy &amp; Industrial Strategy (BEIS) on a National Comprehensive Assessment (NCA) of the potential for efficient heating and cooling in the UK, with a focus on the use of district heating networks, which is due to be published next month.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017172%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=333492","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=333492"}},{"id":"333491","reference":"AQW 17171/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-13","answerBy":"2021-04-28","answered":"2021-04-21","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for her assessment of whether the Utility Regulator’s remit is outdated, and needs reviewed, as suggested by some stakeholders, in the University of Exeter’s Report on Energy governance for the Northern Ireland energy transition.","answerText":"Regulation was identified as a delivery priority in the consultation on Policy Options for a new Energy Strategy which I launched last month.\n\nThe consultation outlines my Department’s intention to work with the Utility Regulator to review the adequacy of its legislative remit in the context of the Energy Strategy.\n\nFurthermore, in its 2021/22 Forward Work Programme, the Utility Regulator has also committed to reviewing the adequacy of its legislative remit in the context of emerging industry requirement and change.\n\nI would encourage you and your constituents to respond to the consultation to help inform our policies to deliver net zero carbon and affordable energy.","answerHtml":"<p>Regulation was identified as a delivery priority in the consultation on Policy Options for a new Energy Strategy which I launched last month.</p><p>The consultation outlines my Department’s intention to work with the Utility Regulator to review the adequacy of its legislative remit in the context of the Energy Strategy.</p><p>Furthermore, in its 2021/22 Forward Work Programme, the Utility Regulator has also committed to reviewing the adequacy of its legislative remit in the context of emerging industry requirement and change.</p><p>I would encourage you and your constituents to respond to the consultation to help inform our policies to deliver net zero carbon and affordable energy.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017171%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=333491","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=333491"}},{"id":"333490","reference":"AQW 17170/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-13","answerBy":"2021-04-28","answered":"2021-04-16","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on her Department's review into Postgraduate Education in Northern Ireland.","answerText":"I refer the member to my response to AQO 1872/17-22 in which I have addressed this matter in some detail.","answerHtml":"<p>I refer the member to my response to AQO 1872/17-22 in which I have addressed this matter in some detail.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017170%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=333490","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=333490"}},{"id":"333489","reference":"AQW 17169/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-13","answerBy":"2021-04-28","answered":"2021-04-27","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs to detail the number of recipients of Farm Payments in East Antrim, broken down by scheme type.","answerText":"My department made payments to farm businesses for the following schemes in East Antrim for the 2020 scheme year.\n\nNumber of recipients of Farm Payments and amount paid by scheme type in East Antrim in 2020 scheme year:\n\nScheme\tNumber of recipients\tAmount Net Total\nCOVID 19 Financial Support\t290\t£331,125.67\nBasic Payment Scheme\t775\t£8,805,865.56\nGreening Payment\t775\t£3,772,823.74\nYoung Farmers’ Payment\t33\t£105,042.49\nEnvironmental Farming Scheme\t57\t£374,245.58\nFarm Woodland Annual Premia\t13\t£7,536.00\nTotal Payments\t787*\t£13,396,639.04\n\n*Number of unique farm businesses paid as most receive more than one payment","answerHtml":"<p>My department made payments to farm businesses for the following schemes in East Antrim for the 2020 scheme year.</p><p>Number of recipients of Farm Payments and amount paid by scheme type in East Antrim in 2020 scheme year:</p><div class=\"table-wrap\"><table><tr><td>Scheme</td><td>Number of recipients</td><td>Amount Net Total</td></tr><tr><td>COVID 19 Financial Support</td><td>290</td><td>£331,125.67</td></tr><tr><td>Basic Payment Scheme</td><td>775</td><td>£8,805,865.56</td></tr><tr><td>Greening Payment</td><td>775</td><td>£3,772,823.74</td></tr><tr><td>Young Farmers’ Payment</td><td>33</td><td>£105,042.49</td></tr><tr><td>Environmental Farming Scheme</td><td>57</td><td>£374,245.58</td></tr><tr><td>Farm Woodland Annual Premia</td><td>13</td><td>£7,536.00</td></tr><tr><td>Total Payments</td><td>787*</td><td>£13,396,639.04</td></tr></table></div><p>*Number of unique farm businesses paid as most receive more than one payment</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017169%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=333489","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=333489"}},{"id":"333255","reference":"AQW 17082/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-12","answerBy":"2021-04-27","answered":"2021-04-16","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to detail (i) when each class of the current railway rolling stock will come to the end of its useful life; and, (ii) what actions her Department is taking to ensure that future rolling stock is powered by clean alternatives to diesel.","answerText":"The current rolling stock has a design life of 30 years, however this can often be extended through refurbishment. The current Enterprise fleet is 24 years old and, despite a recent overhaul and refurbishment in 2015, current projections are that the fleet will require replacement by 2027. The current CAF Class 3000 fleet will reach the end of its design life in 2034 with the Class 4000 fleet following in 2041.\n\nI can also confirm that decarbonising the rail network will be considered in the All Island Strategic Rail Review that I recently announced in conjunction with Department of Transport Minister, Eamon Ryan TD. To assist with this work, Translink is currently undertaking an in depth feasibility study to investigate options for decarbonising the whole rail network. This incorporates the infrastructure and fleet requirements to deliver Translink’s fleet strategy and the studies will also consider electrification, hydrogen or indeed a combination of both.","answerHtml":"<p>The current rolling stock has a design life of 30 years, however this can often be extended through refurbishment. The current Enterprise fleet is 24 years old and, despite a recent overhaul and refurbishment in 2015, current projections are that the fleet will require replacement by 2027. The current CAF Class 3000 fleet will reach the end of its design life in 2034 with the Class 4000 fleet following in 2041.</p><p>I can also confirm that decarbonising the rail network will be considered in the All Island Strategic Rail Review that I recently announced in conjunction with Department of Transport Minister, Eamon Ryan TD. To assist with this work, Translink is currently undertaking an in depth feasibility study to investigate options for decarbonising the whole rail network. This incorporates the infrastructure and fleet requirements to deliver Translink’s fleet strategy and the studies will also consider electrification, hydrogen or indeed a combination of both.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017082%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=333255","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=333255"}},{"id":"333254","reference":"AQW 17081/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-12","answerBy":"2021-04-27","answered":"2021-04-21","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance (i) for an update on progress in bringing forward required regulations for his Department to pay out recently announced one-off grants for businesses totalling £178m, to assist with Covid-19 challenges; and (ii) when these payments are expected to be made.","answerText":"Three Regulations to provide the legal authority for the £178 million in new business support grants which I announced on 15 March 2021, were made on 30 March and came into operation on 31 March 2021.\n\nThe schemes and payment timeframes Land and Property Services (LPS) is working towards are:\n\nThe application portal for the £50,000 grant scheme for businesses in large NAV properties, as provided for in The Financial Assistance (Coronavirus) (Large Business) Regulations (NI) 2021, will open on 21 April and will remain open for 2 weeks;\n\nPayments for the £25,000 grant scheme to mid-sized manufacturing businesses that did not receive funding in the first lockdown, as provided for in The Financial Assistance (Coronavirus) (Industrial Business) Regulations (NI) 2021 provide, will commence to be paid automatically from the end of April; and\n\nTop-up payments to businesses that received the £10,000 and £25,000 grants in the first lockdown but have not received support in the second lockdown, as provided for in The Financial Assistance (Coronavirus) (Business Support) Regulations (NI) 2021, will commence to be paid automatically from the mid May.\n\nI anticipate that the majority of payments from all three grant schemes will be processed by the end of May.","answerHtml":"<p>Three Regulations to provide the legal authority for the £178 million in new business support grants which I announced on 15 March 2021, were made on 30 March and came into operation on 31 March 2021.</p><p>The schemes and payment timeframes Land and Property Services (LPS) is working towards are:</p><p>The application portal for the £50,000 grant scheme for businesses in large NAV properties, as provided for in The Financial Assistance (Coronavirus) (Large Business) Regulations (NI) 2021, will open on 21 April and will remain open for 2 weeks;</p><p>Payments for the £25,000 grant scheme to mid-sized manufacturing businesses that did not receive funding in the first lockdown, as provided for in The Financial Assistance (Coronavirus) (Industrial Business) Regulations (NI) 2021 provide, will commence to be paid automatically from the end of April; and</p><p>Top-up payments to businesses that received the £10,000 and £25,000 grants in the first lockdown but have not received support in the second lockdown, as provided for in The Financial Assistance (Coronavirus) (Business Support) Regulations (NI) 2021, will commence to be paid automatically from the mid May.</p><p>I anticipate that the majority of payments from all three grant schemes will be processed by the end of May.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017081%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=333254","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=333254"}},{"id":"333253","reference":"AQW 17080/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-12","answerBy":"2021-04-27","answered":"2021-04-20","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure (i) to detail the main accident blackspots in East Antrim; and (ii) what action her Department is taking to reduce accidents in these areas.","answerText":"My Department routinely carries out a review of collision cluster sites when developing the Collision Remedial programme that sits within the wider Local Transport and Safety Measures (LTSM) programme. This review seeks to identify sites where 4 or more collisions have occurred within a three year period to determine if the application of appropriate road safety engineering measures would help to reduce the number and severity of collisions.\n\nA number of sites within the East Antrim constituency met the threshold of 4 or more collisions however, when the nature and severity of the collisions and causation factors were considered, further remedial measures were not deemed appropriate. Therefore there are no sites currently being taken forward in East Antrim under the Collision Remedial programme however a further review of collisions is scheduled to take place within the coming months when the latest collision statistics collated by the PSNI are made available.","answerHtml":"<p>My Department routinely carries out a review of collision cluster sites when developing the Collision Remedial programme that sits within the wider Local Transport and Safety Measures (LTSM) programme. This review seeks to identify sites where 4 or more collisions have occurred within a three year period to determine if the application of appropriate road safety engineering measures would help to reduce the number and severity of collisions.</p><p>A number of sites within the East Antrim constituency met the threshold of 4 or more collisions however, when the nature and severity of the collisions and causation factors were considered, further remedial measures were not deemed appropriate. Therefore there are no sites currently being taken forward in East Antrim under the Collision Remedial programme however a further review of collisions is scheduled to take place within the coming months when the latest collision statistics collated by the PSNI are made available.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017080%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=333253","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=333253"}},{"id":"333252","reference":"AQW 17079/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-12","answerBy":"2021-04-27","answered":"2021-04-16","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure what additional 20mph zones her Department is considering in East Antrim.","answerText":"I was delighted to have been able to commit funding from the 2020/2021 capital budget toward the introduction of part-time 20 mph speed limits at 103 schools. These measures increase driver awareness and achieve reductions in vehicle speeds outside and near these schools ensuring that parents, children and staff will be safer as they go to and from the schools on a daily basis.\n\nGiven the restricted budgets for works of this nature, as well as the practicalities of delivery, it was necessary to limit the number of schools to around 100 in the initial programme. However I do intend to take forward a further tranche of part-time speed limits at schools and all schools within the East Antrim area will be considered for inclusion in future programmes, the extent and scale of which will be dependent on the level of funding available to me in the 2021/22 financial year and beyond.","answerHtml":"<p>I was delighted to have been able to commit funding from the 2020/2021 capital budget toward the introduction of part-time 20 mph speed limits at 103 schools. These measures increase driver awareness and achieve reductions in vehicle speeds outside and near these schools ensuring that parents, children and staff will be safer as they go to and from the schools on a daily basis.</p><p>Given the restricted budgets for works of this nature, as well as the practicalities of delivery, it was necessary to limit the number of schools to around 100 in the initial programme. However I do intend to take forward a further tranche of part-time speed limits at schools and all schools within the East Antrim area will be considered for inclusion in future programmes, the extent and scale of which will be dependent on the level of funding available to me in the 2021/22 financial year and beyond.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017079%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=333252","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=333252"}},{"id":"333251","reference":"AQW 17078/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-04-12","answerBy":"2021-04-27","answered":"2021-05-05","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to confirm (i) whether her Department requested that statements critical of current energy governance in Northern Ireland were to be removed in University of Exeter Report on Energy governance for the Northern Ireland energy transition; and, (ii) if so, the rationale for this request.","answerText":"My Department’s role in any external research, is to help ensure it is factually accurate and supported by evidence. The researchers from the University of Exeter provided my officials with an initial draft of the report for review and comment, which was shared with a range of government stakeholders. Officials provided information to the researchers to seek to ensure the factual accuracy of the report’s contents. This would be viewed as ‘normal practice’.\n\nIt is for the authors to use any information provided to them to draw their own conclusions which, naturally, may change as additional evidence is gathered.","answerHtml":"<p>My Department’s role in any external research, is to help ensure it is factually accurate and supported by evidence. The researchers from the University of Exeter provided my officials with an initial draft of the report for review and comment, which was shared with a range of government stakeholders. Officials provided information to the researchers to seek to ensure the factual accuracy of the report’s contents. This would be viewed as ‘normal practice’.</p><p>It is for the authors to use any information provided to them to draw their own conclusions which, naturally, may change as additional evidence is gathered.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2017078%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=333251","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=333251"}},{"id":"332630","reference":"AQW 16925/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-26","answerBy":"2021-04-07","answered":"2021-04-19","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 15611/17-22 and due to the proximity to the end of the financial year, whether delays in payment risk funding for the scheme.","answerText":"I can confirm there is no risk to the funding allocated to the Limited Company Director Support Scheme. Invest NI remain committed to assessing and verifying all outstanding applications, and processing payments, to eligible applicants as quickly as possible.","answerHtml":"<p>I can confirm there is no risk to the funding allocated to the Limited Company Director Support Scheme. Invest NI remain committed to assessing and verifying all outstanding applications, and processing payments, to eligible applicants as quickly as possible.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016925%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=332630","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=332630"}},{"id":"332629","reference":"AQW 16924/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-26","answerBy":"2021-04-14","answered":"2021-06-01","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what actions she is taking to encourage caravan park owners to reduce site fees in line with any COVID-19 financial support received.","answerText":"It is not for my Department to intervene on this matter. This is a contractual issue between the caravan owners and the owners / managers of the caravan park on which they are sited.","answerHtml":"<p>It is not for my Department to intervene on this matter. This is a contractual issue between the caravan owners and the owners / managers of the caravan park on which they are sited.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016924%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=332629","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=332629"}},{"id":"332628","reference":"AQW 16923/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-26","answerBy":"2021-04-14","answered":"2021-04-19","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) for her assessment of the comment that Northern Ireland has an extremely complex structure of energy governance as stated in a recent University of Exeter Report on Energy governance for the Northern Ireland energy transition; and (ii) whether the upcoming Energy Strategy will address this issue.","answerText":"The complexity of energy means that there is no single best approach to energy governance, and the division of roles and responsibilities across the UK and the Republic of Ireland vary widely. There is no ‘right’ or ‘wrong’ answer.\n\nRegardless of the structures in place, a joined-up approach across government will always be required. The governance structures established for the Energy Strategy have already led to the collaborative approach needed across central and local government.\n\nThese structures include a Government Stakeholders Group that brings together all government departments with a role in energy policy. Central and local government have also worked together across the five working groups (consumers, energy efficiency, heat, power and transport) to inform the energy policy options included in the recent Energy Strategy Options Consultation.\n\nThe leadership that my Department is showing across the Executive on energy policy matters is demonstrated through the Options Consultation published at the end of March which covers the full breadth of energy policy issues across government.","answerHtml":"<p>The complexity of energy means that there is no single best approach to energy governance, and the division of roles and responsibilities across the UK and the Republic of Ireland vary widely. There is no ‘right’ or ‘wrong’ answer.</p><p>Regardless of the structures in place, a joined-up approach across government will always be required. The governance structures established for the Energy Strategy have already led to the collaborative approach needed across central and local government.</p><p>These structures include a Government Stakeholders Group that brings together all government departments with a role in energy policy. Central and local government have also worked together across the five working groups (consumers, energy efficiency, heat, power and transport) to inform the energy policy options included in the recent Energy Strategy Options Consultation.</p><p>The leadership that my Department is showing across the Executive on energy policy matters is demonstrated through the Options Consultation published at the end of March which covers the full breadth of energy policy issues across government.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016923%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=332628","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=332628"}},{"id":"332627","reference":"AQW 16922/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-26","answerBy":"2021-04-14","answered":"2021-04-02","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) what support is available for small manufacturers to adapt to the COVID-19 Pandemic; and (ii) whether she is planning to bring forward further support.","answerText":"The Northern Ireland Executive and UK Government have responded to COVID-19 with an unprecedented range of financial support for businesses, individuals and families since March 2020. The Department for the Economy (DfE) has made payments totalling over £400million to more than 30,000 businesses via a number of schemes, and continues to pay millions of pounds to thousands more, including those in the manufacturing sector.\n\nThe combination of this financial help and support has been designed to mitigate against the worst impacts of the pandemic, to prevent businesses from closing and protect people’s main jobs and livelihoods.\n\nThe Finance Minister has recently announced a four month rates holiday for businesses across all sectors until July 2021, and a further £178 million in new business support grants. The manufacturing sector has been identified as one of the key sectors which will benefit most from these new grant payments, subject to eligibility.\n\nMoving forward, my focus will be on the re-opening the economy, as I believe that the best way to support all of our local businesses, employers and high streets, is to make a full and safe return to trading as soon as possible in line with the health regulations and the published roadmap ‘Moving Forward: The Executive's Pathway Out of Restrictions’.\n\nFinally, it will be for the Executive collectively to determine how any new or additional Covid-related funding will be allocated as we move out of restrictions and to support a sustained and successful economic recovery moving forward.","answerHtml":"<p>The Northern Ireland Executive and UK Government have responded to COVID-19 with an unprecedented range of financial support for businesses, individuals and families since March 2020. The Department for the Economy (DfE) has made payments totalling over £400million to more than 30,000 businesses via a number of schemes, and continues to pay millions of pounds to thousands more, including those in the manufacturing sector.</p><p>The combination of this financial help and support has been designed to mitigate against the worst impacts of the pandemic, to prevent businesses from closing and protect people’s main jobs and livelihoods.</p><p>The Finance Minister has recently announced a four month rates holiday for businesses across all sectors until July 2021, and a further £178 million in new business support grants. The manufacturing sector has been identified as one of the key sectors which will benefit most from these new grant payments, subject to eligibility.</p><p>Moving forward, my focus will be on the re-opening the economy, as I believe that the best way to support all of our local businesses, employers and high streets, is to make a full and safe return to trading as soon as possible in line with the health regulations and the published roadmap ‘Moving Forward: The Executive&#39;s Pathway Out of Restrictions’.</p><p>Finally, it will be for the Executive collectively to determine how any new or additional Covid-related funding will be allocated as we move out of restrictions and to support a sustained and successful economic recovery moving forward.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016922%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=332627","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=332627"}},{"id":"332626","reference":"AQW 16921/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-26","answerBy":"2021-04-14","answered":"2021-06-11","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy when the review of the Caravans Act (Northern Ireland) 2011 will commence.","answerText":"It is the Department’s intention to review the Act in 2021 at a date yet to be determined.","answerHtml":"<p>It is the Department’s intention to review the Act in 2021 at a date yet to be determined.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016921%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=332626","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=332626"}},{"id":"332347","reference":"AQW 16781/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-24","answerBy":"2021-04-12","answered":"2021-05-17","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy when (i) AQW 15383/17-22; and (ii) AQW 15610/17-22 will be answered.","answerText":"A response to AQW 15383/17-22 was issued on 14 April 2021 and a response to AQW 15610/17-22 was issued on 31 March 2021.","answerHtml":"<p>A response to AQW 15383/17-22 was issued on 14 April 2021 and a response to AQW 15610/17-22 was issued on 31 March 2021.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016781%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=332347","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=332347"}},{"id":"331844","reference":"AQW 16596/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-19","answerBy":"2021-04-07","answered":"2021-03-30","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities, pursuant to AQW 15965/17-22, for an estimate of the number of Housing Executive houses in East Antrim requiring remedial work; and the timescale and projected costs.","answerText":"Any figures provided at constituency level are to be considered as indicative estimates only.\n\nApproximately 60% of the properties surveyed in East Antrim had cavity wall insulation installations that were non-compliant with modern industry standards because there were found to be voids or debris in the cavity. Although the Housing Executive’s data on the construction of all of its stock is not comprehensive, we estimate that if this 60% is extrapolated, it would represent some 1,860 of the likely cavity wall constructed properties in East Antrim. Applying average cavity wall insulation replacement rates for different types of properties suggests that a programme to address these properties would cost in the order of £3.9-£4.7 million.\n\nThe timescale for delivering such a programme is not known at this time. The intention is to implement a cavity wall insulation remediation/replacement programme for all cavity wall stock as part of the Housing Executive’s future Energy Strategy.\n\nIn the interim, the Housing Executive intends to address instances where the condition of cavity wall insulation is having a detrimental impact on the structure of a property. It is currently identifying and investigating such instances with a view to addressing these, either through its response maintenance service (where they are single or small numbers of properties) or a programme of planned schemes (where there may be an estate-wide issue).","answerHtml":"<p>Any figures provided at constituency level are to be considered as indicative estimates only.</p><p>Approximately 60% of the properties surveyed in East Antrim had cavity wall insulation installations that were non-compliant with modern industry standards because there were found to be voids or debris in the cavity. Although the Housing Executive’s data on the construction of all of its stock is not comprehensive, we estimate that if this 60% is extrapolated, it would represent some 1,860 of the likely cavity wall constructed properties in East Antrim. Applying average cavity wall insulation replacement rates for different types of properties suggests that a programme to address these properties would cost in the order of £3.9-£4.7 million.</p><p>The timescale for delivering such a programme is not known at this time. The intention is to implement a cavity wall insulation remediation/replacement programme for all cavity wall stock as part of the Housing Executive’s future Energy Strategy.</p><p>In the interim, the Housing Executive intends to address instances where the condition of cavity wall insulation is having a detrimental impact on the structure of a property. It is currently identifying and investigating such instances with a view to addressing these, either through its response maintenance service (where they are single or small numbers of properties) or a programme of planned schemes (where there may be an estate-wide issue).</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016596%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=331844","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=331844"}},{"id":"331843","reference":"AQW 16595/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-19","answerBy":"2021-04-07","answered":"2021-03-30","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what consideration has been given in regards to Invest NI contributing its expertise to mainstream Executive Departments, to assist with good practice on the implementation of programmes and project management, as recommended in the Non-Domestic RHI Scheme Inquiry Report.","answerText":"As you are aware, the recent focus of both my Department and Invest NI (INI) has been dealing with the huge impacts on our economy of both the COVID pandemic, and EU Exit. Clearly, this will continue to be the case in the foreseeable future. Notwithstanding that, all of the recommendations arising from the Non-Domestic RHI Scheme Inquiry Report that fall to my Department to deliver are clearly very important, and we will look to implement them in due course, subject to other work priorities.","answerHtml":"<p>As you are aware, the recent focus of both my Department and Invest NI (INI) has been dealing with the huge impacts on our economy of both the COVID pandemic, and EU Exit. Clearly, this will continue to be the case in the foreseeable future. Notwithstanding that, all of the recommendations arising from the Non-Domestic RHI Scheme Inquiry Report that fall to my Department to deliver are clearly very important, and we will look to implement them in due course, subject to other work priorities.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016595%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=331843","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=331843"}},{"id":"331677","reference":"AQW 16509/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-18","answerBy":"2021-04-02","answered":"2021-04-12","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs (i) whether the trees on the former drill site in Woodburn Forest are showing above average mortality; (ii) when was the last inspection of the site carried out; (iii) whether any areas of concern were noted; and (iv) if so, what actions have been put in place to address those areas of concern.","answerText":"Your queries relate to the condition of the re-established woodland at Woodburn forest, previously used as a drill site:\n\nThe site was replanted in 2017 with a mixture of native broadleaves and conifer species. Forest Service’s operational practices include assessments of survival of recently planted trees through which the Woodburn site is deemed to meet an adequate level of growing trees to reconstitute a woodland.\n\nThe most recent assessment of the site was carried out in March 2021.\n\nThis assessment identified the need for some remedial work to control herbaceous weed species and a small number of dead trees to be replaced.\n\nThis is normal practice during the early years of re-establishing forests and is not a cause for specific concern.","answerHtml":"<p>Your queries relate to the condition of the re-established woodland at Woodburn forest, previously used as a drill site:</p><p>The site was replanted in 2017 with a mixture of native broadleaves and conifer species. Forest Service’s operational practices include assessments of survival of recently planted trees through which the Woodburn site is deemed to meet an adequate level of growing trees to reconstitute a woodland.</p><p>The most recent assessment of the site was carried out in March 2021.</p><p>This assessment identified the need for some remedial work to control herbaceous weed species and a small number of dead trees to be replaced.</p><p>This is normal practice during the early years of re-establishing forests and is not a cause for specific concern.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016509%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=331677","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=331677"}},{"id":"331450","reference":"AQW 16424/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-16","answerBy":"2021-04-01","answered":"2021-03-24","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what actions she is taken to ensure resilience in the Northern Ireland electricity grid against the possibility of more severe weather events in the future as a result of climate change.","answerText":"NIE Networks is responsible for the maintenance and resilience of the electricity network in Northern Ireland and has provided my department with the following assurances:\n\nAnnually NIE Networks refurbish or upgrade c. 1,800km of overhead line network across all voltage levels. This work includes removing aged wooden poles, weaker overhead line conductors, etc. and where required, replaced with modern specification equipment capable of withstanding more severe weather.\n\nNIE Networks also annually maintain safety clearances to c. 10,000 km of overhead lines (and other equipment) across all voltage levels from nearby vegetation. The cutting cycle has been changed to help accommodate increased tree growth due to climate change and this is kept under constant review.\n\nFor all large substations (transmission and primary distribution levels) if the substation is within a predicted flooding area, a site specific flood risk assessment is undertaken to determine the predicted flood depth and the subsequent flood defence/protection required. In doing this, NIE Networks is working towards the 2080 climate change models that were developed by the Met Office in its UK Climate Projections (UKCP 18).\n\nNIE Networks is also reviewing its technical standards for electrical plant and apparatus to operate in wider temperature ranges, with higher average summer temperatures.","answerHtml":"<p>NIE Networks is responsible for the maintenance and resilience of the electricity network in Northern Ireland and has provided my department with the following assurances:</p><p>Annually NIE Networks refurbish or upgrade c. 1,800km of overhead line network across all voltage levels. This work includes removing aged wooden poles, weaker overhead line conductors, etc. and where required, replaced with modern specification equipment capable of withstanding more severe weather.</p><p>NIE Networks also annually maintain safety clearances to c. 10,000 km of overhead lines (and other equipment) across all voltage levels from nearby vegetation. The cutting cycle has been changed to help accommodate increased tree growth due to climate change and this is kept under constant review.</p><p>For all large substations (transmission and primary distribution levels) if the substation is within a predicted flooding area, a site specific flood risk assessment is undertaken to determine the predicted flood depth and the subsequent flood defence/protection required. In doing this, NIE Networks is working towards the 2080 climate change models that were developed by the Met Office in its UK Climate Projections (UKCP 18).</p><p>NIE Networks is also reviewing its technical standards for electrical plant and apparatus to operate in wider temperature ranges, with higher average summer temperatures.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016424%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=331450","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=331450"}},{"id":"331449","reference":"AQW 16423/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-16","answerBy":"2021-04-01","answered":"2021-03-26","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure (i) to outline the water supply and wastewater capacity issues that exist in the Larne area; and (ii) how Northern Ireland Water is working to resolve these capacity issues.","answerText":"NI Water has advised me that there are no drinking water supply issues in the Larne area. However, there are wastewater capacity issues in Larne in relation to both sewers and the wastewater treatment works (WwTW). The Larne WwTW is experiencing issues associated with its wastewater treatment process. The sewer network cannot convey flows to the WwTW, resulting in spills from the network into the receiving environment through combined sewer overflows (CSOs). CSOs act as safety valves to stop sewage backing up in the sewers during rainfall events which can cause internal flooding in properties. If the CSOs operate more frequently than they should, they are classified by NI Water as unsatisfactory intermittent discharges (UIDs). The causes of these discharges must be addressed to prevent the spills entering the sensitive marine environment.\n\nThe alleviation of the capacity issues in Larne will require significant investment in new assets throughout the PC21 (2021-2027) period. Such investment is dependent on factors such as funding, land availability and planning approvals. NI Water has estimated the cost of the required investment at approximately £30 million. NI Water’s proposals involve new sites for treatment facilities, network storage, pumping solutions and opportunities to maximise storm water separation and sustainable drainage systems (SuDS) in the Larne catchment. NI Water is also undertaking network modelling, which is due for completion in 2021-22. The modelling is essential for allowing NI Water to correctly size the network solutions. It is also a requirement of the Northern Ireland Environment Agency with whom all NI Water wastewater solutions must be discussed and agreed.","answerHtml":"<p>NI Water has advised me that there are no drinking water supply issues in the Larne area. However, there are wastewater capacity issues in Larne in relation to both sewers and the wastewater treatment works (WwTW). The Larne WwTW is experiencing issues associated with its wastewater treatment process. The sewer network cannot convey flows to the WwTW, resulting in spills from the network into the receiving environment through combined sewer overflows (CSOs). CSOs act as safety valves to stop sewage backing up in the sewers during rainfall events which can cause internal flooding in properties. If the CSOs operate more frequently than they should, they are classified by NI Water as unsatisfactory intermittent discharges (UIDs). The causes of these discharges must be addressed to prevent the spills entering the sensitive marine environment.</p><p>The alleviation of the capacity issues in Larne will require significant investment in new assets throughout the PC21 (2021-2027) period. Such investment is dependent on factors such as funding, land availability and planning approvals. NI Water has estimated the cost of the required investment at approximately £30 million. NI Water’s proposals involve new sites for treatment facilities, network storage, pumping solutions and opportunities to maximise storm water separation and sustainable drainage systems (SuDS) in the Larne catchment. NI Water is also undertaking network modelling, which is due for completion in 2021-22. The modelling is essential for allowing NI Water to correctly size the network solutions. It is also a requirement of the Northern Ireland Environment Agency with whom all NI Water wastewater solutions must be discussed and agreed.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016423%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=331449","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=331449"}},{"id":"331448","reference":"AQW 16422/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-16","answerBy":"2021-04-01","answered":"2021-03-30","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs pursuant to AQW 15709/17-22, (i) for an estimate of the costs to his Department associated with halting work; and (ii) what advice was sought prior to the decision to halt construction work.","answerText":"On 26th February former Minister Lyons instructed DAERA officials to halt works in relation to the permanent infrastructure facilities at the Northern Ireland Points of Entry.\n\nConstruction of the permanent facilities has not yet commenced and my Officials will work through the contractual implications and associated costs of any decision to suspend construction work once the extent is realised.\n\nI have previously confirmed that I will be bringing the matter to the Executive for consideration as soon as possible.","answerHtml":"<p>On 26th February former Minister Lyons instructed DAERA officials to halt works in relation to the permanent infrastructure facilities at the Northern Ireland Points of Entry.</p><p>Construction of the permanent facilities has not yet commenced and my Officials will work through the contractual implications and associated costs of any decision to suspend construction work once the extent is realised.</p><p>I have previously confirmed that I will be bringing the matter to the Executive for consideration as soon as possible.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016422%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=331448","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=331448"}},{"id":"331447","reference":"AQW 16421/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-16","answerBy":"2021-04-01","answered":"2021-03-29","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 15385 17-22, to outline the practical steps she has taken to reduce frictions, and their outcomes to date.","answerText":"Customs remains a reserved matter and is the responsibility of the UK Government to reduce frictions arising from customs controls.\n\nI continue to engage with local businesses to identify issues and press the UK Government for solutions. The reintroduction of the VAT Margin scheme and the resolution of the issue on tariffs for steel imports are examples where my interventions created a positive outcome for our businesses.\n\nI will continue to engage with the UK Government and our businesses to seek resolutions to ongoing and emerging issues regarding the movement of goods from GB to NI. Furthermore, my Department will continue to provide guidance and support to businesses navigating the new trading environment.","answerHtml":"<p>Customs remains a reserved matter and is the responsibility of the UK Government to reduce frictions arising from customs controls.</p><p>I continue to engage with local businesses to identify issues and press the UK Government for solutions. The reintroduction of the VAT Margin scheme and the resolution of the issue on tariffs for steel imports are examples where my interventions created a positive outcome for our businesses.</p><p>I will continue to engage with the UK Government and our businesses to seek resolutions to ongoing and emerging issues regarding the movement of goods from GB to NI. Furthermore, my Department will continue to provide guidance and support to businesses navigating the new trading environment.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016421%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=331447","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=331447"}},{"id":"331071","reference":"AQW 16275/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-12","answerBy":"2021-03-30","answered":"2021-03-23","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health what actions he is taking with Executive colleagues to decarbonise public buildings.","answerText":"The Department of Finance (DoF) is responsible for managing the Civil Service Office Estate, which equates to around 4% of the total Public Sector energy consumption here.\n\nDoF aims, through its Office Estate Energy Efficiency and Carbon Reduction plans, to achieve culminative energy savings and consequential reductions in carbon. These savings support and feed into the wider ‘Energy Management Strategy and Action Plan to 2030 for Central Government’ introduced by the Department for Economy (DfE).\n\nBy implementing Connect 2 regional hubs, footfall in regional locations should increase, thereby reducing commuting frequencies and distances. This, in turn, should lead to reductions in carbon emissions, helping to improve the sustainability of how we work and protect the environment.\n\nFurther, new or refurbished DoF buildings undergo BRE Environmental Assessment Method (BREEAM) appraisal and the use of energy efficient installations has been incorporated into the Civil Service Accommodation Standards specification.\n\nMy officials are also liaising with colleagues in other Departments on related cross-departmental issues. This includes on the development of an Energy Strategy with the Department for the Economy, and ‘Future Generations’ work on carbon reduction planning with the Department for Agriculture, Environment and Rural Affairs.","answerHtml":"<p>The Department of Finance (DoF) is responsible for managing the Civil Service Office Estate, which equates to around 4% of the total Public Sector energy consumption here.</p><p>DoF aims, through its Office Estate Energy Efficiency and Carbon Reduction plans, to achieve culminative energy savings and consequential reductions in carbon. These savings support and feed into the wider ‘Energy Management Strategy and Action Plan to 2030 for Central Government’ introduced by the Department for Economy (DfE).</p><p>By implementing Connect 2 regional hubs, footfall in regional locations should increase, thereby reducing commuting frequencies and distances. This, in turn, should lead to reductions in carbon emissions, helping to improve the sustainability of how we work and protect the environment.</p><p>Further, new or refurbished DoF buildings undergo BRE Environmental Assessment Method (BREEAM) appraisal and the use of energy efficient installations has been incorporated into the Civil Service Accommodation Standards specification.</p><p>My officials are also liaising with colleagues in other Departments on related cross-departmental issues. This includes on the development of an Energy Strategy with the Department for the Economy, and ‘Future Generations’ work on carbon reduction planning with the Department for Agriculture, Environment and Rural Affairs.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016275%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=331071","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=331071"}},{"id":"331070","reference":"AQW 16274/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-12","answerBy":"2021-03-30","answered":"2021-03-23","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance why hospitality businesses paying domestic rates have not been able to avail of a rates holiday; and whether he will consider extending the rates holiday to such businesses.","answerText":"I introduced the business rates holiday to provide relief for business ratepayers, including those in the hospitality sector, to assist them in managing the impact of the pandemic. Small hospitality businesses that operate from domestic premises are not commercially rated and, therefore, are cannot avail of business rate reliefs; hospitality businesses which pay business rates are eligible. I have no plans to extend this relief.\n\nIn recognition of the financial pressures being faced by domestic ratepayers at this difficult time, I introduced a freeze on the domestic Regional Rate for the 2020/21 rating year, and I have announced my plan to freeze the Regional Rate again for 2021/22.\n\nMy Department also provides a range of support measures for those who may be struggling to pay their domestic rates. Details of the support available is provided at:\n\nhttps://www.nidirect.gov.uk/information-and-services/guide-rates/help-paying-your-rates","answerHtml":"<p>I introduced the business rates holiday to provide relief for business ratepayers, including those in the hospitality sector, to assist them in managing the impact of the pandemic. Small hospitality businesses that operate from domestic premises are not commercially rated and, therefore, are cannot avail of business rate reliefs; hospitality businesses which pay business rates are eligible. I have no plans to extend this relief.</p><p>In recognition of the financial pressures being faced by domestic ratepayers at this difficult time, I introduced a freeze on the domestic Regional Rate for the 2020/21 rating year, and I have announced my plan to freeze the Regional Rate again for 2021/22.</p><p>My Department also provides a range of support measures for those who may be struggling to pay their domestic rates. Details of the support available is provided at:</p><p>https://www.nidirect.gov.uk/information-and-services/guide-rates/help-paying-your-rates</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016274%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=331070","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=331070"}},{"id":"330850","reference":"AQW 16206/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-11","answerBy":"2021-03-29","answered":"2021-03-22","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs, with regards to the proposed Islandmagee Caverns Gas Storage Project, for an update on whether he plans to bring the marine construction licence to the Executive Committee for consideration as it is a cross-cutting matter.","answerText":"I expect to be presented with a portfolio of documents within the near future to assist me in determining the application for a marine construction licence for the Islandmagee Gas Storage project.\n\nI have been advised that the briefing will include advice on whether this is a cross cutting issue and on the need for Executive referral. I trust you can appreciate that I am keeping an open mind on the matter and unable comment further until I have had sight of the documents.","answerHtml":"<p>I expect to be presented with a portfolio of documents within the near future to assist me in determining the application for a marine construction licence for the Islandmagee Gas Storage project.</p><p>I have been advised that the briefing will include advice on whether this is a cross cutting issue and on the need for Executive referral. I trust you can appreciate that I am keeping an open mind on the matter and unable comment further until I have had sight of the documents.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016206%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=330850","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=330850"}},{"id":"330849","reference":"AQW 16205/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-11","answerBy":"2021-03-29","answered":"2021-03-22","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance when he will engage in negotiations with Northern Ireland Civil Service staff and representatives to ensure an agreement on a pay award is reached soon.","answerText":"I refer the member to the answer for AQW 16084/17-22.","answerHtml":"<p>I refer the member to the answer for AQW 16084/17-22.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016205%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=330849","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=330849"}},{"id":"330848","reference":"AQW 16204/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-11","answerBy":"2021-03-29","answered":"2021-03-24","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will establish a de-commissioner of last resort regime in Northern Ireland similar to that in Great Britain, to ensure that major energy projects are not abandoned without appropriate decommissioning measures.","answerText":"The term ‘decommissioner of last resort’ is generally used in relation to arrangements for ensuring that offshore energy projects can be safely decommissioned at the appropriate time, for example, if the project owner/operator is unable to carry out full decommissioning due to company failure.\n\nFor offshore oil and gas projects, the decommissioning regime in Great Britain, administered by the Department of Business, Energy and Industrial Strategy (BEIS) and the Oil and Gas Authority, may require companies to establish a type of insurance bond to cover the costs of completing the decommissioning process in the event that the owner/operator does not do so. Drawing on this experience, consideration is currently being given to those arrangements which the developers of the Islandmagee gas storage project may provide, as part of the leasing arrangements with The Crown Estate for such projects, to ensure the safe decommissioning of the facility in due course.\n\nFor offshore electricity generating stations, there is no decommissioning regime in Northern Ireland and therefore no ‘decommissioner of last resort’ in that regard. Discussion has taken place with colleagues in relation to the scheme operating in Great Britain for offshore renewable energy projects and it is an issue that will need to be given careful consideration as we develop the Northern Ireland Energy Strategy, particularly if we are to pursue offshore electricity generation as part of an ambition to diversify our technology mix.","answerHtml":"<p>The term ‘decommissioner of last resort’ is generally used in relation to arrangements for ensuring that offshore energy projects can be safely decommissioned at the appropriate time, for example, if the project owner/operator is unable to carry out full decommissioning due to company failure.</p><p>For offshore oil and gas projects, the decommissioning regime in Great Britain, administered by the Department of Business, Energy and Industrial Strategy (BEIS) and the Oil and Gas Authority, may require companies to establish a type of insurance bond to cover the costs of completing the decommissioning process in the event that the owner/operator does not do so. Drawing on this experience, consideration is currently being given to those arrangements which the developers of the Islandmagee gas storage project may provide, as part of the leasing arrangements with The Crown Estate for such projects, to ensure the safe decommissioning of the facility in due course.</p><p>For offshore electricity generating stations, there is no decommissioning regime in Northern Ireland and therefore no ‘decommissioner of last resort’ in that regard. Discussion has taken place with colleagues in relation to the scheme operating in Great Britain for offshore renewable energy projects and it is an issue that will need to be given careful consideration as we develop the Northern Ireland Energy Strategy, particularly if we are to pursue offshore electricity generation as part of an ambition to diversify our technology mix.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016204%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=330848","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=330848"}},{"id":"330847","reference":"AQW 16203/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-11","answerBy":"2021-03-29","answered":"2021-03-22","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs whether he will work with Executive colleagues to establish a public inquiry to address and consider the marine construction licence, discharge consent and Utility Regulator consents together with regards to the proposed Islandmagee Caverns Gas Storage Project.","answerText":"I expect to be presented with a portfolio of documents within the near future on the determination of an application for a marine construction licence for the Islandmagee Gas Storage project. The documents will also consider reviews of an existing abstraction licence and discharge consent both of which were issued in 2014. I understand that the project requires consents from a number of other consenting authorities. Obtaining these consents would be a matter for the developer to progress with the appropriate consenting authorities.\n\nI also expect to be advised on the option of Executive referral and of the option of holding a public inquiry under section 70 of the Marine and Coastal Access Act 2009.\n\nMy decision will be informed by information that will be presented by officials. I am cognisant of my responsibility to determine the marine licence application and review of the extant abstraction licence and discharge consent in a fair and impartial manner. I am also mindful that I serve all the people of Northern Ireland. Therefore, I am unable to comment or add to speculation on the outcome of a decision I will be making until I have been presented with and considered all relevant information.","answerHtml":"<p>I expect to be presented with a portfolio of documents within the near future on the determination of an application for a marine construction licence for the Islandmagee Gas Storage project. The documents will also consider reviews of an existing abstraction licence and discharge consent both of which were issued in 2014. I understand that the project requires consents from a number of other consenting authorities. Obtaining these consents would be a matter for the developer to progress with the appropriate consenting authorities.</p><p>I also expect to be advised on the option of Executive referral and of the option of holding a public inquiry under section 70 of the Marine and Coastal Access Act 2009.</p><p>My decision will be informed by information that will be presented by officials. I am cognisant of my responsibility to determine the marine licence application and review of the extant abstraction licence and discharge consent in a fair and impartial manner. I am also mindful that I serve all the people of Northern Ireland. Therefore, I am unable to comment or add to speculation on the outcome of a decision I will be making until I have been presented with and considered all relevant information.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016203%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=330847","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=330847"}},{"id":"330931","reference":"AQO 1806/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-03-11","answerBy":"2021-03-23","answered":"2021-03-23","answeredOrally":true,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice for an update on tackling paramilitary activity and crime in East Antrim.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mrs Long","text":"Members will be aware that, although the Executive action plan 'Tackling Paramilitary Activity, Criminality and Organised Crime' is coordinated by my Department, the programme is cross-cutting in nature. Good progress has been made, but we are all too aware that countering the enduring, pervasive nature of paramilitarism requires a long-term, genuinely collaborative approach across government, working closely with community partners. From a law enforcement perspective, the south-east Antrim UDA remains a priority group for the paramilitary crime task force (PCTF). Recent convictions in the area have related to drugs, ammunition and offensive weapon offences. The paramilitary crime task force continues to work with colleagues in local districts to tackle paramilitary activity and crime. In the Mid and East Antrim Borough Council area, a local drugs strategy has been implemented, not only to target those individuals causing most harm to communities but to support the victims of such activity. Learning from the delivery of the programme to date has underlined the importance of developing collaborative models of working between statutory agencies and community partners on the ground to respond effectively to issues in areas that are vulnerable to paramilitary coercion and control. That place-based working will be developed further in phase 2 of the programme. Multi-agency partnership working is already evident in a number of initiatives being delivered under the programme. Those are active in East Antrim and include the Mid and East Antrim Borough Council youth support hub, which is a multi-agency support network supporting vulnerable young people at risk of being influenced or controlled by paramilitary groups. In addition, the Carrickfergus and Larne area has been identified as one of eight priority areas for the focus of the Communities in Transition (CIT) project. A number of projects are being delivered in the area on issues relating to community safety, community capacity-building and restorative justice."},{"speaker":"","text":"Members will be aware that tackling paramilitary activity and criminality is a priority for the Executive. The initiatives that I have described today are specific to the needs of individuals and communities in east Antrim, but continued investment is leading real change for the better for individuals and communities across Northern Ireland. Collaborative working across Departments, drawing on all their strengths, can really deliver positive change."},{"speaker":"Mr Dickson","text":"The Minister will, no doubt, be aware of a recent BBC 'Spotlight' programme in which the horrific murder of Glenn Quinn, a loved son and brother, was highlighted. It shone a much-needed light into a dark and murky corner of paramilitary activity in Carrickfergus. Will the Minister agree that condemnation on its own is wildly insufficient and that we need our communities and people to step up and speak out and to provide evidence of those vile activities to the PSNI and others? That murder is not the only one that has taken place in towns like Carrickfergus and in the wider east Antrim area. Today, while I think in particular of the Quinn family, I think of others going back as far as Simon Tang."},{"speaker":"Mrs Long","text":"I thank the Member for his comments. No one who saw the 'Spotlight' programme last week that featured those affected by the murder of Glenn Quinn could fail to be moved and appalled by what they heard. He was an innocent man who was brutally murdered. The Quinn family have my full support in standing up against those thugs. I encourage anyone with information to contact the PSNI or to go through Crimestoppers, an independent charity that allows people to provide information anonymously. For people to do that, they must have confidence that there will be a response. I have confidence that, if people report that information to the PSNI, there will be a criminal justice response to those who are behind that activity. It is incredibly important that that is the case."},{"speaker":"Mr Beggs","text":"Drug dealing, loan-sharking and brutal violence are hallmarks of organised crime groups. Let us not beat around the bush. It is clear that abusive members of gangs are taking advantage of their local community. I ask the Minister when those responsible for some of the murders will be brought to account. How will she support vulnerable members of the community who have to live there? How can they be protected so that they can be assured that they can live safely with their friends and families?"},{"speaker":"Mrs Long","text":"The Member makes an important point. For those in communities whom we ask to come forward with information, there is a huge vulnerability and a fear. We already know that people can be murdered in their home simply because they have made an offhand comment about thuggery or drug dealing in their community. They are absolutely ruthless organisations. They are interested only in feathering their own nests at the expense of the local community. They are not paramilitaries; they are parasites. They feed off the backs of local communities, and they destroy local communities. It is important that we have a criminal justice response. We can do that only with the full cooperation of the community. It is a question of testing the justice system by bringing forward that information to the PSNI and others. If people feel afraid, they should use Crimestoppers to do that anonymously and allow us to work with the PSNI to ensure that those people can be brought to justice. I would be happy for more of those people to be brought to justice and brought to justice very quickly so that the rest of our community can move on and live in peace."},{"speaker":"Ms Dillon","text":"Go raibh maith agat, a Phríomh-LeasCheann Comhairle. Thank you — Principal Deputy Speaker. I almost forgot it in English. Apologies. I also watched the 'Spotlight' programme and reiterate the remarks of others who have offered condolences to the family. It was difficult to watch. As somebody who also received a threat for speaking up for others who had been threatened by the organisation that we are talking about, I say that we cannot have enough legislation and policing on the issue. Can the Minister give us a timetable for the additional legislation to tackle organised crime that was consulted on late in 2020?"},{"speaker":"Mrs Long","text":"There are a number of threads to the Member's question. I am happy to provide her with a detailed response about the work that the Department is doing. I can give an updated response about the work that commenced last year, with the full support of the Justice Committee, in relation to the commencement in Northern Ireland of the remaining parts of the Criminal Finances Act 2017. We hoped that that work would be brought forward at Westminster in the first quarter of this year. Given the pressures on the legislative programme there, it will now be brought forward by June at the latest. However, the four required pieces of subordinate legislation have been drafted and are going through. Four more pieces are to be done in collaboration with Westminster so that that can complete its course. At that point, we will have access to all parts of the Criminal Finances Act, which includes unexplained wealth orders, forfeiture of accounts and a whole series of other penalties. I firmly believe that, while these individuals use a cloak of political cover to undertake their acts, they are motivated purely and simply by greed. If there were no money in this, they would not be in it either. The sooner we remove the assets that they accrue as a result of their criminal activity, the sooner we will put a stop to what is going on in those communities."},{"speaker":"Mr O'Toole","text":"Minister, in your previous answer, you mentioned political cover being given to these organisations. We cannot ignore the fact that this is happening in the context of increased tension around post-Brexit trade arrangements. Do you agree that there is a real risk that these criminal organisations will use that tension to give cover to their vile acts? Do you agree that it is incumbent on all of us to ensure that, in our words, we do not enable or give \"cover\" to those organisations to do that?"},{"speaker":"Mrs Long","text":"I say to the Member: so it is and so it has always been. People exploit every tension in our community to give some form of political legitimacy to the work that they do in intimidating, bullying, threatening and murdering people in their own communities. It is nothing new, but it is every bit as horrendous now as it ever was during the Troubles. From the perspective of leadership, there is a conversation that we all need to have with organisations that are still wedded to paramilitarism. It is a simple conversation, which is to ask when they are due to stop. There is nothing to be said beyond that. The time has come and gone for people to continue talking about wanting to move forward, particularly when one month they say that they want to move forward, and the next month they rattle sabres about the potential for further violence. You cannot ride two horses. You must choose. If you want to move away from violence, you should get on with it. Show us your bona fides and do it, and you will get nothing but support from those of us in the Assembly Chamber. If you want to continue to use violence and the threat of violence to coerce your community, you will meet with nothing from the Assembly Chamber; you will meet with a police response."},{"speaker":"Mr Principal Deputy Speaker","text":"I remind Members that question 13 has been withdrawn, although the Minister would have set a record if she got to question 13. Topical question 7 has also been withdrawn."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201806%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=330931","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2021-03-23&docID=331535#AQO%201806/17-22","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=330931"}},{"id":"332418","reference":"AQO 1797/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-03-11","answerBy":"2021-03-22","answered":"2021-03-22","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure for an update on the York Street Interchange.","answerText":"The member will be aware that I commissioned a short sharp review of the York Street Interchange scheme, to ensure it is future-proofed and forward looking. This review was completed in November 2020. I am currently considering its findings with a view to deciding on the next steps for the scheme, after which I will make an announcement.","answerHtml":"<p>The member will be aware that I commissioned a short sharp review of the York Street Interchange scheme, to ensure it is future-proofed and forward looking. This review was completed in November 2020. I am currently considering its findings with a view to deciding on the next steps for the scheme, after which I will make an announcement.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201797%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=332418","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=332418"}},{"id":"330713","reference":"AQW 16122/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-10","answerBy":"2021-03-19","answered":"2021-03-12","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will extend the £500 Covid Disruption Payment to all students at further education colleges.","answerText":"As per my responses to AQW 14149/17-22 and AQW 15229/17-22, I have already put in place a range of support measures for further education students. I therefore have no plans to extend the £500 Covid Disruption Payment to all further education students.","answerHtml":"<p>As per my responses to AQW 14149/17-22 and AQW 15229/17-22, I have already put in place a range of support measures for further education students. I therefore have no plans to extend the £500 Covid Disruption Payment to all further education students.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016122%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=330713","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=330713"}},{"id":"330712","reference":"AQW 16121/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-10","answerBy":"2021-03-26","answered":"2021-04-02","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities to detail the number of (i) energy efficiency surveys carried out by Housing Executive surveyors under the Affordable Warmth Scheme; (ii) surveys that identified problems with cavity wall insulation; and (iii) homes that have undergone remedial work due to cavity wall insulation problems highlighted by such inspections.","answerText":"The Housing Executive has provided the following information in relation to energy efficiency surveys under the Affordable Warmth Scheme.\n\n(i) energy efficiency surveys carried out by Housing Executive surveyors under the Affordable Warmth Scheme\n\nThe Housing Executive has confirmed that between September 2014 and 28 February 2021 there have been 24,012 property inspections.\n\n(ii) surveys that identified problems with cavity wall insulation\n\nThe Housing Executive has advised that an electronic record breakdown for the detail requested is only available from April 2019. The survey breakdown from this date to February 2021 is provided in the following table:\n\nNo cavity wall insulation measures required (existing CWI in good condition)\t2,651\nNot applicable (property not suitable due to internal/external defects or construction type Solid Wall / Timber Framed/ Flats)\t949\nCavity wall insulation recommended\t563\nApplicant refused boroscope check\t221\n\nThe Housing Executive can confirm it has offered cavity wall measures to a total of 3,575 households between September 2014 and 28 February 2021.\n\nCavity Wall Insulation may be provided:\n\nwhen the property is suitable for cavity wall insulation; and\n\nwhere a cavity has no insulation; or\n\npartially built in polystyrene sheets; or\n\nextraction and refill is considered necessary.\n\n(iii) homes that have undergone remedial work due to cavity wall insulation problems highlighted by such inspections\n\nThe Housing Executive has confirmed that 2,432 households have chosen to install cavity wall measures between September 2014 and 28 February 2021.","answerHtml":"<p>The Housing Executive has provided the following information in relation to energy efficiency surveys under the Affordable Warmth Scheme.</p><p>(i) energy efficiency surveys carried out by Housing Executive surveyors under the Affordable Warmth Scheme</p><p>The Housing Executive has confirmed that between September 2014 and 28 February 2021 there have been 24,012 property inspections.</p><p>(ii) surveys that identified problems with cavity wall insulation</p><p>The Housing Executive has advised that an electronic record breakdown for the detail requested is only available from April 2019. The survey breakdown from this date to February 2021 is provided in the following table:</p><div class=\"table-wrap\"><table><tr><td>No cavity wall insulation measures required (existing CWI in good condition)</td><td>2,651</td></tr><tr><td>Not applicable (property not suitable due to internal/external defects or construction type Solid Wall / Timber Framed/ Flats)</td><td>949</td></tr><tr><td>Cavity wall insulation recommended</td><td>563</td></tr><tr><td>Applicant refused boroscope check</td><td>221</td></tr></table></div><p>The Housing Executive can confirm it has offered cavity wall measures to a total of 3,575 households between September 2014 and 28 February 2021.</p><p>Cavity Wall Insulation may be provided:</p><p>when the property is suitable for cavity wall insulation; and</p><p>where a cavity has no insulation; or</p><p>partially built in polystyrene sheets; or</p><p>extraction and refill is considered necessary.</p><p>(iii) homes that have undergone remedial work due to cavity wall insulation problems highlighted by such inspections</p><p>The Housing Executive has confirmed that 2,432 households have chosen to install cavity wall measures between September 2014 and 28 February 2021.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016121%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=330712","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=330712"}},{"id":"330711","reference":"AQW 16120/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-10","answerBy":"2021-03-26","answered":"2021-03-16","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance whether there were Barnett Consequentials associated with the Public Sector Decarbonisation Scheme in England.","answerText":"There are no additional Barnett consequentials confirmed in 2020-21 for the Public Sector Decarbonisation Scheme in England.\n\nFor 2021-22, the Spending Review provided Barnett consequentials for English departmental-level changes and not for individual programmes. In that respect it is not possible to determine if individual programmes give rise to Barnett consequentials.","answerHtml":"<p>There are no additional Barnett consequentials confirmed in 2020-21 for the Public Sector Decarbonisation Scheme in England.</p><p>For 2021-22, the Spending Review provided Barnett consequentials for English departmental-level changes and not for individual programmes. In that respect it is not possible to determine if individual programmes give rise to Barnett consequentials.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016120%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=330711","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=330711"}},{"id":"330505","reference":"AQW 16033/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-09","answerBy":"2021-03-18","answered":"2021-04-12","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail (i) the number of £500 Covid Disruption Payments that her Department expects to be made to students in Northern Ireland; and (ii) the number of payments made to date.","answerText":"While many Covid Disruption Payments have already issued to students, it is hoped that the remainder will be paid to eligible students by the end of March 2021. Institutions have been working hard to process the payments to students by this date; however, if necessary, outstanding payments can be accrued into the next financial year.\n\nThe number of HE students (Level 6+) expected to receive a Covid Disruption Payment is 37,034. In respect of HE in FE students (Levels 4 & 5), budgets were allocated on the basis of 3,360 students.\n\nAs the institutions are making the payments themselves, the Department does not hold information regarding the exact number of payments which have been issued to date.","answerHtml":"<p>While many Covid Disruption Payments have already issued to students, it is hoped that the remainder will be paid to eligible students by the end of March 2021. Institutions have been working hard to process the payments to students by this date; however, if necessary, outstanding payments can be accrued into the next financial year.</p><p>The number of HE students (Level 6+) expected to receive a Covid Disruption Payment is 37,034. In respect of HE in FE students (Levels 4 &amp; 5), budgets were allocated on the basis of 3,360 students.</p><p>As the institutions are making the payments themselves, the Department does not hold information regarding the exact number of payments which have been issued to date.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016033%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=330505","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=330505"}},{"id":"330504","reference":"AQW 16032/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-09","answerBy":"2021-03-25","answered":"2021-04-12","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether the £500 Covid Disruption Payment must be paid by institutions to students before the end of this financial year.","answerText":"While many Covid Disruption Payments have already issued to students, it is hoped that the remainder will be paid to eligible students by the end of March 2021. Institutions have been working hard to process the payments to students by this date; however, if necessary, outstanding payments can be accrued into the next financial year.\n\nThe number of HE students (Level 6+) expected to receive a Covid Disruption Payment is 37,034. In respect of HE in FE students (Levels 4 & 5), budgets were allocated on the basis of 3,360 students.\n\nAs the institutions are making the payments themselves, the Department does not hold information regarding the exact number of payments which have been issued to date.","answerHtml":"<p>While many Covid Disruption Payments have already issued to students, it is hoped that the remainder will be paid to eligible students by the end of March 2021. Institutions have been working hard to process the payments to students by this date; however, if necessary, outstanding payments can be accrued into the next financial year.</p><p>The number of HE students (Level 6+) expected to receive a Covid Disruption Payment is 37,034. In respect of HE in FE students (Levels 4 &amp; 5), budgets were allocated on the basis of 3,360 students.</p><p>As the institutions are making the payments themselves, the Department does not hold information regarding the exact number of payments which have been issued to date.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016032%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=330504","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=330504"}},{"id":"330172","reference":"AQW 15965/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-08","answerBy":"2021-03-24","answered":"2021-03-18","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities how many Northern Ireland Housing Executive properties have poorly performing cavity wall insulation; and how many have had remedial and upgrade work carried out to address this since 2015.","answerText":"In 2019 the Housing Executive published their research report on Cavity Wall Insulation. The findings for the Housing Executive’s stock were based on a sample survey of 825 properties, and it was found that 63% of these properties had cavity wall insulation installations that were non-compliant with modern industry standards because there were found to be voids or debris in the cavity.\n\nAlthough the Housing Executive’s data on the construction of all of its stock is not comprehensive, it is estimated that if this 63% is extrapolated it would represent some 44,600 of the Housing Executive’s likely cavity wall constructed properties.\n\nSince 2015 the Housing Executive has completed three schemes relating to cavity wall insulation:\n\nSCHEME NO.\tSCHEME NAME\tDWELLINGS\tCONTRACT START DATE\n24811000\tSTIRLING AVENUE, WEST WINDS CWI\t13\t15/08/2016\n26811000\tCWI WHITEROCK\t146\t03/10/2016\n23811003\tSTRAND AVE HOLYWOOD CWI\t26\t31/10/2016\n\nA number of remedial works have been carried out through the Housing Executive’s response maintenance service but it has not been possible to collate this information in the time available.","answerHtml":"<p>In 2019 the Housing Executive published their research report on Cavity Wall Insulation. The findings for the Housing Executive’s stock were based on a sample survey of 825 properties, and it was found that 63% of these properties had cavity wall insulation installations that were non-compliant with modern industry standards because there were found to be voids or debris in the cavity.</p><p>Although the Housing Executive’s data on the construction of all of its stock is not comprehensive, it is estimated that if this 63% is extrapolated it would represent some 44,600 of the Housing Executive’s likely cavity wall constructed properties.</p><p>Since 2015 the Housing Executive has completed three schemes relating to cavity wall insulation:</p><div class=\"table-wrap\"><table><tr><td>SCHEME NO.</td><td>SCHEME NAME</td><td>DWELLINGS</td><td>CONTRACT START DATE</td></tr><tr><td>24811000</td><td>STIRLING AVENUE, WEST WINDS CWI</td><td>13</td><td>15/08/2016</td></tr><tr><td>26811000</td><td>CWI WHITEROCK</td><td>146</td><td>03/10/2016</td></tr><tr><td>23811003</td><td>STRAND AVE HOLYWOOD CWI</td><td>26</td><td>31/10/2016</td></tr></table></div><p>A number of remedial works have been carried out through the Housing Executive’s response maintenance service but it has not been possible to collate this information in the time available.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015965%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=330172","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=330172"}},{"id":"330171","reference":"AQW 15964/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-08","answerBy":"2021-03-24","answered":"2021-03-22","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities how many properties, identified as having poor cavity wall insulation in the SERC Report 2014 and the BBA Report 2019, have had remedial and upgrade work carried out.","answerText":"The report produced by South Eastern Regional College and the Housing Executive pointed to problems that were arising in some housing stock due to the age of properties and the quality of the cavity wall insulation (CWI). Remedial work was carried out under response maintenance to three of the properties identified in the March 2014 SERC report. The SERC report precipitated the commissioning of the BBA report and as such, unless required for structural reasons, the preparation of further Cavity Wall Insulation schemes was deferred until such time as this investigation had been completed and considered.\n\nFollowing on from the findings of the BBA report, the Housing Executive has published for public and industry consultation a Draft Cavity Wall Action Plan that sets out its proposals for addressing the BBA’s report’s findings and recommendations in respect of its housing stock.\n\nThis consultation document was issued on 22nd December 2021 and responses to it are due by 31st March 2021. The intention is to publish a final Action Plan later this year.","answerHtml":"<p>The report produced by South Eastern Regional College and the Housing Executive pointed to problems that were arising in some housing stock due to the age of properties and the quality of the cavity wall insulation (CWI). Remedial work was carried out under response maintenance to three of the properties identified in the March 2014 SERC report. The SERC report precipitated the commissioning of the BBA report and as such, unless required for structural reasons, the preparation of further Cavity Wall Insulation schemes was deferred until such time as this investigation had been completed and considered.</p><p>Following on from the findings of the BBA report, the Housing Executive has published for public and industry consultation a Draft Cavity Wall Action Plan that sets out its proposals for addressing the BBA’s report’s findings and recommendations in respect of its housing stock.</p><p>This consultation document was issued on 22nd December 2021 and responses to it are due by 31st March 2021. The intention is to publish a final Action Plan later this year.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015964%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=330171","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=330171"}},{"id":"330170","reference":"AQW 15963/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-08","answerBy":"2021-03-24","answered":"2021-03-18","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities, in relation to home energy efficiency and retrofitting, what input her Department has had in the work being undertaken by the Department for the Economy for an Energy Strategy for Northern Ireland.","answerText":"A senior official represents my Department on the Energy Strategy Government Stakeholder Group. Housing officials continue to work with colleagues in the Department for the Economy’s Energy Strategy team in the Energy Efficiency, Heat and Consumer Working Groups supporting the work of the Stakeholder Group. The outputs from the Working Groups will inform the options consultation on the Energy Strategy which is to be published by the end of March.","answerHtml":"<p>A senior official represents my Department on the Energy Strategy Government Stakeholder Group. Housing officials continue to work with colleagues in the Department for the Economy’s Energy Strategy team in the Energy Efficiency, Heat and Consumer Working Groups supporting the work of the Stakeholder Group. The outputs from the Working Groups will inform the options consultation on the Energy Strategy which is to be published by the end of March.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015963%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=330170","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=330170"}},{"id":"330169","reference":"AQW 15962/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-08","answerBy":"2021-03-24","answered":"2021-03-19","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs to detail (i) the source of the funding for (a) staffing; (b) physical port infrastructure for administering post-Brexit checks on goods; and (ii) whether he consulted the relevant bodies providing funding before suspending construction on infrastructure at Northern Ireland ports.","answerText":"Her Majesty’s Treasury agreed to provide additional funding to the Northern Ireland Executive in line with the commitments set out in The UK’s Approach to the Northern Ireland Protocol, published on 20 May 2020.\n\nMy officials are currently engaging with the relevant officials in the Department of Finance and Her Majesty's Treasury as we seek to ensure funding is in place to implement this project.","answerHtml":"<p>Her Majesty’s Treasury agreed to provide additional funding to the Northern Ireland Executive in line with the commitments set out in The UK’s Approach to the Northern Ireland Protocol, published on 20 May 2020.</p><p>My officials are currently engaging with the relevant officials in the Department of Finance and Her Majesty&#39;s Treasury as we seek to ensure funding is in place to implement this project.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015962%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=330169","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=330169"}},{"id":"330168","reference":"AQW 15961/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-08","answerBy":"2021-03-24","answered":"2021-03-18","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities to detail the reasons for the delay in the publication of an Action Plan for cavity wall insulation by the Northern Ireland Housing Executive; and when a plan will be published.","answerText":"The Housing Executive had intended to publish its Draft Cavity Wall Insulation Action Plan in the early autumn last year. However, this was delayed due to the fact that some further analysis of data was required along with further consideration of potential courses of action. The Draft Cavity Wall Insulation Action Plan was issued for consultation on 22nd December 2020. Responses to the consultation document are due by 31st March 2021 and the intention is to publish a final Action Plan later this year.","answerHtml":"<p>The Housing Executive had intended to publish its Draft Cavity Wall Insulation Action Plan in the early autumn last year. However, this was delayed due to the fact that some further analysis of data was required along with further consideration of potential courses of action. The Draft Cavity Wall Insulation Action Plan was issued for consultation on 22nd December 2020. Responses to the consultation document are due by 31st March 2021 and the intention is to publish a final Action Plan later this year.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015961%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=330168","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=330168"}},{"id":"331580","reference":"AQO 1767/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-03-04","answerBy":"2021-03-16","answered":"2021-03-16","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health for an update on any engagement with independent healthcare providers to reduce waiting lists, specifically around diagnosis and treatment.","answerText":"Given the impact of COVID-19 on health service operating capacity, the HSC has secured theatre capacity during 2020/21 from the three local independent sector hospitals to treat the most urgent and time critical patients (i.e. those with confirmed or suspect cancer). These arrangements have allowed many hundreds of patients to be treated by HSC consultants in the private healthcare facilities - during the period 1 April 2020 to 14 February 2021, approximately 4,450 patients have had their procedures undertaken.\n\nIn addition, the HSC has secured capacity from a number of other IS healthcare providers both within Northern Ireland and in the Republic of Ireland to provide assessments, diagnostics and treatments. Furthermore, a number of private healthcare providers are providing in-sourcing services whereby privately recruited teams of clinicians are providing services for HSC patients using available HSC infrastructure.\n\nI have also established a regional approach to ensure that any available theatre capacity across Northern Ireland is allocated for those patients most in need of surgery as we come out of this surge. This approach will include seeking to fully maximise all available HSC and IS capacity.","answerHtml":"<p>Given the impact of COVID-19 on health service operating capacity, the HSC has secured theatre capacity during 2020/21 from the three local independent sector hospitals to treat the most urgent and time critical patients (i.e. those with confirmed or suspect cancer). These arrangements have allowed many hundreds of patients to be treated by HSC consultants in the private healthcare facilities - during the period 1 April 2020 to 14 February 2021, approximately 4,450 patients have had their procedures undertaken.</p><p>In addition, the HSC has secured capacity from a number of other IS healthcare providers both within Northern Ireland and in the Republic of Ireland to provide assessments, diagnostics and treatments. Furthermore, a number of private healthcare providers are providing in-sourcing services whereby privately recruited teams of clinicians are providing services for HSC patients using available HSC infrastructure.</p><p>I have also established a regional approach to ensure that any available theatre capacity across Northern Ireland is allocated for those patients most in need of surgery as we come out of this surge. This approach will include seeking to fully maximise all available HSC and IS capacity.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201767%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=331580","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=331580"}},{"id":"329478","reference":"AQW 15711/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-03","answerBy":"2021-03-11","answered":"2021-04-22","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will seek to introduce Restart Grants to support businesses to resume trading following the easing of COVID-19 restrictions.","answerText":"Any decision on such a scheme would require collective agreement by the Executive. With the Chancellor’s budget announcements now revealed, I have met with Executive colleagues to consider how this impacts on our own situation in Northern Ireland, as we work towards a pathway of sustained recovery. As detailed in the Economic Recovery Action Plan, my Department will launch the High Street Stimulus Scheme, which will provide individuals throughout Northern Ireland with a personalised prepaid card to be spent at ‘bricks and mortar’ businesses including retail, hospitality and close contact services. When it is safe to do so, the launch of this scheme will help to kick-start our economic recovery, and provide a welcome boost to those businesses impacted by the necessary restrictions. As we look forward, my Department’s focus is on a speedy and un-interrupted re-opening of the NI economy as soon as possible, in line with the Executive’s published roadmap ‘Moving Forward: The Executive's Pathway Out of Restrictions’ and the associated health regulations. It will be for the Executive collectively to determine how any Covid-related funding is allocated as we progress through the roadmap and the lifting of restrictions.","answerHtml":"<p>Any decision on such a scheme would require collective agreement by the Executive. With the Chancellor’s budget announcements now revealed, I have met with Executive colleagues to consider how this impacts on our own situation in Northern Ireland, as we work towards a pathway of sustained recovery. As detailed in the Economic Recovery Action Plan, my Department will launch the High Street Stimulus Scheme, which will provide individuals throughout Northern Ireland with a personalised prepaid card to be spent at ‘bricks and mortar’ businesses including retail, hospitality and close contact services. When it is safe to do so, the launch of this scheme will help to kick-start our economic recovery, and provide a welcome boost to those businesses impacted by the necessary restrictions. As we look forward, my Department’s focus is on a speedy and un-interrupted re-opening of the NI economy as soon as possible, in line with the Executive’s published roadmap ‘Moving Forward: The Executive&#39;s Pathway Out of Restrictions’ and the associated health regulations. It will be for the Executive collectively to determine how any Covid-related funding is allocated as we progress through the roadmap and the lifting of restrictions.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015711%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=329478","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=329478"}},{"id":"329476","reference":"AQW 15709/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-03","answerBy":"2021-03-19","answered":"2021-03-16","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs to detail (i) any costs to contactors that his Department may be liable for due to the halting of the construction of border posts at Northern Ireland ports; and (ii) who is contractually responsible for the decision to suspend construction.","answerText":"DAERA officials, with the support of Department for Finance, Construction and Procurement Delivery, appointed contractors across each of the Northern Ireland Points of Entry to secure the full infrastructure build.\n\nUnder the contract, DAERA are the Client/Employer and are therefore contractually responsible for any decision to suspend construction work and any associated compensation cost.","answerHtml":"<p>DAERA officials, with the support of Department for Finance, Construction and Procurement Delivery, appointed contractors across each of the Northern Ireland Points of Entry to secure the full infrastructure build.</p><p>Under the contract, DAERA are the Client/Employer and are therefore contractually responsible for any decision to suspend construction work and any associated compensation cost.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015709%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=329476","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=329476"}},{"id":"329475","reference":"AQW 15708/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-03","answerBy":"2021-03-19","answered":"2021-03-15","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail (i) the impact of the reported 25 per cent departmental staff vacancy rate on the delivery of COVID-19 support; and (ii) what actions her Department is taking to address this issue.","answerText":"Officials across my Department are balancing the day to day activities alongside priority work areas including the Covid-19 pandemic response, EU Exit and putting place plans for economic recovery and our vision for the future.\n\nDespite having a relatively high vacancy rate, the Department, in conjunction with Invest NI which delivers a number of schemes, has developed and delivered significant support to the economy at speed and under difficult and pressurised circumstances. The delivery of support in response to the Covid-19 pandemic remains a priority for the Department and the allocation of staffing resources reflect that priority.\n\nOfficials working on the support schemes are also having to respond to the extensive volume of correspondence received by my Department which includes machinery of government requests, putting further pressure on delivery teams and impacting on the time spent on scheme delivery.","answerHtml":"<p>Officials across my Department are balancing the day to day activities alongside priority work areas including the Covid-19 pandemic response, EU Exit and putting place plans for economic recovery and our vision for the future.</p><p>Despite having a relatively high vacancy rate, the Department, in conjunction with Invest NI which delivers a number of schemes, has developed and delivered significant support to the economy at speed and under difficult and pressurised circumstances. The delivery of support in response to the Covid-19 pandemic remains a priority for the Department and the allocation of staffing resources reflect that priority.</p><p>Officials working on the support schemes are also having to respond to the extensive volume of correspondence received by my Department which includes machinery of government requests, putting further pressure on delivery teams and impacting on the time spent on scheme delivery.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015708%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=329475","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=329475"}},{"id":"329200","reference":"AQW 15611/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-02","answerBy":"2021-03-10","answered":"2021-03-24","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) for an explanation for the delays to payments under the Limited Company Director's Support Scheme; and (ii) what actions she is taking to urgently resolve any issues.","answerText":"(i) In the rolling out of the Limited Company Director's Support Scheme, a potential issue was identified relating to the tax treatment of the proposed grant. In order to prevent retrospective difficulties for applicants, the decision was taken to pause the processing of applications until a solution to the tax treatment issue was identified. Whilst I appreciate that this delay is frustrating for applicants it was considered the best approach to reduce the overall administrative burden and delay of payments. (ii) After taking advice from relevant stakeholders, including HMRC, a solution to allow payments to proceed has been identified. Invest NI, who manage the scheme on behalf of my Department, has written to all relevant applicants providing an update and seeking all relevant additional information to enable processing of applications to proceed. It is anticipated that payments will begin to be made to the employing company of the applicant as soon as possible.","answerHtml":"<p>(i) In the rolling out of the Limited Company Director&#39;s Support Scheme, a potential issue was identified relating to the tax treatment of the proposed grant. In order to prevent retrospective difficulties for applicants, the decision was taken to pause the processing of applications until a solution to the tax treatment issue was identified. Whilst I appreciate that this delay is frustrating for applicants it was considered the best approach to reduce the overall administrative burden and delay of payments. (ii) After taking advice from relevant stakeholders, including HMRC, a solution to allow payments to proceed has been identified. Invest NI, who manage the scheme on behalf of my Department, has written to all relevant applicants providing an update and seeking all relevant additional information to enable processing of applications to proceed. It is anticipated that payments will begin to be made to the employing company of the applicant as soon as possible.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015611%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=329200","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=329200"}},{"id":"329199","reference":"AQW 15610/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-02","answerBy":"2021-03-18","answered":"2021-03-31","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, in relation to the Limited Company Director's Support Scheme, to detail the number of applications (i) submitted; (ii) approved; (iii) approved and paid out; (iv) rejected; and (v) still to be processed.","answerText":"The Limited Company Directors Support Scheme closed to new applications on 4 March 2021, as of 23 March 2021: (i) 6,169 applications had been submitted to the LCDSS. (ii) 647 applications processed (iii) 136 payments issued (iv) 4 applications rejected (v) 5,780 remain to be processed I fully appreciate how important this grant support is, however, in the rolling out of the Limited Company Director's Support Scheme, a potential issue was identified relating to the tax treatment of the proposed grant. In order to prevent retrospective difficulties for applicants, the decision was taken to pause the processing of applications until a solution to the tax treatment issue was identified. Whilst I appreciate that this delay is frustrating for applicants it was considered the best approach to reduce the overall administrative burden and delay of payments. After taking advice from relevant stakeholders, including HMRC, a solution to allow payments to proceed has been identified. Invest NI, who manage the scheme on behalf of my Department, has written to all relevant applicants providing an update and seeking all relevant additional information to enable processing of applications to proceed. The first payments under the scheme were issued 19 March 2021 and to date £476k in support has been provided. Invest NI remain committed to assessing and verifying all outstanding applications, and processing payments, to eligible applicants as quickly as possible.","answerHtml":"<p>The Limited Company Directors Support Scheme closed to new applications on 4 March 2021, as of 23 March 2021: (i) 6,169 applications had been submitted to the LCDSS. (ii) 647 applications processed (iii) 136 payments issued (iv) 4 applications rejected (v) 5,780 remain to be processed I fully appreciate how important this grant support is, however, in the rolling out of the Limited Company Director&#39;s Support Scheme, a potential issue was identified relating to the tax treatment of the proposed grant. In order to prevent retrospective difficulties for applicants, the decision was taken to pause the processing of applications until a solution to the tax treatment issue was identified. Whilst I appreciate that this delay is frustrating for applicants it was considered the best approach to reduce the overall administrative burden and delay of payments. After taking advice from relevant stakeholders, including HMRC, a solution to allow payments to proceed has been identified. Invest NI, who manage the scheme on behalf of my Department, has written to all relevant applicants providing an update and seeking all relevant additional information to enable processing of applications to proceed. The first payments under the scheme were issued 19 March 2021 and to date £476k in support has been provided. Invest NI remain committed to assessing and verifying all outstanding applications, and processing payments, to eligible applicants as quickly as possible.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015610%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=329199","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=329199"}},{"id":"329198","reference":"AQW 15609/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-02","answerBy":"2021-03-18","answered":"2021-03-12","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) for an update on the future of HMS Caroline as a visitor attraction in Belfast; and (ii) to detail the options being considered to end the need to rely on the sole authority of the Budget Act to fund the attraction in future.","answerText":"(i) During the period of temporary closure of HMS Caroline, my officials have been working to identify a range of options for the future of the Ship. Discussions are ongoing with representatives of the National Museum of the Royal Navy and the National Lottery Heritage Fund on the options for the future of the attraction, and due to commercial sensitivities, it would not be appropriate for me to provide any detail on these discussions at this time.\n\nI re-emphasise that I remain committed to finding a solution that ensures that this important cultural and heritage visitor attraction remains in Belfast and I will make further comment on the matter in due course, once the discussions have concluded.\n\n(ii) Differing legal and financial issues are being considered as part of the work on the options for the future of the attraction as outlined above, and it would not be appropriate for me to comment further until the discussions with the National Museum of the Royal Navy and the National Lottery Heritage Fund have completed.","answerHtml":"<p>(i) During the period of temporary closure of HMS Caroline, my officials have been working to identify a range of options for the future of the Ship. Discussions are ongoing with representatives of the National Museum of the Royal Navy and the National Lottery Heritage Fund on the options for the future of the attraction, and due to commercial sensitivities, it would not be appropriate for me to provide any detail on these discussions at this time.</p><p>I re-emphasise that I remain committed to finding a solution that ensures that this important cultural and heritage visitor attraction remains in Belfast and I will make further comment on the matter in due course, once the discussions have concluded.</p><p>(ii) Differing legal and financial issues are being considered as part of the work on the options for the future of the attraction as outlined above, and it would not be appropriate for me to comment further until the discussions with the National Museum of the Royal Navy and the National Lottery Heritage Fund have completed.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015609%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=329198","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=329198"}},{"id":"329197","reference":"AQW 15608/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-02","answerBy":"2021-03-18","answered":"2021-03-11","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on alternative arrangements for the awarding of vocational and essential skills examinations for 2021.","answerText":"On 22 January 2021, I announced the cancellation of all external vocational exams in Northern Ireland for the remainder of this academic year, including BTecs and Essential Skills.\n\nCCEA Regulation has been working closely with other national regulators to develop the detail of the alternative arrangements and following stakeholder consultation, vocational qualifications have been split into 2 broad categories in terms of how they will be managed.\n\nCategory A\n\nThese are qualifications used to signal occupational or professional competency or act as a licence to practise. Results can only be awarded when assessments have taken place given the critical importance of learners practically demonstrating skills/competency prior to entering the workplace to protect public health and safety. Assessments will therefore be taken as normal, or with adaptations, where this is possible. Some assessments may need to be delayed until such times as they can be taken safely, to comply with public health guidance.\n\nCategory B\n\nThese qualifications are used in the same way as GCSEs, AS and A levels to progress to further or higher education. Exams will not go ahead and results will be awarded using a teacher assessed grade submitted by the learning centre, similar to the arrangements for awarding GCSEs and AS or A levels. This will apply to many vocational qualifications such as BTecs, Cambridge Nationals and Technicals, Technical Awards and Technical Certificates.\n\nThere are also smaller qualifications in this category, such as ESOL Skills for Life. Exams and assessments for these qualifications will continue remotely, or in person, in line with public health measures. Where assessments cannot take place, teacher assessed grades will be applied.\n\nIn terms of the alternative arrangements for Essential Skills, a teacher judgment approach will be utilised, based on trusted sources of evidence. To allow suitable transition to the new arrangements, on demand exams will be facilitated.\n\nIn order to facilitate the alternative assessment and awarding arrangements this year, a new regulatory framework will be introduced. This will be called the VQ Contingency Regulatory Framework. This will permit awarding organisations to award results when exams do not take place and/or because learners cannot complete all internal assessments.\n\nAwarding organisations are now required to provide clear and timely guidance to learning centres on the operational requirements for the alternative assessment and awarding arrangements, including timing on when centres need to submit information, the records that they should maintain and the nature of any centre-based quality assurance.","answerHtml":"<p>On 22 January 2021, I announced the cancellation of all external vocational exams in Northern Ireland for the remainder of this academic year, including BTecs and Essential Skills.</p><p>CCEA Regulation has been working closely with other national regulators to develop the detail of the alternative arrangements and following stakeholder consultation, vocational qualifications have been split into 2 broad categories in terms of how they will be managed.</p><p>Category A</p><p>These are qualifications used to signal occupational or professional competency or act as a licence to practise. Results can only be awarded when assessments have taken place given the critical importance of learners practically demonstrating skills/competency prior to entering the workplace to protect public health and safety. Assessments will therefore be taken as normal, or with adaptations, where this is possible. Some assessments may need to be delayed until such times as they can be taken safely, to comply with public health guidance.</p><p>Category B</p><p>These qualifications are used in the same way as GCSEs, AS and A levels to progress to further or higher education. Exams will not go ahead and results will be awarded using a teacher assessed grade submitted by the learning centre, similar to the arrangements for awarding GCSEs and AS or A levels. This will apply to many vocational qualifications such as BTecs, Cambridge Nationals and Technicals, Technical Awards and Technical Certificates.</p><p>There are also smaller qualifications in this category, such as ESOL Skills for Life. Exams and assessments for these qualifications will continue remotely, or in person, in line with public health measures. Where assessments cannot take place, teacher assessed grades will be applied.</p><p>In terms of the alternative arrangements for Essential Skills, a teacher judgment approach will be utilised, based on trusted sources of evidence. To allow suitable transition to the new arrangements, on demand exams will be facilitated.</p><p>In order to facilitate the alternative assessment and awarding arrangements this year, a new regulatory framework will be introduced. This will be called the VQ Contingency Regulatory Framework. This will permit awarding organisations to award results when exams do not take place and/or because learners cannot complete all internal assessments.</p><p>Awarding organisations are now required to provide clear and timely guidance to learning centres on the operational requirements for the alternative assessment and awarding arrangements, including timing on when centres need to submit information, the records that they should maintain and the nature of any centre-based quality assurance.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015608%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=329197","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=329197"}},{"id":"329196","reference":"AQW 15607/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-03-02","answerBy":"2021-03-18","answered":"2021-03-11","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education, pursuant to AQW 14469/17-22, to detail the number of requests that are outstanding for devices or internet access support from schools in East Antrim.","answerText":"I can advise, to date, all requests for digital devices received from the priority years groups have been fulfilled in the East Antrim constituency. The priority year groups were years 12, 14, 7, 11 and 13. Having fully met this demand, I approved the procurement of additional devices and agreed to extend the digital devices lending scheme to eligible learners in other years. To ensure resources are focused where the need is greatest, the remaining year groups were prioritised to allow the additional requests to be processed in a structured and sequential manner.\n\nAs the scheme progresses through the agreed priority list, requests will be administered on a year group basis (years 10, 6, 3, 8, 5, 9, 2 and 1) and the initial estimates from colleagues in the Education Authority indicate there shall be a sufficient number of devices to meet the forecasted demand.\n\nAt present there are 102 requests from learners in the East Antrim constituency and I have been advised that 26 devices, for Year 10 pupils, were allocated from the week commencing 8 March.\n\nIn relation to Wifi devices, there was a request for five Mifi devices within East Antrim and these were to be delivered to learners in the week commencing 15 March.","answerHtml":"<p>I can advise, to date, all requests for digital devices received from the priority years groups have been fulfilled in the East Antrim constituency. The priority year groups were years 12, 14, 7, 11 and 13. Having fully met this demand, I approved the procurement of additional devices and agreed to extend the digital devices lending scheme to eligible learners in other years. To ensure resources are focused where the need is greatest, the remaining year groups were prioritised to allow the additional requests to be processed in a structured and sequential manner.</p><p>As the scheme progresses through the agreed priority list, requests will be administered on a year group basis (years 10, 6, 3, 8, 5, 9, 2 and 1) and the initial estimates from colleagues in the Education Authority indicate there shall be a sufficient number of devices to meet the forecasted demand.</p><p>At present there are 102 requests from learners in the East Antrim constituency and I have been advised that 26 devices, for Year 10 pupils, were allocated from the week commencing 8 March.</p><p>In relation to Wifi devices, there was a request for five Mifi devices within East Antrim and these were to be delivered to learners in the week commencing 15 March.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015607%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=329196","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=329196"}},{"id":"328511","reference":"AQW 15386/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-25","answerBy":"2021-03-05","answered":"2021-03-03","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what engagement she has had with her Executive colleagues in developing her recently published Economic Recovery Action Plan.","answerText":"From the outset of this pandemic I have been in close contact with stakeholders and delivery partners, and my Department has remained engaged throughout the development of the Economic Recovery Action Plan.\n\nEconomic recovery is one of the four pillars of work being taken forward by the Executives Covid-19 Task Force (“ECT”). As part of this work, departments and sectors will be asked to examine the steps needed to start the recovery process which will, in turn, inform the overall “Building Forward” recovery approach for the Executive.\n\nMy Economic Recovery Action Plan provides a comprehensive contribution to this process and the wider Executive framework for recovery. The plan is intended to start a wider and more detailed conversation regarding our recovery journey.\n\nThis is a unique and dynamic situation and as such my Department will remain agile, flexible and adaptive in the support we provide to businesses and our people throughout the recovery process.","answerHtml":"<p>From the outset of this pandemic I have been in close contact with stakeholders and delivery partners, and my Department has remained engaged throughout the development of the Economic Recovery Action Plan.</p><p>Economic recovery is one of the four pillars of work being taken forward by the Executives Covid-19 Task Force (“ECT”). As part of this work, departments and sectors will be asked to examine the steps needed to start the recovery process which will, in turn, inform the overall “Building Forward” recovery approach for the Executive.</p><p>My Economic Recovery Action Plan provides a comprehensive contribution to this process and the wider Executive framework for recovery. The plan is intended to start a wider and more detailed conversation regarding our recovery journey.</p><p>This is a unique and dynamic situation and as such my Department will remain agile, flexible and adaptive in the support we provide to businesses and our people throughout the recovery process.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015386%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=328511","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=328511"}},{"id":"328510","reference":"AQW 15385/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-25","answerBy":"2021-03-12","answered":"2021-03-15","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will review her recently published Economic Recovery Action Plan to ensure actions to maximise the benefits of Northern Ireland’s dual market access to the UK Market, and EU Single Market for goods form part of the plan.","answerText":"‘Investment, Trade and Exports’ is one of the four key themes of my Economic Recovery Action Plan. This sets out that Northern Ireland is a great place to work and do business in. My Department, along with Invest NI, has never stopped promoting that message around the globe.\n\nI have always been clear that my first priority is addressing the frictions relating to new requirements under the Protocol for moving goods from GB to NI, inputs which our businesses so depend on, including for exports.\n\nI will continue to engage to resolve these issues for businesses so that we can continue to demonstrate that NI is an exceptional place to invest in, and to support our businesses to ensure they can grow their exports to their key\n\nmarkets within the UK, EU and beyond. This is a key part of my Economic Recovery Action Plan, and one I intend to continue to build on.","answerHtml":"<p>‘Investment, Trade and Exports’ is one of the four key themes of my Economic Recovery Action Plan. This sets out that Northern Ireland is a great place to work and do business in. My Department, along with Invest NI, has never stopped promoting that message around the globe.</p><p>I have always been clear that my first priority is addressing the frictions relating to new requirements under the Protocol for moving goods from GB to NI, inputs which our businesses so depend on, including for exports.</p><p>I will continue to engage to resolve these issues for businesses so that we can continue to demonstrate that NI is an exceptional place to invest in, and to support our businesses to ensure they can grow their exports to their key</p><p>markets within the UK, EU and beyond. This is a key part of my Economic Recovery Action Plan, and one I intend to continue to build on.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015385%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=328510","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=328510"}},{"id":"328509","reference":"AQW 15384/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-25","answerBy":"2021-03-12","answered":"2021-03-01","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail the level of funding currently agreed by the Executive to fund her recently published Economic Recovery Action Plan.","answerText":"The Economic Recovery Action Plan (“the Plan”) is my blueprint to rebuild a stronger economy for Northern Ireland. The document sets out a range of decisive actions to kick-start economic recovery.\n\nAs you will be aware, the process to set the 2021-22 budget is ongoing, with consultation on the draft budget only recently closing. Within this context, the Plan will inform the Executive’s ongoing budgetary discussions.\n\nWith over £500m of Covid funding available to allocate now, I will be strongly advocating that Covid allocations are made at the earliest opportunity. This will allow my Department, and others, to mobilise our interventions as soon as possible and drive forward recovery.\n\nNotwithstanding this, some of the activity set out in the Plan will be funded from existing departmental baseline budget. The £290m represents the additional monies required to deliver on the Plan in full.","answerHtml":"<p>The Economic Recovery Action Plan (“the Plan”) is my blueprint to rebuild a stronger economy for Northern Ireland. The document sets out a range of decisive actions to kick-start economic recovery.</p><p>As you will be aware, the process to set the 2021-22 budget is ongoing, with consultation on the draft budget only recently closing. Within this context, the Plan will inform the Executive’s ongoing budgetary discussions.</p><p>With over £500m of Covid funding available to allocate now, I will be strongly advocating that Covid allocations are made at the earliest opportunity. This will allow my Department, and others, to mobilise our interventions as soon as possible and drive forward recovery.</p><p>Notwithstanding this, some of the activity set out in the Plan will be funded from existing departmental baseline budget. The £290m represents the additional monies required to deliver on the Plan in full.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015384%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=328509","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=328509"}},{"id":"328508","reference":"AQW 15383/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-25","answerBy":"2021-03-12","answered":"2021-04-14","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will provide financial support to self-employed people in Northern Ireland that have been excluded from the UK Self Employed Income Support Scheme due to the 50 per cent earnings rule.","answerText":"The Executive and the UK Government have introduced a wide range of business support schemes to help ease the extraordinary burden that has been placed on entire communities and our local economy, due to the ongoing global pandemic.\n\nTo date, my Department has provided over £400 million of lifeline support to over 30,000 businesses and individuals, and is currently delivering millions of pounds to thousands more. These included the Newly Self-Employed Support Scheme, Limited Company Director’s Business Support Scheme and the Covid Restrictions Business Support Scheme, all of which were primarily targeted at self-employed people throughout Northern Ireland.\n\nThe Self-Employment Income Support Scheme (SEISS) is administered by HMRC on behalf of the UK Government. Whilst the NI Executive has made representations to the UK Government regarding the eligibility criteria, unfortunately, it has been unable to affect any significant change as to how the scheme is administered.\n\nMoving forward, my focus will be on the re-opening the economy. I firmly believe that the best way to support all of our local businesses, employers and high streets, is to make a full and safe return to working and trading as soon as possible, in line with the health regulations and the published roadmap ‘Moving Forward: The Executive's Pathway Out of Restrictions’.\n\nIt will be for the Executive collectively to determine how any new or additional Covid-related funding for the 2021/22 financial year will be allocated as we move out of restrictions, and towards a sustained and successful economic recovery.","answerHtml":"<p>The Executive and the UK Government have introduced a wide range of business support schemes to help ease the extraordinary burden that has been placed on entire communities and our local economy, due to the ongoing global pandemic.</p><p>To date, my Department has provided over £400 million of lifeline support to over 30,000 businesses and individuals, and is currently delivering millions of pounds to thousands more. These included the Newly Self-Employed Support Scheme, Limited Company Director’s Business Support Scheme and the Covid Restrictions Business Support Scheme, all of which were primarily targeted at self-employed people throughout Northern Ireland.</p><p>The Self-Employment Income Support Scheme (SEISS) is administered by HMRC on behalf of the UK Government. Whilst the NI Executive has made representations to the UK Government regarding the eligibility criteria, unfortunately, it has been unable to affect any significant change as to how the scheme is administered.</p><p>Moving forward, my focus will be on the re-opening the economy. I firmly believe that the best way to support all of our local businesses, employers and high streets, is to make a full and safe return to working and trading as soon as possible, in line with the health regulations and the published roadmap ‘Moving Forward: The Executive&#39;s Pathway Out of Restrictions’.</p><p>It will be for the Executive collectively to determine how any new or additional Covid-related funding for the 2021/22 financial year will be allocated as we move out of restrictions, and towards a sustained and successful economic recovery.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015383%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=328508","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=328508"}},{"id":"328507","reference":"AQW 15382/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-25","answerBy":"2021-03-12","answered":"2021-03-09","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will provide specific financial support to the Northern Ireland wedding industry as COVID-19 restrictions ease.","answerText":"I recently launched the Economic Recovery Action Plan for Northern Ireland which allows us to look beyond the current climate and plan for recovery. It sets out actions to support all businesses going forwards.\n\nAs the restrictions ease I look forward to better times ahead for the local economy. In the meantime my Department continues to do all it can to support businesses and individuals through this crisis.\n\nIt is important to recognise that the wedding industry is a diverse sector covering a variety of different businesses. I acknowledge that they have been particularly impacted, however many of these have been able to access support under the various schemes provided by the NI Executive and the UK Government.\n\nThose operating from retail premises but deemed non-essential and those running wedding venues which have been forced to close, may have been eligible for support under the Localised Restrictions Support Scheme administered by the Department of Finance.\n\nThose operating on a mobile basis, for example delivering close contact services, would have been eligible for Part A of the Covid Restrictions Business Support Scheme administered by Invest NI on behalf of my Department.\n\nSupply chain businesses that would normally provide products and services to businesses required to close may have been eligible for support under Part B of the Covid Restrictions Business Support Scheme.\n\nBusinesses in this sector may have also been eligible for support under UK Government schemes such as the Job Retention Scheme (furlough) for their employees and the Self-Employment Income Support Schemes (SEISS). Both of these have now been extended until September. This is an announcement which I very much welcome as it will provide invaluable support to business across Northern Ireland.\n\nWhilst the Executive and my own Department continue to receive calls for specific targeted support, it is simply not possible to design and fund schemes for every sector of business or employment across our society.","answerHtml":"<p>I recently launched the Economic Recovery Action Plan for Northern Ireland which allows us to look beyond the current climate and plan for recovery. It sets out actions to support all businesses going forwards.</p><p>As the restrictions ease I look forward to better times ahead for the local economy. In the meantime my Department continues to do all it can to support businesses and individuals through this crisis.</p><p>It is important to recognise that the wedding industry is a diverse sector covering a variety of different businesses. I acknowledge that they have been particularly impacted, however many of these have been able to access support under the various schemes provided by the NI Executive and the UK Government.</p><p>Those operating from retail premises but deemed non-essential and those running wedding venues which have been forced to close, may have been eligible for support under the Localised Restrictions Support Scheme administered by the Department of Finance.</p><p>Those operating on a mobile basis, for example delivering close contact services, would have been eligible for Part A of the Covid Restrictions Business Support Scheme administered by Invest NI on behalf of my Department.</p><p>Supply chain businesses that would normally provide products and services to businesses required to close may have been eligible for support under Part B of the Covid Restrictions Business Support Scheme.</p><p>Businesses in this sector may have also been eligible for support under UK Government schemes such as the Job Retention Scheme (furlough) for their employees and the Self-Employment Income Support Schemes (SEISS). Both of these have now been extended until September. This is an announcement which I very much welcome as it will provide invaluable support to business across Northern Ireland.</p><p>Whilst the Executive and my own Department continue to receive calls for specific targeted support, it is simply not possible to design and fund schemes for every sector of business or employment across our society.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015382%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=328507","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=328507"}},{"id":"328627","reference":"AQO 1718/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-02-25","answerBy":"2021-03-09","answered":"2021-03-09","answeredOrally":true,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for her assessment of whether a green economic recovery is integrated effectively into her recently published Economic Recovery Action Plan.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mrs Dodds","text":"With your permission, Mr Speaker, I wish to group questions 2 and 3. Again, with your permission, I would like to avail myself of an extra minute to answer the grouping. On 25 February, I launched my economic recovery action plan, which outlines the decisive actions that I plan to take to support our economy as we emerge from the COVID-19 pandemic. Rebuilding a greener economy is at the heart of the plan, and that includes actions focused on encouraging the development of a greener future in areas such as clean energy, green innovation and energy efficiency. The plan also reaffirms my commitment to the development of the hydrogen and circular economy. Later this month, I will launch an options consultation on my new energy strategy. I expect substantial investment and economic recovery opportunities to arise from the new policies for decarbonising energy in Northern Ireland. Enabling a skilled low-carbon workforce will be key to delivering that. Embracing and investing in environmentally friendly opportunities offers the Northern Ireland economy the opportunity to build resilience, increase productivity, create jobs, strengthen competitiveness and realise carbon, energy and cost savings. It is crucial that funding is made available at the earliest opportunity for my economic recovery plan so that it can have the maximum impact. I look forward to working with the Finance Minister and, indeed, all of my Executive colleagues in the coming weeks to ensure that we can rebuild our economy to be more competitive, more inclusive and more environmentally sustainable."},{"speaker":"Miss Woods","text":"I thank the Minister for her answer. A green recovery will involve not just green stimulus and investment, of which there is none in the economic plan, to create jobs; it requires new ways of measuring progress. Will the Minister adopt or consider any alternative economic models in her plans for COVID-19 recovery, including alternative ways to measure prosperity and address inequalities in wealth and income?"},{"speaker":"Mrs Dodds","text":"I thank the Member for her question. I, of course, want the economic recovery action plan to create not just a stable and prosperous Northern Ireland but a more equal Northern Ireland, including a more equally regionally balanced economy. I will look at all the measures as we continue to work our way through that economic recovery plan. It is important that we get the investment for that economic recovery plan so that we begin the journey of reopening, rebuilding and recovering our economy. That is the way to provide inclusive growth for the future."},{"speaker":"Mr Dickson","text":"Thank you, Minister, for your answers. If your economic recovery plan is to include the whole area of the green economy, it will require you to work together with other Ministers to deliver that; it is not something that you can do on your own or that Northern Ireland can do on its own because it will require the involvement of the European Union and the rest of the United Kingdom. Minister, do you agree that, although your plan is of benefit, it will not stand up unless it includes a wide-ranging and comprehensive green economy intervention?"},{"speaker":"Mrs Dodds","text":"I thank the Member for his question. He somewhat makes my point for me. My economic recovery plan states that we need specific interventions in relation to the green economy for the sustainable and prosperous future that we see as being really important for Northern Ireland. That will involve me working across the Executive with other Ministers. Of course, I am already doing that. Perhaps the Member is knowledgeable about the innovative project that I am doing with Northern Ireland Water. It is the first of its kind; it will lead to greater sustainability; and, of course, it demonstrates working right across the Executive to produce a joined-up plan for economic recovery. As we emerge from the dark times of the COVID pandemic, the most important thing that we can do is to help to recover our economy, our health service and our services to people in their communities. The House has my commitment that I will work across the Executive to do those very important things."},{"speaker":"Mr Catney","text":"Minister, do you consider the expenditure allocation for the greener economy to be sufficient to enable Northern Ireland to meet the UK's 2050 net zero target, or do you intend to approach the Finance Minister to bid for additional funding? What we sow now, we will reap in the future."},{"speaker":"Mrs Dodds","text":"The Member makes a very important point. In my economic recovery plan, I have identified a sum that will give us some element of recovery for Northern Ireland and, indeed, the green economy in Northern Ireland. That economy is already happening all around us. I do not know whether some of you saw the story last week about the mission to build zero emission boats and vessels in Belfast and the huge and really innovative changes that are being made to do that. When it comes to transport, the use of hydrogen buses is happening all around us. It is happening across the different parts of the Executive. The economic recovery plan is a live document. It will evolve and develop, and so, too, will our asks of the Finance Minister to fund the green economy as we move forward."},{"speaker":"Ms Brogan","text":"Does the Minister acknowledge that, as well as providing us with a sound and sustainable economy, a green recovery that delivers cleaner air and water, as well as one that protects biodiversity, can help populations when it comes to developing natural defences to future pandemics?"},{"speaker":"Mrs Dodds","text":"I am no expert in the matter, but I know that a greener recovery — more sustainable environment, more sustainable hopes for businesses and manufacturing and so on as we go forward — is hugely important for the benefit of all of our lives, not least for the jobs and prosperity that it can bring us."},{"speaker":"Mr Irwin","text":"The Minister has identified the importance of clean energy as a priority for her as we rebuild and regrow our local economy. What future opportunities are there for the hydrogen economy?"},{"speaker":"Mrs Dodds","text":"I thank the Member for his question. This is one of the most exciting elements of the work that we are doing. It is cutting-edge, and it has the ability to really drive forward the investment opportunities that investing in the green economy will give us. It is an opportunity to build on our world-leading capabilities in renewables and advanced manufacturing to create those sustainable jobs. Those opportunities can be realised through producing green hydrogen; supplying this for clean heat, power and transport; and developing and manufacturing cutting-edge technologies such as electrolysers. There will also be export opportunities for advanced manufacturing in global hydrogen supply chains. I have already referred to the £5 million of funding that I provided to Northern Ireland Water to undertake an innovative oxygen and hydrogen demonstrator project, the first such project in the United Kingdom and Ireland. That will also help to build momentum in the hydrogen economy. I am aware of many other exciting and emerging projects in this space, and I look forward to engaging with those who develop this cutting-edge technology."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201718%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=328627","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2021-03-09&docID=329455#AQO%201718/17-22","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=328627"}},{"id":"327896","reference":"AQW 15208/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-23","answerBy":"2021-03-10","answered":"2021-03-16","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what engagement she has had with the Chancellor of the Exchequer in regards to the need for an extension to the Coronavirus Job Retention Scheme past the current end date of 30 April 2021.","answerText":"Whilst the Department for Finance leads on engagement with Treasury, I wrote to the Chancellor of the Exchequer on 26 February 2021 in regards to the need for an extension to the Coronavirus Job Retention Scheme past the current end date of 30 April 2021.\n\nI also wrote to him on the same subject last summer, requesting an extension to a previous deadline.","answerHtml":"<p>Whilst the Department for Finance leads on engagement with Treasury, I wrote to the Chancellor of the Exchequer on 26 February 2021 in regards to the need for an extension to the Coronavirus Job Retention Scheme past the current end date of 30 April 2021.</p><p>I also wrote to him on the same subject last summer, requesting an extension to a previous deadline.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015208%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=327896","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=327896"}},{"id":"327895","reference":"AQW 15207/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-23","answerBy":"2021-03-10","answered":"2021-03-04","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will review electricity market regulations to ensure that barriers for the installation of new and updated electric vehicle charging points are minimised.","answerText":"The Department is considering the legislative and regulatory framework for electric vehicle charging points as part of ongoing work on the Electricity Directive (EU) 2019/944 and the Energy Strategy.","answerHtml":"<p>The Department is considering the legislative and regulatory framework for electric vehicle charging points as part of ongoing work on the Electricity Directive (EU) 2019/944 and the Energy Strategy.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015207%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=327895","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=327895"}},{"id":"327894","reference":"AQW 15206/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-23","answerBy":"2021-03-10","answered":"2021-04-19","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will set up a dedicated unit within Invest NI to help ensure Northern Ireland maximises opportunities and investment in the local green economy.","answerText":"Invest NI recognises the increasing significance of the green economy as an emerging driver of future growth and prosperity. In line with DfE’s Economic Recovery Action Plan and as a key strand of my Department’s Energy Strategy Options Consultation, growing the green economy is one of Invest NI’s eight key recovery drivers through which it aims to accelerate progress by industry towards Net Zero by stimulating investment in a green sustainable recovery. To this end, and recognising that there is still much to do to understand the depth & breadth of the opportunities in the green economy it is Invest NI’s aim to review resource allocation in this area.\n\nCurrently, Invest NI works with and supports companies active in Clean Technology sectors. They generate c.£1.77bn in annual sales, of which £1.12bn is exported and £500m is sold to GB. In order to stimulate further growth, it has funded 18 company networks through its Collaborative Network Programme to focus on building capability which can be deployed through the green economy and in addition, has a broad portfolio of support schemes that can and will support businesses to capitalise from opportunities in the green economy as they become clearer.","answerHtml":"<p>Invest NI recognises the increasing significance of the green economy as an emerging driver of future growth and prosperity. In line with DfE’s Economic Recovery Action Plan and as a key strand of my Department’s Energy Strategy Options Consultation, growing the green economy is one of Invest NI’s eight key recovery drivers through which it aims to accelerate progress by industry towards Net Zero by stimulating investment in a green sustainable recovery. To this end, and recognising that there is still much to do to understand the depth &amp; breadth of the opportunities in the green economy it is Invest NI’s aim to review resource allocation in this area.</p><p>Currently, Invest NI works with and supports companies active in Clean Technology sectors. They generate c.£1.77bn in annual sales, of which £1.12bn is exported and £500m is sold to GB. In order to stimulate further growth, it has funded 18 company networks through its Collaborative Network Programme to focus on building capability which can be deployed through the green economy and in addition, has a broad portfolio of support schemes that can and will support businesses to capitalise from opportunities in the green economy as they become clearer.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015206%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=327894","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=327894"}},{"id":"327893","reference":"AQW 15205/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-23","answerBy":"2021-03-10","answered":"2021-03-30","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will set up an expert advisory panel to advise on a green economic recovery and ensure Northern Ireland maximises all opportunities in this area.","answerText":"As part of the development of the new Energy Strategy, an expert advisory panel has already been established to support the Department’s work. This panel is providing advice on a range of energy policy areas, including those which will help to contribute to a green economic recovery. My Department is also leading on the development of a Circular Economy Strategic Framework for Northern Ireland. Officials are currently in the process of establishing an expert advisory panel to facilitate engagement and garner the wealth of subject matter knowledge and expertise necessary to inform the framework development process. Key stakeholders will include local government, business, academia and the third sector. Those invited to contribute will be well positioned to represent the breadth of sectors and organisations working in, developing and delivering aspects of the Circular Economy within Northern Ireland or internationally. There are number of complementary work streams in progress across government that will deliver on the Executives ambitions of a green economy, climate change action and delivery of sustainable economic growth and I welcome the close working relationships that have developed with colleagues in other departments to date.","answerHtml":"<p>As part of the development of the new Energy Strategy, an expert advisory panel has already been established to support the Department’s work. This panel is providing advice on a range of energy policy areas, including those which will help to contribute to a green economic recovery. My Department is also leading on the development of a Circular Economy Strategic Framework for Northern Ireland. Officials are currently in the process of establishing an expert advisory panel to facilitate engagement and garner the wealth of subject matter knowledge and expertise necessary to inform the framework development process. Key stakeholders will include local government, business, academia and the third sector. Those invited to contribute will be well positioned to represent the breadth of sectors and organisations working in, developing and delivering aspects of the Circular Economy within Northern Ireland or internationally. There are number of complementary work streams in progress across government that will deliver on the Executives ambitions of a green economy, climate change action and delivery of sustainable economic growth and I welcome the close working relationships that have developed with colleagues in other departments to date.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015205%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=327893","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=327893"}},{"id":"327584","reference":"AQW 15121/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-22","answerBy":"2021-03-09","answered":"2021-03-09","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health for an update on the vaccination programme for staff at special schools; and whether he will ensure this includes all staff.","answerText":"The Northern Ireland vaccination programme is being implemented in line with JCVI recommendations.\n\nWhilst I acknowledge the anxieties of staff, parents and carers for children and young people who attend special schools, JCVI has not recommended prioritisation by occupation.\n\nHowever plans are being finalised to vaccinate a number of staff in special schools who provide close personal care to a number of clinically vulnerable children.\n\nIt is recognised that staff directly supporting these children will undertake roles which will align to the multi-agency educational and care plans for these children who are the most clinically vulnerable.\n\nDiscussions have taken place between the Education Authority, Public Health Agency, Paediatricians and my department to identify a cohort of children and young people with the most complex additional healthcare needs who are clinically vulnerable to severe effects of COVID.\n\nI am pleased to say these children have now been identified, and operational arrangements are being finalised to help EA and special schools to identify the staff who support these children and young people. These staff undertake procedures with the children identified that require them to work in close proximity for prolonged periods of time with the particular children and young people. The eligible staff will be able to book in for vaccination at one of the seven regional vaccination centres.\n\nAny special school staff not identified as belonging to the cohort above will be vaccinated in line with the age or clinical status cohort they belong to.","answerHtml":"<p>The Northern Ireland vaccination programme is being implemented in line with JCVI recommendations.</p><p>Whilst I acknowledge the anxieties of staff, parents and carers for children and young people who attend special schools, JCVI has not recommended prioritisation by occupation.</p><p>However plans are being finalised to vaccinate a number of staff in special schools who provide close personal care to a number of clinically vulnerable children.</p><p>It is recognised that staff directly supporting these children will undertake roles which will align to the multi-agency educational and care plans for these children who are the most clinically vulnerable.</p><p>Discussions have taken place between the Education Authority, Public Health Agency, Paediatricians and my department to identify a cohort of children and young people with the most complex additional healthcare needs who are clinically vulnerable to severe effects of COVID.</p><p>I am pleased to say these children have now been identified, and operational arrangements are being finalised to help EA and special schools to identify the staff who support these children and young people. These staff undertake procedures with the children identified that require them to work in close proximity for prolonged periods of time with the particular children and young people. The eligible staff will be able to book in for vaccination at one of the seven regional vaccination centres.</p><p>Any special school staff not identified as belonging to the cohort above will be vaccinated in line with the age or clinical status cohort they belong to.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015121%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=327584","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=327584"}},{"id":"327583","reference":"AQW 15120/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-22","answerBy":"2021-03-09","answered":"2021-03-03","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what engagement her Department has had with employers to encourage supportive and flexible working arrangements for parents managing home schooling and working from home.","answerText":"Throughout this pandemic, my Department, in line with the wider Executive, has emphasised the importance of employees working from home, where possible, and has encouraged employers to support their employees in doing so.\n\nI know that many workers and their families appreciate and value the benefits that a good employer and favourable flexible working arrangements bring, not only in terms of managing home schooling but for achieving a wider work-life balance.\n\nI would continue to encourage employers and employees to work together in finding flexible solutions to the difficulties that home schooling can present. I would also hope that the burden of home schooling can soon be lifted from hard pressed working parents as we see the benefits of the wider roll out of the vaccination programme and, in turn, our children returning to normal schooling.\n\nOver the last year, in order to reach and engage with as many employers as possible, my Department, through the auspices of InvestNI, has published a number of coronavirus related business guides. These are available on the NIBusinessInfo website and include advice and guidance for employers on how to facilitate homeworking. The Labour Relations Agency has also published a number of coronavirus related guides, including a practical guide to working from home.\n\nMy focus and that of my Department, throughout this difficult period, has been to ensure that employees and employers alike are supported. Measures which have helped to mitigate against the worst effects of coronavirus on the Northern Ireland economy, its employers and their employees, include the Job Retention Scheme, the Apprenticeship Return, Retain and Result Scheme and various other Business Support Schemes.\n\nFaced with the continuing need to respond effectively to the Covid-19 crisis, my immediate focus is on economic recovery.","answerHtml":"<p>Throughout this pandemic, my Department, in line with the wider Executive, has emphasised the importance of employees working from home, where possible, and has encouraged employers to support their employees in doing so.</p><p>I know that many workers and their families appreciate and value the benefits that a good employer and favourable flexible working arrangements bring, not only in terms of managing home schooling but for achieving a wider work-life balance.</p><p>I would continue to encourage employers and employees to work together in finding flexible solutions to the difficulties that home schooling can present. I would also hope that the burden of home schooling can soon be lifted from hard pressed working parents as we see the benefits of the wider roll out of the vaccination programme and, in turn, our children returning to normal schooling.</p><p>Over the last year, in order to reach and engage with as many employers as possible, my Department, through the auspices of InvestNI, has published a number of coronavirus related business guides. These are available on the NIBusinessInfo website and include advice and guidance for employers on how to facilitate homeworking. The Labour Relations Agency has also published a number of coronavirus related guides, including a practical guide to working from home.</p><p>My focus and that of my Department, throughout this difficult period, has been to ensure that employees and employers alike are supported. Measures which have helped to mitigate against the worst effects of coronavirus on the Northern Ireland economy, its employers and their employees, include the Job Retention Scheme, the Apprenticeship Return, Retain and Result Scheme and various other Business Support Schemes.</p><p>Faced with the continuing need to respond effectively to the Covid-19 crisis, my immediate focus is on economic recovery.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015120%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=327583","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=327583"}},{"id":"327214","reference":"AQW 14945/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-18","answerBy":"2021-03-05","answered":"2021-08-20","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister whether their Department has had any engagement with the Department for the Economy in support of expanding the £500 Covid Disruption Payment to students ordinarily resident in Northern Ireland, but studying elsewhere.","answerText":"Financial support available for students is a matter for Department of Economy. The Executive made decisions on COVID-19 funding on the basis of proposals by the Minister of Finance reflecting bids submitted by departments for their respective needs.\n\nThe Covid Disruption Payment was available to full time publicly funded Higher Education Institutions and full-time Higher Education students at the Further Education Colleges studying here who were enrolled in February 2021. The payments were in recognition of the disruption suffered by students to their studies due to the impact of Covid-19, and these payments have already rolled out to students. Students from here who are studying at an institution in England, Scotland, Wales or Ireland may have been eligible for support schemes provided by the respective administrations.\n\nOn 22 June 2021, the University of Ulster and the Queen’s University of Belfast announced that in addition to the Covid Disruption Payment, they will provide students attending their Universities with an additional £495 payment. This payment will be based on household income and will be issued to approximately 9,000 students. The payment is made possible by the Department for the Economy's financial support package in recognition of the significant challenges faced by university students during the pandemic\n\nFurther details on support for students can be found on nidirect - https://www.nidirect.gov.uk/articles/coronavirus-covid-19-advice-students-higher-education","answerHtml":"<p>Financial support available for students is a matter for Department of Economy. The Executive made decisions on COVID-19 funding on the basis of proposals by the Minister of Finance reflecting bids submitted by departments for their respective needs.</p><p>The Covid Disruption Payment was available to full time publicly funded Higher Education Institutions and full-time Higher Education students at the Further Education Colleges studying here who were enrolled in February 2021. The payments were in recognition of the disruption suffered by students to their studies due to the impact of Covid-19, and these payments have already rolled out to students. Students from here who are studying at an institution in England, Scotland, Wales or Ireland may have been eligible for support schemes provided by the respective administrations.</p><p>On 22 June 2021, the University of Ulster and the Queen’s University of Belfast announced that in addition to the Covid Disruption Payment, they will provide students attending their Universities with an additional £495 payment. This payment will be based on household income and will be issued to approximately 9,000 students. The payment is made possible by the Department for the Economy&#39;s financial support package in recognition of the significant challenges faced by university students during the pandemic</p><p>Further details on support for students can be found on nidirect - https://www.nidirect.gov.uk/articles/coronavirus-covid-19-advice-students-higher-education</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014945%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=327214","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=327214"}},{"id":"327213","reference":"AQW 14944/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-18","answerBy":"2021-03-05","answered":"2021-03-04","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure, pursuant to AQW 12777/17-22, when she will announce (i) the findings of the review; and (ii) the next steps for the project.","answerText":"I recently commissioned a short sharp review of the York Street Interchange scheme, to ensure it is future-proofed and forward looking. I have now considered the outcome of the review and am currently considering the next steps before making an announcement.","answerHtml":"<p>I recently commissioned a short sharp review of the York Street Interchange scheme, to ensure it is future-proofed and forward looking. I have now considered the outcome of the review and am currently considering the next steps before making an announcement.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014944%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=327213","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=327213"}},{"id":"327212","reference":"AQW 14943/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-18","answerBy":"2021-03-05","answered":"2021-02-25","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health what tuition fee and other financial support is available to graduate-entry medical students.","answerText":"Health and student finance are devolved matters. The financial support available to healthcare students varies across the regions of the UK, depending upon where the student is ordinarily resident. Policy reflects the resources available to each administration, and their assessment of workforce supply priorities.\n\nThe Education (Student Support) (No.2) Regulations (NI) 2009 (the Student Support Regulations), preclude Northern Ireland domiciled students who already hold a primary degree awarded by an institution in Northern Ireland or Great Britain from obtaining fee loans or maintenance grants.\n\nThis policy approach focuses our financial resources toward primary degree level, thereby allowing a greater number of students to benefit from third level study.","answerHtml":"<p>Health and student finance are devolved matters. The financial support available to healthcare students varies across the regions of the UK, depending upon where the student is ordinarily resident. Policy reflects the resources available to each administration, and their assessment of workforce supply priorities.</p><p>The Education (Student Support) (No.2) Regulations (NI) 2009 (the Student Support Regulations), preclude Northern Ireland domiciled students who already hold a primary degree awarded by an institution in Northern Ireland or Great Britain from obtaining fee loans or maintenance grants.</p><p>This policy approach focuses our financial resources toward primary degree level, thereby allowing a greater number of students to benefit from third level study.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014943%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=327212","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=327212"}},{"id":"327089","reference":"AQW 14853/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-17","answerBy":"2021-02-25","answered":"2021-03-03","answeredOrally":false,"priority":true,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs whether he has had any engagement with the UK Government in support of a veterinary agreement between the United Kingdom and European Union, to reduce friction and checks on the movement of animals and food between Great Britain and Northern Ireland.","answerText":"Under the terms of the EU Withdrawal Agreement, the Northern Ireland Protocol and domestic legislation, Northern Ireland must continue to align with EU sanitary and phyto-sanitary (SPS) rules. I am opposed to the detrimental impact of these additional rules and the barriers they place on the intra-UK movement of animals, goods and products from Great Britain (GB) to Northern Ireland (NI). My predecessor, Minister Poots, has already written to Defra Secretary of State, George Eustice MP, and the European Commission, to highlight the difficulties caused by these new requirements. I feel that these checks are unnecessary and unacceptable and, as a result, that the Protocol should be replaced.\n\nThe responsibility for considering any potential future alignment on SPS rules between the UK and the EU, including the negotiation of a veterinary agreement, rests with the UK Government. Discussions, between the UK Government and the European Commission, which I hope will find pragmatic solutions and lead to the resolution of the current difficulties, are ongoing.\n\nAs you may be aware my colleague Minister Poots asked the UK Government to explore this issue to identify its merits. I will continue to engage with my Ministerial colleagues across the UK and my officials will also continue to engage with their GB counterparts to consider all available flexibilities, derogations and potential mitigations that could help to minimise the impact on trade.","answerHtml":"<p>Under the terms of the EU Withdrawal Agreement, the Northern Ireland Protocol and domestic legislation, Northern Ireland must continue to align with EU sanitary and phyto-sanitary (SPS) rules. I am opposed to the detrimental impact of these additional rules and the barriers they place on the intra-UK movement of animals, goods and products from Great Britain (GB) to Northern Ireland (NI). My predecessor, Minister Poots, has already written to Defra Secretary of State, George Eustice MP, and the European Commission, to highlight the difficulties caused by these new requirements. I feel that these checks are unnecessary and unacceptable and, as a result, that the Protocol should be replaced.</p><p>The responsibility for considering any potential future alignment on SPS rules between the UK and the EU, including the negotiation of a veterinary agreement, rests with the UK Government. Discussions, between the UK Government and the European Commission, which I hope will find pragmatic solutions and lead to the resolution of the current difficulties, are ongoing.</p><p>As you may be aware my colleague Minister Poots asked the UK Government to explore this issue to identify its merits. I will continue to engage with my Ministerial colleagues across the UK and my officials will also continue to engage with their GB counterparts to consider all available flexibilities, derogations and potential mitigations that could help to minimise the impact on trade.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014853%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=327089","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=327089"}},{"id":"327087","reference":"AQW 14851/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-17","answerBy":"2021-03-04","answered":"2021-03-01","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail the number of installations under the Non-Domestic Renewable Heat Incentive Scheme that have seen enforcement action to date, broken down by (i) the type of installation; and (ii) the area of non-compliance.","answerText":"To date, 91 installations have been subject to enforcement action under the Non Domestic RHI Scheme.\n\n(i) The total is made up of: 2x 25kW solid biomass boilers; 1x 32kW solid biomass boiler; 1x 35kW solid biomass boiler; 1x 36kW solid biomass boiler; 2x 40kW solid biomass boilers; 1x 43kW solid biomass boiler; 1x 49kW solid biomass boiler; 1x 80kW solid biomass boiler; 1x 94kW solid biomass boiler; 17x 95kW solid biomass boilers; 54x 99kW solid biomass boilers; 2x 198kW solid biomass boilers; and 7x 199 kW solid biomass boilers.\n\n(ii) Enforcement activity has been taken under the following regulations (installations with multiple non compliances appear more than once):\n\n Generating heat for the predominant purpose of increasing support payments – Breach of Regulation 33(p) – 24 installations;\n\n Failure to supply information required by the Department for effective administration of the Scheme – Breach of Regulations 33(q) and 35 – 12 installations;\n\n Failure to demonstrate that the installation meets Scheme eligibility criteria - Breach of Regulations 15(1)(a) and/or 4(1), 33(e) – 12 installations;\n\n Failure to provide evidence that heat produced is for an eligible purpose and failure to notify that information provided in support of accreditation was incorrect - Breach of Regulations 33(o), 33(d) – 20 installations;\n\n Failure to provide accurate information in support of accreditation – Breach of Regulation 22(2) – 9 installations;\n\n Failure to correctly install and maintain heat metering equipment – Breach of Regulation 20(1), 34(1) – 4 installations;\n\n Failure to notify where there has been a change in circumstances which may affect eligibility – Breach of Regulation 33(k) – 5 installations;\n\n Requirement to supply weekly meter readings to allow closer analysis of heat use on site - Regulation 33(f), 34(2)(a) – 20 installations; and\n\n Requirement for amendment to an incorrect payment due to an IT error – 1 installation.","answerHtml":"<p>To date, 91 installations have been subject to enforcement action under the Non Domestic RHI Scheme.</p><p>(i) The total is made up of: 2x 25kW solid biomass boilers; 1x 32kW solid biomass boiler; 1x 35kW solid biomass boiler; 1x 36kW solid biomass boiler; 2x 40kW solid biomass boilers; 1x 43kW solid biomass boiler; 1x 49kW solid biomass boiler; 1x 80kW solid biomass boiler; 1x 94kW solid biomass boiler; 17x 95kW solid biomass boilers; 54x 99kW solid biomass boilers; 2x 198kW solid biomass boilers; and 7x 199 kW solid biomass boilers.</p><p>(ii) Enforcement activity has been taken under the following regulations (installations with multiple non compliances appear more than once):</p><p> Generating heat for the predominant purpose of increasing support payments – Breach of Regulation 33(p) – 24 installations;</p><p> Failure to supply information required by the Department for effective administration of the Scheme – Breach of Regulations 33(q) and 35 – 12 installations;</p><p> Failure to demonstrate that the installation meets Scheme eligibility criteria - Breach of Regulations 15(1)(a) and/or 4(1), 33(e) – 12 installations;</p><p> Failure to provide evidence that heat produced is for an eligible purpose and failure to notify that information provided in support of accreditation was incorrect - Breach of Regulations 33(o), 33(d) – 20 installations;</p><p> Failure to provide accurate information in support of accreditation – Breach of Regulation 22(2) – 9 installations;</p><p> Failure to correctly install and maintain heat metering equipment – Breach of Regulation 20(1), 34(1) – 4 installations;</p><p> Failure to notify where there has been a change in circumstances which may affect eligibility – Breach of Regulation 33(k) – 5 installations;</p><p> Requirement to supply weekly meter readings to allow closer analysis of heat use on site - Regulation 33(f), 34(2)(a) – 20 installations; and</p><p> Requirement for amendment to an incorrect payment due to an IT error – 1 installation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014851%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=327087","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=327087"}},{"id":"327086","reference":"AQW 14850/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-17","answerBy":"2021-03-04","answered":"2021-02-25","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail the annual costs associated with the administration of the Non-Domestic Renewable Heat Incentive Scheme.","answerText":"Responsibility for day-to-day administration of the NI Non-Domestic Renewable Heat Incentive (ND RHI) Scheme has been delegated by DfE to Ofgem since 2012. The annual costs associated with the administration of the ND RHI scheme by Ofgem, including work associated with the 100% programme of inspections and compliance, are shown below.\n\nFY\t£\n2012/13\t573,000\n2013/14\t89,180\n2014/15\t211,936\n2015/16\t279,190\n2016/17\t444,724\n2017/18\t564,599\n2018/19\t824,161\n2019/20\t814,870\n9 months to December 2020\t728,591\nTOTAL\t4,530,251","answerHtml":"<p>Responsibility for day-to-day administration of the NI Non-Domestic Renewable Heat Incentive (ND RHI) Scheme has been delegated by DfE to Ofgem since 2012. The annual costs associated with the administration of the ND RHI scheme by Ofgem, including work associated with the 100% programme of inspections and compliance, are shown below.</p><div class=\"table-wrap\"><table><tr><td>FY</td><td>£</td></tr><tr><td>2012/13</td><td>573,000</td></tr><tr><td>2013/14</td><td>89,180</td></tr><tr><td>2014/15</td><td>211,936</td></tr><tr><td>2015/16</td><td>279,190</td></tr><tr><td>2016/17</td><td>444,724</td></tr><tr><td>2017/18</td><td>564,599</td></tr><tr><td>2018/19</td><td>824,161</td></tr><tr><td>2019/20</td><td>814,870</td></tr><tr><td>9 months to December 2020</td><td>728,591</td></tr><tr><td>TOTAL</td><td>4,530,251</td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014850%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=327086","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=327086"}},{"id":"327085","reference":"AQW 14849/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-17","answerBy":"2021-03-04","answered":"2021-03-04","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what work has been undertaken in regards to a replacement for the Domestic Renewable Heat Incentive Scheme.","answerText":"My Department is currently developing a new Energy Strategy. Following the Call for Evidence in December 2019, officials have examined consultation responses, carried out research and are considering potential policy options to enable us to achieve net zero emissions by 2050.\n\nA draft Energy Strategy policy options consultation will issue next month, with a final Energy Strategy due to be published by November 2021. Financial support to encourage the installation and use of lower carbon heating appliances is being considered as part of the new Energy Strategy development process.","answerHtml":"<p>My Department is currently developing a new Energy Strategy. Following the Call for Evidence in December 2019, officials have examined consultation responses, carried out research and are considering potential policy options to enable us to achieve net zero emissions by 2050.</p><p>A draft Energy Strategy policy options consultation will issue next month, with a final Energy Strategy due to be published by November 2021. Financial support to encourage the installation and use of lower carbon heating appliances is being considered as part of the new Energy Strategy development process.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014849%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=327085","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=327085"}},{"id":"326891","reference":"AQW 14766/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-16","answerBy":"2021-03-03","answered":"2021-02-24","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, considering that COVID-19 restrictions may be in place for the nightlife sector for longer than many other parts of the economy, what plans she has for specific support for the sector, and those that work in it.","answerText":"The Executive and the UK Government have introduced a wide range of business support schemes to help ease the extraordinary burden that has been placed on entire communities and our local economy, due to the ongoing global pandemic. These schemes and other financial packages have supported businesses, individual and employers across every sector and industry.\n\nMany of those in the nightlife sector will have been eligible for support under the Localised Restrictions Support Scheme which is administered by the Department of Finance. Eligibility for this scheme is directly linked to the Health Protection Regulations.\n\nThose that work in the sector will have been eligible for support under UK Government schemes such as the Job Retention Scheme and the Self-Employment Income Support Scheme. Decisions about the extension of these schemes to cover sectors subject to longer restrictions will be made by the UK Government. I, along with Executive colleagues, have asked the Chancellor to make this support available for as long as possible to allow businesses time to recover.\n\nWhilst the Executive and my own Department continue to receive calls for specific targeted support, it is not possible to design and fund schemes for every sector of business or employment group across our society.\n\nUltimately however, it will be for the Executive collectively to determine how any new or additional Covid related funding should be allocated.","answerHtml":"<p>The Executive and the UK Government have introduced a wide range of business support schemes to help ease the extraordinary burden that has been placed on entire communities and our local economy, due to the ongoing global pandemic. These schemes and other financial packages have supported businesses, individual and employers across every sector and industry.</p><p>Many of those in the nightlife sector will have been eligible for support under the Localised Restrictions Support Scheme which is administered by the Department of Finance. Eligibility for this scheme is directly linked to the Health Protection Regulations.</p><p>Those that work in the sector will have been eligible for support under UK Government schemes such as the Job Retention Scheme and the Self-Employment Income Support Scheme. Decisions about the extension of these schemes to cover sectors subject to longer restrictions will be made by the UK Government. I, along with Executive colleagues, have asked the Chancellor to make this support available for as long as possible to allow businesses time to recover.</p><p>Whilst the Executive and my own Department continue to receive calls for specific targeted support, it is not possible to design and fund schemes for every sector of business or employment group across our society.</p><p>Ultimately however, it will be for the Executive collectively to determine how any new or additional Covid related funding should be allocated.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014766%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=326891","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=326891"}},{"id":"326890","reference":"AQW 14765/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-16","answerBy":"2021-03-03","answered":"2021-03-01","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 14138/17-22, whether she has had any discussions with the Student Loan Company on whether an agreement can be reached to distribute a £500 Covid Disruption Payment to students ordinarily resident in Northern Ireland, but studying elsewhere.","answerText":"I, and my officials, had discussions with the Student Loan Company (SLC) when considering the design and implementation of the Covid Disruption Payment, to explore the possibility of making this payment through the SLC. Requests such as these must be agreed by the four UK administrations before they can be taken forward by the SLC. Accordingly, a request was formally submitted to shareholders for agreement. However, subsequent legal advice stated that the Department does not have the legal power to make payments through public bodies outside of Northern Ireland, such as a GB or RoI university or the Student Loans Company.\n\nNorthern Ireland students elsewhere in the UK are not without support. The other jurisdictions have all announced significant increases to their student support packages and I have made representations that these students should, like in Northern Ireland, be supported by those administrations who have imposed restrictions on student activities.","answerHtml":"<p>I, and my officials, had discussions with the Student Loan Company (SLC) when considering the design and implementation of the Covid Disruption Payment, to explore the possibility of making this payment through the SLC. Requests such as these must be agreed by the four UK administrations before they can be taken forward by the SLC. Accordingly, a request was formally submitted to shareholders for agreement. However, subsequent legal advice stated that the Department does not have the legal power to make payments through public bodies outside of Northern Ireland, such as a GB or RoI university or the Student Loans Company.</p><p>Northern Ireland students elsewhere in the UK are not without support. The other jurisdictions have all announced significant increases to their student support packages and I have made representations that these students should, like in Northern Ireland, be supported by those administrations who have imposed restrictions on student activities.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014765%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=326890","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=326890"}},{"id":"326889","reference":"AQW 14764/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-16","answerBy":"2021-03-03","answered":"2021-03-01","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 14138/17-22, for her assessment of the risks that the COVID-19 pandemic has adversely affected job opportunities for part-time students, and thus created additional financial pressures.","answerText":"Since the lockdown in March 2020 the economic impact of COVID-19 has been unprecedented, with the burden on young people (aged 16-24), of which students make up a significant percentage, particularly high due to the closure of sectors in which this group is significantly represented.\n\nEvidence of this can be seen in the latest Labour Force Survey estimates, which show that the claimant count for this age group in January 2021 remains almost double the number recorded in March 2020. In addition, the latest unemployment rate (October to December 2020) among young people has also doubled to just over 12%, while the employment rate has decreased by just under 13 percentage points over the year, significantly more than any other age group over the same period.\n\nWhile part-time Higher Education students are not eligible for the Covid Disruption Payment, they are eligible for DfE-funded hardship funds administered by the Universities and Further Education Colleges. Should any part-time students find themselves in financial difficulties, I would encourage them to apply for these funds through their higher education institution.\n\nIn addition to this, any Northern Ireland students, including those studying part-time, who are experiencing financial hardship should also ensure that they have applied online at www.studentfinanceni.co.uk for all the financial assistance to which they may be entitled.\n\nMy Department has worked with the FE colleges to increase the flexibility of their policies in relation to student support, to make them more accessible. This includes free school meals and holiday payments, increasing the Dependant Student rate, which provides eligible FE students with an additional £15 per week; and making part-time and repeat students eligible to apply to Hardship Funds.","answerHtml":"<p>Since the lockdown in March 2020 the economic impact of COVID-19 has been unprecedented, with the burden on young people (aged 16-24), of which students make up a significant percentage, particularly high due to the closure of sectors in which this group is significantly represented.</p><p>Evidence of this can be seen in the latest Labour Force Survey estimates, which show that the claimant count for this age group in January 2021 remains almost double the number recorded in March 2020. In addition, the latest unemployment rate (October to December 2020) among young people has also doubled to just over 12%, while the employment rate has decreased by just under 13 percentage points over the year, significantly more than any other age group over the same period.</p><p>While part-time Higher Education students are not eligible for the Covid Disruption Payment, they are eligible for DfE-funded hardship funds administered by the Universities and Further Education Colleges. Should any part-time students find themselves in financial difficulties, I would encourage them to apply for these funds through their higher education institution.</p><p>In addition to this, any Northern Ireland students, including those studying part-time, who are experiencing financial hardship should also ensure that they have applied online at www.studentfinanceni.co.uk for all the financial assistance to which they may be entitled.</p><p>My Department has worked with the FE colleges to increase the flexibility of their policies in relation to student support, to make them more accessible. This includes free school meals and holiday payments, increasing the Dependant Student rate, which provides eligible FE students with an additional £15 per week; and making part-time and repeat students eligible to apply to Hardship Funds.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014764%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=326889","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=326889"}},{"id":"326271","reference":"AQW 14470/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-11","answerBy":"2021-02-26","answered":"2021-02-17","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, in relation to the £500 Covid Disruption Payment, to detail (i) the rationale for excluding students studying at Belfast Bible College; and (ii) whether she will extend the payment to such students.","answerText":"The Covid Disruption Payment is for full-time UK and EU students at Northern Ireland publicly funded Higher Education Institutions and full-time Higher Education students at the Further Education Colleges, in recognition of the disruption suffered by students to their studies due to the impact of Covid-19.\n\nIt is important to note, however, the funding agreed is for Northern Ireland institutions to support their students. Payments will issue directly from the institutions, not from the Department. It should also be noted the only feasible way in which a payment scheme of this size can be implemented is to work through the students’ institutions; that is, either their university or further education college.\n\nAs the payment is for Northern Ireland publicly funded Higher Education Institutions, this excludes Belfast Bible College and other alternative providers which are not in receipt of recurrent grant funding from the Department. The Department simply does not have the legal vires to make payments to such institutions.\n\nI therefore have no plans to extend the £500 Covid Disruption Payment to students of Belfast Bible College, or other alternative providers.","answerHtml":"<p>The Covid Disruption Payment is for full-time UK and EU students at Northern Ireland publicly funded Higher Education Institutions and full-time Higher Education students at the Further Education Colleges, in recognition of the disruption suffered by students to their studies due to the impact of Covid-19.</p><p>It is important to note, however, the funding agreed is for Northern Ireland institutions to support their students. Payments will issue directly from the institutions, not from the Department. It should also be noted the only feasible way in which a payment scheme of this size can be implemented is to work through the students’ institutions; that is, either their university or further education college.</p><p>As the payment is for Northern Ireland publicly funded Higher Education Institutions, this excludes Belfast Bible College and other alternative providers which are not in receipt of recurrent grant funding from the Department. The Department simply does not have the legal vires to make payments to such institutions.</p><p>I therefore have no plans to extend the £500 Covid Disruption Payment to students of Belfast Bible College, or other alternative providers.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014470%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=326271","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=326271"}},{"id":"326270","reference":"AQW 14469/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-11","answerBy":"2021-02-26","answered":"2021-03-02","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education, in relation to support for schools in East Antrim to adapt to online learning, to detail (i) the number of laptops or other types of IT equipment distributed; (ii) the support provided in regards to internet access; (iii) the number of students that have benefitted from support; and (iv) whether any requests for IT and internet access support are outstanding.","answerText":"I have invested significantly in education technology, with almost £7 million of funding provided during the current financial year, to help those pupils in need across Northern Ireland access the necessary IT equipment to assist with their remote learning.\n\nThe current scheme for lending devices aims to ensure that resources are targeted where there is greatest need. Priority has therefore been given to children currently who are entitled to free school meals, and either have special educational needs, are newcomer children or are children looked after or otherwise vulnerable in year groups 12, 14, 7, 4, 11 and 13.\n\nFollowing the allocation of an initial 11664 devices, I approved the procurement of a further 17,700 devices and Education Authority (EA) has started to allocate these to schools. The procurement of these additional devices will now allow the scheme to extend to pupils in the remaining year groups. Up to the end of February, 15,871 new devices have been provided by the EA to lend to pupils.\n\nIn July 2020, I announced that free Wi-Fi and mobile connectivity will be provided to children and young people, including those in rural settings, who may not have had access to digital technology. To date this support has included 6474 WiFi vouchers and 2039 Mi-Fi devices, a mobile connectivity solution to support those children who are not within a BT Wi-Fi hotspot.\n\nAs outlined above, the focus has been on meeting the demand from the priority year groups and from June 2020 to the end of February 2021, 20 schools from the East Antrim constituency have requested devices and 432 have been allocated. This fulfils the requests to date for devices within the priority groups. The number of devices will increase as the EA continues to allocate further devices to support those children most in need in the other year groups.","answerHtml":"<p>I have invested significantly in education technology, with almost £7 million of funding provided during the current financial year, to help those pupils in need across Northern Ireland access the necessary IT equipment to assist with their remote learning.</p><p>The current scheme for lending devices aims to ensure that resources are targeted where there is greatest need. Priority has therefore been given to children currently who are entitled to free school meals, and either have special educational needs, are newcomer children or are children looked after or otherwise vulnerable in year groups 12, 14, 7, 4, 11 and 13.</p><p>Following the allocation of an initial 11664 devices, I approved the procurement of a further 17,700 devices and Education Authority (EA) has started to allocate these to schools. The procurement of these additional devices will now allow the scheme to extend to pupils in the remaining year groups. Up to the end of February, 15,871 new devices have been provided by the EA to lend to pupils.</p><p>In July 2020, I announced that free Wi-Fi and mobile connectivity will be provided to children and young people, including those in rural settings, who may not have had access to digital technology. To date this support has included 6474 WiFi vouchers and 2039 Mi-Fi devices, a mobile connectivity solution to support those children who are not within a BT Wi-Fi hotspot.</p><p>As outlined above, the focus has been on meeting the demand from the priority year groups and from June 2020 to the end of February 2021, 20 schools from the East Antrim constituency have requested devices and 432 have been allocated. This fulfils the requests to date for devices within the priority groups. The number of devices will increase as the EA continues to allocate further devices to support those children most in need in the other year groups.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014469%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=326270","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=326270"}},{"id":"326269","reference":"AQW 14468/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-11","answerBy":"2021-02-26","answered":"2021-04-13","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 14053/17-22, whether this funding is intended to allow universities to end accommodation contracts with any student that requests this going forward.","answerText":"I have secured additional funding to address lost income for the universities in relation to them carrying out rental pauses and contract releases. This funding is available to the universities for such pauses and releases up to 31 March 2021. Thereafter, ultimately it will be for the individual institution to determine whether they should continue. However, it is anticipated that rental 'pauses' may continue until the end of this semester.","answerHtml":"<p>I have secured additional funding to address lost income for the universities in relation to them carrying out rental pauses and contract releases. This funding is available to the universities for such pauses and releases up to 31 March 2021. Thereafter, ultimately it will be for the individual institution to determine whether they should continue. However, it is anticipated that rental &#39;pauses&#39; may continue until the end of this semester.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014468%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=326269","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=326269"}},{"id":"326268","reference":"AQW 14467/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-11","answerBy":"2021-02-26","answered":"2021-02-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy how the newly announced support for students to help address digital poverty will be delivered.","answerText":"As part of the recently announced enhanced student support package, the Department will provide an allocation to the Universities to assist with digital inclusion. Recent evidence suggests that the key areas for remedy are difficulties with accessing a suitable computer device, and challenges with internet connectivity, as higher education teaching and assessment is being delivered online.\n\nAs such, an allocation will be made to the higher education institutions to support digital inclusion through the purchase of laptops and/or the enabling of enhanced Wi-Fi/4G access.","answerHtml":"<p>As part of the recently announced enhanced student support package, the Department will provide an allocation to the Universities to assist with digital inclusion. Recent evidence suggests that the key areas for remedy are difficulties with accessing a suitable computer device, and challenges with internet connectivity, as higher education teaching and assessment is being delivered online.</p><p>As such, an allocation will be made to the higher education institutions to support digital inclusion through the purchase of laptops and/or the enabling of enhanced Wi-Fi/4G access.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014467%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=326268","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=326268"}},{"id":"328579","reference":"AQO 1640/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-02-11","answerBy":"2021-02-23","answered":"2021-02-23","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health for an update on the operation of the Nightingale facility at Whiteabbey Hospital.","answerText":"I opened the first phase of the Whiteabbey Nightingale facility on 20 November 2020. This provides additional regional ‘step-down’ beds to help lift pressures across the system caused by COVID-19. The Whiteabbey facility is focused on patients who have recovered beyond the acute phase of infection, but still require intense rehabilitation. In light of the increased length of stay for COVID-19 patients, this facility is helping to aid the flow of patients from ICU and acute care and helping to release bed capacity at acute sites.\n\nAs of 16 February 2021, 111 patients from across all five Health and Social Care Trusts have been treated at the Whiteabbey Nightingale hospital.\n\nThe lessons learned from the first eight weeks of operation suggests that the model has been successful. This has been assessed by engaging with both patients and staff and by looking at measures such as patient outcomes, length of stay and staff absenteeism.\n\nAs pressures from the current wave of COVID-19 begin to ease, I have asked my officials to explore how best to utilise the Whiteabbey Nightingale to help with rebuilding HSC. I remain acutely aware, however, that the virus remains unpredictable, so the Whiteabbey Nightingale will retain the ability to refocus quickly back to COVID-19, should the need arise.","answerHtml":"<p>I opened the first phase of the Whiteabbey Nightingale facility on 20 November 2020. This provides additional regional ‘step-down’ beds to help lift pressures across the system caused by COVID-19. The Whiteabbey facility is focused on patients who have recovered beyond the acute phase of infection, but still require intense rehabilitation. In light of the increased length of stay for COVID-19 patients, this facility is helping to aid the flow of patients from ICU and acute care and helping to release bed capacity at acute sites.</p><p>As of 16 February 2021, 111 patients from across all five Health and Social Care Trusts have been treated at the Whiteabbey Nightingale hospital.</p><p>The lessons learned from the first eight weeks of operation suggests that the model has been successful. This has been assessed by engaging with both patients and staff and by looking at measures such as patient outcomes, length of stay and staff absenteeism.</p><p>As pressures from the current wave of COVID-19 begin to ease, I have asked my officials to explore how best to utilise the Whiteabbey Nightingale to help with rebuilding HSC. I remain acutely aware, however, that the virus remains unpredictable, so the Whiteabbey Nightingale will retain the ability to refocus quickly back to COVID-19, should the need arise.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201640%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=328579","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=328579"}},{"id":"326130","reference":"AQW 14399/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-10","answerBy":"2021-02-25","answered":"2021-02-26","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance to detail his legislative programme for the remainder of this Assembly Mandate.","answerText":"Please see table at Annex A for details of the legislation my department plans to advance in the current mandate.\n\nANNEX A\n\nPrimary Legislation\n\nTitle\tPurpose\tStatus\nBudget Bill 2021\tBudget\tWritten evidence to the Finance Committee on 17th February followed by oral evidence on 24th February.\nThe intention is to take the Budget Bill through using accelerated passage.\nThe Budget Bill is planned to be taken through the Assembly on the following dates:\n1st March - Supply Resolution and Budget Bill Stage 1\n2nd March – Budget Bill Stage 2 Consideration\n8th March – Consideration Stage\n9th March – Further Consideration Stage & Final Stage\nRoyal Assent is required by 24th March.\nBudget (No. 2) Bill 2021\tBudget\tAnticipated May/June 2021\nFinancial Reporting (Departments and Public Bodies)\tNecessary to implement the Review of Financial Process.\tWorking with the Office for Legislative Counsel (OLC) the draft bill is complete and a draft Explanatory and Financial Memorandum is with OLC for review. The Bill is now named the Financial Reporting (Departments and Public Bodies) Bill (Northern Ireland).\nWhilst the precise timing will depend on the conclusion of the discussions currently ongoing with HMT, and planned engagement with OLC and DSO, it is anticipated that the Bill will be introduced after Easter recess.\n\nIn addition, work is being taken forward on social value in procurement, a fiscal council, and public bodies’ reform. Legislation on these issues will follow once the policies are in place.\n\nWestminster Bills requiring LCMs\n\nTitle\tPurpose\tStatus\nPublic Service Pensions Bill\tTo remove unlawful age discrimination identified in NI public service pension schemes as a consequence of the ‘McCloud ruling’\tSubject to Executive agreement\n\nStatutory Rules (subject to Affirmative / Draft Affirmative)\n\nTitle\tPurpose\tStatus\nThe Energy Performance of Buildings (Certificates and Inspections) (Amendment) Regulations (Northern Ireland) 2021 (DoF)\tTo reduce the statutory fees that are charged when data is entered onto the domestic and non-domestic register for Energy Performance Certificates, Display Energy Certificate and Air Conditioning Inspection Reports\tDraft documents - SR, SL1, Explanatory Note and Motion for Debate have been prepared for the DoF Minister’s consideration.\nThe Official Statistics (Amendment) Order (Northern Ireland) 2021\tThe Statutory Rule will amend the Official Statistics Order (Northern Ireland) 2012 by naming additional bodies as producers of official statistics.\tDraft being prepared\nThe Rates (Regional Rates) Order (Northern Ireland) 2021 (DOF)\tTo set the regional rate for the upcoming rating year\tSL1 and draft being prepared\nThe Rates (Exemption for Automatic Telling Machines in Rural Areas) Order (Northern Ireland) 2021 (DOF)\tTo extend rate relief to ATMs in rural areas\tSL1 approved by Committee\nThe Land Registry (Fees) Order\n(Northern Ireland) 2021 (DOF)\tTo update the fees to enable Land Registry to generate income sufficient to meet its operating expenses under Land Registration Act (Northern Ireland) 1970.\tSL1 and draft SR being prepared.\n\nStatutory Rules (subject to Negative Resolution)\n\nTitle\tPurpose\tStatus\nThe Pensions Increase (Review) Order (Northern Ireland) 2021\tRoutine uprating wef 12 April 2021 of pensions in payment (and deferred pensions) for public service pensioners with reference to the annual change in CPI (0.5%)\tDraft being prepared\nThe Public Service Pensions Revaluation Order (Northern Ireland) 2021\tRoutine revaluation of in – year pension accruals by active members of CARE (Career average) public service pension schemes for the scheme year ending 31 March 2021, with reference to annual change in CPI (0.5%) or average weekly earnings (2.4%)\tDraft being prepared\nThe Whole of Government Accounts (Designation of Bodies) Order (Northern Ireland) 2021\tTo designate bodies in Northern Ireland to provide information for Whole of Government Accounts (WGA).\tDraft being prepared\nThe Building (Amendment) Regulations (Northern Ireland) 2021\tAmendment of Building Regulations in relation to Fire Safety and Radon Issues.\nAmendment of Building Regulations in relation to transposition of Energy Performance of Buildings (EPBD 3) requirements.\tPublic Consultation on Fire Safety and Radon issues finished in October 2020. The Department’s Building Standards Branch (BSB) has completed an analysis of the consultation responses and given evidence to the Finance Committee.\nFinal proposals are to be considered by the local Building Regulations Advisory Committee (NIBRAC) and the Department hopes to bring forward a Building Regulations amendment (Statutory Rule) and changes to supporting guidance in the relevant Technical Booklets in the near future.\nIt is anticipated that this amendment will not be drafted until the next Assembly mandate.\nThe Rates (Small Business Hereditament Relief) (Amendment) Regulations (Northern Ireland) 2021\tTo extend the small business relief scheme which provides support to local small businesses\tSL1 and draft SR being prepared.\nThe Rates (Coronavirus) (Emergency Relief) (No. 3) (Amendment) Regulations (Northern Ireland) 2021\tTo extend rate relief support to those sectors most affected by the pandemic\tNot yet drafted.","answerHtml":"<p>Please see table at Annex A for details of the legislation my department plans to advance in the current mandate.</p><p>ANNEX A</p><p>Primary Legislation</p><div class=\"table-wrap\"><table><tr><td>Title</td><td>Purpose</td><td>Status</td></tr><tr><td>Budget Bill 2021</td><td>Budget</td><td>Written evidence to the Finance Committee on 17th February followed by oral evidence on 24th February.<br>The intention is to take the Budget Bill through using accelerated passage.<br>The Budget Bill is planned to be taken through the Assembly on the following dates:<br>1st March - Supply Resolution and Budget Bill Stage 1<br>2nd March – Budget Bill Stage 2 Consideration<br>8th March – Consideration Stage<br>9th March – Further Consideration Stage &amp; Final Stage<br>Royal Assent is required by 24th March.</td></tr><tr><td>Budget (No. 2) Bill 2021</td><td>Budget</td><td>Anticipated May/June 2021</td></tr><tr><td>Financial Reporting (Departments and Public Bodies)</td><td>Necessary to implement the Review of Financial Process.</td><td>Working with the Office for Legislative Counsel (OLC) the draft bill is complete and a draft Explanatory and Financial Memorandum is with OLC for review. The Bill is now named the Financial Reporting (Departments and Public Bodies) Bill (Northern Ireland).<br>Whilst the precise timing will depend on the conclusion of the discussions currently ongoing with HMT, and planned engagement with OLC and DSO, it is anticipated that the Bill will be introduced after Easter recess.</td></tr></table></div><p>In addition, work is being taken forward on social value in procurement, a fiscal council, and public bodies’ reform. Legislation on these issues will follow once the policies are in place.</p><p>Westminster Bills requiring LCMs</p><div class=\"table-wrap\"><table><tr><td>Title</td><td>Purpose</td><td>Status</td></tr><tr><td>Public Service Pensions Bill</td><td>To remove unlawful age discrimination identified in NI public service pension schemes as a consequence of the ‘McCloud ruling’</td><td>Subject to Executive agreement</td></tr></table></div><p>Statutory Rules (subject to Affirmative / Draft Affirmative)</p><div class=\"table-wrap\"><table><tr><td>Title</td><td>Purpose</td><td>Status</td></tr><tr><td>The Energy Performance of Buildings (Certificates and Inspections) (Amendment) Regulations (Northern Ireland) 2021 (DoF)</td><td>To reduce the statutory fees that are charged when data is entered onto the domestic and non-domestic register for Energy Performance Certificates, Display Energy Certificate and Air Conditioning Inspection Reports</td><td>Draft documents - SR, SL1, Explanatory Note and Motion for Debate have been prepared for the DoF Minister’s consideration.</td></tr><tr><td>The Official Statistics (Amendment) Order (Northern Ireland) 2021</td><td>The Statutory Rule will amend the Official Statistics Order (Northern Ireland) 2012 by naming additional bodies as producers of official statistics.</td><td>Draft being prepared</td></tr><tr><td>The Rates (Regional Rates) Order (Northern Ireland) 2021 (DOF)</td><td>To set the regional rate for the upcoming rating year</td><td>SL1 and draft being prepared</td></tr><tr><td>The Rates (Exemption for Automatic Telling Machines in Rural Areas) Order (Northern Ireland) 2021 (DOF)</td><td>To extend rate relief to ATMs in rural areas</td><td>SL1 approved by Committee</td></tr><tr><td>The Land Registry (Fees) Order<br>(Northern Ireland) 2021 (DOF)</td><td>To update the fees to enable Land Registry to generate income sufficient to meet its operating expenses under Land Registration Act (Northern Ireland) 1970.</td><td>SL1 and draft SR being prepared.</td></tr></table></div><p>Statutory Rules (subject to Negative Resolution)</p><div class=\"table-wrap\"><table><tr><td>Title</td><td>Purpose</td><td>Status</td></tr><tr><td>The Pensions Increase (Review) Order (Northern Ireland) 2021</td><td>Routine uprating wef 12 April 2021 of pensions in payment (and deferred pensions) for public service pensioners with reference to the annual change in CPI (0.5%)</td><td>Draft being prepared</td></tr><tr><td>The Public Service Pensions Revaluation Order (Northern Ireland) 2021</td><td>Routine revaluation of in – year pension accruals by active members of CARE (Career average) public service pension schemes for the scheme year ending 31 March 2021, with reference to annual change in CPI (0.5%) or average weekly earnings (2.4%)</td><td>Draft being prepared</td></tr><tr><td>The Whole of Government Accounts (Designation of Bodies) Order (Northern Ireland) 2021</td><td>To designate bodies in Northern Ireland to provide information for Whole of Government Accounts (WGA).</td><td>Draft being prepared</td></tr><tr><td>The Building (Amendment) Regulations (Northern Ireland) 2021</td><td>Amendment of Building Regulations in relation to Fire Safety and Radon Issues.<br>Amendment of Building Regulations in relation to transposition of Energy Performance of Buildings (EPBD 3) requirements.</td><td>Public Consultation on Fire Safety and Radon issues finished in October 2020. The Department’s Building Standards Branch (BSB) has completed an analysis of the consultation responses and given evidence to the Finance Committee.<br>Final proposals are to be considered by the local Building Regulations Advisory Committee (NIBRAC) and the Department hopes to bring forward a Building Regulations amendment (Statutory Rule) and changes to supporting guidance in the relevant Technical Booklets in the near future.<br>It is anticipated that this amendment will not be drafted until the next Assembly mandate.</td></tr><tr><td>The Rates (Small Business Hereditament Relief) (Amendment) Regulations (Northern Ireland) 2021</td><td>To extend the small business relief scheme which provides support to local small businesses</td><td>SL1 and draft SR being prepared.</td></tr><tr><td>The Rates (Coronavirus) (Emergency Relief) (No. 3) (Amendment) Regulations (Northern Ireland) 2021</td><td>To extend rate relief support to those sectors most affected by the pandemic</td><td>Not yet drafted.</td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014399%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=326130","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=326130"}},{"id":"326129","reference":"AQW 14398/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-10","answerBy":"2021-02-25","answered":"2021-06-07","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister for an update on the work of the High Street Task Force.","answerText":"The first meeting of the Task Force took place on 23 February, chaired by the Junior Ministers. The Task Force formally adopted its terms of reference, and the vision of:\n\n“sustainable city, town and village centres which are thriving places for people to do business, socialise, shop, be creative and use public services as well as being great places to live.”\n\nSince then, four subgroups have been established on:\n\ninfluencing policy and strategy;\n\npromoting the development of capacity;\n\ndeveloping and promoting good practice; and\n\ninfluencing and shaping intervention and investment.\n\nMeetings of the subgroups are being arranged to initiate the formal projects for each of the key functions, and a programme of comprehensive engagement and co-design with stakeholders.","answerHtml":"<p>The first meeting of the Task Force took place on 23 February, chaired by the Junior Ministers. The Task Force formally adopted its terms of reference, and the vision of:</p><p>“sustainable city, town and village centres which are thriving places for people to do business, socialise, shop, be creative and use public services as well as being great places to live.”</p><p>Since then, four subgroups have been established on:</p><p>influencing policy and strategy;</p><p>promoting the development of capacity;</p><p>developing and promoting good practice; and</p><p>influencing and shaping intervention and investment.</p><p>Meetings of the subgroups are being arranged to initiate the formal projects for each of the key functions, and a programme of comprehensive engagement and co-design with stakeholders.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014398%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=326129","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=326129"}},{"id":"325965","reference":"AQW 14320/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-09","answerBy":"2021-02-24","answered":"2021-02-24","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health whether agency staff working for the Health Service will receive a £500 recognition payment.","answerText":"I have directed that Agency workers on longer term placements, covering vacant posts, be eligible for the HSC Recognition payment. My Officials are finalising the details of the mechanisms for payment.","answerHtml":"<p>I have directed that Agency workers on longer term placements, covering vacant posts, be eligible for the HSC Recognition payment. My Officials are finalising the details of the mechanisms for payment.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014320%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=325965","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=325965"}},{"id":"325964","reference":"AQW 14319/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-09","answerBy":"2021-02-24","answered":"2021-03-01","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to explain why many photographers have not yet received any payments from the Covid Restrictions Business Support Scheme; and what action she is taking to ensure that this is resolved as soon as possible.","answerText":"As at 14th February 2021, Invest NI had received 6,628 applications under the Covid Restrictions Business Support Scheme (CRBSS), Part A and Part B, with payments made to 4,558 applicants (68.8%) to a value of circa £42m. Payments have been made to applicants across many sectors and occupations, including photographers, most of whom had applied for Part B of the scheme\n\nAcross both elements of the scheme, on average it takes 15 working days from an application being submitted to a payment being issued to successful applicants.\n\nDue to the extension and widening of the Health Protection Regulations from 26 December 2020, officials in Invest NI were required to engage more extensively with their governmental colleagues to cross-check data across the various COVID support schemes to avoid any duplication and ensure the accuracy and validity of public funding.\n\nSignificant progress has now been made which has allowed c£16m of payments to be made to applicants during the week ending on 12th February. Invest NI expect to make a substantial number of further payments to applicants week ending 19th February 2021.","answerHtml":"<p>As at 14th February 2021, Invest NI had received 6,628 applications under the Covid Restrictions Business Support Scheme (CRBSS), Part A and Part B, with payments made to 4,558 applicants (68.8%) to a value of circa £42m. Payments have been made to applicants across many sectors and occupations, including photographers, most of whom had applied for Part B of the scheme</p><p>Across both elements of the scheme, on average it takes 15 working days from an application being submitted to a payment being issued to successful applicants.</p><p>Due to the extension and widening of the Health Protection Regulations from 26 December 2020, officials in Invest NI were required to engage more extensively with their governmental colleagues to cross-check data across the various COVID support schemes to avoid any duplication and ensure the accuracy and validity of public funding.</p><p>Significant progress has now been made which has allowed c£16m of payments to be made to applicants during the week ending on 12th February. Invest NI expect to make a substantial number of further payments to applicants week ending 19th February 2021.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014319%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=325964","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=325964"}},{"id":"325963","reference":"AQW 14318/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-09","answerBy":"2021-02-24","answered":"2021-03-01","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 1325 17-22, what work has been undertaken to develop a dedicated fund to support skills growth; and when will any plans be published.","answerText":"Investing in skills must be at the heart of our economic recovery. Good, relevant skills levels do not simply support economic growth, but contribute to people’s well-being and ultimately help to create a more equal society, where everyone can reach their potential\n\nThe last decade has, however, seen very significant reductions in the funding for the skills development programmes that are now urgently needed to support all sectors, as we seek to move towards economic recovery. The strategic importance of the skills system to achieving our long-term goals of economic growth and improving social equality must, therefore, be met with strategic investment.\n\nThis is reflected in the work currently underway to develop a new Skills Strategy for Northern Ireland. Research to support the Skills Strategy consultation document indicated that stakeholders ranked funding as the most important issue for Northern Ireland’s skills system. This is backed up by the approach taken in the highest performing economies, which is to increase their investment in skills.\n\nFor these reasons, a key proposed commitment in the new Strategy is to create a dedicated, ring fenced fund for skills growth. This approach has already been established in England (National Skills Fund - £2.5bn) and in the Republic of Ireland. This funding must be additional to our existing skills budgets, if we are to make an impact; equally, we should not be considering any reduction in our current levels of investment.\n\nMy Department has been developing an initial range of skills proposals to meet the needs of industry, which would sit within a dedicated fund. I should emphasise, however, that this is at a very early stage and these are outline proposals only, which are still under consideration. A bid for resources to support work under the proposed Skills Fund has been submitted to the Department of Finance under the Comprehensive Spending Review.","answerHtml":"<p>Investing in skills must be at the heart of our economic recovery. Good, relevant skills levels do not simply support economic growth, but contribute to people’s well-being and ultimately help to create a more equal society, where everyone can reach their potential</p><p>The last decade has, however, seen very significant reductions in the funding for the skills development programmes that are now urgently needed to support all sectors, as we seek to move towards economic recovery. The strategic importance of the skills system to achieving our long-term goals of economic growth and improving social equality must, therefore, be met with strategic investment.</p><p>This is reflected in the work currently underway to develop a new Skills Strategy for Northern Ireland. Research to support the Skills Strategy consultation document indicated that stakeholders ranked funding as the most important issue for Northern Ireland’s skills system. This is backed up by the approach taken in the highest performing economies, which is to increase their investment in skills.</p><p>For these reasons, a key proposed commitment in the new Strategy is to create a dedicated, ring fenced fund for skills growth. This approach has already been established in England (National Skills Fund - £2.5bn) and in the Republic of Ireland. This funding must be additional to our existing skills budgets, if we are to make an impact; equally, we should not be considering any reduction in our current levels of investment.</p><p>My Department has been developing an initial range of skills proposals to meet the needs of industry, which would sit within a dedicated fund. I should emphasise, however, that this is at a very early stage and these are outline proposals only, which are still under consideration. A bid for resources to support work under the proposed Skills Fund has been submitted to the Department of Finance under the Comprehensive Spending Review.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014318%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=325963","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=325963"}},{"id":"325437","reference":"AQW 14138/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-05","answerBy":"2021-02-15","answered":"2021-02-16","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, in relation to the £500 Covid Disruption Payment, to detail (i) the rationale for excluding students ordinarily resident in Northern Ireland, but studying (a) in other parts of the UK and the Republic of Ireland; (b) with the Open University; or (c) part-time; and (iv) whether she will extend the payment to such students.","answerText":"The Covid Disruption Payment is for full-time students at Northern Ireland publicly funded Higher Education Institutions and full-time Higher Education students at the Further Education Colleges, in recognition of the disruption suffered by students to their studies due to the impact of Covid-19.\n\nI recognise that many Northern Ireland domiciled higher education students are enrolled in universities in Great Britain and the Republic of Ireland and that these students will have been adversely impacted by the pandemic, just as those in local institutions have been. It is important to note, however, the funding agreed is for Northern Ireland institutions to support their students. Payments will issue directly from the institutions, not from the Department. It should also be noted the only feasible way in which a payment scheme of this size can be implemented is to work through the students’ institutions; that is, either their university or further education college. The Department does not have the legal power to make payments through public bodies outside of Northern Ireland, such as a GB or RoI university or the Student Loans Company.\n\nHowever, Northern Ireland students elsewhere in the UK and Republic of Ireland are not without support. The other jurisdictions have all recently announced significant increases to their student support packages, and I would encourage any Northern Ireland student studying outside of Northern Ireland to contact their university, should they be in financial hardship, and to avail of the support which is in place there.\n\nPart-time students, such as those studying at the Open University, are more likely to be in employment than full-time students, while full-time students are more likely to have a different term time address and associated additional living costs. Part-time students continue to be eligible for DfE-funded hardship funds administered by the Universities and Further Education Colleges, in addition to the other support announced. I am happy to have announced a further expansion of these hardship funds last week; as such, should any part-time students find themselves in financial difficulties, I would encourage them to apply for these funds through their higher education institution.","answerHtml":"<p>The Covid Disruption Payment is for full-time students at Northern Ireland publicly funded Higher Education Institutions and full-time Higher Education students at the Further Education Colleges, in recognition of the disruption suffered by students to their studies due to the impact of Covid-19.</p><p>I recognise that many Northern Ireland domiciled higher education students are enrolled in universities in Great Britain and the Republic of Ireland and that these students will have been adversely impacted by the pandemic, just as those in local institutions have been. It is important to note, however, the funding agreed is for Northern Ireland institutions to support their students. Payments will issue directly from the institutions, not from the Department. It should also be noted the only feasible way in which a payment scheme of this size can be implemented is to work through the students’ institutions; that is, either their university or further education college. The Department does not have the legal power to make payments through public bodies outside of Northern Ireland, such as a GB or RoI university or the Student Loans Company.</p><p>However, Northern Ireland students elsewhere in the UK and Republic of Ireland are not without support. The other jurisdictions have all recently announced significant increases to their student support packages, and I would encourage any Northern Ireland student studying outside of Northern Ireland to contact their university, should they be in financial hardship, and to avail of the support which is in place there.</p><p>Part-time students, such as those studying at the Open University, are more likely to be in employment than full-time students, while full-time students are more likely to have a different term time address and associated additional living costs. Part-time students continue to be eligible for DfE-funded hardship funds administered by the Universities and Further Education Colleges, in addition to the other support announced. I am happy to have announced a further expansion of these hardship funds last week; as such, should any part-time students find themselves in financial difficulties, I would encourage them to apply for these funds through their higher education institution.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014138%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=325437","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=325437"}},{"id":"325436","reference":"AQW 14137/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-05","answerBy":"2021-02-22","answered":"2021-02-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what tuition fee support is available to graduate-entry medical students in Northern Ireland.","answerText":"This is not within the remit of my Department. This is for the Department of Health to answer.","answerHtml":"<p>This is not within the remit of my Department. This is for the Department of Health to answer.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014137%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=325436","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=325436"}},{"id":"325435","reference":"AQW 14136/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-05","answerBy":"2021-02-22","answered":"2021-02-19","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 13696/17-22, what work has been undertaken in regards to developing new replacement programmes.","answerText":"As per my response to AQW 11783/17-22, a joint project with the Department for Communities (DfC) has been established to consider the policy and delivery options once the current projects conclude. In addition to DfC’s key involvement, the Department of Health and Department of Justice are included and we are engaging with other Departments, including Education, and Finance.\n\nThe Project Board has made progress in a number of areas with a landscape review commissioned through the Strategic Investment Board (SIB) and a Strategic Insight Lab scheduled for later this month, which will involve input from a wide range of stakeholders drawn from a range of sectors and interests.\n\nMy previous response referred to the successful bid in January monitoring to secure additional funding. The additional funding will enable us to extend the current ESF provision, providing additional time to consider policy and funding options. The additional time will be very welcome but we are in no doubt that this is still a complex and challenging project to deliver. The mechanism for extending ESF activity is currently being explored and I hope to make a formal announcement soon.","answerHtml":"<p>As per my response to AQW 11783/17-22, a joint project with the Department for Communities (DfC) has been established to consider the policy and delivery options once the current projects conclude. In addition to DfC’s key involvement, the Department of Health and Department of Justice are included and we are engaging with other Departments, including Education, and Finance.</p><p>The Project Board has made progress in a number of areas with a landscape review commissioned through the Strategic Investment Board (SIB) and a Strategic Insight Lab scheduled for later this month, which will involve input from a wide range of stakeholders drawn from a range of sectors and interests.</p><p>My previous response referred to the successful bid in January monitoring to secure additional funding. The additional funding will enable us to extend the current ESF provision, providing additional time to consider policy and funding options. The additional time will be very welcome but we are in no doubt that this is still a complex and challenging project to deliver. The mechanism for extending ESF activity is currently being explored and I hope to make a formal announcement soon.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014136%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=325435","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=325435"}},{"id":"325434","reference":"AQW 14135/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-05","answerBy":"2021-02-22","answered":"2021-02-26","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities whether she will consider legislation, similar to that in Scotland, permitting students to end their tenancies in purpose-built student accommodation after giving 28 days’ notice, due to COVID-19.","answerText":"Any tenant in the Private Rented Sector with a tenancy of less than five years here can to end their tenancies after giving 28 days’ notice.\n\nI would however note that the obligation to fulfil a contract between individuals is legally binding and it is outside the powers of my Department to change this.\n\nAny students who may be experiencing financial hardship, should contact their Higher Education Institution to determine if they are eligible to receive support.","answerHtml":"<p>Any tenant in the Private Rented Sector with a tenancy of less than five years here can to end their tenancies after giving 28 days’ notice.</p><p>I would however note that the obligation to fulfil a contract between individuals is legally binding and it is outside the powers of my Department to change this.</p><p>Any students who may be experiencing financial hardship, should contact their Higher Education Institution to determine if they are eligible to receive support.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014135%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=325434","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=325434"}},{"id":"325433","reference":"AQW 14134/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-05","answerBy":"2021-02-22","answered":"2021-03-04","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health whether dentists and dental surgery staff will receive the £500 healthcare recognition payment.","answerText":"The recently announced scheme for bonus recognition payments will, subject to the meeting of certain eligibility criteria, extend to all health and care staff that have worked and contributed to delivering health and care services during the pandemic. This includes GDS Dentists and dental teams, including administrative staff and practice managers.\n\nMy officials are now working with the Health and Social Care Board and will work with all relevant professional representative bodies to finalise the details of the scheme. This will include details on how the bonus scheme will be implemented.","answerHtml":"<p>The recently announced scheme for bonus recognition payments will, subject to the meeting of certain eligibility criteria, extend to all health and care staff that have worked and contributed to delivering health and care services during the pandemic. This includes GDS Dentists and dental teams, including administrative staff and practice managers.</p><p>My officials are now working with the Health and Social Care Board and will work with all relevant professional representative bodies to finalise the details of the scheme. This will include details on how the bonus scheme will be implemented.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014134%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=325433","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=325433"}},{"id":"325283","reference":"AQW 14055/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-04","answerBy":"2021-02-19","answered":"2021-02-12","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether her officials have corresponded with the Competition and Markets Authority concerning the protection of contractors to Moy Park, in what the Renewable Heat Incentive Public Inquiry defined as a monopsony.","answerText":"Officials in my Department have not corresponded with the Competition and Markets Authority concerning Moy Park.","answerHtml":"<p>Officials in my Department have not corresponded with the Competition and Markets Authority concerning Moy Park.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014055%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=325283","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=325283"}},{"id":"325282","reference":"AQW 14054/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-04","answerBy":"2021-02-19","answered":"2021-02-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 12928/17-22, for her assessment of whether all applications and possible appeals can be processed before the end of this financial year.","answerText":"Invest NI is working towards closing out all emergency COVID support applications and payments, including those via the Newly Self Employed Support Scheme, by the end of the present financial year.\n\nAs you will be aware, the funding allocated for these schemes needs to be spent by the Department within this time period so all efforts are being made to ensure this is achieved. A significant number of Invest NI’s staffing complement are presently allocated to progress the various emergency COVID support schemes with additional staff utilised to tackle specific peak activity periods. The agency also continues to work very closely with my officials to ensure processing and assessment procedures are streamlined to complete payments as quickly as possible.","answerHtml":"<p>Invest NI is working towards closing out all emergency COVID support applications and payments, including those via the Newly Self Employed Support Scheme, by the end of the present financial year.</p><p>As you will be aware, the funding allocated for these schemes needs to be spent by the Department within this time period so all efforts are being made to ensure this is achieved. A significant number of Invest NI’s staffing complement are presently allocated to progress the various emergency COVID support schemes with additional staff utilised to tackle specific peak activity periods. The agency also continues to work very closely with my officials to ensure processing and assessment procedures are streamlined to complete payments as quickly as possible.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014054%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=325282","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=325282"}},{"id":"325281","reference":"AQW 14053/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-04","answerBy":"2021-02-19","answered":"2021-02-10","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will provide additional financial support to Northern Ireland universities to allow students to leave university accommodation contracts early without penalty.","answerText":"I am happy to advise that I have recently bid for and secured an additional £37.7million from the Executive to fund a financial support package for higher education. This package includes £3.1million to compensate universities for lost income arising from rental pauses and releasing students from accommodation contracts.","answerHtml":"<p>I am happy to advise that I have recently bid for and secured an additional £37.7million from the Executive to fund a financial support package for higher education. This package includes £3.1million to compensate universities for lost income arising from rental pauses and releasing students from accommodation contracts.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014053%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=325281","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=325281"}},{"id":"325345","reference":"AQO 1554/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-02-04","answerBy":"2021-02-16","answered":null,"answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities whether she will consider making changes to Statutory Sick Pay, to provide adequate support for people who have to self-isolate or shield because of COVID-19.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201554%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=325345","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=325345"}},{"id":"325112","reference":"AQW 13977/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-03","answerBy":"2021-02-18","answered":"2021-02-16","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy how she will ensure that (i) the COVID-19 Micro-business E-commerce Grant will reach relevant businesses quickly; and (ii) the amount allocated to the scheme will be spent.","answerText":"(i) The COVID-19 Micro-business E-commerce Grant for retail businesses\n\nopened to applications on 2 February 2021. Invest NI has been promoting the\n\ngrant and has seen significant interest from retail businesses. Businesses eligible\n\nfor the grant must apply online to Invest NI and if their grant application is\n\napproved the business can begin to incur approved costs for their project. The\n\nbusinesses must then complete their project and pay their supplier before\n\nmaking a grant claim.\n\nii) The scheme has not closed yet but the strong interest so far would indicate\n\nthere will be good uptake of the grant by retail businesses.","answerHtml":"<p>(i) The COVID-19 Micro-business E-commerce Grant for retail businesses</p><p>opened to applications on 2 February 2021. Invest NI has been promoting the</p><p>grant and has seen significant interest from retail businesses. Businesses eligible</p><p>for the grant must apply online to Invest NI and if their grant application is</p><p>approved the business can begin to incur approved costs for their project. The</p><p>businesses must then complete their project and pay their supplier before</p><p>making a grant claim.</p><p>ii) The scheme has not closed yet but the strong interest so far would indicate</p><p>there will be good uptake of the grant by retail businesses.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013977%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=325112","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=325112"}},{"id":"325111","reference":"AQW 13976/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-03","answerBy":"2021-02-18","answered":"2021-02-05","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure whether she plans to extend COVID-19 financial support to taxi drivers.","answerText":"I have carefully examined the evidence for ‘exceptional circumstances’ which are continuing to impact on taxi drivers as a result of the Covid-19 pandemic. A second Taxi Driver Financial Assistance Scheme will therefore be opened to all self-employed taxi drivers in Northern Ireland who meet the eligibility criteria, including those drivers who did not apply for first scheme in November 2020 or whose applications were unsuccessful.\n\nThe second scheme will run for a 12 month period from 22nd March 2020 until 21st March 2021. The scheme will be open to applicants who had either continuous taxi insurance throughout the entire 12 month period, or partial insurance during this time. This will provide support to a wider range of applicants, including some who were not eligible for the first scheme (which covered the period 22nd March 2020 to 30th September 2020).\n\nThe second scheme will be based on the same evidence (in terms of overheads) as the first scheme, and the principle that costs still have to have been incurred by the driver, so continuing to ensure VFM. Payments from the second scheme will therefore be made on a pro rata basis to reflect the individual circumstances of, and actual costs incurred by, the wider pool of eligible drivers. The scheme is addition to the financial support available to self employed taxi drivers through the Self Employment Income Support Scheme (SEISS).\n\nThe second taxi driver scheme is expected to launch week commencing 8th February.","answerHtml":"<p>I have carefully examined the evidence for ‘exceptional circumstances’ which are continuing to impact on taxi drivers as a result of the Covid-19 pandemic. A second Taxi Driver Financial Assistance Scheme will therefore be opened to all self-employed taxi drivers in Northern Ireland who meet the eligibility criteria, including those drivers who did not apply for first scheme in November 2020 or whose applications were unsuccessful.</p><p>The second scheme will run for a 12 month period from 22nd March 2020 until 21st March 2021. The scheme will be open to applicants who had either continuous taxi insurance throughout the entire 12 month period, or partial insurance during this time. This will provide support to a wider range of applicants, including some who were not eligible for the first scheme (which covered the period 22nd March 2020 to 30th September 2020).</p><p>The second scheme will be based on the same evidence (in terms of overheads) as the first scheme, and the principle that costs still have to have been incurred by the driver, so continuing to ensure VFM. Payments from the second scheme will therefore be made on a pro rata basis to reflect the individual circumstances of, and actual costs incurred by, the wider pool of eligible drivers. The scheme is addition to the financial support available to self employed taxi drivers through the Self Employment Income Support Scheme (SEISS).</p><p>The second taxi driver scheme is expected to launch week commencing 8th February.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013976%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=325111","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=325111"}},{"id":"325110","reference":"AQW 13975/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-03","answerBy":"2021-02-18","answered":"2022-02-08","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail any estimates his Department has for the levels of compliance when people are instructed to self-isolate due to COVID-19.","answerText":"The primary role of the Public Health Agency’s Contact Tracing Service is to provide appropriate public health advice to confirmed cases of COVID-19 and to their identified close contacts.\n\nThe Department of Health is not responsible for monitoring compliance with self-isolation guidance in relation to COVID-19.\n\nThe Executive Office has established a COVID Taskforce responsible for taking forward a number of work streams including one related to adherence and compliance, protecting the public, strategic communications and recovery.","answerHtml":"<p>The primary role of the Public Health Agency’s Contact Tracing Service is to provide appropriate public health advice to confirmed cases of COVID-19 and to their identified close contacts.</p><p>The Department of Health is not responsible for monitoring compliance with self-isolation guidance in relation to COVID-19.</p><p>The Executive Office has established a COVID Taskforce responsible for taking forward a number of work streams including one related to adherence and compliance, protecting the public, strategic communications and recovery.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013975%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=325110","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=325110"}},{"id":"325109","reference":"AQW 13974/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-03","answerBy":"2021-02-18","answered":"2021-03-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 12779/17-22, whether the payments to remaining applicants includes those under Part B of the Scheme.","answerText":"Payments to remaining applicants are in the process of being made and include those who applied under Part B of the COVID Restrictions Business Support Scheme.","answerHtml":"<p>Payments to remaining applicants are in the process of being made and include those who applied under Part B of the COVID Restrictions Business Support Scheme.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013974%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=325109","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=325109"}},{"id":"324950","reference":"AQW 13892/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-02","answerBy":"2021-02-17","answered":"2021-02-16","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will provide financial support to essential businesses, including those above £51,000 NAV, negatively impacted by very low footfall in city centre locations, as a result of COVID-19 restrictions.","answerText":"The Executive and the UK Government have introduced a wide range of\n\nbusiness support schemes to help ease the extraordinary burden that has been\n\nplaced on entire communities and our local economy, due to the ongoing global\n\npandemic.\n\nTo date, my Department has provided over £350 million of support to over\n\n30,000 businesses and individuals, and is currently delivering millions of\n\npounds to thousands more through the recent schemes that have been developed\n\nand implemented. The combination of these schemes have provided support to\n\nall sectors and occupations throughout Northern Ireland.\n\nI am on record as stating that whilst the ‘stay at home message’ has been\n\nabsolutely necessary, it has had a damaging impact on our town and city centres\n\nand our local high streets. Beyond the current restriction period, I believe that\n\nthe best way to support these businesses is to negate the cycle of severe\n\nrestrictions which will inevitably cost jobs and livelihoods.\n\nWith the roll-out of a vaccination programme, there is cause for optimism as we\n\nlook towards a return to some form of social and economic normality, and\n\ngovernment support can then be targeted at helping businesses to be able to\n\noperate safely, with as little interruption as possible.\n\nWhilst the Executive and my own Department continue to receive calls for\n\nspecific targeted support, it is simply not possible to design and fund schemes\n\nfor every type of business or employment across our society.","answerHtml":"<p>The Executive and the UK Government have introduced a wide range of</p><p>business support schemes to help ease the extraordinary burden that has been</p><p>placed on entire communities and our local economy, due to the ongoing global</p><p>pandemic.</p><p>To date, my Department has provided over £350 million of support to over</p><p>30,000 businesses and individuals, and is currently delivering millions of</p><p>pounds to thousands more through the recent schemes that have been developed</p><p>and implemented. The combination of these schemes have provided support to</p><p>all sectors and occupations throughout Northern Ireland.</p><p>I am on record as stating that whilst the ‘stay at home message’ has been</p><p>absolutely necessary, it has had a damaging impact on our town and city centres</p><p>and our local high streets. Beyond the current restriction period, I believe that</p><p>the best way to support these businesses is to negate the cycle of severe</p><p>restrictions which will inevitably cost jobs and livelihoods.</p><p>With the roll-out of a vaccination programme, there is cause for optimism as we</p><p>look towards a return to some form of social and economic normality, and</p><p>government support can then be targeted at helping businesses to be able to</p><p>operate safely, with as little interruption as possible.</p><p>Whilst the Executive and my own Department continue to receive calls for</p><p>specific targeted support, it is simply not possible to design and fund schemes</p><p>for every type of business or employment across our society.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013892%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=324950","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=324950"}},{"id":"324775","reference":"AQW 13801/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-01","answerBy":"2021-02-09","answered":"2021-03-24","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) to provide a rationale for excluding hotels under £50,000 NAV, self-catering accommodation, hostels and bunk houses from tourism sector-specific COVID-19 Business Support Schemes; and (ii) to detail whether she will extend sector-specific support to such businesses.","answerText":"My Department has introduced a number of Schemes aimed at supporting our tourist accommodation providers. Most recently, we introduced the Bed and Breakfast, Guest House and Guest Accommodation Scheme which seeks to support tourist accommodation establishments in these sectors which were required to close between March 2020 and the start of July 2020, with many unable to access grant support. In addition, when re-opened, many of these establishments experienced significantly reduced levels of demand (and the opportunity to generate much needed revenue) as a result of the COVID-19 pandemic.\n\nI am aware that Hostels and Bunk Houses, which offer shared accommodation, also experienced reduced levels of demand over the summer, with a number of establishments also unable to access grant support. The Bed and Breakfast, Guest House and Guest Accommodation Scheme has, therefore, been extended to include hostels and bunkhouses.\n\nHotels and guest accommodation premises with an NAV below £51k were eligible for £10k or £25k Covid Business Support Schemes, made available by my department during the spring/early summer lockdown, whereas those with an NAV above £51k received no such support at that time. During the current lockdown period extended from October to early March, all such business premises continue to be eligible for support under the Localised Restrictions Support Scheme.\n\nSelf-catering establishments, especially in rural and coastal areas, experienced a more positive summer in 2020, due to increased consumer confidence in respect of the self-contained nature of self-catering establishments. My Department has not introduced a Scheme aimed specifically at the Self-catering sector, however the sector is able to access support under the Local Restrictions Support Scheme. I am acutely aware that 2021 will be another challenging year for tourism and my officials will monitor the position in respect of our tourist accommodation industry. Should the self-catering sector, or other accommodation sectors, require support this year I will consider bringing forward an appropriate scheme, subject to budget availability.","answerHtml":"<p>My Department has introduced a number of Schemes aimed at supporting our tourist accommodation providers. Most recently, we introduced the Bed and Breakfast, Guest House and Guest Accommodation Scheme which seeks to support tourist accommodation establishments in these sectors which were required to close between March 2020 and the start of July 2020, with many unable to access grant support. In addition, when re-opened, many of these establishments experienced significantly reduced levels of demand (and the opportunity to generate much needed revenue) as a result of the COVID-19 pandemic.</p><p>I am aware that Hostels and Bunk Houses, which offer shared accommodation, also experienced reduced levels of demand over the summer, with a number of establishments also unable to access grant support. The Bed and Breakfast, Guest House and Guest Accommodation Scheme has, therefore, been extended to include hostels and bunkhouses.</p><p>Hotels and guest accommodation premises with an NAV below £51k were eligible for £10k or £25k Covid Business Support Schemes, made available by my department during the spring/early summer lockdown, whereas those with an NAV above £51k received no such support at that time. During the current lockdown period extended from October to early March, all such business premises continue to be eligible for support under the Localised Restrictions Support Scheme.</p><p>Self-catering establishments, especially in rural and coastal areas, experienced a more positive summer in 2020, due to increased consumer confidence in respect of the self-contained nature of self-catering establishments. My Department has not introduced a Scheme aimed specifically at the Self-catering sector, however the sector is able to access support under the Local Restrictions Support Scheme. I am acutely aware that 2021 will be another challenging year for tourism and my officials will monitor the position in respect of our tourist accommodation industry. Should the self-catering sector, or other accommodation sectors, require support this year I will consider bringing forward an appropriate scheme, subject to budget availability.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013801%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=324775","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=324775"}},{"id":"324774","reference":"AQW 13800/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-01","answerBy":"2021-02-16","answered":"2021-02-25","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health whether he will extend the healthcare staff recognition payment to medical students in gratitude for their work supporting the Health Service during the pandemic.","answerText":"I have repeatedly emphasised my appreciation of the contribution made by all employees and students across Health and Social Care during the unprecedented challenges presented by the COVID-19 pandemic.\n\nI am also aware that many medical students have directly contributed to addressing the challenges presented by COVID-19 by taking up medical student technician and other healthcare assistant roles created by the HSC Trusts during this emergency. Individuals employed in these roles for a minimum of one month during the period 27 March 2020 to 31 January 2021 will be entitled to access the HSC Staff Bonus Scheme on a proportionate basis.\n\nMedical Education leadership across the entire NHS has been united that the priority for medical students during the most recent phases of the COVID-19 pandemic should be to support them to progress with their learning. My Department is making significant investment to ensure that this happens despite the constraints resulting from COVID-19 protocols. We have augmented our annual expenditure of £27.2m on facilitating clinical placements for medical students. An additional £4.0m is being spent over the 2020/21 academic year to ensure that the necessary significant additional supervision can be provided when medical students are in clinical environments.\n\nThe flat rate, one-off, special recognition payment I recently announced applies to specific pre-registration programmes where clinical placements are qualitatively different from those of medicine students.","answerHtml":"<p>I have repeatedly emphasised my appreciation of the contribution made by all employees and students across Health and Social Care during the unprecedented challenges presented by the COVID-19 pandemic.</p><p>I am also aware that many medical students have directly contributed to addressing the challenges presented by COVID-19 by taking up medical student technician and other healthcare assistant roles created by the HSC Trusts during this emergency. Individuals employed in these roles for a minimum of one month during the period 27 March 2020 to 31 January 2021 will be entitled to access the HSC Staff Bonus Scheme on a proportionate basis.</p><p>Medical Education leadership across the entire NHS has been united that the priority for medical students during the most recent phases of the COVID-19 pandemic should be to support them to progress with their learning. My Department is making significant investment to ensure that this happens despite the constraints resulting from COVID-19 protocols. We have augmented our annual expenditure of £27.2m on facilitating clinical placements for medical students. An additional £4.0m is being spent over the 2020/21 academic year to ensure that the necessary significant additional supervision can be provided when medical students are in clinical environments.</p><p>The flat rate, one-off, special recognition payment I recently announced applies to specific pre-registration programmes where clinical placements are qualitatively different from those of medicine students.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013800%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=324774","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=324774"}},{"id":"324773","reference":"AQW 13799/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-02-01","answerBy":"2021-02-16","answered":"2021-02-12","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether the Companies Directory will be reinstated on the NI Business Info website.","answerText":"There are currently no plans to reinstate the nibusinessinfo.co.uk Companies Directory. Comparable, and in many cases more detailed, company data is currently available from Companies House via the GOV.UK website. Worldwide company directories can also be accessed through Invest Northern Ireland’s Business Information Centre.\n\nThese free online services were not available or as fully developed when the nibusinessinfo service first launched. Providing this service now would be a duplication of existing information.","answerHtml":"<p>There are currently no plans to reinstate the nibusinessinfo.co.uk Companies Directory. Comparable, and in many cases more detailed, company data is currently available from Companies House via the GOV.UK website. Worldwide company directories can also be accessed through Invest Northern Ireland’s Business Information Centre.</p><p>These free online services were not available or as fully developed when the nibusinessinfo service first launched. Providing this service now would be a duplication of existing information.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013799%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=324773","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=324773"}},{"id":"324548","reference":"AQW 13698/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-29","answerBy":"2021-02-15","answered":"2021-03-11","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) what assessment has been made as to the cost of expanding COVID-19 business support to cover businesses and individuals still excluded; and (ii) to detail any estimates.","answerText":"To date, my Department has provided around £400 million of much needed support to prevent business closures, to protect jobs and to promote our economic recovery. My Department has worked to provide additional support to those who have not been eligible for previous UK-wide and NI specific schemes which have included the introduction of the Newly Self-Employed Support Scheme and the Limited Company Directors Support Scheme.\n\nMy Department continues to consider proposals and explore options for further support measures. In doing so, officials have engaged with stakeholders on a regular basis to develop and refine existing schemes and to assist in identifying potential gaps in support.\n\nHowever in considering proposals, it is not possible to determine with any degree of certainty how many individuals or businesses have not been eligible for any of the various support schemes introduced by the NI Executive or the UK Government. It is therefore not possible to provide an accurate estimate of the cost of providing additional support schemes.","answerHtml":"<p>To date, my Department has provided around £400 million of much needed support to prevent business closures, to protect jobs and to promote our economic recovery. My Department has worked to provide additional support to those who have not been eligible for previous UK-wide and NI specific schemes which have included the introduction of the Newly Self-Employed Support Scheme and the Limited Company Directors Support Scheme.</p><p>My Department continues to consider proposals and explore options for further support measures. In doing so, officials have engaged with stakeholders on a regular basis to develop and refine existing schemes and to assist in identifying potential gaps in support.</p><p>However in considering proposals, it is not possible to determine with any degree of certainty how many individuals or businesses have not been eligible for any of the various support schemes introduced by the NI Executive or the UK Government. It is therefore not possible to provide an accurate estimate of the cost of providing additional support schemes.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013698%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=324548","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=324548"}},{"id":"324547","reference":"AQW 13697/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-29","answerBy":"2021-02-15","answered":"2021-02-08","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance to detail the recent agreement by HM Treasury to fund Department for the Economy and InvestNI Expected Credit Losses, and a Financial Transactions Capital loan write-off, totalling £31 million.","answerText":"The agreement to fund the Department for the Economy and Invest NI Expected Credit Losses totalling £31 million was as a direct result of the implementation of accounting standard IFRS 9. This standard applies to all Executive departments.\n\nAs is usual for a change in accounting treatment, Treasury provided additional budget cover for the initial period following implementation. The level requested by DoF was informed by engagement with departments. Treasury has provided the full level of additional budget cover requested for both 2019-20 and 2020-21. This funding is ring-fenced for the purpose provided.\n\nThere was no agreement or funding for a Financial Transaction Capital loan write-off as referred to in your question.","answerHtml":"<p>The agreement to fund the Department for the Economy and Invest NI Expected Credit Losses totalling £31 million was as a direct result of the implementation of accounting standard IFRS 9. This standard applies to all Executive departments.</p><p>As is usual for a change in accounting treatment, Treasury provided additional budget cover for the initial period following implementation. The level requested by DoF was informed by engagement with departments. Treasury has provided the full level of additional budget cover requested for both 2019-20 and 2020-21. This funding is ring-fenced for the purpose provided.</p><p>There was no agreement or funding for a Financial Transaction Capital loan write-off as referred to in your question.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013697%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=324547","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=324547"}},{"id":"324546","reference":"AQW 13696/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-29","answerBy":"2021-02-15","answered":"2021-02-05","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail the means by which the European Social Fund will be deferred, to allow for funding to be available for projects in the period from April 2022 to March 2023.","answerText":"A successful bid in January Monitoring provides my department with domestic funding for existing ESF projects within the current financial year. This effectively enables my department to defer spending EC funds of c£25.9 million until 2022-23 when EC funding would have otherwise run out. The mechanism for extending ESF activity is currently being explored and I hope to make formal announcements in the coming weeks.\n\nThis welcome outcome also provides the Department with additional time to develop appropriate succession Programmes and secure the necessary funding for these valuable interventions.","answerHtml":"<p>A successful bid in January Monitoring provides my department with domestic funding for existing ESF projects within the current financial year. This effectively enables my department to defer spending EC funds of c£25.9 million until 2022-23 when EC funding would have otherwise run out. The mechanism for extending ESF activity is currently being explored and I hope to make formal announcements in the coming weeks.</p><p>This welcome outcome also provides the Department with additional time to develop appropriate succession Programmes and secure the necessary funding for these valuable interventions.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013696%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=324546","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=324546"}},{"id":"324545","reference":"AQW 13695/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-29","answerBy":"2021-02-15","answered":"2021-02-15","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she is considering a lifetime skills guarantee, similar to that announced in England.","answerText":"I am aware of the announcement made by the Prime Minister to establish a ‘Lifetime Skills Guarantee’ in England. This provides those without a Level 3 qualification with the opportunity to secure the skills they need, no matter where they are in their career. This commitment has been matched with an investment of £2.5 Billion by the Chancellor, however we must await the outcome of the Budget process in Northern Ireland before committing to any new skills initiatives.\n\nMy Department has been following the plans in England closely as we develop our new Skills Strategy. Indeed, many of the interventions planned to deliver the skills guarantee in England are already in place or being developed here.\n\nMy Department has been designing an initial range of skills proposals, which are currently under consideration, however these cannot be advanced without a significant increase in funding for skills. I have submitted a bid for £50m as part of the current Budget process.","answerHtml":"<p>I am aware of the announcement made by the Prime Minister to establish a ‘Lifetime Skills Guarantee’ in England. This provides those without a Level 3 qualification with the opportunity to secure the skills they need, no matter where they are in their career. This commitment has been matched with an investment of £2.5 Billion by the Chancellor, however we must await the outcome of the Budget process in Northern Ireland before committing to any new skills initiatives.</p><p>My Department has been following the plans in England closely as we develop our new Skills Strategy. Indeed, many of the interventions planned to deliver the skills guarantee in England are already in place or being developed here.</p><p>My Department has been designing an initial range of skills proposals, which are currently under consideration, however these cannot be advanced without a significant increase in funding for skills. I have submitted a bid for £50m as part of the current Budget process.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013695%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=324545","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=324545"}},{"id":"324319","reference":"AQW 13593/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-28","answerBy":"2021-02-05","answered":"2021-02-16","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to confirm whether she will be submitting a bid to the Executive to provide broad financial support to students in Northern Ireland to (i) offset the costs of unused accommodation and additional costs associated with restrictions; and (ii) compensate for a lack of in-person tuition as a result of COVID-19.","answerText":"I recently bid for and secured an additional £37.7m from the Executive to fund a financial support package for higher education. This package includes:\n\n£22m to fund a one-off discretionary payment of £500 to all students from the UK and EU who are in full-time higher education in Northern Ireland, whether that is in a university or further education college setting;\n\n£8.5m to address student financial hardship, digital poverty and to support student unions with mental health provision;\n\n£4.1m for the provision of a safe working, learning and research environment; and\n\n£3.1m to compensate universities for lost income arising from rental pauses and releasing students from accommodation contracts.\n\nThese additional resources will help universities target financial support at those students who are most in need.\n\nI have also written to Northern Ireland’s universities and university colleges, on behalf of students, to consider how they might support students by engaging with their private accommodation providers, as well as reviewing their own accommodation policies (where applicable) to ensure they are fair, transparent and have the best interests of students at heart.\n\nI also asked them to review their compliance with consumer law and provide assurance that, in implementing their response to the Covid-19 pandemic, they have given due regard to relevant consumer protection law. Institutions must be clear with new and returning students about how teaching and assessment will be delivered and the circumstances in which changes might be necessary. The higher education institutions have been asked to:\n\nconfirm that they have been, and will continue to be, sufficiently clear with new and continuing students about how teaching and assessment is delivered, the circumstances in which changes might be made, and what those changes might entail;\n\nconfirm that, in their assessment, students received, during the autumn term, the teaching and assessment they were promised and might reasonably have expected to receive based on the information provided; and\n\nconfirm whether their current plans for the spring and summer terms will ensure that students receive the teaching and assessment they were promised and might reasonably expect to receive based on the information provided.\n\nIf new or returning students were not provided with sufficiently clear information about how teaching and assessment would be delivered in 2020-21, or that teaching and assessment were not delivered as promised, I expect the institutions to actively consider their obligations under consumer law for tuition fee refunds or other forms of redress.","answerHtml":"<p>I recently bid for and secured an additional £37.7m from the Executive to fund a financial support package for higher education. This package includes:</p><p>£22m to fund a one-off discretionary payment of £500 to all students from the UK and EU who are in full-time higher education in Northern Ireland, whether that is in a university or further education college setting;</p><p>£8.5m to address student financial hardship, digital poverty and to support student unions with mental health provision;</p><p>£4.1m for the provision of a safe working, learning and research environment; and</p><p>£3.1m to compensate universities for lost income arising from rental pauses and releasing students from accommodation contracts.</p><p>These additional resources will help universities target financial support at those students who are most in need.</p><p>I have also written to Northern Ireland’s universities and university colleges, on behalf of students, to consider how they might support students by engaging with their private accommodation providers, as well as reviewing their own accommodation policies (where applicable) to ensure they are fair, transparent and have the best interests of students at heart.</p><p>I also asked them to review their compliance with consumer law and provide assurance that, in implementing their response to the Covid-19 pandemic, they have given due regard to relevant consumer protection law. Institutions must be clear with new and returning students about how teaching and assessment will be delivered and the circumstances in which changes might be necessary. The higher education institutions have been asked to:</p><p>confirm that they have been, and will continue to be, sufficiently clear with new and continuing students about how teaching and assessment is delivered, the circumstances in which changes might be made, and what those changes might entail;</p><p>confirm that, in their assessment, students received, during the autumn term, the teaching and assessment they were promised and might reasonably have expected to receive based on the information provided; and</p><p>confirm whether their current plans for the spring and summer terms will ensure that students receive the teaching and assessment they were promised and might reasonably expect to receive based on the information provided.</p><p>If new or returning students were not provided with sufficiently clear information about how teaching and assessment would be delivered in 2020-21, or that teaching and assessment were not delivered as promised, I expect the institutions to actively consider their obligations under consumer law for tuition fee refunds or other forms of redress.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013593%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=324319","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=324319"}},{"id":"324318","reference":"AQW 13592/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-28","answerBy":"2021-02-12","answered":"2021-02-10","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) to account for the increase in the Financial Transactions Capital loan write-off estimate, from £9 million in the October monitoring round to £10 million in the January monitoring round, associated with a Sustainable Poultry Litter project; and (ii) whether there is a risk of further credit loss associated with this scheme.","answerText":"Any potential credit losses are assessed on a regular basis, and it was deemed prudent to increase the Expected Credit Loss (ECL) cover for this project in the January monitoring round. As the scheme is ongoing, these assessments will continue and amendments made if necessary.","answerHtml":"<p>Any potential credit losses are assessed on a regular basis, and it was deemed prudent to increase the Expected Credit Loss (ECL) cover for this project in the January monitoring round. As the scheme is ongoing, these assessments will continue and amendments made if necessary.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013592%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=324318","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=324318"}},{"id":"324317","reference":"AQW 13591/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-28","answerBy":"2021-02-12","answered":"2021-02-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 12695/17-22, whether she will submit a bid for Executive approval to introduce a COVID-19 business support scheme specifically for the events sector.","answerText":"Pursuant to my response to AQW 12695/17-22, issued on 22 January 2021, I have nothing further to report at this time.\n\nTo reiterate, the Executive and the UK Government have introduced a wide range of business support schemes to help ease the extraordinary burden that has been placed on entire communities and our local economy, due to the ongoing global pandemic.\n\nTo date, my Department has provided over £370 million of lifeline support to over 30,000 businesses and individuals, and is currently delivering millions of pounds to thousands more, through a range of schemes that have been developed and launched in recent times, each of which require substantial time and resources to implement.\n\nSubject to their specific circumstances, some in events sector may have been eligible for the ‘Stability and Renewal Programme for Organisations’ delivered by the Arts Council of Northern Ireland, on behalf of the Department for Communities, and which was offering grants of up to £500,000.\n\nWhilst the Executive and my own Department continue to receive calls for specific targeted support, it is not possible to design and fund schemes for every sector of business or employment across our society.\n\nUltimately however, it will be for the Executive collectively to determine if any new or additional funding can be allocated to the NI Events sector.","answerHtml":"<p>Pursuant to my response to AQW 12695/17-22, issued on 22 January 2021, I have nothing further to report at this time.</p><p>To reiterate, the Executive and the UK Government have introduced a wide range of business support schemes to help ease the extraordinary burden that has been placed on entire communities and our local economy, due to the ongoing global pandemic.</p><p>To date, my Department has provided over £370 million of lifeline support to over 30,000 businesses and individuals, and is currently delivering millions of pounds to thousands more, through a range of schemes that have been developed and launched in recent times, each of which require substantial time and resources to implement.</p><p>Subject to their specific circumstances, some in events sector may have been eligible for the ‘Stability and Renewal Programme for Organisations’ delivered by the Arts Council of Northern Ireland, on behalf of the Department for Communities, and which was offering grants of up to £500,000.</p><p>Whilst the Executive and my own Department continue to receive calls for specific targeted support, it is not possible to design and fund schemes for every sector of business or employment across our society.</p><p>Ultimately however, it will be for the Executive collectively to determine if any new or additional funding can be allocated to the NI Events sector.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013591%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=324317","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=324317"}},{"id":"324316","reference":"AQW 13590/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-28","answerBy":"2021-02-12","answered":"2021-02-10","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 12692/17-22, whether she will publish the business cases associated with investments made under this scheme.","answerText":"It would be inappropriate to publish the business cases for investments under the scheme as they are based on commercially sensitive information relating to private parties. The information was supplied on a confidential basis to Invest NI.","answerHtml":"<p>It would be inappropriate to publish the business cases for investments under the scheme as they are based on commercially sensitive information relating to private parties. The information was supplied on a confidential basis to Invest NI.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013590%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=324316","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=324316"}},{"id":"324315","reference":"AQW 13589/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-28","answerBy":"2021-02-12","answered":"2021-02-18","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities whether she has assessed if a single support payment could be made to everyone instructed to self-isolate due to COVID-19.","answerText":"In March 2020, in response to the COVID-19 pandemicI moved quickly to introduce assistance for people who were required to self-isolate and were facing financial difficulties as a result.\n\nI also introduced emergency changes to the scheme that were specifically designed to enhance the financial assistance provided.\n\nWhen the Test and Trace Support payment was introduced in Britain in September 2020, five months after I made the enhancements to Discretionary Support, my Department assessed the effectiveness of both payment schemes. The Test and Trace payment provides a fixed amount regardless of family circumstances and is only available to people who have been told to self-isolate by the NHS Test & Trace service. They must also prove they are unable to work and have lost income as a result.\n\nIn contrast the Discretionary Support self-isolation grant is targeted at those people who are in need and are always assessed based on their personal circumstances. This means that rather than a fixed payment an award will always take into account all dependent children in a household.\n\nTo further strengthen the financial support available through Discretionary Support, enhancements to the way in which payments are calculated were introduced in November 2020. My Department continues to assess the effectiveness of all emergency Covid support measures.","answerHtml":"<p>In March 2020, in response to the COVID-19 pandemicI moved quickly to introduce assistance for people who were required to self-isolate and were facing financial difficulties as a result.</p><p>I also introduced emergency changes to the scheme that were specifically designed to enhance the financial assistance provided.</p><p>When the Test and Trace Support payment was introduced in Britain in September 2020, five months after I made the enhancements to Discretionary Support, my Department assessed the effectiveness of both payment schemes. The Test and Trace payment provides a fixed amount regardless of family circumstances and is only available to people who have been told to self-isolate by the NHS Test &amp; Trace service. They must also prove they are unable to work and have lost income as a result.</p><p>In contrast the Discretionary Support self-isolation grant is targeted at those people who are in need and are always assessed based on their personal circumstances. This means that rather than a fixed payment an award will always take into account all dependent children in a household.</p><p>To further strengthen the financial support available through Discretionary Support, enhancements to the way in which payments are calculated were introduced in November 2020. My Department continues to assess the effectiveness of all emergency Covid support measures.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013589%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=324315","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=324315"}},{"id":"324439","reference":"AQO 1543/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-01-28","answerBy":"2021-02-08","answered":"2021-02-08","answeredOrally":true,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs what engagement he has had with the UK Government on streamlining the process for organic foods entering Northern Ireland from Great Britain.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr Lyons","text":"I thank the Member. I am aware, of course, of the additional requirements being placed on local businesses on the import of organic products from Great Britain to Northern Ireland. I oppose those restrictions within the UK internal market, especially if the product is retained for use within the UK. Those restrictions cause economic harm to Northern Ireland business. Under UK domestic law, Northern Ireland is required to adhere to EU rules and regulations for organic products as a result of the Northern Ireland protocol. Although the EU has recognised GB organic standards as equivalent, organic certificate of inspection checks are required for organic produce that is imported from GB for businesses that produce, prepare, store, import or sell organic products. My officials have been working closely with their counterparts in DEFRA with the aim of alleviating the difficulties that are arising from those additional checks and administration. I will also write to Michael Gove and George Eustice to raise these issues and seek a timely, pragmatic resolution."},{"speaker":"Mr Dickson","text":"Welcome, Minister, to your first Question Time and thank you for your answer. I am encouraged by the work that you are doing and, indeed, by the comments that you just made on seeking political solutions to the difficulties that we face in the import and export of goods to and from Northern Ireland. You, Minister, along with your predecessor, also have a statutory duty to perform your functions. I am sure that you would not wish to be in breach of the ministerial code by dragging your feet or working against them."},{"speaker":"Mr Lyons","text":"I am not quite sure whether there was a question in there, Mr Principal Deputy Speaker, but it is absolutely correct that I am not dragging my feet on anything."},{"speaker":"Mrs Barton","text":"Minister, I welcome you to Question Time and wish Mr Poots all the best in his recovery. Is there any progress on removing the barriers to bringing pedigree breeding cattle into Northern Ireland from Great Britain? That has been a problem."},{"speaker":"Mr Lyons","text":"Yes, I am aware of that. It is yet another problem associated with the Northern Ireland protocol, and discussions are going on between my Department and relevant Departments in the UK. Some of the changes are unacceptable. It is not only frustrating from a trade and constitutional point of view but some of them are just absurd and unnecessary, and that is why we need to see change."},{"speaker":"Mr McHugh","text":"Uimhir a cúig. Ceist 5."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201543%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=324439","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2021-02-08&docID=325081#AQO%201543/17-22","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=324439"}},{"id":"324188","reference":"AQW 13498/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-27","answerBy":"2021-02-11","answered":"2021-02-09","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities whether she has had any engagement with the Department for Work and Pensions on the subject of raising Statutory Sick Payment levels to provide adequate support for COVID-19 self-isolation and shielding.","answerText":"I have written to Therese Coffey, Secretary of State for Work and Pensions to request that urgent consideration be given to increasing the rate of Statutory Sick Pay (SSP) to ensure that:\n\nindividuals are properly financially supported during the pandemic and\n\nall those who are ill or self-isolating do not continue working thereby potentially endangering the health of others and further spreading the virus.","answerHtml":"<p>I have written to Therese Coffey, Secretary of State for Work and Pensions to request that urgent consideration be given to increasing the rate of Statutory Sick Pay (SSP) to ensure that:</p><p>individuals are properly financially supported during the pandemic and</p><p>all those who are ill or self-isolating do not continue working thereby potentially endangering the health of others and further spreading the virus.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013498%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=324188","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=324188"}},{"id":"324187","reference":"AQW 13497/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-27","answerBy":"2021-02-11","answered":"2021-02-12","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what work InvestNI is undertaking to promote Northern Ireland as a place to invest, due to its access to both the UK market and the EU Single Market for goods.","answerText":"Invest NI is closely engaged with my department on detailed work to establish the implications of the Trade & Co-operation Agreement and the NI Protocol. Invest NI is actively pursuing opportunities through a number of channels including media interviews, advertorials and editorial in overseas markets and global awareness campaigns are in development. For example, the Invest NI CEO has already conducted interviews with the BBC World Service and ‘Market Watch’ by Dow Jones in the US.","answerHtml":"<p>Invest NI is closely engaged with my department on detailed work to establish the implications of the Trade &amp; Co-operation Agreement and the NI Protocol. Invest NI is actively pursuing opportunities through a number of channels including media interviews, advertorials and editorial in overseas markets and global awareness campaigns are in development. For example, the Invest NI CEO has already conducted interviews with the BBC World Service and ‘Market Watch’ by Dow Jones in the US.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013497%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=324187","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=324187"}},{"id":"324186","reference":"AQW 13496/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-27","answerBy":"2021-02-11","answered":"2021-02-26","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on recouping grant payments made in error as part of the £10,000 Coronavirus Small Business Support Grant scheme.","answerText":"The Department for the Economy continues to develop its processes for dealing with ineligible payments that have arisen through the Covid Business Grant schemes. A dedicated Covid Schemes Fraud and Error Oversight Project has been set up to deliver post-payment validation and to provide post-payment assurance on all Covid Business Grant schemes to date. The Project will deliver a programme of further analysis and testing of payments made which will, in turn, inform a recovery strategy and an ultimate assessment of the Scheme’s impact.","answerHtml":"<p>The Department for the Economy continues to develop its processes for dealing with ineligible payments that have arisen through the Covid Business Grant schemes. A dedicated Covid Schemes Fraud and Error Oversight Project has been set up to deliver post-payment validation and to provide post-payment assurance on all Covid Business Grant schemes to date. The Project will deliver a programme of further analysis and testing of payments made which will, in turn, inform a recovery strategy and an ultimate assessment of the Scheme’s impact.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013496%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=324186","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=324186"}},{"id":"324185","reference":"AQW 13495/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-27","answerBy":"2021-02-11","answered":"2021-03-25","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister whether he will establish a COVID-19 business support scheme for travel agents and tour operators.","answerText":"The Executive agreed to provide a financial support scheme to help vulnerable but viable travel agents, including self-employed homeworkers. The scheme will provide support for the costs of re-opening or keeping a business operational; re-connecting with employees and customers and adapting customer marketing; and financial planning. It will provide a flat payment of £10,000 per premises to travel agency businesses operating from commercial premises, or a £3,500 single payment to self-employed travel agents working from home.\n\nThe scheme will be open for applications from 19 – 26 March 2021 (inclusive).","answerHtml":"<p>The Executive agreed to provide a financial support scheme to help vulnerable but viable travel agents, including self-employed homeworkers. The scheme will provide support for the costs of re-opening or keeping a business operational; re-connecting with employees and customers and adapting customer marketing; and financial planning. It will provide a flat payment of £10,000 per premises to travel agency businesses operating from commercial premises, or a £3,500 single payment to self-employed travel agents working from home.</p><p>The scheme will be open for applications from 19 – 26 March 2021 (inclusive).</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013495%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=324185","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=324185"}},{"id":"324184","reference":"AQW 13494/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-27","answerBy":"2021-02-11","answered":"2021-02-01","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 12694/17-22, whether her Department is currently developing a support package for the industry to submit for Executive approval.","answerText":"Pursuant to AQW 12694/17-22, any decisions on further specific support measures for the NI Travel sector must be agreed by the Executive collectively.\n\nThe Association of Northern Ireland Travel Agents most recently met with the Minister of Finance, along with the First Minister and deputy Frist Minister.\n\nFurther to this engagement, I await proposals coming to the Executive for approval. I am on record as stating that I would support a targeted financial package for this industry, and will do so if an Executive paper is submitted.","answerHtml":"<p>Pursuant to AQW 12694/17-22, any decisions on further specific support measures for the NI Travel sector must be agreed by the Executive collectively.</p><p>The Association of Northern Ireland Travel Agents most recently met with the Minister of Finance, along with the First Minister and deputy Frist Minister.</p><p>Further to this engagement, I await proposals coming to the Executive for approval. I am on record as stating that I would support a targeted financial package for this industry, and will do so if an Executive paper is submitted.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013494%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=324184","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=324184"}},{"id":"323947","reference":"AQW 13394/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-26","answerBy":"2021-02-10","answered":"2021-05-12","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health whether he is considering implementing mandatory quarantine in hotels for arrivals to Northern Ireland from specific countries with a high incidence of COVID-19 and COVID-19 variants of concern.","answerText":"Department officials worked with colleagues in The Executive Office, who led a Task and Finish Group to implement managed hotel isolation for NI arrivals from red list countries. This new policy was introduced within the NI International Travel Regulations from 16th April 2021, ahead of the resumption of direct international flights into NI. There are currently no direct international flights from red list countries, however NI arrivals travelling indirectly from a red list country to NI are subject to managed hotel isolation here. Passengers travelling to NI from a red list country via GB or ROI would be subject to managed hotel isolation at the point of first arrival, before transiting on to NI.","answerHtml":"<p>Department officials worked with colleagues in The Executive Office, who led a Task and Finish Group to implement managed hotel isolation for NI arrivals from red list countries. This new policy was introduced within the NI International Travel Regulations from 16th April 2021, ahead of the resumption of direct international flights into NI. There are currently no direct international flights from red list countries, however NI arrivals travelling indirectly from a red list country to NI are subject to managed hotel isolation here. Passengers travelling to NI from a red list country via GB or ROI would be subject to managed hotel isolation at the point of first arrival, before transiting on to NI.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013394%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=323947","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=323947"}},{"id":"323946","reference":"AQW 13393/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-26","answerBy":"2021-02-10","answered":"2021-02-04","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what specific technical or financial support her Department and InvestNI are providing to assist local businesses in adapting supply chains to avoid Brexit-related friction in trade.","answerText":"While my officials, alongside InvestNI and InterTradeIreland, continue to engage with businesses to provide support and to tailor packages to issues being experienced in real time, I have also made it clear that the UK Government must step up and provide support, financial and technical, to businesses impacted by the terms of the Protocol.\n\nInvestNI continues to engage with local companies to assist in adapting supply chains providing a range of functions including:\n\n supply chain webinars and specialist advice clinics where businesses can book one to one appointments for advice and expertise in relation to supply chain management, disciplines and principles;\n\n a supply chain checklist to assist companies: (https://www.investni.com/support-for-business/operational-excellence-solutions); and\n\n support via the Collaborative Growth Programme to groups of SMEs (minimum of 4) who want to work together, and with stakeholders, to address barriers to growth and secure opportunities, including those in relation to supply chain development.\n\nInvest NI is also in the process of launching a new Supply Chain Resilience and Development Framework (SCRDF) which will provide a framework for NI based businesses to build resilience into their supply chains.\n\nInterTradeIreland continues to support businesses to adapt supply chains through its Brexit Advisory Service which offers:\n\n dedicated advice in planning for and mitigating the impact of Brexit through in person and online events,\n\n 1:1 clinics on impacts and preparation.\n\n Brexit Vouchers which provide 100% financial support up to £2,000/€2,250 towards professional advice to help businesses to identify supply chain exposure and map trade flows. It can also be used to support other areas, for example customs training.\n\nThe InterTradeIreland Brexit 2020 online portal has developed, in association with Ulster University, an online course in supply chain management, review and improvement: (https://brexit2020.intertradeireland.com/trade-in-goods-2021/supply-chain/)\n\nInterTradeIreland is also developing new supply chain supports, including the development of a supply chain resilience tool, which is currently in procurement phase.","answerHtml":"<p>While my officials, alongside InvestNI and InterTradeIreland, continue to engage with businesses to provide support and to tailor packages to issues being experienced in real time, I have also made it clear that the UK Government must step up and provide support, financial and technical, to businesses impacted by the terms of the Protocol.</p><p>InvestNI continues to engage with local companies to assist in adapting supply chains providing a range of functions including:</p><p> supply chain webinars and specialist advice clinics where businesses can book one to one appointments for advice and expertise in relation to supply chain management, disciplines and principles;</p><p> a supply chain checklist to assist companies: (https://www.investni.com/support-for-business/operational-excellence-solutions); and</p><p> support via the Collaborative Growth Programme to groups of SMEs (minimum of 4) who want to work together, and with stakeholders, to address barriers to growth and secure opportunities, including those in relation to supply chain development.</p><p>Invest NI is also in the process of launching a new Supply Chain Resilience and Development Framework (SCRDF) which will provide a framework for NI based businesses to build resilience into their supply chains.</p><p>InterTradeIreland continues to support businesses to adapt supply chains through its Brexit Advisory Service which offers:</p><p> dedicated advice in planning for and mitigating the impact of Brexit through in person and online events,</p><p> 1:1 clinics on impacts and preparation.</p><p> Brexit Vouchers which provide 100% financial support up to £2,000/€2,250 towards professional advice to help businesses to identify supply chain exposure and map trade flows. It can also be used to support other areas, for example customs training.</p><p>The InterTradeIreland Brexit 2020 online portal has developed, in association with Ulster University, an online course in supply chain management, review and improvement: (https://brexit2020.intertradeireland.com/trade-in-goods-2021/supply-chain/)</p><p>InterTradeIreland is also developing new supply chain supports, including the development of a supply chain resilience tool, which is currently in procurement phase.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013393%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=323946","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=323946"}},{"id":"323945","reference":"AQW 13392/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-26","answerBy":"2021-02-10","answered":"2021-01-29","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she has had any engagement with the Republic of Ireland Government in regards to expanding capacity on ferry routes from Ireland to continental Europe to reduce trade friction for importing and exporting goods as a result of Brexit.","answerText":"I have not had any conversations with the Government in Ireland regarding ferry capacity from Ireland to continental Europe. The operation of ferries from Ireland to Europe is a commercial matter for the ferry operators, and they have responded to demand by increasing their sailings. There is no obvious deficit of supply and therefore no need for me to raise this as an issue with the Government in Ireland.","answerHtml":"<p>I have not had any conversations with the Government in Ireland regarding ferry capacity from Ireland to continental Europe. The operation of ferries from Ireland to Europe is a commercial matter for the ferry operators, and they have responded to demand by increasing their sailings. There is no obvious deficit of supply and therefore no need for me to raise this as an issue with the Government in Ireland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013392%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=323945","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=323945"}},{"id":"323944","reference":"AQW 13391/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-26","answerBy":"2021-02-10","answered":"2021-02-05","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance what engagement has she had with HM Treasury regarding the need to continue job support mechanisms after April 2021.","answerText":"I have consistently pressed Treasury to ensure that support is made available to all those that need it, for as long as they need it during the course of the pandemic. My officials have also been in regular contact with their Treasury counterparts on the impact of COVID-19, and the need for ongoing support for jobs and businesses into the next financial year.","answerHtml":"<p>I have consistently pressed Treasury to ensure that support is made available to all those that need it, for as long as they need it during the course of the pandemic. My officials have also been in regular contact with their Treasury counterparts on the impact of COVID-19, and the need for ongoing support for jobs and businesses into the next financial year.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013391%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=323944","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=323944"}},{"id":"323943","reference":"AQW 13390/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-26","answerBy":"2021-02-10","answered":"2021-02-05","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail the number of apprenticeship places supported by (i) the Apprenticeship Return, Retain and Result Scheme; and (ii) the New Apprenticeship Incentive Scheme.","answerText":"(i) The Apprenticeship Return, Retain and Result (RRR) Scheme\n\nThe Apprenticeship Return, Retain and Result Scheme opened for applications on 1st December 2020, the earliest date that a successful application could be made. As of 29th January 48 employers have successfully applied to the scheme supporting 111 apprenticeships with a total of £55,220 paid out. There are three separate incentive payments in the scheme:\n\n Return - £500 for the first month completed from 1st November 2020;\n\n Retain – Up to £2,000, £500 per month of retention between 1st December 2020 – 31st March 2021; and\n\n Result - £1,200 upon successful completion of the apprenticeship.\n\nAs only the smallest, Return, incentive is currently being claimed the value of expenditure is not expected to increase significantly until April 21 when the majority of applications for the larger, Retain and Result, incentives are expected to be received.\n\n(ii) The Apprenticeship Recruitment Incentive Scheme\n\nThe Apprenticeship Recruitment Incentive Scheme opened for applications on 16th September 2020, with eligibility backdated to include all new apprenticeship opportunities created between 1st April 2020 and 31st March 2021. As of 29th January 93 employers have successfully applied to the scheme supporting 140 apprenticeships with £274,000 paid out.\n\nAs with the RRR scheme there are separate elements to this scheme with employers becoming eligible to apply for:\n\n Payment 1 - £2,000 90 days after the start of a new apprenticeship; and\n\n Payment 2 - £1,000 200 days after the start of the apprenticeship,\n\nWith the vast majority of apprenticeship recruitment occurring between September and October each year a significant number of employers are only now becoming eligible to apply for Payment 1. A large increase in the number of applications and the value of monies paid out is therefore expected over the coming months.\n\nIt is important to note that unlike other skills and training interventions, apprenticeships are demand led and directly linked to jobs and skills needs in the real economy. Despite this package of support it is clear the ongoing restrictions, which have seen the prolonged closure of a number of sectors who traditionally utilise apprenticeships including hospitality and hair and beauty, alongside the extension of the UK Government’s Coronavirus Job Retention Scheme are continuing to have a major impact on the recruitment of new apprentices.\n\nA key aspect of the Apprenticeship Recovery Interventions is to promote longer term outcomes and therefore, unlike a number of other COVID-19 financial support interventions, payments are phased - with the majority of applications and payments not expected until later in the current financial year or into the next.\n\nAs a result, in the case of both schemes, it is too early to definitively say how many apprenticeship opportunities are being supported however the availability of support has been well received and the apprenticeship system is responding positively. Reports from training providers would indicate that that the majority of apprentices have been returned from furlough and although, as expected, new apprenticeship recruitment is down on previous years the monthly variance has closed significantly since the announcement of the package.\n\nIn order to ensure that as many employers as possible are aware of the support available the launch of these schemes has been supported by an advertising campaign across TV, radio and social media, my Department has also been working with training providers to ensure that employers are made aware of the support available and to encourage them to utilise the support available to protect existing and create new apprenticeship opportunities Further information on both schemes can be found at the following address:\n\nhttps://www.nibusinessinfo.co.uk/content/coronavirus-apprenticeship-recovery-package","answerHtml":"<p>(i) The Apprenticeship Return, Retain and Result (RRR) Scheme</p><p>The Apprenticeship Return, Retain and Result Scheme opened for applications on 1st December 2020, the earliest date that a successful application could be made. As of 29th January 48 employers have successfully applied to the scheme supporting 111 apprenticeships with a total of £55,220 paid out. There are three separate incentive payments in the scheme:</p><p> Return - £500 for the first month completed from 1st November 2020;</p><p> Retain – Up to £2,000, £500 per month of retention between 1st December 2020 – 31st March 2021; and</p><p> Result - £1,200 upon successful completion of the apprenticeship.</p><p>As only the smallest, Return, incentive is currently being claimed the value of expenditure is not expected to increase significantly until April 21 when the majority of applications for the larger, Retain and Result, incentives are expected to be received.</p><p>(ii) The Apprenticeship Recruitment Incentive Scheme</p><p>The Apprenticeship Recruitment Incentive Scheme opened for applications on 16th September 2020, with eligibility backdated to include all new apprenticeship opportunities created between 1st April 2020 and 31st March 2021. As of 29th January 93 employers have successfully applied to the scheme supporting 140 apprenticeships with £274,000 paid out.</p><p>As with the RRR scheme there are separate elements to this scheme with employers becoming eligible to apply for:</p><p> Payment 1 - £2,000 90 days after the start of a new apprenticeship; and</p><p> Payment 2 - £1,000 200 days after the start of the apprenticeship,</p><p>With the vast majority of apprenticeship recruitment occurring between September and October each year a significant number of employers are only now becoming eligible to apply for Payment 1. A large increase in the number of applications and the value of monies paid out is therefore expected over the coming months.</p><p>It is important to note that unlike other skills and training interventions, apprenticeships are demand led and directly linked to jobs and skills needs in the real economy. Despite this package of support it is clear the ongoing restrictions, which have seen the prolonged closure of a number of sectors who traditionally utilise apprenticeships including hospitality and hair and beauty, alongside the extension of the UK Government’s Coronavirus Job Retention Scheme are continuing to have a major impact on the recruitment of new apprentices.</p><p>A key aspect of the Apprenticeship Recovery Interventions is to promote longer term outcomes and therefore, unlike a number of other COVID-19 financial support interventions, payments are phased - with the majority of applications and payments not expected until later in the current financial year or into the next.</p><p>As a result, in the case of both schemes, it is too early to definitively say how many apprenticeship opportunities are being supported however the availability of support has been well received and the apprenticeship system is responding positively. Reports from training providers would indicate that that the majority of apprentices have been returned from furlough and although, as expected, new apprenticeship recruitment is down on previous years the monthly variance has closed significantly since the announcement of the package.</p><p>In order to ensure that as many employers as possible are aware of the support available the launch of these schemes has been supported by an advertising campaign across TV, radio and social media, my Department has also been working with training providers to ensure that employers are made aware of the support available and to encourage them to utilise the support available to protect existing and create new apprenticeship opportunities Further information on both schemes can be found at the following address:</p><p>https://www.nibusinessinfo.co.uk/content/coronavirus-apprenticeship-recovery-package</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013390%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=323943","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=323943"}},{"id":"323733","reference":"AQW 13279/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-25","answerBy":"2021-02-09","answered":"2021-02-04","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 12692/17-22, how her Department has determined whether the relevant companies are in profit or not, including whether departmental officials have had access to financial records.","answerText":"Invest NI receives and monitors financial and operational reports on a regular basis and attends monthly board meetings in an observer capacity.","answerHtml":"<p>Invest NI receives and monitors financial and operational reports on a regular basis and attends monthly board meetings in an observer capacity.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013279%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=323733","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=323733"}},{"id":"323732","reference":"AQW 13278/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-25","answerBy":"2021-02-09","answered":"2021-02-07","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, pursuant to AQW 12342/17-22, whether her Department is aware of any role for the Republic of Ireland Government in reimbursing healthcare costs incurred in (i) the European Union; and, (ii) Norway, Iceland, Liechtenstein or Switzerland.","answerText":"Under EU reciprocal healthcare arrangements (Reg (EC) No. 883/2004) and the EU Withdrawal Agreement, the Republic of Ireland continues to be responsible for the healthcare costs of those citizens for which the Republic of Ireland is deemed to be their competent state.","answerHtml":"<p>Under EU reciprocal healthcare arrangements (Reg (EC) No. 883/2004) and the EU Withdrawal Agreement, the Republic of Ireland continues to be responsible for the healthcare costs of those citizens for which the Republic of Ireland is deemed to be their competent state.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013278%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=323732","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=323732"}},{"id":"323731","reference":"AQW 13277/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-25","answerBy":"2021-02-09","answered":"2021-02-03","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, following her announcement that essential skills and vocational examinations, including BTecs, are to be cancelled for this year, when she expects detail on specific alternative arrangements to be provided to students.","answerText":"I am acutely aware that timeliness is a critical consideration for learners and learning centres. For those vocational qualifications that are awarded across England, Wales and Northern Ireland, I have instructed CCEA Regulation to work with the other regulators to ensure that clarity on the alternative arrangements is provided by awarding organisations to learning centres as early as possible in March 2021. In relation to Essential Skills and other Northern Ireland only qualifications, I have instructed CCEA Regulation to ensure that the alternative arrangements are available by the end of February 2021.","answerHtml":"<p>I am acutely aware that timeliness is a critical consideration for learners and learning centres. For those vocational qualifications that are awarded across England, Wales and Northern Ireland, I have instructed CCEA Regulation to work with the other regulators to ensure that clarity on the alternative arrangements is provided by awarding organisations to learning centres as early as possible in March 2021. In relation to Essential Skills and other Northern Ireland only qualifications, I have instructed CCEA Regulation to ensure that the alternative arrangements are available by the end of February 2021.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013277%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=323731","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=323731"}},{"id":"323730","reference":"AQW 13276/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-25","answerBy":"2021-02-09","answered":"2021-04-22","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail her legislative programme for this mandate.","answerText":"I intend to introduce a Parental Bereavement and Leave bill. This bill will introduce a statutory right to Parental Bereavement Leave and Pay in Northern Ireland akin to that introduced in GB on 6 April 2020. In addition my officials continue to process subordinate legislation across a wide range of Business areas including Health and Safety, Insolvency, Company Law, Energy and Further and Higher Education.","answerHtml":"<p>I intend to introduce a Parental Bereavement and Leave bill. This bill will introduce a statutory right to Parental Bereavement Leave and Pay in Northern Ireland akin to that introduced in GB on 6 April 2020. In addition my officials continue to process subordinate legislation across a wide range of Business areas including Health and Safety, Insolvency, Company Law, Energy and Further and Higher Education.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013276%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=323730","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=323730"}},{"id":"323729","reference":"AQW 13275/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-25","answerBy":"2021-02-09","answered":"2021-02-03","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for her assessment of the UK Department for Education’s policy paper entitled Skills for Jobs: Lifelong Learning for Opportunity and Growth, including (i) what implications this may have on Northern Ireland; and (ii) whether she is considering similar reforms to the post-16 further education and technical training system.","answerText":"I am aware of the White Paper very recently published by UK Department for Education.\n\nThere is a great degree of complementarity between this White Paper and the emerging thinking for the new Skills Strategy for Northern Ireland, a draft of which will soon be published for consultation. In particular, a core objective identified in the new NI Strategy is creating a culture of lifelong learning.\n\nI can agree with the key premise that investing in skills supports economic recovery and improves an individual’s life and employment chances. In response to COVID-19 I put a number of skills interventions in place allowing free access to a number of on-line courses for those who had been impacted.\n\nI note references in the White Paper to a £2.5bn National Skills Fund. Investment in skills must be a cornerstone of the Executive’s Programme for Government and plans to stimulate economic growth – and I am giving consideration with my Executive colleagues to the creation of a dedicated, new fund to support skills growth and thereby accelerate economic recovery.","answerHtml":"<p>I am aware of the White Paper very recently published by UK Department for Education.</p><p>There is a great degree of complementarity between this White Paper and the emerging thinking for the new Skills Strategy for Northern Ireland, a draft of which will soon be published for consultation. In particular, a core objective identified in the new NI Strategy is creating a culture of lifelong learning.</p><p>I can agree with the key premise that investing in skills supports economic recovery and improves an individual’s life and employment chances. In response to COVID-19 I put a number of skills interventions in place allowing free access to a number of on-line courses for those who had been impacted.</p><p>I note references in the White Paper to a £2.5bn National Skills Fund. Investment in skills must be a cornerstone of the Executive’s Programme for Government and plans to stimulate economic growth – and I am giving consideration with my Executive colleagues to the creation of a dedicated, new fund to support skills growth and thereby accelerate economic recovery.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013275%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=323729","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=323729"}},{"id":"323512","reference":"AQW 13185/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-22","answerBy":"2021-02-08","answered":"2021-02-01","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail the expected timescale from application to payment for successful applicants to the (i) Bed and Breakfast, Guest House and Guest Accommodation Scheme; and (ii) Large Tourism and Hospitality Business Support Scheme.","answerText":"On 21st January 2021, I announced details of a new £26.1m support scheme for larger hospitality and tourism businesses, as well as a £4.1m scheme to support Bed and Breakfast, Guest House and other Guest Accommodation. This is in recognition of the severe impact that the Covid-19 pandemic has had on the local tourism industry.\n\nThe Bed and Breakfast Support Scheme will provide grant to support eligible businesses on a flat ‘per room’ amount plus a percentage of 2019’s turnover. It opened for applications on Thursday 28th January 2021.\n\nEligible businesses will be able to apply online through the Tourism NI Flexigrant system. The grant will be paid by electronic transfer to the business bank account detailed on the application form.\n\nThe Large Tourism and Hospitality Business Support Scheme will provide support to large businesses in these sectors, with a Net Added Value (NAV) of £51,000 and above, and which have been significantly impacted by the Health Protection Regulations put in place by the Executive. The scheme will provide additional financial support to help these businesses meet fixed costs and overheads associated with the survival of their businesses and the protection of jobs.\n\nThe Department will contact eligible businesses to provide an application form (with a unique application number). Once the application form has been fully completed and returned with the required supporting evidence, it will be assessed and a grant payment will issue in March 2021.\n\nFurther details on both of these schemes can be found on the NI Business Info. website:\n\nhttps://www.nibusinessinfo.co.uk/campaign/coronavirus-updates-support-your-business","answerHtml":"<p>On 21st January 2021, I announced details of a new £26.1m support scheme for larger hospitality and tourism businesses, as well as a £4.1m scheme to support Bed and Breakfast, Guest House and other Guest Accommodation. This is in recognition of the severe impact that the Covid-19 pandemic has had on the local tourism industry.</p><p>The Bed and Breakfast Support Scheme will provide grant to support eligible businesses on a flat ‘per room’ amount plus a percentage of 2019’s turnover. It opened for applications on Thursday 28th January 2021.</p><p>Eligible businesses will be able to apply online through the Tourism NI Flexigrant system. The grant will be paid by electronic transfer to the business bank account detailed on the application form.</p><p>The Large Tourism and Hospitality Business Support Scheme will provide support to large businesses in these sectors, with a Net Added Value (NAV) of £51,000 and above, and which have been significantly impacted by the Health Protection Regulations put in place by the Executive. The scheme will provide additional financial support to help these businesses meet fixed costs and overheads associated with the survival of their businesses and the protection of jobs.</p><p>The Department will contact eligible businesses to provide an application form (with a unique application number). Once the application form has been fully completed and returned with the required supporting evidence, it will be assessed and a grant payment will issue in March 2021.</p><p>Further details on both of these schemes can be found on the NI Business Info. website:</p><p>https://www.nibusinessinfo.co.uk/campaign/coronavirus-updates-support-your-business</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013185%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=323512","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=323512"}},{"id":"323511","reference":"AQW 13184/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-22","answerBy":"2021-02-08","answered":"2022-01-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy how she will ensure that all businesses eligible for the Bed and Breakfast, Guest House and Guest Accommodation Scheme are informed of this available support.","answerText":"The Bed and Breakfast, Guest House and Guest Accommodation Scheme sought to support tourist accommodation establishments in these certification categories which were required to close between March 2020 and the start of July 2020, with many unable to access grant support. In addition, when re-opened, many of these establishments experienced significantly reduced levels of demand (and the opportunity to generate much needed revenue) as a result of the COVID-19 pandemic.\n\nThere are eight categories of tourism accommodation under the Tourism (Northern Ireland) Order 1992. The scheme was developed to deliver support to three of those categories; Bed and Breakfast, Guesthouses and Guest Accommodation. With a subsequent extension to Hostels and Bunk Houses.\n\nApplicants were required to be in compliance with The Tourism (Northern Ireland) Order 1992, and to hold a current certificate from Tourism NI under one of the following eligible scheme categories:\n\nBed and Breakfast\n\nGuest House\n\nGuest Accommodation\n\nHostel\n\nBunk house\n\nThe Bed and Breakfast, Guest House and Guest Accommodation Scheme, opened for applications on 28th January 2021 and closed on 11th February 2021. The Hostels and Bunk Houses extension opened for applications on 23rd February 2021 and closed on 9th March 2021.\n\nIn each case, the scheme was supported through published guidelines and communications issued via Tourism NI digital channels. In addition, due to the legal requirement for business in these categories to be certified by Tourism NI, targeted email and telephone communications were issued to listed business owners.\n\nA total of 442 businesses were supported under the programme with 415 under the first iteration of the scheme and 27 under the subsequent extension. This equated to a total package of £1.8m issued in grant payments.","answerHtml":"<p>The Bed and Breakfast, Guest House and Guest Accommodation Scheme sought to support tourist accommodation establishments in these certification categories which were required to close between March 2020 and the start of July 2020, with many unable to access grant support. In addition, when re-opened, many of these establishments experienced significantly reduced levels of demand (and the opportunity to generate much needed revenue) as a result of the COVID-19 pandemic.</p><p>There are eight categories of tourism accommodation under the Tourism (Northern Ireland) Order 1992. The scheme was developed to deliver support to three of those categories; Bed and Breakfast, Guesthouses and Guest Accommodation. With a subsequent extension to Hostels and Bunk Houses.</p><p>Applicants were required to be in compliance with The Tourism (Northern Ireland) Order 1992, and to hold a current certificate from Tourism NI under one of the following eligible scheme categories:</p><p>Bed and Breakfast</p><p>Guest House</p><p>Guest Accommodation</p><p>Hostel</p><p>Bunk house</p><p>The Bed and Breakfast, Guest House and Guest Accommodation Scheme, opened for applications on 28th January 2021 and closed on 11th February 2021. The Hostels and Bunk Houses extension opened for applications on 23rd February 2021 and closed on 9th March 2021.</p><p>In each case, the scheme was supported through published guidelines and communications issued via Tourism NI digital channels. In addition, due to the legal requirement for business in these categories to be certified by Tourism NI, targeted email and telephone communications were issued to listed business owners.</p><p>A total of 442 businesses were supported under the programme with 415 under the first iteration of the scheme and 27 under the subsequent extension. This equated to a total package of £1.8m issued in grant payments.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013184%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=323511","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=323511"}},{"id":"323510","reference":"AQW 13183/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-22","answerBy":"2021-02-08","answered":"2021-02-15","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) what datasets have been used to identify businesses entitled to the Large Tourism and Hospitality Business Support Scheme; and (ii) how she will ensure that all relevant businesses are contacted.","answerText":"In order to qualify for the Large Tourism and Hospitality Business Support Scheme (LTHBSS) a business must be first in receipt of Localised Restrictions Support Scheme (LRSS) funds. It is this data from Land & Property Services that officials will use to contact eligible applicants.\n\nIf a business feels they should be in receipt of LTHBSS but they have not been supplied with an application form then they will be able to contact officials with their LRSS reference number for verification. All these details will be published on www.nibusinessinfo.co.uk in due course.","answerHtml":"<p>In order to qualify for the Large Tourism and Hospitality Business Support Scheme (LTHBSS) a business must be first in receipt of Localised Restrictions Support Scheme (LRSS) funds. It is this data from Land &amp; Property Services that officials will use to contact eligible applicants.</p><p>If a business feels they should be in receipt of LTHBSS but they have not been supplied with an application form then they will be able to contact officials with their LRSS reference number for verification. All these details will be published on www.nibusinessinfo.co.uk in due course.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013183%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=323510","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=323510"}},{"id":"323509","reference":"AQW 13182/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-22","answerBy":"2021-02-08","answered":"2021-03-01","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, in regards to the Large Tourism and Hospitality Business Support Scheme, to detail how support levels were determined for each band, including what fixed costs were considered, and the estimates for these.","answerText":"The Large Tourism and Hospitality Business Support Scheme was developed to provide a “top-up” grant payment to large tourism and hospitality businesses in receipt of the Localised Restrictions Support Scheme. The Scheme was developed in recognition of the very significant and unavoidable fixed costs incurred by these sectors during periods when trading has been restricted due to COVID-19 Health Regulations. The support levels for each Net Annual Value (NAV) band were determined using NAV as a proxy for fixed costs. NAV is defined as the rent at which the property might reasonably be expected to let on a year to year basis on the assumption that the tenant is responsible for repairs and insurance and any other expenses necessary to maintain the property in a state to command the rent.\n\nWhilst NAV is not strictly a proxy for all fixed costs, it is a proxy for rental/mortgage costs. However, it is not unrealistic to assume that these represent a significant proportion of total fixed costs. As other property based expenses, such as insurance, maintenance etc can be assumed to be correlated with rental costs, the relative NAV of one property to another provides a good proxy for the relative fixed costs of one business to another.\n\nWithin the budget available, payments bands were calculated using NAV as a proxy for fixed costs whilst taking into account that the eligible businesses were also eligible for £1,600 per week from the Localised Restrictions Support Scheme.","answerHtml":"<p>The Large Tourism and Hospitality Business Support Scheme was developed to provide a “top-up” grant payment to large tourism and hospitality businesses in receipt of the Localised Restrictions Support Scheme. The Scheme was developed in recognition of the very significant and unavoidable fixed costs incurred by these sectors during periods when trading has been restricted due to COVID-19 Health Regulations. The support levels for each Net Annual Value (NAV) band were determined using NAV as a proxy for fixed costs. NAV is defined as the rent at which the property might reasonably be expected to let on a year to year basis on the assumption that the tenant is responsible for repairs and insurance and any other expenses necessary to maintain the property in a state to command the rent.</p><p>Whilst NAV is not strictly a proxy for all fixed costs, it is a proxy for rental/mortgage costs. However, it is not unrealistic to assume that these represent a significant proportion of total fixed costs. As other property based expenses, such as insurance, maintenance etc can be assumed to be correlated with rental costs, the relative NAV of one property to another provides a good proxy for the relative fixed costs of one business to another.</p><p>Within the budget available, payments bands were calculated using NAV as a proxy for fixed costs whilst taking into account that the eligible businesses were also eligible for £1,600 per week from the Localised Restrictions Support Scheme.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013182%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=323509","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=323509"}},{"id":"323313","reference":"AQW 13105/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-21","answerBy":"2021-02-05","answered":"2021-02-03","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for her assessment of whether the Covid Restrictions Business Support Scheme processing team is adequately staffed and resourced.","answerText":"Balancing the development and implementation of the Covid Restrictions Business Support Scheme (CRBSS), alongside five other business support schemes currently being developed and delivered by my Department, in parallel, within tight timescales, alongside the need to adapt these on an ongoing basis to meet ongoing amendments to the Covid restrictions and Health Protection Regulations, requires extensive input at both a policy and operational level.\n\nThe allocation of sufficient staffing resource to meet the pressure of developing and delivering these schemes remains a priority for my Department and Invest NI who administer a number of the schemes. However members should be aware that officials across my Department are operating under extreme pressure to balance the day to day activity of the Department alongside priority work areas including the Covid-19 pandemic response, EU Exit and putting place plans for economic recovery and our vision for the future.\n\nOfficials working on the CRBSS and other Grant Schemes are also having to respond to the extensive volume of correspondence received by my Department which includes machinery of government requests, putting further pressure on delivery teams and impacting on the time spent on scheme delivery.","answerHtml":"<p>Balancing the development and implementation of the Covid Restrictions Business Support Scheme (CRBSS), alongside five other business support schemes currently being developed and delivered by my Department, in parallel, within tight timescales, alongside the need to adapt these on an ongoing basis to meet ongoing amendments to the Covid restrictions and Health Protection Regulations, requires extensive input at both a policy and operational level.</p><p>The allocation of sufficient staffing resource to meet the pressure of developing and delivering these schemes remains a priority for my Department and Invest NI who administer a number of the schemes. However members should be aware that officials across my Department are operating under extreme pressure to balance the day to day activity of the Department alongside priority work areas including the Covid-19 pandemic response, EU Exit and putting place plans for economic recovery and our vision for the future.</p><p>Officials working on the CRBSS and other Grant Schemes are also having to respond to the extensive volume of correspondence received by my Department which includes machinery of government requests, putting further pressure on delivery teams and impacting on the time spent on scheme delivery.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013105%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=323313","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=323313"}},{"id":"323312","reference":"AQW 13104/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-21","answerBy":"2021-02-05","answered":"2021-02-03","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail the number of people working on processing applications for the Covid Restrictions Business Support.","answerText":"Balancing the development and implementation of the Covid Restrictions Business Support Scheme (CRBSS), alongside five other business support schemes currently being developed and delivered by my Department, in parallel, within tight timescales, alongside the need to adapt these on an ongoing basis to meet ongoing amendments to the Covid restrictions and Health Protection Regulations, requires extensive input at both a policy and operational level.\n\nThe allocation of sufficient staffing resource to meet the pressure of developing and delivering these schemes remains a priority for my Department and Invest NI who administer a number of the schemes. However members should be aware that officials across my Department are operating under extreme pressure to balance the day to day activity of the Department alongside priority work areas including the Covid-19 pandemic response, EU Exit and putting place plans for economic recovery and our vision for the future.\n\nOfficials working on the CRBSS and other Grant Schemes are also having to respond to the extensive volume of correspondence received by my Department which includes machinery of government requests, putting further pressure on delivery teams and impacting on the time spent on scheme delivery.","answerHtml":"<p>Balancing the development and implementation of the Covid Restrictions Business Support Scheme (CRBSS), alongside five other business support schemes currently being developed and delivered by my Department, in parallel, within tight timescales, alongside the need to adapt these on an ongoing basis to meet ongoing amendments to the Covid restrictions and Health Protection Regulations, requires extensive input at both a policy and operational level.</p><p>The allocation of sufficient staffing resource to meet the pressure of developing and delivering these schemes remains a priority for my Department and Invest NI who administer a number of the schemes. However members should be aware that officials across my Department are operating under extreme pressure to balance the day to day activity of the Department alongside priority work areas including the Covid-19 pandemic response, EU Exit and putting place plans for economic recovery and our vision for the future.</p><p>Officials working on the CRBSS and other Grant Schemes are also having to respond to the extensive volume of correspondence received by my Department which includes machinery of government requests, putting further pressure on delivery teams and impacting on the time spent on scheme delivery.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013104%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=323312","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=323312"}},{"id":"323311","reference":"AQW 13103/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-21","answerBy":"2021-02-05","answered":"2021-02-05","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail the average number of days from submitting an application to payment for successful applicants to the Covid Restrictions Business Support Scheme.","answerText":"As at 25th January 2021, Invest NI had received 5,985 applications under the CRBSS, Part A and Part B, with payments made to 4,189 applicants (70%) to a value of £26.1m.\n\nAcross both elements of the scheme, on average it takes 15 working days from an application being submitted to a payment issued to successful applicants.\n\nThe CRBSS is an evidence based assessment process. Each application needs to be reviewed and assessed based on the evidence submitted by the applicant against the eligibility criteria. This is a vital step in helping ensure the proper and correct use of public funds. Unfortunately within CRBSS, in many cases, the initial evidence submitted with applications has not be of a sufficient quality to allow a decision to be made and so additional evidence has had to be requested from the applicant, often resulting in multiple interactions between the processing team and the applicant. This can, understandably, increase the length of time it takes to process the application.\n\nIn addition, the extension and widening of the Health Protection Regulations has also impacted processing, with the scheme reopening to applicants following the extension to regulations on 26 December. This has also resulted in the need to engage more extensively with our governmental colleagues to cross check data across the various multiple emergency COVID schemes that are ongoing to ensure that there is no duplication of funding. Unfortunately, this important governance step will also result in an increase in processing times.\n\nHaving engaged extensively with my officials, I can assure you that they are working tirelessly to process applications as quickly as possible and to ensure public resources are directed to the right applicants.","answerHtml":"<p>As at 25th January 2021, Invest NI had received 5,985 applications under the CRBSS, Part A and Part B, with payments made to 4,189 applicants (70%) to a value of £26.1m.</p><p>Across both elements of the scheme, on average it takes 15 working days from an application being submitted to a payment issued to successful applicants.</p><p>The CRBSS is an evidence based assessment process. Each application needs to be reviewed and assessed based on the evidence submitted by the applicant against the eligibility criteria. This is a vital step in helping ensure the proper and correct use of public funds. Unfortunately within CRBSS, in many cases, the initial evidence submitted with applications has not be of a sufficient quality to allow a decision to be made and so additional evidence has had to be requested from the applicant, often resulting in multiple interactions between the processing team and the applicant. This can, understandably, increase the length of time it takes to process the application.</p><p>In addition, the extension and widening of the Health Protection Regulations has also impacted processing, with the scheme reopening to applicants following the extension to regulations on 26 December. This has also resulted in the need to engage more extensively with our governmental colleagues to cross check data across the various multiple emergency COVID schemes that are ongoing to ensure that there is no duplication of funding. Unfortunately, this important governance step will also result in an increase in processing times.</p><p>Having engaged extensively with my officials, I can assure you that they are working tirelessly to process applications as quickly as possible and to ensure public resources are directed to the right applicants.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013103%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=323311","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=323311"}},{"id":"323310","reference":"AQW 13102/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-21","answerBy":"2021-02-05","answered":"2021-05-24","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health whether he will consider introducing rapid COVID-19 testing for special schools.","answerText":"A programme of regular testing for all staff and children in special schools commenced at the beginning of March 2021. The testing programme in special schools uses a new testing technology called LAMP (loop-mediated isothermal amplification) which utilises a less invasive saliva based testing process.\n\nTest kits have been issued to all 39 special schools.","answerHtml":"<p>A programme of regular testing for all staff and children in special schools commenced at the beginning of March 2021. The testing programme in special schools uses a new testing technology called LAMP (loop-mediated isothermal amplification) which utilises a less invasive saliva based testing process.</p><p>Test kits have been issued to all 39 special schools.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013102%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=323310","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=323310"}},{"id":"327654","reference":"AQO 1492/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2021-01-21","answerBy":"2021-02-01","answered":"2021-02-01","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health for an update on the cancelling of cancer surgeries due to COVID-19.","answerText":"Health Trusts are working tirelessly to maintain cancer care as far as possible during the current COVID-19 surge. However, the increasing COVID-19 infection rate has led to a sustained increase in unscheduled hospital and ICU admissions throughout January. Unfortunately, this has necessitated the redeployment of theatre staff and has significantly impacted on surgical provision, including red flag surgery.\n\nThe current situation throughout cancer services is extremely challenging. All Trusts are maintaining urgent bookable theatre lists for emergency surgery and, where capacity allows, are utilising capacity within those lists for cancer surgery.\n\nMy Department and the Health and Social Care Board have been working with independent sector providers and have secured capacity until end March 2021, and for the next financial year. From 1 April 2020 approximately 3,900 patients have benefited from this collaboration.\n\nThis additional resource will help manage the ongoing challenge in terms of theatre access and identify additional theatre sessions and day procedure lists. This capacity is prioritised for cancer and we are continuing to explore all opportunities to maximise and expand available capacity. Provision for continued access to the three independent hospitals had been made to 31 March 2021 however, given the impact of surge 3 dialogue has resulted in at least another 112 theatre sessions being made available for HSC cancer and time critical patients.\n\nCapacity has also been secured from RoI private clinics and discussions are ongoing with NHS England for in-house and IS capacity for Northern Ireland patients.\n\nIn addition, I have recently approved the establishment of a new regional approach. This will ensure that any available theatre capacity across Northern Ireland is allocated for those patients most in need of surgery. This will include seeking to fully maximise all available in-house Health and Social Care and accessing available Independent Sector capacity.\n\nWhilst this may mean that patients will need to travel further for their surgery, I would rather see the highest priority treatments delivered elsewhere in Northern Ireland, than not at all.\n\nI deeply regret that any patient experiences postponed operations. However I am assured that every attempt will continue to be made to protect the most urgent surgery, and that postponed operations will be rescheduled as quickly as possible. Trusts are keeping the position under daily review.","answerHtml":"<p>Health Trusts are working tirelessly to maintain cancer care as far as possible during the current COVID-19 surge. However, the increasing COVID-19 infection rate has led to a sustained increase in unscheduled hospital and ICU admissions throughout January. Unfortunately, this has necessitated the redeployment of theatre staff and has significantly impacted on surgical provision, including red flag surgery.</p><p>The current situation throughout cancer services is extremely challenging. All Trusts are maintaining urgent bookable theatre lists for emergency surgery and, where capacity allows, are utilising capacity within those lists for cancer surgery.</p><p>My Department and the Health and Social Care Board have been working with independent sector providers and have secured capacity until end March 2021, and for the next financial year. From 1 April 2020 approximately 3,900 patients have benefited from this collaboration.</p><p>This additional resource will help manage the ongoing challenge in terms of theatre access and identify additional theatre sessions and day procedure lists. This capacity is prioritised for cancer and we are continuing to explore all opportunities to maximise and expand available capacity. Provision for continued access to the three independent hospitals had been made to 31 March 2021 however, given the impact of surge 3 dialogue has resulted in at least another 112 theatre sessions being made available for HSC cancer and time critical patients.</p><p>Capacity has also been secured from RoI private clinics and discussions are ongoing with NHS England for in-house and IS capacity for Northern Ireland patients.</p><p>In addition, I have recently approved the establishment of a new regional approach. This will ensure that any available theatre capacity across Northern Ireland is allocated for those patients most in need of surgery. This will include seeking to fully maximise all available in-house Health and Social Care and accessing available Independent Sector capacity.</p><p>Whilst this may mean that patients will need to travel further for their surgery, I would rather see the highest priority treatments delivered elsewhere in Northern Ireland, than not at all.</p><p>I deeply regret that any patient experiences postponed operations. However I am assured that every attempt will continue to be made to protect the most urgent surgery, and that postponed operations will be rescheduled as quickly as possible. Trusts are keeping the position under daily review.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201492%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=327654","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=327654"}},{"id":"323015","reference":"AQW 12928/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-19","answerBy":"2021-02-03","answered":"2021-02-04","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, in regards to the Newly Self Employed Support Scheme, to detail (i) the total number of applications; (ii) the total number of grants paid out; and (iii) the average number of days from submitting an application to receiving a grant.","answerText":"As of 1st February 2021, Invest NI had received 2,334 applications under the Newly Self Employed Support Scheme (NSESS), with payments made to 523 applicants (c22%) to a value of £1.8m.\n\nAs with other emergency COVID support schemes, the NSESS is an evidence based assessment process. Each application needs to be reviewed and assessed, based on the evidence submitted by the applicant, against the eligibility criteria. This is a vital step in helping to ensure the proper and correct use of public funds. Unfortunately within NSESS, in the vast majority of cases (estimated at between 80%-90% of applications) the initial evidence submitted has not been of a sufficient quality to allow a final decision to be made quickly. This has resulted in multiple interactions, quite regularly 8-10, between the processing team and the applicants to gather together a satisfactory level of evidence on which to base a decision. These multiple interactions understandably greatly increase the length of time it takes to fully process each individual application.\n\nThese added difficulties in assessing NSESS applications, in comparison to other emergency COVID grants, is illustrated through a much longer processing timeframe between an application being submitted and an application being paid. For example, whilst on average CRBSS applications are processed within 15 working days, NSESS applications taking on average 29 days to process.\n\nHaving engaged extensively with my officials, I can assure you that they are working tirelessly, including allocating additional resources, to process NSESS applications as quickly as possible. I am hopeful that, now payments have commenced, Invest NI can move to accelerate payments as much as possible. I do, however, caution that given the challenges experienced to date with regards to the quality of evidence received, NSESS processing times are likely to be longer than other similar emergency COVID schemes.","answerHtml":"<p>As of 1st February 2021, Invest NI had received 2,334 applications under the Newly Self Employed Support Scheme (NSESS), with payments made to 523 applicants (c22%) to a value of £1.8m.</p><p>As with other emergency COVID support schemes, the NSESS is an evidence based assessment process. Each application needs to be reviewed and assessed, based on the evidence submitted by the applicant, against the eligibility criteria. This is a vital step in helping to ensure the proper and correct use of public funds. Unfortunately within NSESS, in the vast majority of cases (estimated at between 80%-90% of applications) the initial evidence submitted has not been of a sufficient quality to allow a final decision to be made quickly. This has resulted in multiple interactions, quite regularly 8-10, between the processing team and the applicants to gather together a satisfactory level of evidence on which to base a decision. These multiple interactions understandably greatly increase the length of time it takes to fully process each individual application.</p><p>These added difficulties in assessing NSESS applications, in comparison to other emergency COVID grants, is illustrated through a much longer processing timeframe between an application being submitted and an application being paid. For example, whilst on average CRBSS applications are processed within 15 working days, NSESS applications taking on average 29 days to process.</p><p>Having engaged extensively with my officials, I can assure you that they are working tirelessly, including allocating additional resources, to process NSESS applications as quickly as possible. I am hopeful that, now payments have commenced, Invest NI can move to accelerate payments as much as possible. I do, however, caution that given the challenges experienced to date with regards to the quality of evidence received, NSESS processing times are likely to be longer than other similar emergency COVID schemes.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012928%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=323015","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=323015"}},{"id":"323014","reference":"AQW 12927/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-19","answerBy":"2021-02-03","answered":"2021-01-26","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she has had any engagement with the UK Department for Education or HM Treasury regarding temporarily reducing tuition fees and providing additional support for students as a result of COVID-19.","answerText":"Higher Education is a devolved matter and my Department is responsible only for determining the annual maximum tuition fee level that can be charged by higher education institutions in Northern Ireland. It is a decision for the higher education institutions to determine what they wish to charge Northern Ireland and EU domiciled students, up to that maximum level.\n\nHowever, I will be writing to Northern Ireland’s universities, on behalf of students, asking them to review their compliance with consumer law and provide assurance that, in implementing their response to the Covid-19 pandemic, they have given due regard to relevant consumer protection law.\n\nInstitutions must be clear with new and returning students about how teaching and assessment will be delivered and the circumstances in which changes might be necessary. I will therefore ask the higher education institutions to:\n\n confirm that they have been, and will continue to be, sufficiently clear with new and continuing students about how teaching and assessment is delivered, the circumstances in which changes might be made, and what those changes might entail;\n\n confirm that, in their assessment, students received, during the autumn term, the teaching and assessment they were promised and might reasonably have expected to receive based on the information provided; and\n\n confirm whether their current plans for the spring and summer terms will ensure that students receive the teaching and assessment they were promised and might reasonably expect to receive based on the information provided.\n\nIf new or returning students were not provided with sufficiently clear information about how teaching and assessment would be delivered in 2020-21, or that teaching and assessment were not delivered as promised, I will expect the institutions to actively consider their obligations under consumer law for tuition fee refunds or other forms of redress.\n\nI will also ask Northern Ireland’s universities to consider how they might support students by engaging with their private accommodation providers, as well as reviewing their own accommodation policies (where applicable) to ensure they are fair, transparent and have the best interests of students at heart.\n\nI am aware that the Office for Students (OfS) have written to English institutions along similar lines.\n\nAny Northern Ireland students experiencing financial hardship should first of all ensure that they have applied online at www.studentfinanceni.co.uk for all the financial assistance to which they may be entitled. My Department delivers financial support to eligible Northern Ireland students through Student Finance NI, and by the end of November 2020 had provided £84m in maintenance loans and a further £37m in maintenance grants as a contribution towards students’ living costs during the academic year, including the cost of accommodation.\n\nStudents at Northern Ireland’s universities who find themselves in financial hardship may be eligible to receive an award from the Support Funds made available by my Department, and managed by the higher education institutions. Earlier this financial year, I secured an £1.4m from the Executive and a further £1.4m from the Department’s own budget for these Support Funds, making a total of £5.6m available to support students facing genuine financial hardship.\n\nOn top of this, I have more recently brought forward proposals for an additional £10.4m for student hardship, to be allocated between Northern Ireland’s institutions on a pro rata basis. If approved, I will ask the universities to take a highly proactive approach to the publication and promotion of these funds to their students, and in particular vulnerable students, to ensure it reaches them as quickly as possible. I will also stress to Northern Ireland’s institutions that problems linked to accommodation contracts can be considered a legitimate contributing factor to financial hardship.\n\nMy remit only extends to the provision of hardship funds for students at Northern Ireland institutions. However, I am aware that last month the OfS wrote to English institutions to advise them of additional, one-off funding totalling £20m to be distributed to higher education providers in the financial year 2020-21 to address student hardship. As such, any Northern Ireland students studying at institutions elsewhere in the UK, and who are experiencing financial hardship, may wish to apply for this funding through their individual HE institution.","answerHtml":"<p>Higher Education is a devolved matter and my Department is responsible only for determining the annual maximum tuition fee level that can be charged by higher education institutions in Northern Ireland. It is a decision for the higher education institutions to determine what they wish to charge Northern Ireland and EU domiciled students, up to that maximum level.</p><p>However, I will be writing to Northern Ireland’s universities, on behalf of students, asking them to review their compliance with consumer law and provide assurance that, in implementing their response to the Covid-19 pandemic, they have given due regard to relevant consumer protection law.</p><p>Institutions must be clear with new and returning students about how teaching and assessment will be delivered and the circumstances in which changes might be necessary. I will therefore ask the higher education institutions to:</p><p> confirm that they have been, and will continue to be, sufficiently clear with new and continuing students about how teaching and assessment is delivered, the circumstances in which changes might be made, and what those changes might entail;</p><p> confirm that, in their assessment, students received, during the autumn term, the teaching and assessment they were promised and might reasonably have expected to receive based on the information provided; and</p><p> confirm whether their current plans for the spring and summer terms will ensure that students receive the teaching and assessment they were promised and might reasonably expect to receive based on the information provided.</p><p>If new or returning students were not provided with sufficiently clear information about how teaching and assessment would be delivered in 2020-21, or that teaching and assessment were not delivered as promised, I will expect the institutions to actively consider their obligations under consumer law for tuition fee refunds or other forms of redress.</p><p>I will also ask Northern Ireland’s universities to consider how they might support students by engaging with their private accommodation providers, as well as reviewing their own accommodation policies (where applicable) to ensure they are fair, transparent and have the best interests of students at heart.</p><p>I am aware that the Office for Students (OfS) have written to English institutions along similar lines.</p><p>Any Northern Ireland students experiencing financial hardship should first of all ensure that they have applied online at www.studentfinanceni.co.uk for all the financial assistance to which they may be entitled. My Department delivers financial support to eligible Northern Ireland students through Student Finance NI, and by the end of November 2020 had provided £84m in maintenance loans and a further £37m in maintenance grants as a contribution towards students’ living costs during the academic year, including the cost of accommodation.</p><p>Students at Northern Ireland’s universities who find themselves in financial hardship may be eligible to receive an award from the Support Funds made available by my Department, and managed by the higher education institutions. Earlier this financial year, I secured an £1.4m from the Executive and a further £1.4m from the Department’s own budget for these Support Funds, making a total of £5.6m available to support students facing genuine financial hardship.</p><p>On top of this, I have more recently brought forward proposals for an additional £10.4m for student hardship, to be allocated between Northern Ireland’s institutions on a pro rata basis. If approved, I will ask the universities to take a highly proactive approach to the publication and promotion of these funds to their students, and in particular vulnerable students, to ensure it reaches them as quickly as possible. I will also stress to Northern Ireland’s institutions that problems linked to accommodation contracts can be considered a legitimate contributing factor to financial hardship.</p><p>My remit only extends to the provision of hardship funds for students at Northern Ireland institutions. However, I am aware that last month the OfS wrote to English institutions to advise them of additional, one-off funding totalling £20m to be distributed to higher education providers in the financial year 2020-21 to address student hardship. As such, any Northern Ireland students studying at institutions elsewhere in the UK, and who are experiencing financial hardship, may wish to apply for this funding through their individual HE institution.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012927%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=323014","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=323014"}},{"id":"323013","reference":"AQW 12926/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-19","answerBy":"2021-02-03","answered":"2021-01-28","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for her assessment of the effectiveness of student hardship funds at supporting students facing financial hardship.","answerText":"My Department provides Support Funds to the Universities which are used to provide financial help to students whose access to higher education might be inhibited by financial considerations, or who, for whatever reason, including physical or other disabilities, face financial difficulties in meeting their living costs. The funds are targeted at students in particular need and priority should be given to the following groups of students: Mature students; to lone parents and those students who are not eligible for Childcare Grant; to disabled students who are not in receipt of Disabled Students’ Allowance (DSA); to care leavers; to students who are homeless or who are living in Foyers (these provide accommodation, guidance and support for homeless young people); and final year students who are experiencing financial difficulty.\n\nThe funds are available to eligible undergraduate and postgraduate HE students, who are enrolled at their University and able to demonstrate genuine financial hardship. Support is provided in the form of a non-repayable grant. The Universities take decisions on the award of individual payments and make no judgements on the circumstances which may lead a student to financial hardship – they simply ask that a student provides evidence in support of their claim. Given that the objective of the scheme is to support students facing genuine financial hardship, I consider the provision of a non-repayable grant payment an effective response. I am continuing to explore with the Universities what further options are available to provide support to students at this time.","answerHtml":"<p>My Department provides Support Funds to the Universities which are used to provide financial help to students whose access to higher education might be inhibited by financial considerations, or who, for whatever reason, including physical or other disabilities, face financial difficulties in meeting their living costs. The funds are targeted at students in particular need and priority should be given to the following groups of students: Mature students; to lone parents and those students who are not eligible for Childcare Grant; to disabled students who are not in receipt of Disabled Students’ Allowance (DSA); to care leavers; to students who are homeless or who are living in Foyers (these provide accommodation, guidance and support for homeless young people); and final year students who are experiencing financial difficulty.</p><p>The funds are available to eligible undergraduate and postgraduate HE students, who are enrolled at their University and able to demonstrate genuine financial hardship. Support is provided in the form of a non-repayable grant. The Universities take decisions on the award of individual payments and make no judgements on the circumstances which may lead a student to financial hardship – they simply ask that a student provides evidence in support of their claim. Given that the objective of the scheme is to support students facing genuine financial hardship, I consider the provision of a non-repayable grant payment an effective response. I am continuing to explore with the Universities what further options are available to provide support to students at this time.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012926%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=323013","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=323013"}},{"id":"322563","reference":"AQW 12779/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-15","answerBy":"2021-01-25","answered":"2021-02-02","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy when the next payment will be issued to businesses that previously applied and received grants under the Covid Restrictions Business Support Scheme.","answerText":"Following the reopening of the Covid Restrictions Business Support Scheme, the first top up payments for Part A were issued on 27 January to 2,088 applicants to a value of £7,648,800 Invest NI hope to issue payments to the majority of remaining applicants by the end of week commencing 1 February 2021.","answerHtml":"<p>Following the reopening of the Covid Restrictions Business Support Scheme, the first top up payments for Part A were issued on 27 January to 2,088 applicants to a value of £7,648,800 Invest NI hope to issue payments to the majority of remaining applicants by the end of week commencing 1 February 2021.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012779%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=322563","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=322563"}},{"id":"322562","reference":"AQW 12778/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-15","answerBy":"2021-02-01","answered":"2021-03-01","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an expected timescale for successful applicants to receive payments under the Limited Company Directors Support Scheme.","answerText":"The Limited Company Director Support Scheme is being delivered by Invest Northern Ireland, on behalf of the Department for the Economy, who are committed to assessing and verifying all applications, and processing payments, to eligible applicants as quickly as possible.\n\nHowever, the length of time it takes to process applications and determine eligibility to the grant payment depends on the quality of the supporting evidence that has been submitted with each application. It is essential that each application is reviewed and the submitted evidence verified whilst being mindful of the need to protect public funds.","answerHtml":"<p>The Limited Company Director Support Scheme is being delivered by Invest Northern Ireland, on behalf of the Department for the Economy, who are committed to assessing and verifying all applications, and processing payments, to eligible applicants as quickly as possible.</p><p>However, the length of time it takes to process applications and determine eligibility to the grant payment depends on the quality of the supporting evidence that has been submitted with each application. It is essential that each application is reviewed and the submitted evidence verified whilst being mindful of the need to protect public funds.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012778%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=322562","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=322562"}},{"id":"322561","reference":"AQW 12777/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-15","answerBy":"2021-02-01","answered":"2021-02-01","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure for an update on the review of the York Street Interchange project.","answerText":"I commissioned a short sharp review of the York Street Interchange scheme, to ensure it is future-proofed and forward looking. This review was completed in November 2020. I am currently considering its findings with a view to deciding on the next steps for the scheme, after which I will make an announcement.","answerHtml":"<p>I commissioned a short sharp review of the York Street Interchange scheme, to ensure it is future-proofed and forward looking. This review was completed in November 2020. I am currently considering its findings with a view to deciding on the next steps for the scheme, after which I will make an announcement.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012777%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=322561","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=322561"}},{"id":"322299","reference":"AQW 12696/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-14","answerBy":"2021-01-29","answered":"2021-02-09","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for her assessment of whether tour operators would be eligible for Part B of the Covid Restrictions Business Support Scheme.","answerText":"Part B of the Covid Restrictions Business Support Scheme (CRBSS) provides support to businesses that supply goods and services to businesses named in the Health Protection Regulations, or are reliant on named businesses being open and fully operational in order to operate, and have been severely impacted as a result.\n\nBusinesses that are eligible for the Bus Operator Financial Assistance Scheme are not eligible to apply for Part B of CRBSS. Should a tour operator not be eligible for the Bus Operator Scheme, they may apply to Part B of CRBSS provided the eligibility criteria can be met.\n\nFull details of the scheme, including the full eligibility criteria, are available at https://www.nibusinessinfo.co.uk/content/covid-restrictions-business-support-scheme-part-b.","answerHtml":"<p>Part B of the Covid Restrictions Business Support Scheme (CRBSS) provides support to businesses that supply goods and services to businesses named in the Health Protection Regulations, or are reliant on named businesses being open and fully operational in order to operate, and have been severely impacted as a result.</p><p>Businesses that are eligible for the Bus Operator Financial Assistance Scheme are not eligible to apply for Part B of CRBSS. Should a tour operator not be eligible for the Bus Operator Scheme, they may apply to Part B of CRBSS provided the eligibility criteria can be met.</p><p>Full details of the scheme, including the full eligibility criteria, are available at https://www.nibusinessinfo.co.uk/content/covid-restrictions-business-support-scheme-part-b.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012696%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=322299","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=322299"}},{"id":"322298","reference":"AQW 12695/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-14","answerBy":"2021-01-29","answered":"2021-01-25","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will bring forward COVID-19 financial support for the events sector and traders that rely on now cancelled public events.","answerText":"My Department has led the delivery of the business grants and other financial packages of support since March 2020, and is currently responsible for a number of live schemes, aimed at helping those businesses and individuals who continue to be impacted by the global pandemic.\n\nOne of these schemes is the Covid Restrictions Business Support Scheme (CRBSS).\n\nPart A of CRBSS is targeted at those businesses required to close/cease trading as a result of the recent Health Protection Regulations and, due to not paying business rates on their premises, are not eligible for the DoF Localised Restrictions Support Scheme. Examples of businesses that may be eligible include businesses that deliver their product or service on a mobile basis or operate from their home.\n\nPart B of the CRBSS will support businesses who may not be required to close under the current Health Regulations but provide goods and/or services to those businesses named in the regulations and have been severely impacted.\n\nPart B will also support businesses that do not provide goods or services, but are dependent on businesses defined in the regulations being open in order to operate. This could include businesses in the events sector.\n\nThe events sector and its associated businesses have been impacted particularly hard by the pandemic. The Executive is also aware of this and other Departments, such as the Department for Communities also have a key responsibility in this space.\n\nIt will be for the Executive collectively to determine if any new or additional funding can be allocated to the NI Events sector.","answerHtml":"<p>My Department has led the delivery of the business grants and other financial packages of support since March 2020, and is currently responsible for a number of live schemes, aimed at helping those businesses and individuals who continue to be impacted by the global pandemic.</p><p>One of these schemes is the Covid Restrictions Business Support Scheme (CRBSS).</p><p>Part A of CRBSS is targeted at those businesses required to close/cease trading as a result of the recent Health Protection Regulations and, due to not paying business rates on their premises, are not eligible for the DoF Localised Restrictions Support Scheme. Examples of businesses that may be eligible include businesses that deliver their product or service on a mobile basis or operate from their home.</p><p>Part B of the CRBSS will support businesses who may not be required to close under the current Health Regulations but provide goods and/or services to those businesses named in the regulations and have been severely impacted.</p><p>Part B will also support businesses that do not provide goods or services, but are dependent on businesses defined in the regulations being open in order to operate. This could include businesses in the events sector.</p><p>The events sector and its associated businesses have been impacted particularly hard by the pandemic. The Executive is also aware of this and other Departments, such as the Department for Communities also have a key responsibility in this space.</p><p>It will be for the Executive collectively to determine if any new or additional funding can be allocated to the NI Events sector.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012695%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=322298","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=322298"}},{"id":"322297","reference":"AQW 12694/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-14","answerBy":"2021-01-29","answered":"2021-01-25","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will bring forward a COVID-19 financial support package for the Northern Ireland travel sector, specifically travel agents and tour operators.","answerText":"My Department has led the delivery of the £10k and £25k business grants and other financial packages of support since March 2020. Many Travel Agents and others within this sector have been eligible for one or more of these provisions.\n\nTravel Agencies operating in retail premises have also benefitted from 100% rates holiday for 12 months in 2020/21. Businesses employing staff would also have been eligible for Coronavirus Job Retention Scheme, whilst self-employed Travel Agents or Tour Operators would also have been able to claim for lost revenue through the Self-Employed Income Support Scheme.\n\nI fully appreciate that the travel industry has been impacted particularly hard by the pandemic, both locally and on a global scale. I have met with representatives of the travel industry and am supportive of a specific financial support package being developed for the industry.\n\nHowever, any decisions on further specific support measures for the NI Travel sector must be agreed by the Executive collectively.","answerHtml":"<p>My Department has led the delivery of the £10k and £25k business grants and other financial packages of support since March 2020. Many Travel Agents and others within this sector have been eligible for one or more of these provisions.</p><p>Travel Agencies operating in retail premises have also benefitted from 100% rates holiday for 12 months in 2020/21. Businesses employing staff would also have been eligible for Coronavirus Job Retention Scheme, whilst self-employed Travel Agents or Tour Operators would also have been able to claim for lost revenue through the Self-Employed Income Support Scheme.</p><p>I fully appreciate that the travel industry has been impacted particularly hard by the pandemic, both locally and on a global scale. I have met with representatives of the travel industry and am supportive of a specific financial support package being developed for the industry.</p><p>However, any decisions on further specific support measures for the NI Travel sector must be agreed by the Executive collectively.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012694%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=322297","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=322297"}},{"id":"322296","reference":"AQW 12693/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-14","answerBy":"2021-01-29","answered":"2021-01-21","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 11550/17-22, when the first instalment for the loan was due to be repaid to the Department.","answerText":"The aim of the Sustainable Utilisation of Poultry Litter (SUPL) Scheme was to help resolve a significant local environmental and economic issue, and to help Northern Ireland comply with EU nitrates targets to positively impact the poultry sector and the wider Northern Ireland economy.\n\nThe loan was made on the basis that once the plant was operational and profitable repayments would commence.","answerHtml":"<p>The aim of the Sustainable Utilisation of Poultry Litter (SUPL) Scheme was to help resolve a significant local environmental and economic issue, and to help Northern Ireland comply with EU nitrates targets to positively impact the poultry sector and the wider Northern Ireland economy.</p><p>The loan was made on the basis that once the plant was operational and profitable repayments would commence.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012693%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=322296","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=322296"}},{"id":"322295","reference":"AQW 12692/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-14","answerBy":"2021-01-29","answered":"2021-01-21","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 11548/17-22, to detail (i) the projects included in the scheme and the amount paid out to each; (ii) the projects that continue to pay back loans; and (iii) the amount the Department expects to be repaid out of the £17.8 million in loans issued.","answerText":"The aim of the Sustainable Utilisation of Poultry Litter (SUPL) Scheme was to help resolve a significant local environmental and economic issue, and to help Northern Ireland comply with EU nitrates targets to positively impact the poultry sector and the wider Northern Ireland economy.\n\nTwo companies received support through the SUPL scheme:\n\nGlenmore Generation Ltd received £9.3m of support by way of a commercial loan. There have been no repayments received to date. The situation is fluid, however based on the information currently available there is a risk that the loan will not be repaid.\n\nAnaerobic Advantage Ltd received £8.5m of support by way of a commercial loan and equity investment. Repayments are ongoing and based on information currently available are due to continue.","answerHtml":"<p>The aim of the Sustainable Utilisation of Poultry Litter (SUPL) Scheme was to help resolve a significant local environmental and economic issue, and to help Northern Ireland comply with EU nitrates targets to positively impact the poultry sector and the wider Northern Ireland economy.</p><p>Two companies received support through the SUPL scheme:</p><p>Glenmore Generation Ltd received £9.3m of support by way of a commercial loan. There have been no repayments received to date. The situation is fluid, however based on the information currently available there is a risk that the loan will not be repaid.</p><p>Anaerobic Advantage Ltd received £8.5m of support by way of a commercial loan and equity investment. Repayments are ongoing and based on information currently available are due to continue.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012692%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=322295","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=322295"}},{"id":"322089","reference":"AQW 12598/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-13","answerBy":"2021-01-21","answered":"2021-02-22","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy when AQW 12208/17-22 will be answered.","answerText":"AQW 12208/17-22 was answered on 22 January 2021.","answerHtml":"<p>AQW 12208/17-22 was answered on 22 January 2021.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012598%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=322089","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=322089"}},{"id":"322088","reference":"AQW 12597/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-13","answerBy":"2021-01-28","answered":"2021-01-28","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities for an update on progress on the Housing Executive’s 2021 House Condition Survey.","answerText":"The Housing Executive’s 2021 House Condition Survey has been subject to a consultation with the House Condition Survey Steering Group and Users on how it should be progressed in light of the coronavirus pandemic. The consultation is nearing completion and updates on the proposed way forward will be available on the House Condition Survey web page. It is estimated that this will be by the end of January 2021.","answerHtml":"<p>The Housing Executive’s 2021 House Condition Survey has been subject to a consultation with the House Condition Survey Steering Group and Users on how it should be progressed in light of the coronavirus pandemic. The consultation is nearing completion and updates on the proposed way forward will be available on the House Condition Survey web page. It is estimated that this will be by the end of January 2021.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012597%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=322088","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=322088"}},{"id":"322087","reference":"AQW 12596/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-13","answerBy":"2021-01-28","answered":"2021-01-19","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will extend financial support to those that have not been able to avail of UK-wide or Northern Ireland self-employed COVID-19 support schemes, due to the requirement that 50% of income comes from self-employment.","answerText":"The UK Government’s Self-Employed Income Support Scheme (SEISS) was launched in March 2020, and many thousands of people throughout Northern Ireland have availed of this support. However, it excluded those who started trading in 2019/20.\n\nTherefore, on 3 December 2020, the Minister for the Economy launched the Newly Self-Employed Support Scheme (NSESS), which is specifically targeted at this population.\n\nOn 7 January 2021 I announced changes to ensure that those that moved from paid employment (PAYE) to self-employment during 2019/20 would not have their income from the previous employment taken into account.\n\nHowever, I acknowledge there remain self-employed individuals impacted by the limits on the NSESS and SEISS. Including those who became self-employed 2018/19 or before.\n\nThere is a £10 million funding envelope for the scheme and the eligibility criteria was designed within this funding envelope. The utilisation of any underspend from this scheme as well as any wider funding support will be a decision for the Executive to make collectively.\n\nI along with my Executive colleagues continue to consider all options to provide support to as wide a range of businesses as possible during this pandemic.","answerHtml":"<p>The UK Government’s Self-Employed Income Support Scheme (SEISS) was launched in March 2020, and many thousands of people throughout Northern Ireland have availed of this support. However, it excluded those who started trading in 2019/20.</p><p>Therefore, on 3 December 2020, the Minister for the Economy launched the Newly Self-Employed Support Scheme (NSESS), which is specifically targeted at this population.</p><p>On 7 January 2021 I announced changes to ensure that those that moved from paid employment (PAYE) to self-employment during 2019/20 would not have their income from the previous employment taken into account.</p><p>However, I acknowledge there remain self-employed individuals impacted by the limits on the NSESS and SEISS. Including those who became self-employed 2018/19 or before.</p><p>There is a £10 million funding envelope for the scheme and the eligibility criteria was designed within this funding envelope. The utilisation of any underspend from this scheme as well as any wider funding support will be a decision for the Executive to make collectively.</p><p>I along with my Executive colleagues continue to consider all options to provide support to as wide a range of businesses as possible during this pandemic.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012596%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=322087","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=322087"}},{"id":"322086","reference":"AQW 12595/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-13","answerBy":"2021-01-28","answered":"2021-01-22","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 11853/17-22, to detail (i) the expected funding gap; and, (ii) any assessment her Department has made of where funding could be diverted from to support European Social Fund projects.","answerText":"I have bid in January monitoring for funding that would see my department utilise available domestic funding for existing ESF projects within the current financial year.\n\nThese budgetary actions would effectively enable my department to defer spending EC funds of c£25.9 million until 2022-23 when EC funding would have otherwise run out. This will provide additional time to develop appropriate succession Programmes and secure the necessary funding for these valuable interventions.","answerHtml":"<p>I have bid in January monitoring for funding that would see my department utilise available domestic funding for existing ESF projects within the current financial year.</p><p>These budgetary actions would effectively enable my department to defer spending EC funds of c£25.9 million until 2022-23 when EC funding would have otherwise run out. This will provide additional time to develop appropriate succession Programmes and secure the necessary funding for these valuable interventions.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012595%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=322086","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=322086"}},{"id":"321732","reference":"AQW 12500/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-12","answerBy":"2021-01-20","answered":"2021-01-29","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy when she will launch financial support schemes for (i) the large hospitality and tourist accommodation sectors; and (ii) bed and breakfasts that pay domestic rates.","answerText":"On 21st January 2021, I announced details of a new £26.1m support scheme for larger hospitality and tourism businesses, as well as a £4.1m scheme to support Bed and Breakfast, Guest House and other Guest Accommodation. This is in recognition of the severe impact that the Covid-19 pandemic has had on the local tourism industry.\n\nThe Large Tourism and Hospitality Business Support Scheme will provide support to large businesses in these sectors, with a Net Added Value (NAV) of£51,000 and above, and which have been significantly impacted by the Health Protection Regulations put in place by the Executive. The scheme will provide additional financial support to help these businesses meet fixed costs and overheads associated with the survival of their businesses and the protection of jobs.\n\nThe Department will contact eligible businesses to provide an application form (with a unique application number). Once the application form has been fully completed and returned with the required supporting evidence, it will be assessed and a grant payment will issue in March 2021.\n\nThe Bed and Breakfast Support Scheme will be administered by Tourism NI, and will provide grant to support eligible businesses on a flat ‘per room’ amount plus a percentage of 2019’s turnover. It opens for applications on Thursday 28th January 2021.","answerHtml":"<p>On 21st January 2021, I announced details of a new £26.1m support scheme for larger hospitality and tourism businesses, as well as a £4.1m scheme to support Bed and Breakfast, Guest House and other Guest Accommodation. This is in recognition of the severe impact that the Covid-19 pandemic has had on the local tourism industry.</p><p>The Large Tourism and Hospitality Business Support Scheme will provide support to large businesses in these sectors, with a Net Added Value (NAV) of£51,000 and above, and which have been significantly impacted by the Health Protection Regulations put in place by the Executive. The scheme will provide additional financial support to help these businesses meet fixed costs and overheads associated with the survival of their businesses and the protection of jobs.</p><p>The Department will contact eligible businesses to provide an application form (with a unique application number). Once the application form has been fully completed and returned with the required supporting evidence, it will be assessed and a grant payment will issue in March 2021.</p><p>The Bed and Breakfast Support Scheme will be administered by Tourism NI, and will provide grant to support eligible businesses on a flat ‘per room’ amount plus a percentage of 2019’s turnover. It opens for applications on Thursday 28th January 2021.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012500%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=321732","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=321732"}},{"id":"321731","reference":"AQW 12499/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-12","answerBy":"2021-01-27","answered":"2021-01-22","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail plans for the High Street and Tourism Vouchers schemes, including (i) when the schemes will be launched; and (ii) how she will ensure that the expenditure for such schemes will be made in this financial year.","answerText":"Unfortunately, due to the recent rise in the number of cases of Coronavirus, and the subsequent restrictions which have been deemed necessary by the Executive, it has been decided that it would not be appropriate to implement the High Street Stimulus Scheme and the Holiday at Home Scheme in the current financial year, ending 31 March 2021, given that much of retail and hospitality remains closed and the public health messaging is to remain at home.\n\nTherefore, any implementation in the immediate future would be contrary to the current Coronavirus Health Regulations and the latest information and advice from the Chief Medical Officer and Chief Scientific Adviser.\n\nThe Department for the Economy remains supportive of the policy intervention and intends to put forward a bid to the Executive for these schemes in 2021/22.","answerHtml":"<p>Unfortunately, due to the recent rise in the number of cases of Coronavirus, and the subsequent restrictions which have been deemed necessary by the Executive, it has been decided that it would not be appropriate to implement the High Street Stimulus Scheme and the Holiday at Home Scheme in the current financial year, ending 31 March 2021, given that much of retail and hospitality remains closed and the public health messaging is to remain at home.</p><p>Therefore, any implementation in the immediate future would be contrary to the current Coronavirus Health Regulations and the latest information and advice from the Chief Medical Officer and Chief Scientific Adviser.</p><p>The Department for the Economy remains supportive of the policy intervention and intends to put forward a bid to the Executive for these schemes in 2021/22.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012499%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=321731","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=321731"}},{"id":"321730","reference":"AQW 12498/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-12","answerBy":"2021-01-27","answered":"2021-02-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) what COVID-19 support has been made available to food supply chain businesses; and (ii) whether she is considering additional support to these businesses.","answerText":"(i) The Executive has introduced an unprecedented range of support to businesses as a result of the COVID-19 pandemic. To date, over £340 million of support has been provided via my Department.\n\nFood supply chain businesses were eligible to apply for the £10,000 Small Business Support Grant Scheme and the NI Microbusiness Hardship Fund if the eligibility criteria were met.\n\nMy Department has introduced Part B of the Covid Restrictions Business Support Scheme which provides support to businesses not named in the Health Protection Regulations but are in the supply chain of those named businesses and have been severely impacted. To date, over £1.1 million of support has been provided through this scheme. Businesses in the food supply chain may be eligible if they meet wider scheme eligibility.\n\nIn addition to schemes operated by my Department, businesses may also receive rates relief and support for employee costs via the Coronavirus Job Retention Scheme.\n\nFull details of support available to businesses are available at https://www.nibusinessinfo.co.uk/campaign/coronavirus-updates-support-your-business.\n\n(ii) In considering further interventions, including any new funding or packages of financial support, it will be for the Executive collectively to determine how this will be allocated to best support economic recovery.","answerHtml":"<p>(i) The Executive has introduced an unprecedented range of support to businesses as a result of the COVID-19 pandemic. To date, over £340 million of support has been provided via my Department.</p><p>Food supply chain businesses were eligible to apply for the £10,000 Small Business Support Grant Scheme and the NI Microbusiness Hardship Fund if the eligibility criteria were met.</p><p>My Department has introduced Part B of the Covid Restrictions Business Support Scheme which provides support to businesses not named in the Health Protection Regulations but are in the supply chain of those named businesses and have been severely impacted. To date, over £1.1 million of support has been provided through this scheme. Businesses in the food supply chain may be eligible if they meet wider scheme eligibility.</p><p>In addition to schemes operated by my Department, businesses may also receive rates relief and support for employee costs via the Coronavirus Job Retention Scheme.</p><p>Full details of support available to businesses are available at https://www.nibusinessinfo.co.uk/campaign/coronavirus-updates-support-your-business.</p><p>(ii) In considering further interventions, including any new funding or packages of financial support, it will be for the Executive collectively to determine how this will be allocated to best support economic recovery.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012498%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=321730","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=321730"}},{"id":"321729","reference":"AQW 12497/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-12","answerBy":"2021-01-27","answered":"2021-02-09","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will undertake a review of the COVID-19 support schemes administered by her Department to assess (i) where gaps in support exist; (ii) how to provide support to groups excluded; and (iii) how any potential underspend could be mitigated, before the end of this financial year.","answerText":"To date, my Department has provided over £370 million of lifeline support to over 30,000 businesses and is currently delivering millions of pounds to thousands more. These businesses cover all sectors and occupations throughout Northern Ireland.\n\nIn addition to the £25k and £10k Business Support Schemes for Large, Small and Micro businesses in 2020, my Department, in response to issues and concerns raised by various stakeholders and representative groups, has launched the following schemes:\n\nCovid Restrictions Business Support Scheme, Part A and B;\n\nNewly Self-Employed Support Scheme;\n\nWet Pubs Business Support Scheme;\n\nLimited Company Director’s Support Scheme;\n\nLarge Tourism and Hospitality Business Support Scheme; and\n\nBed and Breakfast, Guest House and Guest Accommodation Scheme.\n\nGiven the ongoing restrictions that have been a necessary response to the global pandemic, my officials and our partner organisations will continue to devote all of their time and commitment to the continued implementation of these schemes, and the subsequent delivery of much needed financial support to the respective applicants.","answerHtml":"<p>To date, my Department has provided over £370 million of lifeline support to over 30,000 businesses and is currently delivering millions of pounds to thousands more. These businesses cover all sectors and occupations throughout Northern Ireland.</p><p>In addition to the £25k and £10k Business Support Schemes for Large, Small and Micro businesses in 2020, my Department, in response to issues and concerns raised by various stakeholders and representative groups, has launched the following schemes:</p><p>Covid Restrictions Business Support Scheme, Part A and B;</p><p>Newly Self-Employed Support Scheme;</p><p>Wet Pubs Business Support Scheme;</p><p>Limited Company Director’s Support Scheme;</p><p>Large Tourism and Hospitality Business Support Scheme; and</p><p>Bed and Breakfast, Guest House and Guest Accommodation Scheme.</p><p>Given the ongoing restrictions that have been a necessary response to the global pandemic, my officials and our partner organisations will continue to devote all of their time and commitment to the continued implementation of these schemes, and the subsequent delivery of much needed financial support to the respective applicants.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012497%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=321729","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=321729"}},{"id":"321728","reference":"AQW 12496/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2021-01-12","answerBy":"2021-01-27","answered":"2021-01-19","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she is considering providing COVID-19 financial support to individuals who became self-employed in the 2020/21 financial year.","answerText":"The UK Government’s Self-Employed Income Support Scheme (SEISS) was launched in March 2020, and many thousands of people throughout Northern Ireland have availed of this support. However, it excluded those who started trading in 2019/20.\n\nTherefore, on 3 December 2020, the Minister for the Economy launched the Newly Self-Employed Support Scheme (NSESS), which is specifically targeted at this population.\n\nHowever, there is a £10 million funding envelope for the scheme and the eligibility criteria was designed within this funding envelope. The utilisation of any underspend from this scheme as well as any wider funding support will be a decision for the Executive to make collectively.\n\nI along with my Executive colleagues continue to consider all options to provide support to as wide a range of businesses as possible during this pandemic.","answerHtml":"<p>The UK Government’s Self-Employed Income Support Scheme (SEISS) was launched in March 2020, and many thousands of people throughout Northern Ireland have availed of this support. However, it excluded those who started trading in 2019/20.</p><p>Therefore, on 3 December 2020, the Minister for the Economy launched the Newly Self-Employed Support Scheme (NSESS), which is specifically targeted at this population.</p><p>However, there is a £10 million funding envelope for the scheme and the eligibility criteria was designed within this funding envelope. The utilisation of any underspend from this scheme as well as any wider funding support will be a decision for the Executive to make collectively.</p><p>I along with my Executive colleagues continue to consider all options to provide support to as wide a range of businesses as possible during this pandemic.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012496%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=321728","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=321728"}},{"id":"321022","reference":"AQW 12377/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-31","answerBy":"2021-01-18","answered":"2021-01-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what alternative arrangements are being made for work experience and examinations for further education students as a result of the COVID-19 pandemic in this academic year.","answerText":" My Department has established an Advisory and Oversight Group (AOG) to ensure that appropriate plans are developed and implemented by providers so that educational provision and related activity in the Further Education (FE) sector and Non-Statutory Contractors (NSC) can safely resume for both staff and learners at the earliest opportunity.\n\n The AOG has developed the Framework for Safe Resumption of On-Site Education and Related Activity which provides guidance to the FE sector and NSCs based on relevant and most up to date medical and scientific advice.\n\n The Framework document sets out the procedures that must be followed to ensure that employers and placement providers have appropriate health and safety measures in place and the level of COVID-19 related risk to learners on training/ apprenticeship, as well as any staff undertaking workplace assessments or monitoring visits, has been appropriately mitigated. In relation to examinations my Department has been working closely with the further education sector throughout the pandemic to ensure that vocational education is delivered as effectively as possible.\n\n In response to the ongoing disruption to teaching and learning time, I recently announced further flexibilities in relation to externally assessed vocational exams due to take place in January, including BTecs and Cambridge Technicals.\n\n Learning centres now have the choice to either proceed with January exams or not, based on their own judgement of the current situation and taking into consideration the personal circumstances of their students and staff.\n\n Alternative arrangements will be put in place for those students who do not sit January exams to ensure they are not disadvantaged.\n\n Subsequently the 6 further education colleges took the decision on 7 January to cancel January BTec exams and they are now working with student and awarding organisations to put alternative arrangements in place.\n\n In conjunction with key stakeholders, my Department is currently giving consideration to the most appropriate approach to vocational exams and assessments in the summer given the high likelihood of continued disruption to teaching and learning.","answerHtml":"<p> My Department has established an Advisory and Oversight Group (AOG) to ensure that appropriate plans are developed and implemented by providers so that educational provision and related activity in the Further Education (FE) sector and Non-Statutory Contractors (NSC) can safely resume for both staff and learners at the earliest opportunity.</p><p> The AOG has developed the Framework for Safe Resumption of On-Site Education and Related Activity which provides guidance to the FE sector and NSCs based on relevant and most up to date medical and scientific advice.</p><p> The Framework document sets out the procedures that must be followed to ensure that employers and placement providers have appropriate health and safety measures in place and the level of COVID-19 related risk to learners on training/ apprenticeship, as well as any staff undertaking workplace assessments or monitoring visits, has been appropriately mitigated. In relation to examinations my Department has been working closely with the further education sector throughout the pandemic to ensure that vocational education is delivered as effectively as possible.</p><p> In response to the ongoing disruption to teaching and learning time, I recently announced further flexibilities in relation to externally assessed vocational exams due to take place in January, including BTecs and Cambridge Technicals.</p><p> Learning centres now have the choice to either proceed with January exams or not, based on their own judgement of the current situation and taking into consideration the personal circumstances of their students and staff.</p><p> Alternative arrangements will be put in place for those students who do not sit January exams to ensure they are not disadvantaged.</p><p> Subsequently the 6 further education colleges took the decision on 7 January to cancel January BTec exams and they are now working with student and awarding organisations to put alternative arrangements in place.</p><p> In conjunction with key stakeholders, my Department is currently giving consideration to the most appropriate approach to vocational exams and assessments in the summer given the high likelihood of continued disruption to teaching and learning.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012377%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=321022","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=321022"}},{"id":"320986","reference":"AQW 12343/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-30","answerBy":"2021-01-08","answered":"2021-01-14","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy when the Covid Restrictions Business Support Scheme will reopen for applications.","answerText":"The Covid Restrictions Business Support Scheme re-opened for applications on 7 January 2021.","answerHtml":"<p>The Covid Restrictions Business Support Scheme re-opened for applications on 7 January 2021.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012343%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=320986","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=320986"}},{"id":"320985","reference":"AQW 12342/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-30","answerBy":"2021-01-15","answered":"2021-01-20","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail what the arrangements for the European Health Insurance Card will be for people in Northern Ireland from 1 January 2021.","answerText":"At the end of the Transition Period, under the terms of the Protocol on Social Security Coordination in the Trade and Cooperation Agreement agreed by the UK and the EU, UK insured people will be able to access needs arising care while visiting the EU.\n\nA UK issued European Health Insurance Card (EHIC) will continue to be accepted until the individuals entitlement expires, at which point, the application will be for the new UK Global Health Insurance Card (GHIC).\n\nAs with the EHIC, the GHIC will continue to cover state healthcare (but not private treatment) and a card holder will be able to get emergency or necessary medical care in the country they are visiting. However it will currently not cover care in Norway, Iceland, Liechtenstein or Switzerland.\n\nFor those who fall under the terms of the EU Withdrawal Agreement, including all EU citizens (and their family) who were living in Northern Ireland before the 31 December 2020, will be able to apply for a legacy EHIC card.\n\nIt remains that an EHIC or GHIC is not a replacement for travel insurance as they do not cover everything, such as mountain rescue or being flown back to the UK (medical repatriation). It is still the position of the Department to recommend the travelers have both before they travel.\n\nUp to date guidance and application portal can be found at https://www.nhs.uk/using-the-nhs/healthcare-abroad/apply-for-a-free-ehic-european-health-insurance-card/","answerHtml":"<p>At the end of the Transition Period, under the terms of the Protocol on Social Security Coordination in the Trade and Cooperation Agreement agreed by the UK and the EU, UK insured people will be able to access needs arising care while visiting the EU.</p><p>A UK issued European Health Insurance Card (EHIC) will continue to be accepted until the individuals entitlement expires, at which point, the application will be for the new UK Global Health Insurance Card (GHIC).</p><p>As with the EHIC, the GHIC will continue to cover state healthcare (but not private treatment) and a card holder will be able to get emergency or necessary medical care in the country they are visiting. However it will currently not cover care in Norway, Iceland, Liechtenstein or Switzerland.</p><p>For those who fall under the terms of the EU Withdrawal Agreement, including all EU citizens (and their family) who were living in Northern Ireland before the 31 December 2020, will be able to apply for a legacy EHIC card.</p><p>It remains that an EHIC or GHIC is not a replacement for travel insurance as they do not cover everything, such as mountain rescue or being flown back to the UK (medical repatriation). It is still the position of the Department to recommend the travelers have both before they travel.</p><p>Up to date guidance and application portal can be found at https://www.nhs.uk/using-the-nhs/healthcare-abroad/apply-for-a-free-ehic-european-health-insurance-card/</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012342%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=320985","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=320985"}},{"id":"320984","reference":"AQW 12341/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-30","answerBy":"2021-01-15","answered":"2021-03-30","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what engagement she has had with the Irish Government in regards to Northern Ireland universities continuing to participate in the Erasmus Programme.","answerText":"My Department is aware of the Irish Government’s plans to support full-time Northern Ireland Higher Education students to allow them to continue to access the Erasmus+ programme through Irish institutions. The Irish Government did not notify the Department that they intended to publically announce the proposed arrangements prior to doing do so.\n\nThe progression of these proposed arrangements is a matter for the Irish Government and my Department has not contributed to their development. The Irish Government has indicated that they will liaise closely with Departmental officials on the more precise details of the proposed arrangements as they continue to be developed, so that any implications for Northern Ireland can be considered.","answerHtml":"<p>My Department is aware of the Irish Government’s plans to support full-time Northern Ireland Higher Education students to allow them to continue to access the Erasmus+ programme through Irish institutions. The Irish Government did not notify the Department that they intended to publically announce the proposed arrangements prior to doing do so.</p><p>The progression of these proposed arrangements is a matter for the Irish Government and my Department has not contributed to their development. The Irish Government has indicated that they will liaise closely with Departmental officials on the more precise details of the proposed arrangements as they continue to be developed, so that any implications for Northern Ireland can be considered.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012341%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=320984","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=320984"}},{"id":"320983","reference":"AQW 12340/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-30","answerBy":"2021-01-15","answered":"2021-01-14","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will allow late applications to the Covid Restrictions Business Support Scheme for businesses that had applied for the Localised Restrictions Scheme, but were notified of their ineligibility for the latter scheme after 16 December 2020.","answerText":"The Covid Restrictions Business Support Scheme re-opened for applications on 7 January 2021.\n\nFor any new applications which are successful, grant payments will be backdated for the period that the restrictions applied to each business.","answerHtml":"<p>The Covid Restrictions Business Support Scheme re-opened for applications on 7 January 2021.</p><p>For any new applications which are successful, grant payments will be backdated for the period that the restrictions applied to each business.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012340%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=320983","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=320983"}},{"id":"320721","reference":"AQW 12208/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-17","answerBy":"2020-12-29","answered":"2021-01-22","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to provide (i) a timeframe for introducing a COVID-19 financial support scheme for company directors; and (ii) what actions her Department is taking to ensure work on the scheme is completed as soon as possible.","answerText":"(i) The Limited Company Directors Support Scheme (LCDSS) will open for applications at 6pm on Thursday 21 January. This scheme will support limited company directors impacted by the pandemic.\n\n(ii) The scheme will be delivered by Invest Northern Ireland on behalf of the Department for the Economy. Applications will be verified and payments made as quickly as possible.\n\nMore information and eligibility criteria for the scheme are available at www.nibusinessinfo.co.uk/lcdss","answerHtml":"<p>(i) The Limited Company Directors Support Scheme (LCDSS) will open for applications at 6pm on Thursday 21 January. This scheme will support limited company directors impacted by the pandemic.</p><p>(ii) The scheme will be delivered by Invest Northern Ireland on behalf of the Department for the Economy. Applications will be verified and payments made as quickly as possible.</p><p>More information and eligibility criteria for the scheme are available at www.nibusinessinfo.co.uk/lcdss</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012208%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=320721","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=320721"}},{"id":"320720","reference":"AQW 12207/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-17","answerBy":"2021-01-06","answered":"2021-01-12","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what plans have been made to ensure that Invest NI does not have its budget negatively impacted by the loss of European Structural and Investment funding.","answerText":"EU funding will continue to support Invest NI programmes until December 2023. However, Invest NI has identified a budget gap from 2021/22 to support new business for Innovation and R&D projects as the EU funding supporting this activity has been fully utilised. My department submitted bids in January monitoring to provide certainty of funding for Invest NI budgets in 2021/22 and to allow time to negotiate a more sustainable future settlement.\n\nThe UK Shared Prosperity Fund (SPF) is being developed by the UK Government to replace EU Structural & Investment funds. Full replacement spending power, with local control over spending, is essential to ensuring that the SPF meets longer term local needs, including those of Invest NI.\n\nDetails of the SPF to date are limited and the timescales are of concern. I am liaising closely with the Minister of Finance, Economy Committee and Executive colleagues to ensure that any budget gap between EU Structural Funds and the SPF is closed and I will continue to work to ensure that we receive full replacement funding to meet Northern Ireland’s priorities and to support our economic recovery.","answerHtml":"<p>EU funding will continue to support Invest NI programmes until December 2023. However, Invest NI has identified a budget gap from 2021/22 to support new business for Innovation and R&amp;D projects as the EU funding supporting this activity has been fully utilised. My department submitted bids in January monitoring to provide certainty of funding for Invest NI budgets in 2021/22 and to allow time to negotiate a more sustainable future settlement.</p><p>The UK Shared Prosperity Fund (SPF) is being developed by the UK Government to replace EU Structural &amp; Investment funds. Full replacement spending power, with local control over spending, is essential to ensuring that the SPF meets longer term local needs, including those of Invest NI.</p><p>Details of the SPF to date are limited and the timescales are of concern. I am liaising closely with the Minister of Finance, Economy Committee and Executive colleagues to ensure that any budget gap between EU Structural Funds and the SPF is closed and I will continue to work to ensure that we receive full replacement funding to meet Northern Ireland’s priorities and to support our economic recovery.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012207%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=320720","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=320720"}},{"id":"320719","reference":"AQW 12206/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-17","answerBy":"2021-01-06","answered":"2020-12-29","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure whether she will seek to bring forward further financial support for taxi drivers.","answerText":"At present, the priority is to process the 4500 valid applications that have been received from taxi drivers for the current scheme, with 3500 payments issued before Christmas. Staff in my Department are working at pace to process all the remaining applications as quickly as possible, once outstanding information is received, to enable payments to be made to those who are eligible without delay.\n\nI have asked my officials to explore further options for helping those taxi drivers who were not eligible for the current scheme. At the same time, I also continue to press for the inclusion of the taxi sector in the various other support schemes being taken forward across the Executive, particularly Part B of the CBRRS run by the Department for the Economy.","answerHtml":"<p>At present, the priority is to process the 4500 valid applications that have been received from taxi drivers for the current scheme, with 3500 payments issued before Christmas. Staff in my Department are working at pace to process all the remaining applications as quickly as possible, once outstanding information is received, to enable payments to be made to those who are eligible without delay.</p><p>I have asked my officials to explore further options for helping those taxi drivers who were not eligible for the current scheme. At the same time, I also continue to press for the inclusion of the taxi sector in the various other support schemes being taken forward across the Executive, particularly Part B of the CBRRS run by the Department for the Economy.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012206%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=320719","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=320719"}},{"id":"320718","reference":"AQW 12205/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-17","answerBy":"2021-01-06","answered":"2021-01-25","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will make a new bid to the Executive for funds to expand the Newly Self Employed Support Scheme, to ensure those who do not meet the 50 per cent earnings rule of the Newly Self Employed Support or the Self Employed Income Support Scheme due to becoming self-employed later in the 2018/19 and 2019/20 tax years can access support.","answerText":"On 7 January 2021, I announced an expansion to the eligibility criteria to the Newly Self Employed Support Scheme to remove the need for over 50% of income to come from self-employment, and allow those who became self-employed later to qualify. The closing date for new applications would also be extended to 5 February 2021.\n\nIt has been determined by my officials that this expansion of the scheme could be implemented within the original funding envelope of £10m allocated by the Executive.","answerHtml":"<p>On 7 January 2021, I announced an expansion to the eligibility criteria to the Newly Self Employed Support Scheme to remove the need for over 50% of income to come from self-employment, and allow those who became self-employed later to qualify. The closing date for new applications would also be extended to 5 February 2021.</p><p>It has been determined by my officials that this expansion of the scheme could be implemented within the original funding envelope of £10m allocated by the Executive.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012205%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=320718","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=320718"}},{"id":"320717","reference":"AQW 12204/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-17","answerBy":"2021-01-06","answered":"2021-02-15","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to provide a timeframe for introducing a COVID-19 financial support scheme for bed and breakfasts that were previously unable to avail of business support grants.","answerText":"A Bed and Breakfast, Guest House and Guest Accommodation Scheme opened on Thursday 28th January 2021. Details about the Scheme can be found here:\n\nhttps://covid19.tourismni.com/accommodationsupport/","answerHtml":"<p>A Bed and Breakfast, Guest House and Guest Accommodation Scheme opened on Thursday 28th January 2021. Details about the Scheme can be found here:</p><p>https://covid19.tourismni.com/accommodationsupport/</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012204%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=320717","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=320717"}},{"id":"320399","reference":"AQW 12057/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-15","answerBy":"2021-01-04","answered":"2020-12-23","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will consider legislating to provide greater consumer protections to static caravan owners who do not have a caravan as a primary residence.","answerText":"The Caravans Act (NI) 2011 Part 2 provides legislative cover in respect of the seasonal caravan sector in Northern Ireland. Responsibility for the Act is shared between the Department for Communities (DfC) and my Department.\n\nHowever, it is DfC which is obliged to review Parts I and 2 of the Schedule every 5 years. The last review took place in 2016 and there were no recommendations arising from it. The next review is scheduled for 2021 and stakeholders including DfE will have an opportunity to contribute input.\n\nI can assure you that I fully recognise the vital contribution consumers provide to the Northern Ireland economy and I support the need to ensure that consumer protection rights are adequate and proportionate. My Department’s Trading Standards Service continuously engages with, and monitors feedback from, consumers and traders, to ensure consumer rights and responsibilities are upheld and appropriate enforcement action taken as necessary.","answerHtml":"<p>The Caravans Act (NI) 2011 Part 2 provides legislative cover in respect of the seasonal caravan sector in Northern Ireland. Responsibility for the Act is shared between the Department for Communities (DfC) and my Department.</p><p>However, it is DfC which is obliged to review Parts I and 2 of the Schedule every 5 years. The last review took place in 2016 and there were no recommendations arising from it. The next review is scheduled for 2021 and stakeholders including DfE will have an opportunity to contribute input.</p><p>I can assure you that I fully recognise the vital contribution consumers provide to the Northern Ireland economy and I support the need to ensure that consumer protection rights are adequate and proportionate. My Department’s Trading Standards Service continuously engages with, and monitors feedback from, consumers and traders, to ensure consumer rights and responsibilities are upheld and appropriate enforcement action taken as necessary.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012057%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=320399","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=320399"}},{"id":"320398","reference":"AQW 12056/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-15","answerBy":"2021-01-04","answered":"2020-12-23","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities whether she will commit to a review of the Caravans Act 2011, including consideration of the need for more protections for static caravan owners.","answerText":"The Department for Communities is required by Section 4 of the Caravan Act 2011 to review Parts I and 2 of the Schedule every 5 years. The Act was last reviewed in 2016.\n\nIt is the intention of the Department that these provisions will be reviewed again by the Department during 2021.","answerHtml":"<p>The Department for Communities is required by Section 4 of the Caravan Act 2011 to review Parts I and 2 of the Schedule every 5 years. The Act was last reviewed in 2016.</p><p>It is the intention of the Department that these provisions will be reviewed again by the Department during 2021.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012056%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=320398","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=320398"}},{"id":"319977","reference":"AQW 11927/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-11","answerBy":"2020-12-21","answered":"2020-12-22","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, in relation to the Covid Restrictions Business Support Scheme, to detail the number of applications submitted from each local council area, to (i) Part A; and (ii) Part B of the Scheme.","answerText":"Information in relation to the number of businesses that that have applied to the Covid Restrictions Business Support Scheme and received payment can be accessed online via the following webpages\n\nPart A: https://www.nibusinessinfo.co.uk/content/covid-restrictions-business-support-scheme-part\n\nPart B: https://www.nibusinessinfo.co.uk/content/covid-restrictions-business-support-scheme-part-b\n\nHere you can find information about the operation of the scheme to date. Based upon applications received this details applications by status (draft/submitted/processed/rejected/paid), and provides a facility to interrogate by District Council area and Parliamentary Constituency. This data will be updated on a weekly basis.","answerHtml":"<p>Information in relation to the number of businesses that that have applied to the Covid Restrictions Business Support Scheme and received payment can be accessed online via the following webpages</p><p>Part A: https://www.nibusinessinfo.co.uk/content/covid-restrictions-business-support-scheme-part</p><p>Part B: https://www.nibusinessinfo.co.uk/content/covid-restrictions-business-support-scheme-part-b</p><p>Here you can find information about the operation of the scheme to date. Based upon applications received this details applications by status (draft/submitted/processed/rejected/paid), and provides a facility to interrogate by District Council area and Parliamentary Constituency. This data will be updated on a weekly basis.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011927%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=319977","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=319977"}},{"id":"319976","reference":"AQW 11926/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-11","answerBy":"2020-12-30","answered":"2020-12-23","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether businesses that are permitted to reopen and resume trading following the lifting of some COVID-19 restrictions but choose to remain closed, will automatically receive support from the Covid Restrictions Business Support Scheme.","answerText":"The Covid Restrictions Business Support Scheme has been introduced to provide financial support to businesses affected by the Health Protection Regulations. The support is available to affected businesses for the duration of the restrictions. As such, the scheme does not apply to periods outside of the restrictions.","answerHtml":"<p>The Covid Restrictions Business Support Scheme has been introduced to provide financial support to businesses affected by the Health Protection Regulations. The support is available to affected businesses for the duration of the restrictions. As such, the scheme does not apply to periods outside of the restrictions.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011926%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=319976","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=319976"}},{"id":"319822","reference":"AQW 11853/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-10","answerBy":"2020-12-29","answered":"2020-12-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for her assessment of whether there is adequate time to design new supported employment programmes that are currently funded by the European Social Fund, before the end of this funding period.","answerText":"Funding for existing projects supported by the Northern Ireland European Social Fund (ESF) Programme (2014-2020) continues until March 2022.\n\nThe UK Shared Prosperity Fund was identified by the UK Government as a replacement for structural funds. To date, however, the details of the scheme continue to be limited and the timescales are of real concern.\n\nIn the absence this clarity from the UK Government, we have established a joint project, with the Department for Communities, to consider and develop a range of options for a successor Programme that will need to be considered by the NI Executive.\n\nWhilst progress is being made on the project, the timetable for the development of a successor programme and securing the necessary funding is an extremely challenging one. Officials within my Department continue to explore options with the Department of Finance to bridge any the potential gap in provision that may arise.","answerHtml":"<p>Funding for existing projects supported by the Northern Ireland European Social Fund (ESF) Programme (2014-2020) continues until March 2022.</p><p>The UK Shared Prosperity Fund was identified by the UK Government as a replacement for structural funds. To date, however, the details of the scheme continue to be limited and the timescales are of real concern.</p><p>In the absence this clarity from the UK Government, we have established a joint project, with the Department for Communities, to consider and develop a range of options for a successor Programme that will need to be considered by the NI Executive.</p><p>Whilst progress is being made on the project, the timetable for the development of a successor programme and securing the necessary funding is an extremely challenging one. Officials within my Department continue to explore options with the Department of Finance to bridge any the potential gap in provision that may arise.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011853%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=319822","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=319822"}},{"id":"319679","reference":"AQW 11785/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-09","answerBy":"2020-12-17","answered":"2020-12-15","answeredOrally":false,"priority":true,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance what action he is taking to obtain further clarification regarding the UK Shared Prosperity Fund (UKSPF), including the distribution and management of funding.","answerText":"Thank you for your question on 9th December. I have written to the British Treasury on multiple occasions regarding the lack of information available for SPF.\n\nMost recently, 9th December, I have written to Chancellor of the Duchy of Lancaster (CDL) stating my disappointment in the outcome of the spending review. A pilot programme, a precursor for SPF, valued at a total of £220 million was announced as part of the SR20 with a significant lack of clarity on allocations or scope. The “Heads of Terms” for SPF released alongside the Spending Review indicate that its full introduction will not take place until next spring and will be subject to the 21/22 spending review. This creates a risk of a significant delay representing a potential loss of approximately £70m of spending power for us. This is wholly unacceptable.\n\nI have asked that our funding for next year and beyond is fully guaranteed and that, as the delivery structures are developed, our devolved responsibilities are fully acknowledged and respected.","answerHtml":"<p>Thank you for your question on 9th December. I have written to the British Treasury on multiple occasions regarding the lack of information available for SPF.</p><p>Most recently, 9th December, I have written to Chancellor of the Duchy of Lancaster (CDL) stating my disappointment in the outcome of the spending review. A pilot programme, a precursor for SPF, valued at a total of £220 million was announced as part of the SR20 with a significant lack of clarity on allocations or scope. The “Heads of Terms” for SPF released alongside the Spending Review indicate that its full introduction will not take place until next spring and will be subject to the 21/22 spending review. This creates a risk of a significant delay representing a potential loss of approximately £70m of spending power for us. This is wholly unacceptable.</p><p>I have asked that our funding for next year and beyond is fully guaranteed and that, as the delivery structures are developed, our devolved responsibilities are fully acknowledged and respected.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011785%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=319679","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=319679"}},{"id":"319678","reference":"AQW 11784/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-09","answerBy":"2020-12-24","answered":"2020-12-21","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance whether there were Barnett Consequentials for Northern Ireland from the Green Homes Grant Scheme in England.","answerText":"There are no additional Barnett consequentials confirmed in 2020-21 for the Green Homes Grant in England.\n\nFor 2021-22, the Spending Review provided Barnett consequentials for English departmental-level changes and not for individual programmes. In that respect it is not possible to determine if individual programmes give rise to Barnett consequentials.","answerHtml":"<p>There are no additional Barnett consequentials confirmed in 2020-21 for the Green Homes Grant in England.</p><p>For 2021-22, the Spending Review provided Barnett consequentials for English departmental-level changes and not for individual programmes. In that respect it is not possible to determine if individual programmes give rise to Barnett consequentials.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011784%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=319678","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=319678"}},{"id":"319677","reference":"AQW 11783/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-09","answerBy":"2020-12-24","answered":"2020-12-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy pursuant to AQW 8409/17-22, for an update on any outcomes from the joint project with the Department for Communities that has been established to consider the policy and delivery options once the current European Social Fund (ESF) projects conclude.","answerText":"The joint project established with the Department for Communities, has recently been established and is making progress in a number of areas.\n\nMost recently a landscape review has been commissioned through the Strategic Investment Board (SIB) to help inform the scope and need, as well as potential options, in relation to future provision. An initial presentation on findings is due to be considered at the December meeting of the Project Board. This evidence base will help inform the Strategic Insight Lab scheduled for early 2021.\n\nWhilst funding for the programme continues until March 2022 there is a significant time constraint to complete all of the necessary steps to implement a replacement scheme. We are exploring all options to bridge any gap in provision and have been engaging with the Department of Finance on this.\n\nOfficials will provide a full update to the Economy Committee in early 2021.","answerHtml":"<p>The joint project established with the Department for Communities, has recently been established and is making progress in a number of areas.</p><p>Most recently a landscape review has been commissioned through the Strategic Investment Board (SIB) to help inform the scope and need, as well as potential options, in relation to future provision. An initial presentation on findings is due to be considered at the December meeting of the Project Board. This evidence base will help inform the Strategic Insight Lab scheduled for early 2021.</p><p>Whilst funding for the programme continues until March 2022 there is a significant time constraint to complete all of the necessary steps to implement a replacement scheme. We are exploring all options to bridge any gap in provision and have been engaging with the Department of Finance on this.</p><p>Officials will provide a full update to the Economy Committee in early 2021.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011783%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=319677","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=319677"}},{"id":"319497","reference":"AQW 11697/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-08","answerBy":"2020-12-16","answered":"2020-12-11","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy when AQW 9452/17-22 will be answered.","answerText":"AQW 9452/17-22 was answered on 9 December 2020.","answerHtml":"<p>AQW 9452/17-22 was answered on 9 December 2020.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011697%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=319497","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=319497"}},{"id":"319093","reference":"AQW 11550/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-04","answerBy":"2020-12-21","answered":"2020-12-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 9679/17-22, to detail (i) the location of the Anaerobic Digestion plant; (ii) the terms of the loan; (iii) how much of the loan has been repaid to date; (iv) the private investor that also contributed funding; and (v) what progress there had been in constructing the plant.","answerText":"The Glenmore Anaerobic Digestion plant is a private and public sector funded initiative to support the build of an operational Anaerobic Digestion (AD) plant in Donegal.\n\nThe aim of the project was to help resolve a significant local environmental and economic issue, and to help Northern Ireland comply with EU nitrates targets to positively impact the poultry sector and the wider Northern Ireland economy.\n\nThe plant uses poultry litter from Northern Ireland as a feedstock, and provides cheaper, green energy for two large Northern Ireland manufacturers.\n\nFunding for the scheme is via both private and public sector investment. Invest NI provided £9.3m funding as a commercial loan via the Sustainable Utilisation of Poultry Litter (SUPL) Scheme. This was alongside a £14m commercial loan from SQN Asset Finance (SQN) and a £1m equity injection. Both commercial loans were provided under the same terms and conditions and SQN has since invested further funds into the project.\n\nThe loan was made on the basis that once the plant was operational and profitable the loan would be repaid by quarterly capital and interest repayments. No loan repayments have been made to date.\n\nConstruction of the plant is complete. The project is currently operational and uses poultry litter from Northern Ireland as a feedstock, and provides cheaper, green energy for two large Northern Ireland manufacturers.","answerHtml":"<p>The Glenmore Anaerobic Digestion plant is a private and public sector funded initiative to support the build of an operational Anaerobic Digestion (AD) plant in Donegal.</p><p>The aim of the project was to help resolve a significant local environmental and economic issue, and to help Northern Ireland comply with EU nitrates targets to positively impact the poultry sector and the wider Northern Ireland economy.</p><p>The plant uses poultry litter from Northern Ireland as a feedstock, and provides cheaper, green energy for two large Northern Ireland manufacturers.</p><p>Funding for the scheme is via both private and public sector investment. Invest NI provided £9.3m funding as a commercial loan via the Sustainable Utilisation of Poultry Litter (SUPL) Scheme. This was alongside a £14m commercial loan from SQN Asset Finance (SQN) and a £1m equity injection. Both commercial loans were provided under the same terms and conditions and SQN has since invested further funds into the project.</p><p>The loan was made on the basis that once the plant was operational and profitable the loan would be repaid by quarterly capital and interest repayments. No loan repayments have been made to date.</p><p>Construction of the plant is complete. The project is currently operational and uses poultry litter from Northern Ireland as a feedstock, and provides cheaper, green energy for two large Northern Ireland manufacturers.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011550%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=319093","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=319093"}},{"id":"319092","reference":"AQW 11549/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-04","answerBy":"2020-12-21","answered":"2020-12-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 9679/17-22, for her assessment of whether the cancellation of this project will have an impact on the poultry sector in Northern Ireland.","answerText":"The Glenmore Anaerobic Digestion Facility has experienced a number of challenges at various stages including design challenges and operational difficulties. It is currently operational and uses poultry litter from Northern Ireland as a feedstock, and provides cheaper, green energy for two large Northern Ireland manufacturers.\n\nSome 200,000 tonnes per annum of poultry litter is produced in Northern Ireland. Due to the nutrient content of this litter, the poultry sector needs to utilise it in a sustainable way. Therefore, alternative processing outlets are needed as not all the poultry litter produced can be sustainably spread on land as a fertiliser in Northern Ireland\n\nSince the plant commenced operations in 2017, it has processed over 37,000 tonnes or about 6% of the Northern Ireland poultry litter produced. If this outlet was not available, the poultry sector would need to source additional outlets to sustainably utilise the poultry litter currently being processed at the plant. However, given the percentage of poultry litter currently processed at the plant, this may not have a significant impact on the poultry sector.","answerHtml":"<p>The Glenmore Anaerobic Digestion Facility has experienced a number of challenges at various stages including design challenges and operational difficulties. It is currently operational and uses poultry litter from Northern Ireland as a feedstock, and provides cheaper, green energy for two large Northern Ireland manufacturers.</p><p>Some 200,000 tonnes per annum of poultry litter is produced in Northern Ireland. Due to the nutrient content of this litter, the poultry sector needs to utilise it in a sustainable way. Therefore, alternative processing outlets are needed as not all the poultry litter produced can be sustainably spread on land as a fertiliser in Northern Ireland</p><p>Since the plant commenced operations in 2017, it has processed over 37,000 tonnes or about 6% of the Northern Ireland poultry litter produced. If this outlet was not available, the poultry sector would need to source additional outlets to sustainably utilise the poultry litter currently being processed at the plant. However, given the percentage of poultry litter currently processed at the plant, this may not have a significant impact on the poultry sector.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011549%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=319092","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=319092"}},{"id":"319091","reference":"AQW 11548/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-04","answerBy":"2020-12-21","answered":"2020-12-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 9679/17-22, to detail (i) the total amount in loans provided by the Department for the Economy, and its predecessor, the Department of Enterprise Trade and Investment, for projects under Sustainable Utilisation of Poultry Litter Scheme;  and (ii) the amount that has been repaid to date.","answerText":"The aim of the Sustainable Utilisation of Poultry Litter (SUPL) Scheme was to help resolve a significant local environmental and economic issue, and to help Northern Ireland comply with EU nitrates targets to positively impact the poultry sector and the wider Northern Ireland economy.\n\nThe total amount of loans for projects under the Sustainable Utilisation of Poultry Litter Scheme was £17.8m.\n\nTo date £1.2m has been repaid.","answerHtml":"<p>The aim of the Sustainable Utilisation of Poultry Litter (SUPL) Scheme was to help resolve a significant local environmental and economic issue, and to help Northern Ireland comply with EU nitrates targets to positively impact the poultry sector and the wider Northern Ireland economy.</p><p>The total amount of loans for projects under the Sustainable Utilisation of Poultry Litter Scheme was £17.8m.</p><p>To date £1.2m has been repaid.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011548%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=319091","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=319091"}},{"id":"318877","reference":"AQW 11476/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-03","answerBy":"2020-12-11","answered":"2020-12-22","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will amend the criteria for the Newly Self-Employed Support Scheme to ensure that those that became self-employed from September 2019 to March 2020 are included in the scheme.","answerText":"The UK Government’s Self-Employed Income Support Scheme excluded those who started trading in 2019/20 as these individuals would not have been able to provide HMRC with the data needed to properly guard against the risk of fraud. The Newly Self-Employed Support Scheme (NSESS) is targeted at this population and applies broadly the same methodology as the SEISS.\n\nI appreciate there remains self-employed individuals impacted by the limits on the NSESS and SEISS. In particular, I am aware of these impacts on those who became self-employed in 2018/19 that were excluded from the SEISS or received limited support due to the policy design of the scheme.\n\nI fully appreciate that this is frustrating for those individuals. However, the scheme was designed to fit within the £10 million funding envelope approved by the Executive. The criteria for the scheme was approved by the Executive. Extending eligibility criteria to try and redress issues around existing national policy decisions has wide ranging implications - not least on affordability - and, therefore, changing the criteria for the scheme is a decision for the Executive.","answerHtml":"<p>The UK Government’s Self-Employed Income Support Scheme excluded those who started trading in 2019/20 as these individuals would not have been able to provide HMRC with the data needed to properly guard against the risk of fraud. The Newly Self-Employed Support Scheme (NSESS) is targeted at this population and applies broadly the same methodology as the SEISS.</p><p>I appreciate there remains self-employed individuals impacted by the limits on the NSESS and SEISS. In particular, I am aware of these impacts on those who became self-employed in 2018/19 that were excluded from the SEISS or received limited support due to the policy design of the scheme.</p><p>I fully appreciate that this is frustrating for those individuals. However, the scheme was designed to fit within the £10 million funding envelope approved by the Executive. The criteria for the scheme was approved by the Executive. Extending eligibility criteria to try and redress issues around existing national policy decisions has wide ranging implications - not least on affordability - and, therefore, changing the criteria for the scheme is a decision for the Executive.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011476%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=318877","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=318877"}},{"id":"322495","reference":"AQO 1365/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2020-12-03","answerBy":"2020-12-15","answered":"2020-12-15","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health for his assessment of the impact of COVID-19 on cancer screenings.","answerText":"Dealing with the Covid-19 pandemic continues to place additional pressures on health services, however, within this context the recovery and restoration of cancer screening services is a priority.\n\nA phased, prioritised restoration of paused screening programmes commenced during June, July and August. The initial priority is to clear the backlog of patients waiting for diagnostic procedures and to issue invitations to those whose screening opportunities were paused. Progress towards restoration continues to be achieved.\n\nThe Public Health Agency established a ‘Screening Restoration Group’ to provide regional coordination and oversight. The Group continues to work, in partnership with Trusts, to restore the paused screening programmes.\n\nThis work is being undertaken in the context of maintaining social distancing in clinical settings and enhanced infection control measures, including the use of personal protective equipment. Restoration also needs to be aligned with the resetting and availability of associated diagnostic and treatment services. This has reduced programme throughput as the time to undertake individual screening has increased.\n\nFull recovery is a complex task and is likely to take some time, particularly as the pandemic is ongoing. Many aspects of service and practice have been altered as a result of the pandemic. It is estimated that a 12 month period will be required to restore screening services.\n\nIt is vitally important that anyone who is experiencing any of the symptoms associated with early stage cancer should contact their doctor rather than waiting for a screening test.","answerHtml":"<p>Dealing with the Covid-19 pandemic continues to place additional pressures on health services, however, within this context the recovery and restoration of cancer screening services is a priority.</p><p>A phased, prioritised restoration of paused screening programmes commenced during June, July and August. The initial priority is to clear the backlog of patients waiting for diagnostic procedures and to issue invitations to those whose screening opportunities were paused. Progress towards restoration continues to be achieved.</p><p>The Public Health Agency established a ‘Screening Restoration Group’ to provide regional coordination and oversight. The Group continues to work, in partnership with Trusts, to restore the paused screening programmes.</p><p>This work is being undertaken in the context of maintaining social distancing in clinical settings and enhanced infection control measures, including the use of personal protective equipment. Restoration also needs to be aligned with the resetting and availability of associated diagnostic and treatment services. This has reduced programme throughput as the time to undertake individual screening has increased.</p><p>Full recovery is a complex task and is likely to take some time, particularly as the pandemic is ongoing. Many aspects of service and practice have been altered as a result of the pandemic. It is estimated that a 12 month period will be required to restore screening services.</p><p>It is vitally important that anyone who is experiencing any of the symptoms associated with early stage cancer should contact their doctor rather than waiting for a screening test.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201365%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=322495","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=322495"}},{"id":"318971","reference":"AQO 1346/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2020-12-03","answerBy":"2020-12-14","answered":"2020-12-14","answeredOrally":true,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance for his assessment of the impact on Northern Ireland of the UK Shared Prosperity Fund, relative to the EU Structural and Investment Funds that it is designed to replace.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr Murphy (The Minister of Finance)","text":"There is still insufficient detail available on the shared prosperity fund to make a final, informed comparison, but I have a number of concerns about where we may lose out. In my engagement with the British Government on the fund, I have made the case repeatedly for at least full replacement spending power, saying that local control over spending is essential to ensuring that the fund meets local needs. The heads of terms for the shared prosperity fund, released alongside the spending review, indicate that its full introduction will be delayed by a year, representing a potential loss of some £70 million of spending power for us. It is also clear that, when the fund is eventually introduced for 2022-23, it may not provide full replacement spending power, will have objectives that are more aligned to the English levelling-up agenda than to our local needs, and will have Whitehall-based rather than local delivery arrangements. That is unacceptable, and I intend to make that case strongly to British Ministers."},{"speaker":"Mr Dickson","text":"I thank the Minister for his response. There are clearly very serious concerns about central control of the fund. Can you assure the House that you and the Department will do everything in your power to ensure that such funds that are allocated will be decentralised to the regions, particularly Northern Ireland? Can you estimate the amount of funding that has already been received by the Department so that we can work out what the loss might be?"},{"speaker":"Mr Murphy","text":"That funding is not received only by my Department. European funding is across a range of areas. When we go beyond the European social fund and some of the big-ticket items, there are quite a lot of small pots of funding that go to various Departments. We therefore have to analyse that when we estimate the total loss. From looking at that figure and at what the British Government have estimated in their pilot scheme, however, we believe that we could be down some £70 million. One issue is replacement spending power in full, which is a principle that we want to see established, and the other is the ability for the Executive to set priorities locally and allocate funding accordingly. The Internal Market Bill that is passing through Westminster seems to wish to take that responsibility into Whitehall and align it with the British Government's levelling-up agenda, which in no way matches the sort of agenda that we have here. There is therefore a significant battle ahead. Fortunately, in that, I am on the same page as the Scottish and Welsh Finance Ministers. We have been making the case collectively and will continue to do so."},{"speaker":"Mr O'Toole","text":"I agree with the Minister on the need to be firm with the UK Government on their obligations in delivering on no reduction in funding. Can the Finance Minister explore and maximise every other possible opportunity for Northern Ireland participation in relevant EU programmes in order to maximise the interpretation of the protocol when it comes to things like this, including things like the European green deal, which is a continent-wide plan for a just transition to overhaul our economy? Will he pledge to be as ambitious as possible in seeking funding and participation in those programmes?"},{"speaker":"Mr Murphy","text":"Yes, absolutely. It may be the responsibility of other Departments and other Ministers to seek access to that funding, but I will try to ensure that we take full advantage of whatever funding may become available to the Executive through those programmes, depending on the outcome of the talks between the British Government and the European Union. We are facing into a very challenging Budget period, as the Member knows, with the potential loss of EU funding, and we have to access whatever support we can, wherever it is available from. We will examine what is available to us and make sure that any Department, agency or body that can access that is aware of it and is encouraged to do so."},{"speaker":"Mr Speaker","text":"Question 5 has been withdrawn."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201346%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=318971","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2020-12-14&docID=319621#AQO%201346/17-22","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=318971"}},{"id":"318511","reference":"AQW 11292/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-01","answerBy":"2020-12-09","answered":"2021-02-18","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy when information on the appeals process for the Covid Restrictions Business Support Scheme will be published.","answerText":"In the interests of fairness, openness and transparency, shortly after the launch of the scheme, Invest NI published detailed information on the COVID Restrictions Business Support Scheme appeals procedure. This information is available at the following link, and is promoted within the scheme’s literature available via Invest NI’s NIBusinessInfo.co.uk website:\n\nhttps://www.investni.com/sites/default/files/2020-12/covid-restrictions-business-support-scheme-appeals-procedure.pdf","answerHtml":"<p>In the interests of fairness, openness and transparency, shortly after the launch of the scheme, Invest NI published detailed information on the COVID Restrictions Business Support Scheme appeals procedure. This information is available at the following link, and is promoted within the scheme’s literature available via Invest NI’s NIBusinessInfo.co.uk website:</p><p>https://www.investni.com/sites/default/files/2020-12/covid-restrictions-business-support-scheme-appeals-procedure.pdf</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011292%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=318511","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=318511"}},{"id":"318510","reference":"AQW 11291/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-01","answerBy":"2020-12-16","answered":"2020-12-21","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether there is a dedicated telephone number or email address for elected representatives to assist constituents with Covid Business Support Scheme problems.","answerText":"A dedicated helpline for elected representatives is not available. However, a helpline is available for applicants to the Covid Restrictions Business Support Scheme. The helpline number is 0800 952 4422 and is open from Monday to Friday, 9am – 4:30pm.\n\nApplicants can also access an online enquiry form at the following link:\n\nhttps://www.investni.com/covid-restrictions-business-support-scheme-enquiry-form.","answerHtml":"<p>A dedicated helpline for elected representatives is not available. However, a helpline is available for applicants to the Covid Restrictions Business Support Scheme. The helpline number is 0800 952 4422 and is open from Monday to Friday, 9am – 4:30pm.</p><p>Applicants can also access an online enquiry form at the following link:</p><p>https://www.investni.com/covid-restrictions-business-support-scheme-enquiry-form.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011291%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=318510","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=318510"}},{"id":"318509","reference":"AQW 11290/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-12-01","answerBy":"2020-12-16","answered":"2020-12-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 9679 17-22, to detail the change in circumstances that subsequently indicated the project might not reach an outcome that fully covers the investment made by Invest NI.","answerText":"The Glenmore Anaerobic Digestion Facility has experienced a number of challenges at various stages, including design challenges and operational difficulties.\n\nConstruction of the plant was commenced in February 2016 by Williams Industrial Services (WIS). Basic construction works were materially complete by June 2017, but plant commissioning challenges were encountered. WIS was also contracted by Glenmore Generation Limited (GGL) to operate and maintain the plant, but went into administration in February 2018.\n\nAn independent Management and Operations Review was commissioned in 2019 and a new operator was appointed in early 2020, with the company preparing a turnaround plan.","answerHtml":"<p>The Glenmore Anaerobic Digestion Facility has experienced a number of challenges at various stages, including design challenges and operational difficulties.</p><p>Construction of the plant was commenced in February 2016 by Williams Industrial Services (WIS). Basic construction works were materially complete by June 2017, but plant commissioning challenges were encountered. WIS was also contracted by Glenmore Generation Limited (GGL) to operate and maintain the plant, but went into administration in February 2018.</p><p>An independent Management and Operations Review was commissioned in 2019 and a new operator was appointed in early 2020, with the company preparing a turnaround plan.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011290%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=318509","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=318509"}},{"id":"317960","reference":"AQW 11105/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-27","answerBy":"2020-12-07","answered":"2021-01-29","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether those who have already received a payment from the Covid Restrictions Business Support Scheme, will need to apply again for additional payments.","answerText":"Previously successful applicants to the Covid Restrictions Business Support\n\nScheme do not need to reapply for support for the additional periods of\n\nrestrictions.\n\nSupport payments for the period that the restrictions apply until 5 March 2021\n\nwill be automatically processed for successful applicants.","answerHtml":"<p>Previously successful applicants to the Covid Restrictions Business Support</p><p>Scheme do not need to reapply for support for the additional periods of</p><p>restrictions.</p><p>Support payments for the period that the restrictions apply until 5 March 2021</p><p>will be automatically processed for successful applicants.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011105%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=317960","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=317960"}},{"id":"317959","reference":"AQW 11104/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-27","answerBy":"2020-12-14","answered":"2020-12-06","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what engagement and working relationship her Department will have with the newly announced UK Office for Investment.","answerText":"It is vitally important that Northern Ireland’s competative strengths and investment opportunities continue to be recognised and promoted as an integral part of the UK approach to investment and trade promotion. I therefore welcome HM Government’s commitment to driving inward investment into all parts of the UK.\n\nMy officials are engaging with their UK Government counterparts to understand better the scope and make-up of the new UK Office for Investment, not least when it is expected to be operational and how it will reflect Northern Ireland interests as part of the Government’s levelling up agenda.","answerHtml":"<p>It is vitally important that Northern Ireland’s competative strengths and investment opportunities continue to be recognised and promoted as an integral part of the UK approach to investment and trade promotion. I therefore welcome HM Government’s commitment to driving inward investment into all parts of the UK.</p><p>My officials are engaging with their UK Government counterparts to understand better the scope and make-up of the new UK Office for Investment, not least when it is expected to be operational and how it will reflect Northern Ireland interests as part of the Government’s levelling up agenda.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011104%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=317959","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=317959"}},{"id":"317958","reference":"AQW 11103/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-27","answerBy":"2020-12-14","answered":"2021-02-04","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what additional COVID-19 business support schemes will be put in place to support businesses through the period of closures from 27 November.","answerText":"In light of the Executive announcement of the necessary further restrictions from 27 November 2020, the Department immediately extended the Covid Restrictions Business Support Scheme Part A and Part B.\n\nOn 30 November 2020, I announced that the Newly Self-Employed Support Scheme would open to applications from 3 December 2020.\n\nSince then, both of these schemes have been extended for further periods and I have introduced the following packages of support in light of the ongoing financial and economic impacts of the pandemic:\n\n- Wet Pubs Business Support Scheme;\n\n- Limited Company Director’s Support Scheme;\n\n- Large Tourism and Hospitality Business Support Scheme; and\n\n- Bed and Breakfast, Guest House and Guest Accommodation Scheme.\n\nTo date, the Department has provided over £370 million of lifeline support to over 30,000 businesses and individuals, and is currently delivering millions of pounds to thousands more.","answerHtml":"<p>In light of the Executive announcement of the necessary further restrictions from 27 November 2020, the Department immediately extended the Covid Restrictions Business Support Scheme Part A and Part B.</p><p>On 30 November 2020, I announced that the Newly Self-Employed Support Scheme would open to applications from 3 December 2020.</p><p>Since then, both of these schemes have been extended for further periods and I have introduced the following packages of support in light of the ongoing financial and economic impacts of the pandemic:</p><p>- Wet Pubs Business Support Scheme;</p><p>- Limited Company Director’s Support Scheme;</p><p>- Large Tourism and Hospitality Business Support Scheme; and</p><p>- Bed and Breakfast, Guest House and Guest Accommodation Scheme.</p><p>To date, the Department has provided over £370 million of lifeline support to over 30,000 businesses and individuals, and is currently delivering millions of pounds to thousands more.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011103%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=317958","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=317958"}},{"id":"317720","reference":"AQW 11033/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-26","answerBy":"2020-12-11","answered":"2020-12-14","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for her assessment of whether, following further announcements on the functioning of the Shared Prosperity Fund, enough financial support will be available to maintain projects currently funded via the European Social Fund.","answerText":"Under the terms of the EU-UK Withdrawal Agreement, the 66 Priority 1 & 2 projects and the Priority 3 Apprenticeships NI programme currently funded via the NI European Social Fund (ESF) Programme 2014-20 will continue to be funded until concluded in March 2022 and December 2023 respectively.\n\nThere is insufficient detail in the Shared Prosperity Fund announcements to inform potential future impact. I continue to liaise with the Minister for Finance who leads on the negotiations on the functioning and quantum of replacement funding.","answerHtml":"<p>Under the terms of the EU-UK Withdrawal Agreement, the 66 Priority 1 &amp; 2 projects and the Priority 3 Apprenticeships NI programme currently funded via the NI European Social Fund (ESF) Programme 2014-20 will continue to be funded until concluded in March 2022 and December 2023 respectively.</p><p>There is insufficient detail in the Shared Prosperity Fund announcements to inform potential future impact. I continue to liaise with the Minister for Finance who leads on the negotiations on the functioning and quantum of replacement funding.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011033%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=317720","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=317720"}},{"id":"320227","reference":"AQO 1311/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2020-11-26","answerBy":"2020-12-08","answered":"2020-12-09","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education whether he will introduce legislation to provide for a flexible school starting age.","answerText":"The requirement for children who have reached the age of 4 by the 1st July to start primary school in September of that year is set out in Article 46 of the Education and Libraries (Northern Ireland) Order 1986.\n\nI have previously stated that I would consider whether changes to provide for a legal deferral is the most appropriate way forward and I have asked my officials to bring forward a paper to update previous proposals for deferring school starting age for my consideration.\n\nIn determining the best way to proceed, it is essential that an in-depth analysis is undertaken to consider the immediate and longer term effects, including assessing the impact any change might have on the overall number of years a pupil spends in compulsory education.\n\nI will want to fully assess the options presented and I will then set out how I intend to proceed, including any possible requirements in terms of legislation.","answerHtml":"<p>The requirement for children who have reached the age of 4 by the 1st July to start primary school in September of that year is set out in Article 46 of the Education and Libraries (Northern Ireland) Order 1986.</p><p>I have previously stated that I would consider whether changes to provide for a legal deferral is the most appropriate way forward and I have asked my officials to bring forward a paper to update previous proposals for deferring school starting age for my consideration.</p><p>In determining the best way to proceed, it is essential that an in-depth analysis is undertaken to consider the immediate and longer term effects, including assessing the impact any change might have on the overall number of years a pupil spends in compulsory education.</p><p>I will want to fully assess the options presented and I will then set out how I intend to proceed, including any possible requirements in terms of legislation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201311%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=320227","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=320227"}},{"id":"320258","reference":"AQO 1297/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2020-11-26","answerBy":"2020-12-08","answered":"2020-12-09","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy how the recently announced High Street Voucher scheme will operate.","answerText":"My Department’s High Street Voucher scheme will provide individuals with a prepaid card to be spent at ‘bricks and mortar’ businesses including retail, restaurants and hotels before the end of March 2021. It will not be available for online sales. The delivery of the scheme will inject £95m into our local economy. The multiplier effect of this innovative financial support offering – from people spending more than the value of the card and the ripple effects from purchases – will deliver even greater economic benefits and make a significant step to kick-starting our recovery. In developing the specifics of the scheme, my Department will implement learnings from Jersey, Malta and other jurisdictions that have rolled out similar initiatives. This will include considerations such as the card value, and how the card will operate in practice. As the scheme is under development, further details will be released in due course. It is anticipated that the scheme will ‘go live’ in early 2021 and its implementation will take into account all public health guidance.","answerHtml":"<p>My Department’s High Street Voucher scheme will provide individuals with a prepaid card to be spent at ‘bricks and mortar’ businesses including retail, restaurants and hotels before the end of March 2021. It will not be available for online sales. The delivery of the scheme will inject £95m into our local economy. The multiplier effect of this innovative financial support offering – from people spending more than the value of the card and the ripple effects from purchases – will deliver even greater economic benefits and make a significant step to kick-starting our recovery. In developing the specifics of the scheme, my Department will implement learnings from Jersey, Malta and other jurisdictions that have rolled out similar initiatives. This will include considerations such as the card value, and how the card will operate in practice. As the scheme is under development, further details will be released in due course. It is anticipated that the scheme will ‘go live’ in early 2021 and its implementation will take into account all public health guidance.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201297%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=320258","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=320258"}},{"id":"320095","reference":"AQO 1286/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2020-11-26","answerBy":"2020-12-07","answered":"2020-12-07","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities whether she will expand support for home insulation and energy efficiency schemes, to address fuel poverty and the climate crisis.","answerText":"The Affordable Warmth Scheme is the Executive’s main fuel poverty scheme. It provides a range of energy efficiency improvement measures which include cavity and loft insulation as well as new and replacement heating systems and windows where appropriate.\n\nI have recently approved changes to the eligibility criteria for the Scheme. Increasing the income threshold from £20,000 to £23,000 and removing disability benefits from the calculation of income will increase the number of households eligible for support. Work is ongoing to amend the relevant Scheme Regulations to enable these changes to be implemented.\n\nThis Scheme is delivered in partnership between the Department, all eleven local Councils and the Housing Executive. It has a targeted approach, aimed at private sector households most at risk of fuel poverty.\n\nThe Boiler Replacement Scheme also provides a grant of up to £1,000 to eligible households towards the cost of replacing old and inefficient boilers over 15 years old.\n\nThe Housing Executive is aware of the significant level of funding that will be required to bring its stock up to a standard at which it can make a marked contribution to addressing climate change.\n\nThe Housing Executive recently commissioned research into the cost of retro-fitting housing to improve energy efficiency standards here (regardless of tenure). The research findings will help to inform policy going forward, but the common challenge for all providers remains the availability of funding to facilitate works to deliver improved energy efficiency standards.\n\nA new Fuel Poverty Strategy, which is in the early stages of development, will align with the new Energy Strategy and associated Energy Efficiency Strategy and Clean Air Strategies.","answerHtml":"<p>The Affordable Warmth Scheme is the Executive’s main fuel poverty scheme. It provides a range of energy efficiency improvement measures which include cavity and loft insulation as well as new and replacement heating systems and windows where appropriate.</p><p>I have recently approved changes to the eligibility criteria for the Scheme. Increasing the income threshold from £20,000 to £23,000 and removing disability benefits from the calculation of income will increase the number of households eligible for support. Work is ongoing to amend the relevant Scheme Regulations to enable these changes to be implemented.</p><p>This Scheme is delivered in partnership between the Department, all eleven local Councils and the Housing Executive. It has a targeted approach, aimed at private sector households most at risk of fuel poverty.</p><p>The Boiler Replacement Scheme also provides a grant of up to £1,000 to eligible households towards the cost of replacing old and inefficient boilers over 15 years old.</p><p>The Housing Executive is aware of the significant level of funding that will be required to bring its stock up to a standard at which it can make a marked contribution to addressing climate change.</p><p>The Housing Executive recently commissioned research into the cost of retro-fitting housing to improve energy efficiency standards here (regardless of tenure). The research findings will help to inform policy going forward, but the common challenge for all providers remains the availability of funding to facilitate works to deliver improved energy efficiency standards.</p><p>A new Fuel Poverty Strategy, which is in the early stages of development, will align with the new Energy Strategy and associated Energy Efficiency Strategy and Clean Air Strategies.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201286%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=320095","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=320095"}},{"id":"317534","reference":"AQW 10952/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-25","answerBy":"2020-12-03","answered":"2021-01-13","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail her plans to provide COVID-19 financial support to (i) the newly self-employed; (ii) company directors; and (iiI) others that have not yet received such support.","answerText":"I am pleased to announce the Newly Self-Employed Support Scheme (NSESS) launched 3 December 2020 and will provide £10 million in financial support to newly self-employed individuals (sole traders and those in partnerships) whose business is adversely impacted by Covid and who have not been able to access support from the UK government’s Self-Employed Income Support Scheme.\n\nA one-off taxable grant of £3,500 will be provided. This will enable support to be provided to approximately 2,900 newly self-employed individuals.\n\nFurther eligibility details and an eligibility tracker are available at this website:\n\nhttps://www.nibusinessinfo.co.uk/content/newly-self-employed-support-scheme\n\nThe NSESS will close for applications at 6pm 7 January 2020\n\nAdditionally, the Executive has agreed a funding allocation of £20million to support sole limited company directors who have been impacted by the Covid-19 pandemic but were not eligible for the UK Government’s Self Employed Income Support Scheme.\n\nMy Department continues to work on bringing forward further details of this scheme as a matter of a priority and these will be made available on the NI Business Info website in due course.\n\nI am committed to continue to work with my Executive colleagues to identify further means of support for as many local businesses as possible during this difficult time.","answerHtml":"<p>I am pleased to announce the Newly Self-Employed Support Scheme (NSESS) launched 3 December 2020 and will provide £10 million in financial support to newly self-employed individuals (sole traders and those in partnerships) whose business is adversely impacted by Covid and who have not been able to access support from the UK government’s Self-Employed Income Support Scheme.</p><p>A one-off taxable grant of £3,500 will be provided. This will enable support to be provided to approximately 2,900 newly self-employed individuals.</p><p>Further eligibility details and an eligibility tracker are available at this website:</p><p>https://www.nibusinessinfo.co.uk/content/newly-self-employed-support-scheme</p><p>The NSESS will close for applications at 6pm 7 January 2020</p><p>Additionally, the Executive has agreed a funding allocation of £20million to support sole limited company directors who have been impacted by the Covid-19 pandemic but were not eligible for the UK Government’s Self Employed Income Support Scheme.</p><p>My Department continues to work on bringing forward further details of this scheme as a matter of a priority and these will be made available on the NI Business Info website in due course.</p><p>I am committed to continue to work with my Executive colleagues to identify further means of support for as many local businesses as possible during this difficult time.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010952%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=317534","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=317534"}},{"id":"317533","reference":"AQW 10951/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-25","answerBy":"2020-12-10","answered":"2021-02-03","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) when her Department decided that wind turbines should not receive the £10,000 Coronavirus Small Business Support Grant; (ii) when this decision was notified to (a) Land and Property Services; and (b) the wider public.","answerText":"The decision that wind turbines were ineligible to receive support from the Coronavirus £10,000 Small Business Support Grant Scheme was made by the Department on 28 May 2020.\n\nLand and Property Services was notified of the decision on 12 June 2020 and the decision was published within the scheme ‘Frequently Asked Questions’ guidance document on the NI Business Info website on 19 June 2020.","answerHtml":"<p>The decision that wind turbines were ineligible to receive support from the Coronavirus £10,000 Small Business Support Grant Scheme was made by the Department on 28 May 2020.</p><p>Land and Property Services was notified of the decision on 12 June 2020 and the decision was published within the scheme ‘Frequently Asked Questions’ guidance document on the NI Business Info website on 19 June 2020.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010951%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=317533","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=317533"}},{"id":"317532","reference":"AQW 10950/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-25","answerBy":"2020-12-10","answered":"2020-12-07","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance for an update on the progress of introducing a Social Value Bill to the Assembly; and whether he will commit to attempting to pass such legislation before the end of this Assembly Mandate.","answerText":"A key priority for me is to deliver maximum social value from public procurement and that includes a Social Value Act.\n\nProcurement resources have been focused on responding to the outbreak of COVID-19 to source PPE and manage contractors to continue delivering essential public services in challenging times.\n\nThis has impacted on progressing the legislation and I will have my officials explore if it is still possible to bring a Social Value Bill to the Assembly during the current term.\n\nUnfortunately it is not simply a matter of replicating Britain’s 2012 Social Value Act. A 2015 review found that following the legislation “the incorporation of social value in actual procurement appears to be relatively low”. It is therefore important that legislation introduced here learns the lessons from the 2012 legislation, and social value legislation in other jurisdictions so that it is effective.\n\nI will be bringing a proposal to the Procurement Board to make inclusion of social value a mandatory policy of public procurement exercises when it meets on 16 December. When the proposal is finalised with the Procurement Board I will be seeking agreement from Executive colleagues for all Departments to comply with this policy. I will also be discussing Social Value legislation with the Board, which includes Colin Jess of Social Enterprise.","answerHtml":"<p>A key priority for me is to deliver maximum social value from public procurement and that includes a Social Value Act.</p><p>Procurement resources have been focused on responding to the outbreak of COVID-19 to source PPE and manage contractors to continue delivering essential public services in challenging times.</p><p>This has impacted on progressing the legislation and I will have my officials explore if it is still possible to bring a Social Value Bill to the Assembly during the current term.</p><p>Unfortunately it is not simply a matter of replicating Britain’s 2012 Social Value Act. A 2015 review found that following the legislation “the incorporation of social value in actual procurement appears to be relatively low”. It is therefore important that legislation introduced here learns the lessons from the 2012 legislation, and social value legislation in other jurisdictions so that it is effective.</p><p>I will be bringing a proposal to the Procurement Board to make inclusion of social value a mandatory policy of public procurement exercises when it meets on 16 December. When the proposal is finalised with the Procurement Board I will be seeking agreement from Executive colleagues for all Departments to comply with this policy. I will also be discussing Social Value legislation with the Board, which includes Colin Jess of Social Enterprise.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010950%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=317532","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=317532"}},{"id":"317531","reference":"AQW 10949/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-25","answerBy":"2020-12-10","answered":"2020-12-06","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what oversight role her Department is undertaking in regards to COVID-19 risk assessments and testing at Northern Ireland universities.","answerText":"The Department for Health has lead responsibility for engaging directly with the Higher Education Institutes on the issues identified. There are a number of cross-cutting issues related to student travel and welfare and the Executive Office has been asked to co-ordinate these plans, with a Task and Finish Group established to do so, which my officials have been involved in, alongside a variety of other Departments.\n\nThe various Departments are working collectively with other partners to develop and communicate a package of advice and support to help students stay safe, and to travel home safely at Christmas. This includes engaging with the local HE providers to agree a phased end to the semester and the facilitation of a move to online learning. The measures also involve testing for students, overseen by public health authorities.","answerHtml":"<p>The Department for Health has lead responsibility for engaging directly with the Higher Education Institutes on the issues identified. There are a number of cross-cutting issues related to student travel and welfare and the Executive Office has been asked to co-ordinate these plans, with a Task and Finish Group established to do so, which my officials have been involved in, alongside a variety of other Departments.</p><p>The various Departments are working collectively with other partners to develop and communicate a package of advice and support to help students stay safe, and to travel home safely at Christmas. This includes engaging with the local HE providers to agree a phased end to the semester and the facilitation of a move to online learning. The measures also involve testing for students, overseen by public health authorities.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010949%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=317531","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=317531"}},{"id":"317530","reference":"AQW 10948/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-25","answerBy":"2020-12-10","answered":"2020-12-02","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will advise Northern Ireland universities to deliver teaching online until Easter to help prevent the spread of COVID-19.","answerText":"While my Department is responsible for higher education policy in relation to the funding of teaching and research, as autonomous institutions, the universities are ultimately responsible for their own policies regarding how they deliver provision, and my Department has no formal remit to intervene. That said, I would expect any provision to be entirely in line with Public Health Agency advice.\n\nI and my officials are in regular contact with our universities and university colleges, and each of them have confirmed that the health, safety and wellbeing of their staff and students is their first priority.","answerHtml":"<p>While my Department is responsible for higher education policy in relation to the funding of teaching and research, as autonomous institutions, the universities are ultimately responsible for their own policies regarding how they deliver provision, and my Department has no formal remit to intervene. That said, I would expect any provision to be entirely in line with Public Health Agency advice.</p><p>I and my officials are in regular contact with our universities and university colleges, and each of them have confirmed that the health, safety and wellbeing of their staff and students is their first priority.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010948%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=317530","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=317530"}},{"id":"317216","reference":"AQW 10837/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-24","answerBy":"2020-12-02","answered":"2021-01-28","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether Part B of the Covid Restrictions Business Support Scheme will automatically be extended to businesses in the direct supply chain of the additional businesses required to close from 27 November.","answerText":"A business that is not named in the Health Protection Regulations that came into effect on 27 November 2020, but which supplies goods or services to such a business, or is reliant upon such a business being open and fully operational in order to trade, could apply to Part B of the Covid Restrictions Business Support Scheme if they met the eligibility criteria. The support period covered those eligible businesses in the direct supply chain of the additional businesses required to close from 27 November. The scheme opened to online applications at 6pm on Thursday 19 November 2020 and closed at 6pm on Wednesday 16 December 2020.\n\nThe Scheme re-opened for applications on 7 January 2021 for the period of restrictions in place from 26 December 2020.\n\nFull details of the scheme, including eligibility criteria, are available at https://www.nibusinessinfo.co.uk/content/covid-restrictions-business-support-scheme-part-b","answerHtml":"<p>A business that is not named in the Health Protection Regulations that came into effect on 27 November 2020, but which supplies goods or services to such a business, or is reliant upon such a business being open and fully operational in order to trade, could apply to Part B of the Covid Restrictions Business Support Scheme if they met the eligibility criteria. The support period covered those eligible businesses in the direct supply chain of the additional businesses required to close from 27 November. The scheme opened to online applications at 6pm on Thursday 19 November 2020 and closed at 6pm on Wednesday 16 December 2020.</p><p>The Scheme re-opened for applications on 7 January 2021 for the period of restrictions in place from 26 December 2020.</p><p>Full details of the scheme, including eligibility criteria, are available at https://www.nibusinessinfo.co.uk/content/covid-restrictions-business-support-scheme-part-b</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010837%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=317216","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=317216"}},{"id":"317080","reference":"AQW 10742/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-23","answerBy":"2020-12-08","answered":"2020-12-04","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs, pursuant to AQW 8129 17-22, to detail the species of trees have been planted thus far.","answerText":"Tree species planted with support from Forestry Grant Schemes and on Departmental land pursuant to AQW 8129 17-22 includes the following; broadleaf species of oak, birch¸ alder, hazel, wild cherry, rowan, crab apple, willow, rowan, aspen, field maple, hornbeam, and beech. These account for 426,000 trees of which approximately 95% are native tree species. Conifer tree species of Sitka spruce, Norway spruce, western red cedar, Douglas fir and Scots pine account for 148,000 trees.","answerHtml":"<p>Tree species planted with support from Forestry Grant Schemes and on Departmental land pursuant to AQW 8129 17-22 includes the following; broadleaf species of oak, birch¸ alder, hazel, wild cherry, rowan, crab apple, willow, rowan, aspen, field maple, hornbeam, and beech. These account for 426,000 trees of which approximately 95% are native tree species. Conifer tree species of Sitka spruce, Norway spruce, western red cedar, Douglas fir and Scots pine account for 148,000 trees.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010742%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=317080","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=317080"}},{"id":"317079","reference":"AQW 10741/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-23","answerBy":"2020-12-08","answered":"2020-12-05","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what role her Department has in regulating the Liquefied Petroleum Gas market in Northern Ireland.","answerText":"My Department has no role in regulating the Liquified Petroleum Gas market in Northern Ireland, and there are no plans to introduce regulation.","answerHtml":"<p>My Department has no role in regulating the Liquified Petroleum Gas market in Northern Ireland, and there are no plans to introduce regulation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010741%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=317079","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=317079"}},{"id":"317078","reference":"AQW 10740/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-23","answerBy":"2020-12-08","answered":"2020-12-06","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will support the creation of a Life Sciences-Charity Partnership Fund to support research in Northern Ireland.","answerText":"This is not within the remit of the Department for the Economy.","answerHtml":"<p>This is not within the remit of the Department for the Economy.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010740%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=317078","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=317078"}},{"id":"316938","reference":"AQW 10672/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-20","answerBy":"2020-11-30","answered":"2021-01-04","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what financial support she will put in place to support businesses impacted by new COVID-19 restrictions from 27 November 2020.","answerText":"I have introduced the Covid Restrictions Business Support Scheme (CRBSS) to support those businesses directly impacted by the Health Protection Regulations.\n\nBusinesses forced to close or severely limit their operations as a result of the increased Health Protection Regulations that came into effect on Friday 27 November could apply to the scheme if they met the eligibility criteria.Businesses which had already applied and received support via the scheme, for the period commencing 16 October, did not need to make a further application for the additional period of restrictions commencing 27 November. The scheme closed for new applications on 16 December.\n\nCRBSS supplements other support measures available such as the Newly Self-Employed Support Scheme. Details of support measures are available at https://www.nibusinessinfo.co.uk/campaign/coronavirus-updates-support-your-business.","answerHtml":"<p>I have introduced the Covid Restrictions Business Support Scheme (CRBSS) to support those businesses directly impacted by the Health Protection Regulations.</p><p>Businesses forced to close or severely limit their operations as a result of the increased Health Protection Regulations that came into effect on Friday 27 November could apply to the scheme if they met the eligibility criteria.Businesses which had already applied and received support via the scheme, for the period commencing 16 October, did not need to make a further application for the additional period of restrictions commencing 27 November. The scheme closed for new applications on 16 December.</p><p>CRBSS supplements other support measures available such as the Newly Self-Employed Support Scheme. Details of support measures are available at https://www.nibusinessinfo.co.uk/campaign/coronavirus-updates-support-your-business.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010672%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=316938","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=316938"}},{"id":"316937","reference":"AQW 10671/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-20","answerBy":"2020-12-07","answered":"2020-12-05","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will consider introducing statutory bereavement pay for employees following the death of a close relative or partner.","answerText":"I am committed during this Assembly mandate to bringing forward legislation for the introduction of parental bereavement leave and pay; I am not currently considering a more general right to statutory paid bereavement leave.\n\nThat said, I do recognise and understand that bereavement has a detrimental impact on those suffering the loss of a loved one. Many employers already offer paid compassionate or special leave as a way of supporting staff in these circumstances and I would encourage more to do so.\n\nEven in the event of an employer not offering paid bereavement leave, all employees have a ‘day 1’ right to unpaid time off to deal with emergencies involving dependents, which includes the death of a dependent. This right extends to attending the funeral of a dependent and for arranging the funeral or making any other necessary practical arrangements.\n\nI am also aware that this issue has been raised in the UK Parliament and I have asked my officials to keep me informed of developments.","answerHtml":"<p>I am committed during this Assembly mandate to bringing forward legislation for the introduction of parental bereavement leave and pay; I am not currently considering a more general right to statutory paid bereavement leave.</p><p>That said, I do recognise and understand that bereavement has a detrimental impact on those suffering the loss of a loved one. Many employers already offer paid compassionate or special leave as a way of supporting staff in these circumstances and I would encourage more to do so.</p><p>Even in the event of an employer not offering paid bereavement leave, all employees have a ‘day 1’ right to unpaid time off to deal with emergencies involving dependents, which includes the death of a dependent. This right extends to attending the funeral of a dependent and for arranging the funeral or making any other necessary practical arrangements.</p><p>I am also aware that this issue has been raised in the UK Parliament and I have asked my officials to keep me informed of developments.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010671%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=316937","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=316937"}},{"id":"316936","reference":"AQW 10670/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-20","answerBy":"2020-12-07","answered":"2021-02-05","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail (i) the process by which the current Covid Restrictions Business Support Scheme was designed; and (ii) whether this included input from affected businesses.","answerText":"The purpose of the Covid Restrictions Business Support Scheme is to provide support to businesses impacted by the Health Protection Regulations who were unable to access the Localised Restrictions Support Scheme. Part B of the scheme includes those businesses in the supply chain, forced to close or severely limit their operations as a result of the increased Health Protection Regulations.\n\nIn developing the scheme, officials in my Department undertook engagement with representatives from the hospitality sector. The key aim of engagement was to determine the extent of the impact of business closures, as a result of the regulations, on the supply side.\n\nThe scheme, including payment structure and eligibility criteria, was agreed by the Executive ahead of launch.\n\nThe Department has continued to take on board feedback on the scheme following launch, from affected businesses and other interested parties, and has made amendments and enhanced communications where appropriate.","answerHtml":"<p>The purpose of the Covid Restrictions Business Support Scheme is to provide support to businesses impacted by the Health Protection Regulations who were unable to access the Localised Restrictions Support Scheme. Part B of the scheme includes those businesses in the supply chain, forced to close or severely limit their operations as a result of the increased Health Protection Regulations.</p><p>In developing the scheme, officials in my Department undertook engagement with representatives from the hospitality sector. The key aim of engagement was to determine the extent of the impact of business closures, as a result of the regulations, on the supply side.</p><p>The scheme, including payment structure and eligibility criteria, was agreed by the Executive ahead of launch.</p><p>The Department has continued to take on board feedback on the scheme following launch, from affected businesses and other interested parties, and has made amendments and enhanced communications where appropriate.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010670%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=316936","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=316936"}},{"id":"316653","reference":"AQW 10588/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-19","answerBy":"2020-11-27","answered":"2020-12-11","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to provide an estimated timeframe from application to the payment of grants, under Part B of the Covid Restrictions Business Support Scheme.","answerText":"All applications to Part B of the Covid Restrictions Business Support Scheme will be assessed and verified as soon as possible. Part B opened for applications on 19 November 2020. The first payments were issued on 8 December 2020.","answerHtml":"<p>All applications to Part B of the Covid Restrictions Business Support Scheme will be assessed and verified as soon as possible. Part B opened for applications on 19 November 2020. The first payments were issued on 8 December 2020.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010588%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=316653","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=316653"}},{"id":"316652","reference":"AQW 10587/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-19","answerBy":"2020-12-04","answered":"2020-12-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will change the criteria of Part B of the Covid Restrictions Business Support Scheme, which requires businesses to have been trading immediately prior to 16 October 2020, in order to support supply chain businesses that have been unable to trade since March due to a long-term reduction in orders and bookings as a result of COVID-19 restrictions on their customers.","answerText":"The Covid Restrictions Business Support Scheme initially required evidence that businesses were trading immediately prior to 16 October 2020 or 5 October 2020 for businesses with the Derry City and Strabane District Council Area. However, this was found to be too restrictive and was therefore relaxed with businesses asked to provide proof of recent trading.\n\nThe scheme has been developed with the aim of providing financial support to businesses that have been directly and indirectly impacted by the Health Protection Regulations put in place by the Executive, effective from the 16 October. Therefore, the scheme includes the criteria that businesses have experienced at least a 40% reduction in turnover as a result of the restrictions being in place.\n\nBusinesses that have seen a long-term reduction in business may not be prevented from applying to the scheme by the recent trading requirement. However, in applying, evidence must be provided that they have seen a significant reduction in turnover as a result of the restrictions which is in keeping with the policy intention and scheme eligibility criteria, as agreed by the Executive.\n\nIn considering further interventions, including additional funding or packages of financial support, it will be for the Executive collectively, to determine how this will be allocated to best support economic recovery moving forward.","answerHtml":"<p>The Covid Restrictions Business Support Scheme initially required evidence that businesses were trading immediately prior to 16 October 2020 or 5 October 2020 for businesses with the Derry City and Strabane District Council Area. However, this was found to be too restrictive and was therefore relaxed with businesses asked to provide proof of recent trading.</p><p>The scheme has been developed with the aim of providing financial support to businesses that have been directly and indirectly impacted by the Health Protection Regulations put in place by the Executive, effective from the 16 October. Therefore, the scheme includes the criteria that businesses have experienced at least a 40% reduction in turnover as a result of the restrictions being in place.</p><p>Businesses that have seen a long-term reduction in business may not be prevented from applying to the scheme by the recent trading requirement. However, in applying, evidence must be provided that they have seen a significant reduction in turnover as a result of the restrictions which is in keeping with the policy intention and scheme eligibility criteria, as agreed by the Executive.</p><p>In considering further interventions, including additional funding or packages of financial support, it will be for the Executive collectively, to determine how this will be allocated to best support economic recovery moving forward.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010587%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=316652","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=316652"}},{"id":"316489","reference":"AQW 10501/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-18","answerBy":"2020-11-26","answered":"2021-08-18","answeredOrally":false,"priority":true,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health how his Department is engaging with businesses to ensure that they are aware of their responsibilities in regards to restrictions and mitigations and that reopening is as safe as possible.","answerText":"There are a number of resources available for businesses to avail of advice and guidance in regards to restrictions and mitigations to enable them to reopen safely as restrictions eased, including the Department of Health’s own website:\n\nhttps://www.health-ni.gov.uk/coronavirus\n\nhttps://www.nidirect.gov.uk/articles/coronavirus-covid-19-support-businesses\n\nhttps://www.nibusinessinfo.co.uk/campaign/coronavirus-updates-support-your-business\n\nThe Department for the Economy and the Health and Safety Executive have been working with businesses to ensure they could reopen in as safe a way as possible. The Public Health Agency also provides advice and guidance to businesses on their responsibilities in regards to restrictions and mitigations.","answerHtml":"<p>There are a number of resources available for businesses to avail of advice and guidance in regards to restrictions and mitigations to enable them to reopen safely as restrictions eased, including the Department of Health’s own website:</p><p>https://www.health-ni.gov.uk/coronavirus</p><p>https://www.nidirect.gov.uk/articles/coronavirus-covid-19-support-businesses</p><p>https://www.nibusinessinfo.co.uk/campaign/coronavirus-updates-support-your-business</p><p>The Department for the Economy and the Health and Safety Executive have been working with businesses to ensure they could reopen in as safe a way as possible. The Public Health Agency also provides advice and guidance to businesses on their responsibilities in regards to restrictions and mitigations.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010501%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=316489","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=316489"}},{"id":"316488","reference":"AQW 10500/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-18","answerBy":"2020-12-03","answered":"2020-12-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she has considered introducing a COVID-19 safety compliance scheme, similar to food hygiene scores on the doors, to improve safety and public confidence.","answerText":"Responsibility for such a proposal does not fall within the responsibility of my department. Indeed, as with the food hygiene scores referred to, such an initiative would be for the local councils to implement.\n\nFrom an Executive perspective, the Department for Communities (DfC) have policy and operational lead responsibility for the eleven councils throughout Northern Ireland.\n\nIn July 2020, DfC, along with the Department for Agriculture, Environment and Rural Affairs (DAERA) announced the launch of the COVID-19 Recovery Revitalisation Programme. This programme was designed to enable councils to invest in their town and city centres to create spaces that were safer and more inviting to shoppers, visitors and workers.\n\nThe first tranche of funding was issued to councils in August, and was used to provide immediate interventions, such as small grants to allow businesses to introduce social distancing measures, the provision of hand sanitiser stations, Covid-related signage, and other infrastructure.","answerHtml":"<p>Responsibility for such a proposal does not fall within the responsibility of my department. Indeed, as with the food hygiene scores referred to, such an initiative would be for the local councils to implement.</p><p>From an Executive perspective, the Department for Communities (DfC) have policy and operational lead responsibility for the eleven councils throughout Northern Ireland.</p><p>In July 2020, DfC, along with the Department for Agriculture, Environment and Rural Affairs (DAERA) announced the launch of the COVID-19 Recovery Revitalisation Programme. This programme was designed to enable councils to invest in their town and city centres to create spaces that were safer and more inviting to shoppers, visitors and workers.</p><p>The first tranche of funding was issued to councils in August, and was used to provide immediate interventions, such as small grants to allow businesses to introduce social distancing measures, the provision of hand sanitiser stations, Covid-related signage, and other infrastructure.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010500%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=316488","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=316488"}},{"id":"316235","reference":"AQW 10386/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-17","answerBy":"2020-12-02","answered":"2020-12-03","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities whether she will bring forward additional COVID-19 financial support for social enterprises.","answerText":"The budget approved by the Executive for the Covid Social Enterprise Fund was £7m. The fund was significantly oversubscribed and Community Finance Ireland (CFI), who were appointed to administer the fund, have now completed their individual assessment of all applications. In order to fund all applicants who were deemed eligible and assessed to be in need a further £2.25m was required. In recognition of the valuable role Social Enterprises play in our community, I bid to the Executive for these additional funds and I am delighted that this has now been approved.\n\nIn addition the Department has also recently launched the £3.3million Voluntary, Community and Social Economy Sector (VCSE) Covid Recovery Fund. This fund is open to applications from VCSE organisations and allows for grant awards to support the purchase of PPE and IT to enable the safe delivery of services.\n\nFunding is being distributed by Co-operation Ireland in partnership with Rural Community Network, and will remain open for applications until 4pm on Friday 11th December 2020. The deadline for applications may be extended subject to a review of committed expenditure and availability of any remaining funds.","answerHtml":"<p>The budget approved by the Executive for the Covid Social Enterprise Fund was £7m. The fund was significantly oversubscribed and Community Finance Ireland (CFI), who were appointed to administer the fund, have now completed their individual assessment of all applications. In order to fund all applicants who were deemed eligible and assessed to be in need a further £2.25m was required. In recognition of the valuable role Social Enterprises play in our community, I bid to the Executive for these additional funds and I am delighted that this has now been approved.</p><p>In addition the Department has also recently launched the £3.3million Voluntary, Community and Social Economy Sector (VCSE) Covid Recovery Fund. This fund is open to applications from VCSE organisations and allows for grant awards to support the purchase of PPE and IT to enable the safe delivery of services.</p><p>Funding is being distributed by Co-operation Ireland in partnership with Rural Community Network, and will remain open for applications until 4pm on Friday 11th December 2020. The deadline for applications may be extended subject to a review of committed expenditure and availability of any remaining funds.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010386%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=316235","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=316235"}},{"id":"315908","reference":"AQW 10206/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-13","answerBy":"2020-11-23","answered":"2020-11-20","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what actions she is taking to support university students in Northern Ireland to safely return home over the winter break period.","answerText":"In Northern Ireland, there are a number of cross-cutting issues related to student travel to be worked through, involving a variety of Departments. For this reason, the Executive Office has been asked to co-ordinate these plans, and a Task and Finish Group has been established to do so.\n\nThe various Departments involved are working collectively with other partners to develop and communicate a package of advice and support to help students stay safe, and to travel home safely at Christmas. This includes engaging with the local HE providers to agree a phased end to the semester and the facilitation of a move to online learning. The measures will also involve testing for students; public health authorities are working to agree the operational aspects of a testing programme to inform arrangements for student travel, while the relevant authorities will be engaged to consider the impacts on public transport.\n\nIn the interim, students should continue to follow the relevant public health advice in terms of travelling, and self-isolating when required.","answerHtml":"<p>In Northern Ireland, there are a number of cross-cutting issues related to student travel to be worked through, involving a variety of Departments. For this reason, the Executive Office has been asked to co-ordinate these plans, and a Task and Finish Group has been established to do so.</p><p>The various Departments involved are working collectively with other partners to develop and communicate a package of advice and support to help students stay safe, and to travel home safely at Christmas. This includes engaging with the local HE providers to agree a phased end to the semester and the facilitation of a move to online learning. The measures will also involve testing for students; public health authorities are working to agree the operational aspects of a testing programme to inform arrangements for student travel, while the relevant authorities will be engaged to consider the impacts on public transport.</p><p>In the interim, students should continue to follow the relevant public health advice in terms of travelling, and self-isolating when required.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010206%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=315908","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=315908"}},{"id":"315907","reference":"AQW 10205/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-13","answerBy":"2020-11-30","answered":"2020-12-11","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she intends to bring forward a financial support scheme for businesses with turnover negatively impacted by heightened COVID-19 restrictions, but not required to close, or in the direct supply chain of a business required to close.","answerText":"The Department of Finance’s Localised Restrictions Support Scheme (LRSS) seeks to support those businesses in commercial premises severely restricted in use or now forced to close directly by the new Regulations. This scheme will supports the majority of businesses directly affected by the restrictions.\n\nI recognise that not all businesses which have been affected by the restrictions are able to access support through this scheme. I have therefore introduced the Covid Restrictions Business Support Scheme to support businesses named in the Regulations but not supported by LRSS and for businesses but which supplies goods or services to such a business, or is reliant upon such a business being open and fully operational in order to trade.\n\nFurther to this support for business affected by the restrictions, my Department has introduced the Newly Self-Employed Support Scheme who may not have been able to access support to date. Similarly a scheme to support limited company directors is currently under development.\n\nTo provide additional support to our hospitality industry, schemes are currently being developed for wet pubs, bed and breakfasts and for large tourism and hospitality businesses.\n\nThe Department has also been provided with a financial allocation for a Northern Ireland wide High Street Stimulus scheme which will inject £95m into our local economy.\n\nAny decisions on further support measures for this sector, and the wider economy, will be agreed collectively by the Executive.","answerHtml":"<p>The Department of Finance’s Localised Restrictions Support Scheme (LRSS) seeks to support those businesses in commercial premises severely restricted in use or now forced to close directly by the new Regulations. This scheme will supports the majority of businesses directly affected by the restrictions.</p><p>I recognise that not all businesses which have been affected by the restrictions are able to access support through this scheme. I have therefore introduced the Covid Restrictions Business Support Scheme to support businesses named in the Regulations but not supported by LRSS and for businesses but which supplies goods or services to such a business, or is reliant upon such a business being open and fully operational in order to trade.</p><p>Further to this support for business affected by the restrictions, my Department has introduced the Newly Self-Employed Support Scheme who may not have been able to access support to date. Similarly a scheme to support limited company directors is currently under development.</p><p>To provide additional support to our hospitality industry, schemes are currently being developed for wet pubs, bed and breakfasts and for large tourism and hospitality businesses.</p><p>The Department has also been provided with a financial allocation for a Northern Ireland wide High Street Stimulus scheme which will inject £95m into our local economy.</p><p>Any decisions on further support measures for this sector, and the wider economy, will be agreed collectively by the Executive.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010205%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=315907","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=315907"}},{"id":"315906","reference":"AQW 10204/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-13","answerBy":"2020-11-30","answered":"2020-11-24","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) for her assessment of the risk of disruption to examinations in the further education sector for the current academic year, as a result of COVID-19; and (ii) what actions she is taking to mitigate this risk.","answerText":"The Covid-19 pandemic and ongoing social distancing measures continue to impact on the delivery and assessment of vocational qualifications in the further education sector and further disruption is a distinct possibility.\n\nFrom the outset of the pandemic, my Department has been working closely with key stakeholders, including the further education sector, through a Departmental Task & Finish Group, to respond to the emerging challenges with regard to the safe and effective delivery of vocational qualifications.\n\nThe focus for this academic year is to ensure that awarding organisations put in place flexible contingency measures and adaptations for providers to be able to respond appropriately to changing needs throughout the academic year and to effectively support learners to complete their courses of study.\n\nIn addition, providers, particularly the further education sector given their prominence in terms of scale, have put in place a range of innovative ways to offer safe delivery of teaching and learning, including enhanced blended learning.\n\nThe Department will continue to closely monitor the situation through the Task & Finish Group and in conjunction with CCEA Regulation in anticipation of any further emerging needs.","answerHtml":"<p>The Covid-19 pandemic and ongoing social distancing measures continue to impact on the delivery and assessment of vocational qualifications in the further education sector and further disruption is a distinct possibility.</p><p>From the outset of the pandemic, my Department has been working closely with key stakeholders, including the further education sector, through a Departmental Task &amp; Finish Group, to respond to the emerging challenges with regard to the safe and effective delivery of vocational qualifications.</p><p>The focus for this academic year is to ensure that awarding organisations put in place flexible contingency measures and adaptations for providers to be able to respond appropriately to changing needs throughout the academic year and to effectively support learners to complete their courses of study.</p><p>In addition, providers, particularly the further education sector given their prominence in terms of scale, have put in place a range of innovative ways to offer safe delivery of teaching and learning, including enhanced blended learning.</p><p>The Department will continue to closely monitor the situation through the Task &amp; Finish Group and in conjunction with CCEA Regulation in anticipation of any further emerging needs.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010204%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=315906","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=315906"}},{"id":"315807","reference":"AQO 1191/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2020-11-12","answerBy":"2020-11-24","answered":"2020-11-24","answeredOrally":true,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance what actions he is taking to ensure that £500 million of centrally-held funding, and any further Barnett consequentials, are spent effectively in this financial year.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr Murphy","text":"Yesterday, 23 November, the Executive agreed allocations of £338·1 million of the £500 million that was held centrally. There is also £150 million that has been set aside for the consideration of longer-term rates support. A further £26·6 million is being held in reserve in case there are further requirements later in the financial year."},{"speaker":"Mr Dickson","text":"Thank you, Minister, for your answer. You are responsible for assessing bids from other Departments and then issuing that funding. It is therefore incumbent on you to ensure that that money is spent, spent well and spent before the end of the financial year. In light of the lateness and lack of ambition of other Ministers, what action is your Department taking to ensure that money that is bid for from you and approved by you is spent appropriately?"},{"speaker":"Mr Murphy","text":"There is and has been a clear understanding among Ministers and Departments that, when they are asked to submit bids — that is how the process works — this is COVID-related money, so it is to be spent in this financial year and directed towards the three broad pillars of the Executive response to COVID: supporting vulnerable people, supporting the health service and supporting business. Bids must meet one of those criteria. We require Departments to demonstrate the area in which they want to spend the money and that they fully understand the requirement to have it spent out by the end of the financial year. We will continue to monitor that. Of course, the Member will know that the January monitoring of the general departmental spend will be coming through as well, and we may well receive further Barnett consequentials early in the new year. It has been a challenge to manage all of that additional money and deal with the stripped-down resource available to the Civil Service because of the pandemic. Nonetheless, it is incumbent on us to make sure that it is spent wisely in the right areas and spent out before the end of the financial year."},{"speaker":"Ms Dolan","text":"Minister, have the British Government responded to your request and the request of the Scottish and Welsh Finance Ministers for greater flexibility to ensure that the funding is spent fully and effectively this financial year?"},{"speaker":"Mr Murphy","text":"There have been discussions with Treasury right up to recent days, and I intend to speak to the Chief Secretary to the Treasury tomorrow. As the Member may know, we expect an announcement on the comprehensive spending review tomorrow that might give an indication of the finances that will be available for next year's Budget. We have pressed consistently for flexibility. In particular, if we are to receive further Barnett consequentials early in the new year, that will add to our case that this kind of drip feed of money, with no long-term planning attached to it, is difficult for any devolved Administration to manage. It reinforces the general point that we have been making about the need for flexibility in the management of public finances."},{"speaker":"Mr O'Toole","text":"I will be brief. Following the results of the spending review, which we expect tomorrow, will the Minister give the Assembly an update on exactly where we are with unallocated new Barnett consequentials, so that we are better able to scrutinise where the finances are at this critical time?"},{"speaker":"Mr Murphy","text":"We hope to receive that tomorrow. That is the date that we have been given, and I have a call scheduled with the Chief Secretary to the Treasury tomorrow. I anticipate knowing that, and I am happy to come back to the House when we get a handle on it. There have been a series of Budget discussions with other Ministers. A couple are still outstanding because other business has overtaken them, and we need to have those discussions and understand what the budgetary requirements of the Departments are for next year. However, it will depend on the amount available to us. I am happy to update the Assembly and the Member's Committee when we get some answers on all that."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201191%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=315807","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2020-11-24&docID=316869#AQO%201191/17-22","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=315807"}},{"id":"315789","reference":"AQO 1173/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2020-11-12","answerBy":"2020-11-24","answered":"2020-11-24","answeredOrally":true,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education when decisions will be made on outstanding development proposals for schools in East Antrim moving to controlled integrated status.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr Weir","text":"Development proposals (DPs) for transformation to controlled integrated status for two mid- and east Antrim schools were published on 26 March. They were DP 645 Carrickfergus Central Primary, where the proposal was to transform to controlled integrated status with effect from 1 September 2021 or as soon as possible thereafter, and DP 648, which is Seaview Primary School, to transform to controlled integrated status, again with effect from 1 September 2021 or soon after. Area planning activity was paused, due to COVID, on 3 April 2020, with the exception of special education provision in mainstream and special school settings, so that all resources, including staff, could be redeployed in the Department’s emergency response to the COVID-19 pandemic. As a consequence, the progression of DPs has been delayed. However, we are now in a position where this can restart, and an extraordinary meeting of the area planning steering group was held on 21 October and a decision taken formally to resume all area planning operations and structures from that date. The Department has extended the statutory objection period — objection can be letters both of support and of opposition — for affected DPs to provide a full two-month consultation outside the suspension period. The revised closing dates for the transformation proposals was 9 November 2020. Work on the assessment of the proposals has recommenced, and decisions on the DPs will be made as soon as possible."},{"speaker":"Mr Dickson","text":"I thank the Minister for his answer. I very much appreciate the difficulties that his Department has had during that time, and I very much welcome that it is now back on track to make these decisions. I particularly welcome the one on Carrickfergus Central. In respect of Seaview, you will appreciate that it is less than three miles away from an already successful integrated primary school that is celebrating 20 years this year. How does the Minister see the development plan proposal, bearing in mind that there are two villages less than three miles apart?"},{"speaker":"Mr Weir","text":"The Member will forgive me, but I do not know how much he is aware, directly, of the process. Development proposals, while they will be initiated by different bodies and brought forward, ultimately will come down a legal decision that has to be made by the Department and, where there is a Minister, by the Minister directly. Therefore, I am duty-bound, ahead of any decision on a development proposal, to make no comment at all on the merits of that case, either for or against that proposal. While all factors will be borne in mind with regard to the situation in Seaview and Carrick, I will have to judge all those factors when they come to me. I cannot comment on, for instance, the distance between existing schools at present. Obviously, all factors will be taken into account before there is a decision."},{"speaker":"Mr Allister","text":"Will the Minister advise the House, in making decisions about these matters, how far are the wider community ramifications considered? Let us take Seaview, for example. The impact on the like of Carnalbanagh Primary School, which the Minister kindly visited, could be serious, in that a school that is struggling to regenerate itself and to get back going could have the rug pulled from under it by the further advancement of an alternative offering nearby."},{"speaker":"Mr Weir","text":"We look at the impact on surrounding schools. It is not simply about the sustainability of the schools. The key focus is on the direct education of the young people. If a school was transforming, for example, or if there was a merger or closure, it is about what the implications will be for the local children. Any school will look at the wider implications for nearby schools. As part of the process, a grid of nearby schools is highlighted. Within that is the distance from the school, and it is broken down by sector and the number of children there. All factors are taken into account, but the overriding considerations are the broader educational implications for those children and what is sustainable. It is rare that any development proposal will be entirely uncontroversial in its nature, apart from, perhaps, a minor indication regarding school numbers. Any decision on a school will have a ripple effect across the board."},{"speaker":"Mr Principal Deputy Speaker","text":"Question 4 in the name of Mr McGuigan, question 7 in the name of Mr Chambers and question 8 in the name of Mrs Cameron have been grouped."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201173%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=315789","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2020-11-24&docID=316869#AQO%201173/17-22","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=315789"}},{"id":"315320","reference":"AQW 9990/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-10","answerBy":"2020-11-25","answered":"2020-11-17","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail the amount of money allocated to the commissioning of a Nightingale Hospital at the Whiteabbey Hospital site; and what long term benefits this additional funding will have for services at the hospital post-COVID-19.","answerText":"The capital costs allocated for the necessary refurbishments at the Whiteabbey site to develop the Nightingale facility amount to £4.53 million. It is anticipated that the facility will remain assigned for Nightingale purposes for a period of up to two years.\n\nDeveloping the second Nightingale facility at Whiteabbey provides a legacy facility for future use, which would not have been the case had a commercial site been chosen. The future use of the Whiteabbey facility will be carefully considered in due course.","answerHtml":"<p>The capital costs allocated for the necessary refurbishments at the Whiteabbey site to develop the Nightingale facility amount to £4.53 million. It is anticipated that the facility will remain assigned for Nightingale purposes for a period of up to two years.</p><p>Developing the second Nightingale facility at Whiteabbey provides a legacy facility for future use, which would not have been the case had a commercial site been chosen. The future use of the Whiteabbey facility will be carefully considered in due course.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209990%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=315320","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=315320"}},{"id":"315319","reference":"AQW 9989/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-10","answerBy":"2020-11-25","answered":"2020-11-24","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for her assessment of whether apprenticeships in the hospitality sector can continue to provide quality skills training over the course of the winter, considering the heightened restrictions on hospitality due to COVID-19.","answerText":"Skills are a key driver of economic growth and provide a powerful tool to promote individual opportunity and social inclusion. This is especially true for apprenticeships that meet specific skills needs and provide a route into many careers across the economy, including hospitality.\n\nIn the current climate, I recognise that ensuring inclusive access to apprenticeships has never been more critical. They will play a significant contribution in providing high quality oppertunities, maintaining the skills pipeline and supporting the renewal of the Northern Ireland economy.\n\nThis is why the Apprenticeship Recovery Package has been developed to minimise apprenticeship job losses, maintain and grow the supply of apprenticeship opportunities and support apprentices who have been displaced and lost their apprenticeship. The package is bespoke to the needs of our local economy and will help to ensure that our Apprenticeship system bounces back from the devastating impact of the COVID-19 crisis.\n\nMy Department also launched an Apprenticeship Challenge Fund to support innovative approaches and new collaborations to increase apprenticeship opportunities in Northern Ireland.\n\nIn relation to sustaining training, my Department has published information for employers and apprentices in respect of COVID-19. This information reflects the current guidance and is updated as the situation evolves. Going forward, updated Key Messages will be shared with the Further Education Colleges and Training Contractors delivering the ApprenticeshipsNI Programme as and when is necessary.\n\nApprenticeship training will continue to be delivered in line with government guidelines and, in the meantime, training suppliers have been asked to facilitate online learning and learning portfolio building work where possible.\n\nMy Department will be closely monitoring programme activity to ensure the continued delivery of the ApprenticeshipsNI programme across all sectors - including Hospitality.\n\nAlternative assessment/awards measures for vocational qualifications have been developed in conjunction with the Department of Education, CCEA, Awarding Organisations and other key stakeholders.","answerHtml":"<p>Skills are a key driver of economic growth and provide a powerful tool to promote individual opportunity and social inclusion. This is especially true for apprenticeships that meet specific skills needs and provide a route into many careers across the economy, including hospitality.</p><p>In the current climate, I recognise that ensuring inclusive access to apprenticeships has never been more critical. They will play a significant contribution in providing high quality oppertunities, maintaining the skills pipeline and supporting the renewal of the Northern Ireland economy.</p><p>This is why the Apprenticeship Recovery Package has been developed to minimise apprenticeship job losses, maintain and grow the supply of apprenticeship opportunities and support apprentices who have been displaced and lost their apprenticeship. The package is bespoke to the needs of our local economy and will help to ensure that our Apprenticeship system bounces back from the devastating impact of the COVID-19 crisis.</p><p>My Department also launched an Apprenticeship Challenge Fund to support innovative approaches and new collaborations to increase apprenticeship opportunities in Northern Ireland.</p><p>In relation to sustaining training, my Department has published information for employers and apprentices in respect of COVID-19. This information reflects the current guidance and is updated as the situation evolves. Going forward, updated Key Messages will be shared with the Further Education Colleges and Training Contractors delivering the ApprenticeshipsNI Programme as and when is necessary.</p><p>Apprenticeship training will continue to be delivered in line with government guidelines and, in the meantime, training suppliers have been asked to facilitate online learning and learning portfolio building work where possible.</p><p>My Department will be closely monitoring programme activity to ensure the continued delivery of the ApprenticeshipsNI programme across all sectors - including Hospitality.</p><p>Alternative assessment/awards measures for vocational qualifications have been developed in conjunction with the Department of Education, CCEA, Awarding Organisations and other key stakeholders.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209989%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=315319","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=315319"}},{"id":"315318","reference":"AQW 9988/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-10","answerBy":"2020-11-25","answered":"2020-11-23","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what action she is taking to ensure that apprenticeships continue to promote a high level of engagement in learning, despite a lower level of on-site training due to COVID-19 restrictions.","answerText":"My Department has responded quickly and decisively in response to the Covid-19 crisis: putting in place supplier relief measures to ensure the continued viability of our skills infrastructure; developing alternative assessment measures for vocational qualifications; providing guidance on learner support; and, supporting apprentices, under the age of 18, who lost their jobs to continue their training on the Training for Success programme.\n\nWorking collaboratively with partners and stakeholders, an Apprenticeship and Youth Training Recovery Package has been developed. This support package is underpinned by four key strategic priorities: minimising apprenticeship job losses; maintaining and growing the supply of apprenticeship opportunities; supporting apprentices who have been displaced; and, growing capacity in the youth training system. In order to help support employers’ engagement with the\n\napprenticeship system and the vital on the job training this provides, financial incentives have been made available to recruit new apprentices, including those previously made redundant, and also to return and retain furloughed apprentices through to successful completion of their apprenticeship.\n\nMy Department has provided advice and guidance to all ApprenticeshipsNI contractors - outlining COVID-19 contingency arrangements. With effect from the 1st November apprenticeship training is continuing for all apprentices (unless an apprentice is furloughed and has no agreement with their employer to continue training at this time).\n\nA Digital Hardship fund was also established to support access to on-line learning for disadvantaged learners - with equipment and internet connectivity being prioritised for those in most need and including internet connectivity where required.\n\nThe Departments Quality Improvement Team commenced a Peer Support Initiative in 2019, where high performing training contractors are invited to provide peer support to training contractors that face challenges in aspects of the quality of delivery. This initiative is well placed to support providers as they continue to engage with learners in the current environment.\n\nThe review of private training contractors’ and colleges’ Quality Improvement Plans has maintained a strong focus on the quality of delivery - closely linked to supporting the health and well-being of all learners. Support with this process has been provided by the Education and Training Inspectorate. The resulting Quality Improvement Plans will provide further information as to themes that will require additional support in the future.","answerHtml":"<p>My Department has responded quickly and decisively in response to the Covid-19 crisis: putting in place supplier relief measures to ensure the continued viability of our skills infrastructure; developing alternative assessment measures for vocational qualifications; providing guidance on learner support; and, supporting apprentices, under the age of 18, who lost their jobs to continue their training on the Training for Success programme.</p><p>Working collaboratively with partners and stakeholders, an Apprenticeship and Youth Training Recovery Package has been developed. This support package is underpinned by four key strategic priorities: minimising apprenticeship job losses; maintaining and growing the supply of apprenticeship opportunities; supporting apprentices who have been displaced; and, growing capacity in the youth training system. In order to help support employers’ engagement with the</p><p>apprenticeship system and the vital on the job training this provides, financial incentives have been made available to recruit new apprentices, including those previously made redundant, and also to return and retain furloughed apprentices through to successful completion of their apprenticeship.</p><p>My Department has provided advice and guidance to all ApprenticeshipsNI contractors - outlining COVID-19 contingency arrangements. With effect from the 1st November apprenticeship training is continuing for all apprentices (unless an apprentice is furloughed and has no agreement with their employer to continue training at this time).</p><p>A Digital Hardship fund was also established to support access to on-line learning for disadvantaged learners - with equipment and internet connectivity being prioritised for those in most need and including internet connectivity where required.</p><p>The Departments Quality Improvement Team commenced a Peer Support Initiative in 2019, where high performing training contractors are invited to provide peer support to training contractors that face challenges in aspects of the quality of delivery. This initiative is well placed to support providers as they continue to engage with learners in the current environment.</p><p>The review of private training contractors’ and colleges’ Quality Improvement Plans has maintained a strong focus on the quality of delivery - closely linked to supporting the health and well-being of all learners. Support with this process has been provided by the Education and Training Inspectorate. The resulting Quality Improvement Plans will provide further information as to themes that will require additional support in the future.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209988%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=315318","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=315318"}},{"id":"314980","reference":"AQW 9909/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-09","answerBy":"2020-11-17","answered":"2021-02-24","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail (i) her Department's current estimate of the value of payments made in error in regards to the Coronavirus £10,000 Small Business Support Grant Scheme; and (ii) how this compares with the estimate of the Auditor General of around £13.5 million.","answerText":"The Department for the Economy continues to develop its processes for dealing with ineligible payments that have arisen through the Covid Business Grant schemes. A dedicated Covid Schemes Fraud and Error Oversight Project has been set up to deliver post-payment validation and to provide post-payment assurance on all Covid Business Grant schemes to date. It is too early to say what the final figures for the value of such payments in the £10k Scheme will be and further investigate work needs to be carried out before a final value on ineligible payments can be provided.","answerHtml":"<p>The Department for the Economy continues to develop its processes for dealing with ineligible payments that have arisen through the Covid Business Grant schemes. A dedicated Covid Schemes Fraud and Error Oversight Project has been set up to deliver post-payment validation and to provide post-payment assurance on all Covid Business Grant schemes to date. It is too early to say what the final figures for the value of such payments in the £10k Scheme will be and further investigate work needs to be carried out before a final value on ineligible payments can be provided.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209909%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=314980","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=314980"}},{"id":"314979","reference":"AQW 9908/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-09","answerBy":"2020-11-24","answered":"2020-12-11","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for her assessment of whether the recommendation that applicants to the COVID-19 Restrictions Business Support Scheme provide a form completed by a registered accountant, will disadvantage small businesses unable to pay for this service.","answerText":"Applicants to the Covid Restrictions Business Support Scheme may supply a template completed by a registered accountant in order to independently verify the eligibility criteria. Although not mandatory, this may strengthen an application and quicken the verification process. However, it is only a recommendation and, where necessary, applicants will be contacted if additional information is required to confirm eligibility.\n\nIt is acknowledged that many businesses are facing hardship at present and may may incur a cost to provide a completed template. However, this option allows the application process to be streamlined and for much needed payments to be made to businesses more quickly.","answerHtml":"<p>Applicants to the Covid Restrictions Business Support Scheme may supply a template completed by a registered accountant in order to independently verify the eligibility criteria. Although not mandatory, this may strengthen an application and quicken the verification process. However, it is only a recommendation and, where necessary, applicants will be contacted if additional information is required to confirm eligibility.</p><p>It is acknowledged that many businesses are facing hardship at present and may may incur a cost to provide a completed template. However, this option allows the application process to be streamlined and for much needed payments to be made to businesses more quickly.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209908%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=314979","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=314979"}},{"id":"314978","reference":"AQW 9907/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-09","answerBy":"2020-11-24","answered":"2020-11-13","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health when AQW 7595/17-22 will be answered.","answerText":"The National Institute for Health and Care Excellence (NICE) provides national guidance and advice designed to support health service commissioners and staff who are considering using new medical devices and other medical or diagnostic technologies to improve healthcare. NICE has a global reputation for rigour, independence and objectivity, which is informed by the best available scientific evidence.\n\nNICE have confirmed that they do not currently make any recommendations on the use of the Cytosponge-TFF3 test in any of their guidelines. However, they are in the process of developing briefing on the use of the Cytosponge-TFF3 test which when published will inform the potential use of this technology in the National Health Service and in Health and Social Care, Northern Ireland.","answerHtml":"<p>The National Institute for Health and Care Excellence (NICE) provides national guidance and advice designed to support health service commissioners and staff who are considering using new medical devices and other medical or diagnostic technologies to improve healthcare. NICE has a global reputation for rigour, independence and objectivity, which is informed by the best available scientific evidence.</p><p>NICE have confirmed that they do not currently make any recommendations on the use of the Cytosponge-TFF3 test in any of their guidelines. However, they are in the process of developing briefing on the use of the Cytosponge-TFF3 test which when published will inform the potential use of this technology in the National Health Service and in Health and Social Care, Northern Ireland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209907%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=314978","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=314978"}},{"id":"314574","reference":"AQW 9763/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-05","answerBy":"2020-11-13","answered":"2020-11-12","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what action she is taking (i) to avoid the loss of 700 jobs at Caterpillar in Larne and Belfast; and (ii) to help support workers at these sites.","answerText":"The decision by Caterpillar in the US to enter a period of consultation will be a worrying time for many. While the company has explained that this is part of a process for the restructuring of its Electric Power Division at Larne, the scale of the potential job losses will have come as a great shock to the workforce and their families.\n\nI met with Caterpillar NI’s Senior Management team, along with representatives from Invest NI, on Friday 6 November 2020 to express my disappointment at the decision. I have asked Invest NI, which has a good working relationship with Caterpillar, to continue to engage with the company throughout this consultation period to explore ways to minimise the impact at the Northern Ireland sites. I also, met the UNITE union on Tuesday 10 November 2020 to hear their concerns and I am confident that everyone will be working to ensure that we can support the workforce at this time.\n\nAt the meeting with Caterpillar NI senior management I made it clear that the Executive is committed to exploring ways to minimise the impact at both Northern Ireland sites. I told the Caterpillar Senior Management that I was keen to discuss with them what future opportunities might exist for the Caterpillar NI operations as the company focusses on other business areas. The team at Invest NI will continue to explore where it might be possible to assist the company with any potential new investment opportunities.\n\nMy Department’s Careers Service officials made contact with the company on Monday 9 November 2020 to make them aware of the advice and guidance services available to support those employees who may be facing redundancy. The Careers Service will maintain contact with Caterpillar over the coming weeks and will be available to support employees at any stage throughout the transition process.\n\nMy Department and Invest NI, alongside other stakeholders (including Mid and East Antrim Borough Council, NI Chamber, Manufacturing NI and DfE Careers Service), are liaising with Caterpillar Senior Management to ensure that assistance is available to support workers through this process. This will include redundancy clinics, re-skilling, job fairs and identification of job opportunities.","answerHtml":"<p>The decision by Caterpillar in the US to enter a period of consultation will be a worrying time for many. While the company has explained that this is part of a process for the restructuring of its Electric Power Division at Larne, the scale of the potential job losses will have come as a great shock to the workforce and their families.</p><p>I met with Caterpillar NI’s Senior Management team, along with representatives from Invest NI, on Friday 6 November 2020 to express my disappointment at the decision. I have asked Invest NI, which has a good working relationship with Caterpillar, to continue to engage with the company throughout this consultation period to explore ways to minimise the impact at the Northern Ireland sites. I also, met the UNITE union on Tuesday 10 November 2020 to hear their concerns and I am confident that everyone will be working to ensure that we can support the workforce at this time.</p><p>At the meeting with Caterpillar NI senior management I made it clear that the Executive is committed to exploring ways to minimise the impact at both Northern Ireland sites. I told the Caterpillar Senior Management that I was keen to discuss with them what future opportunities might exist for the Caterpillar NI operations as the company focusses on other business areas. The team at Invest NI will continue to explore where it might be possible to assist the company with any potential new investment opportunities.</p><p>My Department’s Careers Service officials made contact with the company on Monday 9 November 2020 to make them aware of the advice and guidance services available to support those employees who may be facing redundancy. The Careers Service will maintain contact with Caterpillar over the coming weeks and will be available to support employees at any stage throughout the transition process.</p><p>My Department and Invest NI, alongside other stakeholders (including Mid and East Antrim Borough Council, NI Chamber, Manufacturing NI and DfE Careers Service), are liaising with Caterpillar Senior Management to ensure that assistance is available to support workers through this process. This will include redundancy clinics, re-skilling, job fairs and identification of job opportunities.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209763%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=314574","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=314574"}},{"id":"314573","reference":"AQW 9762/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-05","answerBy":"2020-11-20","answered":"2020-12-23","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail the number of grants paid out under the Covid Restrictions Business Support Scheme thus far.","answerText":"Information in relation to the number of businesses that that have applied to the Covid Restrictions Business Support Scheme and received payment can be accessed online via the following webpages\n\nPart A: https://www.nibusinessinfo.co.uk/content/covid-restrictions-businesssupport-scheme-part\n\nPart B: https://www.nibusinessinfo.co.uk/content/covid-restrictions-businesssupport-scheme-part-b\n\nHere you can find information about the operation of the scheme to date. Based upon applications received this details applications by status (draft/submitted/processed/rejected/paid), and provides a facility to interrogate by District Council area and Parliamentary Constituency.\n\nThis data will be updated on a weekly basis.","answerHtml":"<p>Information in relation to the number of businesses that that have applied to the Covid Restrictions Business Support Scheme and received payment can be accessed online via the following webpages</p><p>Part A: https://www.nibusinessinfo.co.uk/content/covid-restrictions-businesssupport-scheme-part</p><p>Part B: https://www.nibusinessinfo.co.uk/content/covid-restrictions-businesssupport-scheme-part-b</p><p>Here you can find information about the operation of the scheme to date. Based upon applications received this details applications by status (draft/submitted/processed/rejected/paid), and provides a facility to interrogate by District Council area and Parliamentary Constituency.</p><p>This data will be updated on a weekly basis.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209762%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=314573","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=314573"}},{"id":"314572","reference":"AQW 9761/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-05","answerBy":"2020-11-20","answered":"2020-12-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, in relation to the Covid Restrictions Business Support Scheme, for an estimation of the amount of time it will take from application to the payment of grants.","answerText":"All applications received to the Covid Restrictions Business Support Scheme will be assessed and verified as soon as possible.\n\nPart A opened for applications on 28 October 2020. The first payments were issued on 6 November 2020.\n\nPart B opened for applications on 19 November 2020. The first payments were issued on 8 December 2020.","answerHtml":"<p>All applications received to the Covid Restrictions Business Support Scheme will be assessed and verified as soon as possible.</p><p>Part A opened for applications on 28 October 2020. The first payments were issued on 6 November 2020.</p><p>Part B opened for applications on 19 November 2020. The first payments were issued on 8 December 2020.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209761%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=314572","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=314572"}},{"id":"314571","reference":"AQW 9760/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-05","answerBy":"2020-11-20","answered":"2020-12-14","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, in relation to the Covid Restrictions Business Support Scheme, to detail (i) the number of completed applications submitted thus far; and (ii) the number of applications started, but not yet submitted.","answerText":"(i) As of 9 December 2020, 3,718 completed application have been submitted to Part A and 606 have been submitted to Part B.\n\n(ii) As of 9 December 2020, 739 applications for Part A, and 391 applications for Part B, have been started but not submitted.","answerHtml":"<p>(i) As of 9 December 2020, 3,718 completed application have been submitted to Part A and 606 have been submitted to Part B.</p><p>(ii) As of 9 December 2020, 739 applications for Part A, and 391 applications for Part B, have been started but not submitted.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209760%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=314571","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=314571"}},{"id":"314570","reference":"AQW 9759/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-05","answerBy":"2020-11-20","answered":"2021-02-03","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) to detail the rationale for applicants to the Covid Restrictions Business Support Scheme to derive more than 50% of their income from businesses required to close or cease trading; and (ii) whether she will consider removing this threshold to support individuals who rely on multiple sources of income.","answerText":"The inclusion of the eligibility criteria that income lost as a result from businesses closed or that have ceased trading must be the main source of income (more than 50% of income) mitigates against the risk of significant overpayments to applicants whose lost revenue makes up a small proportion of their overall income.\n\nIn order to ensure value for money and the efficient use of public funds, it is essential that support is targeted at those who need it most. On this basis, no changes to the scheme criteria are under consideration.","answerHtml":"<p>The inclusion of the eligibility criteria that income lost as a result from businesses closed or that have ceased trading must be the main source of income (more than 50% of income) mitigates against the risk of significant overpayments to applicants whose lost revenue makes up a small proportion of their overall income.</p><p>In order to ensure value for money and the efficient use of public funds, it is essential that support is targeted at those who need it most. On this basis, no changes to the scheme criteria are under consideration.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209759%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=314570","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=314570"}},{"id":"314426","reference":"AQW 9680/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-04","answerBy":"2020-11-12","answered":"2020-11-12","answeredOrally":false,"priority":true,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance to detail (i) the delays in the payment of grants under the Localised Restrictions Support Scheme; and (ii) the expected amount of time from application to payment of grants under the scheme.","answerText":"Applications for a 2 week support scheme opened on 14th October 2020 in the Derry City and Strabane Council area. The Scheme was subsequently extended by a further 4 weeks to include applications from all Council areas on 19th October 2020.\n\nFinancial Regulations to enable payments to be made to all Council areas under this scheme came into effect on Friday 30th October 2020. Land & Property Services (LPS) is working through applications as quickly as possible. Once an application has been processed and verified, an applicant will receive an e-mail to advise them payment is being made. This will normally follow within three working days of the e-mail.\n\nOfficials in my Department have worked as swiftly as possible to issue payments in line with Regulations without delay while maintaining their responsibilities for managing public money.\n\nAt present over 11,400 applications have been received. Once the applications are received they must be checked and verified to see if they meet the scheme criteria. At the time of this response, £10.83 million of payments have issued to 2,910 businesses. A further 300 applications have so far been identified as not meeting the criteria – we expect this number to be greater as the process continues. It is not possible to give an accurate turnaround time on all applications as it will depend on the individual application and the amount of manual intervention required to validate it.","answerHtml":"<p>Applications for a 2 week support scheme opened on 14th October 2020 in the Derry City and Strabane Council area. The Scheme was subsequently extended by a further 4 weeks to include applications from all Council areas on 19th October 2020.</p><p>Financial Regulations to enable payments to be made to all Council areas under this scheme came into effect on Friday 30th October 2020. Land &amp; Property Services (LPS) is working through applications as quickly as possible. Once an application has been processed and verified, an applicant will receive an e-mail to advise them payment is being made. This will normally follow within three working days of the e-mail.</p><p>Officials in my Department have worked as swiftly as possible to issue payments in line with Regulations without delay while maintaining their responsibilities for managing public money.</p><p>At present over 11,400 applications have been received. Once the applications are received they must be checked and verified to see if they meet the scheme criteria. At the time of this response, £10.83 million of payments have issued to 2,910 businesses. A further 300 applications have so far been identified as not meeting the criteria – we expect this number to be greater as the process continues. It is not possible to give an accurate turnaround time on all applications as it will depend on the individual application and the amount of manual intervention required to validate it.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209680%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=314426","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=314426"}},{"id":"314425","reference":"AQW 9679/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-04","answerBy":"2020-11-19","answered":"2020-11-30","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail the Financial Transactions Capital write-off of £9 million by InvestNI; and what actions are being taken to recoup investments made.","answerText":"Under the Sustainable Utilisation of Poultry Litter (SUPL) Scheme*, Invest NI, alongside a private investor, provided funding towards the build and operation of an Anaerobic Digestion (AD) plant.\n\nThe aim of the project was to help resolve a significant local environmental and economic issue, and to help Northern Ireland comply with EU nitrates targets to positively impact the poultry sector and the wider Northern Ireland economy. Invest NI’s support was by way of a £9.3m commercial loan.\n\nInitial indications show that the project might not reach an outcome that fully covers the investment in the project. Therefore, we have included a provision of £9 million in our accounts should we not be able to achieve a return on our investment. This provision is in line with current accounting standards.\n\n*SUPL is a Department for the Economy and Department of Agriculture, Environment and Rural Affairs scheme, operated by Invest Northern Ireland.","answerHtml":"<p>Under the Sustainable Utilisation of Poultry Litter (SUPL) Scheme*, Invest NI, alongside a private investor, provided funding towards the build and operation of an Anaerobic Digestion (AD) plant.</p><p>The aim of the project was to help resolve a significant local environmental and economic issue, and to help Northern Ireland comply with EU nitrates targets to positively impact the poultry sector and the wider Northern Ireland economy. Invest NI’s support was by way of a £9.3m commercial loan.</p><p>Initial indications show that the project might not reach an outcome that fully covers the investment in the project. Therefore, we have included a provision of £9 million in our accounts should we not be able to achieve a return on our investment. This provision is in line with current accounting standards.</p><p>*SUPL is a Department for the Economy and Department of Agriculture, Environment and Rural Affairs scheme, operated by Invest Northern Ireland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209679%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=314425","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=314425"}},{"id":"314424","reference":"AQW 9678/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-04","answerBy":"2020-11-19","answered":"2020-11-13","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail (i) the legislation required to be progressed by her Department for the implementation of the Protocol on Ireland/Northern Ireland; and (ii) the specific constraints on progress for each.","answerText":"My Department is progressing six Statutory Rules that are required for the implementation of the Protocol on Ireland/Northern Ireland, concerning: the carriage of dangerous goods and use of transportable pressure equipment; biocidal products; biocides / classification, labelling and packaging; equipment and protective systems intended for use in potentially explosive atmospheres; priority dispatch of renewable generators and transposition of priority Single Electricity Market related aspects of the Electricity Directive. The main constraint for each is the limited time available until the end of the Transition Period.\n\nFurther Protocol related legislation will be progressed by my Department after the Transition Period. Greater clarity on the interpretation and outworkings of the Protocol and the UK/EU negotiations is required to inform the full scope of potential legislative requirements.","answerHtml":"<p>My Department is progressing six Statutory Rules that are required for the implementation of the Protocol on Ireland/Northern Ireland, concerning: the carriage of dangerous goods and use of transportable pressure equipment; biocidal products; biocides / classification, labelling and packaging; equipment and protective systems intended for use in potentially explosive atmospheres; priority dispatch of renewable generators and transposition of priority Single Electricity Market related aspects of the Electricity Directive. The main constraint for each is the limited time available until the end of the Transition Period.</p><p>Further Protocol related legislation will be progressed by my Department after the Transition Period. Greater clarity on the interpretation and outworkings of the Protocol and the UK/EU negotiations is required to inform the full scope of potential legislative requirements.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209678%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=314424","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=314424"}},{"id":"314423","reference":"AQW 9677/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-04","answerBy":"2020-11-19","answered":"2020-11-13","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether the unsuccessful bid for capital funding for Project Stratum in the October monitoring round will impact or delay the project.","answerText":"There is no anticipated delay to Project Stratum as full project funding has been confirmed.","answerHtml":"<p>There is no anticipated delay to Project Stratum as full project funding has been confirmed.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209677%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=314423","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=314423"}},{"id":"314422","reference":"AQW 9676/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-04","answerBy":"2020-11-19","answered":"2020-11-18","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health,  in relation to the ongoing pressures of a COVID-19 second wave, for his assessment of the current status of cancer services in Northern Ireland.","answerText":"COVID-19 presents ongoing capacity challenges across the cancer pathway which the service is actively managing. As during the first surge, all possible steps will be taken to maintain cancer services in the event of a second surge. My Department has developed a COVID-19 Surge Planning Strategic Framework, which provides the overall structure and parameters within which HSC Trusts have developed plans for managing the response to COVID-19 in the event of further waves. This framework and plans can be viewed on the Department website https://www.health-ni.gov.uk/publications/winter-surge-plan.\n\nI have established a Cancer Services Rebuilding Cell to set out the approach to implementing the reset of cancer services (assessment and treatments), taking into account the potential need for the HSC to respond to further COVID-19 surge(s) in 2020 and the existing capacity constraints in HSC.\n\nIn addition, the HSC has commissioned additional assessments and treatments from independent sector providers. This capacity is being prioritised for those patients with suspected or confirmed cancer.\n\nOne of my primary aims in the difficult weeks ahead will be to ensure the continued delivery of high quality cancer services, providing of course that it is safe to do so.","answerHtml":"<p>COVID-19 presents ongoing capacity challenges across the cancer pathway which the service is actively managing. As during the first surge, all possible steps will be taken to maintain cancer services in the event of a second surge. My Department has developed a COVID-19 Surge Planning Strategic Framework, which provides the overall structure and parameters within which HSC Trusts have developed plans for managing the response to COVID-19 in the event of further waves. This framework and plans can be viewed on the Department website https://www.health-ni.gov.uk/publications/winter-surge-plan.</p><p>I have established a Cancer Services Rebuilding Cell to set out the approach to implementing the reset of cancer services (assessment and treatments), taking into account the potential need for the HSC to respond to further COVID-19 surge(s) in 2020 and the existing capacity constraints in HSC.</p><p>In addition, the HSC has commissioned additional assessments and treatments from independent sector providers. This capacity is being prioritised for those patients with suspected or confirmed cancer.</p><p>One of my primary aims in the difficult weeks ahead will be to ensure the continued delivery of high quality cancer services, providing of course that it is safe to do so.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209676%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=314422","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=314422"}},{"id":"314201","reference":"AQW 9575/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-03","answerBy":"2020-11-11","answered":"2020-12-09","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what action her Department is taking to ensure that the application process for the COVID-19 Restrictions Business Support Scheme is simplified, so not to exclude businesses that would otherwise qualify for support.","answerText":"The Covid Restrictions Business Support Scheme has been developed to support as many viable business as possible that have been impacted by the Executive’s decision to impose the additional restrictions that initially came into effect on 16 October 2020 and are not eligible for support under the Localised Restrictions Support Scheme.\n\nI fully understand the need to make the application process as accessible as possible to ensure it reaches all eligible businesses and individuals. I can assure you that the Department has taken on board all initial feedback, will continue to monitor future feedback and will review the application process and its associated guidance, as appropriate, to ensure it is as streamlined and comprehensible as possible.","answerHtml":"<p>The Covid Restrictions Business Support Scheme has been developed to support as many viable business as possible that have been impacted by the Executive’s decision to impose the additional restrictions that initially came into effect on 16 October 2020 and are not eligible for support under the Localised Restrictions Support Scheme.</p><p>I fully understand the need to make the application process as accessible as possible to ensure it reaches all eligible businesses and individuals. I can assure you that the Department has taken on board all initial feedback, will continue to monitor future feedback and will review the application process and its associated guidance, as appropriate, to ensure it is as streamlined and comprehensible as possible.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209575%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=314201","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=314201"}},{"id":"314200","reference":"AQW 9574/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-03","answerBy":"2020-11-18","answered":"2020-12-11","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy when applications for Part B of the COVID-19 Restrictions Business Support Scheme will open.","answerText":"Part B of the Covid Restrictions Business Support Scheme scheme opened for applications on 19 November 2020.","answerHtml":"<p>Part B of the Covid Restrictions Business Support Scheme scheme opened for applications on 19 November 2020.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209574%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=314200","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=314200"}},{"id":"314199","reference":"AQW 9573/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-03","answerBy":"2020-11-18","answered":"2020-12-14","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail the process by which her Department will recover any COVID-19 Business Support Grant payments paid to ineligible recipients, including wind turbine owners.","answerText":"I would refer the Member to the reply I gave to AQW 9546/17-22.","answerHtml":"<p>I would refer the Member to the reply I gave to AQW 9546/17-22.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209573%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=314199","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=314199"}},{"id":"314198","reference":"AQW 9572/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-03","answerBy":"2020-11-18","answered":"2021-02-04","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for her assessment as to whether businesses such as market stall traders, which normally trade at now cancelled public events, would be included in Part B of the COVID-19 Restrictions Business Support Scheme.","answerText":"Part B of the Covid Restrictions Business Support Scheme is for businesses which supply goods or services to a business named in the Health Protection (Coronavirus, Restrictions) (No.2) Regulations (Northern Ireland) 2020. The business must be a supplier of goods or services, to a business named in the Health Protection Regulations either directly or via an intermediary supplier or subcontractor; or the business is dependent on a business named in the Health Protection (Coronavirus, Restrictions) (No.2) Regulations (Northern Ireland) 2020 being open and fully operational in order for it to operate. For example, businesses that supply services for weddings or events that have been cancelled/postponed due to a business named in the regulations having to close, cease or restrict trading. Each application is assessed on a case by case basis. I would therefore ask businesses to review the full eligibility criteria and to make use of the online eligibility checker available at https://www.nibusinessinfo.co.uk/content/covid-restrictions-business-support-scheme-part-b. I would encourage all businesses to make applications should the eligibility checker advise eligibility.\n\nInvest NI are also operating a dedicated helpline for the scheme on Tel: 0800 952 4422. Lines are open Monday to Friday from 9am to 5pm.","answerHtml":"<p>Part B of the Covid Restrictions Business Support Scheme is for businesses which supply goods or services to a business named in the Health Protection (Coronavirus, Restrictions) (No.2) Regulations (Northern Ireland) 2020. The business must be a supplier of goods or services, to a business named in the Health Protection Regulations either directly or via an intermediary supplier or subcontractor; or the business is dependent on a business named in the Health Protection (Coronavirus, Restrictions) (No.2) Regulations (Northern Ireland) 2020 being open and fully operational in order for it to operate. For example, businesses that supply services for weddings or events that have been cancelled/postponed due to a business named in the regulations having to close, cease or restrict trading. Each application is assessed on a case by case basis. I would therefore ask businesses to review the full eligibility criteria and to make use of the online eligibility checker available at https://www.nibusinessinfo.co.uk/content/covid-restrictions-business-support-scheme-part-b. I would encourage all businesses to make applications should the eligibility checker advise eligibility.</p><p>Invest NI are also operating a dedicated helpline for the scheme on Tel: 0800 952 4422. Lines are open Monday to Friday from 9am to 5pm.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209572%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=314198","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=314198"}},{"id":"314197","reference":"AQW 9571/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-03","answerBy":"2020-11-18","answered":"2020-12-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for her assessment of whether the recommendation of a letter from a qualified and registered accountant, lawyer or a current bank manager confirming certain details in applying for the COVID-19 Restrictions Business Support Scheme, may place small and micro businesses at a disadvantage in applying.","answerText":"Applicants to the Covid Restrictions Business Support Scheme may supply a template completed by a registered accountant in order to independently verify the eligibility criteria. The option to provide evidence from a lawyer or bank is no longer available.\n\nA completed template may strengthen an application and quicken the verification process. However, this is not mandatory and is therefore only a recommendation and, where necessary, applicants will be contacted if additional information is required to confirm eligibility. This option allows the application process to be streamlined and for much needed payments to be made to businesses more quickly.","answerHtml":"<p>Applicants to the Covid Restrictions Business Support Scheme may supply a template completed by a registered accountant in order to independently verify the eligibility criteria. The option to provide evidence from a lawyer or bank is no longer available.</p><p>A completed template may strengthen an application and quicken the verification process. However, this is not mandatory and is therefore only a recommendation and, where necessary, applicants will be contacted if additional information is required to confirm eligibility. This option allows the application process to be streamlined and for much needed payments to be made to businesses more quickly.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209571%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=314197","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=314197"}},{"id":"313871","reference":"AQW 9455/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-02","answerBy":"2020-11-10","answered":"2020-11-05","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will investigate temporary changes to employment law to allow those made redundant on the basis of the expected end of the Coronavirus Job Retention Scheme on 31 October to take advantage of the extension of the scheme as announced by the Chancellor of the Exchequer on 31 October.","answerText":"My officials are actively engaging with their counterparts in the Department for Business, Energy and Industrial Strategy (BEIS) to ascertain what, if any, legal changes are immediately required to employment law in Northern Ireland following the extension to the Coronavirus Job Retention Scheme (CJRS) and introduction of the Job Support Scheme.\n\nThe CJRS was introduced by HMRC, which also sets the eligibility criteria. It is my understanding that, to be eligible under the extension to the scheme, employees must have been on an employer’s PAYE payroll by 23:59 on 30th October 2020. Any employer making redundancies must follow the legal framework in Northern Ireland. HMRC guidance, as I understand it, advises that an employer can continue to claim for a furloughed employee who is serving a statutory notice period.\n\nAny employer which requires information on the extension should contact HMRC directly. Details are available on its website, with further guidance from it expected to follow imminently.\n\nI firmly believe that employers who have been able to take advantage of the Government’s Job Retention Scheme, which has brought benefit to employers and employees alike, should treat staff fairly and respect employee rights. Specifically, in this situation, those relating to redundancy consultation, notice period and redundancy pay.\n\nIndividuals who believe their employment rights or terms and conditions of employment have been breached (including any potential unlawful deduction of wages) should consider contacting the Labour Relations Agency Workplace Information Service on 03300 555 300 for confidential and impartial information.\n\nFinally, the Law Centre NI continues to provide free, independent, specialist legal advice (subject to capacity) on employment rights. Its advice line can be contacted on 028 9024 4401, or by email: employmentadvice@lawcentreni.org.","answerHtml":"<p>My officials are actively engaging with their counterparts in the Department for Business, Energy and Industrial Strategy (BEIS) to ascertain what, if any, legal changes are immediately required to employment law in Northern Ireland following the extension to the Coronavirus Job Retention Scheme (CJRS) and introduction of the Job Support Scheme.</p><p>The CJRS was introduced by HMRC, which also sets the eligibility criteria. It is my understanding that, to be eligible under the extension to the scheme, employees must have been on an employer’s PAYE payroll by 23:59 on 30th October 2020. Any employer making redundancies must follow the legal framework in Northern Ireland. HMRC guidance, as I understand it, advises that an employer can continue to claim for a furloughed employee who is serving a statutory notice period.</p><p>Any employer which requires information on the extension should contact HMRC directly. Details are available on its website, with further guidance from it expected to follow imminently.</p><p>I firmly believe that employers who have been able to take advantage of the Government’s Job Retention Scheme, which has brought benefit to employers and employees alike, should treat staff fairly and respect employee rights. Specifically, in this situation, those relating to redundancy consultation, notice period and redundancy pay.</p><p>Individuals who believe their employment rights or terms and conditions of employment have been breached (including any potential unlawful deduction of wages) should consider contacting the Labour Relations Agency Workplace Information Service on 03300 555 300 for confidential and impartial information.</p><p>Finally, the Law Centre NI continues to provide free, independent, specialist legal advice (subject to capacity) on employment rights. Its advice line can be contacted on 028 9024 4401, or by email: employmentadvice@lawcentreni.org.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209455%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=313871","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=313871"}},{"id":"313870","reference":"AQW 9454/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-02","answerBy":"2020-11-17","answered":"2021-03-30","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on the Tourism Recovery Steering Group, including; (i) how often the group meets; (ii) how many times in total the group has met; and (iii) any recommendations that have been made thus far.","answerText":"I established the Tourism Recovery Steering Group, which I chair, to help our hard pressed tourism and hospitality industry deal with the many challenges presented by COVID-19. Membership of the Steering Group is comprised of relevant Government Departments, Tourism NI, Tourism Ireland, the Society of Local Authority Chief Executives and tourism and hospitality industry representative bodies. The Steering Group is supported by a Tourism Recovery Working Group which is chaired by Tourism NI. The Tourism Recovery Steering Group met in May, June and September 2020 and, most recently, on 24 February 2021.The Steering Group (supported by the Working Group) developed Phase One of the Tourism Recovery Action Plan which has been instrumental in securing additional funding to help the tourism and hospitality industry deal with the impact of COVID, in terms of supporting business survivability, improving industry resilience and driving essential visitor demand. Progress in respect of implementing Phase One has included: (i) implementation of “We’re Good to Go”; (ii) focussed marketing on the domestic, GB and Republic of Ireland markets to drive visitor demand; (iii) targeted grant support aimed at a wide range of tourist accommodation providers; (iv) support for wet pubs; (v) capital grant support to develop new (and upgrade) existing visitor experiences to meet post COVID consumer expectations; (vi) grant to support tourism businesses to develop their websites to secure future business through online bookings; (vii) grant support towards the cost of consultancy support to assist businesses plan their response to the COVID pandemic; (viii) support for NI tourism businesses participating on international virtual sales platforms to secure business from international tour operators in 2021 and 2022; (ix) support for event promoters; (x) support for international tour operators and Destination Management Companies to programme and promote Northern Ireland as a tourism destination to international consumers for 2021 and 2022; (xi) supporting the conference sector in retaining conference activity planned for Belfast in 2020 but postponed due to COVID, and in securing post COVID business in what will be a very competitive market; and(xii) marketing grant support for businesses to help with the cost of their own marketing in NI and the Republic of Ireland alongside Tourism NI’s marketing campaigns. In addition, other Departments have also played important roles in supporting businesses in the tourism eco-system, for example the Department of Finance’s support for Northern Ireland’s airports and the Department for Infrastructure’s support for coach operators. I am very aware that 2021 will be another challenging year for our tourism and hospitality industries, albeit one where we can start to get back on track and begin recovery. I have, therefore, tasked the Tourism Recovery Steering Group with developing a draft of Phase Two of the Tourism Recovery Action Plan.","answerHtml":"<p>I established the Tourism Recovery Steering Group, which I chair, to help our hard pressed tourism and hospitality industry deal with the many challenges presented by COVID-19. Membership of the Steering Group is comprised of relevant Government Departments, Tourism NI, Tourism Ireland, the Society of Local Authority Chief Executives and tourism and hospitality industry representative bodies. The Steering Group is supported by a Tourism Recovery Working Group which is chaired by Tourism NI. The Tourism Recovery Steering Group met in May, June and September 2020 and, most recently, on 24 February 2021.The Steering Group (supported by the Working Group) developed Phase One of the Tourism Recovery Action Plan which has been instrumental in securing additional funding to help the tourism and hospitality industry deal with the impact of COVID, in terms of supporting business survivability, improving industry resilience and driving essential visitor demand. Progress in respect of implementing Phase One has included: (i) implementation of “We’re Good to Go”; (ii) focussed marketing on the domestic, GB and Republic of Ireland markets to drive visitor demand; (iii) targeted grant support aimed at a wide range of tourist accommodation providers; (iv) support for wet pubs; (v) capital grant support to develop new (and upgrade) existing visitor experiences to meet post COVID consumer expectations; (vi) grant to support tourism businesses to develop their websites to secure future business through online bookings; (vii) grant support towards the cost of consultancy support to assist businesses plan their response to the COVID pandemic; (viii) support for NI tourism businesses participating on international virtual sales platforms to secure business from international tour operators in 2021 and 2022; (ix) support for event promoters; (x) support for international tour operators and Destination Management Companies to programme and promote Northern Ireland as a tourism destination to international consumers for 2021 and 2022; (xi) supporting the conference sector in retaining conference activity planned for Belfast in 2020 but postponed due to COVID, and in securing post COVID business in what will be a very competitive market; and(xii) marketing grant support for businesses to help with the cost of their own marketing in NI and the Republic of Ireland alongside Tourism NI’s marketing campaigns. In addition, other Departments have also played important roles in supporting businesses in the tourism eco-system, for example the Department of Finance’s support for Northern Ireland’s airports and the Department for Infrastructure’s support for coach operators. I am very aware that 2021 will be another challenging year for our tourism and hospitality industries, albeit one where we can start to get back on track and begin recovery. I have, therefore, tasked the Tourism Recovery Steering Group with developing a draft of Phase Two of the Tourism Recovery Action Plan.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209454%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=313870","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=313870"}},{"id":"313869","reference":"AQW 9453/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-02","answerBy":"2020-11-17","answered":"2020-11-11","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy how the forthcoming Energy Strategy will be integrated with a climate change act for Northern Ireland, which was committed to in New Decade, New Approach.","answerText":"The new Energy Strategy is being developed in the context of the UK’s legislation requirement for net-zero carbon emissions by 2050.\n\nThe strategy is taking a collaborative approach, ensuring we actively involve relevant departments across the Executive in its development.\n\nThis joined-up approach ensures that the Energy Strategy will be integrated with other relevant strategies outlined in ‘New Decade, New Approach’ including work on the Climate Change agenda, which the Department for Agriculture, Environment and Rural Affairs (DAERA) lead on.","answerHtml":"<p>The new Energy Strategy is being developed in the context of the UK’s legislation requirement for net-zero carbon emissions by 2050.</p><p>The strategy is taking a collaborative approach, ensuring we actively involve relevant departments across the Executive in its development.</p><p>This joined-up approach ensures that the Energy Strategy will be integrated with other relevant strategies outlined in ‘New Decade, New Approach’ including work on the Climate Change agenda, which the Department for Agriculture, Environment and Rural Affairs (DAERA) lead on.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209453%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=313869","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=313869"}},{"id":"313868","reference":"AQW 9452/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-11-02","answerBy":"2020-11-17","answered":"2020-12-09","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) whether a report into governance in her Department with regards to energy has been commissioned; (ii) if so, when this was commissioned; and (iii) when it will be published.","answerText":"My department grant-funded academics in the University of Exeter to carry out a research think piece on ‘Energy Governance for the NI energy transition’. The purpose of this work is to complement the existing evidence base in place and inform the new Energy Strategy.\n\nWe agreed to fund this particular think piece on 30 March 2020. For external grant-funded research think pieces such as this, we anticipate that the independent academics will seek to publish these reports through their own routes. In doing so, they can contribute to the evidence base alongside all other evidence and data being considered.","answerHtml":"<p>My department grant-funded academics in the University of Exeter to carry out a research think piece on ‘Energy Governance for the NI energy transition’. The purpose of this work is to complement the existing evidence base in place and inform the new Energy Strategy.</p><p>We agreed to fund this particular think piece on 30 March 2020. For external grant-funded research think pieces such as this, we anticipate that the independent academics will seek to publish these reports through their own routes. In doing so, they can contribute to the evidence base alongside all other evidence and data being considered.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209452%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=313868","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=313868"}},{"id":"313420","reference":"AQW 9370/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-23","answerBy":"2020-11-02","answered":"2020-12-05","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, following the Chancellors announcement of additional financial support to businesses in the hospitality, accommodation and leisure sector in high alert level areas in England, whether she will be seeking the full Barnett consequentials from this to expand the COVID-19 Restrictions Business Support Scheme.","answerText":"I will continue to examine and pursue further means to support the local economy in whatever way possible. In considering further interventions, including additional funding or packages of financial support, it will be for the Executive collectively to determine how this will be allocated.\n\nIn addition, I will continue to engage with the UK Government, in order to provide the support that will be required to help businesses and the economy to respond to this pandemic, and then start to rebuild and recover as we move forward.\n\nI launched the Covid Restrictions Business Support Scheme to provide support to businesses affected by the restrictions set out in the NI Health Protection Regulations, which came into effect on 16 October, that are not eligible for the Localised Restrictions Business Support Scheme. I have announced that this scheme will be extended to provide assistance to businesses affected by the additional restrictions from 27 November to 11 December.\n\nI announced on 21 October 2020 that my Department would be developing support schemes for the newly self-employed as well as large tourism and hospitality businesses. On 23 November, the Executive agreed a £213m package of support for businesses which includes further funding for the Department for the Economy to adapt current support schemes, deliver on schemes already announced and develop new interventions to support businesses. This will include support for sole limited Company Directors, large tourism, hospitality, retail and leisure businesses, wet pubs, local online sales support and a High Street Voucher Scheme.\n\nFurther details on these schemes will be made available in due course.","answerHtml":"<p>I will continue to examine and pursue further means to support the local economy in whatever way possible. In considering further interventions, including additional funding or packages of financial support, it will be for the Executive collectively to determine how this will be allocated.</p><p>In addition, I will continue to engage with the UK Government, in order to provide the support that will be required to help businesses and the economy to respond to this pandemic, and then start to rebuild and recover as we move forward.</p><p>I launched the Covid Restrictions Business Support Scheme to provide support to businesses affected by the restrictions set out in the NI Health Protection Regulations, which came into effect on 16 October, that are not eligible for the Localised Restrictions Business Support Scheme. I have announced that this scheme will be extended to provide assistance to businesses affected by the additional restrictions from 27 November to 11 December.</p><p>I announced on 21 October 2020 that my Department would be developing support schemes for the newly self-employed as well as large tourism and hospitality businesses. On 23 November, the Executive agreed a £213m package of support for businesses which includes further funding for the Department for the Economy to adapt current support schemes, deliver on schemes already announced and develop new interventions to support businesses. This will include support for sole limited Company Directors, large tourism, hospitality, retail and leisure businesses, wet pubs, local online sales support and a High Street Voucher Scheme.</p><p>Further details on these schemes will be made available in due course.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209370%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=313420","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=313420"}},{"id":"313419","reference":"AQW 9369/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-23","answerBy":"2020-11-09","answered":"2020-12-06","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what work her Department has undertaken in producing a long-term, comprehensive economic strategy to be endorsed by the wider Executive.","answerText":"The Executive’s current economic focus is supporting the businesses, people and places most heavily impacted by the Covid-19 pandemic, and creating a foundation on which to deliver a greener, competitive and inclusive economy.\n\nMy Department has published a medium term recovery plan – Rebuilding a Stronger Economy – which sets out a framework to deliver higher paying jobs, a highly skilled workforce and a more regionally balanced economy. This will guide activity and interventions for the next twelve months.\n\nAs we move beyond the response and recovery phase of the pandemic, attention will turn to the development of a new Economic Strategy for Northern Ireland which will set out the strategic framework and ambition required to achieve the Executive’s long-term vision for the Northern Ireland economy and will align with, and build upon, the work on rebuilding being undertaken by the Department.","answerHtml":"<p>The Executive’s current economic focus is supporting the businesses, people and places most heavily impacted by the Covid-19 pandemic, and creating a foundation on which to deliver a greener, competitive and inclusive economy.</p><p>My Department has published a medium term recovery plan – Rebuilding a Stronger Economy – which sets out a framework to deliver higher paying jobs, a highly skilled workforce and a more regionally balanced economy. This will guide activity and interventions for the next twelve months.</p><p>As we move beyond the response and recovery phase of the pandemic, attention will turn to the development of a new Economic Strategy for Northern Ireland which will set out the strategic framework and ambition required to achieve the Executive’s long-term vision for the Northern Ireland economy and will align with, and build upon, the work on rebuilding being undertaken by the Department.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209369%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=313419","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=313419"}},{"id":"313418","reference":"AQW 9368/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-23","answerBy":"2020-11-09","answered":"2020-12-14","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy how her Department will review the effectiveness and future role of the Economic Advisory Group, following the initial twelve month period, as indicated in the terms of reference.","answerText":"The Terms of Reference for the Economic Advisory Group (EAG) makes a commitment to review the effectiveness and role of the group going forward, after an initial twelve month period. The approach to this review is yet to be determined.\n\nMy officials will engage with EAG members on the review, in the New Year.","answerHtml":"<p>The Terms of Reference for the Economic Advisory Group (EAG) makes a commitment to review the effectiveness and role of the group going forward, after an initial twelve month period. The approach to this review is yet to be determined.</p><p>My officials will engage with EAG members on the review, in the New Year.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209368%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=313418","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=313418"}},{"id":"313417","reference":"AQW 9367/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-23","answerBy":"2020-11-09","answered":"2020-11-02","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what support she is providing to supply chain operators for airport-based retail, considering the ongoing impact of COVID-19 restrictions on travel.","answerText":"On 22nd October I announced the Covid Restrictions Business Support Scheme (CRBSS).\n\nThe CRBSS will support businesses which meet the following criteria:\n\nPart A\n\nThe business is restricted within the Health Protection (Coronavirus, Restrictions) (No.2) Regulations (Northern Ireland) 2020 but is not eligible for the Localised Restrictions Support Scheme (LRSS);\n\nOr\n\nPart B\n\nThe business is within the supply chain of businesses restricted by the Regulations and as a result has been significantly impacted.\n\nThe new CRBSS will apply for the four week period of current restrictions.\n\nApplications for Part A of this scheme opened on Wednesday 28th October, and details on Part B covering the supply chains will be published soon.\n\nFurther support for businesses and individuals have also been announced by the Chancellor for the Exchequer on 22nd October. This included improving the terms of the Job Support Scheme which was introduced to help employers retain their employees. It applies to businesses who have been required to close and those facing decreased demand, such as supply chain operators. Improved terms for the repayment of the various coronavirus loan schemes have also been introduced.\n\nExecutive Ministers have been asked to bring forward options for additional support for those who may not qualify for these latest schemes, or who may not have been able to avail of previous opportunities.\n\nAll of the latest information on the support available can be found on the NI Business Info and UK Government Coronavirus Business Support websites.","answerHtml":"<p>On 22nd October I announced the Covid Restrictions Business Support Scheme (CRBSS).</p><p>The CRBSS will support businesses which meet the following criteria:</p><p>Part A</p><p>The business is restricted within the Health Protection (Coronavirus, Restrictions) (No.2) Regulations (Northern Ireland) 2020 but is not eligible for the Localised Restrictions Support Scheme (LRSS);</p><p>Or</p><p>Part B</p><p>The business is within the supply chain of businesses restricted by the Regulations and as a result has been significantly impacted.</p><p>The new CRBSS will apply for the four week period of current restrictions.</p><p>Applications for Part A of this scheme opened on Wednesday 28th October, and details on Part B covering the supply chains will be published soon.</p><p>Further support for businesses and individuals have also been announced by the Chancellor for the Exchequer on 22nd October. This included improving the terms of the Job Support Scheme which was introduced to help employers retain their employees. It applies to businesses who have been required to close and those facing decreased demand, such as supply chain operators. Improved terms for the repayment of the various coronavirus loan schemes have also been introduced.</p><p>Executive Ministers have been asked to bring forward options for additional support for those who may not qualify for these latest schemes, or who may not have been able to avail of previous opportunities.</p><p>All of the latest information on the support available can be found on the NI Business Info and UK Government Coronavirus Business Support websites.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209367%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=313417","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=313417"}},{"id":"313131","reference":"AQW 9267/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-22","answerBy":"2020-10-30","answered":"2020-11-04","answeredOrally":false,"priority":true,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health what action he is taking to ensure that patients are able to contact their GP for advice and care during the COVID-19 pandemic.","answerText":"GPs have a responsibility to provide core services to their registered patients and the current pandemic does not negate this requirement. GPs will however use their clinical judgement to decide how best to prioritise patients to provide this core service whilst maintaining patient safety.\n\nGP practices are operating a telephone first triage system which allows patients to seek medical advice from their GP for both routine and urgent problems. The GP then uses their clinical judgement to decide if the patient can be safely managed over the telephone or whether a face to face appointment is required. This approach ensures that patients are only required to visit surgeries where it is absolutely essential. This helps to ensure infection control and social distancing keeping both patients and staff safe.\n\nGP practices are open and are providing face to face appointments for those patients who are assessed as requiring them. All practices have been provided with a supply of Personal Protective Equipment (PPE) to allow them to do so safely.\n\nThe telephone first triage system also allows GPs to identify those patients who may be infected with coronavirus. These patients can then be referred for face to face assessment to one of the Primary Care COVID-19 centres. This ensures that these patients do not attend the GP Practice or community pharmacy and are seen in an appropriate environment as well as ensuring that GP services are maintained with minimal disruption.\n\nGPs are still expected to clinically assess for risk of serious illness and refer as clinically appropriate for diagnostic tests and to specialist services, such as an outpatient clinic, as they have always done.\n\nThe Health and Social Care Board wrote to GP practices in Northern Ireland on 30 July asking that, if this had not been done recently, practices undertake a review of arrangements for patients accessing their services in order to ensure that they are continuing to provide services at times that are appropriate to meet the needs of patients. Practices were advised to communicate to patients about the practice services that are available and how to access them with the recommendation that these communications make clear that GP practices are open.\n\nOn 7 September, GP leaders from the Health and Social Care Board, the Royal College of General Practitioners and the British Medical Association issued a statement to reassure patients that, whilst patients may be seen in a different way, by phone or video-link, GP practices are still open to treat patients, provide advice and issue prescriptions. GPs want anyone who has a health concern to feel reassured that they will be able to get an appointment and see a GP if necessary. If people have symptoms or an unexplained illness or have any reason to be concerned, they should in the first instance contact their GP who will be able to provide advice.\n\nA letter was also issued to MLAs and other local political representatives providing an update on the current arrangements and asking that they share the key message with constituents that GP practices are open, but working differently.\n\nThe COVID-19 pandemic has posed unprecedented challenges for the planning and delivery of health and social care services in Northern Ireland. General practice has rapidly changed its working patterns in order to cope with the current national emergency. Some of the measures taken are to reduce the risk of COVID-19 spread by providing advice by telephone or video where appropriate. Other decisions are based on the potential impact of COVID-19 on conditions, or on the potential impact of treatments on the risk of COVID-19.","answerHtml":"<p>GPs have a responsibility to provide core services to their registered patients and the current pandemic does not negate this requirement. GPs will however use their clinical judgement to decide how best to prioritise patients to provide this core service whilst maintaining patient safety.</p><p>GP practices are operating a telephone first triage system which allows patients to seek medical advice from their GP for both routine and urgent problems. The GP then uses their clinical judgement to decide if the patient can be safely managed over the telephone or whether a face to face appointment is required. This approach ensures that patients are only required to visit surgeries where it is absolutely essential. This helps to ensure infection control and social distancing keeping both patients and staff safe.</p><p>GP practices are open and are providing face to face appointments for those patients who are assessed as requiring them. All practices have been provided with a supply of Personal Protective Equipment (PPE) to allow them to do so safely.</p><p>The telephone first triage system also allows GPs to identify those patients who may be infected with coronavirus. These patients can then be referred for face to face assessment to one of the Primary Care COVID-19 centres. This ensures that these patients do not attend the GP Practice or community pharmacy and are seen in an appropriate environment as well as ensuring that GP services are maintained with minimal disruption.</p><p>GPs are still expected to clinically assess for risk of serious illness and refer as clinically appropriate for diagnostic tests and to specialist services, such as an outpatient clinic, as they have always done.</p><p>The Health and Social Care Board wrote to GP practices in Northern Ireland on 30 July asking that, if this had not been done recently, practices undertake a review of arrangements for patients accessing their services in order to ensure that they are continuing to provide services at times that are appropriate to meet the needs of patients. Practices were advised to communicate to patients about the practice services that are available and how to access them with the recommendation that these communications make clear that GP practices are open.</p><p>On 7 September, GP leaders from the Health and Social Care Board, the Royal College of General Practitioners and the British Medical Association issued a statement to reassure patients that, whilst patients may be seen in a different way, by phone or video-link, GP practices are still open to treat patients, provide advice and issue prescriptions. GPs want anyone who has a health concern to feel reassured that they will be able to get an appointment and see a GP if necessary. If people have symptoms or an unexplained illness or have any reason to be concerned, they should in the first instance contact their GP who will be able to provide advice.</p><p>A letter was also issued to MLAs and other local political representatives providing an update on the current arrangements and asking that they share the key message with constituents that GP practices are open, but working differently.</p><p>The COVID-19 pandemic has posed unprecedented challenges for the planning and delivery of health and social care services in Northern Ireland. General practice has rapidly changed its working patterns in order to cope with the current national emergency. Some of the measures taken are to reduce the risk of COVID-19 spread by providing advice by telephone or video where appropriate. Other decisions are based on the potential impact of COVID-19 on conditions, or on the potential impact of treatments on the risk of COVID-19.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209267%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=313131","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=313131"}},{"id":"313130","reference":"AQW 9266/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-22","answerBy":"2020-11-06","answered":"2020-10-29","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure what action her Department is taking to ensure that people that have had driving tests cancelled as a result of additional COVID-19 restrictions, will be prioritised for rebooking when possible.","answerText":"The Driver & Vehicle Agency’s (DVA) booking system for driving tests reopened on 5 October and thousands of bookings have been made. At this time the DVA has not released any driving tests slots beyond January 2021.\n\nDriving instructors have been included in the Executive’s regulations on businesses that must close until 13 November to help stop the spread of Covid-19. Following this Executive decision, driving tests will also cease over this period of increased restrictions based on public health and scientific advice. The booking service is now closed and the DVA will contact those who had their driving tests cancelled to advise them how they can reschedule their appointments.\n\nTo create additional capacity the DVA is planning to open up the booking system for February for these impacted customers only. Further appointments will also be made available in November, December and January as the DVA increases capacity by recruiting additional examiners. These slots, when they are released, will also only be available to these impacted customers.\n\nWhen testing resumes the DVA also intends to offer driving tests on a Saturday and following consultation with key stakeholders is planning to offer driving tests for Heavy Goods Vehicles on Sundays, where it is suitable to do so without compromising the integrity of the test. The DVA will also use overtime to rota off-shift dual role driving examiners to provide additional capacity and to provide cover for scheduled driving tests, where due to a variety of unforeseen reasons such as sick absence or the requirement to self-isolate, driving examiners are unable to attend work.\n\nThe DVA acknowledges that learner drivers are keen to take their driving tests at the earliest opportunity and will continue to work hard to maximise the availability of test slots. However, all driving test services across these islands are experiencing high demand with longer than usual waiting times. Like all public facing services, the Covid-19 restrictions mean that the DVA has had to adapt its services to ensure that they can be provided safely and they would ask customers for their patience at this difficult time.\n\nIt is my priority to ensure that our staff and customers remain safe and the DVA will continue to be guided by the latest public health and scientific advice as we work as quickly as we can to serve all our customers.","answerHtml":"<p>The Driver &amp; Vehicle Agency’s (DVA) booking system for driving tests reopened on 5 October and thousands of bookings have been made. At this time the DVA has not released any driving tests slots beyond January 2021.</p><p>Driving instructors have been included in the Executive’s regulations on businesses that must close until 13 November to help stop the spread of Covid-19. Following this Executive decision, driving tests will also cease over this period of increased restrictions based on public health and scientific advice. The booking service is now closed and the DVA will contact those who had their driving tests cancelled to advise them how they can reschedule their appointments.</p><p>To create additional capacity the DVA is planning to open up the booking system for February for these impacted customers only. Further appointments will also be made available in November, December and January as the DVA increases capacity by recruiting additional examiners. These slots, when they are released, will also only be available to these impacted customers.</p><p>When testing resumes the DVA also intends to offer driving tests on a Saturday and following consultation with key stakeholders is planning to offer driving tests for Heavy Goods Vehicles on Sundays, where it is suitable to do so without compromising the integrity of the test. The DVA will also use overtime to rota off-shift dual role driving examiners to provide additional capacity and to provide cover for scheduled driving tests, where due to a variety of unforeseen reasons such as sick absence or the requirement to self-isolate, driving examiners are unable to attend work.</p><p>The DVA acknowledges that learner drivers are keen to take their driving tests at the earliest opportunity and will continue to work hard to maximise the availability of test slots. However, all driving test services across these islands are experiencing high demand with longer than usual waiting times. Like all public facing services, the Covid-19 restrictions mean that the DVA has had to adapt its services to ensure that they can be provided safely and they would ask customers for their patience at this difficult time.</p><p>It is my priority to ensure that our staff and customers remain safe and the DVA will continue to be guided by the latest public health and scientific advice as we work as quickly as we can to serve all our customers.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209266%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=313130","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=313130"}},{"id":"313129","reference":"AQW 9265/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-22","answerBy":"2020-11-06","answered":"2020-11-02","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what action her Department is taking to ensure that the Health and Safety Executive for Northern Ireland is adequately resourced to undertake its enforcement role in regards to COVID-19 mitigation measures.","answerText":"Myself and my officials have been in close contact with HSENI since the onset of COVID-19. HSENI continues to play a very important role in ensuring appropriate COVID-19 mitigations have been implemented in the businesses it has enforcement responsibility for. Their staff work closely with colleagues from the Public Health Agency who are the lead organisation when dealing with a community transmissible viral pandemic such as Coronavirus.However, HSENI is facing resourcing challenges but have assured me, that despite these pressures, they are prioritising COVID-19 work and are responding to concerns and complaints that have been raised with them.\n\nI will of course carefully consider any proposals HSENI bring forward for additional resourcing. It is essential that everyone in the workplace plays their part, whether as a manager or employee, to adhere to the public health guidelines and in doing so prevent the spread of this disease in their place of work. If this is not happening, then I would ask employees to raise any concerns directly with HSENI or their local district councils if it their concerns relate to office, retail or leisure activities.","answerHtml":"<p>Myself and my officials have been in close contact with HSENI since the onset of COVID-19. HSENI continues to play a very important role in ensuring appropriate COVID-19 mitigations have been implemented in the businesses it has enforcement responsibility for. Their staff work closely with colleagues from the Public Health Agency who are the lead organisation when dealing with a community transmissible viral pandemic such as Coronavirus.However, HSENI is facing resourcing challenges but have assured me, that despite these pressures, they are prioritising COVID-19 work and are responding to concerns and complaints that have been raised with them.</p><p>I will of course carefully consider any proposals HSENI bring forward for additional resourcing. It is essential that everyone in the workplace plays their part, whether as a manager or employee, to adhere to the public health guidelines and in doing so prevent the spread of this disease in their place of work. If this is not happening, then I would ask employees to raise any concerns directly with HSENI or their local district councils if it their concerns relate to office, retail or leisure activities.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209265%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=313129","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=313129"}},{"id":"315449","reference":"AQO 1036/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2020-10-22","answerBy":"2020-11-09","answered":"2020-11-10","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy how she will ensure that future COVID-19 financial support schemes do not exclude sole traders and others that have not been able to access support previously.","answerText":"In recent months, the Northern Ireland Executive and UK Government have introduced an unprecedented range of support measures to businesses and individuals working across all sectors.\n\nMy own Department has provided over £340 million of support to approximately 32,000 businesses through Business Support Schemes for large, small and microbusinesses throughout Northern Ireland.\n\nOn 22nd October, I announced the Covid Restrictions Business Support Scheme. This latest financial support option has been designed to support those businesses, including self-employed sole traders, who will be directly impacted by the four week period of restrictions deemed necessary by the Executive.\n\nOther schemes are also being developed and, in addition to the financial supports recently announced by the Chancellor of the Exchequer, aim to exclude no-one in our society.\n\nI understand the frustration shared by some in our business community, such as sole traders, who may not have been able to avail of as much support as others previously.\n\nUnfortunately, it has not been possible to provide funding for every scenario that has presented itself during this pandemic.\n\nIn considering further interventions, it will be for the Executive collectively, to determine how limited funding will be allocated to best support economic recovery moving forward.","answerHtml":"<p>In recent months, the Northern Ireland Executive and UK Government have introduced an unprecedented range of support measures to businesses and individuals working across all sectors.</p><p>My own Department has provided over £340 million of support to approximately 32,000 businesses through Business Support Schemes for large, small and microbusinesses throughout Northern Ireland.</p><p>On 22nd October, I announced the Covid Restrictions Business Support Scheme. This latest financial support option has been designed to support those businesses, including self-employed sole traders, who will be directly impacted by the four week period of restrictions deemed necessary by the Executive.</p><p>Other schemes are also being developed and, in addition to the financial supports recently announced by the Chancellor of the Exchequer, aim to exclude no-one in our society.</p><p>I understand the frustration shared by some in our business community, such as sole traders, who may not have been able to avail of as much support as others previously.</p><p>Unfortunately, it has not been possible to provide funding for every scenario that has presented itself during this pandemic.</p><p>In considering further interventions, it will be for the Executive collectively, to determine how limited funding will be allocated to best support economic recovery moving forward.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201036%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=315449","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=315449"}},{"id":"312743","reference":"AQW 9065/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-20","answerBy":"2020-11-04","answered":"2020-10-29","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether her Department is progressing plans to reform the employment contracts of further education college lecturers.","answerText":"I would refer the Member to my answer to AQW 9064/17-22.","answerHtml":"<p>I would refer the Member to my answer to AQW 9064/17-22.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209065%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=312743","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=312743"}},{"id":"312742","reference":"AQW 9064/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-20","answerBy":"2020-11-04","answered":"2020-10-27","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she is committed to maintaining the current terms and conditions for further education college lecturers.","answerText":"As employers, Further Education colleges are responsible for setting the terms and conditions of their own staff. I am aware that negotiations on lecturer’s pay and conditions of service have been taking place between college management and Trade Union Side through the Lecturers’ Negotiation Committee.\n\nIf agreement is reached through this process, a Business Case will be submitted to the Department to seek approval for any additional resources required. However, until that point, I am not in a position to comment other than to encourage both parties to fully engage in the negotiation process in order to reach a satisfactory conclusion as soon as possible.","answerHtml":"<p>As employers, Further Education colleges are responsible for setting the terms and conditions of their own staff. I am aware that negotiations on lecturer’s pay and conditions of service have been taking place between college management and Trade Union Side through the Lecturers’ Negotiation Committee.</p><p>If agreement is reached through this process, a Business Case will be submitted to the Department to seek approval for any additional resources required. However, until that point, I am not in a position to comment other than to encourage both parties to fully engage in the negotiation process in order to reach a satisfactory conclusion as soon as possible.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209064%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=312742","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=312742"}},{"id":"312741","reference":"AQW 9063/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-20","answerBy":"2020-11-04","answered":"2020-12-03","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what actions her Department is taking to promote digital inclusion in Northern Ireland.","answerText":"I fully appreciate the importance of access to good broadband services, particularly in the current circumstances.\n\nAs you are aware, my Department has developed Project Stratum which will utilise funding of £165m to deliver gigabit-capable broadband infrastructure to more than 76,000 premises across Northern Ireland.\n\nFollowing a robust and competitive procurement process, the contract for Project Stratum has now been awarded and deployment activities are underway. The project team will be engaging with the successful bidder, Fibrus Networks, to ensure that citizens and businesses can access further information regarding deployment plans and project implementation updates. Departmental officials have engaged with local council representatives to ensure that key aspects of the project are communicated clearly and that all questions relating to deployment are addressed in a transparent manner.\n\nMy Department also produced a detailed ICT-Digital foresight report in 2016, which has helped shape DfE policy for the sector, and the outworking of which remains ongoing, including in relation to skills. The Matrix Panel, supported by my Department, is in the process of conducting foresight studies, specifically looking at future opportunities in the key areas of Artificial Intelligence and Cyber Security. Work is also progressing on developing an AI Centre of excellence to help raise awareness and use of technologies such as machine learning and natural language processing, and also in delivering against the need to raise awareness and develop skills in cyber security.\n\nI can also advise that Invest NI has a team of 5 ICT advisors operating across Northern Ireland, providing advice to their customers on a range of ICT solutions used within businesses. This is a well-established service, providing 1:1 advice to over 500 businesses per year and can also offer financial support to eligible businesses. The team has also helped to develop online video and reading material available through www.nibusinessinfo.co.uk/IT to help small businesses to move online and grow.\n\nInvestNI has also completed the 1st call of the Digital Selling Capability Grant (DSCG), aimed at moving more NI retail/wholesale businesses online. The scheme has offered funding to over 100 businesses to engage professional expertise to help them plan and/or improve their online selling presence, including upskilling their staff on online marketing/e-commerce techniques.\n\nIt is also important to note that, following the cessation of on-site training and learning due to Covid-19 in March 2020, Further Education (FE) colleges moved quickly to adapt their provision to meet the needs of their learners with over three-quarters of learners able to access provision on-line, thereby enabling students and staff to work remotely from home during this period of uncertainty and complete learners’ vocational qualifications. Additional funding of over £3.1 million was allocated to colleges for additional IT equipment, peripherals and licences to allow continued access from home for both college staff and students.\n\nMy Department’s Essential Skills Strategy aims to provide opportunities for adults to update their essential skills, including ICT provision. Essential Skills qualifications in Information and Communication Technology at Level 1 and Level 2 are available free of charge to all learners.\n\nCourses are delivered by FE colleges, private training providers and community organisations.\n\nYou may also wish to explore the work underway by the Digital Inclusion Unit established within the Department of Finance and the action taken within the Department for Communities to promote digital inclusion in the delivery of its services.","answerHtml":"<p>I fully appreciate the importance of access to good broadband services, particularly in the current circumstances.</p><p>As you are aware, my Department has developed Project Stratum which will utilise funding of £165m to deliver gigabit-capable broadband infrastructure to more than 76,000 premises across Northern Ireland.</p><p>Following a robust and competitive procurement process, the contract for Project Stratum has now been awarded and deployment activities are underway. The project team will be engaging with the successful bidder, Fibrus Networks, to ensure that citizens and businesses can access further information regarding deployment plans and project implementation updates. Departmental officials have engaged with local council representatives to ensure that key aspects of the project are communicated clearly and that all questions relating to deployment are addressed in a transparent manner.</p><p>My Department also produced a detailed ICT-Digital foresight report in 2016, which has helped shape DfE policy for the sector, and the outworking of which remains ongoing, including in relation to skills. The Matrix Panel, supported by my Department, is in the process of conducting foresight studies, specifically looking at future opportunities in the key areas of Artificial Intelligence and Cyber Security. Work is also progressing on developing an AI Centre of excellence to help raise awareness and use of technologies such as machine learning and natural language processing, and also in delivering against the need to raise awareness and develop skills in cyber security.</p><p>I can also advise that Invest NI has a team of 5 ICT advisors operating across Northern Ireland, providing advice to their customers on a range of ICT solutions used within businesses. This is a well-established service, providing 1:1 advice to over 500 businesses per year and can also offer financial support to eligible businesses. The team has also helped to develop online video and reading material available through www.nibusinessinfo.co.uk/IT to help small businesses to move online and grow.</p><p>InvestNI has also completed the 1st call of the Digital Selling Capability Grant (DSCG), aimed at moving more NI retail/wholesale businesses online. The scheme has offered funding to over 100 businesses to engage professional expertise to help them plan and/or improve their online selling presence, including upskilling their staff on online marketing/e-commerce techniques.</p><p>It is also important to note that, following the cessation of on-site training and learning due to Covid-19 in March 2020, Further Education (FE) colleges moved quickly to adapt their provision to meet the needs of their learners with over three-quarters of learners able to access provision on-line, thereby enabling students and staff to work remotely from home during this period of uncertainty and complete learners’ vocational qualifications. Additional funding of over £3.1 million was allocated to colleges for additional IT equipment, peripherals and licences to allow continued access from home for both college staff and students.</p><p>My Department’s Essential Skills Strategy aims to provide opportunities for adults to update their essential skills, including ICT provision. Essential Skills qualifications in Information and Communication Technology at Level 1 and Level 2 are available free of charge to all learners.</p><p>Courses are delivered by FE colleges, private training providers and community organisations.</p><p>You may also wish to explore the work underway by the Digital Inclusion Unit established within the Department of Finance and the action taken within the Department for Communities to promote digital inclusion in the delivery of its services.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209063%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=312741","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=312741"}},{"id":"312740","reference":"AQW 9062/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-20","answerBy":"2020-11-04","answered":"2020-11-04","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance whether she will consider producing a digital inclusion strategy for Northern Ireland.","answerText":"My Department’s Digital Transformation Service (DTS) set out an ambitious Strategy for Digital Transformation of Public Services in 2017 to continue its digital transformation journey and the delivery of a range of new and improved digital services. Digital Inclusion forms an important part of that Strategy.\n\nThe “Making Lives Better” document (https://www.finance-ni.gov.uk/publications/digital-transformation-strategy-2017-2021) describes how the Digital Transformation Programme is providing better public services and enabling collaborative design of public sector digital services.\n\nThe Strategy supports the delivery of Programme for Government (PfG) outcomes through the increased use of online channels to access public services and bringing with it new opportunities to improve how we engage with citizens and stakeholders to develop better policies, deliver better services and to overhaul business processes.\n\nProgress on the delivery of the Strategy has been significant - ensuring a “digital first” approach. A mid-term review of the Strategy is currently underway which will provide an opportunity to take stock of progress in the support of PfG outcomes.\n\nMy Department’s overarching aim for Digital Inclusion is to give citizens access, skills, motivation and trust to use digital services.\n\nA Digital Resilience Foundation Report was initially undertaken to:\n\n• Develop indicators to measure success;\n\n• Formalise strategic partnerships to enable the delivery of priority targeted interventions to support specific difficult to reach groups such as rural communities and the economically disadvantaged;\n\n• Encourage Departments to embed digital inclusion in the policies and work programmes of all transformation programmes across Government;\n\n• Provide support and assistance to innovative projects which have the potential to make a positive difference to priority groups by addressing issues in respect of access, skills, motivation and trust; and\n\n• Increase the number of publicly available and free internet access points through access ‘hotspots’ at facilities such as local libraries and public sector offices.\n\nIt is widely recognised that Digital technologies impact on almost every aspect of modern society, creating huge social benefits. They can improve how we work and communicate with each other, the healthcare available to us, and how information and knowledge can be shared for our benefit.\n\nThe downside of our increasing reliance on ICT in public, economic and social life is that the digitally excluded can also become excluded from engaging with public services, modern working life and society itself.\n\nUnfortunately, a number of individuals still don’t have the necessary digital skills required to take advantage of the benefits the internet offers. Statistics indicate that locally 1 in 7 adults do not use the Internet (rising to 1 in 3 of those with a disability and half of those aged 65+); 1 in 4 do not have access to a computer with Internet access.\n\nThe Department’s Digital Inclusion Team has been addressing this issue with the introduction of the Go ON NI programme which identifies user needs and ensures those individual needs come first.\n\nI am pleased to note that recent pointers suggest that overall 86% of all adults now use the web compared to 67% when the Go ON NI programme commenced.\n\nAs a result of the current COVID-19 situation the GO ON NI programme is providing training sessions remotely whereby anyone can join in. A new Digital Help text and phone service has just been launched to provide one-to-one free digital assistance to the public and this is being supported by BITC volunteers.\n\nA soon to be announced “Connected” pilot project will provide free training as well as a loan of an internet enabled device for a minimum of 6 months to a limited number of elderly or vulnerable citizens. This project will be looking to specifically target the digitally excluded with a specific focus on rural areas through liaison with DAERA and the Rural Community Network.\n\nThe Digital Inclusion Team are also pro-active members of the Digital Assist Steering Group, a cross-sectoral body chaired by Business In The Community which helps ensure that government services are not delivered in isolation through appropriate interaction with organisations from across the private, voluntary and community sectors.\n\nFor more information on all current and future Go ON NI activities, please visit www.nidirect.gov.uk/go-on-ni or contact the Digital Inclusion team directly at future@finance-ni.gov.uk","answerHtml":"<p>My Department’s Digital Transformation Service (DTS) set out an ambitious Strategy for Digital Transformation of Public Services in 2017 to continue its digital transformation journey and the delivery of a range of new and improved digital services. Digital Inclusion forms an important part of that Strategy.</p><p>The “Making Lives Better” document (https://www.finance-ni.gov.uk/publications/digital-transformation-strategy-2017-2021) describes how the Digital Transformation Programme is providing better public services and enabling collaborative design of public sector digital services.</p><p>The Strategy supports the delivery of Programme for Government (PfG) outcomes through the increased use of online channels to access public services and bringing with it new opportunities to improve how we engage with citizens and stakeholders to develop better policies, deliver better services and to overhaul business processes.</p><p>Progress on the delivery of the Strategy has been significant - ensuring a “digital first” approach. A mid-term review of the Strategy is currently underway which will provide an opportunity to take stock of progress in the support of PfG outcomes.</p><p>My Department’s overarching aim for Digital Inclusion is to give citizens access, skills, motivation and trust to use digital services.</p><p>A Digital Resilience Foundation Report was initially undertaken to:</p><p>• Develop indicators to measure success;</p><p>• Formalise strategic partnerships to enable the delivery of priority targeted interventions to support specific difficult to reach groups such as rural communities and the economically disadvantaged;</p><p>• Encourage Departments to embed digital inclusion in the policies and work programmes of all transformation programmes across Government;</p><p>• Provide support and assistance to innovative projects which have the potential to make a positive difference to priority groups by addressing issues in respect of access, skills, motivation and trust; and</p><p>• Increase the number of publicly available and free internet access points through access ‘hotspots’ at facilities such as local libraries and public sector offices.</p><p>It is widely recognised that Digital technologies impact on almost every aspect of modern society, creating huge social benefits. They can improve how we work and communicate with each other, the healthcare available to us, and how information and knowledge can be shared for our benefit.</p><p>The downside of our increasing reliance on ICT in public, economic and social life is that the digitally excluded can also become excluded from engaging with public services, modern working life and society itself.</p><p>Unfortunately, a number of individuals still don’t have the necessary digital skills required to take advantage of the benefits the internet offers. Statistics indicate that locally 1 in 7 adults do not use the Internet (rising to 1 in 3 of those with a disability and half of those aged 65+); 1 in 4 do not have access to a computer with Internet access.</p><p>The Department’s Digital Inclusion Team has been addressing this issue with the introduction of the Go ON NI programme which identifies user needs and ensures those individual needs come first.</p><p>I am pleased to note that recent pointers suggest that overall 86% of all adults now use the web compared to 67% when the Go ON NI programme commenced.</p><p>As a result of the current COVID-19 situation the GO ON NI programme is providing training sessions remotely whereby anyone can join in. A new Digital Help text and phone service has just been launched to provide one-to-one free digital assistance to the public and this is being supported by BITC volunteers.</p><p>A soon to be announced “Connected” pilot project will provide free training as well as a loan of an internet enabled device for a minimum of 6 months to a limited number of elderly or vulnerable citizens. This project will be looking to specifically target the digitally excluded with a specific focus on rural areas through liaison with DAERA and the Rural Community Network.</p><p>The Digital Inclusion Team are also pro-active members of the Digital Assist Steering Group, a cross-sectoral body chaired by Business In The Community which helps ensure that government services are not delivered in isolation through appropriate interaction with organisations from across the private, voluntary and community sectors.</p><p>For more information on all current and future Go ON NI activities, please visit www.nidirect.gov.uk/go-on-ni or contact the Digital Inclusion team directly at future@finance-ni.gov.uk</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209062%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=312740","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=312740"}},{"id":"312159","reference":"AQW 8806/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-15","answerBy":"2020-10-23","answered":"2020-10-28","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what financial support she will provide to businesses impacted by additional COVID-19 restrictions; and what is the timeframe for distributing such support.","answerText":"Following the difficult, but necessary decision by the Executive to impose a four week restriction period for all of Northern Ireland, the Finance Minister announced a new support scheme for those businesses that were instructed to close as a consequence. The Localised Restrictions Support Scheme (LRSS) will run for the four weeks of enforced restrictions, at an estimated cost of £35million. This scheme opened to new applications from Monday 19th October and block payments will be issued as soon as applications are approved.\n\nOn Thursday 22nd October, I announced a further support package to help businesses affected by the recent restrictions announced by the Executive.\n\nThe Covid Restrictions Business Support Scheme (CRBSS) will support businesses which meet the following criteria:\n\n The business is restricted within the Health Protection (Coronavirus, Restrictions) (No.2) Regulations (Northern Ireland) 2020 but is not eligible for the Localised Restrictions Support Scheme (LRSS); or\n\n The business is within the supply chain of businesses restricted by the Regulations and as a result has been significantly impacted; and\n\n The business is operating in Northern Ireland and was trading immediately prior to 16 October 2020; and\n\n The business is not included in the scope of funding already allocated to Executive Departments to respond to Covid restrictions.\n\nThe new CRBSS, which also applies for the same four week period, will open for applications as soon as possible. My officials are working with colleagues in InvestNI, who will administer the scheme on our behalf.\n\nIn addition, I have asked my officials to develop a tourism and hospitality scheme to address issues associated with current restrictions and a scheme to support those recently self-employed","answerHtml":"<p>Following the difficult, but necessary decision by the Executive to impose a four week restriction period for all of Northern Ireland, the Finance Minister announced a new support scheme for those businesses that were instructed to close as a consequence. The Localised Restrictions Support Scheme (LRSS) will run for the four weeks of enforced restrictions, at an estimated cost of £35million. This scheme opened to new applications from Monday 19th October and block payments will be issued as soon as applications are approved.</p><p>On Thursday 22nd October, I announced a further support package to help businesses affected by the recent restrictions announced by the Executive.</p><p>The Covid Restrictions Business Support Scheme (CRBSS) will support businesses which meet the following criteria:</p><p> The business is restricted within the Health Protection (Coronavirus, Restrictions) (No.2) Regulations (Northern Ireland) 2020 but is not eligible for the Localised Restrictions Support Scheme (LRSS); or</p><p> The business is within the supply chain of businesses restricted by the Regulations and as a result has been significantly impacted; and</p><p> The business is operating in Northern Ireland and was trading immediately prior to 16 October 2020; and</p><p> The business is not included in the scope of funding already allocated to Executive Departments to respond to Covid restrictions.</p><p>The new CRBSS, which also applies for the same four week period, will open for applications as soon as possible. My officials are working with colleagues in InvestNI, who will administer the scheme on our behalf.</p><p>In addition, I have asked my officials to develop a tourism and hospitality scheme to address issues associated with current restrictions and a scheme to support those recently self-employed</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208806%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=312159","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=312159"}},{"id":"312157","reference":"AQW 8804/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-15","answerBy":"2020-10-30","answered":"2020-10-27","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether her Department will publish advice to businesses, permitted to continue operation, on following additional COVID-19 restrictions.","answerText":"Guidance documents to help businesses from various different sectors operate had already been published prior to the latest restrictions being imposed, these documents are available on the www.nidirect.gov.uk and the www.nibusinessinfo.co.uk.\n\nIn the constantly changing setting of Covid 19, the guidance documents to aid businesses are regularly reviewed and updated when deemed appropriate, however there are no specific plans to publish new guidance for businesses that are permitted to continue operating whilst the latest restrictions are being imposed.","answerHtml":"<p>Guidance documents to help businesses from various different sectors operate had already been published prior to the latest restrictions being imposed, these documents are available on the www.nidirect.gov.uk and the www.nibusinessinfo.co.uk.</p><p>In the constantly changing setting of Covid 19, the guidance documents to aid businesses are regularly reviewed and updated when deemed appropriate, however there are no specific plans to publish new guidance for businesses that are permitted to continue operating whilst the latest restrictions are being imposed.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208804%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=312157","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=312157"}},{"id":"312156","reference":"AQW 8803/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-15","answerBy":"2020-10-30","answered":"2020-10-27","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what financial support her Department will provide to Further and Higher Education institutions and students to facilitate a recommended move to distance learning.","answerText":"My Department has allocated £3.1 million to Further Education (FE) colleges to enable delivery of curriculum provision online, thereby enabling students and staff to work remotely during this period of uncertainty in order to complete vocational qualifications. This funding will provide additional IT equipment, peripherals and licences.\n\nMy Department has also ensured that current FE student support arrangements with an annual value of £13 million continue to operate effectively, or have been adapted, to direct support to students in need, including facilitating distance learning. For example, eligibility criteria for FE Grants and Hardship Fund have been updated to facilitate claimants participating in distance learning, acceptance of electronic applications and evidence, and paying childcare despite the student studying from home.\n\nAn additional £0.4 million has been allocated to fund direct payment of Free School Meal Allowances into the households of almost 1,900 eligible school-age FE students for the remainder of the 2019/20 academic year and to facilitate summer payments, when students were not able to attend college. For 2020/21 Term 1, I am seeking to allocate an additional £0.17 million to fund direct payment of Free School Meal Allowances into the households of eligible school-age FE students to ensure students are not disadvantaged by distance learning. This arrangement will be reviewed for Term 2.\n\nMy Department will continue to keep FE student support arrangements under review and adapt these as required in response to evolving needs.\n\nFor Higher Education students studying online from home in 2020/21, their student finance will continue to be paid as normal, as if they were studying on site at university or college. Students should ensure that their living location details are up to date on their online account at www.studentfinanceni.co.uk. As part of their student finance agreement, students must keep Student Finance NI up to date with where they'll be living each term, as this may affect how much they have to repay and when. In addition to this support, I have doubled the amount of hardship funds available to students from £2.8m to £5.6m in 2020/21. These funds are distributed by the universities on behalf of my Department, and any students who are experiencing genuine financial hardship should contact the Student Support team at their university to see if they are eligible for a hardship payment.\n\nWhile my Department is responsible for funding NI higher education institutions insofar as teaching and research is concerned, as autonomous institutions, it is for the universities themselves to decide how that teaching will be delivered, taking into account prevailing public health guidance. I understand, however, that as part of their Covid-19 operational planning, both Queen’s University and Ulster University already have in place contingencies to pivot fully to online delivery.","answerHtml":"<p>My Department has allocated £3.1 million to Further Education (FE) colleges to enable delivery of curriculum provision online, thereby enabling students and staff to work remotely during this period of uncertainty in order to complete vocational qualifications. This funding will provide additional IT equipment, peripherals and licences.</p><p>My Department has also ensured that current FE student support arrangements with an annual value of £13 million continue to operate effectively, or have been adapted, to direct support to students in need, including facilitating distance learning. For example, eligibility criteria for FE Grants and Hardship Fund have been updated to facilitate claimants participating in distance learning, acceptance of electronic applications and evidence, and paying childcare despite the student studying from home.</p><p>An additional £0.4 million has been allocated to fund direct payment of Free School Meal Allowances into the households of almost 1,900 eligible school-age FE students for the remainder of the 2019/20 academic year and to facilitate summer payments, when students were not able to attend college. For 2020/21 Term 1, I am seeking to allocate an additional £0.17 million to fund direct payment of Free School Meal Allowances into the households of eligible school-age FE students to ensure students are not disadvantaged by distance learning. This arrangement will be reviewed for Term 2.</p><p>My Department will continue to keep FE student support arrangements under review and adapt these as required in response to evolving needs.</p><p>For Higher Education students studying online from home in 2020/21, their student finance will continue to be paid as normal, as if they were studying on site at university or college. Students should ensure that their living location details are up to date on their online account at www.studentfinanceni.co.uk. As part of their student finance agreement, students must keep Student Finance NI up to date with where they&#39;ll be living each term, as this may affect how much they have to repay and when. In addition to this support, I have doubled the amount of hardship funds available to students from £2.8m to £5.6m in 2020/21. These funds are distributed by the universities on behalf of my Department, and any students who are experiencing genuine financial hardship should contact the Student Support team at their university to see if they are eligible for a hardship payment.</p><p>While my Department is responsible for funding NI higher education institutions insofar as teaching and research is concerned, as autonomous institutions, it is for the universities themselves to decide how that teaching will be delivered, taking into account prevailing public health guidance. I understand, however, that as part of their Covid-19 operational planning, both Queen’s University and Ulster University already have in place contingencies to pivot fully to online delivery.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208803%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=312156","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=312156"}},{"id":"312155","reference":"AQW 8802/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-15","answerBy":"2020-10-30","answered":"2020-10-29","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy how she will ensure that future COVID-19 business support schemes do not unfairly exclude sole traders, and those who have previously been unable to avail of support.","answerText":"In recent months, the NI Executive and UK Government have introduced an unprecedented range of support measures to businesses across all sectors. These packages of financial support were established to mitigate against the worst impact of the Covid-19 pandemic, to prevent businesses from closing and to retain jobs.\n\nTo date, my Department has provided over £340 million of support to over 32,000 local businesses through the grant schemes for large, small and micro-sized businesses.\n\nOn Friday 17th October 2020, the Finance Minister announced a new support package for businesses and employers throughout Northern Ireland. This will be in place for at least four weeks, with an estimated spend of £35 million during this initial period.\n\nFurther to this, on Thursday 22nd October, I announced an additional support package to help businesses affected by the recent restrictions announced by the Executive.\n\nThe Covid Restrictions Business Support Scheme (CRBSS) will support businesses which meet the following criteria:\n\n The business is restricted within the Health Protection (Coronavirus, Restrictions) (No.2) Regulations (Northern Ireland) 2020 but is not eligible for the Localised Restrictions Support Scheme (LRSS); or\n\n The business is within the supply chain of businesses restricted by the Regulations and as a result has been significantly impacted; and\n\n The business is operating in Northern Ireland and was trading immediately prior to 16 October 2020; and\n\n The business is not included in the scope of funding already allocated to Executive Departments to respond to Covid restrictions.\n\nThe new CRBSS, which also applies for the same four week period, will open for applications as soon as possible. My officials are working with colleagues in InvestNI, who will administer the scheme on our behalf.\n\nIn addition, I have asked my officials to develop a tourism and hospitality scheme to address issues associated with current restrictions and a scheme to support those recently self-employed\n\nAll Executive Ministers have been asked to bring forward options to determine what support options may be considered for those who may not qualify for these latest schemes, or who may not have been able to avail of previous opportunities.","answerHtml":"<p>In recent months, the NI Executive and UK Government have introduced an unprecedented range of support measures to businesses across all sectors. These packages of financial support were established to mitigate against the worst impact of the Covid-19 pandemic, to prevent businesses from closing and to retain jobs.</p><p>To date, my Department has provided over £340 million of support to over 32,000 local businesses through the grant schemes for large, small and micro-sized businesses.</p><p>On Friday 17th October 2020, the Finance Minister announced a new support package for businesses and employers throughout Northern Ireland. This will be in place for at least four weeks, with an estimated spend of £35 million during this initial period.</p><p>Further to this, on Thursday 22nd October, I announced an additional support package to help businesses affected by the recent restrictions announced by the Executive.</p><p>The Covid Restrictions Business Support Scheme (CRBSS) will support businesses which meet the following criteria:</p><p> The business is restricted within the Health Protection (Coronavirus, Restrictions) (No.2) Regulations (Northern Ireland) 2020 but is not eligible for the Localised Restrictions Support Scheme (LRSS); or</p><p> The business is within the supply chain of businesses restricted by the Regulations and as a result has been significantly impacted; and</p><p> The business is operating in Northern Ireland and was trading immediately prior to 16 October 2020; and</p><p> The business is not included in the scope of funding already allocated to Executive Departments to respond to Covid restrictions.</p><p>The new CRBSS, which also applies for the same four week period, will open for applications as soon as possible. My officials are working with colleagues in InvestNI, who will administer the scheme on our behalf.</p><p>In addition, I have asked my officials to develop a tourism and hospitality scheme to address issues associated with current restrictions and a scheme to support those recently self-employed</p><p>All Executive Ministers have been asked to bring forward options to determine what support options may be considered for those who may not qualify for these latest schemes, or who may not have been able to avail of previous opportunities.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208802%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=312155","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=312155"}},{"id":"311819","reference":"AQW 8651/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-13","answerBy":"2020-10-28","answered":"2020-11-20","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what actions she will take in response to the Northern Ireland Audit Office report into the Northern Ireland Renewables Obligation scheme, which identifies a significant risk that some investors may be achieving a higher financial return than was required to encourage the adoption of the various supported technologies.","answerText":"Of the six recommendations in the report, three are specifically for my Department, including a recommendation to carry out a review of the levels of support available and rates of return for renewable electricity generators. The Department has accepted these recommendations and will ensure they are addressed going forward.","answerHtml":"<p>Of the six recommendations in the report, three are specifically for my Department, including a recommendation to carry out a review of the levels of support available and rates of return for renewable electricity generators. The Department has accepted these recommendations and will ensure they are addressed going forward.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208651%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=311819","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=311819"}},{"id":"311818","reference":"AQW 8650/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-13","answerBy":"2020-10-28","answered":"2020-11-13","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for her assessment of the levels of return for anaerobic digesters as part of the Northern Ireland Renewables Obligation scheme; and whether these represent value for money.","answerText":"Neither anaerobic digestion plants nor the biogas they produce are eligible for support under the Northern Ireland Renewables Obligation (NIRO). The NIRO supports the generation of renewable electricity, including electricity generated by stations fuelled by biogas produced through the anaerobic digestion process.\n\nThis is an important distinction as any revenue streams for anaerobic digestion plants that do not relate to electricity production by a generating station are not within the scope of the NIRO. I therefore cannot comment on the rates of returns of anaerobic digesters themselves.\n\nThe levels of returns for renewable electricity generating stations are based on a number of factors, not just the Renewable Obligation Certificate (ROC) banding levels set, and the rates of returns will differ substantially depending on the assumptions about the individual circumstances of generators used to calculate any figures.\n\nI note that the Audit Office report includes a recommendation to carry out a review of the levels of support available and rates of return for renewable generators, and I have accepted this.","answerHtml":"<p>Neither anaerobic digestion plants nor the biogas they produce are eligible for support under the Northern Ireland Renewables Obligation (NIRO). The NIRO supports the generation of renewable electricity, including electricity generated by stations fuelled by biogas produced through the anaerobic digestion process.</p><p>This is an important distinction as any revenue streams for anaerobic digestion plants that do not relate to electricity production by a generating station are not within the scope of the NIRO. I therefore cannot comment on the rates of returns of anaerobic digesters themselves.</p><p>The levels of returns for renewable electricity generating stations are based on a number of factors, not just the Renewable Obligation Certificate (ROC) banding levels set, and the rates of returns will differ substantially depending on the assumptions about the individual circumstances of generators used to calculate any figures.</p><p>I note that the Audit Office report includes a recommendation to carry out a review of the levels of support available and rates of return for renewable generators, and I have accepted this.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208650%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=311818","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=311818"}},{"id":"311817","reference":"AQW 8649/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-13","answerBy":"2020-10-28","answered":"2020-11-06","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail the number of requests sent by her Department to HMRC or the Treasury, seeking access to tax data in order to assist those excluded from business support schemes.","answerText":"The Department of Finance would normally be the lead department in any engagement with HM Treasury. That said, my Department has had many previous interactions with HMRC on accessing the data they hold, including liaison over many years in the case of the devolution of Corporation Tax, Trade Data associated with EU Exit and, more recently, my Department has had interactions with HMRC to help operationalise the Micro Business Hardship Scheme. However, we have been unable to gain permission to access taxpayer data, which is guarded zealously and for good reason.\n\nI recognise that not all businesses and individuals have been able to avail of UK-wide support schemes. While my Department is currently working on schemes to assist these groups, I have previously raised with the Executive that there would be challenges in establishing a local scheme for those excluded as access to the national database would be required by HMRC.\n\nIt is also worth noting that many of those making representations about being excluded from business support schemes are the newly self-employed, a group that were, according to the Chancellor of the Exchequer, outside the SEISS Scheme because of a lack of tax data held by HMRC on those not yet within the self-assessment system.\n\nTo this end, HMRC has recently confirmed that it does not have any short term means to verify individuals who are newly self-employed.","answerHtml":"<p>The Department of Finance would normally be the lead department in any engagement with HM Treasury. That said, my Department has had many previous interactions with HMRC on accessing the data they hold, including liaison over many years in the case of the devolution of Corporation Tax, Trade Data associated with EU Exit and, more recently, my Department has had interactions with HMRC to help operationalise the Micro Business Hardship Scheme. However, we have been unable to gain permission to access taxpayer data, which is guarded zealously and for good reason.</p><p>I recognise that not all businesses and individuals have been able to avail of UK-wide support schemes. While my Department is currently working on schemes to assist these groups, I have previously raised with the Executive that there would be challenges in establishing a local scheme for those excluded as access to the national database would be required by HMRC.</p><p>It is also worth noting that many of those making representations about being excluded from business support schemes are the newly self-employed, a group that were, according to the Chancellor of the Exchequer, outside the SEISS Scheme because of a lack of tax data held by HMRC on those not yet within the self-assessment system.</p><p>To this end, HMRC has recently confirmed that it does not have any short term means to verify individuals who are newly self-employed.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208649%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=311817","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=311817"}},{"id":"311816","reference":"AQW 8648/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-13","answerBy":"2020-10-28","answered":"2020-11-13","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy how she will ensure that recommendations made by the Northern Ireland Audit Office in regards to the Northern Ireland Renewables Obligation scheme are incorporated into any future energy schemes.","answerText":"The need for future energy support schemes is being considered as part of the development process for the new Energy Strategy, and no decisions have yet been made on these.\n\nHowever, I have accepted the recommendations that relate directly to my Department and my officials will ensure that they are taken into account once such decisions are made.\n\nIn particular, with relation to recommendation 1, the Energy Strategy has already put in place partnership arrangements through the establishment of a Government Stakeholders Group and the significant involvement of other departments on the five working groups.\n\nThe Power Working Group, which is most relevant for the NIAO report, includes officials from the Department for Infrastructure and Department of Agriculture, Environment and Rural Affairs to ensure a joined-up approach from the outset when considering the need for any such new schemes.","answerHtml":"<p>The need for future energy support schemes is being considered as part of the development process for the new Energy Strategy, and no decisions have yet been made on these.</p><p>However, I have accepted the recommendations that relate directly to my Department and my officials will ensure that they are taken into account once such decisions are made.</p><p>In particular, with relation to recommendation 1, the Energy Strategy has already put in place partnership arrangements through the establishment of a Government Stakeholders Group and the significant involvement of other departments on the five working groups.</p><p>The Power Working Group, which is most relevant for the NIAO report, includes officials from the Department for Infrastructure and Department of Agriculture, Environment and Rural Affairs to ensure a joined-up approach from the outset when considering the need for any such new schemes.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208648%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=311816","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=311816"}},{"id":"311815","reference":"AQW 8647/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-13","answerBy":"2020-10-28","answered":"2020-11-13","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for her assessment of the robustness of the information upon which the level of support was determined for anaerobic digesters under the Northern Ireland Renewables Obligation scheme.","answerText":"Neither anaerobic digestion plants nor the biogas they produce are eligible for support under the Northern Ireland Renewables Obligation (NIRO). The NIRO supports the generation of renewable electricity, including electricity generated by stations fuelled by biogas produced through the anaerobic digestion process.\n\nThis is an important distinction as any revenue streams for anaerobic digestion plants that do not relate to electricity production by a generating station are not within the scope of the NIRO.\n\nThe banding levels set for such stations were informed by information gathered through a public call for evidence in 2010 and subsequent consultation. Information was provided from a range of sources with knowledge and experience in anaerobic digestion, and provided examples from international best practice. Further information was gathered in 2014, upon which banding levels were maintained.\n\nThe decision on banding levels was scrutinised by the Enterprise, Trade & Investment Committee, and debated in the Assembly where the associated legislation was subsequently passed.","answerHtml":"<p>Neither anaerobic digestion plants nor the biogas they produce are eligible for support under the Northern Ireland Renewables Obligation (NIRO). The NIRO supports the generation of renewable electricity, including electricity generated by stations fuelled by biogas produced through the anaerobic digestion process.</p><p>This is an important distinction as any revenue streams for anaerobic digestion plants that do not relate to electricity production by a generating station are not within the scope of the NIRO.</p><p>The banding levels set for such stations were informed by information gathered through a public call for evidence in 2010 and subsequent consultation. Information was provided from a range of sources with knowledge and experience in anaerobic digestion, and provided examples from international best practice. Further information was gathered in 2014, upon which banding levels were maintained.</p><p>The decision on banding levels was scrutinised by the Enterprise, Trade &amp; Investment Committee, and debated in the Assembly where the associated legislation was subsequently passed.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208647%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=311815","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=311815"}},{"id":"311356","reference":"AQW 8487/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-09","answerBy":"2020-10-19","answered":"2020-11-05","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) to account for the low number of completed applications to the Digital Selling Capability Grant and the Equity Investment Fund; and (ii) for her assessment as to whether there will be a significant underspend on these schemes.","answerText":"The Digital Selling Capability Grant\n\nThe Digital Selling Capability Grant (DSCG) was launched on 8th September 2020. It is anticipated that this new grant will run in consecutive years, therefore this launched the first Call for the DSCG, a competitive £1M per annum fund targeted at retail and wholesale businesses based in NI and the scheme is managed and delivered by Invest NI.\n\nFinancial support under DSCG will facilitate businesses to:-\n\nDeveloping their digital/online e-commerce strategy; and\n\nImplement the strategy and/or enhance their e-commerce offering.\n\nAt the closing deadline for the scheme on 7th October 2020, Invest NI had received 126 applications. They are now in the process of reviewing all of those submitted.\n\nGrants will be between £5k and £20k. Working on the basis of an average award of £10k, Invest NI believes that the scheme could afford to process approximately 100 successful cases.\n\nTherefore, for Call One of the new DSCG, Invest NI expects to spend the full allocated budget of £1m. Due to timing and the launch of the new Grant, this expenditure will straddle the financial years 2020/21 and 2021/22. As a consequence of government accounting procedures, and conscious of pressures elsewhere due to COVID-19, Invest NI surrendered £450k of this £1m allocation in the October monitoring round, as the full budget for Call One is not expected to be completely spent by 31 March 2021.\n\nHowever, as this budget will be committed to those successful applicants in the current period, Invest NI has bid for this £450k for 2021/22, in addition to another £1m for Call Two of the DSCG, which they also expect to spend in full during the next financial year 2021/22.\n\nThe Equity Investment Fund\n\nThe Equity Investment Fund, which was also launched on 8th September 2020. Unlike the DSCG, this new scheme does not have a fixed closing date, but instead there is a requirement for all investment legals to be completed by 31 December 2020. As applications are for investments, rather than grant support, the process is more detailed and companies will therefore take longer to prepare an application. Invest NI have received promising levels of interest and are engaging with companies to support them to submit their applications.\n\nFull details on the scheme and eligibility criteria are available will be on the nibusinessinfo website at Covid-19 Equity Investment Fund","answerHtml":"<p>The Digital Selling Capability Grant</p><p>The Digital Selling Capability Grant (DSCG) was launched on 8th September 2020. It is anticipated that this new grant will run in consecutive years, therefore this launched the first Call for the DSCG, a competitive £1M per annum fund targeted at retail and wholesale businesses based in NI and the scheme is managed and delivered by Invest NI.</p><p>Financial support under DSCG will facilitate businesses to:-</p><p>Developing their digital/online e-commerce strategy; and</p><p>Implement the strategy and/or enhance their e-commerce offering.</p><p>At the closing deadline for the scheme on 7th October 2020, Invest NI had received 126 applications. They are now in the process of reviewing all of those submitted.</p><p>Grants will be between £5k and £20k. Working on the basis of an average award of £10k, Invest NI believes that the scheme could afford to process approximately 100 successful cases.</p><p>Therefore, for Call One of the new DSCG, Invest NI expects to spend the full allocated budget of £1m. Due to timing and the launch of the new Grant, this expenditure will straddle the financial years 2020/21 and 2021/22. As a consequence of government accounting procedures, and conscious of pressures elsewhere due to COVID-19, Invest NI surrendered £450k of this £1m allocation in the October monitoring round, as the full budget for Call One is not expected to be completely spent by 31 March 2021.</p><p>However, as this budget will be committed to those successful applicants in the current period, Invest NI has bid for this £450k for 2021/22, in addition to another £1m for Call Two of the DSCG, which they also expect to spend in full during the next financial year 2021/22.</p><p>The Equity Investment Fund</p><p>The Equity Investment Fund, which was also launched on 8th September 2020. Unlike the DSCG, this new scheme does not have a fixed closing date, but instead there is a requirement for all investment legals to be completed by 31 December 2020. As applications are for investments, rather than grant support, the process is more detailed and companies will therefore take longer to prepare an application. Invest NI have received promising levels of interest and are engaging with companies to support them to submit their applications.</p><p>Full details on the scheme and eligibility criteria are available will be on the nibusinessinfo website at Covid-19 Equity Investment Fund</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208487%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=311356","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=311356"}},{"id":"311355","reference":"AQW 8486/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-09","answerBy":"2020-10-26","answered":"2020-11-13","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for her assessment of the potential additional financial burden facing further and higher education students as a result of the COVID-19 pandemic; and what support she can provide.","answerText":"My Department provides approximately £435 million of support to students across further and higher education every year. For Further Education (FE), this includes FE Grants, College Hardship Fund (both of which include childcare support), Free School Meals and Home to College Transport.\n\nIn addition to the current support arrangements, my Department initially secured £1.078 million of additional resource funding in June monitoring for the colleges to provide IT equipment for financially vulnerable learners to assist with remote learning during the initial lockdown. More recently I secured an additional £6.5 million from the Executive to support safe resumption of learning in FE colleges.\n\nAn additional £0.43 million has been allocated to fund direct payment of Free School Meal Allowances into the households of almost 1,900 eligible school-age FE students. My Department also continued to pay Educational Maintenance Allowance to eligible FE students when the FE Colleges shifted to online provision earlier this year.\n\nDuring the pandemic, my Department has ensured that current FE student support arrangements continued to operate effectively, or were adapted, to direct support to students in need. This included paying childcare retainer fees during the initial lockdown, acceptance of electronic applications and evidence, paying Free School Meal allowances into households and ensuring there was effective public transport arrangements in place.\n\nRegarding Higher Education (HE), it is a priority for me that students continue to receive the support to enable them to continue their higher education during this time. To date, a total of £56.2m of support has been paid out to 38,000 students by Student Finance NI for the current financial year. This comprises tuition fee loans, maintenance loans and grants, Disabled Students Allowance and other support.\n\nI am aware that many HE students may be facing financial hardship due to the effects of the pandemic. In response, I have doubled the amount of support funds available to our universities from £2.8m to £5.6m for the current financial year. These funds are distributed by the universities on behalf of my Department and I would encourage any students who are experiencing financial genuine financial hardship to contact the student support team at their institution for details on how to apply.\n\nMy Department continues to keep support arrangements for HE and FE students under review and will adapt these are required in response to evolving needs.","answerHtml":"<p>My Department provides approximately £435 million of support to students across further and higher education every year. For Further Education (FE), this includes FE Grants, College Hardship Fund (both of which include childcare support), Free School Meals and Home to College Transport.</p><p>In addition to the current support arrangements, my Department initially secured £1.078 million of additional resource funding in June monitoring for the colleges to provide IT equipment for financially vulnerable learners to assist with remote learning during the initial lockdown. More recently I secured an additional £6.5 million from the Executive to support safe resumption of learning in FE colleges.</p><p>An additional £0.43 million has been allocated to fund direct payment of Free School Meal Allowances into the households of almost 1,900 eligible school-age FE students. My Department also continued to pay Educational Maintenance Allowance to eligible FE students when the FE Colleges shifted to online provision earlier this year.</p><p>During the pandemic, my Department has ensured that current FE student support arrangements continued to operate effectively, or were adapted, to direct support to students in need. This included paying childcare retainer fees during the initial lockdown, acceptance of electronic applications and evidence, paying Free School Meal allowances into households and ensuring there was effective public transport arrangements in place.</p><p>Regarding Higher Education (HE), it is a priority for me that students continue to receive the support to enable them to continue their higher education during this time. To date, a total of £56.2m of support has been paid out to 38,000 students by Student Finance NI for the current financial year. This comprises tuition fee loans, maintenance loans and grants, Disabled Students Allowance and other support.</p><p>I am aware that many HE students may be facing financial hardship due to the effects of the pandemic. In response, I have doubled the amount of support funds available to our universities from £2.8m to £5.6m for the current financial year. These funds are distributed by the universities on behalf of my Department and I would encourage any students who are experiencing financial genuine financial hardship to contact the student support team at their institution for details on how to apply.</p><p>My Department continues to keep support arrangements for HE and FE students under review and will adapt these are required in response to evolving needs.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208486%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=311355","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=311355"}},{"id":"311354","reference":"AQW 8485/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-09","answerBy":"2020-10-26","answered":"2020-10-21","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities what support she can provide to students in regards to the cost and burden of contracts for private accommodation.","answerText":"The main source of support for students facing genuine financial hardship is the Department for Economy led Student Hardship Fund which is allocated to the local Higher Education Institutions (HEI) for distribution to students who can demonstrate genuine financial hardship. Each HEI is responsible for assessing student’s need and issuing support within the guidelines of the scheme.\n\nAny students who may be experiencing financial hardship, should contact their Higher Education Institution to determine if they are eligible to receive support.\n\nThe obligation to fulfil a contract between individuals is legally binding and it is outside the powers of my Department to change this.\n\nSince the outbreak of this pandemic the Department has put in place a number of provisions to assist private renters. Some students may be eligible to receive Housing Benefit if they already receive certain benefits or have parental or caring responsibilities.\n\nAn increase in Local Housing Allowance rates from 1 April has provided additional financial support for private tenants including any students in receipt of Housing Benefit or the housing costs element of Universal Credit.\n\nIn addition, anyone who has lost their job and who signed on to Universal Credit can apply for a Discretionary Housing Payment to have their full rent paid for 13 weeks.\n\nDiscretionary Support is available to provide financial assistance in extreme, exceptional or crisis situations where there is significant risk to the health, safety or well-being of a person or a member of their immediate family.\n\nA person who is in full time third level education is normally not eligible for Discretionary Support. However, a student who is experiencing financial hardship as a direct result of the COVID-19 pandemic may be entitled to Discretionary Support including a grant for short term living expenses if they, or any member of their immediate family, are diagnosed with COVID-19 or are advised to self-isolate in accordance with the latest public health guidance.\n\nIn addition to this I also worked with local student representatives to ensure that students facing hardship were able to access food parcels.","answerHtml":"<p>The main source of support for students facing genuine financial hardship is the Department for Economy led Student Hardship Fund which is allocated to the local Higher Education Institutions (HEI) for distribution to students who can demonstrate genuine financial hardship. Each HEI is responsible for assessing student’s need and issuing support within the guidelines of the scheme.</p><p>Any students who may be experiencing financial hardship, should contact their Higher Education Institution to determine if they are eligible to receive support.</p><p>The obligation to fulfil a contract between individuals is legally binding and it is outside the powers of my Department to change this.</p><p>Since the outbreak of this pandemic the Department has put in place a number of provisions to assist private renters. Some students may be eligible to receive Housing Benefit if they already receive certain benefits or have parental or caring responsibilities.</p><p>An increase in Local Housing Allowance rates from 1 April has provided additional financial support for private tenants including any students in receipt of Housing Benefit or the housing costs element of Universal Credit.</p><p>In addition, anyone who has lost their job and who signed on to Universal Credit can apply for a Discretionary Housing Payment to have their full rent paid for 13 weeks.</p><p>Discretionary Support is available to provide financial assistance in extreme, exceptional or crisis situations where there is significant risk to the health, safety or well-being of a person or a member of their immediate family.</p><p>A person who is in full time third level education is normally not eligible for Discretionary Support. However, a student who is experiencing financial hardship as a direct result of the COVID-19 pandemic may be entitled to Discretionary Support including a grant for short term living expenses if they, or any member of their immediate family, are diagnosed with COVID-19 or are advised to self-isolate in accordance with the latest public health guidance.</p><p>In addition to this I also worked with local student representatives to ensure that students facing hardship were able to access food parcels.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208485%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=311354","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=311354"}},{"id":"311352","reference":"AQW 8483/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-09","answerBy":"2020-10-26","answered":"2020-11-12","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what action she is taking to co-ordinate with other Executive Ministers to support students and staff at universities and colleges in Northern Ireland during the COVID-19 pandemic.","answerText":"Universities\n\nWhile my Department is responsible for higher education policy in relation to teaching and research, as autonomous institutions, the universities are ultimately responsible for their own policies in relation to responding to the Covid-19 pandemic in line with Public Health Agency (PHA) advice – this includes ensuring there are robust protocols in place to minimise the spread of Covid-19. My Department has no formal remit to intervene, although we have shared a range of relevant supporting guidance with the universities.\n\nThat said, I and my officials are in very regular contact with our universities and university colleges, and I have sought assurances from them on provision for a safe opening, for both students and staff. My officials, along with the universities, have also been participating in the Executive Office’s Covid-19 Strategic Enforcement Group. For the past couple of weeks, this group has had higher education as a key agenda point, in order to discuss actions to help minimise the spread of Covid-19, and discuss support for students who are self-isolating.\n\nAll HEIs have confirmed that the health, safety and wellbeing of their staff and students is their first priority. Plans for a safe return to campus were developed in accordance with the NI Executive’s Pathway to Recovery plan, and are in adherence to all guidelines issued by the Public Health Agency.\n\nFrom a financial perspective, my Department has put in place measures to assist students who experience financial hardship due to Covid-19. This financial year, I have secured an additional £1.4m from the Executive and a further £1.4m from my own Department’s budget, making available a total of £5.6m to support students facing genuine financial hardship. Any increase in funding for the financial year 2021/22 is subject to additional budget being available and also the ongoing demand for the funds.\n\nFurther Education Colleges\n\nMy Department and I recognise that since the start of the Covid-19 pandemic, the needs of staff and learners at Further Education (FE) colleges have changed, as has the nature and delivery of the support they require. Supporting them at this time is a key priority for both the Department and the FE colleges themselves.\n\nIn June my Department established an Advisory and Oversight Group (AOG) to work collaboratively with the FE Sector to prepare for the safe resumption of on-site educational delivery. The AOG developed the ‘Framework for Recommencing On-site Educational Provision and Related Activities in FE Colleges and Non-Statutory Contractors (NSCs)’ which was provided to FE colleges and published online. This document provides clear guidance about how FE colleges should support their staff and learners, for example, through the provision of an extended induction process to ensure that both staff and learners are aware of and understand the college’s policies, procedures and controls; the provision of support services and pastoral support; and guidance for those who are delivering and engaging in industry related courses at the colleges.\n\nIn developing this Framework Document, my Department liaised with other Executive Departments as required. Recognising the need for appropriate medical and scientific advice in guiding the safe resumption of onsite education, my officials engaged with DoH and the Chief Medical Officer, resulting in a number of discussions with the PHA to obtain specific advice for the FE Sector and the challenges it faces. Further, over the summer months, officials liaised with the Department of Education on their approach to Education Restart in schools on a weekly basis; as well as reviewing and considering guidance issued to schools when developing similar guidance for the FE Sector.\n\nMy Department will continue to engage with other Executive Departments as necessary to ensure that issues relating to the resumption of onsite educational delivery and related activity are resolved, and the support required by staff and learners is provided as efficiently and effectively as possible.\n\nFrom a financial perspective, my Department secured £1.078 million of additional resource funding from the Department of Finance for the FE colleges, allocated as part of June monitoring. This was used to provide laptops, equipment and software for financially vulnerable learners and staff to assist with digital and remote study and working during the initial lockdown. More recently, I secured £6.5 million to support the safe resumption of learning in the colleges. This will provide additional IT, cover additional staff costs and embed appropriate measures to provide for safe resumption of delivery at FE campuses across Northern Ireland. An additional £0.43 million has also been allocated to meet the cost to date of funding direct payment of Free School Meal Allowances into the households of almost 1,900 eligible school-age FE students.\n\nDuring the pandemic, my Department ensured that FE student support arrangements continued to operate effectively or were adapted to direct flexible support to students in need. This included paying childcare retainer fees during the initial lockdown, acceptance of electronic applications and evidence, paying Free School Meal allowances into households and ensuring there was effective public transport arrangements for Term 1.","answerHtml":"<p>Universities</p><p>While my Department is responsible for higher education policy in relation to teaching and research, as autonomous institutions, the universities are ultimately responsible for their own policies in relation to responding to the Covid-19 pandemic in line with Public Health Agency (PHA) advice – this includes ensuring there are robust protocols in place to minimise the spread of Covid-19. My Department has no formal remit to intervene, although we have shared a range of relevant supporting guidance with the universities.</p><p>That said, I and my officials are in very regular contact with our universities and university colleges, and I have sought assurances from them on provision for a safe opening, for both students and staff. My officials, along with the universities, have also been participating in the Executive Office’s Covid-19 Strategic Enforcement Group. For the past couple of weeks, this group has had higher education as a key agenda point, in order to discuss actions to help minimise the spread of Covid-19, and discuss support for students who are self-isolating.</p><p>All HEIs have confirmed that the health, safety and wellbeing of their staff and students is their first priority. Plans for a safe return to campus were developed in accordance with the NI Executive’s Pathway to Recovery plan, and are in adherence to all guidelines issued by the Public Health Agency.</p><p>From a financial perspective, my Department has put in place measures to assist students who experience financial hardship due to Covid-19. This financial year, I have secured an additional £1.4m from the Executive and a further £1.4m from my own Department’s budget, making available a total of £5.6m to support students facing genuine financial hardship. Any increase in funding for the financial year 2021/22 is subject to additional budget being available and also the ongoing demand for the funds.</p><p>Further Education Colleges</p><p>My Department and I recognise that since the start of the Covid-19 pandemic, the needs of staff and learners at Further Education (FE) colleges have changed, as has the nature and delivery of the support they require. Supporting them at this time is a key priority for both the Department and the FE colleges themselves.</p><p>In June my Department established an Advisory and Oversight Group (AOG) to work collaboratively with the FE Sector to prepare for the safe resumption of on-site educational delivery. The AOG developed the ‘Framework for Recommencing On-site Educational Provision and Related Activities in FE Colleges and Non-Statutory Contractors (NSCs)’ which was provided to FE colleges and published online. This document provides clear guidance about how FE colleges should support their staff and learners, for example, through the provision of an extended induction process to ensure that both staff and learners are aware of and understand the college’s policies, procedures and controls; the provision of support services and pastoral support; and guidance for those who are delivering and engaging in industry related courses at the colleges.</p><p>In developing this Framework Document, my Department liaised with other Executive Departments as required. Recognising the need for appropriate medical and scientific advice in guiding the safe resumption of onsite education, my officials engaged with DoH and the Chief Medical Officer, resulting in a number of discussions with the PHA to obtain specific advice for the FE Sector and the challenges it faces. Further, over the summer months, officials liaised with the Department of Education on their approach to Education Restart in schools on a weekly basis; as well as reviewing and considering guidance issued to schools when developing similar guidance for the FE Sector.</p><p>My Department will continue to engage with other Executive Departments as necessary to ensure that issues relating to the resumption of onsite educational delivery and related activity are resolved, and the support required by staff and learners is provided as efficiently and effectively as possible.</p><p>From a financial perspective, my Department secured £1.078 million of additional resource funding from the Department of Finance for the FE colleges, allocated as part of June monitoring. This was used to provide laptops, equipment and software for financially vulnerable learners and staff to assist with digital and remote study and working during the initial lockdown. More recently, I secured £6.5 million to support the safe resumption of learning in the colleges. This will provide additional IT, cover additional staff costs and embed appropriate measures to provide for safe resumption of delivery at FE campuses across Northern Ireland. An additional £0.43 million has also been allocated to meet the cost to date of funding direct payment of Free School Meal Allowances into the households of almost 1,900 eligible school-age FE students.</p><p>During the pandemic, my Department ensured that FE student support arrangements continued to operate effectively or were adapted to direct flexible support to students in need. This included paying childcare retainer fees during the initial lockdown, acceptance of electronic applications and evidence, paying Free School Meal allowances into households and ensuring there was effective public transport arrangements for Term 1.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208483%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=311352","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=311352"}},{"id":"311187","reference":"AQW 8413/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-08","answerBy":"2020-10-23","answered":"2020-10-22","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs whether he will bring forward a clean air strategy for Northern Ireland.","answerText":"In December 2016, the previous DAERA Minister, Michele McIlveen, gave a commitment to develop an air quality strategy for Northern Ireland.\n\nSince then, the Department for Agriculture, Environment and Rural Affairs has been working on developing a draft Clean Air Strategy discussion document. Work has involved close collaboration with other Departments, in particular the Department for Infrastructure. The Discussion Document has now been finalised and will be launched shortly for public consultation. The consultation will invite views on a range of matters relating to air quality and will be an opportunity for stakeholders to put ideas and suggestions to my Department. I welcome full engagement in this process.","answerHtml":"<p>In December 2016, the previous DAERA Minister, Michele McIlveen, gave a commitment to develop an air quality strategy for Northern Ireland.</p><p>Since then, the Department for Agriculture, Environment and Rural Affairs has been working on developing a draft Clean Air Strategy discussion document. Work has involved close collaboration with other Departments, in particular the Department for Infrastructure. The Discussion Document has now been finalised and will be launched shortly for public consultation. The consultation will invite views on a range of matters relating to air quality and will be an opportunity for stakeholders to put ideas and suggestions to my Department. I welcome full engagement in this process.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208413%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=311187","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=311187"}},{"id":"311186","reference":"AQW 8412/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-08","answerBy":"2020-10-23","answered":"2020-11-05","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for her assessment of (i) the need for support to travel agents; and (ii) the contribution that the travel sector makes to maintaining key air routes to Northern Ireland.","answerText":"Support for Travel Agents\n\nI refer to my response to AQW 8411/17-22, raised by Mr Dickson on behalf of this industry.\n\nContribution of the Travel Agency sector to maintaining key air routes to Northern Ireland\n\nThere is no available statistical data to determine the contribution that business and travel, generated through local travel agencies, makes to maintaining key routes to Northern Ireland, or indeed to the local economy.\n\nHowever, it is widely accepted that the travel agency business model in Northern Ireland is based on marketing and selling travel packages and services to destinations throughout the world.\n\nIndeed, as stated in my previous response, (AQW 8411/17-22), the local travel industry has been impacted particularly hard as a result of the restrictions and reduction in foreign travel.\n\nThis is due to the fact that we have been and are still very much in the midst of a public health crisis, and all of the decisions that have been made in relation to foreign travel for Northern Ireland residents have been deemed necessary by the NI Executive, based on the very latest health advice and scientific evidence.","answerHtml":"<p>Support for Travel Agents</p><p>I refer to my response to AQW 8411/17-22, raised by Mr Dickson on behalf of this industry.</p><p>Contribution of the Travel Agency sector to maintaining key air routes to Northern Ireland</p><p>There is no available statistical data to determine the contribution that business and travel, generated through local travel agencies, makes to maintaining key routes to Northern Ireland, or indeed to the local economy.</p><p>However, it is widely accepted that the travel agency business model in Northern Ireland is based on marketing and selling travel packages and services to destinations throughout the world.</p><p>Indeed, as stated in my previous response, (AQW 8411/17-22), the local travel industry has been impacted particularly hard as a result of the restrictions and reduction in foreign travel.</p><p>This is due to the fact that we have been and are still very much in the midst of a public health crisis, and all of the decisions that have been made in relation to foreign travel for Northern Ireland residents have been deemed necessary by the NI Executive, based on the very latest health advice and scientific evidence.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208412%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=311186","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=311186"}},{"id":"311185","reference":"AQW 8411/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-08","answerBy":"2020-10-23","answered":"2020-11-20","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what support she is providing for travel agents to help protect businesses and jobs in the sector until at least Spring 2021.","answerText":"The economic impact of COVID-19 is unprecedented. Huge economic impacts that might normally take months or years to unfold occurred within weeks as a result of lockdown and industry shutdowns.\n\nThe travel industry has been impacted particularly hard, both locally and on a global scale. This is as a result of the fact that we have been and are still very much in the midst of a public health crisis. All of the decisions that have been made in relation to foreign travel have been deemed necessary by the NI Executive, based on the very latest health advice and scientific evidence.\n\nThe Executive introduced an unprecedented range of financial support to help businesses impacted by Covid-19 with the objective of protecting jobs, preventing business closures and promoting economic recovery.\n\nThe Department for Economy has paid out more than £340million collectively across three grant schemes. Travel Agents were eligible to apply for all three Business Support Schemes introduced by the Department.\n\nTo date, 11 Travel Agents benefitted from a grant via the £25k Retail, Hospitality, Tourism and Leisure scheme. A further 32 Travel Agents received a grant via the NI Microbusiness Hardship Fund. Travel Agents also benefit from a one year business rates relief introduced by the Department of Finance.\n\nFollowing the recent decision to introduce a four week restriction period under the revised Health Regulations, the Executive has announced a number of new support schemes to help those businesses and individuals most affected.\n\nThe UK Government has also implemented a range of interventions to support business including the Coronavirus Job Retention Scheme (CJRS) and the Self-Employed Income Support Scheme (SEISS), and these have both been extended until March 2021 and possibly beyond.\n\nOn 1 October 2020, I met with a representative of the travel agency industry, and I have received and responded to a significant volume of communication from this sector. My Department is receiving calls from a growing number of sectors, all of whom believe that they require additional support over and above that already offered by the Executive.\n\nIn considering further interventions, it will be for the Executive collectively to determine how the limited funding available will be allocated to best support economic recovery moving forward.\n\nTo this end, I am aware that the First Minister and deputy First Minister, accompanied by the Finance Minister, met with representatives from the Association of Northern Ireland Travel Agents on Wednesday 4th November, and I understand that a number of actions have been agreed as a consequence of this meeting.\n\nI will discuss these with my fellow Executive colleagues in due course, and I have stated on record that I am sympathetic to the requests for help that have been made by this sector.","answerHtml":"<p>The economic impact of COVID-19 is unprecedented. Huge economic impacts that might normally take months or years to unfold occurred within weeks as a result of lockdown and industry shutdowns.</p><p>The travel industry has been impacted particularly hard, both locally and on a global scale. This is as a result of the fact that we have been and are still very much in the midst of a public health crisis. All of the decisions that have been made in relation to foreign travel have been deemed necessary by the NI Executive, based on the very latest health advice and scientific evidence.</p><p>The Executive introduced an unprecedented range of financial support to help businesses impacted by Covid-19 with the objective of protecting jobs, preventing business closures and promoting economic recovery.</p><p>The Department for Economy has paid out more than £340million collectively across three grant schemes. Travel Agents were eligible to apply for all three Business Support Schemes introduced by the Department.</p><p>To date, 11 Travel Agents benefitted from a grant via the £25k Retail, Hospitality, Tourism and Leisure scheme. A further 32 Travel Agents received a grant via the NI Microbusiness Hardship Fund. Travel Agents also benefit from a one year business rates relief introduced by the Department of Finance.</p><p>Following the recent decision to introduce a four week restriction period under the revised Health Regulations, the Executive has announced a number of new support schemes to help those businesses and individuals most affected.</p><p>The UK Government has also implemented a range of interventions to support business including the Coronavirus Job Retention Scheme (CJRS) and the Self-Employed Income Support Scheme (SEISS), and these have both been extended until March 2021 and possibly beyond.</p><p>On 1 October 2020, I met with a representative of the travel agency industry, and I have received and responded to a significant volume of communication from this sector. My Department is receiving calls from a growing number of sectors, all of whom believe that they require additional support over and above that already offered by the Executive.</p><p>In considering further interventions, it will be for the Executive collectively to determine how the limited funding available will be allocated to best support economic recovery moving forward.</p><p>To this end, I am aware that the First Minister and deputy First Minister, accompanied by the Finance Minister, met with representatives from the Association of Northern Ireland Travel Agents on Wednesday 4th November, and I understand that a number of actions have been agreed as a consequence of this meeting.</p><p>I will discuss these with my fellow Executive colleagues in due course, and I have stated on record that I am sympathetic to the requests for help that have been made by this sector.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208411%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=311185","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=311185"}},{"id":"311184","reference":"AQW 8410/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-08","answerBy":"2020-10-23","answered":"2020-10-19","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy how she will ensure that people furthest from the labour market continue to receive support to access employment after the ending of the current European Social Fund Programme funding period in 2022.","answerText":"The European Social Fund Programme currently provides important support to a large number of individuals who face a range of barriers to employment. The current projects are due to conclude in March 2022 and a joint project with the Department for Communities has been established to consider the range of policy and delivery options.\n\nA key consideration for any replacement programme will be access to the necessary funding. This is being progressed by the Department of Finance on behalf of the NI Executive.","answerHtml":"<p>The European Social Fund Programme currently provides important support to a large number of individuals who face a range of barriers to employment. The current projects are due to conclude in March 2022 and a joint project with the Department for Communities has been established to consider the range of policy and delivery options.</p><p>A key consideration for any replacement programme will be access to the necessary funding. This is being progressed by the Department of Finance on behalf of the NI Executive.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208410%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=311184","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=311184"}},{"id":"311183","reference":"AQW 8409/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-08","answerBy":"2020-10-23","answered":"2020-11-13","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, with regard to the ending of the current European Social Fund Programme funding period in 2022, for her assessment of the risks to funding to Northern Ireland disability employment groups.","answerText":"The funding for existing projects supported by the Northern Ireland European Social Fund (ESF) Programme (2014-2020) continues until March 2022. A joint project with the Department for Communities has been established to consider the policy and delivery options once the current projects conclude.\n\nSecuring the necessary funding will be a key consideration. Until we have clarity from the UK Government on the UK Shared Prosperity Fund there is a risk to provision after March 2022. Engagement on the funding issues is being progressed by the Department of Finance with the objective of securing at least the same level of funding as we currently receive from the EU.","answerHtml":"<p>The funding for existing projects supported by the Northern Ireland European Social Fund (ESF) Programme (2014-2020) continues until March 2022. A joint project with the Department for Communities has been established to consider the policy and delivery options once the current projects conclude.</p><p>Securing the necessary funding will be a key consideration. Until we have clarity from the UK Government on the UK Shared Prosperity Fund there is a risk to provision after March 2022. Engagement on the funding issues is being progressed by the Department of Finance with the objective of securing at least the same level of funding as we currently receive from the EU.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208409%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=311183","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=311183"}},{"id":"311032","reference":"AQW 8321/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-07","answerBy":"2020-10-22","answered":"2020-10-26","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health for his assessment of the adequacy of current stocks of Personal Protective Equipment for a potential winter surge of COVID-19 infections.","answerText":"Led by my Department, the Business Services Organisation with the support of other government Departments and agencies has undertaken significant work to ensure reliable and sustainable PPE supply chains are in place now and in preparation for a surge of Covid-19.\n\nStrong supply lines have been established for core PPE products with currently in excess of 350 million items of PPE in stock across Trusts and in central storage.","answerHtml":"<p>Led by my Department, the Business Services Organisation with the support of other government Departments and agencies has undertaken significant work to ensure reliable and sustainable PPE supply chains are in place now and in preparation for a surge of Covid-19.</p><p>Strong supply lines have been established for core PPE products with currently in excess of 350 million items of PPE in stock across Trusts and in central storage.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208321%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=311032","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=311032"}},{"id":"311031","reference":"AQW 8320/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-07","answerBy":"2020-10-22","answered":"2020-10-20","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health (i) how much Personal Protective Equipment is stored in Health and Social Care facilities; (ii) how much is being stored in private/rented storage; and (iii) what is the cost of such storage.","answerText":"Due to the volumes of PPE required, particularly during the current Covid-19 pandemic, it has been necessary for Health and Social Care (HSC) organisations to store goods in both health owned premises as well as commercially rented property. While there has been an increase in the use of commercially rented storage facilities, HSC organisations also rent commercial premises for storage as part of normal business. Therefore, the costs presented below include normal business costs as well as those costs incurred specifically as a result of Covid-19.\n\nStock in hand of PPE is currently 368 million items of PPE of which 97% is centrally stored for onward distribution..\n\nThe split of storage of PPE and commercial cost of storage is as follows:\n\nOrganisation\tPercentage (%) PPE in HSC owned storage\tPercentage (%) PPE in Commercial Storage\tCommercial Rent Costs per annum (£000)**\nBelfast Trust\t100\tN/A\tN/A\nBusiness Services Organisation\t-\t100*\t1,608\nNorthern Trust\t12\t88\t90\nNI Ambulance Service Trust\t-\t100\t19\nSouth Eastern Trust\t100\tN/A\tN/A\nSouthern Trust***\t-\t100\t40\nWestern Trust\t6\t94\t37\n\n*includes PPE stored in business as usual properties\n\n** includes rates costs where applicable/known\n\n*** Southern Trust is currently in the process of moving all PPE stocks to commercial storage as a temporary measure","answerHtml":"<p>Due to the volumes of PPE required, particularly during the current Covid-19 pandemic, it has been necessary for Health and Social Care (HSC) organisations to store goods in both health owned premises as well as commercially rented property. While there has been an increase in the use of commercially rented storage facilities, HSC organisations also rent commercial premises for storage as part of normal business. Therefore, the costs presented below include normal business costs as well as those costs incurred specifically as a result of Covid-19.</p><p>Stock in hand of PPE is currently 368 million items of PPE of which 97% is centrally stored for onward distribution..</p><p>The split of storage of PPE and commercial cost of storage is as follows:</p><div class=\"table-wrap\"><table><tr><td>Organisation</td><td>Percentage (%) PPE in HSC owned storage</td><td>Percentage (%) PPE in Commercial Storage</td><td>Commercial Rent Costs per annum (£000)**</td></tr><tr><td>Belfast Trust</td><td>100</td><td>N/A</td><td>N/A</td></tr><tr><td>Business Services Organisation</td><td>-</td><td>100*</td><td>1,608</td></tr><tr><td>Northern Trust</td><td>12</td><td>88</td><td>90</td></tr><tr><td>NI Ambulance Service Trust</td><td>-</td><td>100</td><td>19</td></tr><tr><td>South Eastern Trust</td><td>100</td><td>N/A</td><td>N/A</td></tr><tr><td>Southern Trust***</td><td>-</td><td>100</td><td>40</td></tr><tr><td>Western Trust</td><td>6</td><td>94</td><td>37</td></tr></table></div><p>*includes PPE stored in business as usual properties</p><p>** includes rates costs where applicable/known</p><p>*** Southern Trust is currently in the process of moving all PPE stocks to commercial storage as a temporary measure</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208320%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=311031","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=311031"}},{"id":"311030","reference":"AQW 8319/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-07","answerBy":"2020-10-22","answered":"2020-11-13","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 6555/17-22, to specifically outline (i) which areas of funding for COVID-19 response measures were ring-fenced; (ii) where reallocations of £23.7 million originated from; and (iii) where they were directed to in order to fund emerging pressures.","answerText":"(i) The Department for the Economy has received a total of £481.6 million Resource DEL funding from the Executive for COVID-19 response measures. All of this funding is ring-fenced.\n\nIn May 2020, £410.0 million was received relating to schemes to assist businesses experiencing financial hardship as a result of the COVID-19 pandemic, with the overarching aim being to protect jobs and prevent business closures. £68.1 million of this funding was surrendered as it was not required based on the uptake of the schemes. £1.4 million was also received for student hardship. These schemes are ring-fenced.\n\nAs part of the June monitoring process £4.7 million was allocated to my Department for four COVID-19 interventions in Invest NI and Higher Education, each of these is ring-fenced. In respect of the COVID SME Process & Organisational Improvement Grant £1.2 million was surrendered at October monitoring as demand was less than originally anticipated.\n\nIn August and September 2020, as a result of the Chancellor’s Summer Economic Update, my Department received urgent allocations for six initiatives totalling £26.3 million. Three for Apprenticeship schemes; two for Further Education relating to the provision of a safe learning environment and the additional cost of free school meals; and one for Higher Education to meet increased student numbers as a result of the policy change in respect of awarding A-level results in 2020. Each of these six initiatives is ring-fenced.\n\nMore recently, in the COVID-19 Allocation Exercise agreed on 24 September 2020, £39.2 million was allocated to my Department for 23 initiatives grouped into eight categories:\n\nAssistance to Business - £8.5 million;\n\nSkills and Youth Training - £8.35 million;\n\nTourism £9.85 million;\n\nStimulating Air Access Restoration – £1.85 million;\n\nEnergy Strategy - £1.35 million;\n\nUniversity Research - £5.8 million;\n\nProvision of a safe learning environment in Higher Education - £2.5 million; and\n\nProvision of a safe learning environment in Further Education not funded in earlier exercises - £1.0 million.\n\nFor this most recent funding, as detailed in AQW 6555/17-22, the Executive approved the ability to exercise flexibility across similar initiatives within the same category of funding. For previous funding there is no flexibility to reallocate funds across the various COVID-19 response measures.\n\n(ii) and (iii) In addition to the allocations from the Executive detailed above, as noted in AQW 6555/17-22, £23.7 million of funding was reallocated from the budget of my own Department, as part of June monitoring, to address emerging COVID-19 budget pressures. This funding is not ring-fenced. These reallocations originated from areas where Reduced Requirements as a result of COVID-19 were identified, and also from an assessment to determine if anything could be reduced or stopped to address priority COVID-19 pressures. The funding was mainly re-prioritised from Invest NI and Higher Education. More details on the pressures which were met from the reallocations are detailed on pages 25 and 26 of the Finance Minister’s June Monitoring Statement at the following link:\n\nhttps://www.finance-ni.gov.uk/publications/year-monitoring-public-expenditure-2020-21","answerHtml":"<p>(i) The Department for the Economy has received a total of £481.6 million Resource DEL funding from the Executive for COVID-19 response measures. All of this funding is ring-fenced.</p><p>In May 2020, £410.0 million was received relating to schemes to assist businesses experiencing financial hardship as a result of the COVID-19 pandemic, with the overarching aim being to protect jobs and prevent business closures. £68.1 million of this funding was surrendered as it was not required based on the uptake of the schemes. £1.4 million was also received for student hardship. These schemes are ring-fenced.</p><p>As part of the June monitoring process £4.7 million was allocated to my Department for four COVID-19 interventions in Invest NI and Higher Education, each of these is ring-fenced. In respect of the COVID SME Process &amp; Organisational Improvement Grant £1.2 million was surrendered at October monitoring as demand was less than originally anticipated.</p><p>In August and September 2020, as a result of the Chancellor’s Summer Economic Update, my Department received urgent allocations for six initiatives totalling £26.3 million. Three for Apprenticeship schemes; two for Further Education relating to the provision of a safe learning environment and the additional cost of free school meals; and one for Higher Education to meet increased student numbers as a result of the policy change in respect of awarding A-level results in 2020. Each of these six initiatives is ring-fenced.</p><p>More recently, in the COVID-19 Allocation Exercise agreed on 24 September 2020, £39.2 million was allocated to my Department for 23 initiatives grouped into eight categories:</p><p>Assistance to Business - £8.5 million;</p><p>Skills and Youth Training - £8.35 million;</p><p>Tourism £9.85 million;</p><p>Stimulating Air Access Restoration – £1.85 million;</p><p>Energy Strategy - £1.35 million;</p><p>University Research - £5.8 million;</p><p>Provision of a safe learning environment in Higher Education - £2.5 million; and</p><p>Provision of a safe learning environment in Further Education not funded in earlier exercises - £1.0 million.</p><p>For this most recent funding, as detailed in AQW 6555/17-22, the Executive approved the ability to exercise flexibility across similar initiatives within the same category of funding. For previous funding there is no flexibility to reallocate funds across the various COVID-19 response measures.</p><p>(ii) and (iii) In addition to the allocations from the Executive detailed above, as noted in AQW 6555/17-22, £23.7 million of funding was reallocated from the budget of my own Department, as part of June monitoring, to address emerging COVID-19 budget pressures. This funding is not ring-fenced. These reallocations originated from areas where Reduced Requirements as a result of COVID-19 were identified, and also from an assessment to determine if anything could be reduced or stopped to address priority COVID-19 pressures. The funding was mainly re-prioritised from Invest NI and Higher Education. More details on the pressures which were met from the reallocations are detailed on pages 25 and 26 of the Finance Minister’s June Monitoring Statement at the following link:</p><p>https://www.finance-ni.gov.uk/publications/year-monitoring-public-expenditure-2020-21</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208319%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=311030","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=311030"}},{"id":"311029","reference":"AQW 8318/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-07","answerBy":"2020-10-22","answered":"2021-03-05","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister when they will meet with ExcludedNI.","answerText":"The Minister for the Economy has met with representatives of ExcludedNI and has also been corresponding with them in relation to a range of issues, such as support for the self-employed, including newly self-employed, company directors and on the eligibility criteria for the Covid Restrictions Business Support Scheme.\n\nThe Executive will continue to consider the range of financial support it can provide to help businesses deal with the impact of the pandemic and we would encourage ExcludedNI to continue its engagement with the Department for the Economy.","answerHtml":"<p>The Minister for the Economy has met with representatives of ExcludedNI and has also been corresponding with them in relation to a range of issues, such as support for the self-employed, including newly self-employed, company directors and on the eligibility criteria for the Covid Restrictions Business Support Scheme.</p><p>The Executive will continue to consider the range of financial support it can provide to help businesses deal with the impact of the pandemic and we would encourage ExcludedNI to continue its engagement with the Department for the Economy.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208318%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=311029","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=311029"}},{"id":"311028","reference":"AQW 8317/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-07","answerBy":"2020-10-22","answered":"2020-11-13","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 6464-17/22, for an expected timeline for bringing forward proposals and a consultation on banning zero hours contracts.","answerText":"As outlined in my reply to AQW 6464-17/22, I will wish to take account of the views of stakeholders on this important issue. The pandemic has had a significant impact on the economy and I have sought to prioritise those legislative measures required to immediately address the effects of the pandemic on workers and businesses. In light of this ongoing priority, it is not possible to give a firm timeframe in relation to bringing forward consultation on this matter. However, I recognise the importance of the issue and I have asked my officials to continue to work towards bringing forward proposals at the earliest opportunity.","answerHtml":"<p>As outlined in my reply to AQW 6464-17/22, I will wish to take account of the views of stakeholders on this important issue. The pandemic has had a significant impact on the economy and I have sought to prioritise those legislative measures required to immediately address the effects of the pandemic on workers and businesses. In light of this ongoing priority, it is not possible to give a firm timeframe in relation to bringing forward consultation on this matter. However, I recognise the importance of the issue and I have asked my officials to continue to work towards bringing forward proposals at the earliest opportunity.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208317%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=311028","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=311028"}},{"id":"310660","reference":"AQW 8130/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-05","answerBy":"2020-10-20","answered":"2020-10-19","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities whether she is working towards introducing a scheme similar to the Green Homes Grant in England.","answerText":"The Department of Finance has advised me the British Treasury has indicated that funding for a Green Homes Grant scheme, is to be found from existing budgets for 2020-21. This means that there is no additional funding for the Executive this year. I will continue to keep options under review.\n\nHowever, my Department currently funds two grant Schemes aimed at reducing fuel poverty by increasing the energy efficiency of households; the Affordable Warmth Scheme and the Boiler Replacement Scheme.\n\nSince the introduction of the Affordable Warmth Scheme in September 2014 a total of 34,683 energy efficiency measures have been installed in 21,027 homes, at a cost of £78.3m. A total of 37,491 boilers have been replaced under the Boiler Replacement Scheme since its introduction in 2012, at a total cost of £20.9m.","answerHtml":"<p>The Department of Finance has advised me the British Treasury has indicated that funding for a Green Homes Grant scheme, is to be found from existing budgets for 2020-21. This means that there is no additional funding for the Executive this year. I will continue to keep options under review.</p><p>However, my Department currently funds two grant Schemes aimed at reducing fuel poverty by increasing the energy efficiency of households; the Affordable Warmth Scheme and the Boiler Replacement Scheme.</p><p>Since the introduction of the Affordable Warmth Scheme in September 2014 a total of 34,683 energy efficiency measures have been installed in 21,027 homes, at a cost of £78.3m. A total of 37,491 boilers have been replaced under the Boiler Replacement Scheme since its introduction in 2012, at a total cost of £20.9m.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208130%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=310660","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=310660"}},{"id":"310659","reference":"AQW 8129/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-05","answerBy":"2020-10-20","answered":"2020-11-23","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs for an update on the Forests for Our Future Programme, including how many trees have been planted thus far.","answerText":"Since March 2020 I have taken a personal lead in promoting ‘Forests for Our Future’ which will become a foundation programme within the Green Growth Strategy. I have attended a planting event with school pupils; opened a revised forestry grant scheme, announced the development of a new small woodland grant scheme and established an afforestation forum to make plans for planting suitable public and council land. To date Forest Service has validated that 574 thousand trees have been planted in new woodland by land owners with support from Forestry Grant Schemes and on Departmental land.","answerHtml":"<p>Since March 2020 I have taken a personal lead in promoting ‘Forests for Our Future’ which will become a foundation programme within the Green Growth Strategy. I have attended a planting event with school pupils; opened a revised forestry grant scheme, announced the development of a new small woodland grant scheme and established an afforestation forum to make plans for planting suitable public and council land. To date Forest Service has validated that 574 thousand trees have been planted in new woodland by land owners with support from Forestry Grant Schemes and on Departmental land.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208129%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=310659","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=310659"}},{"id":"310658","reference":"AQW 8128/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-05","answerBy":"2020-10-20","answered":"2020-10-13","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education what advice his Department is providing schools to assist with planning for the half-term break, including the provision of free school meals.","answerText":"Significant support has been provided to schools to help them manage the COVID-19 pandemic including access to Education Authority Link Officers, an EA helpline and a Public Health Agency dedicated schools phone line. The Department has published comprehensive guidance for schools as well as a flowchart setting out the steps schools should take to manage a positive case; posters for schools and a leaflet for parents.\n\nIt is recognised that holiday periods can be a difficult time for families, however, the current legislation is very clear that school meals are only provided to pupils in attendance at school i.e. during term time. The Coronavirus Act 2020 allowed for modification of this legislation during a time of emergency. Normal Halloween and Christmas breaks are not considered an emergency under the Coronavirus Act. My Department has no legislative power to provide support for food outside the Coronavirus pandemic (and only if schools are closed to children due to the pandemic). Therefore, at present, there are no plans to provide additional funding during the half term break in respect of free school meals.","answerHtml":"<p>Significant support has been provided to schools to help them manage the COVID-19 pandemic including access to Education Authority Link Officers, an EA helpline and a Public Health Agency dedicated schools phone line. The Department has published comprehensive guidance for schools as well as a flowchart setting out the steps schools should take to manage a positive case; posters for schools and a leaflet for parents.</p><p>It is recognised that holiday periods can be a difficult time for families, however, the current legislation is very clear that school meals are only provided to pupils in attendance at school i.e. during term time. The Coronavirus Act 2020 allowed for modification of this legislation during a time of emergency. Normal Halloween and Christmas breaks are not considered an emergency under the Coronavirus Act. My Department has no legislative power to provide support for food outside the Coronavirus pandemic (and only if schools are closed to children due to the pandemic). Therefore, at present, there are no plans to provide additional funding during the half term break in respect of free school meals.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208128%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=310658","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=310658"}},{"id":"310540","reference":"AQW 8074/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-02","answerBy":"2020-10-12","answered":"2020-10-12","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what preparations have been undertaken to provide support to businesses in areas of heightened COVID-19 restrictions.","answerText":"I met with businesses in the North West last Friday and heard about the impacts these new restrictions will have on their businesses. These businesses want, and need, to be open and trading.\n\nThe Executive recognises that these restrictions will have an adverse impact on businesses and the local economy. A support package to provide assistance to businesses within the Derry City and Strabane District Council area has been announced by the Finance Minister on 7th October and will be operational within days.\n\nIt is important that any further support measures are considered within the ever changing context we are operating in and we must retain maximum flexibility to adapt to the frequent changes in virus spread and public health advice.\n\nI accept that more needs to be done, and I will be making further representations to UK Government on the need for greater support measures for our economy.","answerHtml":"<p>I met with businesses in the North West last Friday and heard about the impacts these new restrictions will have on their businesses. These businesses want, and need, to be open and trading.</p><p>The Executive recognises that these restrictions will have an adverse impact on businesses and the local economy. A support package to provide assistance to businesses within the Derry City and Strabane District Council area has been announced by the Finance Minister on 7th October and will be operational within days.</p><p>It is important that any further support measures are considered within the ever changing context we are operating in and we must retain maximum flexibility to adapt to the frequent changes in virus spread and public health advice.</p><p>I accept that more needs to be done, and I will be making further representations to UK Government on the need for greater support measures for our economy.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208074%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=310540","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=310540"}},{"id":"310539","reference":"AQW 8073/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-02","answerBy":"2020-10-19","answered":"2020-11-02","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities what preparations have been made to provide support to people in areas of heightened COVID-19 restrictions.","answerText":"Since the beginning of the pandemic, my Department has adopted a cross sectoral partnership approach to ensuring support is in place for the most vulnerable. This involves working closely with other Executive Departments and Local Government within the civil contingencies framework and enabling the Voluntary and Community Sector response.\n\nAnyone in need of support, including those within the areas of heightened restrictions, can contact the COVID-19 Community Helpline (Freephone 0808 802 0020, Email: covid19@adviceni.net, Text: ACTION to 81025) which will provide personalised advice and referral to appropriate support depending on an individual’s circumstances.\n\nIn order to ensure that sustainable grassroots support is in place, my Department has confirmed an additional £1.75m for the COVID Community Support Fund, through Councils to support the Voluntary and Community Sector response to hardship created by the pandemic. We are also working with partner organisations to support and coordinate volunteering, liaising with local councils to tailor support to changing circumstances.\n\nImproving access to food and a sustainable response to food poverty, is at the heart of my Department’s response and we have invested almost £800k to support Fareshare to deliver an increased supply of food to community food providers. We have also made a further £750k allocation to Councils for a COVID-19 Access to Food Fund. This will help deliver a more strategic response to the issue, recognising that whilst food is at the forefront of need, support and advice on wider issues is needed to reverse longer term need. This will be factored into the development of the Anti-Poverty Strategy.\n\nIt is important that financial support to meet immediate needs is in place to enable the most vulnerable to comply with restrictions. My Department has introduced a new COVID-19 living expenses grant to the Discretionary Support scheme. This grant is available where a person or any member of their immediate family is diagnosed with COVID-19 or is advised to self-isolate in accordance with published guidance.","answerHtml":"<p>Since the beginning of the pandemic, my Department has adopted a cross sectoral partnership approach to ensuring support is in place for the most vulnerable. This involves working closely with other Executive Departments and Local Government within the civil contingencies framework and enabling the Voluntary and Community Sector response.</p><p>Anyone in need of support, including those within the areas of heightened restrictions, can contact the COVID-19 Community Helpline (Freephone 0808 802 0020, Email: covid19@adviceni.net, Text: ACTION to 81025) which will provide personalised advice and referral to appropriate support depending on an individual’s circumstances.</p><p>In order to ensure that sustainable grassroots support is in place, my Department has confirmed an additional £1.75m for the COVID Community Support Fund, through Councils to support the Voluntary and Community Sector response to hardship created by the pandemic. We are also working with partner organisations to support and coordinate volunteering, liaising with local councils to tailor support to changing circumstances.</p><p>Improving access to food and a sustainable response to food poverty, is at the heart of my Department’s response and we have invested almost £800k to support Fareshare to deliver an increased supply of food to community food providers. We have also made a further £750k allocation to Councils for a COVID-19 Access to Food Fund. This will help deliver a more strategic response to the issue, recognising that whilst food is at the forefront of need, support and advice on wider issues is needed to reverse longer term need. This will be factored into the development of the Anti-Poverty Strategy.</p><p>It is important that financial support to meet immediate needs is in place to enable the most vulnerable to comply with restrictions. My Department has introduced a new COVID-19 living expenses grant to the Discretionary Support scheme. This grant is available where a person or any member of their immediate family is diagnosed with COVID-19 or is advised to self-isolate in accordance with published guidance.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208073%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=310539","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=310539"}},{"id":"310538","reference":"AQW 8072/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-02","answerBy":"2020-10-19","answered":"2020-10-12","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health for an update on plans for a Nightingale facility at Whiteabbey Hospital to provide additional Health Service capacity for COVID-19 care.","answerText":"The experience of the first surge in COVID-19 identified a role for additional step down capacity to support flow though hospital and ease pressure on the system; therefore, I have commissioned work to develop an additional Nightingale facility on the Whiteabbey Hospital site.\n\nThis regional, intermediate care facility at Whiteabbey hospital will provide 100 additional beds for patients who have recovered beyond the acute phase of infection, but who still require intense rehabilitation. Work is continuing at pace to deliver this additional facility and remains on track to be operational by December 2020.","answerHtml":"<p>The experience of the first surge in COVID-19 identified a role for additional step down capacity to support flow though hospital and ease pressure on the system; therefore, I have commissioned work to develop an additional Nightingale facility on the Whiteabbey Hospital site.</p><p>This regional, intermediate care facility at Whiteabbey hospital will provide 100 additional beds for patients who have recovered beyond the acute phase of infection, but who still require intense rehabilitation. Work is continuing at pace to deliver this additional facility and remains on track to be operational by December 2020.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208072%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=310538","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=310538"}},{"id":"310537","reference":"AQW 8071/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-02","answerBy":"2020-10-19","answered":"2020-11-04","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister to detail the average length of time for answers to Written Questions to be issued.","answerText":"Between January 2020 and 16 October 2020 the average length of time taken was 34 working days.","answerHtml":"<p>Between January 2020 and 16 October 2020 the average length of time taken was 34 working days.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208071%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=310537","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=310537"}},{"id":"310536","reference":"AQW 8070/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-10-02","answerBy":"2020-10-19","answered":"2021-02-24","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister to detail (i) the number of Written Questions submitted to their Department; and (ii) the number still awaiting answer, since January 2020.","answerText":"Between 11 January 2020 and 4 February 2021 The Executive Office received 575 Written Assembly Questions. Of these 31 were: transferred to another department for answer (24), or withdrawn by the Member (7). 233 are currently awaiting answer. A number of these (7 questions) are subject to ongoing consideration as to their eligibility for response by TEO, or by other departments.","answerHtml":"<p>Between 11 January 2020 and 4 February 2021 The Executive Office received 575 Written Assembly Questions. Of these 31 were: transferred to another department for answer (24), or withdrawn by the Member (7). 233 are currently awaiting answer. A number of these (7 questions) are subject to ongoing consideration as to their eligibility for response by TEO, or by other departments.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208070%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=310536","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=310536"}},{"id":"313554","reference":"AQO 873/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2020-10-01","answerBy":"2020-10-12","answered":"2020-10-15","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs, given the cross-cutting nature of the proposals, whether the decision on a marine licence for the Islandmagee Gas Storage Project will be made by the Executive.","answerText":"The application for a marine construction licence in relation to the proposed gas storage project at Islandmagee is being considered by officials in DAERA Marine and Fisheries Division. The other required DAERA consents to abstract and discharge water are also under review. Due to the strategic nature of the proposed Islandmagee project, the award or withholding of these consents will be subject to my decision.\n\nMy officials are currently working through the determinations. Once I have seen this material, I will consider whether there is a need to refer the decision to the Executive Committee in line with section 2.4 of the Ministerial Code and the Executive Committee (Functions) Act (Northern Ireland) 2020.","answerHtml":"<p>The application for a marine construction licence in relation to the proposed gas storage project at Islandmagee is being considered by officials in DAERA Marine and Fisheries Division. The other required DAERA consents to abstract and discharge water are also under review. Due to the strategic nature of the proposed Islandmagee project, the award or withholding of these consents will be subject to my decision.</p><p>My officials are currently working through the determinations. Once I have seen this material, I will consider whether there is a need to refer the decision to the Executive Committee in line with section 2.4 of the Ministerial Code and the Executive Committee (Functions) Act (Northern Ireland) 2020.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20873%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=313554","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=313554"}},{"id":"310043","reference":"AQW 7880/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-30","answerBy":"2020-10-15","answered":"2020-10-08","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance for an update on his Department’s work on a social value bill; and for a timeline for the progression of such legislation.","answerText":"It is one of my priorities to ensure social value is a key feature of public procurement particularly to help local communities to manage and recover from the impact of COVID-19.\n\nI will be reconvening the Procurement Board in November and social value will be discussed, including the need for a Social Value Bill. The Procurement Board will consider legislation and refreshed policy on this subject.","answerHtml":"<p>It is one of my priorities to ensure social value is a key feature of public procurement particularly to help local communities to manage and recover from the impact of COVID-19.</p><p>I will be reconvening the Procurement Board in November and social value will be discussed, including the need for a Social Value Bill. The Procurement Board will consider legislation and refreshed policy on this subject.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207880%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=310043","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=310043"}},{"id":"309874","reference":"AQW 7793/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-29","answerBy":"2020-10-14","answered":"2020-12-03","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what support she will provide to travel agents in the current context of COVID-19 travel restrictions.","answerText":"I appreciate the difficulty and stress that the Covid-19 public health crisis has placed upon local businesses and our economy at large and I am fully aware that the travel industry has been impacted particularly hard, both locally and on a global scale.\n\nTo date, 11 Travel Agencies have received support via the £25,000 Retail, Hospitality, Tourism and Leisure Grant scheme and a further 32 received support via the NI Microbusiness Hardship Fund. Travel Agents would also have been eligible to apply for the £10,000 Small Business Support Grant Scheme, however I am unable to provide a figure for grants provided for them.\n\nTravel Agencies operating in retail premises have also benefitted from 100% rates holiday for 12 months in 2020/2021. Businesses employing staff would also have been able to claim for 80% of workers’ wage costs via the Coronavirus Job Retention Scheme. Any self-employed Travel Agents would also have been able to claim for 80% of profits via the Self-Employed Income Support Scheme.\n\nA further £9.9 million of tourism support was allocated by the Executive to the Department on 24 September, along with a further £8.5 million allocated for assistance to business.\n\nI have met with representatives of the travel industry to hear the challenges facing the industry directly and I am supportive of a specific financial support package being developed for the industry which is facing ongoing hardship due to the ongoing travel restrictions and the resulting reduction in travelling by the public.\n\nThe First Minister, deputy First Minister, accompanied by the Finance Minister, also met with representatives from the Association of Northern Ireland Travel Agents on 4 November to discuss how the sector has been impacted by the pandemic and have agreed to explore financial support for the sector. I await their recommendations following that engagement.\n\nAny decisions on further support measures for this sector, and the wider economy, will be agreed collectively by the Executive.","answerHtml":"<p>I appreciate the difficulty and stress that the Covid-19 public health crisis has placed upon local businesses and our economy at large and I am fully aware that the travel industry has been impacted particularly hard, both locally and on a global scale.</p><p>To date, 11 Travel Agencies have received support via the £25,000 Retail, Hospitality, Tourism and Leisure Grant scheme and a further 32 received support via the NI Microbusiness Hardship Fund. Travel Agents would also have been eligible to apply for the £10,000 Small Business Support Grant Scheme, however I am unable to provide a figure for grants provided for them.</p><p>Travel Agencies operating in retail premises have also benefitted from 100% rates holiday for 12 months in 2020/2021. Businesses employing staff would also have been able to claim for 80% of workers’ wage costs via the Coronavirus Job Retention Scheme. Any self-employed Travel Agents would also have been able to claim for 80% of profits via the Self-Employed Income Support Scheme.</p><p>A further £9.9 million of tourism support was allocated by the Executive to the Department on 24 September, along with a further £8.5 million allocated for assistance to business.</p><p>I have met with representatives of the travel industry to hear the challenges facing the industry directly and I am supportive of a specific financial support package being developed for the industry which is facing ongoing hardship due to the ongoing travel restrictions and the resulting reduction in travelling by the public.</p><p>The First Minister, deputy First Minister, accompanied by the Finance Minister, also met with representatives from the Association of Northern Ireland Travel Agents on 4 November to discuss how the sector has been impacted by the pandemic and have agreed to explore financial support for the sector. I await their recommendations following that engagement.</p><p>Any decisions on further support measures for this sector, and the wider economy, will be agreed collectively by the Executive.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207793%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=309874","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=309874"}},{"id":"309873","reference":"AQW 7792/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-29","answerBy":"2020-10-14","answered":"2020-10-08","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she is working on a bid to the Department of Finance to provide financial support to Northern Ireland airports.","answerText":"To clarify, I am not responsible for the funding of airports, that work is led by the Department of Finance and the Department for Infrastructure. My responsibility is with maintaining and enhancing Northern Ireland’s air connectivity, both domestically and internationally. In doing so, I fully acknowledge that civil aviation is a reserved matter for the UK Department for Transport (DfT). Hence, I have made no bids to the Department of Finance, nor am I working on any, to provide funding to Northern Ireland airports. In May the Executive put in place measures, in respect of rate payments, to assist Northern Ireland businesses impacted by COVID-19. As a result, all three Northern Ireland airports are receiving 100% rates relief until 31 March 2021, which equates to £2.2m of support, in total.\n\nI understand that the Department of Finance is continuing to engage with the airports and to monitor the sector as it recovers, including consideration of options for further support.\n\nI fully recognise that air connectivity is essential to rebuilding Northern Ireland’s economy and my Department is always willing to consider any requests for support from airports/airlines that deliver value for money and are compliant with EU State Aid regulations.","answerHtml":"<p>To clarify, I am not responsible for the funding of airports, that work is led by the Department of Finance and the Department for Infrastructure. My responsibility is with maintaining and enhancing Northern Ireland’s air connectivity, both domestically and internationally. In doing so, I fully acknowledge that civil aviation is a reserved matter for the UK Department for Transport (DfT). Hence, I have made no bids to the Department of Finance, nor am I working on any, to provide funding to Northern Ireland airports. In May the Executive put in place measures, in respect of rate payments, to assist Northern Ireland businesses impacted by COVID-19. As a result, all three Northern Ireland airports are receiving 100% rates relief until 31 March 2021, which equates to £2.2m of support, in total.</p><p>I understand that the Department of Finance is continuing to engage with the airports and to monitor the sector as it recovers, including consideration of options for further support.</p><p>I fully recognise that air connectivity is essential to rebuilding Northern Ireland’s economy and my Department is always willing to consider any requests for support from airports/airlines that deliver value for money and are compliant with EU State Aid regulations.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207792%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=309873","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=309873"}},{"id":"309872","reference":"AQW 7791/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-29","answerBy":"2020-10-14","answered":"2020-10-14","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy when (i) AQW 6464/17-22; (ii) AQW 6917/17-22; (iii) AQW 6555/17-22; and (iv) AQW 6554/17-22 will be answered.","answerText":"AQW 6464 was answered on 06/10/2020\n\nAQW 6917 was answered on 09/10/2020\n\nAQW 6555 was answered on 02/10/2020\n\nAQW 6554 was answered on 14/10/2020","answerHtml":"<p>AQW 6464 was answered on 06/10/2020</p><p>AQW 6917 was answered on 09/10/2020</p><p>AQW 6555 was answered on 02/10/2020</p><p>AQW 6554 was answered on 14/10/2020</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207791%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=309872","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=309872"}},{"id":"309445","reference":"AQW 7595/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-25","answerBy":"2020-10-12","answered":"2020-11-13","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health what action will he take to ensure the introduction of the Cytosponge TFF3 test in hospitals and other healthcare settings.","answerText":"The National Institute for Health and Care Excellence (NICE) provides national guidance and advice designed to support health service commissioners and staff who are considering using new medical devices and other medical or diagnostic technologies to improve healthcare. NICE has a global reputation for rigour, independence and objectivity, which is informed by the best available scientific evidence.\n\nNICE have confirmed that they do not currently make any recommendations on the use of the Cytosponge-TFF3 test in any of their guidelines. However, they are in the process of developing briefing on the use of the Cytosponge-TFF3 test which when published will inform the potential use of this technology in the National Health Service and in Health and Social Care, Northern Ireland.","answerHtml":"<p>The National Institute for Health and Care Excellence (NICE) provides national guidance and advice designed to support health service commissioners and staff who are considering using new medical devices and other medical or diagnostic technologies to improve healthcare. NICE has a global reputation for rigour, independence and objectivity, which is informed by the best available scientific evidence.</p><p>NICE have confirmed that they do not currently make any recommendations on the use of the Cytosponge-TFF3 test in any of their guidelines. However, they are in the process of developing briefing on the use of the Cytosponge-TFF3 test which when published will inform the potential use of this technology in the National Health Service and in Health and Social Care, Northern Ireland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207595%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=309445","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=309445"}},{"id":"309444","reference":"AQW 7594/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-25","answerBy":"2020-10-12","answered":"2020-10-12","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail the average waiting time for surgery, broken down by type of procedure.","answerText":"The tabulated information overleaf details the average waiting time in weeks for surgery for the years 2018/19 to 2019/20, the information has been broken down by speciality. (Table A).\n\nTable A: Average waiting times in weeks for surgical procedures 2018/19 to 2019/20p\n\nSpeciality\t2018/19\t2019/20P\nGeneral Surgery\t21.5\t21.8\nUrology\t14.0\t14.5\nT&O\t40.2\t37.6\nENT\t21.7\t23.2\nOphthalmology\t23.7\t26.6\nOral Surgery\t15.5\t13.4\nRestorative Dentistry\t13.6\t19.6\nPaediatric Dentistry\t27.6\t22.0\nNeurosurgery\t10.2\t13.1\nPlastic Surgery\t15.8\t16.2\nCardiac Surgery\t14.3\t16.6\nPaediatric Surgery\t23.9\t20.2\nPain Management\t36.7\t36.7\nTotal\t22.3\t21.5\n\nSource: Hospital Inpatient System, Hospital Information Branch, Information & Analysis Directorate, Department of Health, NI.\n\nP Data for time period 2019/20 is provisional and subject to change.\n1 Figures do not include admissions to mental health or learning disability programmes of care which account for less than 1% of all hospital admissions.","answerHtml":"<p>The tabulated information overleaf details the average waiting time in weeks for surgery for the years 2018/19 to 2019/20, the information has been broken down by speciality. (Table A).</p><p>Table A: Average waiting times in weeks for surgical procedures 2018/19 to 2019/20p</p><div class=\"table-wrap\"><table><tr><td>Speciality</td><td>2018/19</td><td>2019/20P</td></tr><tr><td>General Surgery</td><td>21.5</td><td>21.8</td></tr><tr><td>Urology</td><td>14.0</td><td>14.5</td></tr><tr><td>T&amp;O</td><td>40.2</td><td>37.6</td></tr><tr><td>ENT</td><td>21.7</td><td>23.2</td></tr><tr><td>Ophthalmology</td><td>23.7</td><td>26.6</td></tr><tr><td>Oral Surgery</td><td>15.5</td><td>13.4</td></tr><tr><td>Restorative Dentistry</td><td>13.6</td><td>19.6</td></tr><tr><td>Paediatric Dentistry</td><td>27.6</td><td>22.0</td></tr><tr><td>Neurosurgery</td><td>10.2</td><td>13.1</td></tr><tr><td>Plastic Surgery</td><td>15.8</td><td>16.2</td></tr><tr><td>Cardiac Surgery</td><td>14.3</td><td>16.6</td></tr><tr><td>Paediatric Surgery</td><td>23.9</td><td>20.2</td></tr><tr><td>Pain Management</td><td>36.7</td><td>36.7</td></tr><tr><td>Total</td><td>22.3</td><td>21.5</td></tr></table></div><div class=\"table-wrap\"><table><tr><td>Source: Hospital Inpatient System, Hospital Information Branch, Information &amp; Analysis Directorate, Department of Health, NI.</td></tr><tr><td></td></tr><tr><td>P Data for time period 2019/20 is provisional and subject to change.</td></tr><tr><td>1 Figures do not include admissions to mental health or learning disability programmes of care which account for less than 1% of all hospital admissions.</td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207594%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=309444","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=309444"}},{"id":"309443","reference":"AQW 7593/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-25","answerBy":"2020-10-12","answered":"2020-10-26","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health what action he is taking to address cancer treatment delays and ensure a safe resumption and continuance of services.","answerText":"The Strategic Framework for Rebuilding Health and Social Care (HSC) Services which I published in June identified cancer as a key priority, recognising the adverse impact of COVID-19 on referral and treatment waiting times. Under this Framework each Trust has produced plans to reset cancer services as quickly as possible in an environment which is safe for both staff and patients. However, this remains extremely challenging as we face a further peak in community transmission of COVID-19, due to the need for our health service to respond to the current surge in hospital admissions.\n\nThe Framework and associated Trust plans are available at: https://www.health-ni.gov.uk/publications/rebuilding-hsc-services.","answerHtml":"<p>The Strategic Framework for Rebuilding Health and Social Care (HSC) Services which I published in June identified cancer as a key priority, recognising the adverse impact of COVID-19 on referral and treatment waiting times. Under this Framework each Trust has produced plans to reset cancer services as quickly as possible in an environment which is safe for both staff and patients. However, this remains extremely challenging as we face a further peak in community transmission of COVID-19, due to the need for our health service to respond to the current surge in hospital admissions.</p><p>The Framework and associated Trust plans are available at: https://www.health-ni.gov.uk/publications/rebuilding-hsc-services.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207593%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=309443","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=309443"}},{"id":"309442","reference":"AQW 7592/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-25","answerBy":"2020-10-12","answered":"2020-10-05","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail the average waiting time from referral to beginning treatment for cancer patients.","answerText":"In the most recent quarter (April-June 2020), the average waiting time from referral to beginning treatment for cancer patients was 72 days.","answerHtml":"<p>In the most recent quarter (April-June 2020), the average waiting time from referral to beginning treatment for cancer patients was 72 days.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207592%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=309442","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=309442"}},{"id":"309441","reference":"AQW 7591/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-25","answerBy":"2020-10-12","answered":"2020-10-12","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail the average time from first appointment to diagnosis for cancer patients.","answerText":"In the most recently published month (August 2020), provisional figures indicate that the average waiting time from first appointment to diagnosis for patients with an urgent GP referral for suspect cancer was 26 days for patients who began treatment in August 2020. This information is not available for patients referred via other routes.","answerHtml":"<p>In the most recently published month (August 2020), provisional figures indicate that the average waiting time from first appointment to diagnosis for patients with an urgent GP referral for suspect cancer was 26 days for patients who began treatment in August 2020. This information is not available for patients referred via other routes.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207591%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=309441","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=309441"}},{"id":"311475","reference":"AQO 845/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2020-09-24","answerBy":"2020-10-06","answered":"2020-10-06","answeredOrally":false,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice for an update on her Department’s work on tackling paramilitarism.","answerText":"My Department is responsible for co-ordinating the cross Executive Action Plan on Tackling Paramilitary Activity, Criminality and Organised Crime. Members will be aware that commitments under this plan are delivered by a range of government departments, and as Justice Minister I am progressing a number of specific actions.\n\nIt is vital that we have a robust legislative framework underpinning the criminal justice response to paramilitarism. That is why I am moving ahead with legislation on committal and the commencement of the Criminal Finances Act 2017. I am reviewing the results of a public consultation on organised crime offences, which closed on 2 October. I have also expanded the scope of the unduly lenient sentencing scheme to include hybrid offences linked to terrorism, paramilitary activity and organised crime groups\n\nAs members will appreciate, effectively tackling paramilitarism means building capacity across the wider system. As such, my Department supports Policing and Community Safety Partnerships in building community confidence and embedding a culture of lawfulness.\n\nUnder the Action Plan, accredited restorative justice organisations have been at the forefront of developing restorative practice, delivering mediation and support services, and prevention and diversionary programmes. They have been engaged in plans to develop a Centre of Restorative Excellence. Furthermore, training and education opportunities are offered to all prisoners currently within the separated regime.\n\nI have also re-established the Political Advisory Group, which I chair. This will ensure that there is political leadership and engagement on improving our communities’ resilience to paramilitarism.","answerHtml":"<p>My Department is responsible for co-ordinating the cross Executive Action Plan on Tackling Paramilitary Activity, Criminality and Organised Crime. Members will be aware that commitments under this plan are delivered by a range of government departments, and as Justice Minister I am progressing a number of specific actions.</p><p>It is vital that we have a robust legislative framework underpinning the criminal justice response to paramilitarism. That is why I am moving ahead with legislation on committal and the commencement of the Criminal Finances Act 2017. I am reviewing the results of a public consultation on organised crime offences, which closed on 2 October. I have also expanded the scope of the unduly lenient sentencing scheme to include hybrid offences linked to terrorism, paramilitary activity and organised crime groups</p><p>As members will appreciate, effectively tackling paramilitarism means building capacity across the wider system. As such, my Department supports Policing and Community Safety Partnerships in building community confidence and embedding a culture of lawfulness.</p><p>Under the Action Plan, accredited restorative justice organisations have been at the forefront of developing restorative practice, delivering mediation and support services, and prevention and diversionary programmes. They have been engaged in plans to develop a Centre of Restorative Excellence. Furthermore, training and education opportunities are offered to all prisoners currently within the separated regime.</p><p>I have also re-established the Political Advisory Group, which I chair. This will ensure that there is political leadership and engagement on improving our communities’ resilience to paramilitarism.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20845%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=311475","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=311475"}},{"id":"308970","reference":"AQW 7431/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-23","answerBy":"2020-10-08","answered":"2020-10-06","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs, due to the cross-cutting nature of the Islandmagee Gas Caverns proposals, whether marine licensing decisions will be made by the wider Executive.","answerText":"The application for a marine construction licence in relation to the proposed gas storage project at Islandmagee is being considered by officials in DAERA Marine and Fisheries Division. The other required DAERA consents to abstract and discharge water are also under review. Due to the strategic nature of the proposed Islandmagee project, the award or withholding of these consents will be subject to my decision.\n\nOfficials are currently working through the determinations. Once I have seen this material, I will consider whether there is a need to refer the decision to the Executive Committee in line with section 2.4 of the Ministerial Code and the Executive Committee (Functions) Act (Northern Ireland) 2020.","answerHtml":"<p>The application for a marine construction licence in relation to the proposed gas storage project at Islandmagee is being considered by officials in DAERA Marine and Fisheries Division. The other required DAERA consents to abstract and discharge water are also under review. Due to the strategic nature of the proposed Islandmagee project, the award or withholding of these consents will be subject to my decision.</p><p>Officials are currently working through the determinations. Once I have seen this material, I will consider whether there is a need to refer the decision to the Executive Committee in line with section 2.4 of the Ministerial Code and the Executive Committee (Functions) Act (Northern Ireland) 2020.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207431%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=308970","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=308970"}},{"id":"308969","reference":"AQW 7430/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-23","answerBy":"2020-10-08","answered":"2020-10-12","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail the current daily COVID-19 testing capacity; and for his assessment of the adequacy of this capacity.","answerText":"Overall testing capacity is continually reviewed by my Department and there are active discussions underway to further enhance capacity across both aspects of our current testing programme.\n\nPillar 1 testing is delivered via Health and Social Care laboratories and laboratories operating as part of the Scientific Advisory Consortium. My Department is actively working with colleagues in the Public Health Agency and in the Health and Social Care Trusts to ensure that Pillar 1 testing capacity increases further.\n\nPillar 2 testing is delivered through participation in the National Testing Programme managed by the Department of Health and Social care in London (DHSC). Demand for testing has increased significantly across the UK in recent weeks and I am aware that the National Testing Programme is currently experiencing an exceptionally high demand. Officials here continue to link with DHSC on a regular basis to ensure that testing capacity through Pillar 2 is enhanced for Northern Ireland\n\nOptimising available testing capacity will continue to me a key priority for me and for my officials in the weeks and months ahead.","answerHtml":"<p>Overall testing capacity is continually reviewed by my Department and there are active discussions underway to further enhance capacity across both aspects of our current testing programme.</p><p>Pillar 1 testing is delivered via Health and Social Care laboratories and laboratories operating as part of the Scientific Advisory Consortium. My Department is actively working with colleagues in the Public Health Agency and in the Health and Social Care Trusts to ensure that Pillar 1 testing capacity increases further.</p><p>Pillar 2 testing is delivered through participation in the National Testing Programme managed by the Department of Health and Social care in London (DHSC). Demand for testing has increased significantly across the UK in recent weeks and I am aware that the National Testing Programme is currently experiencing an exceptionally high demand. Officials here continue to link with DHSC on a regular basis to ensure that testing capacity through Pillar 2 is enhanced for Northern Ireland</p><p>Optimising available testing capacity will continue to me a key priority for me and for my officials in the weeks and months ahead.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207430%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=308969","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=308969"}},{"id":"308968","reference":"AQW 7429/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-23","answerBy":"2020-10-08","answered":"2020-10-08","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail the average waiting times for each Emergency Department in Northern Ireland, for each month since 1 Janaury 2020.","answerText":"Information on the median waiting times at each Emergency Department by month from January 2020 is detailed in the attached table.\n\nMedian Waiting Times at each Emergency Department, by Month (HH:MM)\nJan\tFeb\tMar\tApr\tMay\tJun\tJul\tAug\tSep\nMater\t3:38\t3:28\t3:05\t2:41\t2:55\t2:59\t2:52\t3:16\t3:29\nRVH\t4:14\t4:28\t3:46\t2:46\t3:55\t3:53\t4:18\t4:19\t4:21\nEye\t2:27\t2:41\t2:04\t1:29\t1:35\t1:59\t1:57\t2:11\t2:18\nRBHSC\t2:21\t2:24\t2:06\t1:29\t1:32\t1:33\t1:29\t1:43\t2:17\nAntrim Area\t3:03\t3:27\t3:02\t2:47\t2:42\t2:46\t3:01\t3:30\t3:22\nCauseway\t2:38\t2:40\t2:31\t2:11\t2:11\t2:26\t2:23\t2:38\t2:32\nMid-Ulster\t0:34\t0:33\t0:39\t0:44\t0:45\t0:46\t0:49\t0:39\t0:40\nArds MIU\t0:49\t0:45\t0:48\t0:35\t0:35\t0:38\t0:45\t0:41\t0:40\nBangor MIU*\t0:39\t0:38\t0:39\t-\t-\t-\t-\t-\t-\nDowne**\t1:39\t1:33\t1:38\t-\t-\t-\t-\t0:24\t0:22\nLagan Valley\t2:10\t2:40\t2:06\t1:27\t1:42\t1:50\t1:41\t2:21\t2:19\nUlster\t3:22\t3:25\t3:22\t2:59\t2:58\t3:00\t3:16\t3:19\t3:10\nCraigavon Area\t4:31\t4:22\t7:39\t6:08\t6:14\t6:47\t7:02\t7:29\t6:47\nDaisy Hill***\t2:54\t3:04\t2:39\t-\t-\t-\t-\t-\t-\nSouth Tyrone\t0:29\t0:26\t0:24\t0:21\t0:21\t0:22\t0:22\t0:25\t0:29\nAltnagelvin Area\t3:57\t4:12\t3:53\t3:02\t3:19\t3:41\t3:43\t3:53\t3:32\nSouth West Acute\t4:22\t3:52\t3:24\t2:49\t2:44\t2:51\t2:49\t2:57\t3:18\nOmagh\t0:54\t0:58\t0:47\t0:46\t0:37\t0:42\t0:57\t0:55\t1:01\n\n* Bangor temporarily closed 12th March 2020.\n\n**Downe temporarily closed between 30th March 2020 and 10 August 2020.\n\n***Daisy Hill temporarily closed on 28 March 2020.","answerHtml":"<p>Information on the median waiting times at each Emergency Department by month from January 2020 is detailed in the attached table.</p><div class=\"table-wrap\"><table><tr><td colspan=\"10\">Median Waiting Times at each Emergency Department, by Month (HH:MM)</td></tr><tr><td></td><td>Jan</td><td>Feb</td><td>Mar</td><td>Apr</td><td>May</td><td>Jun</td><td>Jul</td><td>Aug</td><td>Sep</td></tr><tr><td>Mater</td><td>3:38</td><td>3:28</td><td>3:05</td><td>2:41</td><td>2:55</td><td>2:59</td><td>2:52</td><td>3:16</td><td>3:29</td></tr><tr><td>RVH</td><td>4:14</td><td>4:28</td><td>3:46</td><td>2:46</td><td>3:55</td><td>3:53</td><td>4:18</td><td>4:19</td><td>4:21</td></tr><tr><td>Eye</td><td>2:27</td><td>2:41</td><td>2:04</td><td>1:29</td><td>1:35</td><td>1:59</td><td>1:57</td><td>2:11</td><td>2:18</td></tr><tr><td>RBHSC</td><td>2:21</td><td>2:24</td><td>2:06</td><td>1:29</td><td>1:32</td><td>1:33</td><td>1:29</td><td>1:43</td><td>2:17</td></tr><tr><td>Antrim Area</td><td>3:03</td><td>3:27</td><td>3:02</td><td>2:47</td><td>2:42</td><td>2:46</td><td>3:01</td><td>3:30</td><td>3:22</td></tr><tr><td>Causeway</td><td>2:38</td><td>2:40</td><td>2:31</td><td>2:11</td><td>2:11</td><td>2:26</td><td>2:23</td><td>2:38</td><td>2:32</td></tr><tr><td>Mid-Ulster</td><td>0:34</td><td>0:33</td><td>0:39</td><td>0:44</td><td>0:45</td><td>0:46</td><td>0:49</td><td>0:39</td><td>0:40</td></tr><tr><td>Ards MIU</td><td>0:49</td><td>0:45</td><td>0:48</td><td>0:35</td><td>0:35</td><td>0:38</td><td>0:45</td><td>0:41</td><td>0:40</td></tr><tr><td>Bangor MIU*</td><td>0:39</td><td>0:38</td><td>0:39</td><td>-</td><td>-</td><td>-</td><td>-</td><td>-</td><td>-</td></tr><tr><td>Downe**</td><td>1:39</td><td>1:33</td><td>1:38</td><td>-</td><td>-</td><td>-</td><td>-</td><td>0:24</td><td>0:22</td></tr><tr><td>Lagan Valley</td><td>2:10</td><td>2:40</td><td>2:06</td><td>1:27</td><td>1:42</td><td>1:50</td><td>1:41</td><td>2:21</td><td>2:19</td></tr><tr><td>Ulster</td><td>3:22</td><td>3:25</td><td>3:22</td><td>2:59</td><td>2:58</td><td>3:00</td><td>3:16</td><td>3:19</td><td>3:10</td></tr><tr><td>Craigavon Area</td><td>4:31</td><td>4:22</td><td>7:39</td><td>6:08</td><td>6:14</td><td>6:47</td><td>7:02</td><td>7:29</td><td>6:47</td></tr><tr><td>Daisy Hill***</td><td>2:54</td><td>3:04</td><td>2:39</td><td>-</td><td>-</td><td>-</td><td>-</td><td>-</td><td>-</td></tr><tr><td>South Tyrone</td><td>0:29</td><td>0:26</td><td>0:24</td><td>0:21</td><td>0:21</td><td>0:22</td><td>0:22</td><td>0:25</td><td>0:29</td></tr><tr><td>Altnagelvin Area</td><td>3:57</td><td>4:12</td><td>3:53</td><td>3:02</td><td>3:19</td><td>3:41</td><td>3:43</td><td>3:53</td><td>3:32</td></tr><tr><td>South West Acute</td><td>4:22</td><td>3:52</td><td>3:24</td><td>2:49</td><td>2:44</td><td>2:51</td><td>2:49</td><td>2:57</td><td>3:18</td></tr><tr><td>Omagh</td><td>0:54</td><td>0:58</td><td>0:47</td><td>0:46</td><td>0:37</td><td>0:42</td><td>0:57</td><td>0:55</td><td>1:01</td></tr></table></div><p>* Bangor temporarily closed 12th March 2020.</p><p>**Downe temporarily closed between 30th March 2020 and 10 August 2020.</p><p>***Daisy Hill temporarily closed on 28 March 2020.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207429%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=308968","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=308968"}},{"id":"308967","reference":"AQW 7428/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-23","answerBy":"2020-10-08","answered":"2020-09-30","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will pause the awarding of a contract for research into the economic, societal and environmental impacts of onshore petroleum exploration and production to allow for a full investigation and understanding of issues and implications of the research to take place.","answerText":"My Department is currently undertaking a review of the petroleum licensing regime in Northern Ireland. To inform that review, my Department plans to commission research which will provide the Department with a detailed assessment of the economic, environmental and social impacts of onshore oil and gas exploration and development in Northern Ireland. The Department is currently working through the final stages of the procurement exercise and expects to be in position to provide an update to bidders in due course.\n\nAs the outcome of this research will also be used to help inform the future petroleum licensing regime that we adopt in Northern Ireland and include the consideration of many of the issues raised by respondents to the consultations for the petroleum licence applications PLA1/16 and PLA2/16, it is important that this research is started as soon as possible.","answerHtml":"<p>My Department is currently undertaking a review of the petroleum licensing regime in Northern Ireland. To inform that review, my Department plans to commission research which will provide the Department with a detailed assessment of the economic, environmental and social impacts of onshore oil and gas exploration and development in Northern Ireland. The Department is currently working through the final stages of the procurement exercise and expects to be in position to provide an update to bidders in due course.</p><p>As the outcome of this research will also be used to help inform the future petroleum licensing regime that we adopt in Northern Ireland and include the consideration of many of the issues raised by respondents to the consultations for the petroleum licence applications PLA1/16 and PLA2/16, it is important that this research is started as soon as possible.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207428%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=308967","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=308967"}},{"id":"307966","reference":"AQW 7003/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-16","answerBy":"2020-10-01","answered":"2020-11-02","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister whether they will instruct officials to issue advice for civil servants concerned that they are being asked to work on Brexit policy that may break the law.","answerText":"Guidance already exists for civil servants in respect of circumstances where they consider that they are being asked to act in a way which conflicts with the Northern Ireland Civil Service Code of Ethics, including the requirement to comply with the law and uphold the administration of justice.","answerHtml":"<p>Guidance already exists for civil servants in respect of circumstances where they consider that they are being asked to act in a way which conflicts with the Northern Ireland Civil Service Code of Ethics, including the requirement to comply with the law and uphold the administration of justice.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207003%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=307966","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=307966"}},{"id":"307745","reference":"AQW 6917/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-15","answerBy":"2020-09-23","answered":"2020-10-12","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will make a recommendation to the Executive on a proposed scheme to assist sole traders and others thus far excluded from business support schemes.","answerText":"I remain committed to working with my Executive Colleagues to provide support to as many businesses as possible as we deal with the health, economic and societal impacts of the Covid-19 pandemic.\n\nI submitted an options paper previously to the Executive with further economic policy response proposals as well as options to aid economic recovery.\n\nThis is an evolving situation and my Executive Colleagues and I continue to consider appropriate interventions, particularly as we face the prospect of further restrictions and adapt to the frequent changes in public health advice.","answerHtml":"<p>I remain committed to working with my Executive Colleagues to provide support to as many businesses as possible as we deal with the health, economic and societal impacts of the Covid-19 pandemic.</p><p>I submitted an options paper previously to the Executive with further economic policy response proposals as well as options to aid economic recovery.</p><p>This is an evolving situation and my Executive Colleagues and I continue to consider appropriate interventions, particularly as we face the prospect of further restrictions and adapt to the frequent changes in public health advice.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206917%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=307745","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=307745"}},{"id":"307744","reference":"AQW 6916/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-15","answerBy":"2020-09-30","answered":"2020-09-24","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, following planning approval being granted for the North South Electricity Interconnector, to detail the benefits of a more interconnected Single Electricity Market for (i) the Northern Ireland consumer; and (ii) reducing the carbon footprint of energy use and generation in Northern Ireland.","answerText":"The System Operator for Northern Ireland (SONI) has provided the background information for this answer.\n\nThe North South Interconnector will be a critical piece of electricity infrastructure that will benefit the Northern Ireland consumer by unlocking a green economic recovery as we emerge from the Covid-19 pandemic. It will ensure that local businesses have the power they need to expand and attract foreign investment and, once completed, will facilitate significant new job growth within the emerging green collar sector by supporting the growth of renewables. Based on recent analysis carried out by SONI it is expected to create initial savings to consumers of £20m per year. It is further estimated that there will be savings of up to £40m per year by 2030 as it removes constraints, or bottlenecks, on the grid. A more connected grid will mean a more efficient wholesale market resulting in downward pressure on prices, which is good news for consumers and businesses in both jurisdictions.\n\nThe North South Interconnector is expected to facilitate the connection of an additional 900MW of renewable generation; enough to power 600,000 homes. It will reduce reliance on imported fossil fuels and maximise the use of Northern Ireland’s abundant, clean, natural resources, such as wind and solar energy. It will help Northern Ireland to meet the expected increase in electricity demand, resulting from the uptake of electric vehicles and heat from electricity, by relieving the current constraints on the island’s electricity system. It will be the backbone of the transmission system and will be critical to Northern Ireland’s ability to deliver its contribution to the UK commitment to Net Zero Carbon by 2050.","answerHtml":"<p>The System Operator for Northern Ireland (SONI) has provided the background information for this answer.</p><p>The North South Interconnector will be a critical piece of electricity infrastructure that will benefit the Northern Ireland consumer by unlocking a green economic recovery as we emerge from the Covid-19 pandemic. It will ensure that local businesses have the power they need to expand and attract foreign investment and, once completed, will facilitate significant new job growth within the emerging green collar sector by supporting the growth of renewables. Based on recent analysis carried out by SONI it is expected to create initial savings to consumers of £20m per year. It is further estimated that there will be savings of up to £40m per year by 2030 as it removes constraints, or bottlenecks, on the grid. A more connected grid will mean a more efficient wholesale market resulting in downward pressure on prices, which is good news for consumers and businesses in both jurisdictions.</p><p>The North South Interconnector is expected to facilitate the connection of an additional 900MW of renewable generation; enough to power 600,000 homes. It will reduce reliance on imported fossil fuels and maximise the use of Northern Ireland’s abundant, clean, natural resources, such as wind and solar energy. It will help Northern Ireland to meet the expected increase in electricity demand, resulting from the uptake of electric vehicles and heat from electricity, by relieving the current constraints on the island’s electricity system. It will be the backbone of the transmission system and will be critical to Northern Ireland’s ability to deliver its contribution to the UK commitment to Net Zero Carbon by 2050.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206916%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=307744","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=307744"}},{"id":"307603","reference":"AQW 6828/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-14","answerBy":"2020-09-29","answered":"2020-09-23","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail the average waiting time for a GP appointment.","answerText":"This information is not available. As independent contractors, GP practices are responsible for managing their own appointment systems and waiting times.","answerHtml":"<p>This information is not available. As independent contractors, GP practices are responsible for managing their own appointment systems and waiting times.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206828%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=307603","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=307603"}},{"id":"307602","reference":"AQW 6827/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-14","answerBy":"2020-09-29","answered":"2020-09-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to provide an explanation for the commissioning of research into the economic, societal and environmental impacts of onshore petroleum exploration and production in Northern Ireland.","answerText":"My Department has commissioned research into the economic, societal and environmental impacts of onshore petroleum production as part of an ongoing review of petroleum licensing policy in Northern Ireland.\n\nIn 2019, the Department began a wide ranging review of petroleum licensing policy, aimed at ensuring that the petroleum licensing policy continues to contribute to the delivery of objectives one and two of the December 2019 Outcomes Delivery Plan and future Programme for Government commitments; including that we prosper through a strong, competitive, regionally balanced economy and that we live and work sustainably – protecting the environment.\n\nAn initial high level review identified that, although a large amount of research is already available into the impacts of petroleum production, especially unconventional oil and gas production (including fracking), the information is not directly applicable to our unique position in Northern Ireland.\n\nSimilar, regionally specific, research has shaped petroleum licensing policy in Scotland, Wales and the Republic of Ireland; albeit this work was largely focused on unconventional petroleum development and, we, in Northern Ireland need to consider the evidence base for both conventional and unconventional petroleum development.\n\nThe findings of the research will be used to enable my Department to develop robust, evidence based policy options and to inform meaningful public consultation on a proposed way forward in terms of policy outcomes.\n\nFollowing the policy development and consultation process, it is my intension to bring recommendations for a future petroleum policy to the Executive. It is, therefore, vitally important that my Executive colleagues and I are able to rely upon high quality, regionally specific research when deciding on future petroleum licensing policy in Northern Ireland.\n\nYou will be aware that my Department is also currently considering two Petroleum Licence applications. The consultation on the two applications received over 5700 responses; highlighting a large number of potential impacts of petroleum development. The research will help ensure that the Executive and I are as fully informed as possible, before final decisions are made on whether or not these applications should be granted.","answerHtml":"<p>My Department has commissioned research into the economic, societal and environmental impacts of onshore petroleum production as part of an ongoing review of petroleum licensing policy in Northern Ireland.</p><p>In 2019, the Department began a wide ranging review of petroleum licensing policy, aimed at ensuring that the petroleum licensing policy continues to contribute to the delivery of objectives one and two of the December 2019 Outcomes Delivery Plan and future Programme for Government commitments; including that we prosper through a strong, competitive, regionally balanced economy and that we live and work sustainably – protecting the environment.</p><p>An initial high level review identified that, although a large amount of research is already available into the impacts of petroleum production, especially unconventional oil and gas production (including fracking), the information is not directly applicable to our unique position in Northern Ireland.</p><p>Similar, regionally specific, research has shaped petroleum licensing policy in Scotland, Wales and the Republic of Ireland; albeit this work was largely focused on unconventional petroleum development and, we, in Northern Ireland need to consider the evidence base for both conventional and unconventional petroleum development.</p><p>The findings of the research will be used to enable my Department to develop robust, evidence based policy options and to inform meaningful public consultation on a proposed way forward in terms of policy outcomes.</p><p>Following the policy development and consultation process, it is my intension to bring recommendations for a future petroleum policy to the Executive. It is, therefore, vitally important that my Executive colleagues and I are able to rely upon high quality, regionally specific research when deciding on future petroleum licensing policy in Northern Ireland.</p><p>You will be aware that my Department is also currently considering two Petroleum Licence applications. The consultation on the two applications received over 5700 responses; highlighting a large number of potential impacts of petroleum development. The research will help ensure that the Executive and I are as fully informed as possible, before final decisions are made on whether or not these applications should be granted.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206827%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=307602","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=307602"}},{"id":"307099","reference":"AQW 6555/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-09","answerBy":"2020-09-24","answered":"2020-10-05","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether her Department will be seeking to obtain a limited ability to redistribute funds to ensure flexibility on COVID-19 support scheme spending and avoid underspend.","answerText":"Earlier this year the Executive endorsed the recommendation of the Department of Finance to allow Departments flexibility to reallocate non-ring fenced funding for COVID-19 response measures. My Department took full advantage of this and reallocated £23.7m to fund emerging pressures.\n\nSimilar flexibility does not exist with regard to COVID-19 ring-fenced funding.\n\nWith respect to the latest COVID-19 Allocation Exercise, which was agreed on 24 September 2020, the categories are ring-fenced. However, the Executive has approved the ability of Departments to exercise flexibility across similar initiatives within the same category. This is helpful to us.\n\nMy Department always seeks to fully utilise the funding it receives, and where necessary, facilitate reallocations if it has approval to do so. Its excellent track record in effective budgetary management, which is noted both within its Annual Report and Accounts, and in its annual Business Plan, clearly demonstrates this.","answerHtml":"<p>Earlier this year the Executive endorsed the recommendation of the Department of Finance to allow Departments flexibility to reallocate non-ring fenced funding for COVID-19 response measures. My Department took full advantage of this and reallocated £23.7m to fund emerging pressures.</p><p>Similar flexibility does not exist with regard to COVID-19 ring-fenced funding.</p><p>With respect to the latest COVID-19 Allocation Exercise, which was agreed on 24 September 2020, the categories are ring-fenced. However, the Executive has approved the ability of Departments to exercise flexibility across similar initiatives within the same category. This is helpful to us.</p><p>My Department always seeks to fully utilise the funding it receives, and where necessary, facilitate reallocations if it has approval to do so. Its excellent track record in effective budgetary management, which is noted both within its Annual Report and Accounts, and in its annual Business Plan, clearly demonstrates this.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206555%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=307099","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=307099"}},{"id":"307098","reference":"AQW 6554/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-09","answerBy":"2020-09-24","answered":"2020-10-14","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will publish specific options, compiled by her Department, to provide support to sole traders that have thus far been excluded from COVID-19 business support schemes.","answerText":"A paper setting out options for the use of the Covid-19 business support measures underspend was provided to Ministerial colleagues as an Executive paper on 19 June 2020 and was initially discussed by the Executive on 29th June 2020. At the 10th August 2020 Executive meeting it was agreed that further funding allocations would be deferred until September as part of the Executive’s work on its Economic Recovery Strategy.\n\nAs the paper is part of ongoing policy formulation and the economic recovery package remains under consideration by the Executive, it would be inappropriate to release the paper or detail specific options at this time.","answerHtml":"<p>A paper setting out options for the use of the Covid-19 business support measures underspend was provided to Ministerial colleagues as an Executive paper on 19 June 2020 and was initially discussed by the Executive on 29th June 2020. At the 10th August 2020 Executive meeting it was agreed that further funding allocations would be deferred until September as part of the Executive’s work on its Economic Recovery Strategy.</p><p>As the paper is part of ongoing policy formulation and the economic recovery package remains under consideration by the Executive, it would be inappropriate to release the paper or detail specific options at this time.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206554%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=307098","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=307098"}},{"id":"306918","reference":"AQW 6466/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-08","answerBy":"2020-09-11","answered":"2020-09-25","answeredOrally":false,"priority":true,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health why people were allocated COVID-19 test appointments at Carrickfergus Rugby Club for Saturday 5 September 2020 and Sunday 6 September 2020, despite testing facilities not being operational on these dates.","answerText":"Testing at the Carrickfergus Rugby Club was administered as part of a National Testing Programme managed by the Department of Health and Social Care, London (DHSC). A mobile testing unit previously located at Carrickfergus Rugby Club was moved to a new location in Antrim on Saturday 5th September. Unfortunately, the DHSC portal for booking tests did not update the new location and incorrectly booked people for Carrickfergus after the Mobile testing unit had moved. When the Public Health Agency was made aware of the situation they worked with DHSC London to ensure changes were made to the booking portal.\n\nDHSC London has given assurances that every effort will be made to ensure that similar errors do not occur in future.","answerHtml":"<p>Testing at the Carrickfergus Rugby Club was administered as part of a National Testing Programme managed by the Department of Health and Social Care, London (DHSC). A mobile testing unit previously located at Carrickfergus Rugby Club was moved to a new location in Antrim on Saturday 5th September. Unfortunately, the DHSC portal for booking tests did not update the new location and incorrectly booked people for Carrickfergus after the Mobile testing unit had moved. When the Public Health Agency was made aware of the situation they worked with DHSC London to ensure changes were made to the booking portal.</p><p>DHSC London has given assurances that every effort will be made to ensure that similar errors do not occur in future.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206466%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=306918","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=306918"}},{"id":"306917","reference":"AQW 6465/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-08","answerBy":"2020-09-23","answered":"2020-09-25","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities whether her Department has had any communication with the Department for Work and Pensions in regard to the Kickstart Scheme, in order to assist with setting up a Northern Ireland-specific employer incentive scheme.","answerText":"Officials in the Department for Work and Pensions were in contact with Department for Communities on 8 July 2020 after the announcement requesting a meeting to discuss the measures outlines by the British Chancellor. This meeting took place on 16 July 202 with a second meeting taking place on 30 July 2020. The Department for Work and Pensions has shared information on how the Kickstart Scheme will be delivered in Britian.","answerHtml":"<p>Officials in the Department for Work and Pensions were in contact with Department for Communities on 8 July 2020 after the announcement requesting a meeting to discuss the measures outlines by the British Chancellor. This meeting took place on 16 July 202 with a second meeting taking place on 30 July 2020. The Department for Work and Pensions has shared information on how the Kickstart Scheme will be delivered in Britian.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206465%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=306917","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=306917"}},{"id":"306916","reference":"AQW 6464/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-08","answerBy":"2020-09-23","answered":"2020-10-06","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on progress in banning zero hours contracts, as set out in New Decade, New Approach.","answerText":"My officials are currently developing policy proposals in relation to the New Decade, New Approach statement on zero hours contracts. I am mindful that any measures must support Northern Ireland’s economic recovery as it emerges from lockdown. I will wish to take account of the views of stakeholders on this important issue. Any proposals in relation to zero hours contracts would be subject to public consultation prior to the introduction of any new legislation in the Assembly.","answerHtml":"<p>My officials are currently developing policy proposals in relation to the New Decade, New Approach statement on zero hours contracts. I am mindful that any measures must support Northern Ireland’s economic recovery as it emerges from lockdown. I will wish to take account of the views of stakeholders on this important issue. Any proposals in relation to zero hours contracts would be subject to public consultation prior to the introduction of any new legislation in the Assembly.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206464%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=306916","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=306916"}},{"id":"306915","reference":"AQW 6463/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-08","answerBy":"2020-09-23","answered":"2020-09-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on progress in developing (i) an industrial strategy; and (ii) an investment strategy, as set out in New Decade, New Approach.","answerText":"New Decade, New Approach contained a commitment to develop a new strategic level Programme for Government (PfG) from April 2021 with a supporting Economic Strategy aligned to these timescales.\n\nDevelopment of a new Economic Strategy and PfG was put on hold with the emergence of the Covid-19 pandemic and the Executive’s focus on delivering a response to the crisis.\n\nIn July 2020, the Executive revisited its PfG commitment and agreed to undertake a twin approach to delivery:\n\n Development of a one year activity-based Recovery Framework/Plan which acts as the ‘de facto’ PfG for 2020 to 2021; and\n\n Development of a new strategic PfG, reflecting agreed longer-term priorities of the Executive and aligned to a multi-year budget and legislative programme from April 2021.\n\nIn June, My Department published our medium term recovery plan ‘Rebuilding a Stronger Economy’ which sets out a framework for the next 12-18 months to build a more competitive, inclusive and greener economy, by addressing the key structural weaknesses in our economy and focusing on sectors where there is potential for growth in higher paying jobs.\n\nMy Department has also commenced work on the development of the new Economic Strategy for Northern Ireland which will set out the strategic framework and ambition required to achieve the Executive’s long-term vision for the Northern Ireland economy.\n\nThe Economic Strategy will set out the long term economic policy objectives that demonstrate how we will seek to drive economic growth and prosperity for the benefit of all people across Northern Ireland.\n\nWork on the Investment Strategy is led by The Executive Office.","answerHtml":"<p>New Decade, New Approach contained a commitment to develop a new strategic level Programme for Government (PfG) from April 2021 with a supporting Economic Strategy aligned to these timescales.</p><p>Development of a new Economic Strategy and PfG was put on hold with the emergence of the Covid-19 pandemic and the Executive’s focus on delivering a response to the crisis.</p><p>In July 2020, the Executive revisited its PfG commitment and agreed to undertake a twin approach to delivery:</p><p> Development of a one year activity-based Recovery Framework/Plan which acts as the ‘de facto’ PfG for 2020 to 2021; and</p><p> Development of a new strategic PfG, reflecting agreed longer-term priorities of the Executive and aligned to a multi-year budget and legislative programme from April 2021.</p><p>In June, My Department published our medium term recovery plan ‘Rebuilding a Stronger Economy’ which sets out a framework for the next 12-18 months to build a more competitive, inclusive and greener economy, by addressing the key structural weaknesses in our economy and focusing on sectors where there is potential for growth in higher paying jobs.</p><p>My Department has also commenced work on the development of the new Economic Strategy for Northern Ireland which will set out the strategic framework and ambition required to achieve the Executive’s long-term vision for the Northern Ireland economy.</p><p>The Economic Strategy will set out the long term economic policy objectives that demonstrate how we will seek to drive economic growth and prosperity for the benefit of all people across Northern Ireland.</p><p>Work on the Investment Strategy is led by The Executive Office.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206463%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=306915","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=306915"}},{"id":"311622","reference":"AQO 635/17-22","type":"Oral","typeCode":"AQO","mandate":"17-22","tabled":"2020-09-03","answerBy":"2020-09-14","answered":"2020-10-06","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister for an update on the appointment of a Commissioner for Victims and Survivors.","answerText":"We are currently considering the options for the post of Commissioner for Victims and Survivors.\n\nWe are aware that there are significant issues for Victims and Survivors at this time, which makes it important that we consider the way forward fully and move forward in the right way.\n\nIn the meantime we recognise that continuity is important for victims and survivors and so we are also ensuring that interim arrangements are in place within the Commission, to allow the provision of continued support for victims and survivors.","answerHtml":"<p>We are currently considering the options for the post of Commissioner for Victims and Survivors.</p><p>We are aware that there are significant issues for Victims and Survivors at this time, which makes it important that we consider the way forward fully and move forward in the right way.</p><p>In the meantime we recognise that continuity is important for victims and survivors and so we are also ensuring that interim arrangements are in place within the Commission, to allow the provision of continued support for victims and survivors.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20635%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=311622","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=311622"}},{"id":"306190","reference":"AQW 6112/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-01","answerBy":"2020-09-16","answered":"2021-03-04","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister (i) when the process of appointing the new Victims and Survivors Commissioner will be completed; and (ii) when the new Commissioner will be announced.","answerText":"Our officials are preparing the comprehensive documentation required to begin the recruitment process for a new Commissioner for Victims and Survivors. This documentation will be submitted for our consideration shortly and will allow us to progress to the next stage of the recruitment exercise. As the process will run in compliance with the Code of Practice for Ministerial Public Appointments it may take up to six months to complete.\n\nIn the meantime, we recognise that continuity is important for victims and survivors, so we have ensured that interim arrangements are in place in the Commission to allow the provision of continued support for victims and survivors. The Victims and Survivors Service will continue to deliver its services to victims and survivors, which are tailored to individual needs.","answerHtml":"<p>Our officials are preparing the comprehensive documentation required to begin the recruitment process for a new Commissioner for Victims and Survivors. This documentation will be submitted for our consideration shortly and will allow us to progress to the next stage of the recruitment exercise. As the process will run in compliance with the Code of Practice for Ministerial Public Appointments it may take up to six months to complete.</p><p>In the meantime, we recognise that continuity is important for victims and survivors, so we have ensured that interim arrangements are in place in the Commission to allow the provision of continued support for victims and survivors. The Victims and Survivors Service will continue to deliver its services to victims and survivors, which are tailored to individual needs.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206112%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=306190","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=306190"}},{"id":"306189","reference":"AQW 6111/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-09-01","answerBy":"2020-09-16","answered":"2020-09-23","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister when the process of appointing the new Victims and Survivors Commissioner commenced.","answerText":"We are currently considering the next steps, but have ensured that interim arrangements are in place within the Commission to provide continued support for victims and survivors.","answerHtml":"<p>We are currently considering the next steps, but have ensured that interim arrangements are in place within the Commission to provide continued support for victims and survivors.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206111%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=306189","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=306189"}},{"id":"305939","reference":"AQW 6026/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-08-18","answerBy":"2020-08-26","answered":"2020-09-02","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what action she will take to support and adequately fund local Further and Higher Education institutions to ensure opportunities for young people, as well as maximising the economic benefits of these institutions.","answerText":"FURTHER EDUCATION\n\nFor the 2020/21 period, my Department has already allocated a resource budget of £211.3 million to the Further Education (FE) sector, representing over 20% of the Department’s resource budget. The allocation includes £22.8 million of additional funding to colleges this year.\n\nMy Department initially secured £1.078 million of additional resource funding for the FE colleges which was allocated as part of June monitoring. This was used to provide laptops, related equipment and software for financially vulnerable learners and staff to assist with digital and remote study and working during the initial lockdown period.\n\nMore recently, I secured £5.5 million to support the safe resumption of learning in further education, this will provide additional IT equipment, cover additional staff costs and embed appropriate measures to provide for safe resumption of further education delivery at campuses across Northern Ireland. An additional £0.43 million has also been allocated to meet the cost to date of funding direct payment of Free School Meal Allowances into the households of almost 1,900 eligible school-age FE students.\n\nIn addition capital investment of circa £34.4 million has been allocated in the current financial year to enable colleges to progress the delivery of the planned capital works programme. This will also fund essential equipment to deliver critical skills for the Northern Ireland economy and achieve the strategic outcomes which I and the Executive have set.\n\nIt is important that FE colleges are enabled to welcome as many learners as possible to return to college and this funding will help progress this.\n\nHIGHER EDUCATION (HE)\n\nHE Enrolments for 2020/21\n\nMy Department has already increased the number of higher education places, even before the change in policy on AS and A Level grades. For the academic year 2020-21, the Department has already looked to the potential impact of Covid19 creating an additional demand for local places. Through the June monitoring round, an additional allocation of £1.5 million was secured which would deliver an increase of 5% funded places over three years. At the end of three years, the recurring commitment to maintain that 5% uplift will be £7.1 million. This will see an additional 1,232 places available within the local HE sector, with 410 available for academic year 2020-21.\n\nMy Department advised the universities that it is reinstating maximum student number (MaSN) to the level it was in 2015 prior to budgetary cuts which were applied to the sector which saw an agreed reduction to MaSN. Including the 410 mentioned this will increase the MaSN for the sector for 2020-21 by 1,730.\n\nUntil our universities have received access to the full range of revised grades for all applicant students, they will not be able to confirm places for students or otherwise. As such, we don’t yet know whether the overall quantum will actually remain fairly stable for Northern Ireland as a whole, with any potential increases focussed only in a single institution, or whether we will see increases across the institutions.\n\nWhile we will need to examine the issue in the round, taking into account the impacts on different institutions, the higher education sector as a whole, and the impact on the FE colleges, I am very pleased that my Executive colleagues share my belief that we have a responsibility to our young people, and have agreed to provide any additional funding which may be required.\n\nHE Mobility\n\nInternational students are vital to our universities from an economic and social perspective, providing diversity on campus by exposing local students to different cultures and different ways of thinking, and by generating income and enabling universities to continue to maintain and develop high quality teaching and learning for local students. I have therefore raised the subject of our HEIs’ difficulty in attracting international students directly with Minister Donelan, Minister of State for Universities, and have written to the Home Office outlining the issues and requesting further support. I will continue to seek bold and proactive measures in the area of immigration and visa issues to assist our HEIs achieve their international student aspirations.\n\nWidening Participation\n\nMy Department requires that HE providers that charge above the basic fee must spend a minimum of 10% of that additional fee income on activities and support to widen access and participation to HE. HE providers must detail this spending in widening access and participation plans which are submitted to my Department for review and approval on an annual basis. Providers are required to determine the most effective way to spend this money which is used for direct financial support to students, outreach and retention activities. This is a means of ensuring there are opportunities for young people from disadvantaged and under-represented backgrounds to enter and progress through HE.\n\nHE in FE\n\nThere are a range of opportunities for young people to study HE within the FE Colleges. For various reasons, the FE sector has not met HE enrolment targets in recent years. My Department is working with the sector to address this in order to ensure this HE pathway, which offers routes to employment and progression opportunities for young people, is fully utilised.\n\nResearch\n\nUniversities play a key role in sustaining and growing a vibrant economy, particularly in a small economy such as Northern Ireland. Recent Studies by London Economics found that Queen’s and Ulster Universities contribute a total of £3.2 billion to the UK economy. It is estimated that every £1million invested in research activity at Queen’s and Ulster generates an additional £3.9 million and £3.17 million respectively across the UK economy.\n\nThe role of the higher education research base will be vital as we seek to rebuild our economy in the wake of the Covid19 pandemic. My Department has already provided an additional £5.6 million to support Queen’s and Ulster University’s research functions at this time, and is actively exploring opportunities to attract further funding for local university research.\n\nEMPLOYER SKILLS\n\nThrough my Department, the Assured Skills programme continues to be delivered both by Further and Higher education institutions in response to business needs. In response to the pandemic, the Assured Skills team reacted quickly to the needs of business and in working closely with both FE and HE training providers, successfully transitioned from classroom based learning to delivering online Academies.\n\nCompanies coming out of lockdown are very encouraged by this new way of remote learning and as at 21 August 2020, eight academies are at various stages of recruitment and delivery, with two completed, resulting in 38 of the 41 participants gaining employment.\n\nIn June 2020, 150 free places were funded by the Department for the Economy (£307,000) for a Post-Graduate Certificate in Software Development at Queen’s University Belfast. This part-time course offered an opportunity, for those whose careers were impacted by COVID19, to upskill individuals in a subject area anticipated to be in demand for future economic growth.\n\nThe Skills Focus programme, delivered by my Department across Northern Ireland by the six FE colleges, is targeted at companies with fewer than 250 employees, and is now offering fully funded upskilling for employees including those who are furloughed. The 25% cost to businesses has been removed, until 31 March 2021, to support companies throughout the pandemic.\n\nIn June 2020, my Department published ‘Rebuilding a Stronger Economy’, a framework for the next 12-18 months to build a more competitive, inclusive and greener economy that delivers higher paying jobs, a highly skilled workforce and a more regionally balanced economy\n\nMy Department is currently developing a new Skills Strategy for Northern Ireland. It is clear that as we continue to rebuild our economy, for the benefit of all Northern Ireland’s citizens, strong, strategic investment in the skills system will be vital. The skills of our people are Northern Ireland’s most important resource.\n\nI will continue to make the case for prioritisation of skills funding to my colleagues in the Executive, Assembly and across civic society.","answerHtml":"<p>FURTHER EDUCATION</p><p>For the 2020/21 period, my Department has already allocated a resource budget of £211.3 million to the Further Education (FE) sector, representing over 20% of the Department’s resource budget. The allocation includes £22.8 million of additional funding to colleges this year.</p><p>My Department initially secured £1.078 million of additional resource funding for the FE colleges which was allocated as part of June monitoring. This was used to provide laptops, related equipment and software for financially vulnerable learners and staff to assist with digital and remote study and working during the initial lockdown period.</p><p>More recently, I secured £5.5 million to support the safe resumption of learning in further education, this will provide additional IT equipment, cover additional staff costs and embed appropriate measures to provide for safe resumption of further education delivery at campuses across Northern Ireland. An additional £0.43 million has also been allocated to meet the cost to date of funding direct payment of Free School Meal Allowances into the households of almost 1,900 eligible school-age FE students.</p><p>In addition capital investment of circa £34.4 million has been allocated in the current financial year to enable colleges to progress the delivery of the planned capital works programme. This will also fund essential equipment to deliver critical skills for the Northern Ireland economy and achieve the strategic outcomes which I and the Executive have set.</p><p>It is important that FE colleges are enabled to welcome as many learners as possible to return to college and this funding will help progress this.</p><p>HIGHER EDUCATION (HE)</p><p>HE Enrolments for 2020/21</p><p>My Department has already increased the number of higher education places, even before the change in policy on AS and A Level grades. For the academic year 2020-21, the Department has already looked to the potential impact of Covid19 creating an additional demand for local places. Through the June monitoring round, an additional allocation of £1.5 million was secured which would deliver an increase of 5% funded places over three years. At the end of three years, the recurring commitment to maintain that 5% uplift will be £7.1 million. This will see an additional 1,232 places available within the local HE sector, with 410 available for academic year 2020-21.</p><p>My Department advised the universities that it is reinstating maximum student number (MaSN) to the level it was in 2015 prior to budgetary cuts which were applied to the sector which saw an agreed reduction to MaSN. Including the 410 mentioned this will increase the MaSN for the sector for 2020-21 by 1,730.</p><p>Until our universities have received access to the full range of revised grades for all applicant students, they will not be able to confirm places for students or otherwise. As such, we don’t yet know whether the overall quantum will actually remain fairly stable for Northern Ireland as a whole, with any potential increases focussed only in a single institution, or whether we will see increases across the institutions.</p><p>While we will need to examine the issue in the round, taking into account the impacts on different institutions, the higher education sector as a whole, and the impact on the FE colleges, I am very pleased that my Executive colleagues share my belief that we have a responsibility to our young people, and have agreed to provide any additional funding which may be required.</p><p>HE Mobility</p><p>International students are vital to our universities from an economic and social perspective, providing diversity on campus by exposing local students to different cultures and different ways of thinking, and by generating income and enabling universities to continue to maintain and develop high quality teaching and learning for local students. I have therefore raised the subject of our HEIs’ difficulty in attracting international students directly with Minister Donelan, Minister of State for Universities, and have written to the Home Office outlining the issues and requesting further support. I will continue to seek bold and proactive measures in the area of immigration and visa issues to assist our HEIs achieve their international student aspirations.</p><p>Widening Participation</p><p>My Department requires that HE providers that charge above the basic fee must spend a minimum of 10% of that additional fee income on activities and support to widen access and participation to HE. HE providers must detail this spending in widening access and participation plans which are submitted to my Department for review and approval on an annual basis. Providers are required to determine the most effective way to spend this money which is used for direct financial support to students, outreach and retention activities. This is a means of ensuring there are opportunities for young people from disadvantaged and under-represented backgrounds to enter and progress through HE.</p><p>HE in FE</p><p>There are a range of opportunities for young people to study HE within the FE Colleges. For various reasons, the FE sector has not met HE enrolment targets in recent years. My Department is working with the sector to address this in order to ensure this HE pathway, which offers routes to employment and progression opportunities for young people, is fully utilised.</p><p>Research</p><p>Universities play a key role in sustaining and growing a vibrant economy, particularly in a small economy such as Northern Ireland. Recent Studies by London Economics found that Queen’s and Ulster Universities contribute a total of £3.2 billion to the UK economy. It is estimated that every £1million invested in research activity at Queen’s and Ulster generates an additional £3.9 million and £3.17 million respectively across the UK economy.</p><p>The role of the higher education research base will be vital as we seek to rebuild our economy in the wake of the Covid19 pandemic. My Department has already provided an additional £5.6 million to support Queen’s and Ulster University’s research functions at this time, and is actively exploring opportunities to attract further funding for local university research.</p><p>EMPLOYER SKILLS</p><p>Through my Department, the Assured Skills programme continues to be delivered both by Further and Higher education institutions in response to business needs. In response to the pandemic, the Assured Skills team reacted quickly to the needs of business and in working closely with both FE and HE training providers, successfully transitioned from classroom based learning to delivering online Academies.</p><p>Companies coming out of lockdown are very encouraged by this new way of remote learning and as at 21 August 2020, eight academies are at various stages of recruitment and delivery, with two completed, resulting in 38 of the 41 participants gaining employment.</p><p>In June 2020, 150 free places were funded by the Department for the Economy (£307,000) for a Post-Graduate Certificate in Software Development at Queen’s University Belfast. This part-time course offered an opportunity, for those whose careers were impacted by COVID19, to upskill individuals in a subject area anticipated to be in demand for future economic growth.</p><p>The Skills Focus programme, delivered by my Department across Northern Ireland by the six FE colleges, is targeted at companies with fewer than 250 employees, and is now offering fully funded upskilling for employees including those who are furloughed. The 25% cost to businesses has been removed, until 31 March 2021, to support companies throughout the pandemic.</p><p>In June 2020, my Department published ‘Rebuilding a Stronger Economy’, a framework for the next 12-18 months to build a more competitive, inclusive and greener economy that delivers higher paying jobs, a highly skilled workforce and a more regionally balanced economy</p><p>My Department is currently developing a new Skills Strategy for Northern Ireland. It is clear that as we continue to rebuild our economy, for the benefit of all Northern Ireland’s citizens, strong, strategic investment in the skills system will be vital. The skills of our people are Northern Ireland’s most important resource.</p><p>I will continue to make the case for prioritisation of skills funding to my colleagues in the Executive, Assembly and across civic society.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206026%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=305939","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=305939"}},{"id":"305938","reference":"AQW 6025/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-08-18","answerBy":"2020-09-03","answered":"2020-09-02","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will implement a financial support scheme for individual businesses forced to close due to COVID-19 cases amongst staff or customers.","answerText":"To date my Department has provided over £320 million of support through the Business Support Schemes to mitigate against the impact of the COVID-19 pandemic, to prevent business closure and to retain jobs. In addition to the three business support measures, a wide range of local support has been put in place by the Executive, including a four month business rates holiday for all businesses with the sectors hardest hit by the coronavirus pandemic paying no rates for the full financial year up until 31 March 2021.\n\nAs we progress through the pandemic, I recognise that businesses may have to close as a result of outbreaks or restrictions. In considering further interventions, it will be for the Executive to determine how future funding would be allocated to support economic recovery moving forward.\n\nBusinesses may claim for employee costs through the Coronavirus Job Retention Scheme if forced to close. This is on the basis that costs for any employees have been previously claimed prior to 30 June 2020. Further information is available at https://www.gov.uk/government/collections/coronavirus-job-retention-scheme\n\nI would encourage all businesses to follow the available guidance on social distancing measures to help prevent the spread of COVID-19.","answerHtml":"<p>To date my Department has provided over £320 million of support through the Business Support Schemes to mitigate against the impact of the COVID-19 pandemic, to prevent business closure and to retain jobs. In addition to the three business support measures, a wide range of local support has been put in place by the Executive, including a four month business rates holiday for all businesses with the sectors hardest hit by the coronavirus pandemic paying no rates for the full financial year up until 31 March 2021.</p><p>As we progress through the pandemic, I recognise that businesses may have to close as a result of outbreaks or restrictions. In considering further interventions, it will be for the Executive to determine how future funding would be allocated to support economic recovery moving forward.</p><p>Businesses may claim for employee costs through the Coronavirus Job Retention Scheme if forced to close. This is on the basis that costs for any employees have been previously claimed prior to 30 June 2020. Further information is available at https://www.gov.uk/government/collections/coronavirus-job-retention-scheme</p><p>I would encourage all businesses to follow the available guidance on social distancing measures to help prevent the spread of COVID-19.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206025%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=305938","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=305938"}},{"id":"305937","reference":"AQW 6024/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-08-18","answerBy":"2020-09-03","answered":"2020-09-02","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance for an update on progress in making her Department a Living Wage employer as set out in New Decade, New Approach.","answerText":"In setting the 2020/21 public sector pay policy, I have indicated that public sector employers should now actively consider how pay awards for individual staff groups can be targeted to ensure the payment of the Living Wage Foundation Living Wage. HR officials will incorporate this issue into 2020/21 pay considerations for the Civil Service departments.","answerHtml":"<p>In setting the 2020/21 public sector pay policy, I have indicated that public sector employers should now actively consider how pay awards for individual staff groups can be targeted to ensure the payment of the Living Wage Foundation Living Wage. HR officials will incorporate this issue into 2020/21 pay considerations for the Civil Service departments.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206024%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=305937","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=305937"}},{"id":"305936","reference":"AQW 6023/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-08-18","answerBy":"2020-09-03","answered":"2020-09-02","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what action the Department is taking to widen participation in Higher Education in Northern Ireland.","answerText":"Widening Participation in higher education (HE) is a key priority for the Department for the Economy. My Department works with the sector to ensure that opportunities in HE are available to all, regardless of background.\n\nHE providers that charge above the basic fee are required to spend a minimum of 10% of that additional fee income on activities and support to widen access and participation to under-represented groups including low income, young males, people with disabilities, care experienced and adult returners.\n\nIt is up to individual providers to determine how to use the additional fee income most effectively and efficiently but spending must be outlined in\n\nWidening Access and Participation Plans submitted to the Department annually for approval.\n\nAccess to Success has been our regional HE widening participation strategy since 2012 and will be subject to review in the near future. My officials will be working with a range of stakeholders in the HE sector to take this forward. Ultimately, I want to make sure that there continues to be appropriate support available to students from under-represented and disadvantaged groups to ensure they can progress into and through HE.","answerHtml":"<p>Widening Participation in higher education (HE) is a key priority for the Department for the Economy. My Department works with the sector to ensure that opportunities in HE are available to all, regardless of background.</p><p>HE providers that charge above the basic fee are required to spend a minimum of 10% of that additional fee income on activities and support to widen access and participation to under-represented groups including low income, young males, people with disabilities, care experienced and adult returners.</p><p>It is up to individual providers to determine how to use the additional fee income most effectively and efficiently but spending must be outlined in</p><p>Widening Access and Participation Plans submitted to the Department annually for approval.</p><p>Access to Success has been our regional HE widening participation strategy since 2012 and will be subject to review in the near future. My officials will be working with a range of stakeholders in the HE sector to take this forward. Ultimately, I want to make sure that there continues to be appropriate support available to students from under-represented and disadvantaged groups to ensure they can progress into and through HE.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206023%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=305936","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=305936"}},{"id":"305935","reference":"AQW 6022/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-08-18","answerBy":"2020-09-03","answered":"2020-09-02","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on a tourism recovery plan for Northern Ireland.","answerText":"I am aware of the significant impact which COVID-19 has had on our tourism industry. The mitigations implemented at a national and local level (e.g. grant schemes, business rates relief, loan schemes etc.) have played an important part in helping to sustain many tourism and hospitality businesses through the recent difficult months.\n\nConscious of the importance of planning ahead and of the need to develop plans for recovery of tourism in Northern Ireland, I established the Tourism Recovery Steering Group which I Chair, to lead the planning and preparation for recovery.\n\nThe membership of the Steering Group comprises representation from relevant Government Departments, Tourism NI, Tourism Ireland, the Society of Local Authority Chief Executives, Visit Britain and tourism and hospitality industry representative bodies.\n\nIn recognition of the scale and complexity of the challenges, and the need for government and industry to work together to design and deliver a tourism recovery action plan, a Working Group was also established drawing together key stake holders across the industry and chaired by the CEO of Tourism NI.\n\nThe Working Group established 10 workstreams to identify the key issues facing the various sectors within the tourism industry and to recommend interventions required to address these issues. Task & Finish Groups were set up under the 10 workstreams to reflect the diverse nature of the industry and inform the Working Group\n\nI have asked the Working Group in conjunction with the Task & Finish groups to develop a tourism recovery action plan to address key issues and actions as we move forward to rebuild the industry and protect jobs. The issues and initiatives identified by the Working Group and Task & Finish groups combined with work across Departments will inform the recovery plan\n\nA substantive draft Action Plan will be presented to the Tourism Recovery Steering Group for initial consideration at its next meeting scheduled to be held on 2nd September.","answerHtml":"<p>I am aware of the significant impact which COVID-19 has had on our tourism industry. The mitigations implemented at a national and local level (e.g. grant schemes, business rates relief, loan schemes etc.) have played an important part in helping to sustain many tourism and hospitality businesses through the recent difficult months.</p><p>Conscious of the importance of planning ahead and of the need to develop plans for recovery of tourism in Northern Ireland, I established the Tourism Recovery Steering Group which I Chair, to lead the planning and preparation for recovery.</p><p>The membership of the Steering Group comprises representation from relevant Government Departments, Tourism NI, Tourism Ireland, the Society of Local Authority Chief Executives, Visit Britain and tourism and hospitality industry representative bodies.</p><p>In recognition of the scale and complexity of the challenges, and the need for government and industry to work together to design and deliver a tourism recovery action plan, a Working Group was also established drawing together key stake holders across the industry and chaired by the CEO of Tourism NI.</p><p>The Working Group established 10 workstreams to identify the key issues facing the various sectors within the tourism industry and to recommend interventions required to address these issues. Task &amp; Finish Groups were set up under the 10 workstreams to reflect the diverse nature of the industry and inform the Working Group</p><p>I have asked the Working Group in conjunction with the Task &amp; Finish groups to develop a tourism recovery action plan to address key issues and actions as we move forward to rebuild the industry and protect jobs. The issues and initiatives identified by the Working Group and Task &amp; Finish groups combined with work across Departments will inform the recovery plan</p><p>A substantive draft Action Plan will be presented to the Tourism Recovery Steering Group for initial consideration at its next meeting scheduled to be held on 2nd September.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206022%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=305935","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=305935"}},{"id":"305454","reference":"AQW 5940/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-07-28","answerBy":"2020-08-12","answered":"2020-07-31","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will provide support to businesses that have thus far received little or no assistance from COVID-19 Business Support Schemes.","answerText":"I acknowledge many businesses have not been able to receive support despite extensive local support measures brought forward by the Executive, such as the Business Support Schemes and the business rates relief, as well as the UK-wide schemes including the Self-Employed Income Support Scheme.\n\nThe Northern Ireland economy has been hit hard by the pandemic and significant investment will be required to rebuild and renew the economy. In considering further interventions, it will be for the Executive to determine how future funding, including that which may be available from grant related underspends, would be allocated to support economic recovery moving forward.","answerHtml":"<p>I acknowledge many businesses have not been able to receive support despite extensive local support measures brought forward by the Executive, such as the Business Support Schemes and the business rates relief, as well as the UK-wide schemes including the Self-Employed Income Support Scheme.</p><p>The Northern Ireland economy has been hit hard by the pandemic and significant investment will be required to rebuild and renew the economy. In considering further interventions, it will be for the Executive to determine how future funding, including that which may be available from grant related underspends, would be allocated to support economic recovery moving forward.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205940%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=305454","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=305454"}},{"id":"305453","reference":"AQW 5939/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-07-28","answerBy":"2020-08-12","answered":"2021-02-25","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, pursuant to AQW 5336/17-22, whether staff are recruited directly by his Department, or by an agency.","answerText":"The National Testing Programme is managed by the Department of Health and Social Care, London (DHSC). DHSC hold the contract with Serco to provide management service at test sites across the UK, including all Pillar 2 testing in Northern Ireland. Serco is responsible for the recruitment of staff at all test sites.\n\nThe National Testing Programme is delivered locally in partnership with my Department and with the Public Health Agency.","answerHtml":"<p>The National Testing Programme is managed by the Department of Health and Social Care, London (DHSC). DHSC hold the contract with Serco to provide management service at test sites across the UK, including all Pillar 2 testing in Northern Ireland. Serco is responsible for the recruitment of staff at all test sites.</p><p>The National Testing Programme is delivered locally in partnership with my Department and with the Public Health Agency.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205939%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=305453","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=305453"}},{"id":"305452","reference":"AQW 5938/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-07-28","answerBy":"2020-08-12","answered":"2020-08-18","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, pursuant to AQW 5336/17-22, how regularly staff are tested for COVID-19.","answerText":"To date staff working in the fixed Covid-19 testing sites across Northern Ireland as part of the national testing partnership have not been routinely tested. This is in keeping with the protocol in NI to only test symptomatic individuals. Should any staff member develop symptoms they will be advised to self-isolate and to arrange to be tested.","answerHtml":"<p>To date staff working in the fixed Covid-19 testing sites across Northern Ireland as part of the national testing partnership have not been routinely tested. This is in keeping with the protocol in NI to only test symptomatic individuals. Should any staff member develop symptoms they will be advised to self-isolate and to arrange to be tested.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205938%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=305452","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=305452"}},{"id":"305451","reference":"AQW 5937/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-07-28","answerBy":"2020-08-12","answered":"2020-08-13","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, pursuant to AQW 5336/17-22, what is the extent of the historical test results; and how long is it expected to take to update.","answerText":"Historical test results totalled 39,709. The Northern Ireland Electronic Care Record (NIECR) system has been updated and all test results for individuals tested through the National Testing Programme are now available in the individual’s electronic care record in the NIECR system.","answerHtml":"<p>Historical test results totalled 39,709. The Northern Ireland Electronic Care Record (NIECR) system has been updated and all test results for individuals tested through the National Testing Programme are now available in the individual’s electronic care record in the NIECR system.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205937%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=305451","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=305451"}},{"id":"305450","reference":"AQW 5936/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-07-28","answerBy":"2020-08-12","answered":"2020-08-18","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to outline the current capacity for daily testing of COVID-19 in Northern Ireland.","answerText":"Pillar 1 testing is delivered via Health and Social Care laboratories and laboratories operating as part of the Scientific Advisory Consortium. Current capacity in this testing stream is up to 2,200 tests per day. It is anticipated that Pillar 1 testing capacity will increase further over the coming weeks. Anticipated capacity under Pillar 1 is subject to the availability of reagents, global supply chains and for some laboratories the allocation of ROCHE testing kits which are currently on a national allocation.\n\nPillar 2 testing is delivered through our participation in the National Testing Programme, as established by DHSC, London. Testing capacity under Pillar 2 is flexible and is informed by the number of bookings made on the programme’s digital platform in the preceding 48 hours. The overall testing capacity available through Pillar 2 is up to 6,500 tests per day when operating at full capacity and depending on demand. If demand for testing increases, as recorded on the digital platform, testing capacity can be extended to meet the demand.","answerHtml":"<p>Pillar 1 testing is delivered via Health and Social Care laboratories and laboratories operating as part of the Scientific Advisory Consortium. Current capacity in this testing stream is up to 2,200 tests per day. It is anticipated that Pillar 1 testing capacity will increase further over the coming weeks. Anticipated capacity under Pillar 1 is subject to the availability of reagents, global supply chains and for some laboratories the allocation of ROCHE testing kits which are currently on a national allocation.</p><p>Pillar 2 testing is delivered through our participation in the National Testing Programme, as established by DHSC, London. Testing capacity under Pillar 2 is flexible and is informed by the number of bookings made on the programme’s digital platform in the preceding 48 hours. The overall testing capacity available through Pillar 2 is up to 6,500 tests per day when operating at full capacity and depending on demand. If demand for testing increases, as recorded on the digital platform, testing capacity can be extended to meet the demand.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205936%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=305450","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=305450"}},{"id":"305328","reference":"AQW 5857/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-07-27","answerBy":"2020-08-11","answered":"2020-08-10","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure whether the dualling of the Dargan Viaduct will be prioritised as part of the future proofing of the York Street Interchange project.","answerText":"As part of the development of the York Street Interchange project, a feasibility study on the dualling of the Dargan Viaduct has been completed. It is proposed that works to strengthen the foundations and piers of the Dargan Viaduct will be delivered as part of the York Street Interchange as future proofing for further work.","answerHtml":"<p>As part of the development of the York Street Interchange project, a feasibility study on the dualling of the Dargan Viaduct has been completed. It is proposed that works to strengthen the foundations and piers of the Dargan Viaduct will be delivered as part of the York Street Interchange as future proofing for further work.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205857%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=305328","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=305328"}},{"id":"305327","reference":"AQW 5856/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-07-27","answerBy":"2020-08-11","answered":"2020-07-31","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for a timescale for the completion of her Department's review into Postgraduate Education in Northern Ireland.","answerText":"The Postgraduate Loan Review is a complex piece of work comprising differing strands of the postgraduate funding systems in Northern Ireland. The appropriateness of the current Postgraduate fee loan, of up to £5,500 towards the cost of taught postgraduate courses, will be reviewed alongside a range of potential options for maintenance loans or grants. Separate from that, there will be a review of the Postgraduate Awards Scheme.\n\nIt is anticipated that a public consultation on the Postgraduate Loan Review, comprising the different options for fee loans and maintenance provision, will be published before the end of this year.","answerHtml":"<p>The Postgraduate Loan Review is a complex piece of work comprising differing strands of the postgraduate funding systems in Northern Ireland. The appropriateness of the current Postgraduate fee loan, of up to £5,500 towards the cost of taught postgraduate courses, will be reviewed alongside a range of potential options for maintenance loans or grants. Separate from that, there will be a review of the Postgraduate Awards Scheme.</p><p>It is anticipated that a public consultation on the Postgraduate Loan Review, comprising the different options for fee loans and maintenance provision, will be published before the end of this year.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205856%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=305327","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=305327"}},{"id":"305326","reference":"AQW 5855/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-07-27","answerBy":"2020-08-11","answered":"2021-08-17","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health what support and guidance his Department is providing to travellers returning to Northern Ireland and required to quarantine for 14 days, as a result of a change in quarantine exemption rules.","answerText":"My Department provides appropriate and updated travel advice on NI Direct at: https://www.nidirect.gov.uk/articles/coronavirus-covid-19-regulations-guidance-travel\n\nAdvice for those undertaking managed hotel isolation, including the services provided, is available at:\n\nhttps://www.nidirect.gov.uk/articles/coronavirus-covid-19-travelling-red-list-country#toc-9","answerHtml":"<p>My Department provides appropriate and updated travel advice on NI Direct at: https://www.nidirect.gov.uk/articles/coronavirus-covid-19-regulations-guidance-travel</p><p>Advice for those undertaking managed hotel isolation, including the services provided, is available at:</p><p>https://www.nidirect.gov.uk/articles/coronavirus-covid-19-travelling-red-list-country#toc-9</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205855%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=305326","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=305326"}},{"id":"305325","reference":"AQW 5854/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-07-27","answerBy":"2020-08-11","answered":"2020-08-21","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health whether he intends to widen the groups of people eligible for the flu vaccine this year; and to whom and how will it be distributed.","answerText":"The 2020/21 seasonal flu vaccination programme will be extended to:\n\nHousehold contacts of those who received shielding letters during the Covid-19 pandemic;\n\nStaff in independent care and nursing homes; and\n\nChildren in school year 8.\n\nSubject to vaccine availability, which is partly dependent on uptake rates amongst new and existing eligible groups, the programme may be further expanded later in the year to include those in the 50-64 year old age group, starting with the oldest first.\n\nThe vaccine will be available through the schools programme, through Trust vaccination schemes for staff, and from GPs. Due to the ongoing Covid-19 pandemic, the flu vaccination arrangements in GP practices may need to be slightly different to take account of enhanced infection control and social distancing requirements. It will be up to individual practices to decide how best to offer the vaccine to their patients.","answerHtml":"<p>The 2020/21 seasonal flu vaccination programme will be extended to:</p><p>Household contacts of those who received shielding letters during the Covid-19 pandemic;</p><p>Staff in independent care and nursing homes; and</p><p>Children in school year 8.</p><p>Subject to vaccine availability, which is partly dependent on uptake rates amongst new and existing eligible groups, the programme may be further expanded later in the year to include those in the 50-64 year old age group, starting with the oldest first.</p><p>The vaccine will be available through the schools programme, through Trust vaccination schemes for staff, and from GPs. Due to the ongoing Covid-19 pandemic, the flu vaccination arrangements in GP practices may need to be slightly different to take account of enhanced infection control and social distancing requirements. It will be up to individual practices to decide how best to offer the vaccine to their patients.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205854%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=305325","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=305325"}},{"id":"305324","reference":"AQW 5853/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-07-27","answerBy":"2020-08-11","answered":"2020-08-05","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure how her Department will avoid further delay to the York Street Interchange project whilst also ensuring the project is future proof.","answerText":"The review I have commissioned to ensure an approach to the York Street Interchange scheme that is future-proofed and forward looking, will be short and sharp.\n\nI am determined to see this strategically important scheme delivered. I will be engaging with Executive colleagues to secure sufficient capital funding from future Spending Reviews, to drive the delivery of a range of essential infrastructure projects, as outlined in New Decade New Approach, including York Street Interchange.","answerHtml":"<p>The review I have commissioned to ensure an approach to the York Street Interchange scheme that is future-proofed and forward looking, will be short and sharp.</p><p>I am determined to see this strategically important scheme delivered. I will be engaging with Executive colleagues to secure sufficient capital funding from future Spending Reviews, to drive the delivery of a range of essential infrastructure projects, as outlined in New Decade New Approach, including York Street Interchange.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205853%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=305324","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=305324"}},{"id":"305006","reference":"AQW 5743/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-07-21","answerBy":"2020-08-05","answered":"2020-07-31","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what process her Department uses to ensure that all policies and legislation proactively enables inclusion and equity, particularly for people with disabilities and black and ethnic minority persons.","answerText":"Section 75 of the Northern Ireland Act 1998 requires public authorities to have due regard to the need to promote equality of opportunity and regard to the desirability of promoting good relations across a range of categories outlined in the Act, including people with disabilities, and black and ethnic minority persons. My Department publishes an Equality Scheme (2016-21) that sets out how we fulfil the Section 75 statutory duties, including our procedures to promote equality of opportunity. The Equality Scheme is available at https://www.economy-ni.gov.uk/sites/default/files/publications/economy/DfE-Equality-Scheme-2016-2021.pdf.\n\nAlso, in line with Section 75 guidance issued by the Equality Commission for Northern Ireland, my Department undertakes an audit of inequalities to identify potential inequalities, across all of the Section 75 categories, relevant to our functions. This provides the basis for an action plan to promote equality of opportunity and good relations. Our Audit and associated Action Plan provide a strategic overview of inequalities and sets out the actions by which we intend to address inequality. The Audit of Inequalities and Action Plan are available at https://www.economy-ni.gov.uk/sites/default/files/consultations/economy/Draft-2016-2021-Audit-of-Inequalities.pdf\n\nWith regard to disability, my Department is required to discharge important duties under Section 49A of the Disability Discrimination Act 1995 (DDA 1995). This requires us, when carrying out our functions, to have due regard to the need to promote positive attitudes towards disabled people, and to encourage participation by disabled people in public life. These are collectively referred to as the ‘disability duties'. My Department publishes a Disability Action Plan that sets out how we fulfil our obligations in respect of our disability duties under the DDA 1995. The Disability Action Plan is available at https://www.economy-ni.gov.uk/sites/default/files/consultations/economy/Draft-2016-2021-Disability-Action-Plan.pdf .","answerHtml":"<p>Section 75 of the Northern Ireland Act 1998 requires public authorities to have due regard to the need to promote equality of opportunity and regard to the desirability of promoting good relations across a range of categories outlined in the Act, including people with disabilities, and black and ethnic minority persons. My Department publishes an Equality Scheme (2016-21) that sets out how we fulfil the Section 75 statutory duties, including our procedures to promote equality of opportunity. The Equality Scheme is available at https://www.economy-ni.gov.uk/sites/default/files/publications/economy/DfE-Equality-Scheme-2016-2021.pdf.</p><p>Also, in line with Section 75 guidance issued by the Equality Commission for Northern Ireland, my Department undertakes an audit of inequalities to identify potential inequalities, across all of the Section 75 categories, relevant to our functions. This provides the basis for an action plan to promote equality of opportunity and good relations. Our Audit and associated Action Plan provide a strategic overview of inequalities and sets out the actions by which we intend to address inequality. The Audit of Inequalities and Action Plan are available at https://www.economy-ni.gov.uk/sites/default/files/consultations/economy/Draft-2016-2021-Audit-of-Inequalities.pdf</p><p>With regard to disability, my Department is required to discharge important duties under Section 49A of the Disability Discrimination Act 1995 (DDA 1995). This requires us, when carrying out our functions, to have due regard to the need to promote positive attitudes towards disabled people, and to encourage participation by disabled people in public life. These are collectively referred to as the ‘disability duties&#39;. My Department publishes a Disability Action Plan that sets out how we fulfil our obligations in respect of our disability duties under the DDA 1995. The Disability Action Plan is available at https://www.economy-ni.gov.uk/sites/default/files/consultations/economy/Draft-2016-2021-Disability-Action-Plan.pdf .</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205743%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=305006","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=305006"}},{"id":"305005","reference":"AQW 5742/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-07-21","answerBy":"2020-08-05","answered":"2020-08-20","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health what additional support his Department is providing to dental practices during the COVID-19 pandemic to ensure they can (i) adequately meet the financial cost associated with the procurement of additional personal protective equipment and reduced patient capacity; and (ii) obtain the required personal protective equipment.","answerText":"Throughout the Covid-19 pandemic the Department of Health has provided significant financial support to dentists, primarily through the Financial Support Scheme (FSS). There have been 4 months of FSS payments made to date between April and July 2020. The total level of FSS and net Item of Service payments made over this period is just under £20 million (£16 million FSS) which represents a 23% increase compared with the net IoS payments made over this period in 2019-20.\n\nAt the end of June I agreed that dentists should be provided with Level 1 Personal Protective Equipment (PPE) to assist them during the phased re-establishment of General Dental Services (GDS). Approximately £1m worth of Level 1 PPE has been procured and is being distributed to individual dental practices; equating to approximately £2,600 of PPE per practice.\n\nI have recently approved the allocation of an additional £3.8 million in funding to assist General Dental Practitioners (GDP) in the purchasing of the Level 2 PPE necessary to undertake Aerosol Generation Procedures (AGPs).","answerHtml":"<p>Throughout the Covid-19 pandemic the Department of Health has provided significant financial support to dentists, primarily through the Financial Support Scheme (FSS). There have been 4 months of FSS payments made to date between April and July 2020. The total level of FSS and net Item of Service payments made over this period is just under £20 million (£16 million FSS) which represents a 23% increase compared with the net IoS payments made over this period in 2019-20.</p><p>At the end of June I agreed that dentists should be provided with Level 1 Personal Protective Equipment (PPE) to assist them during the phased re-establishment of General Dental Services (GDS). Approximately £1m worth of Level 1 PPE has been procured and is being distributed to individual dental practices; equating to approximately £2,600 of PPE per practice.</p><p>I have recently approved the allocation of an additional £3.8 million in funding to assist General Dental Practitioners (GDP) in the purchasing of the Level 2 PPE necessary to undertake Aerosol Generation Procedures (AGPs).</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205742%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=305005","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=305005"}},{"id":"305004","reference":"AQW 5741/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-07-21","answerBy":"2020-08-05","answered":"2020-08-03","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure, pursuant to AQW 5118/17-22, (i) where the project currently sits in regards to her departmental priorities; and (ii) whether she can provide a timeline for the project.","answerText":"I recognise the strategic importance of the York Street Interchange. Its inclusion in the New Decade New Approach Agreement is a further indication of the significance of the project to our economic and societal wellbeing and I am determined to see it delivered.\n\nFollowing completion of the short, sharp external review I have commissioned to ensure an approach to the scheme that is future-proofed and forward looking, I will be engaging with Executive colleagues to secure sufficient capital funding from future Spending Reviews to drive the delivery of a range of essential infrastructure projects as outlined in New Decade New Approach, including York Street Interchange.","answerHtml":"<p>I recognise the strategic importance of the York Street Interchange. Its inclusion in the New Decade New Approach Agreement is a further indication of the significance of the project to our economic and societal wellbeing and I am determined to see it delivered.</p><p>Following completion of the short, sharp external review I have commissioned to ensure an approach to the scheme that is future-proofed and forward looking, I will be engaging with Executive colleagues to secure sufficient capital funding from future Spending Reviews to drive the delivery of a range of essential infrastructure projects as outlined in New Decade New Approach, including York Street Interchange.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205741%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=305004","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=305004"}},{"id":"305003","reference":"AQW 5740/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-07-21","answerBy":"2020-08-05","answered":"2020-08-04","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure, pursuant to AQW 5118/17-22, (i) how she will determine if the project is fit for purpose; (ii) what areas may not be fit for purpose currently; and (iii) how these can be remedied.","answerText":"In advance of the next stage of the York Street Interchange scheme, and in line with good practice in relation to the development of major transport projects, I have commissioned a short, sharp external review designed to ensure an approach to the scheme that is future-proofed and forward looking. This will be informed by stakeholders and specialists to ensure that any scheme is fit for purpose.\n\nI am conscious that much of the development work was carried out several years ago and am keen to ensure that the scheme we move to procure is one capable not only of connecting people to opportunities but also of promoting sustainable travel, improving road safety and enhancing the north end of the city centre in a way that can benefit not only those who rely on the road but also those who live and work close to it. Designing and developing our infrastructure means meeting the needs of all of our community and our wider environment now and for future generations.\n\nTerms of Reference for the review are available at: -\n\nhttps://www.infrastructure-ni.gov.uk/articles/york-street-interchange-overview.","answerHtml":"<p>In advance of the next stage of the York Street Interchange scheme, and in line with good practice in relation to the development of major transport projects, I have commissioned a short, sharp external review designed to ensure an approach to the scheme that is future-proofed and forward looking. This will be informed by stakeholders and specialists to ensure that any scheme is fit for purpose.</p><p>I am conscious that much of the development work was carried out several years ago and am keen to ensure that the scheme we move to procure is one capable not only of connecting people to opportunities but also of promoting sustainable travel, improving road safety and enhancing the north end of the city centre in a way that can benefit not only those who rely on the road but also those who live and work close to it. Designing and developing our infrastructure means meeting the needs of all of our community and our wider environment now and for future generations.</p><p>Terms of Reference for the review are available at: -</p><p>https://www.infrastructure-ni.gov.uk/articles/york-street-interchange-overview.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205740%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=305003","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=305003"}},{"id":"305002","reference":"AQW 5739/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-07-21","answerBy":"2020-08-05","answered":"2020-09-10","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on her plans for the future of the Renewable Heat Incentive Scheme.","answerText":"I am currently considering options on the future of the Scheme. There are a series of complex issues under consideration including Value for Money matters, compliance with State aid rules and the impacts on Scheme participants.\n\nI will discuss the options with Executive Colleagues before any final decision is taken.","answerHtml":"<p>I am currently considering options on the future of the Scheme. There are a series of complex issues under consideration including Value for Money matters, compliance with State aid rules and the impacts on Scheme participants.</p><p>I will discuss the options with Executive Colleagues before any final decision is taken.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205739%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=305002","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=305002"}},{"id":"304737","reference":"AQW 5674/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-07-10","answerBy":"2020-07-29","answered":"2020-07-22","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education what advice his Department is giving to school principals for students returning from a holiday outside Northern Ireland, when schools reopen in late summer.","answerText":"In line with Public Health advice, where a student is required to self-isolate after travelling abroad, they should not attend school. Where possible, schools should put in place arrangements to enable individuals to study remotely during any isolation period.\n\nIt is appreciated that the situation concerning travelling outside the Common Travel Area is uncertain at this time and official advice may change. All schools and students should continue to ensure they follow the current Department of Health and Public Health Agency regulations and guidance.","answerHtml":"<p>In line with Public Health advice, where a student is required to self-isolate after travelling abroad, they should not attend school. Where possible, schools should put in place arrangements to enable individuals to study remotely during any isolation period.</p><p>It is appreciated that the situation concerning travelling outside the Common Travel Area is uncertain at this time and official advice may change. All schools and students should continue to ensure they follow the current Department of Health and Public Health Agency regulations and guidance.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205674%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=304737","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=304737"}},{"id":"304736","reference":"AQW 5673/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-07-10","answerBy":"2020-07-29","answered":"2020-07-29","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health whether his Department intends to make free parking permanent for Health and Social Care staff.","answerText":"Free car parking was provided to HSC staff for the period 1 April 2020 to 30 June 2020 in recognition of the unprecedented nature of the Covid-19 pandemic, and the work and commitment the staff were making to keep the health and social care service going during the initial surge.\n\nAs hospital visiting and attendance at outpatient clinics is now increasing, charging for car parking on hospital sites where space is limited is an effective mechanism to encourage turnover to help ensure that spaces are available for patients and visitors. If the policy of charging staff for car parking was to permanently cease, this would not only create accessibility issues for patients and visitors, but the revenue raised to meet the cost of the provision and maintenance of car parking would similarly cease, ultimately reducing the amount of money I would have available to fund patient care.\n\nWhilst the initial free car parking period for staff has now concluded, the position will be kept under review in the context of the evolving position as regards the prevalence and impact of Covid-19.","answerHtml":"<p>Free car parking was provided to HSC staff for the period 1 April 2020 to 30 June 2020 in recognition of the unprecedented nature of the Covid-19 pandemic, and the work and commitment the staff were making to keep the health and social care service going during the initial surge.</p><p>As hospital visiting and attendance at outpatient clinics is now increasing, charging for car parking on hospital sites where space is limited is an effective mechanism to encourage turnover to help ensure that spaces are available for patients and visitors. If the policy of charging staff for car parking was to permanently cease, this would not only create accessibility issues for patients and visitors, but the revenue raised to meet the cost of the provision and maintenance of car parking would similarly cease, ultimately reducing the amount of money I would have available to fund patient care.</p><p>Whilst the initial free car parking period for staff has now concluded, the position will be kept under review in the context of the evolving position as regards the prevalence and impact of Covid-19.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205673%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=304736","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=304736"}},{"id":"304388","reference":"AQW 5536/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-07-07","answerBy":"2020-07-24","answered":"2020-08-25","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs for an update on work on establishing an independent environmental protection agency, as outlined in New Decade, New Approach.","answerText":"I believe that good environmental governance is about focusing on environmental outcomes and taking a strategic approach to the environmental challenges that we face here in Northern Ireland and on the global stage.\n\nThe Assembly has given its consent to extend the provisions of the UK Environment Bill giving effect to an Office for Environmental Protection (OEP) to Northern Ireland and in due course I plan to issue a discussion document to gauge stakeholder views on how we should deal with environmental plans, principles and governance in the future. The OEP will be independent from Government and able to scrutinise and advise on environmental policy, investigate complaints and take enforcement action against public authorities.\n\nI have committed to considering the implications of the ‘New Decade, New Approach’ proposal for the establishment of an independent environmental protection agency to form part of a future Programme for Government but an independent environmental protection agency cannot be created overnight – consideration needs to be given to appropriate options and these will all require robust economic appraisal to determine the best option for Northern Ireland. It is no small task to scope all of the potential impacts, including significant legislative, financial and human resource issues, which would be necessary before decisions can be made.\n\nUnderstandably, in the current crisis resources are spread more thinly than I would like and so some prioritisation has been necessary. There are other issues that need to be addressed first, such as the OEP and Northern Ireland’s first overarching Green Growth Environment Strategy, which will help in our recovery from the devastating effects of Covid-19.","answerHtml":"<p>I believe that good environmental governance is about focusing on environmental outcomes and taking a strategic approach to the environmental challenges that we face here in Northern Ireland and on the global stage.</p><p>The Assembly has given its consent to extend the provisions of the UK Environment Bill giving effect to an Office for Environmental Protection (OEP) to Northern Ireland and in due course I plan to issue a discussion document to gauge stakeholder views on how we should deal with environmental plans, principles and governance in the future. The OEP will be independent from Government and able to scrutinise and advise on environmental policy, investigate complaints and take enforcement action against public authorities.</p><p>I have committed to considering the implications of the ‘New Decade, New Approach’ proposal for the establishment of an independent environmental protection agency to form part of a future Programme for Government but an independent environmental protection agency cannot be created overnight – consideration needs to be given to appropriate options and these will all require robust economic appraisal to determine the best option for Northern Ireland. It is no small task to scope all of the potential impacts, including significant legislative, financial and human resource issues, which would be necessary before decisions can be made.</p><p>Understandably, in the current crisis resources are spread more thinly than I would like and so some prioritisation has been necessary. There are other issues that need to be addressed first, such as the OEP and Northern Ireland’s first overarching Green Growth Environment Strategy, which will help in our recovery from the devastating effects of Covid-19.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205536%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=304388","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=304388"}},{"id":"304387","reference":"AQW 5535/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-07-07","answerBy":"2020-07-24","answered":"2020-07-20","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will consider implementing a Third Sector Resilience Fund, similar to that in Scotland.","answerText":"My Department is currently delivering a £15.5m Executive Covid-19 Charities Fund to support organisations in the charitable sector directly impacted by the health pandemic, unable to access finance from other government schemes and facing the threat of imminent closure.\n\nI am also pleased to say that The Dormant Accounts Fund, designed to help build third sector resilience and improve capacity to adapt to future challenges, is expected to be launched in the near future by the National Lottery Community Fund under direction from the Department of Finance.","answerHtml":"<p>My Department is currently delivering a £15.5m Executive Covid-19 Charities Fund to support organisations in the charitable sector directly impacted by the health pandemic, unable to access finance from other government schemes and facing the threat of imminent closure.</p><p>I am also pleased to say that The Dormant Accounts Fund, designed to help build third sector resilience and improve capacity to adapt to future challenges, is expected to be launched in the near future by the National Lottery Community Fund under direction from the Department of Finance.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205535%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=304387","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=304387"}},{"id":"304386","reference":"AQW 5534/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-07-07","answerBy":"2020-07-24","answered":"2020-07-27","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what action her Department is taking to ensure that apprentices and interns are compensated fairly for the work they undertake for businesses.","answerText":"An apprenticeship is a job combining work, training and study allowing the individual to earn while they learn. Apprenticeships play a hugely important role in our skills system and generate strong labour market and wage returns for participants.\n\nMy Department supports two apprenticeship programmes:\n\n ApprenticeshipsNI (Level 2 and Level 3)\n\n Higher level Apprenticeships (HLAs) (Level 4 and above)\n\nUnder the ApprenticeshipsNI programme, DfE funds the cost of off-the-job training for apprentices aged 16-24 undertaking a Level 2 or Level 3 apprenticeship programme. Funding support for off-the-job training for apprentices aged 25 years and over is set at fifty percent of that available for 16-24 year olds and is focused on priority economic areas. Funding for HLAs is not currently subject to an age cap or limited by priority economic sector.\n\nAs with any employee, apprentice wages are the responsibility of the employer.\n\nThe apprentice’s wage should be commensurate with the industry rate for that job and, in accordance with the National Minimum Wage (NMW) regulations, which can be found at https://www.nidirect.gov.uk/articles/national-minimum-wage-and-living-wage\n\nThe Department’s Training for Success (TfS) programme, primarily designed for young people aged 16 – 17, provides participants with the opportunity to complete work related qualifications and gain experience in a work placement in their chosen occupational area to assist them in their progression to employment/further training or study. TfS participants receive a weekly non means-tested Educational Maintenance Allowance of £40 per week. In addition, assistance is provided towards the costs of travel and, where required, the cost of childcare. Disability Support is also provided for young people with a disability in order that they can fully benefit from their training.\n\nThe Further Education Colleges have a large number of students engaging in work-based learning courses, either as a core part of their programme or at the choice of the student. These courses include relevant work experience which is undertaken alongside a course of study and may include, internships, work placement and work experience.\n\nThe work experience enables the students to gain real world experience and any remuneration, which can vary considerably, is at the discretion of the employer e.g. they may reimburse for travel expenses. The colleges have no record of the nature of any discretionary payment on the part of the employer as this is not the primary purpose of internships.","answerHtml":"<p>An apprenticeship is a job combining work, training and study allowing the individual to earn while they learn. Apprenticeships play a hugely important role in our skills system and generate strong labour market and wage returns for participants.</p><p>My Department supports two apprenticeship programmes:</p><p> ApprenticeshipsNI (Level 2 and Level 3)</p><p> Higher level Apprenticeships (HLAs) (Level 4 and above)</p><p>Under the ApprenticeshipsNI programme, DfE funds the cost of off-the-job training for apprentices aged 16-24 undertaking a Level 2 or Level 3 apprenticeship programme. Funding support for off-the-job training for apprentices aged 25 years and over is set at fifty percent of that available for 16-24 year olds and is focused on priority economic areas. Funding for HLAs is not currently subject to an age cap or limited by priority economic sector.</p><p>As with any employee, apprentice wages are the responsibility of the employer.</p><p>The apprentice’s wage should be commensurate with the industry rate for that job and, in accordance with the National Minimum Wage (NMW) regulations, which can be found at https://www.nidirect.gov.uk/articles/national-minimum-wage-and-living-wage</p><p>The Department’s Training for Success (TfS) programme, primarily designed for young people aged 16 – 17, provides participants with the opportunity to complete work related qualifications and gain experience in a work placement in their chosen occupational area to assist them in their progression to employment/further training or study. TfS participants receive a weekly non means-tested Educational Maintenance Allowance of £40 per week. In addition, assistance is provided towards the costs of travel and, where required, the cost of childcare. Disability Support is also provided for young people with a disability in order that they can fully benefit from their training.</p><p>The Further Education Colleges have a large number of students engaging in work-based learning courses, either as a core part of their programme or at the choice of the student. These courses include relevant work experience which is undertaken alongside a course of study and may include, internships, work placement and work experience.</p><p>The work experience enables the students to gain real world experience and any remuneration, which can vary considerably, is at the discretion of the employer e.g. they may reimburse for travel expenses. The colleges have no record of the nature of any discretionary payment on the part of the employer as this is not the primary purpose of internships.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205534%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=304386","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=304386"}},{"id":"304036","reference":"AQW 5379/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-07-01","answerBy":"2020-07-20","answered":"2020-08-25","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs what support has been offered to food processing and packing facilities in respect of COVID-19 personal protection equipment protocol and assessments.","answerText":"Thank you for your question in relation to those DAERA supportive measures that have been offered to food processing and packing facilities in respect of COVID–19 personal protection equipment (PPE) and assessments.\n\nFirstly, I would like to express my thanks for your recognition and concern for those working in the Agri – Food Industry during these challenging times.\n\nIt is worth noting that my Department’s scope of responsibility extends to the meat processing sector, and that the responsibility for processing and packaging of other food-stuffs lies primarily with the Food Standards Agency and Local Council Environmental Health Departments.\n\nIn response to, and from the outset of this crisis, my officials have facilitated regular (often daily) meetings between the relevant representative industry bodies, individual food business operators (FBOs), Food Standards Agency Northern Ireland (FSANI), Health and Safety Executive Northern Ireland (HSENI) and the Public Health Agency (PHA). The principal objective of these meetings and associated communications is to ensure that industry are familiar with and implementing the latest PHA and HSENI guidance, which is primarily aimed at ensuring a safe and hygienic working environment for all personnel and minimising the risk of COVID-19 transmission in the workplace.\n\nThese fora have proved hugely beneficial, providing attendees with the opportunity to engage with PHA, HSENI and other relevant officials on a range of COVID-19 related control issues including the appropriate use of PPE and development of associated protocols. In addition, HSENI, as the enforcement authority have strategically rolled out a series of unannounced inspections across the meat processing sector to verify compliance with all relevant public health guidance. Assessment of PPE usage and protocols has been a central theme of these inspections.","answerHtml":"<p>Thank you for your question in relation to those DAERA supportive measures that have been offered to food processing and packing facilities in respect of COVID–19 personal protection equipment (PPE) and assessments.</p><p>Firstly, I would like to express my thanks for your recognition and concern for those working in the Agri – Food Industry during these challenging times.</p><p>It is worth noting that my Department’s scope of responsibility extends to the meat processing sector, and that the responsibility for processing and packaging of other food-stuffs lies primarily with the Food Standards Agency and Local Council Environmental Health Departments.</p><p>In response to, and from the outset of this crisis, my officials have facilitated regular (often daily) meetings between the relevant representative industry bodies, individual food business operators (FBOs), Food Standards Agency Northern Ireland (FSANI), Health and Safety Executive Northern Ireland (HSENI) and the Public Health Agency (PHA). The principal objective of these meetings and associated communications is to ensure that industry are familiar with and implementing the latest PHA and HSENI guidance, which is primarily aimed at ensuring a safe and hygienic working environment for all personnel and minimising the risk of COVID-19 transmission in the workplace.</p><p>These fora have proved hugely beneficial, providing attendees with the opportunity to engage with PHA, HSENI and other relevant officials on a range of COVID-19 related control issues including the appropriate use of PPE and development of associated protocols. In addition, HSENI, as the enforcement authority have strategically rolled out a series of unannounced inspections across the meat processing sector to verify compliance with all relevant public health guidance. Assessment of PPE usage and protocols has been a central theme of these inspections.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205379%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=304036","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=304036"}},{"id":"304035","reference":"AQW 5378/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-07-01","answerBy":"2020-07-20","answered":"2020-07-10","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to outline (i) what communication is taking place; and (ii) data is being shared, with local government in respect of forward planning for potential redundancies.","answerText":"This AWQ has been transferred to the Department for Communities to respond to.\n\nMy Department regularly partners with other government departments and local government to provide a tailored redundancy service for employers and their employees. While there is no formal data sharing arrangements in place with local government, analysis about those sectors most impacted by Covid-19 and furlough data has been shared to inform joint plans going forward. My Department is also represented on local government Local Works Forums. In terms of planning ahead, my Department is exploring new ways of working such as virtual delivery of redundancy support via webinars to supplement our face to face socially distanced capacity to deliver redundancy support. We have already partnered with Armagh, Banbridge and Craigavon Council and the Department deliver our first virtual redundancy clinic for Thompson Aero Seating Ltd.","answerHtml":"<p>This AWQ has been transferred to the Department for Communities to respond to.</p><p>My Department regularly partners with other government departments and local government to provide a tailored redundancy service for employers and their employees. While there is no formal data sharing arrangements in place with local government, analysis about those sectors most impacted by Covid-19 and furlough data has been shared to inform joint plans going forward. My Department is also represented on local government Local Works Forums. In terms of planning ahead, my Department is exploring new ways of working such as virtual delivery of redundancy support via webinars to supplement our face to face socially distanced capacity to deliver redundancy support. We have already partnered with Armagh, Banbridge and Craigavon Council and the Department deliver our first virtual redundancy clinic for Thompson Aero Seating Ltd.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205378%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=304035","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=304035"}},{"id":"304034","reference":"AQW 5377/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-07-01","answerBy":"2020-07-20","answered":"2020-07-10","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what steps have been taken in terms of monitoring lone worker potential health and safety risks that may arise due to social distancing or reduced staffing.","answerText":"Employers have a legal duty to ensure the health, safety and welfare of all employees as far as is reasonably possible, including lone workers. Any lone worker health and safety matters should be identified in a risk assessment by an employer. General advice can be found at https://www.hse.gov.uk/lone-working/. In the current pandemic this may include issues such as working at home or away from the normal work location. Employers should consider measures to keep in touch with employees, monitor workloads and ensure they can do their work safely.\n\nEmployers have the same health and safety responsibilities for those working from home as for any other workers. Advice can be found at https://www.hse.gov.uk/toolbox/workers/home.htm.\n\nLone workers, like any worker, must take care of their own health and safety and that of others who may be harmed by their actions at work. Lone workers must cooperate with their employers and other workers to help everyone meet their duties under the law.","answerHtml":"<p>Employers have a legal duty to ensure the health, safety and welfare of all employees as far as is reasonably possible, including lone workers. Any lone worker health and safety matters should be identified in a risk assessment by an employer. General advice can be found at https://www.hse.gov.uk/lone-working/. In the current pandemic this may include issues such as working at home or away from the normal work location. Employers should consider measures to keep in touch with employees, monitor workloads and ensure they can do their work safely.</p><p>Employers have the same health and safety responsibilities for those working from home as for any other workers. Advice can be found at https://www.hse.gov.uk/toolbox/workers/home.htm.</p><p>Lone workers, like any worker, must take care of their own health and safety and that of others who may be harmed by their actions at work. Lone workers must cooperate with their employers and other workers to help everyone meet their duties under the law.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205377%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=304034","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=304034"}},{"id":"303908","reference":"AQW 5336/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-06-30","answerBy":"2020-07-17","answered":"2020-07-22","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, in regards to drive-through COVID-19 testing, to detail (i) the qualifications of staff conducting patient contact swab tests; (ii) whether a medically qualified doctor is always on site; (iii) the percentage of failed tests of completed tests; and (iv) whether the results for each person tested have been shared with their GP, and for an explanation if this is not the case.","answerText":"(i)Staff working at the fixed testing sites in Northern Ireland come from a variety of non-healthcare backgrounds. Staff perform a facilities management function only and do not complete the swabbing of test subjects on site. They are fully trained to complete the role of working on the national testing programme which is a self-swab service. Staff training includes infection control, use of personal protective equipment (PPE), site management, use of test kits and packaging requirements. Staff deemed competent following training will work within the standard operating procedure of the National Testing Programme;\n\n(ii)There are no medical staff on site in keeping with the requirements of a self-administered testing facility. All on-site staff are regularly supervised by the on-site team leaders and there is one trained First Aider on site each day;\n\n(iii)Testing undertaken through the National Testing Programme is co-ordinated by the Department of Health and Social Care in London. Data in relation to people tested in Northern Ireland is provided daily by NHS Digital to the data warehouse in our regional Business Service Organisation. Information available in the data warehouse at 9 July indicates a calculated void rate of 4%. A specific ‘void protocol’ is operated by the National Testing Programme and people are offered repeat testing if appropriate through this protocol;\n\n(iv)From the 9 July, results of tests undertaken through the National Testing Programme are linked to the test subject’s individual Northern Ireland Electronic Care Record (NIECR) and are therefore accessible to the person’s GP. It is anticipated that a process to upload historical test results to the NIECR will start week commencing 20 July.","answerHtml":"<p>(i)Staff working at the fixed testing sites in Northern Ireland come from a variety of non-healthcare backgrounds. Staff perform a facilities management function only and do not complete the swabbing of test subjects on site. They are fully trained to complete the role of working on the national testing programme which is a self-swab service. Staff training includes infection control, use of personal protective equipment (PPE), site management, use of test kits and packaging requirements. Staff deemed competent following training will work within the standard operating procedure of the National Testing Programme;</p><p>(ii)There are no medical staff on site in keeping with the requirements of a self-administered testing facility. All on-site staff are regularly supervised by the on-site team leaders and there is one trained First Aider on site each day;</p><p>(iii)Testing undertaken through the National Testing Programme is co-ordinated by the Department of Health and Social Care in London. Data in relation to people tested in Northern Ireland is provided daily by NHS Digital to the data warehouse in our regional Business Service Organisation. Information available in the data warehouse at 9 July indicates a calculated void rate of 4%. A specific ‘void protocol’ is operated by the National Testing Programme and people are offered repeat testing if appropriate through this protocol;</p><p>(iv)From the 9 July, results of tests undertaken through the National Testing Programme are linked to the test subject’s individual Northern Ireland Electronic Care Record (NIECR) and are therefore accessible to the person’s GP. It is anticipated that a process to upload historical test results to the NIECR will start week commencing 20 July.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205336%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=303908","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=303908"}},{"id":"303494","reference":"AQW 5209/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-06-25","answerBy":"2020-07-10","answered":"2020-07-10","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) whether she has referred to specific scientific advice in deciding whether to advocate for a reduction in the social distancing rule from two metres to one metre; and (ii) will she publish this advice.","answerText":"I advocated the reduction of social distancing to one metre based on published World Health Organisation advice. The final decision on the reduction of social distancing to one metre, with mitigations, was made by the Executive after receiving advice from the Chief Medical Officer.","answerHtml":"<p>I advocated the reduction of social distancing to one metre based on published World Health Organisation advice. The final decision on the reduction of social distancing to one metre, with mitigations, was made by the Executive after receiving advice from the Chief Medical Officer.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205209%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=303494","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=303494"}},{"id":"303247","reference":"AQW 5120/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-06-23","answerBy":"2020-07-08","answered":"2020-07-07","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy how many people in her Department are currently working on EU withdrawal work.","answerText":"There are currently 111.98 FTE (full time equivalent) staff working across my Department and its ALBs on EU withdrawal work.","answerHtml":"<p>There are currently 111.98 FTE (full time equivalent) staff working across my Department and its ALBs on EU withdrawal work.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205120%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=303247","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=303247"}},{"id":"303246","reference":"AQW 5119/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-06-23","answerBy":"2020-07-08","answered":"2020-07-07","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether her Department has sifficient staff to complete all required EU withdrawal work before the end of the transition period.","answerText":"My Department faces significant resourcing challenges on EU Exit work. As a direct impact of Covid 19, the majority of large-scale recruitment to the NICS had been temporarily halted. As we move to a more stable position around Covid 19, my officials have identified a series of critical vacancies which will be resourced through the usual NICS recruitment processes. These will be expedited, but I remain alive to the inherent risks in this area.","answerHtml":"<p>My Department faces significant resourcing challenges on EU Exit work. As a direct impact of Covid 19, the majority of large-scale recruitment to the NICS had been temporarily halted. As we move to a more stable position around Covid 19, my officials have identified a series of critical vacancies which will be resourced through the usual NICS recruitment processes. These will be expedited, but I remain alive to the inherent risks in this area.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205119%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=303246","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=303246"}},{"id":"303245","reference":"AQW 5118/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-06-23","answerBy":"2020-07-08","answered":"2020-07-08","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure for an update on progress on the York Street Interchange project.","answerText":"I am committed to the progression of the York Street Interchange project ensuring that it is fit for purpose. I am actively considering how it sits with my wider priorities as my department moves to the next steps.","answerHtml":"<p>I am committed to the progression of the York Street Interchange project ensuring that it is fit for purpose. I am actively considering how it sits with my wider priorities as my department moves to the next steps.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205118%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=303245","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=303245"}},{"id":"302955","reference":"AQW 5036/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-06-19","answerBy":"2020-07-06","answered":"2020-07-07","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities what consideration her Department has given to the reopening of public libraries for basic borrowing services.","answerText":"Since the beginning of the restrictions, the Department has worked closely with Libraries NI to help establish an appropriate plan of action to ensure the safe reopening of Libraries once the easing of restriction measures allowed.\n\nOn Thursday, 25 June, the Executive confirmed that the Health Protection (Coronavirus, Restrictions) (NI) Regulations 2020 will be lifted to allow libraries to re-open from mid-July.\n\nFrom mid-July, Libraries NI will commence its plan to re-open its library facilities in a phased manner which maximises safety for both the public and its staff.\n\nRisk assessments have been undertaken to inform the services that can initially be offered and, as such, Libraries NI has stated plans are in place to reopen libraries with a ‘book and collect’ service alongside a phased programme of reintroducing browsing and limited IT services.","answerHtml":"<p>Since the beginning of the restrictions, the Department has worked closely with Libraries NI to help establish an appropriate plan of action to ensure the safe reopening of Libraries once the easing of restriction measures allowed.</p><p>On Thursday, 25 June, the Executive confirmed that the Health Protection (Coronavirus, Restrictions) (NI) Regulations 2020 will be lifted to allow libraries to re-open from mid-July.</p><p>From mid-July, Libraries NI will commence its plan to re-open its library facilities in a phased manner which maximises safety for both the public and its staff.</p><p>Risk assessments have been undertaken to inform the services that can initially be offered and, as such, Libraries NI has stated plans are in place to reopen libraries with a ‘book and collect’ service alongside a phased programme of reintroducing browsing and limited IT services.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205036%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=302955","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=302955"}},{"id":"302954","reference":"AQW 5035/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-06-19","answerBy":"2020-07-06","answered":"2020-09-09","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what actions her Department has taken regarding the devolution of powers to set the minimum wage in Northern Ireland, as set out in New Decade, New Approach.","answerText":"To date my Department has not taken any specific actions regarding the devolution of powers to set the minimum wage in Northern Ireland.\n\nIn these difficult times I am prioritising the economic recovery in response to Covid-19. I will, in due course, consider the matter in detail and consult my Executive colleagues as appropriate.","answerHtml":"<p>To date my Department has not taken any specific actions regarding the devolution of powers to set the minimum wage in Northern Ireland.</p><p>In these difficult times I am prioritising the economic recovery in response to Covid-19. I will, in due course, consider the matter in detail and consult my Executive colleagues as appropriate.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205035%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=302954","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=302954"}},{"id":"302953","reference":"AQW 5034/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-06-19","answerBy":"2020-07-06","answered":"2020-08-18","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister what action has been taken to bring forward an Age, Goods and Facilities and Services Bill to address age discrimination, as outlined in New Decade, New Approach.","answerText":"Appendix 1 to the “New Decade, New Approach” document supports the possible outline of a Programme for Government including the bringing forward of an Age, Goods and Facilities and Services Bill. This will be subject to the Executive agreeing a final Programme for Government. Officials are considering next steps to advance this matter.","answerHtml":"<p>Appendix 1 to the “New Decade, New Approach” document supports the possible outline of a Programme for Government including the bringing forward of an Age, Goods and Facilities and Services Bill. This will be subject to the Executive agreeing a final Programme for Government. Officials are considering next steps to advance this matter.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205034%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=302953","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=302953"}},{"id":"302643","reference":"AQW 4886/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-06-16","answerBy":"2020-06-24","answered":"2020-07-08","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, pursuant to AQW 4386/17-22, whether she will introduce specific regulations to ensure redundancy is calculated based on regular contractual pay, rather than Job Retention Scheme pay.","answerText":"Due to the complexity in calculating Redundancy Payments, it is theoretically possible for an employer to use furlough pay as part of this equation. However, I am firmly of the view that employers should assess redundancy pay using employees’ weekly pay prior to furlough as this is how they would be paid contractually.\n\nThere are no specific regulations to enforce this at present. However, I would assure you that this is a situation which I will keep under review and, with that in mind, if you become aware of cases where employers are basing redundancy payments on furloughed rather than normal pay, please bring them to my or my officials’ attention.\n\nFurthermore, I have instructed the Northern Ireland Redundancy Payments Service (RPS) to calculate the redundancy and insolvency payments for which it is responsible based on the relevant weekly wage period prior to initiation of the Job Retention Scheme.\n\nI would not expect an employer to take advantage of the Job Retention Scheme, which has brought benefit to employers and employees alike, to make someone redundant on less favourable terms than they would otherwise have received. Employers should note that any redundancy payment may be subject to determination by an Industrial Tribunal.\n\nIf an employer decides to only pay a furlough amount during a period of notice and subsequently becomes insolvent, RPS will consider a manual calculation of earnings covering this time to give the employee the difference between their actual pay and their furloughed pay.","answerHtml":"<p>Due to the complexity in calculating Redundancy Payments, it is theoretically possible for an employer to use furlough pay as part of this equation. However, I am firmly of the view that employers should assess redundancy pay using employees’ weekly pay prior to furlough as this is how they would be paid contractually.</p><p>There are no specific regulations to enforce this at present. However, I would assure you that this is a situation which I will keep under review and, with that in mind, if you become aware of cases where employers are basing redundancy payments on furloughed rather than normal pay, please bring them to my or my officials’ attention.</p><p>Furthermore, I have instructed the Northern Ireland Redundancy Payments Service (RPS) to calculate the redundancy and insolvency payments for which it is responsible based on the relevant weekly wage period prior to initiation of the Job Retention Scheme.</p><p>I would not expect an employer to take advantage of the Job Retention Scheme, which has brought benefit to employers and employees alike, to make someone redundant on less favourable terms than they would otherwise have received. Employers should note that any redundancy payment may be subject to determination by an Industrial Tribunal.</p><p>If an employer decides to only pay a furlough amount during a period of notice and subsequently becomes insolvent, RPS will consider a manual calculation of earnings covering this time to give the employee the difference between their actual pay and their furloughed pay.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204886%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=302643","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=302643"}},{"id":"302642","reference":"AQW 4885/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-06-16","answerBy":"2020-07-01","answered":"2020-07-07","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will be seeking to participate in the new Re-open EU website and application, which provides travellers with information about COVID-19 rules and restrictions in European countries, so that NI hospitality and tourism businesses are not disadvantaged.","answerText":"Whilst tourism is a Devolved Matter, participation in this scheme involves engaging in EU fora where it would be for the UK Government to engage at Member State level. The UK is no longer part of the EU, and therefore the UK Government would not expect to be included in a map representing member states.\n\nYou will be aware of the expansive work that has been on-going by the Tourism Working and Steering Groups established by me to support and facilitate the re-opening of Northern Ireland’s tourism and hospitality sectors and of the significant progress that has been made in recent days in that regard.\n\nIn addition to this work, I continue to participate in regular meetings with the Minister for Tourism of the Department for Digital, Culture, Media and Sports together with the Tourism Ministers from the other Devolved Administrations. We are committed to doing all we can to support the tourism sector of each of our respective regions and of the UK as a whole. We will continue to work together to ensure that the UK remains an internationally competitive destination for business and leisure. We are committed to ensuring a safe travel environment that helps rebuild consumer confidence in our tourism sectors, by strengthening regional and international coordination.\n\nI can confirm that information is regularly shared on our travel, border and health measures with key partners, including the European Commission, as part of the UK's international cooperation during the Coronavirus crisis.\n\nI will continue to work with my UK counterparts. In turn, the UK Government will continue to work with the travel industry and with other countries through forums such as the OECD and G20 to coordinate the international response.","answerHtml":"<p>Whilst tourism is a Devolved Matter, participation in this scheme involves engaging in EU fora where it would be for the UK Government to engage at Member State level. The UK is no longer part of the EU, and therefore the UK Government would not expect to be included in a map representing member states.</p><p>You will be aware of the expansive work that has been on-going by the Tourism Working and Steering Groups established by me to support and facilitate the re-opening of Northern Ireland’s tourism and hospitality sectors and of the significant progress that has been made in recent days in that regard.</p><p>In addition to this work, I continue to participate in regular meetings with the Minister for Tourism of the Department for Digital, Culture, Media and Sports together with the Tourism Ministers from the other Devolved Administrations. We are committed to doing all we can to support the tourism sector of each of our respective regions and of the UK as a whole. We will continue to work together to ensure that the UK remains an internationally competitive destination for business and leisure. We are committed to ensuring a safe travel environment that helps rebuild consumer confidence in our tourism sectors, by strengthening regional and international coordination.</p><p>I can confirm that information is regularly shared on our travel, border and health measures with key partners, including the European Commission, as part of the UK&#39;s international cooperation during the Coronavirus crisis.</p><p>I will continue to work with my UK counterparts. In turn, the UK Government will continue to work with the travel industry and with other countries through forums such as the OECD and G20 to coordinate the international response.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204885%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=302642","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=302642"}},{"id":"302240","reference":"AQW 4669/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-06-10","answerBy":"2020-06-25","answered":"2020-06-19","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether her Department, in conjunction with Tourism NI, will publish specific advice to prepare local tourism and hospitality businesses for safe reopening in the future.","answerText":"Work is ongoing to develop the overarching government guidance necessary to ensure the sector can re-open safely. This overarching guidance for the Visitor Economy will be based on relevant DCMS guidance tailored for NI. It will include guidance for Hotels & Accommodation and Pubs & Restaurants.\n\nI am aiming to publish this guidance on 22 June.\n\nI understand that several representative bodies are also preparing detailed operational guidance for their sectors.","answerHtml":"<p>Work is ongoing to develop the overarching government guidance necessary to ensure the sector can re-open safely. This overarching guidance for the Visitor Economy will be based on relevant DCMS guidance tailored for NI. It will include guidance for Hotels &amp; Accommodation and Pubs &amp; Restaurants.</p><p>I am aiming to publish this guidance on 22 June.</p><p>I understand that several representative bodies are also preparing detailed operational guidance for their sectors.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204669%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=302240","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=302240"}},{"id":"302146","reference":"AQW 4636/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-06-09","answerBy":"2020-06-24","answered":"2021-02-03","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister for an update on progress in implementing the proposed actions of the Racial Equality Strategy 2015-2025.","answerText":"Good progress has been made in implementing the key actions in the Strategy, specifically:\n\nThe structures to support delivery, including the Racial Equality Sub-Group and Racial Equality Champions in each Department, are now in place. They are developing a joint work programme and approach.\n\nA review of the Race Relations (NI) Order and relevant aspects of other legislation is underway.\n\nResearch into ethnic monitoring, which also includes the potential for amendments to our Fair Employment legislation, has just been completed and we are considering the draft report to inform future proposals. There is growing evidence of a disproportionately high number of BAME deaths from COVID-19 in England and Wales which reinforces the need to gather evidence here to fully identify the extent of racial inequalities. Our work on ethnic monitoring aims to support the establishment of an improved evidence base.\n\nA review of the delivery model for the Minority Ethnic Development Fund (MEDF), a key element of our policy for racial equality and good race relations, is due to complete in the coming weeks. The findings will inform the future operation of the Fund.\n\nWork with the Department of Education (DE) to identify ways to tackle racist bullying in schools is underway. This is supported by the sub group who are also engaging with the PSNI to agree actions to increase identification and monitoring of race hate crime.\n\nWe remain committed to full implementation of the Strategy and its proposed actions. Indeed work is also underway to finalise a draft Refugee Integration Strategy for all refugees and asylum seekers which we hope to consult on later this year.\n\nThe Racial Equality Indicators Baseline Report was published in November 2018 and presents data measuring the progress of the Racial Equality Strategy. We are pleased that the report shows headway made in a number of areas but appreciate that there is more to do and we will continue to work to fully implement the actions in the strategy.","answerHtml":"<p>Good progress has been made in implementing the key actions in the Strategy, specifically:</p><p>The structures to support delivery, including the Racial Equality Sub-Group and Racial Equality Champions in each Department, are now in place. They are developing a joint work programme and approach.</p><p>A review of the Race Relations (NI) Order and relevant aspects of other legislation is underway.</p><p>Research into ethnic monitoring, which also includes the potential for amendments to our Fair Employment legislation, has just been completed and we are considering the draft report to inform future proposals. There is growing evidence of a disproportionately high number of BAME deaths from COVID-19 in England and Wales which reinforces the need to gather evidence here to fully identify the extent of racial inequalities. Our work on ethnic monitoring aims to support the establishment of an improved evidence base.</p><p>A review of the delivery model for the Minority Ethnic Development Fund (MEDF), a key element of our policy for racial equality and good race relations, is due to complete in the coming weeks. The findings will inform the future operation of the Fund.</p><p>Work with the Department of Education (DE) to identify ways to tackle racist bullying in schools is underway. This is supported by the sub group who are also engaging with the PSNI to agree actions to increase identification and monitoring of race hate crime.</p><p>We remain committed to full implementation of the Strategy and its proposed actions. Indeed work is also underway to finalise a draft Refugee Integration Strategy for all refugees and asylum seekers which we hope to consult on later this year.</p><p>The Racial Equality Indicators Baseline Report was published in November 2018 and presents data measuring the progress of the Racial Equality Strategy. We are pleased that the report shows headway made in a number of areas but appreciate that there is more to do and we will continue to work to fully implement the actions in the strategy.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204636%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=302146","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=302146"}},{"id":"302145","reference":"AQW 4635/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-06-09","answerBy":"2020-06-24","answered":"2020-06-19","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for a weekly breakdown of the number redundancies and redundancy consultations, notified to the Department since the beginning of 2020.","answerText":"The Northern Ireland Statistics and Research Agency (NISRA) collects redundancy notifications on behalf of the Department for the Economy. Since the beginning of January 2020, the Department has been notified of 3530 proposed redundancies, originating from 33 different notifications. The table below gives a breakdown of these notifications over the year to date. In order to preserve confidentiality, data has been combined into 4 week bands so that no individual returns can be identified.\n\nDate HR1 received\tNumber of notifications received\tNumber of redundancies proposed\n28th Dec 19 - 24 Jan 20\t3\t424\n25 Jan 20 - 21 Feb 20\t0\t0\n22 Feb 20 - 20 Mar 20\t5\t584\n21 Mar 20 - 17 Apr 20\t5\t784\n18 Apr 20 - 15 May 20\t5\t204\n16 May 20 - 12 Jun 20\t15\t1534\n33\t3530","answerHtml":"<p>The Northern Ireland Statistics and Research Agency (NISRA) collects redundancy notifications on behalf of the Department for the Economy. Since the beginning of January 2020, the Department has been notified of 3530 proposed redundancies, originating from 33 different notifications. The table below gives a breakdown of these notifications over the year to date. In order to preserve confidentiality, data has been combined into 4 week bands so that no individual returns can be identified.</p><div class=\"table-wrap\"><table><tr><td>Date HR1 received</td><td>Number of notifications received</td><td>Number of redundancies proposed</td></tr><tr><td>28th Dec 19 - 24 Jan 20</td><td>3</td><td>424</td></tr><tr><td>25 Jan 20 - 21 Feb 20</td><td>0</td><td>0</td></tr><tr><td>22 Feb 20 - 20 Mar 20</td><td>5</td><td>584</td></tr><tr><td>21 Mar 20 - 17 Apr 20</td><td>5</td><td>784</td></tr><tr><td>18 Apr 20 - 15 May 20</td><td>5</td><td>204</td></tr><tr><td>16 May 20 - 12 Jun 20</td><td>15</td><td>1534</td></tr><tr><td></td><td>33</td><td>3530</td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204635%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=302145","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=302145"}},{"id":"301823","reference":"AQW 4500/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-06-04","answerBy":"2020-06-19","answered":"2020-07-02","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health what action he has taken to restore cancer services.","answerText":"I can confirm Health and Social Care (HSC) Trusts have been tasked with developing service rebuilding plans for all HSC services. Actions are also underway to ensure the rapid and safe stepping up of both diagnosis and treatment of cancer patients in clinically safe environments.\n\nI am also acutely aware of the severe impact that COVID-19 has had on the totality of cancer services. That is why I have informed officials that the resumption of screening, diagnosis and treatment of cancer patients in clinically safe environments is a high priority and should proceed as quickly as possible. Priority will be given to people at highest risk and to clearing any backlog of patients in the cancer pathway. I can assure you that every HSC Trust in Northern Ireland is developing plans and working hard to make that resumption a reality.\n\nThe Department’s “Rebuilding HSC Services Strategic Framework” was published on 9 June 2020, and is available at https://www.health-ni.gov.uk/publications/rebuilding-hsc-services\n\nRebuilding services gives us an opportunity to transform our system for the better and for the real benefit of cancer patients and all those who need our services.","answerHtml":"<p>I can confirm Health and Social Care (HSC) Trusts have been tasked with developing service rebuilding plans for all HSC services. Actions are also underway to ensure the rapid and safe stepping up of both diagnosis and treatment of cancer patients in clinically safe environments.</p><p>I am also acutely aware of the severe impact that COVID-19 has had on the totality of cancer services. That is why I have informed officials that the resumption of screening, diagnosis and treatment of cancer patients in clinically safe environments is a high priority and should proceed as quickly as possible. Priority will be given to people at highest risk and to clearing any backlog of patients in the cancer pathway. I can assure you that every HSC Trust in Northern Ireland is developing plans and working hard to make that resumption a reality.</p><p>The Department’s “Rebuilding HSC Services Strategic Framework” was published on 9 June 2020, and is available at https://www.health-ni.gov.uk/publications/rebuilding-hsc-services</p><p>Rebuilding services gives us an opportunity to transform our system for the better and for the real benefit of cancer patients and all those who need our services.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204500%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=301823","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=301823"}},{"id":"301822","reference":"AQW 4499/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-06-04","answerBy":"2020-06-19","answered":"2020-06-19","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, as of 3 June 2020, how many applications have been submitted to the Micro-business Hardship Fund.","answerText":"There were 2,521 submitted applications to the Micro-business Hardship Fund as at 3 June 2020.","answerHtml":"<p>There were 2,521 submitted applications to the Micro-business Hardship Fund as at 3 June 2020.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204499%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=301822","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=301822"}},{"id":"301821","reference":"AQW 4498/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-06-04","answerBy":"2020-06-19","answered":"2020-06-19","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what engagement there has been between management, staff and trade unions in the six further education colleges to discuss and plan for the academic year ahead, to ensure the safe operation of colleges and the best outcomes for students and young people.","answerText":"The Department has established an Advisory and Oversight Group to work collaboratively with the six Further Education (FE) Colleges, as well as the non-statutory training contractor sector, to prepare for the safe resumption of on-site educational delivery and related activity at all colleges and campuses. The Advisory and Oversight Group includes representatives from the Department for Economy, representatives from the FE Colleges and non-statutory training contractor sectors, and Advisors.\n\nIt is the Department’s priority that all learners should be enabled to succeed in, and complete, their respective courses, while maintaining their safety and their physical, mental and emotional well-being. In establishing this group, the Department recognises its responsibility to facilitate this by working collaboratively with the FE and non-statutory sectors, and by taking account of the sectors’ own skills and expertise in the design and delivery of vocational education. It also recognises that that these plans must be made with appropriate consultation with advisors and stakeholders, and that plans must be communicated clearly and in a timely fashion to ensure not only the safety, but the confidence, of all.\n\nAs key stakeholders, we recognise the importance of the full support and participation of the Trade Unions throughout this process. The Department is engaging regularly with all six Trade Unions, and they have also nominated a member from both the University and College Union and Northern Ireland Public Service Alliance to represent them on the Advisory and Oversight Group. The first meeting of the group was held on 9 June 2020\n\nIn addition to the engagement through the Advisory and Oversight Group, on 9 June 2020, the Committee for the Economy heard representations from the FE Colleges about a range of issues, including the challenges they face in the year ahead. The Department is committed to ensuring that the FE Colleges and non-statutory contractors are sufficiently supported as they prepare to resume safe operation of educational provision and are enabled to achieve the best outcomes possible for students and young people.","answerHtml":"<p>The Department has established an Advisory and Oversight Group to work collaboratively with the six Further Education (FE) Colleges, as well as the non-statutory training contractor sector, to prepare for the safe resumption of on-site educational delivery and related activity at all colleges and campuses. The Advisory and Oversight Group includes representatives from the Department for Economy, representatives from the FE Colleges and non-statutory training contractor sectors, and Advisors.</p><p>It is the Department’s priority that all learners should be enabled to succeed in, and complete, their respective courses, while maintaining their safety and their physical, mental and emotional well-being. In establishing this group, the Department recognises its responsibility to facilitate this by working collaboratively with the FE and non-statutory sectors, and by taking account of the sectors’ own skills and expertise in the design and delivery of vocational education. It also recognises that that these plans must be made with appropriate consultation with advisors and stakeholders, and that plans must be communicated clearly and in a timely fashion to ensure not only the safety, but the confidence, of all.</p><p>As key stakeholders, we recognise the importance of the full support and participation of the Trade Unions throughout this process. The Department is engaging regularly with all six Trade Unions, and they have also nominated a member from both the University and College Union and Northern Ireland Public Service Alliance to represent them on the Advisory and Oversight Group. The first meeting of the group was held on 9 June 2020</p><p>In addition to the engagement through the Advisory and Oversight Group, on 9 June 2020, the Committee for the Economy heard representations from the FE Colleges about a range of issues, including the challenges they face in the year ahead. The Department is committed to ensuring that the FE Colleges and non-statutory contractors are sufficiently supported as they prepare to resume safe operation of educational provision and are enabled to achieve the best outcomes possible for students and young people.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204498%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=301821","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=301821"}},{"id":"301820","reference":"AQW 4497/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-06-04","answerBy":"2020-06-19","answered":"2020-06-11","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education for the estimated cost to schools for additional extended cleaning practices and sanitising products per term, and how this will be budgeted for.","answerText":"My Department has established a Restart Programme to consider a range of issues relating to the safe and effective re-opening of schools. As part of this, guidance is being prepared, through co-design with practitioners, on practical issues linked to a “new school day”. This will cover issues such as hygiene and cleaning practices.\n\nIt is likely that there will be additional costs as a result of additional health and safety measures, such as cleaning. The Department is not in a position to quantify these costs at this stage. These will be identified and managed as work develops on Restart.","answerHtml":"<p>My Department has established a Restart Programme to consider a range of issues relating to the safe and effective re-opening of schools. As part of this, guidance is being prepared, through co-design with practitioners, on practical issues linked to a “new school day”. This will cover issues such as hygiene and cleaning practices.</p><p>It is likely that there will be additional costs as a result of additional health and safety measures, such as cleaning. The Department is not in a position to quantify these costs at this stage. These will be identified and managed as work develops on Restart.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204497%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=301820","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=301820"}},{"id":"301698","reference":"AQW 4442/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-06-02","answerBy":"2020-06-17","answered":"2020-07-10","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health what guidance his Department has given to local councils, and other public bodies, for the safe reopening and operation of public toilets during the COVID-19 pandemic.","answerText":"Public toilets were designated as being able to remain open in schedule 2, Part 3 (42) in the Health Protection (Coronavirus, Restrictions) Regulations (Northern Ireland) 2020. The Department of Health has not developed detailed sector specific guidance, including guidance on reopening and operation of public toilets managed by councils and public bodies.\n\nThere are examples of mitigation measures that could be undertaken in line with the general guidance issued by the Department - https://www.health-ni.gov.uk/publications/health-protection-coronavirus-restrictions-northern-ireland-regulations-2020. These are not exhaustive but should include maintaining social distancing and hygiene measures including regular cleaning and monitoring of facilities. It would be helpful to ensure there are suitable levels of hand cleaning and sanitising products and these are restocked regularly. Appropriate signage (with reference to the continuing Covid-19 risk) should also be in place to re-inforce key public health messages.","answerHtml":"<p>Public toilets were designated as being able to remain open in schedule 2, Part 3 (42) in the Health Protection (Coronavirus, Restrictions) Regulations (Northern Ireland) 2020. The Department of Health has not developed detailed sector specific guidance, including guidance on reopening and operation of public toilets managed by councils and public bodies.</p><p>There are examples of mitigation measures that could be undertaken in line with the general guidance issued by the Department - https://www.health-ni.gov.uk/publications/health-protection-coronavirus-restrictions-northern-ireland-regulations-2020. These are not exhaustive but should include maintaining social distancing and hygiene measures including regular cleaning and monitoring of facilities. It would be helpful to ensure there are suitable levels of hand cleaning and sanitising products and these are restocked regularly. Appropriate signage (with reference to the continuing Covid-19 risk) should also be in place to re-inforce key public health messages.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204442%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=301698","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=301698"}},{"id":"301596","reference":"AQW 4386/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-06-01","answerBy":"2020-06-04","answered":"2020-06-11","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether a furloughed employee, subsequently made redundant, would have redundancy pay calculated based on furloughed pay or regular contractual pay, in Northern Ireland.","answerText":"Responsibility for the UK-wide Job Retention Scheme falls to Her Majesty’s Revenue and Customs. However, I understand there is nothing in the scheme that prevents employers from taking into consideration time on furlough when calculating redundancy pay.\n\nThe rules on calculating redundancy pay are complex and depend on age, length of service, working pattern and contractual arrangements. Theoretically, this complexity could mean that there may be some situations where the employer could use furlough pay as part of this calculation.\n\nHowever, in these difficult times, I am firmly of the view that employers should assess redundancy pay using employees’ weekly pay prior to furlough in line with any contractual obligations at that time. I would not expect an employer to take advantage of the Government’s Job Retention Scheme, which has brought benefit to employers and employees alike, to make someone redundant on less favourable terms than they would otherwise have received. It should also be borne in mind that any redundancy payment may be subject to determination by an Industrial Tribunal.","answerHtml":"<p>Responsibility for the UK-wide Job Retention Scheme falls to Her Majesty’s Revenue and Customs. However, I understand there is nothing in the scheme that prevents employers from taking into consideration time on furlough when calculating redundancy pay.</p><p>The rules on calculating redundancy pay are complex and depend on age, length of service, working pattern and contractual arrangements. Theoretically, this complexity could mean that there may be some situations where the employer could use furlough pay as part of this calculation.</p><p>However, in these difficult times, I am firmly of the view that employers should assess redundancy pay using employees’ weekly pay prior to furlough in line with any contractual obligations at that time. I would not expect an employer to take advantage of the Government’s Job Retention Scheme, which has brought benefit to employers and employees alike, to make someone redundant on less favourable terms than they would otherwise have received. It should also be borne in mind that any redundancy payment may be subject to determination by an Industrial Tribunal.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204386%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=301596","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=301596"}},{"id":"301480","reference":"AQW 4326/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-05-28","answerBy":"2020-06-12","answered":"2020-06-08","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether her Department has had discussions with, or provided guidance to, Northern Ireland universities regarding the delivery of teaching online.","answerText":"Northern Ireland’s higher education institutions are autonomous and as such are responsible for the own policies regarding the delivery of teaching. However, the institutions have shared the following information regarding their plans for online teaching in the coming academic year. Information regarding The Open University is not included as provision is already delivered online.\n\nUlster University\n\nUlster University confirmed on Wednesday 27 May 2020 to students, prospective students, staff, and wider stakeholders that the first term of academic year 2020/21 will commence on 21 September 2020 with plans to deliver lectures and other teaching online for semester one.\n\nWhere it is safe to do so, the University will be exploring face to face activities that can be held on campus following a robust risk assessment. Priority will be given to using campus spaces for practice-based learning activities including lab work.\n\nUlster University staff members who can work from home will continue to do so until at least the end of August and after the summer, the University will look to move to a phased, managed return of all staff within public health guidelines and with the health, safety and wellbeing of staff and students as its primary concern.\n\nIn order to actively plan for the return of some campus-based activities, there will be a safe, phased return to campus for some staff in early summer. Ulster University’s People & Culture team will be on hand to inform and support those colleagues through this transition.\n\nQueen’s University, Belfast\n\nQueen’s University has produced a draft working document outlining three main options for the re-entry of students on 21 September 2020. These options include: 1.) face to face teaching with measures of social distancing and blended learning; 2.) an option to graduate teaching to different groups of students taking account of social distancing and blended learning; and 3.) a contingency plan to move to online learning should physical re-entry not be feasible at that time.\n\nThe first option is the University’s preferred course of action.\n\nThe document is in working draft form and out for consultation and should be agreed in the next few weeks.\n\nStranmillis University College\n\nAt present Stranmillis University College is preparing to open in September using a blended learning approach with small groups on campus at any given time. Priority will be given to first year students coming on campus as on-campus experience is particularly important to enable them to adjust to third level study.\n\nStrict social distancing, sanitization and cleaning regime will be in place. This means that:\n\nAll lecture materials will be online;\n\nBlended/Interactive learning for other classes as standard;\n\nOnline delivery of practical/workshop classes if possible with the postponement of other practical classes to Semester 2, with priority given to on-campus delivery to Year 1 in Semester 1;\n\nIn line with social distancing, consider rotated classes on campus;\n\nOnline assessment and feedback to students; and\n\nOnline evaluations as standard.\n\nWork is currently underway to assess the protocols and systems required to allow for the effective and efficient recommencement of restricted on-campus activity. However at the same time planning is underway to provide an effective connected learning approach for students in the event of on-site delivery being restricted or not permissible.\n\nSt Mary’s University College\n\nIf St Mary’s College is unable to open in September, they are planning:\n\nInteractive delivery for small groups (which are very common at the College);\n\nGoogle Classrooms, or equivalent, attached to each module;\n\nOnline delivery of lectures to large groups;\n\nFormal assessment up to December 2020;\n\nOnline access to Student Guidance and the Library; and\n\nRevisions to placement learning arrangements.\n\nI trust that you find this information helpful.","answerHtml":"<p>Northern Ireland’s higher education institutions are autonomous and as such are responsible for the own policies regarding the delivery of teaching. However, the institutions have shared the following information regarding their plans for online teaching in the coming academic year. Information regarding The Open University is not included as provision is already delivered online.</p><p>Ulster University</p><p>Ulster University confirmed on Wednesday 27 May 2020 to students, prospective students, staff, and wider stakeholders that the first term of academic year 2020/21 will commence on 21 September 2020 with plans to deliver lectures and other teaching online for semester one.</p><p>Where it is safe to do so, the University will be exploring face to face activities that can be held on campus following a robust risk assessment. Priority will be given to using campus spaces for practice-based learning activities including lab work.</p><p>Ulster University staff members who can work from home will continue to do so until at least the end of August and after the summer, the University will look to move to a phased, managed return of all staff within public health guidelines and with the health, safety and wellbeing of staff and students as its primary concern.</p><p>In order to actively plan for the return of some campus-based activities, there will be a safe, phased return to campus for some staff in early summer. Ulster University’s People &amp; Culture team will be on hand to inform and support those colleagues through this transition.</p><p>Queen’s University, Belfast</p><p>Queen’s University has produced a draft working document outlining three main options for the re-entry of students on 21 September 2020. These options include: 1.) face to face teaching with measures of social distancing and blended learning; 2.) an option to graduate teaching to different groups of students taking account of social distancing and blended learning; and 3.) a contingency plan to move to online learning should physical re-entry not be feasible at that time.</p><p>The first option is the University’s preferred course of action.</p><p>The document is in working draft form and out for consultation and should be agreed in the next few weeks.</p><p>Stranmillis University College</p><p>At present Stranmillis University College is preparing to open in September using a blended learning approach with small groups on campus at any given time. Priority will be given to first year students coming on campus as on-campus experience is particularly important to enable them to adjust to third level study.</p><p>Strict social distancing, sanitization and cleaning regime will be in place. This means that:</p><p>All lecture materials will be online;</p><p>Blended/Interactive learning for other classes as standard;</p><p>Online delivery of practical/workshop classes if possible with the postponement of other practical classes to Semester 2, with priority given to on-campus delivery to Year 1 in Semester 1;</p><p>In line with social distancing, consider rotated classes on campus;</p><p>Online assessment and feedback to students; and</p><p>Online evaluations as standard.</p><p>Work is currently underway to assess the protocols and systems required to allow for the effective and efficient recommencement of restricted on-campus activity. However at the same time planning is underway to provide an effective connected learning approach for students in the event of on-site delivery being restricted or not permissible.</p><p>St Mary’s University College</p><p>If St Mary’s College is unable to open in September, they are planning:</p><p>Interactive delivery for small groups (which are very common at the College);</p><p>Google Classrooms, or equivalent, attached to each module;</p><p>Online delivery of lectures to large groups;</p><p>Formal assessment up to December 2020;</p><p>Online access to Student Guidance and the Library; and</p><p>Revisions to placement learning arrangements.</p><p>I trust that you find this information helpful.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204326%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=301480","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=301480"}},{"id":"301479","reference":"AQW 4325/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-05-28","answerBy":"2020-06-12","answered":"2020-06-02","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what support her Department is providing to further education colleges to continue operations and adapt to COVID-19.","answerText":"For the 2020/21 period, my Department has already allocated a resource budget of £209.95 million to the Further Education sector, representing over 25% of the Department’s resource budget. The allocation includes £22.8 million of additional funding to colleges this year.\n\nFurther capital investment of circa £35m in the current financial year, will enable colleges to address the COVID-19 impact and deliver state-of-the-art accommodation in line with the planned capital works programme. This will also fund essential equipment to deliver critical skills for the Northern Ireland economy and achieve the strategic outcomes which I and the Executive have set.\n\nIn addition, in order to address the many challenges arising from COVID-19, my officials are working closely with all six colleges and other key stakeholders, on a number of key strategic and operational matters. These include planning for a return to safe on-site delivery and a more normalised working environment essential to a large cohort of diverse FE learners and vocational and technical education, the completion of the 2019/20 student assessment/qualification process and, reducing the administrative burden on colleges until the emergency eases.\n\nA Learner Support Working Group has also been established to identify what additional support is being provided for all learners including vulnerable learners and review approaches to date.\n\nI will continue to consider the specific impacts of COVID-19 on the colleges within the context of the Executive’s overall approach to managing the emergency.","answerHtml":"<p>For the 2020/21 period, my Department has already allocated a resource budget of £209.95 million to the Further Education sector, representing over 25% of the Department’s resource budget. The allocation includes £22.8 million of additional funding to colleges this year.</p><p>Further capital investment of circa £35m in the current financial year, will enable colleges to address the COVID-19 impact and deliver state-of-the-art accommodation in line with the planned capital works programme. This will also fund essential equipment to deliver critical skills for the Northern Ireland economy and achieve the strategic outcomes which I and the Executive have set.</p><p>In addition, in order to address the many challenges arising from COVID-19, my officials are working closely with all six colleges and other key stakeholders, on a number of key strategic and operational matters. These include planning for a return to safe on-site delivery and a more normalised working environment essential to a large cohort of diverse FE learners and vocational and technical education, the completion of the 2019/20 student assessment/qualification process and, reducing the administrative burden on colleges until the emergency eases.</p><p>A Learner Support Working Group has also been established to identify what additional support is being provided for all learners including vulnerable learners and review approaches to date.</p><p>I will continue to consider the specific impacts of COVID-19 on the colleges within the context of the Executive’s overall approach to managing the emergency.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204325%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=301479","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=301479"}},{"id":"301478","reference":"AQW 4324/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-05-28","answerBy":"2020-06-12","answered":"2020-06-08","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she intends to bring forward support for businesses where the sole employee is the business owner or company director.","answerText":"At present there are no plans to bring forward specific support for those businesses mentioned.\n\nTo date, almost £300 million of support has been provided through the £10,000 Small Business Support Grant scheme and the £25,000 Retail, Hospitality, Tourism and Leisure Grant scheme. Both schemes were available to businesses who met the scheme’s eligibility criteria.\n\nI am aware that there are self-employed people who may not be able to avail of these schemes, such as those not operating out of business premises. Others may not be eligible for the Microbusiness Hardship Fund as they do not employ other people. I, along with my Executive colleagues, will continue to explore if further funding can be identified to help support as many local businesses as possible during this difficult time.\n\nMany other means of support are offered on a UK-wide basis. The Chancellor has announced the Self-Employed Income Support Scheme. This offers 80% of trading profits up to a maximum of £2,500 per month for 3 months. Other support is available such as the Bounce Back Loan scheme, HMRC’s Time to Pay and Income Tax Deferral. Further details are available at https://www.nibusinessinfo.co.uk/business-support/coronavirus.","answerHtml":"<p>At present there are no plans to bring forward specific support for those businesses mentioned.</p><p>To date, almost £300 million of support has been provided through the £10,000 Small Business Support Grant scheme and the £25,000 Retail, Hospitality, Tourism and Leisure Grant scheme. Both schemes were available to businesses who met the scheme’s eligibility criteria.</p><p>I am aware that there are self-employed people who may not be able to avail of these schemes, such as those not operating out of business premises. Others may not be eligible for the Microbusiness Hardship Fund as they do not employ other people. I, along with my Executive colleagues, will continue to explore if further funding can be identified to help support as many local businesses as possible during this difficult time.</p><p>Many other means of support are offered on a UK-wide basis. The Chancellor has announced the Self-Employed Income Support Scheme. This offers 80% of trading profits up to a maximum of £2,500 per month for 3 months. Other support is available such as the Bounce Back Loan scheme, HMRC’s Time to Pay and Income Tax Deferral. Further details are available at https://www.nibusinessinfo.co.uk/business-support/coronavirus.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204324%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=301478","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=301478"}},{"id":"301477","reference":"AQW 4323/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-05-28","answerBy":"2020-06-12","answered":"2020-07-16","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) how many premises in East Antrim are expected to benefit from Project Stratum; and (ii) whether she will consider ways to speed up progress on the project.","answerText":"(i) There are 1,956 premises in the East Antrim constituency within the Project Stratum target intervention area. It is important to note, however, that the number and location of premises that will benefit from this intervention will not be known until the procurement is complete and a contract has been awarded. My Department’s objective is to maximise the number of premises to benefit from available public funding of £165m, in addition to vital industry contribution.\n\n(ii) The closing date for receipt of tenders for Project Stratum has now passed. The evaluation of bids is underway and contract award is expected in late September 2020. My Department’s engagement with industry indicates that a 6-9 month period is required for network design and delivery preparation prior to deployment. It is anticipated, therefore, that deployment of infrastructure will commence a number of months after contract award, with completion by 31 March 2024.\n\nIn the current environment, the importance of telecommunications services has become prominent. Project Stratum has been developed under very robust corporate governance arrangements, to ensure efficient delivery. These will provide the necessary safeguards for the public investment. It is not possible to fast track the procurement or the required governance procedures, notwithstanding my Department’s continued efforts to ensure that the project fully aligns with the envisaged timeline so that as many premises as possible can benefit.","answerHtml":"<p>(i) There are 1,956 premises in the East Antrim constituency within the Project Stratum target intervention area. It is important to note, however, that the number and location of premises that will benefit from this intervention will not be known until the procurement is complete and a contract has been awarded. My Department’s objective is to maximise the number of premises to benefit from available public funding of £165m, in addition to vital industry contribution.</p><p>(ii) The closing date for receipt of tenders for Project Stratum has now passed. The evaluation of bids is underway and contract award is expected in late September 2020. My Department’s engagement with industry indicates that a 6-9 month period is required for network design and delivery preparation prior to deployment. It is anticipated, therefore, that deployment of infrastructure will commence a number of months after contract award, with completion by 31 March 2024.</p><p>In the current environment, the importance of telecommunications services has become prominent. Project Stratum has been developed under very robust corporate governance arrangements, to ensure efficient delivery. These will provide the necessary safeguards for the public investment. It is not possible to fast track the procurement or the required governance procedures, notwithstanding my Department’s continued efforts to ensure that the project fully aligns with the envisaged timeline so that as many premises as possible can benefit.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204323%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=301477","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=301477"}},{"id":"301476","reference":"AQW 4322/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-05-28","answerBy":"2020-06-12","answered":"2020-06-04","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy (i) what input or correspondence has the Department had with the Department of Agriculture, Environment and Rural Affairs' Marine Licensing in regards to the proposed Islandmagee Gas Storage Project; and (ii) whether she will publish this information.","answerText":"My Department has had a number of calls, meetings, and correspondence with the Department of Agriculture, Environment and Rural Affairs (DAERA) Marine Licensing about the Islandmagee gas storage project which have focused on the marine licensing proposals and decommissioning and residual liability issues. The Department for the Economy also provided input to DAERA’s consultation on the project’s application for a marine licence.\n\nThere are no plans to publish this information, however, my Department’s input to DAERA’s consultation on a marine licence for the project may be published on that Department’s website in due course.","answerHtml":"<p>My Department has had a number of calls, meetings, and correspondence with the Department of Agriculture, Environment and Rural Affairs (DAERA) Marine Licensing about the Islandmagee gas storage project which have focused on the marine licensing proposals and decommissioning and residual liability issues. The Department for the Economy also provided input to DAERA’s consultation on the project’s application for a marine licence.</p><p>There are no plans to publish this information, however, my Department’s input to DAERA’s consultation on a marine licence for the project may be published on that Department’s website in due course.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204322%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=301476","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=301476"}},{"id":"301294","reference":"AQW 4235/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-05-22","answerBy":"2020-06-09","answered":"2020-06-19","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to provide her Department’s assessment of the number of social enterprises registered as charities, broken down by constituency, that, thus far, have been excluded from COVID-19 Business Support Schemes.","answerText":"The number of applications from social enterprises registered as charities that have been excluded from the £10,000 or £25,000 Business Support Grant Schemes cannot be provided as the information was not captured in the application process and therefore is not held by the Department.\n\nThe status of a business as a social enterprise was not part of the eligibility criteria for either scheme. Eligibility for the £10,000 Small Business Support Grant scheme included the business receiving Small Business Rate Relief or Industrial derating, subject to exclusions, and having a Total Net Annual Value (NAV) of £15,000 or less. For the £25,000 Retail, Hospitality, Tourism and Leisure Grant scheme, eligibility was based on the business operating in one of the four eligible sectors, subject to exclusions, as well as having a Total NAV of between £15,001 and £51,000.\n\nIt is acknowledged that social enterprises, if receiving Charitable Exemption for rates, would not be able to apply for the £10,000 Small Business Support Grant scheme, and, if they have charitable status, will not qualify for the NI Microbusiness Hardship Fund. Eligibility for the £25,000 Retail, Hospitality, Tourism and Leisure Grant scheme would depend on the sector the social enterprise operates within and the Total NAV.\n\nThe Department for Communities has announced a £15.5 million fund for charities which is aimed at providing support to all charities who are facing financial difficulties as a result of the COVID-19 pandemic.","answerHtml":"<p>The number of applications from social enterprises registered as charities that have been excluded from the £10,000 or £25,000 Business Support Grant Schemes cannot be provided as the information was not captured in the application process and therefore is not held by the Department.</p><p>The status of a business as a social enterprise was not part of the eligibility criteria for either scheme. Eligibility for the £10,000 Small Business Support Grant scheme included the business receiving Small Business Rate Relief or Industrial derating, subject to exclusions, and having a Total Net Annual Value (NAV) of £15,000 or less. For the £25,000 Retail, Hospitality, Tourism and Leisure Grant scheme, eligibility was based on the business operating in one of the four eligible sectors, subject to exclusions, as well as having a Total NAV of between £15,001 and £51,000.</p><p>It is acknowledged that social enterprises, if receiving Charitable Exemption for rates, would not be able to apply for the £10,000 Small Business Support Grant scheme, and, if they have charitable status, will not qualify for the NI Microbusiness Hardship Fund. Eligibility for the £25,000 Retail, Hospitality, Tourism and Leisure Grant scheme would depend on the sector the social enterprise operates within and the Total NAV.</p><p>The Department for Communities has announced a £15.5 million fund for charities which is aimed at providing support to all charities who are facing financial difficulties as a result of the COVID-19 pandemic.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204235%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=301294","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=301294"}},{"id":"301293","reference":"AQW 4234/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-05-22","answerBy":"2020-06-09","answered":"2020-06-12","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether her Department has invited airlines which serve Northern Ireland to be part of the Tourism Recovery Steering Group.","answerText":"I have established a Tourism Recovery Taskforce consisting of a Steering Group which I chair, and a Working Group chaired by John McGrillen, Chief Executive of Tourism NI. The Working Group oversees ten work streams, one of which focuses on air and sea connectivity. A 'Task and Finish' Group has been formed to take forward this work stream, which includes members from British Airways, EasyJet and Loganair. Ryanair have also been invited to attend the Group. The Task and Finish Group is chaired by Albert Harrison, the chairman of City of Derry Airport.","answerHtml":"<p>I have established a Tourism Recovery Taskforce consisting of a Steering Group which I chair, and a Working Group chaired by John McGrillen, Chief Executive of Tourism NI. The Working Group oversees ten work streams, one of which focuses on air and sea connectivity. A &#39;Task and Finish&#39; Group has been formed to take forward this work stream, which includes members from British Airways, EasyJet and Loganair. Ryanair have also been invited to attend the Group. The Task and Finish Group is chaired by Albert Harrison, the chairman of City of Derry Airport.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204234%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=301293","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=301293"}},{"id":"300961","reference":"AQW 4107/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-05-13","answerBy":"2020-05-29","answered":"2020-06-24","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities whether her Department will consider implementing a scheme similar to the Future Jobs Fund that was previously operational in other parts of the United Kingdom, to assist the unemployed, particularly young people, into employment.","answerText":"The response to the emerging economic downturn linked to Covid-19 is a matter for the Executive to consider. As a first step, we need to understand and anticipate the potential impact of the recession on unemployment levels here to inform the specific interventions that we put in place. My Department will be actively involved in shaping and implementing that response to support people who become unemployed.","answerHtml":"<p>The response to the emerging economic downturn linked to Covid-19 is a matter for the Executive to consider. As a first step, we need to understand and anticipate the potential impact of the recession on unemployment levels here to inform the specific interventions that we put in place. My Department will be actively involved in shaping and implementing that response to support people who become unemployed.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204107%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=300961","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=300961"}},{"id":"300960","reference":"AQW 4106/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-05-13","answerBy":"2020-05-29","answered":"2020-06-12","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy, for each of the COVID-19 business support schemes her Department has responsibility for, to detail (i) the number of applications; (ii) the number of successful applications; (iii) the number of applications still waiting to be processed; and (iv) the average waiting time from application to the payment of funds.","answerText":"£10,000 Small Business Support Grant\n\nFor the £10,000 Small Business Support Grant Scheme, 6,775 payments were made automatically to eligible businesses, in receipt of Small Business Rate Relief, whose direct debit details were held by Land & Property Services for ratings purposes. 15,955 applications were submitted via an online web portal.\n\nOf these web portal applications a total of 13,385 have been successfully paid to date.\n\nThere are 2,570 applications still being processed. There are also an additional 1,279 applications which were made through a separate online rental portal, These require additional checking to ensure the business, and not the landlord, receives the grant.\n\nLPS has advised that it is not possible to calculate an average waiting time between application and payment. The range of waiting times is between three days and eight weeks, with the length of time required in each case driven by the complexity of the issues which need to be resolved before the payment can be released.\n\n£25,000 Business Support Grant\n\nFor the £25,000 Retail, Hospitality, Tourism and Leisure Grant scheme, 3,624 applications were received before the scheme closed on 20 May 2020. This figure includes 686 duplicate and ineligible applications.\n\nAs of 26 May 2020, 2,890 applications have been approved for payment. A further 34 applications are still to be processed.\n\nThe average waiting time from receipt of application to approval for payment is 13 days. Payment may take an additional three to five days to reach the applicant’s bank account.\n\nA further breakdown of the number of applications, successful applications and applications being processed is published in the ‘Operation of the scheme by council, constituency and sector’ section on the following webpage - https://www.nibusinessinfo.co.uk/content/coronavirus-£25000-retail-hospitality-tourism-and-leisure-grant.\n\nThis data is updated on a regular basis","answerHtml":"<p>£10,000 Small Business Support Grant</p><p>For the £10,000 Small Business Support Grant Scheme, 6,775 payments were made automatically to eligible businesses, in receipt of Small Business Rate Relief, whose direct debit details were held by Land &amp; Property Services for ratings purposes. 15,955 applications were submitted via an online web portal.</p><p>Of these web portal applications a total of 13,385 have been successfully paid to date.</p><p>There are 2,570 applications still being processed. There are also an additional 1,279 applications which were made through a separate online rental portal, These require additional checking to ensure the business, and not the landlord, receives the grant.</p><p>LPS has advised that it is not possible to calculate an average waiting time between application and payment. The range of waiting times is between three days and eight weeks, with the length of time required in each case driven by the complexity of the issues which need to be resolved before the payment can be released.</p><p>£25,000 Business Support Grant</p><p>For the £25,000 Retail, Hospitality, Tourism and Leisure Grant scheme, 3,624 applications were received before the scheme closed on 20 May 2020. This figure includes 686 duplicate and ineligible applications.</p><p>As of 26 May 2020, 2,890 applications have been approved for payment. A further 34 applications are still to be processed.</p><p>The average waiting time from receipt of application to approval for payment is 13 days. Payment may take an additional three to five days to reach the applicant’s bank account.</p><p>A further breakdown of the number of applications, successful applications and applications being processed is published in the ‘Operation of the scheme by council, constituency and sector’ section on the following webpage - https://www.nibusinessinfo.co.uk/content/coronavirus-£25000-retail-hospitality-tourism-and-leisure-grant.</p><p>This data is updated on a regular basis</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204106%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=300960","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=300960"}},{"id":"300800","reference":"AQW 4037/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-05-07","answerBy":"2020-05-26","answered":"2020-05-14","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether her Department will seek to increase the resources and capacity of the Health and Safety Executive to assist employers and ensure a safe working environment for employees in response to COVID-19.","answerText":"In the early days of the pandemic HSENI staff received an increase in volume of calls for advice and complaints of 2,000% on normal business. All inspectorate staff were required to deal with this. As time has gone on the number of complaints etc., whilst not as just as high, remains significant and constant. The anticipated gradual return to work in many of our sectors will likely to see a sustained rise in the number of complaints and calls for advice coming into HSENI which will again put their limited resources under pressure.\n\nIt should be noted that HSENI are not the policy maker in this instance, as this is the domain of our public health colleagues. However HSENI has worked very effectively with employers, trade groups, employees, trade unions and others to interpret the public health guidance and bring about practical solutions to work situations which have allowed many workplaces to maintain operations. The model they have used of advising and working with organisations and enforcement where required has been successful and one I want to see continue.\n\nHSENI’s inspectorate staff, whilst small in number, have met the challenges presented by the current pandemic. The recruitment, training and warranting of health and safety inspectors takes approximately three years which means there is no easy or quick way to boost their numbers. For this reason the organisation must utilise its resources as it has been doing to best meet the demands it will face.My Department will of course continue to support HSENI in fulfilling its functions and if there is a need to provide additional resources in the short or longer term, consider these favourably.\n\nThe resource issue is also one for our district councils who have responsibility for the enforcement of health and safety law in many businesses including offices, shops, restaurants and many of the premises on our high streets.","answerHtml":"<p>In the early days of the pandemic HSENI staff received an increase in volume of calls for advice and complaints of 2,000% on normal business. All inspectorate staff were required to deal with this. As time has gone on the number of complaints etc., whilst not as just as high, remains significant and constant. The anticipated gradual return to work in many of our sectors will likely to see a sustained rise in the number of complaints and calls for advice coming into HSENI which will again put their limited resources under pressure.</p><p>It should be noted that HSENI are not the policy maker in this instance, as this is the domain of our public health colleagues. However HSENI has worked very effectively with employers, trade groups, employees, trade unions and others to interpret the public health guidance and bring about practical solutions to work situations which have allowed many workplaces to maintain operations. The model they have used of advising and working with organisations and enforcement where required has been successful and one I want to see continue.</p><p>HSENI’s inspectorate staff, whilst small in number, have met the challenges presented by the current pandemic. The recruitment, training and warranting of health and safety inspectors takes approximately three years which means there is no easy or quick way to boost their numbers. For this reason the organisation must utilise its resources as it has been doing to best meet the demands it will face.My Department will of course continue to support HSENI in fulfilling its functions and if there is a need to provide additional resources in the short or longer term, consider these favourably.</p><p>The resource issue is also one for our district councils who have responsibility for the enforcement of health and safety law in many businesses including offices, shops, restaurants and many of the premises on our high streets.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204037%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=300800","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=300800"}},{"id":"300799","reference":"AQW 4036/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-05-07","answerBy":"2020-05-26","answered":"2020-06-09","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether her Department is considering potential financial support measures for businesses to assist with implementing social distancing measures going forward.","answerText":"On 28th March 2020, the First Minister and Deputy First Minister announced a series of enhanced containment measures, agreed by the Executive, designed to restrict the spread of the Coronavirus. This included the publication of The Health Protection (Coronavirus, Restrictions) Regulations (Northern Ireland) 2020.\n\nIn addition, the Executive and the UK government have since introduced a number of interventions and packages of financial support to help those who have been affected by the consequences of Covid-19, including a £370m Grant Scheme to support small and large businesses alike.\n\nAs of the end of May 2020, more than 25,000 business had received payments of either £10k or £25k to help mitigate the financial impacts of Covid-19 on their business, totalling almost £300m of government assistance thus far.\n\nThe Executive has also established a new and very representative multi-stakeholder NI Engagement Forum (the Forum), to advise on how best to manage the challenge of Covid-19, as it applies to the NI Economy / Labour Market.\n\nThe Forum have worked collectively and collaboratively in a short space of time to produce a number of documents, including the following:\n\nA framework of priority sectors/sub sectors; and\n\nAn Emergency Code of Practice offering practical assistance to essential businesses and their workforce to comply with the Health Protection Regulations and Public Health Authority (PHA) and Health and Safety Executive (HSE) guidance.\n\nThe Code of Practice offers practical advice and guidance on safe working practices, including social distancing, as it applies to the working environment.\n\nThe Forum is now taking forward a piece of work, aimed at developing ‘principles’ on restarting the economy. Once again, advice on the importance and specific considerations required, in relation to social distancing measures, are likely to feature prominently.\n\nI have raised this issue with the Business Secretary and will continue to make the case for NI businesses in need of support. Also, officials from my Department are working closely with the Department of Business, Energy & Industrial Strategy (BEIS), as they start to examine in detail, the impacts and challenges facing businesses as they look to implement necessary measures, such as social distancing. This will help to inform future decision making in Northern Ireland.\n\nApplying social distancing measures will place an additional financial burden on many employers and businesses. There will be requests for Government financial assistance to mitigate these operational costs, for example, changing/altering layouts, shift allowance payments, procuring Personal Protection Equipment (PPE) and increased cleaning of premises.\n\nI am not in a position to confirm whether additional financial support will be made available, specifically to support social distancing measures, however, I can confirm that the Executive, along with all stakeholders from across every sector of our society, including those on the aforementioned NI Engagement Forum, share a common goal:\n\n“To deliver a strong, competitive and regionally balanced economy with more people working in better jobs through all phases of the COVID-19 pandemic and within the context of EU Exit.”\n\nIn working towards this goal, the health, safety and well-being of our current and future workforce, will be paramount.","answerHtml":"<p>On 28th March 2020, the First Minister and Deputy First Minister announced a series of enhanced containment measures, agreed by the Executive, designed to restrict the spread of the Coronavirus. This included the publication of The Health Protection (Coronavirus, Restrictions) Regulations (Northern Ireland) 2020.</p><p>In addition, the Executive and the UK government have since introduced a number of interventions and packages of financial support to help those who have been affected by the consequences of Covid-19, including a £370m Grant Scheme to support small and large businesses alike.</p><p>As of the end of May 2020, more than 25,000 business had received payments of either £10k or £25k to help mitigate the financial impacts of Covid-19 on their business, totalling almost £300m of government assistance thus far.</p><p>The Executive has also established a new and very representative multi-stakeholder NI Engagement Forum (the Forum), to advise on how best to manage the challenge of Covid-19, as it applies to the NI Economy / Labour Market.</p><p>The Forum have worked collectively and collaboratively in a short space of time to produce a number of documents, including the following:</p><p>A framework of priority sectors/sub sectors; and</p><p>An Emergency Code of Practice offering practical assistance to essential businesses and their workforce to comply with the Health Protection Regulations and Public Health Authority (PHA) and Health and Safety Executive (HSE) guidance.</p><p>The Code of Practice offers practical advice and guidance on safe working practices, including social distancing, as it applies to the working environment.</p><p>The Forum is now taking forward a piece of work, aimed at developing ‘principles’ on restarting the economy. Once again, advice on the importance and specific considerations required, in relation to social distancing measures, are likely to feature prominently.</p><p>I have raised this issue with the Business Secretary and will continue to make the case for NI businesses in need of support. Also, officials from my Department are working closely with the Department of Business, Energy &amp; Industrial Strategy (BEIS), as they start to examine in detail, the impacts and challenges facing businesses as they look to implement necessary measures, such as social distancing. This will help to inform future decision making in Northern Ireland.</p><p>Applying social distancing measures will place an additional financial burden on many employers and businesses. There will be requests for Government financial assistance to mitigate these operational costs, for example, changing/altering layouts, shift allowance payments, procuring Personal Protection Equipment (PPE) and increased cleaning of premises.</p><p>I am not in a position to confirm whether additional financial support will be made available, specifically to support social distancing measures, however, I can confirm that the Executive, along with all stakeholders from across every sector of our society, including those on the aforementioned NI Engagement Forum, share a common goal:</p><p>“To deliver a strong, competitive and regionally balanced economy with more people working in better jobs through all phases of the COVID-19 pandemic and within the context of EU Exit.”</p><p>In working towards this goal, the health, safety and well-being of our current and future workforce, will be paramount.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204036%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=300799","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=300799"}},{"id":"300671","reference":"AQW 3967/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-05-01","answerBy":"2020-05-19","answered":"2020-05-14","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she intends to provide assistance to social enterprises in Northern Ireland that cannot avail of any of the current COVID-19 business support measures, including a timetable for action.","answerText":"The Small Business Support Grant is open to all businesses who are in receipt of either Small Business Rates Relief or Industrial Derating. If a Social Enterprise receives Charitable Exemption or another form of exemption they are not eligible to apply for this grant.\n\nSocial Enterprises that have a Total Net Annual Value of between £15,001 and £51,000 are eligible to apply for the £25,000 Business Support Grant for the retail, hospitality, tourism and leisure sectors, subject to some exclusions.\n\nThe Executive has approved an additional £40 million for a Hardship Fund which is aimed at microbusinesses who do not qualify for the existing schemes and require financial support. Social Enterprises can apply for this fund if they meet the eligibility criteria. Further details including eligibility and application arrangements will be announced in the week commencing 11 May 2020.","answerHtml":"<p>The Small Business Support Grant is open to all businesses who are in receipt of either Small Business Rates Relief or Industrial Derating. If a Social Enterprise receives Charitable Exemption or another form of exemption they are not eligible to apply for this grant.</p><p>Social Enterprises that have a Total Net Annual Value of between £15,001 and £51,000 are eligible to apply for the £25,000 Business Support Grant for the retail, hospitality, tourism and leisure sectors, subject to some exclusions.</p><p>The Executive has approved an additional £40 million for a Hardship Fund which is aimed at microbusinesses who do not qualify for the existing schemes and require financial support. Social Enterprises can apply for this fund if they meet the eligibility criteria. Further details including eligibility and application arrangements will be announced in the week commencing 11 May 2020.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203967%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=300671","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=300671"}},{"id":"300670","reference":"AQW 3966/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-05-01","answerBy":"2020-05-19","answered":"2020-05-14","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on her Department's Brexit preparations, in line with the Protocol on Ireland/Northern Ireland.","answerText":"My Department has been extensively involved in supporting the NI economy through the unprecedented challenge posed by the COVID-19 pandemic. However, throughout this I have been mindful that the UK Government has stated the transition period will not be extended, thus preparation for this remains a top priority.\n\nI am disappointed to note that there has been no further clarity from UK Government since you last asked this question. I continue to press the UK Government for urgent clarity on how the Protocol, as well as commitments on unfettered access to the UK internal market, will be enacted.\n\nWhilst the responsibility for enacting the Protocol lies primarily with UK Government, my officials are advancing work to ensure the Department and its Arm’s Length Bodies’ legislation, policies and services are as prepared as possible for the end of the transition period.\n\nIn addition, my officials continue to engage directly with businesses to understand how they may be affected by the Protocol and to consider what measures may be required to support them.","answerHtml":"<p>My Department has been extensively involved in supporting the NI economy through the unprecedented challenge posed by the COVID-19 pandemic. However, throughout this I have been mindful that the UK Government has stated the transition period will not be extended, thus preparation for this remains a top priority.</p><p>I am disappointed to note that there has been no further clarity from UK Government since you last asked this question. I continue to press the UK Government for urgent clarity on how the Protocol, as well as commitments on unfettered access to the UK internal market, will be enacted.</p><p>Whilst the responsibility for enacting the Protocol lies primarily with UK Government, my officials are advancing work to ensure the Department and its Arm’s Length Bodies’ legislation, policies and services are as prepared as possible for the end of the transition period.</p><p>In addition, my officials continue to engage directly with businesses to understand how they may be affected by the Protocol and to consider what measures may be required to support them.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203966%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=300670","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=300670"}},{"id":"298420","reference":"AQW 3504/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-03-11","answerBy":"2020-03-27","answered":"2020-06-29","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she will consider using the new Sustainable Development Index (SDI), as outlined by Jason Hickel, as a tool for Northern Ireland to annually monitor its current ecological situation, and thus seek to emulate best practice globally.","answerText":"Following the COVID-19 pandemic, my department has published ‘Rebuilding a Stronger Economy’ which provides a medium term plan for economic recovery moving towards a more competitive, inclusive and greener economy.\n\nIn the longer term, my Department will also lead on the development of an Economic strategy which will support a new Programme for Government. The principles of sustainable development will be a vital component of the strategy and the economic interventions detailed within it. Sustainable Development is an objective of the Northern Ireland Executive and requires a collective effort on behalf of Executive departments and their agencies. The SDI is a measure that is available and may in due course prove useful in measuring progress against wider ecological goals.","answerHtml":"<p>Following the COVID-19 pandemic, my department has published ‘Rebuilding a Stronger Economy’ which provides a medium term plan for economic recovery moving towards a more competitive, inclusive and greener economy.</p><p>In the longer term, my Department will also lead on the development of an Economic strategy which will support a new Programme for Government. The principles of sustainable development will be a vital component of the strategy and the economic interventions detailed within it. Sustainable Development is an objective of the Northern Ireland Executive and requires a collective effort on behalf of Executive departments and their agencies. The SDI is a measure that is available and may in due course prove useful in measuring progress against wider ecological goals.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203504%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=298420","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=298420"}},{"id":"298213","reference":"AQW 3422/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-03-10","answerBy":"2020-03-26","answered":"2020-06-19","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she plans to introduce any new financial support measures in the case of illness, for self-employed workers and independent contractors, in response to COVID-19.","answerText":"As part of my Department’s strategy to support people affected by the Covid-19 public health emergency, we are making a number of temporary changes to our benefit processes and legislation to ensure people who need financial help have access to the benefit system when they need it.\n\nTo avoid increasing the burden on the health system and the risk of further infection, we are temporarily removing the requirement for fit notes in relation to both Employment and Support Allowance (ESA) and Universal Credit (UC) claims relating to Covid-19 only. Anyone who claims and is infected with Covid-19 or who is required to self-isolate will be treated as having Limited Capability for Work in ESA and UC without being required to provide a fit note or to undergo a Work Capability Assessment.\n\nIn addition, to better support the needs of people, particularly the self-employed and those not eligible for Statutory Sick Pay and/or Universal Credit, we are removing the seven waiting days that currently apply to Employment and Support Allowance.\n\nTo further support those self-employed people who choose not to self-isolate there will be a temporary suspension of the minimum income floor used to calculate the household’s Universal Credit entitlement. This will provide greater financial security during this period.\n\nI will continue to keep these and any other available supports under review.","answerHtml":"<p>As part of my Department’s strategy to support people affected by the Covid-19 public health emergency, we are making a number of temporary changes to our benefit processes and legislation to ensure people who need financial help have access to the benefit system when they need it.</p><p>To avoid increasing the burden on the health system and the risk of further infection, we are temporarily removing the requirement for fit notes in relation to both Employment and Support Allowance (ESA) and Universal Credit (UC) claims relating to Covid-19 only. Anyone who claims and is infected with Covid-19 or who is required to self-isolate will be treated as having Limited Capability for Work in ESA and UC without being required to provide a fit note or to undergo a Work Capability Assessment.</p><p>In addition, to better support the needs of people, particularly the self-employed and those not eligible for Statutory Sick Pay and/or Universal Credit, we are removing the seven waiting days that currently apply to Employment and Support Allowance.</p><p>To further support those self-employed people who choose not to self-isolate there will be a temporary suspension of the minimum income floor used to calculate the household’s Universal Credit entitlement. This will provide greater financial security during this period.</p><p>I will continue to keep these and any other available supports under review.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203422%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=298213","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=298213"}},{"id":"298212","reference":"AQW 3421/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-03-10","answerBy":"2020-03-26","answered":"2020-04-09","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she has met, or plans to meet, the Minister for Business, Enterprise and Innovation of the Irish Government.","answerText":"I have not yet had the opportunity to meet with the Minister of Business, Enterprise and Innovation. When the new Irish Government in place, I will engage with them on areas that are mutually beneficial.","answerHtml":"<p>I have not yet had the opportunity to meet with the Minister of Business, Enterprise and Innovation. When the new Irish Government in place, I will engage with them on areas that are mutually beneficial.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203421%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=298212","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=298212"}},{"id":"297476","reference":"AQW 3141/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-03-04","answerBy":"2020-03-09","answered":"2021-01-12","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether she intends to mirror changes in employment legislation in the rest of the UK, in response to COVID-19, to allow for the payment of Statutory Sick Pay from the first day of illness.","answerText":"This is not within my Department’s remit.\n\nThe legislation underpinning statutory sick pay is not regarded as employment legislation but as social security legislation and is therefore within the remit of Department for Communities.","answerHtml":"<p>This is not within my Department’s remit.</p><p>The legislation underpinning statutory sick pay is not regarded as employment legislation but as social security legislation and is therefore within the remit of Department for Communities.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203141%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=297476","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=297476"}},{"id":"297089","reference":"AQW 2961/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-03-02","answerBy":"2020-03-18","answered":"2020-03-18","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health what steps he has taken to implement the recommendations of the Bengoa report since taking office; and when he will provide a full report on the progress of implementation.","answerText":"Since taking office I have committed to supporting the Transformation agenda, with work ongoing across my Department and the wider HSC on a range of key Transformation projects, including the introduction of Multidisciplinary Teams in Primary Care, and the establishment of prototype Elective Care Centres. I am also currently considering the findings of recent public consultations on Stroke and Breast Assessment Services.\n\nA Year 1, and a Year 2 Transformation progress report has been published. These reports can be found at: https://www.health-ni.gov.uk/articles/progressreportintroduction. It is expected that a further progress report will be published later this year.\n\n.","answerHtml":"<p>Since taking office I have committed to supporting the Transformation agenda, with work ongoing across my Department and the wider HSC on a range of key Transformation projects, including the introduction of Multidisciplinary Teams in Primary Care, and the establishment of prototype Elective Care Centres. I am also currently considering the findings of recent public consultations on Stroke and Breast Assessment Services.</p><p>A Year 1, and a Year 2 Transformation progress report has been published. These reports can be found at: https://www.health-ni.gov.uk/articles/progressreportintroduction. It is expected that a further progress report will be published later this year.</p><p>.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202961%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=297089","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=297089"}},{"id":"295239","reference":"AQW 2253/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-02-18","answerBy":"2020-03-04","answered":"2020-03-02","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what plans Invest NI has to extend their Brexit preparation work to (i) the retail sector; and (ii) the haulage sector.","answerText":"Invest NI will continue to advise and support businesses in all sectors to address the challenges and optimise opportunities arising from EU Exit.\n\nA wide range of Brexit related information, advice and guidance has been made available to all businesses, including those in the retail and haulage sector, via www.investni.com/brexit and www.nibusinessinfo.co.uk.\n\nInvest NI’s Brexit information events are delivered in partnership with business bodies (including the Freight & Transport Association and Retail NI) to attract the widest range of businesses.\n\nOnce the out-workings of the NI Protocol become clear, Invest NI will provide further advice and guidance to all NI businesses.","answerHtml":"<p>Invest NI will continue to advise and support businesses in all sectors to address the challenges and optimise opportunities arising from EU Exit.</p><p>A wide range of Brexit related information, advice and guidance has been made available to all businesses, including those in the retail and haulage sector, via www.investni.com/brexit and www.nibusinessinfo.co.uk.</p><p>Invest NI’s Brexit information events are delivered in partnership with business bodies (including the Freight &amp; Transport Association and Retail NI) to attract the widest range of businesses.</p><p>Once the out-workings of the NI Protocol become clear, Invest NI will provide further advice and guidance to all NI businesses.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202253%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=295239","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=295239"}},{"id":"295238","reference":"AQW 2252/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-02-18","answerBy":"2020-03-04","answered":"2020-03-02","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what apprenticeship opportunities will flow from the Belfast Region City Deal.","answerText":"Given the early stage of development of the Belfast City Region Deal it is not yet possible to predict the number and type of new jobs that may be created, or to estimate how many of those will be in the form of an apprenticeship.\n\nThe Deal proposal document includes and ‘Employability and Skills’ Theme which proposes an Apprenticeship HUB. This would provide opportunities to pilot new apprenticeships such as 25+ adult apprenticeships, public sector apprenticeships and shared apprentice solutions for SMEs. However, it is the responsibility of the Councils in the Belfast Region City Deal to work with the projects, which they have selected for inclusion in the Deal, and ensure that these projects provide apprenticeship opportunities.\n\nMy Department continues to work with the Belfast Region City Deal officials and has representation on the Employability and Skills Advisory Board. Their role is to provide advice and guidance so that we maximise the employment opportunities for all, including apprenticeships, that may develop from the Belfast Region City Deal.","answerHtml":"<p>Given the early stage of development of the Belfast City Region Deal it is not yet possible to predict the number and type of new jobs that may be created, or to estimate how many of those will be in the form of an apprenticeship.</p><p>The Deal proposal document includes and ‘Employability and Skills’ Theme which proposes an Apprenticeship HUB. This would provide opportunities to pilot new apprenticeships such as 25+ adult apprenticeships, public sector apprenticeships and shared apprentice solutions for SMEs. However, it is the responsibility of the Councils in the Belfast Region City Deal to work with the projects, which they have selected for inclusion in the Deal, and ensure that these projects provide apprenticeship opportunities.</p><p>My Department continues to work with the Belfast Region City Deal officials and has representation on the Employability and Skills Advisory Board. Their role is to provide advice and guidance so that we maximise the employment opportunities for all, including apprenticeships, that may develop from the Belfast Region City Deal.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202252%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=295238","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=295238"}},{"id":"295237","reference":"AQW 2251/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-02-18","answerBy":"2020-03-04","answered":"2020-03-02","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what plans her Department has to refresh the Higher Education Strategy.","answerText":"i. The Graduating to Success strategy will close on 31 March 2020. The\n\nDepartment will then carry out a review on the strategy.\n\nii. The Department is presently developing a Skills Strategy which will\n\nset the overall direction for skills in Northern Ireland to 2030 and will\n\ninform policy, strategy and investment decisions across the education\n\nand skills landscape.","answerHtml":"<p>i. The Graduating to Success strategy will close on 31 March 2020. The</p><p>Department will then carry out a review on the strategy.</p><p>ii. The Department is presently developing a Skills Strategy which will</p><p>set the overall direction for skills in Northern Ireland to 2030 and will</p><p>inform policy, strategy and investment decisions across the education</p><p>and skills landscape.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202251%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=295237","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=295237"}},{"id":"295236","reference":"AQW 2250/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-02-18","answerBy":"2020-03-04","answered":"2020-03-12","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what representation she is making to the Executive for Apprenticeship Levy Funds, generated in Northern Ireland, to be re-invested in apprenticeships or other forms of upskilling.","answerText":"The Apprenticeship Levy, a fiscal policy and reserved matter for the UK Parliament, was introduced by the UK Government in April 2017. Whilst Northern Ireland receives the Barnett Consequential from the levy this had no significant impact on the block grant.\n\nAlthough the collection of the levy is a reserved matter, with no scope for derogation for Northern Ireland, the delivery of Apprenticeships is a devolved matter.\n\nIn Northern Ireland Apprenticeships are delivered through my Department’s ApprenticeshipsNI and Higher Level Apprenticeship programmes. My Department provides funding to support the cost of apprenticeship training for private sector employers regardless of whether they pay levy contributions. These are demand led programmes, and I encourage all employers to avail of these Programmes to drive forward business growth.\n\nI am also focused on ensuring the apprenticeships system best meets the needs of employers and participants in Northern Ireland. The Strategic Advisory Forum and Sectoral Partnerships are working on an ongoing basis to ensure employers play a central role in policy development and curriculum design.\n\nI have met with a number of employers and representative bodies to understand the impact of the levy and opportunities to enhance our apprenticeships system. I am committed to consider the issues raised by NI employers that I have engaged with and during the consultation on the impact of the levy in NI, including policy changes around the current age related criteria, potential public sector apprenticeships, and how to improve transparency for employers on the level of funding support they are currently availing of through participation in our apprenticeship programmes. I intend to engage with the Executive in due course to outline plans to further enhance our Apprenticeship system.","answerHtml":"<p>The Apprenticeship Levy, a fiscal policy and reserved matter for the UK Parliament, was introduced by the UK Government in April 2017. Whilst Northern Ireland receives the Barnett Consequential from the levy this had no significant impact on the block grant.</p><p>Although the collection of the levy is a reserved matter, with no scope for derogation for Northern Ireland, the delivery of Apprenticeships is a devolved matter.</p><p>In Northern Ireland Apprenticeships are delivered through my Department’s ApprenticeshipsNI and Higher Level Apprenticeship programmes. My Department provides funding to support the cost of apprenticeship training for private sector employers regardless of whether they pay levy contributions. These are demand led programmes, and I encourage all employers to avail of these Programmes to drive forward business growth.</p><p>I am also focused on ensuring the apprenticeships system best meets the needs of employers and participants in Northern Ireland. The Strategic Advisory Forum and Sectoral Partnerships are working on an ongoing basis to ensure employers play a central role in policy development and curriculum design.</p><p>I have met with a number of employers and representative bodies to understand the impact of the levy and opportunities to enhance our apprenticeships system. I am committed to consider the issues raised by NI employers that I have engaged with and during the consultation on the impact of the levy in NI, including policy changes around the current age related criteria, potential public sector apprenticeships, and how to improve transparency for employers on the level of funding support they are currently availing of through participation in our apprenticeship programmes. I intend to engage with the Executive in due course to outline plans to further enhance our Apprenticeship system.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202250%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=295236","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=295236"}},{"id":"295235","reference":"AQW 2249/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-02-18","answerBy":"2020-03-04","answered":"2020-03-09","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what her plans are to implement the previous Executive's Economic Inactivity Strategy.","answerText":"‘Enabling Success’ was the previous Executive’s strategy for addressing the high level of economic inactivity rate in Northern Ireland. This was a joint strategy between the former Department for Enterprise, Trade and Investment and the former Department for Employment and Learning (DEL).\n\nFollowing Departmental restructuring in 2016, responsibility for the Enabling Success Strategy transferred to the Department for Communities. Although the Strategy is no longer active, the broad principles remain relevant given the current level of economic inactivity across Northern Ireland. Key components of the Strategy are being progressed by the Department for Communities within the ‘Employability NI’ Programme and my officials are members of the Programme Board.\n\nThrough the development of a new Northern Ireland Skills Strategy, to cover the period 2021-2030, my Department will continue to work closely with the Department for Communities on measures to reduce economic inactivity, providing support and opportunities so that everyone can contribute to and benefit from our growing economic prosperity.","answerHtml":"<p>‘Enabling Success’ was the previous Executive’s strategy for addressing the high level of economic inactivity rate in Northern Ireland. This was a joint strategy between the former Department for Enterprise, Trade and Investment and the former Department for Employment and Learning (DEL).</p><p>Following Departmental restructuring in 2016, responsibility for the Enabling Success Strategy transferred to the Department for Communities. Although the Strategy is no longer active, the broad principles remain relevant given the current level of economic inactivity across Northern Ireland. Key components of the Strategy are being progressed by the Department for Communities within the ‘Employability NI’ Programme and my officials are members of the Programme Board.</p><p>Through the development of a new Northern Ireland Skills Strategy, to cover the period 2021-2030, my Department will continue to work closely with the Department for Communities on measures to reduce economic inactivity, providing support and opportunities so that everyone can contribute to and benefit from our growing economic prosperity.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202249%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=295235","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=295235"}},{"id":"295089","reference":"AQW 2179/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-02-17","answerBy":"2020-02-25","answered":"2020-02-25","answeredOrally":false,"priority":true,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs to outline the rationale for extending the Islandmagee Gas Storage Project Consultation.","answerText":"The Department received a letter alleging shortcomings with the public notice advertising the consultation on the updated application, Environmental Statement and Marine Environmental Conditions Update Report for the proposed Islandmagee Gas Storage project.\n\nFollowing a review of the notice, the Department decided to re-advertise and extend the consultation using an amended notice.\n\nDAERA has contacted all respondents informing them of the revised consultation closing date of 27 March. Respondents have also been advised that while they do not have to make a further response, they can use this period to add any additional comments in support of their views.","answerHtml":"<p>The Department received a letter alleging shortcomings with the public notice advertising the consultation on the updated application, Environmental Statement and Marine Environmental Conditions Update Report for the proposed Islandmagee Gas Storage project.</p><p>Following a review of the notice, the Department decided to re-advertise and extend the consultation using an amended notice.</p><p>DAERA has contacted all respondents informing them of the revised consultation closing date of 27 March. Respondents have also been advised that while they do not have to make a further response, they can use this period to add any additional comments in support of their views.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202179%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=295089","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=295089"}},{"id":"295088","reference":"AQW 2178/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-02-17","answerBy":"2020-03-03","answered":"2020-03-04","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities for an update on the implementation of the Disability Employment Strategy.","answerText":"My Department is fully committed to supporting people with disabilities and health conditions progress towards, move into and stay in employment, and does this through a number of programmes.\n\nThe current Employment Strategy for People with Disabilities is a five year strategy which will run until March 2021 in which my Department has a clear lead responsibility for the implementation.\n\nSome key achievements my Department has made to date within the strategy include:\n\nUnder Theme One ‘empowering people to secure paid employment’:\n\nestablished a Disability Employment Stakeholder Forum. This forum was established in 2016 and has brought together key officials, along with representatives from the disability sector to monitor and positively influence the implementation of the strategy,\n\nfrom April 2019 to January 2020 supported 3421 people through our disability employment programmes and supported 38 of these into employment.\n\nUnder Theme Two, ‘job retention and career development’:\n\nfrom April 2019 to January 2020 my Department supported 2419 people to retain employment;\n\nWorkable Programme eligibility has been reduced from 16 hours to 10 hours to allow more people to access the Programme;\n\nAccess to Work and Workable participants can also participate on the Condition Management Programme to help them stay in work; and\n\nThe Condition Management Programme has been extended to all Universal Credit regimes and Steps 2 Success participants.\n\nUnder Theme Three, ‘working with employers’:\n\n‘Employing People with Disabilities – a positive action guide for employers’ was launched in January 2019.\n\nWork will continue alongside our partners in the disability sector to ensure we offer the support required for people with disabilities and health conditions to progress towards and remain in employment.","answerHtml":"<p>My Department is fully committed to supporting people with disabilities and health conditions progress towards, move into and stay in employment, and does this through a number of programmes.</p><p>The current Employment Strategy for People with Disabilities is a five year strategy which will run until March 2021 in which my Department has a clear lead responsibility for the implementation.</p><p>Some key achievements my Department has made to date within the strategy include:</p><p>Under Theme One ‘empowering people to secure paid employment’:</p><p>established a Disability Employment Stakeholder Forum. This forum was established in 2016 and has brought together key officials, along with representatives from the disability sector to monitor and positively influence the implementation of the strategy,</p><p>from April 2019 to January 2020 supported 3421 people through our disability employment programmes and supported 38 of these into employment.</p><p>Under Theme Two, ‘job retention and career development’:</p><p>from April 2019 to January 2020 my Department supported 2419 people to retain employment;</p><p>Workable Programme eligibility has been reduced from 16 hours to 10 hours to allow more people to access the Programme;</p><p>Access to Work and Workable participants can also participate on the Condition Management Programme to help them stay in work; and</p><p>The Condition Management Programme has been extended to all Universal Credit regimes and Steps 2 Success participants.</p><p>Under Theme Three, ‘working with employers’:</p><p>‘Employing People with Disabilities – a positive action guide for employers’ was launched in January 2019.</p><p>Work will continue alongside our partners in the disability sector to ensure we offer the support required for people with disabilities and health conditions to progress towards and remain in employment.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202178%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=295088","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=295088"}},{"id":"295087","reference":"AQW 2177/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-02-17","answerBy":"2020-03-03","answered":"2020-02-26","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs when the applicant was made aware of the extension of the Islandmagee Gas Storage Project Consultation.","answerText":"The applicant was advised that the Department was considering extending the consultation on the marine licence application, Environmental Statement and Marine Environmental Conditions Update Report for the proposed Islandmagee Gas Storage Project on 5 February 2020. My Department confirmed that the extension would take place with the applicant and on 12th February a notice/advertisement extending the consultation was issued by DAERA.","answerHtml":"<p>The applicant was advised that the Department was considering extending the consultation on the marine licence application, Environmental Statement and Marine Environmental Conditions Update Report for the proposed Islandmagee Gas Storage Project on 5 February 2020. My Department confirmed that the extension would take place with the applicant and on 12th February a notice/advertisement extending the consultation was issued by DAERA.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202177%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=295087","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=295087"}},{"id":"295086","reference":"AQW 2176/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-02-17","answerBy":"2020-03-03","answered":"2020-03-02","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs for his assessment of the importance of public confidence in the Islandmagee Gas Storage Project Consultation process; and for his assessment of the impact that an extension of the consultation will have on public confidence.","answerText":"I believe that it is very important that the public has full confidence in the consultation for the proposed gas storage project at Island Magee.\n\nThe applicant has hosted a number of public events to promote direct engagement with members of the public. These have been attended by DAERA staff. The extension has facilitated two further events on 20th February and 18th March and gives the general public an additional opportunity to comment on the proposal. The applicant has also established an Islandmagee Energy Fund of £1 million which is to be allocated and utilised within the local community over the life-span of the proposed project.","answerHtml":"<p>I believe that it is very important that the public has full confidence in the consultation for the proposed gas storage project at Island Magee.</p><p>The applicant has hosted a number of public events to promote direct engagement with members of the public. These have been attended by DAERA staff. The extension has facilitated two further events on 20th February and 18th March and gives the general public an additional opportunity to comment on the proposal. The applicant has also established an Islandmagee Energy Fund of £1 million which is to be allocated and utilised within the local community over the life-span of the proposed project.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202176%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=295086","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=295086"}},{"id":"295085","reference":"AQW 2175/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-02-17","answerBy":"2020-03-03","answered":"2020-02-24","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs to what extent the decision to extend the Islandmagee Gas Storage Project Consultation period was influenced by the applicant.","answerText":"The decision to extend the consultation on the marine licence application, an Environmental Statement and Marine Environmental Conditions Update Report, was taken by the Department. The decision was not influenced by the applicant; however, they were advised that the Department was considering this option on 5 February.","answerHtml":"<p>The decision to extend the consultation on the marine licence application, an Environmental Statement and Marine Environmental Conditions Update Report, was taken by the Department. The decision was not influenced by the applicant; however, they were advised that the Department was considering this option on 5 February.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202175%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=295085","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=295085"}},{"id":"294409","reference":"AQW 1941/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-02-12","answerBy":"2020-02-27","answered":"2020-03-02","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail what measures are in place to address the skills requirements in advanced manufacturing and engineering.","answerText":"In response to the increasing demand for skills need in advanced manufacturing and engineering, my Department works closely with South West College (SWC) as the designated Advanced Manufacturing and Engineering (AME) Hub. SWC as the lead college for the AME Hub, collaborates with the other further education (FE) colleges across the region to develop teaching and curriculum excellence that will benefit employers, regardless of geographical area. The Hub has established strong industry links with over 205 participating employers including the AME sectoral partnership and other business engagement activity to ensure that curriculum provision and programmes delivered are fully aligned to the sector’s current and future requirements.\n\nAssured Skills/Bridge to Employment\n\nMy Department’s Employer Skills Team worked closely with SWC to develop a more strategic and sustainable programme to address the demand for welders in local companies. The programme was developed following the delivery of a number of Assured Skills welding academies across the six further education colleges in 2018/19 which trained 57 individuals to Level 2, resulting in 43 participants gaining employment.\n\nIn November 2019, SWC launched a Manufacturing Support Programme (MSP), to provide the AME industries with an integrated support package for workforce development and growth. MSP assists employers in attracting and retaining the talent needed to continue to improve productivity and competitiveness. The package of measures offered under the MSP include:\n\nAssured Skills Welding Academy in Dungannon;\n\nBridge to Employment welding projects in Omagh, Enniskillen and Dungannon; and\n\nthe opportunity for all eligible firms to avail of Skills Focus to upskill current employees.\n\nSkills Focus\n\nThe FE colleges have delivered qualifications to 612 employees in the AME sector in the last two years (1 April 2018 to 31 January 2020) under the auspices of the Skills Focus programme.\n\nInnovateUs\n\nThrough the InnovateUs programme, the FE colleges have delivered 178 innovation upskilling projects in the AME sector in the last two years (1 April 2018 to 31 January 2020). The FE Colleges continue to work to develop projects with the AME sector, and in particular with ADS NI, (the representative body for the Aerospace, Defence, Security and Space Industries) to deliver both the Skills Focus and InnovateUS programmes.\n\nApprenticeships\n\nFunding for apprenticeship training is provided by my Department. Training is available from Level 2 (GCSE equivalent) up to Level 7 (Masters Level). In the case of apprentices aged between 16-24 years, through the ApprenticeshipsNI programme, my Department funds 100% of the cost of off-the-job training at Levels 2 and 3. At the end of April 2019, 759 apprenticeships were enrolled on the engineering related programmes. For apprentices aged 25 years and over, funding (at a reduced rate) is focused on specific priority economic sectors (including engineering). An incentive payment is available for employers whose employees achieve all relevant qualifications.\n\nMy Department also funds off-the-job training for the Higher Level Apprenticeships (HLAs), creating an effective and sustainable pipeline for skills development in the Northern Ireland workforce, while offering an alternative route for participants to gain a third level qualification. HLAs in advanced manufacturing and engineering are currently delivered at Level 5 through the further education colleges and at Level 6 by Ulster University.\n\nHigher Education\n\nThe Department’s Post Graduate Award Scheme provided funding for a total of 86 engineering students at Queen’s University Belfast and Ulster University in 2018/19. The Northern Ireland Skills Barometer indicates that HE skills are, in general, only marginally undersupplied. However, there is an imbalance across individual subject areas with the largest undersupply predicted in ‘Engineering & Technology’ subjects (which includes ‘Production & manufacturing engineering’).\n\nNorthern Ireland’s universities are aware of this undersupply, and have taken measures to rebalance provision, with the result that enrolments and qualifications in ‘Engineering & technology’ subjects have been increasing over the past number of years. Enrolments have increased 36.2% from 2,845 in 2008/09 to 3,875 in 2017/18. Qualifications in these subjects have increased by 41.3% from 690 in 2008/09 to 975 in 2017/18.\n\nInvest NI\n\nInvest NI’s support for support for the Advanced Engineering and Manufacturing (AEM) sector since 2015 has focussed on Skills & Leadership delivering:\n\n£10,583k Skills Growth grant offered to companies in the AEM sector;\n\n£41,183k projected secured spend by companies in the AEM sector;\n\n180 offers made to companies in the AEM sector; and\n\n48 offers made to develop leadership and management potential in the AEM sector through The Leader Programme, Leading within a Group and Leadership Team programmes.","answerHtml":"<p>In response to the increasing demand for skills need in advanced manufacturing and engineering, my Department works closely with South West College (SWC) as the designated Advanced Manufacturing and Engineering (AME) Hub. SWC as the lead college for the AME Hub, collaborates with the other further education (FE) colleges across the region to develop teaching and curriculum excellence that will benefit employers, regardless of geographical area. The Hub has established strong industry links with over 205 participating employers including the AME sectoral partnership and other business engagement activity to ensure that curriculum provision and programmes delivered are fully aligned to the sector’s current and future requirements.</p><p>Assured Skills/Bridge to Employment</p><p>My Department’s Employer Skills Team worked closely with SWC to develop a more strategic and sustainable programme to address the demand for welders in local companies. The programme was developed following the delivery of a number of Assured Skills welding academies across the six further education colleges in 2018/19 which trained 57 individuals to Level 2, resulting in 43 participants gaining employment.</p><p>In November 2019, SWC launched a Manufacturing Support Programme (MSP), to provide the AME industries with an integrated support package for workforce development and growth. MSP assists employers in attracting and retaining the talent needed to continue to improve productivity and competitiveness. The package of measures offered under the MSP include:</p><p>Assured Skills Welding Academy in Dungannon;</p><p>Bridge to Employment welding projects in Omagh, Enniskillen and Dungannon; and</p><p>the opportunity for all eligible firms to avail of Skills Focus to upskill current employees.</p><p>Skills Focus</p><p>The FE colleges have delivered qualifications to 612 employees in the AME sector in the last two years (1 April 2018 to 31 January 2020) under the auspices of the Skills Focus programme.</p><p>InnovateUs</p><p>Through the InnovateUs programme, the FE colleges have delivered 178 innovation upskilling projects in the AME sector in the last two years (1 April 2018 to 31 January 2020). The FE Colleges continue to work to develop projects with the AME sector, and in particular with ADS NI, (the representative body for the Aerospace, Defence, Security and Space Industries) to deliver both the Skills Focus and InnovateUS programmes.</p><p>Apprenticeships</p><p>Funding for apprenticeship training is provided by my Department. Training is available from Level 2 (GCSE equivalent) up to Level 7 (Masters Level). In the case of apprentices aged between 16-24 years, through the ApprenticeshipsNI programme, my Department funds 100% of the cost of off-the-job training at Levels 2 and 3. At the end of April 2019, 759 apprenticeships were enrolled on the engineering related programmes. For apprentices aged 25 years and over, funding (at a reduced rate) is focused on specific priority economic sectors (including engineering). An incentive payment is available for employers whose employees achieve all relevant qualifications.</p><p>My Department also funds off-the-job training for the Higher Level Apprenticeships (HLAs), creating an effective and sustainable pipeline for skills development in the Northern Ireland workforce, while offering an alternative route for participants to gain a third level qualification. HLAs in advanced manufacturing and engineering are currently delivered at Level 5 through the further education colleges and at Level 6 by Ulster University.</p><p>Higher Education</p><p>The Department’s Post Graduate Award Scheme provided funding for a total of 86 engineering students at Queen’s University Belfast and Ulster University in 2018/19. The Northern Ireland Skills Barometer indicates that HE skills are, in general, only marginally undersupplied. However, there is an imbalance across individual subject areas with the largest undersupply predicted in ‘Engineering &amp; Technology’ subjects (which includes ‘Production &amp; manufacturing engineering’).</p><p>Northern Ireland’s universities are aware of this undersupply, and have taken measures to rebalance provision, with the result that enrolments and qualifications in ‘Engineering &amp; technology’ subjects have been increasing over the past number of years. Enrolments have increased 36.2% from 2,845 in 2008/09 to 3,875 in 2017/18. Qualifications in these subjects have increased by 41.3% from 690 in 2008/09 to 975 in 2017/18.</p><p>Invest NI</p><p>Invest NI’s support for support for the Advanced Engineering and Manufacturing (AEM) sector since 2015 has focussed on Skills &amp; Leadership delivering:</p><p>£10,583k Skills Growth grant offered to companies in the AEM sector;</p><p>£41,183k projected secured spend by companies in the AEM sector;</p><p>180 offers made to companies in the AEM sector; and</p><p>48 offers made to develop leadership and management potential in the AEM sector through The Leader Programme, Leading within a Group and Leadership Team programmes.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201941%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=294409","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=294409"}},{"id":"294408","reference":"AQW 1940/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-02-12","answerBy":"2020-02-27","answered":"2020-02-20","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance to detail the Barnett consequentials for the Executive announced during the 2019/20 financial year, providing their value on a per annum basis and stating when they commence.","answerText":"A range of announcements in 2019-20 have led to Barnett Consequentials for Northern Ireland. The Tables below provide details:\n\n2019-20 Barnett changes announced Spring Statement 2019\n£million\n2019-20\nType of Change\tResource\tCapital\nEU Exit\t18.3\t8.9\nEU Exit PSNI\t9.8\nCT Police\t5.0\nKnife Crime\t2.5\nONS claim for 2021 census\t3.2\nMoJ Reserve claim\t41.1\nPensions pressures\t93.0\nNetwork rail CP6 spend\t20.3\t-16.6\nLocal Government changes\t16.5\nNHS\t1.3\nPolice\t2.8\nTotals\t213.6\t-7.7\n\n2019-20 In-year Barnett changes\n£million\n2019-20\nType of Change\tResource\tCapital\tFTC\nEU Exit August 2019\t31.0\t0.4\nEU Exit Operational Contingency Fund PSNI\t3.1\nEU Exit Operational Contingency Fund\t4.0\nEU Exit Business readiness Fund\t1.4\n\nPolice Recruitment\t1.4\t0.0\nCommonwealth Games\t0.9\nHealth\t\t39.3\n\nLate in-year adjustments\t18.0\t\t-59.0\nTotals\t59.8\t39.8\t-59.0\n\nFollowing 2019 Spending Round, NI received Barnett Consequentials for 2020-21.\n\n2019-20 Spending Round Barnett changes\n\n£ million\n2020-21\nResource\tCapital\nResource Baseline / Existing Capital Budget\t10,683.0\t1,373.9\nBarnett Consequentials\t419.9\t9.6\n\nThese funds are unhypothecated, meaning they do not have to be used for the purposes for which they were issued. Barnett consequentials are allocated in line with local needs and priorities.\n\nThe 2020 Spending Review will set Budgets for 2021-22 onwards.","answerHtml":"<p>A range of announcements in 2019-20 have led to Barnett Consequentials for Northern Ireland. The Tables below provide details:</p><div class=\"table-wrap\"><table><tr><td>2019-20 Barnett changes announced Spring Statement 2019</td><td></td><td></td></tr><tr><td></td><td></td><td>£million</td></tr><tr><td></td><td colspan=\"2\">2019-20</td></tr><tr><td>Type of Change</td><td>Resource</td><td>Capital</td></tr><tr><td>EU Exit</td><td>18.3</td><td>8.9</td></tr><tr><td>EU Exit PSNI</td><td>9.8</td><td></td></tr><tr><td>CT Police</td><td>5.0</td><td></td></tr><tr><td>Knife Crime</td><td>2.5</td><td></td></tr><tr><td>ONS claim for 2021 census</td><td>3.2</td><td></td></tr><tr><td>MoJ Reserve claim</td><td>41.1</td><td></td></tr><tr><td>Pensions pressures</td><td>93.0</td><td></td></tr><tr><td>Network rail CP6 spend</td><td>20.3</td><td>-16.6</td></tr><tr><td>Local Government changes</td><td>16.5</td><td></td></tr><tr><td>NHS</td><td>1.3</td><td></td></tr><tr><td>Police</td><td>2.8</td><td></td></tr><tr><td>Totals</td><td>213.6</td><td>-7.7</td></tr></table></div><div class=\"table-wrap\"><table><tr><td colspan=\"2\">2019-20 In-year Barnett changes</td><td colspan=\"2\"></td><td colspan=\"2\"></td><td colspan=\"2\"></td></tr><tr><td colspan=\"2\"></td><td colspan=\"2\"></td><td colspan=\"2\"></td><td colspan=\"2\">£million</td></tr><tr><td colspan=\"3\"></td><td colspan=\"5\">2019-20</td></tr><tr><td colspan=\"3\">Type of Change</td><td colspan=\"2\">Resource</td><td colspan=\"2\">Capital</td><td>FTC</td></tr><tr><td colspan=\"3\">EU Exit August 2019</td><td colspan=\"2\">31.0</td><td colspan=\"2\">0.4</td><td></td></tr><tr><td colspan=\"3\">EU Exit Operational Contingency Fund PSNI</td><td colspan=\"2\">3.1</td><td colspan=\"2\"></td><td></td></tr><tr><td colspan=\"3\">EU Exit Operational Contingency Fund</td><td colspan=\"2\">4.0</td><td colspan=\"2\"></td><td></td></tr><tr><td colspan=\"3\">EU Exit Business readiness Fund</td><td colspan=\"2\">1.4</td><td colspan=\"2\"></td><td></td></tr><tr><td colspan=\"3\"></td><td colspan=\"2\"></td><td colspan=\"2\"></td><td></td></tr><tr><td colspan=\"3\">Police Recruitment</td><td colspan=\"2\">1.4</td><td colspan=\"2\">0.0</td><td></td></tr><tr><td colspan=\"3\">Commonwealth Games</td><td colspan=\"2\">0.9</td><td colspan=\"2\"></td><td></td></tr><tr><td colspan=\"3\">Health</td><td colspan=\"2\"></td><td colspan=\"2\">39.3</td><td></td></tr><tr><td colspan=\"3\"></td><td colspan=\"2\"></td><td colspan=\"2\"></td><td></td></tr><tr><td colspan=\"3\">Late in-year adjustments</td><td colspan=\"2\">18.0</td><td colspan=\"2\"></td><td>-59.0</td></tr><tr><td colspan=\"3\">Totals</td><td colspan=\"2\">59.8</td><td colspan=\"2\">39.8</td><td>-59.0</td></tr><tr><td></td></tr></table></div><p>Following 2019 Spending Round, NI received Barnett Consequentials for 2020-21.</p><p>2019-20 Spending Round Barnett changes</p><div class=\"table-wrap\"><table><tr><td></td><td></td><td>£ million</td></tr><tr><td></td><td colspan=\"2\">2020-21</td></tr><tr><td></td><td>Resource</td><td>Capital</td></tr><tr><td>Resource Baseline / Existing Capital Budget</td><td>10,683.0</td><td>1,373.9</td></tr><tr><td>Barnett Consequentials</td><td>419.9</td><td>9.6</td></tr></table></div><p>These funds are unhypothecated, meaning they do not have to be used for the purposes for which they were issued. Barnett consequentials are allocated in line with local needs and priorities.</p><p>The 2020 Spending Review will set Budgets for 2021-22 onwards.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201940%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=294408","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=294408"}},{"id":"294217","reference":"AQW 1863/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-02-11","answerBy":"2020-02-26","answered":"2020-03-02","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on her Department's Brexit preparations in line with the Northern Ireland protocol; and how many people are working on ensuring compliance with the protocol.","answerText":"My officials are working to ensure the Department and its Arm’s Length Bodies are as prepared as possible for the end of the transition period. This involves considering all of the Department’s legislation, services, policies and strategies to ensure they can respond to the new circumstances resulting from the implementation of the Protocol. I am also considering the measures that may be required to support businesses.\n\nI attend the Executive’s Brexit sub-committee and my officials are working closely with those in other Departments to understand the implications and practical delivery of the Protocol and ensuring the Northern Ireland position is represented in the decision making structures in Whitehall.\n\nThe practical detail of how the Protocol will be implemented has not yet been agreed by the EU and UK Government, nor has the UK Government set out in detail how it will give effect to the commitments it made in New Decade, New Approach.\n\nAs the number of people working on ensuring compliance with the Protocol will ultimately depend on the detail of how it will be implemented, I cannot provide an exact number at this time.","answerHtml":"<p>My officials are working to ensure the Department and its Arm’s Length Bodies are as prepared as possible for the end of the transition period. This involves considering all of the Department’s legislation, services, policies and strategies to ensure they can respond to the new circumstances resulting from the implementation of the Protocol. I am also considering the measures that may be required to support businesses.</p><p>I attend the Executive’s Brexit sub-committee and my officials are working closely with those in other Departments to understand the implications and practical delivery of the Protocol and ensuring the Northern Ireland position is represented in the decision making structures in Whitehall.</p><p>The practical detail of how the Protocol will be implemented has not yet been agreed by the EU and UK Government, nor has the UK Government set out in detail how it will give effect to the commitments it made in New Decade, New Approach.</p><p>As the number of people working on ensuring compliance with the Protocol will ultimately depend on the detail of how it will be implemented, I cannot provide an exact number at this time.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201863%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=294217","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=294217"}},{"id":"294066","reference":"AQW 1794/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-02-10","answerBy":"2020-02-25","answered":"2020-02-25","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to outline what support is currently available to local councils for installing new electric car infrastructure.","answerText":"The Road to Zero Strategy outlines how the UK Government will support the transition to zero emission road transport and reduce emissions from conventional vehicles during the transition. The Office for Low Emission Vehicles continues to provide a broad range of funding UK wide including Plug-in grant for cars, vans, taxis and motorcycles, the provision of grants for home, work and on-street residential charging infrastructure and a £400 million infrastructure investment fund to support private sector investment in charging infrastructure by providing greater access to finance on a commercial basis.\n\nThe UK Transport Secretary also announced on 21 January 2020 that government funding UK-wide will be doubled to £10 million for the installation of charge points on residential streets next year.\n\nMy officials liaise regularly with councils and have recently met with a number of councils, including Mid & East Antrim Borough Council, to provide advice and guidance on a range of e-car related matters including charge point infrastructure. My officials will continue to provide advice and guidance to councils as requested as I am keen to see the electric car infrastructure network improved.","answerHtml":"<p>The Road to Zero Strategy outlines how the UK Government will support the transition to zero emission road transport and reduce emissions from conventional vehicles during the transition. The Office for Low Emission Vehicles continues to provide a broad range of funding UK wide including Plug-in grant for cars, vans, taxis and motorcycles, the provision of grants for home, work and on-street residential charging infrastructure and a £400 million infrastructure investment fund to support private sector investment in charging infrastructure by providing greater access to finance on a commercial basis.</p><p>The UK Transport Secretary also announced on 21 January 2020 that government funding UK-wide will be doubled to £10 million for the installation of charge points on residential streets next year.</p><p>My officials liaise regularly with councils and have recently met with a number of councils, including Mid &amp; East Antrim Borough Council, to provide advice and guidance on a range of e-car related matters including charge point infrastructure. My officials will continue to provide advice and guidance to councils as requested as I am keen to see the electric car infrastructure network improved.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201794%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=294066","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=294066"}},{"id":"294065","reference":"AQW 1793/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-02-10","answerBy":"2020-02-25","answered":"2020-02-25","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure whether Translink has assessed whether existing rolling stock can be converted to non-fossil fuel power sources.","answerText":"I have an ambitious vision for a low carbon future where we make low emission public transport available to people and communities across Northern Ireland. This is essential if we are to deliver on our Programme for Government ambition, connecting people and communities to opportunities whilst playing our part in tackling the climate emergency which is the single greatest global challenge that we face. Realising that ambition is likely to require significant resources and the pace at which I can deliver this change will be determined by the budget made available to my Department.\n\nIn respect of converting the existing public transport bus fleet to non-fossil fuel power sources it is possible but would be extremely challenging as all vehicles would be required to be recertified. Given the relatively short asset life of a bus, it is more effective to replace existing vehicles with new fuel cell or battery electric vehicles.\n\nOn rail, there is the potential of using hybrid technology conversions on the existing fleet however, like the bus fleet, the most effective way of delivering zero emission rail operations is to employ either fuel cell or battery electric propulsion on new replacement rolling stock as the fleet comes to the end of its useful life. I am committed to exploring options to deliver secure, safe, cleaner, sustainable public transport.","answerHtml":"<p>I have an ambitious vision for a low carbon future where we make low emission public transport available to people and communities across Northern Ireland. This is essential if we are to deliver on our Programme for Government ambition, connecting people and communities to opportunities whilst playing our part in tackling the climate emergency which is the single greatest global challenge that we face. Realising that ambition is likely to require significant resources and the pace at which I can deliver this change will be determined by the budget made available to my Department.</p><p>In respect of converting the existing public transport bus fleet to non-fossil fuel power sources it is possible but would be extremely challenging as all vehicles would be required to be recertified. Given the relatively short asset life of a bus, it is more effective to replace existing vehicles with new fuel cell or battery electric vehicles.</p><p>On rail, there is the potential of using hybrid technology conversions on the existing fleet however, like the bus fleet, the most effective way of delivering zero emission rail operations is to employ either fuel cell or battery electric propulsion on new replacement rolling stock as the fleet comes to the end of its useful life. I am committed to exploring options to deliver secure, safe, cleaner, sustainable public transport.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201793%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=294065","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=294065"}},{"id":"294064","reference":"AQW 1792/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-02-10","answerBy":"2020-02-25","answered":"2020-02-25","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure whether her Department plans to cooperate with the relevant authorities in the Republic of Ireland on the future of the Enterprise rail service, including new rolling stock and electrification.","answerText":"The “New Decade: New Approach” sets out an ambitious agenda for North South connectivity. This includes joint considerations through the NSMC of the feasibility of a high-speed rail; connection between Belfast, Dublin and Cork. In addition “New Decade: New Approach” also sets out the potential for investment in a range of capital projects including the Better Connecting Dublin and Belfast study which focusses on the Enterprise.\n\nPursuing that agenda in cooperation with the Irish Government within the resources available will be my priority. I will continue through the NSMC to explore how we advance and build on the ambitions of “New Decade: New Approach”.","answerHtml":"<p>The “New Decade: New Approach” sets out an ambitious agenda for North South connectivity. This includes joint considerations through the NSMC of the feasibility of a high-speed rail; connection between Belfast, Dublin and Cork. In addition “New Decade: New Approach” also sets out the potential for investment in a range of capital projects including the Better Connecting Dublin and Belfast study which focusses on the Enterprise.</p><p>Pursuing that agenda in cooperation with the Irish Government within the resources available will be my priority. I will continue through the NSMC to explore how we advance and build on the ambitions of “New Decade: New Approach”.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201792%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=294064","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=294064"}},{"id":"292305","reference":"AQW 1077/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-01-28","answerBy":"2020-02-12","answered":"2020-02-26","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities to detail the (i) number of people on the Northern Ireland Housing Executive Housing waiting list; and (ii) average waiting time and number of points before allocation, broken down by (a) council area; and (b) constituency.","answerText":"The Housing Executive has advised that the total number of applicants on the social housing waiting list on the final day of the last available quarter (31 December 2019) was 38,308 applicants.\n\nIt has provided the following tables (1 – 2) which provide the average waiting times and number of points before allocation, i.e. at the point of allocation for one year to 31st December 2019, broken down by council area and parliamentary constituency; and table 3, which provides the Housing Executive Common Landlord Areas which cross Parliamentary Constituency boundaries.\n\nTable 1 - Average waiting time and number of points at the point of allocation by Local Government District for 1 year to 31st December 2019.\n\nAllocations for 1 Year to 31/12/19\nLGD\tNo.\tMean Points at the Point of Allocation\tMedian Points at the Point of Allocation\tMean Months on the WL at the Point of Allocation\tMedian Months on the WL at the Point of Allocation\nAntrim & Newtownabbey\t511\t142.1\t140.0\t18.2\t9.0\nArds & North Down\t653\t156.2\t148.0\t16.5\t8.0\nArmagh, Banbridge & Craigavon\t535\t111.6\t120.0\t16.9\t9.0\nBelfast\t1892\t147.0\t142.0\t24.6\t15.0\nCauseway Coast & Glens\t420\t124.1\t130.0\t19.0\t10.5\nDerry & Strabane\t863\t169.1\t170.0\t26.3\t17.0\nFermanagh & Omagh\t302\t131.6\t137.0\t18.4\t10.0\nLisburn & Castlereagh\t424\t148.7\t150.0\t19.7\t13.0\nMid & East Antrim\t560\t132.4\t126.0\t18.0\t10.0\nMid Ulster\t335\t120.0\t130.0\t23.4\t12.0\nNewry, Mourne & Down\t493\t145.0\t148.0\t29.5\t16.0\nTotal\t6988\t143.0\t140.0\t21.8\t12.0\n\nTable 2 - Average waiting time and number of points at the point of allocation by Parliamentary Constituency for 1 year to 31st December 2019.\n\nAllocations for 1 Year to 31/12/19\nParliamentary Constituency\tNo.\tMean Points at the Point of Allocation\tMedian Points at the Point of Allocation\tMean Months on the WL at the Point of Allocation\tMedian Months on the WL at the Point of Allocation\nBelfast East\t378\t138.0\t137.5\t17.4\t11.0\nBelfast East/South\t51\t151.5\t148.0\t20.4\t12.0\nBelfast North\t833\t140.3\t140.0\t21.7\t13.0\nBelfast South\t382\t143.8\t140.0\t23.2\t12.5\nBelfast South/Strangford\t7\t177.3\t160.0\t10.4\t10.0\nBelfast West\t471\t164.9\t168.0\t32.4\t20.0\nBelfast West/North\t22\t136.5\t140.0\t33.8\t21.5\nBelfast West/South\t18\t190.5\t160.0\t34.9\t18.0\nEast Antrim\t292\t134.6\t130.0\t15.7\t8.0\nEast Londonderry\t267\t130.5\t132.0\t19.6\t12.0\nFermanagh South Tyrone\t265\t132.9\t140.0\t21.0\t12.0\nFoyle\t713\t180.2\t180.0\t27.7\t18.0\nLagan Valley\t349\t150.9\t150.0\t20.1\t13.0\nMid Ulster\t233\t115.5\t130.0\t21.8\t11.0\nNewry & Armagh\t272\t130.2\t140.0\t24.1\t12.0\nNorth Antrim\t474\t125.2\t124.0\t19.4\t10.0\nNorth Down\t340\t164.6\t150.0\t18.8\t9.5\nSouth Antrim\t295\t137.8\t137.0\t17.8\t9.0\nSouth Down\t295\t138.4\t142.0\t28.5\t16.0\nStrangford\t381\t144.1\t140.0\t15.3\t7.0\nUpper Bann\t373\t117.7\t124.0\t18.8\t10.0\nWest Tyrone\t277\t121.5\t130.0\t19.8\t11.0\nTotal\t6988\t143.0\t140.0\t21.8\t12.0\n\nTable 3 – Housing Executive Common Landlord Areas which cross Parliamentary Constituency boundaries.\n\nNIHE CLA\tParliamentary Constituency\nCregagh Castlereagh\tBelfast East/South\nWillowfield/Upper Castlereagh Road\tBelfast East/South\nBridge End / Rotherdam Court\tBelfast East/South\nCarryduff\tBelfast South/Strangford\nAinsworth\tBelfast West/North\nTwaddell/Upper Woodvale\tBelfast West/North\nCarrick Hill / Unity Flats\tBelfast West/North\nHamill St / John St\tBelfast West/South","answerHtml":"<p>The Housing Executive has advised that the total number of applicants on the social housing waiting list on the final day of the last available quarter (31 December 2019) was 38,308 applicants.</p><p>It has provided the following tables (1 – 2) which provide the average waiting times and number of points before allocation, i.e. at the point of allocation for one year to 31st December 2019, broken down by council area and parliamentary constituency; and table 3, which provides the Housing Executive Common Landlord Areas which cross Parliamentary Constituency boundaries.</p><p>Table 1 - Average waiting time and number of points at the point of allocation by Local Government District for 1 year to 31st December 2019.</p><div class=\"table-wrap\"><table><tr><td></td><td colspan=\"5\">Allocations for 1 Year to 31/12/19</td></tr><tr><td>LGD</td><td>No.</td><td>Mean Points at the Point of Allocation</td><td>Median Points at the Point of Allocation</td><td>Mean Months on the WL at the Point of Allocation</td><td>Median Months on the WL at the Point of Allocation</td></tr><tr><td>Antrim &amp; Newtownabbey</td><td>511</td><td>142.1</td><td>140.0</td><td>18.2</td><td>9.0</td></tr><tr><td>Ards &amp; North Down</td><td>653</td><td>156.2</td><td>148.0</td><td>16.5</td><td>8.0</td></tr><tr><td>Armagh, Banbridge &amp; Craigavon</td><td>535</td><td>111.6</td><td>120.0</td><td>16.9</td><td>9.0</td></tr><tr><td>Belfast</td><td>1892</td><td>147.0</td><td>142.0</td><td>24.6</td><td>15.0</td></tr><tr><td>Causeway Coast &amp; Glens</td><td>420</td><td>124.1</td><td>130.0</td><td>19.0</td><td>10.5</td></tr><tr><td>Derry &amp; Strabane</td><td>863</td><td>169.1</td><td>170.0</td><td>26.3</td><td>17.0</td></tr><tr><td>Fermanagh &amp; Omagh</td><td>302</td><td>131.6</td><td>137.0</td><td>18.4</td><td>10.0</td></tr><tr><td>Lisburn &amp; Castlereagh</td><td>424</td><td>148.7</td><td>150.0</td><td>19.7</td><td>13.0</td></tr><tr><td>Mid &amp; East Antrim</td><td>560</td><td>132.4</td><td>126.0</td><td>18.0</td><td>10.0</td></tr><tr><td>Mid Ulster</td><td>335</td><td>120.0</td><td>130.0</td><td>23.4</td><td>12.0</td></tr><tr><td>Newry, Mourne &amp; Down</td><td>493</td><td>145.0</td><td>148.0</td><td>29.5</td><td>16.0</td></tr><tr><td>Total</td><td>6988</td><td>143.0</td><td>140.0</td><td>21.8</td><td>12.0</td></tr></table></div><p>Table 2 - Average waiting time and number of points at the point of allocation by Parliamentary Constituency for 1 year to 31st December 2019.</p><div class=\"table-wrap\"><table><tr><td></td><td colspan=\"5\">Allocations for 1 Year to 31/12/19</td></tr><tr><td>Parliamentary Constituency</td><td>No.</td><td>Mean Points at the Point of Allocation</td><td>Median Points at the Point of Allocation</td><td>Mean Months on the WL at the Point of Allocation</td><td>Median Months on the WL at the Point of Allocation</td></tr><tr><td>Belfast East</td><td>378</td><td>138.0</td><td>137.5</td><td>17.4</td><td>11.0</td></tr><tr><td>Belfast East/South</td><td>51</td><td>151.5</td><td>148.0</td><td>20.4</td><td>12.0</td></tr><tr><td>Belfast North</td><td>833</td><td>140.3</td><td>140.0</td><td>21.7</td><td>13.0</td></tr><tr><td>Belfast South</td><td>382</td><td>143.8</td><td>140.0</td><td>23.2</td><td>12.5</td></tr><tr><td>Belfast South/Strangford</td><td>7</td><td>177.3</td><td>160.0</td><td>10.4</td><td>10.0</td></tr><tr><td>Belfast West</td><td>471</td><td>164.9</td><td>168.0</td><td>32.4</td><td>20.0</td></tr><tr><td>Belfast West/North</td><td>22</td><td>136.5</td><td>140.0</td><td>33.8</td><td>21.5</td></tr><tr><td>Belfast West/South</td><td>18</td><td>190.5</td><td>160.0</td><td>34.9</td><td>18.0</td></tr><tr><td>East Antrim</td><td>292</td><td>134.6</td><td>130.0</td><td>15.7</td><td>8.0</td></tr><tr><td>East Londonderry</td><td>267</td><td>130.5</td><td>132.0</td><td>19.6</td><td>12.0</td></tr><tr><td>Fermanagh South Tyrone</td><td>265</td><td>132.9</td><td>140.0</td><td>21.0</td><td>12.0</td></tr><tr><td>Foyle</td><td>713</td><td>180.2</td><td>180.0</td><td>27.7</td><td>18.0</td></tr><tr><td>Lagan Valley</td><td>349</td><td>150.9</td><td>150.0</td><td>20.1</td><td>13.0</td></tr><tr><td>Mid Ulster</td><td>233</td><td>115.5</td><td>130.0</td><td>21.8</td><td>11.0</td></tr><tr><td>Newry &amp; Armagh</td><td>272</td><td>130.2</td><td>140.0</td><td>24.1</td><td>12.0</td></tr><tr><td>North Antrim</td><td>474</td><td>125.2</td><td>124.0</td><td>19.4</td><td>10.0</td></tr><tr><td>North Down</td><td>340</td><td>164.6</td><td>150.0</td><td>18.8</td><td>9.5</td></tr><tr><td>South Antrim</td><td>295</td><td>137.8</td><td>137.0</td><td>17.8</td><td>9.0</td></tr><tr><td>South Down</td><td>295</td><td>138.4</td><td>142.0</td><td>28.5</td><td>16.0</td></tr><tr><td>Strangford</td><td>381</td><td>144.1</td><td>140.0</td><td>15.3</td><td>7.0</td></tr><tr><td>Upper Bann</td><td>373</td><td>117.7</td><td>124.0</td><td>18.8</td><td>10.0</td></tr><tr><td>West Tyrone</td><td>277</td><td>121.5</td><td>130.0</td><td>19.8</td><td>11.0</td></tr><tr><td>Total</td><td>6988</td><td>143.0</td><td>140.0</td><td>21.8</td><td>12.0</td></tr></table></div><p>Table 3 – Housing Executive Common Landlord Areas which cross Parliamentary Constituency boundaries.</p><div class=\"table-wrap\"><table><tr><td>NIHE CLA</td><td>Parliamentary Constituency</td><td></td><td></td></tr><tr><td>Cregagh Castlereagh</td><td>Belfast East/South</td><td></td><td></td></tr><tr><td>Willowfield/Upper Castlereagh Road</td><td>Belfast East/South</td><td></td><td></td></tr><tr><td>Bridge End / Rotherdam Court</td><td>Belfast East/South</td><td></td><td></td></tr><tr><td>Carryduff</td><td>Belfast South/Strangford</td><td></td><td></td></tr><tr><td>Ainsworth</td><td>Belfast West/North</td><td></td><td></td></tr><tr><td>Twaddell/Upper Woodvale</td><td>Belfast West/North</td><td></td><td></td></tr><tr><td>Carrick Hill / Unity Flats</td><td>Belfast West/North</td><td></td><td></td></tr><tr><td>Hamill St / John St</td><td>Belfast West/South</td><td></td><td></td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201077%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=292305","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=292305"}},{"id":"292304","reference":"AQW 1076/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-01-28","answerBy":"2020-02-12","answered":"2020-02-22","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities for her assessment of the number of social homes being built each year; and the effectiveness of support being made available to the Housing Executive and other Housing Associations to construct new homes.","answerText":"The Housing Executive estimates that we need at least 2,000 units to meet the growing need for social housing and address backlog issues. Annual targets in recent years have fallen short of this figure as the budget has been constrained by pressures on capital budgets.\n\nI am committed to increasing the number of social homes being delivered each year.","answerHtml":"<p>The Housing Executive estimates that we need at least 2,000 units to meet the growing need for social housing and address backlog issues. Annual targets in recent years have fallen short of this figure as the budget has been constrained by pressures on capital budgets.</p><p>I am committed to increasing the number of social homes being delivered each year.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201076%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=292304","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=292304"}},{"id":"292303","reference":"AQW 1075/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-01-28","answerBy":"2020-02-12","answered":"2020-02-12","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to detail (i) how many streetlights are currently awaiting (a) repair; or (b) replacement in East Antrim, and (ii) what action will be taken to address the backlog.","answerText":"I understand the concerns of the public affected by street light outages and am working with my Department to address this issue as quickly as possible. Unfortunately as a result of severe budget cuts the Department has had to restrict the street lighting maintenance service across Northern Ireland. As a result, outages are taking longer than usual, and much longer than I would like, to be repaired. I can assure the Member that priority is being given to hazardous electrical defects and group outages and that my officials are doing all that they can, within available budgets, to complete other repairs in as timely a fashion as possible.\n\nThere are currently 3913 street lighting outages reported in Northern Division, which includes the East Antrim area.","answerHtml":"<p>I understand the concerns of the public affected by street light outages and am working with my Department to address this issue as quickly as possible. Unfortunately as a result of severe budget cuts the Department has had to restrict the street lighting maintenance service across Northern Ireland. As a result, outages are taking longer than usual, and much longer than I would like, to be repaired. I can assure the Member that priority is being given to hazardous electrical defects and group outages and that my officials are doing all that they can, within available budgets, to complete other repairs in as timely a fashion as possible.</p><p>There are currently 3913 street lighting outages reported in Northern Division, which includes the East Antrim area.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201075%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=292303","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=292303"}},{"id":"291527","reference":"AQW 657/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-01-21","answerBy":"2020-02-05","answered":"2020-02-20","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities what actions her Department is taking to address housing insecurity.","answerText":"The Department provides funding of up to £855,000 per year to Housing Rights to support members of the public and other housing and advice professionals regarding housing and homelessness issues, including a mortgage debt advice service, and to help bring about improvements in housing legislation, policy and practice.\n\nThe Housing Executive has measures in place to deal with a lack of stability of accommodation experienced by an individual or household as a result of issues relating to:\n\nhomelessness;\n\ndifficulty sustaining a tenancy/ accommodation (in either social or private sector);\n\naffordability of housing;\n\nhousing quality; and\n\ncommunity safety and sustainability.\n\nTo address these issues the Housing Executive delivers variety of operational and strategic activities including:\n\nHousing Solutions and Support;\n\nThe Supporting People programme;\n\nHomelessness Strategy 2017-2022;\n\nCustomer Support & Tenancy Sustainment Strategy 2019- 22;\n\nCommunity Safety Strategy (Working Together for Safer Communities); and\n\nFinancial Inclusion Strategy","answerHtml":"<p>The Department provides funding of up to £855,000 per year to Housing Rights to support members of the public and other housing and advice professionals regarding housing and homelessness issues, including a mortgage debt advice service, and to help bring about improvements in housing legislation, policy and practice.</p><p>The Housing Executive has measures in place to deal with a lack of stability of accommodation experienced by an individual or household as a result of issues relating to:</p><p>homelessness;</p><p>difficulty sustaining a tenancy/ accommodation (in either social or private sector);</p><p>affordability of housing;</p><p>housing quality; and</p><p>community safety and sustainability.</p><p>To address these issues the Housing Executive delivers variety of operational and strategic activities including:</p><p>Housing Solutions and Support;</p><p>The Supporting People programme;</p><p>Homelessness Strategy 2017-2022;</p><p>Customer Support &amp; Tenancy Sustainment Strategy 2019- 22;</p><p>Community Safety Strategy (Working Together for Safer Communities); and</p><p>Financial Inclusion Strategy</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%20657%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=291527","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=291527"}},{"id":"291526","reference":"AQW 656/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-01-21","answerBy":"2020-02-05","answered":"2020-01-31","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance for an update on his Department's plans for a social value act.","answerText":"Like me, I know that you are a strong supporter of a social value act. The Procurement Board is working with the social economy sector to explore options to widen social value through further development of procurement policy. This work will be important as we develop proposals for social value legislation which I intend to bring to Executive Colleagues as soon as possible.","answerHtml":"<p>Like me, I know that you are a strong supporter of a social value act. The Procurement Board is working with the social economy sector to explore options to widen social value through further development of procurement policy. This work will be important as we develop proposals for social value legislation which I intend to bring to Executive Colleagues as soon as possible.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%20656%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=291526","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=291526"}},{"id":"291525","reference":"AQW 655/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-01-21","answerBy":"2020-02-05","answered":"2020-02-05","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure what support her Department has provided Mid and East Antrim Borough Council, including its legacy Councils, for the installation of e-car charging points.","answerText":"In 2010, the former Department for Regional Development and the former Department of the Environment formed a consortium of public and private sector organisations including Larne and Ballymena Borough Councils to deliver a network of 337 charge points to support the introduction of electric vehicles in the transport sector.\n\nFollowing this, the then Department for Regional Development led a public sector estate workplace charge point project to assist public sector organisations to install charge points. This project provided all local councils with the opportunity to avail of the grant to install e-car charge points provided by the Office for Low Emission Vehicles (OLEV). I understand that Ballymena, Carrickfergus and Larne Borough Councils chose not to take part in the project at this time.\n\nMy officials continue to provide advice and guidance to Councils interested in installing public charge point infrastructure and recently met with officials from Mid & East Antrim Borough Council. The meeting was to discuss the Residential Charge Point Scheme, OLEV funding and the public charge point infrastructure.","answerHtml":"<p>In 2010, the former Department for Regional Development and the former Department of the Environment formed a consortium of public and private sector organisations including Larne and Ballymena Borough Councils to deliver a network of 337 charge points to support the introduction of electric vehicles in the transport sector.</p><p>Following this, the then Department for Regional Development led a public sector estate workplace charge point project to assist public sector organisations to install charge points. This project provided all local councils with the opportunity to avail of the grant to install e-car charge points provided by the Office for Low Emission Vehicles (OLEV). I understand that Ballymena, Carrickfergus and Larne Borough Councils chose not to take part in the project at this time.</p><p>My officials continue to provide advice and guidance to Councils interested in installing public charge point infrastructure and recently met with officials from Mid &amp; East Antrim Borough Council. The meeting was to discuss the Residential Charge Point Scheme, OLEV funding and the public charge point infrastructure.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%20655%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=291525","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=291525"}},{"id":"291524","reference":"AQW 654/17-22","type":"Written","typeCode":"AQW","mandate":"17-22","tabled":"2020-01-21","answerBy":"2020-02-05","answered":"2020-02-05","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure whether her Department intends to mirror the United Kingdom's plans of phasing out of diesel-only trains by 2040.","answerText":"In Northern Ireland Translink has developed plans to reduce the dependency on fossil fuels moving its bus and rail fleets towards zero emission, zero carbon technologies. The company continues to engage with manufacturers to look at different technology options including electrification, hydrogen, battery and bi-mode options for rail.\n\nIn coming months, I will be working to identify actions to support the decarbonisation of transport, taking into account the new Executive’s wider Programme for Government and commitments made within the New Decade, New Approach agreement in relation to climate change.","answerHtml":"<p>In Northern Ireland Translink has developed plans to reduce the dependency on fossil fuels moving its bus and rail fleets towards zero emission, zero carbon technologies. The company continues to engage with manufacturers to look at different technology options including electrification, hydrogen, battery and bi-mode options for rail.</p><p>In coming months, I will be working to identify actions to support the decarbonisation of transport, taking into account the new Executive’s wider Programme for Government and commitments made within the New Decade, New Approach agreement in relation to climate change.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%20654%2F17-22","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=291524","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=291524"}},{"id":"287941","reference":"AQO 974/16-21","type":"Oral","typeCode":"AQO","mandate":"16-21","tabled":"2017-01-12","answerBy":"2017-01-24","answered":"2017-01-24","answeredOrally":true,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on his plans for mitigation measures for the non-domestic Renewable Heat Incentive scheme.","answerText":"","answerHtml":"","oralExchange":[],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20974%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=287941","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2017-01-24&docID=288332#AQO%20974/16-21","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=287941"}},{"id":"288706","reference":"AQO 972/16-21","type":"Oral","typeCode":"AQO","mandate":"16-21","tabled":"2017-01-12","answerBy":"2017-01-24","answered":"2017-01-25","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities for an update on discussions with District Councils in relation to regeneration powers.","answerText":"Following my statement to the Assembly on 22 November 2016, announcing my decision not extend the Department's urban regeneration and community development powers to local government, I have received correspondence from a number of local councils asking me to reconsider. I have advised them that I will not be reconsidering my position on the matter.\n\nThrough my Chairmanship of the Partnership Panel, which affords an important connection between the Executive and local government, I will be able to engage with them on the future of regeneration in their areas.\n\nLocal Government has played, and will to continue to play, a huge role in ensuring the successful implementation of the Department’s regeneration programmes.","answerHtml":"<p>Following my statement to the Assembly on 22 November 2016, announcing my decision not extend the Department&#39;s urban regeneration and community development powers to local government, I have received correspondence from a number of local councils asking me to reconsider. I have advised them that I will not be reconsidering my position on the matter.</p><p>Through my Chairmanship of the Partnership Panel, which affords an important connection between the Executive and local government, I will be able to engage with them on the future of regeneration in their areas.</p><p>Local Government has played, and will to continue to play, a huge role in ensuring the successful implementation of the Department’s regeneration programmes.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20972%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=288706","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=288706"}},{"id":"286793","reference":"AQW 9055/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-12-19","answerBy":"2017-01-06","answered":"2017-01-19","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to outline (i) who from his Department, or the former Department of Enterpise, Trade and Investment, met or corresponded with the whistleblower in relation to the non-domestic Renewable Heat Incentive scheme; and (ii) on what dates this occurred.","answerText":"The ‘whistleblower’/concerned individual met with the Director of Energy Division and officials following initial correspondence to the Minister. Follow up correspondence was by email to/from officials.\n\nThe initial correspondence to the Minister was on 24/8/2013 and a reply issued on 5/9/2013 offering a meeting with officials. On 4/10/2013 the ‘whistleblower’/concerned individual provided an agenda for the meeting which took place on 8/10/2013. There was further email correspondence on 11/6/2014 and again on 11/3/2015.","answerHtml":"<p>The ‘whistleblower’/concerned individual met with the Director of Energy Division and officials following initial correspondence to the Minister. Follow up correspondence was by email to/from officials.</p><p>The initial correspondence to the Minister was on 24/8/2013 and a reply issued on 5/9/2013 offering a meeting with officials. On 4/10/2013 the ‘whistleblower’/concerned individual provided an agenda for the meeting which took place on 8/10/2013. There was further email correspondence on 11/6/2014 and again on 11/3/2015.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209055%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=286793","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=286793"}},{"id":"286790","reference":"AQW 9052/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-12-19","answerBy":"2017-01-06","answered":"2017-01-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to provide copies of the Department’s Codes of Practice for whistleblowers, from 2013 to present.","answerText":"Departmental guidance for whistleblowers from 2013 to present has been placed in the Assembly Library.","answerHtml":"<p>Departmental guidance for whistleblowers from 2013 to present has been placed in the Assembly Library.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%209052%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=286790","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=286790"}},{"id":"285960","reference":"AQW 8911/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-12-09","answerBy":"2016-12-29","answered":"2016-12-15","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities to outline (i) the progress of his Department’s Review of the Role and Regulation of the Private Rented Sector; and (ii) whether the Review recommends mandatory electrical checks on Landlord’s property during transitions in tenancy.","answerText":"A set of proposals for change resulting from the Review of the Role and Regulation of the Private Rented Sector will be published for consultation in January 2017.\n\nThe standard of properties, including electrical safety checks, is within the scope of the review.","answerHtml":"<p>A set of proposals for change resulting from the Review of the Role and Regulation of the Private Rented Sector will be published for consultation in January 2017.</p><p>The standard of properties, including electrical safety checks, is within the scope of the review.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208911%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=285960","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=285960"}},{"id":"285959","reference":"AQW 8910/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-12-09","answerBy":"2016-12-29","answered":"2017-01-09","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for an update on future funding of Social Enterprise Hubs.","answerText":"The Social Enterprise Hubs pilot project was one of the Signature Programmes taken forward with funding support, to the end of financial year 2015/16, from the Northern Ireland Executive’s Delivering Social Change framework.\n\nFollowing a positive evaluation of the pilot phase, an extension to funding in the 2016/17 financial year was provided by the Department for Communities and my Department. The contracts for that one year extension are due to end on 31 March 2017. Consideration is currently being given to the potential for future funding beyond that date.","answerHtml":"<p>The Social Enterprise Hubs pilot project was one of the Signature Programmes taken forward with funding support, to the end of financial year 2015/16, from the Northern Ireland Executive’s Delivering Social Change framework.</p><p>Following a positive evaluation of the pilot phase, an extension to funding in the 2016/17 financial year was provided by the Department for Communities and my Department. The contracts for that one year extension are due to end on 31 March 2017. Consideration is currently being given to the potential for future funding beyond that date.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208910%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=285959","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=285959"}},{"id":"285834","reference":"AQW 8838/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-12-08","answerBy":"2016-12-23","answered":"2016-12-21","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education what consideration was applied when creating the social disadvantaged priority criterion for pre-school admission places; and what evidence exists of the effectiveness of this priority criterion in combatting social disadvantage.","answerText":"When the Pre-School Education Expansion Programme was launched in 1998, funded places were available for only around 45% of children in their pre-school year and the social disadvantaged priority criterion was put in place to help ensure that the children considered most in need of pre-school education had priority access to those limited places.\n\nThe social disadvantaged priority criterion was first introduced in 1999 and was designed to give priority in the pre-school admissions process to children from socially disadvantaged circumstances. Research shows that children from socially disadvantaged circumstances tend to experience more difficulty at school than other children, therefore, as part of wider efforts to tackle educational underachievement children from socially disadvantaged circumstances were prioritised for pre-school admission.\n\nPre-school provision is now universal. Currently, the Department is committed to ensure that at all children whose parents want it can access a year of funded pre-school education in their immediate pre-school year. In each of the last five years, at least 99.8% of children whose parents engaged with the pre-school admissions process to the end obtained a funded pre-school place.\n\nGiven the current position with regard to levels of pre-school provision and changes to qualifying benefits with the introduction of Universal Credit, I plan to review the priority criterion. I will consider a range of issues in determining what changes are required. Any proposed changes will be subject to consultation.","answerHtml":"<p>When the Pre-School Education Expansion Programme was launched in 1998, funded places were available for only around 45% of children in their pre-school year and the social disadvantaged priority criterion was put in place to help ensure that the children considered most in need of pre-school education had priority access to those limited places.</p><p>The social disadvantaged priority criterion was first introduced in 1999 and was designed to give priority in the pre-school admissions process to children from socially disadvantaged circumstances. Research shows that children from socially disadvantaged circumstances tend to experience more difficulty at school than other children, therefore, as part of wider efforts to tackle educational underachievement children from socially disadvantaged circumstances were prioritised for pre-school admission.</p><p>Pre-school provision is now universal. Currently, the Department is committed to ensure that at all children whose parents want it can access a year of funded pre-school education in their immediate pre-school year. In each of the last five years, at least 99.8% of children whose parents engaged with the pre-school admissions process to the end obtained a funded pre-school place.</p><p>Given the current position with regard to levels of pre-school provision and changes to qualifying benefits with the introduction of Universal Credit, I plan to review the priority criterion. I will consider a range of issues in determining what changes are required. Any proposed changes will be subject to consultation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208838%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=285834","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=285834"}},{"id":"285833","reference":"AQW 8837/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-12-08","answerBy":"2016-12-23","answered":"2016-12-21","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education to detail (i) the advantages; and (ii) disadvatages of a separate Key Stage Two primary school in delivering social change, such as Strandtown Primary School.","answerText":"As there is only one Key Stage 2 school there is not sufficient data available to the Department of Education to make a valid comparison or to evaluate the advantages or disadvantages of Key Stage 2 schools against Year 1-Year 7 provision.\n\nLocal and international evidence suggests that there can be a range of factors which impact on the outcomes for pupils. This includes issues such as pupil ability and motivation; teaching methods; school leadership; and the level of parental involvement.","answerHtml":"<p>As there is only one Key Stage 2 school there is not sufficient data available to the Department of Education to make a valid comparison or to evaluate the advantages or disadvantages of Key Stage 2 schools against Year 1-Year 7 provision.</p><p>Local and international evidence suggests that there can be a range of factors which impact on the outcomes for pupils. This includes issues such as pupil ability and motivation; teaching methods; school leadership; and the level of parental involvement.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208837%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=285833","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=285833"}},{"id":"285832","reference":"AQW 8836/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-12-08","answerBy":"2016-12-23","answered":"2016-12-21","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education when the current priority criterion for socially disadvantaged children applying for pre-school will be reviewed.","answerText":"Pre-school education, whilst non-compulsory, is an important phase of early education.\n\nIf a pre-school setting, either statutory or non-statutory, is over-subscribed, it will apply the published admissions criteria in order of priority.\n\nThe pre-school education providers set the admissions criteria. However, as research has shown that children from socially disadvantaged circumstances tend to experience more difficulty at school than other children, the Department requires that they are given priority within the pre-school admissions process as part of wider efforts to tackle educational underachievement.\n\nGiven changes to qualifying benefits with the introduction of Universal Credit, I plan to review the priority criterion, and will consider a range of issues in determining what changes are required. Any proposed changes will be subject to consultation.","answerHtml":"<p>Pre-school education, whilst non-compulsory, is an important phase of early education.</p><p>If a pre-school setting, either statutory or non-statutory, is over-subscribed, it will apply the published admissions criteria in order of priority.</p><p>The pre-school education providers set the admissions criteria. However, as research has shown that children from socially disadvantaged circumstances tend to experience more difficulty at school than other children, the Department requires that they are given priority within the pre-school admissions process as part of wider efforts to tackle educational underachievement.</p><p>Given changes to qualifying benefits with the introduction of Universal Credit, I plan to review the priority criterion, and will consider a range of issues in determining what changes are required. Any proposed changes will be subject to consultation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208836%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=285832","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=285832"}},{"id":"285830","reference":"AQW 8834/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-12-08","answerBy":"2016-12-23","answered":"2016-12-19","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health pursuant to AQW 7707/16-21, to outline the alternative options which will be explored by the Health and Social Care Board to ensure GP services in Glenarm continue to be delivered when the current contractor retires at the end of March 2017; and whether the GP service can be maintained in the current timeframe.","answerText":"As set out in AQW 7707/16-21, the Health and Social Care Board advertised a new full-time contract for the provision of GMS services in Glenarm, welcoming single or joint applications. The closing date for applications was 18 November 2016. No applications were received.\n\nThe HSCB is currently in discussions with neighbouring GP practices to establish the possibility of one of these practices merging with Antrim Coast Medical Practice. Every effort is being made to try to ensure a GP service in Glenarm continues, however should this not be achieved the HSCB will seek to deploy patients to the other GP practices in the area.\n\nThe HSCB has been assured that GP services in Glenarm will continue to be provided in the interim until the current practitioner retires at the end of March 2017.","answerHtml":"<p>As set out in AQW 7707/16-21, the Health and Social Care Board advertised a new full-time contract for the provision of GMS services in Glenarm, welcoming single or joint applications. The closing date for applications was 18 November 2016. No applications were received.</p><p>The HSCB is currently in discussions with neighbouring GP practices to establish the possibility of one of these practices merging with Antrim Coast Medical Practice. Every effort is being made to try to ensure a GP service in Glenarm continues, however should this not be achieved the HSCB will seek to deploy patients to the other GP practices in the area.</p><p>The HSCB has been assured that GP services in Glenarm will continue to be provided in the interim until the current practitioner retires at the end of March 2017.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208834%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=285830","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=285830"}},{"id":"285606","reference":"AQW 8697/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-12-07","answerBy":"2016-12-22","answered":"2016-12-20","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education to detail how many (i) children applied with a first preference to Monkstown Nursery School, Newtownabbey; and (ii) first preference applications were successful to Monkstown Nursery School, in each of the last three years.","answerText":"Monkstown Nursery School, Newtownabbey, provides 78 funded pre-school education places. The breakdown is 26 full-time and 52 part-time.\n\nAs advised by the Education Authority, the table below shows the number of first preference applications and successful first preference applications to Monkstown Nursery School, Newtownabbey.\n\nSession\tApplications\t2014/15\t2015/16\t2016/17\nFull Time\tFirst preference applications\t69\t70\t77\nFirst preference applications successful\t26\t26\t26\nPart Time\tFirst preference applications\t13\t9\t13\nFirst preference applications successful\t13\t9\t11","answerHtml":"<p>Monkstown Nursery School, Newtownabbey, provides 78 funded pre-school education places. The breakdown is 26 full-time and 52 part-time.</p><p>As advised by the Education Authority, the table below shows the number of first preference applications and successful first preference applications to Monkstown Nursery School, Newtownabbey.</p><div class=\"table-wrap\"><table><tr><td>Session</td><td>Applications</td><td>2014/15</td><td>2015/16</td><td>2016/17</td></tr><tr><td>Full Time</td><td>First preference applications</td><td>69</td><td>70</td><td>77</td></tr><tr><td></td><td>First preference applications successful</td><td>26</td><td>26</td><td>26</td></tr><tr><td>Part Time</td><td>First preference applications</td><td>13</td><td>9</td><td>13</td></tr><tr><td></td><td>First preference applications successful</td><td>13</td><td>9</td><td>11</td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208697%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=285606","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=285606"}},{"id":"285605","reference":"AQW 8696/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-12-07","answerBy":"2016-12-22","answered":"2016-12-20","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education what consideration his Department has given for a statutory priority criterion for parents applying for pre-school places, who are medically disadvantaged and/or are in receipt of Employment and Support Allowance only.","answerText":"Pre-school education, whilst non-compulsory, is an important phase of early education. If a pre-school setting, either statutory or non-statutory, is over-subscribed, it will apply the published admissions criteria in order of priority.\n\nPre-school education providers set the admissions criteria. However, research has shown that children from socially disadvantaged circumstances tend to experience more difficulty at school than other children; therefore, the Department requires that they are given priority within the pre-school admissions process as part of wider efforts to tackle educational underachievement.\n\nCurrently children from socially disadvantaged circumstances are defined as children whose parents are in receipt of Income Support, Income-based Jobseekers Allowance or Employment Support Allowance where an award of Income-based Jobseekers Allowance has been converted and the amount of the award remains unchanged.\n\nGiven changes to qualifying benefits with the introduction of Universal Credit, I plan to review the priority criterion, and will consider a range of issues in determining what changes are required. Any proposed changes will be subject to consultation.","answerHtml":"<p>Pre-school education, whilst non-compulsory, is an important phase of early education. If a pre-school setting, either statutory or non-statutory, is over-subscribed, it will apply the published admissions criteria in order of priority.</p><p>Pre-school education providers set the admissions criteria. However, research has shown that children from socially disadvantaged circumstances tend to experience more difficulty at school than other children; therefore, the Department requires that they are given priority within the pre-school admissions process as part of wider efforts to tackle educational underachievement.</p><p>Currently children from socially disadvantaged circumstances are defined as children whose parents are in receipt of Income Support, Income-based Jobseekers Allowance or Employment Support Allowance where an award of Income-based Jobseekers Allowance has been converted and the amount of the award remains unchanged.</p><p>Given changes to qualifying benefits with the introduction of Universal Credit, I plan to review the priority criterion, and will consider a range of issues in determining what changes are required. Any proposed changes will be subject to consultation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208696%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=285605","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=285605"}},{"id":"285604","reference":"AQW 8695/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-12-07","answerBy":"2016-12-22","answered":"2016-12-20","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education how many (i) fully-funded; and (ii) part-funded nursery places are available for Monkstown Nursery School, Newtownabbey.","answerText":"All places provided under the Pre-School Education Programme (PSEP) are fully funded by the Department of Education.\n\nMonkstown Nursery School, Newtownabbey, provides 78 funded pre-school education places. The breakdown is 26 full-time and 52 part-time.","answerHtml":"<p>All places provided under the Pre-School Education Programme (PSEP) are fully funded by the Department of Education.</p><p>Monkstown Nursery School, Newtownabbey, provides 78 funded pre-school education places. The breakdown is 26 full-time and 52 part-time.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208695%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=285604","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=285604"}},{"id":"284062","reference":"AQW 8121/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-11-29","answerBy":"2016-12-02","answered":"2016-12-06","answeredOrally":false,"priority":true,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health following reports on Monday 28 November 2016 that the working group on fatal foetal abnormality has recommended legislative change in cases of fatal foetal abnormality, whether she will publish immediately the working group's report.","answerText":"As I indicated in the Assembly Chamber, the report has been shared with the First and deputy First Ministers and the Justice Minister and I intend to submit joint proposals to the Executive early in the new year.\n\nIt remains our intention to publish the document after it has been considered by the Executive.","answerHtml":"<p>As I indicated in the Assembly Chamber, the report has been shared with the First and deputy First Ministers and the Justice Minister and I intend to submit joint proposals to the Executive early in the new year.</p><p>It remains our intention to publish the document after it has been considered by the Executive.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208121%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=284062","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=284062"}},{"id":"283410","reference":"AQW 7872/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-11-24","answerBy":"2016-12-09","answered":"2016-12-01","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure , following the Chancellor's Autumn Statement, for an update on the York Street Interchange project .","answerText":"I welcome the additional funding for infrastructure available to the Block following the Chancellors Autumn Statement. The Executive will now determine its capital allocations for the four years ahead and I will be striving to maximise the amount available to my Department to progress the ambitious agenda I have laid out.\n\nWith regard to the progression of the York Street Interchange scheme, I’m sure you are aware that I announced the publication of the outcome of the Public Inquiry along with a Departmental Statement and Notice to Proceed on Tuesday 15 November. This was an important step, which allows my officials to progress the development of the scheme, in particular the recommendations in the Inspector’s Report from the Public Inquiry regarding consultation with the local community and other key stakeholders.\n\nProgression of this scheme to construction is dependent on funding and I will need to consider this project, together with other priorities as part of my Budget 2017-21. The York Street Interchange, however, remains a priority and I am committed to do all that I can to deliver the scheme within the current financial context, working with the Finance Minister and other Executive colleagues.","answerHtml":"<p>I welcome the additional funding for infrastructure available to the Block following the Chancellors Autumn Statement. The Executive will now determine its capital allocations for the four years ahead and I will be striving to maximise the amount available to my Department to progress the ambitious agenda I have laid out.</p><p>With regard to the progression of the York Street Interchange scheme, I’m sure you are aware that I announced the publication of the outcome of the Public Inquiry along with a Departmental Statement and Notice to Proceed on Tuesday 15 November. This was an important step, which allows my officials to progress the development of the scheme, in particular the recommendations in the Inspector’s Report from the Public Inquiry regarding consultation with the local community and other key stakeholders.</p><p>Progression of this scheme to construction is dependent on funding and I will need to consider this project, together with other priorities as part of my Budget 2017-21. The York Street Interchange, however, remains a priority and I am committed to do all that I can to deliver the scheme within the current financial context, working with the Finance Minister and other Executive colleagues.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207872%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=283410","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=283410"}},{"id":"283401","reference":"AQW 7863/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-11-24","answerBy":"2016-12-09","answered":"2016-12-07","answeredOrally":false,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice  pursuant to AQO 650/16-21, to outline any arrangements to monitor and evaluate the impact of programmes that receive funding from her Department.","answerText":"The Tackling Paramilitarism Programme Board is responsible for deciding on allocations of funding for programmes in support of the Executive action plan. To be clear, funding is held centrally and allocated on the advice of the Programme Board, it is not allocated by my Department.\n\nThe Programme Board will receive regular updates on progress and expenditure. Individual projects will be responsible for ensuring effective project evaluation mechanisms are in place to allow them to report back to the Board.\n\nThe Board are also giving consideration to the commissioning of an independent evaluation to assess the overall impact of the action plan.","answerHtml":"<p>The Tackling Paramilitarism Programme Board is responsible for deciding on allocations of funding for programmes in support of the Executive action plan. To be clear, funding is held centrally and allocated on the advice of the Programme Board, it is not allocated by my Department.</p><p>The Programme Board will receive regular updates on progress and expenditure. Individual projects will be responsible for ensuring effective project evaluation mechanisms are in place to allow them to report back to the Board.</p><p>The Board are also giving consideration to the commissioning of an independent evaluation to assess the overall impact of the action plan.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207863%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=283401","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=283401"}},{"id":"283399","reference":"AQW 7861/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-11-24","answerBy":"2016-12-09","answered":"2016-12-07","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to detail local councils’ powers under the Planning Act (Northern Ireland) 2011 to request the convening of a public hearing following the service of a notice of opinion indicating an intended decision on; (i) a planning application dealt with under 'call in' procedures; and (ii) currently undetermined planning applications retained and being dealt with by his Department after Local Government Reform.","answerText":"Under section 29 of the Planning Act (NI) 2011, where the Department serves a notice of opinion indicating an intended decision for a called-in application or a retained application (which is treated as a called-in application) the council may within the period specified in the notice request a hearing. The Department must afford the council the opportunity of appearing before and being heard by the Planning Appeals Commission or a person appointed by the Department.\n\nFor further guidance I would refer the Member to the Department’s Development Management Practice Note 13: Notification and Call In of Applications which is available on the Planning Portal.","answerHtml":"<p>Under section 29 of the Planning Act (NI) 2011, where the Department serves a notice of opinion indicating an intended decision for a called-in application or a retained application (which is treated as a called-in application) the council may within the period specified in the notice request a hearing. The Department must afford the council the opportunity of appearing before and being heard by the Planning Appeals Commission or a person appointed by the Department.</p><p>For further guidance I would refer the Member to the Department’s Development Management Practice Note 13: Notification and Call In of Applications which is available on the Planning Portal.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207861%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=283399","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=283399"}},{"id":"283398","reference":"AQW 7860/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-11-24","answerBy":"2016-12-09","answered":"2016-12-22","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy pursuant to AQW 4295/16-21, whether his Department has received a response from the licensee seeking details of their future plans for Petroleum Licence PL1/10.","answerText":"My Department is in ongoing discussions with the licensee, InfraStrata plc, concerning its future plans for Petroleum Licence PL1/10.\n\nGiven the commercial nature of these discussions I cannot comment further at this time.","answerHtml":"<p>My Department is in ongoing discussions with the licensee, InfraStrata plc, concerning its future plans for Petroleum Licence PL1/10.</p><p>Given the commercial nature of these discussions I cannot comment further at this time.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207860%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=283398","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=283398"}},{"id":"282838","reference":"AQW 7707/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-11-22","answerBy":"2016-12-07","answered":"2016-12-07","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health pursuant to AQW 6137/16-21, when the measures being taken to ensure that a GP service will be maintained at the Antrim Coast Medical Practice, Glenarm, will be outlined.","answerText":"As set out in AQW 6137/16-21, The HSCB advertised a new full-time contract for the provision of GMS services in Glenarm, welcoming single or joint applications. The contract was advertised widely through a range of media. Sessional doctors also received communication on the advertisement through Northern Ireland Sessional Doctors Association. The closing date for applications was 18th November 2016. Unfortunately as no applications were received, the HSCB will now explore the alternative options to ensure GP services in Glenarm continue to be delivered when the current contractor retires at the end of March 2017.","answerHtml":"<p>As set out in AQW 6137/16-21, The HSCB advertised a new full-time contract for the provision of GMS services in Glenarm, welcoming single or joint applications. The contract was advertised widely through a range of media. Sessional doctors also received communication on the advertisement through Northern Ireland Sessional Doctors Association. The closing date for applications was 18th November 2016. Unfortunately as no applications were received, the HSCB will now explore the alternative options to ensure GP services in Glenarm continue to be delivered when the current contractor retires at the end of March 2017.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207707%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=282838","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=282838"}},{"id":"283952","reference":"AQO 755/16-21","type":"Oral","typeCode":"AQO","mandate":"16-21","tabled":"2016-11-17","answerBy":"2016-11-28","answered":"2016-11-29","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health, given that the Northern Ireland Association of Social Workers has reported that 88 per cent of social workers regularly work unpaid hours and that 50 per cent of social workers report staff vacancies in their team, how she plans to address this issue.","answerText":"I am aware of the Workload Survey report provided by the Northern Ireland Association of Social Workers (NIASW) in September.\n\nSocial work, like many other services in the HSC, has seen an increase in demand over the past number of years. More people are seeking social work help than ever before and social workers are responding positively to those people in need of support or protection.\n\nIn recognition of the growing demand over the past number of years, Trusts have employed 375 more social workers (an 11% increase) between 2011 and 2016. We know that there isn’t a shortage in the supply of social workers to fill vacant posts. We also know that, while some areas have a higher turnover of staff than others, generally, the social work workforce is relatively stable. Recent reports to the Department provide evidence that Trusts are discharging their statutory functions in line with requirements.\n\nThe NIASW report highlights a number of issues regarding delays in recruitment to vacant posts and I would agree with the recommendation that employers should be seeking to fill vacancies in a timely way. The HSCB has been working with the Trusts and Business Services Organisation (BSO) in an effort to speed-up the process of recruitment to vacant posts, which has had some success. This should alleviate some of the pressures on social work teams.\n\nI also agree with the report’s recommendation for employers to undertake an audit to establish the number of unpaid hours worked by social work staff and the number of vacancies in social work teams in HSC. This will establish an accurate assessment of the scale of the problem and ensure employers comply with Human Resource policies in regard to staff working additional hours and vacancy management.\n\nMany professionals in HSC often go above and beyond their duty; however it is unacceptable if staff are routinely working excessive hours. All social workers have a responsibility to ensure they practice safely and it is important that employers exercise a duty of care to their staff","answerHtml":"<p>I am aware of the Workload Survey report provided by the Northern Ireland Association of Social Workers (NIASW) in September.</p><p>Social work, like many other services in the HSC, has seen an increase in demand over the past number of years. More people are seeking social work help than ever before and social workers are responding positively to those people in need of support or protection.</p><p>In recognition of the growing demand over the past number of years, Trusts have employed 375 more social workers (an 11% increase) between 2011 and 2016. We know that there isn’t a shortage in the supply of social workers to fill vacant posts. We also know that, while some areas have a higher turnover of staff than others, generally, the social work workforce is relatively stable. Recent reports to the Department provide evidence that Trusts are discharging their statutory functions in line with requirements.</p><p>The NIASW report highlights a number of issues regarding delays in recruitment to vacant posts and I would agree with the recommendation that employers should be seeking to fill vacancies in a timely way. The HSCB has been working with the Trusts and Business Services Organisation (BSO) in an effort to speed-up the process of recruitment to vacant posts, which has had some success. This should alleviate some of the pressures on social work teams.</p><p>I also agree with the report’s recommendation for employers to undertake an audit to establish the number of unpaid hours worked by social work staff and the number of vacancies in social work teams in HSC. This will establish an accurate assessment of the scale of the problem and ensure employers comply with Human Resource policies in regard to staff working additional hours and vacancy management.</p><p>Many professionals in HSC often go above and beyond their duty; however it is unacceptable if staff are routinely working excessive hours. All social workers have a responsibility to ensure they practice safely and it is important that employers exercise a duty of care to their staff</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20755%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=283952","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=283952"}},{"id":"280905","reference":"AQW 6775/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-11-09","answerBy":"2016-11-14","answered":"2016-11-30","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether his Department or any of its arm's-length bodies has helped fund the sale of the former JTI Gallaher site to Wright Group.","answerText":"The sale of the former JTI Gallaher site to the Wrights Group is a transaction between the two parties without any funding from my Department or any of its arm’s-length bodies.","answerHtml":"<p>The sale of the former JTI Gallaher site to the Wrights Group is a transaction between the two parties without any funding from my Department or any of its arm’s-length bodies.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206775%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=280905","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=280905"}},{"id":"280624","reference":"AQW 6706/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-11-08","answerBy":"2016-11-23","answered":"2016-11-28","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister pursuant to AQW 3388/16-21, to whom the new Executive press secretary will directly report.","answerText":"We refer the Member to the answer given to AQW 3387/16-21 on 11 October 2016.","answerHtml":"<p>We refer the Member to the answer given to AQW 3387/16-21 on 11 October 2016.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206706%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=280624","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=280624"}},{"id":"280619","reference":"AQW 6701/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-11-08","answerBy":"2016-11-23","answered":"2016-11-21","answeredOrally":false,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice  to detail her Department's (i) art; (ii) artefacts; and (iii) other historic items either displayed or held in storage; and to itemise their value.","answerText":"The Department of Justice has the following pieces:\n\n(1) Art:\n\nPaintings\n\nDescription\tEstimated Value\nGilt Frame Portrait Sir Staples Bar\t£800\nGilt Frame Water Colour by F McKelvey\t£5,000\nBlue Moon Painting by Louis Reed\tN/K\nOvergrown Garden Painting\tN/K\n\nLimited Edition Prints\n\nSt Malachy’s Belfast by Jean Duncan\tN/K\nTemple Tree (Pair) by Cliona Doyle\tN/K\nThe Passion (Pair) by Tracy Staunton\tN/K\nTwo Men Talking About Fishing by Eddie Rafferty\tN/K\nDrawing of a Garden by David Barber\tN/K\nEphesis 1 X Hermogenes\tN/K\nLottie by M Martin\tN/K\nEsme by M Martin\tN/K\nForum Romanium by J Adams\tN/K\nNorthern Sea by James Allen\tN/K\nBlue Vase\tN/K\nAntiquity by J Adams\tN/K\nDonegal Place by D Groms\tN/K\nWaterfront by Cynthia Neal\tN/K\nThe Journey by Carmel Benson\tN/K\nIsland Figure by Carmel Benson\tN/K\n\n(ii) Artefacts\n\nDescription\tEstimated Value\nWilliam IV Mahogany Extend Table\t£800\nLarge Mahogany Table\t£1,500\n\n(iii) Other Historical Items\n\nDescription\tEstimated Value\nTable on which the Good Friday Agreement was signed\tN/K\n\nPlease note that all prison service artefacts and files were relocated from the former Prison Service College in Millisle to a secure location in NIPS HQ. At present there is no inventory of the items or any assessment of value, however, I asked my officials to carry out a scoping exercise to determine the work involved.\n\nIn addition the Department has a number of items on loan from NICS Arts Collection which is managed by the Department of Finance.","answerHtml":"<p>The Department of Justice has the following pieces:</p><p>(1) Art:</p><p>Paintings</p><div class=\"table-wrap\"><table><tr><td>Description</td><td>Estimated Value</td></tr><tr><td>Gilt Frame Portrait Sir Staples Bar</td><td>£800</td></tr><tr><td>Gilt Frame Water Colour by F McKelvey</td><td>£5,000</td></tr><tr><td>Blue Moon Painting by Louis Reed</td><td>N/K</td></tr><tr><td>Overgrown Garden Painting</td><td>N/K</td></tr></table></div><p>Limited Edition Prints</p><div class=\"table-wrap\"><table><tr><td>St Malachy’s Belfast by Jean Duncan</td><td>N/K</td></tr><tr><td>Temple Tree (Pair) by Cliona Doyle</td><td>N/K</td></tr><tr><td>The Passion (Pair) by Tracy Staunton</td><td>N/K</td></tr><tr><td>Two Men Talking About Fishing by Eddie Rafferty</td><td>N/K</td></tr><tr><td>Drawing of a Garden by David Barber</td><td>N/K</td></tr><tr><td>Ephesis 1 X Hermogenes</td><td>N/K</td></tr><tr><td>Lottie by M Martin</td><td>N/K</td></tr><tr><td>Esme by M Martin</td><td>N/K</td></tr><tr><td>Forum Romanium by J Adams</td><td>N/K</td></tr><tr><td>Northern Sea by James Allen</td><td>N/K</td></tr><tr><td>Blue Vase</td><td>N/K</td></tr><tr><td>Antiquity by J Adams</td><td>N/K</td></tr><tr><td>Donegal Place by D Groms</td><td>N/K</td></tr><tr><td>Waterfront by Cynthia Neal</td><td>N/K</td></tr><tr><td>The Journey by Carmel Benson</td><td>N/K</td></tr><tr><td>Island Figure by Carmel Benson</td><td>N/K</td></tr></table></div><p>(ii) Artefacts</p><div class=\"table-wrap\"><table><tr><td>Description</td><td>Estimated Value</td></tr><tr><td>William IV Mahogany Extend Table</td><td>£800</td></tr><tr><td>Large Mahogany Table</td><td>£1,500</td></tr></table></div><p>(iii) Other Historical Items</p><div class=\"table-wrap\"><table><tr><td>Description</td><td>Estimated Value</td></tr><tr><td>Table on which the Good Friday Agreement was signed</td><td>N/K</td></tr></table></div><p>Please note that all prison service artefacts and files were relocated from the former Prison Service College in Millisle to a secure location in NIPS HQ. At present there is no inventory of the items or any assessment of value, however, I asked my officials to carry out a scoping exercise to determine the work involved.</p><p>In addition the Department has a number of items on loan from NICS Arts Collection which is managed by the Department of Finance.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206701%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=280619","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=280619"}},{"id":"280618","reference":"AQW 6700/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-11-08","answerBy":"2016-11-23","answered":"2016-11-29","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs to what extent her Department will guarantee replacement finance for the Basic Payment Scheme following a potential United Kingdom exit from the European Union.","answerText":"It is too early in the process to be able to provide financial guarantees.","answerHtml":"<p>It is too early in the process to be able to provide financial guarantees.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206700%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=280618","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=280618"}},{"id":"280351","reference":"AQW 6637/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-11-07","answerBy":"2016-11-10","answered":"2016-11-22","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what reasons United Airlines has given for cancelling the Belfast to Newark flight; and why his Department was unable to secure the necessary funding.","answerText":"United Airlines has stated that it took the decision to cancel the Belfast to Newark service due to the poor financial performance of the route. The decision was prompted by the views of European Commission officials that the support being provided by the Northern Ireland Executive to maintain the service was State aid.\n\nThe necessary funding from both my Department and Belfast International Airport had already been secured.","answerHtml":"<p>United Airlines has stated that it took the decision to cancel the Belfast to Newark service due to the poor financial performance of the route. The decision was prompted by the views of European Commission officials that the support being provided by the Northern Ireland Executive to maintain the service was State aid.</p><p>The necessary funding from both my Department and Belfast International Airport had already been secured.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206637%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=280351","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=280351"}},{"id":"279453","reference":"AQO 659/16-21","type":"Oral","typeCode":"AQO","mandate":"16-21","tabled":"2016-10-27","answerBy":"2016-11-15","answered":"2016-11-15","answeredOrally":true,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education to outline any programmes in schools in East Antrim designed to deter children from illegal activity and paramilitary involvement.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr Weir","text":"There was just a bit of natural flow in that regard. The statutory curriculum that is taught in all schools includes citizenship education which enables young people to participate positively and effectively in society, play their part in democratic processes and make informed and responsible decisions as citizens throughout their lives. At primary level, it is part of the personal development and mutual understanding area of learning. Pupils look at diversity, cultural heritage, promoting inclusion, human rights, causes of and responses to conflict, and playing an active and meaningful part in the community, all of which contribute to turning children away from involvement in illegal and paramilitary organisations. Specifically, at post-primary level, local and global citizenship is part of the learning for life and work area. Pupils explore issues such as diversity, prejudice and racism, promoting inclusion and reconciliation, mutual respect, equality and human rights, social justice and exclusion, democracy, and participation through local and global examples. In addition to this, because, as I may have mentioned earlier, we sometimes focus purely on what is happening in the classroom, my Department also provides funding directly to the Education Authority (EA) under the youth intervention programme. This is to support young people in times of community tension and unrest. Last year, the fund was a little bit over £800,000. This targeted programme enabled the creation of, if you like, diversionary activity for individuals who were often at risk of involvement in paramilitary activity. That is an important part of this as well. I am not aware of specific programmes in schools in East Antrim per se but I hope that the aspects in the curriculum, as I have outlined them, will deter children from involvement in illegal and paramilitary activities. Nobody wants children to go down the wrong route in life. Whether it is paramilitary activity or other criminal activity, we all have to play our part in ensuring that we divert people from that."},{"speaker":"Mr Dickson","text":"I thank the Minister for his answer. Minister, you will appreciate that, given the imminent and real danger to young people in East Antrim, particularly in Carrickfergus and Larne, intervention is vital for how we support our young people in those communities. In respect of dealing with paramilitaries, the Executive agreed an action plan, including an early intervention transformation programme. Have you met that board? What action will you take with the early intervention transformation programme board to deal with the matter?"},{"speaker":"Mr Weir","text":"As yet, I have not had a direct meeting with the board, but I am happy to work alongside it. If we need to do things in a multi-agency or multi-departmental way, I am keen to embrace that. If young people go down that pathway, they are potentially creating a risk to society in terms of deaths, injuries and damage to property. That is bad enough, but added to that is the danger of a young person being left scarred for life by a criminal record. We should take any steps that we can to divert people from that. I am happy to meet anybody in that regard. I will try to get the Member details of any activities that the EA has planned in East Antrim and send them to him."},{"speaker":"Mr McMullan","text":"I thank the Minister for his answers so far. Can you, Minister, give me your Department's assessment of the harm that the culture of paramilitary activity and domination in parts of Carrick and Larne is having on the educational attainment of young people and children? In the absence of such an assessment, will your Department consider carrying one out?"},{"speaker":"Mr Weir","text":"I am not sure whether there is much point in doing something so specifically location-oriented. Unfortunately, there are still parts of Northern Ireland in which there is paramilitary activity and paramilitary organisations in both sections of the community. As I indicated, there is clear damage to the lives of young people who get involved, and they should be discouraged from any such activity. There is risk to their future long-term prospects in terms of criminal records and their life, let alone the damage that they do to others. As you indicated, it is also about the impact that that will have on their educational opportunities and the damage that is done. From that point of view, we need to look at how we can do that throughout Northern Ireland. If there are specific interventions that can happen in a constituency, I am happy for the EA to do those; it will perhaps know what needs to be done directly on the ground. If there is any form of audit, it needs to be taken forward on a much wider basis to ensure that all areas where there are problems are properly dealt with."},{"speaker":"Mr Deputy Speaker (Mr McGlone)","text":"I call Phillip Logan for a brief question and a brief answer."},{"speaker":"Mr Logan","text":"Thank you, Mr Deputy Speaker. What progress has the Minister made on implementing the plans in the Fresh Start Agreement for tackling paramilitary activity?"},{"speaker":"Mr Weir","text":"To add to what has been said, the Council for the Curriculum, Examinations and Assessment (CCEA) has provided outline costs for the development of curriculum materials to address the issues of paramilitary activity, criminality and organised crime. Those materials will support the delivery of citizenship education in the curriculum. It is designed to raise awareness and develop understanding of active citizenship and lawfulness. We have to be mindful of the fact that most of us are of a generation who know about what happened throughout the Troubles. We knew about the damage that was done to society as a whole. A lot of people are growing up for whom it is simply a historical event. We have to make sure that young people do not repeat the mistakes of previous generations, so the damage that can be caused to young people and society has to be brought home to them."},{"speaker":"Mr Deputy Speaker (Mr McGlone)","text":"That ends the period for listed questions. We now move on to topical questions."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20659%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=279453","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2016-11-15&docID=280816#AQO%20659/16-21","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=279453"}},{"id":"281592","reference":"AQO 650/16-21","type":"Oral","typeCode":"AQO","mandate":"16-21","tabled":"2016-10-27","answerBy":"2016-11-14","answered":"2016-11-15","answeredOrally":false,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice what research exists that shows the positive or negative outcomes on crime and community relations in areas where there is community funding for addressing paramilitarism and organised crime.","answerText":"The Fresh Start agreement and Executive action plan are a new approach to tackling paramilitarism and organised crime. We have not done anything like this before. The action plan is based on the comprehensive Report of the Three Person Panel, which was the product of their extensive consultation, research, and informed consideration of the issues.\n\nFresh Start, and the Panel report, stress the importance of building capacity and empowering communities to support them in completing the transition away from paramilitary activity. We want to support community programmes aimed at achieving that goal. Of course, such interventions must be effective and we will need to properly evaluate the outcomes achieved. We will be putting in place arrangements to monitor and evaluate the impact of programmes that we provide funding for and I would hope that we will deliver positive outcomes, including in terms of crime and community relations.","answerHtml":"<p>The Fresh Start agreement and Executive action plan are a new approach to tackling paramilitarism and organised crime. We have not done anything like this before. The action plan is based on the comprehensive Report of the Three Person Panel, which was the product of their extensive consultation, research, and informed consideration of the issues.</p><p>Fresh Start, and the Panel report, stress the importance of building capacity and empowering communities to support them in completing the transition away from paramilitary activity. We want to support community programmes aimed at achieving that goal. Of course, such interventions must be effective and we will need to properly evaluate the outcomes achieved. We will be putting in place arrangements to monitor and evaluate the impact of programmes that we provide funding for and I would hope that we will deliver positive outcomes, including in terms of crime and community relations.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20650%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=281592","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=281592"}},{"id":"279266","reference":"AQW 6273/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-26","answerBy":"2016-11-10","answered":"2016-11-08","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister when will their Department's website be updated to reflect the progress of Social Investment Fund projects.","answerText":"Now that the full £80 million has been committed to Social Investment Fund projects prioritised by local Steering Groups, we are in the process of finalising full details for inclusion on the Executive Office website.\n\nWe expect final updates to be made over the next few weeks.","answerHtml":"<p>Now that the full £80 million has been committed to Social Investment Fund projects prioritised by local Steering Groups, we are in the process of finalising full details for inclusion on the Executive Office website.</p><p>We expect final updates to be made over the next few weeks.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206273%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=279266","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=279266"}},{"id":"279265","reference":"AQW 6272/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-26","answerBy":"2016-11-10","answered":"2016-11-07","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure on what date will the Inspector's report from the York Street Interchange scheme's public inquiry be released.","answerText":"The York Street Interchange Scheme remains one of my priorities given its location at the confluence of our busiest roads, the M1/Westlink, M2 and M3. I can confirm that I intend to make a decision on the status of the scheme and release the Inspectors’ report from the Public Inquiry in the coming weeks.","answerHtml":"<p>The York Street Interchange Scheme remains one of my priorities given its location at the confluence of our busiest roads, the M1/Westlink, M2 and M3. I can confirm that I intend to make a decision on the status of the scheme and release the Inspectors’ report from the Public Inquiry in the coming weeks.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206272%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=279265","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=279265"}},{"id":"279264","reference":"AQW 6271/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-26","answerBy":"2016-11-10","answered":"2016-11-16","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure , pursuant to AQW 5709/16-21, to detail (i) his Department's key priorities for projects for the next ten years; and (ii) the York Street Interchange scheme's place within these priorities.","answerText":"(i) The Executive has set out four flagship infrastructure projects for my Department which will benefit people across the region. These include the Belfast Hub and Belfast Rapid Transit projects, as well as the A5 and A6. These projects are key and will reflect my priorities for transport which I have set out in my Programme for Government Delivery Plan. These will be focused on addressing infrastructure deficit, particularly in the west and increasing the number of people choosing to travel by means of walking, cycling and public transport.\n\nIn addition to the Executive’s flagship projects the Delivery Plan includes a number of priority schemes that will be subject to budget availability including the York Street Interchange, Derry Transport Hub, advancing the Narrow Water Bridge and the Newry Southern Relief Road.\n\nAnother key priority will be the continued funding of the base maintenance and enhancement needs of NI Water, which is currently around £165m per annum until 2021. The Utility Regulator will lead a Price Control in 2021 will determine the capital needs to 2027.\n\nMy Department is also leading the ‘Living with Water Programme’ to develop a Strategic Drainage Infrastructure Plan for Belfast, the main parts of which will be implemented between 2019 and 2027. This will deliver works to reduce the risk of flooding, comply with environmental legislation and provide the increased drainage and wastewater treatment capacity necessary for the city to continue to grow.\n\n(ii) The York Street Interchange project remains a priority for me as it would deliver significant social and economic benefits, both in terms of alleviating traffic congestion and also in terms of improving access to key ports and gateways.\n\nFor this reason I am committed to do all that I can to deliver the scheme within the current financial context, working with the Finance Minister and other Executive colleagues.","answerHtml":"<p>(i) The Executive has set out four flagship infrastructure projects for my Department which will benefit people across the region. These include the Belfast Hub and Belfast Rapid Transit projects, as well as the A5 and A6. These projects are key and will reflect my priorities for transport which I have set out in my Programme for Government Delivery Plan. These will be focused on addressing infrastructure deficit, particularly in the west and increasing the number of people choosing to travel by means of walking, cycling and public transport.</p><p>In addition to the Executive’s flagship projects the Delivery Plan includes a number of priority schemes that will be subject to budget availability including the York Street Interchange, Derry Transport Hub, advancing the Narrow Water Bridge and the Newry Southern Relief Road.</p><p>Another key priority will be the continued funding of the base maintenance and enhancement needs of NI Water, which is currently around £165m per annum until 2021. The Utility Regulator will lead a Price Control in 2021 will determine the capital needs to 2027.</p><p>My Department is also leading the ‘Living with Water Programme’ to develop a Strategic Drainage Infrastructure Plan for Belfast, the main parts of which will be implemented between 2019 and 2027. This will deliver works to reduce the risk of flooding, comply with environmental legislation and provide the increased drainage and wastewater treatment capacity necessary for the city to continue to grow.</p><p>(ii) The York Street Interchange project remains a priority for me as it would deliver significant social and economic benefits, both in terms of alleviating traffic congestion and also in terms of improving access to key ports and gateways.</p><p>For this reason I am committed to do all that I can to deliver the scheme within the current financial context, working with the Finance Minister and other Executive colleagues.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206271%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=279264","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=279264"}},{"id":"279263","reference":"AQW 6270/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-26","answerBy":"2016-11-10","answered":"2016-11-07","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to detail (i) current road schemes; and (ii) future road schemes.","answerText":"Current major road schemes include the recently completed A31 Maghjerafelt Bypass, which I was delighted to open on the 6 October, and the A26 Glarryford to A44 Dualling which is on schedule to open by next summer.\n\nIn addition the Executive, in the December 2015 Budget Statement, has committed almost £490m between 2016 and 2021 to the two Flagship road projects, the A5 and A6. This aligns with one of my key priorities as Infrastructure Minister, to redress the north’s infrastructure deficit, particularly west of the Bann.\n\nSubject to the successful completion of statutory procedures, construction of a first phase of the A5 Western Transport Corridor, the Newbuildings to north of Strabane section, could commence in 2017.\n\nMy Department is currently progressing two projects on the A6 route to improve road links between our two principal cities of Derry and Belfast. I am hopeful that construction of the first of these, the £160m A6 Randalstown to Castledawson scheme, will commence in the near future. Work is also underway to determine the extent of the Derry to Dungiven scheme that can be delivered with the indicative funding allocations contained in the December 2015 Budget Statement, with priority being given to commencing construction with a bypass of Dungiven and progressing westwards towards Drumahoe.\n\nThe York Street Interchange Scheme remains one of my priorities given its location at the junction of our busiest roads, the M1/Westlink, M2 and M3. As I am sure you are aware, this scheme had been highly likely to be eligible for a significant EU funding contribution towards construction. I had intended to award the contract for the design phase of this scheme by October 2016. However as result of the funding uncertainty created by the EU referendum result, the procurement period has been extended to allow further consideration of funding availability for this project, along with other capital schemes, as part of the 2016 Budget process.\n\nIn addition, my Programme for Government Delivery Plan sets out a range of integrated interventions designed to improve transport connections for people, goods and services. The Delivery Plan includes a number of priority road schemes that will be taken forward subject to budget availability.","answerHtml":"<p>Current major road schemes include the recently completed A31 Maghjerafelt Bypass, which I was delighted to open on the 6 October, and the A26 Glarryford to A44 Dualling which is on schedule to open by next summer.</p><p>In addition the Executive, in the December 2015 Budget Statement, has committed almost £490m between 2016 and 2021 to the two Flagship road projects, the A5 and A6. This aligns with one of my key priorities as Infrastructure Minister, to redress the north’s infrastructure deficit, particularly west of the Bann.</p><p>Subject to the successful completion of statutory procedures, construction of a first phase of the A5 Western Transport Corridor, the Newbuildings to north of Strabane section, could commence in 2017.</p><p>My Department is currently progressing two projects on the A6 route to improve road links between our two principal cities of Derry and Belfast. I am hopeful that construction of the first of these, the £160m A6 Randalstown to Castledawson scheme, will commence in the near future. Work is also underway to determine the extent of the Derry to Dungiven scheme that can be delivered with the indicative funding allocations contained in the December 2015 Budget Statement, with priority being given to commencing construction with a bypass of Dungiven and progressing westwards towards Drumahoe.</p><p>The York Street Interchange Scheme remains one of my priorities given its location at the junction of our busiest roads, the M1/Westlink, M2 and M3. As I am sure you are aware, this scheme had been highly likely to be eligible for a significant EU funding contribution towards construction. I had intended to award the contract for the design phase of this scheme by October 2016. However as result of the funding uncertainty created by the EU referendum result, the procurement period has been extended to allow further consideration of funding availability for this project, along with other capital schemes, as part of the 2016 Budget process.</p><p>In addition, my Programme for Government Delivery Plan sets out a range of integrated interventions designed to improve transport connections for people, goods and services. The Delivery Plan includes a number of priority road schemes that will be taken forward subject to budget availability.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206270%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=279263","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=279263"}},{"id":"279262","reference":"AQW 6269/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-26","answerBy":"2016-11-10","answered":"2016-11-07","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure for an update on the planned hub at the Europa Bus Centre/Great Victoria Street railway station.","answerText":"The first stage Outline Business Case (OBC) for the Belfast Transport Hub, identifying a preferred option, has been approved by my Department and the Department of Finance.\n\nThe project is currently at design and planning stage and a budget has been identified to progress it this year and next before a further OBC will be produced. Before developing a full planning application Translink has started a consultation which runs until 2 December 2016 which will provide members of the public with the opportunity to review the proposals and provide their feedback. Details are set out at www.translink.co.uk.\n\nThe feedback from this consultation will help to inform the design and masterplan for the project and further consultation is planned.\n\nThe estimated cost of the project could be over £175m up to 2021.\n\nIt is an Executive flagship project and we need to consider all options including funding and phasing.","answerHtml":"<p>The first stage Outline Business Case (OBC) for the Belfast Transport Hub, identifying a preferred option, has been approved by my Department and the Department of Finance.</p><p>The project is currently at design and planning stage and a budget has been identified to progress it this year and next before a further OBC will be produced. Before developing a full planning application Translink has started a consultation which runs until 2 December 2016 which will provide members of the public with the opportunity to review the proposals and provide their feedback. Details are set out at www.translink.co.uk.</p><p>The feedback from this consultation will help to inform the design and masterplan for the project and further consultation is planned.</p><p>The estimated cost of the project could be over £175m up to 2021.</p><p>It is an Executive flagship project and we need to consider all options including funding and phasing.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206269%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=279262","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=279262"}},{"id":"278905","reference":"AQW 6121/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-25","answerBy":"2016-11-09","answered":"2016-11-10","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure what processes are in place to ensure the speedy release of a Freedom of Information request in circumstances where the absence of clearance from either he or his Special Adviser has taken the request beyond the statutory deadline for response.","answerText":"There have been no such circumstances and I would refer the Member to my response to Assembly Written Question 5883/16-21.","answerHtml":"<p>There have been no such circumstances and I would refer the Member to my response to Assembly Written Question 5883/16-21.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206121%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=278905","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=278905"}},{"id":"278879","reference":"AQW 6095/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-25","answerBy":"2016-11-09","answered":"2016-11-25","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health what processes are in place to ensure the speedy release of a Freedom of Information request in circumstances where the absence of clearance from either her or her Special Adviser has taken the request beyond the statutory deadline for response.","answerText":"The Freedom of Information Act 2000 (FOIA) gives rights of public access to information held by public authorities subject to certain exemptions, if applicable.\n\nA Section 36 exemption requires the authority’s ‘qualified person’ to give their ‘reasonable opinion’ that non disclosure is appropriate. The definition of the \"qualified person\" within the Act is the Minister in charge of that department. Only where section 36 of the FOI Act is being considered, must FOI responses be referred to Minister for consideration and approval before issue.\n\nNo FOI requests have been referred to Minister for a reasonable opinion on non disclosure under the terms of a Section 36 exemption in the period from May 2016.","answerHtml":"<p>The Freedom of Information Act 2000 (FOIA) gives rights of public access to information held by public authorities subject to certain exemptions, if applicable.</p><p>A Section 36 exemption requires the authority’s ‘qualified person’ to give their ‘reasonable opinion’ that non disclosure is appropriate. The definition of the &quot;qualified person&quot; within the Act is the Minister in charge of that department. Only where section 36 of the FOI Act is being considered, must FOI responses be referred to Minister for consideration and approval before issue.</p><p>No FOI requests have been referred to Minister for a reasonable opinion on non disclosure under the terms of a Section 36 exemption in the period from May 2016.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206095%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=278879","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=278879"}},{"id":"280701","reference":"AQO 619/16-21","type":"Oral","typeCode":"AQO","mandate":"16-21","tabled":"2016-10-20","answerBy":"2016-11-08","answered":"2016-11-08","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health for an update on the work of the Regulation and Quality Improvement Authority in ensuring compliance with the regulations and care standards governing nursing homes.","answerText":"The registration and inspection of a range of health and social care services is a key function of RQIA. Nursing homes are regulated establishments and are legally required to be inspected at least twice each year. The majority of inspections are unannounced and examine compliance with regulations and the minimum standards in the areas of care, estates, medicines management and safeguarding service users’ finances. RQIA’s inspections are conducted by a team of qualified and experienced nurses, social workers, pharmacists, estates and finance officers.\n\nWhere necessary, RQIA may take enforcement action to drive improvements in the quality of care. This may include issuing\n\nnotices of failure to comply with regulations; placing conditions\n\nof registration; taking action to impose fines; prosecuting or\n\nclosing a service.\n\nAll RQIA inspection reports and enforcement activity can be found on the Authority’s website (www.rqia.org.uk)","answerHtml":"<p>The registration and inspection of a range of health and social care services is a key function of RQIA. Nursing homes are regulated establishments and are legally required to be inspected at least twice each year. The majority of inspections are unannounced and examine compliance with regulations and the minimum standards in the areas of care, estates, medicines management and safeguarding service users’ finances. RQIA’s inspections are conducted by a team of qualified and experienced nurses, social workers, pharmacists, estates and finance officers.</p><p>Where necessary, RQIA may take enforcement action to drive improvements in the quality of care. This may include issuing</p><p>notices of failure to comply with regulations; placing conditions</p><p>of registration; taking action to impose fines; prosecuting or</p><p>closing a service.</p><p>All RQIA inspection reports and enforcement activity can be found on the Authority’s website (www.rqia.org.uk)</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20619%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=280701","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=280701"}},{"id":"277976","reference":"AQW 5766/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-19","answerBy":"2016-11-03","answered":"2016-10-27","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure , following the York Street Interchange announcement on 19 October 2016, to detail his plans to address the daily traffic gridlock at the current York Street junction.","answerText":"To clarify my position, the York Street Interchange Scheme remains one of my priorities given its location at the junction of our busiest roads, the M1/Westlink, M2 and M3.\n\nThis scheme will address a major bottleneck on the strategic road network, replacing the existing signalised junction at York Street with direct links between Westlink, M2 and M3, the three busiest roads in the north. It will also separate strategic traffic from local traffic movements via underpasses below the existing road and rail bridges and underneath a new bridge at York Street.\n\nI acknowledge, however, that York Street Interchange was the only scheme changed to “on hold” in the recent update of my Department’s TransportNI Procurement Plan 2016/17. This procurement plan, which lists the tender competitions scheduled to be awarded by TransportNI, is available to the construction industry through the TransportNI procurement portal on the Department’s web site. It is a ‘live’ plan and requires updating on an ongoing basis to ensure that the information is meaningful and current.\n\nAs I am sure you are aware, the York Street Interchange scheme had been highly likely to be eligible for a significant EU funding contribution towards construction. I had intended to award the contract for the design phase of York Street Interchange by October 2016. However as result of the funding uncertainty created by the EU referendum result the procurement period has been extended to allow further consideration of funding availability. To reflect this, the status of the York Street Interchange project was changed to “on hold” within the TransportNI Procurement Plan.\n\nThe procurement process for the York Street Interchange Scheme had been progressing in parallel with the statutory processes. The Public Inquiry was held in November 2015 and the Inspector’s report has been received by my Department. I intend to make a decision on the status of the scheme and release the Inspectors’ report from the Public Inquiry in the coming weeks.\n\nThere is no doubt that the outcome of the EU Referendum has presented considerable challenges for the Executive. However, we are working to address those challenges and this will form part of our considerations in the 2016 Budget process.","answerHtml":"<p>To clarify my position, the York Street Interchange Scheme remains one of my priorities given its location at the junction of our busiest roads, the M1/Westlink, M2 and M3.</p><p>This scheme will address a major bottleneck on the strategic road network, replacing the existing signalised junction at York Street with direct links between Westlink, M2 and M3, the three busiest roads in the north. It will also separate strategic traffic from local traffic movements via underpasses below the existing road and rail bridges and underneath a new bridge at York Street.</p><p>I acknowledge, however, that York Street Interchange was the only scheme changed to “on hold” in the recent update of my Department’s TransportNI Procurement Plan 2016/17. This procurement plan, which lists the tender competitions scheduled to be awarded by TransportNI, is available to the construction industry through the TransportNI procurement portal on the Department’s web site. It is a ‘live’ plan and requires updating on an ongoing basis to ensure that the information is meaningful and current.</p><p>As I am sure you are aware, the York Street Interchange scheme had been highly likely to be eligible for a significant EU funding contribution towards construction. I had intended to award the contract for the design phase of York Street Interchange by October 2016. However as result of the funding uncertainty created by the EU referendum result the procurement period has been extended to allow further consideration of funding availability. To reflect this, the status of the York Street Interchange project was changed to “on hold” within the TransportNI Procurement Plan.</p><p>The procurement process for the York Street Interchange Scheme had been progressing in parallel with the statutory processes. The Public Inquiry was held in November 2015 and the Inspector’s report has been received by my Department. I intend to make a decision on the status of the scheme and release the Inspectors’ report from the Public Inquiry in the coming weeks.</p><p>There is no doubt that the outcome of the EU Referendum has presented considerable challenges for the Executive. However, we are working to address those challenges and this will form part of our considerations in the 2016 Budget process.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205766%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=277976","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=277976"}},{"id":"277975","reference":"AQW 5765/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-19","answerBy":"2016-11-03","answered":"2016-11-03","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to detail the information his Department has received from the European Union regarding future funding for (i) ongoing Transport NI projects; and (ii) future Transport NI projects.","answerText":"My Department has, for a prolonged period, worked closely with the Commission and its Agencies to both promote potential projects and ensure that our particular issues and circumstances are acknowledged and accounted for. This has resulted in our projects featuring prominently in Commission Regulations and workplans.\n\nThe latest call for applications for funding through the Connecting Europe Facility – which is a highly competitive programme – opened on the 13 October 2016 with the deadline for the submission of proposals being the 7th February 2017.\n\nThis is a particularly prescriptive call with the majority of funding being targeted at Cohesion countries. Taking the call criteria into account, it is clear that in this case, smaller scale projects will be most likely to attract funding. I have asked my officials to examine the suitability of a range of potential candidate projects with the intention of submitting applications where it is appropriate to do so.","answerHtml":"<p>My Department has, for a prolonged period, worked closely with the Commission and its Agencies to both promote potential projects and ensure that our particular issues and circumstances are acknowledged and accounted for. This has resulted in our projects featuring prominently in Commission Regulations and workplans.</p><p>The latest call for applications for funding through the Connecting Europe Facility – which is a highly competitive programme – opened on the 13 October 2016 with the deadline for the submission of proposals being the 7th February 2017.</p><p>This is a particularly prescriptive call with the majority of funding being targeted at Cohesion countries. Taking the call criteria into account, it is clear that in this case, smaller scale projects will be most likely to attract funding. I have asked my officials to examine the suitability of a range of potential candidate projects with the intention of submitting applications where it is appropriate to do so.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205765%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=277975","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=277975"}},{"id":"277974","reference":"AQW 5764/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-19","answerBy":"2016-11-03","answered":"2016-10-27","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to detail the estimated cost of planning for the York Street Interchange since 2009.","answerText":"I can confirm that the costs incurred in the development of the York Street Interchange Scheme since 2009 are as follows:\n\nYear\tExpenditure (£)\n2009/10\t399,640\n2010/11\t269,284\n2011/12\t602,684\n2012/13\t878,403\n2013/14\t850,468\n2014/15\t1,525,067\n2015/16\t1,836,931\n2016/17\t409,855\n\nPlease note that the expenditure for 2016/17 is to the end of September 2016.","answerHtml":"<p>I can confirm that the costs incurred in the development of the York Street Interchange Scheme since 2009 are as follows:</p><div class=\"table-wrap\"><table><tr><td>Year</td><td>Expenditure (£)</td></tr><tr><td>2009/10</td><td>399,640</td></tr><tr><td>2010/11</td><td>269,284</td></tr><tr><td>2011/12</td><td>602,684</td></tr><tr><td>2012/13</td><td>878,403</td></tr><tr><td>2013/14</td><td>850,468</td></tr><tr><td>2014/15</td><td>1,525,067</td></tr><tr><td>2015/16</td><td>1,836,931</td></tr><tr><td>2016/17</td><td>409,855</td></tr></table></div><p>Please note that the expenditure for 2016/17 is to the end of September 2016.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205764%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=277974","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=277974"}},{"id":"277919","reference":"AQW 5709/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-19","answerBy":"2016-10-24","answered":"2016-10-25","answeredOrally":false,"priority":true,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure why the York Street Interchange is the only Transport NI project on hold.","answerText":"To clarify my position, the York Street Interchange Scheme remains one of my priorities given its location at the confluence of our busiest roads, the M1/Westlink, M2 and M3.\n\nI acknowledge, however, that York Street Interchange was the only scheme changed to “on hold” in the recent update of my Department’s TransportNI Procurement Plan 2016/17. This procurement plan, which lists the tender competitions scheduled to be awarded by TransportNI, is available to the construction industry through the TransportNI procurement portal on the Department’s web site. It is a ‘live’ plan and requires updating on an ongoing basis to ensure that the information is meaningful and current.\n\nAs I am sure you are aware, the York Street Interchange scheme had been highly likely to be eligible for a significant EU funding contribution towards construction. I had intended to award the contract for the design phase of York Street Interchange by October 2016. However as result of the funding uncertainty created by the EU referendum result the procurement period has been extended to allow further consideration of funding availability. To reflect this, the status of the York Street Interchange project was changed to “on hold” within the TransportNI Procurement Plan.\n\nThe procurement process for the York Street Interchange Scheme had been progressing in parallel with the statutory processes. The Public Inquiry was held in November 2015 and the Inspector’s report has been received by my Department. I intend to make a decision on the status of the scheme and release the Inspectors’ report from the Public Inquiry in the coming weeks.\n\nThere is no doubt that the outcome of the EU Referendum has presented considerable challenges for the Executive. However, we are working to address those challenges and this will form part of our considerations in the 2016 Budget process.","answerHtml":"<p>To clarify my position, the York Street Interchange Scheme remains one of my priorities given its location at the confluence of our busiest roads, the M1/Westlink, M2 and M3.</p><p>I acknowledge, however, that York Street Interchange was the only scheme changed to “on hold” in the recent update of my Department’s TransportNI Procurement Plan 2016/17. This procurement plan, which lists the tender competitions scheduled to be awarded by TransportNI, is available to the construction industry through the TransportNI procurement portal on the Department’s web site. It is a ‘live’ plan and requires updating on an ongoing basis to ensure that the information is meaningful and current.</p><p>As I am sure you are aware, the York Street Interchange scheme had been highly likely to be eligible for a significant EU funding contribution towards construction. I had intended to award the contract for the design phase of York Street Interchange by October 2016. However as result of the funding uncertainty created by the EU referendum result the procurement period has been extended to allow further consideration of funding availability. To reflect this, the status of the York Street Interchange project was changed to “on hold” within the TransportNI Procurement Plan.</p><p>The procurement process for the York Street Interchange Scheme had been progressing in parallel with the statutory processes. The Public Inquiry was held in November 2015 and the Inspector’s report has been received by my Department. I intend to make a decision on the status of the scheme and release the Inspectors’ report from the Public Inquiry in the coming weeks.</p><p>There is no doubt that the outcome of the EU Referendum has presented considerable challenges for the Executive. However, we are working to address those challenges and this will form part of our considerations in the 2016 Budget process.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205709%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=277919","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=277919"}},{"id":"277578","reference":"AQW 5639/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-18","answerBy":"2016-11-02","answered":"2016-11-15","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister to detail the departmental (i) art; (ii) artefacts; and (iii) other historic items either displayed or held in storage; and to itemise their value.","answerText":"The Executive Office does not own any art, artefacts or historic items as these form part of the NICS collection. The items held by our Department are on-loan from the Department of Finance, which maintains a database of all works throughout the NICS. You may therefore wish to refer this question to the Minister of Finance.","answerHtml":"<p>The Executive Office does not own any art, artefacts or historic items as these form part of the NICS collection. The items held by our Department are on-loan from the Department of Finance, which maintains a database of all works throughout the NICS. You may therefore wish to refer this question to the Minister of Finance.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205639%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=277578","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=277578"}},{"id":"277577","reference":"AQW 5638/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-18","answerBy":"2016-11-02","answered":"2016-11-08","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister , pursuant to AQW 3841/16-21, to outline (i) who was responsible for the decision to not attend; (ii) why that decision was not given in a timely manner; and (iii) whether they were aware that non-attendance would mean non-compliance from the United Kingdom.","answerText":"Attendance by a representative of the Executive at the dialogue with the UN in Geneva on 15-16 June 2016 was not, in itself, an international obligation under the International Covenant on Economic, Social and Cultural Rights. As such, non-attendance by a representative of the Executive does not mean non-compliance from the United Kingdom.\n\nAs outlined in the response to AQW 3841/16-21, no decision was taken concerning attendance. However, we are committed to actively engaging in the future to enable the many positive actions here to be reported back to the United Nations.","answerHtml":"<p>Attendance by a representative of the Executive at the dialogue with the UN in Geneva on 15-16 June 2016 was not, in itself, an international obligation under the International Covenant on Economic, Social and Cultural Rights. As such, non-attendance by a representative of the Executive does not mean non-compliance from the United Kingdom.</p><p>As outlined in the response to AQW 3841/16-21, no decision was taken concerning attendance. However, we are committed to actively engaging in the future to enable the many positive actions here to be reported back to the United Nations.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205638%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=277577","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=277577"}},{"id":"277576","reference":"AQW 5637/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-18","answerBy":"2016-11-02","answered":"2016-11-02","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister , pursuant to AQW 3990/16-21, to outline the action (i) taken; and (ii) to be taken by their Department to ensure the retention of the Human Rights Act.","answerText":"As outlined in the response to AQW 3990/16-21, we are aware that the UK Government proposes to replace the Human Rights Act with a British Bill of Rights. We are currently waiting on details on the proposal and will then wish to discuss it with the Westminster Government.","answerHtml":"<p>As outlined in the response to AQW 3990/16-21, we are aware that the UK Government proposes to replace the Human Rights Act with a British Bill of Rights. We are currently waiting on details on the proposal and will then wish to discuss it with the Westminster Government.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205637%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=277576","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=277576"}},{"id":"277566","reference":"AQW 5627/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-18","answerBy":"2016-11-02","answered":"2016-11-22","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to list the art, artefacts, and other historic items owned by her Department that are displayed or held in storage; and to itemise their value.","answerText":"My Department does not own any such items. Art, artefacts and other historic items in the Department form part of the Civil Service Art Collection which is owned by Department of Finance. Other HSC bodies do not routinely collect and hold this information.","answerHtml":"<p>My Department does not own any such items. Art, artefacts and other historic items in the Department form part of the Civil Service Art Collection which is owned by Department of Finance. Other HSC bodies do not routinely collect and hold this information.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205627%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=277566","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=277566"}},{"id":"277024","reference":"AQW 5323/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-13","answerBy":"2016-10-28","answered":"2016-11-08","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister , pursuant to AQW 2029/16-21, how civil service teams considering potential implications to Northern Ireland’s interests will report their findings and observations; and when they will publish their progress.","answerText":"The information will be used to inform our input to the negotiations. It would not be appropriate to publish it at this time.","answerHtml":"<p>The information will be used to inform our input to the negotiations. It would not be appropriate to publish it at this time.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205323%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=277024","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=277024"}},{"id":"277023","reference":"AQW 5322/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-13","answerBy":"2016-10-28","answered":"2016-11-02","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister , pursuant to AQW 2029/16-21, to whom the established departmental civil service teams considering potential implications to Northern Ireland’s interests are reporting.","answerText":"The teams referred to in AQW 2120/16-21 are reporting through their Departmental Ministers to the First and deputy First Ministers.","answerHtml":"<p>The teams referred to in AQW 2120/16-21 are reporting through their Departmental Ministers to the First and deputy First Ministers.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205322%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=277023","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=277023"}},{"id":"277021","reference":"AQW 5320/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-13","answerBy":"2016-10-28","answered":"2016-11-08","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister , pursuant to AQW 2029/16-21, what level of contact, and with what grade level, will these Civil Service teams have with Whitehall, Irish and EU counterparts.","answerText":"NICS officials are engaging with Whitehall, Irish and EU counterparts regularly at all levels (up to and including the Head of the Civil Service) to ensure that issues of particular significance for us are fed into considerations relating to the EU referendum result.","answerHtml":"<p>NICS officials are engaging with Whitehall, Irish and EU counterparts regularly at all levels (up to and including the Head of the Civil Service) to ensure that issues of particular significance for us are fed into considerations relating to the EU referendum result.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205320%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=277021","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=277021"}},{"id":"278982","reference":"AQO 560/16-21","type":"Oral","typeCode":"AQO","mandate":"16-21","tabled":"2016-10-13","answerBy":"2016-10-25","answered":"2016-10-28","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for his assessment of the importance of Northern Ireland continuing to participate in the European Single Market.","answerText":"Maintaining close trading ties with our European neighbours is undoubtedly important for us and I want to make it clear that I will be working with my colleagues in the Executive to get the best deal for Northern Ireland in the negotiations for the UK exit from the EU.\n\nWhichever means of accessing the EU emerges in due course I remain committed to ensuring that Northern Ireland will remain a great place to live, work and invest, with close business and trading ties with our European neighbours.","answerHtml":"<p>Maintaining close trading ties with our European neighbours is undoubtedly important for us and I want to make it clear that I will be working with my colleagues in the Executive to get the best deal for Northern Ireland in the negotiations for the UK exit from the EU.</p><p>Whichever means of accessing the EU emerges in due course I remain committed to ensuring that Northern Ireland will remain a great place to live, work and invest, with close business and trading ties with our European neighbours.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20560%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=278982","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=278982"}},{"id":"276810","reference":"AQW 5201/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-12","answerBy":"2016-10-27","answered":"2016-10-26","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs , in relation to a plan to replace the Basic Payment Scheme, what discussions (i) she has had with departmental officials; (ii) her Department has had with Scottish officials; (iii) her Department has had with Welsh officials; and (iv) her Department has had with Whitehall officials.","answerText":"I have regular discussions with my departmental officials on the implications of the decision to leave the EU. Initial discussions have also taken place between my officials and their counterparts both in Whitehall and some of the other devolved administrations and will continue as the process evolves.","answerHtml":"<p>I have regular discussions with my departmental officials on the implications of the decision to leave the EU. Initial discussions have also taken place between my officials and their counterparts both in Whitehall and some of the other devolved administrations and will continue as the process evolves.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205201%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=276810","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=276810"}},{"id":"276809","reference":"AQW 5200/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-12","answerBy":"2016-10-27","answered":"2016-10-27","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs for her assesment on when her Department will make the last payment from the Basic Payment Scheme following the result of the referendum on European Union membership.","answerText":"It is not possible to be definitive when the last payment will be made from the Basic Payment Scheme. This will depend on precisely when the UK leaves the EU and the provisions within the withdrawal agreement.","answerHtml":"<p>It is not possible to be definitive when the last payment will be made from the Basic Payment Scheme. This will depend on precisely when the UK leaves the EU and the provisions within the withdrawal agreement.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205200%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=276809","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=276809"}},{"id":"276798","reference":"AQW 5189/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-12","answerBy":"2016-10-27","answered":"2016-11-02","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister , pursuant to AQW 2029/16-21, whether teams at senior levels of the Northern Ireland Civil Service had been established to consider potential implications for each Department.","answerText":"The governance structures outlined in AQW 2120/16-21 are now in place. They include an Inter-departmental Coordination Group (ICG) comprised of senior civil servants and chaired jointly by the Permanent Secretaries of the Departments of Finance and Economy. The ICG is supported by teams in each department.","answerHtml":"<p>The governance structures outlined in AQW 2120/16-21 are now in place. They include an Inter-departmental Coordination Group (ICG) comprised of senior civil servants and chaired jointly by the Permanent Secretaries of the Departments of Finance and Economy. The ICG is supported by teams in each department.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205189%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=276798","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=276798"}},{"id":"276797","reference":"AQW 5188/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-12","answerBy":"2016-10-27","answered":"2016-11-08","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister to detail plans to ensure full and proper engagement before United Nations Treaty monitoring bodies in all future scenarios.","answerText":"As detailed in the response to AQW 3841/16-21, we are committed to engaging actively with the reporting process, to promote the many positive actions here and ensure the good work being taken forward to protect human rights is reported back to the United Nations.","answerHtml":"<p>As detailed in the response to AQW 3841/16-21, we are committed to engaging actively with the reporting process, to promote the many positive actions here and ensure the good work being taken forward to protect human rights is reported back to the United Nations.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205188%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=276797","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=276797"}},{"id":"275889","reference":"AQW 4777/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-06","answerBy":"2016-10-21","answered":"2016-11-22","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health , pursuant to AQW 3992/16-21, since April 2016 how many (i) urgent breast cancer referrals were seen within 14 days; (ii) what percentage of 98 per cent of patients diagnosed with cancer received their first definitive treatment within 31 days of a decision to treat; and (iii) what percentage of 95 per cent of patients urgently referred with a suspected cancer begin their first definitive treatment within 62 days.","answerText":"(i) Number of patients seen by a breast cancer specialist following an urgent referral for suspect cancer in the Northern HSC Trust (April – June 2016)\n\nTotal seen\tWaited 14 days or less\t% seen within 14 days\n\nApr 2016\tMay 2016\tJun 2016\tApr 2016\tMay 2016\tJun 2016\tApr 2016\tMay 2016\tJun 2016\n309\t322\t349\t285\t322\t337\t92.2%\t100.0%\t96.6%\n\nSource: Departmental Return SDR2\n\n(ii) Number of patients who commenced first treatment, for all cancers in the Northern HSC Trust (April – June 2016)\n\nTotal treated\tTreated within 31 days of a decision to treat\t% treated within 31 days\n\nApr 2016\tMay 2016\tJun 2016\tApr 2016\tMay 2016\tJun 2016\tApr 2016\tMay 2016\tJun 2016\n114\t87\t114\t96\t79\t99\t84.2%\t90.8%\t86.8%\n\nSource: Cancer Patient Pathway System (CaPPS)\n\n(iii) Number of patients who commenced first treatment following an urgent GP referral for suspect cancer, in the Northern HSC Trust (April – June 2016)\n\nCommenced Treatment\tCommenced within 62 days of Referral\t% within 62 days\n\nApr 2016\tMay 2016\tJun 2016\tApr 2016\tMay 2016\tJun 2016\tApr 2016\tMay 2016\tJun 2016\n65.5\t62.5\t69.0\t45.5\t39.0\t54.0\t69.5%\t62.4%\t78.3%\n\nSource: Cancer Patient Pathway System (CaPPS)\n\nInformation on waiting times for cancer services in relation to the Ministerial target is published quarterly on the Department’s website:\n\nhttps://www.health-ni.gov.uk/articles/cancer-waiting-times","answerHtml":"<p>(i) Number of patients seen by a breast cancer specialist following an urgent referral for suspect cancer in the Northern HSC Trust (April – June 2016)</p><div class=\"table-wrap\"><table><tr><td colspan=\"3\">Total seen</td><td colspan=\"3\">Waited 14 days or less</td><td colspan=\"3\">% seen within 14 days</td></tr><tr><td colspan=\"3\"></td><td colspan=\"3\"></td><td colspan=\"3\"></td></tr><tr><td>Apr 2016</td><td>May 2016</td><td>Jun 2016</td><td>Apr 2016</td><td>May 2016</td><td>Jun 2016</td><td>Apr 2016</td><td>May 2016</td><td>Jun 2016</td></tr><tr><td>309</td><td>322</td><td>349</td><td>285</td><td>322</td><td>337</td><td>92.2%</td><td>100.0%</td><td>96.6%</td></tr></table></div><p>Source: Departmental Return SDR2</p><p>(ii) Number of patients who commenced first treatment, for all cancers in the Northern HSC Trust (April – June 2016)</p><div class=\"table-wrap\"><table><tr><td colspan=\"3\">Total treated</td><td colspan=\"3\">Treated within 31 days of a decision to treat</td><td colspan=\"3\">% treated within 31 days</td></tr><tr><td colspan=\"3\"></td><td colspan=\"3\"></td><td colspan=\"3\"></td></tr><tr><td>Apr 2016</td><td>May 2016</td><td>Jun 2016</td><td>Apr 2016</td><td>May 2016</td><td>Jun 2016</td><td>Apr 2016</td><td>May 2016</td><td>Jun 2016</td></tr><tr><td>114</td><td>87</td><td>114</td><td>96</td><td>79</td><td>99</td><td>84.2%</td><td>90.8%</td><td>86.8%</td></tr></table></div><p>Source: Cancer Patient Pathway System (CaPPS)</p><p>(iii) Number of patients who commenced first treatment following an urgent GP referral for suspect cancer, in the Northern HSC Trust (April – June 2016)</p><div class=\"table-wrap\"><table><tr><td colspan=\"3\">Commenced Treatment</td><td colspan=\"3\">Commenced within 62 days of Referral</td><td colspan=\"3\">% within 62 days</td></tr><tr><td colspan=\"3\"></td><td colspan=\"3\"></td><td colspan=\"3\"></td></tr><tr><td>Apr 2016</td><td>May 2016</td><td>Jun 2016</td><td>Apr 2016</td><td>May 2016</td><td>Jun 2016</td><td>Apr 2016</td><td>May 2016</td><td>Jun 2016</td></tr><tr><td>65.5</td><td>62.5</td><td>69.0</td><td>45.5</td><td>39.0</td><td>54.0</td><td>69.5%</td><td>62.4%</td><td>78.3%</td></tr></table></div><p>Source: Cancer Patient Pathway System (CaPPS)</p><p>Information on waiting times for cancer services in relation to the Ministerial target is published quarterly on the Department’s website:</p><p>https://www.health-ni.gov.uk/articles/cancer-waiting-times</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204777%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=275889","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=275889"}},{"id":"275849","reference":"AQW 4737/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-06","answerBy":"2016-10-21","answered":"2016-10-20","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister for an update on Social Investment Fund projects that have been (i) approved; (ii) started; and (iii) completed.","answerText":"All £80 million of the Social Investment Fund has now been committed to the 69 approved projects, prioritised by local Steering Groups. Thirty-nine of these projects have commenced, and 15 are now operational. Details of the 69 approved projects have been placed in the Assembly Library.\n\nIt should be noted that capital projects which have appointed an Integrated Consultants Team (ICT) are considered commenced, and those which have completed construction works and are delivering services are considered operational. Similarly, revenue projects which have appointed a service delivery organisation are considered commenced, and those which have engaged participants, or are engaged in equivalent delivery on the ground, are considered operational.","answerHtml":"<p>All £80 million of the Social Investment Fund has now been committed to the 69 approved projects, prioritised by local Steering Groups. Thirty-nine of these projects have commenced, and 15 are now operational. Details of the 69 approved projects have been placed in the Assembly Library.</p><p>It should be noted that capital projects which have appointed an Integrated Consultants Team (ICT) are considered commenced, and those which have completed construction works and are delivering services are considered operational. Similarly, revenue projects which have appointed a service delivery organisation are considered commenced, and those which have engaged participants, or are engaged in equivalent delivery on the ground, are considered operational.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204737%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=275849","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=275849"}},{"id":"275848","reference":"AQW 4736/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-06","answerBy":"2016-10-21","answered":"2016-10-20","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister to detail all Social Investment Fund projects and their (i) Project Lead/Management Agent; and (ii) Project Delivery Agent.","answerText":"The information requested has been placed in the Assembly Library.","answerHtml":"<p>The information requested has been placed in the Assembly Library.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204736%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=275848","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=275848"}},{"id":"275114","reference":"AQW 4472/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-03","answerBy":"2016-10-18","answered":"2016-10-18","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs to outline her plans to (i) protecting fishing stocks; and (ii) stop overfishing if fishing quotas and the Common Fisheries Policy are replaced following the referendum result to leave the European Union.","answerText":"As I have said previously, new arrangements will need to be negotiatied between the UK, the EU and other coastal states to manage fishing opportunities and access to resources. The trading and support framework that will apply to the fisheries sector following a UK withdrawal from the European Union will be the subject of negotiation.\n\nI have already held a series of meetings with both Ministers from the UK government and Devolved Adminsitrations as well as with our own stakeholders to consider the potential implications of Brexit. The meetings included discussions on the need to ensure that future trade and policy frameworks take account of the importance of Northern Ireland’s agri-food and fishing industries, rural communities and environment sector.\n\nI intend to be closely and directly involved in the domestic agricultural, environmental, fisheries, and trade policy agendas as they unfold in order to maximise the opportunities that will come from leaving the European Union.","answerHtml":"<p>As I have said previously, new arrangements will need to be negotiatied between the UK, the EU and other coastal states to manage fishing opportunities and access to resources. The trading and support framework that will apply to the fisheries sector following a UK withdrawal from the European Union will be the subject of negotiation.</p><p>I have already held a series of meetings with both Ministers from the UK government and Devolved Adminsitrations as well as with our own stakeholders to consider the potential implications of Brexit. The meetings included discussions on the need to ensure that future trade and policy frameworks take account of the importance of Northern Ireland’s agri-food and fishing industries, rural communities and environment sector.</p><p>I intend to be closely and directly involved in the domestic agricultural, environmental, fisheries, and trade policy agendas as they unfold in order to maximise the opportunities that will come from leaving the European Union.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204472%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=275114","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=275114"}},{"id":"275113","reference":"AQW 4471/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-03","answerBy":"2016-10-18","answered":"2016-10-25","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs to outline the plans to replace fishing quotas following the referendum result to leave the European Union.","answerText":"As I said in a previous response, new arrangements will need to be negotiatied between the UK, the EU and other coastal states to manage fishing opportunities and access to resources. The trading and support framework that will apply to the fisheries sector following a UK withdrawal from the European Union will be the subject of negotiation.\n\nI intend to be closely and directly involved in the domestic agricultural, environmental, fisheries, and trade policy agendas as they unfold in order to maximise the opportunities that will come from leaving the European Union.","answerHtml":"<p>As I said in a previous response, new arrangements will need to be negotiatied between the UK, the EU and other coastal states to manage fishing opportunities and access to resources. The trading and support framework that will apply to the fisheries sector following a UK withdrawal from the European Union will be the subject of negotiation.</p><p>I intend to be closely and directly involved in the domestic agricultural, environmental, fisheries, and trade policy agendas as they unfold in order to maximise the opportunities that will come from leaving the European Union.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204471%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=275113","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=275113"}},{"id":"275112","reference":"AQW 4470/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-03","answerBy":"2016-10-18","answered":"2016-10-10","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs how ministerial time for party business is accounted for on departmentally funded trips.","answerText":"I have not carried out any party business while on departmentally funded trips, nor do I seek opportunities to do so.\n\nIf any occasion should occur when party business is performed on such a trip, it would be carried out in my own time.","answerHtml":"<p>I have not carried out any party business while on departmentally funded trips, nor do I seek opportunities to do so.</p><p>If any occasion should occur when party business is performed on such a trip, it would be carried out in my own time.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204470%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=275112","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=275112"}},{"id":"275111","reference":"AQW 4469/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-03","answerBy":"2016-10-07","answered":"2016-10-10","answeredOrally":false,"priority":true,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to outline the environmental impact study for the proposal to build a compressed air energy storage plant in Islandmagee.","answerText":"A planning application accompanied by an Environmental Statement for a Compressed Air Energy Storage (CAES) project was received on 23 December 2015. Following consideration of the proposal, the Department requested Further Environmental Information. This was received on 4 October 2016 and will be subject to the requirements of Regulation 20 of The Planning (Environmental Impact Assessment) Regulations (NI) 2015 in terms of consultations and advertisements.\n\nThis information will assist officials when making a recommendation on the application for my consideration.","answerHtml":"<p>A planning application accompanied by an Environmental Statement for a Compressed Air Energy Storage (CAES) project was received on 23 December 2015. Following consideration of the proposal, the Department requested Further Environmental Information. This was received on 4 October 2016 and will be subject to the requirements of Regulation 20 of The Planning (Environmental Impact Assessment) Regulations (NI) 2015 in terms of consultations and advertisements.</p><p>This information will assist officials when making a recommendation on the application for my consideration.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204469%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=275111","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=275111"}},{"id":"275078","reference":"AQW 4436/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-10-03","answerBy":"2016-10-18","answered":"2016-10-24","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to outline how Ministerial time used for party business is accounted for on departmental-funded trips.","answerText":"Since taking office I have undertaken three departmental funded trips, one to Rotterdam, one to Oxford, and one to China. I did not conduct any party business on any of these trips.","answerHtml":"<p>Since taking office I have undertaken three departmental funded trips, one to Rotterdam, one to Oxford, and one to China. I did not conduct any party business on any of these trips.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204436%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=275078","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=275078"}},{"id":"274975","reference":"AQW 4394/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-30","answerBy":"2016-10-17","answered":"2016-10-18","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister what action is being taken to (i) accommodate refugees currently in Northern Ireland; and (ii) accommodate more refugees to come to Northern Ireland.","answerText":"We have committed to receive further groups of refugees on a phased basis under the Syrian Vulnerable Persons Relocation Scheme (VPR). Officials are in ongoing discussion with the Home Office about the arrival of further groups. Under this Scheme we have been accommodating refugees in privately owned rental properties. This will continue.\n\nAnyone arriving here independently outside the VPR Scheme who has made a claim for asylum and who is destitute, is eligible for accommodation provided by the Home Office.\n\nPrior to the arrival of each group of refugees under the VPR Scheme, the Operational Planning Group take a range of factors into consideration as to where refugees will be housed. The priority is to ensure that we have the appropriate services in place, including accommodation, health services and education. It is important that all plans, including settlement locations, are based on the ability to meet refugee needs and to help them to integrate.\n\nPeople who have arrived outside the VPR Scheme and who are granted refugee status by the Home Office are entitled to apply for public sector housing.","answerHtml":"<p>We have committed to receive further groups of refugees on a phased basis under the Syrian Vulnerable Persons Relocation Scheme (VPR). Officials are in ongoing discussion with the Home Office about the arrival of further groups. Under this Scheme we have been accommodating refugees in privately owned rental properties. This will continue.</p><p>Anyone arriving here independently outside the VPR Scheme who has made a claim for asylum and who is destitute, is eligible for accommodation provided by the Home Office.</p><p>Prior to the arrival of each group of refugees under the VPR Scheme, the Operational Planning Group take a range of factors into consideration as to where refugees will be housed. The priority is to ensure that we have the appropriate services in place, including accommodation, health services and education. It is important that all plans, including settlement locations, are based on the ability to meet refugee needs and to help them to integrate.</p><p>People who have arrived outside the VPR Scheme and who are granted refugee status by the Home Office are entitled to apply for public sector housing.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204394%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=274975","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=274975"}},{"id":"274974","reference":"AQW 4393/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-30","answerBy":"2016-10-17","answered":"2016-10-18","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister what action has been taken to address a potential rise in racist harassment following the European Union referendum result.","answerText":"Immediately after the referendum result, we issued a joint statement to provide assurance to our migrant and minority ethnic communities. We remain committed to the vision expressed in the Racial Equality Strategy of a society which is strengthened by its ethnic diversity, free from racism, and where we can share a common sense of belonging. This vision is unaffected by the result of the referendum.\n\nThe Racial Equality Strategy contains the commitment that we will work with the Department of Justice to develop our approach to tackling race hate crime and we are working to progress the implementation of this Strategy. It is our view that there is absolutely no place for racism or intolerance of any kind in our society.\n\nRecent statistics from the PSNI have shown a reduction in reports of both racist incidents and racist crime. We remain committed to zero tolerance on hate crime and the attitudes that allow it to happen.\n\nWe unequivocally condemn all racist attacks and strongly encourage all victims to report any racist incident, however minor. While there may be a level of uncertainty following the referendum result, there remains no excuse for racism in any of its manifestations.","answerHtml":"<p>Immediately after the referendum result, we issued a joint statement to provide assurance to our migrant and minority ethnic communities. We remain committed to the vision expressed in the Racial Equality Strategy of a society which is strengthened by its ethnic diversity, free from racism, and where we can share a common sense of belonging. This vision is unaffected by the result of the referendum.</p><p>The Racial Equality Strategy contains the commitment that we will work with the Department of Justice to develop our approach to tackling race hate crime and we are working to progress the implementation of this Strategy. It is our view that there is absolutely no place for racism or intolerance of any kind in our society.</p><p>Recent statistics from the PSNI have shown a reduction in reports of both racist incidents and racist crime. We remain committed to zero tolerance on hate crime and the attitudes that allow it to happen.</p><p>We unequivocally condemn all racist attacks and strongly encourage all victims to report any racist incident, however minor. While there may be a level of uncertainty following the referendum result, there remains no excuse for racism in any of its manifestations.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204393%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=274974","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=274974"}},{"id":"274972","reference":"AQW 4391/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-30","answerBy":"2016-10-17","answered":"2016-10-17","answeredOrally":false,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice  what action her Department has taken to address a potential rise in racist harassment in Northern Ireland following the European Union referendum result.","answerText":"While reports of racist incidents following the referendum here in Northern Ireland have not been on the same scale as in England, this is an issue of concern for my Department. We will continue to monitor hate incidents in conjunction with the PSNI and other partners and take action where necessary.\n\nI am committed to working with the Executive Office, who lead on tackling hate and intolerance in society, and other partners to ensure that the valuable contribution of migrants to Northern Ireland society is recognised, and to enhance their feelings of safety and security in our community. I recently launched the ‘No Hate Here’ campaign alongside Junior Ministers Fearon and Ross. This initiative, developed by North Belfast District Policing and Community Safety Partnership, is designed to raise awareness of hate crime, support victims, and encourage local businesses and community groups to act as safe places where vulnerable members of the community can go for support.\n\nFrom a criminal justice perspective, work to tackle hate crime is taken forward through my Department’s Community Safety Strategy, which contains a commitment to tackling all forms of hate crime and the harm it causes through prevention, awareness, education and support for victims and communities. To deliver on this commitment, my Department chairs a multi-agency Hate Crime Delivery Group, which takes forward actions relating to hate crime. Membership includes PSNI, the Probation Board, Courts Service, Prison Service, the Executive Office, the Housing Executive, and Victim Support NI.\n\nAn Action Plan has been developed to deliver this commitment; this includes actions around increasing reporting and providing support for victims of all hate crime, including through the regional Hate Crime Advocacy Service which is jointly funded by the PSNI and DOJ.\n\nAt a local level, Policing and Community Safety Partnerships (PCSPs) develop and deliver a range of initiatives that aim to tackle racism and promote tolerance. I understand that, for example, Mid and East Antrim PCSP funds a bilingual advocacy service which provides a range of supports to black and minority ethnic communities in the local area.","answerHtml":"<p>While reports of racist incidents following the referendum here in Northern Ireland have not been on the same scale as in England, this is an issue of concern for my Department. We will continue to monitor hate incidents in conjunction with the PSNI and other partners and take action where necessary.</p><p>I am committed to working with the Executive Office, who lead on tackling hate and intolerance in society, and other partners to ensure that the valuable contribution of migrants to Northern Ireland society is recognised, and to enhance their feelings of safety and security in our community. I recently launched the ‘No Hate Here’ campaign alongside Junior Ministers Fearon and Ross. This initiative, developed by North Belfast District Policing and Community Safety Partnership, is designed to raise awareness of hate crime, support victims, and encourage local businesses and community groups to act as safe places where vulnerable members of the community can go for support.</p><p>From a criminal justice perspective, work to tackle hate crime is taken forward through my Department’s Community Safety Strategy, which contains a commitment to tackling all forms of hate crime and the harm it causes through prevention, awareness, education and support for victims and communities. To deliver on this commitment, my Department chairs a multi-agency Hate Crime Delivery Group, which takes forward actions relating to hate crime. Membership includes PSNI, the Probation Board, Courts Service, Prison Service, the Executive Office, the Housing Executive, and Victim Support NI.</p><p>An Action Plan has been developed to deliver this commitment; this includes actions around increasing reporting and providing support for victims of all hate crime, including through the regional Hate Crime Advocacy Service which is jointly funded by the PSNI and DOJ.</p><p>At a local level, Policing and Community Safety Partnerships (PCSPs) develop and deliver a range of initiatives that aim to tackle racism and promote tolerance. I understand that, for example, Mid and East Antrim PCSP funds a bilingual advocacy service which provides a range of supports to black and minority ethnic communities in the local area.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204391%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=274972","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=274972"}},{"id":"274937","reference":"AQW 4356/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-30","answerBy":"2016-10-17","answered":"2016-10-10","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities to outline what assessment his Department has undertaken on electrical safety of the Private Rented Sector.","answerText":"My Department is currently carrying out a review of the role and regulation of the private rented sector. The standard of properties, including electrical safety issues, is within the scope of the review. Proposals for change resulting from the review will be published for consultation in the coming months.\n\nIn addition the review of the housing fitness standard across all tenures, including the private rented sector, is considering a range of proposals including the provision of a specific requirement in relation to domestic electrical safety. I expect to bring forward proposals for change within a public consultation in early 2017.","answerHtml":"<p>My Department is currently carrying out a review of the role and regulation of the private rented sector. The standard of properties, including electrical safety issues, is within the scope of the review. Proposals for change resulting from the review will be published for consultation in the coming months.</p><p>In addition the review of the housing fitness standard across all tenures, including the private rented sector, is considering a range of proposals including the provision of a specific requirement in relation to domestic electrical safety. I expect to bring forward proposals for change within a public consultation in early 2017.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204356%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=274937","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=274937"}},{"id":"274734","reference":"AQW 4295/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-29","answerBy":"2016-10-14","answered":"2016-11-09","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy to detail the future plans for the area covered by license PL1/10; and whether PL1/10 will be terminated once the announced divestment of Infrastrata’s remaining oil and gas exploration interests are completed.","answerText":"My Department has formally written to the Licensee seeking details of their future plans for Petroleum Licence PL1/10.","answerHtml":"<p>My Department has formally written to the Licensee seeking details of their future plans for Petroleum Licence PL1/10.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204295%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=274734","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=274734"}},{"id":"274732","reference":"AQW 4293/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-29","answerBy":"2016-10-14","answered":"2016-10-19","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail the progress on implementing the recommendations from the review of GP-led primary care services.","answerText":"I fully appreciate the challenges facing GP-led services and I am committed to developing a plan that will ensure their long-term sustainability. I am currently considering the findings and recommendations of the GP-led care working group’s report within the context of the development of my vision for the future of health and social care and future funding priorities for my Department.\n\nA number of investments have already been made in recent years in the areas identified by the working group’s report. The number of GP training places has been increased from 65 per year to 85, the biggest increase in more than ten years, and a new scheme has been put in place to retain GPs in general practice.\n\nIn addition my Department is investing up to £14m by 2020/21 to put almost 300 pharmacists into practices to see patients, improve care and ease the workload on GPs. I also recently announced an additional £900k to support the work of GP Federations. GP Federations will help practices work together to increase their resilience and meet rising demand.\n\nThere have also been significant developments in information technology aimed at reducing GPs’ administrative workload, freeing up GP time for those patients who most need to see them, and making it easier for patients to access their GP practice.\n\nI am determined to build on these investments to ensure everyone here continues to have access to sustainable, high quality GP services.","answerHtml":"<p>I fully appreciate the challenges facing GP-led services and I am committed to developing a plan that will ensure their long-term sustainability. I am currently considering the findings and recommendations of the GP-led care working group’s report within the context of the development of my vision for the future of health and social care and future funding priorities for my Department.</p><p>A number of investments have already been made in recent years in the areas identified by the working group’s report. The number of GP training places has been increased from 65 per year to 85, the biggest increase in more than ten years, and a new scheme has been put in place to retain GPs in general practice.</p><p>In addition my Department is investing up to £14m by 2020/21 to put almost 300 pharmacists into practices to see patients, improve care and ease the workload on GPs. I also recently announced an additional £900k to support the work of GP Federations. GP Federations will help practices work together to increase their resilience and meet rising demand.</p><p>There have also been significant developments in information technology aimed at reducing GPs’ administrative workload, freeing up GP time for those patients who most need to see them, and making it easier for patients to access their GP practice.</p><p>I am determined to build on these investments to ensure everyone here continues to have access to sustainable, high quality GP services.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204293%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=274732","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=274732"}},{"id":"274730","reference":"AQW 4291/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-29","answerBy":"2016-10-14","answered":"2016-11-04","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health when the Bengoa Report will be published.","answerText":"The report was published on 25th October 2016.","answerHtml":"<p>The report was published on 25th October 2016.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204291%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=274730","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=274730"}},{"id":"274152","reference":"AQW 4098/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-27","answerBy":"2016-10-12","answered":"2016-10-10","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities to provide an update on the next stages of his Department's reviews into (i) the role and regulation of the private rented sector; and (ii) the fitness standard.","answerText":"A set of proposals for change resulting from the Review of the Role and Regulation of the Private Rented Sector will be published for consultation in the coming months.\n\nMy Department has also committed to undertake a review of the Housing Fitness Standard to ensure that the legislation that governs our understanding of unacceptable housing is fit for purpose and enables us to take action to address poor housing conditions.\n\nIn March 2016 my officials circulated a discussion document setting out the case for change and potential options for the way ahead. Responses to the document are being given careful consideration, and I expect in the coming months to bring forward proposals for consultation on the future of the Housing Fitness Standard.","answerHtml":"<p>A set of proposals for change resulting from the Review of the Role and Regulation of the Private Rented Sector will be published for consultation in the coming months.</p><p>My Department has also committed to undertake a review of the Housing Fitness Standard to ensure that the legislation that governs our understanding of unacceptable housing is fit for purpose and enables us to take action to address poor housing conditions.</p><p>In March 2016 my officials circulated a discussion document setting out the case for change and potential options for the way ahead. Responses to the document are being given careful consideration, and I expect in the coming months to bring forward proposals for consultation on the future of the Housing Fitness Standard.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204098%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=274152","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=274152"}},{"id":"274151","reference":"AQW 4097/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-27","answerBy":"2016-10-12","answered":"2016-10-10","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities to outline what consideration he has given to five-yearly electrical safety checks in the private rented sector.","answerText":"My Department is currently carrying out a review of the role and regulation of the private rented sector. The standard of properties, including electrical safety issues, is within the scope of the review. Proposals for change resulting from the review will be published for consultation in the coming months.","answerHtml":"<p>My Department is currently carrying out a review of the role and regulation of the private rented sector. The standard of properties, including electrical safety issues, is within the scope of the review. Proposals for change resulting from the review will be published for consultation in the coming months.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204097%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=274151","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=274151"}},{"id":"274150","reference":"AQW 4096/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-27","answerBy":"2016-10-12","answered":"2016-10-10","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities what work his Department is undertaking with the private rented sector to improve safety for tenants in rented homes.","answerText":"The Department is currently undertaking a review of the Role and Regulation of the Private Rented Sector. The standard of properties, including safety issues, is within the scope of the review. Proposals for change resulting from the review will be published for consultation in the coming months.\n\nThe Houses in Multiple Occupation Act (Northern Ireland) 2016 will improve standards in the HMO sector by ensuring that a landlord or any agent is a fit and proper person, and by checking the standards of physical accommodation as well as tenancy management standards. This will provide protection for tenants ensuring accommodation is safe, well managed and of good quality. New regulations under development will also require carbon monoxide alarms/detectors to be installed in all HMOs. It is the intention to have these completed and ready for implementation by April 2018.","answerHtml":"<p>The Department is currently undertaking a review of the Role and Regulation of the Private Rented Sector. The standard of properties, including safety issues, is within the scope of the review. Proposals for change resulting from the review will be published for consultation in the coming months.</p><p>The Houses in Multiple Occupation Act (Northern Ireland) 2016 will improve standards in the HMO sector by ensuring that a landlord or any agent is a fit and proper person, and by checking the standards of physical accommodation as well as tenancy management standards. This will provide protection for tenants ensuring accommodation is safe, well managed and of good quality. New regulations under development will also require carbon monoxide alarms/detectors to be installed in all HMOs. It is the intention to have these completed and ready for implementation by April 2018.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204096%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=274150","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=274150"}},{"id":"274149","reference":"AQW 4095/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-27","answerBy":"2016-10-12","answered":"2016-10-07","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities what recent assessment his Department has made on homes in the private rented sector in relation to (i) gas safety; (ii) domestic electrical distribution safety; (iii) the provision of fire safety measures; and (iv) the provision of carbon monoxide safety measures.","answerText":"My officials are carrying out a review of the role and regulation of the private rented sector. The provision of smoke alarms, carbon monoxide detectors and 5 year electrical checks are some of the issues being considered as part of this review. Proposals for change resulting from the review will be published for consultation in the coming months.\n\nMy Department has responsibility for determining the statutory housing fitness standard which contains measures aimed at ensuring that dwellings across all tenures, including the private rented sector, are fit for human habitation.\n\nMy officials are currently undertaking a review of the housing fitness standard and are examining the areas of fire safety, electrical safety and the detection of carbon monoxide.\n\nI expect to consult on proposals for the future of the housing fitness standard in early 2017.","answerHtml":"<p>My officials are carrying out a review of the role and regulation of the private rented sector. The provision of smoke alarms, carbon monoxide detectors and 5 year electrical checks are some of the issues being considered as part of this review. Proposals for change resulting from the review will be published for consultation in the coming months.</p><p>My Department has responsibility for determining the statutory housing fitness standard which contains measures aimed at ensuring that dwellings across all tenures, including the private rented sector, are fit for human habitation.</p><p>My officials are currently undertaking a review of the housing fitness standard and are examining the areas of fire safety, electrical safety and the detection of carbon monoxide.</p><p>I expect to consult on proposals for the future of the housing fitness standard in early 2017.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204095%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=274149","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=274149"}},{"id":"274148","reference":"AQW 4094/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-27","answerBy":"2016-10-12","answered":"2016-10-10","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities to outline how Ministerial time used for party business is accounted for on departmentally funded trips.","answerText":"I have not conducted any party business on departmentally funded trips.\n\nThe Ministerial Code sets out the rules and procedures for the exercise of the duties and responsibilities of Ministers. It places clear requirements on Ministers to observe the highest standards of propriety and regularity involving impartiality; ensure that their public positions are not used to promote their private interests; and declare any interests which may conflict with their responsibilities.\n\nI am satisfied that I am fully compliant with the Code.","answerHtml":"<p>I have not conducted any party business on departmentally funded trips.</p><p>The Ministerial Code sets out the rules and procedures for the exercise of the duties and responsibilities of Ministers. It places clear requirements on Ministers to observe the highest standards of propriety and regularity involving impartiality; ensure that their public positions are not used to promote their private interests; and declare any interests which may conflict with their responsibilities.</p><p>I am satisfied that I am fully compliant with the Code.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204094%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=274148","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=274148"}},{"id":"273922","reference":"AQW 3992/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-26","answerBy":"2016-10-11","answered":"2016-09-30","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health to detail the 2016 targets to reduce patient waiting times in the Northern Health and Social Care Trust.","answerText":"The excessive waiting times across the HSC are due to demand for elective procedures exceeding available capacity caused by a number of factors including funding pressures. Within this context the performance targets detailed at Annex A are designed to ensure that the HSC, including the Northern Trust, operates as efficiently as possible within the resources available to my Department.\n\nI have stated on many occasions that long waiting times for treatment are unacceptable to me, and addressing this issue is a priority for me. I am looking forward to setting out my vision for Health and Social care in the coming weeks which will include a strategy for addressing waiting times in the long term.\n\nAnnex A - Commissioning Plan Targets relating to reducing patient waiting times\n\nFrom April 2016, 95% of patients attending any Type 1, 2 or 3 emergency department are either treated and discharged home, or admitted, within four hours of their arrival in the department; and no patient attending any emergency department should wait longer than 12 hours.\n\nBy March 2017, at least 80% of patients to have commenced treatment, following triage, within 2 hours.\n\nFrom April 2016, 95% of patients, where clinically appropriate, wait no longer than 48 hours for inpatient treatment for hip fractures.\n\nBy March 2017, 50% of patients should wait no longer than 9 weeks for an outpatient appointment and no patient waits longer than 52 weeks.\n\nBy March 2017, 75% of patients should wait no longer than 9 weeks for a diagnostic test and no patient waits longer than 26 weeks.\n\nBy March 2017, 55% of patients should wait no longer than 13 weeks for inpatient/daycase treatment and no patient waits longer than 52 weeks.\n\nFrom April 2016, all urgent breast cancer referrals should be seen within 14 days; at least 98% of patients diagnosed with cancer should receive their first definitive treatment within 31 days of a decision to treat; at least 95% of patients urgently referred with a suspected cancer should begin their first definitive treatment within 62 days.\n\nFrom April 2016, no patient waits longer than: nine weeks to access child and adolescent mental health services; nine weeks to access adult mental health services; nine weeks to access dementia services; and 13 weeks to psychological services (any age).\n\nBy March 2017, no patient should wait longer than 13 weeks from referral to commencement of treatment by an allied health professional.\n\nBy March 2017, reduce by 20% the number of hospital-cancelled consultant-led outpatient appointments.\n\nFrom April 2016, ensure that 90% of complex discharges from an acute hospital take place within 48 hour with no complex discharge taking more than seven day, and all non complex discharges from an acute hospital take place within six hours.","answerHtml":"<p>The excessive waiting times across the HSC are due to demand for elective procedures exceeding available capacity caused by a number of factors including funding pressures. Within this context the performance targets detailed at Annex A are designed to ensure that the HSC, including the Northern Trust, operates as efficiently as possible within the resources available to my Department.</p><p>I have stated on many occasions that long waiting times for treatment are unacceptable to me, and addressing this issue is a priority for me. I am looking forward to setting out my vision for Health and Social care in the coming weeks which will include a strategy for addressing waiting times in the long term.</p><p>Annex A - Commissioning Plan Targets relating to reducing patient waiting times</p><p>From April 2016, 95% of patients attending any Type 1, 2 or 3 emergency department are either treated and discharged home, or admitted, within four hours of their arrival in the department; and no patient attending any emergency department should wait longer than 12 hours.</p><p>By March 2017, at least 80% of patients to have commenced treatment, following triage, within 2 hours.</p><p>From April 2016, 95% of patients, where clinically appropriate, wait no longer than 48 hours for inpatient treatment for hip fractures.</p><p>By March 2017, 50% of patients should wait no longer than 9 weeks for an outpatient appointment and no patient waits longer than 52 weeks.</p><p>By March 2017, 75% of patients should wait no longer than 9 weeks for a diagnostic test and no patient waits longer than 26 weeks.</p><p>By March 2017, 55% of patients should wait no longer than 13 weeks for inpatient/daycase treatment and no patient waits longer than 52 weeks.</p><p>From April 2016, all urgent breast cancer referrals should be seen within 14 days; at least 98% of patients diagnosed with cancer should receive their first definitive treatment within 31 days of a decision to treat; at least 95% of patients urgently referred with a suspected cancer should begin their first definitive treatment within 62 days.</p><p>From April 2016, no patient waits longer than: nine weeks to access child and adolescent mental health services; nine weeks to access adult mental health services; nine weeks to access dementia services; and 13 weeks to psychological services (any age).</p><p>By March 2017, no patient should wait longer than 13 weeks from referral to commencement of treatment by an allied health professional.</p><p>By March 2017, reduce by 20% the number of hospital-cancelled consultant-led outpatient appointments.</p><p>From April 2016, ensure that 90% of complex discharges from an acute hospital take place within 48 hour with no complex discharge taking more than seven day, and all non complex discharges from an acute hospital take place within six hours.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203992%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=273922","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=273922"}},{"id":"273921","reference":"AQW 3991/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-26","answerBy":"2016-10-11","answered":"2016-10-11","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister what issues in the Brexit negotiation are specific to Northern Ireland; and how these issues will be represented.","answerText":"The issues of particular significance are set out in our letter to the Prime Minister of 10th August. It is our intention to be fully involved and represented in the negotiations on the terms of our future relationships with the EU and other countries. A copy of the letter can be found at: https://www.executiveoffice-ni.gov.uk/publications/letter-prime-minister-rt-hon-theresa-may-mp","answerHtml":"<p>The issues of particular significance are set out in our letter to the Prime Minister of 10th August. It is our intention to be fully involved and represented in the negotiations on the terms of our future relationships with the EU and other countries. A copy of the letter can be found at: https://www.executiveoffice-ni.gov.uk/publications/letter-prime-minister-rt-hon-theresa-may-mp</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203991%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=273921","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=273921"}},{"id":"273920","reference":"AQW 3990/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-26","answerBy":"2016-10-11","answered":"2016-10-06","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister to outline their commitment to a Bill of Rights for Northern Ireland.","answerText":"The development of a Bill of Rights for Northern Ireland is an excepted matter and is, therefore, the responsibility of the UK Government. However, we are aware that the UK Government proposes to replace the Human Rights Act 1998 with a British Bill of Rights. As details emerge on the proposals, we will wish to discuss them with the Westminster Government.","answerHtml":"<p>The development of a Bill of Rights for Northern Ireland is an excepted matter and is, therefore, the responsibility of the UK Government. However, we are aware that the UK Government proposes to replace the Human Rights Act 1998 with a British Bill of Rights. As details emerge on the proposals, we will wish to discuss them with the Westminster Government.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203990%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=273920","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=273920"}},{"id":"273913","reference":"AQW 3983/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-26","answerBy":"2016-10-11","answered":"2016-10-04","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to outline (i) the programme for weed spraying in East Antrim; (ii) the weed spraying conducted in East Antrim in 2016 to date; and (iii) whether he will ensure that all public footpaths and roads in East Antrim are sprayed for weeds.","answerText":"Unfortunately due to funding limitations last year no weed spraying was undertaken which had created the overgrown condition of our road and footpath network throughout the north. This year I am pleased to advise I allocated funding to allow a full weed spraying programme to take place.\n\nThe weed spray operation in East Antrim was completed this year on 25 May 2016 and whilst this did decay a large proportion of the vegetation, additional remedial spot treatments were required due to the size and spread of the weeds. A further treatment of the entire East Antrim area was considered necessary and was completed on 20 September 2016 and should be another step in rectifying the current situation.\n\nIn relation to similar work in 2017-18, I will discuss with Executive colleagues the requirements for resource funding to meet service delivery demands. These discussions are ongoing as part of the Programme for Government so I am currently unable to confirm service delivery levels for next year.","answerHtml":"<p>Unfortunately due to funding limitations last year no weed spraying was undertaken which had created the overgrown condition of our road and footpath network throughout the north. This year I am pleased to advise I allocated funding to allow a full weed spraying programme to take place.</p><p>The weed spray operation in East Antrim was completed this year on 25 May 2016 and whilst this did decay a large proportion of the vegetation, additional remedial spot treatments were required due to the size and spread of the weeds. A further treatment of the entire East Antrim area was considered necessary and was completed on 20 September 2016 and should be another step in rectifying the current situation.</p><p>In relation to similar work in 2017-18, I will discuss with Executive colleagues the requirements for resource funding to meet service delivery demands. These discussions are ongoing as part of the Programme for Government so I am currently unable to confirm service delivery levels for next year.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203983%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=273913","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=273913"}},{"id":"273739","reference":"AQW 3873/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-23","answerBy":"2016-10-10","answered":"2016-11-11","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy whether a reassessment has been made on the necessity to build a Compressed Air Energy Storage plant in Islandmagee.","answerText":"The project to develop a Compressed Air Energy Storage plant at Islandmagee is supported as a designated Project of Common Interest through two existing Connecting Europe Facility (CEF) grant agreements with the European Commission. While this is a private sector developer led project and decisions relating to the development of the plant are a matter for the developer, not my Department, the delivery of a compressed air energy storage solution has the potential to add to our energy mix and this could be important in terms of maintaining a stable grid, putting downward pressure on prices and contributing to security of supply. As the project progresses it will be subject to a range of assessments, including its interaction with electricity market arrangements, and while my Department will not lead on such work, it will be interested in the outcomes.","answerHtml":"<p>The project to develop a Compressed Air Energy Storage plant at Islandmagee is supported as a designated Project of Common Interest through two existing Connecting Europe Facility (CEF) grant agreements with the European Commission. While this is a private sector developer led project and decisions relating to the development of the plant are a matter for the developer, not my Department, the delivery of a compressed air energy storage solution has the potential to add to our energy mix and this could be important in terms of maintaining a stable grid, putting downward pressure on prices and contributing to security of supply. As the project progresses it will be subject to a range of assessments, including its interaction with electricity market arrangements, and while my Department will not lead on such work, it will be interested in the outcomes.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203873%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=273739","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=273739"}},{"id":"273708","reference":"AQW 3842/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-23","answerBy":"2016-10-10","answered":"2016-10-24","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy what efforts were made by Invest NI in the last 12 months to mitigate Caterpillar job losses.","answerText":"Caterpillar Inc. announced in September 2015 that it was seeking to reduce its annual operating costs by approximately $1.5 billion through workforce reduction of approximately10,000 and the consolidation and closure of a number of plants throughout the world.\n\nFollowing this announcement, Invest NI’s Chief Executive met with the company’s local and US teams in Belfast in May 2016, and with US senior management at the company’s US headquarters in August 2016.\n\nThis is in addition to the regular engagement between Invest NI staff and the company on both operational and strategic matters.","answerHtml":"<p>Caterpillar Inc. announced in September 2015 that it was seeking to reduce its annual operating costs by approximately $1.5 billion through workforce reduction of approximately10,000 and the consolidation and closure of a number of plants throughout the world.</p><p>Following this announcement, Invest NI’s Chief Executive met with the company’s local and US teams in Belfast in May 2016, and with US senior management at the company’s US headquarters in August 2016.</p><p>This is in addition to the regular engagement between Invest NI staff and the company on both operational and strategic matters.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203842%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=273708","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=273708"}},{"id":"273707","reference":"AQW 3841/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-23","answerBy":"2016-09-28","answered":"2016-10-06","answeredOrally":false,"priority":true,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister why the Executive was not represented alongside the other devolved administrations at the 58th Session of the United Nations Committee on Economic, Social and Cultural Rights.","answerText":"In common with other main UN human rights treaties, the International Covenant on Economic, Social and Cultural Rights (ICESCR) requires the State Parties to it, including the UK, to make periodic reports detailing how the rights are being implemented. These reports are examined by a body of independent experts- the Committee on Economic, Social and Cultural Rights (CESCR). The CESCR considered the Sixth Periodic Report of the UK on the implementation of ICESCR at its 36th and 37th meetings held in Geneva on 15 and 16 June 2016. It is regular practice for the CESCR to examine these Reports in the presence of officials from the reporting State.\n\nThe Ministry of Justice had coordinated the reporting process on behalf of the UK State Party, and the UK’s written response forwarded to the UN did not contain input specific to the Northern Ireland Executive.\n\nWhilst a decision was not taken on this occasion to send a specific representative from the Executive to Geneva to take part in the oral examination of the UK’s sixth Periodic Report, we are committed to engaging actively with the reporting process in the future, to promote the many positive actions here and ensure the good work being taken forward to protect human rights is reported back to the United Nations.","answerHtml":"<p>In common with other main UN human rights treaties, the International Covenant on Economic, Social and Cultural Rights (ICESCR) requires the State Parties to it, including the UK, to make periodic reports detailing how the rights are being implemented. These reports are examined by a body of independent experts- the Committee on Economic, Social and Cultural Rights (CESCR). The CESCR considered the Sixth Periodic Report of the UK on the implementation of ICESCR at its 36th and 37th meetings held in Geneva on 15 and 16 June 2016. It is regular practice for the CESCR to examine these Reports in the presence of officials from the reporting State.</p><p>The Ministry of Justice had coordinated the reporting process on behalf of the UK State Party, and the UK’s written response forwarded to the UN did not contain input specific to the Northern Ireland Executive.</p><p>Whilst a decision was not taken on this occasion to send a specific representative from the Executive to Geneva to take part in the oral examination of the UK’s sixth Periodic Report, we are committed to engaging actively with the reporting process in the future, to promote the many positive actions here and ensure the good work being taken forward to protect human rights is reported back to the United Nations.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203841%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=273707","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=273707"}},{"id":"273706","reference":"AQW 3840/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-23","answerBy":"2016-10-10","answered":"2016-10-05","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance how ministerial time for party business is accounted for on departmental funded trips.","answerText":"The Ministerial Code sets out the rules and procedures for the exercise of the duties and responsibilities of Ministers. It places clear requirements on Ministers to observe the highest standards of propriety and regularity involving impartiality; ensure that their public positions are not used to promote their private interests; and declare any interests which may conflict with their responsibilities.\n\nI am satisfied that I am fully compliant with the Code. I do not spend ministerial time on party business.","answerHtml":"<p>The Ministerial Code sets out the rules and procedures for the exercise of the duties and responsibilities of Ministers. It places clear requirements on Ministers to observe the highest standards of propriety and regularity involving impartiality; ensure that their public positions are not used to promote their private interests; and declare any interests which may conflict with their responsibilities.</p><p>I am satisfied that I am fully compliant with the Code. I do not spend ministerial time on party business.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203840%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=273706","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=273706"}},{"id":"273705","reference":"AQW 3839/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-23","answerBy":"2016-10-10","answered":"2016-11-22","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health how ministerial time for party business is accounted for on departmental funded trips.","answerText":"I keep my duties carried out as the Minister of Health separate from Party business. At all times I act in accordance with the provisions of the Ministerial Code.","answerHtml":"<p>I keep my duties carried out as the Minister of Health separate from Party business. At all times I act in accordance with the provisions of the Ministerial Code.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203839%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=273705","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=273705"}},{"id":"273587","reference":"AQW 3783/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-22","answerBy":"2016-10-07","answered":"2016-10-06","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education , pursuant to AQO 193/16-21, to detail what is contained within the 12 per cent of the overall 2016-17 budget allocated to schools from centre budgets held by the Education Authority.","answerText":"The 13% of the 2016-17 Education Budget which is attributed to schools for services provided by the Education Authority includes: Transport, C2K (managed ICT service), School Meals, Headquarters, Pupil Support, Schools Development Service, Music Service and School Library Service.\n\nThe 12% of the 2016-17 Education Budget which is allocated to schools from centre budgets, held by the Education Authority, includes: the Special Schools budget, Special Education in Mainstream, Rates and Substitution costs.","answerHtml":"<p>The 13% of the 2016-17 Education Budget which is attributed to schools for services provided by the Education Authority includes: Transport, C2K (managed ICT service), School Meals, Headquarters, Pupil Support, Schools Development Service, Music Service and School Library Service.</p><p>The 12% of the 2016-17 Education Budget which is allocated to schools from centre budgets, held by the Education Authority, includes: the Special Schools budget, Special Education in Mainstream, Rates and Substitution costs.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203783%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=273587","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=273587"}},{"id":"273586","reference":"AQW 3782/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-22","answerBy":"2016-10-07","answered":"2016-10-06","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education , pursuant to AQO 193/16-21, to detail what is contained in the 13 per cent of the overall 2016-17 budget attributable to services to schools.","answerText":"The 13% of the 2016-17 Education Budget which is attributed to schools for services provided by the Education Authority includes: Transport, C2K (managed ICT service), School Meals, Headquarters, Pupil Support, Schools Development Service, Music Service and School Library Service.\n\nThe 12% of the 2016-17 Education Budget which is allocated to schools from centre budgets, held by the Education Authority, includes: the Special Schools budget, Special Education in Mainstream, Rates and Substitution costs.","answerHtml":"<p>The 13% of the 2016-17 Education Budget which is attributed to schools for services provided by the Education Authority includes: Transport, C2K (managed ICT service), School Meals, Headquarters, Pupil Support, Schools Development Service, Music Service and School Library Service.</p><p>The 12% of the 2016-17 Education Budget which is allocated to schools from centre budgets, held by the Education Authority, includes: the Special Schools budget, Special Education in Mainstream, Rates and Substitution costs.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203782%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=273586","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=273586"}},{"id":"273585","reference":"AQW 3781/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-22","answerBy":"2016-10-07","answered":"2016-10-06","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education how Ministerial time used for party business is accounted for on Assembly-funded trips.","answerText":"I have not been on any Assembly-funded business trips.","answerHtml":"<p>I have not been on any Assembly-funded business trips.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203781%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=273585","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=273585"}},{"id":"273560","reference":"AQW 3756/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-22","answerBy":"2016-10-07","answered":"2016-12-05","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister for the Economy","question":"To ask the Minister for the Economy for his assessment of the importance of European Union funding on the construction of a second power station at Islandmagee.","answerText":"The proposal to develop a compressed air energy storage project at Islandmagee is a power storage facility rather than a power station. The storage project is a private sector, developer-led investment. As a designated EU Project of Common Interest (PCI) it is currently accessing Connecting Europe Facility (CEF) grant funding for a range of pre-construction activities. CEF is administered centrally by the European Commission, not through an allocation to each Member State, and the Commission carries out the evaluation and selection of submitted proposals.\n\nThe CEF budget does not typically extend to funding construction works associated with PCIs. As the project develops it will continue to be a matter for the project promoters to consider construction funding requirements and options.","answerHtml":"<p>The proposal to develop a compressed air energy storage project at Islandmagee is a power storage facility rather than a power station. The storage project is a private sector, developer-led investment. As a designated EU Project of Common Interest (PCI) it is currently accessing Connecting Europe Facility (CEF) grant funding for a range of pre-construction activities. CEF is administered centrally by the European Commission, not through an allocation to each Member State, and the Commission carries out the evaluation and selection of submitted proposals.</p><p>The CEF budget does not typically extend to funding construction works associated with PCIs. As the project develops it will continue to be a matter for the project promoters to consider construction funding requirements and options.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203756%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=273560","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=273560"}},{"id":"272752","reference":"AQW 3395/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-19","answerBy":"2016-10-04","answered":"2016-09-27","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister to detail the decisions made under the powers conferred on them by section 23 (3) of the Northern Ireland Act 1998.","answerText":"In addition to the appointment of the new Executive press secretary the prerogative powers in section 23(3) have been used by the then First Ministers and deputy First Ministers as follows:\n\nThe Commissioner for Public Appointments (Amendment) Order (Northern Ireland) 2001;\n\nThe Commissioner for Public Appointments (Amendment) Order (Northern Ireland) 2008; and\n\nThe Commissioner for Public Appointments (Amendment) Order (Northern Ireland) 2010.\n\nDetails of these orders can be found at: https://www.publicappointmentsni.org/our-role","answerHtml":"<p>In addition to the appointment of the new Executive press secretary the prerogative powers in section 23(3) have been used by the then First Ministers and deputy First Ministers as follows:</p><p>The Commissioner for Public Appointments (Amendment) Order (Northern Ireland) 2001;</p><p>The Commissioner for Public Appointments (Amendment) Order (Northern Ireland) 2008; and</p><p>The Commissioner for Public Appointments (Amendment) Order (Northern Ireland) 2010.</p><p>Details of these orders can be found at: https://www.publicappointmentsni.org/our-role</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203395%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=272752","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=272752"}},{"id":"272751","reference":"AQW 3394/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-19","answerBy":"2016-10-04","answered":"2016-10-06","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister whether the position of Head of the Executive Information Service has been filled; and through what process this position was filled.","answerText":"The Director of Communications and Executive Support role, from which the postholder recently announced his retirement, has not yet been filled as the current postholder will not retire until October 2016.","answerHtml":"<p>The Director of Communications and Executive Support role, from which the postholder recently announced his retirement, has not yet been filled as the current postholder will not retire until October 2016.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203394%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=272751","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=272751"}},{"id":"272745","reference":"AQW 3388/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-09-19","answerBy":"2016-09-23","answered":"2016-10-27","answeredOrally":false,"priority":true,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister whether the newly appointed press secretary has the power to direct members of the Executive Information Service or other civil servants.","answerText":"The new Executive press secretary will not exercise any power in relation to the management of any part of the Civil Service.","answerHtml":"<p>The new Executive press secretary will not exercise any power in relation to the management of any part of the Civil Service.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203388%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=272745","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=272745"}},{"id":"270973","reference":"AQO 193/16-21","type":"Oral","typeCode":"AQO","mandate":"16-21","tabled":"2016-09-05","answerBy":"2016-09-12","answered":"2016-09-12","answeredOrally":true,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education, whether he plans to increase the proportion of the departmental budget fund allocated to schools beyond the current level of 59 per cent.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr Weir","text":"The percentage of the 2016-17 education budget currently allocated to the aggregated schools budget is just over 60%. It has slightly moved up proportionately, I think, because of some of the other reductions. When one is quoting any government statistics, there is always a slight degree of caveat to be added to that. On top of the 60% that is in the aggregated schools budget, around an additional 12% of the overall 2016-17 budget is allocated to schools from centre budgets held by the Education Authority, with a further 13% attributable to services to them. So, about 85% goes directly into some form of schools' budgets funding. For example, all special schools are paid for directly out of the block grant that comes to the Education Authority. Classroom assistants and home-to-school transport are not paid for through the aggregated schools budget, and those are fairly substantial funds. While adding that caveat, it is my intention, as Education Minister, to give greater freedom and autonomy to schools over how they spend their budget. I want to do that in a considered way to see how we can get a level of advantage to have that greater level of autonomy, so, over the next few months, I will give that some consideration. I believe that there are a lot of things that are very worthy in education, but I regard the front-line delivery in schools, if you like, as the key priority. I will give priority to schools funding in future budget allocations, and I will continue to argue in the Executive, within the constraints of the overall Northern Ireland Budget, for additional funding for schools where possible."},{"speaker":"Mr Dickson","text":"While I appreciate what the Minister has informed the House, why does he not appear to have the same confidence in school principals and boards of governors in Northern Ireland as his colleagues in England, Scotland and Wales, where, traditionally, they have given a much higher percentage of departmental budgets to schools for them to administer locally? After all, governors and school principals should know best how to deliver for their local schools."},{"speaker":"Mr Weir","text":"I have every confidence. The Member will realise that the distribution of funding cannot simply happen overnight; it needs to be carefully thought through. In Northern Ireland we have about 1·8 million people. We have to look at where there are direct economies of scale but give that opportunity to schools to spend a greater percentage of their budget. The direction of travel for the percentage of the overall education budget and what can be directly spent by schools will be upwards while I am Minister. To be fair, we also have to realise that sometimes, when we compare Northern Ireland with England, for example, there is a very different school system in England that has evolved over many years. Also, to some extent — this is true of almost any form of statistics — you are not always absolutely comparing like with like. For example, we have a situation now where £85 million is spent on classroom assistants. That is spent directly in classrooms, but it does not appear in the line for the aggregated schools budget. We have to make sure that, when we talk about levels of school spend and school autonomy, we are talking on a similar basis."},{"speaker":"Mr Deputy Speaker (Mr McGlone)","text":"I remind Members that, if they wish to speak, they should stand. Those who have provision made should let us know."},{"speaker":"Mr McGrath","text":"Does the Minister agree that it is difficult for principals to effectively budget in area learning communities when some of the funding has to be claimed retrospectively? Will he undertake an investigation into this to ensure that risks are not taken by principals, and that all support that can be offered to them is offered to them?"},{"speaker":"Mr Weir","text":"There is always the possibility of some bolt out of the sky in terms of funding. I want to make sure that whatever announcements are made, even if it means taking a little bit more time and be it either capital or resources, are then stood over. The one thing we want to avoid, as much as possible, is uncertainty. If there is a particular problem of area learning communities receiving their money late or having to claim it back retrospectively, I will be very happy to look into it and see how we can move that forward for 2017-18."},{"speaker":"Mr Logan","text":"Has the Minister any plans to review the common funding formula?"},{"speaker":"Mr Weir","text":"The common funding formula, and associated formula funding arrangements, are kept under constant review. There was a previous independent review in 2013. I want to try to ensure particularly, as I mentioned earlier, that there may be a little more flexibility on the capital side, but there is no doubt that anybody in education, particularly in schools, will tell you that resource funding is very tight at the moment. What I want to do is to examine the common funding formula to make sure that it is fit for purpose — that, where money is actually happening, it is going the right way and getting the maximum advantage. I will be keeping it under review to try to ensure that the best possible support is given to schools across the board."},{"speaker":"Mr McElduff","text":"I ask the Minister if he has any message for school principals who are feeling the pressure of reduced school budgets and the possibility of the loss of teaching posts and bigger sized classrooms. Is there any good news emanating from the Department and the Minister on that front?"},{"speaker":"Mr Weir","text":"I always like to be the Minister for good news. Unfortunately, it does not always work out that way. I am working on the situation, and I hope to be in a position in the near future to be able to give some level of additional support to schools from within the budget. People have always got to remember that any money going to schools from within the budget is being cut elsewhere. We have to make sure we do not have our cake and eat it. The prioritisation of trying to retain as many jobs as possible will also be a key focus as we move ahead. I hope to be able to say something in the near future on that issue."},{"speaker":"Mrs Palmer","text":"I thank the Minister for his determination to make sure that the Department gives schools more control over their budgets. When you are looking at this review, have you a timetabled plan in mind to execute it?"},{"speaker":"Mr Weir","text":"In terms of any short-term action I can take within 2016-17, I hope to be able to announce that reasonably soon. On other more strategic issues, I will want to take a little bit of time. In that regard, it is important to get things right. Moving forward, the other critical factor in terms of the level of support that we can give schools will be getting a clearer understanding of the 2017-18 budget, because that will show the level of room for manoeuvre. I have no doubt that we have a lot of school principals who are trying to manage their budget under very difficult circumstances, and the vast bulk of them are doing that in a very responsible fashion. I want to see what additional help can be given to them. In the short term, I am not going to be able to promise miracles, but, hopefully, there will be some help that will be given in the near future directly to schools."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20193%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=270973","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2016-09-12&docID=270889#AQO%20193/16-21","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=270973"}},{"id":"269279","reference":"AQW 2029/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-06-29","answerBy":"2016-07-18","answered":"2016-07-26","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister to detail the plans in place to ensure that Northern Ireland’s interests are effectively represented at a national and European level in the coming months.","answerText":"The priority of the Executive will be to ensure that our interests are protected.\n\nThe Head of the Civil Service met with key stakeholders in Brussels on 30 June and 1 July. Detailed discussions will follow at a suitable point to seek to ensure that our specific circumstances are accounted for in any new arrangements that are developed.\n\nWe have asked the Head of the Civil Service to establish individual teams at senior level to consider the potential implications for each department. These teams will liaise with Whitehall, Irish and EU counterparts to ensure we get the best possible deal we can.","answerHtml":"<p>The priority of the Executive will be to ensure that our interests are protected.</p><p>The Head of the Civil Service met with key stakeholders in Brussels on 30 June and 1 July. Detailed discussions will follow at a suitable point to seek to ensure that our specific circumstances are accounted for in any new arrangements that are developed.</p><p>We have asked the Head of the Civil Service to establish individual teams at senior level to consider the potential implications for each department. These teams will liaise with Whitehall, Irish and EU counterparts to ensure we get the best possible deal we can.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202029%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=269279","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=269279"}},{"id":"269278","reference":"AQW 2028/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-06-29","answerBy":"2016-07-18","answered":"2016-07-07","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health (i) for her assessment of the current provision of GP in and out of hours services; and (ii) to outline what is being done to reduce the risks and pressure on these services.","answerText":"GPs are an essential part of our health and social care system. They provide high quality advice and treatment to the population here and, together with the wider primary care team, play a vital part in supporting people to manage and improve their own health and wellbeing.\n\nHowever, I recognise that in hours and out of hours GP services are under pressure. GP workload has increased significantly over the last decade, largely as a result of a growing and ageing population. And as we seek, rightly, to treat people as close to home as possible, GPs are seeing more people with multiple complex conditions and are managing these patients in the primary care setting. The GP workforce is also changing—a number of GPs may choose to retire over the next five years and it is important that younger doctors see general practice as an attractive career option. While GPs across the north are experiencing these pressures, I know that the challenges are particularly acute in rural areas and in smaller GP practices.\n\nAll of these challenges are reflected in the findings of the BMA’s recent General Practice in Crisis report. I have noted the actions identified by the BMA as being necessary to address the challenges facing general practice, and indeed action is already underway in a number of these areas.\n\nThere has been significant investment in general practice over recent years aimed at increasing capacity, developing new models of care to help meet rising demand for services, increasing the GP workforce, and building the wider primary care team. In 2015/16, an investment package of up to £5.1 million was agreed for general medical services, including additional funding to build capacity in GP out of hours services, to increase skills mix in general practice, to support GP Federations, and to support improvements in premises. Further non-recurrent funding was also provided in 2015/16 to invest in GP Federations, to develop a leadership training package for GPs, and to pilot a phone and online triage system. In 2016/17 my Department will invest a further £7 million in general practice, including £2m to help meet additional demand, £1.7m to continue to rollout the practice-based pharmacists programme, and £160,000 to develop online booking and repeat prescribing systems. In addition to this, further investment of £1.2 million per year is being provided to increase the number of GP training places available here each year to 85, up from 65.\n\nA working group set up to make recommendations aimed at addressing the difficulties facing general practice reported in March. The findings of that working group, and the actions identified by the BMA’s recent report, will inform my consideration of the next steps required to ensure that everyone here has access to high quality, sustainable GP services.","answerHtml":"<p>GPs are an essential part of our health and social care system. They provide high quality advice and treatment to the population here and, together with the wider primary care team, play a vital part in supporting people to manage and improve their own health and wellbeing.</p><p>However, I recognise that in hours and out of hours GP services are under pressure. GP workload has increased significantly over the last decade, largely as a result of a growing and ageing population. And as we seek, rightly, to treat people as close to home as possible, GPs are seeing more people with multiple complex conditions and are managing these patients in the primary care setting. The GP workforce is also changing—a number of GPs may choose to retire over the next five years and it is important that younger doctors see general practice as an attractive career option. While GPs across the north are experiencing these pressures, I know that the challenges are particularly acute in rural areas and in smaller GP practices.</p><p>All of these challenges are reflected in the findings of the BMA’s recent General Practice in Crisis report. I have noted the actions identified by the BMA as being necessary to address the challenges facing general practice, and indeed action is already underway in a number of these areas.</p><p>There has been significant investment in general practice over recent years aimed at increasing capacity, developing new models of care to help meet rising demand for services, increasing the GP workforce, and building the wider primary care team. In 2015/16, an investment package of up to £5.1 million was agreed for general medical services, including additional funding to build capacity in GP out of hours services, to increase skills mix in general practice, to support GP Federations, and to support improvements in premises. Further non-recurrent funding was also provided in 2015/16 to invest in GP Federations, to develop a leadership training package for GPs, and to pilot a phone and online triage system. In 2016/17 my Department will invest a further £7 million in general practice, including £2m to help meet additional demand, £1.7m to continue to rollout the practice-based pharmacists programme, and £160,000 to develop online booking and repeat prescribing systems. In addition to this, further investment of £1.2 million per year is being provided to increase the number of GP training places available here each year to 85, up from 65.</p><p>A working group set up to make recommendations aimed at addressing the difficulties facing general practice reported in March. The findings of that working group, and the actions identified by the BMA’s recent report, will inform my consideration of the next steps required to ensure that everyone here has access to high quality, sustainable GP services.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202028%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=269278","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=269278"}},{"id":"269276","reference":"AQW 2026/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-06-29","answerBy":"2016-07-18","answered":"2016-07-07","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health","question":"To ask the Minister of Health for her assessment of the British Medical Association’s Report General Practice in Crisis – a report on primary care in Northern Ireland.","answerText":"GPs are an essential part of our health and social care system. They provide high quality advice and treatment to the population here and, together with the wider primary care team, play a vital part in supporting people to manage and improve their own health and wellbeing.\n\nHowever, I recognise that in hours and out of hours GP services are under pressure. GP workload has increased significantly over the last decade, largely as a result of a growing and ageing population. And as we seek, rightly, to treat people as close to home as possible, GPs are seeing more people with multiple complex conditions and are managing these patients in the primary care setting. The GP workforce is also changing—a number of GPs may choose to retire over the next five years and it is important that younger doctors see general practice as an attractive career option. While GPs across the north are experiencing these pressures, I know that the challenges are particularly acute in rural areas and in smaller GP practices.\n\nAll of these challenges are reflected in the findings of the BMA’s recent General Practice in Crisis report. I have noted the actions identified by the BMA as being necessary to address the challenges facing general practice, and indeed action is already underway in a number of these areas.\n\nThere has been significant investment in general practice over recent years aimed at increasing capacity, developing new models of care to help meet rising demand for services, increasing the GP workforce, and building the wider primary care team. In 2015/16, an investment package of up to £5.1 million was agreed for general medical services, including additional funding to build capacity in GP out of hours services, to increase skills mix in general practice, to support GP Federations, and to support improvements in premises. Further non-recurrent funding was also provided in 2015/16 to invest in GP Federations, to develop a leadership training package for GPs, and to pilot a phone and online triage system. In 2016/17 my Department will invest a further £7 million in general practice, including £2m to help meet additional demand, £1.7m to continue to rollout the practice-based pharmacists programme, and £160,000 to develop online booking and repeat prescribing systems. In addition to this, further investment of £1.2 million per year is being provided to increase the number of GP training places available here each year to 85, up from 65.\n\nA working group set up to make recommendations aimed at addressing the difficulties facing general practice reported in March. The findings of that working group, and the actions identified by the BMA’s recent report, will inform my consideration of the next steps required to ensure that everyone here has access to high quality, sustainable GP services.","answerHtml":"<p>GPs are an essential part of our health and social care system. They provide high quality advice and treatment to the population here and, together with the wider primary care team, play a vital part in supporting people to manage and improve their own health and wellbeing.</p><p>However, I recognise that in hours and out of hours GP services are under pressure. GP workload has increased significantly over the last decade, largely as a result of a growing and ageing population. And as we seek, rightly, to treat people as close to home as possible, GPs are seeing more people with multiple complex conditions and are managing these patients in the primary care setting. The GP workforce is also changing—a number of GPs may choose to retire over the next five years and it is important that younger doctors see general practice as an attractive career option. While GPs across the north are experiencing these pressures, I know that the challenges are particularly acute in rural areas and in smaller GP practices.</p><p>All of these challenges are reflected in the findings of the BMA’s recent General Practice in Crisis report. I have noted the actions identified by the BMA as being necessary to address the challenges facing general practice, and indeed action is already underway in a number of these areas.</p><p>There has been significant investment in general practice over recent years aimed at increasing capacity, developing new models of care to help meet rising demand for services, increasing the GP workforce, and building the wider primary care team. In 2015/16, an investment package of up to £5.1 million was agreed for general medical services, including additional funding to build capacity in GP out of hours services, to increase skills mix in general practice, to support GP Federations, and to support improvements in premises. Further non-recurrent funding was also provided in 2015/16 to invest in GP Federations, to develop a leadership training package for GPs, and to pilot a phone and online triage system. In 2016/17 my Department will invest a further £7 million in general practice, including £2m to help meet additional demand, £1.7m to continue to rollout the practice-based pharmacists programme, and £160,000 to develop online booking and repeat prescribing systems. In addition to this, further investment of £1.2 million per year is being provided to increase the number of GP training places available here each year to 85, up from 65.</p><p>A working group set up to make recommendations aimed at addressing the difficulties facing general practice reported in March. The findings of that working group, and the actions identified by the BMA’s recent report, will inform my consideration of the next steps required to ensure that everyone here has access to high quality, sustainable GP services.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202026%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=269276","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=269276"}},{"id":"268074","reference":"AQW 1528/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-06-21","answerBy":"2016-07-06","answered":"2016-07-05","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Infrastructure","question":"To ask the Minister for Infrastructure to outline (i) when Translink will be able to accept card payments for fares; and (ii) how Translink deal with passengers with only this method of payment at present.","answerText":"Translink currently accepts contact and contactless credit and debit card payments at all its bus and rail station ticket offices.\n\nNI Railways have commenced a pilot on-train for contact and contactless credit and debit card payment acceptance using our Conductors’ handheld ticket machines.\n\nThe pilot software is only deployed on a small number of such machines while the performance of the devices 'in the field' is monitored and assessed.\n\nAssuming that no significant issues arise during the pilot, staff will be trained and EMV card acceptance rolled out to all handheld ticket machines over the coming months.\n\nCurrently, if customers only have this method of payment they can either:\n\n(a) pay using credit or debit card at any NI Railways ticket office; or\n\n(b) download Translink’s mLink mobile ticketing app and pay for their NI Railways ticket using their credit/debit card or PayPal account: or\n\n(c) purchase their ticket online on the Translink website using their credit/debit card.\n\nCredit and debit card payments cannot currently be accepted on Metro and Ulsterbus services due to the age of Translink’s current ticketing equipment but it is Translink’s intention to deploy contactless EMV acceptance functionality when the new on-bus ticketing system is implemented in the coming years.","answerHtml":"<p>Translink currently accepts contact and contactless credit and debit card payments at all its bus and rail station ticket offices.</p><p>NI Railways have commenced a pilot on-train for contact and contactless credit and debit card payment acceptance using our Conductors’ handheld ticket machines.</p><p>The pilot software is only deployed on a small number of such machines while the performance of the devices &#39;in the field&#39; is monitored and assessed.</p><p>Assuming that no significant issues arise during the pilot, staff will be trained and EMV card acceptance rolled out to all handheld ticket machines over the coming months.</p><p>Currently, if customers only have this method of payment they can either:</p><p>(a) pay using credit or debit card at any NI Railways ticket office; or</p><p>(b) download Translink’s mLink mobile ticketing app and pay for their NI Railways ticket using their credit/debit card or PayPal account: or</p><p>(c) purchase their ticket online on the Translink website using their credit/debit card.</p><p>Credit and debit card payments cannot currently be accepted on Metro and Ulsterbus services due to the age of Translink’s current ticketing equipment but it is Translink’s intention to deploy contactless EMV acceptance functionality when the new on-bus ticketing system is implemented in the coming years.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201528%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=268074","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=268074"}},{"id":"268073","reference":"AQW 1527/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-06-21","answerBy":"2016-07-06","answered":"2016-07-22","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Communities","question":"To ask the Minister for Communities whether he intends to bring forward reform to licensing laws to allow the hospitality industry to maximise local and tourism income during the holidays.","answerText":"Alcohol is not an ordinary product and the sale of it must be regulated to ensure the protection of public health and the preservation of public order.\n\nI recognise that certain aspects of liquor licensing law in Northern Ireland are in need of reform and I have copied a paper to my Executive colleagues seeking agreement to introduce a Licensing Bill.\n\nProvisions in the draft Bill mainly flow from the consultation carried out by one of my predecessors in 2012.\n\nThe Bill includes a number of measures to tackle practices which may encourage alcohol misuse, safeguards for children and young people and some minor changes to opening hours.\n\nIn recent years, drinking patterns in Northern Ireland have changed. 70% of drink is now sold for consumption at home rather than in the relatively controlled environment of a public house. It is important that our legislation is updated to take account of these changes.\n\nWhen I have received comments from my Executive colleagues and agreement to the introduction of the Bill I will publish full details of the measures contained in the Bill.","answerHtml":"<p>Alcohol is not an ordinary product and the sale of it must be regulated to ensure the protection of public health and the preservation of public order.</p><p>I recognise that certain aspects of liquor licensing law in Northern Ireland are in need of reform and I have copied a paper to my Executive colleagues seeking agreement to introduce a Licensing Bill.</p><p>Provisions in the draft Bill mainly flow from the consultation carried out by one of my predecessors in 2012.</p><p>The Bill includes a number of measures to tackle practices which may encourage alcohol misuse, safeguards for children and young people and some minor changes to opening hours.</p><p>In recent years, drinking patterns in Northern Ireland have changed. 70% of drink is now sold for consumption at home rather than in the relatively controlled environment of a public house. It is important that our legislation is updated to take account of these changes.</p><p>When I have received comments from my Executive colleagues and agreement to the introduction of the Bill I will publish full details of the measures contained in the Bill.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201527%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=268073","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=268073"}},{"id":"267335","reference":"AQW 1210/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-06-15","answerBy":"2016-06-23","answered":"2016-06-23","answeredOrally":false,"priority":true,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs what action the Northern Ireland Environment Agency is taking to mitigate the damage from the recent oil spill at Larne.","answerText":"As the product discharged from the Caterpillar NI factory in Larne was diesel and it was released into the sea there is very little that can practically be done to clean it up as it spreads so quickly. Once released the behaviour of this light oil is influenced by the wind and tide and at this stage it would be expected that at least 50% of the product will have evaporated (hence the strong smell associated with such spills) and the rest will be broken down by natural dispersion and biodegradation. The biggest risk to the environment is through certain toxic chemicals dissolving in the water column but even this should be limited in the marine environment because of the massive dilution and strong tidal movements.","answerHtml":"<p>As the product discharged from the Caterpillar NI factory in Larne was diesel and it was released into the sea there is very little that can practically be done to clean it up as it spreads so quickly. Once released the behaviour of this light oil is influenced by the wind and tide and at this stage it would be expected that at least 50% of the product will have evaporated (hence the strong smell associated with such spills) and the rest will be broken down by natural dispersion and biodegradation. The biggest risk to the environment is through certain toxic chemicals dissolving in the water column but even this should be limited in the marine environment because of the massive dilution and strong tidal movements.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201210%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=267335","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=267335"}},{"id":"267175","reference":"AQW 1176/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-06-14","answerBy":"2016-06-29","answered":"2016-06-17","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education to outline the actions he plans to take in response to the recent report from the United Nations Committee on the Rights of the Child thats recommends children should be able to decide on their own not to attend religious worship in schools.","answerText":"It is for Boards of Governors, in consultation with the school trustees and the principal, to decide the arrangements for collective worship, having regard to the ethos of the school and its registered pupils. Parental consent is required for children to withdraw from Collective Worship and I have no plans to change this at present.","answerHtml":"<p>It is for Boards of Governors, in consultation with the school trustees and the principal, to decide the arrangements for collective worship, having regard to the ethos of the school and its registered pupils. Parental consent is required for children to withdraw from Collective Worship and I have no plans to change this at present.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201176%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=267175","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=267175"}},{"id":"267174","reference":"AQW 1175/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-06-14","answerBy":"2016-06-29","answered":"2016-06-21","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education to outline the action he plans to take in response to the recent report from the United Nations Committee on the Rights of the Child, which condemns academic selection in Northern Ireland and calls for the Executive to actively promote a fully integrated education system.","answerText":"I am committed to respecting and progressing the rights of children and young people and it is important that a collective approach across Executive Departments is taken when considering UNCRC recommendations.\n\nOn the issue of selection, I have made it clear that I support the right of schools to select on the basis of academic ability. I will be discussing this issue with a wide range of stakeholders and will want to consider very carefully how any changes might be taken forward. Shared education policy sits within a broader education policy framework designed to improve educational outcomes for young people and this will be given due regard.\n\nI am also awaiting receipt of a detailed report on Integrated Education, which I will also be considering.","answerHtml":"<p>I am committed to respecting and progressing the rights of children and young people and it is important that a collective approach across Executive Departments is taken when considering UNCRC recommendations.</p><p>On the issue of selection, I have made it clear that I support the right of schools to select on the basis of academic ability. I will be discussing this issue with a wide range of stakeholders and will want to consider very carefully how any changes might be taken forward. Shared education policy sits within a broader education policy framework designed to improve educational outcomes for young people and this will be given due regard.</p><p>I am also awaiting receipt of a detailed report on Integrated Education, which I will also be considering.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201175%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=267174","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=267174"}},{"id":"267173","reference":"AQW 1174/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-06-14","answerBy":"2016-06-29","answered":"2016-06-27","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs to outline what action will be taken against the persons responsible for the oil spill on the Larne coast to contribute towards the cost of the clean up; and to encourage more diligent oil storage and transport in the future.","answerText":"My Department is conducting a thorough investigation into the circumstances that led to this release of oil into the Irish Sea. On Saturday 11 June statutory samples of the spilt oil were taken with a view to prosecution. Given that this case may result in a file be passed to the Public Prosecution Service it would be inappropriate for me to comment any further on these issues at this time.\n\nAny costs incurred by the Department will be recovered from the polluter.","answerHtml":"<p>My Department is conducting a thorough investigation into the circumstances that led to this release of oil into the Irish Sea. On Saturday 11 June statutory samples of the spilt oil were taken with a view to prosecution. Given that this case may result in a file be passed to the Public Prosecution Service it would be inappropriate for me to comment any further on these issues at this time.</p><p>Any costs incurred by the Department will be recovered from the polluter.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201174%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=267173","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=267173"}},{"id":"267172","reference":"AQW 1173/16-21","type":"Written","typeCode":"AQW","mandate":"16-21","tabled":"2016-06-14","answerBy":"2016-06-22","answered":"2016-06-23","answeredOrally":false,"priority":true,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture, Environment and Rural Affairs","question":"To ask the Minister of Agriculture, Environment and Rural Affairs whether she can give an assurance that the oil spill on the coast of Larne represents no threat to the health of residents along the East Antrim coast.","answerText":"My officials have been involved with the investigation of this incident since it was reported to the Northern Ireland Environment Agency on Saturday 11 June.\n\nI am unable to give an assurance regarding the health of residents along the East Antrim Coast because it is outside the remit of my Department. I can however assure you that Mid and East Antrim Council, the Food Standards Agency and the Public Health Agency have all been kept informed of the incident to allow them to assess the consequences of the incident for their areas of responsibility.","answerHtml":"<p>My officials have been involved with the investigation of this incident since it was reported to the Northern Ireland Environment Agency on Saturday 11 June.</p><p>I am unable to give an assurance regarding the health of residents along the East Antrim Coast because it is outside the remit of my Department. I can however assure you that Mid and East Antrim Council, the Food Standards Agency and the Public Health Agency have all been kept informed of the incident to allow them to assess the consequences of the incident for their areas of responsibility.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201173%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=267172","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=267172"}},{"id":"267929","reference":"AQO 82/16-21","type":"Oral","typeCode":"AQO","mandate":"16-21","tabled":"2016-06-09","answerBy":"2016-06-20","answered":"2016-06-20","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance","question":"To ask the Minister of Finance when he plans to introduce a civil marriage equality bill.","answerText":"I am committed to the concept of equal marriage and I want this Assembly to legislate for such marriage as soon as possible. The Member and I are on the same page in that regard, but we have a little way to go in terms of bringing other Members with us and securing the necessary support from the floor. I believe we will be able to do that during this mandate and that Members will choose to legislate, rather than be forced to legislate on foot of an adverse judgment. We must do the groundwork now, so that, as soon as the Executive and the Assembly signal their readiness, we are able to move swiftly toward introduction. I have, therefore, asked my officials to start working on a draft Bill and to initiate discussions with other interested Departments, given that the Bill may touch on matters that are not within my Department’s remit.","answerHtml":"<p>I am committed to the concept of equal marriage and I want this Assembly to legislate for such marriage as soon as possible. The Member and I are on the same page in that regard, but we have a little way to go in terms of bringing other Members with us and securing the necessary support from the floor. I believe we will be able to do that during this mandate and that Members will choose to legislate, rather than be forced to legislate on foot of an adverse judgment. We must do the groundwork now, so that, as soon as the Executive and the Assembly signal their readiness, we are able to move swiftly toward introduction. I have, therefore, asked my officials to start working on a draft Bill and to initiate discussions with other interested Departments, given that the Bill may touch on matters that are not within my Department’s remit.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%2082%2F16-21","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=267929","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=267929"}},{"id":"262340","reference":"AQO 9892/11-16","type":"Oral","typeCode":"AQO","mandate":"11-16","tabled":"2016-03-03","answerBy":"2016-03-15","answered":null,"answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development when he plans to introduce regulations confirming the non-application of the under-occupancy charge in Northern Ireland.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%209892%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=262340","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=262340"}},{"id":"263782","reference":"AQO 9892/11-16","type":"Oral","typeCode":"AQO","mandate":"11-16","tabled":"2016-03-03","answerBy":"2016-03-15","answered":"2016-03-16","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development when he plans to introduce regulations confirming the non-application of the under-occupancy charge in Northern Ireland.","answerText":"The Northern Ireland Executive confirmed in, ‘A Fresh Start: the Stormont Agreement and Implementation Plan’ the Social Sector Size Criteria, also known as the ‘Bedroom Tax’ or ‘under-occupancy charge’, will not apply in Northern Ireland.\n\nThe Welfare Reform Mitigations Working Group report led by Professor Eileen Evason welcomed this provision to provide full mitigation of the Social Sector Size Criteria for Northern Ireland Housing Executive and Housing Association tenants. I am currently considering options which will deliver the Executive’s commitment that current and future claimants will not be impacted by the Social Sector Size Criteria.","answerHtml":"<p>The Northern Ireland Executive confirmed in, ‘A Fresh Start: the Stormont Agreement and Implementation Plan’ the Social Sector Size Criteria, also known as the ‘Bedroom Tax’ or ‘under-occupancy charge’, will not apply in Northern Ireland.</p><p>The Welfare Reform Mitigations Working Group report led by Professor Eileen Evason welcomed this provision to provide full mitigation of the Social Sector Size Criteria for Northern Ireland Housing Executive and Housing Association tenants. I am currently considering options which will deliver the Executive’s commitment that current and future claimants will not be impacted by the Social Sector Size Criteria.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%209892%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=263782","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=263782"}},{"id":"262325","reference":"AQO 9848/11-16","type":"Oral","typeCode":"AQO","mandate":"11-16","tabled":"2016-03-03","answerBy":"2016-03-14","answered":null,"answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment for his assessment of the exclusion of Whitehead from the Northern Ireland natural gas network.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%209848%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=262325","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=262325"}},{"id":"263603","reference":"AQO 9848/11-16","type":"Oral","typeCode":"AQO","mandate":"11-16","tabled":"2016-03-03","answerBy":"2016-03-14","answered":"2016-03-15","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment for his assessment of the exclusion of Whitehead from the Northern Ireland natural gas network.","answerText":"Local extensions to the natural gas network, such as to Whitehead, are a matter for consideration between the Utility Regulator and the gas industry, and will take into account the economic viability of connecting new areas.","answerHtml":"<p>Local extensions to the natural gas network, such as to Whitehead, are a matter for consideration between the Utility Regulator and the gas industry, and will take into account the economic viability of connecting new areas.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%209848%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=263603","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=263603"}},{"id":"261484","reference":"AQW 54873/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2016-02-26","answerBy":"2016-03-14","answered":"2016-03-14","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety whether he will provide an option for parents to purchase the Meningitis B vaccine on private prescription, but have it administered by their Health Service GP or practice nurse.","answerText":"It is up to individual Practices to decide if they will write a private prescription and administer the Men B vaccine privately. Contractually it is not possible for Practices to charge for the prescription or the administration of the vaccine to a patient who is registered with the practice.\n\nI do not propose to make any changes to the current arrangements operating in individual Practices in relation to the private administration of the Men B vaccine.","answerHtml":"<p>It is up to individual Practices to decide if they will write a private prescription and administer the Men B vaccine privately. Contractually it is not possible for Practices to charge for the prescription or the administration of the vaccine to a patient who is registered with the practice.</p><p>I do not propose to make any changes to the current arrangements operating in individual Practices in relation to the private administration of the Men B vaccine.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2054873%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=261484","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=261484"}},{"id":"260325","reference":"AQW 54496/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2016-02-18","answerBy":"2016-03-04","answered":"2016-03-02","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel, pursuant to AQW 53516/11-16, to detail the reasons for the 6 promotions during the freeze period, given the Northern Ireland Civil Service is expected to be downsizing and streamlining its total workforce.","answerText":"The terms of the current embargo on recruitment and substantive promotions in the NICS are that any recruitment or promotion can only be approved by the relevant Departmental Accounting Officer. Therefore DFP can only give the reasons for any DFP appointments during the embargo. As advised in response to AQW 53516/11-16, between 1 April 2015 and 28 January 2016, a total of 6 people have been appointed to Grade 7 or analogous level in the NICS. One of these was a DFP promotion and the reason for this promotion is as follows:-\n\nCentral Procurement Directorate (CPD) is currently managing a number of experienced Principal Professional and Technical Officer (PPTO) staff leaving under the Voluntary Exit Scheme. As such, CPD needed to fill a critical PPTO vacancy involving a promotion of an internal Senior Professional and Technical Officer (SPTO) candidate from within CPD. Whilst this critical PPTO post was filled, it was offset by a subsequent headcount reduction at SPTO level within CPD.\n\nThe details of the other five appointments are as follows:-\n\nIRC202476 – DE - Internal Audit G7\n\nIRC203577 – DARD – DHR G7\n\nIRC203877 – DHSSPS – DHR G7\n\nIRC204585 – DOE – PPTO Planning Officer\n\nIRC203597 – DOJ – G7 Economist.\n\nThe Member would, therefore, need to contact these Departments for information on the reasons for these appointments.","answerHtml":"<p>The terms of the current embargo on recruitment and substantive promotions in the NICS are that any recruitment or promotion can only be approved by the relevant Departmental Accounting Officer. Therefore DFP can only give the reasons for any DFP appointments during the embargo. As advised in response to AQW 53516/11-16, between 1 April 2015 and 28 January 2016, a total of 6 people have been appointed to Grade 7 or analogous level in the NICS. One of these was a DFP promotion and the reason for this promotion is as follows:-</p><p>Central Procurement Directorate (CPD) is currently managing a number of experienced Principal Professional and Technical Officer (PPTO) staff leaving under the Voluntary Exit Scheme. As such, CPD needed to fill a critical PPTO vacancy involving a promotion of an internal Senior Professional and Technical Officer (SPTO) candidate from within CPD. Whilst this critical PPTO post was filled, it was offset by a subsequent headcount reduction at SPTO level within CPD.</p><p>The details of the other five appointments are as follows:-</p><p>IRC202476 – DE - Internal Audit G7</p><p>IRC203577 – DARD – DHR G7</p><p>IRC203877 – DHSSPS – DHR G7</p><p>IRC204585 – DOE – PPTO Planning Officer</p><p>IRC203597 – DOJ – G7 Economist.</p><p>The Member would, therefore, need to contact these Departments for information on the reasons for these appointments.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2054496%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=260325","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=260325"}},{"id":"260323","reference":"AQW 54494/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2016-02-18","answerBy":"2016-03-04","answered":"2016-03-07","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel, pursuant to AQW 53519/11-16, how many of the five Fast Stream participants promoted since 2011 received their promotion after November 2015.","answerText":"None of the five fast stream participants referred to in the response to AQW 53519/11-16 received their promotion after November 2015.","answerHtml":"<p>None of the five fast stream participants referred to in the response to AQW 53519/11-16 received their promotion after November 2015.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2054494%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=260323","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=260323"}},{"id":"260322","reference":"AQW 54493/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2016-02-18","answerBy":"2016-03-04","answered":"2016-03-04","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel, pursuant to AQW 53517/11-16, how many Grade 7 positions were allowed to leave under the Voluntary Exit Scheme during the same period; and whether they have not and will not be replaced by newly promoted staff.","answerText":"128 Grade 7 and analogous grades have accepted offers to leave the NICS under tranches 1-4 of the Voluntary Exit Scheme. The closing date for accepting offers under tranche 5 is 29 February 2016.\n\nThe decision as to whether those that leave are replaced and by what method is for individual Departmental Accounting Officers, taking account of the need to balance protecting the pay-bill savings achieved through the Voluntary Exit Scheme and to maintain business continuity.","answerHtml":"<p>128 Grade 7 and analogous grades have accepted offers to leave the NICS under tranches 1-4 of the Voluntary Exit Scheme. The closing date for accepting offers under tranche 5 is 29 February 2016.</p><p>The decision as to whether those that leave are replaced and by what method is for individual Departmental Accounting Officers, taking account of the need to balance protecting the pay-bill savings achieved through the Voluntary Exit Scheme and to maintain business continuity.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2054493%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=260322","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=260322"}},{"id":"259855","reference":"AQW 54352/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2016-02-16","answerBy":"2016-03-02","answered":"2016-02-24","answeredOrally":false,"priority":false,"department":"Department for Employment and Learning","departmentId":"83","minister":"Minister for Employment and Learning","question":"To ask the Minister for Employment and Learning to detail the schemes that exist to help people with mental health problems obtain or resume paid work; and for his assessment of the effectiveness of these schemes.","answerText":"My Department’s Employment Service provides a range of programmes and services, all of which are available to people with disabilities, including those who have a mental health condition.\n\nThe main adult employment programme is Steps 2 Success. This is delivered throughout Northern Ireland and can be accessed via the 35 Jobs and Benefits offices and Job centres. This programme has been designed, with a service level guarantee, to ensure that people with health and disability related barriers to work, can be supported.\n\nMore specifically, my Department has a dedicated Disability Employment Service that provides a comprehensive package of support measures, aimed at helping people with a full range of disabilities, including mental ill-health, to progress towards, move into and sustain paid employment.\n\nThis range of specialist disability provision includes pre-employment programmes such as Work Connect, the Job Introduction Scheme and the Condition Management Programme (CMP). These are aimed specifically at those people who have a disability, but who want to get back to work, and require additional support to do so.\n\nSince its introduction in September 2012, 554 people presenting with mental ill-health have registered for the Work Connect programme, with 176 of these successfully moving into paid employment, both part-time and full-time. This programme is delivered by a consortium of seven local disability organisations, including Action Mental Health and others who work with people who experience a variety of mental health conditions.\n\nCMP is delivered on behalf of the Department, through multi-disciplinary teams in each of the five health trusts. It is a positive example of cross-departmental partnership working, focussing on health and work as mutually beneficial solutions for individuals. The teams include mental health nursing staff and many use cognitive behavioural methods to help the individuals better manage their own mental health and well-being, with employment, or the prospect of getting back to work, being viewed as a very positive goal for the individual.\n\nFrom April 2015, through to the end of January 2016, there have been 1,134 referrals from the Employment Service to CMP. Of this total 769 people, presented with mental ill-health as either the primary or secondary health condition, which was viewed by the individual as a barrier to work.\n\nBoth of these programmes are offered to unemployed clients, and participation is totally voluntary. This demonstrates the Department’s commitment to supporting people with disabilities to progress towards and move into employment.\n\nFor people with mental health problems who successfully make this transition, or for those in work and who are struggling to remain so, the Disability Employment Service manages a very successful programme, called Workable (NI).\n\nThis programme, which is also delivered by specialist disability organisations, is currently supporting 586 disabled people in employment across a full range of occupations and sectors. The majority of people have some form of learning disability or difficulty, and many of these people may also suffer from mental ill-health. However, 125 of the Workable participants have mental health as their primary condition. Again, this reinforces the level of support, and the priority that is given to people with disabilities, not just to secure employment, but to ensure that they are able to stay in work when their health condition fluctuates or deteriorates.\n\nThe Department also has its own Occupational Psychology Service which offers an all age advice, guidance and assessment service in areas relating to disability and employment. The team have a particular level of experience and expertise in working with customers with mental illness.\n\nFinally, to illustrate its long term commitment to helping and supporting people with disabilities, officials from the Disability Employment Service have been working with key representatives of many local disability organisations and other relevant stakeholders, for almost three years, on the development of a new ‘Employment Strategy for People with Disabilities’.\n\nThe strategy, which is due to launch in March 2016, will focus on people who have significant disability related barriers to work, including those with diagnosed mental health conditions. The strategy will also promote and implement the Supported Employment Delivery Model. Underpinning this well established model, is the provision of person-centred, tailored, and often long term support to help people with disabilities to prepare for work, move into and then sustain paid employment.\n\nAs with its development, the strategy will be implemented in partnership with the local disability sector, and will be informed by people who live and work with disabilities throughout their lives.\n\nIn conclusion, I am content with the effectiveness of these programmes and services and I am confident that the launch of the strategy and associated implementation action plan will further promote and develop the combined efforts of Executive departments, disability organisations and other key stakeholders, which will result in more people with disabilities obtaining and progressing within paid employment.","answerHtml":"<p>My Department’s Employment Service provides a range of programmes and services, all of which are available to people with disabilities, including those who have a mental health condition.</p><p>The main adult employment programme is Steps 2 Success. This is delivered throughout Northern Ireland and can be accessed via the 35 Jobs and Benefits offices and Job centres. This programme has been designed, with a service level guarantee, to ensure that people with health and disability related barriers to work, can be supported.</p><p>More specifically, my Department has a dedicated Disability Employment Service that provides a comprehensive package of support measures, aimed at helping people with a full range of disabilities, including mental ill-health, to progress towards, move into and sustain paid employment.</p><p>This range of specialist disability provision includes pre-employment programmes such as Work Connect, the Job Introduction Scheme and the Condition Management Programme (CMP). These are aimed specifically at those people who have a disability, but who want to get back to work, and require additional support to do so.</p><p>Since its introduction in September 2012, 554 people presenting with mental ill-health have registered for the Work Connect programme, with 176 of these successfully moving into paid employment, both part-time and full-time. This programme is delivered by a consortium of seven local disability organisations, including Action Mental Health and others who work with people who experience a variety of mental health conditions.</p><p>CMP is delivered on behalf of the Department, through multi-disciplinary teams in each of the five health trusts. It is a positive example of cross-departmental partnership working, focussing on health and work as mutually beneficial solutions for individuals. The teams include mental health nursing staff and many use cognitive behavioural methods to help the individuals better manage their own mental health and well-being, with employment, or the prospect of getting back to work, being viewed as a very positive goal for the individual.</p><p>From April 2015, through to the end of January 2016, there have been 1,134 referrals from the Employment Service to CMP. Of this total 769 people, presented with mental ill-health as either the primary or secondary health condition, which was viewed by the individual as a barrier to work.</p><p>Both of these programmes are offered to unemployed clients, and participation is totally voluntary. This demonstrates the Department’s commitment to supporting people with disabilities to progress towards and move into employment.</p><p>For people with mental health problems who successfully make this transition, or for those in work and who are struggling to remain so, the Disability Employment Service manages a very successful programme, called Workable (NI).</p><p>This programme, which is also delivered by specialist disability organisations, is currently supporting 586 disabled people in employment across a full range of occupations and sectors. The majority of people have some form of learning disability or difficulty, and many of these people may also suffer from mental ill-health. However, 125 of the Workable participants have mental health as their primary condition. Again, this reinforces the level of support, and the priority that is given to people with disabilities, not just to secure employment, but to ensure that they are able to stay in work when their health condition fluctuates or deteriorates.</p><p>The Department also has its own Occupational Psychology Service which offers an all age advice, guidance and assessment service in areas relating to disability and employment. The team have a particular level of experience and expertise in working with customers with mental illness.</p><p>Finally, to illustrate its long term commitment to helping and supporting people with disabilities, officials from the Disability Employment Service have been working with key representatives of many local disability organisations and other relevant stakeholders, for almost three years, on the development of a new ‘Employment Strategy for People with Disabilities’.</p><p>The strategy, which is due to launch in March 2016, will focus on people who have significant disability related barriers to work, including those with diagnosed mental health conditions. The strategy will also promote and implement the Supported Employment Delivery Model. Underpinning this well established model, is the provision of person-centred, tailored, and often long term support to help people with disabilities to prepare for work, move into and then sustain paid employment.</p><p>As with its development, the strategy will be implemented in partnership with the local disability sector, and will be informed by people who live and work with disabilities throughout their lives.</p><p>In conclusion, I am content with the effectiveness of these programmes and services and I am confident that the launch of the strategy and associated implementation action plan will further promote and develop the combined efforts of Executive departments, disability organisations and other key stakeholders, which will result in more people with disabilities obtaining and progressing within paid employment.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2054352%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=259855","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=259855"}},{"id":"258424","reference":"AQW 53970/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2016-02-08","answerBy":"2016-02-11","answered":"2016-02-12","answeredOrally":false,"priority":true,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice  for his assessment of the impact on his Department of the decision by the Northern Ireland Office not to make any further funding available for legacy investigations.","answerText":"I understand that the Northern Ireland Office will not release the funding for legacy investigations, agreed as part of the Stormont House Agreement, until the new legacy bodies are established. The justice system is not funded to undertake such work. Without additional funding, the PSNI would be reliant on diverting funding from other priorities to deal with legacy matters. Inevitably this will affect its capacity to respond to current policing challenges. Failure to provide the funds earmarked by the Treasury as long ago as December 2014 is simply punishing the Justice system for the failure of others.\n\nThe work my Department has been taking forward, in conjunction with the judiciary and the Police Service of Northern Ireland, to improve legacy inquests is not dependant on the new institutions. I therefore believe that the Northern Ireland Office should release funding to improve legacy inquests now. The issues of the past are the responsibility of the United Kingdom government and should be, funded through the Treasury, in line with the Stormont House Agreement.","answerHtml":"<p>I understand that the Northern Ireland Office will not release the funding for legacy investigations, agreed as part of the Stormont House Agreement, until the new legacy bodies are established. The justice system is not funded to undertake such work. Without additional funding, the PSNI would be reliant on diverting funding from other priorities to deal with legacy matters. Inevitably this will affect its capacity to respond to current policing challenges. Failure to provide the funds earmarked by the Treasury as long ago as December 2014 is simply punishing the Justice system for the failure of others.</p><p>The work my Department has been taking forward, in conjunction with the judiciary and the Police Service of Northern Ireland, to improve legacy inquests is not dependant on the new institutions. I therefore believe that the Northern Ireland Office should release funding to improve legacy inquests now. The issues of the past are the responsibility of the United Kingdom government and should be, funded through the Treasury, in line with the Stormont House Agreement.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2053970%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=258424","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=258424"}},{"id":"257216","reference":"AQW 53641/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2016-01-29","answerBy":"2016-02-15","answered":"2016-02-09","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development whether the commitment in A Fresh Start agreement not to apply the bedroom tax will be enacted by his Department declining to introduce subordinate legislation that would maintain parity in this regard, namely the Housing Benefit (Amendment) Regulations 2012.","answerText":"As agreed in ‘A Fresh Start: the Stormont Agreement and Implementation Plan’ the Social Sector Size Criteria will not apply in Northern Ireland. Following receipt of the Welfare Reform Mitigations Working Group report led by Eileen Evason, officials are currently considering options, which will deliver the Executive’s commitment that current and future claimants will not be impacted by the Social Sector Size Criteria. This work also involves considering any legislative changes that may be required.","answerHtml":"<p>As agreed in ‘A Fresh Start: the Stormont Agreement and Implementation Plan’ the Social Sector Size Criteria will not apply in Northern Ireland. Following receipt of the Welfare Reform Mitigations Working Group report led by Eileen Evason, officials are currently considering options, which will deliver the Executive’s commitment that current and future claimants will not be impacted by the Social Sector Size Criteria. This work also involves considering any legislative changes that may be required.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2053641%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=257216","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=257216"}},{"id":"256874","reference":"AQW 53519/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2016-01-27","answerBy":"2016-02-11","answered":"2016-02-10","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel how many of those appointed to Grade 7 in the Northern Ireland Civil Service were participants in the Fast Stream scheme.","answerText":"Since the scheme commenced in 2011, to date there have been five people appointed to Grade 7 who were participants in the Fast Stream Scheme.","answerHtml":"<p>Since the scheme commenced in 2011, to date there have been five people appointed to Grade 7 who were participants in the Fast Stream Scheme.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2053519%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=256874","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=256874"}},{"id":"256873","reference":"AQW 53518/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2016-01-27","answerBy":"2016-02-11","answered":"2016-02-10","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel whether a promotion freeze applies to those appointed to the Northern Ireland Civil Service under the Fast Stream scheme.","answerText":"The embargo on recruitment and substantive promotion introduced to the NICS in November 2014 applies to all NICS grades and disciplines, including those appointed under the fast Stream Scheme. The terms of the embargo are that any exceptions require the approval of Departmental Accounting Officers.","answerHtml":"<p>The embargo on recruitment and substantive promotion introduced to the NICS in November 2014 applies to all NICS grades and disciplines, including those appointed under the fast Stream Scheme. The terms of the embargo are that any exceptions require the approval of Departmental Accounting Officers.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2053518%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=256873","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=256873"}},{"id":"256872","reference":"AQW 53517/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2016-01-27","answerBy":"2016-02-11","answered":"2016-02-10","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to detail the number of people that have retired from Grade 7 positions in the Northern Ireland Civil Service in the 2015-16 financial year.","answerText":"There have been 10 retirements in the Northern Ireland Civil Service at Grade 7 level since 1 April 2015. These figures do not include staff who exited under the Voluntary Exit Scheme.","answerHtml":"<p>There have been 10 retirements in the Northern Ireland Civil Service at Grade 7 level since 1 April 2015. These figures do not include staff who exited under the Voluntary Exit Scheme.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2053517%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=256872","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=256872"}},{"id":"256871","reference":"AQW 53516/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2016-01-27","answerBy":"2016-02-11","answered":"2016-02-10","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to detail the number of people appointed to Grade 7 positions in the Northern Ireland Civil Service in the 2015-16 financial year.","answerText":"Between 1 April 2015 and 28 January 2016, a total of 6 people have been appointed to Grade 7 or analogous level in the NICS.","answerHtml":"<p>Between 1 April 2015 and 28 January 2016, a total of 6 people have been appointed to Grade 7 or analogous level in the NICS.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2053516%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=256871","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=256871"}},{"id":"256043","reference":"AQO 9520/11-16","type":"Oral","typeCode":"AQO","mandate":"11-16","tabled":"2016-01-21","answerBy":"2016-02-01","answered":null,"answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development why it will take four months for water mains replacement work on North Road, Carrickfergus, to be completed.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%209520%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=256043","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=256043"}},{"id":"257446","reference":"AQO 9520/11-16","type":"Oral","typeCode":"AQO","mandate":"11-16","tabled":"2016-01-21","answerBy":"2016-02-01","answered":"2016-02-02","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development why it will take four months for water mains replacement work on North Road, Carrickfergus, to be completed.","answerText":"The proposed water mains replacement scheme at North Road, Carrickfergus is part of Northern Ireland Water’s £10.9 million package of work across Belfast and Carrickfergus to upgrade the water supply infrastructure.\n\nNI Water is replacing an aging 12” cast iron trunk water main which was installed in 1950. This existing cast iron main is reaching the end of its usable life and, if not replaced, may result in future water quality issues and unplanned interruptions to supply.\n\nThis is a substantial scheme, costing £302k, and involves the laying of 1km of new water mains from the junction of Prince Andrew Way to the Marshallstown Road. The current proposed start date is May 2016, with the scheme being completed during the summer months when traffic levels are reduced due to the local schools being closed.\n\nAlthough it has been estimated that the scheme will take a maximum duration of four months, this is dependent on agreed traffic management and working restrictions to be implemented during the scheme. NI Water is currently liaising with TransportNI regarding the traffic management proposals and, when confirmed, NI Water will be able to provide a more accurate timescale for the scheme.\n\nThis major water mains investment for Carrickfergus is good news for the local area, as the upgraded water mains will improve the quality, reliability and security of the local water supply, while also reducing leakage and improving pressure in the area.","answerHtml":"<p>The proposed water mains replacement scheme at North Road, Carrickfergus is part of Northern Ireland Water’s £10.9 million package of work across Belfast and Carrickfergus to upgrade the water supply infrastructure.</p><p>NI Water is replacing an aging 12” cast iron trunk water main which was installed in 1950. This existing cast iron main is reaching the end of its usable life and, if not replaced, may result in future water quality issues and unplanned interruptions to supply.</p><p>This is a substantial scheme, costing £302k, and involves the laying of 1km of new water mains from the junction of Prince Andrew Way to the Marshallstown Road. The current proposed start date is May 2016, with the scheme being completed during the summer months when traffic levels are reduced due to the local schools being closed.</p><p>Although it has been estimated that the scheme will take a maximum duration of four months, this is dependent on agreed traffic management and working restrictions to be implemented during the scheme. NI Water is currently liaising with TransportNI regarding the traffic management proposals and, when confirmed, NI Water will be able to provide a more accurate timescale for the scheme.</p><p>This major water mains investment for Carrickfergus is good news for the local area, as the upgraded water mains will improve the quality, reliability and security of the local water supply, while also reducing leakage and improving pressure in the area.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%209520%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=257446","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=257446"}},{"id":"255112","reference":"AQO 9491/11-16","type":"Oral","typeCode":"AQO","mandate":"11-16","tabled":"2016-01-14","answerBy":"2016-01-26","answered":null,"answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment whether his Department intends to impose taxi regulations on wedding cars.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%209491%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=255112","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=255112"}},{"id":"256786","reference":"AQO 9491/11-16","type":"Oral","typeCode":"AQO","mandate":"11-16","tabled":"2016-01-14","answerBy":"2016-01-26","answered":"2016-01-28","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment whether his Department intends to impose taxi regulations on wedding cars.","answerText":"With the speaker’s permission I would like to combine the two Oral questions numbers 9 and 13.\n\nWedding cars are regarded as taxis within the meaning of the Taxis Act (NI) 2008, as they are vehicles which carry passengers for hire or reward in the course of their business. This means that, amongst other things, wedding cars currently undertake a PSV test and their drivers are required to be licensed taxi drivers.\n\nMy Department has taken steps to reduce the regulatory burden by exempting wedding cars from having to use a taximeter or displaying a roof sign or external plates. Further, drivers need not display their Taxi Driver badge and there is an exemption from the Taxi Operator Licensing regime for such operations. In doing so we are putting in place a proportionate licensing regime. This regime strikes the right balance between the important safeguards we put in place to protect the travelling public and the commercial interests of operators.\n\nI have met with representatives of the industry and have been sympathetic to the arguments being put forward in respect of removing them completely from the taxi legislation, including consideration of how drivers of wedding cars who only undertake this type of work should be treated in relation to driving test and periodic training requirements. However removing wedding cars from the Act will require consultation and a Primary legislative amendment. I had hoped for the remaining Taxi legislation implementing the Taxis Act to be well established by now, but opposition to single tier and further issues during 2015 have delayed this progress.\n\nNevertheless, my Department made the remaining regulations in December 2015 and I am confident that these regulations will be up and running by May 2016.\n\nIt therefore remains my intention to review the regulation of wedding car and courtesy transport operations under the Taxis Act, to determine if the regulation is proportionate and fit for purpose.","answerHtml":"<p>With the speaker’s permission I would like to combine the two Oral questions numbers 9 and 13.</p><p>Wedding cars are regarded as taxis within the meaning of the Taxis Act (NI) 2008, as they are vehicles which carry passengers for hire or reward in the course of their business. This means that, amongst other things, wedding cars currently undertake a PSV test and their drivers are required to be licensed taxi drivers.</p><p>My Department has taken steps to reduce the regulatory burden by exempting wedding cars from having to use a taximeter or displaying a roof sign or external plates. Further, drivers need not display their Taxi Driver badge and there is an exemption from the Taxi Operator Licensing regime for such operations. In doing so we are putting in place a proportionate licensing regime. This regime strikes the right balance between the important safeguards we put in place to protect the travelling public and the commercial interests of operators.</p><p>I have met with representatives of the industry and have been sympathetic to the arguments being put forward in respect of removing them completely from the taxi legislation, including consideration of how drivers of wedding cars who only undertake this type of work should be treated in relation to driving test and periodic training requirements. However removing wedding cars from the Act will require consultation and a Primary legislative amendment. I had hoped for the remaining Taxi legislation implementing the Taxis Act to be well established by now, but opposition to single tier and further issues during 2015 have delayed this progress.</p><p>Nevertheless, my Department made the remaining regulations in December 2015 and I am confident that these regulations will be up and running by May 2016.</p><p>It therefore remains my intention to review the regulation of wedding car and courtesy transport operations under the Taxis Act, to determine if the regulation is proportionate and fit for purpose.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%209491%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=256786","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=256786"}},{"id":"255066","reference":"AQW 52853/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2016-01-13","answerBy":"2016-01-21","answered":"2016-03-23","answeredOrally":false,"priority":true,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety, following a target that no patient should wait more than 18 weeks for their first outpatient appointment, to detail why 47.6 per cent of patients are waiting more than 18 weeks.","answerText":"It is regrettable that more people are waiting to be seen and are waiting longer due to the financial constraints that led to the decision to suspend independent sector and additional in-house activity last year. It was extremely frustrating that we wasted £200m of taxpayers money over the last 3 years in penalties because of the failure to implement welfare reform. Such a sum could have funded many thousands of assessments and procedures. However I was pleased to recently announce the allocation of a further £30 million, which follows the Executive’s earlier allocation of £40 million to reduce waiting lists. The combined £70 million will ensure in the region of 1‎50,000 extra assessments, tests and procedures will be completed.\n\nProvisional figures for February 2016 show that those waiting more than 18 weeks for a first outpatient appointment have fallen by 9% and those waiting longer than 26 weeks for an inpatient day case has fallen by nearly 13%. It is clear that the investments we are directing towards waiting lists are making a difference. But it will take time and significant non recurrent and recurrent investment to bring waiting lists back to an acceptable level while simultaneously increasing capacity to meet demand. My commitment to an additional £30 million is an important step to ensuring continued progress.","answerHtml":"<p>It is regrettable that more people are waiting to be seen and are waiting longer due to the financial constraints that led to the decision to suspend independent sector and additional in-house activity last year. It was extremely frustrating that we wasted £200m of taxpayers money over the last 3 years in penalties because of the failure to implement welfare reform. Such a sum could have funded many thousands of assessments and procedures. However I was pleased to recently announce the allocation of a further £30 million, which follows the Executive’s earlier allocation of £40 million to reduce waiting lists. The combined £70 million will ensure in the region of 1‎50,000 extra assessments, tests and procedures will be completed.</p><p>Provisional figures for February 2016 show that those waiting more than 18 weeks for a first outpatient appointment have fallen by 9% and those waiting longer than 26 weeks for an inpatient day case has fallen by nearly 13%. It is clear that the investments we are directing towards waiting lists are making a difference. But it will take time and significant non recurrent and recurrent investment to bring waiting lists back to an acceptable level while simultaneously increasing capacity to meet demand. My commitment to an additional £30 million is an important step to ensuring continued progress.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2052853%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=255066","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=255066"}},{"id":"255064","reference":"AQW 52852/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2016-01-13","answerBy":"2016-01-28","answered":"2016-02-23","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety for his assessment of (i) why the number of patients on waiting lists has more than doubled since December 2012; and (ii) why no Health and Social Care Trust met waiting time targets in 2015.","answerText":"The increase in waiting times since 2014/15 is due to a number of factors including a year-on-year increase in referrals and agreed volumes of funded activity not being fully delivered across a number of specialties by Health and Social Care Trusts. It was also a great frustration that we wasted over £200 million of tax payers’ money over the last 3 years in penalties because of the failure to implement welfare reform. This has affected thousands of vulnerable people who have not been able to obtain the operations they desperately need.\n\nSince the announcement in November of £40 million additional funding for my Department there has been significant efforts made by the Trusts and independent sector to provide additional outpatient clinics and treatments targeted at those who have been waiting the longest. This will provide up to\n\n40,000 additional assessments and between 10,000 and 15,000 additional operations and treatments to be progressed.","answerHtml":"<p>The increase in waiting times since 2014/15 is due to a number of factors including a year-on-year increase in referrals and agreed volumes of funded activity not being fully delivered across a number of specialties by Health and Social Care Trusts. It was also a great frustration that we wasted over £200 million of tax payers’ money over the last 3 years in penalties because of the failure to implement welfare reform. This has affected thousands of vulnerable people who have not been able to obtain the operations they desperately need.</p><p>Since the announcement in November of £40 million additional funding for my Department there has been significant efforts made by the Trusts and independent sector to provide additional outpatient clinics and treatments targeted at those who have been waiting the longest. This will provide up to</p><p>40,000 additional assessments and between 10,000 and 15,000 additional operations and treatments to be progressed.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2052852%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=255064","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=255064"}},{"id":"255060","reference":"AQW 52851/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2016-01-13","answerBy":"2016-01-28","answered":"2016-02-18","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety what actions the Health and Social Care Trusts are taking to maximise the potential benefits of the TF3 Consortium telehealth services to patients with chronic conditions.","answerText":"The Health and Social Care Trusts are required to develop annual implementation plans setting out the areas of practice in which they are targeting telehealth interventions. Each Trust has a dedicated Telehealth Service Manager (TSM) who works with stakeholders to implement the plan, embed use of the service and identify new areas for service intervention.\n\nAll the Trusts undertake a range of stakeholder engagement activities to promote uptake of the telemonitoring service. Much of this effort continues to be focused on increasing uptake and usage among GPs and Integrated Care Partnerships. Demonstration sessions have been held at GP practices which have also been issued with leaflets promoting the service. TSMs meet regularly with clinical teams which use the service to review progress and provide training and advice on day-to-day user issues.\n\nWhile the telemonitoring service has traditionally been used by people with respiratory and heart conditions, diabetes, renal disease and post-stroke and weight management, individual Trusts have explored opportunities for expansion into new areas. For example the Northern Health and Social Care Trust has begun to use telehealth monitoring in areas such as Parkinson’s disease and learning disability; and the Southern Health and Social Care Trust is exploring the potential for its use to support smoking cessation.\n\nTSMs attend monthly regional service management group meetings with representatives of the TF3 consortium. These meetings are service-orientated and encourage sharing of knowledge, experience and good practice. Some Trust staff and key stakeholders have also taken the opportunity to visit the Telemonitoring NI centre to gain a better understanding of the service and its associated benefits and to develop positive working relationships with the TF3 team.","answerHtml":"<p>The Health and Social Care Trusts are required to develop annual implementation plans setting out the areas of practice in which they are targeting telehealth interventions. Each Trust has a dedicated Telehealth Service Manager (TSM) who works with stakeholders to implement the plan, embed use of the service and identify new areas for service intervention.</p><p>All the Trusts undertake a range of stakeholder engagement activities to promote uptake of the telemonitoring service. Much of this effort continues to be focused on increasing uptake and usage among GPs and Integrated Care Partnerships. Demonstration sessions have been held at GP practices which have also been issued with leaflets promoting the service. TSMs meet regularly with clinical teams which use the service to review progress and provide training and advice on day-to-day user issues.</p><p>While the telemonitoring service has traditionally been used by people with respiratory and heart conditions, diabetes, renal disease and post-stroke and weight management, individual Trusts have explored opportunities for expansion into new areas. For example the Northern Health and Social Care Trust has begun to use telehealth monitoring in areas such as Parkinson’s disease and learning disability; and the Southern Health and Social Care Trust is exploring the potential for its use to support smoking cessation.</p><p>TSMs attend monthly regional service management group meetings with representatives of the TF3 consortium. These meetings are service-orientated and encourage sharing of knowledge, experience and good practice. Some Trust staff and key stakeholders have also taken the opportunity to visit the Telemonitoring NI centre to gain a better understanding of the service and its associated benefits and to develop positive working relationships with the TF3 team.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2052851%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=255060","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=255060"}},{"id":"254397","reference":"AQW 52559/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2016-01-07","answerBy":"2016-01-22","answered":"2016-01-21","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development whether Translink will construct a public use railway halt at Ballymartin Park and Ride so that those using the facility can make full use of the adjacent railway line.","answerText":"Translink has advised that it has considered the requirements for a railway halt in the overall Ballymartin Park and Ride site development plan.\n\nThere are however currently no plans to construct a railway halt in the short term, although the project is retained as a longer term strategic objective.","answerHtml":"<p>Translink has advised that it has considered the requirements for a railway halt in the overall Ballymartin Park and Ride site development plan.</p><p>There are however currently no plans to construct a railway halt in the short term, although the project is retained as a longer term strategic objective.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2052559%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=254397","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=254397"}},{"id":"254367","reference":"AQO 9384/11-16","type":"Oral","typeCode":"AQO","mandate":"11-16","tabled":"2016-01-07","answerBy":"2016-01-18","answered":null,"answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister when they will publish a Sexual Orientation Strategy.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%209384%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=254367","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=254367"}},{"id":"255632","reference":"AQO 9384/11-16","type":"Oral","typeCode":"AQO","mandate":"11-16","tabled":"2016-01-07","answerBy":"2016-01-18","answered":"2016-02-02","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister when they will publish a Sexual Orientation Strategy.","answerText":"We remain committed to producing a Sexual Orientation Strategy.\n\nTo achieve this commitment officials have completed a public consultation process and the responses are being used to inform the content of a draft Strategy.\n\nOnce developed, the draft Strategy will be referred to the Executive for final agreement and a further 12 week period of public consultation will then take place.\n\nWe would anticipate that the Strategy would be published after this final phase of consultation.","answerHtml":"<p>We remain committed to producing a Sexual Orientation Strategy.</p><p>To achieve this commitment officials have completed a public consultation process and the responses are being used to inform the content of a draft Strategy.</p><p>Once developed, the draft Strategy will be referred to the Executive for final agreement and a further 12 week period of public consultation will then take place.</p><p>We would anticipate that the Strategy would be published after this final phase of consultation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%209384%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=255632","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=255632"}},{"id":"252060","reference":"AQW 51820/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-12-02","answerBy":"2015-12-17","answered":"2015-12-14","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment whether his Department has undertaken an Environmental Impact Assessment regarding the marine impact of the proposed compressed air storage scheme near Islandmagee.","answerText":"The Department has not yet received a planning application for this development. Following pre-application discussions, the Department is aware that any forthcoming application will be accompanied by a full environmental statement.","answerHtml":"<p>The Department has not yet received a planning application for this development. Following pre-application discussions, the Department is aware that any forthcoming application will be accompanied by a full environmental statement.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2051820%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=252060","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=252060"}},{"id":"252057","reference":"AQW 51819/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-12-02","answerBy":"2015-12-17","answered":"2015-12-15","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development to detail the number of kitchen refurbishments that have been cancelled for Northern Ireland Housing Executive tenants in the last twelve months due to insufficient funding.","answerText":"This is an operational matter for the Northern Ireland Housing Executive, which has advised me that it has not cancelled any kitchen refurbishments in the last 12 months due to insufficient funding. However, the expected start dates of some kitchen schemes have been re-profiled.","answerHtml":"<p>This is an operational matter for the Northern Ireland Housing Executive, which has advised me that it has not cancelled any kitchen refurbishments in the last 12 months due to insufficient funding. However, the expected start dates of some kitchen schemes have been re-profiled.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2051819%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=252057","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=252057"}},{"id":"251235","reference":"AQW 51521/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-11-26","answerBy":"2015-12-11","answered":"2015-12-08","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development whether her Department will undertake more robust measures to tackle the flouting of the pedestrian precinct rules by drivers on North Street and West Street in Carrickfergus.","answerText":"I am aware that a relatively low number of Penalty Charge notices have been issued on both streets. However, pedestrian permits issued for Carrickfergus Pedestrian Zone might give the impression to the public that vehicles are parking in contravention. In addition, vehicles loading/ unloading in these locations would be permitted as long as drivers remain within the appropriate observation times.\n\nBoth locations form part of a wider route patrolled by Traffic Attendants and therefore cannot receive permanent attention. The current daily frequency for Traffic Attendants at both North Street and West Street is a minimum of four visits per day. However, my Department will examine the possibility of providing additional visits by Traffic Attendants from the Parking Enforcement Mobile Unit.\n\nI should also advise that Moving Traffic offences, which may be contributing to the overall problem, cannot be enforced by NSL. This would be an issue for the PSNI.","answerHtml":"<p>I am aware that a relatively low number of Penalty Charge notices have been issued on both streets. However, pedestrian permits issued for Carrickfergus Pedestrian Zone might give the impression to the public that vehicles are parking in contravention. In addition, vehicles loading/ unloading in these locations would be permitted as long as drivers remain within the appropriate observation times.</p><p>Both locations form part of a wider route patrolled by Traffic Attendants and therefore cannot receive permanent attention. The current daily frequency for Traffic Attendants at both North Street and West Street is a minimum of four visits per day. However, my Department will examine the possibility of providing additional visits by Traffic Attendants from the Parking Enforcement Mobile Unit.</p><p>I should also advise that Moving Traffic offences, which may be contributing to the overall problem, cannot be enforced by NSL. This would be an issue for the PSNI.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2051521%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=251235","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=251235"}},{"id":"251238","reference":"AQO 9319/11-16","type":"Oral","typeCode":"AQO","mandate":"11-16","tabled":"2015-11-26","answerBy":"2015-12-08","answered":"2015-12-08","answeredOrally":true,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice what are the implications for the justice system of legacy issues not being included in A Fresh Start.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr Ford","text":"With permission, Mr Deputy Speaker, I will take questions 4, 7, 9 and 15 together. I am extremely disappointed that legacy issues were excluded from the recent political agreement. Whilst there is progress in certain areas, the failure to address or make a commitment to the legacy institutions set out in the Stormont House Agreement leaves a major hole in how we address the issues of our past."},{"speaker":"","text":"There are immediate implications, as well as potential long-term implications, for the justice system and the families of victims of Troubles-related deaths. Without the establishment of the Historical Investigations Unit (HIU), the responsibility for carrying out legacy investigations remains with the existing bodies involved in this important work."},{"speaker":"","text":"A key ingredient of the Stormont House Agreement's approach to dealing with the past was the £150 million promised over a five-year period to fund new legacy structures and arrangements. I met the Secretary of State last Monday on legacy matters. At the meeting, I raised a number of issues of concern, including the UK Government's obligations under the ECHR; the implications of non-agreement for victims; the financial implications of managing legacy issues without the new institutions; and funding for existing legacy institutions. The failure to agree to the establishment of the HIU means that significant burdens fall to my Department. Those legacy issues are much wider than the remit of my Department, and responsibility for dealing with them lies with the Executive and the Government. There is no \"do nothing\" solution. In the absence of political agreement on dealing with the past, it is crucial that existing structures are adequately funded to fill the gap. Without the necessary additional resources to address outstanding Troubles-related deaths, we will fail the families of victims and fail to meet our obligations under the European Convention on Human Rights. We will be potentially throwing away the best opportunity for a generation to resolve issues of dealing with our troubled past."},{"speaker":"Mr A Maginness","text":"I thank the Minister for a detailed reply, and I agree with much of what he said. The failure in the recent talks to agree on the HIU leaves a terrible gap in dealing with the past. Is the Minister telling the House that there is no additional funding coming to the PSNI to deal with legacy issues either from the Department or through it from the British Government? Is that the position, or can some of the moneys that were, at least, notionally committed by the British Government during the talks come forward to assist the PSNI, at least in the interim period?"},{"speaker":"Mr Ford","text":"I thank Mr Maginness for that supplementary; he puts his finger on a significant issue. There is, at this point, no additional funding for the PSNI. There is, at this point, no additional funding for the Police Ombudsman. There is, at this point, no additional funding for legacy inquests. I have made the point strenuously to the Secretary of State, although it is not a matter solely for her, because it is an issue that also engages the Executive. Given that the Government were promising £150 million for legacy institutions, there are major questions about the responsibility that the Government have to deal with those issues in the absence of the legacy institutions. Certainly, there were to be no new institutions for inquests, and the police and the ombudsman have to carry out functions, including those that, at times, are court-ordered or are ordered by the DPP, in the absence of funding. It is simply not sustainable to expect them to deal with the past on the budget for the present. There will need to be an arrangement to find that funding if we are to meet the needs of the victims of the past."},{"speaker":"Mr Deputy Speaker (Mr Dallat)","text":"Mr Lyttle, your question has been answered: do you wish to ask a supplementary question?"},{"speaker":"Mr Lyttle","text":"Yes, please, Mr Deputy Speaker. I thank the Minister for his stark warning about the implications of failing to adequately deal with the past and, indeed, to fund the institutions that are required to do so. Can he provide any insight into where the blockage to the delivery of a comprehensive mechanism for legacy issues lies? Does he believe that the UK Government will honour their responsibility to adequately fund existing structures to ensure that victims and survivors get access to the information, justice and services that they deserve?"},{"speaker":"Mr Ford","text":"I thank my colleague for that expansion of Mr Maginness's point. It is not easy to define where blockages currently sit. In fairness to the Secretary of State, I know that she has said that the money that was committed by the Treasury is still committed if legacy institutions are established. The challenge is that the work has to be done whether or not legacy institutions are established, and issues such as those that would be dealt with by inquests would be done without new institutions. I believe, therefore, that the commitment that was made by the Treasury on the back of the engagement with the Prime Minister a year ago shows that there was a recognition that the work had to be done. At the end of the day, the obligations under ECHR are obligations for the state party, even though they are carried out by devolved institutions, and it will be the UK Government who will answer in Strasbourg and in other international fora if they fail to provide the necessary resources."},{"speaker":"Mr G Kelly","text":"Go raibh maith agat, a LeasCheann Comhairle. Gabhaim buíochas leis an Aire. I thank the Minister for his comprehensive answer. I agree that doing nothing is not an option as far as victims and survivors are concerned. Does the Minister agree with me that the lack of disclosure, which I think he mentioned earlier, by various agencies of the British Government, including the PSNI, to families and, indeed, to inquests and other courts is a huge issue and that justice delayed, in some cases for a number of decades, is justice denied?"},{"speaker":"Mr Ford","text":"I thank Mr Kelly for the question. I am not sure that he and I would necessarily have an identical view on issues of national security, but there are difficult issues that need to be worked through in that area. There is no doubt that there are a number of legacy inquests where there are not concerns about national security and it should be possible to make progress. I welcome the work being done by the Lord Chief Justice and Lord Justice Weir to carry through the examination of the state of each potential inquest. The provision of additional resources at judicial level, including the provision of a High Court judge to take on the role of coroner in one complex inquest, the work, which I have already highlighted, being done by Judge Sherrard in another one and the examination of the whole package as one by a single judge in January will be very beneficial. However, there will be issues, and I will continue to engage on the issues of disclosure and how they are carried through in order to best meet the needs of families."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%209319%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=251238","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2015-12-08&docID=251987#AQO%209319/11-16","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=251238"}},{"id":"250877","reference":"AQW 51408/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-11-25","answerBy":"2015-12-10","answered":"2015-12-18","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment what is the outstanding balance on the £175m loan provided to the Presbyterian Mutual Society in 2011; and whether all payments are up to date as of November 2015.","answerText":"The outstanding balance on the £175million loan provided to the Presbyterian Mutual Society in 2011 is £128.75million. All payments, as agreed with the Department, are up to date as of November 2015.","answerHtml":"<p>The outstanding balance on the £175million loan provided to the Presbyterian Mutual Society in 2011 is £128.75million. All payments, as agreed with the Department, are up to date as of November 2015.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2051408%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=250877","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=250877"}},{"id":"250763","reference":"AQW 51383/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-11-25","answerBy":"2015-12-10","answered":"2015-12-08","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development why Translink services are not integrated with the Google Maps route finder facility, as is the case in other parts of the UK.","answerText":"Translink has provided Google with a selection of its timetabling data, which is in line with the relevant public transport industry standard formats. However, Google uses a different format. Translink has, therefore, engaged its software supplier to identify what will be necessary to provide data in a format that meets Google’s requirements. Translink envisages that it will be in a position to release data sets to Google in 2016.","answerHtml":"<p>Translink has provided Google with a selection of its timetabling data, which is in line with the relevant public transport industry standard formats. However, Google uses a different format. Translink has, therefore, engaged its software supplier to identify what will be necessary to provide data in a format that meets Google’s requirements. Translink envisages that it will be in a position to release data sets to Google in 2016.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2051383%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=250763","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=250763"}},{"id":"250423","reference":"AQW 51225/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-11-20","answerBy":"2015-12-07","answered":"2015-12-07","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development whether Translink will consider a later final service on the Larne Line to allow passengers on the last Dublin to Belfast train to connect to the Larne Line.","answerText":"Translink has advised me that Irish rail are currently considering the rescheduling of their Intercity and Commuter (Dublin Area Rapid Transit) services that use Connolly Station which also has a knock on effect on the Enterprise Services.\n\nThe proposals mean that the Enterprise service would become a two-hourly service leaving Dublin and arriving in Belfast Central Station at 25 minutes past the hour from 09:25 to 23:25.\n\nCurrently the last service to Larne departs Belfast Central station at 22:55 but following a number of requests I can inform the member that this departure time is currently under consideration and will be considered as part of the January 2016 timetable review.\n\nThis and other Translink timetable revisions from next year are still under consideration. Translink will need to consider its overall timetable connections when considering changes.","answerHtml":"<p>Translink has advised me that Irish rail are currently considering the rescheduling of their Intercity and Commuter (Dublin Area Rapid Transit) services that use Connolly Station which also has a knock on effect on the Enterprise Services.</p><p>The proposals mean that the Enterprise service would become a two-hourly service leaving Dublin and arriving in Belfast Central Station at 25 minutes past the hour from 09:25 to 23:25.</p><p>Currently the last service to Larne departs Belfast Central station at 22:55 but following a number of requests I can inform the member that this departure time is currently under consideration and will be considered as part of the January 2016 timetable review.</p><p>This and other Translink timetable revisions from next year are still under consideration. Translink will need to consider its overall timetable connections when considering changes.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2051225%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=250423","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=250423"}},{"id":"250399","reference":"AQW 51210/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-11-20","answerBy":"2015-12-07","answered":"2015-11-26","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development whether his Department intends to reassess claimants with lifetime Disability Living Allowance awards when transitioning to Personal Independence Payments.","answerText":"Personal Independence Payment will replace Disability Living Allowance for working age claimants (age 16 – 64). All existing working age claimants with an indefinite (lifetime) award of Disability Living Allowance will be reassessed for Personal Independence Payment over a period of time.","answerHtml":"<p>Personal Independence Payment will replace Disability Living Allowance for working age claimants (age 16 – 64). All existing working age claimants with an indefinite (lifetime) award of Disability Living Allowance will be reassessed for Personal Independence Payment over a period of time.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2051210%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=250399","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=250399"}},{"id":"250394","reference":"AQW 51205/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-11-20","answerBy":"2015-12-07","answered":"2015-12-07","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to outline the logic of the road numbering system in Northern Ireland.","answerText":"Road classification dates back pre 1973 and consequently it has not been possible to locate any historic record of how the classification system was originally determined. Its use today is limited to route identification, and has no relevance to current funding allocations. Any new road outside a motorway would be classified on the basis of the comparable route classification in the area.","answerHtml":"<p>Road classification dates back pre 1973 and consequently it has not been possible to locate any historic record of how the classification system was originally determined. Its use today is limited to route identification, and has no relevance to current funding allocations. Any new road outside a motorway would be classified on the basis of the comparable route classification in the area.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2051205%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=250394","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=250394"}},{"id":"250393","reference":"AQW 51204/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-11-20","answerBy":"2015-12-07","answered":"2015-12-07","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to account for the delays to the Enterprise service on the day of its relaunch; and the unreliability of the rolling stock in general.","answerText":"Translink has advised me that the 11:00 hours Enterprise departure from Dublin Connolly on 16 November 2015 was delayed by 88 minutes due to severe wheel slip in Balbriggan area of the Irish Republic. Low adhesion on the railway line resulted in significant delays and damage to the train wheels.\n\nOver the past six months the performance of the services on the Belfast to Dublin route for punctuality and reliability has been a 99.93% score for reliability and a 93.8% for punctuality. Punctuality is defined as trains arriving at their destination either on time or within 10 minutes as set out in the timetable.\n\nThe Passenger Charter targets for the Dublin line are that 99.5% of trains will operate and 90% of trains will arrive no more than 10 minutes late. These targets have been more than achieved.","answerHtml":"<p>Translink has advised me that the 11:00 hours Enterprise departure from Dublin Connolly on 16 November 2015 was delayed by 88 minutes due to severe wheel slip in Balbriggan area of the Irish Republic. Low adhesion on the railway line resulted in significant delays and damage to the train wheels.</p><p>Over the past six months the performance of the services on the Belfast to Dublin route for punctuality and reliability has been a 99.93% score for reliability and a 93.8% for punctuality. Punctuality is defined as trains arriving at their destination either on time or within 10 minutes as set out in the timetable.</p><p>The Passenger Charter targets for the Dublin line are that 99.5% of trains will operate and 90% of trains will arrive no more than 10 minutes late. These targets have been more than achieved.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2051204%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=250393","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=250393"}},{"id":"250392","reference":"AQW 51203/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-11-20","answerBy":"2015-12-07","answered":"2015-12-07","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development whether her Department intends to procure new trains for the Enterprise service in the near future.","answerText":"£12 million of European funding, through the Special European Union Programme Body, is being invested in the current Enterprise refurbishment programme. This project is to completely overhaul and refurbish all 28 coaches.\n\nThe first refurbished train was launched on Monday 16 November 2015 and work on the remaining sets is expected to be completed by February 2016.\n\nThere are no plans to procure new trains for the Enterprise service in the near future. This would require agreement between Irish Rail and NI Rail.","answerHtml":"<p>£12 million of European funding, through the Special European Union Programme Body, is being invested in the current Enterprise refurbishment programme. This project is to completely overhaul and refurbish all 28 coaches.</p><p>The first refurbished train was launched on Monday 16 November 2015 and work on the remaining sets is expected to be completed by February 2016.</p><p>There are no plans to procure new trains for the Enterprise service in the near future. This would require agreement between Irish Rail and NI Rail.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2051203%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=250392","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=250392"}},{"id":"250200","reference":"AQW 51120/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-11-19","answerBy":"2015-11-24","answered":"2015-11-25","answeredOrally":false,"priority":true,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what action is being taken to remedy flooding at Greenisland Railway Station.","answerText":"Translink has advised me that all of the local station drains including a large storm sewer have been opened up and cleaned out to ensure that maximum flows can be achieved.\n\nCCTV investigations of the drains are being undertaken to ensure that there are no blockages or collapses in the vicinity of the station which might prevent the water from getting away and Translink is also seeking to make contact with the relevant authorities to progress a study of the drainage capacity in the area.","answerHtml":"<p>Translink has advised me that all of the local station drains including a large storm sewer have been opened up and cleaned out to ensure that maximum flows can be achieved.</p><p>CCTV investigations of the drains are being undertaken to ensure that there are no blockages or collapses in the vicinity of the station which might prevent the water from getting away and Translink is also seeking to make contact with the relevant authorities to progress a study of the drainage capacity in the area.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2051120%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=250200","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=250200"}},{"id":"250206","reference":"AQO 9211/11-16","type":"Oral","typeCode":"AQO","mandate":"11-16","tabled":"2015-11-19","answerBy":"2015-11-30","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education what initiatives are in place to encourage the development of computer programming skills in schools.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%209211%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=250206","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=250206"}},{"id":"251906","reference":"AQO 9211/11-16","type":"Oral","typeCode":"AQO","mandate":"11-16","tabled":"2015-11-19","answerBy":"2015-11-30","answered":"2015-12-01","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education what initiatives are in place to encourage the development of computer programming skills in schools.","answerText":"The curriculum has been designed to provide flexibility for schools to develop experiences that best suit the needs of their pupils. Embedding mandatory, cross-curricular skills and keeping prescribed content to a minimum, allows schools to choose the most appropriate approach to take to ensure that pupils are engaged and challenged, to reach their full potential.\n\nComputer Science, which includes computer coding, is a specialised field and the flexibility already in place within the curriculum, enables schools to teach Computer Science at any Key Stage.\n\nMy Department continues to provide core funding of £300k in 2015/16 to Sentinus, the Department’s frontline STEM delivery partner, to deliver a range of STEM interventions to primary and post-primary schools.\n\nSentinus’s “IT’s Your Choice” programme, which promotes practical computer programming to young people from Key Stage 2 to post 16 will be available this year and will engage over 8,000 primary and post-primary pupils.","answerHtml":"<p>The curriculum has been designed to provide flexibility for schools to develop experiences that best suit the needs of their pupils. Embedding mandatory, cross-curricular skills and keeping prescribed content to a minimum, allows schools to choose the most appropriate approach to take to ensure that pupils are engaged and challenged, to reach their full potential.</p><p>Computer Science, which includes computer coding, is a specialised field and the flexibility already in place within the curriculum, enables schools to teach Computer Science at any Key Stage.</p><p>My Department continues to provide core funding of £300k in 2015/16 to Sentinus, the Department’s frontline STEM delivery partner, to deliver a range of STEM interventions to primary and post-primary schools.</p><p>Sentinus’s “IT’s Your Choice” programme, which promotes practical computer programming to young people from Key Stage 2 to post 16 will be available this year and will engage over 8,000 primary and post-primary pupils.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%209211%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=251906","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=251906"}},{"id":"249967","reference":"AQW 51051/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-11-18","answerBy":"2015-11-23","answered":"2015-11-23","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment how many (i) co-operatives; (ii) community benefit societies; (iii) community interested companies; and (iv) registered charities have been formed with the support of the 11 Social Enterprise Hubs since they were funded under the Executive’s Accelerating Social Enterprises programme.","answerText":"The 11 Social Enterprise Hubs are now in their second year of delivery. The hubs offer various types of support including training, mentoring, workshops and advice clinics to enable groups to set up social enterprises.\n\nTo date they have assisted groups to form 3 co-operatives, 10 community benefit societies, 82 community interest companies and 21 registered charities. In addition to this, 9 companies limited by guarantee, 1 development trust and 10 companies limited by guarantee with charitable status have been established. Work is ongoing with many other groups who are at various stages of setting up social enterprises.","answerHtml":"<p>The 11 Social Enterprise Hubs are now in their second year of delivery. The hubs offer various types of support including training, mentoring, workshops and advice clinics to enable groups to set up social enterprises.</p><p>To date they have assisted groups to form 3 co-operatives, 10 community benefit societies, 82 community interest companies and 21 registered charities. In addition to this, 9 companies limited by guarantee, 1 development trust and 10 companies limited by guarantee with charitable status have been established. Work is ongoing with many other groups who are at various stages of setting up social enterprises.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2051051%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=249967","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=249967"}},{"id":"249861","reference":"AQW 51011/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-11-17","answerBy":"2015-11-20","answered":"2015-12-07","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment whether his Department will consider lowering the charges for registering co-operatives in Northern Ireland, given it costs five times more to register new co-operatives than in the rest of UK.","answerText":"Charges to register co-operatives in Northern Ireland and GB are not directly comparable as an annual fee is paid in GB whereas in NI, societies are only charged for the transactions they make.\n\nIn NI, if a co-operative registers using pre-approved (‘model’) rules, the cost is £200; or £535 if the co-operative wishes to register its own amended rules. In GB, if a co-operative registers using pre-approved (‘model’) rules, the cost is £40, but can increase to £950 if the co-operative wishes to register its own amended rules. Additionally, an annual fee is applied in GB based on the assets held by the co-operative, from £60 to £470 per annum. There is no annual fee in Northern Ireland.\n\nHowever, my officials are currently working with their counterparts in HM Treasury and the Financial Conduct Authority to bring about the transfer of responsibility for the registration of Northern Ireland incorporated industrial and provident societies from DETI to the Financial Conduct Authority.\n\nThe proposed transfer of societies will result in the consistency of registration fees throughout the United Kingdom.","answerHtml":"<p>Charges to register co-operatives in Northern Ireland and GB are not directly comparable as an annual fee is paid in GB whereas in NI, societies are only charged for the transactions they make.</p><p>In NI, if a co-operative registers using pre-approved (‘model’) rules, the cost is £200; or £535 if the co-operative wishes to register its own amended rules. In GB, if a co-operative registers using pre-approved (‘model’) rules, the cost is £40, but can increase to £950 if the co-operative wishes to register its own amended rules. Additionally, an annual fee is applied in GB based on the assets held by the co-operative, from £60 to £470 per annum. There is no annual fee in Northern Ireland.</p><p>However, my officials are currently working with their counterparts in HM Treasury and the Financial Conduct Authority to bring about the transfer of responsibility for the registration of Northern Ireland incorporated industrial and provident societies from DETI to the Financial Conduct Authority.</p><p>The proposed transfer of societies will result in the consistency of registration fees throughout the United Kingdom.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2051011%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=249861","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=249861"}},{"id":"249454","reference":"AQO 9168/11-16","type":"Oral","typeCode":"AQO","mandate":"11-16","tabled":"2015-11-12","answerBy":"2015-11-24","answered":"2015-11-24","answeredOrally":true,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture and Rural Development","question":"To ask the Minister of Agriculture and Rural Development to outline her plans to assist farmers to move to lower-cost dairy production.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mrs O'Neill","text":"My Department plans to assist dairy farmers to move towards lower-cost production methods through the ongoing delivery of education and training programmes at the College of Agriculture, Food and Rural Enterprise. CAFRE will also continue to demonstrate knowledge and technology transfer projects, which aim to improve business efficiency for dairy farm businesses. From April 2015 to 16 November 2015, CAFRE delivered 57 training events aimed at improving production performance to 1,166 dairy farmers, and it is currently demonstrating five technology projects to the dairy industry. My Department will continue to work with AFBI to ensure that knowledge and technology transfer projects reflect the outcomes of research into low-cost dairy production systems. My CAFRE advisers are assisting farmers by offering workshops entitled 'Feed and Finance’ to look at the cost of milk production. In addition, my staff are assisting farmers to complete business plans and cash flows."},{"speaker":"","text":"Participating in CAFRE's business development groups will also provide dairy farmers with the opportunity to work collaboratively, improve technical efficiency, improve business management skills and learn about new technologies and innovative ways of working. I encourage all farmers, including dairy farmers, to apply to business development groups before the closing date of 14 December."},{"speaker":"Mr Principal Deputy Speaker","text":"That ends the period for listed questions. We now move to topical questions."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%209168%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=249454","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2015-11-24&docID=250211#AQO%209168/11-16","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=249454"}},{"id":"249447","reference":"AQO 9137/11-16","type":"Oral","typeCode":"AQO","mandate":"11-16","tabled":"2015-11-12","answerBy":"2015-11-23","answered":null,"answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister to outline their Department's response to the finding in the Good Relations Indicators that 54 per cent of people see town centres as safe and welcoming for people of all walks of life.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%209137%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=249447","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=249447"}},{"id":"250675","reference":"AQO 9137/11-16","type":"Oral","typeCode":"AQO","mandate":"11-16","tabled":"2015-11-12","answerBy":"2015-11-23","answered":"2016-02-10","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister to outline their Department's response to the finding in the Good Relations Indicators that 54 per cent of people see town centres as safe and welcoming for people of all walks of life.","answerText":"The Good Relations Indicators report was published on 22 September 2015. Future reports will highlight trends and changes and will allow the Executive to identify the necessary steps to aid positive progress.\n\nOne of the key priorities identified in Together: Building a United Community Strategy is Our Safe Community which aims to create a community where everyone feels safe in moving around and where life choices are not inhibited by fears around safety.\n\nBuilding a truly united community can only be possible when people feel safe and secure in all neighbourhoods and spaces within our community.\n\nTogether:Building a United Community provides the framework for government action in tackling sectarianism, racism and other forms of intolerance while seeking to address division, hate and separation.\n\nHowever, this is not just the responsibility of OFMDFM. The Strategy is an Executive Strategy which places responsibilities on all government departments","answerHtml":"<p>The Good Relations Indicators report was published on 22 September 2015. Future reports will highlight trends and changes and will allow the Executive to identify the necessary steps to aid positive progress.</p><p>One of the key priorities identified in Together: Building a United Community Strategy is Our Safe Community which aims to create a community where everyone feels safe in moving around and where life choices are not inhibited by fears around safety.</p><p>Building a truly united community can only be possible when people feel safe and secure in all neighbourhoods and spaces within our community.</p><p>Together:Building a United Community provides the framework for government action in tackling sectarianism, racism and other forms of intolerance while seeking to address division, hate and separation.</p><p>However, this is not just the responsibility of OFMDFM. The Strategy is an Executive Strategy which places responsibilities on all government departments</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%209137%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=250675","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=250675"}},{"id":"249243","reference":"AQW 50759/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-11-11","answerBy":"2015-11-16","answered":"2015-11-25","answeredOrally":false,"priority":true,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to outline the reasons for the overcrowding on the Larne line train, in particular at Whiteabbey station in the morning when there are such large crowds that passengers are left behind; and what action she is taking to rectify this matter.","answerText":"Translink has advised me that since 29 September 2015, NI Railways has been operating a 6-carriage train on the 07:30 service from Whitehead to accommodate demand. It is scheduled to arrive at Whiteabbey at 7.55 am. Regrettably, this service has been reduced to 3 carriages on a number of occasions due to fleet availability.\n\nWhilst the Whitehead service is scheduled to operate as a 6-carriage set there is another service leaving 9 minutes later at 8:04 am from Whiteabbey which is a 6-carriage set (originating in Londonderry).\n\nTranslink is hopeful that this is a temporary problem and should ease in the coming weeks when the first refurbished Enterprise train re-enters passenger service, releasing an additional train unit back into the fleet pool.","answerHtml":"<p>Translink has advised me that since 29 September 2015, NI Railways has been operating a 6-carriage train on the 07:30 service from Whitehead to accommodate demand. It is scheduled to arrive at Whiteabbey at 7.55 am. Regrettably, this service has been reduced to 3 carriages on a number of occasions due to fleet availability.</p><p>Whilst the Whitehead service is scheduled to operate as a 6-carriage set there is another service leaving 9 minutes later at 8:04 am from Whiteabbey which is a 6-carriage set (originating in Londonderry).</p><p>Translink is hopeful that this is a temporary problem and should ease in the coming weeks when the first refurbished Enterprise train re-enters passenger service, releasing an additional train unit back into the fleet pool.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2050759%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=249243","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=249243"}},{"id":"248939","reference":"AQW 50625/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-11-09","answerBy":"2015-11-24","answered":"2015-12-17","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety (i) whether he will publish the Public Health Agency's Consultation Plan for the proposed changes to Lifeline, outlining (a) the pre-consultation undertaken; (b) information analysis; (c) options appraisal; (d) Contact NI evaluation of existing services; and (d) the budget for the consultation; and (ii) whether he intends to make a statement on the process of the consultation.","answerText":"The Public Health Agency has published its pre-consultation report on its website. The information analysis and options appraisal, carried out as part of the consultation process, together with details on the Strategic Outline Business Case are also available on the Agency’s website. If ContactNI has carried out an evaluation of its existing services, it is for that organisation to decide if it will publish the findings. There is no set budget for the consultation exercise; spend to date has been £1,389. I do not intend to make a statement on the process of the consultation being undertaken by the Public Health Agency.","answerHtml":"<p>The Public Health Agency has published its pre-consultation report on its website. The information analysis and options appraisal, carried out as part of the consultation process, together with details on the Strategic Outline Business Case are also available on the Agency’s website. If ContactNI has carried out an evaluation of its existing services, it is for that organisation to decide if it will publish the findings. There is no set budget for the consultation exercise; spend to date has been £1,389. I do not intend to make a statement on the process of the consultation being undertaken by the Public Health Agency.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2050625%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=248939","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=248939"}},{"id":"248550","reference":"AQO 9111/11-16","type":"Oral","typeCode":"AQO","mandate":"11-16","tabled":"2015-11-05","answerBy":"2015-11-17","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice for an update on the outcome of the Speeding up Justice pilot in the Ards court division.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%209111%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=248550","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=248550"}},{"id":"249963","reference":"AQO 9111/11-16","type":"Oral","typeCode":"AQO","mandate":"11-16","tabled":"2015-11-05","answerBy":"2015-11-17","answered":"2015-11-18","answeredOrally":false,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice for an update on the outcome of the Speeding up Justice pilot in the Ards court division.","answerText":"The Indictable Cases Pilot launched in Ards on 2 January this year and will run until the end of December.\n\nCurrently, 128 cases are in the pilot, of which 96 are at court stages. Ten cases have concluded. Two of those cases took only 56 days from the date the incident was reported to police until sentencing, with an average of 97 days across the ten concluded cases.\n\nThis is a significant improvement on processing times for the same period in the same area last year, when the average time taken was 197 days.\n\nI want to recognise the tremendous efforts of PSNI, PPS and FSNI in the pilot, and the leadership provided by the Lord Chief Justice and local judiciary.","answerHtml":"<p>The Indictable Cases Pilot launched in Ards on 2 January this year and will run until the end of December.</p><p>Currently, 128 cases are in the pilot, of which 96 are at court stages. Ten cases have concluded. Two of those cases took only 56 days from the date the incident was reported to police until sentencing, with an average of 97 days across the ten concluded cases.</p><p>This is a significant improvement on processing times for the same period in the same area last year, when the average time taken was 197 days.</p><p>I want to recognise the tremendous efforts of PSNI, PPS and FSNI in the pilot, and the leadership provided by the Lord Chief Justice and local judiciary.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%209111%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=249963","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=249963"}},{"id":"248159","reference":"AQW 50313/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-11-03","answerBy":"2015-11-18","answered":"2015-11-20","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment for his assessment of the legality of councils paying a Councillor's allowances directly to a third party.","answerText":"The legislation clearly states that councillor allowances are payable by councils directly to councillors. This is contained in Part 3 of the Local Government Finance Act (NI) 2011 and in the Local Government (Payments to Councillors) Regulations (NI) 2012.\n\nIn light of the recent court proceedings, my officials wrote to all district council chief executives to remind them of their duty under this legislation. However the legislation is silent on which bank accounts councillors' allowances must be paid into and councils do not have an investigative power to allow enquiries; such as that available to the Assembly. This is a subject that I will discuss with council Chief Executives to ascertain if such a legislative power is necessary and would be of benefit.","answerHtml":"<p>The legislation clearly states that councillor allowances are payable by councils directly to councillors. This is contained in Part 3 of the Local Government Finance Act (NI) 2011 and in the Local Government (Payments to Councillors) Regulations (NI) 2012.</p><p>In light of the recent court proceedings, my officials wrote to all district council chief executives to remind them of their duty under this legislation. However the legislation is silent on which bank accounts councillors&#39; allowances must be paid into and councils do not have an investigative power to allow enquiries; such as that available to the Assembly. This is a subject that I will discuss with council Chief Executives to ascertain if such a legislative power is necessary and would be of benefit.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2050313%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=248159","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=248159"}},{"id":"248122","reference":"AQW 50302/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-11-03","answerBy":"2015-11-18","answered":"2015-12-17","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety whether his Department intends to formally mark the European Day on the Protection of Children Against Sexual Exploitation and Abuse.","answerText":"My Department has a significant programme of work ongoing in Northern Ireland relating to Child Sexual Exploitation and that is our priority. Our intention is to host information on the DHSSPS website and to ask the Health and Social Care (HSC) Board and Trusts to also host information on their websites to refer the reader to the Council of Europe dedicated webpage.","answerHtml":"<p>My Department has a significant programme of work ongoing in Northern Ireland relating to Child Sexual Exploitation and that is our priority. Our intention is to host information on the DHSSPS website and to ask the Health and Social Care (HSC) Board and Trusts to also host information on their websites to refer the reader to the Council of Europe dedicated webpage.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2050302%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=248122","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=248122"}},{"id":"248120","reference":"AQW 50301/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-11-03","answerBy":"2015-11-18","answered":"2015-11-10","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education whether his Department intends to formally mark the European Day on the Protection of Children Against Sexual Exploitation and Abuse.","answerText":"My Department has made the European Day on the ‘Protection of Children against Sexual Exploitation and Abuse’ the subject of the November ‘Message of the Month’ to mark the launch. The ‘Message of the Month’ forms part of the i-Matter programme, which aims to address issues relating to emotional health and wellbeing.\n\nMy Department continues to engage with schools to share information and advice on the issue of child sexual exploitation. I recently published my Departments progress report on the CSE Action Plan, following the Marshall Report. In August 15 I issued new guidance for schools on Relationship and Sexuality Education (RSE) and Drugs Education, this guidance references the recent inquiries into child sexual exploitation and provides an opportunity for schools to play a preventative role by improving awareness amongst staff of the vulnerability factors and current indicators of child sexual exploitation.","answerHtml":"<p>My Department has made the European Day on the ‘Protection of Children against Sexual Exploitation and Abuse’ the subject of the November ‘Message of the Month’ to mark the launch. The ‘Message of the Month’ forms part of the i-Matter programme, which aims to address issues relating to emotional health and wellbeing.</p><p>My Department continues to engage with schools to share information and advice on the issue of child sexual exploitation. I recently published my Departments progress report on the CSE Action Plan, following the Marshall Report. In August 15 I issued new guidance for schools on Relationship and Sexuality Education (RSE) and Drugs Education, this guidance references the recent inquiries into child sexual exploitation and provides an opportunity for schools to play a preventative role by improving awareness amongst staff of the vulnerability factors and current indicators of child sexual exploitation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2050301%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=248120","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=248120"}},{"id":"248119","reference":"AQW 50300/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-11-03","answerBy":"2015-11-18","answered":"2015-11-10","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education to detail the expected timeframe for the passage of the Shared Education Bill.","answerText":"The Shared Education Bill was introduced to the Assembly on 2 November 2015 and second stage is scheduled for 10 November. The Committee stage would commence immediately thereafter and providing there is not an extension to this stage, I would anticipate the Consideration stages taking place during February with the Final stage in early March.","answerHtml":"<p>The Shared Education Bill was introduced to the Assembly on 2 November 2015 and second stage is scheduled for 10 November. The Committee stage would commence immediately thereafter and providing there is not an extension to this stage, I would anticipate the Consideration stages taking place during February with the Final stage in early March.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2050300%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=248119","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=248119"}},{"id":"246397","reference":"AQW 49818/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-10-14","answerBy":"2015-10-29","answered":"2016-03-23","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety what actions the Health and Social Care trusts are taking to maximise the potential benefits of the TF3 Consortium telehealth services to patients with chronic conditions.","answerText":"I refer the Member to my answer to AQW 52851/11-16.","answerHtml":"<p>I refer the Member to my answer to AQW 52851/11-16.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2049818%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=246397","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=246397"}},{"id":"246325","reference":"AQW 49809/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-10-14","answerBy":"2015-10-29","answered":"2015-10-29","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to outline her Department's response to the issues raised in the Rail Services in East Antrim Adjournment Debate on 13 October 2015.","answerText":"Since taking office I have had the opportunity to review the debate in some detail. There were many and various issues raised during the debate and my responses are detailed under the respective headings below. This inevitably makes for a somewhat lengthy answer. By way of setting context it is important to note that demand for rail travel has nearly doubled in the last decade and now stands at close to 14 million journeys a year. There has also been significant growth on the Larne line although it has been below the average. This is an undoubted success story and one I am keen to continue. There are however some financial realities we must address including those impacting on Translink including NI Railways. Rail travel is heavily subsidised by my Department and this subsidy did reduce this year because of financial decisions made. The Rail subsidy remains at around £18million this year but was reduced from a baseline of close to £21million. Inevitably this means that to avoid excessive fare increases Translink must find operational efficiencies to ensure the rail network remains sustainable but it is important to point out that savings generated from train frequency adjustments will be much less than the reduction in revenue funding.\n\nThe Larne rail line has some infrastructure constraints including capacity on the Dargan viaduct and level crossings at Trooperslane and Jordanstown.\n\nTimetable changes and consultation exercise – including the comment that ‘Section 75 obligations were not met as required by the Northern Ireland Act 1998’\n\nTranslink held an extensive public consultation exercise in April 2015, following notification that service funding was to be reduced. Some 1,700 submissions were received in face-to-face interviews with rail customers, both in stations and on trains where low passenger numbers were prevalent. These surveys took place between Wednesday 15 April 2015 and Saturday 2 May 2015 inclusive, and did not coincide with public holidays. This exercise was extensive and gave Translink a better understanding of the needs of customers.\n\nFollowing this consultation Translink and the Department for Regional Development have worked hard to protect the geographic coverage of the network, however, to reduce costs there had to be some frequency reductions to a number of services and some services were retimed. Public information sessions were then convened in mid-August and passenger timetables were made available from 17 August 2015.\n\nThe revised timetable was introduced on Sunday 30 August 2015 having taken account of customer feedback.\n\nEquality Commission documentation and published corporate reports such as the NITHC Section 75 5-year Review carried out in early 2011 are available on the internet. Translink has confirmed that where there is a duty to screen for equality impacts this is carried out; but the relevant schedule advises that services, routes and frequencies have been screened out.\n\nAlso available on Translink’s website is an Annual Equality Progress Report, the most recent report was submitted mid-2014 to the Equality Commission. This contains reference to the measures undertaken by Translink operationally to ensure all areas of the network are as fair, accessible and equitable as possible to all shades of protected groups of potential and actual users.\n\nIt is Translink’s view that its Equality Impact Assessment must be seen in the context of its commitments covered by, inter alia,\n\nthe Transport Act 2011:\n\nthe Department for Regional Development’s own Equality Scheme (e.g. Rural Transport Policy);\n\nchanges to the network screened out previously; and\n\ncompliance with the Transport Act 1967.\n\nFinally, the approach taken to the recent service review has not changed the focus of maintaining the network and the geographical coverage.\n\nCost of travel by car against rail\n\nThese statistics are generally difficult to quantify, given the running costs of large -v- small vehicles, and the argument that people still require cars for leisure travel and as a result will incur insurance costs and wear/tear and depreciation whether they travel by train or not.\n\nHowever taking the average family car, ranging from 1600-2000cc., and costing the price of petrol and diesel at £1.10 per litre. On a journey from Whitehead to Belfast, a distance of 22 miles, at an average fuel consumption of 40 miles per gallon, with a departure time of 07:30, returning at 16:30 hours over a 5-day working week, the costs are as follows;\n\nWhitehead to Belfast to Whitehead (Monday – Friday)\n\nCar Costs\t\t\tRail Costs\nFuel\t£27.50\t\tTicket\t£32 weekly\n(average of monthly pass)\nParking\t£30.00\t\tParking\t£0.00\nInsurance\t£7.50\nWear/tear and depreciation\t£25.00\nTotal weekly cost\t£90.00\t\t\t£32\n\nEven if we exclude parking and depreciation the cost of rail compares favourably. In reality the savings are much greater - up to £60 per week, potentially.\n\nEarliest arrival time of train into Belfast on Larne line compared to Bangor line\n\nThe first two services from Larne in the old timetable were combined to form a 06:50 departure. The average loadings on the 05:48 and 06:25 hour trains between Larne and Whitehead were 8 and 14 passengers respectively. Regrettably given the funding constraints referred to above, this level of service was not sustainable.\n\nThe first train from the Larne line (from Whitehead) arrives into Belfast Central at 07:06.\n\nConnectivity from the Larne line to link with the 06:50 Enterprise departure from Belfast Central was typically very low with 2-3 journeys recorded per week.\n\nCapacity on the 7:30am train from Whitehead and need for 6-car set\n\nFollowing significant roster and set allocation changes an additional train set was made available to strengthen the 07:30 from Whitehead from Tuesday 29 September. The 07:30 service from Whitehead will remain a 6-car operation subject to availability.\n\nIt should be noted that there are also frequent departures between Larne and Belfast on Goldline service 256 at 06:15*, 06:30, 06:45, 07:00*, 07:15, 07:30, 07:45*, 08:00, etc. (Those marked * call at the railway station stop to pick up intending passengers.)\n\nLate Night & Early morning services on the line\n\nPreviously the last service departed Belfast Central at 23:25. This changed to a 22:55 departure. Following a number of requests I can inform the member this new departure time is currently under review. Translink will consider the possibility of moving this service by 10-15 minutes to later in the evening. This will be considered as part of the January timetable review.\n\nTrains stopping/starting at Larne Town rather than Harbour\n\nTranslink has advised that 14 of the 17 train departures from Larne commence at Larne Harbour (Monday through Friday), complemented by all Saturday and Sunday services. In the opposite direction the same frequency applies. Given the running times and passing posts on the single line sections of the Larne line it is not possible for the remaining three services in each direction (Monday through Friday) to operate from the Harbour.\n\n2 Hour Frequency on Saturdays (Whitehead to Larne)\n\nThe 30 August 2015 timetable changes were introduced to reduce costs to get closer to balancing costs and income. Regretfully the Saturday frequency between Larne and Whitehead was reduced to 2-hourly, as a result. These services were carrying exceptionally low passenger volumes, on average 14 customers each. Translink has worked hard to minimise the impact on its customers however it is tasked with running a sustainable business model.\n\nPotential Use of the Larne Railway Line for the Purposes of Freight\n\nTranslink has advised that it has undertaken no specific investigations in respect of freight operations on the Larne line. However, there are no capacity restrictions on the current rail network that would prevent NI Railways in carrying rail freight, should a demand arise.\n\nNI Railways will occasionally have specific enquiries for freight movement on the network and NI Railways respond by providing indicative costing in accordance with its network statement. Within Europe, freight on rail is not normally considered cost viable for distances of less than circa 200 km. However, freight viability is also dependent on annual tonnage, the type of product and the ease\\cost of getting the product onto the rail network and back off the rail network.\n\nThe Northern Ireland rail network is, and always has been, open to existing and new rail operators to seek to offer services including freight, and no application has ever been received from other operators interested in providing freight or passenger services.\n\nThe Departmental Railway Investment Prioritisation Strategy, which sets out the strategic direction for future railways investment over the next 20, does not envisage a demand for the development of rail freight facilities to any of Northern Ireland ports within its timeframe.\n\nDargan Viaduct dualling\n\nTransportNI and Translink are currently working together to develop a design which will allow the strengthening of the bridge foundations necessary to facilitate the dualling of the Dargan bridge. It is proposed that the strengthening works would be carried out as part of the construction of the York Street Interchange. The provision of these works is dependent on Translink confirming the business case for the dualling of this part of the rail network and securing funding for this element of the project.\n\nReopening of Whitehouse Halt Newtownabbey\n\nThere are no plans to re-open the former Whitehouse station in Whiteabbey. This station is located on a 70mph stretch of track. To re-open the station would add a minimum of 3 minutes to Larne line services and would also result in the need to completely ‘recast’ all timetables on all other routes to accommodate departures from/to Belfast. An additional stop on this particular section could also result in the current 30-minute peak Londonderry line services being unworkable due to additional time being taken for the Larne line trains to clear the sections. These services already operate on a tight schedule with little or no room for any additional time to be added.\n\nBallycarry Park & Ride\n\nNI Railways have no current plans to develop a Park and Ride facility at Ballycarry.\n\nTraffic Management in Transport NI - Northern Division is currently developing a scheme to improve pedestrian facilities to Ballycarry Halt railway station.\n\nThis scheme will take the form of approx 130m of footpath over the bridge connecting the existing footpaths on both sides of the bridge allowing continuous pedestrian access from both Ballystrudder and Ballycarry.\n\nThe scheme is expected to be completed by 22 December 2015.\n\nPark & Ride in East Antrim in general\n\nPark and Ride facilities are a fundamental part of Translink’s growth strategy. My Department has taken forward a Strategic Review of Park and Ride facilities throughout the railways network. As a result, a very successful programme of developing excellent Park and Ride facilities in the East Antrim area has been completed and further cost effective options to enhance this customer facility are being explored.\n\nIntegrated Ticketing\n\nILink is an integrated Smartcard from Translink which provides unlimited day, weekly and monthly bus and rail travel within specified zones across Northern Ireland. It is available for adults and children and is ideal if you travel by both bus and train to your destination on a regular basis. With link when you need more travel you simply top-up at one of Translink’s sales outlets. Further details are available at all Sales Offices and on the Translink website.\n\nLive Bus route information\n\nLive bus information is presently available on Translink Journey Planner, providing customers with a countdown of the next departure from a specific stop. This tracking facility is facilitated through an on-board SIM card which is also used to provide real time information at shelters, audio-visual announcements across the Metro fleet as well as priority at junctions for buses. This project is led by TransportNI.\n\nUlster bus do not presently have this facility, however, consideration is being given to utilizing other on-board tracking facilities to provide similar real time functionality.\n\nWi-Fi availability\n\nFree Wi-Fi has been operational for over 3 years now on all rail services network-wide and has been hugely successful with over 235,000 sessions per month. The system is at capacity at times and Translink is reviewing options for increasing capacity and coverage. However, any investment to improve Wi-Fi will be dependent on funding being available.\n\nCycling\n\nThe Bicycle Strategy for Northern Ireland recognizes the importance of developing both urban and rural greenways, making use of former canal towpaths and disused railways where possible. I see the development of greenways as an area where there is an opportunity for local authorities to take ownership.\n\nMy Department has established a Greenways Working Group to scope a Strategic Plan for the development of greenways across Northern Ireland but it does not envisage managing their delivery or construction.\n\nElectrification of the Northern Ireland network\n\nThe Railway Investment Prioritisation Strategy for Northern Ireland, published in May 2014, sets out a vision and strategic direction for future railways investment over the next 20 years and beyond. It identifies the priority themes for future investment and associated key projects as follows:\n\n•Priority 1 - Maintain and Improve Passenger Capacity on the Existing Network;\n\n•Priority 2 - Removing Bottlenecks and Stimulating Economic Development along the core TENT-T Network; and\n\n•Priority 3 - Enhancing the TEN-T Comprehensive Network including potential network extensions.\n\nIn relation to electrification of the Northern Ireland network the Strategy does not envisage electrification taking place within its timeframe though projects within Priority 1 of the Strategy (if taken forward and funded) will allow for the eventual electrification of the network in the longer term.","answerHtml":"<p>Since taking office I have had the opportunity to review the debate in some detail. There were many and various issues raised during the debate and my responses are detailed under the respective headings below. This inevitably makes for a somewhat lengthy answer. By way of setting context it is important to note that demand for rail travel has nearly doubled in the last decade and now stands at close to 14 million journeys a year. There has also been significant growth on the Larne line although it has been below the average. This is an undoubted success story and one I am keen to continue. There are however some financial realities we must address including those impacting on Translink including NI Railways. Rail travel is heavily subsidised by my Department and this subsidy did reduce this year because of financial decisions made. The Rail subsidy remains at around £18million this year but was reduced from a baseline of close to £21million. Inevitably this means that to avoid excessive fare increases Translink must find operational efficiencies to ensure the rail network remains sustainable but it is important to point out that savings generated from train frequency adjustments will be much less than the reduction in revenue funding.</p><p>The Larne rail line has some infrastructure constraints including capacity on the Dargan viaduct and level crossings at Trooperslane and Jordanstown.</p><p>Timetable changes and consultation exercise – including the comment that ‘Section 75 obligations were not met as required by the Northern Ireland Act 1998’</p><p>Translink held an extensive public consultation exercise in April 2015, following notification that service funding was to be reduced. Some 1,700 submissions were received in face-to-face interviews with rail customers, both in stations and on trains where low passenger numbers were prevalent. These surveys took place between Wednesday 15 April 2015 and Saturday 2 May 2015 inclusive, and did not coincide with public holidays. This exercise was extensive and gave Translink a better understanding of the needs of customers.</p><p>Following this consultation Translink and the Department for Regional Development have worked hard to protect the geographic coverage of the network, however, to reduce costs there had to be some frequency reductions to a number of services and some services were retimed. Public information sessions were then convened in mid-August and passenger timetables were made available from 17 August 2015.</p><p>The revised timetable was introduced on Sunday 30 August 2015 having taken account of customer feedback.</p><p>Equality Commission documentation and published corporate reports such as the NITHC Section 75 5-year Review carried out in early 2011 are available on the internet. Translink has confirmed that where there is a duty to screen for equality impacts this is carried out; but the relevant schedule advises that services, routes and frequencies have been screened out.</p><p>Also available on Translink’s website is an Annual Equality Progress Report, the most recent report was submitted mid-2014 to the Equality Commission. This contains reference to the measures undertaken by Translink operationally to ensure all areas of the network are as fair, accessible and equitable as possible to all shades of protected groups of potential and actual users.</p><p>It is Translink’s view that its Equality Impact Assessment must be seen in the context of its commitments covered by, inter alia,</p><p>the Transport Act 2011:</p><p>the Department for Regional Development’s own Equality Scheme (e.g. Rural Transport Policy);</p><p>changes to the network screened out previously; and</p><p>compliance with the Transport Act 1967.</p><p>Finally, the approach taken to the recent service review has not changed the focus of maintaining the network and the geographical coverage.</p><p>Cost of travel by car against rail</p><p>These statistics are generally difficult to quantify, given the running costs of large -v- small vehicles, and the argument that people still require cars for leisure travel and as a result will incur insurance costs and wear/tear and depreciation whether they travel by train or not.</p><p>However taking the average family car, ranging from 1600-2000cc., and costing the price of petrol and diesel at £1.10 per litre. On a journey from Whitehead to Belfast, a distance of 22 miles, at an average fuel consumption of 40 miles per gallon, with a departure time of 07:30, returning at 16:30 hours over a 5-day working week, the costs are as follows;</p><p>Whitehead to Belfast to Whitehead (Monday – Friday)</p><div class=\"table-wrap\"><table><tr><td>Car Costs</td><td></td><td></td><td>Rail Costs</td><td></td></tr><tr><td>Fuel</td><td>£27.50</td><td></td><td>Ticket</td><td>£32 weekly<br>(average of monthly pass)</td></tr><tr><td>Parking</td><td>£30.00</td><td></td><td>Parking</td><td>£0.00</td></tr><tr><td>Insurance</td><td>£7.50</td><td></td><td></td><td></td></tr><tr><td>Wear/tear and depreciation</td><td>£25.00</td><td></td><td></td><td></td></tr><tr><td>Total weekly cost</td><td>£90.00</td><td></td><td></td><td>£32</td></tr></table></div><p>Even if we exclude parking and depreciation the cost of rail compares favourably. In reality the savings are much greater - up to £60 per week, potentially.</p><p>Earliest arrival time of train into Belfast on Larne line compared to Bangor line</p><p>The first two services from Larne in the old timetable were combined to form a 06:50 departure. The average loadings on the 05:48 and 06:25 hour trains between Larne and Whitehead were 8 and 14 passengers respectively. Regrettably given the funding constraints referred to above, this level of service was not sustainable.</p><p>The first train from the Larne line (from Whitehead) arrives into Belfast Central at 07:06.</p><p>Connectivity from the Larne line to link with the 06:50 Enterprise departure from Belfast Central was typically very low with 2-3 journeys recorded per week.</p><p>Capacity on the 7:30am train from Whitehead and need for 6-car set</p><p>Following significant roster and set allocation changes an additional train set was made available to strengthen the 07:30 from Whitehead from Tuesday 29 September. The 07:30 service from Whitehead will remain a 6-car operation subject to availability.</p><p>It should be noted that there are also frequent departures between Larne and Belfast on Goldline service 256 at 06:15*, 06:30, 06:45, 07:00*, 07:15, 07:30, 07:45*, 08:00, etc. (Those marked * call at the railway station stop to pick up intending passengers.)</p><p>Late Night &amp; Early morning services on the line</p><p>Previously the last service departed Belfast Central at 23:25. This changed to a 22:55 departure. Following a number of requests I can inform the member this new departure time is currently under review. Translink will consider the possibility of moving this service by 10-15 minutes to later in the evening. This will be considered as part of the January timetable review.</p><p>Trains stopping/starting at Larne Town rather than Harbour</p><p>Translink has advised that 14 of the 17 train departures from Larne commence at Larne Harbour (Monday through Friday), complemented by all Saturday and Sunday services. In the opposite direction the same frequency applies. Given the running times and passing posts on the single line sections of the Larne line it is not possible for the remaining three services in each direction (Monday through Friday) to operate from the Harbour.</p><p>2 Hour Frequency on Saturdays (Whitehead to Larne)</p><p>The 30 August 2015 timetable changes were introduced to reduce costs to get closer to balancing costs and income. Regretfully the Saturday frequency between Larne and Whitehead was reduced to 2-hourly, as a result. These services were carrying exceptionally low passenger volumes, on average 14 customers each. Translink has worked hard to minimise the impact on its customers however it is tasked with running a sustainable business model.</p><p>Potential Use of the Larne Railway Line for the Purposes of Freight</p><p>Translink has advised that it has undertaken no specific investigations in respect of freight operations on the Larne line. However, there are no capacity restrictions on the current rail network that would prevent NI Railways in carrying rail freight, should a demand arise.</p><p>NI Railways will occasionally have specific enquiries for freight movement on the network and NI Railways respond by providing indicative costing in accordance with its network statement. Within Europe, freight on rail is not normally considered cost viable for distances of less than circa 200 km. However, freight viability is also dependent on annual tonnage, the type of product and the ease\\cost of getting the product onto the rail network and back off the rail network.</p><p>The Northern Ireland rail network is, and always has been, open to existing and new rail operators to seek to offer services including freight, and no application has ever been received from other operators interested in providing freight or passenger services.</p><p>The Departmental Railway Investment Prioritisation Strategy, which sets out the strategic direction for future railways investment over the next 20, does not envisage a demand for the development of rail freight facilities to any of Northern Ireland ports within its timeframe.</p><p>Dargan Viaduct dualling</p><p>TransportNI and Translink are currently working together to develop a design which will allow the strengthening of the bridge foundations necessary to facilitate the dualling of the Dargan bridge. It is proposed that the strengthening works would be carried out as part of the construction of the York Street Interchange. The provision of these works is dependent on Translink confirming the business case for the dualling of this part of the rail network and securing funding for this element of the project.</p><p>Reopening of Whitehouse Halt Newtownabbey</p><p>There are no plans to re-open the former Whitehouse station in Whiteabbey. This station is located on a 70mph stretch of track. To re-open the station would add a minimum of 3 minutes to Larne line services and would also result in the need to completely ‘recast’ all timetables on all other routes to accommodate departures from/to Belfast. An additional stop on this particular section could also result in the current 30-minute peak Londonderry line services being unworkable due to additional time being taken for the Larne line trains to clear the sections. These services already operate on a tight schedule with little or no room for any additional time to be added.</p><p>Ballycarry Park &amp; Ride</p><p>NI Railways have no current plans to develop a Park and Ride facility at Ballycarry.</p><p>Traffic Management in Transport NI - Northern Division is currently developing a scheme to improve pedestrian facilities to Ballycarry Halt railway station.</p><p>This scheme will take the form of approx 130m of footpath over the bridge connecting the existing footpaths on both sides of the bridge allowing continuous pedestrian access from both Ballystrudder and Ballycarry.</p><p>The scheme is expected to be completed by 22 December 2015.</p><p>Park &amp; Ride in East Antrim in general</p><p>Park and Ride facilities are a fundamental part of Translink’s growth strategy. My Department has taken forward a Strategic Review of Park and Ride facilities throughout the railways network. As a result, a very successful programme of developing excellent Park and Ride facilities in the East Antrim area has been completed and further cost effective options to enhance this customer facility are being explored.</p><p>Integrated Ticketing</p><p>ILink is an integrated Smartcard from Translink which provides unlimited day, weekly and monthly bus and rail travel within specified zones across Northern Ireland. It is available for adults and children and is ideal if you travel by both bus and train to your destination on a regular basis. With link when you need more travel you simply top-up at one of Translink’s sales outlets. Further details are available at all Sales Offices and on the Translink website.</p><p>Live Bus route information</p><p>Live bus information is presently available on Translink Journey Planner, providing customers with a countdown of the next departure from a specific stop. This tracking facility is facilitated through an on-board SIM card which is also used to provide real time information at shelters, audio-visual announcements across the Metro fleet as well as priority at junctions for buses. This project is led by TransportNI.</p><p>Ulster bus do not presently have this facility, however, consideration is being given to utilizing other on-board tracking facilities to provide similar real time functionality.</p><p>Wi-Fi availability</p><p>Free Wi-Fi has been operational for over 3 years now on all rail services network-wide and has been hugely successful with over 235,000 sessions per month. The system is at capacity at times and Translink is reviewing options for increasing capacity and coverage. However, any investment to improve Wi-Fi will be dependent on funding being available.</p><p>Cycling</p><p>The Bicycle Strategy for Northern Ireland recognizes the importance of developing both urban and rural greenways, making use of former canal towpaths and disused railways where possible. I see the development of greenways as an area where there is an opportunity for local authorities to take ownership.</p><p>My Department has established a Greenways Working Group to scope a Strategic Plan for the development of greenways across Northern Ireland but it does not envisage managing their delivery or construction.</p><p>Electrification of the Northern Ireland network</p><p>The Railway Investment Prioritisation Strategy for Northern Ireland, published in May 2014, sets out a vision and strategic direction for future railways investment over the next 20 years and beyond. It identifies the priority themes for future investment and associated key projects as follows:</p><p>•Priority 1 - Maintain and Improve Passenger Capacity on the Existing Network;</p><p>•Priority 2 - Removing Bottlenecks and Stimulating Economic Development along the core TENT-T Network; and</p><p>•Priority 3 - Enhancing the TEN-T Comprehensive Network including potential network extensions.</p><p>In relation to electrification of the Northern Ireland network the Strategy does not envisage electrification taking place within its timeframe though projects within Priority 1 of the Strategy (if taken forward and funded) will allow for the eventual electrification of the network in the longer term.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2049809%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=246325","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=246325"}},{"id":"245681","reference":"AQW 49567/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-10-07","answerBy":"2015-10-22","answered":"2015-10-22","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development to detail the decisions that have been presented to him by departmental officials and are awaiting ministerial sign-off since 10 September 2015.","answerText":"My officials regularly provide me with advice on a range of subjects and I subsequently make decisions where required.\n\nAny decisions, which require an announcement, will be made in the usual manner.","answerHtml":"<p>My officials regularly provide me with advice on a range of subjects and I subsequently make decisions where required.</p><p>Any decisions, which require an announcement, will be made in the usual manner.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2049567%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=245681","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=245681"}},{"id":"245680","reference":"AQW 49566/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-10-07","answerBy":"2015-10-22","answered":"2015-10-22","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development to detail the ministerial decisions he has taken since 10 September 2015.","answerText":"I refer the Member to information laid out in the table below:\n\nDate\tSubject\tDecision\n16 September\tState Pension changes: Communication/Advertising\nBriefing on the new social housing regulatory framework to the Social Development Committee\nSupporting People Review\nFinlock Guttering\tAgreed to the launch of the Communication campaign to highlight changes to State Pension.\nCleared the briefing to be provided to the Committee.\nApproved the release of the review report and recommendations to key stakeholders to seek their views.\nAgreed to support a bid for budget to allow NIHE to begin removal of this guttering in Ballysillan/Silverstream.\n23 September\tRegional Infrastructure Programme and Development Trusts NI\nImplications of Westminster Summer Budget Proposals\nSocial Security (DLA) Amendment Regulations\nMortgage Rescue Scheme (MRS)\nNIHE Board Appointments\tAgreed to continue funding for 6 months from April 2016.\nAgreed to release communications to stakeholders, including the Social Development Committee.\nAgreed these be made.\nAgreed for officials to continue examining the feasibility of introducing a MRS in Northern Ireland.\nIn line with the Code of Practice for Public Appointments, appointed four NI Housing Council members to the Board of the NIHE effective from 01/11/2015.\n30 September\tVoluntary Exit Scheme\nCredit Unions\nFinance\tAgreed to write to staff.\nAgreement for Chief Executive, SSA to meet with Irish League of Credit Unions and Ulster Federation of Credit Unions.\nNoted a draft departmental return to DFP on capital expenditure, which was subject to further consideration by senior managers. He agreed the return could be issued to DFP to meet the deadline.\n7 October\tCommunity Asset Transfer\nTenancy Fraud\nCapital Budget 2016/17\nSDC Information Request\nSSA Changes\nWritten AQs\tAgreed a response to Minister O’Dowd on the way forward for a Community Asset Transfer proposal for a former Primary School in Belfast.\nAgreed the release of information to the Committee.\nNoted the content of the Department’s return to DFP.\nNoted and agreed information to be provided to SDC.\nAgreement for officials to write to the Social Development Committee advising of some operational arrangements after internal communication with relevant staff.\nClearance of a range of outstanding Written AQs.","answerHtml":"<p>I refer the Member to information laid out in the table below:</p><div class=\"table-wrap\"><table><tr><td>Date</td><td>Subject</td><td>Decision</td></tr><tr><td>16 September</td><td>State Pension changes: Communication/Advertising<br>Briefing on the new social housing regulatory framework to the Social Development Committee<br>Supporting People Review<br>Finlock Guttering</td><td>Agreed to the launch of the Communication campaign to highlight changes to State Pension.<br>Cleared the briefing to be provided to the Committee.<br>Approved the release of the review report and recommendations to key stakeholders to seek their views.<br>Agreed to support a bid for budget to allow NIHE to begin removal of this guttering in Ballysillan/Silverstream.</td></tr><tr><td>23 September</td><td>Regional Infrastructure Programme and Development Trusts NI<br>Implications of Westminster Summer Budget Proposals<br>Social Security (DLA) Amendment Regulations<br>Mortgage Rescue Scheme (MRS)<br>NIHE Board Appointments</td><td>Agreed to continue funding for 6 months from April 2016.<br>Agreed to release communications to stakeholders, including the Social Development Committee.<br>Agreed these be made.<br>Agreed for officials to continue examining the feasibility of introducing a MRS in Northern Ireland.<br>In line with the Code of Practice for Public Appointments, appointed four NI Housing Council members to the Board of the NIHE effective from 01/11/2015.</td></tr><tr><td>30 September</td><td>Voluntary Exit Scheme<br>Credit Unions<br>Finance</td><td>Agreed to write to staff.<br>Agreement for Chief Executive, SSA to meet with Irish League of Credit Unions and Ulster Federation of Credit Unions.<br>Noted a draft departmental return to DFP on capital expenditure, which was subject to further consideration by senior managers. He agreed the return could be issued to DFP to meet the deadline.</td></tr><tr><td>7 October</td><td>Community Asset Transfer<br>Tenancy Fraud<br>Capital Budget 2016/17<br>SDC Information Request<br>SSA Changes<br>Written AQs</td><td>Agreed a response to Minister O’Dowd on the way forward for a Community Asset Transfer proposal for a former Primary School in Belfast.<br>Agreed the release of information to the Committee.<br>Noted the content of the Department’s return to DFP.<br>Noted and agreed information to be provided to SDC.<br>Agreement for officials to write to the Social Development Committee advising of some operational arrangements after internal communication with relevant staff.<br>Clearance of a range of outstanding Written AQs.</td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2049566%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=245680","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=245680"}},{"id":"244937","reference":"AQW 49282/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-09-30","answerBy":"2015-10-15","answered":"2015-11-04","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to list the policy decisions that have been awaiting ministerial sign-off since 10 September 2015.","answerText":"There are no significant policy decisions which are awaiting ministerial sign-off.","answerHtml":"<div class=\"table-wrap\"><table><tr><td></td></tr></table></div><p>There are no significant policy decisions which are awaiting ministerial sign-off.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2049282%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=244937","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=244937"}},{"id":"244933","reference":"AQW 49279/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-09-30","answerBy":"2015-10-15","answered":"2015-11-04","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development, should clause one of the Water and Sewerage Services Bill not be passed, on what date the current authorisation expires for grants to water and sewerage undertakers to be paid.","answerText":"I would refer the Member to his previous question, AQW 48973/11-16.","answerHtml":"<p>I would refer the Member to his previous question, AQW 48973/11-16.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2049279%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=244933","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=244933"}},{"id":"244632","reference":"AQW 49183/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-09-28","answerBy":"2015-10-13","answered":"2015-11-11","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment what policy decisions have been awaiting sign off since he first resigned on 10 September 2015.","answerText":"There are no policy decisions referred to me between 10 September and 21 October that are awaiting sign off.","answerHtml":"<p>There are no policy decisions referred to me between 10 September and 21 October that are awaiting sign off.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2049183%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=244632","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=244632"}},{"id":"244631","reference":"AQW 49182/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-09-28","answerBy":"2015-10-13","answered":"2015-11-04","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment what impact the current instability is having on his Department's ability to attract foreign investment.","answerText":"Invest NI has experienced considerable success in promoting Northern Ireland as a location that can meet the needs of international investors. The business proposition, based on a skilled workforce, competitive operating costs and advanced infrastructure in a strategic location, has not changed. There is no evidence to suggest that any potential investors have changed their plans as a result of the current political situation.","answerHtml":"<p>Invest NI has experienced considerable success in promoting Northern Ireland as a location that can meet the needs of international investors. The business proposition, based on a skilled workforce, competitive operating costs and advanced infrastructure in a strategic location, has not changed. There is no evidence to suggest that any potential investors have changed their plans as a result of the current political situation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2049182%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=244631","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=244631"}},{"id":"244583","reference":"AQW 49150/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-09-25","answerBy":"2015-10-12","answered":"2015-10-05","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education to detail the minor works schemes scheduled for the North Eastern Region, broken down by priority.","answerText":"The following table lists the minor works schemes in the North Eastern Region and details the type of improvements and priority in each case.\n\nSchool\tMinor Work Scheme\t*Priority\nSchemes carried over from 2014/15 year\nAbbey Community College\tSite clearance & car park\t2.\nAshgrove Primary School (PS)\tRefurbishment of toilets\t2.\nBallyclare Vehicle Maintenance Depot\tPhase 2 - Upgrade of car park - Health & Safety works (tarmac/car park/barrier)\t1.\nBelfast High School (HS), Newtownabbey\tReplace windows and dangerous cladding\t1.\nBelfast HS, N’abbey\tRepair ceiling of indoor changing and toilet area\t1.\nBelfast HS , N’abbey\tSchool heating improvements\t2.\nBroughshane PS\tProvision of hygiene room, refurbishment of toilets, security fencing, additional car parking and replacement of mobiles\t2.\nBunscoil An Chaistil, Ballycastle\tProvision of modular accommodation for multi –purpose room and 2 no classrooms\t2.\nCarnaghts PS\tProvision of multi-purpose hall, staffroom & toilet refurbishment\t2.\nCarrickfergus GS\tProvision of lift, internal alterations; ramps to outdoor seating area. (DDA- pupil specific)\t1.\nCastle Tower (Loughan Campus)\tConversion of Music room to teaching room\t1.\nColeraine College\tToilet refurbishment works\t2.\n#Coleraine Grammar School (GS)\tReplacement windows (formerly Coleraine Academical Institution)\t2.\nFairview PS\tProvision of turning circle and other improvements to access\t2.\nGlengormley HS\tProvision of CCTV , car parking and gates to address security issues (managed access)\t2.\nHill Croft Special School (SS)\tPhase 1 a - Infant classroom - traditional building (double modular building to address increased intake to P1)\t2.\nLinn PS\tSenior toilets to address statutory requirements for DDA access\t1.\nLinn PS\tPhase 2 refurbishment of admin area\t2.\nLoreto College, Coleraine\tAdaptations for visually impaired child\t1.\nMount St Michael’s PS\tAdditional accommodation\t1.\nRiverside SS\tLighting and sound in meeting room\t1.\nRoddensvale SS\tReplace sub-standard mobile accommodation /provision of additional classroom to ensure integrity & suitability of the estate\t1.\nRound Tower Integrated Primary School (IPS)\tPhase 2 - Refurbishment of toilets/fire security\t2.\nSandelford SS\tFencing to old school site\t2.\nSt Benedict’s College, Randalstown\tStructural defects to windows\t1.\nSt Bernard’s PS, Newtownabbey\tSpecial needs adaptations\t1.\nSt Brigid’s PS, Ballymoney\tWheelchair lift for disabled pupil\t1.\nSt James Primary PS, Newtownabbey\tSEN adaptations & refurbishment of toilets including disabled toilet\t1.\nSt Killian’s College, (formerly Garron Tower)\tReplacement of windows in castle buildings\t2.\nSt Louis GS, Ballymena\tReplacement of 4 mobiles\t2.\nSt Malachy’s PS, Coleraine\tVisibility door panels\t1.\nSt Mary’s PS, Draperstown\tRefurbishment and extension of toilet facilities\t2.\nSt Mary’s College, Portglenone\tSpecialist classroom for Careers Education – remove mobile and replace with double modular\t1.\nSt Mary’s PS, Cushendall\tRefurbishment of children’s’ toilets throughout the school\t1.\nSt Mary’s on the Hill PS, Newtownabbey\tProvision of extension for Special Educational Needs (SEN) accommodation\t1.\nSt Trea’s PS, Ballyronan\tProvision of double modular building and internal adaptations\t2.\nThornfield SS\tExternal works to include fencing & resurfacing to all weather pitch.\t2.\nNew schemes 2015/16 year\nCreavery PS\tEmergency works - relocation of mobile from Kilronan\t1.\nColeraine College\tBoiler replacement\t1.\nColeraine College\tToilet refurbishment works\t2.\n#Coleraine GS (formerly Coleraine HS - split site)\tConversion of weights room to girls’ changing room to allow for new Co-Ed Grammar School\t1.\n#Coleraine GS (formerly Coleraine HS - split site)\tAlterations to changing rooms to allow for new Co-Ed Grammar School\t1.\nCross and Passion College, Ballycastle\tAsbestos works\t1.\nCross and Passion College, Ballycastle\tInstallation of circular saw\t1.\nDalriada GS\tAsbestos works\t1.\nGaelscoil an Tseanchai\tProvision of modular building\t2.\nHill Croft SS\tPhase 1 - provision of low stimulation room ( to facilitate specific pupil needs)\t1.\nMillburn PS\tBoiler replacement\t1.\nNew Row PS\tReplacement mobile – latent defects\t1.\nOur Lady of Lourdes HS\tInstallation of circular saw\t1.\nRosstulla SS\tProvision of security fencing to site boundary & upgrade to door security - pupil specific scheme\t1.\nSt Joseph’s PS, Antrim\tAsbestos works\t1.\nSt Joseph’s Nursery School\tAsbestos survey\t1.\nSt Joseph’s HS\tInstallation of circular saw\t1.\nSt Patrick’s College, Ballymena\tInstallation of circular saw\t1.\nSt Patrick’s College, Maghera\tInstallation of circular saw\t1.\nSt Paul’s HS\tInstallation of circular saw\t1.\nSt Pius X HS\tInstallation of circular saw\t1.\n\n*Priority\n\n1. Inescapable statutory requirements /obligations under Health & Safety / Disability Discrimination Act\n\n2. Essential Minor Works\n\n# Coleraine Grammar School (GS) was established as a co-educational school from September 2015 and is currently operating over a split site following the amalgamation of Coleraine Academical Institution with Coleraine (Girls’) High School.","answerHtml":"<p>The following table lists the minor works schemes in the North Eastern Region and details the type of improvements and priority in each case.</p><div class=\"table-wrap\"><table><tr><td>School</td><td>Minor Work Scheme</td><td>*Priority</td></tr><tr><td colspan=\"3\">Schemes carried over from 2014/15 year</td></tr><tr><td>Abbey Community College</td><td>Site clearance &amp; car park</td><td>2.</td></tr><tr><td>Ashgrove Primary School (PS)</td><td>Refurbishment of toilets</td><td>2.</td></tr><tr><td>Ballyclare Vehicle Maintenance Depot</td><td>Phase 2 - Upgrade of car park - Health &amp; Safety works (tarmac/car park/barrier)</td><td>1.</td></tr><tr><td>Belfast High School (HS), Newtownabbey</td><td>Replace windows and dangerous cladding</td><td>1.</td></tr><tr><td>Belfast HS, N’abbey</td><td>Repair ceiling of indoor changing and toilet area</td><td>1.</td></tr><tr><td>Belfast HS , N’abbey</td><td>School heating improvements</td><td>2.</td></tr><tr><td>Broughshane PS</td><td>Provision of hygiene room, refurbishment of toilets, security fencing, additional car parking and replacement of mobiles</td><td>2.</td></tr><tr><td>Bunscoil An Chaistil, Ballycastle</td><td>Provision of modular accommodation for multi –purpose room and 2 no classrooms</td><td>2.</td></tr><tr><td>Carnaghts PS</td><td>Provision of multi-purpose hall, staffroom &amp; toilet refurbishment</td><td>2.</td></tr><tr><td>Carrickfergus GS</td><td>Provision of lift, internal alterations; ramps to outdoor seating area. (DDA- pupil specific)</td><td>1.</td></tr><tr><td>Castle Tower (Loughan Campus)</td><td>Conversion of Music room to teaching room</td><td>1.</td></tr><tr><td>Coleraine College</td><td>Toilet refurbishment works</td><td>2.</td></tr><tr><td>#Coleraine Grammar School (GS)</td><td>Replacement windows (formerly Coleraine Academical Institution)</td><td>2.</td></tr><tr><td>Fairview PS</td><td>Provision of turning circle and other improvements to access</td><td>2.</td></tr><tr><td>Glengormley HS</td><td>Provision of CCTV , car parking and gates to address security issues (managed access)</td><td>2.</td></tr><tr><td>Hill Croft Special School (SS)</td><td>Phase 1 a - Infant classroom - traditional building (double modular building to address increased intake to P1)</td><td>2.</td></tr><tr><td>Linn PS</td><td>Senior toilets to address statutory requirements for DDA access</td><td>1.</td></tr><tr><td>Linn PS</td><td>Phase 2 refurbishment of admin area</td><td>2.</td></tr><tr><td>Loreto College, Coleraine</td><td>Adaptations for visually impaired child</td><td>1.</td></tr><tr><td>Mount St Michael’s PS</td><td>Additional accommodation</td><td>1.</td></tr><tr><td>Riverside SS</td><td>Lighting and sound in meeting room</td><td>1.</td></tr><tr><td>Roddensvale SS</td><td>Replace sub-standard mobile accommodation /provision of additional classroom to ensure integrity &amp; suitability of the estate</td><td>1.</td></tr><tr><td>Round Tower Integrated Primary School (IPS)</td><td>Phase 2 - Refurbishment of toilets/fire security</td><td>2.</td></tr><tr><td>Sandelford SS</td><td>Fencing to old school site</td><td>2.</td></tr><tr><td>St Benedict’s College, Randalstown</td><td>Structural defects to windows</td><td>1.</td></tr><tr><td>St Bernard’s PS, Newtownabbey</td><td>Special needs adaptations</td><td>1.</td></tr><tr><td>St Brigid’s PS, Ballymoney</td><td>Wheelchair lift for disabled pupil</td><td>1.</td></tr><tr><td>St James Primary PS, Newtownabbey</td><td>SEN adaptations &amp; refurbishment of toilets including disabled toilet</td><td>1.</td></tr><tr><td>St Killian’s College, (formerly Garron Tower)</td><td>Replacement of windows in castle buildings</td><td>2.</td></tr><tr><td>St Louis GS, Ballymena</td><td>Replacement of 4 mobiles</td><td>2.</td></tr><tr><td>St Malachy’s PS, Coleraine</td><td>Visibility door panels</td><td>1.</td></tr><tr><td>St Mary’s PS, Draperstown</td><td>Refurbishment and extension of toilet facilities</td><td>2.</td></tr><tr><td>St Mary’s College, Portglenone</td><td>Specialist classroom for Careers Education – remove mobile and replace with double modular</td><td>1.</td></tr><tr><td>St Mary’s PS, Cushendall</td><td>Refurbishment of children’s’ toilets throughout the school</td><td>1.</td></tr><tr><td>St Mary’s on the Hill PS, Newtownabbey</td><td>Provision of extension for Special Educational Needs (SEN) accommodation</td><td>1.</td></tr><tr><td>St Trea’s PS, Ballyronan</td><td>Provision of double modular building and internal adaptations</td><td>2.</td></tr><tr><td>Thornfield SS</td><td>External works to include fencing &amp; resurfacing to all weather pitch.</td><td>2.</td></tr><tr><td colspan=\"3\">New schemes 2015/16 year</td></tr><tr><td>Creavery PS</td><td>Emergency works - relocation of mobile from Kilronan</td><td>1.</td></tr><tr><td>Coleraine College</td><td>Boiler replacement</td><td>1.</td></tr><tr><td>Coleraine College</td><td>Toilet refurbishment works</td><td>2.</td></tr><tr><td>#Coleraine GS (formerly Coleraine HS - split site)</td><td>Conversion of weights room to girls’ changing room to allow for new Co-Ed Grammar School</td><td>1.</td></tr><tr><td>#Coleraine GS (formerly Coleraine HS - split site)</td><td>Alterations to changing rooms to allow for new Co-Ed Grammar School</td><td>1.</td></tr><tr><td>Cross and Passion College, Ballycastle</td><td>Asbestos works</td><td>1.</td></tr><tr><td>Cross and Passion College, Ballycastle</td><td>Installation of circular saw</td><td>1.</td></tr><tr><td>Dalriada GS</td><td>Asbestos works</td><td>1.</td></tr><tr><td>Gaelscoil an Tseanchai</td><td>Provision of modular building</td><td>2.</td></tr><tr><td>Hill Croft SS</td><td>Phase 1 - provision of low stimulation room ( to facilitate specific pupil needs)</td><td>1.</td></tr><tr><td>Millburn PS</td><td>Boiler replacement</td><td>1.</td></tr><tr><td>New Row PS</td><td>Replacement mobile – latent defects</td><td>1.</td></tr><tr><td>Our Lady of Lourdes HS</td><td>Installation of circular saw</td><td>1.</td></tr><tr><td>Rosstulla SS</td><td>Provision of security fencing to site boundary &amp; upgrade to door security - pupil specific scheme</td><td>1.</td></tr><tr><td>St Joseph’s PS, Antrim</td><td>Asbestos works</td><td>1.</td></tr><tr><td>St Joseph’s Nursery School</td><td>Asbestos survey</td><td>1.</td></tr><tr><td>St Joseph’s HS</td><td>Installation of circular saw</td><td>1.</td></tr><tr><td>St Patrick’s College, Ballymena</td><td>Installation of circular saw</td><td>1.</td></tr><tr><td>St Patrick’s College, Maghera</td><td>Installation of circular saw</td><td>1.</td></tr><tr><td>St Paul’s HS</td><td>Installation of circular saw</td><td>1.</td></tr><tr><td>St Pius X HS</td><td>Installation of circular saw</td><td>1.</td></tr></table></div><p>*Priority</p><p>1. Inescapable statutory requirements /obligations under Health &amp; Safety / Disability Discrimination Act</p><p>2. Essential Minor Works</p><p># Coleraine Grammar School (GS) was established as a co-educational school from September 2015 and is currently operating over a split site following the amalgamation of Coleraine Academical Institution with Coleraine (Girls’) High School.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2049150%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=244583","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=244583"}},{"id":"244394","reference":"AQO 8800/11-16","type":"Oral","typeCode":"AQO","mandate":"11-16","tabled":"2015-09-24","answerBy":"2015-10-06","answered":"2015-10-06","answeredOrally":true,"priority":false,"department":"Department of Culture, Arts and Leisure","departmentId":"77","minister":"Minister of Culture, Arts and Leisure","question":"To ask the Minister of Culture, Arts and Leisure for an update on the appointment of new members to the board of Sport NI.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Ms Ní Chuilín","text":"I thank the Member for his question. As the Member is aware, nine members of the board of Sport NI resigned in July. I have commissioned an open competition to appoint up to five new members to the board. It was advertised in the local press on 10 and 11 September with a closing date of 5 October. The competition is being taken forward in accordance with the Commissioner for Public Appointments' 'Code of Practice for Ministerial Public Appointments'. I expect the new appointments to be made in December. I have acted to ensure that the board continues to operate effectively in the meantime. I can confirm that, following a circular that I sent seeking volunteers throughout the Civil Service, three civil servants have been co-opted to provide advice and support to the remaining board members. The volunteers will also provide additional support by sitting on a number of committees, including the audit and risk management committee. This is an interim measure, and the co-opted senior civil servants are not board members and do not have full voting rights."},{"speaker":"Mr Dickson","text":"Thank you, Minister, for that answer. Minister, to lose part of a board might be described as unfortunate; to lose it again would be a disaster. What steps are you taking to ensure that the new board that you appoint does not resign again?"},{"speaker":"Ms Ní Chuilín","text":"I am still at a loss as to why the nine members resigned. I offered to meet them to ascertain their reasons: one of them accepted that offer. I have spoken to others who have spoken to others who have spoken to others, but, rather than relying on fifth- and sixth-hand information, I think the point is that, when I was presented with the problem and challenge, I acted immediately. The co-option of members of the Senior Civil Service onto the board is an interim measure. In fairness to the five remaining members, they need support from us all. I thank the members who came forward. These temporary measures will be in place only until the remaining appointments are made. I hope that we will then go through exercises, information, discussions and meetings to ensure that people not only feel supported but understand their role. I am really encouraged by the response and the interest that there was. People still feel very loyal to Sport NI and, indeed, sport."},{"speaker":"Mr Allister","text":"Could the Minister update us on the position of chief executive of Sport NI? There is presently an acting chief executive. Is that situation to continue, or is there a recruitment process? Are there outstanding matters to be attended to in respect of the former chief executive?"},{"speaker":"Ms Ní Chuilín","text":"The Member will be aware that it is inappropriate to comment on the chief executive because the grievance process is still ongoing. The interim chief executive will be there until the grievance procedure has been completed. I hope that we can move forward once that has been completed. However, I have acted very decisively to ensure that, in the interim, there is leadership given at Sport NI at an executive level."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%208800%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=244394","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2015-10-06&docID=244868#AQO%208800/11-16","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=244394"}},{"id":"244063","reference":"AQW 48994/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-09-21","answerBy":"2015-10-06","answered":"2015-09-29","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education why according to his Department's Shared Education policy a single school that is jointly managed is treated as a shared school while a single integrated school is not treated as a shared school and is therefore placed on a spectrum of shared school options.","answerText":"Shared Education aims to improve educational outcomes (including reconciliation outcomes) resulting from schools working collaboratively on a cross-community basis.\n\nSection 4 of the ‘Sharing Works’ policy sets out a description for Shared Education which includes:\n\n“ .. involves schools and other education providers of differing ownership, sectoral identity and ethos, management type or governance arrangement;”\n\nAs per paragraph 4.17 of ‘Circular 2015/5 - Jointly Managed Schools’ a ‘voluntary maintained’ management type is likely to be the most practicable management type for a jointly managed school.\n\nIn progressing Shared Education, a jointly managed school, as is the case for an Integrated school, would be required to collaborate with a school of a different management type as set out in the policy description.\n\nIt is my intention to bring forward a Shared Education Bill which will provide a statutory definition of Shared Education and avoid any possible confusion.","answerHtml":"<p>Shared Education aims to improve educational outcomes (including reconciliation outcomes) resulting from schools working collaboratively on a cross-community basis.</p><p>Section 4 of the ‘Sharing Works’ policy sets out a description for Shared Education which includes:</p><p>“ .. involves schools and other education providers of differing ownership, sectoral identity and ethos, management type or governance arrangement;”</p><p>As per paragraph 4.17 of ‘Circular 2015/5 - Jointly Managed Schools’ a ‘voluntary maintained’ management type is likely to be the most practicable management type for a jointly managed school.</p><p>In progressing Shared Education, a jointly managed school, as is the case for an Integrated school, would be required to collaborate with a school of a different management type as set out in the policy description.</p><p>It is my intention to bring forward a Shared Education Bill which will provide a statutory definition of Shared Education and avoid any possible confusion.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2048994%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=244063","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=244063"}},{"id":"244022","reference":"AQW 48973/11-16","type":"Written","typeCode":"AQW","mandate":"11-16","tabled":"2015-09-21","answerBy":"2015-10-06","answered":"2015-11-04","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development when the current authorisation for grants to be paid to water and sewerage undertakers expires should clause one of the Water and Sewerage Services Bill (NIA 51/11-16) not pass.","answerText":"My Department pays a subsidy to Northern Ireland Water in lieu of domestic charging for water and sewerage services under Article 213 of the Water and Sewerage Services (Northern Ireland) Order 2006, as extended by the Water and Sewerage Services (Amendment) Act (Northern Ireland) 2010 and again, by the Water and Sewerages Services (Amendment) Act (Northern Ireland) 2013. Should the Water and Sewerage Services Bill not pass, my Department’s legislative authority to pay this subsidy will expire on 31 March 2016.","answerHtml":"<p>My Department pays a subsidy to Northern Ireland Water in lieu of domestic charging for water and sewerage services under Article 213 of the Water and Sewerage Services (Northern Ireland) Order 2006, as extended by the Water and Sewerage Services (Amendment) Act (Northern Ireland) 2010 and again, by the Water and Sewerages Services (Amendment) Act (Northern Ireland) 2013. Should the Water and Sewerage Services Bill not pass, my Department’s legislative authority to pay this subsidy will expire on 31 March 2016.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2048973%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=244022","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=244022"}},{"id":"243869","reference":"AQO 8746/11-16","type":"Oral","typeCode":"AQO","mandate":"11-16","tabled":"2015-09-17","answerBy":"2015-09-29","answered":null,"answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development whether Translink will construct a public use railway halt at Ballymartin Park and Ride so that those using the facility can make full use of the adjacent railway line.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%208746%2F11-16","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=243869","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=243869"}},{"id":"240860","reference":"AQW 48071/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-07-01","answerBy":"2015-07-20","answered":"2015-07-21","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to outline (i) the estimated cost savings her Department could make through sourcing temporary workers for NICS positions through her Department’s dedicated on-line recruitment portal, rather than maintaining Contract P3436 with private recruitment agencies at an estimated annual cost of £20m; and (ii) the reason why this method is not currently used to fill short-term fixed contracts for NICS posts, given the current financial challenges faced by the Executive.","answerText":"As recently advised in the response to AQW 46567/11-15 the total cost paid to temporary agencies to supply staff across the NICS for the financial year 2014/15 was £9,228,998. It is not possible to quantify what, if any, estimated savings could be realised from recruiting directly for temporary workers since a number of variables will influence the costs. These include the number of posts to be filled from each competition etc, the number of competitions, the fact that HR Connect charges are only agreed for some grades but would have to be negotiated for additional grades/posts. For illustrative purposes, the current Agency workers contracts cover over 100 different job roles, this would mean the NICS potentially running over 100 competitions every year in order to be in a supply position. The costs paid to HR Connect for running these competitions depends on the number of posts that would be filled from each competition. For the grades already covered in the contract this could range from approximately £2,000 to £23,000 per competition. This figure only covers the direct HR Connect charges, it doesn’t cover other costs such as staff time sitting on recruitment interview panels etc.\n\nContract P3436 with Kennedy Recruitment and Premiere Employment Group Ltd to provide a range of staff across administrative, professional and technical job categories and contract P9115 with Apple Recruitment Services to provide accountants and auditors are only used to fill short-term vacancies required for urgent business needs that cannot reasonably be met in any other way.","answerHtml":"<p>As recently advised in the response to AQW 46567/11-15 the total cost paid to temporary agencies to supply staff across the NICS for the financial year 2014/15 was £9,228,998. It is not possible to quantify what, if any, estimated savings could be realised from recruiting directly for temporary workers since a number of variables will influence the costs. These include the number of posts to be filled from each competition etc, the number of competitions, the fact that HR Connect charges are only agreed for some grades but would have to be negotiated for additional grades/posts. For illustrative purposes, the current Agency workers contracts cover over 100 different job roles, this would mean the NICS potentially running over 100 competitions every year in order to be in a supply position. The costs paid to HR Connect for running these competitions depends on the number of posts that would be filled from each competition. For the grades already covered in the contract this could range from approximately £2,000 to £23,000 per competition. This figure only covers the direct HR Connect charges, it doesn’t cover other costs such as staff time sitting on recruitment interview panels etc.</p><p>Contract P3436 with Kennedy Recruitment and Premiere Employment Group Ltd to provide a range of staff across administrative, professional and technical job categories and contract P9115 with Apple Recruitment Services to provide accountants and auditors are only used to fill short-term vacancies required for urgent business needs that cannot reasonably be met in any other way.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2048071%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=240860","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=240860"}},{"id":"240858","reference":"AQW 48070/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-07-01","answerBy":"2015-07-20","answered":"2015-07-08","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to confirm that all temporary agency staff hired for NI Civil Servant assignments (i) are fully security cleared before taking up their post; and (ii) can expect their personal details to be subject to the same standards of data protection and confidentiality as permanent NI Civil Service staff.","answerText":"I can confirm that all temporary agency staff hired for NI Civil Service assignments are subject to at least baseline personal security clearance prior to taking up the post. In some cases, subject to the nature of the post, further security checks will be required. No individual may work on a NICS Contract without the appropriate level of security clearance; to do so may constitute a breach of the contract.\n\nI can also confirm that all temporary agency staff can expect their personal details to be subject to the same standards of data protection and confidentiality as NI Civil Service staff.","answerHtml":"<p>I can confirm that all temporary agency staff hired for NI Civil Service assignments are subject to at least baseline personal security clearance prior to taking up the post. In some cases, subject to the nature of the post, further security checks will be required. No individual may work on a NICS Contract without the appropriate level of security clearance; to do so may constitute a breach of the contract.</p><p>I can also confirm that all temporary agency staff can expect their personal details to be subject to the same standards of data protection and confidentiality as NI Civil Service staff.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2048070%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=240858","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=240858"}},{"id":"240855","reference":"AQW 48069/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-07-01","answerBy":"2015-07-20","answered":"2015-07-22","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to estimate, in the event of an employment tribunal establishing that the Swedish Derogation contracts for temporary agency workers in NICS between 2011 and 2015, imposed by a recruitment agency under contract to her Department, were not lawfully administered in accordance with the Agency Workers Regulations (Northern Ireland) 2011, and that equal pay rights had been wrongfully withheld during this period, the potential (i) legal and (ii) financial liabilities her Department may face as the hirer of these workers.","answerText":"The contract of employment for temporary agency workers in the NICS is with their respective agency, not the Department; therefore, my Department would not face any legal or financial liabilities as the hirer of the agency workers in the event of an employment tribunal establishing that the Swedish derogation contracts were not lawfully administered.","answerHtml":"<p>The contract of employment for temporary agency workers in the NICS is with their respective agency, not the Department; therefore, my Department would not face any legal or financial liabilities as the hirer of the agency workers in the event of an employment tribunal establishing that the Swedish derogation contracts were not lawfully administered.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2048069%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=240855","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=240855"}},{"id":"240853","reference":"AQW 48068/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-07-01","answerBy":"2015-07-20","answered":"2015-07-21","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to detail, between 2011 and 2015, the number of temporary agency workers on assignment to her Department who have (i) received out-of-court settlements from their recruitment agency to recover unlawfully withheld wages due to misapplied and ineffective Swedish Derogation contracts wrongfully denying them equal pay rights under Regulation 5 of the Agency Worker Regulations (Northern Ireland) 2011; (ii) been required to sign non-disclosure statements by the agency as part of their settlement for unlawfully withheld wages, preventing them from speaking openly about their experiences; and (iii) been subsequently barred by the agency from taking up publicly advertised NICS temporary vacancy posts through the same recruitment agency following these settlements, in breach of Regulation 17 of the Agency Workers Regulations (Northern Ireland) 2011.","answerText":"The information requested is not held by my Department.","answerHtml":"<p>The information requested is not held by my Department.</p><div class=\"table-wrap\"><table><tr><td></td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2048068%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=240853","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=240853"}},{"id":"240848","reference":"AQW 48067/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-07-01","answerBy":"2015-07-20","answered":"2015-07-08","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to detail (i) the criteria used to review Contract P3436 (Supply of temporary/short-term workers to NI Civil Service 2011) when her Department twice exercised its annual option to extend the initial two year contract in 2013 and 2014: (ii) the managerial level at which this review was carried out and the decision to extend the contract made.","answerText":"The Department of Finance and Personnel’s Central Procurement Directorate (CPD) establishes contracts on behalf of NICS Departments and their sponsored bodies. The process for considering extensions to Contract P3436 was as follows:\n\nConsult with NICS Departments and their sponsored bodies to establish if they still require the services and to confirm that the Contractor’s performance is satisfactory.\n\nConfirm that the contract users have sufficient funds available to pay for the service and that a business case has been documented and approved for the extension period.\n\nIssue a letter to Contractors offering an extension and asking the Contractors to confirm if they are willing to accept this offer.\n\nContracts extended and finance systems updated.\n\nThe contract performance was reviewed by a CPD Procurement Manager (Deputy Principal equivalent). The business case and contract extension was approved by the CPD Divisional Director (Grade 5 equivalent).","answerHtml":"<p>The Department of Finance and Personnel’s Central Procurement Directorate (CPD) establishes contracts on behalf of NICS Departments and their sponsored bodies. The process for considering extensions to Contract P3436 was as follows:</p><p>Consult with NICS Departments and their sponsored bodies to establish if they still require the services and to confirm that the Contractor’s performance is satisfactory.</p><p>Confirm that the contract users have sufficient funds available to pay for the service and that a business case has been documented and approved for the extension period.</p><p>Issue a letter to Contractors offering an extension and asking the Contractors to confirm if they are willing to accept this offer.</p><p>Contracts extended and finance systems updated.</p><p>The contract performance was reviewed by a CPD Procurement Manager (Deputy Principal equivalent). The business case and contract extension was approved by the CPD Divisional Director (Grade 5 equivalent).</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2048067%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=240848","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=240848"}},{"id":"240666","reference":"AQW 47995/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-30","answerBy":"2015-07-06","answered":"2015-08-25","answeredOrally":false,"priority":true,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety whether a professional duty of candour exists for Health Service staff, as has been introduced by the Department of Health in England; and if it not, whether his Department intends to introduce such a duty.","answerText":"Individual doctors and nurses already operate under a duty of candour as part of the conditions of their professional registration. This will soon be extended to other registered health professionals.\n\nWork has begun on the introduction of a statutory duty of candour for Northern Ireland and I expect a consultation to issue later in the year. Once the policy is agreed, the relevant legislation will be put in place to set the duty on a statutory footing.\n\nThe duty in Northern Ireland will, like other UK jurisdictions, apply at organisational level.","answerHtml":"<p>Individual doctors and nurses already operate under a duty of candour as part of the conditions of their professional registration. This will soon be extended to other registered health professionals.</p><p>Work has begun on the introduction of a statutory duty of candour for Northern Ireland and I expect a consultation to issue later in the year. Once the policy is agreed, the relevant legislation will be put in place to set the duty on a statutory footing.</p><p>The duty in Northern Ireland will, like other UK jurisdictions, apply at organisational level.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2047995%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=240666","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=240666"}},{"id":"240480","reference":"AQW 47915/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-29","answerBy":"2015-07-16","answered":"2015-08-07","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to detail the number of temporary agency workers on Swedish Derogation contracts currently on assignment to her Department who (i) qualify for receipt of in-work tax credits; and (ii) would not qualify for any such tax credits if they were to    receive equal pay with permanent colleagues after 12 weeks, in line with Regulation 5 of the Agency Workers Regulations (Northern Ireland) 2011.","answerText":"The Department does not hold this information.","answerHtml":"<p>The Department does not hold this information.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2047915%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=240480","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=240480"}},{"id":"240177","reference":"AQW 47779/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-25","answerBy":"2015-07-10","answered":"2015-07-02","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development to detail the number of new-build shared housing schemes under the Together: Building a United Community strategy, which are in addition to schemes that were already proposed under the Northern Ireland Housing Executive’s Shared Future Housing Programme.","answerText":"The Department for Social Development’s Housing Group has lead responsibility for delivering the Together: Building a United Community strategy commitment\n\nTo create 10 new shared neighbourhoods.\n\nTo date, one site, Ravenhill Road in Belfast, has completed. The development has a total of 67 housing units, and Apex Housing Association is currently finalising the allocation of the units.\n\nA further 5 schemes have commenced; Ravenhill Avenue, Belfast; Felden Mill, Newtownabbey; Crossgar Road, Saintfield; Killard School, Newtownards; and Burn Road, Cookstown. These schemes are all in addition to the 11 schemes delivered to date under the Housing Executive’s Shared Future Programme.\n\nDSD Housing Group is currently liaising with the Housing Executive to identify further schemes for deliver the commitment for 10 new shared neighbourhoods.","answerHtml":"<p>The Department for Social Development’s Housing Group has lead responsibility for delivering the Together: Building a United Community strategy commitment</p><p>To create 10 new shared neighbourhoods.</p><p>To date, one site, Ravenhill Road in Belfast, has completed. The development has a total of 67 housing units, and Apex Housing Association is currently finalising the allocation of the units.</p><p>A further 5 schemes have commenced; Ravenhill Avenue, Belfast; Felden Mill, Newtownabbey; Crossgar Road, Saintfield; Killard School, Newtownards; and Burn Road, Cookstown. These schemes are all in addition to the 11 schemes delivered to date under the Housing Executive’s Shared Future Programme.</p><p>DSD Housing Group is currently liaising with the Housing Executive to identify further schemes for deliver the commitment for 10 new shared neighbourhoods.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2047779%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=240177","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=240177"}},{"id":"239984","reference":"AQW 47744/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-25","answerBy":"2015-07-10","answered":"2015-07-08","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development to outline his Department’s responsibilities in regards to achieving child poverty targets.","answerText":"The Office of the First Minister and deputy First Minister currently has lead responsibility within the Executive for tackling child poverty. However, my Department has responsibility for many of the policy and operational levers to address poverty and disadvantage on the ground, thus it has a key role in contributing to the achievement of child poverty targets. These policies and programmes include: the Neighbourhood Renewal Strategy; the provision of decent and affordable housing; action to address fuel poverty; improved child maintenance arrangements and the delivery of comprehensive social security arrangements.\n\nMy Department has committed to a number of important high level targets and supporting actions within the proposed new Child Poverty Strategy 2014-2017. Examples include the delivery of new social and affordable housing, the provision of specialist housing and debt advice to households having difficulty paying their mortgage, the provision of childcare places to assist parents in low income families to increase their skills and gain education and training to avail of paid employment; the support of 30 Nurture Units in local primary schools; and delivery of projects designed to promote social, economic, physical and community renewal in 36 Neighbourhood Renewal Areas. We have also committed to contributing to actions being led by other departments and organisations.\n\nAs part of our work on improving the uptake of benefits, the Department is developing a Household Income Administrative Database to assess eligibility for means tested benefit. This database should improve our capacity to better target those eligible for additional social security and other benefits.\n\nMy Department is also responsible for the measurement of poverty in Northern Ireland. The Northern Ireland Poverty Bulletin 2013/14 was released on 25 June 2015 and provides annual estimates of the percentage and number of people, children, working age adults and pensioners living in low income households in Northern Ireland. The estimates are used to monitor progress towards United Kingdom targets to reduce poverty.","answerHtml":"<p>The Office of the First Minister and deputy First Minister currently has lead responsibility within the Executive for tackling child poverty. However, my Department has responsibility for many of the policy and operational levers to address poverty and disadvantage on the ground, thus it has a key role in contributing to the achievement of child poverty targets. These policies and programmes include: the Neighbourhood Renewal Strategy; the provision of decent and affordable housing; action to address fuel poverty; improved child maintenance arrangements and the delivery of comprehensive social security arrangements.</p><p>My Department has committed to a number of important high level targets and supporting actions within the proposed new Child Poverty Strategy 2014-2017. Examples include the delivery of new social and affordable housing, the provision of specialist housing and debt advice to households having difficulty paying their mortgage, the provision of childcare places to assist parents in low income families to increase their skills and gain education and training to avail of paid employment; the support of 30 Nurture Units in local primary schools; and delivery of projects designed to promote social, economic, physical and community renewal in 36 Neighbourhood Renewal Areas. We have also committed to contributing to actions being led by other departments and organisations.</p><p>As part of our work on improving the uptake of benefits, the Department is developing a Household Income Administrative Database to assess eligibility for means tested benefit. This database should improve our capacity to better target those eligible for additional social security and other benefits.</p><p>My Department is also responsible for the measurement of poverty in Northern Ireland. The Northern Ireland Poverty Bulletin 2013/14 was released on 25 June 2015 and provides annual estimates of the percentage and number of people, children, working age adults and pensioners living in low income households in Northern Ireland. The estimates are used to monitor progress towards United Kingdom targets to reduce poverty.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2047744%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=239984","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=239984"}},{"id":"239516","reference":"AQW 47528/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-22","answerBy":"2015-07-07","answered":"2015-07-02","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development to detail the number of staff appointed or promoted to management level in the Northern Ireland Housing Executive in 2014/2015.","answerText":"The Housing Executive has advised that in 2014/15:\n\n- 21people were appointed to management level; and\n\n- 24 people were promoted to management level.","answerHtml":"<p>The Housing Executive has advised that in 2014/15:</p><p>- 21people were appointed to management level; and</p><p>- 24 people were promoted to management level.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2047528%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=239516","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=239516"}},{"id":"239453","reference":"AQW 47493/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-19","answerBy":"2015-07-06","answered":"2015-07-07","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development to detail the salary paid to the Director of Transformation in the Northern Ireland Housing Executive.","answerText":"The Director of Transformation is an employee of the Strategic Investment Board (SIB) who had been recruited to work in the NIHE.\n\nThe annual salary is £142,000.","answerHtml":"<p>The Director of Transformation is an employee of the Strategic Investment Board (SIB) who had been recruited to work in the NIHE.</p><p>The annual salary is £142,000.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2047493%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=239453","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=239453"}},{"id":"239452","reference":"AQW 47492/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-19","answerBy":"2015-07-06","answered":"2015-10-08","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development whether the Northern Ireland Housing Executive Board has asked its acting Chief Executive to resign.","answerText":"I understand from correspondence I have seen between the former Chief Executive, Mags Lightbody, and the Chairman of the Housing Executive that Ms Lightbody voluntarily tendered her resignation on the 27 May 2015.","answerHtml":"<p>I understand from correspondence I have seen between the former Chief Executive, Mags Lightbody, and the Chairman of the Housing Executive that Ms Lightbody voluntarily tendered her resignation on the 27 May 2015.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2047492%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=239452","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=239452"}},{"id":"239451","reference":"AQW 47491/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-19","answerBy":"2015-06-29","answered":"2015-07-07","answeredOrally":false,"priority":true,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development to explain the very low number of installations of energy efficiency measures under the Affordable Warmth Scheme, in contrast to the Warm Homes Scheme.","answerText":"The Affordable Warmth Scheme is a new, whole house, comprehensive energy efficiency scheme which became fully operational on 1 April 2015. While introduced as a replacement to Warm Homes, the Affordable Warmth Scheme is fundamentally different. The number of completed works for the scheme reflects the short period of time the scheme has been fully operational and the fact that the applicant has up to 3 months to have the required works undertaken through a contractor of their choice and at a time of their choosing.","answerHtml":"<p>The Affordable Warmth Scheme is a new, whole house, comprehensive energy efficiency scheme which became fully operational on 1 April 2015. While introduced as a replacement to Warm Homes, the Affordable Warmth Scheme is fundamentally different. The number of completed works for the scheme reflects the short period of time the scheme has been fully operational and the fact that the applicant has up to 3 months to have the required works undertaken through a contractor of their choice and at a time of their choosing.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2047491%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=239451","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=239451"}},{"id":"239450","reference":"AQW 47490/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-19","answerBy":"2015-07-06","answered":"2015-07-07","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development to detail the number of referrals and installations of energy efficiency measures under the Affordable Warmth Scheme, broken down by month from September 2014.","answerText":"The number of referrals and installations of energy efficiency measures under the Affordable Warmth Scheme broken down month by month from September 2014 is set out in the table below.\n\nREFERRALS\tINSTALLATIONS\nSeptember 2014\t0\t0\nOctober 2014\t0\t0\nNovember 2014\t51\t0\nDecember 2014\t731\t0\nJanuary 2015\t602\t0\nFebruary 2015\t973\t3\nMarch 2015\t1,250\t5\nApril 2015\t1,452\t12\nMay 2015\t1,040\t47\nJune 2015\t975\t56\nTotals\t7,074\t123\n\nThe Information provided in this response is governed by the Principles and Protocols of the Code of Practice for Official Statistics. This is enforced by UK Statistics Authority.","answerHtml":"<p>The number of referrals and installations of energy efficiency measures under the Affordable Warmth Scheme broken down month by month from September 2014 is set out in the table below.</p><div class=\"table-wrap\"><table><tr><td></td><td>REFERRALS</td><td>INSTALLATIONS</td></tr><tr><td>September 2014</td><td>0</td><td>0</td></tr><tr><td>October 2014</td><td>0</td><td>0</td></tr><tr><td>November 2014</td><td>51</td><td>0</td></tr><tr><td>December 2014</td><td>731</td><td>0</td></tr><tr><td>January 2015</td><td>602</td><td>0</td></tr><tr><td>February 2015</td><td>973</td><td>3</td></tr><tr><td>March 2015</td><td>1,250</td><td>5</td></tr><tr><td>April 2015</td><td>1,452</td><td>12</td></tr><tr><td>May 2015</td><td>1,040</td><td>47</td></tr><tr><td>June 2015</td><td>975</td><td>56</td></tr><tr><td>Totals</td><td>7,074</td><td>123</td></tr></table></div><p>The Information provided in this response is governed by the Principles and Protocols of the Code of Practice for Official Statistics. This is enforced by UK Statistics Authority.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2047490%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=239450","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=239450"}},{"id":"239449","reference":"AQW 47489/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-19","answerBy":"2015-07-06","answered":"2015-10-08","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development to detail the number of installations of energy efficiency measures under the (i) Warm Homes Scheme; and (ii) Affordable Warmth Scheme, broken down by month since September 2014.","answerText":"My Department’s Affordable Warmth Scheme was launched in September 2014 to enable councils and Housing Executive to build up capacity to deliver the new scheme when it became fully operational in April 2015.\n\nThe tables below show the number of installations of energy efficiency measures under the (i) Warm Homes Scheme and (ii) Affordable Warmth Scheme from September 2014.\n\nWARM HOMES INSTALLATIONS BY MONTH\n\nWARM HOMES SCHEME\nSeptember 2014\t536\nOctober 2014\t534\nNovember 2014\t530\nDecember 2014\t565\nJanuary 2015\t679\nFebruary 2015\t747\nMarch 2015\t1253\nScheme closed on 31st March 2015\nApril 2015\t0\nMay 2015\t0\nJune 2015\t0\n4844\n\nAFFORDABLE WARMTH INSTALLATIONS BY MONTH\n\nAFFORDABLE WARMTH\nSeptember 2014\t0\nOctober 2014\t0\nNovember 2014\t0\nDecember 2014\t0\nJanuary 2015\t0\nFebruary 2015\t3\nMarch 2015\t5\nApril 2015\t12\nMay 2015\t47\nJune 2015\t56\n123\n\nThe Information provided in this response is governed by the Principles and Protocols of the Code of Practice for Official Statistics. This is enforced by UK Statistics Authority.","answerHtml":"<p>My Department’s Affordable Warmth Scheme was launched in September 2014 to enable councils and Housing Executive to build up capacity to deliver the new scheme when it became fully operational in April 2015.</p><p>The tables below show the number of installations of energy efficiency measures under the (i) Warm Homes Scheme and (ii) Affordable Warmth Scheme from September 2014.</p><p>WARM HOMES INSTALLATIONS BY MONTH</p><div class=\"table-wrap\"><table><tr><td></td><td>WARM HOMES SCHEME</td></tr><tr><td>September 2014</td><td>536</td></tr><tr><td>October 2014</td><td>534</td></tr><tr><td>November 2014</td><td>530</td></tr><tr><td>December 2014</td><td>565</td></tr><tr><td>January 2015</td><td>679</td></tr><tr><td>February 2015</td><td>747</td></tr><tr><td>March 2015</td><td>1253</td></tr><tr><td></td><td>Scheme closed on 31st March 2015</td></tr><tr><td>April 2015</td><td>0</td></tr><tr><td>May 2015</td><td>0</td></tr><tr><td>June 2015</td><td>0</td></tr><tr><td></td><td>4844</td></tr></table></div><p>AFFORDABLE WARMTH INSTALLATIONS BY MONTH</p><div class=\"table-wrap\"><table><tr><td></td><td>AFFORDABLE WARMTH</td></tr><tr><td>September 2014</td><td>0</td></tr><tr><td>October 2014</td><td>0</td></tr><tr><td>November 2014</td><td>0</td></tr><tr><td>December 2014</td><td>0</td></tr><tr><td>January 2015</td><td>0</td></tr><tr><td>February 2015</td><td>3</td></tr><tr><td>March 2015</td><td>5</td></tr><tr><td>April 2015</td><td>12</td></tr><tr><td>May 2015</td><td>47</td></tr><tr><td>June 2015</td><td>56</td></tr><tr><td></td><td>123</td></tr></table></div><p>The Information provided in this response is governed by the Principles and Protocols of the Code of Practice for Official Statistics. This is enforced by UK Statistics Authority.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2047489%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=239449","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=239449"}},{"id":"239153","reference":"AQO 8541/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2015-06-18","answerBy":"2015-06-30","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel whether she has had discussions recently with the British Government regarding the devolution of corporation tax.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%208541%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=239153","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=239153"}},{"id":"240722","reference":"AQO 8541/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2015-06-18","answerBy":"2015-06-30","answered":"2015-06-30","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel whether she has had discussions recently with the British Government regarding the devolution of corporation tax.","answerText":"During a meeting I had with the Chief Secretary to the Treasury earlier this month, a range of issues relating to the provisions in the Stormont House Agreement were discussed, including the devolution of Corporation Tax.","answerHtml":"<p>During a meeting I had with the Chief Secretary to the Treasury earlier this month, a range of issues relating to the provisions in the Stormont House Agreement were discussed, including the devolution of Corporation Tax.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%208541%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=240722","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=240722"}},{"id":"238376","reference":"AQW 47140/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-12","answerBy":"2015-06-29","answered":"2015-06-30","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment what action his Department is taking to ensure tyres and other materials which are hazardous to the health of nearby residents are not burned on bonfires this year.","answerText":"The burning of tyres in an unauthorised manner such as bonfires is illegal and generates toxic fumes and by-products which are extremely dangerous to our health and the environment. It is a practice which must be brought to an end.\n\nLead responsibility for bonfire management rests with local councils; however I am committed to working with and supporting the councils to reduce and ultimately eliminate the burning of tyres on bonfires. The Department will of course use its enforcement powers in support of Councils, where it can. My Department is also working in partnership with councils on tyre related matters. I recently met with senior representatives of all local councils to offer leadership and support on developing a multi-agency approach to deal with these difficult matters.\n\nIn Northern Ireland we have problematic waste streams where it is difficult to provide routes for re-use and recycling, in particular with the likes of waste tyres. Yet I am working hard to try and address this issue, for example through a recently signed innovative Partnership Agreement with Lafarge Cement, we are exploring opportunities to re-use these waste materials in ways that will bring about both environmental and economic gains. This will help to remove substantial amounts of waste tyres from being dumped or used illegally.\n\nI have asked my officials to maximise the use of our powers in dealing with this issue. We have powers to take action against people who stockpile and distribute used tyres. We will educate and enforce in areas where this problem has been identified. We will investigate the sources of tyres that have been disposed of at bonfire sites, so that action can be taken where possible to deter it from happening in the future.\n\nThe Department’s current tyre policy includes legislative, regulatory, enforcement, alternative uses and communication measures, all of which are included as Actions in The DOE’s Tyre Action Plan.\n\nI have allocated staff to audit the disposal of waste tyres amongst other issues. The team will be concentrating on the audit of waste tyres from the retailer to the carrier and finally to disposal by the waste operator. DOE officials and local council officers have jointly visited 15 businesses throughout the North to inspect for compliance with waste regulations. Two of these sites are now under active investigation.\n\nDialogue has also commenced regarding proposals for a new Used Tyre Scheme in Ireland and the potential for a complementary scheme for Northern Ireland. I have approved the establishment of a Tyres Working Group which would assist my Department in the drafting of new Regulations to underpin the structures recommended in the draft report.","answerHtml":"<p>The burning of tyres in an unauthorised manner such as bonfires is illegal and generates toxic fumes and by-products which are extremely dangerous to our health and the environment. It is a practice which must be brought to an end.</p><p>Lead responsibility for bonfire management rests with local councils; however I am committed to working with and supporting the councils to reduce and ultimately eliminate the burning of tyres on bonfires. The Department will of course use its enforcement powers in support of Councils, where it can. My Department is also working in partnership with councils on tyre related matters. I recently met with senior representatives of all local councils to offer leadership and support on developing a multi-agency approach to deal with these difficult matters.</p><p>In Northern Ireland we have problematic waste streams where it is difficult to provide routes for re-use and recycling, in particular with the likes of waste tyres. Yet I am working hard to try and address this issue, for example through a recently signed innovative Partnership Agreement with Lafarge Cement, we are exploring opportunities to re-use these waste materials in ways that will bring about both environmental and economic gains. This will help to remove substantial amounts of waste tyres from being dumped or used illegally.</p><p>I have asked my officials to maximise the use of our powers in dealing with this issue. We have powers to take action against people who stockpile and distribute used tyres. We will educate and enforce in areas where this problem has been identified. We will investigate the sources of tyres that have been disposed of at bonfire sites, so that action can be taken where possible to deter it from happening in the future.</p><p>The Department’s current tyre policy includes legislative, regulatory, enforcement, alternative uses and communication measures, all of which are included as Actions in The DOE’s Tyre Action Plan.</p><p>I have allocated staff to audit the disposal of waste tyres amongst other issues. The team will be concentrating on the audit of waste tyres from the retailer to the carrier and finally to disposal by the waste operator. DOE officials and local council officers have jointly visited 15 businesses throughout the North to inspect for compliance with waste regulations. Two of these sites are now under active investigation.</p><p>Dialogue has also commenced regarding proposals for a new Used Tyre Scheme in Ireland and the potential for a complementary scheme for Northern Ireland. I have approved the establishment of a Tyres Working Group which would assist my Department in the drafting of new Regulations to underpin the structures recommended in the draft report.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2047140%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=238376","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=238376"}},{"id":"238375","reference":"AQW 47139/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-12","answerBy":"2015-06-29","answered":"2015-08-10","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety whether in line with the Department of Health in England, his Department plans to reduce the number of agency nurses working in the Health Service.","answerText":"Trust expenditure on agency nurses is incurred to ensure that safe and effective services are sustained and it contributes significantly to maintaining service provision to patients and clients. It is, however, an important policy aim for the health service to endeavour to reduce expenditure across all areas of agency, locum and bank staff.\n\nAn additional £12million has been secured to support the implementation of Delivering Care which will result in additional permanent posts within medical and surgical in patient wards. As additional posts are created, a key performance indicator is also being developed to incrementally reduce spend on nursing bank and agency spend as the posts are being filled.","answerHtml":"<p>Trust expenditure on agency nurses is incurred to ensure that safe and effective services are sustained and it contributes significantly to maintaining service provision to patients and clients. It is, however, an important policy aim for the health service to endeavour to reduce expenditure across all areas of agency, locum and bank staff.</p><p>An additional £12million has been secured to support the implementation of Delivering Care which will result in additional permanent posts within medical and surgical in patient wards. As additional posts are created, a key performance indicator is also being developed to incrementally reduce spend on nursing bank and agency spend as the posts are being filled.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2047139%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=238375","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=238375"}},{"id":"238313","reference":"AQW 47095/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-11","answerBy":"2015-06-26","answered":"2015-08-10","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety for an update on addressing car parking capacity issues at the Royal Victoria Hospital for Sick Children, Belfast.","answerText":"Belfast Health and Social Care Trust have advised that they have a contract with a private sector operator, Car Park Services (CPS), and meet with them monthly to discuss how they can improve capacity in visitor car parks. Recent initiatives include reducing staff spaces by 60, offering shuttle buses for staff , and providing parking in areas other than visitor’s car parks for certain categories of patients.\n\nIn the medium term plans exist for the construction of a new multi-storey car park at the Royal Hospitals site, which would create much needed car parking spaces close to all key facilities. This is linked to the development of the new regional Children’s Hospital.","answerHtml":"<p>Belfast Health and Social Care Trust have advised that they have a contract with a private sector operator, Car Park Services (CPS), and meet with them monthly to discuss how they can improve capacity in visitor car parks. Recent initiatives include reducing staff spaces by 60, offering shuttle buses for staff , and providing parking in areas other than visitor’s car parks for certain categories of patients.</p><p>In the medium term plans exist for the construction of a new multi-storey car park at the Royal Hospitals site, which would create much needed car parking spaces close to all key facilities. This is linked to the development of the new regional Children’s Hospital.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2047095%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=238313","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=238313"}},{"id":"238312","reference":"AQW 47094/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-11","answerBy":"2015-06-26","answered":"2015-06-23","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment whether his Department has assessed the number of non-licenced car parks in the environs of Belfast International Airport.","answerText":"I am advised that the member is referring to ‘unauthorised’ car parks in the environs of Belfast International Airport. Prior to 1 April 2015 my Department was actively involved in taking enforcement action against a number of these alleged unauthorised car parks in the vicinity of the airport. The majority of Planning functions, including most planning applications and enforcement cases, transferred to the new councils on 1 April 2015. Any planning application or enforcement investigation in the environs referred to in the question is now the responsibility of Antrim & Newtownabbey Borough Council.\n\nYou may therefore wish to contact the Council regarding the matters raised. The point of contact for Antrim & Newtownabbey Borough Council is John Linden who can be emailed at planning@antrimandnewtownabbey.gov.uk","answerHtml":"<p>I am advised that the member is referring to ‘unauthorised’ car parks in the environs of Belfast International Airport. Prior to 1 April 2015 my Department was actively involved in taking enforcement action against a number of these alleged unauthorised car parks in the vicinity of the airport. The majority of Planning functions, including most planning applications and enforcement cases, transferred to the new councils on 1 April 2015. Any planning application or enforcement investigation in the environs referred to in the question is now the responsibility of Antrim &amp; Newtownabbey Borough Council.</p><p>You may therefore wish to contact the Council regarding the matters raised. The point of contact for Antrim &amp; Newtownabbey Borough Council is John Linden who can be emailed at planning@antrimandnewtownabbey.gov.uk</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2047094%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=238312","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=238312"}},{"id":"238311","reference":"AQW 47093/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-11","answerBy":"2015-06-26","answered":"2015-06-25","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to detail the number of temporary agency workers removed from their post in the Northern Ireland Civil Service for (i) failure to sign or return a ‘Regulation 10 Declaration’ waiving their right to equal pay under Regulation 5 of the Agency Workers’ Regulations (Northern Ireland) 2011; (ii) asserting their rights to equal holiday and working conditions under Regulation 5 of the Agency Workers’ Regulations (Northern Ireland) 2011; (iii) querying the legality of the contract of employment signed with the temporary work agency, or an ‘umbrella’ company to which the worker has apparently been assigned without signing a contract of employment; and (iv) instigating legal action against the hiring Northern Ireland Civil Service Department, a temporary work agency, and/or an ‘umbrella’ company for perceived breaches of equal pay, holiday and working conditions as stipulated by Regulation 5 of the Agency Worker’s Regulations (Northern Ireland) 2011 between November 2011 and March 2015.","answerText":"(i)–(iii)This is a matter between the recruitment agency (or employer) and the worker. The Department does not hold the information requested.\n\n(iv)No DFP agency staff were removed from their post due to instigating legal action. I do not hold information in relation to other departments.","answerHtml":"<p>(i)–(iii)This is a matter between the recruitment agency (or employer) and the worker. The Department does not hold the information requested.</p><p>(iv)No DFP agency staff were removed from their post due to instigating legal action. I do not hold information in relation to other departments.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2047093%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=238311","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=238311"}},{"id":"237544","reference":"AQW 46784/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-05","answerBy":"2015-06-22","answered":"2015-06-16","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to detail any Personal Tax Relief Schemes onto which temporary agency workers within the NI Civil Service are automatically enrolled, either by (i) the contracted temporary worker agency or (ii) an assigned 'umbrella' company.","answerText":"The Department does not hold this information. This is a matter between the temporary worker and their employer. The Department is not the employer of temporary workers.","answerHtml":"<p>The Department does not hold this information. This is a matter between the temporary worker and their employer. The Department is not the employer of temporary workers.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2046784%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=237544","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=237544"}},{"id":"237539","reference":"AQW 46782/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-05","answerBy":"2015-06-22","answered":"2015-06-16","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to confirm that temporary agency workers who have worked for more that 12 continuous weeks within the NI civil Service under a 'Swedish Derogation' and /or Regulation 10' contract will automatically receive a minimum of the four weeks 'between assignments pay' at National Minimum Wage once their contract concludes, in accordance with Regulation 10 of the Agency Workers' Regulations (Northern Ireland) 2011, unless the agency first finds them a suitable post within that time line.","answerText":"The NICS contract for the supply of temporary workers to the NICS has been set up to comply with the Agency Workers Regulations (Northern Ireland) 2011. The regulations provide that those agency workers who have signed up to Swedish Derogation/Regulation 10 contracts with their agencies will receive pay between assignments of at least 50% of the assignment pay, and not below the National Minimum Wage. In addition, the pay between assignments must be at least 4 weeks’ pay before the contract is terminated.","answerHtml":"<p>The NICS contract for the supply of temporary workers to the NICS has been set up to comply with the Agency Workers Regulations (Northern Ireland) 2011. The regulations provide that those agency workers who have signed up to Swedish Derogation/Regulation 10 contracts with their agencies will receive pay between assignments of at least 50% of the assignment pay, and not below the National Minimum Wage. In addition, the pay between assignments must be at least 4 weeks’ pay before the contract is terminated.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2046782%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=237539","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=237539"}},{"id":"237529","reference":"AQW 46778/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-05","answerBy":"2015-06-22","answered":"2015-06-16","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to detail the estimate the total monetary value of wages withheld from temporary agency workers hired by the NI Civil Service, through the use of a 'Swedish Derogation ' and/or 'Regulation 10' clause , between the awarding of Contract P3436 (Supply of Temporary /Short-term Workers to NI Civil Service 2011) in November 2011 and March 2015, compared to providing these workers with their equal pay rights as stipulated by Regulation 5 of the Agency Workers' Regulations (Northern Ireland) 2011.","answerText":"No wages have been withheld from temporary workers hired by the NI Civil service through agencies who use the Swedish Derogation Model/Regulation 10 clause, between the awarding of contract P3436 (Supply of Temporary/Short-term Workers to the NI Civil Service 2011) in November 2011 and March 2015.\n\nThe NICS contract for the supply of temporary workers to the NICS has been set up to comply with the Agency Workers Regulations (Northern Ireland) 2011 and staff have been paid accordingly. The legislation gives agency workers the right to the same basic employment and working conditions (including pay) as if they had been recruited directly, if/when they complete a qualifying period of 12 weeks in the same job. However, as per the Regulations, those agency workers who have signed up to the Swedish Derogation with their agency are not entitled to the same pay as this effectively waives their right to equal pay.","answerHtml":"<p>No wages have been withheld from temporary workers hired by the NI Civil service through agencies who use the Swedish Derogation Model/Regulation 10 clause, between the awarding of contract P3436 (Supply of Temporary/Short-term Workers to the NI Civil Service 2011) in November 2011 and March 2015.</p><p>The NICS contract for the supply of temporary workers to the NICS has been set up to comply with the Agency Workers Regulations (Northern Ireland) 2011 and staff have been paid accordingly. The legislation gives agency workers the right to the same basic employment and working conditions (including pay) as if they had been recruited directly, if/when they complete a qualifying period of 12 weeks in the same job. However, as per the Regulations, those agency workers who have signed up to the Swedish Derogation with their agency are not entitled to the same pay as this effectively waives their right to equal pay.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2046778%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=237529","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=237529"}},{"id":"237518","reference":"AQW 46776/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-05","answerBy":"2015-06-22","answered":"2015-06-15","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to detail the relationship between her Department , Kennedy Recruitment and the business entity trading variously as Zeva/Corvus Contact Ltd/UKPA Ltd.","answerText":"Kennedy Recruitment was awarded a contract by the Department of Finance and Personnel in November 2011 on behalf of all NI Government departments and their sponsored bodies for temporary/short term workers to the NICS. This contract is due to expire on 30 November 2016. The Department has no contracts with Zeva/Corvus Contract Ltd or UKPA Ltd for the provision of temporary workers.","answerHtml":"<p>Kennedy Recruitment was awarded a contract by the Department of Finance and Personnel in November 2011 on behalf of all NI Government departments and their sponsored bodies for temporary/short term workers to the NICS. This contract is due to expire on 30 November 2016. The Department has no contracts with Zeva/Corvus Contract Ltd or UKPA Ltd for the provision of temporary workers.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2046776%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=237518","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=237518"}},{"id":"237331","reference":"AQW 46723/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-04","answerBy":"2015-06-19","answered":"2015-06-15","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to detail why temporary agency workers employed within the NI Civil Service do not receive equal pay commensurate with their permanent colleagues after twelve weeks continuous employment.","answerText":"The NICS contract for the supply of temporary workers to the NICS has been set up to comply with the Agency Workers Regulations (Northern Ireland) 2011. The legislation gives agency workers the right to the same basic employment and working conditions (including pay) as if they had been recruited directly, if/when they complete a qualifying period of 12 weeks in the same job. However, as per the Regulations, those agency workers who have signed up to the Swedish Derogation with their agency, are not entitled to the same pay as this effectively waives their right to equal pay.","answerHtml":"<p>The NICS contract for the supply of temporary workers to the NICS has been set up to comply with the Agency Workers Regulations (Northern Ireland) 2011. The legislation gives agency workers the right to the same basic employment and working conditions (including pay) as if they had been recruited directly, if/when they complete a qualifying period of 12 weeks in the same job. However, as per the Regulations, those agency workers who have signed up to the Swedish Derogation with their agency, are not entitled to the same pay as this effectively waives their right to equal pay.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2046723%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=237331","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=237331"}},{"id":"237299","reference":"AQO 8396/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2015-06-04","answerBy":"2015-06-16","answered":"2015-06-16","answeredOrally":true,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to outline the impact of the budget crisis on future capital projects, including the York Street Interchange.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr Kennedy","text":"My Department has a capital allocation of £328·3 million in 2015. That is some £70 million less than projected expenditure in 2014-15. However, we are still taking forward a substantial capital programme. I am pleased to inform the Member that development work on the York Street interchange is progressing well. This important project will alleviate the existing bottleneck on the strategic road network, which affects the M1/Westlink, M2 and M3. It will reduce congestion, improve the reliability of journey times and improve access to the regional gateways from the eastern seaboard corridor. A considerable amount of work is required to take the scheme through the public inquiry process, scheduled to start on 10 November 2015, and the necessary budget has been set aside in this financial year to complete this task. The scheme has already received EU funding towards design development. I am hopeful about being successful in attracting further EU funding for construction. I continue to engage with EU officials to secure further funding for this and other important projects. If there were to be any cuts to my capital budget as a consequence of the current austerity measures, I would, of course, have to review the capital programme, including the Yorkgate interchange. However, any decisions would be informed by the extent of budget reductions and a review of the progress on schemes and capital commitments existing at that time."},{"speaker":"Mr Dickson","text":"Minister, thank you for your answer so far, particularly in relation to an actual date for a public inquiry, one at which I will certainly be supporting the project. One key element of the York Street interchange is the opportunity to provide a dualling of the railway track across that section; but it is a once-in-a-lifetime opportunity, as the consultants have advised that it can be done only at the same time as construction of the roadworks. Will the Minister confirm that that is true and that he will use his best endeavours to ensure that the work for the rail track is done at the same time as the roadworks?"},{"speaker":"Mr Kennedy","text":"I am grateful to the Member for the point that he raises. I understand it entirely, and it appears that, from an engineering point of view, that is the case. Clearly, it would be sensible that two schemes could run parallel to each other. I say to him directly, and not in any aggressive way, that I think the difficulty and challenge will be, clearly, that the financial implications of both in terms of capital are substantial. We will have to look at those issues and other capital projects, which have also been waiting for some considerable time. Members will be quick to raise particular capital projects that are of interest to them. I understand the point he has raised, but I see challenges in bringing forward a track scheme of that nature in the immediate period that we are facing."},{"speaker":"Mr G Robinson","text":"Can the Minister outline whether budget allocations will affect the Gortcorbies climbing lane project on the Broad Road between Coleraine and Limavady or Limavady and Coleraine?"},{"speaker":"Mr Kennedy","text":"I am grateful to the Member, and I join with other Members to congratulate him on being a recent recipient in the honours system. Enjoy the moment. I am aware of the scheme that the Member speaks of. Indeed, there are a clutch of other similar schemes for improvements that would give considerable benefit to areas and, indeed, communities. It was always my intention that we would somehow create a pocketful of money to carry out schemes of that nature. That might even perhaps be useful to improve the reputation of the Assembly and the Executive for what they are able to deliver, but the financial situations we find ourselves in are very constrained. Whilst that scheme remains active on the books, we are not able to indicate at this stage how quickly it will further develop."},{"speaker":"Mr Principal Deputy Speaker","text":"That ends the period for listed questions. We will now move to topical questions."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%208396%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=237299","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2015-06-16&docID=238200#AQO%208396/11-15","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=237299"}},{"id":"237199","reference":"AQW 46682/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-03","answerBy":"2015-06-18","answered":"2015-06-15","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to detail who is the legal employer of temporary agency staff and temporary contract workers employed in the NICS through Kennedy Recruitment, Premier Employment Group Ltd and Brook Street Bureau PLC.","answerText":"Temporary workers provided by Kennedy:-\n\nKennedy Recruitment Ltd is the legal employer for some temporary workers assigned to NICS. However, the majority of temporary workers provided by Kennedy Recruitment Ltd are employed by the Zeva Group of companies.\n\nTemporary workers provided by Premiere:-\n\nThe legal employer of all workers assigned to NICS by Premier Employment Group Ltd is Premier Employment Group Ltd.\n\nBrook Street is no longer a contracted supplier to the NICS for temporary workers.","answerHtml":"<p>Temporary workers provided by Kennedy:-</p><p>Kennedy Recruitment Ltd is the legal employer for some temporary workers assigned to NICS. However, the majority of temporary workers provided by Kennedy Recruitment Ltd are employed by the Zeva Group of companies.</p><p>Temporary workers provided by Premiere:-</p><p>The legal employer of all workers assigned to NICS by Premier Employment Group Ltd is Premier Employment Group Ltd.</p><p>Brook Street is no longer a contracted supplier to the NICS for temporary workers.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2046682%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=237199","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=237199"}},{"id":"237198","reference":"AQW 46681/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-03","answerBy":"2015-06-18","answered":"2015-06-15","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to detail how may temporary workers were employed on Swedish Derogation or Regulation 10 contracts by (i) Kennedy Recruitment; (ii) Premier Employment Group Ltd; and (iii) Brook Street Bureau PLC for each year between 2011 and 2015.","answerText":"(i)For temporary workers provided by Kennedy Recruitment all assignees to NICS operated under Swedish Derogation contracts. The number for each assignees each year is as the table below:-\n\nYear\tNo. Swedish derogation contracts\n2011\t46\n2012\t325\n2013\t410\n2014\t350\n2015\t163\n\n(ii) For temporary workers provided by Premiere no assignees operated under Swedish Derogation contracts.\n\n(iii) Brook Street is no longer a contracted supplier to the NICS for temporary worker services.","answerHtml":"<p>(i)For temporary workers provided by Kennedy Recruitment all assignees to NICS operated under Swedish Derogation contracts. The number for each assignees each year is as the table below:-</p><div class=\"table-wrap\"><table><tr><td>Year</td><td>No. Swedish derogation contracts</td></tr><tr><td>2011</td><td>46</td></tr><tr><td>2012</td><td>325</td></tr><tr><td>2013</td><td>410</td></tr><tr><td>2014</td><td>350</td></tr><tr><td>2015</td><td>163</td></tr></table></div><p>(ii) For temporary workers provided by Premiere no assignees operated under Swedish Derogation contracts.</p><p>(iii) Brook Street is no longer a contracted supplier to the NICS for temporary worker services.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2046681%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=237198","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=237198"}},{"id":"237176","reference":"AQW 46671/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-03","answerBy":"2015-06-18","answered":"2015-06-15","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel (i) whether umbrella companies are used as part of the recruitment and payroll process for temporary agency workers hired by the NI Civil Service and (ii) what steps her Department take to ensure legal compliance with the Agency Workers' Regulation (Northern Ireland) 2011.","answerText":"The majority of temporary workers assigned to NICS by Kennedy Recruitment have their recruitment and payroll processed by umbrella companies. No temporary workers assigned to NICS by Premiere have their recruitment and payroll processed through umbrella companies. Apple Recruitment provides temporary accountants and auditors to the NICS and at present do not use umbrella companies as part of their recruitment and payroll process.\n\nMonitoring compliance with the Agency Workers’ Regulations (Northern Ireland) 2011 does not fall within the remit of my Department.","answerHtml":"<p>The majority of temporary workers assigned to NICS by Kennedy Recruitment have their recruitment and payroll processed by umbrella companies. No temporary workers assigned to NICS by Premiere have their recruitment and payroll processed through umbrella companies. Apple Recruitment provides temporary accountants and auditors to the NICS and at present do not use umbrella companies as part of their recruitment and payroll process.</p><p>Monitoring compliance with the Agency Workers’ Regulations (Northern Ireland) 2011 does not fall within the remit of my Department.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2046671%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=237176","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=237176"}},{"id":"237164","reference":"AQW 46668/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-03","answerBy":"2015-06-18","answered":"2015-09-02","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel whether his Departmental Solicitor's office provided advice on the use of 'Swedish Derogation' and /or  'Regulation 10' clauses during the tendering process for Contract P3436 (Supply of temporary /short-term workers to NI Civil Service 2011), and what advice did they provide.","answerText":"By convention, the Department does not disclose whether it has requested or received legal advice.","answerHtml":"<p>By convention, the Department does not disclose whether it has requested or received legal advice.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2046668%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=237164","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=237164"}},{"id":"236826","reference":"AQW 46571/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-02","answerBy":"2015-06-17","answered":"2015-06-15","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel whether the inclusion of a 'Swedish Derogation' and /or 'Regulation 10' clause in temporary agency worker contracts formed a key factor in the decision to award Contract P3436 (Supply of Temporary/short term, Workers to NICS 2011) to Kennedy Recruitment, Premier Employment Group Ltd, and Brooke Street Bureau PLC, in November 2011.","answerText":"No, the inclusion of a ‘Swedish Derogation’ or ‘Regulation 10’ clause in the temporary worker contracts had no bearing on the award of the contract.","answerHtml":"<p>No, the inclusion of a ‘Swedish Derogation’ or ‘Regulation 10’ clause in the temporary worker contracts had no bearing on the award of the contract.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2046571%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=236826","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=236826"}},{"id":"236823","reference":"AQW 46570/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-02","answerBy":"2015-06-17","answered":"2015-06-15","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel whether her Department has stipulated that a 'Swedish Derogation' and/or 'Regulation 10' clause be invoked when hiring temporary agency staff and temporary contract workers to fill posts within NICS, in order to circumvent the equal pay requirements under Regulation 5 of the Agency Workers' Regulations (NI) 2011.","answerText":"No. I can confirm that no stipulation has ever been made by my Department with regards to invocation of ‘Swedish Derogation’ or ‘Regulation 10’ clause to circumvent the equal pay requirements under the Agency Workers’ Regulations (NI) 2011.","answerHtml":"<p>No. I can confirm that no stipulation has ever been made by my Department with regards to invocation of ‘Swedish Derogation’ or ‘Regulation 10’ clause to circumvent the equal pay requirements under the Agency Workers’ Regulations (NI) 2011.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2046570%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=236823","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=236823"}},{"id":"236821","reference":"AQW 46568/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-02","answerBy":"2015-06-17","answered":"2015-06-25","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to detail, month by month, the number of temporary agency staff (i) beginning a contract, and (ii) ending a contract, for each financial year between 2008 and 2015 , broken down by Department.","answerText":"The number of temporary agency staff beginning a contract, and ending a contract, for each financial year between 2008 and 2015, broken down by Department is shown in the attached tables.\n\n2014/15\n\nApril\tMay\tJune\tJuly\tAugust\tSeptember\tOctober\tNovember\tDecember\tJanuary\tFebruary\tMarch\n(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i)\nBeginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii)\nEnding Contract\t(i)\nBeginning contract\n(ii)\nEnding Contract\nOFMDFM\t(i) 1\t\t(ii)1\t(i) 1 (ii) 2\t(ii) 1\t(ii) 2\t\t\t(ii) 1\t(i) 1 (ii) 1\t(ii) 1\nDARD\t(i) 3 (ii) 2\t(i)1 (ii) 12\t(i) 5 (ii) 3\t(i) 3 (ii) 3\t(i) 6 (ii) 2\t(i) 9 (ii) 7\t(i) 2 (ii) 8\t(i) 2 (ii) 13\t(ii) 3\t(i) 1 (ii) 3\t(i) 3 (ii) 1\t(i) 4 (ii) 2\nDCAL\t(i) 2 (ii) 5\t(ii) 3\t(ii) 1\t(i) 2 (ii) 1\t(i) 1\t(i) 3 (ii) 2\t(i) 1 (ii) 1\t(i) 1 (ii) 1\t(ii) 2\t\t(i) 1 (ii) 3\t(i) 1\nDE\t(i) 2 (ii) 2\t(i) 1\t(i) 1\t(i) 2 (ii) 2\t(i) 5 (ii) 1\t(i) 2 (ii) 1\t(ii) 3\t(ii) 1\t(i) 4 (ii) 1\t(ii) 1\t(i) 1 (ii) 2\nDEL\t(ii) 1\t(i) 2 (ii) 1\t\t(i) 1\t(ii) 1\t(ii) 2\t\t(i) 1 (ii) 2\nDETI\t\t\t(ii) 1\t\t\t(ii) 1\t(ii) 1\t(ii) 1\t(i) 1\t(ii) 1\t\t(i) 1 (ii) 1\nDOE\t(i) 33 (ii) 9\t(i) 23 (ii) 10\t(i) 39 (ii) 15\t(i) 13 (ii) 89\t(i) 3 (ii) 91\t(i) 5 (ii) 43\t(ii) 3\t(i) 2 (ii) 4\t(ii) 2\t(ii) 2\t(i) 2 (ii) 3\t(i) 2 (ii) 2\nDHSSPS\t\t(i) 2 (ii) 1\t\t\t(i) 1\t\t\t\t\t\t(ii) 1\nDFP\t(i) 13 (ii) 11\t(i) 10 (ii) 8\t(i) 29 (ii) 10\t(i) 12 (ii) 14\t(i) 7 (ii) 34\t(i) 11 (ii) 20\t(i) 8 (ii) 12\t(i) 21 (ii) 2\t(i) 7 (ii) 7\t(i) 13 (ii) 17\t(i) 16 (ii) 5\t(i) 1 (ii) 11\nDOJ\t\t(ii) 2\t(i) 2 (ii) 2\t\t\t(ii) 3\t\t\t\t\t\t(ii)1\nDRD\t(i) 2 (ii) 4\t(i) 1 (ii) 3\t(i) 2 (ii) 6\t(i) 3\t(i) 2 (ii) 5\t(i) 1 (ii) 11\t(i) 2 (ii) 4\t(i) 1 (ii) 1\t(ii) 6\t(ii) 2\t\t(ii) 1\nDSD\t(i) 21 (ii) 6\t(i) 20 (ii) 12\t(i) 32 (ii) 14\t(i) 67 (ii) 99\t(i) 17 (ii) 12\t(i) 3 (ii) 16\t(i) 1 (ii) 17\t(i) 17 (ii) 6\t(i) 1 (ii) 11\t(ii) 6\t(i) 70 (ii) 8\t(ii) 24\nPPS\t(i) 5 (ii) 3\t(i) 2\t(i) 2\t(i) 1 (ii) 1\t(ii) 1\t(ii) 19\t\t(ii) 1\t(i) 1 (ii) 1\t(ii) 1\n\n2013/14\n\nApril\tMay\tJune\tJuly\tAugust\tSeptember\tOctober\tNovember\tDecember\tJanuary\tFebruary\tMarch\n(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i)\nBeginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii) Ending Contract\nOFMDFM\t(i) 2 (ii) 1\t\t\t\t(i) 1 (ii) 1\t\t(i) 2\t\t\t(ii) 1\t(i) 3\t(i) 1 (ii) 1\nDARD\t(i) 5 (ii) 2\t(i) 6 (ii) 10\t(i) 6 (ii) 10\t(i) 3 (ii) 3\t(i) 5 (ii) 4\t(i) 12 (ii) 3\t(i) 5\t(i) 4\t(i) 3 (ii) 3\t(i) 3 (ii) 4\t(i) 4 (ii) 2\t(i) 3 (ii) 2\nDCAL\t(ii) 1\t(i) 2\t(ii) 2\t(i) 2\t(i) 4 (ii) 1\t(i) 2 (ii) 1\t(ii) 1\t(i) 7 (ii) 1\t(i) 1 (ii) 1\t(i) 3 (ii) 1\t(i) 10 (ii) 5\t(i) 5 (ii) 14\nDE\t(i) 1 (ii) 2\t\t\t\t\t\t(i) 5 (ii) 2\t(i) 1 (ii) 1\t(i) 1 (ii) 1\t\t\t(i) 4\nDEL\t(ii) 1\t\t\t(i) 2\t(i) 2 (i) 1\t(i) 1\t(i) 2 (ii) 4\t(i) 1 (ii) 2\t(i) 1\t(ii) 1\nDETI\t\t\t\t\t\t\t(i) 2\t(i) 1 (ii) 1\t(i) 1\t\t(i) 2\t(i) 1 (ii) 1\nDOE\t(i) 42 (ii) 13\t(i) 17 (ii) 18\t(i) 72 (ii) 46\t(i) 31 (ii) 10\t(i) 5 9ii) 34\t(i) 33 (ii) 88\t(i) 17 (ii) 25\t(i) 21 (ii) 20\t(i) 13 (ii) 13\t(i) 13 (ii) 13\t(i) 18 (ii) 11\t(i) 8 (ii) 38\nDHSSPS\t\t\t\t\t(i) 1\t(i) 1\t(i) 1 (ii) 1\t(i) 1 (ii) 1\t(i) 1( ii) 2\t(i) 1 (ii) 1\nDFP\t(i) 13 (ii) 6\t(i) 11 (ii) 3\t(i) 10 (ii) 7\t(i) 13 (ii) 45\t(i) 8 (ii) 8\t(i) 9 (ii) 17\t(i) 8 (ii) 2\t(i) 23 (ii) 4\t(i) 12 (ii) 3\t(i) 23 (ii) 9\t(i) 9 (ii) 7\t(i) 12 (ii) 32\nDOJ\t(i) 10 (ii) 1\t(i) 14 (ii) 2\t(i) 13\t(i) 2 (ii) 3\t\t(i) 1 (ii) 1\t(i) 9 (ii) 2\t(i) 1 (ii) 2\t(ii) 13\t(i) 1 (ii) 1\t(ii) 62\t(i) 1 (ii) 3\nDRD\t(i) 7 (ii) 2\t(i) 3 (ii) 3\t(i) 2\t(i) 4 (ii) 3\t(i) 2 (ii) 6\t(i) 7 (ii) 3\t(i) 6 (ii) 5\t(i) 7 (ii) 5\t(i) 3 (ii) 4\t(i) 3 (ii) 5\t(i) 6 (ii) 2\t(i) 6 (ii) 6\nDSD\t(i) 19 (ii) 35\t(i) 12 (ii) 26\t(i) 12 (ii) 11\t(i) 55 (ii) 14\t(i) 8 (ii) 20\t(i) 43 (ii) 14\t(i) 17 (ii) 16\t(i) 28 (ii) 25\t(i) 6 (ii) 12\t(i) 14 (ii) 12\t(i) 18 (ii) 2\t(i) 67 (ii) 14\nPPS\t(i) 6 (ii) 3\t(i) 2 (ii) 2\t(i) 2 (ii) 2\t(i) 1 (ii) 4\t(ii) 1\t(i) 3 (ii) 1\t(ii) 3\t(i) 2\t\t(i) 3 (ii) 2\t(ii) 1\n\n2012/13\n\nApril\tMay\tJune\tJuly\tAugust\tSeptember\tOctober\tNovember\tDecember\tJanuary\tFebruary\tMarch\n(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i)\nBeginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii) Ending Contract\nOFMDFM\t\t\t(i) 1\t(i) 1\t\t(i) 1\t(ii) 2\t(i) 2\t\t\t\t(ii) 1\nDARD\t(i) 2 (ii) 2\t(i) 3 (ii) 4\t(i) 2 (ii) 4\t(i) 3 (ii) 1\t(i) 3 (ii) 4\t(i) 4 (ii) 6\t(i) 6 (ii) 3\t(i) 3 (ii) 1\t(i) 2 (ii) 4\t(i) 5 (ii) 5\t(i) 9 (ii) 3\t(i) 3 (ii) 3\nDCAL\t\t\t(i) 3\t(i) 1 (ii) 1\t\t\t(i) 2\t(i) 1 (ii) 1\t(ii) 1\t(i) 4\t(i) 3 (ii) 3\t(i) 5 (i) 2\nDE\t\t(i) 2\t\t\t\t\t(i) 2 (ii) 1\t(ii) 1\t\t\t\t(i) 1 (ii) 1\nDEL\t(i) 1 (ii) 1\t(i) 2 (ii) 2\t(i) 1 (ii) 1\t\t(i) 2 (i) 1\t(i) 3 (ii) 1\t(ii) 1\t\t(i) 2\t(ii) 2\t\t(ii) 4\nDETI\t\t\t\t\t\t\t\t(i) 1 (ii) 1\t\t\t\t(i) 1 (ii) 1\nDOE\t(i) 17 (ii) 5\t(i) 21 (ii) 4\t(i) 56 (ii) 4\t(i) 13 (ii) 3\t(i) 13 (ii) 15\t(i) 28 (ii) 35\t(i) 16 (ii) 12\t(i) 19 (ii) 4\t(i) 7 (ii) 3\t(i) 12 (ii) 6\t(i) 14 (ii) 9\t(i) 28 (ii) 34\nDHSSPS\nDFP\t(i) 3 (ii) 4\t(i) 12 (ii) 2\t(i) 9 (ii) 7\t(i) 59 (ii) 13\t(i) 10 (ii) 3\t(i) 16 (ii) 25\t(i) 12 (ii) 20\t(i) 14 (ii) 5\t(i) 4 (ii) 6\t(i) 5 (ii) 4\t(i) 6 (ii) 7\t(i) 4 (ii) 14\nDOJ\t(i) 2\t(i) 2\t(i) 1 (ii) 1\t\t(i) 1 (ii) 1\t(i) 3\t(i) 24 (ii) 3\t(i) 3 (ii) 2\t\t(i) 2 (ii) 2\t(i) 13 (ii) 1\t(ii) 1\nDRD\t(i) 1\t(ii) 2\t(ii) 2\t(i) 3 (ii) 2\t(i) 1 (ii) 1\t(i) 7 (ii) 3\t(i) 1 (ii) 2\t(i) 1\t(i) 2 (ii) 1\t(i) 2 (ii) 3\t(i) 1 (ii) 2\t(i) 1\nDSD\t(i) 4 (ii) 3\t(i) 4 (ii) 7\t(i) 8 (ii) 7\t(i) 11 (ii) 3\t(i) 8 (ii) 4\t(i) 4 (ii) 7\t(i) 8 (ii) 5\t(i) 10 (ii) 4\t(ii) 3\t(i) 7 (ii) 9\t(i) 8 (ii) 4\t(i) 6 (ii) 19\nPPS\t(i) 3 (ii) 3\t(i) 3\t(i) 1\t(i) 1 (i) 1\t(i) 2 (ii) 1\t(i) 1\t(i) 4 (ii) 2\t(i) 3\t(i) 2 (ii) 1\t(i) 1\t(i) 6\t(i) 1 (ii) 6\n\n2011/12\n\nApril\tMay\tJune\tJuly\tAugust\tSeptember\tOctober\tNovember\tDecember\tJanuary\tFebruary\tMarch\n(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i)\nBeginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii) Ending Contract\nOFMDFM\nDARD\nDCAL\nDE\t(ii) 3\t\t(i) 1\t\t(i) 1 (ii) 1\t\t(i) 1 (ii) 1\t\t\t(i) 1\nDEL\t(ii) 1\t(i) 1\t(i) 2 (ii) 1\t\t(ii) 1\t\t(i) 2\t(i) 2\t(i) 1\t\t\t(i) 3 (ii) 2\nDETI\t\t\t\t\t\t\t\t\t\t\t\t(i) 1 (ii) 1\nDOE\t(i) 9 (ii) 2\t(i) 9 (ii) 7\t(i) 11 (ii) 5\t(i) 6 (ii) 5\t(i) 6 (ii) 7\t(i) 10 (ii) 3\t(i) 13 (ii) 8\t(i) 15 (ii) 5\t(i) 2 (ii) 24\t(i) 65 (ii) 6\t(i) 10 (ii) 6\t(i) 8 (ii) 25\nDHSSPS\nDFP\t(i) 2 (ii) 1\t(ii) 3\t(i) 1 (ii) 17\t(i) 5\t(i) 2\t(i) 2 (ii) 2\t(i) 1 (ii) 8\t(i) 3\t(i) 1 (ii) 2\t(i) 33 (ii) 2\t(i) 18 (ii) 7\t(i) 5 (ii) 28\nDOJ\t(i) 1\t\t\t\t(i) 1\t\t\t(i) 1\t(i) 1 (ii) 2\t(i) 1\t(ii) 1\t(i) 2\nDRD\t(i) 2 (ii) 1\t\t(i) 4 (ii) 1\t(ii) 1\t(i) 2 (ii) 1\t(ii) 3\t(i) 2\t(i) 1 (ii) 6\t\t(i) 6 (ii) 3\t(i) 3\t(i) 2\nDSD\t(i) 1 (ii) 1\t(i) 4 (ii) 1\t(i) 7 (ii) 2\t(i) 3\t(i) 16 (ii) 4\t(i) 18 (ii) 4\t(i) 18 (ii) 5\t(i) 13 (ii) 2\t(i) 11 (ii) 4\t(i) 17 (ii) 6\t(i) 8 (ii) 3\t(i) 3 (ii) 2\nPPS\t\t(i) 2\t(ii) 1\t(ii) 1\t(i) 1 (ii) 1\t(i) 2\t(i) 2\t(i) 1\t\t(i) 1\t(i) 2 (ii) 1\t(ii) 1\n\n2010/11\n\nApril\tMay\tJune\tJuly\tAugust\tSeptember\tOctober\tNovember\tDecember\tJanuary\tFebruary\tMarch\n(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i)\nBeginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii) Ending Contract\nOFMDFM\nDARD\nDCAL\nDE\t(ii) 5\t(ii) 2\t(i) 2 (ii) 2\t\t\t(i) 1 (ii) 4\t(i) 3 (ii) 2\t(ii) 2\t\t(i) 1 (ii) 3\t(ii) 1\nDEL\t\t(i) 1 (ii) 1\t(ii) 2\t(ii) 1\t\t\t(i) 1 (ii) 2\t(ii) 2\t\t\t(i) 1\t(ii) 1\nDETI\t\t\t\t(ii) 1\t\t\t\t(i) 1\t\t(ii) 1\nDOE\t(i) 2 (ii) 3\t(i) 2 (ii) 1\t(i) 4 (ii) 4\t(i) 1 (ii) 1\t(ii) 2\t(ii) 6\t(i) 13 (ii) 4\t(i) 1 (ii) 3\t(i) 1(ii) 2\t(i) 10 (ii) 2\t(i) 4 (ii) 12\t(i) 11 (ii) 2\nDHSSPS\nDFP\t(i) 3 (ii) 11\t(i) 1 (ii) 2\t(i) 1 (ii) 3\t(ii) 2\t(ii) 3\t(i) 6 (ii) 1\t(i) 1 (ii) 2\t(i) 1 (ii) 3\t\t(i) 5 (ii) 5\t(i) 10 (ii) 2\t(i) 7 (ii) 2\nDOJ\t(ii) 1\t\t\t(ii) 1\t\t(ii) 2\nDRD\nDSD\t(ii) 6\t(i) 1 (ii) 14\t(ii) 5\t(ii) 1\t(i) 1 (ii) 3\t(i) 1 (ii) 3\t(i) 3 (ii) 4\t(i) 1 (ii) 4\t(i) 4 (ii) 2\t(i) 4 (ii) 4\t(i) 2\t(i) 1 (ii) 3\nPPS\t(ii) 1\t(ii) 1\t(i) 1 (ii) 2\t\t(i) 1\t(i) 1 (ii) 1\t(i) 1 (ii) 1\t\t(ii) 1\t\t(ii) 1\n\n2009/10\n\nApril\tMay\tJune\tJuly\tAugust\tSeptember\tOctober\tNovember\tDecember\tJanuary\tFebruary\tMarch\n(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i)\nBeginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii) Ending Contract\nOFMDFM\nDARD\nDCAL\nDE\t(i) 1 (ii) 1\t(i) 3\t(i) 2\t(ii) 1\t(i) 3\t\t(i) 6 (ii) 1\t(i) 2 (ii) 3\t(ii) 5\t(i) 2 (ii) 2\t(i) 5\t(i) 1 (ii) 1\nDEL\t\t(ii) 3\t(i) 3 (ii) 2\t(i) 1 (ii) 1\t(ii) 4\t(i) 1\t\t(i) 4 (ii) 2\t\t(ii) 1\t(ii) 3\t(i) 2 (ii) 3\nDETI\t(i) 2\t(i) 1\t\t(i) 2\t(ii) 1\t(i) 1 (ii) 1\t(ii) 1\t(ii) 2\nDOE\nDHSSPS\t(i) 1 (ii) 2\t\t(i) 1\t\t\t(i) 1\t\t(ii) 1\nDFP\t(i) 3 (ii) 2\t(i) 6 (ii) 3\t(ii) 4\t(i) 2 (ii) 2\t(i) 1 (ii) 5\t(i) 4 (ii) 18\t\t(ii) 2\t(ii) 3\t(i) 4\t(i) 5 (ii) 1\t(i) 2 (ii) 1\nDOJ\nDRD\nDSD\t(i) 17 (ii) 18\t(i) 17 (ii) 8\t(i) 39 (ii) 15\t(i) 33 (ii) 22\t(i) 16 (ii) 18\t(i) 22 (ii) 30\t(i) 9 (ii) 19\t(i) 2 (ii) 21\t(i) 5 (ii) 19\t(i) 15 (ii) 23\t(i) 8 (ii) 10\t(i) 6 (ii) 10\nPPS\t\t(i) 2\t(i) 1\t(i) 1\t(i) 1\t\t(ii) 1\t(i) 1 (ii) 5\t\t\t(i) 1\t(i) 1\n\n2008/09\n\nApril\tMay\tJune\tJuly\tAugust\tSeptember\tOctober\tNovember\tDecember\tJanuary\tFebruary\tMarch\n(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i)\nBeginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii) Ending Contract\t(i) Beginning contract\n(ii)\nEnding Contract\t(i) Beginning contract\n(ii) Ending Contract\nOFMDFM\nDARD\nDCAL\nDE\t\t(i) 1\t\t(ii) 1\t\t\t(i) 1\t(i) 4 (ii) 1\t(i) 1\t(i) 2\t(i) 1 (ii) 2\nDEL\t(i) 1\t(ii) 1\t(i) 5 (ii) 1\t(i) 1\t(ii) 2\t(i) 2 (ii) 2\t(i) 1\t(i) 3\t(i) 2\t(ii) 3\t(i) 5 (ii) 1\t(i) 3\nDETI\t(i) 6\t(ii) 4\t(ii) 1\t(i) 1\t(i) 1 (ii) 1\t(ii) 1\t\t(ii) 1\t\t\t\t(ii) 1\nDOE\nDHSSPS\t(ii) 1\t(i) 1\t(i) 1 (i) 1\t(i) 1 (ii) 2\t(i) 2 (ii) 3\t(i) 1\t(i) 2 (ii) 1\t(i) 1\t(ii) 4\t(ii) 3\t(i) 2\t(ii) 1\nDFP\t(i) 6 (ii) 1\t(i) 3\t(i) 6\t(i) 3\t(i) 3 (ii) 4\t(i) 13 (ii) 11\t(i) 8 (ii) 9\t(i) 9 (ii) 3\t(i) 3 (ii) 3\t(i) 4 (ii) 3\t(i) 4 (ii) 6\t(i) 3 (ii) 2\nDOJ\nDRD\nDSD\t(i) 3\t(i) 4\t(i) 9 (ii) 1\t(i) 10 (ii) 3\t(i) 7 (ii) 10\t(i) 11 (ii) 18\t(i) 17 (ii) 8\t(i) 8 (ii) 11\t(i) 11 (ii) 13\t(i) 25 (ii) 16\t(i) 8 (ii) 12\t(i) 24 (ii) 12\nPPS\t\t\t\t\t\t\t\t(i) 5","answerHtml":"<p>The number of temporary agency staff beginning a contract, and ending a contract, for each financial year between 2008 and 2015, broken down by Department is shown in the attached tables.</p><p>2014/15</p><div class=\"table-wrap\"><table><tr><td></td><td>April</td><td>May</td><td>June</td><td>July</td><td>August</td><td>September</td><td>October</td><td>November</td><td>December</td><td>January</td><td>February</td><td>March</td></tr><tr><td></td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i)<br>Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii)<br>Ending Contract</td><td>(i)<br>Beginning contract<br>(ii)<br>Ending Contract</td></tr><tr><td>OFMDFM</td><td>(i) 1</td><td></td><td>(ii)1</td><td>(i) 1 (ii) 2</td><td>(ii) 1</td><td>(ii) 2</td><td></td><td></td><td>(ii) 1</td><td>(i) 1 (ii) 1</td><td>(ii) 1</td><td></td></tr><tr><td>DARD</td><td>(i) 3 (ii) 2</td><td>(i)1 (ii) 12</td><td>(i) 5 (ii) 3</td><td>(i) 3 (ii) 3</td><td>(i) 6 (ii) 2</td><td>(i) 9 (ii) 7</td><td>(i) 2 (ii) 8</td><td>(i) 2 (ii) 13</td><td>(ii) 3</td><td>(i) 1 (ii) 3</td><td>(i) 3 (ii) 1</td><td>(i) 4 (ii) 2</td></tr><tr><td>DCAL</td><td>(i) 2 (ii) 5</td><td>(ii) 3</td><td>(ii) 1</td><td>(i) 2 (ii) 1</td><td>(i) 1</td><td>(i) 3 (ii) 2</td><td>(i) 1 (ii) 1</td><td>(i) 1 (ii) 1</td><td>(ii) 2</td><td></td><td>(i) 1 (ii) 3</td><td>(i) 1</td></tr><tr><td>DE</td><td>(i) 2 (ii) 2</td><td>(i) 1</td><td>(i) 1</td><td>(i) 2 (ii) 2</td><td>(i) 5 (ii) 1</td><td>(i) 2 (ii) 1</td><td>(ii) 3</td><td>(ii) 1</td><td>(i) 4 (ii) 1</td><td>(ii) 1</td><td>(i) 1 (ii) 2</td><td></td></tr><tr><td>DEL</td><td>(ii) 1</td><td>(i) 2 (ii) 1</td><td></td><td>(i) 1</td><td>(ii) 1</td><td>(ii) 2</td><td></td><td>(i) 1 (ii) 2</td><td></td><td></td><td></td><td></td></tr><tr><td>DETI</td><td></td><td></td><td>(ii) 1</td><td></td><td></td><td>(ii) 1</td><td>(ii) 1</td><td>(ii) 1</td><td>(i) 1</td><td>(ii) 1</td><td></td><td>(i) 1 (ii) 1</td></tr><tr><td>DOE</td><td>(i) 33 (ii) 9</td><td>(i) 23 (ii) 10</td><td>(i) 39 (ii) 15</td><td>(i) 13 (ii) 89</td><td>(i) 3 (ii) 91</td><td>(i) 5 (ii) 43</td><td>(ii) 3</td><td>(i) 2 (ii) 4</td><td>(ii) 2</td><td>(ii) 2</td><td>(i) 2 (ii) 3</td><td>(i) 2 (ii) 2</td></tr><tr><td>DHSSPS</td><td></td><td>(i) 2 (ii) 1</td><td></td><td></td><td>(i) 1</td><td></td><td></td><td></td><td></td><td></td><td>(ii) 1</td><td></td></tr><tr><td>DFP</td><td>(i) 13 (ii) 11</td><td>(i) 10 (ii) 8</td><td>(i) 29 (ii) 10</td><td>(i) 12 (ii) 14</td><td>(i) 7 (ii) 34</td><td>(i) 11 (ii) 20</td><td>(i) 8 (ii) 12</td><td>(i) 21 (ii) 2</td><td>(i) 7 (ii) 7</td><td>(i) 13 (ii) 17</td><td>(i) 16 (ii) 5</td><td>(i) 1 (ii) 11</td></tr><tr><td>DOJ</td><td></td><td>(ii) 2</td><td>(i) 2 (ii) 2</td><td></td><td></td><td>(ii) 3</td><td></td><td></td><td></td><td></td><td></td><td>(ii)1</td></tr><tr><td>DRD</td><td>(i) 2 (ii) 4</td><td>(i) 1 (ii) 3</td><td>(i) 2 (ii) 6</td><td>(i) 3</td><td>(i) 2 (ii) 5</td><td>(i) 1 (ii) 11</td><td>(i) 2 (ii) 4</td><td>(i) 1 (ii) 1</td><td>(ii) 6</td><td>(ii) 2</td><td></td><td>(ii) 1</td></tr><tr><td>DSD</td><td>(i) 21 (ii) 6</td><td>(i) 20 (ii) 12</td><td>(i) 32 (ii) 14</td><td>(i) 67 (ii) 99</td><td>(i) 17 (ii) 12</td><td>(i) 3 (ii) 16</td><td>(i) 1 (ii) 17</td><td>(i) 17 (ii) 6</td><td>(i) 1 (ii) 11</td><td>(ii) 6</td><td>(i) 70 (ii) 8</td><td>(ii) 24</td></tr><tr><td>PPS</td><td>(i) 5 (ii) 3</td><td>(i) 2</td><td>(i) 2</td><td>(i) 1 (ii) 1</td><td>(ii) 1</td><td>(ii) 19</td><td></td><td>(ii) 1</td><td>(i) 1 (ii) 1</td><td>(ii) 1</td><td></td><td></td></tr></table></div><p>2013/14</p><div class=\"table-wrap\"><table><tr><td></td><td>April</td><td>May</td><td>June</td><td>July</td><td>August</td><td>September</td><td>October</td><td>November</td><td>December</td><td>January</td><td>February</td><td>March</td></tr><tr><td></td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i)<br>Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td></tr><tr><td>OFMDFM</td><td>(i) 2 (ii) 1</td><td></td><td></td><td></td><td>(i) 1 (ii) 1</td><td></td><td>(i) 2</td><td></td><td></td><td>(ii) 1</td><td>(i) 3</td><td>(i) 1 (ii) 1</td></tr><tr><td>DARD</td><td>(i) 5 (ii) 2</td><td>(i) 6 (ii) 10</td><td>(i) 6 (ii) 10</td><td>(i) 3 (ii) 3</td><td>(i) 5 (ii) 4</td><td>(i) 12 (ii) 3</td><td>(i) 5</td><td>(i) 4</td><td>(i) 3 (ii) 3</td><td>(i) 3 (ii) 4</td><td>(i) 4 (ii) 2</td><td>(i) 3 (ii) 2</td></tr><tr><td>DCAL</td><td>(ii) 1</td><td>(i) 2</td><td>(ii) 2</td><td>(i) 2</td><td>(i) 4 (ii) 1</td><td>(i) 2 (ii) 1</td><td>(ii) 1</td><td>(i) 7 (ii) 1</td><td>(i) 1 (ii) 1</td><td>(i) 3 (ii) 1</td><td>(i) 10 (ii) 5</td><td>(i) 5 (ii) 14</td></tr><tr><td>DE</td><td>(i) 1 (ii) 2</td><td></td><td></td><td></td><td></td><td></td><td>(i) 5 (ii) 2</td><td>(i) 1 (ii) 1</td><td>(i) 1 (ii) 1</td><td></td><td></td><td>(i) 4</td></tr><tr><td>DEL</td><td>(ii) 1</td><td></td><td></td><td>(i) 2</td><td>(i) 2 (i) 1</td><td>(i) 1</td><td>(i) 2 (ii) 4</td><td>(i) 1 (ii) 2</td><td>(i) 1</td><td>(ii) 1</td><td></td><td></td></tr><tr><td>DETI</td><td></td><td></td><td></td><td></td><td></td><td></td><td>(i) 2</td><td>(i) 1 (ii) 1</td><td>(i) 1</td><td></td><td>(i) 2</td><td>(i) 1 (ii) 1</td></tr><tr><td>DOE</td><td>(i) 42 (ii) 13</td><td>(i) 17 (ii) 18</td><td>(i) 72 (ii) 46</td><td>(i) 31 (ii) 10</td><td>(i) 5 9ii) 34</td><td>(i) 33 (ii) 88</td><td>(i) 17 (ii) 25</td><td>(i) 21 (ii) 20</td><td>(i) 13 (ii) 13</td><td>(i) 13 (ii) 13</td><td>(i) 18 (ii) 11</td><td>(i) 8 (ii) 38</td></tr><tr><td>DHSSPS</td><td></td><td></td><td></td><td></td><td>(i) 1</td><td>(i) 1</td><td>(i) 1 (ii) 1</td><td>(i) 1 (ii) 1</td><td>(i) 1( ii) 2</td><td>(i) 1 (ii) 1</td><td></td><td></td></tr><tr><td>DFP</td><td>(i) 13 (ii) 6</td><td>(i) 11 (ii) 3</td><td>(i) 10 (ii) 7</td><td>(i) 13 (ii) 45</td><td>(i) 8 (ii) 8</td><td>(i) 9 (ii) 17</td><td>(i) 8 (ii) 2</td><td>(i) 23 (ii) 4</td><td>(i) 12 (ii) 3</td><td>(i) 23 (ii) 9</td><td>(i) 9 (ii) 7</td><td>(i) 12 (ii) 32</td></tr><tr><td>DOJ</td><td>(i) 10 (ii) 1</td><td>(i) 14 (ii) 2</td><td>(i) 13</td><td>(i) 2 (ii) 3</td><td></td><td>(i) 1 (ii) 1</td><td>(i) 9 (ii) 2</td><td>(i) 1 (ii) 2</td><td>(ii) 13</td><td>(i) 1 (ii) 1</td><td>(ii) 62</td><td>(i) 1 (ii) 3</td></tr><tr><td>DRD</td><td>(i) 7 (ii) 2</td><td>(i) 3 (ii) 3</td><td>(i) 2</td><td>(i) 4 (ii) 3</td><td>(i) 2 (ii) 6</td><td>(i) 7 (ii) 3</td><td>(i) 6 (ii) 5</td><td>(i) 7 (ii) 5</td><td>(i) 3 (ii) 4</td><td>(i) 3 (ii) 5</td><td>(i) 6 (ii) 2</td><td>(i) 6 (ii) 6</td></tr><tr><td>DSD</td><td>(i) 19 (ii) 35</td><td>(i) 12 (ii) 26</td><td>(i) 12 (ii) 11</td><td>(i) 55 (ii) 14</td><td>(i) 8 (ii) 20</td><td>(i) 43 (ii) 14</td><td>(i) 17 (ii) 16</td><td>(i) 28 (ii) 25</td><td>(i) 6 (ii) 12</td><td>(i) 14 (ii) 12</td><td>(i) 18 (ii) 2</td><td>(i) 67 (ii) 14</td></tr><tr><td>PPS</td><td>(i) 6 (ii) 3</td><td>(i) 2 (ii) 2</td><td>(i) 2 (ii) 2</td><td>(i) 1 (ii) 4</td><td>(ii) 1</td><td>(i) 3 (ii) 1</td><td>(ii) 3</td><td>(i) 2</td><td></td><td>(i) 3 (ii) 2</td><td>(ii) 1</td><td></td></tr></table></div><p>2012/13</p><div class=\"table-wrap\"><table><tr><td></td><td>April</td><td>May</td><td>June</td><td>July</td><td>August</td><td>September</td><td>October</td><td>November</td><td>December</td><td>January</td><td>February</td><td>March</td></tr><tr><td></td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i)<br>Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td></tr><tr><td>OFMDFM</td><td></td><td></td><td>(i) 1</td><td>(i) 1</td><td></td><td>(i) 1</td><td>(ii) 2</td><td>(i) 2</td><td></td><td></td><td></td><td>(ii) 1</td></tr><tr><td>DARD</td><td>(i) 2 (ii) 2</td><td>(i) 3 (ii) 4</td><td>(i) 2 (ii) 4</td><td>(i) 3 (ii) 1</td><td>(i) 3 (ii) 4</td><td>(i) 4 (ii) 6</td><td>(i) 6 (ii) 3</td><td>(i) 3 (ii) 1</td><td>(i) 2 (ii) 4</td><td>(i) 5 (ii) 5</td><td>(i) 9 (ii) 3</td><td>(i) 3 (ii) 3</td></tr><tr><td>DCAL</td><td></td><td></td><td>(i) 3</td><td>(i) 1 (ii) 1</td><td></td><td></td><td>(i) 2</td><td>(i) 1 (ii) 1</td><td>(ii) 1</td><td>(i) 4</td><td>(i) 3 (ii) 3</td><td>(i) 5 (i) 2</td></tr><tr><td>DE</td><td></td><td>(i) 2</td><td></td><td></td><td></td><td></td><td>(i) 2 (ii) 1</td><td>(ii) 1</td><td></td><td></td><td></td><td>(i) 1 (ii) 1</td></tr><tr><td>DEL</td><td>(i) 1 (ii) 1</td><td>(i) 2 (ii) 2</td><td>(i) 1 (ii) 1</td><td></td><td>(i) 2 (i) 1</td><td>(i) 3 (ii) 1</td><td>(ii) 1</td><td></td><td>(i) 2</td><td>(ii) 2</td><td></td><td>(ii) 4</td></tr><tr><td>DETI</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td>(i) 1 (ii) 1</td><td></td><td></td><td></td><td>(i) 1 (ii) 1</td></tr><tr><td>DOE</td><td>(i) 17 (ii) 5</td><td>(i) 21 (ii) 4</td><td>(i) 56 (ii) 4</td><td>(i) 13 (ii) 3</td><td>(i) 13 (ii) 15</td><td>(i) 28 (ii) 35</td><td>(i) 16 (ii) 12</td><td>(i) 19 (ii) 4</td><td>(i) 7 (ii) 3</td><td>(i) 12 (ii) 6</td><td>(i) 14 (ii) 9</td><td>(i) 28 (ii) 34</td></tr><tr><td>DHSSPS</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>DFP</td><td>(i) 3 (ii) 4</td><td>(i) 12 (ii) 2</td><td>(i) 9 (ii) 7</td><td>(i) 59 (ii) 13</td><td>(i) 10 (ii) 3</td><td>(i) 16 (ii) 25</td><td>(i) 12 (ii) 20</td><td>(i) 14 (ii) 5</td><td>(i) 4 (ii) 6</td><td>(i) 5 (ii) 4</td><td>(i) 6 (ii) 7</td><td>(i) 4 (ii) 14</td></tr><tr><td>DOJ</td><td>(i) 2</td><td>(i) 2</td><td>(i) 1 (ii) 1</td><td></td><td>(i) 1 (ii) 1</td><td>(i) 3</td><td>(i) 24 (ii) 3</td><td>(i) 3 (ii) 2</td><td></td><td>(i) 2 (ii) 2</td><td>(i) 13 (ii) 1</td><td>(ii) 1</td></tr><tr><td>DRD</td><td>(i) 1</td><td>(ii) 2</td><td>(ii) 2</td><td>(i) 3 (ii) 2</td><td>(i) 1 (ii) 1</td><td>(i) 7 (ii) 3</td><td>(i) 1 (ii) 2</td><td>(i) 1</td><td>(i) 2 (ii) 1</td><td>(i) 2 (ii) 3</td><td>(i) 1 (ii) 2</td><td>(i) 1</td></tr><tr><td>DSD</td><td>(i) 4 (ii) 3</td><td>(i) 4 (ii) 7</td><td>(i) 8 (ii) 7</td><td>(i) 11 (ii) 3</td><td>(i) 8 (ii) 4</td><td>(i) 4 (ii) 7</td><td>(i) 8 (ii) 5</td><td>(i) 10 (ii) 4</td><td>(ii) 3</td><td>(i) 7 (ii) 9</td><td>(i) 8 (ii) 4</td><td>(i) 6 (ii) 19</td></tr><tr><td>PPS</td><td>(i) 3 (ii) 3</td><td>(i) 3</td><td>(i) 1</td><td>(i) 1 (i) 1</td><td>(i) 2 (ii) 1</td><td>(i) 1</td><td>(i) 4 (ii) 2</td><td>(i) 3</td><td>(i) 2 (ii) 1</td><td>(i) 1</td><td>(i) 6</td><td>(i) 1 (ii) 6</td></tr></table></div><p>2011/12</p><div class=\"table-wrap\"><table><tr><td></td><td>April</td><td>May</td><td>June</td><td>July</td><td>August</td><td>September</td><td>October</td><td>November</td><td>December</td><td>January</td><td>February</td><td>March</td></tr><tr><td></td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i)<br>Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td></tr><tr><td>OFMDFM</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>DARD</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>DCAL</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>DE</td><td>(ii) 3</td><td></td><td>(i) 1</td><td></td><td>(i) 1 (ii) 1</td><td></td><td>(i) 1 (ii) 1</td><td></td><td></td><td>(i) 1</td><td></td><td></td></tr><tr><td>DEL</td><td>(ii) 1</td><td>(i) 1</td><td>(i) 2 (ii) 1</td><td></td><td>(ii) 1</td><td></td><td>(i) 2</td><td>(i) 2</td><td>(i) 1</td><td></td><td></td><td>(i) 3 (ii) 2</td></tr><tr><td>DETI</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td>(i) 1 (ii) 1</td></tr><tr><td>DOE</td><td>(i) 9 (ii) 2</td><td>(i) 9 (ii) 7</td><td>(i) 11 (ii) 5</td><td>(i) 6 (ii) 5</td><td>(i) 6 (ii) 7</td><td>(i) 10 (ii) 3</td><td>(i) 13 (ii) 8</td><td>(i) 15 (ii) 5</td><td>(i) 2 (ii) 24</td><td>(i) 65 (ii) 6</td><td>(i) 10 (ii) 6</td><td>(i) 8 (ii) 25</td></tr><tr><td>DHSSPS</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>DFP</td><td>(i) 2 (ii) 1</td><td>(ii) 3</td><td>(i) 1 (ii) 17</td><td>(i) 5</td><td>(i) 2</td><td>(i) 2 (ii) 2</td><td>(i) 1 (ii) 8</td><td>(i) 3</td><td>(i) 1 (ii) 2</td><td>(i) 33 (ii) 2</td><td>(i) 18 (ii) 7</td><td>(i) 5 (ii) 28</td></tr><tr><td>DOJ</td><td>(i) 1</td><td></td><td></td><td></td><td>(i) 1</td><td></td><td></td><td>(i) 1</td><td>(i) 1 (ii) 2</td><td>(i) 1</td><td>(ii) 1</td><td>(i) 2</td></tr><tr><td>DRD</td><td>(i) 2 (ii) 1</td><td></td><td>(i) 4 (ii) 1</td><td>(ii) 1</td><td>(i) 2 (ii) 1</td><td>(ii) 3</td><td>(i) 2</td><td>(i) 1 (ii) 6</td><td></td><td>(i) 6 (ii) 3</td><td>(i) 3</td><td>(i) 2</td></tr><tr><td>DSD</td><td>(i) 1 (ii) 1</td><td>(i) 4 (ii) 1</td><td>(i) 7 (ii) 2</td><td>(i) 3</td><td>(i) 16 (ii) 4</td><td>(i) 18 (ii) 4</td><td>(i) 18 (ii) 5</td><td>(i) 13 (ii) 2</td><td>(i) 11 (ii) 4</td><td>(i) 17 (ii) 6</td><td>(i) 8 (ii) 3</td><td>(i) 3 (ii) 2</td></tr><tr><td>PPS</td><td></td><td>(i) 2</td><td>(ii) 1</td><td>(ii) 1</td><td>(i) 1 (ii) 1</td><td>(i) 2</td><td>(i) 2</td><td>(i) 1</td><td></td><td>(i) 1</td><td>(i) 2 (ii) 1</td><td>(ii) 1</td></tr></table></div><p>2010/11</p><div class=\"table-wrap\"><table><tr><td></td><td>April</td><td>May</td><td>June</td><td>July</td><td>August</td><td>September</td><td>October</td><td>November</td><td>December</td><td>January</td><td>February</td><td>March</td></tr><tr><td></td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i)<br>Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td></tr><tr><td>OFMDFM</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>DARD</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>DCAL</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>DE</td><td>(ii) 5</td><td>(ii) 2</td><td>(i) 2 (ii) 2</td><td></td><td></td><td>(i) 1 (ii) 4</td><td>(i) 3 (ii) 2</td><td>(ii) 2</td><td></td><td>(i) 1 (ii) 3</td><td>(ii) 1</td><td></td></tr><tr><td>DEL</td><td></td><td>(i) 1 (ii) 1</td><td>(ii) 2</td><td>(ii) 1</td><td></td><td></td><td>(i) 1 (ii) 2</td><td>(ii) 2</td><td></td><td></td><td>(i) 1</td><td>(ii) 1</td></tr><tr><td>DETI</td><td></td><td></td><td></td><td>(ii) 1</td><td></td><td></td><td></td><td>(i) 1</td><td></td><td>(ii) 1</td><td></td><td></td></tr><tr><td>DOE</td><td>(i) 2 (ii) 3</td><td>(i) 2 (ii) 1</td><td>(i) 4 (ii) 4</td><td>(i) 1 (ii) 1</td><td>(ii) 2</td><td>(ii) 6</td><td>(i) 13 (ii) 4</td><td>(i) 1 (ii) 3</td><td>(i) 1(ii) 2</td><td>(i) 10 (ii) 2</td><td>(i) 4 (ii) 12</td><td>(i) 11 (ii) 2</td></tr><tr><td>DHSSPS</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>DFP</td><td>(i) 3 (ii) 11</td><td>(i) 1 (ii) 2</td><td>(i) 1 (ii) 3</td><td>(ii) 2</td><td>(ii) 3</td><td>(i) 6 (ii) 1</td><td>(i) 1 (ii) 2</td><td>(i) 1 (ii) 3</td><td></td><td>(i) 5 (ii) 5</td><td>(i) 10 (ii) 2</td><td>(i) 7 (ii) 2</td></tr><tr><td>DOJ</td><td>(ii) 1</td><td></td><td></td><td>(ii) 1</td><td></td><td>(ii) 2</td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>DRD</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>DSD</td><td>(ii) 6</td><td>(i) 1 (ii) 14</td><td>(ii) 5</td><td>(ii) 1</td><td>(i) 1 (ii) 3</td><td>(i) 1 (ii) 3</td><td>(i) 3 (ii) 4</td><td>(i) 1 (ii) 4</td><td>(i) 4 (ii) 2</td><td>(i) 4 (ii) 4</td><td>(i) 2</td><td>(i) 1 (ii) 3</td></tr><tr><td>PPS</td><td>(ii) 1</td><td>(ii) 1</td><td>(i) 1 (ii) 2</td><td></td><td>(i) 1</td><td>(i) 1 (ii) 1</td><td>(i) 1 (ii) 1</td><td></td><td>(ii) 1</td><td></td><td>(ii) 1</td><td></td></tr></table></div><p>2009/10</p><div class=\"table-wrap\"><table><tr><td></td><td>April</td><td>May</td><td>June</td><td>July</td><td>August</td><td>September</td><td>October</td><td>November</td><td>December</td><td>January</td><td>February</td><td>March</td></tr><tr><td></td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i)<br>Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td></tr><tr><td>OFMDFM</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>DARD</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>DCAL</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>DE</td><td>(i) 1 (ii) 1</td><td>(i) 3</td><td>(i) 2</td><td>(ii) 1</td><td>(i) 3</td><td></td><td>(i) 6 (ii) 1</td><td>(i) 2 (ii) 3</td><td>(ii) 5</td><td>(i) 2 (ii) 2</td><td>(i) 5</td><td>(i) 1 (ii) 1</td></tr><tr><td>DEL</td><td></td><td>(ii) 3</td><td>(i) 3 (ii) 2</td><td>(i) 1 (ii) 1</td><td>(ii) 4</td><td>(i) 1</td><td></td><td>(i) 4 (ii) 2</td><td></td><td>(ii) 1</td><td>(ii) 3</td><td>(i) 2 (ii) 3</td></tr><tr><td>DETI</td><td>(i) 2</td><td>(i) 1</td><td></td><td>(i) 2</td><td>(ii) 1</td><td>(i) 1 (ii) 1</td><td>(ii) 1</td><td>(ii) 2</td><td></td><td></td><td></td><td></td></tr><tr><td>DOE</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>DHSSPS</td><td>(i) 1 (ii) 2</td><td></td><td>(i) 1</td><td></td><td></td><td>(i) 1</td><td></td><td>(ii) 1</td><td></td><td></td><td></td><td></td></tr><tr><td>DFP</td><td>(i) 3 (ii) 2</td><td>(i) 6 (ii) 3</td><td>(ii) 4</td><td>(i) 2 (ii) 2</td><td>(i) 1 (ii) 5</td><td>(i) 4 (ii) 18</td><td></td><td>(ii) 2</td><td>(ii) 3</td><td>(i) 4</td><td>(i) 5 (ii) 1</td><td>(i) 2 (ii) 1</td></tr><tr><td>DOJ</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>DRD</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>DSD</td><td>(i) 17 (ii) 18</td><td>(i) 17 (ii) 8</td><td>(i) 39 (ii) 15</td><td>(i) 33 (ii) 22</td><td>(i) 16 (ii) 18</td><td>(i) 22 (ii) 30</td><td>(i) 9 (ii) 19</td><td>(i) 2 (ii) 21</td><td>(i) 5 (ii) 19</td><td>(i) 15 (ii) 23</td><td>(i) 8 (ii) 10</td><td>(i) 6 (ii) 10</td></tr><tr><td>PPS</td><td></td><td>(i) 2</td><td>(i) 1</td><td>(i) 1</td><td>(i) 1</td><td></td><td>(ii) 1</td><td>(i) 1 (ii) 5</td><td></td><td></td><td>(i) 1</td><td>(i) 1</td></tr></table></div><p>2008/09</p><div class=\"table-wrap\"><table><tr><td></td><td>April</td><td>May</td><td>June</td><td>July</td><td>August</td><td>September</td><td>October</td><td>November</td><td>December</td><td>January</td><td>February</td><td>March</td></tr><tr><td></td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i)<br>Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td><td>(i) Beginning contract<br>(ii)<br>Ending Contract</td><td>(i) Beginning contract<br>(ii) Ending Contract</td></tr><tr><td>OFMDFM</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>DARD</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>DCAL</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>DE</td><td></td><td>(i) 1</td><td></td><td>(ii) 1</td><td></td><td></td><td>(i) 1</td><td>(i) 4 (ii) 1</td><td>(i) 1</td><td>(i) 2</td><td>(i) 1 (ii) 2</td><td></td></tr><tr><td>DEL</td><td>(i) 1</td><td>(ii) 1</td><td>(i) 5 (ii) 1</td><td>(i) 1</td><td>(ii) 2</td><td>(i) 2 (ii) 2</td><td>(i) 1</td><td>(i) 3</td><td>(i) 2</td><td>(ii) 3</td><td>(i) 5 (ii) 1</td><td>(i) 3</td></tr><tr><td>DETI</td><td>(i) 6</td><td>(ii) 4</td><td>(ii) 1</td><td>(i) 1</td><td>(i) 1 (ii) 1</td><td>(ii) 1</td><td></td><td>(ii) 1</td><td></td><td></td><td></td><td>(ii) 1</td></tr><tr><td>DOE</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>DHSSPS</td><td>(ii) 1</td><td>(i) 1</td><td>(i) 1 (i) 1</td><td>(i) 1 (ii) 2</td><td>(i) 2 (ii) 3</td><td>(i) 1</td><td>(i) 2 (ii) 1</td><td>(i) 1</td><td>(ii) 4</td><td>(ii) 3</td><td>(i) 2</td><td>(ii) 1</td></tr><tr><td>DFP</td><td>(i) 6 (ii) 1</td><td>(i) 3</td><td>(i) 6</td><td>(i) 3</td><td>(i) 3 (ii) 4</td><td>(i) 13 (ii) 11</td><td>(i) 8 (ii) 9</td><td>(i) 9 (ii) 3</td><td>(i) 3 (ii) 3</td><td>(i) 4 (ii) 3</td><td>(i) 4 (ii) 6</td><td>(i) 3 (ii) 2</td></tr><tr><td>DOJ</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>DRD</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>DSD</td><td>(i) 3</td><td>(i) 4</td><td>(i) 9 (ii) 1</td><td>(i) 10 (ii) 3</td><td>(i) 7 (ii) 10</td><td>(i) 11 (ii) 18</td><td>(i) 17 (ii) 8</td><td>(i) 8 (ii) 11</td><td>(i) 11 (ii) 13</td><td>(i) 25 (ii) 16</td><td>(i) 8 (ii) 12</td><td>(i) 24 (ii) 12</td></tr><tr><td>PPS</td><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td>(i) 5</td><td></td><td></td><td></td><td></td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2046568%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=236821","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=236821"}},{"id":"236820","reference":"AQW 46567/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-02","answerBy":"2015-06-17","answered":"2015-07-01","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to detail (i) the total cost paid to temporary work agencies to supply temporary staff across the NI Civil Service for the financial year 2014/15; (ii) the total cost disbursed as wages to temporary agency workers for 2014/15; and (iii) the total cost disbursed as fees administration and any other cost paid to temporary work agencies for 2014/15.","answerText":"The total cost paid to temporary work agencies to supply temporary staff across the NI Civil Service for the financial year 2014/15 was £9,228,998.\n\nWe do not hold information in relation to the total cost disbursed as wages to temporary agency workers for 2014/15, the total cost disbursed as fees administration and any other cost paid to temporary work agencies for 2014/15. However, if we did have this information it would be commercially sensitive and could not be released.","answerHtml":"<p>The total cost paid to temporary work agencies to supply temporary staff across the NI Civil Service for the financial year 2014/15 was £9,228,998.</p><p>We do not hold information in relation to the total cost disbursed as wages to temporary agency workers for 2014/15, the total cost disbursed as fees administration and any other cost paid to temporary work agencies for 2014/15. However, if we did have this information it would be commercially sensitive and could not be released.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2046567%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=236820","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=236820"}},{"id":"236819","reference":"AQW 46566/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-06-02","answerBy":"2015-06-17","answered":"2015-06-15","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to detail the total annual cost of employing a temporary agency worker at Executive Officer 1 grade for the financial year 2014/15, compared with the total annual cost, including NICS Nuvos Pension and National Insurance Contributions, of a permanent NICS employee on step 1 of the Executive Officer1 grade pay scale.","answerText":"The total annual cost, including NICS Nuvos Pension and National Insurance Contributions, of a permanent NICS employee on step 1 of the Executive Officer 1 grade pay scale is £32833.68.\n\nThe total annual cost of employing a temporary agency worker at Executive Officer 1 grade for the financial year 2014/15 cannot be released as this information is commercially sensitive.","answerHtml":"<p>The total annual cost, including NICS Nuvos Pension and National Insurance Contributions, of a permanent NICS employee on step 1 of the Executive Officer 1 grade pay scale is £32833.68.</p><p>The total annual cost of employing a temporary agency worker at Executive Officer 1 grade for the financial year 2014/15 cannot be released as this information is commercially sensitive.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2046566%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=236819","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=236819"}},{"id":"236419","reference":"AQW 46433/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-05-29","answerBy":"2015-06-15","answered":"2015-06-09","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education, given the commitment to provide financial assistance to schools in formal intervention, as outlined in Every School is a Good School, why this has not been provided to Ashgrove Primary School to help them deal with the issues highlighted following their recent inspection.","answerText":"When a school enters formal intervention it is the responsibility of the school’s Board of Governors to prepare and implement an action plan to address the areas for improvement identified. In taking this work forward the school will be supported by the Education Authority and, in the case of catholic maintained schools, the CCMS. The action plan will identify the support and resources required to address the areas for improvement. The Education Authority will provide guidance and support through its Curriculum Advisory Support Service (CASS).\n\nSchools in formal intervention do not automatically receive funding to assist them in addressing areas for improvement identified in an inspection report.\n\nHowever, if it is identified that particular action(s) will require additional funding for resources or support beyond that provided by the school or the EA CASS then the EA can submit a request for such funding to the Department. Such requests are considered on a case by case basis and subject to the approval of a business case prepared by the EA and any subsequent bid for funding being successful.\n\nThe EA has advised that Ashgrove Primary School has not identified any significant need for additional financial assistance. However, the EA will be happy to meet with the school should they wish to discuss resource needs.","answerHtml":"<p>When a school enters formal intervention it is the responsibility of the school’s Board of Governors to prepare and implement an action plan to address the areas for improvement identified. In taking this work forward the school will be supported by the Education Authority and, in the case of catholic maintained schools, the CCMS. The action plan will identify the support and resources required to address the areas for improvement. The Education Authority will provide guidance and support through its Curriculum Advisory Support Service (CASS).</p><p>Schools in formal intervention do not automatically receive funding to assist them in addressing areas for improvement identified in an inspection report.</p><p>However, if it is identified that particular action(s) will require additional funding for resources or support beyond that provided by the school or the EA CASS then the EA can submit a request for such funding to the Department. Such requests are considered on a case by case basis and subject to the approval of a business case prepared by the EA and any subsequent bid for funding being successful.</p><p>The EA has advised that Ashgrove Primary School has not identified any significant need for additional financial assistance. However, the EA will be happy to meet with the school should they wish to discuss resource needs.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2046433%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=236419","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=236419"}},{"id":"236127","reference":"AQW 46331/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-05-27","answerBy":"2015-06-11","answered":"2015-07-29","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to detail the total wage bill for temporary agency staff and temporary contract workers employed by the Northern Ireland Civil Service for each financial years between 2008 and 2015, broken down by Department.","answerText":"The total wage bill for temporary agency staff and temporary contract workers employed by the Department of Finance and Personnel for each financial year is available online in the annual report and resource accounts of the Department at the attached link:\n\nhttp://www.dfpni.gov.uk/publications-foi/publications-browse/publication-scheme-what-we-spend-how-we-spend-it/publication-scheme-what-we-spend-financial-statements/pub-ps-what-we-spend-resource_accounts.htm\n\nAudited figures for the most recent financial year are not yet available. The information requested is not held centrally for all departments, therefore, this answer relates to DFP only.","answerHtml":"<p>The total wage bill for temporary agency staff and temporary contract workers employed by the Department of Finance and Personnel for each financial year is available online in the annual report and resource accounts of the Department at the attached link:</p><p>http://www.dfpni.gov.uk/publications-foi/publications-browse/publication-scheme-what-we-spend-how-we-spend-it/publication-scheme-what-we-spend-financial-statements/pub-ps-what-we-spend-resource_accounts.htm</p><p>Audited figures for the most recent financial year are not yet available. The information requested is not held centrally for all departments, therefore, this answer relates to DFP only.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2046331%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=236127","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=236127"}},{"id":"236126","reference":"AQW 46330/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-05-27","answerBy":"2015-06-11","answered":"2015-08-06","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to detail the number of temporary agency staff and temporary contract workers employed by the Northern Ireland Civil Service, for financial year between 2008 and 2015 in posts requiring (i) a graduate certificate and (ii) a postgraduate qualification.","answerText":"The information requested is not held centrally for all departments therefore, this answer relates to DFP only.\n\nFrom the information available, the Department of Finance and Personnel has employed 377 temporary agency staff for financial years between 2008 and 2015 in posts requiring a graduate certificate.\n\nNone of the posts filled by agency staff required a postgraduate qualification. Postgraduate qualifications may be accepted as an addition but is not an essential requirement.","answerHtml":"<p>The information requested is not held centrally for all departments therefore, this answer relates to DFP only.</p><p>From the information available, the Department of Finance and Personnel has employed 377 temporary agency staff for financial years between 2008 and 2015 in posts requiring a graduate certificate.</p><p>None of the posts filled by agency staff required a postgraduate qualification. Postgraduate qualifications may be accepted as an addition but is not an essential requirement.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2046330%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=236126","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=236126"}},{"id":"236123","reference":"AQW 46327/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-05-27","answerBy":"2015-06-11","answered":"2015-08-06","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to detail the total number of temporary agency staff and temporary contract workers employed by the Northern Ireland Civil Service for each of the financial years between 2008 and 2015 broken down by General Service and Analogous grades.","answerText":"The information requested is not held centrally for all departments, therefore, this answer relates to DFP only.\n\n2008/09\t2009/10\t2010/11\t2011/12\t2012/13\t2013/14\t2014/15\nGeneral Service\t11\t9\t24\t29\t19\t45\t34\nAnalogous Grades\t12\t9\t10\t43\t136\t119\t117\nGrade not held\t42\t9\t0\t0\t0\t0\t0","answerHtml":"<p>The information requested is not held centrally for all departments, therefore, this answer relates to DFP only.</p><div class=\"table-wrap\"><table><tr><td></td><td>2008/09</td><td>2009/10</td><td>2010/11</td><td>2011/12</td><td>2012/13</td><td>2013/14</td><td>2014/15</td></tr><tr><td>General Service</td><td>11</td><td>9</td><td>24</td><td>29</td><td>19</td><td>45</td><td>34</td></tr><tr><td>Analogous Grades</td><td>12</td><td>9</td><td>10</td><td>43</td><td>136</td><td>119</td><td>117</td></tr><tr><td>Grade not held</td><td>42</td><td>9</td><td>0</td><td>0</td><td>0</td><td>0</td><td>0</td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2046327%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=236123","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=236123"}},{"id":"236115","reference":"AQW 46319/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-05-27","answerBy":"2015-06-11","answered":"2015-07-29","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to detail the total number of (i) temporary agency staff and (ii) temporary contract workers hired by the Northern Ireland Civil Service for each financial year between 2008 and 2015, broken down by Department.","answerText":"(i) I refer you to the response previously given to AQW 46568/11-15 which provides an answer to this question.\n\n(ii) Information on the number of temporary contract workers in the NICS is not held. The term 'temporary contract workers' refers to the staff who work on specific contracts tendered by departments. Departments would have two main types of services contract; i) a contract to satisfy a specific one-off (i.e. temporary) business need (i.e. professional services; ad-hoc maintenance services etc); or ii) contracts for recurring services (e.g. cleaning; security guarding etc).\n\nContracts for specific one-off services would mostly be undertaken by a team of individuals dedicating hours/days to specific activities. Temporary contract workers are not employees of the NICS and are supplied under contract by a Contractor to perform specific services. These contracts are not generally performed on NICS properties. The number of staff (or inputs) would never be recorded or captured. The overall objective of the contract would be to measure the outcomes of the contract (i.e. whether the contract was delivered on time and to the appropriate standard) as opposed to measuring the inputs (number of contract staff).","answerHtml":"<p>(i) I refer you to the response previously given to AQW 46568/11-15 which provides an answer to this question.</p><p>(ii) Information on the number of temporary contract workers in the NICS is not held. The term &#39;temporary contract workers&#39; refers to the staff who work on specific contracts tendered by departments. Departments would have two main types of services contract; i) a contract to satisfy a specific one-off (i.e. temporary) business need (i.e. professional services; ad-hoc maintenance services etc); or ii) contracts for recurring services (e.g. cleaning; security guarding etc).</p><p>Contracts for specific one-off services would mostly be undertaken by a team of individuals dedicating hours/days to specific activities. Temporary contract workers are not employees of the NICS and are supplied under contract by a Contractor to perform specific services. These contracts are not generally performed on NICS properties. The number of staff (or inputs) would never be recorded or captured. The overall objective of the contract would be to measure the outcomes of the contract (i.e. whether the contract was delivered on time and to the appropriate standard) as opposed to measuring the inputs (number of contract staff).</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2046319%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=236115","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=236115"}},{"id":"236112","reference":"AQW 46316/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-05-27","answerBy":"2015-06-11","answered":"2015-07-29","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to detail the total number of staff working for each Department within the Northern Ireland Civil Service, comprising of (i) permanent and fixed term Civil Servants, (ii) temporary agency staff and (iii) temporary contract workers, for the financial year between 2008 and 2015.","answerText":"The number of staff working in the Northern Ireland Civil Service is published by NISRA and can be accessed via the following link:\n\nhttp://www.nisra.gov.uk/publications/Employment_in_the_NICS.html\n\nI refer you to the response previously given to AQW 46568/11-15 which provides an answer to this question.\n\nInformation on the number of temporary contract workers in the NICS is not held. The term 'temporary contract workers' refers to the staff who work on specific contracts tendered by departments. Departments would have two main types of services contract; i) a contract to satisfy a specific one-off (i.e. temporary) business need (i.e. professional services; ad-hoc maintenance services etc); or ii) contracts for recurring services (e.g. cleaning; security guarding etc). Contracts for specific one-off services would mostly be undertaken by a team of individuals dedicating hours/days to specific activities. Temporary contract workers are not employees of the NICS and are supplied under contract by a Contractor to perform specific services. These contracts are not generally performed on NICS properties. The number of staff (or inputs) would never be recorded or captured. The overall objective of the contract would be to measure the outcomes of the contract (i.e. whether the contract was delivered on time and to the appropriate standard) as opposed to measuring the inputs (number of contract staff).","answerHtml":"<p>The number of staff working in the Northern Ireland Civil Service is published by NISRA and can be accessed via the following link:</p><p>http://www.nisra.gov.uk/publications/Employment_in_the_NICS.html</p><p>I refer you to the response previously given to AQW 46568/11-15 which provides an answer to this question.</p><p>Information on the number of temporary contract workers in the NICS is not held. The term &#39;temporary contract workers&#39; refers to the staff who work on specific contracts tendered by departments. Departments would have two main types of services contract; i) a contract to satisfy a specific one-off (i.e. temporary) business need (i.e. professional services; ad-hoc maintenance services etc); or ii) contracts for recurring services (e.g. cleaning; security guarding etc). Contracts for specific one-off services would mostly be undertaken by a team of individuals dedicating hours/days to specific activities. Temporary contract workers are not employees of the NICS and are supplied under contract by a Contractor to perform specific services. These contracts are not generally performed on NICS properties. The number of staff (or inputs) would never be recorded or captured. The overall objective of the contract would be to measure the outcomes of the contract (i.e. whether the contract was delivered on time and to the appropriate standard) as opposed to measuring the inputs (number of contract staff).</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2046316%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=236112","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=236112"}},{"id":"234820","reference":"AQW 45816/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-05-15","answerBy":"2015-06-02","answered":"2015-10-13","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel whether his Department has assessed the additional revenue to be gained by lifting the valuation cap on houses for rating purposes.","answerText":"The removal of the maximum capital value could potentially provide additional rate revenue for the Executive of just over £4.1 million a year based on the 2015-16 regional rate poundage.","answerHtml":"<p>The removal of the maximum capital value could potentially provide additional rate revenue for the Executive of just over £4.1 million a year based on the 2015-16 regional rate poundage.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2045816%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=234820","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=234820"}},{"id":"234819","reference":"AQW 45815/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-05-15","answerBy":"2015-06-02","answered":"2015-06-01","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development whether his Department monitors non-compliance with tenancy deposit scheme requirements; and if so, to detail the number of prosecutions or fines imposed since 2013.","answerText":"The Tenancy Deposit Schemes Regulations (NI) 2012 came into effect on 1 April 2013. Council environmental health departments are responsible for enforcement action where a landlord / agent does not comply with the law.\n\nMy Department monitors non compliance on a quarterly basis and is aware that standard council practice is to issue warning letters before issuing a fixed penalty.\n\nSince the introduction of the Tenancy Deposit Schemes in April 2013 there have been 4 fixed penalties, 2 of which resulted in court referrals.","answerHtml":"<p>The Tenancy Deposit Schemes Regulations (NI) 2012 came into effect on 1 April 2013. Council environmental health departments are responsible for enforcement action where a landlord / agent does not comply with the law.</p><p>My Department monitors non compliance on a quarterly basis and is aware that standard council practice is to issue warning letters before issuing a fixed penalty.</p><p>Since the introduction of the Tenancy Deposit Schemes in April 2013 there have been 4 fixed penalties, 2 of which resulted in court referrals.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2045815%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=234819","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=234819"}},{"id":"234818","reference":"AQW 45814/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-05-15","answerBy":"2015-06-02","answered":"2015-06-01","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development whether his Department has assessed the need for further statutory powers to provide for more effective regulation of the private rental sector.","answerText":"My Department is currently undertaking a review of the role and regulation of the Private Rented Sector. Part of this review includes evaluating the effectiveness of existing regulation and considering regulatory practice in other jurisdictions. A discussion document will issue before Summer to garner views. A consultation paper, on proposals for change, will issue before the end of 2015. Any legislation that will need to be introduced will be taken forward during 2016/17.\n\nRegulation, in order to be fully effective, requires robust enforcement. Better regulation does not necessarily mean ‘more’ but can mean enhanced focus on enforcement of existing regulation.\n\nA key aim of the review will be to clarify the Department’s approach to regulation.","answerHtml":"<p>My Department is currently undertaking a review of the role and regulation of the Private Rented Sector. Part of this review includes evaluating the effectiveness of existing regulation and considering regulatory practice in other jurisdictions. A discussion document will issue before Summer to garner views. A consultation paper, on proposals for change, will issue before the end of 2015. Any legislation that will need to be introduced will be taken forward during 2016/17.</p><p>Regulation, in order to be fully effective, requires robust enforcement. Better regulation does not necessarily mean ‘more’ but can mean enhanced focus on enforcement of existing regulation.</p><p>A key aim of the review will be to clarify the Department’s approach to regulation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2045814%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=234818","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=234818"}},{"id":"234811","reference":"AQW 45811/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-05-15","answerBy":"2015-06-02","answered":"2015-05-28","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development whether his Department will bring forward legislation to effectively regulate the payment of upfront fees in the private rental sector.","answerText":"The ‘Tenancy Deposit Scheme’ introduced by my Department in April 2013 safeguards tenancy deposits paid by a tenant at the start of a tenancy. In the first two years of operation over 40,000 deposits have been protected.\n\nProtecting tenants from fees charged specifically by letting agents is one of a number of issues being considered under the review of the role and regulation of the Private Rented Sector which is currently underway. Developments in other jurisdictions, in relation to letting agents, will be considered under the review. A discussion document will issue before Summer to garner views. A consultation paper, on proposals for change, will issue before the end of 2015. Any legislation that will need to be introduced will be taken forward during 2016/17.\n\nThe Department of Enterprise, Trade and Investment can investigate any unreasonable charges under the Unfair Terms in Consumer Contract Regulations 1999.","answerHtml":"<p>The ‘Tenancy Deposit Scheme’ introduced by my Department in April 2013 safeguards tenancy deposits paid by a tenant at the start of a tenancy. In the first two years of operation over 40,000 deposits have been protected.</p><p>Protecting tenants from fees charged specifically by letting agents is one of a number of issues being considered under the review of the role and regulation of the Private Rented Sector which is currently underway. Developments in other jurisdictions, in relation to letting agents, will be considered under the review. A discussion document will issue before Summer to garner views. A consultation paper, on proposals for change, will issue before the end of 2015. Any legislation that will need to be introduced will be taken forward during 2016/17.</p><p>The Department of Enterprise, Trade and Investment can investigate any unreasonable charges under the Unfair Terms in Consumer Contract Regulations 1999.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2045811%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=234811","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=234811"}},{"id":"234189","reference":"AQW 45657/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-05-12","answerBy":"2015-05-20","answered":"2015-11-27","answeredOrally":false,"priority":true,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety to detail the average waiting times in each Health and Social Care Trust area for a routine ultrasound.","answerText":"Information on the Number of patients waiting, in weeks, and the average waiting time, for a routine ultrasound, in each Health and Social Care Trusts, is shown in the table overleaf.\n\nNumber of patients waiting, in weeks, and the average waiting time, for a routine ultrasound, in each Health and Social Care Trusts\n\nHSC Trust1\tNumber of patients waiting, in weeks, for a routine ultrasound\tAverage waiting time in weeks\n0-3\t>3-6\t>6-9\t>9-13\t>13-21\t>21-26\t>26\tTotal Waiting\nBelfast\t1,571\t1,149\t772\t734\t392\t7\t19\t4,646\t6.2\nNorthern\t1,331\t1,055\t537\t195\t94\t23\t2\t3,237\t4.7\nSouth Eastern\t1,348\t603\t247\t71\t0\t0\t0\t2,269\t9\nSouthern\t1,243\t1,218\t1,072\t1,008\t568\t8\t0\t5,117\t7\nWestern\t1,107\t332\t30\t0\t0\t0\t0\t1,469\t4\n\nSource: HSC Trusts\n\nInformation from Trusts relates to those waiting during week commencing 26th October 2015.","answerHtml":"<p>Information on the Number of patients waiting, in weeks, and the average waiting time, for a routine ultrasound, in each Health and Social Care Trusts, is shown in the table overleaf.</p><p>Number of patients waiting, in weeks, and the average waiting time, for a routine ultrasound, in each Health and Social Care Trusts</p><div class=\"table-wrap\"><table><tr><td>HSC Trust1</td><td colspan=\"8\">Number of patients waiting, in weeks, for a routine ultrasound</td><td>Average waiting time in weeks</td></tr><tr><td></td><td>0-3</td><td>&gt;3-6</td><td>&gt;6-9</td><td>&gt;9-13</td><td>&gt;13-21</td><td>&gt;21-26</td><td>&gt;26</td><td>Total Waiting</td><td></td></tr><tr><td>Belfast</td><td>1,571</td><td>1,149</td><td>772</td><td>734</td><td>392</td><td>7</td><td>19</td><td>4,646</td><td>6.2</td></tr><tr><td>Northern</td><td>1,331</td><td>1,055</td><td>537</td><td>195</td><td>94</td><td>23</td><td>2</td><td>3,237</td><td>4.7</td></tr><tr><td>South Eastern</td><td>1,348</td><td>603</td><td>247</td><td>71</td><td>0</td><td>0</td><td>0</td><td>2,269</td><td>9</td></tr><tr><td>Southern</td><td>1,243</td><td>1,218</td><td>1,072</td><td>1,008</td><td>568</td><td>8</td><td>0</td><td>5,117</td><td>7</td></tr><tr><td>Western</td><td>1,107</td><td>332</td><td>30</td><td>0</td><td>0</td><td>0</td><td>0</td><td>1,469</td><td>4</td></tr></table></div><p>Source: HSC Trusts</p><p>Information from Trusts relates to those waiting during week commencing 26th October 2015.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2045657%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=234189","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=234189"}},{"id":"234186","reference":"AQW 45656/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-05-12","answerBy":"2015-05-28","answered":"2015-05-19","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education to provide a timetable for the introduction of the Shared Education Bill to the Assembly.","answerText":"It is my intention to introduce the Shared Education Bill to the Assembly in advance of the summer recess.","answerHtml":"<p>It is my intention to introduce the Shared Education Bill to the Assembly in advance of the summer recess.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2045656%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=234186","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=234186"}},{"id":"233208","reference":"AQO 8169/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2015-04-30","answerBy":"2015-05-12","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to outline the number of homes in Northern Ireland valued at £400,000 and above for rating purposes.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%208169%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=233208","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=233208"}},{"id":"234530","reference":"AQO 8169/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2015-04-30","answerBy":"2015-05-12","answered":"2015-05-13","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to outline the number of homes in Northern Ireland valued at £400,000 and above for rating purposes.","answerText":"There are 7,412 domestic properties in the Valuation List with a capital value equal to or above £400,000.\n\nDomestic rates are capped at £400,000; in other words, all 7,412 of these properties have rate bills based on a capital value of £400,000 regardless of their actual capital value assessment in the Valuation List.","answerHtml":"<p>There are 7,412 domestic properties in the Valuation List with a capital value equal to or above £400,000.</p><p>Domestic rates are capped at £400,000; in other words, all 7,412 of these properties have rate bills based on a capital value of £400,000 regardless of their actual capital value assessment in the Valuation List.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%208169%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=234530","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=234530"}},{"id":"233206","reference":"AQO 8111/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2015-04-30","answerBy":"2015-05-11","answered":"2015-05-11","answeredOrally":true,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister for their assessment of whether the Commissioner for Older People in Northern Ireland's budget is sufficient to allow all legal action on behalf of older people to be initiated.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mr M McGuinness","text":"With your permission, Mr Speaker, junior Minister McCann will answer the question."},{"speaker":"Ms J McCann","text":"The Commissioner for Older People's main aim is to safeguard and promote the interests of older people. The commissioner is provided with a budget of £822,000 for 2015-16, and it is for her to allocate, including to decide whether or not to initiate legal action on behalf of older people. The commissioner applies criteria for acceptance of requests for individual assistance and applies a further set of criteria should the request include or necessitate legal funding or action. Neither set of criteria takes into account the cost of a case or the available resources in a legal funding budget. The commissioner has confirmed that she has not declined to offer assistance or take legal action in part or full on the basis of cost."},{"speaker":"Mr Speaker","text":"I am sorry. There is not time for a supplementary question. That ends the period for listed questions. We will now move on to 15 minutes of topical questions."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%208111%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=233206","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2015-05-11&docID=233139#AQO%208111/11-15","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=233206"}},{"id":"233204","reference":"AQO 8100/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2015-04-30","answerBy":"2015-05-11","answered":null,"answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment to outline the financial support planned in the next budgetary period for Carrickfergus Enterprise and Larne Enterprise and Development Company.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%208100%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=233204","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=233204"}},{"id":"234319","reference":"AQO 8100/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2015-04-30","answerBy":"2015-05-11","answered":"2015-05-11","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment to outline the financial support planned in the next budgetary period for Carrickfergus Enterprise and Larne Enterprise and Development Company.","answerText":"My Department and Invest NI work closely with Enterprise NI and their members, including Carrickfergus and Larne Enterprise Development Company, both as deliverers of programmes under procured contracts and local stakeholders in the enterprise arena. These organisations are commercial entities and generate income from contracts they deliver, won through a competitive tendering process, on behalf of government departments and other customers. There are, therefore, no plans to provide direct financial support to either Carrickfergus Enterprise or Larne Enterprise and Development Company.","answerHtml":"<p>My Department and Invest NI work closely with Enterprise NI and their members, including Carrickfergus and Larne Enterprise Development Company, both as deliverers of programmes under procured contracts and local stakeholders in the enterprise arena. These organisations are commercial entities and generate income from contracts they deliver, won through a competitive tendering process, on behalf of government departments and other customers. There are, therefore, no plans to provide direct financial support to either Carrickfergus Enterprise or Larne Enterprise and Development Company.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%208100%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=234319","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=234319"}},{"id":"232944","reference":"AQW 45217/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-04-28","answerBy":"2015-05-14","answered":"2015-05-12","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development for his Department’s assessment of the level of congestion on the Dargan Viaduct.","answerText":"Translink advises that the Dargan Bridge track section, between Yorkgate and Lagan Junction, is the most heavily utilised single line section on the NI Railways network. For example, during the morning peak from 07:55 to 08:55, 13 services operate between Yorkgate and Belfast Central Station – seven leaving from Belfast Central and six leaving from Yorkgate. Furthermore these services are also required to ‘thread’ through Lagan Junction, co-ordinating with 12 services per hour on the Bangor line - six in each direction.\n\nWhilst the railway timetable is designed to prevent conflicting train paths and hence delays due to congestion, this area of the rail network is now operating close to capacity during the morning and evening peaks, Monday to Friday.","answerHtml":"<p>Translink advises that the Dargan Bridge track section, between Yorkgate and Lagan Junction, is the most heavily utilised single line section on the NI Railways network. For example, during the morning peak from 07:55 to 08:55, 13 services operate between Yorkgate and Belfast Central Station – seven leaving from Belfast Central and six leaving from Yorkgate. Furthermore these services are also required to ‘thread’ through Lagan Junction, co-ordinating with 12 services per hour on the Bangor line - six in each direction.</p><p>Whilst the railway timetable is designed to prevent conflicting train paths and hence delays due to congestion, this area of the rail network is now operating close to capacity during the morning and evening peaks, Monday to Friday.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2045217%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=232944","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=232944"}},{"id":"232943","reference":"AQW 45216/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-04-28","answerBy":"2015-05-14","answered":"2015-05-12","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development for his Department’s assessment of the viability of relaying the Dargan Viaduct before, and following, the York Street Interchange Project completion.","answerText":"Translink is currently engaging with my Department’s Transport NI York Street Interchange Project Team to coordinate the design and construction of essential enabling works to the Dargan Viaduct piers and foundations, in order to facilitate future dualling of the section between Yorkgate and Donegall Quay.\n\nIt is hoped to bring forward a Business Case in 2016/17 for these, enabling works to coincide with the York Street Interchange project schedule. The scheme will be dependent on funding availability within the next Comprehensive Spending Review period.\n\nThere are no plans to relay the track this year or next.","answerHtml":"<p>Translink is currently engaging with my Department’s Transport NI York Street Interchange Project Team to coordinate the design and construction of essential enabling works to the Dargan Viaduct piers and foundations, in order to facilitate future dualling of the section between Yorkgate and Donegall Quay.</p><p>It is hoped to bring forward a Business Case in 2016/17 for these, enabling works to coincide with the York Street Interchange project schedule. The scheme will be dependent on funding availability within the next Comprehensive Spending Review period.</p><p>There are no plans to relay the track this year or next.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2045216%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=232943","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=232943"}},{"id":"232816","reference":"AQW 45175/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-04-28","answerBy":"2015-05-14","answered":"2015-05-12","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development whether Translink has considered the cost of completely relaying track between York Street and Central Station; and if so, to provide details of the cost.","answerText":"Translink is currently engaging with my Department’s Transport NI York Street Interchange Project Team to coordinate the design and construction of essential enabling works to the Dargan Viaduct piers and foundations, in order to facilitate future dualling of the section between Yorkgate and Donegall Quay.\n\nIt is hoped to bring forward a Business Case in 2016/17 for these, enabling works to coincide with the York Street Interchange project schedule. The scheme will be dependent on funding availability within the next Comprehensive Spending Review period. As no Business case has been prepared yet, there are no cost details at this time.\n\nThere are no plans to relay the track this year or next.","answerHtml":"<p>Translink is currently engaging with my Department’s Transport NI York Street Interchange Project Team to coordinate the design and construction of essential enabling works to the Dargan Viaduct piers and foundations, in order to facilitate future dualling of the section between Yorkgate and Donegall Quay.</p><p>It is hoped to bring forward a Business Case in 2016/17 for these, enabling works to coincide with the York Street Interchange project schedule. The scheme will be dependent on funding availability within the next Comprehensive Spending Review period. As no Business case has been prepared yet, there are no cost details at this time.</p><p>There are no plans to relay the track this year or next.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2045175%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=232816","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=232816"}},{"id":"232815","reference":"AQW 45174/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-04-28","answerBy":"2015-05-14","answered":"2015-05-12","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to detail the number of trains between York Street and Central Station, and vice versa, each day.","answerText":"Translink advises that Monday to Friday, a total of 112 services operate on this section of the route, 56 in each direction. On Saturday a total of 96 services operate, 48 in each direction, and on Sunday a total of 54 services operate, 27 in each direction.","answerHtml":"<p>Translink advises that Monday to Friday, a total of 112 services operate on this section of the route, 56 in each direction. On Saturday a total of 96 services operate, 48 in each direction, and on Sunday a total of 54 services operate, 27 in each direction.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2045174%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=232815","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=232815"}},{"id":"232814","reference":"AQW 45173/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-04-28","answerBy":"2015-05-07","answered":"2015-05-05","answeredOrally":false,"priority":true,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to outline Translink’s position on relaying track on the Dargan Viaduct, during the York Street Interchange project.","answerText":"Translink is currently engaging with my Department’s Transport NI York Street Interchange Project Team to co-ordinate the design and construction of essential enabling works to the Dargan Viaduct piers and foundations in order to facilitate future dualling of the section between Yorkgate and Donegall Quay.\n\nIt is hoped to bring forward a Business Case in 2016/17 for these enabling works to coincide with the York Street Interchange project schedule. The scheme will be dependent on funding availability within the next Comprehensive Spending Review period.\n\nThere are no plans to relay the track this year or next.","answerHtml":"<p>Translink is currently engaging with my Department’s Transport NI York Street Interchange Project Team to co-ordinate the design and construction of essential enabling works to the Dargan Viaduct piers and foundations in order to facilitate future dualling of the section between Yorkgate and Donegall Quay.</p><p>It is hoped to bring forward a Business Case in 2016/17 for these enabling works to coincide with the York Street Interchange project schedule. The scheme will be dependent on funding availability within the next Comprehensive Spending Review period.</p><p>There are no plans to relay the track this year or next.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2045173%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=232814","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=232814"}},{"id":"232164","reference":"AQW 45008/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-04-23","answerBy":"2015-05-11","answered":"2015-05-06","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development whether his Department has considered additional traffic calming measures on the Upper Road in Greenisland.","answerText":"My Department does not intend to provide any additional ‘formal’ traffic calming measures on the Upper Road Greenisland. However, as a result of representations from elected representatives about driver behaviour on the B90, TransportNI in conjunction with the PSNI, recently carried out a review of speed limits along the B90 from the A8 to the B149 Beltoy Road.\n\nThis review indicated that, given the gradual increase in residential development and traffic volumes around Greenisland, a revision of the current speed limits along the B90 at Greenisland would better reflect the function of the road and help improve driver respect and in turn compliance with the speed limits. With this in mind, it has been agreed to begin the consultation process to provide a 40mph limit to the west of Greenisland to include the Monkstown Road junction and extend the existing 40mph limit to the east of the village to include the development around the Trooperslane Road junction.","answerHtml":"<p>My Department does not intend to provide any additional ‘formal’ traffic calming measures on the Upper Road Greenisland. However, as a result of representations from elected representatives about driver behaviour on the B90, TransportNI in conjunction with the PSNI, recently carried out a review of speed limits along the B90 from the A8 to the B149 Beltoy Road.</p><p>This review indicated that, given the gradual increase in residential development and traffic volumes around Greenisland, a revision of the current speed limits along the B90 at Greenisland would better reflect the function of the road and help improve driver respect and in turn compliance with the speed limits. With this in mind, it has been agreed to begin the consultation process to provide a 40mph limit to the west of Greenisland to include the Monkstown Road junction and extend the existing 40mph limit to the east of the village to include the development around the Trooperslane Road junction.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2045008%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=232164","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=232164"}},{"id":"232162","reference":"AQW 45007/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-04-23","answerBy":"2015-05-11","answered":"2015-05-06","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development how six closed questions and three consultation events is considered adequate for the Social Housing Reform Programme, Regulatory Framework Consultation.","answerText":"This consultation is considered at least adequate for the following reasons. Firstly, it is facilitated by a proforma that is based on six questions to which respondents may reply without restriction. Respondents may use the proforma or reply through their own written submission. Based on previous consultations, many typically will.\n\nSecondly, as well as the 3 public events the Department has used a range of communication channels to extend the reach of the consultation:\n\n35 tweets\n\n1 Facebook post\n\n6 website articles (Housing Rights Service (HRS) x 2, Housing Executive (NIHE) x 2, NI Community Relations Council & Disability Action)\n\n3 press articles\n\n1 stakeholder newsletter article\n\nThirdly, the Tenant Participation Strategy consultation which ran from 15 January until 8 April 2015, also examined the most directly tenant-focussed parts of the proposed regulatory framework. It was the subject of 3 public meetings and 21additional events.","answerHtml":"<p>This consultation is considered at least adequate for the following reasons. Firstly, it is facilitated by a proforma that is based on six questions to which respondents may reply without restriction. Respondents may use the proforma or reply through their own written submission. Based on previous consultations, many typically will.</p><p>Secondly, as well as the 3 public events the Department has used a range of communication channels to extend the reach of the consultation:</p><p>35 tweets</p><p>1 Facebook post</p><p>6 website articles (Housing Rights Service (HRS) x 2, Housing Executive (NIHE) x 2, NI Community Relations Council &amp; Disability Action)</p><p>3 press articles</p><p>1 stakeholder newsletter article</p><p>Thirdly, the Tenant Participation Strategy consultation which ran from 15 January until 8 April 2015, also examined the most directly tenant-focussed parts of the proposed regulatory framework. It was the subject of 3 public meetings and 21additional events.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2045007%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=232162","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=232162"}},{"id":"232161","reference":"AQW 45006/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-04-23","answerBy":"2015-05-11","answered":"2015-05-07","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety, pursuant to AQW 43571/11-15, to detail the pressures felt by the Belfast Health and Social Care Trust that results in expenditure on agency nurses to be £5m, 2200 per cent higher than the Southern Health and Social Care Trust in 2013/14.","answerText":"The use of agency staff is a necessary requirement to ensure a flexible, responsive mechanism to sustain safe and effective service delivery.\n\nBelfast Health and Social Care Trust has stated that the Trust uses agency staff to complement their workforce, primarily to cover short-term vacancies arising from sickness or maternity leave absence, or where there is a temporary increase in demand for which recurrent funding is not available to make additional permanent appointments, for example, the surge in unscheduled care demand in winter.\n\nReasons for agency use across Trusts will vary and expenditure on agency staff will fluctuate in line with service needs. BHSCT employ the majority of nursing and midwifery staff across the region, 34% (6,177wte) against 15-18% for the other Trusts. It should therefore be expected that their use of agency staff will be higher than for the other Trusts.","answerHtml":"<p>The use of agency staff is a necessary requirement to ensure a flexible, responsive mechanism to sustain safe and effective service delivery.</p><p>Belfast Health and Social Care Trust has stated that the Trust uses agency staff to complement their workforce, primarily to cover short-term vacancies arising from sickness or maternity leave absence, or where there is a temporary increase in demand for which recurrent funding is not available to make additional permanent appointments, for example, the surge in unscheduled care demand in winter.</p><p>Reasons for agency use across Trusts will vary and expenditure on agency staff will fluctuate in line with service needs. BHSCT employ the majority of nursing and midwifery staff across the region, 34% (6,177wte) against 15-18% for the other Trusts. It should therefore be expected that their use of agency staff will be higher than for the other Trusts.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2045006%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=232161","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=232161"}},{"id":"232090","reference":"AQW 44968/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-04-23","answerBy":"2015-05-11","answered":"2015-05-12","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment for an update on the taxi licensing legislation in regard to the regulation of wedding cars.","answerText":"The position on the regulation of wedding car remains as I advised at our meeting on 20 October 2014. Wedding cars are regarded as taxis within the meaning of the Taxis Act (NI) 2008, as they are vehicles which carry passengers for hire or reward in the course of their business.\n\nThis means that, amongst other things, wedding cars undertake a PSV test and their drivers are licensed taxi drivers. As you are aware, my Department has taken steps to reduce the regulatory burden by exempting the vehicle from having to use a taximeter or displaying a roofsign. Further, drivers need not display their Taxi Driver badge and there is an exemption from the Taxi Operator Licensing regime.\n\nMy officials met with representatives from the wedding car industry on 29 April 2015 to discuss the ongoing concerns they have about the impact of the Taxis Act on their sector. I note that their overriding concern was in relation to the recruitment of drivers due to the taxi driver licensing regime that came into force in October 2014.\n\nIt remains my intention to review the regulation of wedding car and courtesy transport operations under the Taxis Act, to ensure that the regulation is proportionate and fit for purpose. I have asked that the scoping stage of the review is completed by September 2015 with a consultation on the matter issuing thereafter. My oficials have committed to involving key stakeholders in the development of proposals and I will ensure you are kept updated as matters progress.","answerHtml":"<p>The position on the regulation of wedding car remains as I advised at our meeting on 20 October 2014. Wedding cars are regarded as taxis within the meaning of the Taxis Act (NI) 2008, as they are vehicles which carry passengers for hire or reward in the course of their business.</p><p>This means that, amongst other things, wedding cars undertake a PSV test and their drivers are licensed taxi drivers. As you are aware, my Department has taken steps to reduce the regulatory burden by exempting the vehicle from having to use a taximeter or displaying a roofsign. Further, drivers need not display their Taxi Driver badge and there is an exemption from the Taxi Operator Licensing regime.</p><p>My officials met with representatives from the wedding car industry on 29 April 2015 to discuss the ongoing concerns they have about the impact of the Taxis Act on their sector. I note that their overriding concern was in relation to the recruitment of drivers due to the taxi driver licensing regime that came into force in October 2014.</p><p>It remains my intention to review the regulation of wedding car and courtesy transport operations under the Taxis Act, to ensure that the regulation is proportionate and fit for purpose. I have asked that the scoping stage of the review is completed by September 2015 with a consultation on the matter issuing thereafter. My oficials have committed to involving key stakeholders in the development of proposals and I will ensure you are kept updated as matters progress.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2044968%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=232090","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=232090"}},{"id":"231992","reference":"AQW 44931/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-04-22","answerBy":"2015-04-30","answered":"2015-05-19","answeredOrally":false,"priority":true,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel what action is being taken to repair or replace the defective communications system used for passing emails between NI Direct and Mid and East Antrim.","answerText":"The communication issues are due to a problem with the Council’s IT. NI Direct officials have been liaising with the Council’s network supplier to resolve their problem. An interim solution has been established to pass callers’ details from NI Direct to the Council.","answerHtml":"<p>The communication issues are due to a problem with the Council’s IT. NI Direct officials have been liaising with the Council’s network supplier to resolve their problem. An interim solution has been established to pass callers’ details from NI Direct to the Council.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2044931%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=231992","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=231992"}},{"id":"231863","reference":"AQW 44892/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-04-22","answerBy":"2015-05-08","answered":"2015-05-07","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety for a breakdown of the health services which have been put out to tender, broken down by (i) service; and (ii) fiscal value; and to detail the cost of the tendering process.","answerText":"The information sought is not readily available, and could only be obtained at disproportionate cost.","answerHtml":"<p>The information sought is not readily available, and could only be obtained at disproportionate cost.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2044892%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=231863","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=231863"}},{"id":"231862","reference":"AQW 44891/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-04-22","answerBy":"2015-05-08","answered":"2015-05-06","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety how many clinical contracts have been awarded to public providers since 2010.","answerText":"The HSC Board commissions the vast majority of its services from public sector providers through Service Agreements, rather than formal contractual arrangements, for example with each of the Health and Social Care Trusts.\n\nSince 2010, one clinical contract has been awarded to a public provider, namely a cardiac surgery contract awarded by the HSC Board to Guys & St Thomas’ Hospitals, London.","answerHtml":"<p>The HSC Board commissions the vast majority of its services from public sector providers through Service Agreements, rather than formal contractual arrangements, for example with each of the Health and Social Care Trusts.</p><p>Since 2010, one clinical contract has been awarded to a public provider, namely a cardiac surgery contract awarded by the HSC Board to Guys &amp; St Thomas’ Hospitals, London.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2044891%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=231862","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=231862"}},{"id":"231861","reference":"AQW 44890/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-04-22","answerBy":"2015-05-08","answered":"2015-05-07","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety how many Health and Social Care services are provided by private healthcare providers across all services, such as mental health services, care in the community and initial assessments.","answerText":"Commissioners decide which health and social care services are required and how to purchase those services. The aim is to provide safe, sustainable and high quality services and to secure best value for money. The number of services provided by private health and social care providers is not collected centrally and the information could only be obtained at a disproportionate cost.","answerHtml":"<p>Commissioners decide which health and social care services are required and how to purchase those services. The aim is to provide safe, sustainable and high quality services and to secure best value for money. The number of services provided by private health and social care providers is not collected centrally and the information could only be obtained at a disproportionate cost.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2044890%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=231861","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=231861"}},{"id":"231860","reference":"AQW 44889/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-04-22","answerBy":"2015-05-08","answered":"2015-05-05","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety to detail (i) the number of people waiting for; and (ii) the average waiting time for a consultation with a neurologist in Craigavon Area Hospital.","answerText":"(i) Information on the number of patients waiting, in weeks, for a first consultant led outpatient appointment in the neurology specialty at Craigavon Area Hospital, at 18th April 2015, is shown below.\n\nNumber of patients waiting, in weeks, for a first consultant led outpatient appointment in the neurology specialty at Craigavon Area Hospital, at 18th April 2015\n0-6\nweeks\t>6-9 weeks\t>9-12\nweeks\t>12-15\nweeks\t>15-18\nweeks\t>18\nweeks\tTotal\nCraigavon Area\t267\t136\t111\t117\t80\t503\t1,214\n\nSource: Southern HSC Trust\n\n(ii) The average waiting time for a first consultant led outpatient appointment in the neurology specialty in Craigavon Area Hospital at 18th April 2015 was 15 weeks.","answerHtml":"<p>(i) Information on the number of patients waiting, in weeks, for a first consultant led outpatient appointment in the neurology specialty at Craigavon Area Hospital, at 18th April 2015, is shown below.</p><div class=\"table-wrap\"><table><tr><td></td><td colspan=\"7\">Number of patients waiting, in weeks, for a first consultant led outpatient appointment in the neurology specialty at Craigavon Area Hospital, at 18th April 2015</td></tr><tr><td></td><td>0-6<br>weeks</td><td>&gt;6-9 weeks</td><td>&gt;9-12<br>weeks</td><td>&gt;12-15<br>weeks</td><td>&gt;15-18<br>weeks</td><td>&gt;18<br>weeks</td><td>Total</td></tr><tr><td>Craigavon Area</td><td>267</td><td>136</td><td>111</td><td>117</td><td>80</td><td>503</td><td>1,214</td></tr></table></div><p>Source: Southern HSC Trust</p><p>(ii) The average waiting time for a first consultant led outpatient appointment in the neurology specialty in Craigavon Area Hospital at 18th April 2015 was 15 weeks.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2044889%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=231860","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=231860"}},{"id":"231627","reference":"AQW 44781/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-04-20","answerBy":"2015-05-06","answered":"2015-05-13","answeredOrally":false,"priority":false,"department":"Northern Ireland Assembly Commission","departmentId":"2","minister":"Assembly Commission","question":"To ask the Assembly Commission, following investigation, what penalties or sanctions will be placed on parties or Members found to have acted contrary to the agreement signed by all MLA's not to use Parliament Buildings for the purposes of election campaigns.","answerText":"The Assembly Commission will be considering a report on Members’ compliance with guidance on the use of Parliament Buildings during the General Election campaign at its next meeting. I will write to you again following that meeting.","answerHtml":"<p>The Assembly Commission will be considering a report on Members’ compliance with guidance on the use of Parliament Buildings during the General Election campaign at its next meeting. I will write to you again following that meeting.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2044781%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=231627","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=231627"}},{"id":"231583","reference":"AQW 44744/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-04-20","answerBy":"2015-05-06","answered":"2015-05-05","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development for a breakdown of number of (i) pelican; and (ii) puffin crossings in each constituency.","answerText":"My Department is unable to provide this information in the format requested.","answerHtml":"<p>My Department is unable to provide this information in the format requested.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2044744%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=231583","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=231583"}},{"id":"231580","reference":"AQW 44743/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-04-20","answerBy":"2015-05-06","answered":"2015-05-05","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to list the location of all puffin crossings.","answerText":"Details of the locations of all puffin crossings are set out below, by local government area:\n\nAntrim and Newtownabbey\n\nHigh Street, Antrim\n\nFountain Street, Antrim\n\nArds and North Down\n\nBridge Street, Comber\n\nNew Street at High Street, Donaghadee\n\nHigh Street, Kilaughey Road, Donaghadee\n\nParade/New Street junction, Donaghadee\n\nMoat Street, Bridge Street, High Street, Donaghadee\n\nMain Street, Kircubbin\n\nHigh Street adjacent to Meeting House Lane, Newtownards\n\nHigh Street at Conway Square, Newtownards\n\nCastle Place near Movilla Street, Newtownards\n\nGibson Lane at Regent Street, Newtownards\n\nZion Place, Newtownards\n\nArmagh City, Banbridge and Craigavon\n\nAlexander Road, Armagh\n\nBarrack Hill, Armagh\n\nCathedral Rd, Armagh\n\nCollege Hill, Armagh\n\nCollege Hill at Armstrong PS, Armagh\n\nIrish Street at Christian Brothers School, Armagh\n\nKillylea Road, Armagh\n\nLonsdale Road, Armagh\n\nLoughgall Road, Armagh\n\nMall East at White Walk, Armagh\n\nMall West, Armagh\n\nMall West at Sainsburys, Armagh\n\nMoy Road, Armagh\n\nNewry Rd, Armagh\n\nPortadown Road, Armagh\n\nRailway Street, Armagh\n\nUpper English Street, Armagh\n\nKinelowen Street, Keady\n\nMain Street, Markethill\n\nMain Street, Middletown\n\nChurch Street, Poyntzpass\n\nMain Street, Richhill\n\nNew Line, Richhill\n\nMarket Street, Tandragee\n\nPortadown Road, Tandragee\n\nBridge Street at Railway Street, Banbridge\n\nCastlewellan Road at Tesco's, Banbridge\n\nCommercial Road, Banbridge\n\nHuntly Road, Banbridge\n\nKenlis St, Banbridge\n\nLurgan Road at Banbridge Academy, Banbridge\n\nNewry Road, Banbridge (at Abercorn PS), Banbridge\n\nNewry Street at the Cutt, Banbridge\n\nNewry Street near War Memorial, Banbridge\n\nMain Street, Rathfriland\n\nAvenue Road at Kings Park PS, Lurgan\n\nFrancis Street St Winifred's Terrace, Lurgan\n\nWilliam Street at Charles Street, Lurgan\n\nBridge Street at Bachelors Walk, Portadown\n\nLoughgall Road, Portadown,\n\nLurgan Road at Kernan Shops, Portadown\n\nOld Lurgan Road at Bocombra PS, Portadown\n\nMain Street, Waringstown\n\nBelfast City Council\n\nUniversity Road at Elmwood Avenue\n\nDee Street at Island Street\n\nConnsbrook Avenue at Strandburn Crescent\n\nCliftonville Road at Belfast Royal Academy\n\nOldpark Road at Cliftondene Crescent\n\nBeechmount Avenue at Islandbawn Street\n\nWhitewell Road at Whitewell Parade\n\nHolywood Road at Station Road\n\nBlacks Road at Oranmore Drive\n\nAntrim Road at Adela Place\n\nRavenhill Road at St Judes\n\nCrumlin Road at Mater Hospital\n\nDonegall Road at Maldon Street\n\nKings Road at Comber Greenway\n\nBeersbridge Road at Comber Greenway\n\nLisburn Road at Cranmore Park\n\nGreat Victoria Street at Glengall Street\n\nOldpark Road at Manor Street\n\nShort Strand at Albertbridge Road\n\nUpper Lisburn Road at Locksley Park\n\nGrosvenor Road at Distillery Street\n\nOldpark Road at Oldpark Avenue\n\nGlen Road at St Oliver Plunkets\n\nSpringfield Road at Cupar Street\n\nHawthornden Way at Campbell College\n\nEast Bridge Street at Central Station\n\nFalls Road at Beechview Park\n\nMountpottinger Road at Mountforde Road\n\nSandown Road at Comber Greenway\n\nMilltown Road at Grays Park\n\nUpper Newtownards Road at Ormeston Avenue\n\nCauseway Coast and Glens\n\nRailway Road, Coleraine\n\nCircular Road, Coleraine\n\nCastlerock Road, Coleraine\n\nMoyle Road, Ballycastle\n\nAnn Street, Ballycastle\n\nMain Street, Limavady\n\nIrish Green Street, Limavady\n\nMain Street, Dungiven\n\nDerry City and Strabane\n\nCarlisle Road, Londonderry at Fountain Street\n\nFerryquay Street, Londonderry\n\nFoyle Embankment, Londonderry at City Hotel\n\nJohn Street, Londonderry at Carlisle Square\n\nOrchard Street/Bridge Street, Londonderry\n\nQueens Quay, Londonderry at City Hotel\n\nQueens Quay, Londonderry at P&D Car Park\n\nRossdowney Road, Londonderry\n\nStrand Road, Londonderry at Council Offices\n\nMain Street, Castlederg\n\nWilliam St, Castlederg\n\nMelmount Road, Strabane at Beechmount Avenue\n\nRailway Street, Strabane at Fire Station\n\nDerry Road, Strabane\n\nFermanagh and Omagh\n\nMain Street, Derrylin\n\nThe Brook, Enniskillen\n\nMain Street, Maguiresbridge\n\nMain Street, Belleek\n\nKevlin Road, Omagh\n\nDrumragh Avenue, Omagh\n\nLisburn and Castlereagh\n\nPurdysburn Road at Royal Lodge Road\n\nEastlink Road at Moat Park\n\nAntrim Road at Railway Bridge\n\nEastlink Road at Comber Greenway\n\nRailway Street at Wallace Avenue\n\nAntrim Road at Benson Street\n\nQueensway at Lambeg Station\n\nMid and East Antrim\n\nDoury Road/Thomas Street, Ballymena\n\nLarne Road/Casement Street, Ballymena\n\nNorth Road/Galgorm Street, Ballymena\n\nPats Brae/Linenhall Street, Ballymena\n\nMain street, Ahoghill\n\nMain Street, Cullybackey\n\nMain Street, Portglenone\n\nLower Cairncastle Road, Larne\n\nMid Ulster\n\nRainey Street, Magherafelt\n\nChurch Street, Maghera\n\nHillhead Road, Stewartstown\n\nChurch Street, Cookstown\n\nOrritor Street, Cookstown\n\nWestland Road South, Cookstown\n\nMain Street, Clogher\n\nNewry, Mourne and Down\n\nDrumaness Walk, Downpatrick\n\nHigh Street at Windmill Street, Ballynahinch\n\nWindmill Street at Leisure Centre, Ballynahinch\n\nHigh Street/Lisburn Street/Main Street, Ballynahinch\n\nMain Street, Ballynahinch\n\nCentral Promenade, Newcastle\n\nMain Street at Railway Street, Newcastle\n\nMain Street at Downs Road, Newcastle\n\nCentral Promenade at Post Office, Newcastle\n\nRailway Street at Bus Station, Newcastle\n\nShimna Road at Castle Park, Newcastle\n\nButtercrane Quay at Shopping Centre, Newry\n\nGreat Georges Street South at Church Street, Warrenpoint\n\nSeaview, Warrenpoint\n\nUpper Dromore Road south-east of Burren Road, Warrenpoint","answerHtml":"<p>Details of the locations of all puffin crossings are set out below, by local government area:</p><p>Antrim and Newtownabbey</p><p>High Street, Antrim</p><p>Fountain Street, Antrim</p><p>Ards and North Down</p><p>Bridge Street, Comber</p><p>New Street at High Street, Donaghadee</p><p>High Street, Kilaughey Road, Donaghadee</p><p>Parade/New Street junction, Donaghadee</p><p>Moat Street, Bridge Street, High Street, Donaghadee</p><p>Main Street, Kircubbin</p><p>High Street adjacent to Meeting House Lane, Newtownards</p><p>High Street at Conway Square, Newtownards</p><p>Castle Place near Movilla Street, Newtownards</p><p>Gibson Lane at Regent Street, Newtownards</p><p>Zion Place, Newtownards</p><p>Armagh City, Banbridge and Craigavon</p><p>Alexander Road, Armagh</p><p>Barrack Hill, Armagh</p><p>Cathedral Rd, Armagh</p><p>College Hill, Armagh</p><p>College Hill at Armstrong PS, Armagh</p><p>Irish Street at Christian Brothers School, Armagh</p><p>Killylea Road, Armagh</p><p>Lonsdale Road, Armagh</p><p>Loughgall Road, Armagh</p><p>Mall East at White Walk, Armagh</p><p>Mall West, Armagh</p><p>Mall West at Sainsburys, Armagh</p><p>Moy Road, Armagh</p><p>Newry Rd, Armagh</p><p>Portadown Road, Armagh</p><p>Railway Street, Armagh</p><p>Upper English Street, Armagh</p><p>Kinelowen Street, Keady</p><p>Main Street, Markethill</p><p>Main Street, Middletown</p><p>Church Street, Poyntzpass</p><p>Main Street, Richhill</p><p>New Line, Richhill</p><p>Market Street, Tandragee</p><p>Portadown Road, Tandragee</p><p>Bridge Street at Railway Street, Banbridge</p><p>Castlewellan Road at Tesco&#39;s, Banbridge</p><p>Commercial Road, Banbridge</p><p>Huntly Road, Banbridge</p><p>Kenlis St, Banbridge</p><p>Lurgan Road at Banbridge Academy, Banbridge</p><p>Newry Road, Banbridge (at Abercorn PS), Banbridge</p><p>Newry Street at the Cutt, Banbridge</p><p>Newry Street near War Memorial, Banbridge</p><p>Main Street, Rathfriland</p><p>Avenue Road at Kings Park PS, Lurgan</p><p>Francis Street St Winifred&#39;s Terrace, Lurgan</p><p>William Street at Charles Street, Lurgan</p><p>Bridge Street at Bachelors Walk, Portadown</p><p>Loughgall Road, Portadown,</p><p>Lurgan Road at Kernan Shops, Portadown</p><p>Old Lurgan Road at Bocombra PS, Portadown</p><p>Main Street, Waringstown</p><p>Belfast City Council</p><p>University Road at Elmwood Avenue</p><p>Dee Street at Island Street</p><p>Connsbrook Avenue at Strandburn Crescent</p><p>Cliftonville Road at Belfast Royal Academy</p><p>Oldpark Road at Cliftondene Crescent</p><p>Beechmount Avenue at Islandbawn Street</p><p>Whitewell Road at Whitewell Parade</p><p>Holywood Road at Station Road</p><p>Blacks Road at Oranmore Drive</p><p>Antrim Road at Adela Place</p><p>Ravenhill Road at St Judes</p><p>Crumlin Road at Mater Hospital</p><p>Donegall Road at Maldon Street</p><p>Kings Road at Comber Greenway</p><p>Beersbridge Road at Comber Greenway</p><p>Lisburn Road at Cranmore Park</p><p>Great Victoria Street at Glengall Street</p><p>Oldpark Road at Manor Street</p><p>Short Strand at Albertbridge Road</p><p>Upper Lisburn Road at Locksley Park</p><p>Grosvenor Road at Distillery Street</p><p>Oldpark Road at Oldpark Avenue</p><p>Glen Road at St Oliver Plunkets</p><p>Springfield Road at Cupar Street</p><p>Hawthornden Way at Campbell College</p><p>East Bridge Street at Central Station</p><p>Falls Road at Beechview Park</p><p>Mountpottinger Road at Mountforde Road</p><p>Sandown Road at Comber Greenway</p><p>Milltown Road at Grays Park</p><p>Upper Newtownards Road at Ormeston Avenue</p><p>Causeway Coast and Glens</p><p>Railway Road, Coleraine</p><p>Circular Road, Coleraine</p><p>Castlerock Road, Coleraine</p><p>Moyle Road, Ballycastle</p><p>Ann Street, Ballycastle</p><p>Main Street, Limavady</p><p>Irish Green Street, Limavady</p><p>Main Street, Dungiven</p><p>Derry City and Strabane</p><p>Carlisle Road, Londonderry at Fountain Street</p><p>Ferryquay Street, Londonderry</p><p>Foyle Embankment, Londonderry at City Hotel</p><p>John Street, Londonderry at Carlisle Square</p><p>Orchard Street/Bridge Street, Londonderry</p><p>Queens Quay, Londonderry at City Hotel</p><p>Queens Quay, Londonderry at P&amp;D Car Park</p><p>Rossdowney Road, Londonderry</p><p>Strand Road, Londonderry at Council Offices</p><p>Main Street, Castlederg</p><p>William St, Castlederg</p><p>Melmount Road, Strabane at Beechmount Avenue</p><p>Railway Street, Strabane at Fire Station</p><p>Derry Road, Strabane</p><p>Fermanagh and Omagh</p><p>Main Street, Derrylin</p><p>The Brook, Enniskillen</p><p>Main Street, Maguiresbridge</p><p>Main Street, Belleek</p><p>Kevlin Road, Omagh</p><p>Drumragh Avenue, Omagh</p><p>Lisburn and Castlereagh</p><p>Purdysburn Road at Royal Lodge Road</p><p>Eastlink Road at Moat Park</p><p>Antrim Road at Railway Bridge</p><p>Eastlink Road at Comber Greenway</p><p>Railway Street at Wallace Avenue</p><p>Antrim Road at Benson Street</p><p>Queensway at Lambeg Station</p><p>Mid and East Antrim</p><p>Doury Road/Thomas Street, Ballymena</p><p>Larne Road/Casement Street, Ballymena</p><p>North Road/Galgorm Street, Ballymena</p><p>Pats Brae/Linenhall Street, Ballymena</p><p>Main street, Ahoghill</p><p>Main Street, Cullybackey</p><p>Main Street, Portglenone</p><p>Lower Cairncastle Road, Larne</p><p>Mid Ulster</p><p>Rainey Street, Magherafelt</p><p>Church Street, Maghera</p><p>Hillhead Road, Stewartstown</p><p>Church Street, Cookstown</p><p>Orritor Street, Cookstown</p><p>Westland Road South, Cookstown</p><p>Main Street, Clogher</p><p>Newry, Mourne and Down</p><p>Drumaness Walk, Downpatrick</p><p>High Street at Windmill Street, Ballynahinch</p><p>Windmill Street at Leisure Centre, Ballynahinch</p><p>High Street/Lisburn Street/Main Street, Ballynahinch</p><p>Main Street, Ballynahinch</p><p>Central Promenade, Newcastle</p><p>Main Street at Railway Street, Newcastle</p><p>Main Street at Downs Road, Newcastle</p><p>Central Promenade at Post Office, Newcastle</p><p>Railway Street at Bus Station, Newcastle</p><p>Shimna Road at Castle Park, Newcastle</p><p>Buttercrane Quay at Shopping Centre, Newry</p><p>Great Georges Street South at Church Street, Warrenpoint</p><p>Seaview, Warrenpoint</p><p>Upper Dromore Road south-east of Burren Road, Warrenpoint</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2044743%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=231580","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=231580"}},{"id":"231579","reference":"AQW 44742/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-04-20","answerBy":"2015-05-06","answered":"2015-05-05","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development whether his Department has considered implementing a policy, similar to Network Rail in GB, to phase out all level crossings to improve safety on the rail network.","answerText":"In Northern Ireland safety matters remain the operational responsibility of the NI Transport Holding Company and its subsidiary NI Railways but this is overseen by my Department, in its role as the Safety Authority for Northern Ireland. In common with both Network Rail and Irish Rail, NI Railways has embarked on a level crossing Safety Improvement Project. The policy of all three organisations is broadly similar in prioritising crossing closures.\n\nNI Railways has a Crossings Management Group that consists of people with a range of expertise from across the business. The objective of the group is to improve level crossing safety and the strategy adopted has three main elements: Closure/Safety Improvement; Compliance and Engagement. This is similar to the Network Rail strategy of the 4 E’s (Education, Enforcement, Enablement, and Engineering.)\n\nThe most effective way of reducing level crossing risk is to eliminate the crossings completely. Such closures require the agreement of authorised users, and often, more than one user has the right to use a crossing. Negotiations with users can be protracted, and if a closure project requires planning permission it can take some time to get the necessary consents before construction can commence. Nevertheless, NI Railways has successfully closed over 60 level crossings in the last 5 years.\n\nNI Railways is now at a point in the project where other technical solutions will be progressed for those crossings that may remain open, including signalling schemes, warning lights and additional crossing telephones.\n\nNI Railways has now fully adopted a Level Crossing Risk Model that was developed by Network Rail. This will mean that in future, the assessment of risk and the identification of suitable mitigations will be managed using the same approach as Network Rail, the aim of which is to make all crossings as safe as is practical.","answerHtml":"<p>In Northern Ireland safety matters remain the operational responsibility of the NI Transport Holding Company and its subsidiary NI Railways but this is overseen by my Department, in its role as the Safety Authority for Northern Ireland. In common with both Network Rail and Irish Rail, NI Railways has embarked on a level crossing Safety Improvement Project. The policy of all three organisations is broadly similar in prioritising crossing closures.</p><p>NI Railways has a Crossings Management Group that consists of people with a range of expertise from across the business. The objective of the group is to improve level crossing safety and the strategy adopted has three main elements: Closure/Safety Improvement; Compliance and Engagement. This is similar to the Network Rail strategy of the 4 E’s (Education, Enforcement, Enablement, and Engineering.)</p><p>The most effective way of reducing level crossing risk is to eliminate the crossings completely. Such closures require the agreement of authorised users, and often, more than one user has the right to use a crossing. Negotiations with users can be protracted, and if a closure project requires planning permission it can take some time to get the necessary consents before construction can commence. Nevertheless, NI Railways has successfully closed over 60 level crossings in the last 5 years.</p><p>NI Railways is now at a point in the project where other technical solutions will be progressed for those crossings that may remain open, including signalling schemes, warning lights and additional crossing telephones.</p><p>NI Railways has now fully adopted a Level Crossing Risk Model that was developed by Network Rail. This will mean that in future, the assessment of risk and the identification of suitable mitigations will be managed using the same approach as Network Rail, the aim of which is to make all crossings as safe as is practical.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2044742%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=231579","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=231579"}},{"id":"231578","reference":"AQW 44741/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-04-20","answerBy":"2015-05-06","answered":"2015-04-30","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development for his assessment of the future use of zebra crossings on the road network; and whether standards require new or upgraded zebra crossings to be placed on a speed table.","answerText":"Controlled crossings are provided to facilitate safe and convenient access for pedestrians and cyclists. The legislation governing their installation is The Zebra, Pelican and Puffin Pedestrian Crossings Regulations (Northern Ireland) 2006.\n\nThe selection of the type of controlled pedestrian crossing to be installed at a given location is dependent upon a number of factors. These include the level of pedestrian demand, the type of road, and traffic volumes and speeds at the location. Zebra crossings tend to be more suitable where pedestrian flows are quite low and traffic speeds are already low, such as in the vicinity of roundabouts.\n\nThe Road Humps Regulations (Northern Ireland) 1999 permit the use of a road hump in connection with a Zebra crossing, but not within the zig-zag road markings on either side of the crossing, and provided that the location of the road hump conforms to the other requirements in the regulations. Where these requirements can be met, there is benefit in providing a road hump as vehicle speeds will be slower on the approach and pedestrians can cross the carriageway at the same level as the footway. One such example of a zebra crossing, used in conjunction with a speed table, is at North Street in Carrickfergus.","answerHtml":"<p>Controlled crossings are provided to facilitate safe and convenient access for pedestrians and cyclists. The legislation governing their installation is The Zebra, Pelican and Puffin Pedestrian Crossings Regulations (Northern Ireland) 2006.</p><p>The selection of the type of controlled pedestrian crossing to be installed at a given location is dependent upon a number of factors. These include the level of pedestrian demand, the type of road, and traffic volumes and speeds at the location. Zebra crossings tend to be more suitable where pedestrian flows are quite low and traffic speeds are already low, such as in the vicinity of roundabouts.</p><p>The Road Humps Regulations (Northern Ireland) 1999 permit the use of a road hump in connection with a Zebra crossing, but not within the zig-zag road markings on either side of the crossing, and provided that the location of the road hump conforms to the other requirements in the regulations. Where these requirements can be met, there is benefit in providing a road hump as vehicle speeds will be slower on the approach and pedestrians can cross the carriageway at the same level as the footway. One such example of a zebra crossing, used in conjunction with a speed table, is at North Street in Carrickfergus.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2044741%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=231578","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=231578"}},{"id":"230863","reference":"AQW 44399/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-04-13","answerBy":"2015-04-28","answered":"2015-04-29","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development to outline the work being undertaken by his Department and the Northern Ireland Housing Executive to seek removal of tributes to illegal paramilitary organisations situated within the publicly funded memorial area created within Kilcooley Estate, Bangor in 2009.","answerText":"Officials from DSD and the Housing Executive had been involved in discussions with the local community on this issue but were unable to bring a conclusion to the matter. The Housing Executive’s Cohesion Unit is about to embark on the new ‘Building Relationships in the Community 2’ programme and they will look at restarting discussions regarding this matter as part of this programme.","answerHtml":"<p>Officials from DSD and the Housing Executive had been involved in discussions with the local community on this issue but were unable to bring a conclusion to the matter. The Housing Executive’s Cohesion Unit is about to embark on the new ‘Building Relationships in the Community 2’ programme and they will look at restarting discussions regarding this matter as part of this programme.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2044399%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=230863","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=230863"}},{"id":"230131","reference":"AQW 44334/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-03-27","answerBy":"2015-04-15","answered":"2015-04-14","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development whether his Department has considered phasing out pelican crossings in favour of puffin or countdown crossings.","answerText":"My Department has been installing Puffin Crossings since September 2011. Both Pelican and Puffin crossings are fully approved for use on the public road network in the UK. However, for all new controlled crossing installations, my Department’s first consideration will be to install a Puffin crossing. Due to the cost involved, my Department does not have a retrofit programme to change all existing Pelicans to Puffins, but as existing Pelican equipment becomes due for upgrading, then again Puffins will be the initial consideration.\n\nWith regard to countdown crossings, my Department is aware of the work ongoing in London with this facility and we will continue to monitor and assess their effectiveness before determining any potential future usage in Northern Ireland.","answerHtml":"<p>My Department has been installing Puffin Crossings since September 2011. Both Pelican and Puffin crossings are fully approved for use on the public road network in the UK. However, for all new controlled crossing installations, my Department’s first consideration will be to install a Puffin crossing. Due to the cost involved, my Department does not have a retrofit programme to change all existing Pelicans to Puffins, but as existing Pelican equipment becomes due for upgrading, then again Puffins will be the initial consideration.</p><p>With regard to countdown crossings, my Department is aware of the work ongoing in London with this facility and we will continue to monitor and assess their effectiveness before determining any potential future usage in Northern Ireland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2044334%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=230131","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=230131"}},{"id":"230119","reference":"AQW 44322/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-03-27","answerBy":"2015-04-15","answered":"2015-04-14","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development for his assessment of the potential gains in road safety from the replacement of pelican crossings with newer designs, such as puffin or countdown crossings.","answerText":"Both Pelican and Puffin crossings are fully approved for use on the public road network in the UK. However, for all new controlled crossing installations, my Department’s first consideration will be to install a Puffin crossing. Due to the cost involved, my Department does not have a retrofit programme to change all existing Pelicans to Puffins, but as existing Pelican equipment becomes due for upgrading, then again Puffins will be the initial consideration.\n\nResearch undertaken by Transport for London has indicated that there are fewer pedestrian casualties at sites equipped with Puffin crossings compared to those with Pelican crossings.\n\nPuffin crossings offer several improvements to the Pelican crossing system. Unlike Pelican crossings there is no flashing amber light for drivers, which helps to reduce the potential for aggressive drivers intimidating pedestrians on the crossing. Similarly, there is no flashing ‘Green Man’ signal which can lead to confusion with pedestrians as to whether they can safely cross the road in time. The Red/ Green Man signals are mounted on the poles beside pedestrians wishing to cross, providing clear indication as to when it is safe to leave the footway and a better view of approaching traffic than afforded by a crossing signal on the other side of the road.\n\nDetectors on a Puffin crossing sense pedestrians crossing the road and keep the traffic lights red for drivers until pedestrians get to the other side of the road. If pedestrians cross quickly the lights will change back to green for traffic sooner than a Pelican crossing, but a Puffin crossing will also allow extra time for slower pedestrians such as wheelchair users or those with young children.\n\nThe Northern Ireland Road Safety Strategy to 2020 contains an action measure to consider the introduction of countdown timer signals at pedestrian crossings. These systems are popular in many European countries at sites where there is high pedestrian flow and where many crossing movements frequently occur outside the safe operational crossing time. My Department is aware of the work ongoing in London with this facility and we will continue to monitor and assess their effectiveness before determining any potential future usage in Northern Ireland.","answerHtml":"<p>Both Pelican and Puffin crossings are fully approved for use on the public road network in the UK. However, for all new controlled crossing installations, my Department’s first consideration will be to install a Puffin crossing. Due to the cost involved, my Department does not have a retrofit programme to change all existing Pelicans to Puffins, but as existing Pelican equipment becomes due for upgrading, then again Puffins will be the initial consideration.</p><p>Research undertaken by Transport for London has indicated that there are fewer pedestrian casualties at sites equipped with Puffin crossings compared to those with Pelican crossings.</p><p>Puffin crossings offer several improvements to the Pelican crossing system. Unlike Pelican crossings there is no flashing amber light for drivers, which helps to reduce the potential for aggressive drivers intimidating pedestrians on the crossing. Similarly, there is no flashing ‘Green Man’ signal which can lead to confusion with pedestrians as to whether they can safely cross the road in time. The Red/ Green Man signals are mounted on the poles beside pedestrians wishing to cross, providing clear indication as to when it is safe to leave the footway and a better view of approaching traffic than afforded by a crossing signal on the other side of the road.</p><p>Detectors on a Puffin crossing sense pedestrians crossing the road and keep the traffic lights red for drivers until pedestrians get to the other side of the road. If pedestrians cross quickly the lights will change back to green for traffic sooner than a Pelican crossing, but a Puffin crossing will also allow extra time for slower pedestrians such as wheelchair users or those with young children.</p><p>The Northern Ireland Road Safety Strategy to 2020 contains an action measure to consider the introduction of countdown timer signals at pedestrian crossings. These systems are popular in many European countries at sites where there is high pedestrian flow and where many crossing movements frequently occur outside the safe operational crossing time. My Department is aware of the work ongoing in London with this facility and we will continue to monitor and assess their effectiveness before determining any potential future usage in Northern Ireland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2044322%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=230119","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=230119"}},{"id":"229849","reference":"AQW 44231/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-03-26","answerBy":"2015-04-14","answered":"2015-04-03","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture and Rural Development","question":"To ask the Minister of Agriculture and Rural Development for an outline of the capacity building infrastructure that her Department will provide to beneficiaries of the 2014-2020 Rural Development Programme.","answerText":"As part of the 2014-2020 Rural Development Programme, my Department will establish a rural network for the north of Ireland, which will bring together organisations and administrations with an interest in rural development. Networking activities will include informing potential beneficiaries on rural development policy and funding opportunities and increasing their involvement in rural development. The network will be run by a support unit who will provide training and networking for Local Action Groups and set up groups to engage with beneficiaries on specific themes. The network support unit will also help with capacity building by gathering and disseminating examples of good practice in rural development. My officials are currently working on setting up the network.","answerHtml":"<p>As part of the 2014-2020 Rural Development Programme, my Department will establish a rural network for the north of Ireland, which will bring together organisations and administrations with an interest in rural development. Networking activities will include informing potential beneficiaries on rural development policy and funding opportunities and increasing their involvement in rural development. The network will be run by a support unit who will provide training and networking for Local Action Groups and set up groups to engage with beneficiaries on specific themes. The network support unit will also help with capacity building by gathering and disseminating examples of good practice in rural development. My officials are currently working on setting up the network.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2044231%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=229849","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=229849"}},{"id":"229848","reference":"AQW 44230/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-03-26","answerBy":"2015-04-14","answered":"2015-04-09","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment for her assessment of the level of 4G availability; and what her Department is doing to encourage faster roll out to customers outside Belfast.","answerText":"My Department does not gather information on mobile coverage. Such data is collected by the telecommunications regulator, Ofcom and is published on an annual basis in its Infrastructure Reports. The latest report, published in December 2014, indicates that, at June 2014, outdoor 4G coverage in Northern Ireland stood at 79% of premises and 41% geographically from at least one operator. This was the highest coverage of any UK nation.\n\nMy Department maintains regular contact with the Mobile Network Operators (MNOs) and takes every opportunity to press for faster roll-out of services. However, the telecommunications market is fully privatised and independently regulated, with investment decisions taken on the basis of commercial return and it is not therefore within DETI’s gift to compel a provider to invest in particular infrastructure, technologies or to deploy services. In recent years the MNOs have invested significantly to improve their 2G and 3G networks and commence the roll-out 4G services and this is having a positive impact.\n\nTo address areas where the market is not currently investing, the Department of Culture, Media and Sport (DCMS) is implementing the Mobile Infrastructure project. This is focused on 2G technology but, it is understood that operators will future proof the infrastructure being deployed, to further support 3G, 4G and beyond, where possible. Northern Ireland is now in line for the deployment of 70 nominal, new mast sites under this project.\n\nFurthermore, in December 2014, the UK Government announced that it had reached an agreement with the MNOs which will see the mobile industry investing £5 billion in UK infrastructure and increasing coverage by 2017 with a view to addressing the issue of partial not-spots i.e. those areas where coverage is provided by just one or two of the four MNOs.\n\nAll of these initiatives should help to further improve mobile services across Northern Ireland. However, my Department is keeping a watching brief and will assess the need for further Government intervention once they have completed.","answerHtml":"<p>My Department does not gather information on mobile coverage. Such data is collected by the telecommunications regulator, Ofcom and is published on an annual basis in its Infrastructure Reports. The latest report, published in December 2014, indicates that, at June 2014, outdoor 4G coverage in Northern Ireland stood at 79% of premises and 41% geographically from at least one operator. This was the highest coverage of any UK nation.</p><p>My Department maintains regular contact with the Mobile Network Operators (MNOs) and takes every opportunity to press for faster roll-out of services. However, the telecommunications market is fully privatised and independently regulated, with investment decisions taken on the basis of commercial return and it is not therefore within DETI’s gift to compel a provider to invest in particular infrastructure, technologies or to deploy services. In recent years the MNOs have invested significantly to improve their 2G and 3G networks and commence the roll-out 4G services and this is having a positive impact.</p><p>To address areas where the market is not currently investing, the Department of Culture, Media and Sport (DCMS) is implementing the Mobile Infrastructure project. This is focused on 2G technology but, it is understood that operators will future proof the infrastructure being deployed, to further support 3G, 4G and beyond, where possible. Northern Ireland is now in line for the deployment of 70 nominal, new mast sites under this project.</p><p>Furthermore, in December 2014, the UK Government announced that it had reached an agreement with the MNOs which will see the mobile industry investing £5 billion in UK infrastructure and increasing coverage by 2017 with a view to addressing the issue of partial not-spots i.e. those areas where coverage is provided by just one or two of the four MNOs.</p><p>All of these initiatives should help to further improve mobile services across Northern Ireland. However, my Department is keeping a watching brief and will assess the need for further Government intervention once they have completed.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2044230%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=229848","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=229848"}},{"id":"229847","reference":"AQW 44229/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-03-26","answerBy":"2015-04-14","answered":"2015-03-31","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education to detail his Department’s approach to promoting French, German and Spanish in (i) primary; and (ii) post-primary education.","answerText":"Modern languages are not a statutory part of the curriculum at primary level here and it is a matter for primary schools to decide whether they wish to teach an additional language.\n\nIn order to protect frontline services and the Aggregated Schools Budget, it has been decided that the earmarked funding for the Primary Modern Languages Programme (PMLP), which provided tuition in Spanish, Irish and Polish, will cease with effect from 31 March 2015.\n\nMy Department is aware that many primary schools provide language tuition, including French, German and Spanish, outside of the PMLP and I hope that schools can continue to do so.\n\nModern languages are a statutory requirement at Key Stage 3 and a qualification choice at Key Stage 4 and Sixth form. Schools are now able to choose any of the languages of the 27 EU member states to meet the minimum requirement, as well as any other additional languages they wish. I am aware that French, Spanish and to a lesser extent German are some of the most popular languages chosen by students.","answerHtml":"<p>Modern languages are not a statutory part of the curriculum at primary level here and it is a matter for primary schools to decide whether they wish to teach an additional language.</p><p>In order to protect frontline services and the Aggregated Schools Budget, it has been decided that the earmarked funding for the Primary Modern Languages Programme (PMLP), which provided tuition in Spanish, Irish and Polish, will cease with effect from 31 March 2015.</p><p>My Department is aware that many primary schools provide language tuition, including French, German and Spanish, outside of the PMLP and I hope that schools can continue to do so.</p><p>Modern languages are a statutory requirement at Key Stage 3 and a qualification choice at Key Stage 4 and Sixth form. Schools are now able to choose any of the languages of the 27 EU member states to meet the minimum requirement, as well as any other additional languages they wish. I am aware that French, Spanish and to a lesser extent German are some of the most popular languages chosen by students.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2044229%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=229847","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=229847"}},{"id":"229846","reference":"AQW 44228/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-03-26","answerBy":"2015-04-14","answered":"2015-04-17","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education to outline the measures put in place by his Department to promote the integration of education.","answerText":"My Department funds NICIE to promote integrated education. Funding of £632,000 is being provided to NICIE in the 2015/16 financial year.\n\nIn addition, I am committed to ensuring my Department’s statutory duty to encourage and facilitate integrated education continues to be discharged fully, positively and proactively.\n\nI am also currently considering the need for and scope of a future review of integrated education.","answerHtml":"<p>My Department funds NICIE to promote integrated education. Funding of £632,000 is being provided to NICIE in the 2015/16 financial year.</p><p>In addition, I am committed to ensuring my Department’s statutory duty to encourage and facilitate integrated education continues to be discharged fully, positively and proactively.</p><p>I am also currently considering the need for and scope of a future review of integrated education.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2044228%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=229846","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=229846"}},{"id":"229845","reference":"AQW 44227/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-03-26","answerBy":"2015-04-14","answered":"2015-04-09","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety for his assessment of the prudence of Health and Social Care Trusts measuring the number of patients treated in corridor beds, and the duration of time spent in a corridor bed.","answerText":"My Department has no plans at present to collect such data centrally. Health and Social Care Trusts will be fully aware if patients are waiting in non-designated beds in corridors. I expect Trusts to ensure that any such patients are transferred to a designated ward bed as soon as possible.","answerHtml":"<p>My Department has no plans at present to collect such data centrally. Health and Social Care Trusts will be fully aware if patients are waiting in non-designated beds in corridors. I expect Trusts to ensure that any such patients are transferred to a designated ward bed as soon as possible.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2044227%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=229845","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=229845"}},{"id":"229976","reference":"AQO 7970/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2015-03-26","answerBy":"2015-04-20","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety to explain the disparity in expenditure on agency nurses between Health and Social Care Trusts in the past five years, as highlighted in his answer to AQW 43571/11-15.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%207970%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=229976","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=229976"}},{"id":"231746","reference":"AQO 7970/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2015-03-26","answerBy":"2015-04-20","answered":"2015-04-20","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety to explain the disparity in expenditure on agency nurses between Health and Social Care Trusts in the past five years, as highlighted in his answer to AQW 43571/11-15.","answerText":"Trust expenditure on agency nurses has been incurred to ensure that safe and effective services are sustained at all times for patients and clients. During 2013/14, the cost of employing agency nursing staff was approximately £11m, which represents less than 0.25% of the total Health and Social Care budget.\n\nThere are many reasons for HSC Trusts employing agency staff at different times. These include, for example, cover for sickness, maternity and increases in beds over the winter months.\n\nHSC Trusts have developed internal bank systems – a pool of qualified staff available for ad hoc work. The supply of bank staff however can fluctuate at times during the year across the region, particularly during holiday periods. Therefore, on occasion, service staffing needs will be greater than internal supply can meet and in these exceptional circumstances shifts will go to agencies for cover.\n\nWhile Locum Doctors will only be engaged where necessary, they are a vital component of the HSC workforce, providing cover when there are vacancies and to cover sick leave and maternity/paternity leave. They are used to cover all grades of medical staff and contribute importantly to maintaining service provision to patients and clients.\n\nNonetheless, Trusts have been asked to examine reliance upon agency staff and my Department will continue to monitor expenditure closely.","answerHtml":"<p>Trust expenditure on agency nurses has been incurred to ensure that safe and effective services are sustained at all times for patients and clients. During 2013/14, the cost of employing agency nursing staff was approximately £11m, which represents less than 0.25% of the total Health and Social Care budget.</p><p>There are many reasons for HSC Trusts employing agency staff at different times. These include, for example, cover for sickness, maternity and increases in beds over the winter months.</p><p>HSC Trusts have developed internal bank systems – a pool of qualified staff available for ad hoc work. The supply of bank staff however can fluctuate at times during the year across the region, particularly during holiday periods. Therefore, on occasion, service staffing needs will be greater than internal supply can meet and in these exceptional circumstances shifts will go to agencies for cover.</p><p>While Locum Doctors will only be engaged where necessary, they are a vital component of the HSC workforce, providing cover when there are vacancies and to cover sick leave and maternity/paternity leave. They are used to cover all grades of medical staff and contribute importantly to maintaining service provision to patients and clients.</p><p>Nonetheless, Trusts have been asked to examine reliance upon agency staff and my Department will continue to monitor expenditure closely.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%207970%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=231746","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=231746"}},{"id":"229904","reference":"AQO 7953/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2015-03-26","answerBy":"2015-04-20","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel for his assessment of the impact of delays, and any potential additional cost, caused by the failure to agree the Final Stage of the Welfare Reform Bill.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%207953%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=229904","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=229904"}},{"id":"231699","reference":"AQO 7953/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2015-03-26","answerBy":"2015-04-20","answered":"2015-04-20","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel for his assessment of the impact of delays, and any potential additional cost, caused by the failure to agree the Final Stage of the Welfare Reform Bill.","answerText":"Should the Welfare Reform Bill fail to pass through the NI Assembly, the £114 million reduction set out by Her Majesty’s Treasury will apply in full to the Northern Ireland Executive’s Budget in 2015-16.\n\nHM Treasury have not indicated the level of reductions beyond 2015-16 however Social Security Agency (SSA) estimates of the foregone UK Exchequer savings of not implementing welfare reform in Northern Ireland are significant and will increase in the coming years reaching £366 million in 2018-19.\n\nIn addition to the Resource DEL reductions applied by HM Treasury non-implementation will also lead to significant capital costs associated with developing a bespoke IT system for Northern Ireland.\n\nFailure to proceed with the Welfare Reform Bill will also put at risk the other aspects of the financial package agreed under the Stormont House Agreement.","answerHtml":"<p>Should the Welfare Reform Bill fail to pass through the NI Assembly, the £114 million reduction set out by Her Majesty’s Treasury will apply in full to the Northern Ireland Executive’s Budget in 2015-16.</p><p>HM Treasury have not indicated the level of reductions beyond 2015-16 however Social Security Agency (SSA) estimates of the foregone UK Exchequer savings of not implementing welfare reform in Northern Ireland are significant and will increase in the coming years reaching £366 million in 2018-19.</p><p>In addition to the Resource DEL reductions applied by HM Treasury non-implementation will also lead to significant capital costs associated with developing a bespoke IT system for Northern Ireland.</p><p>Failure to proceed with the Welfare Reform Bill will also put at risk the other aspects of the financial package agreed under the Stormont House Agreement.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%207953%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=231699","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=231699"}},{"id":"229017","reference":"AQW 43939/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-03-19","answerBy":"2015-04-03","answered":"2015-03-31","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what Translink is doing to reduce the number of people smoking on platforms in both manned and un-manned stations.","answerText":"I have been advised that Translink has been proactive in this matter and operates a no smoking policy at all of its rail stations, halts and on its services.\n\nTranslink also does not permit electronic cigarettes to be used at any of its stations or on any of its services and this decision is in line with the British Medical Association's recommendation that e-cigarettes should be included in the ban on smoking in public places.\n\nDesignated smoking areas have also been identified at main stations.\n\nNo smoking signage is visible at all of the locations, and staff will intervene, if required. However, Translink has no enforcement powers, as legislation removed the NIR bye-law that would have allowed it to enforce the ruling. Enforcement is now through local councils.\n\nTherefore, Translink actively engages with the local authority ‘smoking cessation officers’ to try and raise awareness of this issue and it regularly has information stalls in its main stations, most recently for No Smoking Day on 11 March 2015 in the Europa Buscentre / Great Victoria Street and in Coleraine. This information provides both staff and members of the public with advice on how to stop smoking. Translink also displays information on ‘stop smoking’ support services at other locations.","answerHtml":"<p>I have been advised that Translink has been proactive in this matter and operates a no smoking policy at all of its rail stations, halts and on its services.</p><p>Translink also does not permit electronic cigarettes to be used at any of its stations or on any of its services and this decision is in line with the British Medical Association&#39;s recommendation that e-cigarettes should be included in the ban on smoking in public places.</p><p>Designated smoking areas have also been identified at main stations.</p><p>No smoking signage is visible at all of the locations, and staff will intervene, if required. However, Translink has no enforcement powers, as legislation removed the NIR bye-law that would have allowed it to enforce the ruling. Enforcement is now through local councils.</p><p>Therefore, Translink actively engages with the local authority ‘smoking cessation officers’ to try and raise awareness of this issue and it regularly has information stalls in its main stations, most recently for No Smoking Day on 11 March 2015 in the Europa Buscentre / Great Victoria Street and in Coleraine. This information provides both staff and members of the public with advice on how to stop smoking. Translink also displays information on ‘stop smoking’ support services at other locations.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2043939%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=229017","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=229017"}},{"id":"229016","reference":"AQW 43938/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-03-19","answerBy":"2015-04-03","answered":"2015-04-02","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development, pursuant to AQW 42828/11-15, how his Department intends to end the use of open fire and open fire back boiler heating systems in Housing Executive homes.","answerText":"The Housing Executive has advised that through their planned investment programmes they have installed almost eighty thousand oil or gas heating installations into their tenants’ homes. They have also provided the option of an electric focal point fire which continues to provide an alternative heat source, if required.\n\nHowever, in line with the Housing Executive’s heating policy, and in order to help alleviate fuel poverty for some Housing Executive tenants, they can allow the retention of an existing open coal fire with no back boiler. In a heating replacement scheme, where an open fire with back boiler exists, the tenant has the option to retain the open fire or have an electric focal point fire. The back boiler is removed with a fire back and fireplace provided for room heat only.","answerHtml":"<p>The Housing Executive has advised that through their planned investment programmes they have installed almost eighty thousand oil or gas heating installations into their tenants’ homes. They have also provided the option of an electric focal point fire which continues to provide an alternative heat source, if required.</p><p>However, in line with the Housing Executive’s heating policy, and in order to help alleviate fuel poverty for some Housing Executive tenants, they can allow the retention of an existing open coal fire with no back boiler. In a heating replacement scheme, where an open fire with back boiler exists, the tenant has the option to retain the open fire or have an electric focal point fire. The back boiler is removed with a fire back and fireplace provided for room heat only.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2043938%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=229016","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=229016"}},{"id":"227910","reference":"AQW 43573/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-03-11","answerBy":"2015-03-27","answered":"2015-04-02","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister when Northern Ireland will be included as a signatory to the European Convention on Local Self Government.","answerText":"As the ratification of European Charters, including the European Charter on Local Self-Government, is not a devolved matter, this is an issue for the Westminster Government.","answerHtml":"<p>As the ratification of European Charters, including the European Charter on Local Self-Government, is not a devolved matter, this is an issue for the Westminster Government.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2043573%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=227910","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=227910"}},{"id":"227909","reference":"AQW 43572/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-03-11","answerBy":"2015-03-27","answered":"2015-03-19","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety to detail the average hourly cost of an agency nurse, compared with a nurse employed by the Health Service.","answerText":"Nursing Agencies charge a wide range of standard hourly rates which can vary, for example, from around £14.37 to £42.60 in specific circumstances such as, being dependent on when shifts are worked, location and particular agency. In addition the amount the Agency is paid may not be the amount paid directly to the Agency nurse. It is not possible therefore to compare rates in a meaningful way.","answerHtml":"<p>Nursing Agencies charge a wide range of standard hourly rates which can vary, for example, from around £14.37 to £42.60 in specific circumstances such as, being dependent on when shifts are worked, location and particular agency. In addition the amount the Agency is paid may not be the amount paid directly to the Agency nurse. It is not possible therefore to compare rates in a meaningful way.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2043572%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=227909","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=227909"}},{"id":"227907","reference":"AQW 43571/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-03-11","answerBy":"2015-03-23","answered":"2015-02-20","answeredOrally":false,"priority":true,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety to detail the amount spent on agency nurses in each of the last five years.","answerText":"The table below details the expenditure on Nursing Agency staff for the period 2009/10 -2013/14.\n\nAgency Staff – Nursing £s\n\nYear\tBelfast HSC Trust\tNorthern HSC Trust\tSouth Eastern HSC Trust\tSouthern HSC Trust\tWestern HSC Trust\tTotal\n09/10\t*6,066,000\t*540,199\t*3,303,414\t1,185,710\t*1,268,818\t12,305,407\n10/11\t*2,818,000\t612,964\t*3,398,887\t452,734\t*1,525,742\t8,808,327\n11/12\t*3,114,000\t836,225\t2,031,664\t263,240\t*2,070,303\t8,315,432\n12/13\t*3,742,000\t1,078,594\t2,768,074\t672,111\t*1,591,350\t9,852,129\n13/14\t5,326,064\t1,153,486\t2,187,685\t232,546\t*2,224,631\t11,124,413\n\nSource: Trust Finance Returns except those marked *, which have been recently sourced from the HSC Trusts.","answerHtml":"<p>The table below details the expenditure on Nursing Agency staff for the period 2009/10 -2013/14.</p><div class=\"table-wrap\"><table><tr><td colspan=\"4\">Agency Staff – Nursing £s</td><td></td><td></td><td></td><td></td></tr><tr><td></td><td></td><td colspan=\"2\"></td><td></td><td></td><td></td><td></td></tr><tr><td>Year</td><td>Belfast HSC Trust</td><td>Northern HSC Trust</td><td colspan=\"2\">South Eastern HSC Trust</td><td>Southern HSC Trust</td><td>Western HSC Trust</td><td>Total</td></tr><tr><td>09/10</td><td>*6,066,000</td><td>*540,199</td><td colspan=\"2\">*3,303,414</td><td>1,185,710</td><td>*1,268,818</td><td>12,305,407</td></tr><tr><td>10/11</td><td>*2,818,000</td><td>612,964</td><td colspan=\"2\">*3,398,887</td><td>452,734</td><td>*1,525,742</td><td>8,808,327</td></tr><tr><td>11/12</td><td>*3,114,000</td><td>836,225</td><td colspan=\"2\">2,031,664</td><td>263,240</td><td>*2,070,303</td><td>8,315,432</td></tr><tr><td>12/13</td><td>*3,742,000</td><td>1,078,594</td><td colspan=\"2\">2,768,074</td><td>672,111</td><td>*1,591,350</td><td>9,852,129</td></tr><tr><td>13/14</td><td>5,326,064</td><td>1,153,486</td><td colspan=\"2\">2,187,685</td><td>232,546</td><td>*2,224,631</td><td>11,124,413</td></tr><tr><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr></table></div><p>Source: Trust Finance Returns except those marked *, which have been recently sourced from the HSC Trusts.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2043571%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=227907","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=227907"}},{"id":"227624","reference":"AQW 43499/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-03-10","answerBy":"2015-03-26","answered":"2015-03-25","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development whether he has had any discussions on the designating of the hard shoulder of the M2, from Sandyknowes to Greencastle, as a bus lane with traffic merging at Bellevue Bridge for 100 yards to accommodate the lower part of the bridge structure.","answerText":"In general, bus lanes are provided to reduce journey times and improve reliability for bus passengers, and to help make public transport an attractive alternative to travel by private car, particularly at peak times.\n\nIn 2008, a hard shoulder bus lane was provided on the M2 at Sandyknowes roundabout to allow buses to avoid the peak time congestion, however, since the third lane was provided on the citybound carriageway from Sandyknowes, the congestion has dissipated and buses rarely need to avail of this facility. This being the case, my Department is not proposing to introduce any other bus measures on the stretch of the M2 from Sandyknowes to Greencastle junction.","answerHtml":"<p>In general, bus lanes are provided to reduce journey times and improve reliability for bus passengers, and to help make public transport an attractive alternative to travel by private car, particularly at peak times.</p><p>In 2008, a hard shoulder bus lane was provided on the M2 at Sandyknowes roundabout to allow buses to avoid the peak time congestion, however, since the third lane was provided on the citybound carriageway from Sandyknowes, the congestion has dissipated and buses rarely need to avail of this facility. This being the case, my Department is not proposing to introduce any other bus measures on the stretch of the M2 from Sandyknowes to Greencastle junction.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2043499%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=227624","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=227624"}},{"id":"227621","reference":"AQW 43496/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-03-10","answerBy":"2015-03-26","answered":"2015-03-25","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development for an update on the A8 upgrade scheme, including an expected date for completion.","answerText":"Construction of the £130 million, 14 km-long A8 dualling scheme is progressing very well and is approximately 95 per cent complete.\n\nTo date, all eight of the bridges on the scheme are now substantially complete, with six open to traffic. In addition, the contractor has also laid over 270,000 tonnes of the 300,000 tonnes of bituminous material required for the scheme.\n\nThe contract completion date for the opening of the new dual carriageway is the end of May 2015, however, landscaping work will continue until December 2015.","answerHtml":"<p>Construction of the £130 million, 14 km-long A8 dualling scheme is progressing very well and is approximately 95 per cent complete.</p><p>To date, all eight of the bridges on the scheme are now substantially complete, with six open to traffic. In addition, the contractor has also laid over 270,000 tonnes of the 300,000 tonnes of bituminous material required for the scheme.</p><p>The contract completion date for the opening of the new dual carriageway is the end of May 2015, however, landscaping work will continue until December 2015.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2043496%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=227621","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=227621"}},{"id":"227256","reference":"AQW 43333/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-03-06","answerBy":"2015-03-24","answered":"2015-03-19","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety whether his Department considers minimum staffing levels to be acceptable for the everyday running of the Health Service.","answerText":"It is the responsibility of employing organisations to ensure that staffing levels are consistent with the provision of safe and cost effective patient care.","answerHtml":"<p>It is the responsibility of employing organisations to ensure that staffing levels are consistent with the provision of safe and cost effective patient care.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2043333%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=227256","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=227256"}},{"id":"227190","reference":"AQW 43298/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-03-05","answerBy":"2015-03-23","answered":"2015-03-18","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety what additional work pressures on staff his Department has considered in relation to patients treated on beds in hospital corridors.","answerText":"My Department, and the Health and Social Care Board, expect HSC Trusts to ensure that any additional beds that are opened are adequately staffed and that care is provided in an appropriate clinical environment. It is, however, inevitable that during any prolonged period of escalated activity, some staff will be required to work additional hours due to the increased workload.","answerHtml":"<p>My Department, and the Health and Social Care Board, expect HSC Trusts to ensure that any additional beds that are opened are adequately staffed and that care is provided in an appropriate clinical environment. It is, however, inevitable that during any prolonged period of escalated activity, some staff will be required to work additional hours due to the increased workload.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2043298%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=227190","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=227190"}},{"id":"227189","reference":"AQW 43297/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-03-05","answerBy":"2015-03-23","answered":"2015-03-16","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety whether beds in hospital corridors are counted towards the capacity of a hospital; and if so, how many such beds are in each hospital","answerText":"Bed occupancy is a measure in hospital capacity and information on the availability and occupancy of beds in wards open overnight in HSC hospitals is collected quarterly by the Department. As such, any beds outside of a hospital ward would not be counted towards the capacity of a hospital.","answerHtml":"<p>Bed occupancy is a measure in hospital capacity and information on the availability and occupancy of beds in wards open overnight in HSC hospitals is collected quarterly by the Department. As such, any beds outside of a hospital ward would not be counted towards the capacity of a hospital.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2043297%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=227189","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=227189"}},{"id":"227188","reference":"AQW 43296/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-03-05","answerBy":"2015-03-23","answered":"2015-03-16","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety how many patients have been treated in beds in hospital corridors in the last month; and what his Department is doing to avoid the use of such beds.","answerText":"At key pressure times, situations have arisen where non-designated beds have been used by a patient where an inpatient bed is not immediately available. It is not possible to determine the number of patients who have been treated in a non-designated bed in a hospital corridor, as these are not included as bed stock on the Patient Administration System. There have been occasions where patients have been placed in such a bed for brief periods in a select range of ward environments to either reallocate beds to meet unscheduled patient needs or to alleviate pressures on an Emergency Department.\n\nTrusts are expected to ensure that any additional beds have the appropriate staffing levels and are in clinical areas that do not compromise the safety and/or dignity of patients.","answerHtml":"<p>At key pressure times, situations have arisen where non-designated beds have been used by a patient where an inpatient bed is not immediately available. It is not possible to determine the number of patients who have been treated in a non-designated bed in a hospital corridor, as these are not included as bed stock on the Patient Administration System. There have been occasions where patients have been placed in such a bed for brief periods in a select range of ward environments to either reallocate beds to meet unscheduled patient needs or to alleviate pressures on an Emergency Department.</p><p>Trusts are expected to ensure that any additional beds have the appropriate staffing levels and are in clinical areas that do not compromise the safety and/or dignity of patients.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2043296%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=227188","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=227188"}},{"id":"227186","reference":"AQW 43295/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-03-05","answerBy":"2015-03-23","answered":"2015-03-11","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety what additional risk to health and dignity his Department has considered in regards to patients in beds in hospital corridors.","answerText":"During periods of escalation, Health and Social Care Trusts will expand their capacity by increasing the number of beds available. I expect Trusts to ensure that any additional beds have the appropriate staffing levels and are in clinical areas that do not compromise the safety and/or dignity of patients. It is not appropriate for patients to be placed in beds situated in corridors.\n\nUnfortunately, situations may arise where patients who require an inpatient bed are unable to access that bed immediately. In such cases, a bed is placed in the next most suitable environment until the right bed is available. Any areas where there are additional beds will have nursing and medical input, and a risk assessment is carried out to ensure patients’ needs are responded to. Nurses and medical staff, as well as managers, will continually assess the situation.","answerHtml":"<p>During periods of escalation, Health and Social Care Trusts will expand their capacity by increasing the number of beds available. I expect Trusts to ensure that any additional beds have the appropriate staffing levels and are in clinical areas that do not compromise the safety and/or dignity of patients. It is not appropriate for patients to be placed in beds situated in corridors.</p><p>Unfortunately, situations may arise where patients who require an inpatient bed are unable to access that bed immediately. In such cases, a bed is placed in the next most suitable environment until the right bed is available. Any areas where there are additional beds will have nursing and medical input, and a risk assessment is carried out to ensure patients’ needs are responded to. Nurses and medical staff, as well as managers, will continually assess the situation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2043295%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=227186","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=227186"}},{"id":"227168","reference":"AQW 43289/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-03-05","answerBy":"2015-03-23","answered":"2015-03-18","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development for the commencement date of legislative changes on higher levels of pension for those with 35 years of National Insurance contributions, scheduled for 6 April 2016.","answerText":"Subject to Assembly approval, Part 1 of the Pensions Bill, currently before the Assembly, provides for a new state pension scheme for people reaching state pension age on or after 6 April 2016. The Bill provides for Part 1 to come fully into operation on 6 April 2016. However, to ensure that the scheme can be fully functional from that date, some provisions will be commenced earlier. For example, it is anticipated that some provisions will be commenced shortly after Royal Assent to allow the Department to make Regulations necessary to support the new scheme.","answerHtml":"<p>Subject to Assembly approval, Part 1 of the Pensions Bill, currently before the Assembly, provides for a new state pension scheme for people reaching state pension age on or after 6 April 2016. The Bill provides for Part 1 to come fully into operation on 6 April 2016. However, to ensure that the scheme can be fully functional from that date, some provisions will be commenced earlier. For example, it is anticipated that some provisions will be commenced shortly after Royal Assent to allow the Department to make Regulations necessary to support the new scheme.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2043289%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=227168","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=227168"}},{"id":"227073","reference":"AQO 7797/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2015-03-05","answerBy":"2015-03-16","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety to outline his specific proposals to improve the standard of social care provided as part of Transforming Your Care.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%207797%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=227073","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=227073"}},{"id":"228613","reference":"AQO 7797/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2015-03-05","answerBy":"2015-03-16","answered":"2015-03-16","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety to outline his specific proposals to improve the standard of social care provided as part of Transforming Your Care.","answerText":"The Transforming Your Care Review identified that “Social care will also be a central part of the support provided to enable independent living. This will include access to a diverse range of provision to meet people’s social and emotional needs and tackle social isolation.”\n\nMy department has continued to work to improve the quality of social care in Northern Ireland, including:\n\nThe rollout of a regional approach to Self Directed Support - offering individuals more control over their personal support budgets, to avail of greater flexibility, independence and choice in how and when social care services are provided.\n\nThe introduction of Reablement services which are designed to support people to live independently in their own homes for longer. This involves working with individuals whose independence is at risk, helping to rebuild their confidence, develop (or re-learn) daily living skills and promote social inclusion.\n\nSupport for people with a learning disability, many more of whom are now able to live semi-independently in the community with support rather than in hospital or institutions. Improvements and modernisation of buildings-based day services for those individuals with the most complex conditions is also continuing.\n\nImproving mental health services, following the Bamford Review and Transforming Your Care. We continue to focus on implementing the more recovery-based approaches envisaged by that review. We have also pursued the resettlement of existing residents of institutional care and inpatient beds to more independent living in the community through the provision of intensive home support, alternative supported living arrangements and individual budgets.","answerHtml":"<p>The Transforming Your Care Review identified that “Social care will also be a central part of the support provided to enable independent living. This will include access to a diverse range of provision to meet people’s social and emotional needs and tackle social isolation.”</p><p>My department has continued to work to improve the quality of social care in Northern Ireland, including:</p><p>The rollout of a regional approach to Self Directed Support - offering individuals more control over their personal support budgets, to avail of greater flexibility, independence and choice in how and when social care services are provided.</p><p>The introduction of Reablement services which are designed to support people to live independently in their own homes for longer. This involves working with individuals whose independence is at risk, helping to rebuild their confidence, develop (or re-learn) daily living skills and promote social inclusion.</p><p>Support for people with a learning disability, many more of whom are now able to live semi-independently in the community with support rather than in hospital or institutions. Improvements and modernisation of buildings-based day services for those individuals with the most complex conditions is also continuing.</p><p>Improving mental health services, following the Bamford Review and Transforming Your Care. We continue to focus on implementing the more recovery-based approaches envisaged by that review. We have also pursued the resettlement of existing residents of institutional care and inpatient beds to more independent living in the community through the provision of intensive home support, alternative supported living arrangements and individual budgets.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%207797%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=228613","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=228613"}},{"id":"226409","reference":"AQW 42993/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-02-27","answerBy":"2015-03-16","answered":"2015-03-12","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development, following his recent visit to Dorisland, for an update on progress, including whether Dorisland now meets European regulatory standards; and if so, how long this will be the case.","answerText":"The £5 million upgrade of the Dorisland Water Treatment Works aims to ensure that the drinking water provided to Carrickfergus and the surrounding area is of the highest standard and will continue to comply with EU drinking water quality standards.\n\nThe contract to install Granular Activated Carbon filters at Dorisland will be operational at the end of March 2015. These filters are designed to remove pesticides in raw water. The Works will be fully compliant with all EU Drinking Water Directives from the end of April 2015 until any future changes in EU legislation.","answerHtml":"<p>The £5 million upgrade of the Dorisland Water Treatment Works aims to ensure that the drinking water provided to Carrickfergus and the surrounding area is of the highest standard and will continue to comply with EU drinking water quality standards.</p><p>The contract to install Granular Activated Carbon filters at Dorisland will be operational at the end of March 2015. These filters are designed to remove pesticides in raw water. The Works will be fully compliant with all EU Drinking Water Directives from the end of April 2015 until any future changes in EU legislation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2042993%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=226409","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=226409"}},{"id":"226408","reference":"AQW 42992/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-02-27","answerBy":"2015-03-09","answered":"2015-03-09","answeredOrally":false,"priority":true,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development, following his visit to the Shore Road Project on 25 February 2015, for his assessment of the progress made and the expected completion date.","answerText":"I visited the A2 Shore Road, Greenisland scheme on 25 February 2015 to view progress on this major scheme and mark the milestone of 500,000 working hours on the project.\n\nBetween Jordanstown Road and Station Road, one carriageway has been constructed and is open to contra-flow traffic, while the other carriageway is being constructed. Accommodation works for adjacent properties, retaining walls, utility diversions, culvert construction and construction of the carriageway are ongoing. On the off-line section of the scheme, between Station Road and Seapark, the road pavement and construction of Whinfield Lane bridge is substantially complete.\n\nI congratulate everyone who is helping to successfully deliver this project and would like to thank local residents and property owners, business owners, drivers and other road users for their patience and co-operation while work is progressing.\n\nThe scheme is due for completion this summer and will significantly ease the long-standing traffic congestion on this busy route, which carries some 35,000 vehicles each day.","answerHtml":"<p>I visited the A2 Shore Road, Greenisland scheme on 25 February 2015 to view progress on this major scheme and mark the milestone of 500,000 working hours on the project.</p><p>Between Jordanstown Road and Station Road, one carriageway has been constructed and is open to contra-flow traffic, while the other carriageway is being constructed. Accommodation works for adjacent properties, retaining walls, utility diversions, culvert construction and construction of the carriageway are ongoing. On the off-line section of the scheme, between Station Road and Seapark, the road pavement and construction of Whinfield Lane bridge is substantially complete.</p><p>I congratulate everyone who is helping to successfully deliver this project and would like to thank local residents and property owners, business owners, drivers and other road users for their patience and co-operation while work is progressing.</p><p>The scheme is due for completion this summer and will significantly ease the long-standing traffic congestion on this busy route, which carries some 35,000 vehicles each day.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2042992%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=226408","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=226408"}},{"id":"226227","reference":"AQO 7752/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2015-02-26","answerBy":"2015-03-09","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel for his assessment of the effectiveness of the Voluntary Exit Scheme in the current economic circumstances.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%207752%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=226227","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=226227"}},{"id":"227746","reference":"AQO 7752/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2015-02-26","answerBy":"2015-03-09","answered":"2015-03-09","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel for his assessment of the effectiveness of the Voluntary Exit Scheme in the current economic circumstances.","answerText":"The closing date for applications to the Scheme is 27 March, therefore it is too early to assess its effectiveness at this stage and until all applications have been considered against the Scheme selection criteria. At the deadline for applications, all those who have applied will then go forward to be considered for selection.\n\nI can confirm that the Scheme was successfully launched on 2 March 2015. Applications are invited until 5 pm on 27 March 2015. My officials will then work closely with Departments to manage the process of selection, in line with the published selection criteria. It is important to emphasise that this Scheme is entirely voluntary and not part of a process that will lead to compulsory redundancy.\n\nAll staff who apply will receive notification of the outcome of the selection process. Acceptance to leave will commit those staff to leave on the exit date notified. All staff selected to leave will be given three months notice.\n\nThe Scheme has been developed to operate within the 2015/16 financial year only, subject to available resources and we anticipate those selected to leave under the Scheme will do so in tranches between 30 September 2015 and 31 March 2016. Trade Union Side has been consulted throughout the development of the Scheme, both at Departmental level and centrally through the Whitley Executive machinery. We will continue this consultation.","answerHtml":"<p>The closing date for applications to the Scheme is 27 March, therefore it is too early to assess its effectiveness at this stage and until all applications have been considered against the Scheme selection criteria. At the deadline for applications, all those who have applied will then go forward to be considered for selection.</p><p>I can confirm that the Scheme was successfully launched on 2 March 2015. Applications are invited until 5 pm on 27 March 2015. My officials will then work closely with Departments to manage the process of selection, in line with the published selection criteria. It is important to emphasise that this Scheme is entirely voluntary and not part of a process that will lead to compulsory redundancy.</p><p>All staff who apply will receive notification of the outcome of the selection process. Acceptance to leave will commit those staff to leave on the exit date notified. All staff selected to leave will be given three months notice.</p><p>The Scheme has been developed to operate within the 2015/16 financial year only, subject to available resources and we anticipate those selected to leave under the Scheme will do so in tranches between 30 September 2015 and 31 March 2016. Trade Union Side has been consulted throughout the development of the Scheme, both at Departmental level and centrally through the Whitley Executive machinery. We will continue this consultation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%207752%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=227746","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=227746"}},{"id":"225936","reference":"AQW 42840/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-02-25","answerBy":"2015-03-12","answered":"2015-03-11","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment whether she has had discussions with P&O and Larne Port on making pricing more competitive to facilitate a greater flow of trade and tourists across the North Channel and through Larne Port.","answerText":"Northern Ireland’s ferry links with Great Britain are essential to the growth of the local economy. However, the development and operation of ferry links, and the fares the operators charge, are commercial matters for individual sea carriers and the Northern Ireland and GB ports.\n\nOur ferry links are particularly important to the tourism industry and Tourism Ireland works closely with all the major ferry operators to highlight value fares, inclusive packages and ease of access to Northern Ireland.\n\nTourism Ireland engages in co-operative marketing with both sea and air carriers in major markets and invests in co-operative marketing activity with ferry operators such as Stena Line and P&O Lines. For example, in 2014 a spring digital marketing campaign in partnership with P&O and Causeway Coast and Glens targeted potential visitors from Scotland and the North of England, highlighting good value fares from Cairnryan and Troon to Larne and themes such as the Causeway Coastal Route, Game of Thrones, the Grande Partenza of the Giro d’Italia and the Dalriada Festival.\n\nSimilarly, an autumn print and digital marketing campaign in partnership with P&O highlighted good value fares and Londonderry as a festival and city break destination. Further co-operative marketing campaigns with sea carriers serving routes to Northern Ireland are at planning stage for 2015.","answerHtml":"<p>Northern Ireland’s ferry links with Great Britain are essential to the growth of the local economy. However, the development and operation of ferry links, and the fares the operators charge, are commercial matters for individual sea carriers and the Northern Ireland and GB ports.</p><p>Our ferry links are particularly important to the tourism industry and Tourism Ireland works closely with all the major ferry operators to highlight value fares, inclusive packages and ease of access to Northern Ireland.</p><p>Tourism Ireland engages in co-operative marketing with both sea and air carriers in major markets and invests in co-operative marketing activity with ferry operators such as Stena Line and P&amp;O Lines. For example, in 2014 a spring digital marketing campaign in partnership with P&amp;O and Causeway Coast and Glens targeted potential visitors from Scotland and the North of England, highlighting good value fares from Cairnryan and Troon to Larne and themes such as the Causeway Coastal Route, Game of Thrones, the Grande Partenza of the Giro d’Italia and the Dalriada Festival.</p><p>Similarly, an autumn print and digital marketing campaign in partnership with P&amp;O highlighted good value fares and Londonderry as a festival and city break destination. Further co-operative marketing campaigns with sea carriers serving routes to Northern Ireland are at planning stage for 2015.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2042840%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=225936","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=225936"}},{"id":"225935","reference":"AQW 42839/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-02-25","answerBy":"2015-03-12","answered":"2015-03-10","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to detail any investigations into the possible electrification of the Larne Railway line, which would provide for faster, cleaner and more efficient rail journeys for the people of East Antrim.","answerText":"The question of electrification is linked to rolling stock usage and procurement. Electrification will therefore always be most cost effective when it coincides with a natural requirement for fleet replacement. Translink’s current inter urban fleet is relatively new, with the first C3K train sets coming into service in 2005/06. These train sets have an expected operating life of approximately 30 years.\n\nThe Railway Investment Prioritisation Strategy which I published last year setting out the strategic direction for future railways investment over the next 20 years does not envisage electrification of any part of the Northern Ireland network within its timeframe.\n\nHowever I recognise the efficiency and environmental benefits which a move to electrification could bring and the strategy expects that investment in priority projects will make provision for eventual electrification in the longer term.","answerHtml":"<p>The question of electrification is linked to rolling stock usage and procurement. Electrification will therefore always be most cost effective when it coincides with a natural requirement for fleet replacement. Translink’s current inter urban fleet is relatively new, with the first C3K train sets coming into service in 2005/06. These train sets have an expected operating life of approximately 30 years.</p><p>The Railway Investment Prioritisation Strategy which I published last year setting out the strategic direction for future railways investment over the next 20 years does not envisage electrification of any part of the Northern Ireland network within its timeframe.</p><p>However I recognise the efficiency and environmental benefits which a move to electrification could bring and the strategy expects that investment in priority projects will make provision for eventual electrification in the longer term.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2042839%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=225935","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=225935"}},{"id":"225934","reference":"AQW 42838/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-02-25","answerBy":"2015-03-05","answered":"2015-03-04","answeredOrally":false,"priority":true,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what investigations have been undertaken on the potential use of the Larne Railway Line for the purposes of freight, connecting Larne port with the wider railway network.","answerText":"I can advise you that no specific investigations have been undertaken by NI Railways in respect of freight operations on the Larne line. However there are no capacity restrictions on the current rail network that would prevent NI Railways in carrying rail freight, should a demand arise.\n\nThe Northern Ireland rail network is, and always has been, open to existing and new rail operators to seek to offer services including freight, and no application has ever been received from other operators interested in providing freight or passenger services.\n\nThe Railway Investment Prioritisation Strategy which sets out the strategic direction for future railways investment over the next 20 does not envisage a demand for the development of rail freight facilities to any of Northern Ireland ports within its timeframe.","answerHtml":"<p>I can advise you that no specific investigations have been undertaken by NI Railways in respect of freight operations on the Larne line. However there are no capacity restrictions on the current rail network that would prevent NI Railways in carrying rail freight, should a demand arise.</p><p>The Northern Ireland rail network is, and always has been, open to existing and new rail operators to seek to offer services including freight, and no application has ever been received from other operators interested in providing freight or passenger services.</p><p>The Railway Investment Prioritisation Strategy which sets out the strategic direction for future railways investment over the next 20 does not envisage a demand for the development of rail freight facilities to any of Northern Ireland ports within its timeframe.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2042838%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=225934","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=225934"}},{"id":"225915","reference":"AQW 42829/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-02-25","answerBy":"2015-03-12","answered":"2015-03-03","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development to detail the policy in regards to the preferred energy source for heating in Housing Executive owned homes.","answerText":"The Housing Executive has advised that their heating policy states:-\n\nGas remains the preferred option offered in heat replacement schemes in gas areas;\n\nOil heating is the preferred option outside a gas area;\n\nTenant choice outside the gas area is increased to include wood pellet boilers as a potentially viable alternative to oil; and\n\nEconomy7 electric systems may be retained by tenant choice.","answerHtml":"<p>The Housing Executive has advised that their heating policy states:-</p><p>Gas remains the preferred option offered in heat replacement schemes in gas areas;</p><p>Oil heating is the preferred option outside a gas area;</p><p>Tenant choice outside the gas area is increased to include wood pellet boilers as a potentially viable alternative to oil; and</p><p>Economy7 electric systems may be retained by tenant choice.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2042829%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=225915","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=225915"}},{"id":"225914","reference":"AQW 42828/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-02-25","answerBy":"2015-03-12","answered":"2015-03-11","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development to detail the number of homes owned by the Housing Executive in East Antrim that have gas fired central heating systems, as well as those heated by other means.","answerText":"The Housing Executive has advised that in the East Antrim constituency there are 2,725 properties that have gas fired central heating systems. They have also advised that those heated by other means are as follows:-\n\nOil833\n\nElectric225\n\nOpen Fire Back Boiler 82\n\nRoomheater16\n\nLiquefied Petroleum Gas9\n\nOpen fire6","answerHtml":"<p>The Housing Executive has advised that in the East Antrim constituency there are 2,725 properties that have gas fired central heating systems. They have also advised that those heated by other means are as follows:-</p><p>Oil833</p><p>Electric225</p><p>Open Fire Back Boiler 82</p><p>Roomheater16</p><p>Liquefied Petroleum Gas9</p><p>Open fire6</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2042828%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=225914","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=225914"}},{"id":"225677","reference":"AQW 42773/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-02-24","answerBy":"2015-03-11","answered":"2015-03-11","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what work is being undertaken to implement a long-term solution to the maintenance and refurbishment of the Castle Car Park Subway in Carrickfergus.","answerText":"This subway is part of our structures inventory. It undergoes regular inspections and is currently assessed to be structurally sound. Maintenance work is carried out on the structure on a routine and as-required basis.\n\nGiven the current budget settlement, my Department is not in a position to undertake any long term refurbishment work at this time.","answerHtml":"<p>This subway is part of our structures inventory. It undergoes regular inspections and is currently assessed to be structurally sound. Maintenance work is carried out on the structure on a routine and as-required basis.</p><p>Given the current budget settlement, my Department is not in a position to undertake any long term refurbishment work at this time.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2042773%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=225677","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=225677"}},{"id":"225676","reference":"AQW 42772/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-02-24","answerBy":"2015-03-11","answered":"2015-03-11","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what work has been done to explore the possibility of creating a free-flowing junction between the M2 and A8 at Sandyknowes to facilitate more efficient traffic flows on the Belfast to Larne route.","answerText":"My Department has a proposal to improve the strategic link between the M2 at Sandyknowes and the A8(M) which is included in our Strategic Road Improvement Programme.\n\nOfficials have undertaken a preliminary assessment of the M2 Sandyknowes Junction to consider options for linking the M2 and A8(M), however, further work will be required to identify feasible and economically viable solutions. Progression of this work will be dependent upon future budget allocations and the prioritisation of scheme proposals within the Strategic Road Improvement Programme.\n\nThe completion of the M2 Widening scheme in 2009 did provide some much needed relief to the M2 Sanyknowes Junction.","answerHtml":"<p>My Department has a proposal to improve the strategic link between the M2 at Sandyknowes and the A8(M) which is included in our Strategic Road Improvement Programme.</p><p>Officials have undertaken a preliminary assessment of the M2 Sandyknowes Junction to consider options for linking the M2 and A8(M), however, further work will be required to identify feasible and economically viable solutions. Progression of this work will be dependent upon future budget allocations and the prioritisation of scheme proposals within the Strategic Road Improvement Programme.</p><p>The completion of the M2 Widening scheme in 2009 did provide some much needed relief to the M2 Sanyknowes Junction.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2042772%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=225676","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=225676"}},{"id":"225250","reference":"AQW 42618/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-02-20","answerBy":"2015-03-09","answered":"2015-03-20","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development for his Department’s position on the enforceability of legislation limiting or prohibiting up-front fees when renting homes.","answerText":"While my Department is responsible for the legislation governing the private rented sector it does not have any legislative/regulatory powers in relation to upfront fees charged by landlords or letting agents in Northern Ireland.\n\nThe regulation of letting agents is one of a number of issues being considered under the review of the role and regulation of the Private Rented Sector which is currently underway. Developments in other jurisdictions, in relation to letting agents, will be considered under the review.","answerHtml":"<p>While my Department is responsible for the legislation governing the private rented sector it does not have any legislative/regulatory powers in relation to upfront fees charged by landlords or letting agents in Northern Ireland.</p><p>The regulation of letting agents is one of a number of issues being considered under the review of the role and regulation of the Private Rented Sector which is currently underway. Developments in other jurisdictions, in relation to letting agents, will be considered under the review.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2042618%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=225250","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=225250"}},{"id":"225249","reference":"AQW 42617/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-02-20","answerBy":"2015-03-09","answered":"2015-04-28","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development what specific schemes exists to address the issue of fuel poverty in the private rented sector.","answerText":"My Department provides energy efficiency measures to address the issue of fuel poverty in the private rented sector through the Warm Homes and Affordable Warmth Schemes.\n\nThe Warm Homes Scheme has been operational since 2009 and will end on 31 March 2015. To qualify for the Warm Homes Scheme, applicants must be in receipt of a qualifying benefit.\n\nMy Department held a public consultation regarding the new Affordable Warmth Scheme between February and May 2014.\n\nThe new Affordable Warmth Scheme was introduced on 15 September 2014. This scheme will actively target households considered to be most at risk of fuel poverty and includes those in low paid work who do not necessarily qualify for benefits. To qualify for the scheme, the gross annual household income must be less than £20,000.\n\nThere is evidence that the Warm Homes Scheme improved the energy efficiency of properties of some landlords with large portfolios, over 50 properties in some cases. This was never the intention of the scheme. My Department considers that private landlords have a responsibility to ensure that the properties they are letting have adequate heating systems and adequate insulation. In the case of privately rented properties, the landlord must be registered with my Departments Landlord Registration Scheme and the landlord must contribute 50% towards the cost of the works approved. Where the approved works cost more than the grant limit, my Department will contribute up to 50% of the grant limit.","answerHtml":"<p>My Department provides energy efficiency measures to address the issue of fuel poverty in the private rented sector through the Warm Homes and Affordable Warmth Schemes.</p><p>The Warm Homes Scheme has been operational since 2009 and will end on 31 March 2015. To qualify for the Warm Homes Scheme, applicants must be in receipt of a qualifying benefit.</p><p>My Department held a public consultation regarding the new Affordable Warmth Scheme between February and May 2014.</p><p>The new Affordable Warmth Scheme was introduced on 15 September 2014. This scheme will actively target households considered to be most at risk of fuel poverty and includes those in low paid work who do not necessarily qualify for benefits. To qualify for the scheme, the gross annual household income must be less than £20,000.</p><p>There is evidence that the Warm Homes Scheme improved the energy efficiency of properties of some landlords with large portfolios, over 50 properties in some cases. This was never the intention of the scheme. My Department considers that private landlords have a responsibility to ensure that the properties they are letting have adequate heating systems and adequate insulation. In the case of privately rented properties, the landlord must be registered with my Departments Landlord Registration Scheme and the landlord must contribute 50% towards the cost of the works approved. Where the approved works cost more than the grant limit, my Department will contribute up to 50% of the grant limit.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2042617%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=225249","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=225249"}},{"id":"224267","reference":"AQW 42304/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-02-13","answerBy":"2015-03-02","answered":"2015-02-25","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment what actions are being taken to encourage competition and compel transparency in pricing in the domestic gas supply market.","answerText":"The natural gas market in Greater Belfast is fully open to gas supply competition. The gas market in the “10 Towns” licence area outside Belfast is already open to supply competition for larger energy users and will open fully for all consumers from April 2015.\n\nUnlike the situation in Great Britain, prices of incumbent gas suppliers in Northern Ireland are subject to regulation. The Utility Regulator's spring 2015 reviews of Airtricity Gas Supply and firmus energy, the incumbent gas suppliers in Greater Belfast and the “10 Towns” respectively, are underway. These reviews scrutinise the constituent elements of retail gas tariffs, ensuring transparency, and providing assurance for consumers.","answerHtml":"<p>The natural gas market in Greater Belfast is fully open to gas supply competition. The gas market in the “10 Towns” licence area outside Belfast is already open to supply competition for larger energy users and will open fully for all consumers from April 2015.</p><p>Unlike the situation in Great Britain, prices of incumbent gas suppliers in Northern Ireland are subject to regulation. The Utility Regulator&#39;s spring 2015 reviews of Airtricity Gas Supply and firmus energy, the incumbent gas suppliers in Greater Belfast and the “10 Towns” respectively, are underway. These reviews scrutinise the constituent elements of retail gas tariffs, ensuring transparency, and providing assurance for consumers.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2042304%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=224267","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=224267"}},{"id":"224266","reference":"AQW 42303/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-02-13","answerBy":"2015-02-18","answered":"2015-02-18","answeredOrally":false,"priority":true,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment what efforts are being made to ensure that reductions in the wholesale price of natural gas are being passed on to domestic customers.","answerText":"The Utility Regulator is currently engaged in a review of regulated gas tariffs in respect of Airtricity Gas Supply (for the Greater Belfast area) and firmus energy (for the Ten Towns area). It is expected that these reviews will conclude soon to allow any changes to gas bills to take effect from 1 April 2015.","answerHtml":"<p>The Utility Regulator is currently engaged in a review of regulated gas tariffs in respect of Airtricity Gas Supply (for the Greater Belfast area) and firmus energy (for the Ten Towns area). It is expected that these reviews will conclude soon to allow any changes to gas bills to take effect from 1 April 2015.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2042303%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=224266","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=224266"}},{"id":"222731","reference":"AQO 7610/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2015-02-05","answerBy":"2015-02-17","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice for an update on the development of facilities for female prisoners at Hydebank Wood.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%207610%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=222731","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=222731"}},{"id":"224859","reference":"AQO 7610/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2015-02-05","answerBy":"2015-02-17","answered":"2015-02-17","answeredOrally":false,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice for an update on the development of facilities for female prisoners at Hydebank Wood.","answerText":"Following approval of the Strategic Outline Case by the Department of Finance and Personnel in July 2014, NIPS Officials are in the process of finalising an Outline Business Case for a new women’s facility at Hydebank.\n\nI am pleased to advise the House that work to construct a step-down facility on the Hydebank Wood site for women prisoners nearing the end of their sentence and preparing to return to the community has started. This facility should be available by the late summer.\n\nWork to upgrade the facilities in Ash House was completed in September 2014. The new facility, known as Ornella, provides a range of additional educational, training and support services for female prisoners.","answerHtml":"<p>Following approval of the Strategic Outline Case by the Department of Finance and Personnel in July 2014, NIPS Officials are in the process of finalising an Outline Business Case for a new women’s facility at Hydebank.</p><p>I am pleased to advise the House that work to construct a step-down facility on the Hydebank Wood site for women prisoners nearing the end of their sentence and preparing to return to the community has started. This facility should be available by the late summer.</p><p>Work to upgrade the facilities in Ash House was completed in September 2014. The new facility, known as Ornella, provides a range of additional educational, training and support services for female prisoners.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%207610%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=224859","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=224859"}},{"id":"221858","reference":"AQO 7527/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2015-01-29","answerBy":"2015-02-09","answered":null,"answeredOrally":false,"priority":false,"department":"Department for Employment and Learning","departmentId":"83","minister":"Minister for Employment and Learning","question":"To ask the Minister for Employment and Learning how he will balance his budget in 2015/16.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%207527%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=221858","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=221858"}},{"id":"223668","reference":"AQO 7527/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2015-01-29","answerBy":"2015-02-09","answered":"2015-02-10","answeredOrally":false,"priority":false,"department":"Department for Employment and Learning","departmentId":"83","minister":"Minister for Employment and Learning","question":"To ask the Minister for Employment and Learning how he will balance his budget in 2015/16.","answerText":"The final Executive Budget leaves me with a pressure of £62m to find. The Department’s Budget Consultation paper set out proposed reductions of £33.2m , current advanced thinking is that these will be confirmed.\n\nThe remaining budget pressure, including European Social Fund match funding pressure of £1.8m, totals £30.1 m.\n\nIt is proposed that this will come from a reduction to higher education of £14 million, further education £12 million and additional Departmental efficiency savings and reductions of £4.1 million.\n\nTo mitigate these reductions as far as possible I have agreed to relax the minimum required level of reinvestment of additional student fee income on widening participation measures to 10%. This change could free up to £8 million in spending powers for the higher education providers.\n\nIn addition, the further education reduction will be partially mitigated by the use of £6 million in End Year Flexibility, subject to agreement of the Executive. However, this is effectively reducing the colleges’ level of reserves.\n\nIt is my hope to confirm the final budget position for the Department over the coming days.","answerHtml":"<p>The final Executive Budget leaves me with a pressure of £62m to find. The Department’s Budget Consultation paper set out proposed reductions of £33.2m , current advanced thinking is that these will be confirmed.</p><p>The remaining budget pressure, including European Social Fund match funding pressure of £1.8m, totals £30.1 m.</p><p>It is proposed that this will come from a reduction to higher education of £14 million, further education £12 million and additional Departmental efficiency savings and reductions of £4.1 million.</p><p>To mitigate these reductions as far as possible I have agreed to relax the minimum required level of reinvestment of additional student fee income on widening participation measures to 10%. This change could free up to £8 million in spending powers for the higher education providers.</p><p>In addition, the further education reduction will be partially mitigated by the use of £6 million in End Year Flexibility, subject to agreement of the Executive. However, this is effectively reducing the colleges’ level of reserves.</p><p>It is my hope to confirm the final budget position for the Department over the coming days.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%207527%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=223668","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=223668"}},{"id":"220823","reference":"AQO 7454/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2015-01-22","answerBy":"2015-02-02","answered":null,"answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister for an update on the implementation of those aspects of the Stormont House Agreement that are within their remit.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%207454%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=220823","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=220823"}},{"id":"222145","reference":"AQO 7454/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2015-01-22","answerBy":"2015-02-02","answered":"2015-02-17","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister for an update on the implementation of those aspects of the Stormont House Agreement that are within their remit.","answerText":"A commitment to effective implementation and to active review and monitoring is an intrinsic part of the Stormont House Agreement.\n\nAn Implementation Plan has been drawn up by the Head of the Civil Service and agreed by the Executive Party Leaders Group. This allocates responsibility to the relevant department for each of the commitments in the Agreement and sets out a projected timeline for their implementation. The Plan will be updated regularly and progress will be reviewed at the weekly meetings of the Party Leaders. The Agreement also provides for quarterly review meetings between the Party Leaders and the UK and Irish Governments. The first meeting took place last Friday, 30 January.\n\nA number of these commitments falls specifically to our department, particularly in relation to the establishment of a Commission on Flags, Identity, Culture and Tradition; support for victims; institutional reform; and civic engagement. Our officials are already working on all of these issues in accordance with the work plans and timescales set out in the agreed Implementation Plan.","answerHtml":"<p>A commitment to effective implementation and to active review and monitoring is an intrinsic part of the Stormont House Agreement.</p><p>An Implementation Plan has been drawn up by the Head of the Civil Service and agreed by the Executive Party Leaders Group. This allocates responsibility to the relevant department for each of the commitments in the Agreement and sets out a projected timeline for their implementation. The Plan will be updated regularly and progress will be reviewed at the weekly meetings of the Party Leaders. The Agreement also provides for quarterly review meetings between the Party Leaders and the UK and Irish Governments. The first meeting took place last Friday, 30 January.</p><p>A number of these commitments falls specifically to our department, particularly in relation to the establishment of a Commission on Flags, Identity, Culture and Tradition; support for victims; institutional reform; and civic engagement. Our officials are already working on all of these issues in accordance with the work plans and timescales set out in the agreed Implementation Plan.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%207454%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=222145","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=222145"}},{"id":"219584","reference":"AQW 40658/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-01-13","answerBy":"2015-01-28","answered":"2015-01-28","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development whether he would consider extending the Warm Homes Scheme until such times as the new councils have the appropriate capacity in place to manage and roll out the new Affordable Warmth programme.","answerText":"The Affordable Warmth Scheme was launched in September 2014 and although at an early stage is already being effectively delivered across all council areas. Whilst local Councils are going through a period of significant restructure, officials have been working with council staff for over 2 years to pilot and develop the Affordable Warmth Scheme. Each of the 11 lead councils have signed a Service Level Agreement with the Department demonstrating their commitment to delivering the new scheme. All councils have appointed a co-ordinator and support staff for the scheme. Officials from my Department meet regularly with lead council officers to monitor progress, receive feedback and provide additional support where necessary.\n\nOne of the reasons for extending the existing Warm Homes Scheme contract from 18 June 2014 to 31 March 2015 was to allow the Affordable Warmth Scheme to become established and embedded in the new structures. Due to procurement rules, it is not possible to further extend the Warm Homes Scheme, nor is it possible to provide Affordable Warmth measures under the existing Warm Homes Scheme contract.\n\nI am closely monitoring the Affordable Warmth Scheme to ensure that those households most at risk of fuel poverty are being supported.","answerHtml":"<p>The Affordable Warmth Scheme was launched in September 2014 and although at an early stage is already being effectively delivered across all council areas. Whilst local Councils are going through a period of significant restructure, officials have been working with council staff for over 2 years to pilot and develop the Affordable Warmth Scheme. Each of the 11 lead councils have signed a Service Level Agreement with the Department demonstrating their commitment to delivering the new scheme. All councils have appointed a co-ordinator and support staff for the scheme. Officials from my Department meet regularly with lead council officers to monitor progress, receive feedback and provide additional support where necessary.</p><p>One of the reasons for extending the existing Warm Homes Scheme contract from 18 June 2014 to 31 March 2015 was to allow the Affordable Warmth Scheme to become established and embedded in the new structures. Due to procurement rules, it is not possible to further extend the Warm Homes Scheme, nor is it possible to provide Affordable Warmth measures under the existing Warm Homes Scheme contract.</p><p>I am closely monitoring the Affordable Warmth Scheme to ensure that those households most at risk of fuel poverty are being supported.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2040658%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=219584","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=219584"}},{"id":"219166","reference":"AQW 40454/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2015-01-08","answerBy":"2015-01-23","answered":"2015-01-22","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment, as part of his Department’s responsibility to develop policy and legislation to facilitate the transition from 26 to 11 councils, what advice has been given to councils on what would be considered the legal status quo if a council should fail to adopt a policy on the flying of flags.","answerText":"My Department has provided no advice to councils, in the context of the local government reform programme.\n\nThe policy on the flying of flags on council property is a matter for each council as a local democratically elected body. This position was reinforced by the Assembly’s rejection of proposals to legislate on the matter at the Consideration Stage of the Local Government Act (Northern Ireland) 2014.","answerHtml":"<p>My Department has provided no advice to councils, in the context of the local government reform programme.</p><p>The policy on the flying of flags on council property is a matter for each council as a local democratically elected body. This position was reinforced by the Assembly’s rejection of proposals to legislate on the matter at the Consideration Stage of the Local Government Act (Northern Ireland) 2014.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2040454%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=219166","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=219166"}},{"id":"214978","reference":"AQO 7175/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-11-20","answerBy":"2014-12-01","answered":"2014-12-01","answeredOrally":true,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment what support she plans to make available to small businesses in East Antrim.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mrs Foster","text":"Invest Northern Ireland provides a wide range of support to small businesses across Northern Ireland, including in east Antrim. Indeed, during 2013-14, 81% of Invest NI offers were to local small businesses. This support covers help to create jobs, research and development and skills and exporting. In east Antrim, for example, Invest Northern Ireland provided over £230,000 to Yelo Ltd, ultimately to create 15 new jobs and to assist projects aimed at research and development and developing trade activities. In addition to financial support, Invest NI provides help to start a business through the regional start initiative, advice and guidance through its wide range of free workshops and seminars on topics such as exports, design, finance and information through nibusinessinfo.co.uk. Over the last five years, 556 locally owned business starts offered support, with an estimated 318 jobs."},{"speaker":"Mr Dickson","text":"I thank the Minister for her answer. Excellent work has been done by two enterprise agencies, Carrickfergus and Larne. How will you guarantee that that work will continue once the local authorities are merged into one?"},{"speaker":"Mrs Foster","text":"I very much hope that the enterprise agencies will see this as an opportunity for a renewal of their vision for their areas. I was with LEDCOM, the Larne Enterprise Development Company, recently to celebrate the Advance programme, which had been run in conjunction with the Department for Employment and Learning. It was an absolutely tremendous programme, whereby 100% of those young people achieved jobs at the end of it. I thought that that was very good value for money, and, more than that, it was using a social enterprise model to try to get these young people involved. So I very much hope that Larne, Carrick and all the enterprise units across Northern Ireland will see this as a new opportunity. They can learn from their colleagues across Northern Ireland about best practice and then use it in a meaningful way to help people. I congratulate LEDCOM in particular."},{"speaker":"Mr Ross","text":"I also congratulate the work that Ken Nelson and his team do at LEDCOM. One of the Department's priorities is to encourage entrepreneurship and people to start their own business. Will the Minister advise the House on what specific support there is for those in our community who may consider starting their own business?"},{"speaker":"Mrs Foster","text":"I thank the Member for his question. Many times, you will have young people who want to start their own business. In many cases, you will have people who are entrepreneurs of necessity; in other words, they have been made redundant and have to find a new way. We have a range of programmes to help all those people. We have the regional start initiative, which provides support at a very basic level for individuals who want to start their own businesses. Sometimes that is not needed; sometimes, it very much is needed. We also operate the Go for It brand, which provides programmes and initiatives to try to stimulate enterprise, particularly with under-represented groups, whether they are women, young people or people with a disability. We provide a range of support to people who want to export, whether that tries to give them help with trade initiatives, skills or innovation. So, Invest Northern Ireland has a wide range of initiatives available. However, importantly, there is also a range of initiatives that we funded through the councils. I have seen some very good examples across Northern Ireland of the use of the European regional development fund (ERDF) in that respect."},{"speaker":"Mr McMullan","text":"Go raibh maith agat, a Phríomh-LeasCheann Comhairle. I thank the Minister for her answers so far. I also join in the congratulations for LEDCOM and the wonderful work it does. Minister, I ask you to look at the dispersed rural areas in east Antrim, such as Glenarm, Carnlough and the glens area, where young people find it difficult to get to work in small businesses because of the lack of transport. What help is there for small businesses in those areas?"},{"speaker":"Mrs Foster","text":"I thank the Member for his question. The initiatives that I have just mentioned that try to support entrepreneurs are also very much available to those who live in rural areas. Indeed, some of our best artisan producers live in rural areas, and I am sure that he will know of some in the glens who are working very hard to provide niche products for the home and export markets. We have seen them grow, and some of them are in his area. For example, the way in which Glenarm Salmon has grown its exports and has been able to become a global player in salmon production has been a tremendous exemplar for everybody else. So, I very much say to the Member that the range of supports are available right across Northern Ireland."},{"speaker":"Mr Beggs","text":"The Minister will be aware of the high regard in which the Larne Enterprise Development Company and Carrickfergus Enterprise are held as a result of their innovation, flexible rental terms and training and support. Will the Minister indicate how, when companies want to develop in the future, Invest NI will step in and link well with the new councils so that companies will be able to grow further? Will she also assure me that the information on the NI Business Info site will continue to be updated centrally and will be available to all business in Northern Ireland that need it?"},{"speaker":"Mrs Foster","text":"In relation to the Member's last point, I want to very much confirm that that will be the case. The website nibusinessinfo.co.uk will be there for the whole of the business base. We very much want that to remain the case despite the fact that some powers from Invest Northern Ireland will go to councils. The new arrangements will only work if there is a partnership ethos, and I hope that the councils will see it as such. Invest Northern Ireland certainly stands ready to assist with the transition of the powers that are going to councils, but it will also give a strategic lead for Northern Ireland. I hope that the councils will work with it on where we want to see Northern Ireland in general. We will also support them in their particular areas."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%207175%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=214978","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2014-12-01&docID=215896#AQO%207175/11-15","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=214978"}},{"id":"214073","reference":"AQO 7108/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-11-13","answerBy":"2014-11-24","answered":null,"answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister when the Sexual Orientation Strategy will be published.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%207108%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=214073","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=214073"}},{"id":"215502","reference":"AQO 7108/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-11-13","answerBy":"2014-11-24","answered":"2014-12-09","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister when the Sexual Orientation Strategy will be published.","answerText":"We have regularly stated our commitment to producing a Sexual Orientation Strategy in the Assembly and in the text of the good relations strategy, Together: Building a United Community.\n\nTo achieve this commitment we asked officials to commence a public consultation process. The first phase of this process ended on 6 June.\n\nAnalysis of responses to this 12 week consultation period has begun and the results will be used to inform the content of a draft Sexual Orientation Strategy.\n\nThe draft Strategy will be referred to the Executive for final agreement and publication. A further 12 week period of public consultation will then take place.\n\nWe would anticipate that the Sexual Orientation Strategy would be published after this final phase of consultation.","answerHtml":"<p>We have regularly stated our commitment to producing a Sexual Orientation Strategy in the Assembly and in the text of the good relations strategy, Together: Building a United Community.</p><p>To achieve this commitment we asked officials to commence a public consultation process. The first phase of this process ended on 6 June.</p><p>Analysis of responses to this 12 week consultation period has begun and the results will be used to inform the content of a draft Sexual Orientation Strategy.</p><p>The draft Strategy will be referred to the Executive for final agreement and publication. A further 12 week period of public consultation will then take place.</p><p>We would anticipate that the Sexual Orientation Strategy would be published after this final phase of consultation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%207108%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=215502","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=215502"}},{"id":"213479","reference":"AQW 38518/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-11-10","answerBy":"2014-11-25","answered":"2014-11-19","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development what actions his Department has taken to advance the Together: Building a United Community objective of reviewing housing provision to bring forward recommendations on enhancing shared neighbourhoods.","answerText":"There is already a substantial body of research, evidence and literature on shared housing. As a first step, my officials are working on producing a review of this to identify key gaps. It is then my intention to commission a study in the next financial year, resources permitting, which aims to build further our understanding on how we can further enhance the provision of shared neighbourhoods.","answerHtml":"<p>There is already a substantial body of research, evidence and literature on shared housing. As a first step, my officials are working on producing a review of this to identify key gaps. It is then my intention to commission a study in the next financial year, resources permitting, which aims to build further our understanding on how we can further enhance the provision of shared neighbourhoods.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2038518%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=213479","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=213479"}},{"id":"213478","reference":"AQW 38517/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-11-10","answerBy":"2014-11-25","answered":"2014-11-18","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development for an update on the objective of building ten new Shared Neighbourhood Developments under the Together: Building a United Community strategy.","answerText":"The Housing Executive has identified ten sites which provide the potential for development as shared neighbourhoods and is working to identify further potential sites.\n\nConstruction works on 1 site have been completed and site or construction works have commenced on 3 further sites.\n\nAll new social housing, including on potential shared neighbourhood developments, will be allocated on the basis of housing need and in accordance with the Housing Executive’s Housing Selection Scheme. This means that while sites will be earmarked for development as shared neighbourhoods, this status cannot be confirmed until all the social housing within a development is allocated.","answerHtml":"<p>The Housing Executive has identified ten sites which provide the potential for development as shared neighbourhoods and is working to identify further potential sites.</p><p>Construction works on 1 site have been completed and site or construction works have commenced on 3 further sites.</p><p>All new social housing, including on potential shared neighbourhood developments, will be allocated on the basis of housing need and in accordance with the Housing Executive’s Housing Selection Scheme. This means that while sites will be earmarked for development as shared neighbourhoods, this status cannot be confirmed until all the social housing within a development is allocated.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2038517%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=213478","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=213478"}},{"id":"213138","reference":"AQO 7045/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-11-06","answerBy":"2014-11-17","answered":"2014-11-17","answeredOrally":true,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice how he has sought to protect frontline public services against the cuts to his departmental budget since devolution of Justice in 2010.","answerText":"","answerHtml":"","oralExchange":[],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%207045%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=213138","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2014-11-17&docID=213940#AQO%207045/11-15","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=213138"}},{"id":"212343","reference":"AQW 38014/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-11-03","answerBy":"2014-11-18","answered":"2014-11-18","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development to detail (i) the number of people that have benefited from the extra statutory scheme set up in 2013 for contributions based Employment Support Allowance (ESA) and extended in 2014 to include income based ESA, which allows claimants to continue to receive ESA when they move between Northern Ireland and Great Britain; and (ii) how much income has been generated for claimants as a result of the scheme.","answerText":"(i)The number of Employment and Support Allowance claimants moving from Great Britain to Northern Ireland and paid under the extra statutory scheme since its introduction in October 2012 to 30 September 2014 is 239*.\n\n(ii)The total amount of Employment and Support Allowance paid under the extra statutory scheme for the period October 2012 to September 2014 is approximately £672,000*.\n\n*These are not statistics provided by the Department’s Analytical Services Unit. They have been taken from management information collected by the Employment and Support Allowance Centre for the periods stated.","answerHtml":"<p>(i)The number of Employment and Support Allowance claimants moving from Great Britain to Northern Ireland and paid under the extra statutory scheme since its introduction in October 2012 to 30 September 2014 is 239*.</p><p>(ii)The total amount of Employment and Support Allowance paid under the extra statutory scheme for the period October 2012 to September 2014 is approximately £672,000*.</p><p>*These are not statistics provided by the Department’s Analytical Services Unit. They have been taken from management information collected by the Employment and Support Allowance Centre for the periods stated.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2038014%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=212343","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=212343"}},{"id":"211946","reference":"AQW 37960/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-10-24","answerBy":"2014-11-10","answered":"2014-11-11","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety to detail the annual cost of the free prescriptions programme, compared to the previous system which included exemptions.","answerText":"Based on the income generated under the previous system when a prescription charge of £3.00 per item was in place, alongside a number of exemption categories, it is estimated that the annual cost of the introduction of free prescriptions in April 2010 is £5m - £6million per annum.\n\nIt should be noted, however, that in the four years from 2010/2011 2013/2014 the Health and Social care Board has reported that it has reduced expenditure on prescriptions from £426m to £346m a reduction of over 18%.","answerHtml":"<p>Based on the income generated under the previous system when a prescription charge of £3.00 per item was in place, alongside a number of exemption categories, it is estimated that the annual cost of the introduction of free prescriptions in April 2010 is £5m - £6million per annum.</p><p>It should be noted, however, that in the four years from 2010/2011 2013/2014 the Health and Social care Board has reported that it has reduced expenditure on prescriptions from £426m to £346m a reduction of over 18%.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2037960%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=211946","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=211946"}},{"id":"211945","reference":"AQW 37959/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-10-24","answerBy":"2014-11-10","answered":"2014-11-24","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel how much additional resource the Executive would receive should the cap on household rates be removed.","answerText":"The removal of the maximum capital value would provide additional rates revenue for the Executive of just over £4 million a year.","answerHtml":"<p>The removal of the maximum capital value would provide additional rates revenue for the Executive of just over £4 million a year.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2037959%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=211945","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=211945"}},{"id":"211944","reference":"AQW 37958/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-10-24","answerBy":"2014-11-10","answered":"2014-11-28","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel for his estimation of the revenue that would be generated from a 1 per cent increase in the regional rate in the next financial year.","answerText":"It is likely that in the region of at least £7m additional revenue would result from a 1% increase to regional rate revenue.\n\nAlmost the same amount of additional revenue would result from a 1% increase to district rate revenue when estimated at a Northern Ireland level.","answerHtml":"<p>It is likely that in the region of at least £7m additional revenue would result from a 1% increase to regional rate revenue.</p><p>Almost the same amount of additional revenue would result from a 1% increase to district rate revenue when estimated at a Northern Ireland level.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2037958%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=211944","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=211944"}},{"id":"211940","reference":"AQW 37954/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-10-24","answerBy":"2014-11-10","answered":"2014-11-03","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what is the annual cost of the free bus pass for people over 60 years old; and what percentage of users are aged between 60 and 65.","answerText":"For 2013/14 the cost of free bus travel for the over 60s was £27.9m out of a total for free travel of £40.2m\n\nIn terms of users, passenger journeys 2013/14 show that 27% of smart pass users were in the 60-65 age category across both bus and rail.","answerHtml":"<p>For 2013/14 the cost of free bus travel for the over 60s was £27.9m out of a total for free travel of £40.2m</p><p>In terms of users, passenger journeys 2013/14 show that 27% of smart pass users were in the 60-65 age category across both bus and rail.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2037954%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=211940","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=211940"}},{"id":"211856","reference":"AQO 7004/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-10-23","answerBy":"2014-11-11","answered":null,"answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment to outline the urban regeneration and community planning functions that are yet to be scheduled for transfer to the new councils.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%207004%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=211856","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=211856"}},{"id":"213770","reference":"AQO 7004/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-10-23","answerBy":"2014-11-11","answered":"2014-11-13","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment to outline the urban regeneration and community planning functions that are yet to be scheduled for transfer to the new councils.","answerText":"The Member’s question concerns two elements of the reform of local government.\n\nThe first is the provision to councils of urban regeneration powers currently exercised by the Department for Social Development and which requires primary legislation to be brought forward by DSD. As this is firmly the remit of the Minister for Social Development, I do not intend outlining this function in any great detail, other than to state that I have raised my concern in recent meetings with Ministerial colleagues, including Minister Storey, at the continued delay in reaching Executive agreement for the introduction of the DSD Bill to provide councils with regeneration powers to the Assembly.\n\nWhilst a failure to provide councils with urban regeneration and community development powers will not prevent the rest of the reform programme from going ahead, it is, nonetheless, a very important element of the reform process. I believe that the re-coupling of regeneration with the planning functions transferring from my department will provide councils with the ability to shape their communities.\n\nThe second function raised by this question, relates to community planning. Councils will have duties and powers of community planning, but these are not transferring to councils – they are entirely new and have been provided by the Local Government Act (NI) 2014.\n\nCommunity planning involves integrating the various streams of public life, such as the services and functions that are delivered in an area, and producing a plan that will set out the future direction of a council area. Councils will lead this process. However, they will not be able to achieve this on their own. A duty has been placed on all Government Departments to promote, encourage and have regard for community planning. Councils will also work with statutory\n\nbodies, agencies and the wider community, including the voluntary, community and business sectors, to develop and implement a shared vision for promoting the well-being of an area and improving the quality of life of its citizens.\n\nI recently launched a consultation on those bodies to be named in subordinate legislation as statutory community planning partners, and I would encourage anyone with an interest in community planning to respond to that consultation.\n\nLocal government has been preparing for the new community planning powers for some time, and capacity building work is ongoing with both central and local government to ensure that all key partners are able to fulfil their community planning responsibilities from April 2015.","answerHtml":"<p>The Member’s question concerns two elements of the reform of local government.</p><p>The first is the provision to councils of urban regeneration powers currently exercised by the Department for Social Development and which requires primary legislation to be brought forward by DSD. As this is firmly the remit of the Minister for Social Development, I do not intend outlining this function in any great detail, other than to state that I have raised my concern in recent meetings with Ministerial colleagues, including Minister Storey, at the continued delay in reaching Executive agreement for the introduction of the DSD Bill to provide councils with regeneration powers to the Assembly.</p><p>Whilst a failure to provide councils with urban regeneration and community development powers will not prevent the rest of the reform programme from going ahead, it is, nonetheless, a very important element of the reform process. I believe that the re-coupling of regeneration with the planning functions transferring from my department will provide councils with the ability to shape their communities.</p><p>The second function raised by this question, relates to community planning. Councils will have duties and powers of community planning, but these are not transferring to councils – they are entirely new and have been provided by the Local Government Act (NI) 2014.</p><p>Community planning involves integrating the various streams of public life, such as the services and functions that are delivered in an area, and producing a plan that will set out the future direction of a council area. Councils will lead this process. However, they will not be able to achieve this on their own. A duty has been placed on all Government Departments to promote, encourage and have regard for community planning. Councils will also work with statutory</p><p>bodies, agencies and the wider community, including the voluntary, community and business sectors, to develop and implement a shared vision for promoting the well-being of an area and improving the quality of life of its citizens.</p><p>I recently launched a consultation on those bodies to be named in subordinate legislation as statutory community planning partners, and I would encourage anyone with an interest in community planning to respond to that consultation.</p><p>Local government has been preparing for the new community planning powers for some time, and capacity building work is ongoing with both central and local government to ensure that all key partners are able to fulfil their community planning responsibilities from April 2015.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%207004%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=213770","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=213770"}},{"id":"210704","reference":"AQO 6927/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-10-16","answerBy":"2014-11-03","answered":"2014-11-03","answeredOrally":true,"priority":false,"department":"Department of Culture, Arts and Leisure","departmentId":"77","minister":"Minister of Culture, Arts and Leisure","question":"To ask the Minister of Culture, Arts and Leisure for her assessment of the cultural impact of the decision by Northern Ireland Tourist Board to withdraw funding from the Tourism Events Fund.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Ms Ní Chuilín","text":"I thank the Member for his question. The fund in question has been a key source of support for some of our highest-profile festivals and events, and I recognise that many of those will be significantly impacted by its potential withdrawal. Events such as Féile an Phobail, the North West 200, the Milk Cup and Foyle Cup and the Walled City Tattoo, just to mention a few, will potentially be affected by the decision of the Tourist Board. Those events are about much more than simply showcasing what we have to offer here in terms of money; they also help to break down barriers within our local communities and develop mutual respect amongst our increasingly diverse population. While I recognise the value that those larger events bring in economic and social benefits, I think it is important that the whole impact of small community events also has to be acknowledged. I understand that those events remain a priority for the Tourist Board and that it will endeavour to source budgets for those events in future years."},{"speaker":"Mr Dickson","text":"Thank you, Minister, for your answer so far. Can you explain to the House what actions you intend to take to ensure that that range of significant cultural and sporting activities that have been taking place will not be lost to the economy and to Northern Ireland as a result of changes in the budget?"},{"speaker":"Ms Ní Chuilín","text":"The Member might be surprised, but I learned about the withdrawal of the funding through the media. Again, it is still speculation as to which events will be supported and which will not. I am trying to find out exactly what the Tourist Board will support, but, as I said to other Members who have raised it with me — I want to be totally clear on this — the Tourist Board made a decision not to bring forward events funding. That does not mean to say that the responsibility for that gets passed to DCAL. It is not my responsibility to be the first source of funding for those events. I am certainly loath, because one department has made a decision, to pick the ball up and run. That is not happening."},{"speaker":"Mr Humphrey","text":"I thank the Minister for her answers. In relation to the Milk Cup, which was mentioned as part of the question, can I ask the Minister why, after the evidence given by the Milk Cup organisers only a few weeks ago at the CAL Committee, her Department did not give any funding to the Milk Cup? It is internationally renowned, attracting thousands of spectators each year, with hundreds of players coming from across the world, and DCAL was unable to sponsor that event. Why is that?"},{"speaker":"Ms Ní Chuilín","text":"I am confused about why the Member thinks I have never invested any money in the Milk Cup and Foyle Cup: I have. In the October monitoring round, for the Milk Cup and the Foyle Cup — the Milk Cup for this year — we were advised by the organisers that they could not spend the money before the end of this financial year. Obviously, that information has not been fed back to the Member, in fairness to him."},{"speaker":"Mr Milne","text":"Go raibh maith agat, a Phríomh-LeasCheann Comhairle. Gabhaim buíochas leis an Aire as a freagraí go dtí seo. Does the Minister agree that it is vital that sports and cultural events are supported, as they are vital to the local economy and a key factor in attracting tourism?"},{"speaker":"Ms Ní Chuilín","text":"Yes, I agree. It is vital that that cultural package for events or the events support for a cultural package in sports and even some of the bigger events is supported as best as possible in future years. The Member will know better than I, coming from a rural background, that events, particularly in small rural areas or communities, are sometimes the only opportunity for regenerating some of the local economy. Local and small businesses have come to rely on those benefits on an annual basis. It is with regret that I say that they are now in the situation of wondering what will happen this year. It is important that the Tourist Board has indicated that, where possible, it will try to focus on those events as a priority. However, like many others, those groups are still waiting for funding to become available."},{"speaker":"Mr Dallat","text":"I do not intend to chastise the Minister for the gross errors of the Northern Ireland Tourist Board, but will she accept that she now has a responsibility to give leadership and guidance to the organisers of events such as the Milk Cup, the North West 200, the Foyle Cup and so on, who have clearly been grossly let down by the Tourist Board, which apparently does not see beyond the Titanic centre?"},{"speaker":"Ms Ní Chuilín","text":"I am happy to forward a copy of the Hansard report of these questions to the ETI Minister so that she can forward it to the Tourist Board. I know that some of our officials have engaged with some of the events' organisers, and I am sure that the Member will not be surprised that they have come to DCAL seeking support and assistance. The Member will also be aware that, for reasons that will become known in the future, what small support and assistance we gave to the events was transferred from DCAL in 2010. It is regrettable that these people are now in the situation of not knowing whether they can plan events at all. It is important, particularly for areas like the north-west, that such events have more security and sustainability in the future."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%206927%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=210704","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2014-11-03&docID=211611#AQO%206927/11-15","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=210704"}},{"id":"210690","reference":"AQO 6912/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-10-16","answerBy":"2014-11-03","answered":"2014-11-03","answeredOrally":true,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture and Rural Development","question":"To ask the Minister of Agriculture and Rural Development to outline the measures she is taking to mitigate flooding in East Antrim.","answerText":"","answerHtml":"","oralExchange":[{"speaker":"Mrs O'Neill","text":"My Department is planning to deliver culvert upgrading works in the East Antrim area, costing over £150,000, over the next 12 months. In addition, Rivers Agency will continue to carry out maintenance to designated watercourses to ensure that they are free-flowing and are performing their drainage function. Designated open watercourses are inspected routinely, with those benefiting rural areas typically being on a six-year rolling inspection programme and urban watercourses being inspected and maintained annually. Where a designated watercourse has been culverted, it is inspected on a three-year cycle. In addition, culvert inlet grilles are inspected and maintained on a frequent basis, many of them weekly. Additional grille inspections are undertaken when heavy rainfall is forecast and after flood events, as debris can often be carried downstream by high river flows, which can cause obstructions. We are also drafting flood risk management plans for the north eastern river basin district, which will set out a range of objectives and measures to reduce the risk of flooding from all significant sources."},{"speaker":"Mr Dickson","text":"Thank you, Minister, for your answer. I trust that you subscribe to concerns about climate change, unlike others who do not seem to understand that it is a reality. What actions are you taking to mitigate the worst excesses of climate change and plan for the future so that flooding can and will be alleviated in those areas that you have responsibility for, not only in East Antrim but across Northern Ireland?"},{"speaker":"Mrs O'Neill","text":"Rivers Agency has been very proactive, particularly in working with the Met Office. It signed an agreement recently with the Met Office on forward planning for the impact of climate change. The map systems that we have can always be improved. We are in a better position with the maps, which is the result of a collective effort and will hopefully improve things. Rivers Agency is obviously very focused on the fact that we have a different climate. We have seen extreme weather, such as the snow in March almost two years ago and the extreme flooding that occurs within an hour's notice. That is obviously factored into the Rivers Agency's work programme and its maintenance work and is part of its business plan."},{"speaker":"Mr Milne","text":"Go raibh maith agat, a Phríomh-LeasCheann Comhairle. How does the Minister prioritise funding for flood alleviation projects?"},{"speaker":"Mrs O'Neill","text":"Each area is considered on its own merit, and funding for projects across the North is prioritised on the basis of the level of risk posed to people and property, the associated costs and the benefits of the project to the alleviation of flooding. Given the economic climate, we are always trying to look at where we can get the best value for the investment. Rivers Agency takes that forward in a constructive and structured way, but basically it boils down to prioritising on the level of risk to property and the associated costs and benefits that can be derived from that investment."},{"speaker":"Dr McDonnell","text":"I thank the Minister for her answers, particularly regarding flooding in East Antrim. What initiatives are being undertaken to deal with the watercourses in south Belfast that lead to persistent flooding in Finaghy, Lisburn Road and across south Belfast in general?"},{"speaker":"Mrs O'Neill","text":"I have spoken to the Member about this before at Question Time, so he will be aware that there is a cross-departmental working group in place to look at south Belfast. My Department plays a key role in that and knows what it needs to do. I have visited south Belfast and met residents to discuss the problems that we have. In the past, additional members of staff were employed to deal with the issues, and we increased inspections of the grilles because there were problems with debris and so on. Hopefully, that will assure the Member that Rivers Agency is playing its role in tackling the problems faced by people in south Belfast."}],"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%206912%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=210690","officialReport":"https://aims.niassembly.gov.uk/officialreport/report.aspx?&eveDate=2014-11-03&docID=211611#AQO%206912/11-15","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=210690"}},{"id":"210355","reference":"AQW 37464/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-10-14","answerBy":"2014-10-29","answered":"2015-01-05","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development whether the plans for a cycleway, as part of the A2 Shore Road upgrade at Greenisland, have been altered during construction.","answerText":"The published plans for the A2 Shore Road Greenisland include a continuous combined footway/cycleway on the shore side of the road, between Jordanstown Road and Station Road Greenisland. These plans have not changed during construction.","answerHtml":"<p>The published plans for the A2 Shore Road Greenisland include a continuous combined footway/cycleway on the shore side of the road, between Jordanstown Road and Station Road Greenisland. These plans have not changed during construction.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2037464%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=210355","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=210355"}},{"id":"210353","reference":"AQW 37463/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-10-14","answerBy":"2014-10-29","answered":"2014-10-29","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development for an update on the York Street Interchange road scheme.","answerText":"Design of the preferred option for the York Street Interchange, along with the associated work to inform and prepare the Statutory Orders, is progressing to schedule with publication of the draft Statutory Orders programmed for later this financial year.","answerHtml":"<p>Design of the preferred option for the York Street Interchange, along with the associated work to inform and prepare the Statutory Orders, is progressing to schedule with publication of the draft Statutory Orders programmed for later this financial year.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2037463%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=210353","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=210353"}},{"id":"209329","reference":"AQO 6835/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-10-02","answerBy":"2014-10-13","answered":"2014-10-14","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment what actions his Department is taking to improve the audit trail for managing tyres from purchase to disposal.","answerText":"The Department does not have the powers to audit tyres when purchased for use on vehicles. Further, tyre retailers, distributors and wholesalers do not require a waste authorisation from the DOE (NIEA) for waste tyres that have been produced on their premises.\n\nOnce tyres become waste, the tyre retailer is required to comply with the Duty of Care Regulations and the statutory Code of Practice. The business must ensure that the collector of the waste tyres is registered with the DOE (NIEA) as a waste carrier and that a waste transfer note is completed and retained by both parties for at least 2 years. The waste carrier must also comply with Duty of Care and only deliver waste tyres to a suitably authorised waste recycling facility.\n\nThe Department has allocated staff to audit the completion and retention of waste transfer notes. The team will be concentrating on the audit of waste tyres from the retailer to the carrier and finally to disposal by the waste operator on a risk basis.\n\nThe Department working in partnership with the Chief Environmental Health Officers Group (CEHOG) has set up a tyre pilot study in four council areas; Cookstown, Ballymoney, Strabane and Antrim. Phase 1 of the study includes joint inspections by Environmental Health Officers and DOE staff to respectively audit part worn/waste tyres on tyre retailer premises.\n\nDOE also has in place a Flytipping pilot project with most of the District Councils. This project provides an audit trail for waste tyres that have been flytipped on public land and removed by the authorised contractor.","answerHtml":"<p>The Department does not have the powers to audit tyres when purchased for use on vehicles. Further, tyre retailers, distributors and wholesalers do not require a waste authorisation from the DOE (NIEA) for waste tyres that have been produced on their premises.</p><p>Once tyres become waste, the tyre retailer is required to comply with the Duty of Care Regulations and the statutory Code of Practice. The business must ensure that the collector of the waste tyres is registered with the DOE (NIEA) as a waste carrier and that a waste transfer note is completed and retained by both parties for at least 2 years. The waste carrier must also comply with Duty of Care and only deliver waste tyres to a suitably authorised waste recycling facility.</p><p>The Department has allocated staff to audit the completion and retention of waste transfer notes. The team will be concentrating on the audit of waste tyres from the retailer to the carrier and finally to disposal by the waste operator on a risk basis.</p><p>The Department working in partnership with the Chief Environmental Health Officers Group (CEHOG) has set up a tyre pilot study in four council areas; Cookstown, Ballymoney, Strabane and Antrim. Phase 1 of the study includes joint inspections by Environmental Health Officers and DOE staff to respectively audit part worn/waste tyres on tyre retailer premises.</p><p>DOE also has in place a Flytipping pilot project with most of the District Councils. This project provides an audit trail for waste tyres that have been flytipped on public land and removed by the authorised contractor.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%206835%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=209329","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=209329"}},{"id":"209328","reference":"AQO 6803/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-10-02","answerBy":"2014-10-14","answered":"2014-10-14","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel what discussions he has had with the Treasury regarding the consequences of the official notification that the Executive is on track to exceed its spending limits.","answerText":"HM Treasury officials indicated to DFP that they should be kept informed of any developments in regards of a DEL breach. This breach would, as stated in the Statement of Funding Policy with the Devolved Administrations, be an act of “serious financial mismanagement”.\n\nYou will be aware that the Head of the Civil Service has now written to his counterpart in HM Treasury setting out his concerns about the in-year position and the 2015-16 Budget challenges.\n\nIn addition I have now had discussions with the Chancellor about securing access to the UK Reserve in 2014-15. As a result of these\n\nnegotiations I have secured access of up to £100 million, this will be repayable in 2015-16.","answerHtml":"<p>HM Treasury officials indicated to DFP that they should be kept informed of any developments in regards of a DEL breach. This breach would, as stated in the Statement of Funding Policy with the Devolved Administrations, be an act of “serious financial mismanagement”.</p><p>You will be aware that the Head of the Civil Service has now written to his counterpart in HM Treasury setting out his concerns about the in-year position and the 2015-16 Budget challenges.</p><p>In addition I have now had discussions with the Chancellor about securing access to the UK Reserve in 2014-15. As a result of these</p><p>negotiations I have secured access of up to £100 million, this will be repayable in 2015-16.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%206803%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=209328","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=209328"}},{"id":"206846","reference":"AQO 6702/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-09-18","answerBy":"2014-09-29","answered":null,"answeredOrally":false,"priority":false,"department":"Department for Employment and Learning","departmentId":"83","minister":"Minister for Employment and Learning","question":"To ask the Minister for Employment and Learning for his assessment of the competitive position of Northern Ireland’s universities.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%206702%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=206846","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=206846"}},{"id":"208247","reference":"AQO 6702/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-09-18","answerBy":"2014-09-29","answered":"2014-09-29","answeredOrally":false,"priority":false,"department":"Department for Employment and Learning","departmentId":"83","minister":"Minister for Employment and Learning","question":"To ask the Minister for Employment and Learning for his assessment of the competitive position of Northern Ireland’s universities.","answerText":"My central objective is to ensure that Northern Ireland continues to have a world-class and internationally recognised higher education sector. Our universities are key partners in the economic transformation of Northern Ireland and are central to our inward investment narrative and efforts to create more jobs and business start-ups. They are key providers of higher level skills and research.\n\nI have been pleased to be able to provide additional undergraduate places, all in STEM subjects, to set in train the doubling of the number of publically-funded PhDs over this decade, to facilitate additional Masters courses, and to make new investments in research activities.\n\nNevertheless, in light of the underlying squeeze on public sector funding over the course of the 2011-15 Budget period, there is an ongoing challenge to maintain the competitive position of our universities.\n\nThe universities in Northern Ireland receive grant from my Department for funded undergraduate and post-graduate places and tuition fees from the students.\n\nTaking these together, the universities receive between £1,000 and £2,500 less per student than their counterparts in England and Scotland.\n\nIn total terms, for the number of students being funded in the current year, our universities receive up to £39m less than they would in England or £22m less than they would in Scotland. This funding gap is growing and it directly impacts on the competitive position of our universities.\n\nIn terms of research funding, our universities are also funded at a lower per capita rate than those in England or Scotland. Not only is their competitiveness compromised but also that of Northern Ireland, as research and innovation are key catalysts for economic growth and prosperity.","answerHtml":"<p>My central objective is to ensure that Northern Ireland continues to have a world-class and internationally recognised higher education sector. Our universities are key partners in the economic transformation of Northern Ireland and are central to our inward investment narrative and efforts to create more jobs and business start-ups. They are key providers of higher level skills and research.</p><p>I have been pleased to be able to provide additional undergraduate places, all in STEM subjects, to set in train the doubling of the number of publically-funded PhDs over this decade, to facilitate additional Masters courses, and to make new investments in research activities.</p><p>Nevertheless, in light of the underlying squeeze on public sector funding over the course of the 2011-15 Budget period, there is an ongoing challenge to maintain the competitive position of our universities.</p><p>The universities in Northern Ireland receive grant from my Department for funded undergraduate and post-graduate places and tuition fees from the students.</p><p>Taking these together, the universities receive between £1,000 and £2,500 less per student than their counterparts in England and Scotland.</p><p>In total terms, for the number of students being funded in the current year, our universities receive up to £39m less than they would in England or £22m less than they would in Scotland. This funding gap is growing and it directly impacts on the competitive position of our universities.</p><p>In terms of research funding, our universities are also funded at a lower per capita rate than those in England or Scotland. Not only is their competitiveness compromised but also that of Northern Ireland, as research and innovation are key catalysts for economic growth and prosperity.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%206702%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=208247","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=208247"}},{"id":"205920","reference":"AQO 6678/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-09-11","answerBy":"2014-09-23","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety what action his Department is taking in response to the Independent Review of the Actions Taken in Relation to Concerns Raised about the Care Delivered at Cherry Tree House, Carrickfergus.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%206678%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=205920","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=205920"}},{"id":"207596","reference":"AQO 6678/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-09-11","answerBy":"2014-09-23","answered":"2014-09-23","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety what action his Department is taking in response to the Independent Review of the Actions Taken in Relation to Concerns Raised about the Care Delivered at Cherry Tree House, Carrickfergus.","answerText":"Senior officials from my Department met in August with the Health and Social Care Board and the Regulation and Quality Improvement Authority to consider the 22 recommendations made by the review. It was agreed that they would most effectively be delivered by the delegation of individual recommendations to each responsible organisation.\n\nMy Department will monitor the overall implementation of the recommendations, with each organisation required to submit an interim progress report by the end of October. It is intended that all the recommendations will be fully implemented by the end of this year.","answerHtml":"<p>Senior officials from my Department met in August with the Health and Social Care Board and the Regulation and Quality Improvement Authority to consider the 22 recommendations made by the review. It was agreed that they would most effectively be delivered by the delegation of individual recommendations to each responsible organisation.</p><p>My Department will monitor the overall implementation of the recommendations, with each organisation required to submit an interim progress report by the end of October. It is intended that all the recommendations will be fully implemented by the end of this year.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%206678%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=207596","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=207596"}},{"id":"205257","reference":"AQO 6621/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-09-04","answerBy":"2014-09-16","answered":null,"answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment for an update on the proposal to extend the natural gas network to Whitehead, County Antrim.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%206621%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=205257","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=205257"}},{"id":"206571","reference":"AQO 6621/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-09-04","answerBy":"2014-09-16","answered":"2014-09-17","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment for an update on the proposal to extend the natural gas network to Whitehead, County Antrim.","answerText":"The Utility Regulator and the natural gas industry have considered the possibility of bringing gas to Whitehead, and are continuing discussions with the aim of finding an economic option.The DETI Minister continues to support the development of the gas industry in Northern Ireland.","answerHtml":"<p>The Utility Regulator and the natural gas industry have considered the possibility of bringing gas to Whitehead, and are continuing discussions with the aim of finding an economic option.The DETI Minister continues to support the development of the gas industry in Northern Ireland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%206621%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=206571","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=206571"}},{"id":"204695","reference":"AQO 6516/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-09-01","answerBy":"2014-09-09","answered":null,"answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development for an update on the work of the Housing Repossessions Taskforce in addressing the impact of negative equity.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%206516%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=204695","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=204695"}},{"id":"205641","reference":"AQO 6516/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-09-01","answerBy":"2014-09-09","answered":"2014-09-09","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development for an update on the work of the Housing Repossessions Taskforce in addressing the impact of negative equity.","answerText":"The work of the Housing Repossession Taskforce will be time bound and completed in two phases. The findings from the first phase were published in July, which are now informing the second phase of developing evidence-based recommendations for potential mitigating actions. I am pleased to advise that the Taskforce is making strong progress in the completion of this options phase. While a final report will be published by the end of this year, where possible, the Taskforce will endeavour to expedite the implementation of any recommendations.","answerHtml":"<p>The work of the Housing Repossession Taskforce will be time bound and completed in two phases. The findings from the first phase were published in July, which are now informing the second phase of developing evidence-based recommendations for potential mitigating actions. I am pleased to advise that the Taskforce is making strong progress in the completion of this options phase. While a final report will be published by the end of this year, where possible, the Taskforce will endeavour to expedite the implementation of any recommendations.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%206516%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=205641","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=205641"}},{"id":"203644","reference":"AQW 35165/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-07-04","answerBy":"2014-07-23","answered":"2014-07-11","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development what proportion of bank loans secured by Clanmill Housing to construct 1,600 houses has been drawn down.","answerText":"My Department does not hold information about the private finance arrangements between housing associations and financial institutions. In April Clanmil announced that some £100m of the £120m bank loans agreed with Barclays and Danske would be invested in building 1,600 new social homes, with the remainder used to finance existing loan facilities.","answerHtml":"<p>My Department does not hold information about the private finance arrangements between housing associations and financial institutions. In April Clanmil announced that some £100m of the £120m bank loans agreed with Barclays and Danske would be invested in building 1,600 new social homes, with the remainder used to finance existing loan facilities.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2035165%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=203644","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=203644"}},{"id":"203643","reference":"AQW 35164/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-07-04","answerBy":"2014-07-23","answered":"2014-07-11","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development, pursuant to AQW 32786/11-15, on how many sites will construction commence during this financial year.","answerText":"Plans are for housing associations to start a total of 2,000 new social homes during 2014/15. The information provided in AQW 32786/11-15 shows that Clanmil is programmed to start construction work on 28 sites with 629 new homes during the period. However, as also previously stated, the Clanmil programme is a gross programme and some schemes can be lost in year or slip to later years for a variety of reasons, such as delays in securing planning or inability to acquire a site.","answerHtml":"<p>Plans are for housing associations to start a total of 2,000 new social homes during 2014/15. The information provided in AQW 32786/11-15 shows that Clanmil is programmed to start construction work on 28 sites with 629 new homes during the period. However, as also previously stated, the Clanmil programme is a gross programme and some schemes can be lost in year or slip to later years for a variety of reasons, such as delays in securing planning or inability to acquire a site.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2035164%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=203643","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=203643"}},{"id":"203642","reference":"AQW 35163/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-07-04","answerBy":"2014-07-23","answered":"2014-07-11","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development, pursuant to AQW 32785/11-15, whether his Department intends to recover funding from Clanmill Housing for projects that have not acquired planning permission.","answerText":"The Housing Executive assesses and approves each individual scheme in the social housing programme, determines the level of grant payable and pays out that grant in three separate tranches. No funding is allocated or paid until each scheme is approved. A first tranche is paid for land acquisition, a second tranche is paid when planning permission has been secured and construction starts and a third tranche is paid on scheme completion.\n\nIn the event that grant is paid for land acquisition and planning permission cannot be achieved for whatever reason, the Housing Executive would initiate recovery procedures. However, at this point all of Clanmil’s planning applications are proceeding as normal, so there is no need to consider recovery.","answerHtml":"<p>The Housing Executive assesses and approves each individual scheme in the social housing programme, determines the level of grant payable and pays out that grant in three separate tranches. No funding is allocated or paid until each scheme is approved. A first tranche is paid for land acquisition, a second tranche is paid when planning permission has been secured and construction starts and a third tranche is paid on scheme completion.</p><p>In the event that grant is paid for land acquisition and planning permission cannot be achieved for whatever reason, the Housing Executive would initiate recovery procedures. However, at this point all of Clanmil’s planning applications are proceeding as normal, so there is no need to consider recovery.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2035163%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=203642","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=203642"}},{"id":"203445","reference":"AQW 35126/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-07-03","answerBy":"2014-07-22","answered":"2014-07-10","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development what actions his Department has taken, in line with the Volunteering Strategy, to mitigate financial difficulties volunteer drivers may face in paying for full D1 or D licenses, should the Department of the Environment require community organisations to adopt full bus operator licensing.","answerText":"My Department is currently reviewing the draft guidance for new license requirements for buses and minibuses received from the Minister for the Environment, Mark Durkan, MLA. This review will consider any impact of the guidance on the successful delivery of the Volunteering Strategy.","answerHtml":"<p>My Department is currently reviewing the draft guidance for new license requirements for buses and minibuses received from the Minister for the Environment, Mark Durkan, MLA. This review will consider any impact of the guidance on the successful delivery of the Volunteering Strategy.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2035126%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=203445","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=203445"}},{"id":"203444","reference":"AQW 35125/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-07-03","answerBy":"2014-07-22","answered":"2014-07-10","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development what actions his Department has taken to ensure that, in line with the Volunteering Strategy, the Department of the Environment protects volunteer drivers in its review of bus operator licensing.","answerText":"My Department is currently reviewing the draft guidance for new license requirements for buses and minibuses received from the Minister for the Environment, Mark Durkan, MLA . This review will consider any impact of the guidance on the successful delivery of the Volunteering Strategy.","answerHtml":"<p>My Department is currently reviewing the draft guidance for new license requirements for buses and minibuses received from the Minister for the Environment, Mark Durkan, MLA . This review will consider any impact of the guidance on the successful delivery of the Volunteering Strategy.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2035125%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=203444","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=203444"}},{"id":"203443","reference":"AQW 35124/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-07-03","answerBy":"2014-07-22","answered":"2014-07-10","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development what actions his Department’s Voluntary and Community Unit is taking to ensure that the Volunteering Strategy and its agreed objectives are being adopted by each Executive Department.","answerText":"Northern Ireland’s first ever Volunteering Strategy, endorsed by the NI Executive in June 2011, was welcomed by my Ministerial colleagues and received strong support. The Volunteering Strategy is accompanied by an Action Plan that sets out a programme of work that is currently underway to achieve the Strategy objectives. A Volunteering Strategy Steering Group has been established with representation from volunteering stakeholders, both from government and non government, to monitor and report on the implementation of the Strategy.\n\nA mid-term evaluation of the Volunteering Strategy is planned to take place in this financial year. The outcome of this evaluation will be key to any changes to delivery post 2015 and I will be updating the NI Executive as appropriate, to ensure its continued commitment and the creation of a strong policy context which will provide the conditions to enable volunteering to flourish and ensure its impact on life in Northern Ireland is maximised.","answerHtml":"<p>Northern Ireland’s first ever Volunteering Strategy, endorsed by the NI Executive in June 2011, was welcomed by my Ministerial colleagues and received strong support. The Volunteering Strategy is accompanied by an Action Plan that sets out a programme of work that is currently underway to achieve the Strategy objectives. A Volunteering Strategy Steering Group has been established with representation from volunteering stakeholders, both from government and non government, to monitor and report on the implementation of the Strategy.</p><p>A mid-term evaluation of the Volunteering Strategy is planned to take place in this financial year. The outcome of this evaluation will be key to any changes to delivery post 2015 and I will be updating the NI Executive as appropriate, to ensure its continued commitment and the creation of a strong policy context which will provide the conditions to enable volunteering to flourish and ensure its impact on life in Northern Ireland is maximised.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2035124%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=203443","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=203443"}},{"id":"202597","reference":"AQW 34774/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-06-25","answerBy":"2014-07-10","answered":"2014-07-09","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development how many social housing properties, over which his Department has has responsibility, either by way of grants provided for the property, or by housing association, have paramilitarty murals painted on their outside walls broken down by paramilitary groupings.","answerText":"The information is not available in the format requested in relation to Housing Executive properties as the Housing Executive does not collate information on the particular paramilitary groupings associated with murals on their properties. The Housing Executive has advised there are 204 properties with paramilitary murals.\n\nIn relation to Housing Associations they have advised as follows: -\n\nfour Housing Association properties with paramilitary murals: -\n\n2: dissident republican\n\n1: republican (Housing Association is unsure which organisation)\n\n1: UVF (as far as the Housing Association is aware)","answerHtml":"<p>The information is not available in the format requested in relation to Housing Executive properties as the Housing Executive does not collate information on the particular paramilitary groupings associated with murals on their properties. The Housing Executive has advised there are 204 properties with paramilitary murals.</p><p>In relation to Housing Associations they have advised as follows: -</p><p>four Housing Association properties with paramilitary murals: -</p><p>2: dissident republican</p><p>1: republican (Housing Association is unsure which organisation)</p><p>1: UVF (as far as the Housing Association is aware)</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2034774%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=202597","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=202597"}},{"id":"202596","reference":"AQW 34773/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-06-25","answerBy":"2014-07-10","answered":"2014-07-09","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development how many Housing Executive property offices, and all other property owned, occupied or rented by his Department have outside walls painted with paramilitary murals, broken down by paramilitary grouping.","answerText":"The Housing Executive has advised that none of their offices have any outside walls painted with paramilitary murals. My Department owns one property that has a mural painted on the gable wall. While this is primarily a World War 1 memorial it includes Ulster Volunteer Force (UVF) and Young Citizen Volunteers (YCV) emblems.","answerHtml":"<p>The Housing Executive has advised that none of their offices have any outside walls painted with paramilitary murals. My Department owns one property that has a mural painted on the gable wall. While this is primarily a World War 1 memorial it includes Ulster Volunteer Force (UVF) and Young Citizen Volunteers (YCV) emblems.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2034773%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=202596","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=202596"}},{"id":"202595","reference":"AQW 34772/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-06-25","answerBy":"2014-07-10","answered":"2014-07-09","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development how many occupied Housing Executive homes have paramilitary murals painted on them, broken down by paramilitary grouping.","answerText":"The information is not available in the format requested as the Housing Executive advises that it does not record the types of murals painted on their properties, or whether properties with murals painted on them are occupied.\n\nThey do advise however, that 204 paramilitary murals are painted on their properties.","answerHtml":"<p>The information is not available in the format requested as the Housing Executive advises that it does not record the types of murals painted on their properties, or whether properties with murals painted on them are occupied.</p><p>They do advise however, that 204 paramilitary murals are painted on their properties.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2034772%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=202595","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=202595"}},{"id":"202585","reference":"AQW 34765/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-06-25","answerBy":"2014-07-10","answered":"2014-06-30","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education where the new build for Abbey Community College will be built; and for an estimated time period for this work to be completed.","answerText":"The location of the school will be a matter for consideration in the economic appraisal that will be prepared for the capital project.\n\nIn my Statement of 24 June I said that different projects will progress at different speeds and given the likely timescales required to complete the economic appraisal, design and procurement processes, significant spend is unlikely before financial year 2016/2017. Progression of this project to construction stage is also dependent on the availability of capital budget however the school should have a valid expectation that construction will follow within a reasonable timescale.","answerHtml":"<p>The location of the school will be a matter for consideration in the economic appraisal that will be prepared for the capital project.</p><p>In my Statement of 24 June I said that different projects will progress at different speeds and given the likely timescales required to complete the economic appraisal, design and procurement processes, significant spend is unlikely before financial year 2016/2017. Progression of this project to construction stage is also dependent on the availability of capital budget however the school should have a valid expectation that construction will follow within a reasonable timescale.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2034765%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=202585","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=202585"}},{"id":"201990","reference":"AQO 6502/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-06-19","answerBy":"2014-07-01","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice for his assessment of the recent comments by the Chair of the Community Relations Council on the prospects of removing all interface barriers by 2023.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%206502%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=201990","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=201990"}},{"id":"203316","reference":"AQO 6502/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-06-19","answerBy":"2014-07-01","answered":"2014-07-01","answeredOrally":false,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice for his assessment of the recent comments by the Chair of the Community Relations Council on the prospects of removing all interface barriers by 2023.","answerText":"I agree with Peter Osborne’s recent comments and indeed those of Dr Adrian Johnston, IFI Chairman, that working towards the removal of ‘peace walls’ is complex, difficult and challenging work, and they are correct in highlighting that a lack of resources is a risk to progress.\n\nIt is clear to me that there are three main issues that need to be addressed to make progress. The lack of a dedicated programme budget is one. The need for a cross Executive commitment to address economic and social renewal is another. The need for continued and intensive good relations work is the third. These issues remain key to achieving the target of removal of barriers and must be addressed.\n\nI know for local engagement there is a real need to tackle physical, economic, social and community renewal within interface areas. The Department of Justice cannot deliver this magnitude of change alone. It requires a properly funded programme which brings together the community, statutory bodies and voluntary groups. I believe that the Executive needs to address the issue comprehensively so that we see meaningful change in interface communities. I hope we can move forward soon.","answerHtml":"<p>I agree with Peter Osborne’s recent comments and indeed those of Dr Adrian Johnston, IFI Chairman, that working towards the removal of ‘peace walls’ is complex, difficult and challenging work, and they are correct in highlighting that a lack of resources is a risk to progress.</p><p>It is clear to me that there are three main issues that need to be addressed to make progress. The lack of a dedicated programme budget is one. The need for a cross Executive commitment to address economic and social renewal is another. The need for continued and intensive good relations work is the third. These issues remain key to achieving the target of removal of barriers and must be addressed.</p><p>I know for local engagement there is a real need to tackle physical, economic, social and community renewal within interface areas. The Department of Justice cannot deliver this magnitude of change alone. It requires a properly funded programme which brings together the community, statutory bodies and voluntary groups. I believe that the Executive needs to address the issue comprehensively so that we see meaningful change in interface communities. I hope we can move forward soon.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%206502%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=203316","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=203316"}},{"id":"201993","reference":"AQO 6453/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-06-19","answerBy":"2014-06-30","answered":"2014-06-30","answeredOrally":true,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment for an update on his progress in achieving a reduction in greenhouse gas emissions by at least 35 per cent on 1990 levels by 2025, as per the commitment in the Programme for Government 2011-15.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%206453%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=201993","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-13-14/30-June-2014","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=201993"}},{"id":"203122","reference":"AQO 6453/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-06-19","answerBy":"2014-06-30","answered":"2014-07-03","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment for an update on his progress in achieving a reduction in greenhouse gas emissions by at least 35 per cent on 1990 levels by 2025, as per the commitment in the Programme for Government 2011-15.","answerText":"The Northern Ireland Executive has a target to continue to work towards a reduction in greenhouse gas emissions by at least 35 per cent on 1990 levels by 2025. The latest inventory published on 10 June 2014, for the 1990-2012 period, shows a reduction of 16 per cent in 2012 in emissions since the base year of 1990.\n\nMy department’s analysts use a projection tool to estimate reductions in 2025 based on the latest inventory. A projection figure based on the 2012 figures will only be available in December 2014. However the 2011-based projection figure shows a 27.6 per cent reduction in greenhouse gas emissions between 1990 and 2025.","answerHtml":"<p>The Northern Ireland Executive has a target to continue to work towards a reduction in greenhouse gas emissions by at least 35 per cent on 1990 levels by 2025. The latest inventory published on 10 June 2014, for the 1990-2012 period, shows a reduction of 16 per cent in 2012 in emissions since the base year of 1990.</p><p>My department’s analysts use a projection tool to estimate reductions in 2025 based on the latest inventory. A projection figure based on the 2012 figures will only be available in December 2014. However the 2011-based projection figure shows a 27.6 per cent reduction in greenhouse gas emissions between 1990 and 2025.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%206453%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=203122","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=203122"}},{"id":"199871","reference":"AQO 6292/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-05-29","answerBy":"2014-06-09","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel for his assessment of the success of programmes to improve the energy efficiency of public buildings.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%206292%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=199871","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=199871"}},{"id":"200790","reference":"AQO 6292/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-05-29","answerBy":"2014-06-09","answered":"2014-06-10","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel for his assessment of the success of programmes to improve the energy efficiency of public buildings.","answerText":"I can only answer the question in relation to Northern Ireland Civil Service (NICS) Office Estate for which my Department has responsibility. Energy consumption of this Estate equates to 4% of the total Northern Ireland public sector consumption. Energy efficiency programmes for all other public buildings are the responsibility of the Department which manages those buildings.\n\nA three year Energy Efficiency Plan for 2011-14 for the Office Estate has been completed and an updated Plan covering 2014-17 will be published shortly. Both Plans identify three primary mechanisms by which energy consumption can be reduced:\n\nreduction in the footprint of the Office Estate;\n\ncapital investments in energy efficiency measures and equipment; and\n\nbehavioural change of staff occupying the Estate.\n\nSteps taken so far to improve energy efficiency include:\n\nthe implementation of recommendations from comprehensive energy surveys;\n\nthe implementation of Display Energy Certificate (DECs) recommendations;\n\nvoltage optimisation pilot projects; and\n\nproviding premises officers with limited access to Building Energy Management System (BEMS).\n\nEnergy consumption data has shown that in first year of the 2011-14 Office Estate Energy Efficiency Plan, a 3.5% reduction in energy consumption was achieved and assessment of the following two years indicates that the Department is on track to meet the combined 2011–14 plan target of 10% energy reduction (approximately 9,500megawatts hours (Mwh)).","answerHtml":"<p>I can only answer the question in relation to Northern Ireland Civil Service (NICS) Office Estate for which my Department has responsibility. Energy consumption of this Estate equates to 4% of the total Northern Ireland public sector consumption. Energy efficiency programmes for all other public buildings are the responsibility of the Department which manages those buildings.</p><p>A three year Energy Efficiency Plan for 2011-14 for the Office Estate has been completed and an updated Plan covering 2014-17 will be published shortly. Both Plans identify three primary mechanisms by which energy consumption can be reduced:</p><p>reduction in the footprint of the Office Estate;</p><p>capital investments in energy efficiency measures and equipment; and</p><p>behavioural change of staff occupying the Estate.</p><p>Steps taken so far to improve energy efficiency include:</p><p>the implementation of recommendations from comprehensive energy surveys;</p><p>the implementation of Display Energy Certificate (DECs) recommendations;</p><p>voltage optimisation pilot projects; and</p><p>providing premises officers with limited access to Building Energy Management System (BEMS).</p><p>Energy consumption data has shown that in first year of the 2011-14 Office Estate Energy Efficiency Plan, a 3.5% reduction in energy consumption was achieved and assessment of the following two years indicates that the Department is on track to meet the combined 2011–14 plan target of 10% energy reduction (approximately 9,500megawatts hours (Mwh)).</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%206292%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=200790","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=200790"}},{"id":"199553","reference":"AQO 6211/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-05-15","answerBy":"2014-05-27","answered":"2014-05-27","answeredOrally":false,"priority":false,"department":"Department of Culture, Arts and Leisure","departmentId":"77","minister":"Minister of Culture, Arts and Leisure","question":"To ask the Minister of Culture, Arts and Leisure what action she has taken to ensure that sufficient arts and cultural facilities are available for future screen and television productions.","answerText":"I am not aware of any limitations to arts or culture infrastructure which have hindered or could hinder film productions here, or any evidence that the arts and cultural sector is not supportive of film production.\n\nNI Screen has been extremely successful in attracting a growing number of high profile productions to the north of Ireland in recent years. For example, even aside from the phenomenally successful Game of Thrones, we have seen the filming of City of Ember, Your Highness, Dracula Untold, Hunger, The Fall and Oscar winning short film The Shore. The film industry has contributed approximately £121m to the local economy over the last four years. This highlights the quality of what we have to offer as a location.\n\nNI Screen has implemented key multi-channel campaigns to showcase the benefits of the North as a centre for independent film, television and new media production, selling our location, funding opportunities and facilities to the global screen industry, and will continue to do so throughout the course of its new strategy ‘Opening Doors’. It has recently announced that the feature film High-Rise, featuring Sienna Millar and Jeremy Irons, will begin filming in Co. Down in July.\n\nIn terms of facilities available to productions, NI Screen offers a brochure detailing not only Titanic Studios, but other diverse studio and build spaces such as The Linen Mill (Co. Down), KBL Mill in Ballyclare, and Kilroot, which was used in the feature film Hunger.\n\nDue to the growing success and expansion of the film industry in the north, NI Screen, in conjunction with Invest NI, is currently looking into options to increase the available infrastructure, in particular with regard to sound stages, to maximize our ability to attract future productions.","answerHtml":"<p>I am not aware of any limitations to arts or culture infrastructure which have hindered or could hinder film productions here, or any evidence that the arts and cultural sector is not supportive of film production.</p><p>NI Screen has been extremely successful in attracting a growing number of high profile productions to the north of Ireland in recent years. For example, even aside from the phenomenally successful Game of Thrones, we have seen the filming of City of Ember, Your Highness, Dracula Untold, Hunger, The Fall and Oscar winning short film The Shore. The film industry has contributed approximately £121m to the local economy over the last four years. This highlights the quality of what we have to offer as a location.</p><p>NI Screen has implemented key multi-channel campaigns to showcase the benefits of the North as a centre for independent film, television and new media production, selling our location, funding opportunities and facilities to the global screen industry, and will continue to do so throughout the course of its new strategy ‘Opening Doors’. It has recently announced that the feature film High-Rise, featuring Sienna Millar and Jeremy Irons, will begin filming in Co. Down in July.</p><p>In terms of facilities available to productions, NI Screen offers a brochure detailing not only Titanic Studios, but other diverse studio and build spaces such as The Linen Mill (Co. Down), KBL Mill in Ballyclare, and Kilroot, which was used in the feature film Hunger.</p><p>Due to the growing success and expansion of the film industry in the north, NI Screen, in conjunction with Invest NI, is currently looking into options to increase the available infrastructure, in particular with regard to sound stages, to maximize our ability to attract future productions.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%206211%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=199553","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=199553"}},{"id":"199560","reference":"AQO 6196/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-05-15","answerBy":"2014-05-27","answered":"2014-05-27","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development, in light of the recent comments by the former Ombudsman for Northern Ireland, Dr Maurice Hayes, whether he will restrict his interaction with the Northern Ireland Housing Executive to the Board or the Chief Executive.","answerText":"In my role as Minister for Social Development I meet regularly with the Chairman and the Chief Executive of the Housing Executive to discuss both strategic and operational issues. However, there are also meetings, in my role as Minister, when it is entirely appropriate and normal protocol for the relevant departmental and Housing Executive officials, who have responsibility for the area under discussion, to attend meetings with me in order to provide appropriate advice.","answerHtml":"<p>In my role as Minister for Social Development I meet regularly with the Chairman and the Chief Executive of the Housing Executive to discuss both strategic and operational issues. However, there are also meetings, in my role as Minister, when it is entirely appropriate and normal protocol for the relevant departmental and Housing Executive officials, who have responsibility for the area under discussion, to attend meetings with me in order to provide appropriate advice.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%206196%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=199560","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=199560"}},{"id":"198414","reference":"AQO 6164/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-05-08","answerBy":"2014-05-19","answered":"2014-05-19","answeredOrally":true,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice whether he has received a response from HM Treasury in relation to the legislation that prevents the identification of filling stations that have failed compliance visits by HMRC.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%206164%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=198414","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-13-14/19-May-2014","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=198414"}},{"id":"198380","reference":"AQO 6153/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-05-08","answerBy":"2014-05-19","answered":null,"answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what discussions he has had with the Minister of Enterprise, Trade and Investment regarding the physical infrastructure legacy of the Giro d'Italia.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%206153%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=198380","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=198380"}},{"id":"199189","reference":"AQO 6153/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-05-08","answerBy":"2014-05-19","answered":"2014-05-19","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what discussions he has had with the Minister of Enterprise, Trade and Investment regarding the physical infrastructure legacy of the Giro d'Italia.","answerText":"I am sure that you will want to join with me in congratulating all those involved in the organisation of the Giro d’Italia NI Grande Partenza, which has been a huge success due to the effective joint working of many Departments and bodies to promote NI and cycling.\n\nMy Department has been heavily involved in numerous activities with the Giro d’Italia from the operational aspects of the Race Committee through to representation on the Northern Ireland Local Steering Group for the Legacy Plan.\n\nThe delivery structure of the event has targeted ‘legacy’ as one of its primary objectives of the event. Whilst the Northern Ireland Tourist Board is leading this aspect of the event organisation, my Department has provided input. Cycling Unit officials have contributed to the draft Legacy Plan which, among other things, seeks to promote Active Travel for the journey to school and to encourage the wider local population to engage with cycling as an everyday means of transport. It is expected that the draft Legacy Plan will be endorsed by the Executive in due course.\n\nMy Department is also setting up a cross-sectoral Cycling Group to ensure that the wider benefits of cycling are promoted and I have written to the Minister of Enterprise, Trade and Investment seeking her Department’s involvement in this Group. I intend to chair this Group which will have representation from a wide range of stakeholders. Encouraging more cycling and providing safe and accessible infrastructure would be a legacy from the Giro d’Italia for all our citizens.\n\nIn terms of infrastructure, we are moving forward plans for a dedicated pedestrian and cycle bridge across the Lagan to provide a direct link from the city centre to Ormeau Park. This will link with the National Cycle Network routes alongside the Lagan and open up a quiet route for cyclists from both the east and south of Belfast.\n\nAs well as the funding I intend to commit to cycling infrastructure, my Department is pursuing opportunities for EU funding in partnership with cross-border groups to develop traffic-free Greenway routes throughout Northern Ireland.","answerHtml":"<p>I am sure that you will want to join with me in congratulating all those involved in the organisation of the Giro d’Italia NI Grande Partenza, which has been a huge success due to the effective joint working of many Departments and bodies to promote NI and cycling.</p><p>My Department has been heavily involved in numerous activities with the Giro d’Italia from the operational aspects of the Race Committee through to representation on the Northern Ireland Local Steering Group for the Legacy Plan.</p><p>The delivery structure of the event has targeted ‘legacy’ as one of its primary objectives of the event. Whilst the Northern Ireland Tourist Board is leading this aspect of the event organisation, my Department has provided input. Cycling Unit officials have contributed to the draft Legacy Plan which, among other things, seeks to promote Active Travel for the journey to school and to encourage the wider local population to engage with cycling as an everyday means of transport. It is expected that the draft Legacy Plan will be endorsed by the Executive in due course.</p><p>My Department is also setting up a cross-sectoral Cycling Group to ensure that the wider benefits of cycling are promoted and I have written to the Minister of Enterprise, Trade and Investment seeking her Department’s involvement in this Group. I intend to chair this Group which will have representation from a wide range of stakeholders. Encouraging more cycling and providing safe and accessible infrastructure would be a legacy from the Giro d’Italia for all our citizens.</p><p>In terms of infrastructure, we are moving forward plans for a dedicated pedestrian and cycle bridge across the Lagan to provide a direct link from the city centre to Ormeau Park. This will link with the National Cycle Network routes alongside the Lagan and open up a quiet route for cyclists from both the east and south of Belfast.</p><p>As well as the funding I intend to commit to cycling infrastructure, my Department is pursuing opportunities for EU funding in partnership with cross-border groups to develop traffic-free Greenway routes throughout Northern Ireland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%206153%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=199189","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=199189"}},{"id":"195690","reference":"AQW 32527/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-03-31","answerBy":"2014-04-15","answered":"2014-04-09","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety to detail the doctor to patient ratio in medical and surgical wards at Antrim Area Hospital on (i) weekdays; and (ii) weekends.","answerText":"The Northern Health and Social Care Trust have provided the following response.\n\nThere is no formal ratio of patient to doctor calculation in medicine as there is in nursing. On any weekday there are doctors of all grades linked to consultant teams in medicine and surgery working within a rota or job plan either in wards, outpatients or theatre.","answerHtml":"<p>The Northern Health and Social Care Trust have provided the following response.</p><p>There is no formal ratio of patient to doctor calculation in medicine as there is in nursing. On any weekday there are doctors of all grades linked to consultant teams in medicine and surgery working within a rota or job plan either in wards, outpatients or theatre.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2032527%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=195690","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=195690"}},{"id":"195689","reference":"AQW 32526/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-03-31","answerBy":"2014-04-15","answered":"2014-04-14","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety for his assessment of Antrim Area Hospital’s ability to cope with a major incident following the major incident drill of 23 March 2014.","answerText":"Antrim Area Hospital, like all public service organisations, is required to ensure that the people of Northern Ireland receive a level of protection and emergency response which is consistent with that elsewhere in the UK and which meets their needs and expectations.\n\nAccordingly, my Department sets standards of assurance to ensure that emergency preparedness or ‘Major Incident’ plans are not simply in place; but must be part of an annual programme for testing, exercising and validation. This is an important part of emergency preparedness as it permits aspects of the plans to be tested in safe conditions and for review and updating of plans in the light of any learning from the experience.\n\nThe recent exercise, to which you refer, is an admirable demonstration of the Trust testing its ability to cope with a major incident – particularly with a scenario that is clearly outside of its normal experience. In doing so, the Trust is following best practice in emergency preparedness.","answerHtml":"<p>Antrim Area Hospital, like all public service organisations, is required to ensure that the people of Northern Ireland receive a level of protection and emergency response which is consistent with that elsewhere in the UK and which meets their needs and expectations.</p><p>Accordingly, my Department sets standards of assurance to ensure that emergency preparedness or ‘Major Incident’ plans are not simply in place; but must be part of an annual programme for testing, exercising and validation. This is an important part of emergency preparedness as it permits aspects of the plans to be tested in safe conditions and for review and updating of plans in the light of any learning from the experience.</p><p>The recent exercise, to which you refer, is an admirable demonstration of the Trust testing its ability to cope with a major incident – particularly with a scenario that is clearly outside of its normal experience. In doing so, the Trust is following best practice in emergency preparedness.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2032526%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=195689","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=195689"}},{"id":"195688","reference":"AQW 32525/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-03-31","answerBy":"2014-04-15","answered":"2014-04-03","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety for an update on the Northern Health and Social Care Trust’s proposal for an additional MRI scanner at Antrim Area Hospital.","answerText":"This proposal remains under consideration.\n\nThe Northern Health and Social Care Trust (NHSCT) submitted a revised Outline Business Case (OBC) in respect of an additional MRI scanner at Antrim Area Hospital to my Department for consideration on 29 January 2014.\n\nThe Trust’s preferred option within the business case will provide a second scanner at the Antrim Area Hospital, increasing capacity by approximately 2,930 examinations and offering a contingency for the maintenance of the NHSCT MRI service in the event of failure or prolonged breakdown of the existing scanner.\n\nDepartmental advisors have assessed the revised OBC and their comments have been issued to the Trust to address.","answerHtml":"<p>This proposal remains under consideration.</p><p>The Northern Health and Social Care Trust (NHSCT) submitted a revised Outline Business Case (OBC) in respect of an additional MRI scanner at Antrim Area Hospital to my Department for consideration on 29 January 2014.</p><p>The Trust’s preferred option within the business case will provide a second scanner at the Antrim Area Hospital, increasing capacity by approximately 2,930 examinations and offering a contingency for the maintenance of the NHSCT MRI service in the event of failure or prolonged breakdown of the existing scanner.</p><p>Departmental advisors have assessed the revised OBC and their comments have been issued to the Trust to address.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2032525%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=195688","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=195688"}},{"id":"193044","reference":"AQO 5795/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-03-06","answerBy":"2014-03-18","answered":null,"answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development whether his Department has a policy on housing children in high rise accomodation.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%205795%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=193044","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=193044"}},{"id":"194305","reference":"AQO 5795/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-03-06","answerBy":"2014-03-18","answered":"2014-03-18","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development whether his Department has a policy on housing children in high rise accomodation.","answerText":"Rule 57 of the Housing Selection Scheme states “in considering whether a particular offer is suitable, the designated officer must consider the reasonable needs of the applicant, including the applicants household having regard to suitability of features”. The Housing Executive has advised that in relation to the application of Rule 57 in regard to high rise accommodation they as a general rule would not allocate this type of accommodation to families with children under 10.","answerHtml":"<p>Rule 57 of the Housing Selection Scheme states “in considering whether a particular offer is suitable, the designated officer must consider the reasonable needs of the applicant, including the applicants household having regard to suitability of features”. The Housing Executive has advised that in relation to the application of Rule 57 in regard to high rise accommodation they as a general rule would not allocate this type of accommodation to families with children under 10.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%205795%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=194305","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=194305"}},{"id":"192285","reference":"AQO 5744/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-02-27","answerBy":"2014-03-11","answered":"2014-03-11","answeredOrally":true,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety for an update on his plans to introduce legislation on adoption reform.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%205744%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=192285","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-13-14/11-March-2014","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=192285"}},{"id":"191500","reference":"AQW 31239/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-02-20","answerBy":"2014-03-07","answered":"2014-03-04","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development to outline his plans for the construction of new social housing in East Antrim.","answerText":"The Housing Executive has advised that in the current programme year, 2013/14, one scheme for seven units has gone on site in the East Antrim Parliamentary constituency. They have also advised that there is potential for a further scheme for 12 units to go on site before the 31 March 2014.\n\nThe Housing Executive has further advised that there are six schemes totalling 101 units programmed in the Social Housing Development Programme (SHDP) to go on site in East Antrim in 2014/15, and three schemes totalling 51 units are programmed in the SHDP for East Antrim to go on site in 2015/16. There are currently no schemes programmed in the SHDP to go on site in East Antrim in 2016/17.","answerHtml":"<p>The Housing Executive has advised that in the current programme year, 2013/14, one scheme for seven units has gone on site in the East Antrim Parliamentary constituency. They have also advised that there is potential for a further scheme for 12 units to go on site before the 31 March 2014.</p><p>The Housing Executive has further advised that there are six schemes totalling 101 units programmed in the Social Housing Development Programme (SHDP) to go on site in East Antrim in 2014/15, and three schemes totalling 51 units are programmed in the SHDP for East Antrim to go on site in 2015/16. There are currently no schemes programmed in the SHDP to go on site in East Antrim in 2016/17.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2031239%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=191500","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=191500"}},{"id":"190961","reference":"AQW 31080/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-02-18","answerBy":"2014-03-05","answered":"2014-02-25","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development, pursuant to AQW 30542/11-15, to detail the estimated completion date for the installation of odour control equipment.","answerText":"Northern Ireland Water has advised that the odour plant at Carrickfergus Wastewater Treatment Works will be operational from the end of June 2014.","answerHtml":"<p>Northern Ireland Water has advised that the odour plant at Carrickfergus Wastewater Treatment Works will be operational from the end of June 2014.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2031080%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=190961","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=190961"}},{"id":"190608","reference":"AQO 5618/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-02-13","answerBy":"2014-02-24","answered":null,"answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development what discussions he has had with the Office of the First Minister and deputy First Minister regarding the shared housing objectives under Together: Building a United Community.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%205618%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=190608","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=190608"}},{"id":"191812","reference":"AQO 5618/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-02-13","answerBy":"2014-02-24","answered":"2014-02-24","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development what discussions he has had with the Office of the First Minister and deputy First Minister regarding the shared housing objectives under Together: Building a United Community.","answerText":"As a Member of the Ministerial Panel for the Together: Building a United Community Strategy, I attended the inaugural meeting of this group on 16 December 2013. This group will meet on a quarterly basis and will set objectives and actions plans; assign resources and targets; and monitor progress to ensure Departmental policies are achieving the objectives of the Strategy, including the shared housing objectives.\n\nFurthermore, from May to November 2013 my officials participated in a number of planning meetings with OFMdFM and other Departments to develop the proposals/objectives for the Together: Building a United Community Strategy.\n\nIn December 2013 the Good Relations Project Board, comprising officials from all Departments advancing Headline Actions under the Strategy, was established. This group will provide advice to the Ministerial Panel on the effective use of resources and questions of policy and report on delivery and performance against the range of actions and commitments within the Strategy.","answerHtml":"<p>As a Member of the Ministerial Panel for the Together: Building a United Community Strategy, I attended the inaugural meeting of this group on 16 December 2013. This group will meet on a quarterly basis and will set objectives and actions plans; assign resources and targets; and monitor progress to ensure Departmental policies are achieving the objectives of the Strategy, including the shared housing objectives.</p><p>Furthermore, from May to November 2013 my officials participated in a number of planning meetings with OFMdFM and other Departments to develop the proposals/objectives for the Together: Building a United Community Strategy.</p><p>In December 2013 the Good Relations Project Board, comprising officials from all Departments advancing Headline Actions under the Strategy, was established. This group will provide advice to the Ministerial Panel on the effective use of resources and questions of policy and report on delivery and performance against the range of actions and commitments within the Strategy.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%205618%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=191812","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=191812"}},{"id":"189370","reference":"AQW 30545/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-02-04","answerBy":"2014-02-19","answered":"2014-02-19","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture and Rural Development","question":"To ask the Minister of Agriculture and Rural Development to detail the total number of household visits that have taken place in East Antrim under the Maximising Access in Rural Areas programme.","answerText":"Four hundred and forty four households have been visited in the East Antrim constituency area through the Maximising Access in Rural Areas (MARA) Project.","answerHtml":"<p>Four hundred and forty four households have been visited in the East Antrim constituency area through the Maximising Access in Rural Areas (MARA) Project.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2030545%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=189370","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=189370"}},{"id":"189349","reference":"AQW 30543/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-02-04","answerBy":"2014-02-19","answered":"2014-02-17","answeredOrally":false,"priority":false,"department":"Department of Culture, Arts and Leisure","departmentId":"77","minister":"Minister of Culture, Arts and Leisure","question":"To ask the Minister of Culture, Arts and Leisure, pursuant to AQO 5287/11-15, how many of the 155 projects have reverted to sectarian murals.","answerText":"I have been informed by the Arts Council that, to the best of their knowledge, none of Re-imaging Communities projects have `reverted’ to sectarian murals.","answerHtml":"<p>I have been informed by the Arts Council that, to the best of their knowledge, none of Re-imaging Communities projects have `reverted’ to sectarian murals.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2030543%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=189349","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=189349"}},{"id":"189348","reference":"AQW 30542/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-02-04","answerBy":"2014-02-19","answered":"2014-02-17","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development, pursuant to AQO 5422/11-15, whether he will seek funding for additional deodorising equipment at Carrickfergus Waste Water Treatment Works.","answerText":"I have been advised by Northern Ireland Water (NIW) that the current project underway at Carrickfergus Wastewater Treatment Works includes the installation of odour control equipment to comply with the Pollution Prevention Control Licence.\n\nIf it is considered that additional deodorising equipment is required following completion of the current work, then NIW will seek to meet the cost from within its PC15 funding allocation without the need to seek additional funding.","answerHtml":"<p>I have been advised by Northern Ireland Water (NIW) that the current project underway at Carrickfergus Wastewater Treatment Works includes the installation of odour control equipment to comply with the Pollution Prevention Control Licence.</p><p>If it is considered that additional deodorising equipment is required following completion of the current work, then NIW will seek to meet the cost from within its PC15 funding allocation without the need to seek additional funding.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2030542%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=189348","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=189348"}},{"id":"189347","reference":"AQW 30541/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-02-04","answerBy":"2014-02-19","answered":"2014-02-11","answeredOrally":false,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice to detail the number of successful prosecutions arising from the death of a cyclist in a road traffic collision in each financial year since 2002; and whether the outcome resulted in a custodial or non-custodial sentence.","answerText":"Conviction data is recorded for generic offences, such as, for example, causing death by dangerous driving or causing death by driving carelessly when unfit. Datasets held by my Department currently do not contain information on the location and circumstances in which offences were committed. Therefore, it is not currently possible to identify from the data whether a conviction associated with a road traffic collision relates to one involving the death of a cyclist.","answerHtml":"<p>Conviction data is recorded for generic offences, such as, for example, causing death by dangerous driving or causing death by driving carelessly when unfit. Datasets held by my Department currently do not contain information on the location and circumstances in which offences were committed. Therefore, it is not currently possible to identify from the data whether a conviction associated with a road traffic collision relates to one involving the death of a cyclist.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2030541%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=189347","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=189347"}},{"id":"188969","reference":"AQO 5528/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-01-30","answerBy":"2014-02-11","answered":"2014-02-11","answeredOrally":true,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment whether he plans to amend the Local Government Bill to allow the use of the Single Transferable Vote system for the allocation of positions of responsibility.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%205528%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=188969","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-13-14/11-February-2014","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=188969"}},{"id":"188223","reference":"AQO 5474/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-01-23","answerBy":"2014-02-04","answered":"2014-02-04","answeredOrally":true,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education how his Department improves literacy and numeracy in deprived communities.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%205474%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=188223","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-13-14/04-February-2014","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=188223"}},{"id":"187516","reference":"AQW 29913/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-01-16","answerBy":"2014-01-31","answered":"2014-02-13","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel when a final decision on the Northern Ireland Civil Service equal pay settlement will be made.","answerText":"It was clearly established in court that there is no legal equal pay liability within the PSNI or the NIO. Nevertheless I am mindful of the strength of feeling on this issue and am continuing to explore ways in which the moral argument could be recognised in some way. I have spoken to the Minister of Justice and am consulting with officials to investigate if there are any possible solutions to the issue that could be considered by the Northern Ireland Executive.","answerHtml":"<p>It was clearly established in court that there is no legal equal pay liability within the PSNI or the NIO. Nevertheless I am mindful of the strength of feeling on this issue and am continuing to explore ways in which the moral argument could be recognised in some way. I have spoken to the Minister of Justice and am consulting with officials to investigate if there are any possible solutions to the issue that could be considered by the Northern Ireland Executive.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2029913%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=187516","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=187516"}},{"id":"187486","reference":"AQO 5422/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-01-16","answerBy":"2014-01-28","answered":null,"answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what further investment is planned for the Carrickfergus Waste Water Treatment Works.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%205422%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=187486","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=187486"}},{"id":"188743","reference":"AQO 5422/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-01-16","answerBy":"2014-01-28","answered":"2014-01-28","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what further investment is planned for the Carrickfergus Waste Water Treatment Works.","answerText":"I have been advised by Northern Ireland Water (NIW) that a project is currently underway at Carrickfergus Wastewater Treatment Works which will deliver approximately £900k investment in base maintenance in the 2013/14 and 2014/15 financial years. For the subsequent planning period covering 2015 to 2021, NIW has identified a further £2,400k of base maintenance work.\n\nBase maintenance is capital investment and represents like for like replacement of assets rather than increasing works capacity or improving the works to meet changes to environmental standards. Carrickfergus Wastewater Treatment Works is performing satisfactorily and upgrades to increase capacity or improve compliance performance are not currently envisaged.\n\nThe base maintenance investment is in addition to the routine planned maintenance which is undertaken by NIW staff directly.","answerHtml":"<p>I have been advised by Northern Ireland Water (NIW) that a project is currently underway at Carrickfergus Wastewater Treatment Works which will deliver approximately £900k investment in base maintenance in the 2013/14 and 2014/15 financial years. For the subsequent planning period covering 2015 to 2021, NIW has identified a further £2,400k of base maintenance work.</p><p>Base maintenance is capital investment and represents like for like replacement of assets rather than increasing works capacity or improving the works to meet changes to environmental standards. Carrickfergus Wastewater Treatment Works is performing satisfactorily and upgrades to increase capacity or improve compliance performance are not currently envisaged.</p><p>The base maintenance investment is in addition to the routine planned maintenance which is undertaken by NIW staff directly.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%205422%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=188743","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=188743"}},{"id":"187078","reference":"AQW 29758/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-01-13","answerBy":"2014-01-28","answered":"2014-01-27","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development how many people are waiting to be allocated housing in East Antrim, broken down by estate.","answerText":"The information is not available in the format requested as the Housing Executive does not routinely collate information by estate. However, the table below details the number of applicants on the waiting list at 1January 2014 for the Housing Executive District Office areas that cover the East Antrim constituency by Common Landlord Area.\n\nApplicants first preference registered on the Waiting List as at 1 January 2014 by NIHE District Office/Common Landlord Areas\n\nNewtownabbey 1\tApplicants\tLarne\tApplicants\nAbbeyglen\t13\tBallycarry\t9\nAbbeyville\t32\tClough/Croft/Beachland\t49\nBawnmore/Old Mill\t67\tFerris Park\t15\nBleach Green\t16\tGlenarm, Glenview, Parkview/Munie\t11\nGlenville\t45\tGlynn\t14\nHightown\t18\tIslandmagee\t6\nLonglands\t50\tLinn Road\t114\nRathcoole\t432\tMagheramourne\t1\nRathfern\t25\tMillbrook\t7\nRushpark\t151\tOld Glenarm Road/Seacourt\t27\nNewtownabbey1 Total\t849\tSallagh Park\t13\nRiverdale\t14\nLarne Town\t151\nLarne Total\t431\n\nNewtownabbey 2\tApplicants\tCarrickfergus\tApplicants\nCarrickfergus Central\t62\nBallyclare\t229\tCastlemara\t21\nBallyduff\t122\tDavy Street\t2\nBallynure\t7\tDrumhoy/ Salia/ Ederney\t17\nDoagh/ Kelburn Park\t21\tDunloskin Central\t10\nGlenvarna/ Glengormley\t127\tEden\t80\nHyde Park/ Parkmount\t13\tGlenfield\t11\nJennings Drive /Monkstown\t1\tGreenisland\t108\nMonkstown\t123\tScotch Quarter/ Green Edge/ McKeens\t10\nNew Mossley\t139\tSunnylands\t205\nOakview/Roughfort\t3\tTaylors Ave\t10\nOld Mossley\t29\tVictoria\t87\nQueens Park /Avenue\t75\tWhitehead\t85\nNewtownabbey 2 Total\t889\tWindmill\t96\nWoodburn Lower\t132\nWoodburn Upper\t11\nCarrickfergus Total\t947\n\nThe Information provided in this response is governed by the Principles and Protocols of the Code of Practice for Official Statistics. This is enforced by UK Statistics Authority.","answerHtml":"<p>The information is not available in the format requested as the Housing Executive does not routinely collate information by estate. However, the table below details the number of applicants on the waiting list at 1January 2014 for the Housing Executive District Office areas that cover the East Antrim constituency by Common Landlord Area.</p><p>Applicants first preference registered on the Waiting List as at 1 January 2014 by NIHE District Office/Common Landlord Areas</p><div class=\"table-wrap\"><table><tr><td>Newtownabbey 1</td><td>Applicants</td><td>Larne</td><td>Applicants</td></tr><tr><td>Abbeyglen</td><td>13</td><td>Ballycarry</td><td>9</td></tr><tr><td>Abbeyville</td><td>32</td><td>Clough/Croft/Beachland</td><td>49</td></tr><tr><td>Bawnmore/Old Mill</td><td>67</td><td>Ferris Park</td><td>15</td></tr><tr><td>Bleach Green</td><td>16</td><td>Glenarm, Glenview, Parkview/Munie</td><td>11</td></tr><tr><td>Glenville</td><td>45</td><td>Glynn</td><td>14</td></tr><tr><td>Hightown</td><td>18</td><td>Islandmagee</td><td>6</td></tr><tr><td>Longlands</td><td>50</td><td>Linn Road</td><td>114</td></tr><tr><td>Rathcoole</td><td>432</td><td>Magheramourne</td><td>1</td></tr><tr><td>Rathfern</td><td>25</td><td>Millbrook</td><td>7</td></tr><tr><td>Rushpark</td><td>151</td><td>Old Glenarm Road/Seacourt</td><td>27</td></tr><tr><td>Newtownabbey1 Total</td><td>849</td><td>Sallagh Park</td><td>13</td></tr><tr><td></td><td></td><td>Riverdale</td><td>14</td></tr><tr><td></td><td></td><td>Larne Town</td><td>151</td></tr><tr><td></td><td></td><td>Larne Total</td><td>431</td></tr><tr><td></td><td></td><td></td><td></td></tr><tr><td>Newtownabbey 2</td><td>Applicants</td><td>Carrickfergus</td><td>Applicants</td></tr><tr><td></td><td></td><td>Carrickfergus Central</td><td>62</td></tr><tr><td>Ballyclare</td><td>229</td><td>Castlemara</td><td>21</td></tr><tr><td>Ballyduff</td><td>122</td><td>Davy Street</td><td>2</td></tr><tr><td>Ballynure</td><td>7</td><td>Drumhoy/ Salia/ Ederney</td><td>17</td></tr><tr><td>Doagh/ Kelburn Park</td><td>21</td><td>Dunloskin Central</td><td>10</td></tr><tr><td>Glenvarna/ Glengormley</td><td>127</td><td>Eden</td><td>80</td></tr><tr><td>Hyde Park/ Parkmount</td><td>13</td><td>Glenfield</td><td>11</td></tr><tr><td>Jennings Drive /Monkstown</td><td>1</td><td>Greenisland</td><td>108</td></tr><tr><td>Monkstown</td><td>123</td><td>Scotch Quarter/ Green Edge/ McKeens</td><td>10</td></tr><tr><td>New Mossley</td><td>139</td><td>Sunnylands</td><td>205</td></tr><tr><td>Oakview/Roughfort</td><td>3</td><td>Taylors Ave</td><td>10</td></tr><tr><td>Old Mossley</td><td>29</td><td>Victoria</td><td>87</td></tr><tr><td>Queens Park /Avenue</td><td>75</td><td>Whitehead</td><td>85</td></tr><tr><td>Newtownabbey 2 Total</td><td>889</td><td>Windmill</td><td>96</td></tr><tr><td></td><td></td><td>Woodburn Lower</td><td>132</td></tr><tr><td></td><td></td><td>Woodburn Upper</td><td>11</td></tr><tr><td></td><td></td><td>Carrickfergus Total</td><td>947</td></tr></table></div><p>The Information provided in this response is governed by the Principles and Protocols of the Code of Practice for Official Statistics. This is enforced by UK Statistics Authority.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2029758%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=187078","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=187078"}},{"id":"187077","reference":"AQW 29757/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2014-01-13","answerBy":"2014-01-28","answered":"2014-01-22","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development whether his Department is on target to spend the full budget allocation of the Boiler Replacement Scheme.","answerText":"The Boiler Replacement Scheme commenced on the 1st September 2012 with a total budget of £12m, allocated by the NI Executive over the three financial years 2012/13, 2013/14 and 2014/15. In addition, £6m match funding has been secured from the European Regional Development Fund for the final two years of the scheme.\n\nIn the 16 months up to the end of December 2013, almost £7m of the total funding allocation has been spent which indicates that my Department is on target to spend the full budget allocation.","answerHtml":"<p>The Boiler Replacement Scheme commenced on the 1st September 2012 with a total budget of £12m, allocated by the NI Executive over the three financial years 2012/13, 2013/14 and 2014/15. In addition, £6m match funding has been secured from the European Regional Development Fund for the final two years of the scheme.</p><p>In the 16 months up to the end of December 2013, almost £7m of the total funding allocation has been spent which indicates that my Department is on target to spend the full budget allocation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2029757%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=187077","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=187077"}},{"id":"187722","reference":"AQO 5357/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-01-09","answerBy":"2014-01-21","answered":"2014-01-21","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel how he intends to reform the procurement process to make it easier for small and medium sized businesses to bid for government contracts.","answerText":"A key focus of the Procurement Board for Northern Ireland, which I chair, has been to make it easier for small and medium size businesses to bid for public sector contracts by simplifying procurement processes and making them less bureaucratic. Much of this work has been taken forward in consultation with the construction industry and business sector representatives.\n\nActions taken include:\n\nadvertising all government contracts over £30,000 on a single portal;\n\nbreaking larger contracts into lots to bring them within the scope of smaller businesses;\n\nsimplifying procurement processes resulting in reduced bidding costs;\n\nrequiring contracts which are over the value of the EU threshold to have a procurement strategy which includes engagement with the supply base;\n\nreducing liability and insurance requirements by making them proportionate to the risks associated with the contracts; and\n\nencouraging the advertisement of subcontracting opportunities.\n\nThe levels of small business and local business participation in the delivery of public contracts in Northern Ireland compares very well with the other devolved UK Administrations and is well above the levels achieved in England. For example:\n\n80% of all contracts awarded by departments, agencies and non departmental public bodies in 2011/2012 were awarded to SMEs. 75% of these contracts went to businesses with fewer than 50 employees. In the construction sector 93% of contracts were awarded to SMEs.\n\n79% of all contracts awarded in 2011/2012 went to companies based in Northern Ireland. Within the construction sector some 96% of contracts went to local businesses.\n\nThe work to improve procurement processes continues. A key priority is to ensure that Northern Ireland takes maximum advantage of the additional freedoms provided by the new EU procurement Directives to be adopted in the near future.\n\nWe continue to work closely with business organisations and a procurement conference to be held later this month will highlight improvements to the procurement process resulting from work carried out in conjunction with CBI.","answerHtml":"<p>A key focus of the Procurement Board for Northern Ireland, which I chair, has been to make it easier for small and medium size businesses to bid for public sector contracts by simplifying procurement processes and making them less bureaucratic. Much of this work has been taken forward in consultation with the construction industry and business sector representatives.</p><p>Actions taken include:</p><p>advertising all government contracts over £30,000 on a single portal;</p><p>breaking larger contracts into lots to bring them within the scope of smaller businesses;</p><p>simplifying procurement processes resulting in reduced bidding costs;</p><p>requiring contracts which are over the value of the EU threshold to have a procurement strategy which includes engagement with the supply base;</p><p>reducing liability and insurance requirements by making them proportionate to the risks associated with the contracts; and</p><p>encouraging the advertisement of subcontracting opportunities.</p><p>The levels of small business and local business participation in the delivery of public contracts in Northern Ireland compares very well with the other devolved UK Administrations and is well above the levels achieved in England. For example:</p><p>80% of all contracts awarded by departments, agencies and non departmental public bodies in 2011/2012 were awarded to SMEs. 75% of these contracts went to businesses with fewer than 50 employees. In the construction sector 93% of contracts were awarded to SMEs.</p><p>79% of all contracts awarded in 2011/2012 went to companies based in Northern Ireland. Within the construction sector some 96% of contracts went to local businesses.</p><p>The work to improve procurement processes continues. A key priority is to ensure that Northern Ireland takes maximum advantage of the additional freedoms provided by the new EU procurement Directives to be adopted in the near future.</p><p>We continue to work closely with business organisations and a procurement conference to be held later this month will highlight improvements to the procurement process resulting from work carried out in conjunction with CBI.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%205357%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=187722","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=187722"}},{"id":"186557","reference":"AQO 5287/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-01-06","answerBy":"2014-01-14","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Culture, Arts and Leisure","departmentId":"77","minister":"Minister of Culture, Arts and Leisure","question":"To ask the Minister of Culture, Arts and Leisure for her assessment of previous reimaging schemes for sectarian murals in the light of the creation of several new murals in recent months.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%205287%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=186557","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=186557"}},{"id":"187235","reference":"AQO 5287/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2014-01-06","answerBy":"2014-01-14","answered":"2014-01-14","answeredOrally":false,"priority":false,"department":"Department of Culture, Arts and Leisure","departmentId":"77","minister":"Minister of Culture, Arts and Leisure","question":"To ask the Minister of Culture, Arts and Leisure for her assessment of previous reimaging schemes for sectarian murals in the light of the creation of several new murals in recent months.","answerText":"The previous Re-imaging Communities Programme invested over £3.3million in 155 community projects across the north of Ireland. The programme, rooted in A Shared Future, brought together key statutory bodies and departments and delivered an integrated and co-ordinated approach to addressing the issues of flags, emblems and sectional symbols in the north of Ireland.\n\nWhile it is always disappointing to learn of the creation of new sectarian murals, the Re-Imaging Communities evaluation concluded that the programme has been a considerable success both in relation to its own aims and objectives and also in relation to the wider context of inter-group relations across the north of Ireland. In addition, the report highlighted significant benefits to communities including increased community cohesion through strengthening relationships, the development of links between communities and Councils and an increased willingness for individuals and communities to dissociate from division and hostility.\n\nThe new “Building Peace Through the Arts – Re-Imaging Communities Programme” is currently underway after its launch in April 2013.","answerHtml":"<p>The previous Re-imaging Communities Programme invested over £3.3million in 155 community projects across the north of Ireland. The programme, rooted in A Shared Future, brought together key statutory bodies and departments and delivered an integrated and co-ordinated approach to addressing the issues of flags, emblems and sectional symbols in the north of Ireland.</p><p>While it is always disappointing to learn of the creation of new sectarian murals, the Re-Imaging Communities evaluation concluded that the programme has been a considerable success both in relation to its own aims and objectives and also in relation to the wider context of inter-group relations across the north of Ireland. In addition, the report highlighted significant benefits to communities including increased community cohesion through strengthening relationships, the development of links between communities and Councils and an increased willingness for individuals and communities to dissociate from division and hostility.</p><p>The new “Building Peace Through the Arts – Re-Imaging Communities Programme” is currently underway after its launch in April 2013.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%205287%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=187235","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=187235"}},{"id":"185646","reference":"AQW 29377/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-12-11","answerBy":"2013-12-31","answered":"2013-12-18","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety (i) how many nursing home inspectors are employed by the Regulation and Quality Improvement Authority (RQIA); (ii) how many nursing homes are on the RQIA’s register; and (iii) how many people currently reside in those nursing homes.","answerText":"RQIA employs a team of 9 nursing home inspectors. In addition RQIA employ a number of estates, pharmacy and financial inspectors who may also play a role in the inspection of nursing homes.\n\nThere are currently 269 nursing homes in Northern Ireland registered with the RQIA.\n\nThere are 10,965 nursing bed spaces within these nursing homes. Whilst RQIA records the number of patients accommodated within an individual home on the day of inspection, it does not maintain a day by day occupancy figure across the whole sector .","answerHtml":"<p>RQIA employs a team of 9 nursing home inspectors. In addition RQIA employ a number of estates, pharmacy and financial inspectors who may also play a role in the inspection of nursing homes.</p><p>There are currently 269 nursing homes in Northern Ireland registered with the RQIA.</p><p>There are 10,965 nursing bed spaces within these nursing homes. Whilst RQIA records the number of patients accommodated within an individual home on the day of inspection, it does not maintain a day by day occupancy figure across the whole sector .</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2029377%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=185646","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=185646"}},{"id":"185645","reference":"AQW 29376/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-12-11","answerBy":"2013-12-31","answered":"2013-12-23","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety when domiciliary care workers will be registered with the Northern Ireland Social Care Council.","answerText":"Strengthening public protection through registration of the social care workforce in Northern Ireland is one of my Department’s key policy priorities. The Northern Ireland Social Care Council was set up specifically to deliver on that policy commitment and ensure we have a competent and confident workforce that is trusted by service users and their families.\n\nRoll out of registration has been subject to public consultation and on that basis registration has been progressed on a phased priority basis for specific groups. It is compulsory for the following groups to be registered with the NISCC: social workers, social work students; social care workers in adult residential care and in nursing homes; and social care managers in adult residential, day care and domiciliary settings.\n\nMy officials are currently working with the NISCC to develop proposals, including a timeframe, for continuation of rollout of registration to the final groups of social care workers, including domiciliary care workers. These proposals will be subject to public consultation.","answerHtml":"<p>Strengthening public protection through registration of the social care workforce in Northern Ireland is one of my Department’s key policy priorities. The Northern Ireland Social Care Council was set up specifically to deliver on that policy commitment and ensure we have a competent and confident workforce that is trusted by service users and their families.</p><p>Roll out of registration has been subject to public consultation and on that basis registration has been progressed on a phased priority basis for specific groups. It is compulsory for the following groups to be registered with the NISCC: social workers, social work students; social care workers in adult residential care and in nursing homes; and social care managers in adult residential, day care and domiciliary settings.</p><p>My officials are currently working with the NISCC to develop proposals, including a timeframe, for continuation of rollout of registration to the final groups of social care workers, including domiciliary care workers. These proposals will be subject to public consultation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2029376%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=185645","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=185645"}},{"id":"185644","reference":"AQW 29375/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-12-11","answerBy":"2013-12-19","answered":"2013-12-18","answeredOrally":false,"priority":true,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety for his assessment of the introduction of minimum pack size for tobacco products under the revised EU Tobacco Products Directive.","answerText":"I support the UK position on the revised EU Tobacco Products Directive which is currently under consideration in the European Parliament. The revised Directive includes measures for banning certain flavourings from tobacco products, introducing larger warnings on packaging and phasing out smaller packs of ten cigarettes.\n\nI support these measures that will help to reduce the appeal of smoking for children and young people, and will also limit their access to cigarettes.\n\nI understand the revised Directive is expected to be adopted in 2014 and the agreed measures will come into effect in all EU Member States, including the UK, from 2015/16.","answerHtml":"<p>I support the UK position on the revised EU Tobacco Products Directive which is currently under consideration in the European Parliament. The revised Directive includes measures for banning certain flavourings from tobacco products, introducing larger warnings on packaging and phasing out smaller packs of ten cigarettes.</p><p>I support these measures that will help to reduce the appeal of smoking for children and young people, and will also limit their access to cigarettes.</p><p>I understand the revised Directive is expected to be adopted in 2014 and the agreed measures will come into effect in all EU Member States, including the UK, from 2015/16.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2029375%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=185644","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=185644"}},{"id":"184467","reference":"AQW 28949/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-12-02","answerBy":"2013-12-05","answered":"2013-12-05","answeredOrally":false,"priority":true,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety, given the recent whistle blower case regarding Cherry Tree House Nursing Home, whether he will widen the Desk Top Review which he has commissioned, to permit staff, relatives and elected representatives, an opportunity to give oral evidence to the Review Team.","answerText":"The objective of the review currently being undertaken by the Regulation and Quality Improvement Authority (RQIA) is to examine the evidence held by, among others, the HSC Board, Trusts and the Department regarding all the concerns raised about the quality of care in Cherry Tree House during the period 1 January 2005 – 31 March 2013.\n\nRQIA has now compiled a volume of evidence which will include concerns raised to relevant organisations by staff, relatives and elected representatives during the period of time covered by the review. At this point I am content that RQIA continues with this already significant exercise and, to that end, I have agreed an extension until the end of January 2014 to allow full consideration of evidence gathered.","answerHtml":"<p>The objective of the review currently being undertaken by the Regulation and Quality Improvement Authority (RQIA) is to examine the evidence held by, among others, the HSC Board, Trusts and the Department regarding all the concerns raised about the quality of care in Cherry Tree House during the period 1 January 2005 – 31 March 2013.</p><p>RQIA has now compiled a volume of evidence which will include concerns raised to relevant organisations by staff, relatives and elected representatives during the period of time covered by the review. At this point I am content that RQIA continues with this already significant exercise and, to that end, I have agreed an extension until the end of January 2014 to allow full consideration of evidence gathered.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2028949%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=184467","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=184467"}},{"id":"183412","reference":"AQO 5137/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-11-21","answerBy":"2013-12-02","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education for his assessment of the proposed changes to the English proposals to measure schools' examination results by awarding each grade achieved an individual score, rather than assessments based on the number of pupils achieving A*-C grades.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%205137%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=183412","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=183412"}},{"id":"184594","reference":"AQO 5137/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-11-21","answerBy":"2013-12-02","answered":"2013-12-03","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education for his assessment of the proposed changes to the English proposals to measure schools' examination results by awarding each grade achieved an individual score, rather than assessments based on the number of pupils achieving A*-C grades.","answerText":"There are fundamental differences between the approach taken here and the approach taken in England given that we do not use league tables.\n\nThe Department for Education in England is at liberty to take forward changes to its performance measures and there may be lessons that we can draw upon from its research.\n\nThe English proposals will continue to be based on exam results and we have a number of questions about the impact the proposed measures may have on decisions relating to pupils' subject choices and examination entries.\n\nI agree that the range and nature of accountability measures should be under continual review.\n\nMy Department is currently considering a number of options in this area and it is likely that I will wish to consult on these in due course.","answerHtml":"<p>There are fundamental differences between the approach taken here and the approach taken in England given that we do not use league tables.</p><p>The Department for Education in England is at liberty to take forward changes to its performance measures and there may be lessons that we can draw upon from its research.</p><p>The English proposals will continue to be based on exam results and we have a number of questions about the impact the proposed measures may have on decisions relating to pupils&#39; subject choices and examination entries.</p><p>I agree that the range and nature of accountability measures should be under continual review.</p><p>My Department is currently considering a number of options in this area and it is likely that I will wish to consult on these in due course.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%205137%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=184594","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=184594"}},{"id":"182622","reference":"AQO 5112/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-11-14","answerBy":"2013-11-26","answered":null,"answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister whether there have been discussions about ensuring that recommendations from the Haass talks are not left unimplemented due to disagreements.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%205112%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=182622","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=182622"}},{"id":"181831","reference":"AQO 5038/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-11-07","answerBy":"2013-11-19","answered":"2013-11-19","answeredOrally":true,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice for an update on his plans to introduce Statutory Time Limits in youth cases.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%205038%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=181831","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-13-14/19-November-2013","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=181831"}},{"id":"181677","reference":"AQW 27932/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-11-06","answerBy":"2013-11-21","answered":"2013-12-02","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development whether he has received a proposal from the Northern Ireland Housing Executive to reinstate the Home Repair Assistance grant scheme.","answerText":"The Housing Executive submitted a proposal to my Department earlier this year to have a more flexible approach to Home Repairs Assistance Grants (HRAG). However, the proposal related to a short term scheme which would only be available in a selected number of areas. It was therefore considered not to be a feasible option at this time\n\nHaving consulted on proposals to deregulate the statutory grants schemes, including the HRAG, my Department is currently examining options to make available alternative forms of assistance for repair and improvement in the private sector. I hope to make an announcement about this matter by Spring 2014.","answerHtml":"<p>The Housing Executive submitted a proposal to my Department earlier this year to have a more flexible approach to Home Repairs Assistance Grants (HRAG). However, the proposal related to a short term scheme which would only be available in a selected number of areas. It was therefore considered not to be a feasible option at this time</p><p>Having consulted on proposals to deregulate the statutory grants schemes, including the HRAG, my Department is currently examining options to make available alternative forms of assistance for repair and improvement in the private sector. I hope to make an announcement about this matter by Spring 2014.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2027932%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=181677","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=181677"}},{"id":"181233","reference":"AQW 27765/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-11-04","answerBy":"2013-11-19","answered":"2013-11-20","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development whether his Department has any plans to allow public transport to avail of the hard shoulder on the M2 and M5 motorways.","answerText":"Currently public transport does use the hard shoulder on the M2 between Browns Road (between Junction 5 and Junction 4) and the Hightown Bridge (just after Junction 4).\n\nMy Department’s Roads Service has commissioned consultants to investigate what additional parts of the Northern Ireland motorway network might benefit from using the hard shoulder and the cost effectiveness of using motorway hard shoulders for use by all traffic and, separately, for use by public transport only. Roads Service is currently considering the results of this study.","answerHtml":"<p>Currently public transport does use the hard shoulder on the M2 between Browns Road (between Junction 5 and Junction 4) and the Hightown Bridge (just after Junction 4).</p><p>My Department’s Roads Service has commissioned consultants to investigate what additional parts of the Northern Ireland motorway network might benefit from using the hard shoulder and the cost effectiveness of using motorway hard shoulders for use by all traffic and, separately, for use by public transport only. Roads Service is currently considering the results of this study.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2027765%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=181233","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=181233"}},{"id":"180790","reference":"AQW 27695/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-10-25","answerBy":"2013-11-11","answered":"2013-11-06","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development to detail the properties owned by (i) Carrickfergus Borough Council; (ii) Larne Borough Council; and (iii) Ballymena Borough Council, in which interest has been expressed to take over their management or ownership under Community Asset Transfer.","answerText":"The Community Asset Transfer Demonstration Programme, led by Development Trusts NI, closed to applications on October 18th 2013. Under the programme no expressions of interest were received for managing or taking ownership of property owned by Carrickfergus Borough Council, Larne Borough Council or Ballymena Borough Council.","answerHtml":"<p>The Community Asset Transfer Demonstration Programme, led by Development Trusts NI, closed to applications on October 18th 2013. Under the programme no expressions of interest were received for managing or taking ownership of property owned by Carrickfergus Borough Council, Larne Borough Council or Ballymena Borough Council.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2027695%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=180790","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=180790"}},{"id":"180788","reference":"AQW 27694/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-10-25","answerBy":"2013-11-11","answered":"2013-11-06","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development whether predecessor Councils have been consulted on which of their buildings might be transferred to new management or ownership under Community Asset Transfer.","answerText":"Community Asset Transfer can only take place following consultation with and the approval of the asset owner. Under the Community Asset Transfer Demonstration Programme, organisations interested in acquiring an asset must show evidence of consultation with the asset owner in order to be eligible under the programme. They also have to provide evidence of support from at least one public sector body for the proposed transfer.","answerHtml":"<p>Community Asset Transfer can only take place following consultation with and the approval of the asset owner. Under the Community Asset Transfer Demonstration Programme, organisations interested in acquiring an asset must show evidence of consultation with the asset owner in order to be eligible under the programme. They also have to provide evidence of support from at least one public sector body for the proposed transfer.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2027694%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=180788","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=180788"}},{"id":"180786","reference":"AQW 27693/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-10-25","answerBy":"2013-11-04","answered":"2013-10-31","answeredOrally":false,"priority":true,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development to detail (i) any organisations funded by his Department that have expressed an interest in managing or purchasing property owned by Carrickfergus Borough Council under Community Asset Transfer; (ii) the monetary value placed on each property by those interested organisations; and (iii) whether Carrickfergus Borough Council was consulted by those organisations prior to any expressions of interest.","answerText":"The Community Asset Transfer Demonstration Programme closed to applications on October 18th 2013. This programme is being lead by Development Trusts NI, my Department’s delivery partner on Community Asset Transfer. Under the programme no organisations funded by my Department have expressed an interest in managing or purchasing property owned by Carrickfergus Borough Council.","answerHtml":"<p>The Community Asset Transfer Demonstration Programme closed to applications on October 18th 2013. This programme is being lead by Development Trusts NI, my Department’s delivery partner on Community Asset Transfer. Under the programme no organisations funded by my Department have expressed an interest in managing or purchasing property owned by Carrickfergus Borough Council.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2027693%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=180786","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=180786"}},{"id":"180581","reference":"AQO 4995/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-10-24","answerBy":"2013-11-12","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety how he will ensure that the future quality of care in statutory and private care homes will be of the highest standard.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%204995%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=180581","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=180581"}},{"id":"182298","reference":"AQO 4995/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-10-24","answerBy":"2013-11-12","answered":"2013-11-13","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety how he will ensure that the future quality of care in statutory and private care homes will be of the highest standard.","answerText":"The Regulation and Quality Improvement Authority (RQIA) is an independent arms length body which has overall responsibility for the registration and inspection of all care homes in Northern Ireland. This is in accordance with regulations and against minimum care standards published by the Department of Health Social Services and Public Safety. These minimum care standards ensure that the care being provided is of an acceptable high quality and standard.\n\nEach home receives two inspections annually – one announced and one unannounced – with the aim of ensuring the safety and wellbeing of all residents and encouraging improvement.\n\nWhere RQIA identifies concerns about a particular care home it may take enforcement action to ensure the safety, wellbeing and protection of those residents living in the care home. If the care being provided does not comply with standards, RQIA has powers of enforcement, which are granted under the Health and Personal Social Services (Quality, Improvement and Regulation)(Northern Ireland) Order 2003.","answerHtml":"<p>The Regulation and Quality Improvement Authority (RQIA) is an independent arms length body which has overall responsibility for the registration and inspection of all care homes in Northern Ireland. This is in accordance with regulations and against minimum care standards published by the Department of Health Social Services and Public Safety. These minimum care standards ensure that the care being provided is of an acceptable high quality and standard.</p><p>Each home receives two inspections annually – one announced and one unannounced – with the aim of ensuring the safety and wellbeing of all residents and encouraging improvement.</p><p>Where RQIA identifies concerns about a particular care home it may take enforcement action to ensure the safety, wellbeing and protection of those residents living in the care home. If the care being provided does not comply with standards, RQIA has powers of enforcement, which are granted under the Health and Personal Social Services (Quality, Improvement and Regulation)(Northern Ireland) Order 2003.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%204995%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=182298","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=182298"}},{"id":"180519","reference":"AQW 27611/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-10-23","answerBy":"2013-11-07","answered":"2013-11-05","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development for his assessment of the suitability of Northern Ireland for a 'Homes for a Pound' scheme, similar to that operated by Liverpool City Council.","answerText":"My Department continually monitors housing initiatives, such as the ‘Homes for a Pound’ scheme, across other jurisdictions to determine their suitability for adoption in Northern Ireland. In my Housing Strategy for Northern Ireland ‘Facing the Future’, I have already outlined a wide range of proposals and actions I want to take here to restore a balanced housing market, providing households with a range of good quality housing choices at a price they can afford.\n\nThese include increasing access to affordable housing, developing further innovation in the funding of new social housing, improving standards in the private rented sector, bringing more empty homes back into use and taking a housing-led approach to regenerating communities.\n\nMany of these proposals and schemes are currently being developed and implemented and there will be a need to evaluate their success and the value for money they are delivering to the public purse, before adopting any further initiatives.","answerHtml":"<p>My Department continually monitors housing initiatives, such as the ‘Homes for a Pound’ scheme, across other jurisdictions to determine their suitability for adoption in Northern Ireland. In my Housing Strategy for Northern Ireland ‘Facing the Future’, I have already outlined a wide range of proposals and actions I want to take here to restore a balanced housing market, providing households with a range of good quality housing choices at a price they can afford.</p><p>These include increasing access to affordable housing, developing further innovation in the funding of new social housing, improving standards in the private rented sector, bringing more empty homes back into use and taking a housing-led approach to regenerating communities.</p><p>Many of these proposals and schemes are currently being developed and implemented and there will be a need to evaluate their success and the value for money they are delivering to the public purse, before adopting any further initiatives.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2027611%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=180519","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=180519"}},{"id":"180518","reference":"AQW 27610/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-10-23","answerBy":"2013-11-07","answered":"2013-11-07","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development to detail the number of vacant homes owned by the Northern Ireland Housing Executive, or other public sector bodies, that are not currently in a condition suitable for habitation.","answerText":"The Housing Executive has advised that they have 622 vacant properties that are currently not suitable for habitation. There are also 213vacant Housing Association properties that are not suitable for habitation.","answerHtml":"<p>The Housing Executive has advised that they have 622 vacant properties that are currently not suitable for habitation. There are also 213vacant Housing Association properties that are not suitable for habitation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2027610%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=180518","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=180518"}},{"id":"180503","reference":"AQW 27601/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-10-23","answerBy":"2013-11-07","answered":"2013-10-30","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development why his Department has decided to cut the funding for the Special Needs Management Allowance.","answerText":"In 1993 the Department introduced a payment known as Special Needs Management Allowance hereafter known as SNMA.\n\nAt that time it was Departmental policy to invest in housing which provided a permanent home for tenants, or equipped them with the life skills and confidence to move into permanent accommodation. Schemes that did not provide tenants with a permanent home were expected to ensure that its tenants received the necessary help and advice to enable them to move to more independent and appropriate housing and were required to have a strategy in place to enable\n\nmove–on accommodation to be found.\n\nSNMA was a cash limited source of funding paid to qualifying Housing Associations that attracted higher than normal management costs due to the intensive style of management required by vulnerable clients.\n\nOn 1 April 2003 the Supporting People Programme was introduced which provided new arrangements for vulnerable people living in supported accommodation.\n\nThe new policy marked a change of direction for the provision of housing accommodation with a focus on providing people with accommodation and housing support services to enable them to achieve independent living.\n\nThe new funding source combined a number of legacy funding streams available at that time including SNMA into a single funding stream known as the Supporting People Grant.\n\nThe change in direction of policy led to the Department examining the nature and policy intention of all its housing stock and determined that the majority of the schemes in receipt of SNMA were able to demonstrate that the policy intention was being achieved with the exception of Registered Care Homes.\n\nThe Housing Support Services Order NI 2002 and the Housing Support Services Regulations NI 2003 outlined the terms and conditions and eligibility criteria for accessing the new funding stream and all Registered Care Homes were excluded from accessing Supporting People grant from 1 April 2003 because Registered Care Homes, which provide twenty four hour board and care, as opposed to individual tenancies, were considered to be outside the scope of the Supporting People policy intention which was to enable people to live independently.\n\nIn 2009 the Department carried out a review of the continued payment of Special Needs Management Allowance. The review concluded that continued funding to Registered Care Homes from the supporting people grant was not delivering the Policy Intention to promote independent living.\n\nOn 30 March 2011 representatives from the Northern Ireland Federation of Housing (NIFHA) met with the previous Department for Social Development Minister and Director of Housing to discuss the continued payment of Special Needs Management Allowance. At the meeting the Director of Housing indicated to the Northern Ireland Federation of Housing Associations the Department’s intention to cease the payment of Special Needs Management Allowance from the Supporting People grant as continued payment of the allowance did not adhere to the original policy intent of the programme.\n\nThe intention at that time was to reduce funding by 10% in the 2012/2013 financial year and to cease payment from April 2014 to allow the Housing Associations and their Joint Management Partners sufficient time to prepare for the phasing out of the payment.\n\nA high level task force was formed to include representation from DHSSPS, the Health Trusts, the Regulation and Quality Improvement Authority and DSD officials to assist the housing associations through the transitional period and explore options on a scheme by scheme basis to minimise disruption to service users\n\nHousing associations are working closely with the task group and departmental officials to bring forward individual plans to address the deficit to include;\n\nRemodelling schemes\n\nReviewing the registration status of schemes\n\nReviewing contracts with the relevant trusts\n\nReviewing internal finance to absorb costs.\n\nA great deal has been achieved to date and early indications are that service delivery can be maintained with appropriate transitional plans actioned and continued assessment of potential impact to service users monitored closely.","answerHtml":"<p>In 1993 the Department introduced a payment known as Special Needs Management Allowance hereafter known as SNMA.</p><p>At that time it was Departmental policy to invest in housing which provided a permanent home for tenants, or equipped them with the life skills and confidence to move into permanent accommodation. Schemes that did not provide tenants with a permanent home were expected to ensure that its tenants received the necessary help and advice to enable them to move to more independent and appropriate housing and were required to have a strategy in place to enable</p><p>move–on accommodation to be found.</p><p>SNMA was a cash limited source of funding paid to qualifying Housing Associations that attracted higher than normal management costs due to the intensive style of management required by vulnerable clients.</p><p>On 1 April 2003 the Supporting People Programme was introduced which provided new arrangements for vulnerable people living in supported accommodation.</p><p>The new policy marked a change of direction for the provision of housing accommodation with a focus on providing people with accommodation and housing support services to enable them to achieve independent living.</p><p>The new funding source combined a number of legacy funding streams available at that time including SNMA into a single funding stream known as the Supporting People Grant.</p><p>The change in direction of policy led to the Department examining the nature and policy intention of all its housing stock and determined that the majority of the schemes in receipt of SNMA were able to demonstrate that the policy intention was being achieved with the exception of Registered Care Homes.</p><p>The Housing Support Services Order NI 2002 and the Housing Support Services Regulations NI 2003 outlined the terms and conditions and eligibility criteria for accessing the new funding stream and all Registered Care Homes were excluded from accessing Supporting People grant from 1 April 2003 because Registered Care Homes, which provide twenty four hour board and care, as opposed to individual tenancies, were considered to be outside the scope of the Supporting People policy intention which was to enable people to live independently.</p><p>In 2009 the Department carried out a review of the continued payment of Special Needs Management Allowance. The review concluded that continued funding to Registered Care Homes from the supporting people grant was not delivering the Policy Intention to promote independent living.</p><p>On 30 March 2011 representatives from the Northern Ireland Federation of Housing (NIFHA) met with the previous Department for Social Development Minister and Director of Housing to discuss the continued payment of Special Needs Management Allowance. At the meeting the Director of Housing indicated to the Northern Ireland Federation of Housing Associations the Department’s intention to cease the payment of Special Needs Management Allowance from the Supporting People grant as continued payment of the allowance did not adhere to the original policy intent of the programme.</p><p>The intention at that time was to reduce funding by 10% in the 2012/2013 financial year and to cease payment from April 2014 to allow the Housing Associations and their Joint Management Partners sufficient time to prepare for the phasing out of the payment.</p><p>A high level task force was formed to include representation from DHSSPS, the Health Trusts, the Regulation and Quality Improvement Authority and DSD officials to assist the housing associations through the transitional period and explore options on a scheme by scheme basis to minimise disruption to service users</p><p>Housing associations are working closely with the task group and departmental officials to bring forward individual plans to address the deficit to include;</p><p>Remodelling schemes</p><p>Reviewing the registration status of schemes</p><p>Reviewing contracts with the relevant trusts</p><p>Reviewing internal finance to absorb costs.</p><p>A great deal has been achieved to date and early indications are that service delivery can be maintained with appropriate transitional plans actioned and continued assessment of potential impact to service users monitored closely.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2027601%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=180503","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=180503"}},{"id":"179664","reference":"AQO 4930/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-10-17","answerBy":"2013-11-05","answered":"2013-11-05","answeredOrally":true,"priority":false,"department":"Department for Employment and Learning","departmentId":"83","minister":"Minister for Employment and Learning","question":"To ask the Minister for Employment and Learning for an update on the Assured Skills project.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%204930%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=179664","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-13-14/05-November-2013","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=179664"}},{"id":"179665","reference":"AQO 4904/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-10-17","answerBy":"2013-11-04","answered":null,"answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development for an update on the feasibility study of the Belfast Transport Hub project.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%204904%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=179665","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=179665"}},{"id":"181344","reference":"AQO 4904/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-10-17","answerBy":"2013-11-04","answered":"2013-11-05","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development for an update on the feasibility study of the Belfast Transport Hub project.","answerText":"Great Victoria Street station has one of the largest footfalls on any single site in Northern Ireland but its facilities are outdated. I am therefore excited about the prospect of a new Transport Hub based in Great Victoria Street in Belfast.\n\nOn 14 October, I announced further plans about the new Transport Hub that will bring even more benefits to those choosing to use our growing public transport services network. The project has an approved Strategic Outline case. The project team is currently undertaking a procurement exercise to appoint an Integrated Design Team early in 2014. The Team will initially produce a Master Plan of the new Transport Hub and surrounding lands which will allow for full public consultation towards the end of 2014. A stakeholder plan is under development to ensure engagement at appropriate levels with all interested parties.\n\nProvisional development of the business case for the Transport Hub is continuing. The formal Outline Business Case is due to be completed for early 2015.\n\nAssuming the appropriate approvals for funding and planning are achieved, the aspiration is to start construction in 2016.\n\nOur focus is now on the next Comprehensive Spending Review to secure funding as needed. The project has great potential in addressing the growing Public Transport demand, creating opportunities for land development and for creating a gateway to Belfast and Northern Ireland with potential tourism, business and job benefits. It also throws up opportunities for community regeneration in the area.\n\nThe result will be the delivery of a signature transport facility that will bring benefits to passengers across Northern Ireland as well as visitors from the Republic of Ireland and beyond.\n\nThe growth in numbers using public transport particularly on rail means we now must think ahead about the capacity needed to deal with this demand.","answerHtml":"<p>Great Victoria Street station has one of the largest footfalls on any single site in Northern Ireland but its facilities are outdated. I am therefore excited about the prospect of a new Transport Hub based in Great Victoria Street in Belfast.</p><p>On 14 October, I announced further plans about the new Transport Hub that will bring even more benefits to those choosing to use our growing public transport services network. The project has an approved Strategic Outline case. The project team is currently undertaking a procurement exercise to appoint an Integrated Design Team early in 2014. The Team will initially produce a Master Plan of the new Transport Hub and surrounding lands which will allow for full public consultation towards the end of 2014. A stakeholder plan is under development to ensure engagement at appropriate levels with all interested parties.</p><p>Provisional development of the business case for the Transport Hub is continuing. The formal Outline Business Case is due to be completed for early 2015.</p><p>Assuming the appropriate approvals for funding and planning are achieved, the aspiration is to start construction in 2016.</p><p>Our focus is now on the next Comprehensive Spending Review to secure funding as needed. The project has great potential in addressing the growing Public Transport demand, creating opportunities for land development and for creating a gateway to Belfast and Northern Ireland with potential tourism, business and job benefits. It also throws up opportunities for community regeneration in the area.</p><p>The result will be the delivery of a signature transport facility that will bring benefits to passengers across Northern Ireland as well as visitors from the Republic of Ireland and beyond.</p><p>The growth in numbers using public transport particularly on rail means we now must think ahead about the capacity needed to deal with this demand.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%204904%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=181344","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=181344"}},{"id":"178969","reference":"AQW 27057/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-10-11","answerBy":"2013-10-28","answered":"2013-10-17","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education what progress has been made on a new and permanent building for Corran Integrated Primary School, Larne following his announcement on 22 January 2013.","answerText":"Corran Integrated Primary School was included in my capital investment statement of 22 January 2013 as one of 22 primary and post-primary schools which will be advanced in planning.\n\nThe project is still at an early stage of the planning process and my officials are currently considering all options regarding the appointment of consultants for those projects included in the January 2013 announcement.\n\nUntil this work has been concluded and outcomes agreed no further planning on the Corran Integrated Primary School project can proceed. It is hoped that this matter will be resolved shortly. Officials will engage with the school authorities in the coming weeks to advance the appointment of the required professional consultants.","answerHtml":"<p>Corran Integrated Primary School was included in my capital investment statement of 22 January 2013 as one of 22 primary and post-primary schools which will be advanced in planning.</p><p>The project is still at an early stage of the planning process and my officials are currently considering all options regarding the appointment of consultants for those projects included in the January 2013 announcement.</p><p>Until this work has been concluded and outcomes agreed no further planning on the Corran Integrated Primary School project can proceed. It is hoped that this matter will be resolved shortly. Officials will engage with the school authorities in the coming weeks to advance the appointment of the required professional consultants.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2027057%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=178969","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=178969"}},{"id":"178968","reference":"AQW 27056/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-10-11","answerBy":"2013-10-28","answered":"2013-10-29","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development what progress has been made in securing funding commitments and obtaining planning permission for new supported living accommodation and services at Whiteabbey Hospital.","answerText":"A 24 unit scheme for people suffering from mental health problems has been programmed into the Social Housing Development Programme for construction start in 2013/14. The site is being developed by Trinity Housing Association.\n\nCapital funding has been set aside in 2013/14 and beyond to fund its construction, subject to an approvable application for grant from Trinity. An application has yet to be received.\n\nTrinity aims to make a planning application before the end of October.","answerHtml":"<p>A 24 unit scheme for people suffering from mental health problems has been programmed into the Social Housing Development Programme for construction start in 2013/14. The site is being developed by Trinity Housing Association.</p><p>Capital funding has been set aside in 2013/14 and beyond to fund its construction, subject to an approvable application for grant from Trinity. An application has yet to be received.</p><p>Trinity aims to make a planning application before the end of October.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2027056%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=178968","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=178968"}},{"id":"178966","reference":"AQW 27055/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-10-11","answerBy":"2013-10-28","answered":"2013-11-15","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development, pursuant to AQW 23850/11-15, what health and safety assessments his Department have undertaken on the dangers posed by the possible detachment of flags and other materials from lamp posts and other street furniture.","answerText":"My Department has assessed that the possible detachment of flags and other materials from lamp posts and other street furniture could potentially distract or injure road users. Fortunately, there have been no significant incidents of this nature to date.\n\nA more significant safety concern, as referred to in my earlier answer to the Member’s previous question AQW 23850/11-15, comes from large banners attached to street lighting columns, due to the effect of wind loading on the structural stability of the column.\n\nWhile it is not feasible for my Department to routinely carry out individual assessments of all unauthorised attachments, it does respond and take appropriate action on any unsafe attachments that it becomes aware of.","answerHtml":"<p>My Department has assessed that the possible detachment of flags and other materials from lamp posts and other street furniture could potentially distract or injure road users. Fortunately, there have been no significant incidents of this nature to date.</p><p>A more significant safety concern, as referred to in my earlier answer to the Member’s previous question AQW 23850/11-15, comes from large banners attached to street lighting columns, due to the effect of wind loading on the structural stability of the column.</p><p>While it is not feasible for my Department to routinely carry out individual assessments of all unauthorised attachments, it does respond and take appropriate action on any unsafe attachments that it becomes aware of.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2027055%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=178966","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=178966"}},{"id":"176402","reference":"AQW 26203/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-09-24","answerBy":"2013-10-09","answered":"2013-10-09","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education for his assessment of the financial impact of the proposed Common Funding Scheme on schools in the district electoral areas of (i) Carrickfergus; (ii) Antrim; and (iii) Newtownabbey.","answerText":"The illustrative budgets prepared for schools as part of the current Common Funding Scheme (CFS) consultation exercise reflect what schools would have received in the current year if all the proposed changes had applied. The figures are based on this year’s enrolment numbers, free school meals entitlement and Aggregated Schools’ Budget (plus the additional £10m for social deprivation). The ASB for next year will increase by an additional £15.8m which is not included in these figures.\n\nMy proposals on the reform of the Common Funding Scheme are still out for consultation. I have not taken any final decisions on these proposals yet.\n\nIt is not possible therefore to provide figures, or an assessment, on the budgets that will be made available to schools for next year, until these decisions are made. In addition, other factors, such as the increased Aggregated Schools’ Budget (ASB) for next year, overall enrolment levels, the number of Free School Meal Entitled pupils, and the number of Newcomer and Traveller pupils etc will impact on funding levels at individual school level.\n\nThe report of the independent review panel highlighted the relationship between social deprivation and low educational outcomes and recommended that more funding should be targeted at pupils from socially disadvantaged backgrounds and that this funding should be weighted towards schools with significant concentrations of disadvantage.\n\nThe consultation period closes on 18 October and I would encourage everyone with an interest in education to take part in the debate. I will take all responses into account before I make my final decisions on the way ahead.","answerHtml":"<p>The illustrative budgets prepared for schools as part of the current Common Funding Scheme (CFS) consultation exercise reflect what schools would have received in the current year if all the proposed changes had applied. The figures are based on this year’s enrolment numbers, free school meals entitlement and Aggregated Schools’ Budget (plus the additional £10m for social deprivation). The ASB for next year will increase by an additional £15.8m which is not included in these figures.</p><p>My proposals on the reform of the Common Funding Scheme are still out for consultation. I have not taken any final decisions on these proposals yet.</p><p>It is not possible therefore to provide figures, or an assessment, on the budgets that will be made available to schools for next year, until these decisions are made. In addition, other factors, such as the increased Aggregated Schools’ Budget (ASB) for next year, overall enrolment levels, the number of Free School Meal Entitled pupils, and the number of Newcomer and Traveller pupils etc will impact on funding levels at individual school level.</p><p>The report of the independent review panel highlighted the relationship between social deprivation and low educational outcomes and recommended that more funding should be targeted at pupils from socially disadvantaged backgrounds and that this funding should be weighted towards schools with significant concentrations of disadvantage.</p><p>The consultation period closes on 18 October and I would encourage everyone with an interest in education to take part in the debate. I will take all responses into account before I make my final decisions on the way ahead.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2026203%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=176402","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=176402"}},{"id":"176400","reference":"AQW 26201/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-09-24","answerBy":"2013-10-09","answered":"2013-10-02","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety what form the replacement facility will take on the site of Greenisland House.","answerText":"The redevelopment of the site of Greenisland House will provide supported living accommodation for older people. The Northern Trust anticipates that the supported living scheme will be completed by 2015.","answerHtml":"<p>The redevelopment of the site of Greenisland House will provide supported living accommodation for older people. The Northern Trust anticipates that the supported living scheme will be completed by 2015.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2026201%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=176400","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=176400"}},{"id":"176399","reference":"AQW 26200/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-09-24","answerBy":"2013-10-09","answered":"2013-10-04","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development what progress has been made to secure funding commitments and obtain planning permission for new accommodation and services on the site of Greenisland House.","answerText":"A scheme at this location to provide accommodation for 32 frail elderly people is included in my Department’s Social Housing Development Programme for 2013/14. The scheme is being taken forward by Trinity Housing Association.\n\nProvisional funding has been set aside for 2013/14 and will be confirmed on receipt of an approvable application from Trinity. Trinity expects to make that application in November. At that point, the scheme detail will be assessed and provided all is in order, funding will be confirmed.\n\nTrinity made its planning application on 29 August 2013 and anticipates planning permission being granted in time to start construction work in February 2014.","answerHtml":"<p>A scheme at this location to provide accommodation for 32 frail elderly people is included in my Department’s Social Housing Development Programme for 2013/14. The scheme is being taken forward by Trinity Housing Association.</p><p>Provisional funding has been set aside for 2013/14 and will be confirmed on receipt of an approvable application from Trinity. Trinity expects to make that application in November. At that point, the scheme detail will be assessed and provided all is in order, funding will be confirmed.</p><p>Trinity made its planning application on 29 August 2013 and anticipates planning permission being granted in time to start construction work in February 2014.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2026200%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=176399","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=176399"}},{"id":"176085","reference":"AQW 26076/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-09-20","answerBy":"2013-10-07","answered":"2013-10-02","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what plans Translink have to provide a park and ride facility, including safe pick-up and drop-off facilities, at Ballycarry Railway Station,","answerText":"NI Railways have no current plans to develop a Park and Ride facility at Ballycarry. Translink have been liaising with Road Services in respect of traffic management and pedestrian access issues at Ballycarry.","answerHtml":"<p>NI Railways have no current plans to develop a Park and Ride facility at Ballycarry. Translink have been liaising with Road Services in respect of traffic management and pedestrian access issues at Ballycarry.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2026076%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=176085","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=176085"}},{"id":"176084","reference":"AQW 26075/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-09-20","answerBy":"2013-10-07","answered":"2013-10-07","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development for an update on road and footpath improvements in the vicinity of Ballycarry Railway Station.","answerText":"A number of options have been considered for the provision of a footway over the bridge adjacent to Ballycarry Railway Station. The site is particularly constrained and it is difficult to find a solution that is deliverable, both in terms of practicality and value for money.\n\nOne of the options being considered was a footbridge, however, preliminary estimates indicated it would be very expensive to construct. Another option is to introduce traffic signals to control traffic to a single lane, freeing up space for footway provision on the bridge itself. This is more economically viable and has potential for further development, although it may interrupt the flow of traffic on the bridge and lead to some delays at peak periods.\n\nMy Department’s officials have had preliminary discussions with their counterparts from Larne Borough Council regarding a number of issues relating to the development of the Gobbins Coastal Path project. These discussions have included consideration of pedestrian movements from Ballycarry Halt to the centre that will be constructed on the Middle Road. My officials will continue discussions with both Translink and Larne Borough Council to further consider the options available for infrastructure improvements, in the vicinity of Ballycarry Halt.","answerHtml":"<p>A number of options have been considered for the provision of a footway over the bridge adjacent to Ballycarry Railway Station. The site is particularly constrained and it is difficult to find a solution that is deliverable, both in terms of practicality and value for money.</p><p>One of the options being considered was a footbridge, however, preliminary estimates indicated it would be very expensive to construct. Another option is to introduce traffic signals to control traffic to a single lane, freeing up space for footway provision on the bridge itself. This is more economically viable and has potential for further development, although it may interrupt the flow of traffic on the bridge and lead to some delays at peak periods.</p><p>My Department’s officials have had preliminary discussions with their counterparts from Larne Borough Council regarding a number of issues relating to the development of the Gobbins Coastal Path project. These discussions have included consideration of pedestrian movements from Ballycarry Halt to the centre that will be constructed on the Middle Road. My officials will continue discussions with both Translink and Larne Borough Council to further consider the options available for infrastructure improvements, in the vicinity of Ballycarry Halt.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2026075%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=176084","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=176084"}},{"id":"176083","reference":"AQW 26074/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-09-20","answerBy":"2013-10-07","answered":"2013-10-03","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to detail the number of recorded breakdowns and delays on the Larne Railway Line since the introduction of the 2013 timetable.","answerText":"Translink has confirmed that for the Larne line over 9,600 services there were 6 breakdowns resulting in the cancellation of services and 157 delays since the introduction of the 2013 timetable.\n\nPunctuality on the Larne Line since the introduction of the new timetable has been excellent, with 98.3% of all trains arriving at their destination within 5 minutes of their scheduled arrival time. This is above the Passenger Charter standards agreed with the Department and Consumer Council.","answerHtml":"<p>Translink has confirmed that for the Larne line over 9,600 services there were 6 breakdowns resulting in the cancellation of services and 157 delays since the introduction of the 2013 timetable.</p><p>Punctuality on the Larne Line since the introduction of the new timetable has been excellent, with 98.3% of all trains arriving at their destination within 5 minutes of their scheduled arrival time. This is above the Passenger Charter standards agreed with the Department and Consumer Council.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2026074%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=176083","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=176083"}},{"id":"176082","reference":"AQW 26073/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-09-20","answerBy":"2013-10-07","answered":"2013-10-02","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development when six-carriage trains will be fully deployed on the Larne Railway Line.","answerText":"At present NI Railways regularly operate one 6-carriage train during both the morning and evening peaks on the Larne Line.\n\nDeployment of 6-carriage trains is based on need across the network and NI Railways continue to monitor passenger loadings on all peak services.","answerHtml":"<p>At present NI Railways regularly operate one 6-carriage train during both the morning and evening peaks on the Larne Line.</p><p>Deployment of 6-carriage trains is based on need across the network and NI Railways continue to monitor passenger loadings on all peak services.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2026073%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=176082","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=176082"}},{"id":"176081","reference":"AQW 26072/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-09-20","answerBy":"2013-10-07","answered":"2013-10-02","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to detail the number of passengers using the Larne Railway Line since the introduction of the 2013 timetable compared to the comparable period under the previous timetable.","answerText":"The current railway timetable on the Larne line commenced on 24 March 2013. Translink advise 1,008,075 passenger journeys have been recorded on the Larne line from April to September 2013 compared to 849,243 in the corresponding period in 2012.","answerHtml":"<p>The current railway timetable on the Larne line commenced on 24 March 2013. Translink advise 1,008,075 passenger journeys have been recorded on the Larne line from April to September 2013 compared to 849,243 in the corresponding period in 2012.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2026072%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=176081","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=176081"}},{"id":"175909","reference":"AQO 4672/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-09-19","answerBy":"2013-09-30","answered":null,"answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what action he is taking to address the delay in the renewals process for the Blue Badge Scheme.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%204672%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=175909","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=175909"}},{"id":"177225","reference":"AQO 4672/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-09-19","answerBy":"2013-09-30","answered":"2013-09-30","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what action he is taking to address the delay in the renewals process for the Blue Badge Scheme.","answerText":"My Department has a target to inform 95% of applicants for Blue Badges of our decision within 15 working days of receipt of their valid applications. Given that in excess of 35,000 applications are received each year, this is a challenging target.\n\nAs of 29 August 2013, there were approximately 3500 Blue Badge applications waiting to be processed. The Blue Badge Unit is currently working approximately six to seven days behind the 15-day target due to a number of short-term resourcing issues that are being addressed. Two additional posts in the unit were created earlier in the year following a review of workloads. Pending recruitment of permanent staff, casual staff have been employed and weekend overtime arranged to address the backlog. Until the unit is up to full complement, it is expected that delays may persist during September. Departmental staff are working to fill all vacancies as soon as possible.\n\nI have instructed officials to extend the grace period for expired Blue Badges to one calendar month. This is in line with car tax expiry dates.","answerHtml":"<p>My Department has a target to inform 95% of applicants for Blue Badges of our decision within 15 working days of receipt of their valid applications. Given that in excess of 35,000 applications are received each year, this is a challenging target.</p><p>As of 29 August 2013, there were approximately 3500 Blue Badge applications waiting to be processed. The Blue Badge Unit is currently working approximately six to seven days behind the 15-day target due to a number of short-term resourcing issues that are being addressed. Two additional posts in the unit were created earlier in the year following a review of workloads. Pending recruitment of permanent staff, casual staff have been employed and weekend overtime arranged to address the backlog. Until the unit is up to full complement, it is expected that delays may persist during September. Departmental staff are working to fill all vacancies as soon as possible.</p><p>I have instructed officials to extend the grace period for expired Blue Badges to one calendar month. This is in line with car tax expiry dates.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%204672%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=177225","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=177225"}},{"id":"175097","reference":"AQO 4610/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-09-12","answerBy":"2013-09-23","answered":null,"answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment what correspondence he has had with the Northern Ireland Office regarding the proposed date for elections to the new district councils.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%204610%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=175097","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=175097"}},{"id":"176319","reference":"AQO 4610/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-09-12","answerBy":"2013-09-23","answered":"2013-10-09","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment what correspondence he has had with the Northern Ireland Office regarding the proposed date for elections to the new district councils.","answerText":"My Department has been working closely with the Northern Ireland Office in relation to arrangements for the next local government election, including the proposal to bring forward the date of the election to 2014. Moving the date of the election will allow for a transitional period in advance of the eleven new councils taking up their full range of powers and responsibilities.\n\nI understand that an Order in Council is to be laid at Westminster in early October which will include provision for the election to take place on 22 May 2014, subject to Parliament’s approval of the legislation.","answerHtml":"<p>My Department has been working closely with the Northern Ireland Office in relation to arrangements for the next local government election, including the proposal to bring forward the date of the election to 2014. Moving the date of the election will allow for a transitional period in advance of the eleven new councils taking up their full range of powers and responsibilities.</p><p>I understand that an Order in Council is to be laid at Westminster in early October which will include provision for the election to take place on 22 May 2014, subject to Parliament’s approval of the legislation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%204610%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=176319","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=176319"}},{"id":"171697","reference":"AQW 24612/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-06-24","answerBy":"2013-06-27","answered":"2013-06-27","answeredOrally":false,"priority":true,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to outline the action that his Department has taken to avert the train strike on 24 June 2013.","answerText":"Industrial Relations issues are the responsibility of Translink as the employer. I can advise you that Translink has kept me informed of developments as this issue has progressed. I was aware that both Translink and the Labour Relations Agency have offered to meet the union representing the employees concerned. I would hope that this offer can be taken up as soon as possible if this has not already happened.","answerHtml":"<p>Industrial Relations issues are the responsibility of Translink as the employer. I can advise you that Translink has kept me informed of developments as this issue has progressed. I was aware that both Translink and the Labour Relations Agency have offered to meet the union representing the employees concerned. I would hope that this offer can be taken up as soon as possible if this has not already happened.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2024612%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=171697","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=171697"}},{"id":"170185","reference":"AQW 24137/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-06-10","answerBy":"2013-06-13","answered":"2013-06-17","answeredOrally":false,"priority":true,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to outline the cause of the fire on the Belfast to Dublin Enterprise train on 6 June 2013; and the action that is being taken to ensure that there is no recurrence.","answerText":"The investigation into the cause of the fire is ongoing. The findings of that investigation will inform any necessary action to reduce the risk of any further recurrence.\n\nAs required under their Safety Management System NIR will commission their own inquiry into the matter. Engineers will investigate the cause of the fire on the locomotive and the inquiry team will also include representatives from Iarnrod Eireann, given the shared nature of the Enterprise service, the fact that the train in question is an Iarnrod Eireann vehicle and that all locomotives in the Enterprise fleet are maintained in the Iarnrod Eireann engineering depot in Dublin. The Department has asked to be kept fully informed.\n\nThe Rail Accident Investigation Board have been informed and, while they have yet to decide if they will investigate directly, have indicated that they are content with the investigation now underway. The Health & Safety Executive have also indicated that they will carry out an investigation into the incident and they have been briefed by Translink on the incident.\n\nI recognise that this was a very distressing situation for all passengers concerned and I am very relieved that no-one was injured. I attended the scene of the incident and I have met with officials and Translink staff. The safety of the public remains our key priority. The response from the train crew, Translink’s response teams and emergency services was excellent.","answerHtml":"<p>The investigation into the cause of the fire is ongoing. The findings of that investigation will inform any necessary action to reduce the risk of any further recurrence.</p><p>As required under their Safety Management System NIR will commission their own inquiry into the matter. Engineers will investigate the cause of the fire on the locomotive and the inquiry team will also include representatives from Iarnrod Eireann, given the shared nature of the Enterprise service, the fact that the train in question is an Iarnrod Eireann vehicle and that all locomotives in the Enterprise fleet are maintained in the Iarnrod Eireann engineering depot in Dublin. The Department has asked to be kept fully informed.</p><p>The Rail Accident Investigation Board have been informed and, while they have yet to decide if they will investigate directly, have indicated that they are content with the investigation now underway. The Health &amp; Safety Executive have also indicated that they will carry out an investigation into the incident and they have been briefed by Translink on the incident.</p><p>I recognise that this was a very distressing situation for all passengers concerned and I am very relieved that no-one was injured. I attended the scene of the incident and I have met with officials and Translink staff. The safety of the public remains our key priority. The response from the train crew, Translink’s response teams and emergency services was excellent.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2024137%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=170185","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=170185"}},{"id":"169843","reference":"AQO 4320/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-06-06","answerBy":"2013-06-18","answered":"2013-06-18","answeredOrally":true,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development for an assessment of his Department's responsibilities under the Together: Building a United Community strategy.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%204320%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=169843","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-12-13/18-June-2013","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=169843"}},{"id":"169720","reference":"AQW 24009/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-06-05","answerBy":"2013-06-20","answered":"2013-06-20","answeredOrally":false,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice for his assessment of the sense of unfairness felt by some police officers who had completed the required length of service but were unable to leave the PSNI under the Patten Scheme due to age requirements.","answerText":"The Voluntary Severance Scheme arose from the recommendations of the Independent Commission on Policing for Northern Ireland (Patten Commission) which was established as a result of the Good Friday Agreement. Consultation with members of Police Associations on this Scheme indicated that, while they felt the scheme should have been more generous, it offered the best overall deal for the majority of police officers.\n\nThe regulations governing the severance arrangements for members of the Police Service of Northern Ireland detail the criteria for admission to the Severance Scheme.\n\nIn line with similar schemes, there had to be a cut off point for eligibility. I recognise that in such circumstances there will often be individuals who feel a sense of grievance.","answerHtml":"<p>The Voluntary Severance Scheme arose from the recommendations of the Independent Commission on Policing for Northern Ireland (Patten Commission) which was established as a result of the Good Friday Agreement. Consultation with members of Police Associations on this Scheme indicated that, while they felt the scheme should have been more generous, it offered the best overall deal for the majority of police officers.</p><p>The regulations governing the severance arrangements for members of the Police Service of Northern Ireland detail the criteria for admission to the Severance Scheme.</p><p>In line with similar schemes, there had to be a cut off point for eligibility. I recognise that in such circumstances there will often be individuals who feel a sense of grievance.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2024009%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=169720","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=169720"}},{"id":"169297","reference":"AQW 23852/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-05-31","answerBy":"2013-06-17","answered":"2013-06-10","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development if his Department will bid for funding under the June Monitoring Round for improvements to level-crossings at Jordanstown and Trooperslane.","answerText":"My Department is providing funding to Translink to enable it to take forward a project to improve signalling arrangements at Jordanstown and Trooperslane level crossings.\n\nThe works will help reduce the duration of level crossing barriers/road closures when trains are in this line section.\n\nThe project is expected to be fully complete by late summer this year.","answerHtml":"<p>My Department is providing funding to Translink to enable it to take forward a project to improve signalling arrangements at Jordanstown and Trooperslane level crossings.</p><p>The works will help reduce the duration of level crossing barriers/road closures when trains are in this line section.</p><p>The project is expected to be fully complete by late summer this year.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2023852%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=169297","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=169297"}},{"id":"169295","reference":"AQW 23851/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-05-31","answerBy":"2013-06-17","answered":"2013-06-13","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development if his Department considers lamp posts as places of work for Roads Service employees.","answerText":"My officials are required to work in a range of environments, including offices, depots, stores, workshops, construction sites, and on the public highway. Lamp posts however are not considered to be places of work.\n\nWork on lamp posts is generally regarded and treated as site works on the public highway, and is carried out under a range of health and safety regulations and procedures relevant to the specific operation. These include compliance with the necessary signing and guarding of the works to ensure safety of workers and road users.","answerHtml":"<p>My officials are required to work in a range of environments, including offices, depots, stores, workshops, construction sites, and on the public highway. Lamp posts however are not considered to be places of work.</p><p>Work on lamp posts is generally regarded and treated as site works on the public highway, and is carried out under a range of health and safety regulations and procedures relevant to the specific operation. These include compliance with the necessary signing and guarding of the works to ensure safety of workers and road users.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2023851%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=169295","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=169295"}},{"id":"169294","reference":"AQW 23850/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-05-31","answerBy":"2013-06-17","answered":"2013-06-13","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what health and safety assessments have been undertaken of the dangers posed by flags and other materials attached to lamp posts and other street furniture.","answerText":"My Department’s assessment is that flags or other materials attached to lamp posts or other street furniture do not, generally, cause structural concerns. However, where such attachments interfere with the light output of the street lights or the visibility of traffic signs there would be safety implications for the travelling public. In these situations, attachments would be removed on safety grounds.\n\nIn addition, large banners attached to street lighting columns, which have not been designed for this purpose, would also cause safety concerns, due to the effect of wind loading on the structural stability of the column. In such circumstances, officials would seek to have such banners removed on safety grounds.","answerHtml":"<p>My Department’s assessment is that flags or other materials attached to lamp posts or other street furniture do not, generally, cause structural concerns. However, where such attachments interfere with the light output of the street lights or the visibility of traffic signs there would be safety implications for the travelling public. In these situations, attachments would be removed on safety grounds.</p><p>In addition, large banners attached to street lighting columns, which have not been designed for this purpose, would also cause safety concerns, due to the effect of wind loading on the structural stability of the column. In such circumstances, officials would seek to have such banners removed on safety grounds.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2023850%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=169294","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=169294"}},{"id":"169137","reference":"AQW 23789/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-05-30","answerBy":"2013-06-14","answered":"2013-06-04","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel whether his Department owns the buildings on which he has approved the erection of new flag poles.","answerText":"My Department owns 3 of the buildings on which I have approved the erection of new flag poles.","answerHtml":"<p>My Department owns 3 of the buildings on which I have approved the erection of new flag poles.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2023789%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=169137","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=169137"}},{"id":"169993","reference":"AQO 4256/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-05-29","answerBy":"2013-06-10","answered":"2013-10-18","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister to outline his plans for reassessing the financial costs of providing public services as part of the Together: Building a United Community Strategy.","answerText":"Avoidance of unnecessary expenditure or duplication in the provision of public services is a core aspect of the new Strategy.","answerHtml":"<p>Avoidance of unnecessary expenditure or duplication in the provision of public services is a core aspect of the new Strategy.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%204256%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=169993","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=169993"}},{"id":"168574","reference":"AQO 4195/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-05-23","answerBy":"2013-06-03","answered":"2013-06-04","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel for an update on the number of renewable energy jobs created locally compared to other regions of the UK, since April 2011.","answerText":"It is not possible to provide a comprehensive estimate of the number of renewable energy jobs created in Northern Ireland relative to other regions of the UK. This is because renewable energy related activities are not separately identified within the UK Standard Industrial Classification system (SIC2007) used to classify business activity.\n\nHowever, for information, the number of employee jobs in the electrical power generation, transmission and distribution sector, which includes some renewable energy activity, is provided in table below for the years 2009 and 2011 (the latest available).\n\nNumber of Jobs in Electric Power Generation, Transmission and Distribution\n\nYear\tNumber of Employee Jobs\tEmployee Job Change\n2009\t1043\n2011\t949\t-94","answerHtml":"<p>It is not possible to provide a comprehensive estimate of the number of renewable energy jobs created in Northern Ireland relative to other regions of the UK. This is because renewable energy related activities are not separately identified within the UK Standard Industrial Classification system (SIC2007) used to classify business activity.</p><p>However, for information, the number of employee jobs in the electrical power generation, transmission and distribution sector, which includes some renewable energy activity, is provided in table below for the years 2009 and 2011 (the latest available).</p><p>Number of Jobs in Electric Power Generation, Transmission and Distribution</p><div class=\"table-wrap\"><table><tr><td>Year</td><td>Number of Employee Jobs</td><td>Employee Job Change</td></tr><tr><td>2009</td><td>1043</td><td></td></tr><tr><td>2011</td><td>949</td><td>-94</td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%204195%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=168574","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=168574"}},{"id":"167999","reference":"AQW 23440/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-05-21","answerBy":"2013-06-06","answered":"2013-06-04","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture and Rural Development","question":"To ask the Minister of Agriculture and Rural Development what support her Department will provide to Carrickfergus Borough Council to replace trees lost to Ash Dieback disease.","answerText":"I have asked officials to develop a policy outlining the support which may be made available to assist woodland owners with existing grant agreements to replant areas affected by Chalara ash dieback with alternative tree species, following compliance with a statutory plant health notice.","answerHtml":"<p>I have asked officials to develop a policy outlining the support which may be made available to assist woodland owners with existing grant agreements to replant areas affected by Chalara ash dieback with alternative tree species, following compliance with a statutory plant health notice.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2023440%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=167999","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=167999"}},{"id":"167998","reference":"AQW 23439/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-05-21","answerBy":"2013-06-06","answered":"2013-05-31","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development whether Northern Ireland Water will extend the storm sewers on Mill Street and High Street, Cushendall.","answerText":"I have been advised by Northern Ireland Water that it is planning to install a new storm sewer at the junction of Mill Street and High Street this summer. The work, which will reduce the risk of out-of-sewer flooding, is being implemented in advance of the on-going Drainage Area Study (DAS) for Cushendall which is due to be completed early next year. The outcome of the DAS will determine if further capital investment is required to further reduce the risk of out-of-sewer flooding in the area.","answerHtml":"<p>I have been advised by Northern Ireland Water that it is planning to install a new storm sewer at the junction of Mill Street and High Street this summer. The work, which will reduce the risk of out-of-sewer flooding, is being implemented in advance of the on-going Drainage Area Study (DAS) for Cushendall which is due to be completed early next year. The outcome of the DAS will determine if further capital investment is required to further reduce the risk of out-of-sewer flooding in the area.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2023439%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=167998","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=167998"}},{"id":"167996","reference":"AQW 23437/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-05-21","answerBy":"2013-06-06","answered":"2013-05-24","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education how many children, who did not take the new transfer tests in the previous academic year, have subsequently transferred to grammar schools.","answerText":"The Department does not hold any information on the number of children who have taken unregulated entrance tests in any of the years since they were first used by grammar schools in contravention of the Department’s policy that no child should have to sit a test as part of the process of transfer from primary to post-primary school. It is therefore not possible to identify how many children were admitted to grammar schools without having sat unregulated entrance tests in the previous academic year.","answerHtml":"<p>The Department does not hold any information on the number of children who have taken unregulated entrance tests in any of the years since they were first used by grammar schools in contravention of the Department’s policy that no child should have to sit a test as part of the process of transfer from primary to post-primary school. It is therefore not possible to identify how many children were admitted to grammar schools without having sat unregulated entrance tests in the previous academic year.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2023437%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=167996","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=167996"}},{"id":"167553","reference":"AQW 23234/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-05-17","answerBy":"2013-06-04","answered":"2013-05-23","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development whether he is aware of the difficulties that users of the Door-to-Door Transport service in Newtownabbey and Carrickfergus are experiencing following the introduction of the Disability Action contract, and if so, what measures he has put in place to improve the service.","answerText":"The Disability Action Transport Scheme (DATS) which commenced on 1 April 2013 is operated by Disability Action. My officials were made aware that Disability Action wrote to all customers in the Newtownabbey and Carrickfergus areas at the end of March 2013 advising that due to operational issues in relation to the availability of accessible vehicles from Northern Ireland providers that there would be a limited service in April 2013.\n\nHowever Disability Action has advised me that since then additional vehicles have been sourced and transport provision in that area has improved with a 43% increase in the number of trips undertaken since the end of April.","answerHtml":"<p>The Disability Action Transport Scheme (DATS) which commenced on 1 April 2013 is operated by Disability Action. My officials were made aware that Disability Action wrote to all customers in the Newtownabbey and Carrickfergus areas at the end of March 2013 advising that due to operational issues in relation to the availability of accessible vehicles from Northern Ireland providers that there would be a limited service in April 2013.</p><p>However Disability Action has advised me that since then additional vehicles have been sourced and transport provision in that area has improved with a 43% increase in the number of trips undertaken since the end of April.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2023234%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=167553","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=167553"}},{"id":"163881","reference":"AQW 21831/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-04-16","answerBy":"2013-05-01","answered":"2013-04-30","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to detail the roads that have been adopted; broken down by District Council area, in the last two years.","answerText":"I would advise the Member that a list of the roads that have been adopted in the last two years is available in the Assembly Library.","answerHtml":"<p>I would advise the Member that a list of the roads that have been adopted in the last two years is available in the Assembly Library.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2021831%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=163881","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=163881"}},{"id":"163808","reference":"AQW 21801/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-04-15","answerBy":"2013-04-30","answered":"2013-04-25","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment to detail the advertising spend by InvestNI in the United States of America, in each of the last three years.","answerText":"Presenting and promoting Northern Ireland as a great place to do business is key to Northern Ireland’s success in attracting inward investment and encouraging exports.\n\nThe advertising spend for media placed in the US market over the last 3 years has been collated and is detailed below. The total is £819,990.\n\nFinancial Year\tAdvertising Placement (£)\n2010-11\t34,843\n2011-12\t366,171\n2012-13\t418,976\nGrand Total\t819,990\n\nAdvertising activity over the last 3 years has supported sales activity in-market and has been specifically aimed at raising the profile of Northern Ireland and promoting the region as a destination for inward investment and to highlight expertise in the region. Channels used include online, airport advertising and selected print publications.\n\nResearch has indicated that Northern Ireland does not enjoy a widespread positive high profile particularly in the more distant emerging markets. In some markets including the US there exists a level of supposed familiarity that requires augmented/adjusted – eg some people’s awareness is confined to bad news stories they may have been exposed to and their perception of Northern Ireland may be based on outdated information about the region’s stability. Research has also highlighted that people are sometimes unlikely to be able to differentiate between Northern Ireland and Republic of Ireland.\n\nGiven that the biggest barrier is one of perception, this can be addressed by marketing and promotion and increased budget has been allocated to this over the last 2 years.","answerHtml":"<p>Presenting and promoting Northern Ireland as a great place to do business is key to Northern Ireland’s success in attracting inward investment and encouraging exports.</p><p>The advertising spend for media placed in the US market over the last 3 years has been collated and is detailed below. The total is £819,990.</p><div class=\"table-wrap\"><table><tr><td>Financial Year</td><td>Advertising Placement (£)</td></tr><tr><td>2010-11</td><td>34,843</td></tr><tr><td>2011-12</td><td>366,171</td></tr><tr><td>2012-13</td><td>418,976</td></tr><tr><td>Grand Total</td><td>819,990</td></tr></table></div><p>Advertising activity over the last 3 years has supported sales activity in-market and has been specifically aimed at raising the profile of Northern Ireland and promoting the region as a destination for inward investment and to highlight expertise in the region. Channels used include online, airport advertising and selected print publications.</p><p>Research has indicated that Northern Ireland does not enjoy a widespread positive high profile particularly in the more distant emerging markets. In some markets including the US there exists a level of supposed familiarity that requires augmented/adjusted – eg some people’s awareness is confined to bad news stories they may have been exposed to and their perception of Northern Ireland may be based on outdated information about the region’s stability. Research has also highlighted that people are sometimes unlikely to be able to differentiate between Northern Ireland and Republic of Ireland.</p><p>Given that the biggest barrier is one of perception, this can be addressed by marketing and promotion and increased budget has been allocated to this over the last 2 years.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2021801%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=163808","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=163808"}},{"id":"163531","reference":"AQO 3872/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-04-11","answerBy":"2013-04-23","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to outline any initial findings from the responses to the consultation on the Rate Rebate Replacement Arrangements.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203872%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=163531","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=163531"}},{"id":"164707","reference":"AQO 3872/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-04-11","answerBy":"2013-04-23","answered":"2013-04-23","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to outline any initial findings from the responses to the consultation on the Rate Rebate Replacement Arrangements.","answerText":"The preliminary consultation process officially closed on the 10th April, however, my Department extended the deadline for a week or so to afford those organisations that had met with my officials, a little more time to write up their formal responses.\n\nAll these responses will be presented in full on the Department’s website in a few days time and a summary report will also be published shortly.\n\nGiven the short period since the consultation closed it is too early to report findings. What I can say, however, is that the responses themselves broadly fell within two polarised camps.\n\nThe first advocating a consolidation or rationalisation of the existing range of rate support measures, as a means of preserving as much as possible the current coverage of the main rate rebate scheme.\n\nThe second – put forward reluctantly as the ‘least worst’ option - advocates a flat rate cut in entitlement to rate rebate across the board without cutting other support measures.\n\nIt is clear that the choices facing the Executive will not be easy ones.\n\nMy Department is modelling a range of options for me to present to the Executive to help Ministers decide on the preferred solution or solutions. This will then need to go out to a further round of public consultation, accompanied by an initial integrated impact assessment before final decisions are made in the Autumn.","answerHtml":"<p>The preliminary consultation process officially closed on the 10th April, however, my Department extended the deadline for a week or so to afford those organisations that had met with my officials, a little more time to write up their formal responses.</p><p>All these responses will be presented in full on the Department’s website in a few days time and a summary report will also be published shortly.</p><p>Given the short period since the consultation closed it is too early to report findings. What I can say, however, is that the responses themselves broadly fell within two polarised camps.</p><p>The first advocating a consolidation or rationalisation of the existing range of rate support measures, as a means of preserving as much as possible the current coverage of the main rate rebate scheme.</p><p>The second – put forward reluctantly as the ‘least worst’ option - advocates a flat rate cut in entitlement to rate rebate across the board without cutting other support measures.</p><p>It is clear that the choices facing the Executive will not be easy ones.</p><p>My Department is modelling a range of options for me to present to the Executive to help Ministers decide on the preferred solution or solutions. This will then need to go out to a further round of public consultation, accompanied by an initial integrated impact assessment before final decisions are made in the Autumn.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203872%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=164707","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=164707"}},{"id":"160394","reference":"AQW 20613/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-03-05","answerBy":"2013-03-21","answered":"2013-03-12","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development how Transport Northern Ireland will help to coordinate and improve the planning, management and delivery of transport across Departments.","answerText":"Transport NI will be responsible for planning, managing and regulating public transport service in Northern Ireland. This includes licensing of routes but operator licensing will remain with the Department of Environment. Transport NI does not currently have any statutory or operational remit for the publicly funded passenger services provided by other Departments. Nonetheless, the Department for Regional Development has proactively organised and is currently working with the Department of Health, Social Services & Public Safety, the Department of Education, the Department of Agriculture and Rural Development and other organisations to explore the opportunities for improved integration and efficiency of services through a pilot project in the Dungannon and Cookstown areas. When the pilot project gets underway later this year it will be subject to a period of evaluation to assess the benefits and viability of the wider roll-out of such arrangements. The evaluation will help to determine the degree to which more integrated planning and delivery is possible and the timescales for implementation.","answerHtml":"<p>Transport NI will be responsible for planning, managing and regulating public transport service in Northern Ireland. This includes licensing of routes but operator licensing will remain with the Department of Environment. Transport NI does not currently have any statutory or operational remit for the publicly funded passenger services provided by other Departments. Nonetheless, the Department for Regional Development has proactively organised and is currently working with the Department of Health, Social Services &amp; Public Safety, the Department of Education, the Department of Agriculture and Rural Development and other organisations to explore the opportunities for improved integration and efficiency of services through a pilot project in the Dungannon and Cookstown areas. When the pilot project gets underway later this year it will be subject to a period of evaluation to assess the benefits and viability of the wider roll-out of such arrangements. The evaluation will help to determine the degree to which more integrated planning and delivery is possible and the timescales for implementation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020613%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=160394","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=160394"}},{"id":"159213","reference":"AQW 20227/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-02-21","answerBy":"2013-03-08","answered":"2013-03-05","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to detail any planned repair work to reservoirs.","answerText":"I have been advised by Northern Ireland Water (NIW) that it plans to carry out repair work on eduction tower valves and pipe work at the following impounding reservoirs which will ensure that their safety is not compromised - Dorisland, Copeland, Lough Mourne, Lower South Woodburn, Middle South Woodburn, Upper South Woodburn, North Woodburn, Church Road, Portavoe, Lower Ballysallagh, Upper Ballysallagh, Lower Conlig, Upper Conlig, Killea, Knockbracken, Boomers and Fofanny. It is anticipated that this work will commence in April 2013 and be completed by December 2014.\n\nIn addition, NIW undertakes periodic inspections at its impounding reservoirs and carries out minor maintenance on an on-going basis.","answerHtml":"<p>I have been advised by Northern Ireland Water (NIW) that it plans to carry out repair work on eduction tower valves and pipe work at the following impounding reservoirs which will ensure that their safety is not compromised - Dorisland, Copeland, Lough Mourne, Lower South Woodburn, Middle South Woodburn, Upper South Woodburn, North Woodburn, Church Road, Portavoe, Lower Ballysallagh, Upper Ballysallagh, Lower Conlig, Upper Conlig, Killea, Knockbracken, Boomers and Fofanny. It is anticipated that this work will commence in April 2013 and be completed by December 2014.</p><p>In addition, NIW undertakes periodic inspections at its impounding reservoirs and carries out minor maintenance on an on-going basis.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2020227%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=159213","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=159213"}},{"id":"159089","reference":"AQO 3565/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-02-21","answerBy":"2013-03-05","answered":"2013-03-05","answeredOrally":true,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture and Rural Development","question":"To ask the Minister of Agriculture and Rural Development how she can guarantee that relocating her Department's headquarters to Ballykelly is the most desirable option if a business case is not developed for any other site.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203565%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=159089","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-12-13/05-March-2013","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=159089"}},{"id":"158223","reference":"AQW 19866/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-02-14","answerBy":"2013-03-01","answered":"2013-02-27","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development how many times each E-car charge point has been used since the activation of the Charge Point Management System in July 2012.","answerText":"Data on charging point usage is compiled quarterly. The latest data is for the period up to 31 December 2012.\n\nThe number of charging events for each charge post from the activation of the Charge Point Management System in July 2012 to 31 December 2012 is contained in the attached table.\n\nCharge Point Location\tCharge Point ID\tID number\tNumber of Charging Events to 31 December 2012\nBelfast\tLittle Victoria Street Car Park\tSC22\t1\nBelfast\tLittle Donegall Street\tSC23\t2\nBelfast\tCromac Street Car Park\tSC33\t1\nBelfast\tHope Street North\tSC03\t3\nBelfast\tAdelaide Street on street\tSC19\t40\nBelfast\tDublin Road on street\tSC08\t2\nBelfast\tLower Crescent on street\tSC21\t2\nBelfast\tCentral Station car park\tSC09\t5\nBelfast\tCairns Hill Park and Ride\tSC35\t4\nArmagh\tLinenhall Street car park\tSC02\t1\nArmagh\tLonsdale Street car park\tSC15\nArmagh\tCathedral Road Recreational Centre\tSC40\nArmagh\tPalace Demense\tSC04\t3\nNewry\tBagenal’s Castle\tSC05\t1\nNewry\tBridge Street car park\tSC28\t1\nNewry\tBasin Walk car park\tSC10\t1\nNewry\tMonaghan Street car park\tSC32\t1\nNewry\tHill Street on street\tSC30\nNewry\tCanal Court Merchants Quay\tSC37\t2\nNewry\tNewry Train station\tSC41\t3\nLondonderry\tVictoria Market car park\tSC27\t8\nLondonderry\tBishop Street car park\tSC39\nLondonderry\tRailway Yard\tSC06\nLondonderry\tStrand Road\tSC07\nLondonderry\tCarlisle Road on street\tSC25\t1\nLondonderry\tThe Diamond on street\tSC34\t5\nLondonderry\tTemplemore Leisure Centre\tSC26\t1\nFermanagh\tDown/Market/Cross Street\tSC18\t2\nFermanagh\tEden Street\tSC13\t9\nFermanagh\tQuay Lane North\tSC11\t1\nFermanagh\tWellington Street\tSC16\t8\nFermanagh\tQueen St,Carpark, Enniskillen\tSC17\t1\nFermanagh\tCross Street, Carpark, Lisnaskea\tSC31\t2\nFermanagh\tMain Street, Irvinestown – DRD\tSC29\nFermanagh\tMain Street, Belleek – DRD\tSC12\t1\nLarne\tNarrow Gauge Road\tSC14\t1\nLarne\tAgnew Street\tSC20\t2\nLarne\tRiverdale\tSC01\nLarne\tCarnlough Havelock Place\tSC36\t1\nCookstown\tSouthwest College\tSC38\t2\nDungannon\tRapid Charge Point\tRC01\t12\nMaghera\tRapid Charge Point\tRC03\t18\nNewry\tRapid Charge Point\tRC02\t43\nPortrush (from August 2012)\tRapid Charge Point\tRC04\t47","answerHtml":"<p>Data on charging point usage is compiled quarterly. The latest data is for the period up to 31 December 2012.</p><p>The number of charging events for each charge post from the activation of the Charge Point Management System in July 2012 to 31 December 2012 is contained in the attached table.</p><div class=\"table-wrap\"><table><tr><td>Charge Point Location</td><td>Charge Point ID</td><td>ID number</td><td>Number of Charging Events to 31 December 2012</td></tr><tr><td>Belfast</td><td>Little Victoria Street Car Park</td><td>SC22</td><td>1</td></tr><tr><td>Belfast</td><td>Little Donegall Street</td><td>SC23</td><td>2</td></tr><tr><td>Belfast</td><td>Cromac Street Car Park</td><td>SC33</td><td>1</td></tr><tr><td>Belfast</td><td>Hope Street North</td><td>SC03</td><td>3</td></tr><tr><td>Belfast</td><td>Adelaide Street on street</td><td>SC19</td><td>40</td></tr><tr><td>Belfast</td><td>Dublin Road on street</td><td>SC08</td><td>2</td></tr><tr><td>Belfast</td><td>Lower Crescent on street</td><td>SC21</td><td>2</td></tr><tr><td>Belfast</td><td>Central Station car park</td><td>SC09</td><td>5</td></tr><tr><td>Belfast</td><td>Cairns Hill Park and Ride</td><td>SC35</td><td>4</td></tr><tr><td>Armagh</td><td>Linenhall Street car park</td><td>SC02</td><td>1</td></tr><tr><td>Armagh</td><td>Lonsdale Street car park</td><td>SC15</td><td></td></tr><tr><td>Armagh</td><td>Cathedral Road Recreational Centre</td><td>SC40</td><td></td></tr><tr><td>Armagh</td><td>Palace Demense</td><td>SC04</td><td>3</td></tr><tr><td>Newry</td><td>Bagenal’s Castle</td><td>SC05</td><td>1</td></tr><tr><td>Newry</td><td>Bridge Street car park</td><td>SC28</td><td>1</td></tr><tr><td>Newry</td><td>Basin Walk car park</td><td>SC10</td><td>1</td></tr><tr><td>Newry</td><td>Monaghan Street car park</td><td>SC32</td><td>1</td></tr><tr><td>Newry</td><td>Hill Street on street</td><td>SC30</td><td></td></tr><tr><td>Newry</td><td>Canal Court Merchants Quay</td><td>SC37</td><td>2</td></tr><tr><td>Newry</td><td>Newry Train station</td><td>SC41</td><td>3</td></tr><tr><td>Londonderry</td><td>Victoria Market car park</td><td>SC27</td><td>8</td></tr><tr><td>Londonderry</td><td>Bishop Street car park</td><td>SC39</td><td></td></tr><tr><td>Londonderry</td><td>Railway Yard</td><td>SC06</td><td></td></tr><tr><td>Londonderry</td><td>Strand Road</td><td>SC07</td><td></td></tr><tr><td>Londonderry</td><td>Carlisle Road on street</td><td>SC25</td><td>1</td></tr><tr><td>Londonderry</td><td>The Diamond on street</td><td>SC34</td><td>5</td></tr><tr><td>Londonderry</td><td>Templemore Leisure Centre</td><td>SC26</td><td>1</td></tr><tr><td>Fermanagh</td><td>Down/Market/Cross Street</td><td>SC18</td><td>2</td></tr><tr><td>Fermanagh</td><td>Eden Street</td><td>SC13</td><td>9</td></tr><tr><td>Fermanagh</td><td>Quay Lane North</td><td>SC11</td><td>1</td></tr><tr><td>Fermanagh</td><td>Wellington Street</td><td>SC16</td><td>8</td></tr><tr><td>Fermanagh</td><td>Queen St,Carpark, Enniskillen</td><td>SC17</td><td>1</td></tr><tr><td>Fermanagh</td><td>Cross Street, Carpark, Lisnaskea</td><td>SC31</td><td>2</td></tr><tr><td>Fermanagh</td><td>Main Street, Irvinestown – DRD</td><td>SC29</td><td></td></tr><tr><td>Fermanagh</td><td>Main Street, Belleek – DRD</td><td>SC12</td><td>1</td></tr><tr><td>Larne</td><td>Narrow Gauge Road</td><td>SC14</td><td>1</td></tr><tr><td>Larne</td><td>Agnew Street</td><td>SC20</td><td>2</td></tr><tr><td>Larne</td><td>Riverdale</td><td>SC01</td><td></td></tr><tr><td>Larne</td><td>Carnlough Havelock Place</td><td>SC36</td><td>1</td></tr><tr><td>Cookstown</td><td>Southwest College</td><td>SC38</td><td>2</td></tr><tr><td>Dungannon</td><td>Rapid Charge Point</td><td>RC01</td><td>12</td></tr><tr><td>Maghera</td><td>Rapid Charge Point</td><td>RC03</td><td>18</td></tr><tr><td>Newry</td><td>Rapid Charge Point</td><td>RC02</td><td>43</td></tr><tr><td>Portrush (from August 2012)</td><td>Rapid Charge Point</td><td>RC04</td><td>47</td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019866%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=158223","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=158223"}},{"id":"158220","reference":"AQW 19865/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-02-14","answerBy":"2013-03-01","answered":"2013-02-27","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture and Rural Development","question":"To ask the Minister of Agriculture and Rural Development how many memoranda of dissent have been recorded within her Department since May 2011.","answerText":"I can confirm that no memoranda of dissent have been recorded within my Department since May 2011.","answerHtml":"<p>I can confirm that no memoranda of dissent have been recorded within my Department since May 2011.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2019865%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=158220","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=158220"}},{"id":"159625","reference":"AQO 3501/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-02-14","answerBy":"2013-02-26","answered":"2013-02-26","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety what efforts his Department, in conjunction with other Departments, has made to co-ordinate transport services.","answerText":"Officials from my Department met with Department of Regional Development (DRD) officials in early 2012 to explore the potential for a collaborative approach between Northern Ireland’s health and public transport sectors. Following this, DRD developed a proposal to run a pilot project in the Dungannon and Cookstown District Council areas to assess the benefits of a more joined up approach to the design and delivery of publicly funded passenger transport services. My Department is a member of the Project Board along with representatives from the Departments of Regional Development, Education and Agriculture and Rural Development","answerHtml":"<p>Officials from my Department met with Department of Regional Development (DRD) officials in early 2012 to explore the potential for a collaborative approach between Northern Ireland’s health and public transport sectors. Following this, DRD developed a proposal to run a pilot project in the Dungannon and Cookstown District Council areas to assess the benefits of a more joined up approach to the design and delivery of publicly funded passenger transport services. My Department is a member of the Project Board along with representatives from the Departments of Regional Development, Education and Agriculture and Rural Development</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203501%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=159625","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=159625"}},{"id":"156586","reference":"AQO 3398/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-01-31","answerBy":"2013-02-12","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture and Rural Development","question":"To ask the Minister of Agriculture and Rural Development to outline the scores achieved against the defined set of criteria by the 23 local government districts for the relocation of her Department's headquarters.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203398%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=156586","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=156586"}},{"id":"157974","reference":"AQO 3398/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-01-31","answerBy":"2013-02-12","answered":"2013-02-12","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture and Rural Development","question":"To ask the Minister of Agriculture and Rural Development to outline the scores achieved against the defined set of criteria by the 23 local government districts for the relocation of her Department's headquarters.","answerText":"The process for identifying appropriate locations for my new headquarters was done in two stages – the first stage identified the 23 local government districts highlighted in the Spatial Framework of the Regional Development Strategy. These 23 areas were then scored against a set of 9 bespoke criteria. The scores for each of the 23 locations are as follows:-\n\nScore of the 23 Potential Locations\n\nLocation\tScore\t\tLocation\tScore\nAntrim\t30\t\tDown\t53\nArds\t50\t\tDungannon\t49\nArmagh\t44\t\tFermanagh\t41\nBallymena\t35\t\tLarne\t45\nBanbridge\t57\t\tLimavady\t59\nBelfast\t34\t\tLisburn\t24\nCarrickfergus\t17\t\tNewry & Mourne\t56\nCastlereagh\t20\t\tNewtownabbey\t21\nColeraine\t37\t\tNorth Down\t23\nCookstown\t53\t\tOmagh\t42\nCraigavon\t49\t\tStrabane\t73\nDerry\t51","answerHtml":"<p>The process for identifying appropriate locations for my new headquarters was done in two stages – the first stage identified the 23 local government districts highlighted in the Spatial Framework of the Regional Development Strategy. These 23 areas were then scored against a set of 9 bespoke criteria. The scores for each of the 23 locations are as follows:-</p><p>Score of the 23 Potential Locations</p><div class=\"table-wrap\"><table><tr><td>Location</td><td>Score</td><td></td><td>Location</td><td>Score</td></tr><tr><td>Antrim</td><td>30</td><td></td><td>Down</td><td>53</td></tr><tr><td>Ards</td><td>50</td><td></td><td>Dungannon</td><td>49</td></tr><tr><td>Armagh</td><td>44</td><td></td><td>Fermanagh</td><td>41</td></tr><tr><td>Ballymena</td><td>35</td><td></td><td>Larne</td><td>45</td></tr><tr><td>Banbridge</td><td>57</td><td></td><td>Limavady</td><td>59</td></tr><tr><td>Belfast</td><td>34</td><td></td><td>Lisburn</td><td>24</td></tr><tr><td>Carrickfergus</td><td>17</td><td></td><td>Newry &amp; Mourne</td><td>56</td></tr><tr><td>Castlereagh</td><td>20</td><td></td><td>Newtownabbey</td><td>21</td></tr><tr><td>Coleraine</td><td>37</td><td></td><td>North Down</td><td>23</td></tr><tr><td>Cookstown</td><td>53</td><td></td><td>Omagh</td><td>42</td></tr><tr><td>Craigavon</td><td>49</td><td></td><td>Strabane</td><td>73</td></tr><tr><td>Derry</td><td>51</td><td></td><td></td><td></td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203398%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=157974","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=157974"}},{"id":"156581","reference":"AQO 3347/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-01-31","answerBy":"2013-02-11","answered":"2013-02-11","answeredOrally":true,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister when the Sexual Orientation strategy will be published.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203347%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=156581","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-12-13/11-February-2013","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=156581"}},{"id":"155705","reference":"AQO 3306/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-01-24","answerBy":"2013-02-04","answered":null,"answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment for her assessment of the damage caused to Northern Ireland's tourist brand by the recent unrest.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203306%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=155705","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=155705"}},{"id":"156905","reference":"AQO 3306/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-01-24","answerBy":"2013-02-04","answered":"2013-02-07","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment for her assessment of the damage caused to Northern Ireland's tourist brand by the recent unrest.","answerText":"The press coverage of Northern Ireland in recent weeks has portrayed a negative image of Northern Ireland which is unhelpful especially as this region has been so successful in attracting visitors in recent years.\n\nThe ni2012 campaign was hugely successful in enhancing the image of Northern Ireland and I want to ensure that a positive message continues to be delivered.\n\nMy Department, through NITB and TIL, remains fully committed to promoting Northern Ireland as a visitor destination; providing reassurance to potential visitors and emphasising that it is ‘business as usual’ in Northern Ireland.","answerHtml":"<p>The press coverage of Northern Ireland in recent weeks has portrayed a negative image of Northern Ireland which is unhelpful especially as this region has been so successful in attracting visitors in recent years.</p><p>The ni2012 campaign was hugely successful in enhancing the image of Northern Ireland and I want to ensure that a positive message continues to be delivered.</p><p>My Department, through NITB and TIL, remains fully committed to promoting Northern Ireland as a visitor destination; providing reassurance to potential visitors and emphasising that it is ‘business as usual’ in Northern Ireland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203306%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=156905","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=156905"}},{"id":"155390","reference":"AQW 18787/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-01-22","answerBy":"2013-02-06","answered":"2013-02-05","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development why Translink has ceased the refreshment trolley service on the Londonderry Railway Line.","answerText":"Translink has advised that it ceased the operation of a refreshment trolley on the Londonderry-Belfast railway line in late 2005. It was not profit making.","answerHtml":"<p>Translink has advised that it ceased the operation of a refreshment trolley on the Londonderry-Belfast railway line in late 2005. It was not profit making.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018787%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=155390","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=155390"}},{"id":"155389","reference":"AQW 18786/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-01-22","answerBy":"2013-02-06","answered":"2013-02-06","answeredOrally":false,"priority":false,"department":"Department for Employment and Learning","departmentId":"83","minister":"Minister for Employment and Learning","question":"To ask the Minister for Employment and Learning to detail (i) the number of civil servants from his Department who have left work early since 3 December 2012 due to the civil unrest associated with the flag protests; and (ii) the associated financial cost to his departmental budget.","answerText":"The NICS is fully aware of its responsibility to maintain a service to the public and every effort is made to keep its offices open for business.\n\nBusiness continuity and staff safety are the key issues to be assessed when considering office closure. My Department has a process in place outlining the appropriate steps to take when considering office closure. Managers monitor the situation locally and if they foresee any security, safety or transport related difficulties for staff, decide on the appropriate action to take in light of the information available within the rules of the Flexible Working Time - Code of Practice.\n\nSince 3rd December all DEL Headquarter buildings have been closed at 5pm on a small number of occasions. Under the NICS Flexible Working Time scheme, staff are able to vary times of arrival and departure from work, the length and timing of lunch breaks and to take time off if extra hours are worked. As staff were able to avail of flexible working to leave at 4 p.m. on the days where DEL Headquarter buildings were closed at 5 p.m., there is no associated financial cost to my departmental budget.","answerHtml":"<p>The NICS is fully aware of its responsibility to maintain a service to the public and every effort is made to keep its offices open for business.</p><p>Business continuity and staff safety are the key issues to be assessed when considering office closure. My Department has a process in place outlining the appropriate steps to take when considering office closure. Managers monitor the situation locally and if they foresee any security, safety or transport related difficulties for staff, decide on the appropriate action to take in light of the information available within the rules of the Flexible Working Time - Code of Practice.</p><p>Since 3rd December all DEL Headquarter buildings have been closed at 5pm on a small number of occasions. Under the NICS Flexible Working Time scheme, staff are able to vary times of arrival and departure from work, the length and timing of lunch breaks and to take time off if extra hours are worked. As staff were able to avail of flexible working to leave at 4 p.m. on the days where DEL Headquarter buildings were closed at 5 p.m., there is no associated financial cost to my departmental budget.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018786%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=155389","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=155389"}},{"id":"155388","reference":"AQW 18785/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-01-22","answerBy":"2013-02-06","answered":"2013-02-01","answeredOrally":false,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice to detail (i) the number of civil servants from his Department who have left work early since 3 December 2012 due to the civil unrest associated with the flag protests; and (ii) the associated financial cost to his departmental budget.","answerText":"The Department of Justice (DOJ) is fully aware of its responsibility to maintain a service to the public and every effort is made to keep its offices open for business.\n\nWhilst the timing of the protests allowed most staff to make their way home unhindered, affected staff were entitled to seek approval from their line manager to leave work early within the rules of the Flexible Working Time - Code of Practice and without additional credits.\n\nAny staff who had specific concerns were advised to discuss the situation with their line manager. Line managers are best placed to consider all the relevant issues including the need to maintain a service to the public and exercise local discretion within the normal rules of the NICS HR Handbook.\n\nTherefore no associated financial cost to the DOJ budget was recorded.","answerHtml":"<p>The Department of Justice (DOJ) is fully aware of its responsibility to maintain a service to the public and every effort is made to keep its offices open for business.</p><p>Whilst the timing of the protests allowed most staff to make their way home unhindered, affected staff were entitled to seek approval from their line manager to leave work early within the rules of the Flexible Working Time - Code of Practice and without additional credits.</p><p>Any staff who had specific concerns were advised to discuss the situation with their line manager. Line managers are best placed to consider all the relevant issues including the need to maintain a service to the public and exercise local discretion within the normal rules of the NICS HR Handbook.</p><p>Therefore no associated financial cost to the DOJ budget was recorded.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018785%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=155388","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=155388"}},{"id":"155175","reference":"AQW 18703/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-01-21","answerBy":"2013-02-05","answered":"2013-01-29","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development how often the Roads Service audits the number of cyclists on major routes.","answerText":"At present, my Department’s Roads Service does not carry out audits of the number of cyclists on major routes. Every two years a Belfast City Centre Cordon Survey is undertaken by officials in Roads Service, to assist in monitoring performance against targets established in the Belfast Metropolitan Transport Plan (BMTP) 2015. The purpose of this survey is to determine the modes of travel used by people, crossing a predefined city centre cordon, to travel into Belfast City Centre during the morning peak hour (08:00 to 09:00). The most recent cordon survey was completed in 2011.\n\nThe Travel Survey for Northern Ireland (TSNI) 2009-2011 provides information on how, over the region as a whole, people use different forms of transport, including bicycles, to meet their travel needs, as individuals or family groups. The TSNI also provides information to inform government policy, assist with setting objectives and monitor performance in relation to transport and travel in Northern Ireland, for example, in the Regional Transportation Strategy.","answerHtml":"<p>At present, my Department’s Roads Service does not carry out audits of the number of cyclists on major routes. Every two years a Belfast City Centre Cordon Survey is undertaken by officials in Roads Service, to assist in monitoring performance against targets established in the Belfast Metropolitan Transport Plan (BMTP) 2015. The purpose of this survey is to determine the modes of travel used by people, crossing a predefined city centre cordon, to travel into Belfast City Centre during the morning peak hour (08:00 to 09:00). The most recent cordon survey was completed in 2011.</p><p>The Travel Survey for Northern Ireland (TSNI) 2009-2011 provides information on how, over the region as a whole, people use different forms of transport, including bicycles, to meet their travel needs, as individuals or family groups. The TSNI also provides information to inform government policy, assist with setting objectives and monitor performance in relation to transport and travel in Northern Ireland, for example, in the Regional Transportation Strategy.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018703%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=155175","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=155175"}},{"id":"155174","reference":"AQW 18702/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-01-21","answerBy":"2013-02-05","answered":"2013-01-30","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development if his Department will consider installing electronic cycle counters on key arterial routes.","answerText":"I can advise the Member that my Department’s Roads Service currently has 65 automatic cycle counters installed across the National Cycle Network. These cycle counters are generally installed on dedicated cycle paths, some of which are part of key arterial routes, for example, Hawthornden Way, Belfast. My Department’s Roads Service and Travelwise NI continue to work with third sector organisations such as Sustrans, Sport N.I and the N.I Cycling Forum alongside many other local groups to identify the need for further cycle counter sites.","answerHtml":"<p>I can advise the Member that my Department’s Roads Service currently has 65 automatic cycle counters installed across the National Cycle Network. These cycle counters are generally installed on dedicated cycle paths, some of which are part of key arterial routes, for example, Hawthornden Way, Belfast. My Department’s Roads Service and Travelwise NI continue to work with third sector organisations such as Sustrans, Sport N.I and the N.I Cycling Forum alongside many other local groups to identify the need for further cycle counter sites.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018702%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=155174","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=155174"}},{"id":"155173","reference":"AQW 18701/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-01-21","answerBy":"2013-02-05","answered":"2013-01-31","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what action his Department is taking to reduce cycling casualties.","answerText":"My Department’s Roads Service is committed to providing safer roads for vulnerable road users, including cyclists and pedestrians, by utilising a range of measures, such as road safety engineering, traffic calming and enhancement of the pedestrian and cycling network. The overall objective is to maximise the resources it has available for cycle initiatives.\n\nIn the 10-year period, including this financial year, my Department will have invested almost £9 million in the provision of 200km of cycle lanes.\n\nMy Department also works closely with the Department of the Environment and the Police Service of Northern Ireland in the promotion of Road Safety to all road users through its Travelwise initiative. This initiative aims to increase the number of commuters who choose to cycle to work, and as part of its promotion of cycling, encourages all road users to consider the needs and safety of others.\n\nIn addition, my Department has designed a leaflet entitled ‘Sharing Space on the Road’ to encourage safe behaviour among road users. The leaflet sets out tips for motorists and cyclists on sharing the roads with others. The leaflet was distributed to 120,000 motorists with motor tax renewal forms in March of last year and has been made available at various government and local government locations as well as cycling outlets. A copy of the leaflet can be found online at http://www.nidirect.gov.uk/sharing_space_on_the_road.pdf or from Travelwise NI (telephone 0845 378 0908).\n\nIn recent years, cycling has benefited from capital investment, and the cycling infrastructure in Northern Ireland is well established. It remains my intention to continue to improve this network, in so far as available resources permit.","answerHtml":"<p>My Department’s Roads Service is committed to providing safer roads for vulnerable road users, including cyclists and pedestrians, by utilising a range of measures, such as road safety engineering, traffic calming and enhancement of the pedestrian and cycling network. The overall objective is to maximise the resources it has available for cycle initiatives.</p><p>In the 10-year period, including this financial year, my Department will have invested almost £9 million in the provision of 200km of cycle lanes.</p><p>My Department also works closely with the Department of the Environment and the Police Service of Northern Ireland in the promotion of Road Safety to all road users through its Travelwise initiative. This initiative aims to increase the number of commuters who choose to cycle to work, and as part of its promotion of cycling, encourages all road users to consider the needs and safety of others.</p><p>In addition, my Department has designed a leaflet entitled ‘Sharing Space on the Road’ to encourage safe behaviour among road users. The leaflet sets out tips for motorists and cyclists on sharing the roads with others. The leaflet was distributed to 120,000 motorists with motor tax renewal forms in March of last year and has been made available at various government and local government locations as well as cycling outlets. A copy of the leaflet can be found online at http://www.nidirect.gov.uk/sharing_space_on_the_road.pdf or from Travelwise NI (telephone 0845 378 0908).</p><p>In recent years, cycling has benefited from capital investment, and the cycling infrastructure in Northern Ireland is well established. It remains my intention to continue to improve this network, in so far as available resources permit.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018701%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=155173","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=155173"}},{"id":"155167","reference":"AQW 18699/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-01-21","answerBy":"2013-02-05","answered":"2013-02-25","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment for his assessment of the effectiveness of current planning policy in encouraging travel by bicycle.","answerText":"Cycling is promoted through various planning policies and guidance - PPS 3 ‘Access, Movement and Parking’, PPS 7 ‘Quality Residential Environments’ and PPS 13 ‘Transportation and land use’. These policies require developers to consider the needs of cyclists in bringing forward proposals for residential development and for development that provides jobs, shopping, leisure and services. Relevant guidance is included in ‘Creating Places, Achieving Quality in Residential Developments’ which refers to the layout and design of cycle routes, to ensure they are safe and pleasant to use.\n\nI am satisfied that current planning policy and guidance sets the right direction in encouraging travel by bicycle however, its effectiveness is difficult to assess as these policy instruments in themselves cannot guarantee increased cycle usage.","answerHtml":"<p>Cycling is promoted through various planning policies and guidance - PPS 3 ‘Access, Movement and Parking’, PPS 7 ‘Quality Residential Environments’ and PPS 13 ‘Transportation and land use’. These policies require developers to consider the needs of cyclists in bringing forward proposals for residential development and for development that provides jobs, shopping, leisure and services. Relevant guidance is included in ‘Creating Places, Achieving Quality in Residential Developments’ which refers to the layout and design of cycle routes, to ensure they are safe and pleasant to use.</p><p>I am satisfied that current planning policy and guidance sets the right direction in encouraging travel by bicycle however, its effectiveness is difficult to assess as these policy instruments in themselves cannot guarantee increased cycle usage.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018699%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=155167","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=155167"}},{"id":"155163","reference":"AQW 18696/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-01-21","answerBy":"2013-02-05","answered":"2013-02-25","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment what actions his Department is taking to reduce cycling casualties.","answerText":"The DOE has a statutory duty to promote road safety. One of the ways it raises awareness of road safety issues is through the Department’s road safety advertising campaigns.\n\nPSNI data shows that drivers are responsible for the majority of collisions and, as such, DOE continuously targets drivers to amend their driving behaviour, encouraging them to never ever drink and drive, to pay attention and to slow down. By changing the attitudes and behaviours of drivers, this is the most effective way of protecting all road users – cyclists, pedestrians, motorcyclists, horse riders, passengers and drivers themselves.\n\nIn October 2011 the Department launched the ‘Be Cycle Aware’ campaign, employing radio and bus rear advertising, in order to remind drivers and cyclists alike to pay attention when sharing the road.\n\nA radio advert targets drivers at the point of danger as they travel in the car during daytime hours when they would be expected to share the road with cyclists.\n\nA second radio advert and bus rear advertising targets cyclists, reminding them of their vulnerability and the need to pay attention and stay safe on the roads. Resources have specifically been directed towards the ‘Be Cycle Aware’ campaign and it is currently on air every month as part of the Department’s monthly road safety intervention radio activity throughout the year.\n\nThis activity is in line with Action Measure 124 of the Road Safety Strategy 2020 - “We will give consideration to measures that improve the safety of cyclists; including what cyclists can do to keep themselves safe and what other road users can do”.\n\nIn May 2012 I launched a campaign that encourages road users to ‘respect everyone’s journey’. Even though cyclists are not referred to specifically, it is anticipated that the messages to drivers are such that all vulnerable road user groups, including cyclists, will benefit from the safety messages contained within them.\n\nIn September last year, I launched a campaign focusing on wider road user responsibility. This campaign urges all road users to behave appropriately and to take responsibility for their actions on the road. The opening scene of the advert addresses cyclist vulnerability by showing an injured cyclist in hospital saying “I was cycling in the bike lane. The driver said the sun was in his eyes.” This campaign highlights the fact that over 95% of road deaths and serious injuries are caused by human error and carries the strapline “Kill the Excuses. It’s no Accident”.\n\nIn addition, a ‘Cycling Skills & Cycling Safety’ leaflet has been developed jointly by DOE and DRD to provide a basic guide for adult cyclists.\n\nThe leaflet provides information on the benefits of cycling, advice on basic safety requirements for a cyclist, information on the rules of the road as they apply to cyclists and advice for cyclists on safe use of the road and on interacting with other users, both vehicular and pedestrian. The leaflet is being distributed widely across Northern Ireland.\n\nCurrently all road users are provided with detailed guidance through the current edition of the Highway Code which contains rules, information and advice that helps prepare them for the demands of today’s roads. Advice on how drivers should treat vulnerable road users, including cyclists, with extra care and attention is covered specifically by Rules 204 to 218 of the Code. Advice for cyclists can be found under Rules 59-82.\n\nFurthermore, the Cycling Proficiency Scheme (CPS) is offered by the DOE Road Safety Education Officer Service (RSEOS) to every primary school in Northern Ireland. The decision to take up the offer lies with the individual schools, as does the decision on whether to include on road / off road training. Over 500 Primary Schools participate in the scheme each year with between 8,500 and 9,000 children benefiting from the scheme annually.\n\nA review of the CPS commenced in August 2012 and is due to be completed in March 2013. The CPS continues to be offered to all primary schools in Northern Ireland while the review is in progress and schools offering CPS are fully supported by DOE RSEOS.","answerHtml":"<p>The DOE has a statutory duty to promote road safety. One of the ways it raises awareness of road safety issues is through the Department’s road safety advertising campaigns.</p><p>PSNI data shows that drivers are responsible for the majority of collisions and, as such, DOE continuously targets drivers to amend their driving behaviour, encouraging them to never ever drink and drive, to pay attention and to slow down. By changing the attitudes and behaviours of drivers, this is the most effective way of protecting all road users – cyclists, pedestrians, motorcyclists, horse riders, passengers and drivers themselves.</p><p>In October 2011 the Department launched the ‘Be Cycle Aware’ campaign, employing radio and bus rear advertising, in order to remind drivers and cyclists alike to pay attention when sharing the road.</p><p>A radio advert targets drivers at the point of danger as they travel in the car during daytime hours when they would be expected to share the road with cyclists.</p><p>A second radio advert and bus rear advertising targets cyclists, reminding them of their vulnerability and the need to pay attention and stay safe on the roads. Resources have specifically been directed towards the ‘Be Cycle Aware’ campaign and it is currently on air every month as part of the Department’s monthly road safety intervention radio activity throughout the year.</p><p>This activity is in line with Action Measure 124 of the Road Safety Strategy 2020 - “We will give consideration to measures that improve the safety of cyclists; including what cyclists can do to keep themselves safe and what other road users can do”.</p><p>In May 2012 I launched a campaign that encourages road users to ‘respect everyone’s journey’. Even though cyclists are not referred to specifically, it is anticipated that the messages to drivers are such that all vulnerable road user groups, including cyclists, will benefit from the safety messages contained within them.</p><p>In September last year, I launched a campaign focusing on wider road user responsibility. This campaign urges all road users to behave appropriately and to take responsibility for their actions on the road. The opening scene of the advert addresses cyclist vulnerability by showing an injured cyclist in hospital saying “I was cycling in the bike lane. The driver said the sun was in his eyes.” This campaign highlights the fact that over 95% of road deaths and serious injuries are caused by human error and carries the strapline “Kill the Excuses. It’s no Accident”.</p><p>In addition, a ‘Cycling Skills &amp; Cycling Safety’ leaflet has been developed jointly by DOE and DRD to provide a basic guide for adult cyclists.</p><p>The leaflet provides information on the benefits of cycling, advice on basic safety requirements for a cyclist, information on the rules of the road as they apply to cyclists and advice for cyclists on safe use of the road and on interacting with other users, both vehicular and pedestrian. The leaflet is being distributed widely across Northern Ireland.</p><p>Currently all road users are provided with detailed guidance through the current edition of the Highway Code which contains rules, information and advice that helps prepare them for the demands of today’s roads. Advice on how drivers should treat vulnerable road users, including cyclists, with extra care and attention is covered specifically by Rules 204 to 218 of the Code. Advice for cyclists can be found under Rules 59-82.</p><p>Furthermore, the Cycling Proficiency Scheme (CPS) is offered by the DOE Road Safety Education Officer Service (RSEOS) to every primary school in Northern Ireland. The decision to take up the offer lies with the individual schools, as does the decision on whether to include on road / off road training. Over 500 Primary Schools participate in the scheme each year with between 8,500 and 9,000 children benefiting from the scheme annually.</p><p>A review of the CPS commenced in August 2012 and is due to be completed in March 2013. The CPS continues to be offered to all primary schools in Northern Ireland while the review is in progress and schools offering CPS are fully supported by DOE RSEOS.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018696%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=155163","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=155163"}},{"id":"155017","reference":"AQW 18608/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-01-17","answerBy":"2013-02-01","answered":"2013-01-28","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment to detail (i) the number of Civil Servants from his Department who have left work early since 3 December 2012 due to the civil unrest associated with the flag protests; and (ii) the associated financial cost to his departmental budget.","answerText":"Similar to other NICS Departments the Department of Environment has a Flexible Working Time facility which allows staff flexibility in the way they arrange their working hours. With the approval of their line manager, staff can leave work in the afternoon within the agreed flexible working hours band (3.30pm to 6pm). There is no cost to the Departmental budget when using Flexible Working Time arrangements.\n\nThe Department therefore has no record of staff leaving the office early during the civil unrest associated with the flag protests.","answerHtml":"<p>Similar to other NICS Departments the Department of Environment has a Flexible Working Time facility which allows staff flexibility in the way they arrange their working hours. With the approval of their line manager, staff can leave work in the afternoon within the agreed flexible working hours band (3.30pm to 6pm). There is no cost to the Departmental budget when using Flexible Working Time arrangements.</p><p>The Department therefore has no record of staff leaving the office early during the civil unrest associated with the flag protests.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018608%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=155017","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=155017"}},{"id":"155016","reference":"AQW 18607/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-01-17","answerBy":"2013-02-01","answered":"2013-01-23","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety to detail (i) the number of Civil Servants from his Department who have left work early since 3 December 2012 due to the civil unrest associated with the flag protests; and (ii) the associated financial cost to his departmental budget.","answerText":"I can confirm that my Department has no record of any staff who have left work early since 3 December 2012 due to the civil unrest associated with the flag protests.\n\nI can confirm that my Department has not incurred any associated financial cost to its departmental budget since 3 December 2012 due to the civil unrest associated with the flag protests.","answerHtml":"<p>I can confirm that my Department has no record of any staff who have left work early since 3 December 2012 due to the civil unrest associated with the flag protests.</p><p>I can confirm that my Department has not incurred any associated financial cost to its departmental budget since 3 December 2012 due to the civil unrest associated with the flag protests.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018607%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=155016","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=155016"}},{"id":"155015","reference":"AQW 18606/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-01-17","answerBy":"2013-02-01","answered":"2013-01-29","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to detail (i) the number of Civil Servants from his Department who have left work early since 3 December 2012 due to the civil unrest associated with the flag protests; and (ii) the associated financial cost to his departmental budget.","answerText":"Since 3 December 2012 a total of 74 DFP staff in city centre offices left early due to the civil unrest associated with the flag protests.\n\nThe associated financial cost to the departmental budget was £3492.","answerHtml":"<p>Since 3 December 2012 a total of 74 DFP staff in city centre offices left early due to the civil unrest associated with the flag protests.</p><p>The associated financial cost to the departmental budget was £3492.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018606%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=155015","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=155015"}},{"id":"155013","reference":"AQW 18605/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-01-17","answerBy":"2013-02-01","answered":"2013-01-29","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education to detail (i) the number of Civil Servants from his Department who have left work early since 3 December 2012 due to the civil unrest associated with the flag protests; and (ii) the associated financial cost to his departmental budget.","answerText":"The Department of Education (DE) has not issued any general advice or instruction to staff to leave early as a result of recent civil unrest. DE staff can seek approval from their line manager to leave work early within the rules of the Flexible Working Time - Code of Practice. There has been no associated cost to the departmental budget.","answerHtml":"<p>The Department of Education (DE) has not issued any general advice or instruction to staff to leave early as a result of recent civil unrest. DE staff can seek approval from their line manager to leave work early within the rules of the Flexible Working Time - Code of Practice. There has been no associated cost to the departmental budget.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018605%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=155013","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=155013"}},{"id":"155010","reference":"AQW 18604/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-01-17","answerBy":"2013-02-01","answered":"2013-01-28","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment to detail (i) the number of Civil Servants from her Department who have left work early since 3 December 2012 due to the civil unrest associated with the flag protests; and (ii) the associated financial cost to her departmental budget.","answerText":"(i) No formal record of numbers was maintained and therefore (ii) the financial cost to the Department is not known.","answerHtml":"<p>(i) No formal record of numbers was maintained and therefore (ii) the financial cost to the Department is not known.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018604%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=155010","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=155010"}},{"id":"154997","reference":"AQO 3279/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-01-17","answerBy":"2013-01-29","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel what support his Department is offering to businesses that have experienced trading loss as a consequence of flag protests.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203279%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=154997","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=154997"}},{"id":"156319","reference":"AQO 3279/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-01-17","answerBy":"2013-01-29","answered":"2013-01-29","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel what support his Department is offering to businesses that have experienced trading loss as a consequence of flag protests.","answerText":"This is a matter for wider Executive consideration in terms of what other Departments can do to offer help. My Ministerial Colleagues and I have held meetings with a number of retail organisations including the Northern Ireland Independent Retailers Association, Belfast Chamber of Trade and Commerce and Pubs of Ulster to discuss the matter and look at the way forward. The focus of this is on remedies that will increase footfall, such as providing financial support for marketing campaigns.\n\nThis is rather than looking to the rating system. Rates relief will not get people back out shopping and socialising. In any case there is little or no scope within rates legislation to provide relief in these circumstances and it would take too long to develop a rates policy to deal with this, which would then require new legislation.\n\nLPS, however, is prepared to consider flexibility in terms of payment arrangements for those badly hit by the current disturbances. Many will already have payment arrangements in place and will have paid all or most of their rates for the year. However, LPS will consider sympathetically any requests to defer a final payment to next year when it would be added to next year’s instalments. I would urge anyone in real difficulty to talk to LPS as soon as possible. LPS cannot, however, waive rates nor can they terminate recovery of rate debt where ratepayers have made little or no effort to pay.","answerHtml":"<p>This is a matter for wider Executive consideration in terms of what other Departments can do to offer help. My Ministerial Colleagues and I have held meetings with a number of retail organisations including the Northern Ireland Independent Retailers Association, Belfast Chamber of Trade and Commerce and Pubs of Ulster to discuss the matter and look at the way forward. The focus of this is on remedies that will increase footfall, such as providing financial support for marketing campaigns.</p><p>This is rather than looking to the rating system. Rates relief will not get people back out shopping and socialising. In any case there is little or no scope within rates legislation to provide relief in these circumstances and it would take too long to develop a rates policy to deal with this, which would then require new legislation.</p><p>LPS, however, is prepared to consider flexibility in terms of payment arrangements for those badly hit by the current disturbances. Many will already have payment arrangements in place and will have paid all or most of their rates for the year. However, LPS will consider sympathetically any requests to defer a final payment to next year when it would be added to next year’s instalments. I would urge anyone in real difficulty to talk to LPS as soon as possible. LPS cannot, however, waive rates nor can they terminate recovery of rate debt where ratepayers have made little or no effort to pay.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203279%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=156319","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=156319"}},{"id":"154995","reference":"AQO 3234/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-01-17","answerBy":"2013-01-28","answered":null,"answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister what efforts are being made to find agreement on matters of deep dispute in our society, such as flags and parades.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203234%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=154995","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=154995"}},{"id":"154699","reference":"AQW 18463/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-01-15","answerBy":"2013-01-30","answered":"2013-01-29","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development to detail (i) the number of Civil Servants from his Department who have left work early since 3 December 2012 due to the civil unrest associated with the flag protests; and (ii) the associated financial cost to his departmental budget.","answerText":"In the Department for Social Development the flexible working time arrangements permit staff to leave work at the end of ‘core’ working time which may be either 3.30pm or 4pm depending on the business area. Generally, these arrangements are sufficient for any member of staff with concerns about any unrest associated with the flag protests, to leave earlier than is their norm. Under these arrangements there is no associated cost to the Departmental budget.\n\nHowever, there has been a limited number of staff with specific concerns who were allowed by management to leave work early and given credit for the time in question. Details of staff numbers and the associated financial cost are set out in the table below.\n\nNumber of staff who left work early since 3 December 2012\tAssociated financial cost to the Departmental budget\n148\t*£1801.21\n\nThe figures provided are up to and including 18 January 2013.\n\n* This figure is based on average salary costs for the grades of the staff in question. Part of the cost is funded through DSD’s contract with the Department for Work & Pensions.","answerHtml":"<p>In the Department for Social Development the flexible working time arrangements permit staff to leave work at the end of ‘core’ working time which may be either 3.30pm or 4pm depending on the business area. Generally, these arrangements are sufficient for any member of staff with concerns about any unrest associated with the flag protests, to leave earlier than is their norm. Under these arrangements there is no associated cost to the Departmental budget.</p><p>However, there has been a limited number of staff with specific concerns who were allowed by management to leave work early and given credit for the time in question. Details of staff numbers and the associated financial cost are set out in the table below.</p><div class=\"table-wrap\"><table><tr><td>Number of staff who left work early since 3 December 2012</td><td>Associated financial cost to the Departmental budget</td></tr><tr><td>148</td><td>*£1801.21</td></tr></table></div><p>The figures provided are up to and including 18 January 2013.</p><p>* This figure is based on average salary costs for the grades of the staff in question. Part of the cost is funded through DSD’s contract with the Department for Work &amp; Pensions.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018463%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=154699","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=154699"}},{"id":"154698","reference":"AQW 18462/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-01-15","answerBy":"2013-01-30","answered":"2013-02-04","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister to detail (i) the number of Civil Servants from their Department who have left work early since 3 December 2012 due to the civil unrest associated with the flag protests; and (ii) the associated financial cost to their departmental budget.","answerText":"Civil servants working in OFMDFM have flexible working arrangements that provide for flexitime to be utilised from 4pm. We do not hold central records of how many civil servants utilised this flexible arrangement due to civil unrest. There is no associated financial cost to the Departmental budget.","answerHtml":"<p>Civil servants working in OFMDFM have flexible working arrangements that provide for flexitime to be utilised from 4pm. We do not hold central records of how many civil servants utilised this flexible arrangement due to civil unrest. There is no associated financial cost to the Departmental budget.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018462%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=154698","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=154698"}},{"id":"154692","reference":"AQW 18458/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-01-15","answerBy":"2013-01-30","answered":"2013-01-29","answeredOrally":false,"priority":false,"department":"Department of Culture, Arts and Leisure","departmentId":"77","minister":"Minister of Culture, Arts and Leisure","question":"To ask the Minister of Culture, Arts and Leisure to detail (i) the number of Civil Servants from her Department who have left work early since 3 December 2012 due to unrest; and (ii) the associated financial cost to her departmental budget.","answerText":"Staff, as normal, are able to leave work within the normal NICS flexible working arrangements. There has been no disruption to our normal business and no financial cost.","answerHtml":"<p>Staff, as normal, are able to leave work within the normal NICS flexible working arrangements. There has been no disruption to our normal business and no financial cost.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018458%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=154692","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=154692"}},{"id":"154691","reference":"AQW 18457/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-01-15","answerBy":"2013-01-30","answered":"2013-01-23","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture and Rural Development","question":"To ask the Minister of Agriculture and Rural Development to detail (i) the number of Civil Servants from her Department who have left work early since 3 December 2012 due to unrest; and (ii) the associated financial cost to her departmental budget.","answerText":"The Department has not put any arrangements in place to allow staff to leave work outside normal working hours because of the recent disruptive protests. As such, there is no associated financial cost to the departmental budget.","answerHtml":"<p>The Department has not put any arrangements in place to allow staff to leave work outside normal working hours because of the recent disruptive protests. As such, there is no associated financial cost to the departmental budget.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018457%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=154691","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=154691"}},{"id":"154690","reference":"AQW 18456/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-01-15","answerBy":"2013-01-30","answered":"2013-01-23","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to detail (i) the number of Civil Servants from his Department who have left work early since 3 December 2012 due to unrest; (ii) and to detail the associated financial cost to his departmental budget.","answerText":"My Department has not issued any formal instruction to its staff on this matter. However, staff can make use of flexible working arrangements which allow them to leave work early if required. The nature of flexible working is such that hours unworked during a particular day or time period are made up at a later stage.","answerHtml":"<p>My Department has not issued any formal instruction to its staff on this matter. However, staff can make use of flexible working arrangements which allow them to leave work early if required. The nature of flexible working is such that hours unworked during a particular day or time period are made up at a later stage.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018456%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=154690","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=154690"}},{"id":"154400","reference":"AQW 18326/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-01-10","answerBy":"2013-01-25","answered":"2013-01-25","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment how many businesses received financial support from her Department, or its arm's-length bodies, between 1 September 2012 and 31 December 2012.","answerText":"Provisional results show that between 1st September and 31st December 2012, Invest NI approved offers of financial support to 1,159 businesses.\n\nIn addition, during this period Invest NI engaged with more than 1,071 individuals who were interested in starting their own business, 227 of which completed business plans.\n\nIn the period 1st September 2012 to 31st December 2012 the North South Body InterTradeIreland had 199 companies on their programmes receiving financial support.","answerHtml":"<p>Provisional results show that between 1st September and 31st December 2012, Invest NI approved offers of financial support to 1,159 businesses.</p><p>In addition, during this period Invest NI engaged with more than 1,071 individuals who were interested in starting their own business, 227 of which completed business plans.</p><p>In the period 1st September 2012 to 31st December 2012 the North South Body InterTradeIreland had 199 companies on their programmes receiving financial support.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018326%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=154400","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=154400"}},{"id":"154396","reference":"AQW 18325/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2013-01-10","answerBy":"2013-01-25","answered":"2013-01-22","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment, pursuant to AQW 13912/11-15 and in relation to the support offered to the 1,841 businesses between 1 January and 31 August 2012, how many jobs have been created.","answerText":"It is not possible to provide detailed information on the number of jobs created since Invest Northern Ireland reports on the number of jobs promoted through assisted projects. This is in line with its Corporate Plan and Programme for Government targets.\n\nThe 1,841 businesses offered support included 651 employment-related projects which plan to create 3,519 jobs. Since these projects will take some time to fully implement, the jobs associated with them may take up to five years to be fully realised.\n\nInvest NI is currently reviewing options to enable it to report actual job creation in the future. However, this will take some time to implement and for the information to become meaningful, since assisted projects can take up to five years to reach their maximum level of job creation.","answerHtml":"<p>It is not possible to provide detailed information on the number of jobs created since Invest Northern Ireland reports on the number of jobs promoted through assisted projects. This is in line with its Corporate Plan and Programme for Government targets.</p><p>The 1,841 businesses offered support included 651 employment-related projects which plan to create 3,519 jobs. Since these projects will take some time to fully implement, the jobs associated with them may take up to five years to be fully realised.</p><p>Invest NI is currently reviewing options to enable it to report actual job creation in the future. However, this will take some time to implement and for the information to become meaningful, since assisted projects can take up to five years to reach their maximum level of job creation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2018325%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=154396","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=154396"}},{"id":"154415","reference":"AQO 3211/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2013-01-10","answerBy":"2013-01-22","answered":"2013-01-22","answeredOrally":true,"priority":false,"department":"Department of Culture, Arts and Leisure","departmentId":"77","minister":"Minister of Culture, Arts and Leisure","question":"To ask the Minister of Culture, Arts and Leisure, given the funding package announced for boxing, what action her Department has taken to support other minority sports following the success of the 2012 Olympic Games.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203211%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=154415","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-12-13/22-January-2013","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=154415"}},{"id":"151778","reference":"AQO 3103/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-11-29","answerBy":"2012-12-11","answered":null,"answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment when he intends to transform Voluntary Transitional Committees into Statutory Transitional Committees.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203103%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=151778","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=151778"}},{"id":"153096","reference":"AQO 3103/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-11-29","answerBy":"2012-12-11","answered":"2012-12-18","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment when he intends to transform Voluntary Transitional Committees into Statutory Transitional Committees.","answerText":"In order to drive the process of transition and convergence of local councils under the reform of local government, my Department is working to transform local Transition Committees from a voluntary standing to a statutory position as soon as possible. I intend to lay regulations in the Assembly by February 2013 and will put the Committees onto a statutory footing as soon as this legislation has been passed by the Assembly.\n\nThis will enable Statutory Transition Committees to take forward key areas of work that will include governance, corporate and financial planning, service delivery, transferring functions, community planning, capacity building and the appointment of senior staff. I believe this will help create certainty and provide leadership.\n\nHowever, there is no impediment for VTC’s pressing on with their work programmes, which should be accelerating as we are now 500 days to the shadow elections and 850 days to the new council clusters going live.","answerHtml":"<p>In order to drive the process of transition and convergence of local councils under the reform of local government, my Department is working to transform local Transition Committees from a voluntary standing to a statutory position as soon as possible. I intend to lay regulations in the Assembly by February 2013 and will put the Committees onto a statutory footing as soon as this legislation has been passed by the Assembly.</p><p>This will enable Statutory Transition Committees to take forward key areas of work that will include governance, corporate and financial planning, service delivery, transferring functions, community planning, capacity building and the appointment of senior staff. I believe this will help create certainty and provide leadership.</p><p>However, there is no impediment for VTC’s pressing on with their work programmes, which should be accelerating as we are now 500 days to the shadow elections and 850 days to the new council clusters going live.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203103%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=153096","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=153096"}},{"id":"151779","reference":"AQO 3084/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-11-29","answerBy":"2012-12-11","answered":"2012-12-11","answeredOrally":true,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment, given the recent redundancies in the construction sector, what discussions she has had with affected contractors.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%203084%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=151779","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-12-13/11-December-2012","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=151779"}},{"id":"150156","reference":"AQW 16877/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-11-16","answerBy":"2012-12-03","answered":"2012-11-26","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment why the Road Safety Council is not receiving any government funding.","answerText":"Following a third highly critical independent review of the Road Safety Council (RSC) in 2008, the then DOE Minister took the decision to withdraw core funding from the Road Safety Council and to channel funding direct to the front line road safety activities of local committees; this decision was implemented in 2009. The Department was also tasked with carrying out a fundamental policy review of how it should engage with the wider voluntary and community sector.\n\nIn April 2010, following a review of road safety funding to the voluntary & community sector, the decision was taken by the DOE Minister at that time, to appoint an Intermediary Funding Body (IFB) and open up funding to the wider voluntary and community sector rather than all available funding going to the Road Safety Council.\n\nSubsequently, the Department engaged with Central Procurement Directorate (CPD) to initiate an open tender competition to appoint an IFB to design and manage a road safety funding programme on its behalf.\n\nThe funding programme was designed to direct funding to frontline road safety activities and enable the Department to engage effectively with local communities and the wider voluntary & community sector in addressing local road safety concerns.\n\nThe principal aims of the funding programme are to:\n\nfund projects which support the achievement of the objectives of the Northern Ireland Road Safety Strategy;\n\ndirect funding to frontline road safety activities which provide direct benefits to the community; and\n\nenable the Department to engage effectively with the wider local voluntary and community sector in the promotion of road safety.\n\nThe Community Transport Association (CTA) currently holds the contract to administer the Road Safety Grant Funding Programme on behalf of the Department.\n\nThe Road Safety Grant Funding Programme is open to the voluntary and community sector, including the Road Safety Council and local Road Safety Committees. To date no application for funding has been received from the Road Safety Council but a number of local Road Safety Committees have applied for funding with some success.","answerHtml":"<p>Following a third highly critical independent review of the Road Safety Council (RSC) in 2008, the then DOE Minister took the decision to withdraw core funding from the Road Safety Council and to channel funding direct to the front line road safety activities of local committees; this decision was implemented in 2009. The Department was also tasked with carrying out a fundamental policy review of how it should engage with the wider voluntary and community sector.</p><p>In April 2010, following a review of road safety funding to the voluntary &amp; community sector, the decision was taken by the DOE Minister at that time, to appoint an Intermediary Funding Body (IFB) and open up funding to the wider voluntary and community sector rather than all available funding going to the Road Safety Council.</p><p>Subsequently, the Department engaged with Central Procurement Directorate (CPD) to initiate an open tender competition to appoint an IFB to design and manage a road safety funding programme on its behalf.</p><p>The funding programme was designed to direct funding to frontline road safety activities and enable the Department to engage effectively with local communities and the wider voluntary &amp; community sector in addressing local road safety concerns.</p><p>The principal aims of the funding programme are to:</p><p>fund projects which support the achievement of the objectives of the Northern Ireland Road Safety Strategy;</p><p>direct funding to frontline road safety activities which provide direct benefits to the community; and</p><p>enable the Department to engage effectively with the wider local voluntary and community sector in the promotion of road safety.</p><p>The Community Transport Association (CTA) currently holds the contract to administer the Road Safety Grant Funding Programme on behalf of the Department.</p><p>The Road Safety Grant Funding Programme is open to the voluntary and community sector, including the Road Safety Council and local Road Safety Committees. To date no application for funding has been received from the Road Safety Council but a number of local Road Safety Committees have applied for funding with some success.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2016877%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=150156","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=150156"}},{"id":"149278","reference":"AQO 2880/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-11-08","answerBy":"2012-11-19","answered":null,"answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development for his initial assessment of the report from the Committee for Regional Development on Unadopted Roads.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202880%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=149278","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=149278"}},{"id":"150738","reference":"AQO 2880/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-11-08","answerBy":"2012-11-19","answered":"2012-11-19","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development for his initial assessment of the report from the Committee for Regional Development on Unadopted Roads.","answerText":"As the Member will be aware, I was recently provided with an advanced draft of the Committee for Regional Development’s report on Unadopted Roads which, I understand, is due to issue in final form in the coming days. This is an important issue and I sympathise with homeowners who are left with unfinished or inadequate private roads and sewerage systems.\n\nWhen it is published, I will examine its findings and recommendations in conjunction with my officials and carefully consider what needs to be done in light of those findings.","answerHtml":"<p>As the Member will be aware, I was recently provided with an advanced draft of the Committee for Regional Development’s report on Unadopted Roads which, I understand, is due to issue in final form in the coming days. This is an important issue and I sympathise with homeowners who are left with unfinished or inadequate private roads and sewerage systems.</p><p>When it is published, I will examine its findings and recommendations in conjunction with my officials and carefully consider what needs to be done in light of those findings.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202880%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=150738","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=150738"}},{"id":"148108","reference":"AQO 2840/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-10-25","answerBy":"2012-11-12","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice to outline the next steps in the development of the Prison Service Estates Strategy.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202840%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=148108","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=148108"}},{"id":"149761","reference":"AQO 2840/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-10-25","answerBy":"2012-11-12","answered":"2012-11-13","answeredOrally":false,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice to outline the next steps in the development of the Prison Service Estates Strategy.","answerText":"A public consultation on the Northern Ireland Prison Service’s Outline Estate Strategy was launched on 7 June this year. The written consultation formally closed on 28 September and since then NIPS has hosted a number of workshops with consultees to explore some of the issues raised, as well as public meetings and meetings with staff.\n\nThroughout this consultation process I have been impressed by the level of engagement and the quality of input from stakeholders. The concerns and the suggestions which have been raised have been useful and insightful and are helping to challenge assumptions and to shape the strategy.\n\nIn response to some of the issues raised I have written to those consultees who have participated in workshops inviting further engagement on a range of themes, including how best to build in flexibility to our management of women prisoners in order to best meet their needs; how to put in place an effective approach, based on learning and development, to work with young offenders; and how best to meet the needs of the adult male population, including whether any of those needs might be served by locating a prison in the North West, rather than in a more central location. I have also met with three Coleraine, Limavady and Ballymoney Borough Councils and have invited further submissions from them on whether there is scope to build on and improve rehabilitation opportunities for prisoners in the North West.\n\nNIPS’ strategy for the development of the prison estate is an opportunity to create an environment which will promote rehabilitation, reduce risk and enhance public safety. That is why I want to ensure that all consultation responses are properly considered and evaluated before making final decisions. However, I hope to be able to make an interim announcement on the way forward before the end of November.","answerHtml":"<p>A public consultation on the Northern Ireland Prison Service’s Outline Estate Strategy was launched on 7 June this year. The written consultation formally closed on 28 September and since then NIPS has hosted a number of workshops with consultees to explore some of the issues raised, as well as public meetings and meetings with staff.</p><p>Throughout this consultation process I have been impressed by the level of engagement and the quality of input from stakeholders. The concerns and the suggestions which have been raised have been useful and insightful and are helping to challenge assumptions and to shape the strategy.</p><p>In response to some of the issues raised I have written to those consultees who have participated in workshops inviting further engagement on a range of themes, including how best to build in flexibility to our management of women prisoners in order to best meet their needs; how to put in place an effective approach, based on learning and development, to work with young offenders; and how best to meet the needs of the adult male population, including whether any of those needs might be served by locating a prison in the North West, rather than in a more central location. I have also met with three Coleraine, Limavady and Ballymoney Borough Councils and have invited further submissions from them on whether there is scope to build on and improve rehabilitation opportunities for prisoners in the North West.</p><p>NIPS’ strategy for the development of the prison estate is an opportunity to create an environment which will promote rehabilitation, reduce risk and enhance public safety. That is why I want to ensure that all consultation responses are properly considered and evaluated before making final decisions. However, I hope to be able to make an interim announcement on the way forward before the end of November.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202840%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=149761","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=149761"}},{"id":"147223","reference":"AQW 15832/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-10-18","answerBy":"2012-10-26","answered":"2012-10-29","answeredOrally":false,"priority":true,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development how the new contract for parking enforcement and car parking management will affect the operation and cost to users of the bus service between the Northside Park and Ride and Belfast City Centre.","answerText":"My Department’s Roads Service plans to convert its remaining 29 kiosk-operated car parks to pay-and-display by April 2013. This includes the Northside and Eastside Park and Ride car parks in Belfast.\n\nThe park and ride facility will continue to operate in these car parks after they are converted to pay-and-display and there will be no change in the cost of the service to users as a result of the conversion. In addition to issuing a pay-and-display ticket, the pay-and-display machines in these car parks will also issue tear-off tickets for the inward and outward bound bus journeys.\n\nSignage will be installed to provide customers with full instructions on how to use the new system and the car parks will continue to be manned for a period after conversion to assist customers. Customers will still be able to purchase season tickets in the normal way, and they will be issued with permits for the car park and the associated bus journeys.\n\nIn due course and after the conversion to pay-and-display, traffic attendants will make routine enforcement patrols to ensure that vehicles do not park in contravention of restrictions that apply to the car park.","answerHtml":"<p>My Department’s Roads Service plans to convert its remaining 29 kiosk-operated car parks to pay-and-display by April 2013. This includes the Northside and Eastside Park and Ride car parks in Belfast.</p><p>The park and ride facility will continue to operate in these car parks after they are converted to pay-and-display and there will be no change in the cost of the service to users as a result of the conversion. In addition to issuing a pay-and-display ticket, the pay-and-display machines in these car parks will also issue tear-off tickets for the inward and outward bound bus journeys.</p><p>Signage will be installed to provide customers with full instructions on how to use the new system and the car parks will continue to be manned for a period after conversion to assist customers. Customers will still be able to purchase season tickets in the normal way, and they will be issued with permits for the car park and the associated bus journeys.</p><p>In due course and after the conversion to pay-and-display, traffic attendants will make routine enforcement patrols to ensure that vehicles do not park in contravention of restrictions that apply to the car park.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015832%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=147223","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=147223"}},{"id":"147153","reference":"AQW 15809/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-10-18","answerBy":"2012-11-02","answered":"2012-10-30","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development for his assessment of the potential for a Gritting Bill that would clarify the laws in relation to the liability faced by the public in the cleaning or gritting of footpaths or roads.","answerText":"I can advise the Member that I have no plans to introduce legislation such as you have described. However, I would state that there is no law stopping the public from clearing snow and ice on the pavement outside their homes or from public places. In 2010, the Attorney General of Northern Ireland advised “if you clear snow/ice carefully you are unlikely to be held liable”.","answerHtml":"<p>I can advise the Member that I have no plans to introduce legislation such as you have described. However, I would state that there is no law stopping the public from clearing snow and ice on the pavement outside their homes or from public places. In 2010, the Attorney General of Northern Ireland advised “if you clear snow/ice carefully you are unlikely to be held liable”.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015809%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=147153","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=147153"}},{"id":"147151","reference":"AQW 15808/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-10-18","answerBy":"2012-11-02","answered":"2012-11-01","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development, pursuant to AQW 14112/11-15 and given the low number of applications for the Ecar Home and Workplace Charge Point Grant, what further actions his Department will take to make the transition to an electric vehicle a more attractive option.","answerText":"Studies have shown that electric vehicles become more prevalent as charge point infrastructure is developed. My Department has to date overseen the installation of 40 charge points and 4 rapid charge points for electric vehicles. By the end of March 2013 it is anticipated that a further 120 charge points and 10 rapid charge points will have been installed with the result that nobody in Northern Ireland will be more than 30 miles from a charge point. I also recently introduced legislation to ensure that the parking spaces at charge points in DRD managed sites are restricted to electric vehicles which are using the charge point.\n\nOver the past year, there have been launch events held in six council areas, in addition to overall project and website launch events in Stormont during 2011. A formal charge point launch event took place in March 2011 at Belfast City Hall, to which approx. 200 people attended.\n\nHowever, to further encourage the uptake of Electric Vehicles my Department is currently planning a number of marketing activities, culminating in a three day conference during ‘Climate Week’ in March 2013, which will target schools, businesses and motorists in general. I anticipate that around 700 people will have a direct opportunity to hear about, and drive in, an electric vehicle during the conference. My Department is also engaging in speaking events, magazine and newspaper articles and local electric vehicle launches, all of which assist in raising the profile of the ecar Project. Other marketing activities planned for include further website development, the launch of a smart phone app and advertisement.\n\nMy Department is also in regular contact with car dealers and distributors to keep them informed of our growing infrastructure and also with local councils who are members of our ecar Consortium to encourage local promotional events. Local dealerships are also engaging with manufacturers on reducing the purchase price of the electric vehicles, and offering deals and incentives for electric vehicle drivers. We are aware that purchase price is currently a barrier to uptake, and manufacturers have assured us that less expensive electric vehicle options will be appearing on the market in early 2013.\n\nFinally, my Department is running a series of ‘fleet trials’, where businesses across Northern Ireland have been offered the opportunity to trial electric vehicles for a 1-week period. There has been considerable interest in this, with up to 15 businesses taking part to date.","answerHtml":"<p>Studies have shown that electric vehicles become more prevalent as charge point infrastructure is developed. My Department has to date overseen the installation of 40 charge points and 4 rapid charge points for electric vehicles. By the end of March 2013 it is anticipated that a further 120 charge points and 10 rapid charge points will have been installed with the result that nobody in Northern Ireland will be more than 30 miles from a charge point. I also recently introduced legislation to ensure that the parking spaces at charge points in DRD managed sites are restricted to electric vehicles which are using the charge point.</p><p>Over the past year, there have been launch events held in six council areas, in addition to overall project and website launch events in Stormont during 2011. A formal charge point launch event took place in March 2011 at Belfast City Hall, to which approx. 200 people attended.</p><p>However, to further encourage the uptake of Electric Vehicles my Department is currently planning a number of marketing activities, culminating in a three day conference during ‘Climate Week’ in March 2013, which will target schools, businesses and motorists in general. I anticipate that around 700 people will have a direct opportunity to hear about, and drive in, an electric vehicle during the conference. My Department is also engaging in speaking events, magazine and newspaper articles and local electric vehicle launches, all of which assist in raising the profile of the ecar Project. Other marketing activities planned for include further website development, the launch of a smart phone app and advertisement.</p><p>My Department is also in regular contact with car dealers and distributors to keep them informed of our growing infrastructure and also with local councils who are members of our ecar Consortium to encourage local promotional events. Local dealerships are also engaging with manufacturers on reducing the purchase price of the electric vehicles, and offering deals and incentives for electric vehicle drivers. We are aware that purchase price is currently a barrier to uptake, and manufacturers have assured us that less expensive electric vehicle options will be appearing on the market in early 2013.</p><p>Finally, my Department is running a series of ‘fleet trials’, where businesses across Northern Ireland have been offered the opportunity to trial electric vehicles for a 1-week period. There has been considerable interest in this, with up to 15 businesses taking part to date.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015808%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=147151","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=147151"}},{"id":"147150","reference":"AQW 15807/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-10-18","answerBy":"2012-11-02","answered":"2012-11-01","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development why infrastructure projects and upgrades at Carrickfergus Waste Water Treatment Works have not yet begun.","answerText":"I am pleased to confirm that my Department has been able to bring forward some capital funding from future years which has enabled Northern Ireland Water (NIW) to approve maintenance work at Carrickfergus Waste Water Treatment Works. A contractor has been appointed to undertake the work and NIW anticipates that it will commence before Christmas.","answerHtml":"<p>I am pleased to confirm that my Department has been able to bring forward some capital funding from future years which has enabled Northern Ireland Water (NIW) to approve maintenance work at Carrickfergus Waste Water Treatment Works. A contractor has been appointed to undertake the work and NIW anticipates that it will commence before Christmas.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015807%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=147150","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=147150"}},{"id":"147217","reference":"AQO 2786/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-10-18","answerBy":"2012-11-06","answered":"2012-11-06","answeredOrally":true,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture and Rural Development","question":"To ask the Minister of Agriculture and Rural Development whether she will publish the business case for the relocation of her Department's headquarters.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202786%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=147217","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-12-13/06-November-2012","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=147217"}},{"id":"147077","reference":"AQW 15776/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-10-17","answerBy":"2012-11-01","answered":"2012-10-30","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what progress has been made on NI Water's capital projects in East Antrim.","answerText":"I have been advised by Northern Ireland Water (NIW) that the planned expenditure within its Capital Works Programme for East Antrim Constituency area is as detailed in the table below.\n\nPeriod\tExpenditure (£000s)\nPC10 year 3 (2012/13)\t£3,629\nPC13 year 1 (2013/14)\t£7,235\nPC13 year 2 (2014/15)\t£27\nTotal\t£10,891\n\nThis will include expenditure on projects such as improvements to Killylane Watermain, Lough Mourne Zone Watermain, Carrickfergus Zone Watermain, upgrading Carrickfergus Wastewater Treatment Works and capital maintenance at Larne Wastewater Treatment Works.","answerHtml":"<p>I have been advised by Northern Ireland Water (NIW) that the planned expenditure within its Capital Works Programme for East Antrim Constituency area is as detailed in the table below.</p><div class=\"table-wrap\"><table><tr><td>Period</td><td>Expenditure (£000s)</td></tr><tr><td>PC10 year 3 (2012/13)</td><td>£3,629</td></tr><tr><td>PC13 year 1 (2013/14)</td><td>£7,235</td></tr><tr><td>PC13 year 2 (2014/15)</td><td>£27</td></tr><tr><td>Total</td><td>£10,891</td></tr></table></div><p>This will include expenditure on projects such as improvements to Killylane Watermain, Lough Mourne Zone Watermain, Carrickfergus Zone Watermain, upgrading Carrickfergus Wastewater Treatment Works and capital maintenance at Larne Wastewater Treatment Works.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015776%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=147077","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=147077"}},{"id":"147018","reference":"AQW 15758/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-10-17","answerBy":"2012-11-01","answered":"2012-10-25","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment whether her Department complies with the Freedom of Information Act in relation to the amount of redacted information that it releases in response to written requests.","answerText":"My Department makes use of redaction/blanking-out of information only in circumstances where such information is considered to be exempt from disclosure to members of the public under the Freedom of Information Act, the Environmental Information Regulations, or the Data Protection Act. In such circumstances, the applicant is also referred to the relevant section of legislation under which the information is being withheld.","answerHtml":"<p>My Department makes use of redaction/blanking-out of information only in circumstances where such information is considered to be exempt from disclosure to members of the public under the Freedom of Information Act, the Environmental Information Regulations, or the Data Protection Act. In such circumstances, the applicant is also referred to the relevant section of legislation under which the information is being withheld.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015758%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=147018","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=147018"}},{"id":"147014","reference":"AQW 15757/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-10-17","answerBy":"2012-11-01","answered":"2012-11-01","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment to detail any meetings that she, or her predecessor, has had with the Caleb Foundation since 8 May 2007.","answerText":"I met with the Caleb Foundation on 2 March 2010.","answerHtml":"<p>I met with the Caleb Foundation on 2 March 2010.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015757%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=147014","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=147014"}},{"id":"146986","reference":"AQW 15756/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-10-17","answerBy":"2012-11-01","answered":"2012-10-25","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment to detail any meetings that her Department has had with the Northern Ireland Tourist Board since 8 May 2007 in relation to the Giant's Causeway Visitor Centre.","answerText":"There have been a substantial number of meetings between the Department and the Northern Ireland Tourist Board in relation to the Giant’s Causeway Visitor Centre since 8 May 2007.","answerHtml":"<p>There have been a substantial number of meetings between the Department and the Northern Ireland Tourist Board in relation to the Giant’s Causeway Visitor Centre since 8 May 2007.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015756%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=146986","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=146986"}},{"id":"146985","reference":"AQW 15755/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-10-17","answerBy":"2012-11-01","answered":"2012-10-25","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment whether her Department held discussions with the National Trust or the Northern Ireland Tourist Board on the potential for the reflection of creationism within the new Giant's Causeway Visitor Centre being a condition of the grant that the National Trust received from her Department.","answerText":"The Department received a number of representations relating to the Giant's Causeway Visitor Centre about a range of issues including creationism. At no time did my Department try to dictate or influence the content of the exhibition at the visitors centre or make the content a condition of grant support. The letter of offer to the National Trust did not make the inclusion of creationism in the exhibition a grant condition.\n\nThe final decision as to the content of the interpretive solution was taken by the National Trust as project promoters. It was based on research into visitor expectation and need and involved consultation with a wide group of stakeholders.","answerHtml":"<p>The Department received a number of representations relating to the Giant&#39;s Causeway Visitor Centre about a range of issues including creationism. At no time did my Department try to dictate or influence the content of the exhibition at the visitors centre or make the content a condition of grant support. The letter of offer to the National Trust did not make the inclusion of creationism in the exhibition a grant condition.</p><p>The final decision as to the content of the interpretive solution was taken by the National Trust as project promoters. It was based on research into visitor expectation and need and involved consultation with a wide group of stakeholders.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015755%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=146985","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=146985"}},{"id":"146365","reference":"AQO 2746/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-10-11","answerBy":"2012-10-23","answered":"2012-10-23","answeredOrally":true,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel for an update on the impact of the empty retail rate concession since its introduction.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202746%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=146365","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-12-13/23-October-2012","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=146365"}},{"id":"146081","reference":"AQW 15362/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-10-10","answerBy":"2012-10-25","answered":"2012-10-23","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety what consideration the Northern Health and Social Care Trust gave to (i) the travel to work area and; (ii) the availability of public transport in its proposal to introduce car parking charges for staff at the Causeway and Antrim Area Hospitals.","answerText":"The Trust has advised that it carried out a staff survey in relation to Antrim Hospital, gathering information on staff travel to work areas. In subsequent negotiations with Translink, the fact that the largest number of staff travel from the Ballymena area was one of the reasons they were prepared to include a stop at the front of Antrim Hospital for the Ballymena to Belfast Goldline Express Service which has been operating since summer 2012. The Antrim Ulsterbus Town Service (321e) also stops at the hospital to facilitate staff living in the Antrim area.\n\nIt is intended to complete a similar survey for the Causeway Hospital in the coming weeks, although the Coleraine Goldline Express service and the Ulsterbus Town service currently provide a service to the Hospital.","answerHtml":"<p>The Trust has advised that it carried out a staff survey in relation to Antrim Hospital, gathering information on staff travel to work areas. In subsequent negotiations with Translink, the fact that the largest number of staff travel from the Ballymena area was one of the reasons they were prepared to include a stop at the front of Antrim Hospital for the Ballymena to Belfast Goldline Express Service which has been operating since summer 2012. The Antrim Ulsterbus Town Service (321e) also stops at the hospital to facilitate staff living in the Antrim area.</p><p>It is intended to complete a similar survey for the Causeway Hospital in the coming weeks, although the Coleraine Goldline Express service and the Ulsterbus Town service currently provide a service to the Hospital.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015362%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=146081","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=146081"}},{"id":"145740","reference":"AQW 15228/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-10-08","answerBy":"2012-10-23","answered":"2012-10-22","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment whether her Department will consider extending the natural gas network to Whitehead.","answerText":"My Department has been considering the issues associated with extending the natural gas network to new areas of Northern Ireland, and will continue to liaise with the Utility Regulator, and the gas industry on such matters, including consideration of extending the gas network to towns such as Whitehead.","answerHtml":"<p>My Department has been considering the issues associated with extending the natural gas network to new areas of Northern Ireland, and will continue to liaise with the Utility Regulator, and the gas industry on such matters, including consideration of extending the gas network to towns such as Whitehead.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2015228%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=145740","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=145740"}},{"id":"143780","reference":"AQO 2584/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-09-20","answerBy":"2012-10-02","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel for his assessment of the potential for the proposed ‘business bank’ to benefit the local economy.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202584%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=143780","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=143780"}},{"id":"145577","reference":"AQO 2584/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-09-20","answerBy":"2012-10-02","answered":"2012-10-02","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel for his assessment of the potential for the proposed ‘business bank’ to benefit the local economy.","answerText":"The detail on the design of the new business bank announced by the Business Secretary Vince Cable MP and the types of interventions it will support have yet to be finalised. This is not expected until later in the Autumn and therefore it is too early for me to come to any firm view on how beneficial it will be locally.\n\nClearly, any intervention that will increase the availability of finance for businesses is to be welcomed, however, I have been concerned that measures taken by the Government in this regard in the past have not been effective here in Northern Ireland. This is a point I have made repeatedly and forcibly to Treasury Ministers.\n\nMy officials are already liaising with their counterparts in Whitehall on how the new Funding for Lending Scheme will be implemented in Northern Ireland and they have now also indicated that we wish to explore how this new business bank might operate in Northern Ireland.","answerHtml":"<p>The detail on the design of the new business bank announced by the Business Secretary Vince Cable MP and the types of interventions it will support have yet to be finalised. This is not expected until later in the Autumn and therefore it is too early for me to come to any firm view on how beneficial it will be locally.</p><p>Clearly, any intervention that will increase the availability of finance for businesses is to be welcomed, however, I have been concerned that measures taken by the Government in this regard in the past have not been effective here in Northern Ireland. This is a point I have made repeatedly and forcibly to Treasury Ministers.</p><p>My officials are already liaising with their counterparts in Whitehall on how the new Funding for Lending Scheme will be implemented in Northern Ireland and they have now also indicated that we wish to explore how this new business bank might operate in Northern Ireland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202584%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=145577","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=145577"}},{"id":"143800","reference":"AQO 2546/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-09-20","answerBy":"2012-10-01","answered":null,"answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment, given the recent job losses in the manufacturing and engineering sector, to outline the steps taken by her Department to ensure that this has as little impact as possible on other companies involved in the wider supply chain.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202546%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=143800","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=143800"}},{"id":"142714","reference":"AQW 14112/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-09-11","answerBy":"2012-09-26","answered":"2012-09-25","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development how many applications for the Ecar Home and Workplace Charge Point Grant have been received; (ii) how many have been successful and; (iii) the total amount of grant funding awarded to date.","answerText":"My Department has to date received 6 applications for a total of 9 charge points. All of these have been successful with a total of £9122.33 having been paid to date with a further grant of £1990.00 still proceeding through the payment process.","answerHtml":"<p>My Department has to date received 6 applications for a total of 9 charge points. All of these have been successful with a total of £9122.33 having been paid to date with a further grant of £1990.00 still proceeding through the payment process.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014112%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=142714","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=142714"}},{"id":"142713","reference":"AQW 14111/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-09-11","answerBy":"2012-09-26","answered":"2012-09-24","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment how many businesses in the South Antrim area obtained funding under the Jobs Fund during 2012, broken down by each of the maximum grants.","answerText":"To date during 2012 a total of 14 businesses in South Antrim have received offers of support through the Jobs Fund for employment based investment projects which collectively have the potential to create a total of 68 new jobs.\n\nUnder the Jobs Fund scheme the grant offered is determined by the salaries of the jobs being created and ranges from £3,000 per job to £7,000 per job. The 14 projects supported in South Antrim range from a two person employment project with a total grant offer of £10,000 to an eight person employment project with a total grant offer of £50,000.\n\nThe Jobs Fund work is ongoing and Invest NI is continuing to build a pipeline of projects that may lead to further new job creation in South Antrim in the near future.","answerHtml":"<p>To date during 2012 a total of 14 businesses in South Antrim have received offers of support through the Jobs Fund for employment based investment projects which collectively have the potential to create a total of 68 new jobs.</p><p>Under the Jobs Fund scheme the grant offered is determined by the salaries of the jobs being created and ranges from £3,000 per job to £7,000 per job. The 14 projects supported in South Antrim range from a two person employment project with a total grant offer of £10,000 to an eight person employment project with a total grant offer of £50,000.</p><p>The Jobs Fund work is ongoing and Invest NI is continuing to build a pipeline of projects that may lead to further new job creation in South Antrim in the near future.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014111%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=142713","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=142713"}},{"id":"142712","reference":"AQW 14110/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-09-11","answerBy":"2012-09-26","answered":"2012-09-24","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment how many businesses in the East Antrim area obtained funding under the Jobs Fund during 2012, broken down by each of the maximum grants.","answerText":"To date during 2012 a total of 8 businesses in East Antrim have received offers of support through the Jobs Fund for employment based investment projects which collectively have the potential to create a total of 29 new jobs.\n\nUnder the Jobs Fund scheme the grant offered is determined by the salaries of the jobs being created and ranges from £3,000 per job to £7,000 per job. The 8 projects supported in East Antrim range from a one person employment project with a grant offer of £7,000 to a 15 person project with a total grant offer of £45,000.\n\nIn addition to these company investment projects, the Jobs Fund also provided support to three young people in East Antrim (aged 16-24 Not in Education, Employment or Training) to set up a new business through the NEET Business Start Grant.\n\nThe Jobs Fund work is ongoing and Invest NI is continuing to build a pipeline of projects that may lead to further new job creation in East Antrim in the near future.","answerHtml":"<p>To date during 2012 a total of 8 businesses in East Antrim have received offers of support through the Jobs Fund for employment based investment projects which collectively have the potential to create a total of 29 new jobs.</p><p>Under the Jobs Fund scheme the grant offered is determined by the salaries of the jobs being created and ranges from £3,000 per job to £7,000 per job. The 8 projects supported in East Antrim range from a one person employment project with a grant offer of £7,000 to a 15 person project with a total grant offer of £45,000.</p><p>In addition to these company investment projects, the Jobs Fund also provided support to three young people in East Antrim (aged 16-24 Not in Education, Employment or Training) to set up a new business through the NEET Business Start Grant.</p><p>The Jobs Fund work is ongoing and Invest NI is continuing to build a pipeline of projects that may lead to further new job creation in East Antrim in the near future.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014110%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=142712","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=142712"}},{"id":"142711","reference":"AQW 14109/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-09-11","answerBy":"2012-09-26","answered":"2012-09-24","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment how much funding InvestNI has allocated to the East Antrim area in each of the last three years.","answerText":"Whilst the question asks for the amount allocated to East Antrim, it should be noted that Invest NI does not determine the level of funding to particular areas. Assistance patterns are based on the location of those clients which are seeking to grow and develop their business. Table 1 shows the amount of assistance, or funding, that Invest NI has offered to businesses in the East Antrim Parliamentary Constituency Area (PCA) in each of the last three financial years.\n\nTable 1: Invest NI Assistance Offered in East Antrim PCA (2009-10 to 2011-12)\n\nFinancial Year\tTotal Assistance £million\n2009-10\t4.54\n2010-11\t2.42\n2011-12\t1.59\nTotal\t8.55","answerHtml":"<p>Whilst the question asks for the amount allocated to East Antrim, it should be noted that Invest NI does not determine the level of funding to particular areas. Assistance patterns are based on the location of those clients which are seeking to grow and develop their business. Table 1 shows the amount of assistance, or funding, that Invest NI has offered to businesses in the East Antrim Parliamentary Constituency Area (PCA) in each of the last three financial years.</p><p>Table 1: Invest NI Assistance Offered in East Antrim PCA (2009-10 to 2011-12)</p><div class=\"table-wrap\"><table><tr><td>Financial Year</td><td>Total Assistance £million</td></tr><tr><td>2009-10</td><td>4.54</td></tr><tr><td>2010-11</td><td>2.42</td></tr><tr><td>2011-12</td><td>1.59</td></tr><tr><td>Total</td><td>8.55</td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2014109%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=142711","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=142711"}},{"id":"142409","reference":"AQW 13913/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-09-06","answerBy":"2012-09-21","answered":"2012-09-14","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development for an update on plans to provide funding for Carrickfergus town centre through the ReStore Programme.","answerText":"In an earlier response to AQW 8487/11-15 I advised that funding for a Revitalisation scheme for Carrickfergus town was scheduled in the Department’s capital expenditure programme for 2013/14. This funding is subject to a satisfactory business case and appraisal being completed and approvals being granted.\n\nIt is anticipated that a scheme will be developed in conjunction with Carrickfergus Borough Council and a representative local traders’ body after the ongoing public realm works in the town centre have been completed.","answerHtml":"<p>In an earlier response to AQW 8487/11-15 I advised that funding for a Revitalisation scheme for Carrickfergus town was scheduled in the Department’s capital expenditure programme for 2013/14. This funding is subject to a satisfactory business case and appraisal being completed and approvals being granted.</p><p>It is anticipated that a scheme will be developed in conjunction with Carrickfergus Borough Council and a representative local traders’ body after the ongoing public realm works in the town centre have been completed.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013913%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=142409","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=142409"}},{"id":"142407","reference":"AQW 13912/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-09-06","answerBy":"2012-09-21","answered":"2012-09-19","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment how many businesses have received financial support to date in 2012; and how many jobs have been created during this period.","answerText":"Provisional results show that between 1st January and 31st August 2012, Invest NI offered support to 1,841 businesses. These included 651 employment-related projects which plan to create 3,519 jobs. Since these projects will take some time to fully implement, the jobs associated with them may take up to five years to be fully realised. It should be noted that grant payments are normally made in relation to the number of jobs created.\n\nAlthough actual job creation figures for all these projects are not yet available, information available for the ‘Jobs Fund’ shows that this programme has created just over 1,000 jobs during January – August 2012. However, not all of these jobs relate to assistance offered during this period.\n\nIn addition, during this period Invest NI engaged with more than 1600 individuals who were interested in starting their own business, 852 of which completed business plans. These businesses are expected to create more than 360 new jobs.","answerHtml":"<p>Provisional results show that between 1st January and 31st August 2012, Invest NI offered support to 1,841 businesses. These included 651 employment-related projects which plan to create 3,519 jobs. Since these projects will take some time to fully implement, the jobs associated with them may take up to five years to be fully realised. It should be noted that grant payments are normally made in relation to the number of jobs created.</p><p>Although actual job creation figures for all these projects are not yet available, information available for the ‘Jobs Fund’ shows that this programme has created just over 1,000 jobs during January – August 2012. However, not all of these jobs relate to assistance offered during this period.</p><p>In addition, during this period Invest NI engaged with more than 1600 individuals who were interested in starting their own business, 852 of which completed business plans. These businesses are expected to create more than 360 new jobs.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013912%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=142407","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=142407"}},{"id":"142406","reference":"AQW 13911/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-09-06","answerBy":"2012-09-21","answered":"2012-09-21","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment how many potential business owners have attended the InvestNI Business Planning sessions in County Antrim to date in 2012; and how many new businesses in the area have received assistance during this period.","answerText":"Since 1 January 2012, 499 people have attended business planning sessions in Co. Antrim which includes figures for Belfast Council area. Excluding Belfast, 254 attended planning sessions in the rest of County Antrim.\n\nSince 1st January 2012, Invest NI has provided financial support to 101 new businesses in County Antrim which includes figures for Belfast Council area. Excluding Belfast, 41 businesses received assistance. This figure ranges from global start to locally focused businesses receiving jobs funds business incentives start up support.","answerHtml":"<p>Since 1 January 2012, 499 people have attended business planning sessions in Co. Antrim which includes figures for Belfast Council area. Excluding Belfast, 254 attended planning sessions in the rest of County Antrim.</p><p>Since 1st January 2012, Invest NI has provided financial support to 101 new businesses in County Antrim which includes figures for Belfast Council area. Excluding Belfast, 41 businesses received assistance. This figure ranges from global start to locally focused businesses receiving jobs funds business incentives start up support.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013911%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=142406","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=142406"}},{"id":"142404","reference":"AQW 13910/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-09-06","answerBy":"2012-09-21","answered":"2012-09-24","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister why priority question AQW 11698/11-15 has not yet been answered.","answerText":"A response to AQW 11698/11-15 was issued on 17 September 2012.","answerHtml":"<p>A response to AQW 11698/11-15 was issued on 17 September 2012.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013910%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=142404","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=142404"}},{"id":"142403","reference":"AQW 13909/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-09-06","answerBy":"2012-09-21","answered":"2012-09-18","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what action his Department is taking to improve cycle lane connectivity.","answerText":"My Department’s Roads Service is committed to providing safer roads for vulnerable road users, such as pedestrians and cyclists. This is facilitated by the use of a range of measures, such as road safety education and engineering, traffic calming and enhancement of the pedestrian and cycling network.\n\nThe provision of bicycle paths or cycle lanes in Northern Ireland is led by Roads Service, through its Local Transport and Safety Measures and in accordance with the Regional Transport Strategy and the Belfast Metropolitan Transport Plan. These plans build on the Northern Ireland Cycling Strategy and recognise that cycling is an ideal form of transport for short journeys.\n\nIt is Roads Service’s intention to invest and implement, in so far as available resources permit, additional cycling measures which will complement the existing National Cycle Network and improve the connectivity of cycle lanes.","answerHtml":"<p>My Department’s Roads Service is committed to providing safer roads for vulnerable road users, such as pedestrians and cyclists. This is facilitated by the use of a range of measures, such as road safety education and engineering, traffic calming and enhancement of the pedestrian and cycling network.</p><p>The provision of bicycle paths or cycle lanes in Northern Ireland is led by Roads Service, through its Local Transport and Safety Measures and in accordance with the Regional Transport Strategy and the Belfast Metropolitan Transport Plan. These plans build on the Northern Ireland Cycling Strategy and recognise that cycling is an ideal form of transport for short journeys.</p><p>It is Roads Service’s intention to invest and implement, in so far as available resources permit, additional cycling measures which will complement the existing National Cycle Network and improve the connectivity of cycle lanes.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013909%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=142403","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=142403"}},{"id":"142402","reference":"AQO 2441/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-09-06","answerBy":"2012-09-17","answered":null,"answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what actions his Department has taken to address the gaps in legislation regarding responsibility for the gritting of footpaths.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202441%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=142402","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=142402"}},{"id":"143654","reference":"AQO 2441/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-09-06","answerBy":"2012-09-17","answered":"2012-09-17","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what actions his Department has taken to address the gaps in legislation regarding responsibility for the gritting of footpaths.","answerText":"As the Member will be aware, there is no statutory duty on my Department’s Roads Service or on Councils to salt or clear snow and ice from footways. Roads Service clears ice and snow from carriageways under the 1993 Roads Order legislation. While new legislation may be necessary in the future, it is not an option that I am actively pursuing at present.\n\nThe Member may recall that following heavy snowfalls and prolonged periods of wintry weather in previous years, it was generally accepted by the Assembly that Roads Service should, where possible, enlist the help of other agencies, such as district councils, to help clear busy town centre footways of snow and ice. It was envisaged that the best way of salting busy town centre footways in prolonged freezing conditions would be a partnership between Roads Service and Councils, with Roads Service supplying the salt and the Councils supplying the plant and labour to spread it.\n\nIn an attempt to facilitate such agreements, Roads Service held discussions with all Councils during last year’s winter season, and as a result, I am happy to confirm that as of January 2012, the majority of Councils had agreed a Memorandum of Understanding or exchanged letters agreeing local arrangements for the removal of ice and snow from town centre footways during severe winter weather. A small number of Councils have indicated that they are unlikely to agree to such arrangements. However, Roads Service will continue its efforts to try to bring these Councils on board with this initiative.\n\nI believe the best way to deal with this matter is through the partnering arrangements that have been offered and agreed by the majority of Councils.","answerHtml":"<p>As the Member will be aware, there is no statutory duty on my Department’s Roads Service or on Councils to salt or clear snow and ice from footways. Roads Service clears ice and snow from carriageways under the 1993 Roads Order legislation. While new legislation may be necessary in the future, it is not an option that I am actively pursuing at present.</p><p>The Member may recall that following heavy snowfalls and prolonged periods of wintry weather in previous years, it was generally accepted by the Assembly that Roads Service should, where possible, enlist the help of other agencies, such as district councils, to help clear busy town centre footways of snow and ice. It was envisaged that the best way of salting busy town centre footways in prolonged freezing conditions would be a partnership between Roads Service and Councils, with Roads Service supplying the salt and the Councils supplying the plant and labour to spread it.</p><p>In an attempt to facilitate such agreements, Roads Service held discussions with all Councils during last year’s winter season, and as a result, I am happy to confirm that as of January 2012, the majority of Councils had agreed a Memorandum of Understanding or exchanged letters agreeing local arrangements for the removal of ice and snow from town centre footways during severe winter weather. A small number of Councils have indicated that they are unlikely to agree to such arrangements. However, Roads Service will continue its efforts to try to bring these Councils on board with this initiative.</p><p>I believe the best way to deal with this matter is through the partnering arrangements that have been offered and agreed by the majority of Councils.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202441%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=143654","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=143654"}},{"id":"142438","reference":"AQO 2418/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-09-06","answerBy":"2012-09-17","answered":null,"answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister following the publication of 'Advancing Transgender Equality - A Plan For Action' by the Home Office and the meeting of the Junior Ministers with the Northern Ireland Transgender Forum, what steps are being taken to develop a transgender strategy.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202418%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=142438","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=142438"}},{"id":"143636","reference":"AQO 2418/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-09-06","answerBy":"2012-09-17","answered":"2012-09-26","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister following the publication of 'Advancing Transgender Equality - A Plan For Action' by the Home Office and the meeting of the Junior Ministers with the Northern Ireland Transgender Forum, what steps are being taken to develop a transgender strategy.","answerText":"We are well aware of the Home Office’s publication “Advancing Transgender Equality – A Plan for Action”. There are, however, no plans to develop a separate local Transgender Strategy. Transgender issues will be considered during the review of the Gender Equality Strategy.","answerHtml":"<p>We are well aware of the Home Office’s publication “Advancing Transgender Equality – A Plan for Action”. There are, however, no plans to develop a separate local Transgender Strategy. Transgender issues will be considered during the review of the Gender Equality Strategy.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202418%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=143636","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=143636"}},{"id":"142316","reference":"AQW 13865/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-09-05","answerBy":"2012-09-20","answered":"2012-09-18","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what action his departmental officials have taken to assess the feasibility of a two-tier parking fine system.","answerText":"The Assembly recently approved an increase to the amount of a parking Penalty Charge Notice from £60 to £90 for all contraventions.\n\nI am aware that other parts of the United Kingdom do apply differential penalties for different contraventions, however, I felt it was necessary to increase the level of deterrent for all contraventions.\n\nMy Department is currently monitoring the impact of this fee increase on illegal parking, as well as the nature of the contraventions. It is anticipated that this monitoring exercise will run for approximately twelve months to enable a comprehensive assessment to be completed. My Department will then carry out a statistical analysis of the results found in Northern Ireland compared with those in England and Wales, where differential penalties are in place, and in Scotland, where differential penalties are not in use.","answerHtml":"<p>The Assembly recently approved an increase to the amount of a parking Penalty Charge Notice from £60 to £90 for all contraventions.</p><p>I am aware that other parts of the United Kingdom do apply differential penalties for different contraventions, however, I felt it was necessary to increase the level of deterrent for all contraventions.</p><p>My Department is currently monitoring the impact of this fee increase on illegal parking, as well as the nature of the contraventions. It is anticipated that this monitoring exercise will run for approximately twelve months to enable a comprehensive assessment to be completed. My Department will then carry out a statistical analysis of the results found in Northern Ireland compared with those in England and Wales, where differential penalties are in place, and in Scotland, where differential penalties are not in use.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013865%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=142316","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=142316"}},{"id":"142315","reference":"AQW 13864/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-09-05","answerBy":"2012-09-20","answered":"2012-09-18","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development how the progress of RG6 Strengthen Community Cohesion, under the Regional Development Strategy, is monitored","answerText":"The Regional Development Strategy (RDS) 2035 is a long term strategic document whose purpose is to deliver the spatial aspects of the Programme for Government. It complements the Sustainable Development Strategy and informs the spatial aspects of the strategies of all Government Departments. The Strategy is not limited to land use but recognises that policies for physical development have far reaching implications. The RDS therefore seeks to addresses economic, social and environmental issues aimed at achieving sustainable development and social cohesion.\n\nThe purpose of the RDS is to provide an overarching strategic planning framework to facilitate and guide the public and private sectors, it does not redefine other Departments’ strategies but compliments them with a spatial perspective.\n\nMany of the policies can only be implemented through individual departments and their strategies. Now that the RDS 2035 has been published my officials are working with a range of other bodies to develop appropriate indicators to monitor the strategy and ensure that government departments take account of the RDS 2035.\n\nDue to the cross-cutting nature of the RDS 2035 a number of stakeholders will be involved in delivery. As a result measuring progress on the implementation of the strategy may therefore have to rely on monitoring carried out by individual departments.\n\nCommunity cohesion within the RDS 2035 relates to three elements – (1) Developing integrated services and facilities, (2) fostering a stronger community spirit and sense of place, and (3) encouraging mixed housing development. Once appropriate indicators are agreed we will work with our partner departments and other stakeholders to assess the impact of the RDS 2035.","answerHtml":"<p>The Regional Development Strategy (RDS) 2035 is a long term strategic document whose purpose is to deliver the spatial aspects of the Programme for Government. It complements the Sustainable Development Strategy and informs the spatial aspects of the strategies of all Government Departments. The Strategy is not limited to land use but recognises that policies for physical development have far reaching implications. The RDS therefore seeks to addresses economic, social and environmental issues aimed at achieving sustainable development and social cohesion.</p><p>The purpose of the RDS is to provide an overarching strategic planning framework to facilitate and guide the public and private sectors, it does not redefine other Departments’ strategies but compliments them with a spatial perspective.</p><p>Many of the policies can only be implemented through individual departments and their strategies. Now that the RDS 2035 has been published my officials are working with a range of other bodies to develop appropriate indicators to monitor the strategy and ensure that government departments take account of the RDS 2035.</p><p>Due to the cross-cutting nature of the RDS 2035 a number of stakeholders will be involved in delivery. As a result measuring progress on the implementation of the strategy may therefore have to rely on monitoring carried out by individual departments.</p><p>Community cohesion within the RDS 2035 relates to three elements – (1) Developing integrated services and facilities, (2) fostering a stronger community spirit and sense of place, and (3) encouraging mixed housing development. Once appropriate indicators are agreed we will work with our partner departments and other stakeholders to assess the impact of the RDS 2035.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013864%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=142315","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=142315"}},{"id":"142314","reference":"AQW 13863/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-09-05","answerBy":"2012-09-20","answered":"2012-09-18","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to detail the criteria used to decide the Door-2-Door Transport Scheme's operational area boundaries.","answerText":"An independent review of the Transport Programme for People with Disabilities in 2003 recommended that door-to-door transport services should be introduced for people with disabilities living in urban areas throughout Northern Ireland. The services were to be used primarily by people who are unable to use conventional public transport and would fulfil the same function as conventional town bus services by enabling people to get to and from their home to local facilities and services.\n\nFollowing consultation, the Department decided to introduce services in all urban areas with a population of 10,000 or more based on data obtained from the 2001 census.\n\nUsing the town/city boundary maps as a starting point, the Department consulted locally with people with disabilities, disability groups and other relevant bodies to agree the operational areas. To allow for possible future expansion of the town/cities and to address some local anomalies the operational boundaries were extended by a further mile.","answerHtml":"<p>An independent review of the Transport Programme for People with Disabilities in 2003 recommended that door-to-door transport services should be introduced for people with disabilities living in urban areas throughout Northern Ireland. The services were to be used primarily by people who are unable to use conventional public transport and would fulfil the same function as conventional town bus services by enabling people to get to and from their home to local facilities and services.</p><p>Following consultation, the Department decided to introduce services in all urban areas with a population of 10,000 or more based on data obtained from the 2001 census.</p><p>Using the town/city boundary maps as a starting point, the Department consulted locally with people with disabilities, disability groups and other relevant bodies to agree the operational areas. To allow for possible future expansion of the town/cities and to address some local anomalies the operational boundaries were extended by a further mile.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013863%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=142314","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=142314"}},{"id":"142313","reference":"AQW 13862/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-09-05","answerBy":"2012-09-20","answered":"2012-09-18","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what preparatory measures his Department is taking to minimise disruption during the upgrade of the A2 road at Greenisland.","answerText":"Implementation of a major project, such as the A2 Shore Road Greenisland, will inevitably cause significant disruption along the A2 and adjacent roads during the construction phase. There are significant challenges associated with carrying out these works within the space available on this very constrained urban corridor. These include laying new gas mains, sewers, water mains, electricity and telephone cables. All utilities to the adjoining properties must be maintained during construction of the new road, while at the same time accommodating the 35,000 vehicles that use the road every day.\n\nIn order to tackle these issues, my Department’s Road Service has established a Temporary Traffic Management Strategy Group (TTMSG) which includes representatives from PSNI, Translink, Transportation Unit and officials from Newtownabbey and Carrickfergus Borough Councils.\n\nThe aims of this wide-ranging group will be to minimise disruption and keep all those affected by the works informed of developments throughout the contract. These will be delivered through three distinct strands:\n\nissues to be conditioned for delivery within the contract;\n\nworks to be undertaken by Roads Service and other bodies in advance of, or during, the contract works; and\n\ndevelopment of a communication strategy to provide timely and relevant information to those who require it.\n\nThe TTMSG has, over the past 3 years, developed a range of proposals, which are progressing and are to be established in advance of the commencement of the construction stage of the scheme in early 2013.\n\nThe proposals include:-\n\nthe deferment of planned public utility work in the run-up to and during the construction phase of the contract;\n\nthe acceleration of resurfacing and utility work on the B90 Old Carrick Road in advance of the scheme;\n\nthe acceleration of planned improvement works on alternative routes so that they are completed in advance of the main scheme;\n\nthe extension and expansion of Park and Ride facilities and an increase in Translink facilities and services; and\n\na communications strategy, which will involve the use of multi-media facilities, in order to keep stakeholders informed of scheme developments at all times.","answerHtml":"<p>Implementation of a major project, such as the A2 Shore Road Greenisland, will inevitably cause significant disruption along the A2 and adjacent roads during the construction phase. There are significant challenges associated with carrying out these works within the space available on this very constrained urban corridor. These include laying new gas mains, sewers, water mains, electricity and telephone cables. All utilities to the adjoining properties must be maintained during construction of the new road, while at the same time accommodating the 35,000 vehicles that use the road every day.</p><p>In order to tackle these issues, my Department’s Road Service has established a Temporary Traffic Management Strategy Group (TTMSG) which includes representatives from PSNI, Translink, Transportation Unit and officials from Newtownabbey and Carrickfergus Borough Councils.</p><p>The aims of this wide-ranging group will be to minimise disruption and keep all those affected by the works informed of developments throughout the contract. These will be delivered through three distinct strands:</p><p>issues to be conditioned for delivery within the contract;</p><p>works to be undertaken by Roads Service and other bodies in advance of, or during, the contract works; and</p><p>development of a communication strategy to provide timely and relevant information to those who require it.</p><p>The TTMSG has, over the past 3 years, developed a range of proposals, which are progressing and are to be established in advance of the commencement of the construction stage of the scheme in early 2013.</p><p>The proposals include:-</p><p>the deferment of planned public utility work in the run-up to and during the construction phase of the contract;</p><p>the acceleration of resurfacing and utility work on the B90 Old Carrick Road in advance of the scheme;</p><p>the acceleration of planned improvement works on alternative routes so that they are completed in advance of the main scheme;</p><p>the extension and expansion of Park and Ride facilities and an increase in Translink facilities and services; and</p><p>a communications strategy, which will involve the use of multi-media facilities, in order to keep stakeholders informed of scheme developments at all times.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013862%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=142313","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=142313"}},{"id":"142312","reference":"AQW 13861/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-09-05","answerBy":"2012-09-13","answered":"2012-09-10","answeredOrally":false,"priority":true,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development why Translink estimates that a new train timetable will not be introduced until the end of 2012.","answerText":"Translink has advised that there are a number of elements involved in the introduction of a new timetable. Translink has indicated that all of these elements will be in place by the end of 2012.\n\nFirstly the process requires meaningful consultation, which is on-going. Secondly relevant communications plans for both staff and customers need to be developed and implemented.\n\nThirdly all elements of the New Trains capital programme need to be finalised and tested and commissioned where appropriate. Apart from the delivery and testing of the new trains and the platform extension programme, construction of the new train stabling and maintenance facility at Adelaide must be completed. This latter project will also require requisite staff transfers to fully mobilise the new facility.Finally revised work patterns arising from the change in timetable will require Translink to carry out appropriate staff training, amend staff rosters and plan the full logistics of train scheduling and signaling required for operation of the new timetable.","answerHtml":"<p>Translink has advised that there are a number of elements involved in the introduction of a new timetable. Translink has indicated that all of these elements will be in place by the end of 2012.</p><p>Firstly the process requires meaningful consultation, which is on-going. Secondly relevant communications plans for both staff and customers need to be developed and implemented.</p><p>Thirdly all elements of the New Trains capital programme need to be finalised and tested and commissioned where appropriate. Apart from the delivery and testing of the new trains and the platform extension programme, construction of the new train stabling and maintenance facility at Adelaide must be completed. This latter project will also require requisite staff transfers to fully mobilise the new facility.Finally revised work patterns arising from the change in timetable will require Translink to carry out appropriate staff training, amend staff rosters and plan the full logistics of train scheduling and signaling required for operation of the new timetable.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2013861%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=142312","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=142312"}},{"id":"139790","reference":"AQO 2311/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-06-21","answerBy":"2012-07-02","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education whether he can give an assurance that Integrated Schools will not be discriminated against in the Area Planning Process.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202311%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=139790","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=139790"}},{"id":"140849","reference":"AQO 2311/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-06-21","answerBy":"2012-07-02","answered":"2012-07-04","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education whether he can give an assurance that Integrated Schools will not be discriminated against in the Area Planning Process.","answerText":"I have commissioned the Education and Library Boards to draw up plans for education provision in their areas. When doing so, they will work with the Council for Catholic Maintained Schools. The Boards and CCMS have statutory responsibility for planning in their sectors.\n\nThe Terms of Reference for area planning also require the Boards to engage with the NICIE and CnaG when drawing up their plans. This will include the integrated sector.\n\nThe Boards will launch their plans on 5 July for public consultation. The consultation period will run until the end of October. In November the Boards will examine the responses and submit final drafts to my Department. I aim to be able to approve the plans by the end of December.\n\nDuring the planning and consultation periods all sectors and interests will have a chance to give their views.","answerHtml":"<p>I have commissioned the Education and Library Boards to draw up plans for education provision in their areas. When doing so, they will work with the Council for Catholic Maintained Schools. The Boards and CCMS have statutory responsibility for planning in their sectors.</p><p>The Terms of Reference for area planning also require the Boards to engage with the NICIE and CnaG when drawing up their plans. This will include the integrated sector.</p><p>The Boards will launch their plans on 5 July for public consultation. The consultation period will run until the end of October. In November the Boards will examine the responses and submit final drafts to my Department. I aim to be able to approve the plans by the end of December.</p><p>During the planning and consultation periods all sectors and interests will have a chance to give their views.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202311%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=140849","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=140849"}},{"id":"138598","reference":"AQW 12852/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-06-12","answerBy":"2012-06-27","answered":"2012-06-19","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education when the twenty-year-old mobile classrooms at Corran Integrated Primary School and Nursery Unit, Larne, will be replaced with a new purpose built school building.","answerText":"As you will be aware the work on area planning is being taken forward at this time and will in due course identify priorities for capital investment. However, in the interim I recognise there is a need to ensure capital funding is utilised to improve the schools estate.\n\nTherefore I have asked officials to consider an interim process for the identification of major school projects, which are consistent with and supportive of the Area Planning work and in which capital investment can be made in the coming period.\n\nI would hope to be in the position to confirm an interim capital investment plan before the summer. Until then I cannot comment on any individual school proposal.","answerHtml":"<p>As you will be aware the work on area planning is being taken forward at this time and will in due course identify priorities for capital investment. However, in the interim I recognise there is a need to ensure capital funding is utilised to improve the schools estate.</p><p>Therefore I have asked officials to consider an interim process for the identification of major school projects, which are consistent with and supportive of the Area Planning work and in which capital investment can be made in the coming period.</p><p>I would hope to be in the position to confirm an interim capital investment plan before the summer. Until then I cannot comment on any individual school proposal.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2012852%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=138598","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=138598"}},{"id":"138059","reference":"AQO 2216/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-06-07","answerBy":"2012-06-19","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety for his assessment of the Northern Health and Social Care Trust’s proposal to withdraw from provision of residential care home accommodation.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202216%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=138059","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=138059"}},{"id":"139518","reference":"AQO 2216/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-06-07","answerBy":"2012-06-19","answered":"2012-06-19","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety for his assessment of the Northern Health and Social Care Trust’s proposal to withdraw from provision of residential care home accommodation.","answerText":"The Northern HSC Trust is in the process of finalising their population plans which will address the future of statutory residential care, in response to recommendations within the Transforming Your Care report.\n\nOnce the Trust population plan is completed this will be presented to me for consideration. It would be inappropriate for me to make any assessments before I have had sight of the proposals.","answerHtml":"<p>The Northern HSC Trust is in the process of finalising their population plans which will address the future of statutory residential care, in response to recommendations within the Transforming Your Care report.</p><p>Once the Trust population plan is completed this will be presented to me for consideration. It would be inappropriate for me to make any assessments before I have had sight of the proposals.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202216%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=139518","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=139518"}},{"id":"138050","reference":"AQO 2180/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-06-07","answerBy":"2012-06-18","answered":"2012-06-18","answeredOrally":true,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment for an update on his plans for the creation of a national park.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202180%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=138050","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-11-12/18-June-2012","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=138050"}},{"id":"137560","reference":"AQO 2106/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-05-31","answerBy":"2012-06-11","answered":"2012-06-11","answeredOrally":true,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture and Rural Development","question":"To ask the Minister of Agriculture and Rural Development to outline how her Department is working, on a cross-departmental basis, to promote renewable energy generation.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202106%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=137560","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-11-12/11-June-2012","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=137560"}},{"id":"135871","reference":"AQO 2062/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-05-17","answerBy":"2012-05-28","answered":"2012-05-28","answeredOrally":true,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to outline his preferred governance model for Northern Ireland Water.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202062%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=135871","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-11-12/28-May-2012","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=135871"}},{"id":"135532","reference":"AQW 11770/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-05-15","answerBy":"2012-05-30","answered":"2012-05-31","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel what action Land and Property Services is taking to address the loss of rates revenue resulting from the presence of illegal car parks in the vicinity of Belfast International Airport.","answerText":"Land & Property Services (LPS), in co-operation with both Antrim District Council and Belfast International Airport, carried out a special exercise in 2010 to review those properties in the vicinity of the airport which are operating as car parks, to ensure that an up to date entry in the valuation list was in place. At present there are eight properties valued that include an element related to car parking. These are shown in the valuation list, which can be viewed at: -\n\nhttp://www.dfpni.gov.uk/lps/index/property_valuation/valuation-of-property/valuation-lists.htm\n\nThere are practical difficulties in this particular area, given that car park businesses may begin operating without the normal formal approvals. Information, therefore, is not always made available to LPS. However, LPS continues to regularly monitor the situation on the ground and is confident that currently the properties referred to have been valued. Where information relevant to such properties becomes available, it should be forwarded to the District Valuer (Lisburn) in LPS.","answerHtml":"<p>Land &amp; Property Services (LPS), in co-operation with both Antrim District Council and Belfast International Airport, carried out a special exercise in 2010 to review those properties in the vicinity of the airport which are operating as car parks, to ensure that an up to date entry in the valuation list was in place. At present there are eight properties valued that include an element related to car parking. These are shown in the valuation list, which can be viewed at: -</p><p>http://www.dfpni.gov.uk/lps/index/property_valuation/valuation-of-property/valuation-lists.htm</p><p>There are practical difficulties in this particular area, given that car park businesses may begin operating without the normal formal approvals. Information, therefore, is not always made available to LPS. However, LPS continues to regularly monitor the situation on the ground and is confident that currently the properties referred to have been valued. Where information relevant to such properties becomes available, it should be forwarded to the District Valuer (Lisburn) in LPS.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011770%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=135532","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=135532"}},{"id":"135531","reference":"AQW 11769/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-05-15","answerBy":"2012-05-30","answered":"2012-06-18","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment what action the Driver and Vehicle Agency is taking against the owners of vehicles that do not meet road traffic regulations, but are operating from illegal car parks around Belfast International Airport.","answerText":"The Department has primary responsibility for the enforcement of regulations that pertain to the use of buses and coaches on Northern Ireland’s roads.\n\nA series of enforcement spot checks have been carried out in recent months on passenger carrying vehicles used for the conveyance of passengers travelling from car parks located close to the Belfast International Airport. During these operations 4 car park operators were detected operating courtesy vehicles without proper PSV licenses or insurance. These detections have resulted in prosecution files being prepared for the Public Prosecution Service covering a variety of offences including: using a public service vehicle without a road service licence in force; using a public service vehicle without a public service licence in force; using a public service vehicle without a certificate of motor insurance in force; and driving a public service vehicle without being the holder of an appropriate licence.\n\nThe Department will continue to monitor this situation in conjunction with the Belfast International Airport Constabulary and the Police Service of Northern Ireland, and where vehicles are detected that do not meet road traffic regulations appropriate enforcement action will be taken.\n\nI believe that DOE planning and DOE DVA have critical responsibilities to ensure full and proper compliance with the law. I intend to ensure both live up to these duties.","answerHtml":"<p>The Department has primary responsibility for the enforcement of regulations that pertain to the use of buses and coaches on Northern Ireland’s roads.</p><p>A series of enforcement spot checks have been carried out in recent months on passenger carrying vehicles used for the conveyance of passengers travelling from car parks located close to the Belfast International Airport. During these operations 4 car park operators were detected operating courtesy vehicles without proper PSV licenses or insurance. These detections have resulted in prosecution files being prepared for the Public Prosecution Service covering a variety of offences including: using a public service vehicle without a road service licence in force; using a public service vehicle without a public service licence in force; using a public service vehicle without a certificate of motor insurance in force; and driving a public service vehicle without being the holder of an appropriate licence.</p><p>The Department will continue to monitor this situation in conjunction with the Belfast International Airport Constabulary and the Police Service of Northern Ireland, and where vehicles are detected that do not meet road traffic regulations appropriate enforcement action will be taken.</p><p>I believe that DOE planning and DOE DVA have critical responsibilities to ensure full and proper compliance with the law. I intend to ensure both live up to these duties.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011769%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=135531","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=135531"}},{"id":"135530","reference":"AQW 11768/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-05-15","answerBy":"2012-05-30","answered":"2012-06-18","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment what action his Department is taking to ensure that the appropriate enforcement action is being taken to close off-site car parks operating around the Belfast International Airport without the appropriate planning permission.","answerText":"The Department is aware of 13 car parks that have been or currently are operating outside the lands zoned for such uses around Belfast International Airport.\n\nAs a result of effective enforcement action, 6 of the sites of unauthorised car parks in this area have ceased to operate and 1 is operating lawfully as established by the Planning Appeals Commission.\n\nThe Department continues to investigate the operation of 6 alleged unauthorised car parks, one of which has had an enforcement notice served, two are subject to planning (enforcement) appeals, one is subject to a current planning application, one has a court hearing pending and one continues to be investigated.\n\nThe Department will continue to deal with such breaches of planning control robustly and use those enforcement powers available as appropriate. To date, the Department has brought prosecutions against the operators of 2 of the remaining unauthorised car parks; both operators have been fined with 1 amassed fines totalling £40,000 from 3 successful prosecutions.\n\nI keep this matter under close scrutiny in an attempt to ensure breaches are addressed.","answerHtml":"<p>The Department is aware of 13 car parks that have been or currently are operating outside the lands zoned for such uses around Belfast International Airport.</p><p>As a result of effective enforcement action, 6 of the sites of unauthorised car parks in this area have ceased to operate and 1 is operating lawfully as established by the Planning Appeals Commission.</p><p>The Department continues to investigate the operation of 6 alleged unauthorised car parks, one of which has had an enforcement notice served, two are subject to planning (enforcement) appeals, one is subject to a current planning application, one has a court hearing pending and one continues to be investigated.</p><p>The Department will continue to deal with such breaches of planning control robustly and use those enforcement powers available as appropriate. To date, the Department has brought prosecutions against the operators of 2 of the remaining unauthorised car parks; both operators have been fined with 1 amassed fines totalling £40,000 from 3 successful prosecutions.</p><p>I keep this matter under close scrutiny in an attempt to ensure breaches are addressed.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011768%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=135530","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=135530"}},{"id":"135386","reference":"AQW 11699/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-05-14","answerBy":"2012-05-29","answered":"2012-06-01","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education when the single-pane windows in Sunnylands Primary School, Carrickfergus, will be replaced.","answerText":"The replacement of single pane windows is a matter for the Education & Library Board who has responsibility for planning maintenance programmes throughout the schools estate. The windows are listed for replacement as a maintenance backlog item at an estimated cost of £124k out of a total window backlog of £9.5m.\n\nThere are many schools throughout the Board’s estate with windows in a poor condition and the Board addresses window replacement schemes on a priority basis within the available resources.\n\nI am therefore unable to give a definitive time frame for replacement single pane windows at Sunnylands Primary School, Carrickfergus.","answerHtml":"<p>The replacement of single pane windows is a matter for the Education &amp; Library Board who has responsibility for planning maintenance programmes throughout the schools estate. The windows are listed for replacement as a maintenance backlog item at an estimated cost of £124k out of a total window backlog of £9.5m.</p><p>There are many schools throughout the Board’s estate with windows in a poor condition and the Board addresses window replacement schemes on a priority basis within the available resources.</p><p>I am therefore unable to give a definitive time frame for replacement single pane windows at Sunnylands Primary School, Carrickfergus.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011699%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=135386","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=135386"}},{"id":"135385","reference":"AQW 11698/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-05-14","answerBy":"2012-05-22","answered":"2012-09-17","answeredOrally":false,"priority":true,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister, in light of the misuse of flags, what plans the Executive has to introduce legislation to regulate the flying of flags on public property.","answerText":"The display of flags and emblems is a matter for continued consideration by the Cross-Party Working Group on Cohesion, Sharing and Integration. Discussions at the Cross-Party Working Group continue to be held on a confidential basis and any future action on flags and emblems will be dependent on the outcome of the group’s consideration.\n\nHowever, in parallel, the Flags Protocol Working Group continues to develop recommendations for a flags framework. The Working Group was reconvened in December 2011 at our request and that of the cross party working group on CSI. The Working Group has now met on three occasions. A draft discussion paper has been produced to inform the ongoing considerations of the Working Group before recommendations on a revised framework are brought forward.\n\nFollowing agreement of a revised framework it is the intention that this document would form one aspect of the monitoring and implementation arrangements of the CSI Strategy.","answerHtml":"<p>The display of flags and emblems is a matter for continued consideration by the Cross-Party Working Group on Cohesion, Sharing and Integration. Discussions at the Cross-Party Working Group continue to be held on a confidential basis and any future action on flags and emblems will be dependent on the outcome of the group’s consideration.</p><p>However, in parallel, the Flags Protocol Working Group continues to develop recommendations for a flags framework. The Working Group was reconvened in December 2011 at our request and that of the cross party working group on CSI. The Working Group has now met on three occasions. A draft discussion paper has been produced to inform the ongoing considerations of the Working Group before recommendations on a revised framework are brought forward.</p><p>Following agreement of a revised framework it is the intention that this document would form one aspect of the monitoring and implementation arrangements of the CSI Strategy.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011698%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=135385","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=135385"}},{"id":"135376","reference":"AQW 11693/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-05-14","answerBy":"2012-05-29","answered":"2012-05-28","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development, pursuant to AQW 10826/11-15, to detail the extra cost to the public purse incurred as a result of the reclassification of Northern Ireland Water as a non-departmental public body.","answerText":"As noted in the earlier response, the reclassification of Northern Ireland Water as a non-departmental public body was a direct consequence of the Executive’s decision to defer the introduction of domestic water charges. The financial implications of deferral are that DRD requires public expenditure budget cover for the bulk of Northern Ireland Water’s expenditure of around £340 million in 2012/13.\n\nThe extent to which these costs would be reduced if Northern Ireland Water was reclassified as a public corporation, (i.e. if it was majority self-funding) would depend on the policy decisions taken about funding arrangements, for example, any arrangements for vulnerable groups, phasing in of additional payments and so on.\n\nAn indirect cost of the reclassification is that Northern Ireland Water has less freedom to achieve efficiencies because of public expenditure constraints.","answerHtml":"<p>As noted in the earlier response, the reclassification of Northern Ireland Water as a non-departmental public body was a direct consequence of the Executive’s decision to defer the introduction of domestic water charges. The financial implications of deferral are that DRD requires public expenditure budget cover for the bulk of Northern Ireland Water’s expenditure of around £340 million in 2012/13.</p><p>The extent to which these costs would be reduced if Northern Ireland Water was reclassified as a public corporation, (i.e. if it was majority self-funding) would depend on the policy decisions taken about funding arrangements, for example, any arrangements for vulnerable groups, phasing in of additional payments and so on.</p><p>An indirect cost of the reclassification is that Northern Ireland Water has less freedom to achieve efficiencies because of public expenditure constraints.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011693%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=135376","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=135376"}},{"id":"134992","reference":"AQO 2005/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-05-10","answerBy":"2012-05-21","answered":"2012-05-21","answeredOrally":true,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel for an update on discussions with Treasury on the devolution of Corporation Tax powers.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%202005%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=134992","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-11-12/21-May-2012","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=134992"}},{"id":"134367","reference":"AQW 11317/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-05-03","answerBy":"2012-05-21","answered":"2012-05-09","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development for an update on Translink’s plans for a new Belfast transport hub.","answerText":"The plans to construct a new Transport Hub in Belfast are still at an early stage. Translink has submitted a Strategic Outline Case which my Department and the Department of Finance and Personnel have approved. Translink is now in the process of developing the Outline Business Case for the project. When complete this will also be submitted to my Department for approval.","answerHtml":"<p>The plans to construct a new Transport Hub in Belfast are still at an early stage. Translink has submitted a Strategic Outline Case which my Department and the Department of Finance and Personnel have approved. Translink is now in the process of developing the Outline Business Case for the project. When complete this will also be submitted to my Department for approval.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011317%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=134367","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=134367"}},{"id":"134366","reference":"AQW 11316/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-05-03","answerBy":"2012-05-21","answered":"2012-08-03","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment for an update on planning application F/2010/0092/F.","answerText":"Ornithology information required by NIEA was received on 2 April 2012, and advertised as a second addendum for this application on 20 April 2012 .Roads clarification was received on 12 April 2012. Environmental Health clarification was received on 17 May 2012.\n\nTo date 447 objections have been received for this application, no objections have been received in response to the 2nd Addendum.\n\nThis application was presented to Larne Council on 18 June 2012 as an approval. A deferral was requested and granted for this application. The deferred office meeting was held on 28 June 2012. Reconsideration is ongoing and it is anticipated that this application will be re-presented to Larne Council on the 6 August 2012.","answerHtml":"<p>Ornithology information required by NIEA was received on 2 April 2012, and advertised as a second addendum for this application on 20 April 2012 .Roads clarification was received on 12 April 2012. Environmental Health clarification was received on 17 May 2012.</p><p>To date 447 objections have been received for this application, no objections have been received in response to the 2nd Addendum.</p><p>This application was presented to Larne Council on 18 June 2012 as an approval. A deferral was requested and granted for this application. The deferred office meeting was held on 28 June 2012. Reconsideration is ongoing and it is anticipated that this application will be re-presented to Larne Council on the 6 August 2012.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011316%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=134366","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=134366"}},{"id":"134193","reference":"AQW 11260/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-05-03","answerBy":"2012-05-21","answered":"2012-05-21","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development when he will bring forward his proposals on the future governance of NI Water.","answerText":"The Executive’s PfG commitment not to introduce additional household charges for water means that, during the current Assembly mandate, NIW will continue to be subject to full public expenditure controls.\n\nAs decisions on water funding are cross-cutting, because of their significant public expenditure implications, it remains my intention to bring a paper to the Executive in the coming months.","answerHtml":"<p>The Executive’s PfG commitment not to introduce additional household charges for water means that, during the current Assembly mandate, NIW will continue to be subject to full public expenditure controls.</p><p>As decisions on water funding are cross-cutting, because of their significant public expenditure implications, it remains my intention to bring a paper to the Executive in the coming months.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011260%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=134193","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=134193"}},{"id":"134192","reference":"AQW 11259/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-05-03","answerBy":"2012-05-21","answered":"2012-05-21","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to detail how Roads Service notifies district councils when a road is adopted.","answerText":"When my Department’s Roads Service adopts a new road, it forwards a copy of the Adoption Certificate, along with an appropriate plan showing the newly adopted road, to the relevant council.","answerHtml":"<p>When my Department’s Roads Service adopts a new road, it forwards a copy of the Adoption Certificate, along with an appropriate plan showing the newly adopted road, to the relevant council.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011259%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=134192","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=134192"}},{"id":"134191","reference":"AQW 11258/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-05-03","answerBy":"2012-05-21","answered":"2012-05-16","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety whether his Department plans to close Lisgarel Residential Home, Larne.","answerText":"Lisgarel Residential Home in Larne currently provides permanent residential placements, respite care and a number of intermediate care beds. The respite care and intermediate care beds are intended to provide short-term support for older people with a view to enabling them to return to live in their own homes.\n\nAny plans regarding the future of Lisgarel will be subject to consultation and will be shared with local communities prior to any implementation.","answerHtml":"<p>Lisgarel Residential Home in Larne currently provides permanent residential placements, respite care and a number of intermediate care beds. The respite care and intermediate care beds are intended to provide short-term support for older people with a view to enabling them to return to live in their own homes.</p><p>Any plans regarding the future of Lisgarel will be subject to consultation and will be shared with local communities prior to any implementation.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2011258%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=134191","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=134191"}},{"id":"134300","reference":"AQO 1984/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-05-03","answerBy":"2012-05-15","answered":null,"answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment what discussions her Department has had with the Ministry of Defence to ensure that HMS Caroline remains in Belfast.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201984%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=134300","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=134300"}},{"id":"135580","reference":"AQO 1984/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-05-03","answerBy":"2012-05-15","answered":"2012-05-15","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment what discussions her Department has had with the Ministry of Defence to ensure that HMS Caroline remains in Belfast.","answerText":"My Department has been in communication with a number of key stakeholders regarding the possible retention of HMS Caroline in Belfast. She has been in Belfast since 1924, she is part of the city and we want her to stay. To help inform the department an independent study was carried out to look at options for the ship.\n\nThat work is complete and it has shown that there are benefits in keeping the ship in Belfast but there are funding challenges. We are working closely with the National Museum of the Royal Navy to find a suitable way forward, these conversations are ongoing.","answerHtml":"<p>My Department has been in communication with a number of key stakeholders regarding the possible retention of HMS Caroline in Belfast. She has been in Belfast since 1924, she is part of the city and we want her to stay. To help inform the department an independent study was carried out to look at options for the ship.</p><p>That work is complete and it has shown that there are benefits in keeping the ship in Belfast but there are funding challenges. We are working closely with the National Museum of the Royal Navy to find a suitable way forward, these conversations are ongoing.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201984%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=135580","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=135580"}},{"id":"134298","reference":"AQO 1948/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-05-03","answerBy":"2012-05-14","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education what support his Department provides for children with autism.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201948%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=134298","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=134298"}},{"id":"135555","reference":"AQO 1948/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-05-03","answerBy":"2012-05-14","answered":"2012-05-15","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education what support his Department provides for children with autism.","answerText":"My priority is to ensure that every child, including those with autism, receives a high quality education and to that end I am continuing to put in place a range of policies aimed at raising standards for all pupils, including the school improvement policy and the Review of Special Educational Needs and Inclusion.\n\nThe Review of Special Educational Needs and Inclusion prioritises the focus on early identification of needs and early intervention by schools, supported by the Education and Library Boards, and improved collaboration between health and education bodies to support schools in meeting the needs of their pupils.\n\nEducation and Library Boards have dedicated Autistic Spectrum Disorder Support Teams providing tailored support to match the individual needs of each child in order to ensure that each child can reach his or her full potential;\n\nThere has been significant investment by my Department in support for those with autism since the publication of the Task Group Report on Autism in 2002 including a range of autism resources to schools.\n\nIn addition the new Autism Act places a statutory duty on the Department of Health, Social Services and Public Safety to prepare an autism strategy in conjunction with all other Departments. My officials are working closely with DHSSPS officials in developing this strategy\n\nFurthermore the Middletown Centre for Autism continues to provide support to schools, families and educational professionals.","answerHtml":"<p>My priority is to ensure that every child, including those with autism, receives a high quality education and to that end I am continuing to put in place a range of policies aimed at raising standards for all pupils, including the school improvement policy and the Review of Special Educational Needs and Inclusion.</p><p>The Review of Special Educational Needs and Inclusion prioritises the focus on early identification of needs and early intervention by schools, supported by the Education and Library Boards, and improved collaboration between health and education bodies to support schools in meeting the needs of their pupils.</p><p>Education and Library Boards have dedicated Autistic Spectrum Disorder Support Teams providing tailored support to match the individual needs of each child in order to ensure that each child can reach his or her full potential;</p><p>There has been significant investment by my Department in support for those with autism since the publication of the Task Group Report on Autism in 2002 including a range of autism resources to schools.</p><p>In addition the new Autism Act places a statutory duty on the Department of Health, Social Services and Public Safety to prepare an autism strategy in conjunction with all other Departments. My officials are working closely with DHSSPS officials in developing this strategy</p><p>Furthermore the Middletown Centre for Autism continues to provide support to schools, families and educational professionals.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201948%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=135555","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=135555"}},{"id":"133431","reference":"AQO 1915/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-04-26","answerBy":"2012-05-08","answered":"2012-05-08","answeredOrally":true,"priority":false,"department":"Department of Culture, Arts and Leisure","departmentId":"77","minister":"Minister of Culture, Arts and Leisure","question":"To ask the Minister of Culture, Arts and Leisure what plans her Department has to develop a cross-departmental strategy to increase youth participation in sport.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201915%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=133431","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-11-12/08-May-2012","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=133431"}},{"id":"133094","reference":"AQW 10839/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-04-24","answerBy":"2012-05-10","answered":"2012-05-01","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education (i) what percentage of children are currently enrolled in integrated education; and (ii) what plans he has to increase this number.","answerText":"(i) 6.79 % of pupils are enrolled in integrated schools.\n\n(ii) The area planning process will consider the future need for a given area taking account of population projection. The level of demand for each sector will be determined and where there is clear evidence of a need to increase the provision in any sector then this will be built into the plan. As there is a finite number of pupils in an area, growth in any sector, including the integrated sector, will therefore have to be contained within the total planning figure for each Education and Library Board, so that the overall planning figure for all Boards is not exceeded. This means that growth in one sector may lead to a reduction in another sector.\n\nShould proposals come forward within the area plans for increases in the number of places in integrated schools, I will consider these in the context of the area plan.","answerHtml":"<p>(i) 6.79 % of pupils are enrolled in integrated schools.</p><p>(ii) The area planning process will consider the future need for a given area taking account of population projection. The level of demand for each sector will be determined and where there is clear evidence of a need to increase the provision in any sector then this will be built into the plan. As there is a finite number of pupils in an area, growth in any sector, including the integrated sector, will therefore have to be contained within the total planning figure for each Education and Library Board, so that the overall planning figure for all Boards is not exceeded. This means that growth in one sector may lead to a reduction in another sector.</p><p>Should proposals come forward within the area plans for increases in the number of places in integrated schools, I will consider these in the context of the area plan.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010839%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=133094","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=133094"}},{"id":"133093","reference":"AQW 10838/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-04-24","answerBy":"2012-05-10","answered":"2012-05-03","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment to detail (i) how many people were convicted of littering offences last year; (ii) how much revenue was raised from the resulting fines; and (iii) what further measures he is taking to combat this problem.","answerText":"District Councils are much more likely to issue on-the-spot fines to litter offenders instead of seeking convictions through the courts. Therefore, figures for convictions are quite low compared to those for on-the-spot fines.\n\nThe latest information held by the Department shows that 133 people were convicted by the courts for littering offences in the period 1 April 2010 to 31 March 2011 and a total of £7,707 in fines and £5,935 in court costs were imposed. By contrast, in the same period, district councils issued 3,930 £50 fines for littering offences resulting in a total of £150,268 received. Information for the period 1 April 2011 to 31 March 2012 will not be compiled and verified until August 2012.\n\nLitter is still a major problem costing Councils and therefore ratepayers a lot of money to clean up. Despite the ongoing good work to tackle the problem by District Councils and, for example, Tidy Northern Ireland. Voluntary groups and many concerned residents in local communities also seek to tackle the problems through the current series of Big Spring Clean events.\n\nSince becoming Minister of the Environment I have taken part, along with many other concerned and dedicated volunteers, in a number of Big Spring Clean events and in doing so I have become much more aware of the extent of the environmental impact caused by litter and how it can spoil the visible appearance of local beauty spots. I am determined to do all that I can to help to deal with this pernicious problem. Litter in all of its forms e.g. bottles, cans, cigarette butts, chewing gum, if left unchecked, is an eyesore which leads to dirty and unhealthy local environments. Also local beauty spots, including our beaches and countryside, can also be spoiled by litter which can be detrimental to our tourist industry.\n\nThere are a number of measures which I am bringing forward to help to deal with the litter problem. These include the development of a Marine Litter Strategy, the introduction of a carrier bag levy and the bringing into operation on 1 April 2012 of the Clean Neighbourhoods and Environment Act 2011. Also Departmental funding to Tidy Northern Ireland has been increased to help with the organisation’s work to make Northern Ireland a cleaner and more pleasant place in which to live. Tidy Northern Ireland’s work, for example, in relation to the Big Spring Clean, the Eco-schools Programme, the Clean Coast Programme and its ongoing monitoring of local environmental cleanliness makes an important contribution to raising awareness and helping to reduce the overall litter problem.\n\nThe Clean Neighbourhoods and Environment Act (Northern Ireland) 2011 contains significant measures specifically designed to strengthen the law to help district councils to deal more effectively with the scourge of litter. I was pleased to bring the Act into operation on 1 April 2012 and I look forward to positive results in the future in terms of better local environmental cleanliness once the Act begins to have an impact.\n\nThis Act introduced bigger on-the-spot fines for litter offenders and a range of other measures. For example, it gives district councils new powers to issue litter clearing notices to require businesses and individuals to clear litter from their land. By utilising the new powers introduced by the Act, district councils will be able to deal more effectively with litter on land in private ownership and will also be able to enter the land, clear it of litter and impose a reasonable charge on the person who failed to comply with the notice.\n\nBigger on-the-spot fines for litter offenders together with the stronger anti-litter laws generally should send out a strong message to people who litter to think about the quality of their environments. Bigger fines should act as an effective deterrent against littering in the future. From 1st April 2012 Councils will be able to impose fines of up to £80 on people who litter – this is a significant increase on the previous £50.\n\nThere is now a real determination to tackle the litter problem more effectively than before so that we can all look forward to a cleaner Northern Ireland in the future.","answerHtml":"<p>District Councils are much more likely to issue on-the-spot fines to litter offenders instead of seeking convictions through the courts. Therefore, figures for convictions are quite low compared to those for on-the-spot fines.</p><p>The latest information held by the Department shows that 133 people were convicted by the courts for littering offences in the period 1 April 2010 to 31 March 2011 and a total of £7,707 in fines and £5,935 in court costs were imposed. By contrast, in the same period, district councils issued 3,930 £50 fines for littering offences resulting in a total of £150,268 received. Information for the period 1 April 2011 to 31 March 2012 will not be compiled and verified until August 2012.</p><p>Litter is still a major problem costing Councils and therefore ratepayers a lot of money to clean up. Despite the ongoing good work to tackle the problem by District Councils and, for example, Tidy Northern Ireland. Voluntary groups and many concerned residents in local communities also seek to tackle the problems through the current series of Big Spring Clean events.</p><p>Since becoming Minister of the Environment I have taken part, along with many other concerned and dedicated volunteers, in a number of Big Spring Clean events and in doing so I have become much more aware of the extent of the environmental impact caused by litter and how it can spoil the visible appearance of local beauty spots. I am determined to do all that I can to help to deal with this pernicious problem. Litter in all of its forms e.g. bottles, cans, cigarette butts, chewing gum, if left unchecked, is an eyesore which leads to dirty and unhealthy local environments. Also local beauty spots, including our beaches and countryside, can also be spoiled by litter which can be detrimental to our tourist industry.</p><p>There are a number of measures which I am bringing forward to help to deal with the litter problem. These include the development of a Marine Litter Strategy, the introduction of a carrier bag levy and the bringing into operation on 1 April 2012 of the Clean Neighbourhoods and Environment Act 2011. Also Departmental funding to Tidy Northern Ireland has been increased to help with the organisation’s work to make Northern Ireland a cleaner and more pleasant place in which to live. Tidy Northern Ireland’s work, for example, in relation to the Big Spring Clean, the Eco-schools Programme, the Clean Coast Programme and its ongoing monitoring of local environmental cleanliness makes an important contribution to raising awareness and helping to reduce the overall litter problem.</p><p>The Clean Neighbourhoods and Environment Act (Northern Ireland) 2011 contains significant measures specifically designed to strengthen the law to help district councils to deal more effectively with the scourge of litter. I was pleased to bring the Act into operation on 1 April 2012 and I look forward to positive results in the future in terms of better local environmental cleanliness once the Act begins to have an impact.</p><p>This Act introduced bigger on-the-spot fines for litter offenders and a range of other measures. For example, it gives district councils new powers to issue litter clearing notices to require businesses and individuals to clear litter from their land. By utilising the new powers introduced by the Act, district councils will be able to deal more effectively with litter on land in private ownership and will also be able to enter the land, clear it of litter and impose a reasonable charge on the person who failed to comply with the notice.</p><p>Bigger on-the-spot fines for litter offenders together with the stronger anti-litter laws generally should send out a strong message to people who litter to think about the quality of their environments. Bigger fines should act as an effective deterrent against littering in the future. From 1st April 2012 Councils will be able to impose fines of up to £80 on people who litter – this is a significant increase on the previous £50.</p><p>There is now a real determination to tackle the litter problem more effectively than before so that we can all look forward to a cleaner Northern Ireland in the future.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010838%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=133093","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=133093"}},{"id":"133092","reference":"AQW 10837/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-04-24","answerBy":"2012-05-10","answered":"2012-05-08","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development why grounds maintenance contracts between his Department and the Housing Executive have been allowed to expire before new contracts are put in place.","answerText":"There are no grounds maintenance contracts between my Department and the Housing Executive. The Housing Executive grounds maintenance procurement process is due to complete with the renewal contracts commencing on 1 June 2012. This will coincide with the completion of the current contracts.","answerHtml":"<p>There are no grounds maintenance contracts between my Department and the Housing Executive. The Housing Executive grounds maintenance procurement process is due to complete with the renewal contracts commencing on 1 June 2012. This will coincide with the completion of the current contracts.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010837%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=133092","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=133092"}},{"id":"133075","reference":"AQW 10826/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-04-24","answerBy":"2012-05-10","answered":"2012-05-02","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what are the financial implications of the classification by the the Office of National Statistics of NI Water as a non-departmental public body.","answerText":"The financial implications of the classification by the Office of National Statistics (ONS) of NI Water as a non-departmental public body (rather than a public corporation as had previously been the case) are that the majority of its expenditure forms part of the DRD budget. This has been the case since the 2008/09 financial year. Prior to the reclassification, it was only the cash transactions (subsidy, loan draw downs, interest and dividend) between DRD and NI Water that formed part of the DRD budget.\n\nThe ONS decision was a direct consequence of NI Water continuing to receive the majority of its revenue through subsidy from the Executive in lieu of domestic charging. This has meant that the company has not been able to act as intended when it was established – as a regulated utility with an independent income stream from charging operating at arm’s length from Government.","answerHtml":"<p>The financial implications of the classification by the Office of National Statistics (ONS) of NI Water as a non-departmental public body (rather than a public corporation as had previously been the case) are that the majority of its expenditure forms part of the DRD budget. This has been the case since the 2008/09 financial year. Prior to the reclassification, it was only the cash transactions (subsidy, loan draw downs, interest and dividend) between DRD and NI Water that formed part of the DRD budget.</p><p>The ONS decision was a direct consequence of NI Water continuing to receive the majority of its revenue through subsidy from the Executive in lieu of domestic charging. This has meant that the company has not been able to act as intended when it was established – as a regulated utility with an independent income stream from charging operating at arm’s length from Government.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010826%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=133075","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=133075"}},{"id":"132750","reference":"AQW 10617/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-04-19","answerBy":"2012-05-04","answered":"2012-05-03","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety whether he has plans to introduce fines for people who fail to attend medical appointments at a hospital or with a GP.","answerText":"There are on average 170,000 missed appointments every year in health and social care trusts alone. This represents a substantial cost to the health service and is an unacceptable waste of scarce public resources. I want to ensure that all options that can help to reduce the numbers of missed appointments and ensure better use of taxpayers money are explored. The HSCB is responsible for performance monitoring of Trusts and I will be looking to the HSCB working with the Trusts to address this.","answerHtml":"<p>There are on average 170,000 missed appointments every year in health and social care trusts alone. This represents a substantial cost to the health service and is an unacceptable waste of scarce public resources. I want to ensure that all options that can help to reduce the numbers of missed appointments and ensure better use of taxpayers money are explored. The HSCB is responsible for performance monitoring of Trusts and I will be looking to the HSCB working with the Trusts to address this.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2010617%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=132750","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=132750"}},{"id":"132815","reference":"AQO 1832/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-04-19","answerBy":"2012-04-30","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to outline what work he will ask his Department to undertake to reduce the cost of division.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201832%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=132815","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=132815"}},{"id":"134008","reference":"AQO 1832/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-04-19","answerBy":"2012-04-30","answered":"2012-04-30","answeredOrally":false,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel to outline what work he will ask his Department to undertake to reduce the cost of division.","answerText":"The nature of the work progressed by my Department is largely in support of the other government departments and as such does not have direct exposure to the policies that cut across the cost of division.\n\nI expect officials in my Department to explore all opportunities to reduce costs to ensure that we continue to deliver quality, cost effective and efficient public services.","answerHtml":"<p>The nature of the work progressed by my Department is largely in support of the other government departments and as such does not have direct exposure to the policies that cut across the cost of division.</p><p>I expect officials in my Department to explore all opportunities to reduce costs to ensure that we continue to deliver quality, cost effective and efficient public services.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201832%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=134008","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=134008"}},{"id":"132814","reference":"AQO 1809/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-04-19","answerBy":"2012-04-30","answered":"2012-04-30","answeredOrally":true,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture and Rural Development","question":"To ask the Minister of Agriculture and Rural Development what commitment her Department will give to increase protection for ancient and long established woodlands.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201809%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=132814","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-11-12/30-April-2012","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=132814"}},{"id":"131463","reference":"AQO 1768/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-03-29","answerBy":"2012-04-23","answered":"2012-04-23","answeredOrally":true,"priority":false,"department":"Department for Employment and Learning","departmentId":"83","minister":"Minister for Employment and Learning","question":"To ask the Minister for Employment and Learning what action he is taking to support the tourism and hospitality sector.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201768%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=131463","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-11-12/23-April-2012","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=131463"}},{"id":"129872","reference":"AQO 1675/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-03-15","answerBy":"2012-03-27","answered":null,"answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what work his Department will undertake in conjunction with the Department of the Environment to improve road safety for cyclists.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201675%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=129872","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=129872"}},{"id":"131320","reference":"AQO 1675/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-03-15","answerBy":"2012-03-27","answered":"2012-03-27","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what work his Department will undertake in conjunction with the Department of the Environment to improve road safety for cyclists.","answerText":"I meet regularly with Assembly Colleagues, including Minister Attwood in the Ministerial Road Safety Group, to discuss all aspects of road safety including road safety for cyclists. Specifically, my Department’s Travelwise team is working with the Department of the Environment’s Road Safety team to produce a joint publication aimed at providing advice for cyclists about safely interacting with other road users.\n\nMy Department’s Roads Service is committed to providing safer roads for all road users, particularly vulnerable road users such as pedestrians and cyclists. This is achieved, by utilising a range of measures, including road safety education and engineering, traffic calming and enhancement of the pedestrian and cycling network.","answerHtml":"<p>I meet regularly with Assembly Colleagues, including Minister Attwood in the Ministerial Road Safety Group, to discuss all aspects of road safety including road safety for cyclists. Specifically, my Department’s Travelwise team is working with the Department of the Environment’s Road Safety team to produce a joint publication aimed at providing advice for cyclists about safely interacting with other road users.</p><p>My Department’s Roads Service is committed to providing safer roads for all road users, particularly vulnerable road users such as pedestrians and cyclists. This is achieved, by utilising a range of measures, including road safety education and engineering, traffic calming and enhancement of the pedestrian and cycling network.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201675%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=131320","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=131320"}},{"id":"129877","reference":"AQO 1634/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-03-15","answerBy":"2012-03-26","answered":null,"answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment whether he would consider speeding up the planning process for renewable energy applications.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201634%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=129877","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=129877"}},{"id":"131299","reference":"AQO 1634/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-03-15","answerBy":"2012-03-26","answered":"2012-04-06","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment whether he would consider speeding up the planning process for renewable energy applications.","answerText":"The Department welcomes the contribution that renewables make to the drive to reduce carbon emissions and acknowledges the importance of processing these types of applications in a timely manner.\n\nA number of short term reform measures have been initiated to improve performance and speed in decision making and to stimulate and support economic recovery in the region. A range of measures are currently in place which is intended to improve the speed of decision making for renewable energy project applications.\n\nA Sub Group of the Planning Forum is considering development proposals for renewable energy development in the context of planning applications, licensing requirements and resources and structures for dealing with such proposals.\n\nPlanning staff are actively engaging with consultees to the planning process to ensure that any relevant information required in respect of renewable energy is submitted at the beginning of the process and consultation is focused and timely.\n\nThe specialist teams in Planning Headquarters who deal exclusively with specific types of renewable energy applications ensure that a consistent approach is taken. Specific training to planning staff on the assessment of planning applications for single wind turbines has just been completed and this will ensure consistency throughout Area Planning Offices.\n\nIn preparation for the transfer of planning functions to Local Councils, the Department will be fundamentally reviewing the system for measuring planning application processing targets.","answerHtml":"<p>The Department welcomes the contribution that renewables make to the drive to reduce carbon emissions and acknowledges the importance of processing these types of applications in a timely manner.</p><p>A number of short term reform measures have been initiated to improve performance and speed in decision making and to stimulate and support economic recovery in the region. A range of measures are currently in place which is intended to improve the speed of decision making for renewable energy project applications.</p><p>A Sub Group of the Planning Forum is considering development proposals for renewable energy development in the context of planning applications, licensing requirements and resources and structures for dealing with such proposals.</p><p>Planning staff are actively engaging with consultees to the planning process to ensure that any relevant information required in respect of renewable energy is submitted at the beginning of the process and consultation is focused and timely.</p><p>The specialist teams in Planning Headquarters who deal exclusively with specific types of renewable energy applications ensure that a consistent approach is taken. Specific training to planning staff on the assessment of planning applications for single wind turbines has just been completed and this will ensure consistency throughout Area Planning Offices.</p><p>In preparation for the transfer of planning functions to Local Councils, the Department will be fundamentally reviewing the system for measuring planning application processing targets.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201634%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=131299","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=131299"}},{"id":"126956","reference":"AQO 1502/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-02-23","answerBy":"2012-03-06","answered":null,"answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development for his assessment of the current flags protocol.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201502%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=126956","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=126956"}},{"id":"128725","reference":"AQO 1502/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-02-23","answerBy":"2012-03-06","answered":"2012-03-06","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development for his assessment of the current flags protocol.","answerText":"My Department does not approve of, or support, the unauthorised use of departmental property for any purpose, however, as the Member will appreciate, the removal of sectarian motivated signs and emblems, including flags, is a matter that needs to be treated with sensitivity. The Department also has to take into account the safety of those who are asked to undertake the removal. The risk of escalating the problem also needs to be taken into consideration.\n\nThe Department has signed up to the multi-agency Protocol on the Display of Flags in Public Areas, which was introduced in April 2005. Under the Protocol, my Department’s Roads Service will, when called upon by the lead Agency, provide the access equipment and resources to assist in the removal of unwanted flags, once agreement has been reached with the local community.\n\nUnauthorised memorials on the property of the Department’s arms- length bodies are matters for the Boards of those organisations, bearing in mind their responsibilities for safety and statutory obligations to promote good relations between people of different religious beliefs or political persuasions.\n\nWhile the current protocol has been helpful, I welcome its review, which is being led by OFMDFM and is currently ongoing. Roads Service will, of course, be participating in the review.","answerHtml":"<p>My Department does not approve of, or support, the unauthorised use of departmental property for any purpose, however, as the Member will appreciate, the removal of sectarian motivated signs and emblems, including flags, is a matter that needs to be treated with sensitivity. The Department also has to take into account the safety of those who are asked to undertake the removal. The risk of escalating the problem also needs to be taken into consideration.</p><p>The Department has signed up to the multi-agency Protocol on the Display of Flags in Public Areas, which was introduced in April 2005. Under the Protocol, my Department’s Roads Service will, when called upon by the lead Agency, provide the access equipment and resources to assist in the removal of unwanted flags, once agreement has been reached with the local community.</p><p>Unauthorised memorials on the property of the Department’s arms- length bodies are matters for the Boards of those organisations, bearing in mind their responsibilities for safety and statutory obligations to promote good relations between people of different religious beliefs or political persuasions.</p><p>While the current protocol has been helpful, I welcome its review, which is being led by OFMDFM and is currently ongoing. Roads Service will, of course, be participating in the review.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201502%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=128725","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=128725"}},{"id":"126649","reference":"AQW 8685/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-02-22","answerBy":"2012-03-08","answered":"2012-03-07","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment what action his Department is taking to ensure that district councils comply with good tendering practices for legal services.","answerText":"Under the Local Government (Best Value) Act (Northern Ireland) 2002, (the 2002 Act), district councils are required to make arrangements for continuous improvement in the way in which their functions are exercised, having regard to a combination of economy, efficiency and effectiveness.\n\nHow individual councils obtain their legal services is legally and technically a matter for each council. However, it is expected that, in line with best value, councils should seek out the most economical provider of a quality service. Also, in his report of 12 June 2008, the Chief Local Government Auditor encouraged all councils to review their legal advice arrangements on a more regular basis. This was reiterated in the current Chief Local Government Auditor’s report in 2011 and is something that will be considered in future local government audits.\n\nI have been encouraging local authorities to demonstrate how current procurement arrangements can provide value for money and comply with legislation. I will be meeting with the Local Government Procurement Group shortly to discuss how the sector can improve procurement practices and to encourage collaborative procurement.\n\nI agree strongly that best practice should prevail when tendering legal services and indeed I wrote to councils last year to request details of practices. I shall make it clear at the LGPG meeting my views on these matters.","answerHtml":"<p>Under the Local Government (Best Value) Act (Northern Ireland) 2002, (the 2002 Act), district councils are required to make arrangements for continuous improvement in the way in which their functions are exercised, having regard to a combination of economy, efficiency and effectiveness.</p><p>How individual councils obtain their legal services is legally and technically a matter for each council. However, it is expected that, in line with best value, councils should seek out the most economical provider of a quality service. Also, in his report of 12 June 2008, the Chief Local Government Auditor encouraged all councils to review their legal advice arrangements on a more regular basis. This was reiterated in the current Chief Local Government Auditor’s report in 2011 and is something that will be considered in future local government audits.</p><p>I have been encouraging local authorities to demonstrate how current procurement arrangements can provide value for money and comply with legislation. I will be meeting with the Local Government Procurement Group shortly to discuss how the sector can improve procurement practices and to encourage collaborative procurement.</p><p>I agree strongly that best practice should prevail when tendering legal services and indeed I wrote to councils last year to request details of practices. I shall make it clear at the LGPG meeting my views on these matters.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208685%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=126649","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=126649"}},{"id":"126648","reference":"AQW 8684/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-02-22","answerBy":"2012-03-08","answered":"2012-04-02","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment to detail the district councils that (i) tender; and (ii) do not tender for legal services.","answerText":"The information requested is provided in the attached table.\n\nTender\tDo not tender\nAntrim Borough Council\tBallymoney Borough Council\nArds Borough Council\tBanbridge District Council *\nArmagh City and District Council\tBelfast City Council^\nBallymena Borough Council\tCarrickfergus Borough Council\nCookstown District Council\tCastlereagh Borough Council\nCraigavon Borough Council\tColeraine Borough Council *\nLisburn City Council\tDerry City Council\nNewtownabbey Borough Council\tDown District Council^\nNorth Down Borough Council\tDungannon and South Tyrone Borough Council\nFermanagh District Council *\nLarne Borough Council\nLimavady Borough Council\nMagherafelt District Council\nMoyle District Council\nNewry & Mourne District Council**\nOmagh District Council\nStrabane District Council\n\n^Please note Belfast City Council has its own in-house legal department and therefore does not need to tender. Down District Council also uses this legal facility.\n\n* reported that although they do not formally tender they seek competition from a formal approved panel of solicitors.\n\n** reported that it does tender for HR legal services.\n\nI have asked for further information on this issue which may raise questions.","answerHtml":"<p>The information requested is provided in the attached table.</p><div class=\"table-wrap\"><table><tr><td>Tender</td><td>Do not tender</td></tr><tr><td>Antrim Borough Council</td><td>Ballymoney Borough Council</td></tr><tr><td>Ards Borough Council</td><td>Banbridge District Council *</td></tr><tr><td>Armagh City and District Council</td><td>Belfast City Council^</td></tr><tr><td>Ballymena Borough Council</td><td>Carrickfergus Borough Council</td></tr><tr><td>Cookstown District Council</td><td>Castlereagh Borough Council</td></tr><tr><td>Craigavon Borough Council</td><td>Coleraine Borough Council *</td></tr><tr><td>Lisburn City Council</td><td>Derry City Council</td></tr><tr><td>Newtownabbey Borough Council</td><td>Down District Council^</td></tr><tr><td>North Down Borough Council</td><td>Dungannon and South Tyrone Borough Council</td></tr><tr><td></td><td>Fermanagh District Council *</td></tr><tr><td></td><td>Larne Borough Council</td></tr><tr><td></td><td>Limavady Borough Council</td></tr><tr><td></td><td>Magherafelt District Council</td></tr><tr><td></td><td>Moyle District Council</td></tr><tr><td></td><td>Newry &amp; Mourne District Council**</td></tr><tr><td></td><td>Omagh District Council</td></tr><tr><td></td><td>Strabane District Council</td></tr></table></div><p>^Please note Belfast City Council has its own in-house legal department and therefore does not need to tender. Down District Council also uses this legal facility.</p><p>* reported that although they do not formally tender they seek competition from a formal approved panel of solicitors.</p><p>** reported that it does tender for HR legal services.</p><p>I have asked for further information on this issue which may raise questions.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208684%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=126648","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=126648"}},{"id":"126190","reference":"AQW 8487/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-02-17","answerBy":"2012-03-05","answered":"2012-03-01","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development, pursuant to AQW 1670/11-15, what funding will be made available under the ReStore Programme in Carrickfergus.","answerText":"The level of grant funding available for a ReStore project or similar type of town centre revitalisation scheme is up to £150,000 for each location or town centre. The exact content of each scheme is decided by a representative group of traders, but projects typically focus on improving the appearance of building frontages and some forms of promotional and marketing activity designed to attract more people into the town centre.\n\nFunding for a scheme in Carrickfergus town centre is currently scheduled in the Department’s capital expenditure programme in 2013/14. Any offer of funding for the scheme will be subject to a satisfactory business case and appraisal being completed and necessary approvals being granted. The timing of the scheme is designed to follow after the current public realm works in the town centre have been completed as combining public realm and revitalisation projects in this way has been found to be more effective.","answerHtml":"<p>The level of grant funding available for a ReStore project or similar type of town centre revitalisation scheme is up to £150,000 for each location or town centre. The exact content of each scheme is decided by a representative group of traders, but projects typically focus on improving the appearance of building frontages and some forms of promotional and marketing activity designed to attract more people into the town centre.</p><p>Funding for a scheme in Carrickfergus town centre is currently scheduled in the Department’s capital expenditure programme in 2013/14. Any offer of funding for the scheme will be subject to a satisfactory business case and appraisal being completed and necessary approvals being granted. The timing of the scheme is designed to follow after the current public realm works in the town centre have been completed as combining public realm and revitalisation projects in this way has been found to be more effective.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%208487%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=126190","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=126190"}},{"id":"125931","reference":"AQO 1423/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-02-16","answerBy":"2012-02-28","answered":null,"answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment how the provisions in the Marine Bill will address the issue of marine management.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201423%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=125931","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=125931"}},{"id":"127802","reference":"AQO 1423/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-02-16","answerBy":"2012-02-28","answered":"2012-02-29","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment how the provisions in the Marine Bill will address the issue of marine management.","answerText":"The Marine Bill, which I introduced to the Assembly last week, provides for marine plans, marine conservation zones, and further provision in relation to marine licensing for certain electricity works in the Northern Ireland inshore region.\n\nThese provisions together will provide the basis for the future, sustainable management of the North’s marine environment, so that current and future generations can enjoy its social, economic and environmental benefits.\n\nI remain committed to ensuring that the Bill is implemented in an integrated way so that those benefits can be realised in full.\n\nI will also continue my conversations with Executive colleagues that the Bill should legislate for a Marine Management Organisation (MMO) as the best vehicle to manage and reconcile the many interests and needs of marine management.","answerHtml":"<p>The Marine Bill, which I introduced to the Assembly last week, provides for marine plans, marine conservation zones, and further provision in relation to marine licensing for certain electricity works in the Northern Ireland inshore region.</p><p>These provisions together will provide the basis for the future, sustainable management of the North’s marine environment, so that current and future generations can enjoy its social, economic and environmental benefits.</p><p>I remain committed to ensuring that the Bill is implemented in an integrated way so that those benefits can be realised in full.</p><p>I will also continue my conversations with Executive colleagues that the Bill should legislate for a Marine Management Organisation (MMO) as the best vehicle to manage and reconcile the many interests and needs of marine management.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201423%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=127802","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=127802"}},{"id":"125937","reference":"AQO 1390/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-02-16","answerBy":"2012-02-27","answered":"2012-02-27","answeredOrally":true,"priority":false,"department":"Department for Employment and Learning","departmentId":"83","minister":"Minister for Employment and Learning","question":"To ask the Minister for Employment and Learning what role his Department has had in informing the draft Programme for Government and the draft Economic Strategy.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201390%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=125937","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-11-12/27-February-2012","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=125937"}},{"id":"124463","reference":"AQW 7829/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-02-07","answerBy":"2012-02-22","answered":"2012-02-16","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment what support her Department will offer to credit unions during their transfer to Financial Services Authority regulation.","answerText":"DETI officials, together with staff from the Financial Services Authority (FSA), the Financial Services Compensation Scheme (FSCS) and the Financial Ombudsman Service (FOS) have provided a programme of support to all NI credit unions (NICU) in the period leading up to transfer of regulatory arrangements to FSA in March 2012.\n\nThis has included two separate series of road shows held in locations across Northern Ireland; one in September/October 2011 was designed to inform the consultation process, while the most recent was aimed at providing NICUs with a fuller understanding of how the new regulatory arrangements will work in practice. These, with considerable contribution from, and participation of, DETI officials, were delivered by FSA / FSCS representatives and provided valuable opportunities for discussion and for useful contacts to be made between individual NICUs and FSA / FSCS staff. The road-shows, which concluded on 2 February 2012, were well attended by NICU representatives. FSA has also included a special Northern Ireland ‘help section’ on its website specifically for the assistance of NICUs.\n\nFSA has indicated that it will maintain its support to NICUs for as long as required.","answerHtml":"<p>DETI officials, together with staff from the Financial Services Authority (FSA), the Financial Services Compensation Scheme (FSCS) and the Financial Ombudsman Service (FOS) have provided a programme of support to all NI credit unions (NICU) in the period leading up to transfer of regulatory arrangements to FSA in March 2012.</p><p>This has included two separate series of road shows held in locations across Northern Ireland; one in September/October 2011 was designed to inform the consultation process, while the most recent was aimed at providing NICUs with a fuller understanding of how the new regulatory arrangements will work in practice. These, with considerable contribution from, and participation of, DETI officials, were delivered by FSA / FSCS representatives and provided valuable opportunities for discussion and for useful contacts to be made between individual NICUs and FSA / FSCS staff. The road-shows, which concluded on 2 February 2012, were well attended by NICU representatives. FSA has also included a special Northern Ireland ‘help section’ on its website specifically for the assistance of NICUs.</p><p>FSA has indicated that it will maintain its support to NICUs for as long as required.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207829%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=124463","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=124463"}},{"id":"124462","reference":"AQW 7828/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-02-07","answerBy":"2012-02-22","answered":"2012-02-16","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment what representations she has made, or intends to make, to Treasury regarding the concerns of credit unions about the proposals to restrict the majority of their investments to one year maturity.","answerText":"Following the joint HM Treasury and FSA consultation exercise on future regulation policy in relation to NI credit unions, I wrote to the Financial Secretary to the Treasury (FST) in November 2011, setting out a number of concerns with the proposals within the document. One of these related to the twelve month limit on investment periods for those credit unions which will transfer as ‘version 1’ on 31 March 2012 and which will comprise the majority of transferees. The letter was copied to the Chief Executive of the Financial Services Authority for his observations. As a result of my intervention, in its December 2011 policy response to the consultation, FSA announced a policy change in respect of several issues, including a one year transitional easement for investment limits following the transfer date of 31 March 2012.\n\nHowever, from my contact with the trade bodies as well as correspondence received from individual credit unions, I am aware that there is considerable disappointment that the policy easement remains as an interim, transitional measure. In view of this, I have again written to the FST and the FSA on 1 February 2012, outlining the detrimental effect this policy will continue to have on credit unions here and requested that this issue be reviewed.","answerHtml":"<p>Following the joint HM Treasury and FSA consultation exercise on future regulation policy in relation to NI credit unions, I wrote to the Financial Secretary to the Treasury (FST) in November 2011, setting out a number of concerns with the proposals within the document. One of these related to the twelve month limit on investment periods for those credit unions which will transfer as ‘version 1’ on 31 March 2012 and which will comprise the majority of transferees. The letter was copied to the Chief Executive of the Financial Services Authority for his observations. As a result of my intervention, in its December 2011 policy response to the consultation, FSA announced a policy change in respect of several issues, including a one year transitional easement for investment limits following the transfer date of 31 March 2012.</p><p>However, from my contact with the trade bodies as well as correspondence received from individual credit unions, I am aware that there is considerable disappointment that the policy easement remains as an interim, transitional measure. In view of this, I have again written to the FST and the FSA on 1 February 2012, outlining the detrimental effect this policy will continue to have on credit unions here and requested that this issue be reviewed.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207828%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=124462","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=124462"}},{"id":"124348","reference":"AQW 7796/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-02-07","answerBy":"2012-02-22","answered":"2012-02-22","answeredOrally":false,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice for an update on the steps that have been taken to implement the agreement made by the Prison Service in August 2010 on the management of separated prisoners.","answerText":"In line with the agreement of August 2010 NIPS has taken a number of steps which have led to significant improvements for separated republican prisoners in Roe House. These include:\n\nimproved access to association in the recreation room, exercise yard and astro-turf pitch and the introduction of inter-cell association and communal dining for prisoners in Roe 3 and 4;\n\na prisoner forum, established in August 2010;\n\na review of search technology; and\n\nthe introduction of significant changes to search arrangements which have eliminated the need for rub down searching on the landings (with the exception of Roe 4 where it has been necessary to reintroduce rubdown searching in response to the actions of protesting prisoners on that landing), and removed the requirement for separated prisoners to be routinely full body searched within the prison.\n\nThe installation of a new search facility, located within the separated complex, which enables prisoners entering or leaving Roe House to be searched by means of a full rub down search combined with the use of electronic devices including an airport style scanner, hand held metal detector, and BOSS Chair.\n\nA detailed breakdown of the elements of the agreement, and action taken in relation to each is attached.\n\nWhilst the requirement for full body searching has been significantly reduced, prisoners are still required to undergo a full body search on entry to and exit from the prison. I am satisfied that this requirement is consistent with the agreement, and I consider those elements of the agreement relating to searching to be implemented in full.\n\nDespite these efforts to implement the agreement, a significant number of separated republican prisoners have chosen to re-engage in protest action. Consequently, these prisoners are currently subject to a restricted regime and are unable to avail of the full regime. In addition, a number of prisoners who are not participating in the dirty protest have nonetheless chosen not to avail of all of the facilities available.\n\nUnder the agreement, those elements relating to the relaxation of controlled movement were to be implemented on a phased basis, contingent on the fundamental principles of the agreement being upheld by both parties. Whilst both NIPS and I remain committed to this aim, it is difficult to see how further progress can be made on these elements in the context of ongoing protest action in Roe House.\n\nNevertheless, I remain committed to the full implementation of the agreement and to making every possible effort to resolve the current protest as soon as possible.\n\nIn addition to the steps taken under the agreement, NIPS has completed a further review of search technology, in line with a recommendation made by the Prison Review Team. I am currently considering the findings of that review.\n\nANNEX A\n\nIssues\tStatus\nPrisoner Forum\nAn effective Prisoner Forum will be established\tActioned:\nPrisoner Forum was established in August 2010 to meet regularly on a monthly basis.\nSearching\nNo random full body searching will take place on the way to domestic and legal visits and the videolink or from the SSU\tActioned:\nProcedures revised.\nNo “rub-down” searching internally within Roe 3 and 4\tActioned:\nUnfortunately, in response to the ongoing protest action by prisoners on Roe 4, rub down searching has had to be re introduced internally on that landing. In line with the August agreement and the actions of prisoners on Roe 3, rub down searches are not carried out on that landing.\nNIPS will introduce a new search facility and revised search policy for separated prisoners… which will remove the requirement for routine full-body searching of separated prisoners within the prison\tActioned:\nNew search facility has been put in place, with a BOSS Chair installed and is operational. This new facility has removed the requirement for routine full-body searching within the prison.\nFor security reasons there is still a requirement for full-body searching where a prisoner enters or exits the prison.\nWhere full body search is required because of positive indication or intelligence / suspicion it must be authorised and observed by a supervisor and carried out in a manner which is both sensitive and dignified.\nThe process of searching will be audited and monitored to ensure it complies with human rights standards.\tActioned:\nWhere searches are required they are authorised and observed by the Senior Officer.\nSearching now subject to auditing and monitoring\nReview of full body searching to report by the end of September and agreed recommendations implemented as soon as possible\tActioned:\nThe report was produced by the end of September 2010. However the subsequent independent competitive analysis of the review was delayed considerably due to availability of the independent reviewers.\nThe review was published in January and made no additional recommendations for revisions to search practices in the context of separated prisoners.\nSubsequent Judicial Review of full body searching, specifically on entry and exit to the prison has ruled that the requirement is lawful and not incompatible with ECHR.\nIn addition, in light of the recommendation by the PRT in its final report (Oct 2011) NIPS has conducted a further review of available and anticipated search technology. This review is now complete and its recommendations are being considered. HMP Holme has submitted an application, under the under the Justification of Practices involving Ionising Radiation Regulations 2004, for use of full body imaging scanners in UK prisons. NIPS is keeping abreast of developments in this area.\nOral searching\tActioned:\nAlthough not in the original agreement, in response to concerns raised by prisoners in December 2010, NIPS revised its Security Manual to make the requirement for an oral search (during rub down searches) discretionary rather than mandatory.\nOral searches are now only required when there is a suspicion that a prisoner may be concealing an illicit item in his mouth.\nMovement / association\nSubject to the fundamental principles, NIPS’s aim is to move from the existing arrangements towards a more progressive, supervised free-flow movement system within Roe House on a phased basis:\tOngoing:\nNIPS remains committed to this aim, and the full implementation of the agreement, subject to the fundamental principles being upheld.\nHowever progress towards this goal is – as the agreement makes clear – dependent on adherence to the fundamental principles.\nPhase 1 – commencing August 2010:\nAssociation within the recreation room, yard and – when it is completed – the astro-turf pitch from 0830 until fifteen minutes before lock-up\nConsidering the wing – for the purposes of movement – as one unit, rather than two landings, to permit a maximum of six prisoners on the landing at any one time, while other prisoners can have access to the kitchen, laundry room, classrooms, showers, ironing and haircutting room.\tActioned:\nPrior to the resumption of the protest, prisoners were given enhanced association within the recreation room, yard and astro-turf from 0830 until 15 minutes before lock-up.\nRevised arrangements for moving prisoners were also introduced.\nPrisoners’ access to these facilities has been affected by the ongoing dirty protest. Those prisoners who are not engaging in dirty protest are nonetheless choosing not to use the recreation room..\nPhase 2 – commencing December 2010:\nIn addition to implementing the recommendations of the Prisoner Ombudsman’s report and this agreement, NIPS will take steps to implement agreed recommendations from the Independent Review as quickly as possible\tOngoing\nThe Prison Review Team’s interim report did not contain any specific recommendations on this.\nSubject to the fundamental principles, NIPS remains committed to the full implementation of the agreement.\nWhilst NIPS remains committed to the full implementation of the Agreement, it is difficult to see how further progress can be made in relation to moving towards more free-flow movement arrangements in the context of the current ongoing protest action by prisoners in Roe 3 and 4 which is a clear breach of the fundamental principles under the agreement.\nPhase 3\nNIPS will continue to review and assess ways to further progress supervised free flow movement of prisoners. This will include implementing agreed recommendations – if any – contained in the final independent Prison Review Report.\tOngoing:\nNIPS remains committed to the agreement. However the agreement set out that the ability to progress, implement and maintain phased changes to movement procedures will be determined by adherence to the fundamental principles.\nIt is difficult to make further progress at this stage in the context of prisoner protests and behaviours which undermine the fundamental principles of the agreement.\nInter-cell association\tActioned:\nAlthough not included in the agreement, Inter-cell association was made available to prisoners from 11 March 2011.\nOther issues\nAssessment Team appointed for continuous monitoring and evidencing of the agreement\tActioned:\nAssessment Team have conducted assessments and briefed the Minister on a number of occasions.","answerHtml":"<p>In line with the agreement of August 2010 NIPS has taken a number of steps which have led to significant improvements for separated republican prisoners in Roe House. These include:</p><p>improved access to association in the recreation room, exercise yard and astro-turf pitch and the introduction of inter-cell association and communal dining for prisoners in Roe 3 and 4;</p><p>a prisoner forum, established in August 2010;</p><p>a review of search technology; and</p><p>the introduction of significant changes to search arrangements which have eliminated the need for rub down searching on the landings (with the exception of Roe 4 where it has been necessary to reintroduce rubdown searching in response to the actions of protesting prisoners on that landing), and removed the requirement for separated prisoners to be routinely full body searched within the prison.</p><p>The installation of a new search facility, located within the separated complex, which enables prisoners entering or leaving Roe House to be searched by means of a full rub down search combined with the use of electronic devices including an airport style scanner, hand held metal detector, and BOSS Chair.</p><p>A detailed breakdown of the elements of the agreement, and action taken in relation to each is attached.</p><p>Whilst the requirement for full body searching has been significantly reduced, prisoners are still required to undergo a full body search on entry to and exit from the prison. I am satisfied that this requirement is consistent with the agreement, and I consider those elements of the agreement relating to searching to be implemented in full.</p><p>Despite these efforts to implement the agreement, a significant number of separated republican prisoners have chosen to re-engage in protest action. Consequently, these prisoners are currently subject to a restricted regime and are unable to avail of the full regime. In addition, a number of prisoners who are not participating in the dirty protest have nonetheless chosen not to avail of all of the facilities available.</p><p>Under the agreement, those elements relating to the relaxation of controlled movement were to be implemented on a phased basis, contingent on the fundamental principles of the agreement being upheld by both parties. Whilst both NIPS and I remain committed to this aim, it is difficult to see how further progress can be made on these elements in the context of ongoing protest action in Roe House.</p><p>Nevertheless, I remain committed to the full implementation of the agreement and to making every possible effort to resolve the current protest as soon as possible.</p><p>In addition to the steps taken under the agreement, NIPS has completed a further review of search technology, in line with a recommendation made by the Prison Review Team. I am currently considering the findings of that review.</p><p>ANNEX A</p><div class=\"table-wrap\"><table><tr><td>Issues</td><td>Status</td></tr><tr><td colspan=\"2\">Prisoner Forum</td></tr><tr><td>An effective Prisoner Forum will be established</td><td>Actioned:<br>Prisoner Forum was established in August 2010 to meet regularly on a monthly basis.</td></tr><tr><td colspan=\"2\">Searching</td></tr><tr><td>No random full body searching will take place on the way to domestic and legal visits and the videolink or from the SSU</td><td>Actioned:<br>Procedures revised.</td></tr><tr><td>No “rub-down” searching internally within Roe 3 and 4</td><td>Actioned:<br>Unfortunately, in response to the ongoing protest action by prisoners on Roe 4, rub down searching has had to be re introduced internally on that landing. In line with the August agreement and the actions of prisoners on Roe 3, rub down searches are not carried out on that landing.</td></tr><tr><td>NIPS will introduce a new search facility and revised search policy for separated prisoners… which will remove the requirement for routine full-body searching of separated prisoners within the prison</td><td>Actioned:<br>New search facility has been put in place, with a BOSS Chair installed and is operational. This new facility has removed the requirement for routine full-body searching within the prison.<br>For security reasons there is still a requirement for full-body searching where a prisoner enters or exits the prison.</td></tr><tr><td>Where full body search is required because of positive indication or intelligence / suspicion it must be authorised and observed by a supervisor and carried out in a manner which is both sensitive and dignified.<br>The process of searching will be audited and monitored to ensure it complies with human rights standards.</td><td>Actioned:<br>Where searches are required they are authorised and observed by the Senior Officer.<br>Searching now subject to auditing and monitoring</td></tr><tr><td>Review of full body searching to report by the end of September and agreed recommendations implemented as soon as possible</td><td>Actioned:<br>The report was produced by the end of September 2010. However the subsequent independent competitive analysis of the review was delayed considerably due to availability of the independent reviewers.<br>The review was published in January and made no additional recommendations for revisions to search practices in the context of separated prisoners.<br>Subsequent Judicial Review of full body searching, specifically on entry and exit to the prison has ruled that the requirement is lawful and not incompatible with ECHR.<br>In addition, in light of the recommendation by the PRT in its final report (Oct 2011) NIPS has conducted a further review of available and anticipated search technology. This review is now complete and its recommendations are being considered. HMP Holme has submitted an application, under the under the Justification of Practices involving Ionising Radiation Regulations 2004, for use of full body imaging scanners in UK prisons. NIPS is keeping abreast of developments in this area.</td></tr><tr><td>Oral searching</td><td>Actioned:<br>Although not in the original agreement, in response to concerns raised by prisoners in December 2010, NIPS revised its Security Manual to make the requirement for an oral search (during rub down searches) discretionary rather than mandatory.<br>Oral searches are now only required when there is a suspicion that a prisoner may be concealing an illicit item in his mouth.</td></tr><tr><td colspan=\"2\">Movement / association</td></tr><tr><td>Subject to the fundamental principles, NIPS’s aim is to move from the existing arrangements towards a more progressive, supervised free-flow movement system within Roe House on a phased basis:</td><td>Ongoing:<br>NIPS remains committed to this aim, and the full implementation of the agreement, subject to the fundamental principles being upheld.<br>However progress towards this goal is – as the agreement makes clear – dependent on adherence to the fundamental principles.</td></tr><tr><td>Phase 1 – commencing August 2010:<br>Association within the recreation room, yard and – when it is completed – the astro-turf pitch from 0830 until fifteen minutes before lock-up<br>Considering the wing – for the purposes of movement – as one unit, rather than two landings, to permit a maximum of six prisoners on the landing at any one time, while other prisoners can have access to the kitchen, laundry room, classrooms, showers, ironing and haircutting room.</td><td>Actioned:<br>Prior to the resumption of the protest, prisoners were given enhanced association within the recreation room, yard and astro-turf from 0830 until 15 minutes before lock-up.<br>Revised arrangements for moving prisoners were also introduced.<br>Prisoners’ access to these facilities has been affected by the ongoing dirty protest. Those prisoners who are not engaging in dirty protest are nonetheless choosing not to use the recreation room..</td></tr><tr><td>Phase 2 – commencing December 2010:<br>In addition to implementing the recommendations of the Prisoner Ombudsman’s report and this agreement, NIPS will take steps to implement agreed recommendations from the Independent Review as quickly as possible</td><td>Ongoing<br>The Prison Review Team’s interim report did not contain any specific recommendations on this.<br>Subject to the fundamental principles, NIPS remains committed to the full implementation of the agreement.<br>Whilst NIPS remains committed to the full implementation of the Agreement, it is difficult to see how further progress can be made in relation to moving towards more free-flow movement arrangements in the context of the current ongoing protest action by prisoners in Roe 3 and 4 which is a clear breach of the fundamental principles under the agreement.</td></tr><tr><td>Phase 3<br>NIPS will continue to review and assess ways to further progress supervised free flow movement of prisoners. This will include implementing agreed recommendations – if any – contained in the final independent Prison Review Report.</td><td>Ongoing:<br>NIPS remains committed to the agreement. However the agreement set out that the ability to progress, implement and maintain phased changes to movement procedures will be determined by adherence to the fundamental principles.<br>It is difficult to make further progress at this stage in the context of prisoner protests and behaviours which undermine the fundamental principles of the agreement.</td></tr><tr><td>Inter-cell association</td><td>Actioned:<br>Although not included in the agreement, Inter-cell association was made available to prisoners from 11 March 2011.</td></tr><tr><td colspan=\"2\">Other issues</td></tr><tr><td>Assessment Team appointed for continuous monitoring and evidencing of the agreement</td><td>Actioned:<br>Assessment Team have conducted assessments and briefed the Minister on a number of occasions.</td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%207796%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=124348","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=124348"}},{"id":"122057","reference":"AQW 6869/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-01-20","answerBy":"2012-02-06","answered":"2012-02-02","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to detail his Department’s capital budget broken down by the amount allocated to (i) each objective; and (ii) each spending area up to, and including, the 2014-15 financial year.","answerText":"The following table details the Department’s capital budget broken down by the amount allocated to (i) each objective; and (ii) each spending area up to, and including, the 2014-15 financial year.\n\n2011-12\t2012-13\t2013-14\t2014-15\nObjective and Spending Area\t£m\t£m\t£m\t£m\nObjective A\nRoads *\t155.9\t235.5\t385.4\t379.2\nTransport\t107.5\t47.7\t13.4\t53.6\nEU Structural Funds\t0.3\t0.1\t0.1\t0.3\nTotal Objective A\t263.8\t283.3\t398.9\t433.2\nObjective B\nWater and Sewerage\t189.0\t147.6\t151.3\t180.0\nTotal Objective B\t189.0\t147.6\t151.3\t180.0\nTotal\t452.8\t430.9\t550.2\t613.2\n\nNote: Totals may not add due to rounding.\n\nObjective A: Supporting the economy by planning, developing and maintaining safe and sustainable transportation networks, promoting airport and harbour services, addressing regional imbalance in infrastructure and shaping the long-term future of the region.\n\nObjective B: Contributing to the health and well being of the community and the protection of the environment by maintaining and developing the policy and regulatory environment which facilitates the provision of sustainable, high quality water and sewerage services.\n\n*At the North South Ministerial Council (NSMC) Plenary Meeting held on Friday 18 November 2011, it was noted that provision of further funding by the Irish Government, for progression of the A5 and A8 projects, is being deferred and that, in this regard, the Irish Government will provide £25 million per annum in 2015 and 2016 towards the project.\n\nA new funding and implementation plan is now being prepared for the two projects, for agreement at the next NSMC Transport meeting, with endorsement at the next NSMC Plenary meeting. This process will, undoubtedly, affect the funding available to the Department for Regional Development and, therefore potentially, delivery of the Strategic Roads Programme.\n\nWhen the funding is confirmed, I intend to review the spending priorities across my Department.","answerHtml":"<p>The following table details the Department’s capital budget broken down by the amount allocated to (i) each objective; and (ii) each spending area up to, and including, the 2014-15 financial year.</p><div class=\"table-wrap\"><table><tr><td colspan=\"2\">2011-12</td><td>2012-13</td><td>2013-14</td><td>2014-15</td></tr><tr><td>Objective and Spending Area</td><td>£m</td><td>£m</td><td>£m</td><td>£m</td></tr><tr><td colspan=\"5\">Objective A</td></tr><tr><td>Roads *</td><td>155.9</td><td>235.5</td><td>385.4</td><td>379.2</td></tr><tr><td>Transport</td><td>107.5</td><td>47.7</td><td>13.4</td><td>53.6</td></tr><tr><td>EU Structural Funds</td><td>0.3</td><td>0.1</td><td>0.1</td><td>0.3</td></tr><tr><td>Total Objective A</td><td>263.8</td><td>283.3</td><td>398.9</td><td>433.2</td></tr><tr><td colspan=\"5\">Objective B</td></tr><tr><td>Water and Sewerage</td><td>189.0</td><td>147.6</td><td>151.3</td><td>180.0</td></tr><tr><td>Total Objective B</td><td>189.0</td><td>147.6</td><td>151.3</td><td>180.0</td></tr><tr><td>Total</td><td>452.8</td><td>430.9</td><td>550.2</td><td>613.2</td></tr></table></div><p>Note: Totals may not add due to rounding.</p><p>Objective A: Supporting the economy by planning, developing and maintaining safe and sustainable transportation networks, promoting airport and harbour services, addressing regional imbalance in infrastructure and shaping the long-term future of the region.</p><p>Objective B: Contributing to the health and well being of the community and the protection of the environment by maintaining and developing the policy and regulatory environment which facilitates the provision of sustainable, high quality water and sewerage services.</p><p>*At the North South Ministerial Council (NSMC) Plenary Meeting held on Friday 18 November 2011, it was noted that provision of further funding by the Irish Government, for progression of the A5 and A8 projects, is being deferred and that, in this regard, the Irish Government will provide £25 million per annum in 2015 and 2016 towards the project.</p><p>A new funding and implementation plan is now being prepared for the two projects, for agreement at the next NSMC Transport meeting, with endorsement at the next NSMC Plenary meeting. This process will, undoubtedly, affect the funding available to the Department for Regional Development and, therefore potentially, delivery of the Strategic Roads Programme.</p><p>When the funding is confirmed, I intend to review the spending priorities across my Department.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206869%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=122057","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=122057"}},{"id":"122056","reference":"AQW 6868/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2012-01-20","answerBy":"2012-02-06","answered":"2012-02-06","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to detail his Department’s proposed capital spend projects, for each of the next three financial years, including the projected timescales and the costs for each project.","answerText":"AQW 6869/11-15 provides details of my Department’s total capital budget for 2011-15.\n\nMy Department has several hundred projects in progress or under development during each of the next 3 years. The following table lists those projects which have a projected cost greater than £5m, providing details of the budgeted spend across the next 3 years, (2012-15) and the estimated completion date.\n\nThe table also includes details of capital programmes within which a number of smaller projects are being taken forward.\n\n2012-13 £m\t2013-14 £m\t2014-15\n£m\tTotal Project Cost\n£m\tEstimated Completion\nDate\nRoads\n(including EU Structural Funds)\nA5 Western Transport Corridor *\t143.0\t285.0\t210.0\t650 - 850\t2016\nA8 Belfast to Larne*\t46.0\t51.0\t12.0\t110 - 120\t2016\nOther Strategic Road Improvements*\t11.1\t7.2\t67.8\t\tOngoing\nStructural Maintenance\t25.5\t29.4\t55.0\t\tOngoing\nLocal Transport and Safety Measures\t7.0\t9.9\t19.0\t\tOngoing\nStreet Lighting, Plant and Equipment\t3.0\t3.0\t15.7\t\tOngoing\nTotal Roads\t235.6\t385.5\t379.5\nTransport\nNew Trains 2\t0.9\t0.1\t\t114.0\t2012\nAdelaide Train Maintenance Facility\t1.8\t\t\t27.8\t2012\nNew Trains 2 Platform Extension\t1.0\t\t\t7.9\t2012\nClass 3000 Overhaul\t1.6\t2.8\t2.5\t13.7\t2015\nColeraine to Derry Track Safety Improvement Works\t2.6\t\t\t7.7\t2012\nColeraine to Derry Track Renewal\t23.0\t\t\t27.0\t2013 (Phase1)\nColeraine to Derry Track Renewal\t\t1.5\t18.0\t20.0\t2015 (Phase 2)\nMetro/Goldline Fleet Replacement\t0.2\t\t\t15.0\t2012\nBuilding Services Upgrade Programme\t1.6\t\t1.4\t5.5\t2016\nOther Rail Safety and Infrastructure Projects\t9.7\t7.0\t9.9\t\tOngoing\nOther Bus Infrastructure Projects\t1.0\t\t\t\tOngoing\nSustainable Transport\t3.5\t0.5\t11.8\t\tOngoing\nBelfast Rapid Transit\t0.8\t1.5\t10.0\t100.0\t2017\nTotal Transport\t47.7\t13.4\t53.6\nWater and Sewerage\nWater Infrastructure\t49.7\t46.5\t50.5\t\tOngoing\nWater Non-infrastructure\t25.6\t27.2\t39.5\t\tOngoing\nSewerage Infrastructure\t26.8\t23.5\t21.5\t\tOngoing\nSewerage Non-infrastructure\t48.2\t56.2\t70.5\t\tOngoing\nTotal Water and Sewerage\t150.3\t153.4\t182.0\n\nThe information provided above reflects current plans and may be subject to change.\n\nThe several hundred Roads Service schemes being undertaken mean that it is not possible to specify these individually. However, a list of these projects broken down by council area can be found at:\n\nhttp://www.drdni.gov.uk/index/freedom_of_information/customer_information/cinformationtype- results.htm?signpost=Customer+information&informationType=Roads+Service+reports+to+councils\n\n*At the North South Ministerial Council (NSMC) Plenary Meeting held on Friday 18 November 2011, it was noted that provision of further funding by the Irish Government, for progression of the A5 and A8 projects, is being deferred and that, in this regard, the Irish Government will provide £25 million per annum in 2015 and 2016 towards the project.\n\nA new funding and implementation plan is now being prepared for the two projects, for agreement at the next NSMC Transport meeting, with endorsement at the next NSMC Plenary meeting. This process will, undoubtedly, affect the funding available to the Department for Regional Development and, therefore potentially, delivery of the Strategic Road Improvements Programme.\n\nWhen the funding is confirmed, I intend to review the spending priorities across my Department.\n\nDRD provides funding for Northern Ireland Water’s (NIW) capital works programme. The majority of projects are due for completion during the current Budget period. The investment levels and project numbers for 2013/14 and 2014/15 are indicative and will be determined by the Utility Regulator through its next regulatory price control process for water (PC13).\n\nThe budget for NIW shown in the table above is slightly higher than the published Budget 2010 capital allocation because NIW receive additional capital contributions from sources such as fees for new connections.","answerHtml":"<p>AQW 6869/11-15 provides details of my Department’s total capital budget for 2011-15.</p><p>My Department has several hundred projects in progress or under development during each of the next 3 years. The following table lists those projects which have a projected cost greater than £5m, providing details of the budgeted spend across the next 3 years, (2012-15) and the estimated completion date.</p><p>The table also includes details of capital programmes within which a number of smaller projects are being taken forward.</p><div class=\"table-wrap\"><table><tr><td></td><td>2012-13 £m</td><td>2013-14 £m</td><td>2014-15<br>£m</td><td>Total Project Cost<br>£m</td><td>Estimated Completion<br>Date</td></tr><tr><td>Roads<br>(including EU Structural Funds)</td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>A5 Western Transport Corridor *</td><td>143.0</td><td>285.0</td><td>210.0</td><td>650 - 850</td><td>2016</td></tr><tr><td>A8 Belfast to Larne*</td><td>46.0</td><td>51.0</td><td>12.0</td><td>110 - 120</td><td>2016</td></tr><tr><td>Other Strategic Road Improvements*</td><td>11.1</td><td>7.2</td><td>67.8</td><td></td><td>Ongoing</td></tr><tr><td>Structural Maintenance</td><td>25.5</td><td>29.4</td><td>55.0</td><td></td><td>Ongoing</td></tr><tr><td>Local Transport and Safety Measures</td><td>7.0</td><td>9.9</td><td>19.0</td><td></td><td>Ongoing</td></tr><tr><td>Street Lighting, Plant and Equipment</td><td>3.0</td><td>3.0</td><td>15.7</td><td></td><td>Ongoing</td></tr><tr><td>Total Roads</td><td>235.6</td><td>385.5</td><td>379.5</td><td></td><td></td></tr><tr><td>Transport</td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>New Trains 2</td><td>0.9</td><td>0.1</td><td></td><td>114.0</td><td>2012</td></tr><tr><td>Adelaide Train Maintenance Facility</td><td>1.8</td><td></td><td></td><td>27.8</td><td>2012</td></tr><tr><td>New Trains 2 Platform Extension</td><td>1.0</td><td></td><td></td><td>7.9</td><td>2012</td></tr><tr><td>Class 3000 Overhaul</td><td>1.6</td><td>2.8</td><td>2.5</td><td>13.7</td><td>2015</td></tr><tr><td>Coleraine to Derry Track Safety Improvement Works</td><td>2.6</td><td></td><td></td><td>7.7</td><td>2012</td></tr><tr><td>Coleraine to Derry Track Renewal</td><td>23.0</td><td></td><td></td><td>27.0</td><td>2013 (Phase1)</td></tr><tr><td>Coleraine to Derry Track Renewal</td><td></td><td>1.5</td><td>18.0</td><td>20.0</td><td>2015 (Phase 2)</td></tr><tr><td>Metro/Goldline Fleet Replacement</td><td>0.2</td><td></td><td></td><td>15.0</td><td>2012</td></tr><tr><td>Building Services Upgrade Programme</td><td>1.6</td><td></td><td>1.4</td><td>5.5</td><td>2016</td></tr><tr><td>Other Rail Safety and Infrastructure Projects</td><td>9.7</td><td>7.0</td><td>9.9</td><td></td><td>Ongoing</td></tr><tr><td>Other Bus Infrastructure Projects</td><td>1.0</td><td></td><td></td><td></td><td>Ongoing</td></tr><tr><td>Sustainable Transport</td><td>3.5</td><td>0.5</td><td>11.8</td><td></td><td>Ongoing</td></tr><tr><td>Belfast Rapid Transit</td><td>0.8</td><td>1.5</td><td>10.0</td><td>100.0</td><td>2017</td></tr><tr><td>Total Transport</td><td>47.7</td><td>13.4</td><td>53.6</td><td></td><td></td></tr><tr><td>Water and Sewerage</td><td></td><td></td><td></td><td></td><td></td></tr><tr><td>Water Infrastructure</td><td>49.7</td><td>46.5</td><td>50.5</td><td></td><td>Ongoing</td></tr><tr><td>Water Non-infrastructure</td><td>25.6</td><td>27.2</td><td>39.5</td><td></td><td>Ongoing</td></tr><tr><td>Sewerage Infrastructure</td><td>26.8</td><td>23.5</td><td>21.5</td><td></td><td>Ongoing</td></tr><tr><td>Sewerage Non-infrastructure</td><td>48.2</td><td>56.2</td><td>70.5</td><td></td><td>Ongoing</td></tr><tr><td>Total Water and Sewerage</td><td>150.3</td><td>153.4</td><td>182.0</td><td></td><td></td></tr></table></div><p>The information provided above reflects current plans and may be subject to change.</p><p>The several hundred Roads Service schemes being undertaken mean that it is not possible to specify these individually. However, a list of these projects broken down by council area can be found at:</p><p>http://www.drdni.gov.uk/index/freedom_of_information/customer_information/cinformationtype- results.htm?signpost=Customer+information&amp;informationType=Roads+Service+reports+to+councils</p><p>*At the North South Ministerial Council (NSMC) Plenary Meeting held on Friday 18 November 2011, it was noted that provision of further funding by the Irish Government, for progression of the A5 and A8 projects, is being deferred and that, in this regard, the Irish Government will provide £25 million per annum in 2015 and 2016 towards the project.</p><p>A new funding and implementation plan is now being prepared for the two projects, for agreement at the next NSMC Transport meeting, with endorsement at the next NSMC Plenary meeting. This process will, undoubtedly, affect the funding available to the Department for Regional Development and, therefore potentially, delivery of the Strategic Road Improvements Programme.</p><p>When the funding is confirmed, I intend to review the spending priorities across my Department.</p><p>DRD provides funding for Northern Ireland Water’s (NIW) capital works programme. The majority of projects are due for completion during the current Budget period. The investment levels and project numbers for 2013/14 and 2014/15 are indicative and will be determined by the Utility Regulator through its next regulatory price control process for water (PC13).</p><p>The budget for NIW shown in the table above is slightly higher than the published Budget 2010 capital allocation because NIW receive additional capital contributions from sources such as fees for new connections.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%206868%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=122056","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=122056"}},{"id":"121810","reference":"AQO 1198/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-01-19","answerBy":"2012-01-31","answered":"2012-01-31","answeredOrally":true,"priority":false,"department":"Department for Employment and Learning","departmentId":"83","minister":"Minister for Employment and Learning","question":"To ask the Minister for Employment and Learning what actions his Department is taking to address the skills issues in the Information and Communications Technology sector.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201198%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=121810","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-11-12/31-January-2012","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=121810"}},{"id":"120638","reference":"AQO 1065/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-01-09","answerBy":"2012-01-17","answered":"2012-01-17","answeredOrally":true,"priority":false,"department":"Department of Finance","departmentId":"81","minister":"Minister of Finance and Personnel","question":"To ask the Minister of Finance and Personnel for an update on the devolution of air passenger duty powers.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201065%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=120638","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-11-12/17-January-2012","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=120638"}},{"id":"121397","reference":"AQO 1043/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2012-01-09","answerBy":"2012-01-16","answered":"2012-01-16","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment how many initial business advice sessions, training plans and business plans have been delivered by InvestNI in the East Antrim constituency since 30 September 2011.","answerText":"Invest NI is not currently delivering a Business Start Programme.\n\nInvest NI had proposed to launch a new Business Start Programme on 1st October 2011. However the launch of this programme has been delayed as a result of legal action by Enterprise Northern Ireland challenging the award decision.\n\nThose individuals in East Antrim interested in starting a business can access relevant advice and guidance through Invest NI’s North Eastern Office in Ballymena.","answerHtml":"<p>Invest NI is not currently delivering a Business Start Programme.</p><p>Invest NI had proposed to launch a new Business Start Programme on 1st October 2011. However the launch of this programme has been delayed as a result of legal action by Enterprise Northern Ireland challenging the award decision.</p><p>Those individuals in East Antrim interested in starting a business can access relevant advice and guidance through Invest NI’s North Eastern Office in Ballymena.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%201043%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=121397","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=121397"}},{"id":"119473","reference":"AQW 5928/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-12-14","answerBy":"2012-01-04","answered":"2011-12-21","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment how many Improvement and Prohibition notices have been issued to each District Council by the Health and Safety Executive in the last five years.","answerText":"The Health and Safety Executive for Northern Ireland has issued a total of 23 enforcement notices to Councils in the last five years. The notices are set out in the table below.\n\nCouncil\tImprovement Notice\tProhibition Notice\tTotal\nArds\t1\t0\t1\nBelfast City\t1\t0\t1\nCarrickfergus\t6\t2\t8\nColeraine\t2\t0\t2\nCraigavon\t2\t5\t7\nFermanagh\t2\t0\t2\nLarne\t1\t0\t1\nNorth Down\t0\t1\t1\nTotal\t15\t8\t23*\n\n* The recipient of an enforcement notice may appeal to an Industrial Tribunal within 21 days of service of the notice. Therefore the table does not include notices served which are still within the appeal period.","answerHtml":"<p>The Health and Safety Executive for Northern Ireland has issued a total of 23 enforcement notices to Councils in the last five years. The notices are set out in the table below.</p><div class=\"table-wrap\"><table><tr><td>Council</td><td>Improvement Notice</td><td>Prohibition Notice</td><td>Total</td></tr><tr><td>Ards</td><td>1</td><td>0</td><td>1</td></tr><tr><td>Belfast City</td><td>1</td><td>0</td><td>1</td></tr><tr><td>Carrickfergus</td><td>6</td><td>2</td><td>8</td></tr><tr><td>Coleraine</td><td>2</td><td>0</td><td>2</td></tr><tr><td>Craigavon</td><td>2</td><td>5</td><td>7</td></tr><tr><td>Fermanagh</td><td>2</td><td>0</td><td>2</td></tr><tr><td>Larne</td><td>1</td><td>0</td><td>1</td></tr><tr><td>North Down</td><td>0</td><td>1</td><td>1</td></tr><tr><td>Total</td><td>15</td><td>8</td><td>23*</td></tr></table></div><p>* The recipient of an enforcement notice may appeal to an Industrial Tribunal within 21 days of service of the notice. Therefore the table does not include notices served which are still within the appeal period.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205928%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=119473","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=119473"}},{"id":"119469","reference":"AQW 5926/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-12-14","answerBy":"2012-01-04","answered":"2012-01-05","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety what action his Department is taking to increase GPs understanding of myalgic encephalomyelitis.","answerText":"My Department endorsed National Institute for Health and Clinical Excellence (NICE) guidance on Myalgic Encephalomyelitis/Chronic Fatigue Syndrome (ME/CFS) in 2008. The guidance provided good practice guidelines for services for patients with ME/ CFS across both primary and secondary care and was issued to the Health and social Care sector.\n\nThe Health and Social Care Board and the Public Health Agency have recently set up a Working Group on Myalgic Encephalomyelitis / Chronic Fatigue Syndrome (ME CFS) Services. The Group is currently addressing the need to improve the primary care response to the needs of patients with ME/CFS. One of the priorities which the Group is taking forward is a survey of GP attitudes and awareness about ME/CFS. The Group is also considering the need to ensure that GP and other medical training programmes cover ME/CFS management.","answerHtml":"<p>My Department endorsed National Institute for Health and Clinical Excellence (NICE) guidance on Myalgic Encephalomyelitis/Chronic Fatigue Syndrome (ME/CFS) in 2008. The guidance provided good practice guidelines for services for patients with ME/ CFS across both primary and secondary care and was issued to the Health and social Care sector.</p><p>The Health and Social Care Board and the Public Health Agency have recently set up a Working Group on Myalgic Encephalomyelitis / Chronic Fatigue Syndrome (ME CFS) Services. The Group is currently addressing the need to improve the primary care response to the needs of patients with ME/CFS. One of the priorities which the Group is taking forward is a survey of GP attitudes and awareness about ME/CFS. The Group is also considering the need to ensure that GP and other medical training programmes cover ME/CFS management.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205926%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=119469","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=119469"}},{"id":"119137","reference":"AQW 5747/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-12-09","answerBy":"2011-12-29","answered":"2011-12-20","answeredOrally":false,"priority":false,"department":"Department of Culture, Arts and Leisure","departmentId":"77","minister":"Minister of Culture, Arts and Leisure","question":"To ask the Minister of Culture, Arts and Leisure what support her Department provides for emerging artists.","answerText":"The Arts Council of Northern Ireland provides a suite of support through its Support for the Individual Artist Programme (SIAP). They aim to award 30% of SIAP grants to new and emerging artists and are on target to achieve this aim for 2011/12. Details are provided on the attached annex.\n\nAnnex\n\nGeneral Art Awards – Grants up to £1,500\n\nAwards can be for specific projects, specialised research, personal artistic development and certain materials/ equipment.\n\nSelf Arranged Residencies – Grants up to £5,000\n\nThese awards enable individual artists wishing to work outside the north of Ireland to develop exchanges and take up self-arranged residencies.\n\nMajor Individual Awards – Grants of £15,000 (4 awards made in 2011/12)\n\nA limited number of awards each year intended to create the circumstances in which established artists with national/ international recognition may develop extended or ambitious work.\n\nTravel Awards – Level of grant fixed by destination (from £200 to £800)\n\nThese awards enable individual artists to travel from the north of Ireland to develop their skills and expertise. Applicants must provide evidence that they have been invited by a host organisation in the country to which they intend to travel.\n\nArtists’ Career Enhancement Scheme – Grants of £5,000 (13 awards made in 2011/12)\n\nThese awards aim to deepen the developmental impact of Arts Council’s support for artists, with a targeted package of training, mentoring and support provided for successful applicants. These awards aim to support career artists whose practice is of high quality, original, challenging and innovative. The awards are designed to support artists in their professional development, enabling successful applicants to raise their profile and significantly enhance their career.\n\nThe British School at Rome Fellowship (one award made every other year)\n\nThis residency offers visual artists the opportunity to work in Rome for a period of 6 months between 2nd January and 27th June 2012 on a project of their choosing. Rather than experimenting on new techniques, scholars are encouraged to use their time to work on developing ideas for a new body of work or exploring themes that will advance their practice. The Fellow is encouraged to be self reliant and adaptable.\n\nYoung Musicians Platform – Biennial scheme - 3 grants of £5,000\n\nThe Arts Council, in collaboration with BBC NI, offers awards for young, exceptionally talented solo musicians/singers or ensembles who have finished their first academic, graduate level qualification and are ready to enter the professional world as artists. The financial award associated with this scheme will allow applicants to spend a sizeable amount of time learning from a master musician/ teacher/composer etc. abroad. Priority will be given to applications where the associated period of learning is taking place outside of Great Britain and Ireland. The BBC will facilitate this scheme by offering two professional broadcast performances to successful applicants.","answerHtml":"<p>The Arts Council of Northern Ireland provides a suite of support through its Support for the Individual Artist Programme (SIAP). They aim to award 30% of SIAP grants to new and emerging artists and are on target to achieve this aim for 2011/12. Details are provided on the attached annex.</p><p>Annex</p><p>General Art Awards – Grants up to £1,500</p><p>Awards can be for specific projects, specialised research, personal artistic development and certain materials/ equipment.</p><p>Self Arranged Residencies – Grants up to £5,000</p><p>These awards enable individual artists wishing to work outside the north of Ireland to develop exchanges and take up self-arranged residencies.</p><p>Major Individual Awards – Grants of £15,000 (4 awards made in 2011/12)</p><p>A limited number of awards each year intended to create the circumstances in which established artists with national/ international recognition may develop extended or ambitious work.</p><p>Travel Awards – Level of grant fixed by destination (from £200 to £800)</p><p>These awards enable individual artists to travel from the north of Ireland to develop their skills and expertise. Applicants must provide evidence that they have been invited by a host organisation in the country to which they intend to travel.</p><p>Artists’ Career Enhancement Scheme – Grants of £5,000 (13 awards made in 2011/12)</p><p>These awards aim to deepen the developmental impact of Arts Council’s support for artists, with a targeted package of training, mentoring and support provided for successful applicants. These awards aim to support career artists whose practice is of high quality, original, challenging and innovative. The awards are designed to support artists in their professional development, enabling successful applicants to raise their profile and significantly enhance their career.</p><p>The British School at Rome Fellowship (one award made every other year)</p><p>This residency offers visual artists the opportunity to work in Rome for a period of 6 months between 2nd January and 27th June 2012 on a project of their choosing. Rather than experimenting on new techniques, scholars are encouraged to use their time to work on developing ideas for a new body of work or exploring themes that will advance their practice. The Fellow is encouraged to be self reliant and adaptable.</p><p>Young Musicians Platform – Biennial scheme - 3 grants of £5,000</p><p>The Arts Council, in collaboration with BBC NI, offers awards for young, exceptionally talented solo musicians/singers or ensembles who have finished their first academic, graduate level qualification and are ready to enter the professional world as artists. The financial award associated with this scheme will allow applicants to spend a sizeable amount of time learning from a master musician/ teacher/composer etc. abroad. Priority will be given to applications where the associated period of learning is taking place outside of Great Britain and Ireland. The BBC will facilitate this scheme by offering two professional broadcast performances to successful applicants.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205747%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=119137","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=119137"}},{"id":"119136","reference":"AQW 5746/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-12-09","answerBy":"2011-12-29","answered":"2011-12-20","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what action his Department is taking to integrate the Port of Larne with the Larne Railway Line.","answerText":"The railway station at Larne Harbour is integrated with the ferry passenger terminal and the majority of rail services are planned to link with both ferry departures and arrivals to ensure good connectivity. I am not aware of any commercially viable freight opportunities which would support the development of direct rail connections to the freight handling area within Larne Harbour. Northern Ireland Railways, along with representatives from my Department, continues to participate in the All Ireland Freight Forum, which examines suggestions for the transfer of freight from roads to rail (or coastal shipping).","answerHtml":"<p>The railway station at Larne Harbour is integrated with the ferry passenger terminal and the majority of rail services are planned to link with both ferry departures and arrivals to ensure good connectivity. I am not aware of any commercially viable freight opportunities which would support the development of direct rail connections to the freight handling area within Larne Harbour. Northern Ireland Railways, along with representatives from my Department, continues to participate in the All Ireland Freight Forum, which examines suggestions for the transfer of freight from roads to rail (or coastal shipping).</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205746%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=119136","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=119136"}},{"id":"119135","reference":"AQW 5745/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-12-09","answerBy":"2011-12-29","answered":"2011-12-20","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development, given that the Regional Transportation Strategy consultation document acknowledges that greenhouse gas emissions from transport must be reduced, why the document does not contain a specific target to achieve such a reduction; and whether he will consider the inclusion of a specific target for the reduction of greenhouse gas emissions from transport in the finalised strategy.","answerText":"In developing the New Approach to Regional Transportation, we have outlined the Strategic Objectives which we want to work towards including “Reduce Greenhouse gas emissions from transport”.\n\nThe use of the proposed Policy Prioritisation Framework will ensure that potential Strategic Transport Interventions are assessed for their ability to contribute to this Strategic Objective before they are included in the Delivery Plan. As the costed Delivery Plan is developed, specific targets for achievement will be set, including targets for greenhouse gas emissions. These targets will assume full implementation of the Strategic Transportation Interventions in the Delivery Plans and will be both challenging and realistic.","answerHtml":"<p>In developing the New Approach to Regional Transportation, we have outlined the Strategic Objectives which we want to work towards including “Reduce Greenhouse gas emissions from transport”.</p><p>The use of the proposed Policy Prioritisation Framework will ensure that potential Strategic Transport Interventions are assessed for their ability to contribute to this Strategic Objective before they are included in the Delivery Plan. As the costed Delivery Plan is developed, specific targets for achievement will be set, including targets for greenhouse gas emissions. These targets will assume full implementation of the Strategic Transportation Interventions in the Delivery Plans and will be both challenging and realistic.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205745%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=119135","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=119135"}},{"id":"119134","reference":"AQW 5744/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-12-09","answerBy":"2011-12-29","answered":"2011-12-20","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development, given that the Regional Transportation Strategy consultation document acknowledges the desirability of moving people away from using car and towards more sustainable means of transport, why the twelve proposed objectives in the document do not include an objective to achieve such a modal shift; and whether he will consider the inclusion of a specific target to achieve a modal shift in the finalised strategy.","answerText":"In developing the New Approach to Regional Transportation, we have outlined the Strategic aims and objectives which we want to work towards revolving around: Support the Growth of the Economy, Enhance the quality of life for all, and Reduce the Environmental Impact of Transport.\n\nModal shift from individual car use to more sustainable patterns of travel will play an important part in achieving these Strategic high level aims and objectives; but it is a means to an end, not an end in itself.\n\nAs the costed Delivery Plan is developed, specific targets for achievement will be set, including targets for modal shift. The targets will assume full implementation of the Strategic Transportation Interventions in the Delivery Plans and will be both challenging and realistic.","answerHtml":"<p>In developing the New Approach to Regional Transportation, we have outlined the Strategic aims and objectives which we want to work towards revolving around: Support the Growth of the Economy, Enhance the quality of life for all, and Reduce the Environmental Impact of Transport.</p><p>Modal shift from individual car use to more sustainable patterns of travel will play an important part in achieving these Strategic high level aims and objectives; but it is a means to an end, not an end in itself.</p><p>As the costed Delivery Plan is developed, specific targets for achievement will be set, including targets for modal shift. The targets will assume full implementation of the Strategic Transportation Interventions in the Delivery Plans and will be both challenging and realistic.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205744%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=119134","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=119134"}},{"id":"119133","reference":"AQW 5743/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-12-09","answerBy":"2011-12-29","answered":"2011-12-23","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety to detail the length of time a patient must wait from requesting to see a doctor at the Old School Surgery, Greenisland until they receive an appointment.","answerText":"This information is not available regarding waiting times for a GP appointment at the practice. I understand the Old School Surgery have taken steps to try and minimise the length of time a patient may have to wait for an appointment with their GP. There are, however, a number of factors which can influence waiting times for appointments, for example if a patient requests to see a specific GP, particularly those GPs who are part-time; or requests an appointment at a specific time or on a specific day.","answerHtml":"<p>This information is not available regarding waiting times for a GP appointment at the practice. I understand the Old School Surgery have taken steps to try and minimise the length of time a patient may have to wait for an appointment with their GP. There are, however, a number of factors which can influence waiting times for appointments, for example if a patient requests to see a specific GP, particularly those GPs who are part-time; or requests an appointment at a specific time or on a specific day.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205743%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=119133","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=119133"}},{"id":"117689","reference":"AQW 5258/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-11-29","answerBy":"2011-12-14","answered":"2011-12-08","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development whether Translink will introduce additional services to Great Victoria Street station from the Larne railway line.","answerText":"Translink advises that at present the majority of Larne line trains terminate in Central Station. Following the delivery of New Trains (Class 4000) during 2011/12, Translink proposes to introduce a revised timetable from circa mid-2012. The details of this timetable are currently being worked up to enable further discussion with the Translink Board and my department.","answerHtml":"<p>Translink advises that at present the majority of Larne line trains terminate in Central Station. Following the delivery of New Trains (Class 4000) during 2011/12, Translink proposes to introduce a revised timetable from circa mid-2012. The details of this timetable are currently being worked up to enable further discussion with the Translink Board and my department.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205258%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=117689","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=117689"}},{"id":"117688","reference":"AQW 5257/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-11-29","answerBy":"2011-12-14","answered":"2011-12-15","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development why he indicated that he would require a satisfactory performance from the Chief Executive of NI Water over the winter period, rather than an exceptional performance.","answerText":"The reference to a satisfactory performance in the approved Northern Ireland Water (NIW) Board’s proposed salary increase for the Chief Executive of NIW, related to the role of the Board’s Remuneration Committee in deciding whether or not to back-date the increase in salary from 1 November 2011, subject to the satisfactory performance of the Company and the Chief Executive over the 2011/12 winter period. It is a matter for the Remuneration Committee to develop the criteria that will be used to judge the performance of the Chief Executive over the winter period and to justify their decision. I have asked to be kept informed.","answerHtml":"<p>The reference to a satisfactory performance in the approved Northern Ireland Water (NIW) Board’s proposed salary increase for the Chief Executive of NIW, related to the role of the Board’s Remuneration Committee in deciding whether or not to back-date the increase in salary from 1 November 2011, subject to the satisfactory performance of the Company and the Chief Executive over the 2011/12 winter period. It is a matter for the Remuneration Committee to develop the criteria that will be used to judge the performance of the Chief Executive over the winter period and to justify their decision. I have asked to be kept informed.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205257%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=117688","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=117688"}},{"id":"117684","reference":"AQW 5256/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-11-29","answerBy":"2011-12-14","answered":"2011-12-15","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development on what date an announcement will be made regarding the assessment of the performance of the Chief Executive of NI Water’s over the winter period.","answerText":"It is a matter for the Northern Ireland Water Board’s Remuneration Committee to develop the criteria that will be used to judge the performance of the Chief Executive over the winter period. Therefore any decisions on the outcome of the Committee’s assessment (including when and how to communicate the Committee’s findings to stakeholders) will be a matter for the Board and will not be taken before March 2012.","answerHtml":"<p>It is a matter for the Northern Ireland Water Board’s Remuneration Committee to develop the criteria that will be used to judge the performance of the Chief Executive over the winter period. Therefore any decisions on the outcome of the Committee’s assessment (including when and how to communicate the Committee’s findings to stakeholders) will be a matter for the Board and will not be taken before March 2012.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205256%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=117684","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=117684"}},{"id":"117683","reference":"AQW 5255/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-11-29","answerBy":"2011-12-14","answered":"2011-12-15","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to detail the criteria that will be used to judge the performance of the Chief Executive of NI Water over the winter period.","answerText":"While I will wish to be kept informed, it is a matter for the Northern Ireland Water Board’s Remuneration Committee to develop the criteria that will be used to judge the performance of the Chief Executive over the winter period.","answerHtml":"<p>While I will wish to be kept informed, it is a matter for the Northern Ireland Water Board’s Remuneration Committee to develop the criteria that will be used to judge the performance of the Chief Executive over the winter period.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%205255%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=117683","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=117683"}},{"id":"115900","reference":"AQW 4554/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-11-15","answerBy":"2011-11-30","answered":"2011-12-12","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment, in relation to the proposed changes to MOT tests, whether any financial support will be made available for small automobile repair shops to invest in the technology necessary to prepare vehicles for the proposed revised MOT test.","answerText":"The proposed changes to MOT tests are required by European Commission Roadworthiness Directive 2009/40/EC (as amended). The Department must implement such Directives to avoid possible infraction proceedings and resultant fines.\n\nThe MOT test changes include checks of malfunction indicator lights. The majority of established repair shops have the diagnostic equipment and systems required to ensure that they can deal with auto-electronic system failures or have arrangements for diagnostic equipment to be accessed. The Department has no plans at present to make financial support available for small repair businesses to assist in purchase of such equipment.\n\nThe new tests do not apply to all vehicles. Those that do so relate to electronic safety and warning systems and vehicle construction and use. However, a number of new test items apply only to goods vehicles, buses and trailers, such as additional braking devices. At the same time, a number of test items are being upgraded to ensure that vehicles are properly maintained and tested. This will make a significant contribution to road safety and environmental protection.","answerHtml":"<p>The proposed changes to MOT tests are required by European Commission Roadworthiness Directive 2009/40/EC (as amended). The Department must implement such Directives to avoid possible infraction proceedings and resultant fines.</p><p>The MOT test changes include checks of malfunction indicator lights. The majority of established repair shops have the diagnostic equipment and systems required to ensure that they can deal with auto-electronic system failures or have arrangements for diagnostic equipment to be accessed. The Department has no plans at present to make financial support available for small repair businesses to assist in purchase of such equipment.</p><p>The new tests do not apply to all vehicles. Those that do so relate to electronic safety and warning systems and vehicle construction and use. However, a number of new test items apply only to goods vehicles, buses and trailers, such as additional braking devices. At the same time, a number of test items are being upgraded to ensure that vehicles are properly maintained and tested. This will make a significant contribution to road safety and environmental protection.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204554%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=115900","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=115900"}},{"id":"115893","reference":"AQW 4551/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-11-15","answerBy":"2011-11-30","answered":"2012-01-09","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment for his assessment of the financial impact of the proposed changes to MOT tests on small automobile repair shops.","answerText":"The proposed changes to MOT tests should have a negligible impact on small automobile repair shops. While the MOT test changes include checks of malfunction indicator lights, many repair shops already have the diagnostic equipment and systems required to ensure that they can deal with auto-electronic system failures or already have access to such equipment at other locations. Many of the other tests are developments and the wider application of a number of existing tests which should cause limited new expense or demands on existing mechanics.","answerHtml":"<p>The proposed changes to MOT tests should have a negligible impact on small automobile repair shops. While the MOT test changes include checks of malfunction indicator lights, many repair shops already have the diagnostic equipment and systems required to ensure that they can deal with auto-electronic system failures or already have access to such equipment at other locations. Many of the other tests are developments and the wider application of a number of existing tests which should cause limited new expense or demands on existing mechanics.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204551%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=115893","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=115893"}},{"id":"115514","reference":"AQW 4376/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-11-10","answerBy":"2011-11-25","answered":"2011-11-21","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety how many consultants work at each hospital's paediatrics department; and what is the average daily number of patients they treat.","answerText":"The number of consultants working in paediatric departments by hospital is not centrally available from DHSSPS as staff may work across hospital sites and may provide both hospital and community services. Therefore the total number of consultants recorded as working in paediatric hospital and community services (excluding mental health) by HSC Trust is provided in Table 1 below.\n\nTable 1: Consultants within Paediatrics Services (excluding mental health) at 30th September 2010\n\nHSC Trust\tHeadcount\tWTE\nBelfast\t36\t33.21\nNorthern\t15\t13.95\nSouth Eastern\t10\t9.25\nSouthern\t14\t13.4\nWestern\t15\t14.7\n\nSource: Human Resource Management System\n\nNotes:\n\nFigures exclude staff with a whole-time equivalent (WTE) less than or equal to 0.03 and staff on career breaks.\n\nInformation is not collected centrally on all contacts a patient may have with a paediatric consultant. We are, however, able to provide information on the number of inpatient admissions and outpatient attendances within a paediatric specialty. These are provided in the form of average daily numbers in Tables 2 and 3.\n\nTable 2: Average Daily Number of Inpatient Admissions to Paediatric Specialties during 2010/11\n\nHospital\tAverage Daily Number of Admissions\nAltnagelvin\t9.5\nAntrim\t8.6\nCauseway\t4.0\nCraigavon\t7.1\nDaisy Hill\t4.3\nErne\t5.2\nLagan Valley\t0.1\nMid Ulster\t0\nRoyal Belfast Hospital for Sick Children\t12.5\nRoyal Maternity\t1.2\nRoyal Victoria\t0\nTyrone County\t0\nUlster\t12.5\n\nSource: Hospital Inpatient System\n\nNotes:\n\nPaediatric Specialties have been defined as (142) Paediatric Dentistry, (171) Paediatric Surgery, (420) Paediatrics and (421) Paediatric Neurology.\n\nIt must be noted that the data presented in Tables 2 and 3 will not represent all patients that will come into contact with a paediatric consultant.\n\nTable 3: Average Daily Outpatient Attendances (Seen - New and Review) during 2010/11 - Paediatric Specialties\n\nHSC Hospital\tAverage Daily Number of Attendances\nBelfast City\t0.2\nArds\t2.7\nUlster\t20.1\nRoyal Victoria\t0.0\nRoyal Maternity\t2.9\nRBHSC\t55.8\nMuckamore Abbey\t7.1\nLagan Valley\t0.9\nDowne\t1.0\nCauseway Hospital\t11.5\nMoyle\t1.9\nWhiteabbey\t1.0\nMid Ulster\t3.6\nAntrim\t15.3\nWaveney\t2.6\nArmagh Community\t5.2\nSouth Tyrone\t3.3\nBanbridge\t1.4\nLurgan\t0.2\nCraigavon Area\t11.5\nDaisy Hill\t8.9\nBluestone (formerly Craigavon Area PNU)\t0.8\nAltnagelvin Area\t20.4\nRoe Valley (Outpatients)\t0.4\nGransha\t1.9\nErne\t7.9\nTyrone County\t5.7\n\nSource: Quarterly Outpatient Activity Return (QOAR)\n\nNotes:\n\nPaediatric Specialties have been defined as (142) Paediatric Dentistry, (171) Paediatric Surgery, (420) Paediatrics and (421) Paediatric Neurology.\n\nIt must be noted that the data presented in Tables 2 and 3 will not represent all patients that will come into contact with a paediatric consultant.","answerHtml":"<p>The number of consultants working in paediatric departments by hospital is not centrally available from DHSSPS as staff may work across hospital sites and may provide both hospital and community services. Therefore the total number of consultants recorded as working in paediatric hospital and community services (excluding mental health) by HSC Trust is provided in Table 1 below.</p><p>Table 1: Consultants within Paediatrics Services (excluding mental health) at 30th September 2010</p><div class=\"table-wrap\"><table><tr><td>HSC Trust</td><td>Headcount</td><td>WTE</td></tr><tr><td>Belfast</td><td>36</td><td>33.21</td></tr><tr><td>Northern</td><td>15</td><td>13.95</td></tr><tr><td>South Eastern</td><td>10</td><td>9.25</td></tr><tr><td>Southern</td><td>14</td><td>13.4</td></tr><tr><td>Western</td><td>15</td><td>14.7</td></tr></table></div><p>Source: Human Resource Management System</p><p>Notes:</p><p>Figures exclude staff with a whole-time equivalent (WTE) less than or equal to 0.03 and staff on career breaks.</p><p>Information is not collected centrally on all contacts a patient may have with a paediatric consultant. We are, however, able to provide information on the number of inpatient admissions and outpatient attendances within a paediatric specialty. These are provided in the form of average daily numbers in Tables 2 and 3.</p><div class=\"table-wrap\"><table><tr><td>Table 2: Average Daily Number of Inpatient Admissions to Paediatric Specialties during 2010/11</td><td></td><td></td></tr></table></div><div class=\"table-wrap\"><table><tr><td>Hospital</td><td>Average Daily Number of Admissions</td></tr><tr><td>Altnagelvin</td><td>9.5</td></tr><tr><td>Antrim</td><td>8.6</td></tr><tr><td>Causeway</td><td>4.0</td></tr><tr><td>Craigavon</td><td>7.1</td></tr><tr><td>Daisy Hill</td><td>4.3</td></tr><tr><td>Erne</td><td>5.2</td></tr><tr><td>Lagan Valley</td><td>0.1</td></tr><tr><td>Mid Ulster</td><td>0</td></tr><tr><td>Royal Belfast Hospital for Sick Children</td><td>12.5</td></tr><tr><td>Royal Maternity</td><td>1.2</td></tr><tr><td>Royal Victoria</td><td>0</td></tr><tr><td>Tyrone County</td><td>0</td></tr><tr><td>Ulster</td><td>12.5</td></tr></table></div><p>Source: Hospital Inpatient System</p><p>Notes:</p><p>Paediatric Specialties have been defined as (142) Paediatric Dentistry, (171) Paediatric Surgery, (420) Paediatrics and (421) Paediatric Neurology.</p><p>It must be noted that the data presented in Tables 2 and 3 will not represent all patients that will come into contact with a paediatric consultant.</p><p>Table 3: Average Daily Outpatient Attendances (Seen - New and Review) during 2010/11 - Paediatric Specialties</p><div class=\"table-wrap\"><table><tr><td>HSC Hospital</td><td>Average Daily Number of Attendances</td></tr><tr><td>Belfast City</td><td>0.2</td></tr><tr><td>Ards</td><td>2.7</td></tr><tr><td>Ulster</td><td>20.1</td></tr><tr><td>Royal Victoria</td><td>0.0</td></tr><tr><td>Royal Maternity</td><td>2.9</td></tr><tr><td>RBHSC</td><td>55.8</td></tr><tr><td>Muckamore Abbey</td><td>7.1</td></tr><tr><td>Lagan Valley</td><td>0.9</td></tr><tr><td>Downe</td><td>1.0</td></tr><tr><td>Causeway Hospital</td><td>11.5</td></tr><tr><td>Moyle</td><td>1.9</td></tr><tr><td>Whiteabbey</td><td>1.0</td></tr><tr><td>Mid Ulster</td><td>3.6</td></tr><tr><td>Antrim</td><td>15.3</td></tr><tr><td>Waveney</td><td>2.6</td></tr><tr><td>Armagh Community</td><td>5.2</td></tr><tr><td>South Tyrone</td><td>3.3</td></tr><tr><td>Banbridge</td><td>1.4</td></tr><tr><td>Lurgan</td><td>0.2</td></tr><tr><td>Craigavon Area</td><td>11.5</td></tr><tr><td>Daisy Hill</td><td>8.9</td></tr><tr><td>Bluestone (formerly Craigavon Area PNU)</td><td>0.8</td></tr><tr><td>Altnagelvin Area</td><td>20.4</td></tr><tr><td>Roe Valley (Outpatients)</td><td>0.4</td></tr><tr><td>Gransha</td><td>1.9</td></tr><tr><td>Erne</td><td>7.9</td></tr><tr><td>Tyrone County</td><td>5.7</td></tr></table></div><p>Source: Quarterly Outpatient Activity Return (QOAR)</p><p>Notes:</p><p>Paediatric Specialties have been defined as (142) Paediatric Dentistry, (171) Paediatric Surgery, (420) Paediatrics and (421) Paediatric Neurology.</p><p>It must be noted that the data presented in Tables 2 and 3 will not represent all patients that will come into contact with a paediatric consultant.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204376%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=115514","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=115514"}},{"id":"114381","reference":"AQW 4001/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-10-28","answerBy":"2011-11-14","answered":"2011-11-10","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development when the public address systems at the stations on the Larne Railway line will be repaired.","answerText":"Translink have advised that the Long Line Public Address (LLPA) system on the Larne line is approximately 20 years old and has experienced reliability problems over the last several years. NI Railways continuously monitor LLPA performance and repair as necessary. Obsolete and unreliable components of the system will be replaced on a phased basis over the next 12 months.","answerHtml":"<p>Translink have advised that the Long Line Public Address (LLPA) system on the Larne line is approximately 20 years old and has experienced reliability problems over the last several years. NI Railways continuously monitor LLPA performance and repair as necessary. Obsolete and unreliable components of the system will be replaced on a phased basis over the next 12 months.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%204001%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=114381","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=114381"}},{"id":"113540","reference":"AQW 3689/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-10-21","answerBy":"2011-11-07","answered":"2011-12-14","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister when a decision will be made on the bids received under the Social Investment Fund.","answerText":"The proposals for the Social Investment Fund are currently out for consultation. There are no bids being considered at this time. Officials are working with other departments to finalise proposals for consideration under the Social Protection Fund.","answerHtml":"<p>The proposals for the Social Investment Fund are currently out for consultation. There are no bids being considered at this time. Officials are working with other departments to finalise proposals for consideration under the Social Protection Fund.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203689%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=113540","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=113540"}},{"id":"112354","reference":"AQW 3223/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-10-12","answerBy":"2011-10-27","answered":"2011-10-26","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what action his Department is taking to improve the public perception of, and attitude towards, the use of public transport.","answerText":"My Department's Travelwise Northern Ireland initiative is seeking to promote, and raise the awareness levels of the general public, towards more sustainable transport options including cycling, walking, greater use of public transport. This includes car sharing and park and ride facilities, in order to encourage a change in public attitudes away from the private car as the main mode of travel in Northern Ireland.\n\nIn addition my Department established an Active Travel Forum during March 2010 with the principal aim of drawing up a high level strategy for active travel, setting out the framework to help people choose more sustainable and active transport modes, including walking and cycling for shorter everyday journeys and linked to public transport for longer trips. The draft Active Travel strategy, is currently being finalised and will set out the strategic context and vision, as well as proposals for future programme and partnership delivery mechanisms.\n\nInformation about the range of Travelwise initiatives can be found at www.nidirect.gov.uk/travelwiseni.\n\nIn consultation with key stakeholders, my Department is also taking steps to implement the Transport Act (Northern Ireland) 2011. This legislation enables contracts be awarded and introduces a new system of regulation for public transport services, helping to ensure that decisions on services are taken in the public interest.\n\nIn recognition of the importance of Park and Ride in promoting sustainable transport, and with the aim of developing proposals which would offer the best prospect of maximising modal shift away from the private car to public transport, my Department recently published a Strategic review of Park and Ride including the provision of quality bus corridors. The Review sets out a number of conclusions and recommendations, and identifies those Park and Ride sites which the Department will aim to prioritise as available funding permits.\n\nIn the most recent Passengers Charter monitor (spring 2011), Translink met or exceeded all reliability and punctuality targets for both bus and rail. In addition, customer satisfaction also remains at very high levels.\n\nTranslink recently announced there will be no fares increase in 2011 across bus and rail services. Fares being frozen combined with a high quality bus and rail service means that there has never been a better time to switch to public transport.\n\nReflecting the depth of commitment to continue to invest in improving public transport, the table below sets out the budget plans for Translink for each of the next four years:\n\nTRANSLINK FUNDING\t2011/12\t2012/13\t2013/14\t2014/15\n£k\t£k\t£k\t£k\n\nREVENUE FUNDING\n\nRail\t33,507\t32,702\t33,458\t29,507\nBus\t35,744\t37,244\t31,444\t32,944\nTotal Revenue\t69,251\t69,946\t64,902\t62,451\n\nCAPITAL FUNDING\n\nRail\t92,065\t18,646\t11,327\t30,404\nBus\t12,864\t2,800\t58\t1,400\nTotal Capital\t104,929\t21,446\t11,385\t31,804\n\nTOTAL FUNDING\t174,180\t91,392\t76,287\t94,255\n\nThe figures above have not been adjusted for recent announcements made in respect of Londonderry to Coleraine track relay or on street car parking charges in Provincial towns. It is intended to confirm these adjustments when budget mechanisms allow.","answerHtml":"<p>My Department&#39;s Travelwise Northern Ireland initiative is seeking to promote, and raise the awareness levels of the general public, towards more sustainable transport options including cycling, walking, greater use of public transport. This includes car sharing and park and ride facilities, in order to encourage a change in public attitudes away from the private car as the main mode of travel in Northern Ireland.</p><p>In addition my Department established an Active Travel Forum during March 2010 with the principal aim of drawing up a high level strategy for active travel, setting out the framework to help people choose more sustainable and active transport modes, including walking and cycling for shorter everyday journeys and linked to public transport for longer trips. The draft Active Travel strategy, is currently being finalised and will set out the strategic context and vision, as well as proposals for future programme and partnership delivery mechanisms.</p><p>Information about the range of Travelwise initiatives can be found at www.nidirect.gov.uk/travelwiseni.</p><p>In consultation with key stakeholders, my Department is also taking steps to implement the Transport Act (Northern Ireland) 2011. This legislation enables contracts be awarded and introduces a new system of regulation for public transport services, helping to ensure that decisions on services are taken in the public interest.</p><p>In recognition of the importance of Park and Ride in promoting sustainable transport, and with the aim of developing proposals which would offer the best prospect of maximising modal shift away from the private car to public transport, my Department recently published a Strategic review of Park and Ride including the provision of quality bus corridors. The Review sets out a number of conclusions and recommendations, and identifies those Park and Ride sites which the Department will aim to prioritise as available funding permits.</p><p>In the most recent Passengers Charter monitor (spring 2011), Translink met or exceeded all reliability and punctuality targets for both bus and rail. In addition, customer satisfaction also remains at very high levels.</p><p>Translink recently announced there will be no fares increase in 2011 across bus and rail services. Fares being frozen combined with a high quality bus and rail service means that there has never been a better time to switch to public transport.</p><p>Reflecting the depth of commitment to continue to invest in improving public transport, the table below sets out the budget plans for Translink for each of the next four years:</p><div class=\"table-wrap\"><table><tr><td></td><td></td><td></td><td></td><td></td></tr><tr><td>TRANSLINK FUNDING</td><td>2011/12</td><td>2012/13</td><td>2013/14</td><td>2014/15</td></tr><tr><td></td><td>£k</td><td>£k</td><td>£k</td><td>£k</td></tr><tr><td></td><td></td><td></td><td></td><td></td></tr><tr><td>REVENUE FUNDING</td><td></td><td></td><td></td><td></td></tr><tr><td></td><td></td><td></td><td></td><td></td></tr><tr><td>Rail</td><td>33,507</td><td>32,702</td><td>33,458</td><td>29,507</td></tr><tr><td>Bus</td><td>35,744</td><td>37,244</td><td>31,444</td><td>32,944</td></tr><tr><td>Total Revenue</td><td>69,251</td><td>69,946</td><td>64,902</td><td>62,451</td></tr><tr><td></td><td></td><td></td><td></td><td></td></tr><tr><td>CAPITAL FUNDING</td><td></td><td></td><td></td><td></td></tr><tr><td></td><td></td><td></td><td></td><td></td></tr><tr><td>Rail</td><td>92,065</td><td>18,646</td><td>11,327</td><td>30,404</td></tr><tr><td>Bus</td><td>12,864</td><td>2,800</td><td>58</td><td>1,400</td></tr><tr><td>Total Capital</td><td>104,929</td><td>21,446</td><td>11,385</td><td>31,804</td></tr><tr><td></td><td></td><td></td><td></td><td></td></tr><tr><td>TOTAL FUNDING</td><td>174,180</td><td>91,392</td><td>76,287</td><td>94,255</td></tr></table></div><p>The figures above have not been adjusted for recent announcements made in respect of Londonderry to Coleraine track relay or on street car parking charges in Provincial towns. It is intended to confirm these adjustments when budget mechanisms allow.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203223%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=112354","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=112354"}},{"id":"112351","reference":"AQW 3222/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-10-12","answerBy":"2011-10-27","answered":"2011-10-25","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development whether his Department will support the extension of audio-visual information systems to buses.","answerText":"My Department, in partnership with the Guide Dogs for the Blind Association and Translink, is currently running a three-month audio visual pilot on bus services on the 5A Metro route in east Belfast. The pilot project is intended to assess the benefits of audio visual systems for all passengers and in particular for those with visual impairments, hearing impairments and older people. A full evaluation of the pilot project will be carried out by the Department. Future decisions about the extension of audio visual information systems will be taken in light of the evaluation and the resources available at the time.","answerHtml":"<p>My Department, in partnership with the Guide Dogs for the Blind Association and Translink, is currently running a three-month audio visual pilot on bus services on the 5A Metro route in east Belfast. The pilot project is intended to assess the benefits of audio visual systems for all passengers and in particular for those with visual impairments, hearing impairments and older people. A full evaluation of the pilot project will be carried out by the Department. Future decisions about the extension of audio visual information systems will be taken in light of the evaluation and the resources available at the time.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203222%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=112351","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=112351"}},{"id":"112350","reference":"AQW 3221/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-10-12","answerBy":"2011-10-27","answered":"2011-10-26","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development what action his Department is taking to ensure that footpaths are free from obstructions to people who are visually impaired.","answerText":"My Department’s Roads Service is highly cognisant of the need to ensure the safety of visually impaired members of the public who use footpaths. The Roads (Northern Ireland) Order 1993 empowers the Department to take action to remove obstructions.\n\nRoads Service will intervene and consider the removal of obstacles from footpaths usually in circumstances where a complaint is made by a member of the public. It will request the removal of any obstacles which are considered to compromise the safety of members of the public using the footpath, and in doing so, is particularly mindful of the risks posed to those who may be visually impaired.","answerHtml":"<p>My Department’s Roads Service is highly cognisant of the need to ensure the safety of visually impaired members of the public who use footpaths. The Roads (Northern Ireland) Order 1993 empowers the Department to take action to remove obstructions.</p><p>Roads Service will intervene and consider the removal of obstacles from footpaths usually in circumstances where a complaint is made by a member of the public. It will request the removal of any obstacles which are considered to compromise the safety of members of the public using the footpath, and in doing so, is particularly mindful of the risks posed to those who may be visually impaired.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203221%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=112350","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=112350"}},{"id":"112325","reference":"AQW 3217/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-10-12","answerBy":"2011-10-27","answered":"2011-10-19","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development for his assessment of the advantages and the economic viability of community heating schemes and the bulk purchase of fuel.","answerText":"The Housing Executive has examined the potential for installing community heating in some areas, but concluded that it is not economically viable within existing housing estates due to the high number of house sales. To be economically successful it would require most, if not all, dwellings within an estate to take part in a scheme. Many home owners have installed their own individual boilers and, having made that investment, would not take part in a community scheme. Extending into adjacent areas to obtain the critical mass required to make a scheme successful would be prohibitively expensive in terms of the underground pipe network.\n\nCommunity heating is best suited to new build situations and a recent example is the Woodbrook private housing development outside Lisburn.\n\nThe Housing Executive is developing an Energy Brokerage Scheme and plan to market test a scheme by the end of March 2012.","answerHtml":"<p>The Housing Executive has examined the potential for installing community heating in some areas, but concluded that it is not economically viable within existing housing estates due to the high number of house sales. To be economically successful it would require most, if not all, dwellings within an estate to take part in a scheme. Many home owners have installed their own individual boilers and, having made that investment, would not take part in a community scheme. Extending into adjacent areas to obtain the critical mass required to make a scheme successful would be prohibitively expensive in terms of the underground pipe network.</p><p>Community heating is best suited to new build situations and a recent example is the Woodbrook private housing development outside Lisburn.</p><p>The Housing Executive is developing an Energy Brokerage Scheme and plan to market test a scheme by the end of March 2012.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%203217%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=112325","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=112325"}},{"id":"111696","reference":"AQO 588/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2011-10-06","answerBy":"2011-10-18","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture and Rural Development","question":"To ask the Minister of Agriculture and Rural Development whether her Department would consider the development of a woodland inventory.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20588%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=111696","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=111696"}},{"id":"113228","reference":"AQO 588/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2011-10-06","answerBy":"2011-10-18","answered":"2011-10-18","answeredOrally":false,"priority":false,"department":"Department of Agriculture, Environment and Rural Affairs","departmentId":"76","minister":"Minister of Agriculture and Rural Development","question":"To ask the Minister of Agriculture and Rural Development whether her Department would consider the development of a woodland inventory.","answerText":"Yes, my Department’s Forest Service is already compiling a woodland inventory from existing data sources. These include data held by DARD, DoE’s Environment Agency and Land and Property Services.\n\nWe started this work last year and found a modest increase in woodland area, however, there are issues to be resolved about the quality of some of the mapping data. Further analysis is being carried out this year, taking account of new data, based on a combination of satellite imagery and digital cartography, to validate the woodland data set.\n\nAt the end of this business year, Forest Service will publish improved baseline information of woodland area in the north of Ireland.","answerHtml":"<p>Yes, my Department’s Forest Service is already compiling a woodland inventory from existing data sources. These include data held by DARD, DoE’s Environment Agency and Land and Property Services.</p><p>We started this work last year and found a modest increase in woodland area, however, there are issues to be resolved about the quality of some of the mapping data. Further analysis is being carried out this year, taking account of new data, based on a combination of satellite imagery and digital cartography, to validate the woodland data set.</p><p>At the end of this business year, Forest Service will publish improved baseline information of woodland area in the north of Ireland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20588%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=113228","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=113228"}},{"id":"110884","reference":"AQO 524/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2011-09-29","answerBy":"2011-10-11","answered":null,"answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety whether he has any plans to introduce legislation on adoption during this mandate.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20524%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=110884","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=110884"}},{"id":"112358","reference":"AQO 524/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2011-09-29","answerBy":"2011-10-11","answered":"2011-10-11","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety whether he has any plans to introduce legislation on adoption during this mandate.","answerText":"I can confirm that it is my intention is to introduce new adoption legislation in the Assembly within the current mandate. However, I intend to await the outcome of an ongoing judicial review of existing adoption legislation before introducing a Bill.","answerHtml":"<p>I can confirm that it is my intention is to introduce new adoption legislation in the Assembly within the current mandate. However, I intend to await the outcome of an ongoing judicial review of existing adoption legislation before introducing a Bill.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20524%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=112358","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=112358"}},{"id":"110731","reference":"AQW 2645/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-28","answerBy":"2011-10-13","answered":"2011-10-12","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development, given the delay in the reopening of the Jordanstown Road, what action his Department is taking to ensure that similar delays are avoided in the future.","answerText":"My Department’s Roads Service has advised that the Jordanstown Road was programmed to re-open to traffic by 31 August 2011. Unfortunately, a utility company was unable to complete its service alterations to its agreed programme, which prevented Roads Service’s contractor from completing the road works. This issue has now been resolved, and the road was re-opened on Sunday 2 October.\n\nMy Department’s Roads Service has confirmed that a full and detailed Post Project Evaluation is completed after every scheme of this nature, in accordance with Roads Service policy. I can advise the Member that the evaluation of this scheme will include a review of the project management arrangements for service alterations by utility companies as part of improvements of this type, in order to identify potential improvements for future projects so that any risk of delays is minimised.\n\nI am disappointed that the extension of this road closure caused considerable inconvenience, particularly to local schools and residents.","answerHtml":"<p>My Department’s Roads Service has advised that the Jordanstown Road was programmed to re-open to traffic by 31 August 2011. Unfortunately, a utility company was unable to complete its service alterations to its agreed programme, which prevented Roads Service’s contractor from completing the road works. This issue has now been resolved, and the road was re-opened on Sunday 2 October.</p><p>My Department’s Roads Service has confirmed that a full and detailed Post Project Evaluation is completed after every scheme of this nature, in accordance with Roads Service policy. I can advise the Member that the evaluation of this scheme will include a review of the project management arrangements for service alterations by utility companies as part of improvements of this type, in order to identify potential improvements for future projects so that any risk of delays is minimised.</p><p>I am disappointed that the extension of this road closure caused considerable inconvenience, particularly to local schools and residents.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202645%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=110731","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=110731"}},{"id":"109906","reference":"AQW 2326/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-21","answerBy":"2011-10-06","answered":"2011-09-28","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development how many children are living below the poverty line in each constituency.","answerText":"During the period 2005/09 the number and percentage of children living below the relative poverty line for each Westminster Parliamentary Constituency is presented in Table 1. The results are produced using the Family Resources Survey datasets for Northern Ireland, and the Households Below Average Income datasets for Northern Ireland.\n\nTable 1:\n\nParliamentary Constituency\tNumber of children in relative low income\tPercentage of children in relative low income\nBelfast East\t..\t15\nBelfast North\t4,800\t26\nBelfast South\t..\t9\nBelfast West\t8,700\t34\nEast Antrim\t5,600\t29\nEast Londonderry\t5,100\t23\nFermanagh and South Tyrone\t7,400\t33\nFoyle\t11,200\t40\nLagan Valley\t..\t14\nMid Ulster\t9,600\t31\nNewry and Armagh\t..\t25\nNorth Antrim\t5,100\t21\nNorth Down\t5,000\t22\nSouth Antrim\t..\t18\nSouth Down\t7,900\t24\nStrangford\t..\t14\nUpper Bann\t5,200\t21\nWest Tyrone\t6,100\t25\nNorthern Ireland\t103,600\t24","answerHtml":"<p>During the period 2005/09 the number and percentage of children living below the relative poverty line for each Westminster Parliamentary Constituency is presented in Table 1. The results are produced using the Family Resources Survey datasets for Northern Ireland, and the Households Below Average Income datasets for Northern Ireland.</p><p>Table 1:</p><div class=\"table-wrap\"><table><tr><td>Parliamentary Constituency</td><td>Number of children in relative low income</td><td>Percentage of children in relative low income</td></tr><tr><td>Belfast East</td><td>..</td><td>15</td></tr><tr><td>Belfast North</td><td>4,800</td><td>26</td></tr><tr><td>Belfast South</td><td>..</td><td>9</td></tr><tr><td>Belfast West</td><td>8,700</td><td>34</td></tr><tr><td>East Antrim</td><td>5,600</td><td>29</td></tr><tr><td>East Londonderry</td><td>5,100</td><td>23</td></tr><tr><td>Fermanagh and South Tyrone</td><td>7,400</td><td>33</td></tr><tr><td>Foyle</td><td>11,200</td><td>40</td></tr><tr><td>Lagan Valley</td><td>..</td><td>14</td></tr><tr><td>Mid Ulster</td><td>9,600</td><td>31</td></tr><tr><td>Newry and Armagh</td><td>..</td><td>25</td></tr><tr><td>North Antrim</td><td>5,100</td><td>21</td></tr><tr><td>North Down</td><td>5,000</td><td>22</td></tr><tr><td>South Antrim</td><td>..</td><td>18</td></tr><tr><td>South Down</td><td>7,900</td><td>24</td></tr><tr><td>Strangford</td><td>..</td><td>14</td></tr><tr><td>Upper Bann</td><td>5,200</td><td>21</td></tr><tr><td>West Tyrone</td><td>6,100</td><td>25</td></tr><tr><td>Northern Ireland</td><td>103,600</td><td>24</td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202326%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=109906","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=109906"}},{"id":"109851","reference":"AQW 2317/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-21","answerBy":"2011-10-06","answered":"2011-09-27","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety what action his Department is taking to reduce the number of people with mood and anxiety disorders in the East Antrim area.","answerText":"Most people with mood and anxiety disorders are seen by Primary Care who have access to services such as computerised Cognitive Behavioural Therapy (CBT), anxiety management groups and counselling services.\n\nWithin Northern Trust Mental Health Services, there are 8 Community Mental Health Teams for adults, 6 Community teams for older people with mental health problems, a CBT service and a psychology service. These teams all provide services for mood and anxiety disorders as part of the Trust’s overall mental health services.\n\nWork is also being done to reduce the number of people with mood and anxiety disorder through the Public Health Agency, such as through the Protect Life Strategy work and Community Development projects promoting good mental health..","answerHtml":"<p>Most people with mood and anxiety disorders are seen by Primary Care who have access to services such as computerised Cognitive Behavioural Therapy (CBT), anxiety management groups and counselling services.</p><p>Within Northern Trust Mental Health Services, there are 8 Community Mental Health Teams for adults, 6 Community teams for older people with mental health problems, a CBT service and a psychology service. These teams all provide services for mood and anxiety disorders as part of the Trust’s overall mental health services.</p><p>Work is also being done to reduce the number of people with mood and anxiety disorder through the Public Health Agency, such as through the Protect Life Strategy work and Community Development projects promoting good mental health..</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202317%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=109851","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=109851"}},{"id":"109760","reference":"AQW 2278/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-21","answerBy":"2011-10-06","answered":"2011-10-04","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development for his assessment of how the funding allocation for the A5 scheme will impact upon structural maintenance elsewhere.","answerText":"The budget for period 2011/12 to 2014/15 was announced to the Assembly by the Minister for Finance and Personnel on 4 March 2011. The structural maintenance budget is currently held by my Department’s Roads Service is that allocated to it centrally by the Department of Finance and Personnel following the Budget 2010 settlement. Progression of the A5 scheme does not necessarily impact on Roads Service’s structural maintenance budget.","answerHtml":"<p>The budget for period 2011/12 to 2014/15 was announced to the Assembly by the Minister for Finance and Personnel on 4 March 2011. The structural maintenance budget is currently held by my Department’s Roads Service is that allocated to it centrally by the Department of Finance and Personnel following the Budget 2010 settlement. Progression of the A5 scheme does not necessarily impact on Roads Service’s structural maintenance budget.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202278%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=109760","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=109760"}},{"id":"109758","reference":"AQW 2277/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-21","answerBy":"2011-10-06","answered":"2011-10-04","answeredOrally":false,"priority":false,"department":"Department of Culture, Arts and Leisure","departmentId":"77","minister":"Minister of Culture, Arts and Leisure","question":"To ask the Minister of Culture, Arts and Leisure, given that children are one of the largest groups of library users and that the consultation process is not open to people under 16 years old, for her assessment of whether the current public consultation process on the reduction of library opening hours is in breach of Article 12 of the United Nations Convention on the Rights of the Child, and the Northern Ireland Act 1998 on the basis of age discrimination.","answerText":"The draft Equality Impact Assessment carried out as part of the Libraries NI consultation on opening hours identifies that children and young people under 16 make extensive use of libraries and that they are likely to be affected if their local library reduces opening hours.\n\nAccordingly Libraries NI have developed a strategy to ensure participation by children in the consultation, in line with consultation best practice. This will include a separate (child-friendly) questionnaire. Libraries NI also intend to hold a number of engagement groups to which children will be invited.\n\nLibraries NI have undertaken to amend their online consultation site to make it clearer how children can contribute in the consultation process.","answerHtml":"<p>The draft Equality Impact Assessment carried out as part of the Libraries NI consultation on opening hours identifies that children and young people under 16 make extensive use of libraries and that they are likely to be affected if their local library reduces opening hours.</p><p>Accordingly Libraries NI have developed a strategy to ensure participation by children in the consultation, in line with consultation best practice. This will include a separate (child-friendly) questionnaire. Libraries NI also intend to hold a number of engagement groups to which children will be invited.</p><p>Libraries NI have undertaken to amend their online consultation site to make it clearer how children can contribute in the consultation process.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202277%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=109758","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=109758"}},{"id":"109682","reference":"AQW 2237/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-20","answerBy":"2011-10-05","answered":"2011-09-23","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety to detail the change in patient numbers attending (i) Whiteabbey Hospital; and (ii) Antrim Area Hospital as a result of the closure of the Accident and Emergency Unit at Whiteabbey Hospital.","answerText":"Emergency care services were reconfigured at both Whiteabbey and Mid Ulster emergency care departments on 24th May 2010, from consultant-led treatment services (Type 2 - emergency care departments) to nurse-led minor injury units with designated accommodation for the reception of patients with minor injuries and/or illnesses (Type 3 - emergency care departments). In addition, opening hours at both departments were reduced to 9am to 5pm, 5 days a week.\n\nInformation on the total number of new and unplanned review attendances each month at (i) Whiteabbey and (ii) Antrim Area emergency care departments is presented in the table overleaf.\n\nMonthly Attendances at Whiteabbey and Antrim Area Emergency Care Departments (December 2009 – March 2011)\n\nEmergency Care Dept.\tAntrim\tChange from previous Month\tWhiteabbey\tChange from previous Month\tNorthern HSC Trust\tChange from previous Month\nDecember 2009\t5,495\t-\t1,402\t-\t11,421\t-\nJanuary 2010\t5,428\t-67\t1,450\t48\t11,354\t-67\nFebruary 2010\t4,869\t-559\t1,375\t-75\t10,373\t-981\nMarch 2010\t5,802\t933\t1,589\t214\t12,308\t1935\nApril 2010\t5,554\t-248\t1,651\t62\t12,374\t66\nMay 2010 1\t6,052\t498\t1,256\t-395\t12,334\t-40\nJune 2010\t6,228\t176\t743\t-513\t11,405\t-929\nJuly 2010\t6,185\t-43\t591\t-152\t11,333\t-72\nAugust 2010\t6,167\t-18\t676\t85\t11,448\t115\nSeptember 2010\t6,104\t-63\t773\t97\t11,043\t-405\nOctober 2010\t6,160\t56\t707\t-66\t10,960\t-83\nNovember 2010\t5,596\t-564\t677\t-30\t10,048\t-912\nDecember 2010\t5,541\t-55\t615\t-62\t9,708\t-340\nJanuary 2011\t5,873\t332\t687\t72\t10,405\t697\nFebruary 2011\t5,273\t-600\t629\t-58\t9,653\t-752\nMarch 2011\t6,169\t896\t855\t226\t11,333\t1680\n\n1 Emergency Care Services at Whiteabbey were reconfigured on 24 May 2010.","answerHtml":"<p>Emergency care services were reconfigured at both Whiteabbey and Mid Ulster emergency care departments on 24th May 2010, from consultant-led treatment services (Type 2 - emergency care departments) to nurse-led minor injury units with designated accommodation for the reception of patients with minor injuries and/or illnesses (Type 3 - emergency care departments). In addition, opening hours at both departments were reduced to 9am to 5pm, 5 days a week.</p><p>Information on the total number of new and unplanned review attendances each month at (i) Whiteabbey and (ii) Antrim Area emergency care departments is presented in the table overleaf.</p><p>Monthly Attendances at Whiteabbey and Antrim Area Emergency Care Departments (December 2009 – March 2011)</p><div class=\"table-wrap\"><table><tr><td>Emergency Care Dept.</td><td>Antrim</td><td>Change from previous Month</td><td>Whiteabbey</td><td>Change from previous Month</td><td>Northern HSC Trust</td><td>Change from previous Month</td></tr><tr><td>December 2009</td><td>5,495</td><td>-</td><td>1,402</td><td>-</td><td>11,421</td><td>-</td></tr><tr><td>January 2010</td><td>5,428</td><td>-67</td><td>1,450</td><td>48</td><td>11,354</td><td>-67</td></tr><tr><td>February 2010</td><td>4,869</td><td>-559</td><td>1,375</td><td>-75</td><td>10,373</td><td>-981</td></tr><tr><td>March 2010</td><td>5,802</td><td>933</td><td>1,589</td><td>214</td><td>12,308</td><td>1935</td></tr><tr><td>April 2010</td><td>5,554</td><td>-248</td><td>1,651</td><td>62</td><td>12,374</td><td>66</td></tr><tr><td>May 2010 1</td><td>6,052</td><td>498</td><td>1,256</td><td>-395</td><td>12,334</td><td>-40</td></tr><tr><td>June 2010</td><td>6,228</td><td>176</td><td>743</td><td>-513</td><td>11,405</td><td>-929</td></tr><tr><td>July 2010</td><td>6,185</td><td>-43</td><td>591</td><td>-152</td><td>11,333</td><td>-72</td></tr><tr><td>August 2010</td><td>6,167</td><td>-18</td><td>676</td><td>85</td><td>11,448</td><td>115</td></tr><tr><td>September 2010</td><td>6,104</td><td>-63</td><td>773</td><td>97</td><td>11,043</td><td>-405</td></tr><tr><td>October 2010</td><td>6,160</td><td>56</td><td>707</td><td>-66</td><td>10,960</td><td>-83</td></tr><tr><td>November 2010</td><td>5,596</td><td>-564</td><td>677</td><td>-30</td><td>10,048</td><td>-912</td></tr><tr><td>December 2010</td><td>5,541</td><td>-55</td><td>615</td><td>-62</td><td>9,708</td><td>-340</td></tr><tr><td>January 2011</td><td>5,873</td><td>332</td><td>687</td><td>72</td><td>10,405</td><td>697</td></tr><tr><td>February 2011</td><td>5,273</td><td>-600</td><td>629</td><td>-58</td><td>9,653</td><td>-752</td></tr><tr><td>March 2011</td><td>6,169</td><td>896</td><td>855</td><td>226</td><td>11,333</td><td>1680</td></tr></table></div><p>1 Emergency Care Services at Whiteabbey were reconfigured on 24 May 2010.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202237%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=109682","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=109682"}},{"id":"109679","reference":"AQW 2234/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-20","answerBy":"2011-10-05","answered":"2011-10-04","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development, pursuant to AQW 1728/11-15, what steps his Department has taken, and plans to take, to address the high level of child poverty in the East Antrim area.","answerText":"Although OFMDFM has lead responsibility for tackling child poverty my Department clearly has a key role to play. My Department has recently contributed to the Executive’s delivery plan for the Child Poverty Strategy and I am keen for this work to be progressed. My Department included its main strategies for tackling child poverty in all areas including;\n\nProviding financial support for parents through the social security system and through the delivery of better child support arrangements. This includes the Benefit Uptake Programme which since 2007 contacted over 15,000 families and offered a full benefit assessment carried out by an independent advice sector partner;\n\nRaising the standards of housing available for young people and families in both the private rented and social housing sectors;\n\nTackling fuel poverty in the most vulnerable households through our Fuel Poverty Strategy;\n\nFunding the provision of advice and volunteer services and a range of programmes, such as the areas at risk programme which have a direct impact on the lives of families in most need.\n\nIn the East Antrim Constituency Area my Department provides funding through the Community Investment Fund (CIF) to two recipient Groups. DSD CIF funding to these Groups for 2011/12 is:\n\nCarrickfergus Community Forum£60,642\n\nLarne Community Development Programme£50,379","answerHtml":"<p>Although OFMDFM has lead responsibility for tackling child poverty my Department clearly has a key role to play. My Department has recently contributed to the Executive’s delivery plan for the Child Poverty Strategy and I am keen for this work to be progressed. My Department included its main strategies for tackling child poverty in all areas including;</p><p>Providing financial support for parents through the social security system and through the delivery of better child support arrangements. This includes the Benefit Uptake Programme which since 2007 contacted over 15,000 families and offered a full benefit assessment carried out by an independent advice sector partner;</p><p>Raising the standards of housing available for young people and families in both the private rented and social housing sectors;</p><p>Tackling fuel poverty in the most vulnerable households through our Fuel Poverty Strategy;</p><p>Funding the provision of advice and volunteer services and a range of programmes, such as the areas at risk programme which have a direct impact on the lives of families in most need.</p><p>In the East Antrim Constituency Area my Department provides funding through the Community Investment Fund (CIF) to two recipient Groups. DSD CIF funding to these Groups for 2011/12 is:</p><p>Carrickfergus Community Forum£60,642</p><p>Larne Community Development Programme£50,379</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202234%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=109679","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=109679"}},{"id":"109602","reference":"AQW 2204/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-20","answerBy":"2011-10-05","answered":"2011-09-30","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development how many people have been charged with fare evasion on Translink services in each of the last three years; and how much revenue this generated.","answerText":"The table below shows how many people have been charged with fare evasion on Translink services in each of the last three years.\n\nCalendar Year\tNIR\tULSTERBUS\tCITYBUS (METRO)\n\n2008\t32\t4\t0\n2009\t54\t7\t3\n2010\t25\t8\t1\n\nTranslink report that these cases do not generate revenue and fines are allocated to the court services.","answerHtml":"<p>The table below shows how many people have been charged with fare evasion on Translink services in each of the last three years.</p><div class=\"table-wrap\"><table><tr><td>Calendar Year</td><td>NIR</td><td>ULSTERBUS</td><td>CITYBUS (METRO)</td></tr><tr><td></td><td></td><td></td><td></td></tr><tr><td>2008</td><td>32</td><td>4</td><td>0</td></tr><tr><td>2009</td><td>54</td><td>7</td><td>3</td></tr><tr><td>2010</td><td>25</td><td>8</td><td>1</td></tr></table></div><p>Translink report that these cases do not generate revenue and fines are allocated to the court services.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202204%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=109602","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=109602"}},{"id":"109601","reference":"AQW 2203/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-20","answerBy":"2011-10-05","answered":"2011-09-27","answeredOrally":false,"priority":false,"department":"Department of Culture, Arts and Leisure","departmentId":"77","minister":"Minister of Culture, Arts and Leisure","question":"To ask the Minister of Culture, Arts and Leisure what weight she will attach to the responses to the public consultation on the proposed reduction in the opening hours of Greenisland and Whitehead libraries.","answerText":"The Board of Libraries NI has commenced a review of library opening hours, including those of Greenisland and Whitehead libraries.\n\nI would emphasise that nothing has been finalised by the Libraries NI Board at this stage. A consultation has commenced and that will include a conversation with each community about when they would like to see their library opened. I would encourage people to take part in the consultation.\n\nConsideration of the responses made during the public consultation is a matter for the Libraries NI Board.\n\nDecisions will not be made until all the information from the consultation has been collated and presented to the Libraries NI Board. The Board of Libraries NI contains councillors from the DUP, the SDLP, my own party and the UUP.","answerHtml":"<p>The Board of Libraries NI has commenced a review of library opening hours, including those of Greenisland and Whitehead libraries.</p><p>I would emphasise that nothing has been finalised by the Libraries NI Board at this stage. A consultation has commenced and that will include a conversation with each community about when they would like to see their library opened. I would encourage people to take part in the consultation.</p><p>Consideration of the responses made during the public consultation is a matter for the Libraries NI Board.</p><p>Decisions will not be made until all the information from the consultation has been collated and presented to the Libraries NI Board. The Board of Libraries NI contains councillors from the DUP, the SDLP, my own party and the UUP.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202203%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=109601","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=109601"}},{"id":"109599","reference":"AQW 2202/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-20","answerBy":"2011-10-05","answered":"2011-09-27","answeredOrally":false,"priority":false,"department":"Department of Culture, Arts and Leisure","departmentId":"77","minister":"Minister of Culture, Arts and Leisure","question":"To ask the Minister of Culture, Arts and Leisure what steps she has taken, and intends to take, to secure the long-term futures of Greenisland and Whitehead libraries.","answerText":"I recognise the valuable contribution that the public library service makes to our local (both rural and urban) communities and I am fully committed to the provision of a comprehensive and efficient library service.\n\nI also recognise that both my Department and its sponsored bodies have already had to take very difficult decisions in planning to live within reduced budget allocations over the next four years.\n\nLibraries NI has recently started a Review of its opening hours. The purpose of this Review is to deliver the savings required while protecting a network of sustainable libraries into the future.","answerHtml":"<p>I recognise the valuable contribution that the public library service makes to our local (both rural and urban) communities and I am fully committed to the provision of a comprehensive and efficient library service.</p><p>I also recognise that both my Department and its sponsored bodies have already had to take very difficult decisions in planning to live within reduced budget allocations over the next four years.</p><p>Libraries NI has recently started a Review of its opening hours. The purpose of this Review is to deliver the savings required while protecting a network of sustainable libraries into the future.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%202202%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=109599","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=109599"}},{"id":"109300","reference":"AQO 412/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2011-09-15","answerBy":"2011-09-27","answered":"2011-09-27","answeredOrally":true,"priority":false,"department":"Department of Culture, Arts and Leisure","departmentId":"77","minister":"Minister of Culture, Arts and Leisure","question":"To ask the Minister of Culture, Arts and Leisure to outline preparations for the 2013 World Police and Fire Games.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20412%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=109300","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-11-12/27-September-2011","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=109300"}},{"id":"109328","reference":"AQO 372/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2011-09-15","answerBy":"2011-09-26","answered":"2011-09-26","answeredOrally":true,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister for an update on discussions on the Programme for Government.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20372%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=109328","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-11-12/26-September-2011","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=109328"}},{"id":"108914","reference":"AQW 1921/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-13","answerBy":"2011-09-28","answered":"2011-09-21","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety (i) how many people are classed as obese; and (ii) what actions his Department is taking to address this problem.","answerText":"The 2005/06 Health & Social Wellbeing Survey reported that overall 24% of adults were obese. A similar proportion of men (25%) and women (23%) were identified as having a BMI of 30 or over and therefore classified as obese.\n\nThe HSWB Survey 2005/06 also collected height and weight measurements for children aged 2-15 years. This survey indicated that using the International Approach 8% of these children were recorded as obese (8% of boys and 7% of girls).\n\nThe results from the 2010/11 Health Survey are expected to be released next month.\n\nMy Department has led the development of a Framework for Preventing and Addressing Overweight and Obesity in Northern Ireland 2011-2021: A Fitter Future for All.\n\nThis Framework will incorporate and oversee the existing Fit Futures Implementation Plan which had a focus on children and young people and widen the scope to contain outcomes regarding food and nutrition, and physical activity throughout the life course of the population. It is anticipated that this Framework will be issued for final Ministerial and Executive approval in the autumn of 2011.\n\nThe successful implementation of the Framework will rely on close collaboration with DE, DCAL and other Departments. SportNI, through its Sports Matter Strategy, will also be a key delivery partner for many of the outcomes relating to increasing participation in physical activity.\n\nThe Public Health Agency currently undertakes a range of programmes and initiatives to address overweight and obesity across Northern Ireland, working in collaboration with other Departments and their agencies. Work in this area includes the following:\n\nWorking to ensure that healthy weight and reducing obesity forms part of local action plans.\n\nWorking with DE to support the development and implementation of the Food in School Policy; and\n\nSupport enhanced opportunities for all age groups and abilities to be physically active, including collaborative work to build/enhance the infrastructure that supports activity in various settings.","answerHtml":"<p>The 2005/06 Health &amp; Social Wellbeing Survey reported that overall 24% of adults were obese. A similar proportion of men (25%) and women (23%) were identified as having a BMI of 30 or over and therefore classified as obese.</p><p>The HSWB Survey 2005/06 also collected height and weight measurements for children aged 2-15 years. This survey indicated that using the International Approach 8% of these children were recorded as obese (8% of boys and 7% of girls).</p><p>The results from the 2010/11 Health Survey are expected to be released next month.</p><p>My Department has led the development of a Framework for Preventing and Addressing Overweight and Obesity in Northern Ireland 2011-2021: A Fitter Future for All.</p><p>This Framework will incorporate and oversee the existing Fit Futures Implementation Plan which had a focus on children and young people and widen the scope to contain outcomes regarding food and nutrition, and physical activity throughout the life course of the population. It is anticipated that this Framework will be issued for final Ministerial and Executive approval in the autumn of 2011.</p><p>The successful implementation of the Framework will rely on close collaboration with DE, DCAL and other Departments. SportNI, through its Sports Matter Strategy, will also be a key delivery partner for many of the outcomes relating to increasing participation in physical activity.</p><p>The Public Health Agency currently undertakes a range of programmes and initiatives to address overweight and obesity across Northern Ireland, working in collaboration with other Departments and their agencies. Work in this area includes the following:</p><p>Working to ensure that healthy weight and reducing obesity forms part of local action plans.</p><p>Working with DE to support the development and implementation of the Food in School Policy; and</p><p>Support enhanced opportunities for all age groups and abilities to be physically active, including collaborative work to build/enhance the infrastructure that supports activity in various settings.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201921%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108914","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108914"}},{"id":"108913","reference":"AQW 1920/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-13","answerBy":"2011-09-28","answered":"2011-09-21","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development how many people in the East Antrim area received Job Seekers Allowance in each of the last four years.","answerText":"The information requested is set out in the table below. The figures quoted show the number of people in receipt of Jobseeker’s Allowance at the dates of extract for the East Antrim Parliamentary Constituency.\n\nParliamentary Constituency\tMar-08\tMar-09\tMar-10\tMar-11\nEast Antrim\t900\t1,909\t2,374\t2,315","answerHtml":"<p>The information requested is set out in the table below. The figures quoted show the number of people in receipt of Jobseeker’s Allowance at the dates of extract for the East Antrim Parliamentary Constituency.</p><div class=\"table-wrap\"><table><tr><td>Parliamentary Constituency</td><td>Mar-08</td><td>Mar-09</td><td>Mar-10</td><td>Mar-11</td></tr><tr><td>East Antrim</td><td>900</td><td>1,909</td><td>2,374</td><td>2,315</td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201920%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108913","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108913"}},{"id":"108886","reference":"AQW 1908/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-13","answerBy":"2011-09-28","answered":"2011-09-21","answeredOrally":false,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice (i) how many arrests were made in relation to the rioting in Ballyclare and Carrickfergus on 9 July 2011; and (ii) how many people have been prosecuted and convicted in relation to the disturbances.","answerText":"Fourteen arrests have been made by the PSNI, to date (15 September 2011), in relation to the rioting in Ballyclare and Carrickfergus on 9 July 2011.\n\nThe nature of many of the offences charged is serious and the cases concerned are under consideration by PPS prosecutors. Information is not yet available on convictions, therefore.","answerHtml":"<p>Fourteen arrests have been made by the PSNI, to date (15 September 2011), in relation to the rioting in Ballyclare and Carrickfergus on 9 July 2011.</p><p>The nature of many of the offences charged is serious and the cases concerned are under consideration by PPS prosecutors. Information is not yet available on convictions, therefore.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201908%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108886","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108886"}},{"id":"108659","reference":"AQW 1784/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-08","answerBy":"2011-09-23","answered":"2011-09-20","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment (i) how many people have been convicted of dog fouling offences in the last twelve months; (ii) how much revenue was raised from the resulting fines; and (iii) what further measures he is taking to combat this problem.","answerText":"The Department obtains information concerning dog fouling offences from district councils on a financial year basis only. 89 people were convicted by the courts for dog fouling offences in 2010/11 and a total of £4,451 in fines and £88 in court costs were imposed. The Department does not hold any information on the fines subsequently paid.\n\nIn the same period, district councils issued 323 fixed penalty notices (£50) for dog fouling offences resulting in a total of £12,800 received in penalties. Such a notice may be given to a person offering that person the opportunity of discharging any liability to conviction for the dog fouling offence by payment of a fixed penalty.\n\nThe Clean Neighbourhoods and Environment Act (Northern Ireland) 2011 will strengthen the law in relation to dog fouling by the introduction of a new system of dog control orders.\n\nUnder the new system, it will be an offence, subject to certain conditions, for anyone in charge of a dog on land to which a dog control order applies, not to remove the faeces deposited by the dog. A person guilty of the offence will be liable on summary conviction to a fine not exceeding £1,000 (currently £500 under the Litter (Northern Ireland) Order 1994). The district council will still be able to offer the person the opportunity of discharging any liability to conviction for the offence by payment of a fixed penalty. The district council will have the flexibility, subject to upper and lower limits, to set their own fixed penalty rates, with the default rate being £75.","answerHtml":"<p>The Department obtains information concerning dog fouling offences from district councils on a financial year basis only. 89 people were convicted by the courts for dog fouling offences in 2010/11 and a total of £4,451 in fines and £88 in court costs were imposed. The Department does not hold any information on the fines subsequently paid.</p><p>In the same period, district councils issued 323 fixed penalty notices (£50) for dog fouling offences resulting in a total of £12,800 received in penalties. Such a notice may be given to a person offering that person the opportunity of discharging any liability to conviction for the dog fouling offence by payment of a fixed penalty.</p><p>The Clean Neighbourhoods and Environment Act (Northern Ireland) 2011 will strengthen the law in relation to dog fouling by the introduction of a new system of dog control orders.</p><p>Under the new system, it will be an offence, subject to certain conditions, for anyone in charge of a dog on land to which a dog control order applies, not to remove the faeces deposited by the dog. A person guilty of the offence will be liable on summary conviction to a fine not exceeding £1,000 (currently £500 under the Litter (Northern Ireland) Order 1994). The district council will still be able to offer the person the opportunity of discharging any liability to conviction for the offence by payment of a fixed penalty. The district council will have the flexibility, subject to upper and lower limits, to set their own fixed penalty rates, with the default rate being £75.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201784%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108659","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108659"}},{"id":"108658","reference":"AQW 1783/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-08","answerBy":"2011-09-23","answered":"2011-09-15","answeredOrally":false,"priority":false,"department":"Department for Employment and Learning","departmentId":"83","minister":"Minister for Employment and Learning","question":"To ask the Minister for Employment and Learning what percentage of people aged 16-25 years old are not in employment, education, or training.","answerText":"Estimates of the number of people in Northern Ireland not in education, employment, or training are derived from the Labour Force Survey (LFS). The latest figures for Quarter 2 2011 estimate that there were 19.1% (48,000) of all those aged 16-25 in Northern Ireland who were not in employment, participating in government training schemes or in full-time education. It is not possible to identify separately those in part-time education or non-government sponsored training.","answerHtml":"<p>Estimates of the number of people in Northern Ireland not in education, employment, or training are derived from the Labour Force Survey (LFS). The latest figures for Quarter 2 2011 estimate that there were 19.1% (48,000) of all those aged 16-25 in Northern Ireland who were not in employment, participating in government training schemes or in full-time education. It is not possible to identify separately those in part-time education or non-government sponsored training.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201783%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108658","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108658"}},{"id":"108657","reference":"AQW 1782/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-08","answerBy":"2011-09-23","answered":"2011-09-21","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to detail any road lighting schemes proposed for the Carrickfergus Borough Council area over the next four years; and the wards in which they will take place.","answerText":"My Department’s Roads Service has advised that it does not record information on proposed street lighting schemes by ward area. However, information on completed and proposed street lighting schemes for the current financial year can be found in Roads Service’s Spring and Autumn Reports to Councils. These reports can be accessed from my Department’s internet site at the following web address:\n\nhttp://www.drdni.gov.uk/index/freedom_of_information/customer_information/cinformationtype-results.htm?signpost=Customer+information&informationType=Roads+Service+reports+to+councils\n\nI can advise that the detailed budget for subsequent years has not yet been finalised and it is therefore not possible to provide details of future works programmes at this time.","answerHtml":"<p>My Department’s Roads Service has advised that it does not record information on proposed street lighting schemes by ward area. However, information on completed and proposed street lighting schemes for the current financial year can be found in Roads Service’s Spring and Autumn Reports to Councils. These reports can be accessed from my Department’s internet site at the following web address:</p><p>http://www.drdni.gov.uk/index/freedom_of_information/customer_information/cinformationtype-results.htm?signpost=Customer+information&amp;informationType=Roads+Service+reports+to+councils</p><p>I can advise that the detailed budget for subsequent years has not yet been finalised and it is therefore not possible to provide details of future works programmes at this time.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201782%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108657","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108657"}},{"id":"108655","reference":"AQW 1781/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-08","answerBy":"2011-09-23","answered":"2011-09-21","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development whether his Department charges utility companies for operating on roads during peak times; and if not, would he consider imposing a charge.","answerText":"My Department’s Roads Service has advised that it does not charge utility companies for operating on roads during peak times and, at present, there are no plans to introduce such charges.\n\nPilot schemes were carried out in England between 2002 and 2004. However, I understand that they did not prove to be an effective model for reducing congestion and other disruption caused by utility company street works.\n\nRoads Service endeavours to prevent works taking place during peak times on roads which have been designated as traffic sensitive. Where such work is unavoidable, Roads Service works with utility companies to ensure that the duration and impact of these works is kept to a minimum.","answerHtml":"<p>My Department’s Roads Service has advised that it does not charge utility companies for operating on roads during peak times and, at present, there are no plans to introduce such charges.</p><p>Pilot schemes were carried out in England between 2002 and 2004. However, I understand that they did not prove to be an effective model for reducing congestion and other disruption caused by utility company street works.</p><p>Roads Service endeavours to prevent works taking place during peak times on roads which have been designated as traffic sensitive. Where such work is unavoidable, Roads Service works with utility companies to ensure that the duration and impact of these works is kept to a minimum.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201781%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108655","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108655"}},{"id":"108654","reference":"AQW 1780/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-08","answerBy":"2011-09-23","answered":"2011-09-21","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to detail the annual cost to the local economy that results from congestion caused by road works.","answerText":"My Department’s Roads Service has advised that it has not attempted to estimate the annual cost to the local economy resulting from congestion caused by road works. However, it does try to quantify the impact of delays on specific sections of the road network, when assessing the costs and benefits of proposed major capital works. These are scheme specific assessments and do not provide a basis for assessment of overall congestion costs.\n\nEstimates in relation to the cost of congestion caused by road works in GB vary significantly, with the highest estimate being around 10 times the size of the lowest estimate. However, I understand that in GB, it is considered that traffic congestion caused by works on roads, including those carried out by local road authorities and utility companies, is estimated at only one tenth of total traffic congestion.","answerHtml":"<p>My Department’s Roads Service has advised that it has not attempted to estimate the annual cost to the local economy resulting from congestion caused by road works. However, it does try to quantify the impact of delays on specific sections of the road network, when assessing the costs and benefits of proposed major capital works. These are scheme specific assessments and do not provide a basis for assessment of overall congestion costs.</p><p>Estimates in relation to the cost of congestion caused by road works in GB vary significantly, with the highest estimate being around 10 times the size of the lowest estimate. However, I understand that in GB, it is considered that traffic congestion caused by works on roads, including those carried out by local road authorities and utility companies, is estimated at only one tenth of total traffic congestion.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201780%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108654","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108654"}},{"id":"108642","reference":"AQO 357/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2011-09-08","answerBy":"2011-09-20","answered":"2011-09-20","answeredOrally":true,"priority":false,"department":"Department of Justice","departmentId":"134","minister":"Minister of Justice","question":"To ask the Minister of Justice for an update on the progress that has been made in resuming normal business in the Crown Court following the decision of solicitors who were involved in the legal aid dispute to return to work.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20357%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108642","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-11-12/20-September-2011","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108642"}},{"id":"108515","reference":"AQW 1728/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-07","answerBy":"2011-09-22","answered":"2011-09-14","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development how many children in the East Antrim area are living below the poverty line.","answerText":"During the period 2005/09, 5,600 children in East Antrim Westminster Parliamentary Constituency were living below the relative poverty line. This equates to 29% of children in East Antrim Westminster Parliamentary Constituency. The results are produced using the Family Resources Survey datasets for Northern Ireland, and the Households Below Average Income datasets for Northern Ireland.","answerHtml":"<p>During the period 2005/09, 5,600 children in East Antrim Westminster Parliamentary Constituency were living below the relative poverty line. This equates to 29% of children in East Antrim Westminster Parliamentary Constituency. The results are produced using the Family Resources Survey datasets for Northern Ireland, and the Households Below Average Income datasets for Northern Ireland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201728%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108515","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108515"}},{"id":"108514","reference":"AQW 1727/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-07","answerBy":"2011-09-22","answered":"2011-09-13","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education to outline the provision in the post-primary curriculum for the teaching of Northern Irish history.","answerText":"History is a statutory requirement at Key Stage 3 and a qualification choice at Key Stage 4.\n\nUnder the statutory minimum content for history all post-primary schools are required to provide pupils at Key Stage 3 with the opportunities to investigate Irish and British historical periods including the long and short term causes and consequences of the partition of Ireland and how it has influenced this State today, including key events and turning points.\n\nAt Key Stage 4 there is a significantly less curricular prescription in order to provide greater choice and flexibility for pupils. At Key Stage 4 and in sixth form it is for pupils to choose to study history.","answerHtml":"<p>History is a statutory requirement at Key Stage 3 and a qualification choice at Key Stage 4.</p><p>Under the statutory minimum content for history all post-primary schools are required to provide pupils at Key Stage 3 with the opportunities to investigate Irish and British historical periods including the long and short term causes and consequences of the partition of Ireland and how it has influenced this State today, including key events and turning points.</p><p>At Key Stage 4 there is a significantly less curricular prescription in order to provide greater choice and flexibility for pupils. At Key Stage 4 and in sixth form it is for pupils to choose to study history.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201727%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108514","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108514"}},{"id":"108513","reference":"AQW 1726/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-07","answerBy":"2011-09-22","answered":"2011-09-20","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development to detail the level of funding allocated to cross-community projects in the East Antrim area in each of the last three years.","answerText":"The Housing Executive delivers neighbourhood renewal funding through the DSD Small Pockets of Deprivation programme to three areas in the East Antrim constituency - Greenisland estate, Sunnylands estate in Carrickfergus and Larne town centre areas. The Small Pockets of Deprivation Programme along with other programmes like Areas at Risk is often used to build capacity and begin to address inter and intra community relations. The Craigyhill/Antiville, Seacourt and Ferris Park areas of Larne have been included in the Areas at Risk programme and although funding is not specifically targeted to Cross Community projects, such activities are encouraged.\n\nThe Voluntary & Community Unit, through its Community Support Programme, works in partnership with local Councils to develop communities. The East Antrim constituency covers 3 district council areas, namely Larne, Carrickfergus and part of Newtownabbey. Two of these councils, namely Newtownabbey and Carrickfergus Borough Councils have allocated DSD community support programme monies to cross community projects and details are included in the table below.\n\nThe table also includes details of funding through the Voluntary & Community Unit’s Community Investment Fund Programme to Carrickfergus Community Forum and Larne Community Development Programme whose catchment areas are in the East Antrim Constituency. Whilst this programme’s emphasis is on building cohesive communities, again inter and intra community initiatives would be supported as part of the overall intervention.\n\nThe table below sets out funding details for the above programmes.\n\n2009 / 10\t2010 / 11\t2011 /12\nSmall Pockets of Deprivation\t£115,052\t£60,365\t£53,693\nAreas at Risk\t£49,042.08\t£66,258.10\t£117,748.53\nCommunity Support Programme\t£99,792.25\t£120,852.02\tnot yet finalised\nCommunity Investment Fund\t£117,500\t£112,143\t£111,021","answerHtml":"<p>The Housing Executive delivers neighbourhood renewal funding through the DSD Small Pockets of Deprivation programme to three areas in the East Antrim constituency - Greenisland estate, Sunnylands estate in Carrickfergus and Larne town centre areas. The Small Pockets of Deprivation Programme along with other programmes like Areas at Risk is often used to build capacity and begin to address inter and intra community relations. The Craigyhill/Antiville, Seacourt and Ferris Park areas of Larne have been included in the Areas at Risk programme and although funding is not specifically targeted to Cross Community projects, such activities are encouraged.</p><p>The Voluntary &amp; Community Unit, through its Community Support Programme, works in partnership with local Councils to develop communities. The East Antrim constituency covers 3 district council areas, namely Larne, Carrickfergus and part of Newtownabbey. Two of these councils, namely Newtownabbey and Carrickfergus Borough Councils have allocated DSD community support programme monies to cross community projects and details are included in the table below.</p><p>The table also includes details of funding through the Voluntary &amp; Community Unit’s Community Investment Fund Programme to Carrickfergus Community Forum and Larne Community Development Programme whose catchment areas are in the East Antrim Constituency. Whilst this programme’s emphasis is on building cohesive communities, again inter and intra community initiatives would be supported as part of the overall intervention.</p><p>The table below sets out funding details for the above programmes.</p><div class=\"table-wrap\"><table><tr><td></td><td>2009 / 10</td><td>2010 / 11</td><td>2011 /12</td></tr><tr><td>Small Pockets of Deprivation</td><td>£115,052</td><td>£60,365</td><td>£53,693</td></tr><tr><td>Areas at Risk</td><td>£49,042.08</td><td>£66,258.10</td><td>£117,748.53</td></tr><tr><td>Community Support Programme</td><td>£99,792.25</td><td>£120,852.02</td><td>not yet finalised</td></tr><tr><td>Community Investment Fund</td><td>£117,500</td><td>£112,143</td><td>£111,021</td></tr><tr><td></td><td></td><td></td><td></td></tr></table></div>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201726%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108513","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108513"}},{"id":"108512","reference":"AQW 1725/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-07","answerBy":"2011-09-22","answered":"2011-09-20","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development which community based projects in the Carrickfergus Borough Council area currently receive funding from his Department.","answerText":"DSD currently provide funding to community based projects in the Carrickfergus Borough Council area through both the Community Support Programme and the Community Investment Fund.\n\nProjects funded through the Community Support Programme which is run in partnership and administered by the local Council include;\n\nGlenfield PAKT\nWhitehead Community Association\nGreenisland Community Council\nWindmill and Minorica Drive Assoc.\nWoodburn Residents Association\nCarrickfergus Neighbourhood Development Group\nCarrickfergus Community Forum\nCarrickfergus Women's Forum\nCarrickfergus Drug & Alcohol Advisory Group.\nGlenfield Residents Association\nMount Vernon Community Development Group\nCITHRAH\nCarrick YMCA - Woodburn PAKT\nCarrickfergus Women's Aid\nPregnancy Resource Centre\nShopmobility\n\nOne local organisation, Carrickfergus Community Forum, is funded through the Community Investment Fund programme to provide sub-regional support to voluntary and community organisations across the local Council area.","answerHtml":"<p>DSD currently provide funding to community based projects in the Carrickfergus Borough Council area through both the Community Support Programme and the Community Investment Fund.</p><p>Projects funded through the Community Support Programme which is run in partnership and administered by the local Council include;</p><div class=\"table-wrap\"><table><tr><td>Glenfield PAKT</td></tr><tr><td>Whitehead Community Association</td></tr><tr><td>Greenisland Community Council</td></tr><tr><td>Windmill and Minorica Drive Assoc.</td></tr><tr><td>Woodburn Residents Association</td></tr><tr><td>Carrickfergus Neighbourhood Development Group</td></tr><tr><td>Carrickfergus Community Forum</td></tr><tr><td>Carrickfergus Women&#39;s Forum</td></tr><tr><td>Carrickfergus Drug &amp; Alcohol Advisory Group.</td></tr><tr><td>Glenfield Residents Association</td></tr><tr><td>Mount Vernon Community Development Group</td></tr><tr><td>CITHRAH</td></tr><tr><td>Carrick YMCA - Woodburn PAKT</td></tr><tr><td>Carrickfergus Women&#39;s Aid</td></tr><tr><td>Pregnancy Resource Centre</td></tr><tr><td>Shopmobility</td></tr></table></div><p>One local organisation, Carrickfergus Community Forum, is funded through the Community Investment Fund programme to provide sub-regional support to voluntary and community organisations across the local Council area.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201725%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108512","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108512"}},{"id":"108511","reference":"AQW 1724/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-07","answerBy":"2011-09-22","answered":"2011-09-21","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to detail any road surfacing projects which have been identified for the Carrickfergus Borough Council area over the next three years.","answerText":"My Department’s Roads Service presented its Spring Report to Carrickfergus Borough Council on 12 May 2011. The report included details of programmes for both footway reconstruction and carriageway resurfacing schemes.\n\nThis report can be accessed from my Department’s internet site at the following web address:\n\nhttp://www.drdni.gov.uk/index/freedom_of_information/customer_information/cinformationtyperesults.htm?signpost=Customer+information&informationType=Roads+Service+reports+to+councils\n\nNorthern Ireland Water (NIW) subsequently published proposals for extensive water main renewal across the Borough and this has, unfortunately, necessitated the deferral of the proposed carriageway resurfacing at the A2 Larne Road.\n\nRoads Service plans to present its Autumn Progress Report to Carrickfergus Borough Council on 14 November 2011. As well as providing an update on the progress of schemes, the report will set out details of any changes to the works programmes.\n\nDue to uncertainty surrounding NIW’s proposals and future funding levels, it is difficult to prepare a meaningful three year programme at the present time. However, Roads Service will endeavour to develop an indicative three year programme and this will be presented to Carrickfergus Borough Council in due course.","answerHtml":"<p>My Department’s Roads Service presented its Spring Report to Carrickfergus Borough Council on 12 May 2011. The report included details of programmes for both footway reconstruction and carriageway resurfacing schemes.</p><p>This report can be accessed from my Department’s internet site at the following web address:</p><p>http://www.drdni.gov.uk/index/freedom_of_information/customer_information/cinformationtyperesults.htm?signpost=Customer+information&amp;informationType=Roads+Service+reports+to+councils</p><p>Northern Ireland Water (NIW) subsequently published proposals for extensive water main renewal across the Borough and this has, unfortunately, necessitated the deferral of the proposed carriageway resurfacing at the A2 Larne Road.</p><p>Roads Service plans to present its Autumn Progress Report to Carrickfergus Borough Council on 14 November 2011. As well as providing an update on the progress of schemes, the report will set out details of any changes to the works programmes.</p><p>Due to uncertainty surrounding NIW’s proposals and future funding levels, it is difficult to prepare a meaningful three year programme at the present time. However, Roads Service will endeavour to develop an indicative three year programme and this will be presented to Carrickfergus Borough Council in due course.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201724%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108511","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108511"}},{"id":"108429","reference":"AQW 1670/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-06","answerBy":"2011-09-21","answered":"2011-09-20","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development what capital projects his Department has planned for the East Antrim constituency in each of the next five years.","answerText":"Over the course of the next five years, my Department has included capital investment projects in its urban regeneration programme for East Antrim as follows:\n\nReStore Programme in Larne town centre - 2011/12\n\nPublic Realm Scheme Dunluce Street and Point Street, Larne – 2011/12\n\nPublic Realm Scheme in Carrickfergus – 2012/13\n\nReStore Programme in Carrickfergus – 2013/14\n\nPublic Realm Scheme in Larne town centre – 2014/15\n\nIn addition, my Department has included a number of capital investment Housing projects for East Antrim as follows:\n\nEden, Carrickfergus, Phase 3B, 22 units – 2011/12\n\nArds Drive, Monkstown, Newtownabbey, 12 units – 2011/12\n\nCraigyhill, Larne, 31 units – 2012/13\n\nTaylors Avenue, Carrickfergus, 24 units – 2012/13\n\nA further scheme at Sunnylands/Sunnylands Grove, Carrickfergus is currently undergoing initial feasibility investigations.\n\nIt should be noted that these schemes are all subject to the necessary approval processes being completed.","answerHtml":"<p>Over the course of the next five years, my Department has included capital investment projects in its urban regeneration programme for East Antrim as follows:</p><p>ReStore Programme in Larne town centre - 2011/12</p><p>Public Realm Scheme Dunluce Street and Point Street, Larne – 2011/12</p><p>Public Realm Scheme in Carrickfergus – 2012/13</p><p>ReStore Programme in Carrickfergus – 2013/14</p><p>Public Realm Scheme in Larne town centre – 2014/15</p><p>In addition, my Department has included a number of capital investment Housing projects for East Antrim as follows:</p><p>Eden, Carrickfergus, Phase 3B, 22 units – 2011/12</p><p>Ards Drive, Monkstown, Newtownabbey, 12 units – 2011/12</p><p>Craigyhill, Larne, 31 units – 2012/13</p><p>Taylors Avenue, Carrickfergus, 24 units – 2012/13</p><p>A further scheme at Sunnylands/Sunnylands Grove, Carrickfergus is currently undergoing initial feasibility investigations.</p><p>It should be noted that these schemes are all subject to the necessary approval processes being completed.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201670%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108429","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108429"}},{"id":"108428","reference":"AQW 1669/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-06","answerBy":"2011-09-21","answered":"2011-09-15","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education for his assessment of whether children sitting several entrance exams for post-primary schools, including exams for the Catholic maintained and controlled sector (i) is in the best interests of the children; and (ii) is sustainable in the long-term.","answerText":"I do not believe that it is in the best educational interests of children to be sitting any entrance test that is referenced to a school’s admissions processes. Children should be able to access a first-rate education without the trauma and stress associated with sitting up to five test papers.\n\nOur pupils should be academically challenged throughout their school career, but academic selection has been used to prevent young people from accessing schools. Instead I want to nurture the talents of all our young people and to ensure all schools provide a high standard of educational experience and build on pupils’ individual abilities.\n\nI want to see, and I am working towards, an equal system across the board where we have area planning to cater for the educational needs of all pupils , where we can look at our schools in a sustainable way, and where we have a fair and level playing field for all our schools in terms of admissions processes.","answerHtml":"<p>I do not believe that it is in the best educational interests of children to be sitting any entrance test that is referenced to a school’s admissions processes. Children should be able to access a first-rate education without the trauma and stress associated with sitting up to five test papers.</p><p>Our pupils should be academically challenged throughout their school career, but academic selection has been used to prevent young people from accessing schools. Instead I want to nurture the talents of all our young people and to ensure all schools provide a high standard of educational experience and build on pupils’ individual abilities.</p><p>I want to see, and I am working towards, an equal system across the board where we have area planning to cater for the educational needs of all pupils , where we can look at our schools in a sustainable way, and where we have a fair and level playing field for all our schools in terms of admissions processes.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201669%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108428","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108428"}},{"id":"108421","reference":"AQW 1667/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-06","answerBy":"2011-09-21","answered":"2011-09-19","answeredOrally":false,"priority":false,"department":"Northern Ireland Assembly Commission","departmentId":"2","minister":"Assembly Commission","question":"To ask the Assembly Commission what plans are currently in place to upgrade (i) internet speed; and (ii) the phone system in Parliament Buildings.","answerText":"(i) The Assembly Commission recently procured an independent internet connection for use by Assembly Members, Party staff and Secretariat staff on Assembly business installed in March 2011. The 20 Mbps synchronous connection is performing optimally with no delays or congestion detected.If you are experiencing difficulties accessing a specific website or using a specific piece of Assembly provided equipment please contact the IS Service desk (028 905 21000), the Head of the Information Systems Office or the Director of Information and Outreach, who will be happy to assist.\n\n(ii) At present there are no plans to upgrade the telephone system in Parliament Buildings. However, it is likely that the Assembly will move towards modernising / upgrading the existing system with a view to taking advantage of modern ICT technologies in the near future. This will of course be dependent upon future work schedules and the availability of financial resources.","answerHtml":"<p>(i) The Assembly Commission recently procured an independent internet connection for use by Assembly Members, Party staff and Secretariat staff on Assembly business installed in March 2011. The 20 Mbps synchronous connection is performing optimally with no delays or congestion detected.If you are experiencing difficulties accessing a specific website or using a specific piece of Assembly provided equipment please contact the IS Service desk (028 905 21000), the Head of the Information Systems Office or the Director of Information and Outreach, who will be happy to assist.</p><p>(ii) At present there are no plans to upgrade the telephone system in Parliament Buildings. However, it is likely that the Assembly will move towards modernising / upgrading the existing system with a view to taking advantage of modern ICT technologies in the near future. This will of course be dependent upon future work schedules and the availability of financial resources.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201667%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108421","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108421"}},{"id":"108420","reference":"AQW 1666/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-06","answerBy":"2011-09-21","answered":"2011-09-15","answeredOrally":false,"priority":false,"department":"Department for Employment and Learning","departmentId":"83","minister":"Minister for Employment and Learning","question":"To ask the Minister for Employment and Learning (i) how many of the students enrolled in higher education in Northern Ireland are international students; and (ii) how many of them receive financial assistance.","answerText":"In 2009/10, there were 1,605 international students enrolled at Northern Ireland Higher Education Institutions.\n\n(ii) International students studying in Northern Ireland do not receive financial assistance or support from the Department for Employment and Learning.","answerHtml":"<p>In 2009/10, there were 1,605 international students enrolled at Northern Ireland Higher Education Institutions.</p><p>(ii) International students studying in Northern Ireland do not receive financial assistance or support from the Department for Employment and Learning.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201666%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108420","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108420"}},{"id":"108419","reference":"AQW 1665/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-06","answerBy":"2011-09-21","answered":"2011-09-19","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment, given that a company suspended its hydraulic fracturing activities in Blackpool after two minor earthquakes were related to its work, what steps her Department has taken to ensure that any hydraulic fracturing being carried out in Northern Ireland does not damage the environment.","answerText":"No applications have been made to carry out hydraulic fracturing in Northern Ireland and it is unlikely that such an application will be submitted before 2014. The Department of the Environment has primary responsibility for environmental protection but DETI will work closely with DOE to ensure that the activities that are specific to shale gas exploration are adequately regulated and monitored. In the interim, DETI and NIEA will consult with their counterparts in GB and Ireland, and take into account the recommendations of recent and forthcoming studies from the USA, to ensure that appropriate controls in Northern Ireland conform to highest regulatory standards.","answerHtml":"<p>No applications have been made to carry out hydraulic fracturing in Northern Ireland and it is unlikely that such an application will be submitted before 2014. The Department of the Environment has primary responsibility for environmental protection but DETI will work closely with DOE to ensure that the activities that are specific to shale gas exploration are adequately regulated and monitored. In the interim, DETI and NIEA will consult with their counterparts in GB and Ireland, and take into account the recommendations of recent and forthcoming studies from the USA, to ensure that appropriate controls in Northern Ireland conform to highest regulatory standards.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201665%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108419","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108419"}},{"id":"108308","reference":"AQW 1581/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-05","answerBy":"2011-09-20","answered":"2011-09-13","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education how many (i) primary schools; and (ii) post-primary schools have closed in the last three years due to a lack of student numbers; and of those, how many were from the (a) Catholic maintained sector; and (b) controlled sector.","answerText":"It is the relevant School Managing Authority in conjunction with the Board of Governors of individual schools that bring forward Development Proposals to the Department of Education for school closures.\n\nA school’s future viability is considered on its own merits against the six criteria listed in the Sustainable Schools Policy and therefore any decision is not based solely on the enrolment number. This means that it is not possible to attribute closures purely to low enrolments. However, details have been provided below of the total number of school closures during the last three years by school type and sector.\n\nThere have been 25 school closures in the last three school years. This total is broken down as follows:\n\n11 Controlled primary schools\n\n8 Maintained primary schools\n\n2 Preparatory departments\n\n3 Controlled post-primary schools\n\n1 Grant-maintained integrated post-primary school\n\nAdditionally, 7 schools have closed due to amalgamations in the last 3 years to form 3 new schools. This total is broken down as follows:\n\n4 Maintained primary schools formed 2 new primary schools.\n\n2 Maintained post-primary schools and 1 voluntary grammar formed 1 new post-primary school.","answerHtml":"<p>It is the relevant School Managing Authority in conjunction with the Board of Governors of individual schools that bring forward Development Proposals to the Department of Education for school closures.</p><p>A school’s future viability is considered on its own merits against the six criteria listed in the Sustainable Schools Policy and therefore any decision is not based solely on the enrolment number. This means that it is not possible to attribute closures purely to low enrolments. However, details have been provided below of the total number of school closures during the last three years by school type and sector.</p><p>There have been 25 school closures in the last three school years. This total is broken down as follows:</p><p>11 Controlled primary schools</p><p>8 Maintained primary schools</p><p>2 Preparatory departments</p><p>3 Controlled post-primary schools</p><p>1 Grant-maintained integrated post-primary school</p><p>Additionally, 7 schools have closed due to amalgamations in the last 3 years to form 3 new schools. This total is broken down as follows:</p><p>4 Maintained primary schools formed 2 new primary schools.</p><p>2 Maintained post-primary schools and 1 voluntary grammar formed 1 new post-primary school.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201581%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108308","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108308"}},{"id":"108307","reference":"AQW 1580/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-05","answerBy":"2011-09-20","answered":"2011-09-15","answeredOrally":false,"priority":false,"department":"Department for Communities","departmentId":"85","minister":"Minister for Social Development","question":"To ask the Minister for Social Development how many houses owned by the Housing Executive in the East Antrim area are currently unoccupied.","answerText":"The Housing Executive has advised that there are currently 201 unoccupied dwellings in the East Antrim area, which covers their Carrickfergus and Larne District Offices.","answerHtml":"<p>The Housing Executive has advised that there are currently 201 unoccupied dwellings in the East Antrim area, which covers their Carrickfergus and Larne District Offices.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201580%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108307","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108307"}},{"id":"108306","reference":"AQW 1579/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-05","answerBy":"2011-09-20","answered":"2011-09-13","answeredOrally":false,"priority":false,"department":"Department of Education","departmentId":"78","minister":"Minister of Education","question":"To ask the Minister of Education how many children were unable to obtain a place at a nursery school in the East Antrim area in each of the last five years.","answerText":"Funded pre-school places are available in statutory nursery schools and nursery units attached to primary schools and in voluntary/private settings in receipt of funding under the Pre-School Education Expansion Programme.\n\nThe aim of the Programme is to provide a funded pre-school place for every child, in their final pre-school year, whose parent wishes to avail of it.\n\nIt is not possible to determine the number of children who did not get a place in a nursery school as, in applying for a funded place, parents are invited to list a number of preferences across the range of statutory and voluntary/private providers. When a setting is unable to accommodate a child the application is passed on to the next provider on the parent’s list of preferences. A child is not considered to be unplaced until all parental preferences on an application form have been exhausted.\n\nThe table below, therefore, shows the number of children, in their final pre-school year, who did not get a pre-school place in any DE funded setting in the East Antrim* area in the last five years:\n\nYear\t2007\t2008\t2009\t2010\t2011\nNo of Unplaced Children\t50\t64\t60\t79\t24\n\n* The North Eastern Education and Library Board define the East Antrim area as being Newtownabbey, Larne and Carrickfergus Council areas.","answerHtml":"<p>Funded pre-school places are available in statutory nursery schools and nursery units attached to primary schools and in voluntary/private settings in receipt of funding under the Pre-School Education Expansion Programme.</p><p>The aim of the Programme is to provide a funded pre-school place for every child, in their final pre-school year, whose parent wishes to avail of it.</p><p>It is not possible to determine the number of children who did not get a place in a nursery school as, in applying for a funded place, parents are invited to list a number of preferences across the range of statutory and voluntary/private providers. When a setting is unable to accommodate a child the application is passed on to the next provider on the parent’s list of preferences. A child is not considered to be unplaced until all parental preferences on an application form have been exhausted.</p><p>The table below, therefore, shows the number of children, in their final pre-school year, who did not get a pre-school place in any DE funded setting in the East Antrim* area in the last five years:</p><div class=\"table-wrap\"><table><tr><td>Year</td><td>2007</td><td>2008</td><td>2009</td><td>2010</td><td>2011</td></tr><tr><td>No of Unplaced Children</td><td>50</td><td>64</td><td>60</td><td>79</td><td>24</td></tr></table></div><p>* The North Eastern Education and Library Board define the East Antrim area as being Newtownabbey, Larne and Carrickfergus Council areas.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201579%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108306","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108306"}},{"id":"108287","reference":"AQW 1563/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-05","answerBy":"2011-09-20","answered":"2011-09-19","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development to detail the average number of passengers who have travelled daily on the Larne Line during off-peak hours over the last six months.","answerText":"NI Railways report that under their fare system the time of day is only captured when the ticket is sold to the customer, not when the ticket is used to travel. There is therefore no means of electronically recording when every passenger journey is made. NI Railways however has provided an estimate of 451,000 passenger journeys on the Larne Line during off-peak hours over the last six months from 1st March 2011 to 31st August 2011. Over the same period NI Railways operated 5,980 off peak services. This is an average of 230 services per week. On this basis the estimated daily average number of passenger journeys on the Larne Line during off-peak hours over the last six months is around 2,470.\n\nThe large bulk of the daily passenger journeys on the Larne line travel on the Belfast-Carrickfergus-Whitehead section.","answerHtml":"<p>NI Railways report that under their fare system the time of day is only captured when the ticket is sold to the customer, not when the ticket is used to travel. There is therefore no means of electronically recording when every passenger journey is made. NI Railways however has provided an estimate of 451,000 passenger journeys on the Larne Line during off-peak hours over the last six months from 1st March 2011 to 31st August 2011. Over the same period NI Railways operated 5,980 off peak services. This is an average of 230 services per week. On this basis the estimated daily average number of passenger journeys on the Larne Line during off-peak hours over the last six months is around 2,470.</p><p>The large bulk of the daily passenger journeys on the Larne line travel on the Belfast-Carrickfergus-Whitehead section.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201563%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108287","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108287"}},{"id":"108286","reference":"AQW 1562/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-09-05","answerBy":"2011-09-20","answered":"2011-09-19","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development for an estimate of the potential savings over the next five years as a result of the proposed reductions in rail services on the Larne Line.","answerText":"Timetables for the Larne line are still in draft. However Translink have informed me that the proposed reduction in services between Whitehead and Larne, are expected to yield operational cost savings in the region of £500,000 to £700,000 per year over the next five years.","answerHtml":"<p>Timetables for the Larne line are still in draft. However Translink have informed me that the proposed reduction in services between Whitehead and Larne, are expected to yield operational cost savings in the region of £500,000 to £700,000 per year over the next five years.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201562%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108286","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108286"}},{"id":"108190","reference":"AQO 301/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2011-08-31","answerBy":"2011-09-13","answered":null,"answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment for an update on his Department's discussion paper on Environmental Governance.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20301%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108190","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108190"}},{"id":"109148","reference":"AQO 301/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2011-08-31","answerBy":"2011-09-13","answered":"2011-09-19","answeredOrally":false,"priority":false,"department":"Department of the Environment","departmentId":"80","minister":"Minister of the Environment","question":"To ask the Minister of the Environment for an update on his Department's discussion paper on Environmental Governance.","answerText":"The Department issued the Environmental Governance discussion document on 5th August 2011 setting out a number of options for consideration, seeking feedback from key interests by 9th September 2011. I am currently considering the way forward in light of the responses received, will advise the Environment committee and work to earn their support. Full public consultation will be required on any final proposals which may emerge from this initial exercise.","answerHtml":"<p>The Department issued the Environmental Governance discussion document on 5th August 2011 setting out a number of options for consideration, seeking feedback from key interests by 9th September 2011. I am currently considering the way forward in light of the responses received, will advise the Environment committee and work to earn their support. Full public consultation will be required on any final proposals which may emerge from this initial exercise.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20301%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=109148","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=109148"}},{"id":"108192","reference":"AQO 283/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2011-08-31","answerBy":"2011-09-13","answered":"2011-09-13","answeredOrally":true,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment whether her Department plans to produce an energy strategy to help improve energy security and energy independence.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20283%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108192","officialReport":"https://www.niassembly.gov.uk/Assembly-Business/Official-Report/Reports-11-12/13-September-2011","api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108192"}},{"id":"108187","reference":"AQO 259/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2011-08-31","answerBy":"2011-09-12","answered":null,"answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development if he would attend a full meeting of Carrickfergus Borough Council to discuss the A2 road upgrade.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20259%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108187","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108187"}},{"id":"108955","reference":"AQO 259/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2011-08-31","answerBy":"2011-09-12","answered":"2011-09-12","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development if he would attend a full meeting of Carrickfergus Borough Council to discuss the A2 road upgrade.","answerText":"The Member will be aware that the upgrade of the A2 in East Antrim was the subject of an Adjournment Debate held in the Assembly Chamber on 31 May 2011, when I made a statement outlining my Department’s position on the scheme. A Hansard record of the Adjournment Debate is available to view on the Northern Ireland Assembly website.\n\nThe Member will also be aware that I met a delegation from the Council, which included him, on 17 August 2011, to discuss this scheme.\n\nAs the position regarding the Scheme has not changed in the interim, I feel that a further meeting would not be beneficial at this stage, but I will keep the situation under review.","answerHtml":"<p>The Member will be aware that the upgrade of the A2 in East Antrim was the subject of an Adjournment Debate held in the Assembly Chamber on 31 May 2011, when I made a statement outlining my Department’s position on the scheme. A Hansard record of the Adjournment Debate is available to view on the Northern Ireland Assembly website.</p><p>The Member will also be aware that I met a delegation from the Council, which included him, on 17 August 2011, to discuss this scheme.</p><p>As the position regarding the Scheme has not changed in the interim, I feel that a further meeting would not be beneficial at this stage, but I will keep the situation under review.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20259%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=108955","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=108955"}},{"id":"106308","reference":"AQW 1103/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-06-21","answerBy":"2011-07-06","answered":"2011-06-30","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister why the Executive did not respond to the Treasury's consultation on Air Passenger Duty.","answerText":"As the department with the policy lead on Air Passenger Duty, the Department of Finance and Personnel responded to the consultation, having sought the views of Executive members. We also raised the issue with both the Prime Minister and the Chancellor of the Exchequer at our recent meetings with them.","answerHtml":"<p>As the department with the policy lead on Air Passenger Duty, the Department of Finance and Personnel responded to the consultation, having sought the views of Executive members. We also raised the issue with both the Prime Minister and the Chancellor of the Exchequer at our recent meetings with them.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201103%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=106308","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=106308"}},{"id":"106236","reference":"AQW 1077/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-06-20","answerBy":"2011-07-05","answered":"2011-06-30","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development whether he intends to introduce a residents only parking scheme in the Rosstulla Park area, adjacent to the University of Ulster, Jordanstown, to ensure that residents are not restricted by vehicles parking in this area to avoid car parking charges at the University.","answerText":"My Department’s Roads Service has advised that the purpose of Residents’ Parking schemes is to enable residents to find convenient on-street parking places close to their home. As the properties in Rosstulla Park have private driveways, a Residents’ Parking Scheme is not considered to be a priority and there are no plans to introduce such a scheme in the area.","answerHtml":"<p>My Department’s Roads Service has advised that the purpose of Residents’ Parking schemes is to enable residents to find convenient on-street parking places close to their home. As the properties in Rosstulla Park have private driveways, a Residents’ Parking Scheme is not considered to be a priority and there are no plans to introduce such a scheme in the area.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%201077%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=106236","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=106236"}},{"id":"106906","reference":"AQO 186/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2011-06-16","answerBy":"2011-06-27","answered":"2011-07-19","answeredOrally":false,"priority":false,"department":"The Executive Office","departmentId":"86","minister":"First Minister and deputy First Minister","question":"To ask the First Minister and deputy First Minister for an update on the consultation on the draft Child Poverty Strategy.","answerText":"The period of formal consultation in respect of our Child Poverty Strategy proposals ended on 6 February 2011.\n\nFollowing an analysis of the 49 formal consultation responses received and the subsequent Executive approval on 22 March 2011, the Child Poverty Strategy was published on 24 March 2011. The Strategy sets out the actions proposed by the Executive to address the issue of Child Poverty.\n\nWe are developing a delivery plan and monitoring framework which will detail key initiatives and signature projects to progress the strategic priorities and priority action areas identified in the strategy.\n\nIt is intended that a first draft of this plan and monitoring framework will be provided to the Ministerial-led Poverty and Social Inclusion Stakeholder Forum for their consideration and input. The plan and monitoring framework will allow us to measure progress towards eradicating child poverty here.","answerHtml":"<p>The period of formal consultation in respect of our Child Poverty Strategy proposals ended on 6 February 2011.</p><p>Following an analysis of the 49 formal consultation responses received and the subsequent Executive approval on 22 March 2011, the Child Poverty Strategy was published on 24 March 2011. The Strategy sets out the actions proposed by the Executive to address the issue of Child Poverty.</p><p>We are developing a delivery plan and monitoring framework which will detail key initiatives and signature projects to progress the strategic priorities and priority action areas identified in the strategy.</p><p>It is intended that a first draft of this plan and monitoring framework will be provided to the Ministerial-led Poverty and Social Inclusion Stakeholder Forum for their consideration and input. The plan and monitoring framework will allow us to measure progress towards eradicating child poverty here.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%20186%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=106906","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=106906"}},{"id":"105778","reference":"AQW 928/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-06-15","answerBy":"2011-06-30","answered":"2011-06-21","answeredOrally":false,"priority":false,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety whether he will ensure that the Accident and Emergency Unit at the Mater Hospital will remain open and that a full service will continue until he has determined the appropriate level of accident and emergency services for the Greater Belfast area.","answerText":"I have not made any decisions regarding the re-configuration of health and social care services. I shall be looking at issues which impact on the provision of treatment and care in the Trusts. I want to assure the public that the safety and quality of services will be my first concern. My focus will be on improvement in health outcomes for the population of Northern Ireland.","answerHtml":"<p>I have not made any decisions regarding the re-configuration of health and social care services. I shall be looking at issues which impact on the provision of treatment and care in the Trusts. I want to assure the public that the safety and quality of services will be my first concern. My focus will be on improvement in health outcomes for the population of Northern Ireland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%20928%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=105778","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=105778"}},{"id":"105757","reference":"AQW 919/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-06-15","answerBy":"2011-06-30","answered":"2011-06-28","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment, in relation to air passenger duty, what action she intends to take to ensure that Northern Ireland will be treated on a no less favourable basis than the Republic of Ireland to ensure fair competition between airlines and airports on the island of Ireland.","answerText":"The impact of Air Passenger Duty (APD) on Northern Ireland is exacerbated because of competitive pressure from the Republic of Ireland, which has become even more acute following the Irish Government’s decision to reduce, and possibly remove altogether, their equivalent tax.\n\nI and Ministerial colleagues have made representations to HM Treasury Ministers on the impact of APD on Northern Ireland. During his visit to Northern Ireland on 17 June 2011 the Chancellor of the Exchequer referred to APD and the particular challenges presented by Northern Ireland’s land border with the Republic of Ireland.\n\nThe Department of Finance and Personnel (DFP) has led on the Northern Ireland response to an HM Treasury consultation on the reform of APD. My officials have worked closely with counterparts in DFP to ensure that a strong case has been put to HM Treasury in respect of the impact of APD on Northern Ireland.","answerHtml":"<p>The impact of Air Passenger Duty (APD) on Northern Ireland is exacerbated because of competitive pressure from the Republic of Ireland, which has become even more acute following the Irish Government’s decision to reduce, and possibly remove altogether, their equivalent tax.</p><p>I and Ministerial colleagues have made representations to HM Treasury Ministers on the impact of APD on Northern Ireland. During his visit to Northern Ireland on 17 June 2011 the Chancellor of the Exchequer referred to APD and the particular challenges presented by Northern Ireland’s land border with the Republic of Ireland.</p><p>The Department of Finance and Personnel (DFP) has led on the Northern Ireland response to an HM Treasury consultation on the reform of APD. My officials have worked closely with counterparts in DFP to ensure that a strong case has been put to HM Treasury in respect of the impact of APD on Northern Ireland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%20919%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=105757","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=105757"}},{"id":"104418","reference":"AQO 90/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2011-06-02","answerBy":"2011-06-13","answered":null,"answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment whether her Department will implement a strategy to develop the green economy.","answerText":"","answerHtml":"","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%2090%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=104418","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=104418"}},{"id":"105560","reference":"AQO 90/11-15","type":"Oral","typeCode":"AQO","mandate":"11-15","tabled":"2011-06-02","answerBy":"2011-06-13","answered":"2011-06-13","answeredOrally":false,"priority":false,"department":"Department for the Economy","departmentId":"79","minister":"Minister of Enterprise, Trade and Investment","question":"To ask the Minister of Enterprise, Trade and Investment whether her Department will implement a strategy to develop the green economy.","answerText":"The framework for the new Economic Strategy, which is currently being developed by the Executive Sub-Committee on the Economy, has identified the important contribution made by the green economy in encouraging business growth and growing the private sector.\n\nWithin my Department, Invest NI has developed a strategy to maximise the return to Northern Ireland from heightened global activity in the development and deployment of renewable energy and resource efficient technologies. This includes identifying opportunities in the renewable energy sector and promoting and implementing energy and resource efficiency measures within business.","answerHtml":"<p>The framework for the new Economic Strategy, which is currently being developed by the Executive Sub-Committee on the Economy, has identified the important contribution made by the green economy in encouraging business growth and growing the private sector.</p><p>Within my Department, Invest NI has developed a strategy to maximise the return to Northern Ireland from heightened global activity in the development and deployment of renewable energy and resource efficient technologies. This includes identifying opportunities in the renewable energy sector and promoting and implementing energy and resource efficiency measures within business.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/oralsearchresults.aspx?&qf=0&qfv=1&ref=AQO%2090%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=105560","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=105560"}},{"id":"104192","reference":"AQW 372/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-05-31","answerBy":"2011-06-08","answered":"2011-06-09","answeredOrally":false,"priority":true,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development whether he will visit Carrickfergus Borough Council to outline his Department's stance on the A2 upgrade.","answerText":"The Member will be aware that a number of MLAs, who are also members of Carrickfergus Borough Council, were in attendance during the Adjournment debate held on 31 May 2011 in the Assembly Chamber on the Upgrade of the A2 in East Antrim.\n\nHaving made my statement during Adjournment Debate to outline my Department’s position on the scheme, I do not feel there would be any benefit in reiterating this in the Council Chamber.\n\nA Hansard record of the Adjournment Debate is available to view on the Northern Ireland Assembly website.\n\nI have asked my Department’s Roads Service officials to make themselves available should you, or any member of Carrickfergus Council, wish to discuss any aspect or detail of the proposed scheme for the Upgrade of the A2 Shore Road, Greenisland.","answerHtml":"<p>The Member will be aware that a number of MLAs, who are also members of Carrickfergus Borough Council, were in attendance during the Adjournment debate held on 31 May 2011 in the Assembly Chamber on the Upgrade of the A2 in East Antrim.</p><p>Having made my statement during Adjournment Debate to outline my Department’s position on the scheme, I do not feel there would be any benefit in reiterating this in the Council Chamber.</p><p>A Hansard record of the Adjournment Debate is available to view on the Northern Ireland Assembly website.</p><p>I have asked my Department’s Roads Service officials to make themselves available should you, or any member of Carrickfergus Council, wish to discuss any aspect or detail of the proposed scheme for the Upgrade of the A2 Shore Road, Greenisland.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%20372%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=104192","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=104192"}},{"id":"103466","reference":"AQW 125/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-05-23","answerBy":"2011-05-26","answered":"2011-05-25","answeredOrally":false,"priority":true,"department":"Department of Health","departmentId":"82","minister":"Minister of Health, Social Services and Public Safety","question":"To ask the Minister of Health, Social Services and Public Safety whether he plans to repeal the legislation that was introduced by the previous Minister which requires dental surgeries to register as independent hospitals with the Regulation and Quality Improvement Authority on a form which is not designed for use by small businesses; and if he will engage with the relevant dental authorities and organisations on this issue.","answerText":"I have no plans to repeal legislation, which from 1 April 2011 provides for the regulation of all dental establishments delivering private dental care, including orthodontics. This legislation will provide assurance to the public, through regular inspection and monitoring by the Regulation and Quality Improvement Authority (RQIA) that private dental treatment is delivered to a minimum standard.\n\nThe registration of private dental practices within the classification of “independent hospital” is a legislative mechanism to facilitate regulation of the sector, but does not mean that they are treated, in terms of regulation and inspection, as hospitals. They are regulated and inspected with respect to the minimum standards for dental services set by the Department.\n\nThe registration application procedure, including documentation, is a matter for the RQIA and I understand that application forms and guidance on completion have been issued to all relevant practices.\n\nI am happy to engage with dental authorities and organisations on any issues of concern.","answerHtml":"<p>I have no plans to repeal legislation, which from 1 April 2011 provides for the regulation of all dental establishments delivering private dental care, including orthodontics. This legislation will provide assurance to the public, through regular inspection and monitoring by the Regulation and Quality Improvement Authority (RQIA) that private dental treatment is delivered to a minimum standard.</p><p>The registration of private dental practices within the classification of “independent hospital” is a legislative mechanism to facilitate regulation of the sector, but does not mean that they are treated, in terms of regulation and inspection, as hospitals. They are regulated and inspected with respect to the minimum standards for dental services set by the Department.</p><p>The registration application procedure, including documentation, is a matter for the RQIA and I understand that application forms and guidance on completion have been issued to all relevant practices.</p><p>I am happy to engage with dental authorities and organisations on any issues of concern.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%20125%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=103466","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=103466"}},{"id":"103392","reference":"AQW 91/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-05-19","answerBy":"2011-06-06","answered":"2011-06-01","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development whether he intends to reverse the decision not to progress with the A2 upgrade.","answerText":"I would like to see improvements across the Strategic Road Network which will enhance safety, reduce journey times and provide value for money.\n\nTherefore, I intend to consider proposed investment across my Department, including the impact of Budget 2010 on the strategic roads programme, and explore opportunities for bringing forward schemes such as the A2 Shore Road, Greenisland project.","answerHtml":"<p>I would like to see improvements across the Strategic Road Network which will enhance safety, reduce journey times and provide value for money.</p><p>Therefore, I intend to consider proposed investment across my Department, including the impact of Budget 2010 on the strategic roads programme, and explore opportunities for bringing forward schemes such as the A2 Shore Road, Greenisland project.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2091%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=103392","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=103392"}},{"id":"103391","reference":"AQW 90/11-15","type":"Written","typeCode":"AQW","mandate":"11-15","tabled":"2011-05-19","answerBy":"2011-06-06","answered":"2011-06-01","answeredOrally":false,"priority":false,"department":"Department for Infrastructure","departmentId":"84","minister":"Minister for Regional Development","question":"To ask the Minister for Regional Development if he intends, under the Private Streets (NI) Order 1980, to adopt the streets in Loughview Village, Carrickfergus so that salt boxes can be provided for next winter.","answerText":"My Department’s Roads Service has advised that a preliminary certificate of completion for the roads within Loughview Village was issued in January 2007, which included a list of defects that required attention by the developer before a final adoption certificate can be issued. However, to date, the developer has not requested the issue of the final certificate of adoption.\n\nRoads Service recently inspected the roads within the development and identified some defects that would need to be repaired prior to adoption. Unfortunately, it appears that the developer is not prepared to carry out these repairs, therefore, Roads Service will issue an Article 11 enforcement, under the Private Streets (NI) Order 1980, to have the roads completed to adoption standard.\n\nWith regard to requests for salt boxes in adopted streets, I am advised that a comprehensive process is used to assess all requests for salt boxes, this takes into account the road layout, gradient and residential/community welfare issues. Salt boxes are not provided on streets where the gradient is less than 5% and as the topography in Loughview Village is generally flat, this minimum criterion would not be met.","answerHtml":"<p>My Department’s Roads Service has advised that a preliminary certificate of completion for the roads within Loughview Village was issued in January 2007, which included a list of defects that required attention by the developer before a final adoption certificate can be issued. However, to date, the developer has not requested the issue of the final certificate of adoption.</p><p>Roads Service recently inspected the roads within the development and identified some defects that would need to be repaired prior to adoption. Unfortunately, it appears that the developer is not prepared to carry out these repairs, therefore, Roads Service will issue an Article 11 enforcement, under the Private Streets (NI) Order 1980, to have the roads completed to adoption standard.</p><p>With regard to requests for salt boxes in adopted streets, I am advised that a comprehensive process is used to assess all requests for salt boxes, this takes into account the road layout, gradient and residential/community welfare issues. Salt boxes are not provided on streets where the gradient is less than 5% and as the topography in Loughview Village is generally flat, this minimum criterion would not be met.</p>","oralExchange":null,"onAssemblySite":true,"links":{"assembly":"https://aims.niassembly.gov.uk/questions/writtensearchresults.aspx?&qf=0&qfv=1&ref=AQW%2090%2F11-15","printable":"https://aims.niassembly.gov.uk/questions/printquestionsummary.aspx?docid=103391","officialReport":null,"api":"https://data.niassembly.gov.uk/questions.asmx/GetQuestionDetails?documentId=103391"}}]}